JP2014147143A - Control board and replacement method thereof - Google Patents

Control board and replacement method thereof Download PDF

Info

Publication number
JP2014147143A
JP2014147143A JP2013012513A JP2013012513A JP2014147143A JP 2014147143 A JP2014147143 A JP 2014147143A JP 2013012513 A JP2013012513 A JP 2013012513A JP 2013012513 A JP2013012513 A JP 2013012513A JP 2014147143 A JP2014147143 A JP 2014147143A
Authority
JP
Japan
Prior art keywords
board
old
cable
new
control panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013012513A
Other languages
Japanese (ja)
Inventor
Satoshi Aoki
聡 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2013012513A priority Critical patent/JP2014147143A/en
Publication of JP2014147143A publication Critical patent/JP2014147143A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a control board which allows for reduction in the effort required for the replacement work of an old board and a new board as much as possible, and to provide a replacement method thereof.SOLUTION: A control board 20 provided, in the bottom thereof, with an opening facing the opening of a cable pit formed in the floor while opening upward so as to house the cables being laid, has a housing 23 including a cable installation hole 25 formed in the front on the bottom, and a drawer 24 that is a detachable closing member normally closing the cable installation hole 25.

Description

本発明は制御盤およびその取替方法に関し、特に制御ケーブルの使用本数が多く停電切替ステップが多い制御盤である遠方監視制御盤(TC盤)等を旧盤から新盤に取替える際に適用して有用なものである。   The present invention relates to a control panel and a method for replacing the control panel, and particularly to a remote monitoring control panel (TC panel) that is a control panel that uses a large number of control cables and has many power failure switching steps. It is useful.

電気所の情報は、遠隔監視制御装置(TC)から制御中継所の情報集配信装置(DX)を介して遠隔地(制御所や営業所など)の監視制御装置へ伝送している。遠隔監視制御装置の各種の機器類は、遠方監視制御盤(TC盤)に収納されている。かかるTC盤を含む制御盤の取替時には、新しい制御盤を置くスペースがない場合には、旧制御盤を撤去した後に、新しい制御盤を据え付けているが、ケーブル敷設、接続および諸試験を実施すると長期間に亘り制御盤を使用することができない。特に、TC盤等のように、制御ケーブルの使用本数が多く、停電切替ステップが多い制御盤に関しては、長期間の直接運転や停電が必要になり、系統運用に大きな支障を及ぼす。   The information on the electric station is transmitted from the remote monitoring and control device (TC) to the monitoring and control device in a remote location (such as a control station or a sales office) via the information collection and distribution device (DX) at the control relay station. Various devices of the remote monitoring control device are housed in a remote monitoring control panel (TC panel). When replacing a control panel including such a TC panel, if there is no space for a new control panel, the new control panel is installed after the old control panel is removed, but cable laying, connection and various tests are conducted. Then, the control panel cannot be used for a long time. In particular, a control panel such as a TC panel that uses a large number of control cables and has many power failure switching steps requires long-term direct operation or power failure, which greatly impedes system operation.

かかる問題を解消するため、撤去する旧制御盤の前方に取替設置する新制御盤を仮置きし、旧制御盤を嵩上げして、その盤下から新ケーブルを布設して取替えを行っている。   In order to solve this problem, a new control panel to be replaced and installed is temporarily placed in front of the old control panel to be removed, the old control panel is raised, and a new cable is installed from the bottom of the panel to replace it. .

かかる制御盤の取替方法を図12〜図18に基づき説明する。なお、ここでは、取替えの対象として撤去されるTC盤を含む旧制御盤を旧盤と呼称し、取替えの対象として新たに設置されるTC盤を含む新制御盤を新盤と呼称して説明を行なう。   Such a control panel replacement method will be described with reference to FIGS. Here, the old control panel including the TC panel to be removed as an object of replacement is referred to as the old panel, and the new control panel including the TC panel newly installed as the target of replacement is referred to as the new panel. To do.

図12〜図18は従来技術に係る嵩上げ方式による制御盤の取替方法を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。これらの図に基づき各工程を時系列的に説明する。なお、各図において同一部分には同一番号を付し、重複する説明は省略する。   FIGS. 12 to 18 are explanatory views conceptually showing a method for replacing a control panel by the raising method according to the prior art, in which (a) shows a state viewed from a plane and (b) shows a state viewed from a side. ing. Each process will be described in time series based on these drawings. In addition, the same number is attached | subjected to the same part in each figure, and the overlapping description is abbreviate | omitted.

1)新盤の仮置き工程
図12に示すように、制御盤が設置される建物4(太い点線で囲んだ領域)の床面5に、取替撤去の対象である旧盤1が、それ以外の既設の制御盤である他盤3とともに配設してある。当該工程では、旧盤1と取替えて設置される新盤2を、旧盤1の表面側の前面に仮置きする。ここで、旧盤1,他盤3および新盤2はチャンネルベース6,7上にそれぞれ載置されている。また、旧盤1と他盤3との相互間は旧ケーブル8で接続されている。
1) Temporary placement process of new board As shown in FIG. 12, the old board 1 to be replaced and removed is placed on the floor 5 of the building 4 (area surrounded by a thick dotted line) where the control board is installed. It is arrange | positioned with the other board 3 which is an existing control board other than. In this process, the new board 2 that is replaced with the old board 1 is temporarily placed on the front surface of the old board 1. Here, the old board 1, the other board 3 and the new board 2 are placed on the channel bases 6 and 7, respectively. The old board 1 and the other board 3 are connected to each other by the old cable 8.

2)旧盤の嵩上げ工程
図13に示すように、旧盤1を高さ方向に嵩上げした状態で、床面5にスペーサとなる添木11を配設し、添木11とチャンネルベース6に跨って両者の上面にHアングル10を載置するとともに、Hアングル10上に旧盤1を載置する。かくして旧盤1の高さ位置がHアングル10の高さ分、嵩上げされる。嵩上げした後、旧盤1の上面と新盤2の上面との間に固定金具13を渡し、固定金具13の両端部を旧盤1の上面と新盤2の上面とに固着する。かくして、旧盤1は固定金具を介して新盤2に固定され、新盤2の仮置き期間中(通常2〜3週間)の地震等の揺れに備えている。
2) Raising process of the old board As shown in FIG. 13, with the old board 1 raised in the height direction, a splint 11 serving as a spacer is disposed on the floor surface 5, and the splint 11 and the channel base 6 are The H angle 10 is placed on the upper surface of both of them, and the old board 1 is placed on the H angle 10. Thus, the height of the old board 1 is raised by the height of the H angle 10. After raising, the fixing metal 13 is passed between the upper surface of the old board 1 and the upper surface of the new board 2, and both ends of the fixing metal 13 are fixed to the upper surface of the old board 1 and the upper surface of the new board 2. Thus, the old board 1 is fixed to the new board 2 through the fixing bracket, and is prepared for shaking such as an earthquake during the temporary placement period of the new board 2 (usually 2 to 3 weeks).

3)旧盤下への新ケーブルの布設工程
図14に示すように、旧ケーブル8に代え、新盤2から繰出される新ケーブル9をHアングル10およびチャンネルベース6の内側を通して屋外機器12に接続する。
3) New cable laying process under the old board As shown in FIG. 14, instead of the old cable 8, the new cable 9 fed from the new board 2 is passed through the H angle 10 and the inside of the channel base 6 to the outdoor equipment 12. Connecting.

ここで、図14(c)、図14(d)は、特にHアングル10と新ケーブル9との位置関係を示している。図14(c)が側面から見た状態、図14(d)が平面で見た状態をそれぞれ示している。両図に示すように、Hアングル10は、旧盤1を嵩上げするためのスペーサとして機能すると同時に、新ケーブル9の保護機能も有する。   Here, FIG. 14C and FIG. 14D show the positional relationship between the H angle 10 and the new cable 9 in particular. FIG. 14C shows a state seen from the side, and FIG. 14D shows a state seen from the plane. As shown in both figures, the H angle 10 functions as a spacer for raising the old board 1 and also has a protection function for the new cable 9.

4)旧ケーブルの撤去工程
図15に示すように、新ケーブル9に切替えた後、旧ケーブル8を撤去する。
4) Removal process of old cable As shown in FIG. 15, after switching to the new cable 9, the old cable 8 is removed.

5)固定金具および旧盤の撤去工程
図16に示すように、固定金具13による固定を解除し、Hアングル10上から旧盤1を撤去する。
5) Removal step of fixing bracket and old board As shown in FIG. 16, the fixing by the fixing bracket 13 is released, and the old board 1 is removed from the H angle 10.

6)新盤の移動工程
図17に示すように、Hアングル10を新盤2側に移動し、その新盤2側の端部に別の添木14を配設し、添木11,14間にHアングル10を設置する。かかる状態で新盤2を一旦持ち上げてHアングル10に載置し、Hアングル10をレールとして撤去した旧盤1の配設位置へ向けて移動させ、Hアングル10の旧盤1側の端部でHアングル10からチャンネルベース6に降ろす(かかる一連の新盤2の移動方向を、図17(b)中に矢印で示す。)かくして、撤去した旧盤1の配設位置へ取替える新盤2を配設する。
6) Moving process of new board As shown in FIG. 17, the H angle 10 is moved to the new board 2 side, and another splint 14 is disposed at the end of the new board 2 side. An H angle 10 is installed between them. In this state, the new board 2 is once lifted and placed on the H angle 10, moved toward the position of the old board 1 where the H angle 10 is removed as a rail, and the end of the H angle 10 on the old board 1 side. Then, the H angle 10 is lowered to the channel base 6 (the moving direction of such a series of new discs 2 is indicated by an arrow in FIG. 17B). Is disposed.

7)完了工程
図18に示すように、チャンネルベース6,Hアングル10,添木11,14を撤去して一連の取替作業を完了する。
7) Completion Step As shown in FIG. 18, the channel base 6, the H angle 10, and the splints 11 and 14 are removed to complete a series of replacement work.

上述の如く、従来技術の取替方法では、旧盤1の嵩上げに伴い、固定金具13による新盤2への旧盤1の固定、またその解除等、多くの煩雑な作業が必要となる。この結果、多大な労力、時間を要し、さらに合理的な取替方法の提案が待望されている。   As described above, in the replacement method of the conventional technique, as the old board 1 is raised, many complicated operations such as fixing the old board 1 to the new board 2 by the fixing bracket 13 and releasing the old board 1 are required. As a result, much labor and time are required, and further proposals for a rational replacement method are awaited.

同様の目的を達成する公知文献としては、特許文献1が存在するが、充分ではない。   As a known document that achieves the same object, Patent Document 1 exists, but it is not sufficient.

特開2007−330001号公報JP 2007-330001 A

本発明は、上記従来技術に鑑み、旧盤と新盤との取替作業に要する労力を可及的に低減することができる制御盤およびその取替方法を提供することを目的とする。   An object of the present invention is to provide a control panel and a replacement method thereof that can reduce as much as possible the labor required for replacement work between an old board and a new board.

本発明の第1の態様は、
布設するケーブルを収納するよう上方に開口する開口部を有して床に形成したケーブルピットの前記開口部に相対向する開口部を底部に有する制御盤であって、
最下部の前面に形成したケーブル布設用穴と、通常時にはケーブル布設用穴を閉塞している着脱可能な閉塞部材とを備えた筐体を有することを特徴とする制御盤にある。
The first aspect of the present invention is:
A control panel having an opening at the bottom opposite to the opening of the cable pit formed on the floor having an opening that opens upward to store the cable to be laid,
The control panel includes a housing having a cable laying hole formed in a lowermost front surface and a detachable closing member that normally closes the cable laying hole.

本態様によれば、ケーブル布設用穴を利用して新ケーブルを布設することができるので、撤去する旧盤の嵩上げは必要ない。   According to this aspect, since the new cable can be laid using the cable laying hole, it is not necessary to raise the old board to be removed.

本発明の第2の態様は、
第1の態様に記載する制御盤において、
前記閉塞部材は、前記ケーブル布設用穴に対し前記筐体の前面側から裏面側に向かう方向に挿入するとともに、前記裏面側から前記前面側に引き出すことができる抽斗で構成したことを特徴とする制御盤にある。
The second aspect of the present invention is:
In the control panel described in the first aspect,
The closing member is configured by a drawer that can be inserted into the cable laying hole in a direction from the front side to the back side of the housing and pulled out from the back side to the front side. Located in the control panel.

本態様によれば、通常時(ケーブル布設用穴の閉塞時)には、抽斗を制御盤の付属物を収納する収納部として利用することができる。   According to this aspect, at the normal time (when the cable laying hole is closed), the drawer can be used as a storage unit for storing the accessories of the control panel.

本発明の第3の態様は、
第1または第2の態様に記載する制御盤において、
前記ケーブル布設用穴の周囲の筐体の内周面を補強部材で補強したことを特徴とする制御盤にある。
The third aspect of the present invention is:
In the control panel described in the first or second aspect,
In the control panel, the inner peripheral surface of the casing around the cable laying hole is reinforced by a reinforcing member.

本態様によれば、ケーブル布設用穴を設けることにより低下する筐体の機械的強度を補強することができる。   According to this aspect, it is possible to reinforce the mechanical strength of the casing which is lowered by providing the cable laying hole.

本発明の第4の態様は、
第1〜第3の態様の何れか一つに記載する制御盤において、
前記筐体を固定する場合の構造体であり、前記筐体の裏面側の内周面に沿い水平に伸びる着脱可能なバーを有することを特徴とする制御盤にある。
The fourth aspect of the present invention is:
In the control panel described in any one of the first to third aspects,
The control panel is a structure for fixing the casing, and has a detachable bar extending horizontally along the inner peripheral surface on the back side of the casing.

本態様によれば、新ケーブルを挿入する方向の障害物を除去することができ、その分円滑な新ケーブルの布設を行うことができる。   According to this aspect, the obstacle in the direction of inserting the new cable can be removed, and the new cable can be laid smoothly accordingly.

本発明の第5の態様は、
第1〜第3の態様に記載する何れか一つの制御盤を取替える取替方法であって、
取替え対象として撤去される制御盤である旧盤の前面に相対向させて新たに設置される制御盤である新盤を仮置きするとともに、前記旧盤の閉塞部材を取外して前記旧盤の前面にケーブル布設用穴を開口させる工程と、
前記新盤から引出した新ケーブルを、前記ケーブル布設穴を介して前記旧盤の底部に開口するケーブルピットに布設して前記新ケーブルに切替える工程と、
前記旧盤の端子台に接続されている旧ケーブルを前記端子台から取外して撤去する工程と、
仮置きした前記新盤に向けて前記旧盤を移動させ、さらに前記新盤の手前で、前記移動の方向に交差する方向に移動させることにより、撤去される前の前記旧盤の設置位置と仮置きした前記新盤とを結ぶ直線上から前記旧盤を撤去する工程と、
仮置きした前記新盤を、前記直線上に沿い、撤去される前の前記旧盤の設置位置まで直線的に移動させて前記設置位置に新盤を設置させる工程とを有することを特徴とする制御盤の取替方法にある。
According to a fifth aspect of the present invention,
A replacement method for replacing any one of the control panels described in the first to third aspects,
Temporarily place a new board, which is a newly installed control panel facing the front of the old board, which is the control panel to be removed as a replacement target, and remove the blocking member of the old board to remove the front of the old board Opening a cable laying hole in
Laying a new cable drawn from the new board to a cable pit opened at the bottom of the old board through the cable laying hole and switching to the new cable;
Removing the old cable connected to the terminal block of the old board from the terminal block and removing the old cable;
The old board is moved toward the new board that has been temporarily placed, and further moved in a direction crossing the direction of the movement in front of the new board, and the installation position of the old board before being removed Removing the old board from a straight line connecting the newly placed new board;
A step of moving the temporarily placed new board along the straight line to the installation position of the old board before being removed and installing the new board at the installation position. The control panel replacement method.

本態様によれば、多大な時間、労力を有していた撤去する旧盤の嵩上げ工程を省略することができるので、その分短時間で合理的なと取替え作業が可能になる。   According to this aspect, it is possible to omit the step of raising the old board to be removed, which has required a great amount of time and labor, so that the replacement work can be performed in a short time.

本発明の第6の態様は、
第4の態様に記載する制御盤を取替える取替方法であって、
取替え対象として撤去される制御盤である旧盤の前面に相対向させて新たに設置される制御盤である新盤を仮置きするとともに、前記旧盤の閉塞部材を取外して前記旧盤の前面にケーブル布設用穴を開口させる工程と、
前記制御盤の筐体を固定する場合の構造体であり、前記筐体の裏面側の内周面に沿い水平に伸びる着脱可能なバーを取外す工程と、
前記新盤から引出した新ケーブルを、前記ケーブル布設用穴を介して前記旧盤の底部に開口するケーブルピットに布設して前記新ケーブルに切替える工程と、
前記旧盤の端子台に接続されている旧ケーブルを前記端子台から取外して撤去する工程と、
仮置きした前記新盤に向けて前記旧盤を移動させ、さらに前記新盤の手前で、前記移動の方向に交差する方向に移動させることにより、撤去される前の前記旧盤の設置位置と仮置きした前記新盤とを結ぶ直線上から前記旧盤を撤去する工程と、
仮置きした前記新盤を、前記直線上に沿い、撤去される前の前記旧盤の設置位置まで直線的に移動させて前記設置位置に新盤を設置させる工程とを有することを特徴とする制御盤の取替方法にある。
The sixth aspect of the present invention is:
A replacement method for replacing the control panel described in the fourth aspect,
Temporarily place a new board, which is a newly installed control panel facing the front of the old board, which is the control panel to be removed as a replacement target, and remove the blocking member of the old board to remove the front of the old board Opening a cable laying hole in
A structure for fixing the casing of the control panel, and a step of removing a detachable bar extending horizontally along the inner peripheral surface on the back side of the casing;
Laying a new cable drawn from the new board to a cable pit opened at the bottom of the old board through the cable laying hole and switching to the new cable;
Removing the old cable connected to the terminal block of the old board from the terminal block and removing the old cable;
The old board is moved toward the new board that has been temporarily placed, and further moved in a direction crossing the direction of the movement in front of the new board, and the installation position of the old board before being removed Removing the old board from a straight line connecting the newly placed new board;
A step of moving the temporarily placed new board along the straight line to the installation position of the old board before being removed and installing the new board at the installation position. The control panel replacement method.

本態様によれば、バーを外すことで新ケーブルを布設する際の新ケーブルの挿入方向の障害物を除去することができ、その分円滑な新ケーブルの布設を行うことができる。   According to this aspect, the obstacle in the insertion direction of the new cable when the new cable is laid can be removed by removing the bar, and the new cable can be laid smoothly accordingly.

本発明によれば、ケーブル布設用穴を利用して新ケーブルを布設できるため、旧盤の嵩上げ不要となり、嵩上げに伴う面倒な作業を排除でき、作業の合理化および低コスト化を同時に達成し得る。例えば、嵩上げが不要であるので、旧盤の固定金具が必要なくなるばかりでなく、新ケーブルを盤下に布設できるため布設ルートが増える。   According to the present invention, since a new cable can be laid using the hole for laying the cable, it is not necessary to raise the old board, the troublesome work associated with the raising can be eliminated, and rationalization and cost reduction of the work can be achieved at the same time. . For example, since the raising is not necessary, not only the fixing bracket of the old board is not necessary, but also a new cable can be laid under the board, thereby increasing the number of installation routes.

また、閉塞部材を抽斗で形成した場合には、盤専用付属品等を納めることができるばかりでなく、抽斗を外して、盤下の手前側のボルトの締付け確認等も可能になる。さらに、ケーブル布設用穴の周囲に補強材を設けることに盤強度を従来と同程度のものとすることができる。また、バーを取り外すことで、新ケーブルの布設方向に存在する障害物の一つを良好に撤去することができ、この点で間取替え作業の効率化を実現し得る。   Further, when the closing member is formed of a drawer, not only can the dedicated accessories for the panel be accommodated, but it is also possible to confirm the tightening of the bolt on the near side under the panel by removing the drawer. Furthermore, providing the reinforcing material around the cable laying hole can make the board strength comparable to that of the prior art. Also, by removing the bar, one of the obstacles existing in the direction of laying the new cable can be removed well, and in this respect, efficiency of the replacement work can be realized.

本発明の実施の形態に係る制御盤の、通常時の状態を概念的に示す説明図で、(a)は正面から見た状態、(b)は側面から見た状態、(c)は裏面から見た状態、(d)は(b)のA−A′線から見た状態をそれぞれ示している。BRIEF DESCRIPTION OF THE DRAWINGS It is explanatory drawing which shows notionally the state at the time of the control panel which concerns on embodiment of this invention, (a) is the state seen from the front, (b) is the state seen from the side, (c) is the back surface. (D) shows the state seen from line AA ′ in (b). 本発明の実施の形態に係る制御盤の、抽斗を取外した状態を概念的に示す説明図で、(a)は正面から見た状態、(b)は側面から見た状態、(c)は裏面から見た状態、(d)は(b)のA−A′線から見た状態をそれぞれ示している。It is explanatory drawing which shows notionally the state which removed the drawer of the control board which concerns on embodiment of this invention, (a) is the state seen from the front, (b) is the state seen from the side, (c) is The state seen from the back surface, (d) shows the state seen from the line AA 'in (b). 本発明の実施の形態に係る制御盤の、抽斗を取外した後の新ケーブル挿入時の状態を概念的に示す説明図で、(a)は正面から見た状態、(b)は側面から見た状態、(c)は裏面から見た状態、(d)は(b)のA−A′線から見た状態をそれぞれ示している。BRIEF DESCRIPTION OF THE DRAWINGS It is explanatory drawing which shows notionally the state at the time of new cable insertion after removing the drawer of the control board which concerns on embodiment of this invention, (a) is the state seen from the front, (b) is seen from the side. (C) shows the state seen from the back side, and (d) shows the state seen from the AA 'line in (b). 本発明の実施の形態に係る制御盤の、旧ケーブル撤去後、筐体の裏面のカバーを外した後の新ケーブル挿入時の状態を概念的に示す説明図で、(a)は正面から見た状態、(b)は側面から見た状態、(c)は裏面から見た状態、(d)は(b)のA−A′線から見た状態をそれぞれ示している。BRIEF DESCRIPTION OF THE DRAWINGS It is explanatory drawing which shows notionally the state at the time of new cable insertion after removing the cover of the back surface of a housing | casing of the control panel which concerns on embodiment of this invention, (a) is seen from the front. (B) shows the state seen from the side, (c) shows the state seen from the back surface, and (d) shows the state seen from the line AA 'in (b). 本発明の実施の形態に係る制御盤の取替方法の第1の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 1st process of the replacement | exchange method of the control panel which concerns on embodiment of this invention notionally, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. ing. 本発明の実施の形態に係る制御盤の取替方法の第2の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態、(c)が旧盤を正面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 2nd process of the replacement | exchange method of the control panel which concerns on embodiment of this invention notionally, (a) is the state seen planarly, (b) is the state seen from the side, (c ) Shows the old board as seen from the front. 本発明の実施の形態に係る制御盤の取替方法の第3の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 3rd process of the replacement method of the control panel which concerns on embodiment of this invention in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. ing. 本発明の実施の形態に係る制御盤の取替方法の第4の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 4th process of the replacement method of the control panel which concerns on embodiment of this invention in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. ing. 本発明の実施の形態に係る制御盤の取替方法の第5の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 5th process of the replacement method of the control panel which concerns on embodiment of this invention notionally, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. ing. 本発明の実施の形態に係る制御盤の取替方法の第6の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 6th process of the replacement method of the control panel which concerns on embodiment of this invention notionally, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. ing. 本発明の実施の形態に係る制御盤の取替方法の第7の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 7th process of the replacement | exchange method of the control panel which concerns on embodiment of this invention notionally, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. ing. 従来技術に係る嵩上げ方式による制御盤の取替方法の第1の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 1st process of the replacement | exchange method of the control panel by the raising method based on a prior art notionally, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. Yes. 従来技術に係る嵩上げ方式による制御盤の取替方法の第2の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 2nd process of the replacement method of the control panel by the raising system based on a prior art in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. Yes. 従来技術に係る嵩上げ方式による制御盤の取替方法の第3の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態、(c)がHアングルと新ケーブルの関係を側面から見た状態、(d)がHアングルと新ケーブルの関係を平面的に見た状態をそれぞれ示している。It is explanatory drawing which shows the 3rd process of the control panel replacement | exchange method by the raising method based on a prior art in a concept, (a) is the state seen planarly, (b) is the state seen from the side, (c) (D) shows a state where the relationship between the H angle and the new cable is viewed from the side, and FIG. 従来技術に係る嵩上げ方式による制御盤の取替方法の第4の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 4th process of the replacement method of the control panel by the raising method based on a prior art in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. Yes. 従来技術に係る嵩上げ方式による制御盤の取替方法の第5の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 5th process of the replacement method of the control panel by the raising system based on a prior art in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. Yes. 従来技術に係る嵩上げ方式による制御盤の取替方法の第6の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 6th process of the replacement method of the control panel by the raising method based on a prior art in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. Yes. 従来技術に係る嵩上げ方式による制御盤の取替方法の第7の工程を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。It is explanatory drawing which shows the 7th process of the replacement method of the control panel by the raising method based on a prior art in a concept, (a) shows the state seen planarly, (b) shows the state seen from the side, respectively. Yes.

以下、本発明の実施の形態を図面に基づき詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

図1は本発明の実施の形態に係る制御盤の、通常時の状態を概念的に示す説明図、図2は前記制御盤の、抽斗を取外した状態を概念的に示す説明図、図3は前記制御盤の、抽斗を取外した後の新ケーブル挿入時の状態を概念的に示す説明図である。また、各図の(a)は正面から見た状態、(b)は側面から見た状態、(c)は裏面から見た状態、(d)は(b)のA−A′線から見た状態をそれぞれ示している。なお、図1〜図4中、同一部分には同一番号を付し、重複する説明は省略する。   1 is an explanatory diagram conceptually showing a normal state of the control panel according to the embodiment of the present invention, FIG. 2 is an explanatory diagram conceptually showing a state of the control panel with the drawer removed, FIG. These are explanatory drawings which show notionally the state at the time of new cable insertion after removing the drawer of the said control panel. Further, in each figure, (a) is a state viewed from the front, (b) is a state viewed from the side, (c) is a state viewed from the back surface, and (d) is a state viewed from the line AA 'in (b). Each state is shown. 1 to 4, the same parts are denoted by the same reference numerals, and redundant description is omitted.

図1〜図4に示す本形態に係る制御盤20は、布設するケーブルを収納するよう上方に開口する開口部を有して床に形成したケーブルピットの前記開口部に相対向する開口部を底部に有している。そして、筐体23の最下部の前面には、ケーブル布設用穴25を設けてあり、通常時(図1に示す状態)には、ケーブル布設用穴25を閉塞する着脱可能な閉塞部材としての抽斗24がケーブル布設用穴25に挿入されている。   The control panel 20 according to this embodiment shown in FIGS. 1 to 4 has an opening opposite to the opening of the cable pit formed on the floor having an opening that opens upward so as to store the cable to be laid. At the bottom. A cable laying hole 25 is provided in the lowermost front surface of the casing 23. As a detachable closing member for closing the cable laying hole 25 in a normal state (the state shown in FIG. 1). The drawer 24 is inserted into the cable laying hole 25.

ここで、抽斗24は筐体23の側面の内周面に配設されて前後方向に直線的に水平に伸びるレール26に沿って出し入れ可能に構成されている。抽斗24は、筐体23に挿入されている通常時には、当該制御盤20の付属品等の収納部として利用することができる。一方、抽斗24を取り外した場合には、ケーブル布設用穴25から挿入した新ケーブル9をケーブルピット(図示せず)に布設し得るような構造となっている。   Here, the drawer 24 is arranged on the inner peripheral surface of the side surface of the housing 23 and is configured to be able to be taken in and out along a rail 26 that extends linearly in the front-rear direction. The drawer 24 can be used as a storage unit for accessories or the like of the control panel 20 during normal insertion into the housing 23. On the other hand, when the drawer 24 is removed, the new cable 9 inserted from the cable laying hole 25 can be laid in a cable pit (not shown).

筐体23の内部において抽斗24の上方には抽斗24の開口部分を覆うように防護板27が設けられている。防護板27は抽斗24の出し入れに伴う新ケーブル9の損傷を未然に防止するためのものである。また、旧ケーブル8はそれぞれの一端が端子台35に接続されて垂直下方に垂下され、ケーブルピットに至るように接続してある。   A protective plate 27 is provided above the drawer 24 in the housing 23 so as to cover the opening of the drawer 24. The protective plate 27 is for preventing damage to the new cable 9 due to the drawer 24 being put in and out. The old cable 8 is connected so that one end of each of the old cables 8 is connected to the terminal block 35 and droops vertically downward to reach the cable pit.

筐体23において、ケーブル布設用穴25の周囲の筐体23の内周面は、補強部材30Aおよび補強部材30Bで補強してある。筐体23にケーブル布設用穴25を形成したことに伴い、抽斗24を取り外した場合のケーブル布設用穴25の周囲の機械的な強度を確保するためである。ここで、補強部材30Aはケーブル布設用穴25の上縁部に沿うように筐体23の幅方向に配設してあり、補強部材30Bはケーブル布設用穴25の左右の両端部分に配設してある。これによりケーブル布設用穴25の上方と左右両側の機械的な強度を向上させている。   In the housing 23, the inner peripheral surface of the housing 23 around the cable laying hole 25 is reinforced by the reinforcing member 30A and the reinforcing member 30B. This is to ensure the mechanical strength around the cable laying hole 25 when the drawer 24 is removed in association with the formation of the cable laying hole 25 in the housing 23. Here, the reinforcing member 30A is disposed in the width direction of the housing 23 along the upper edge of the cable laying hole 25, and the reinforcing member 30B is disposed at both left and right end portions of the cable laying hole 25. It is. This improves the mechanical strength above the cable laying hole 25 and on both the left and right sides.

フレーム28は筐体23の下部において内周面に沿うように配設されて筐体23の機械的強度を向上させている。これは、抽斗24が挿入されるケーブル布設用穴25の部分を除く枠体として構成されており、左右の側面枠体28B,28Cと、側面枠体28B,28Cを連結するバー28Aからなり、通常は、ネジ31,32,33でチャンネルベース6に固定してある。一方、図3および図4に示すように、新ケーブル9を布設する際には、ネジ31を緩めてバー28Aを取り外すようになっている。このことにより、新ケーブル9の挿通方向で障害物を除去して、新ケーブル9の布設をより合理的に行なうことができる。後に説明するが、新ケーブル9を布設した状態で制御盤20を前方(制御盤の裏面から前面に向かう方向)に移動することにより撤去する際に有用なものとなる。   The frame 28 is disposed along the inner peripheral surface at the lower part of the casing 23 to improve the mechanical strength of the casing 23. This is configured as a frame excluding the portion of the cable laying hole 25 into which the drawer 24 is inserted, and includes left and right side frame bodies 28B and 28C and a bar 28A connecting the side frame bodies 28B and 28C. Usually, it is fixed to the channel base 6 with screws 31, 32, 33. On the other hand, as shown in FIGS. 3 and 4, when the new cable 9 is laid, the screw 31 is loosened to remove the bar 28A. Accordingly, the obstacle can be removed in the insertion direction of the new cable 9, and the new cable 9 can be laid more rationally. As will be described later, this is useful when the control panel 20 is removed by moving it forward (in the direction from the back surface to the front surface of the control panel) with the new cable 9 installed.

かかる構成の制御盤20を撤去する際には、図1に示す状態から抽斗24を取り外して、図2に示すようにケーブル布設用穴25を開口する。その後、図3に示すように、ケーブル布設用穴25を介して新ケーブル9を筐体23内に挿入し、下方のケーブルピットに布設する。このとき、バー28Aは取り外しておく。   When the control panel 20 having such a configuration is removed, the drawer 24 is removed from the state shown in FIG. 1 and a cable laying hole 25 is opened as shown in FIG. Thereafter, as shown in FIG. 3, the new cable 9 is inserted into the housing 23 through the cable laying hole 25 and laid in the lower cable pit. At this time, the bar 28A is removed.

続いて筐体23の裏面の下部に着脱可能に取付けてあるカバー23Aを取り外して旧ケーブル8を端子台35から取り外す。かかる制御盤20は、新ケーブル9を布設したままで、前方(図の右方向)に押すことにより移動撤去することができる。   Subsequently, the cover 23 </ b> A detachably attached to the lower part of the back surface of the housing 23 is removed, and the old cable 8 is removed from the terminal block 35. The control panel 20 can be moved and removed by pushing it forward (rightward in the figure) with the new cable 9 installed.

なお、上記実施の形態では、ケーブル布設用穴25の閉塞部材を抽斗24で構成したが、これに限るものではない。ケーブル布設用穴25を塞ぐ機能を有すればよいので、単なる板状部材であっても構わない。ただ、抽斗24とした場合には収納容器としての機能も兼備させることができる。   In the above-described embodiment, the closing member of the cable laying hole 25 is configured by the drawer 24, but is not limited thereto. Since it only needs to have a function of closing the cable laying hole 25, it may be a simple plate member. However, when the drawer 24 is used, it can also function as a storage container.

図5〜図11は本形態に係る制御盤の取替方法を概念に示す説明図で、(a)が平面的に見た状態、(b)が側面から見た状態をそれぞれ示している。これらの図に基づき各工程を時系列的に説明する。なお、各図において、従来技術を示す図12〜図18および相互に同一部分には同一番号を付し、重複する説明は省略する。   FIGS. 5-11 is explanatory drawing which shows the replacement | exchange method of the control board concerning this form notionally, (a) has shown the state seen planarly, (b) has each shown the state seen from the side. Each process will be described in time series based on these drawings. In addition, in each figure, the same number is attached | subjected to FIGS. 12-18 which show a prior art, and the mutually same part, and the overlapping description is abbreviate | omitted.

1)新盤の仮置き工程
図5に示すように、制御盤が設置される建物4(太い点線で囲んだ領域)の床面5に、取替撤去の対象である旧盤21が、それ以外の既設の制御盤である他盤3とともに配設してある。当該工程では、旧盤21と取替えて設置される新盤22を、旧盤21の表面側の前面に仮置きする。ここで、旧盤21,他盤3および新盤22はチャンネルベース6,7上にそれぞれ載置されている。この状態では旧盤21には抽斗24が取付けられたままである。また、旧盤21と他盤3との相互間は旧ケーブル8で接続されている。なお、旧盤21および新盤22の構成自体は、図1〜図4に基づき説明した制御盤20と同様である。すなわち、本形態における制御盤20は、旧盤21および新盤22の両方を含む概念である(以下、同じ)。
1) Temporary placement process of new board As shown in FIG. 5, the old board 21 to be replaced and removed is placed on the floor 5 of the building 4 (area surrounded by a thick dotted line) where the control board is installed. It is arrange | positioned with the other board 3 which is an existing control board other than. In this process, the new board 22 that is installed by replacing the old board 21 is temporarily placed on the front surface of the old board 21. Here, the old board 21, the other board 3 and the new board 22 are placed on the channel bases 6 and 7, respectively. In this state, the drawer 24 is still attached to the old board 21. The old board 21 and the other board 3 are connected to each other by the old cable 8. In addition, the structure itself of the old board 21 and the new board 22 is the same as that of the control board 20 demonstrated based on FIGS. That is, the control panel 20 in this embodiment is a concept including both the old board 21 and the new board 22 (hereinafter the same).

2)新ケーブル布設の準備工程
図6に示すように、図5に示す旧盤21の抽斗24を取り外すことにより、本工程における旧盤21を正面から見た状態を示す(c)に明示するように、仮置きされた新盤22の方向に向かってケーブル布設用穴25が開口される。この時点でバー28A(図1〜図4参照)を外しておいても良い。新ケーブル9をケーブル布設用穴25に挿入する時点以前にバー28Aが撤去されていれば、新ケーブル9の敷設作業の障害にはならないからである。
2) New cable laying preparation process As shown in FIG. 6, by removing the drawer 24 of the old board 21 shown in FIG. 5, the state of the old board 21 in this process as viewed from the front is clearly shown in (c). Thus, the cable laying hole 25 is opened toward the temporarily placed new board 22. At this point, the bar 28A (see FIGS. 1 to 4) may be removed. This is because if the bar 28A is removed before the new cable 9 is inserted into the cable laying hole 25, it will not hinder the laying operation of the new cable 9.

3)旧盤下への新ケーブルの布設工程
図7に示すように、旧盤21の前面の位置から仮置きした新盤22の手前の位置までの長さを有するHアングル30を配設するとともに、旧ケーブル8に代え、新盤22から繰出される新ケーブル9をHアングル30の内側およびチャンネルベース6の内側を通して屋外機器12に接続する。ここで、Hアングル30は新ケーブル9の保護とともに、旧盤21および新盤22の移動の際のレールとして機能させる。
3) New cable laying process under the old board As shown in FIG. 7, the H angle 30 having a length from the position of the front face of the old board 21 to the position just before the newly placed new board 22 is disposed. At the same time, instead of the old cable 8, the new cable 9 fed from the new board 22 is connected to the outdoor equipment 12 through the inside of the H angle 30 and the inside of the channel base 6. Here, the H angle 30 is made to function as a rail when the old board 21 and the new board 22 are moved together with the protection of the new cable 9.

4)旧ケーブルの撤去工程
図8に示すように、新ケーブル9に切替えた後、旧ケーブル8を撤去する。
4) Removal process of old cable As shown in FIG. 8, after switching to the new cable 9, the old cable 8 is removed.

5)旧盤の撤去工程
図9に示すように、Hアングル30をレールとして機能させ、仮置きした新盤に向けて旧盤21を直線移動させる。その後、新盤22の手前の位置で旧盤21と新盤22とを結ぶ直線方向に直交する横方向に移動させることにより撤去する。
5) Removal process of old board As shown in FIG. 9, the H angle 30 is made to function as a rail, and the old board 21 is linearly moved toward the temporarily placed new board. Then, it removes by moving to the horizontal direction orthogonal to the linear direction which connects the old board 21 and the new board 22 in the position before the new board 22.

6)旧盤の撤去工程
図10に示すように、Hアングル30をレールとして機能させ、旧盤21が設置されていた場所に向かって仮置き位置の新盤22を直線移動させ(図10(b)中に矢印で示す方向)、撤去した旧盤21の代わりにチャンネルベース6の所定位置に新盤22を配設する。
6) Removal process of old board As shown in FIG. 10, the H angle 30 is made to function as a rail, and the new board 22 at the temporary placement position is linearly moved toward the place where the old board 21 was installed (FIG. 10 ( b) direction indicated by an arrow), a new board 22 is arranged at a predetermined position of the channel base 6 instead of the removed old board 21.

7)完了工程
図11に示すように、図10に示す、チャンネルベース7,Hアングル30を撤去して一連の取替作業を完了する。
7) Completion Step As shown in FIG. 11, the channel base 7 and the H angle 30 shown in FIG. 10 are removed to complete a series of replacement work.

本発明は各種の電気機器類を備え、遠隔からの制御信号により制御される制御盤を使用する産業分野で有効に利用することができる。   INDUSTRIAL APPLICABILITY The present invention can be effectively used in an industrial field that includes various electric devices and uses a control panel controlled by a remote control signal.

8 旧ケーブル
9 新ケーブル
20 制御盤
21 旧盤
22 新盤
23 筐体
24 抽斗
25 ケーブル布設用穴
28 フレーム
28A バー
28B,28C 側面枠体
30A,30B 補強部材
8 Old cable 9 New cable 20 Control board 21 Old board 22 New board 23 Case 24 Drawer 25 Hole for cable installation 28 Frame 28A Bar 28B, 28C Side frame 30A, 30B Reinforcing member

Claims (6)

布設するケーブルを収納するよう上方に開口する開口部を有して床に形成したケーブルピットの前記開口部に相対向する開口部を底部に有する制御盤であって、
最下部の前面に形成したケーブル布設用穴と、通常時にはケーブル布設用穴を閉塞している着脱可能な閉塞部材とを備えた筐体を有することを特徴とする制御盤。
A control panel having an opening at the bottom opposite to the opening of the cable pit formed on the floor having an opening that opens upward to store the cable to be laid,
A control panel comprising a casing having a cable laying hole formed in a lowermost front surface and a detachable closing member that normally closes the cable laying hole.
請求項1に記載する制御盤において、
前記閉塞部材は、前記ケーブル布設用穴に対し前記筐体の前面側から裏面側に向かう方向に挿入するとともに、前記裏面側から前記前面側に引き出すことができる抽斗で構成したことを特徴とする制御盤。
The control panel according to claim 1,
The closing member is configured by a drawer that can be inserted into the cable laying hole in a direction from the front side to the back side of the housing and pulled out from the back side to the front side. control panel.
請求項1または請求項2に記載する制御盤において、
前記ケーブル布設用穴の周囲の筐体の内周面を補強部材で補強したことを特徴とする制御盤。
In the control panel according to claim 1 or 2,
A control panel, wherein an inner peripheral surface of a housing around the cable laying hole is reinforced by a reinforcing member.
請求項1〜請求項3の何れか一つに記載する制御盤において、
前記筐体を固定する場合の構造体であり、前記筐体の裏面側の内周面に沿い水平に伸びる着脱可能なバーを有することを特徴とする制御盤。
In the control board as described in any one of Claims 1-3,
A control panel, which is a structure for fixing the casing, and has a detachable bar extending horizontally along the inner peripheral surface on the back side of the casing.
請求項1〜請求項3に記載する何れか一つの制御盤を取替える取替方法であって、
取替え対象として撤去される制御盤である旧盤の前面に相対向させて新たに設置される制御盤である新盤を仮置きするとともに、前記旧盤の閉塞部材を取外して前記旧盤の前面にケーブル布設用穴を開口させる工程と、
前記新盤から引出した新ケーブルを、前記ケーブル布設穴を介して前記旧盤の底部に開口するケーブルピットに布設して前記新ケーブルに切替える工程と、
前記旧盤の端子台に接続されている旧ケーブルを前記端子台から取外して撤去する工程と、
仮置きした前記新盤に向けて前記旧盤を移動させ、さらに前記新盤の手前で、前記移動の方向に交差する方向に移動させることにより、撤去される前の前記旧盤の設置位置と仮置きした前記新盤とを結ぶ直線上から前記旧盤を撤去する工程と、
仮置きした前記新盤を、前記直線上に沿い、撤去される前の前記旧盤の設置位置まで直線的に移動させて前記設置位置に新盤を設置させる工程とを有することを特徴とする制御盤の取替方法。
A replacement method for replacing any one of the control panels according to claim 1, wherein
Temporarily place a new board, which is a newly installed control panel facing the front of the old board, which is the control panel to be removed as a replacement target, and remove the blocking member of the old board to remove the front of the old board Opening a cable laying hole in
Laying a new cable drawn from the new board to a cable pit opened at the bottom of the old board through the cable laying hole and switching to the new cable;
Removing the old cable connected to the terminal block of the old board from the terminal block and removing the old cable;
The old board is moved toward the new board that has been temporarily placed, and further moved in a direction crossing the direction of the movement in front of the new board, and the installation position of the old board before being removed Removing the old board from a straight line connecting the newly placed new board;
A step of moving the temporarily placed new board along the straight line to the installation position of the old board before being removed and installing the new board at the installation position. How to replace the control panel.
請求項4に記載する制御盤を取替える取替方法であって、
取替え対象として撤去される制御盤である旧盤の前面に相対向させて新たに設置される制御盤である新盤を仮置きするとともに、前記旧盤の閉塞部材を取外して前記旧盤の前面にケーブル布設用穴を開口させる工程と、
前記制御盤の筐体を固定する場合の構造体であり、前記筐体の裏面側の内周面に沿い水平に伸びる着脱可能なバーを取外す工程と、
前記新盤から引出した新ケーブルを、前記ケーブル布設用穴を介して前記旧盤の底部に開口するケーブルピットに布設して前記新ケーブルに切替える工程と、
前記旧盤の端子台に接続されている旧ケーブルを前記端子台から取外して撤去する工程と、
仮置きした前記新盤に向けて前記旧盤を移動させ、さらに前記新盤の手前で、前記移動の方向に交差する方向に移動させることにより、撤去される前の前記旧盤の設置位置と仮置きした前記新盤とを結ぶ直線上から前記旧盤を撤去する工程と、
仮置きした前記新盤を、前記直線上に沿い、撤去される前の前記旧盤の設置位置まで直線的に移動させて前記設置位置に新盤を設置させる工程とを有することを特徴とする制御盤の取替方法。
A replacement method for replacing the control panel according to claim 4,
Temporarily place a new board, which is a newly installed control panel facing the front of the old board, which is the control panel to be removed as a replacement target, and remove the blocking member of the old board to remove the front of the old board Opening a cable laying hole in
A structure for fixing the casing of the control panel, and a step of removing a detachable bar extending horizontally along the inner peripheral surface on the back side of the casing;
Laying a new cable drawn from the new board to a cable pit opened at the bottom of the old board through the cable laying hole and switching to the new cable;
Removing the old cable connected to the terminal block of the old board from the terminal block and removing the old cable;
The old board is moved toward the new board that has been temporarily placed, and further moved in a direction crossing the direction of the movement in front of the new board, and the installation position of the old board before being removed Removing the old board from a straight line connecting the newly placed new board;
A step of moving the temporarily placed new board along the straight line to the installation position of the old board before being removed and installing the new board at the installation position. How to replace the control panel.
JP2013012513A 2013-01-25 2013-01-25 Control board and replacement method thereof Pending JP2014147143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013012513A JP2014147143A (en) 2013-01-25 2013-01-25 Control board and replacement method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013012513A JP2014147143A (en) 2013-01-25 2013-01-25 Control board and replacement method thereof

Publications (1)

Publication Number Publication Date
JP2014147143A true JP2014147143A (en) 2014-08-14

Family

ID=51426988

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013012513A Pending JP2014147143A (en) 2013-01-25 2013-01-25 Control board and replacement method thereof

Country Status (1)

Country Link
JP (1) JP2014147143A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016152768A (en) * 2015-02-19 2016-08-22 中国電力株式会社 Replacement method of electric switchboard and guide rail used for them
JP2020089124A (en) * 2018-11-28 2020-06-04 中国電力株式会社 Exchanging method of control board
JP2021125947A (en) * 2020-02-04 2021-08-30 株式会社東芝 Power receiving and transforming facility update method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016152768A (en) * 2015-02-19 2016-08-22 中国電力株式会社 Replacement method of electric switchboard and guide rail used for them
JP2020089124A (en) * 2018-11-28 2020-06-04 中国電力株式会社 Exchanging method of control board
JP7151421B2 (en) 2018-11-28 2022-10-12 中国電力株式会社 How to replace the control panel
JP2021125947A (en) * 2020-02-04 2021-08-30 株式会社東芝 Power receiving and transforming facility update method
JP7395375B2 (en) 2020-02-04 2023-12-11 株式会社東芝 How to update power receiving and substation equipment

Similar Documents

Publication Publication Date Title
JP2014147143A (en) Control board and replacement method thereof
JP5689327B2 (en) Cable bundling device
KR20110041937A (en) Power supply device for electric vehicle protected by concrete structure
KR20170013011A (en) Method for junction construction a between the double wall Precast Concrete and junction structure of thereby
KR20150005301A (en) Permanent form and construction method for coping
JP5856124B2 (en) Control device replacement method and control device mount
KR20150114299A (en) Apparatus for manufacturing and assembling reinforcing steel bar net and construction method of foundation reinforcement using the same
KR20130133736A (en) Connector for vertical type cable tray
JP5495834B2 (en) Switchgear
JP5497126B2 (en) Control device replacement method
JP2017046458A (en) Control device replacement method
JP6575846B2 (en) Switchboard replacement method and guide rail used therefor
JP3186436U (en) Guide hanger for assembly type buried boxes such as hand holes and manholes
JP4979441B2 (en) Wall panels
CN107207205A (en) The assemble method of elevator protection plate and protective plate
JP6667302B2 (en) Underground box
JP5547240B2 (en) Switch gear and method for removing the switch gear
JP6356398B2 (en) Home structure and foundation construction method for Tomori home
JP4016382B2 (en) Electric construction method for SC structure
JP5123149B2 (en) Construction method of partition wall
JP6444808B2 (en) Method of installing new equipment in power plant and power plant
CN210380148U (en) Assembly type building machine electric pipeline installation connecting device
CN209608250U (en) A kind of assembled cable rack slot
JP2011032718A (en) Equipotentiality of important room in building and structure grounding mechanism
KR20090036746A (en) Vibrationproof wall using slurry wall and method for constructing the same

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20150422