JP5547240B2 - Switch gear and method for removing the switch gear - Google Patents

Switch gear and method for removing the switch gear Download PDF

Info

Publication number
JP5547240B2
JP5547240B2 JP2012133495A JP2012133495A JP5547240B2 JP 5547240 B2 JP5547240 B2 JP 5547240B2 JP 2012133495 A JP2012133495 A JP 2012133495A JP 2012133495 A JP2012133495 A JP 2012133495A JP 5547240 B2 JP5547240 B2 JP 5547240B2
Authority
JP
Japan
Prior art keywords
cable
switchgear
opening
box
switch gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012133495A
Other languages
Japanese (ja)
Other versions
JP2013258838A (en
Inventor
武志 浅野
浩典 原田
弘行 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2012133495A priority Critical patent/JP5547240B2/en
Publication of JP2013258838A publication Critical patent/JP2013258838A/en
Application granted granted Critical
Publication of JP5547240B2 publication Critical patent/JP5547240B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Patch Boards (AREA)

Description

本発明は、電力供給を遮断する遮断器等の電気機器を内部に収容する箱体を備えたスイッチギヤ及びこのスイッチギヤの撤去方法に関する。 The present invention relates to a switchgear including a box body that houses therein an electric device such as a circuit breaker that cuts off power supply, and a method for removing the switchgear .

例えば、落雷等によって送電系統に事故が発生した場合は、スイッチギヤが電力供給を遮断して送電系統を保護する。スイッチギヤは、例えば、変電所等から電力を供給するために屋内の床面や屋外の地面等の敷設面に敷設された電力ケーブルと接続されている。   For example, when an accident occurs in the power transmission system due to lightning or the like, the switch gear cuts off the power supply and protects the power transmission system. For example, the switchgear is connected to a power cable laid on a floor such as an indoor floor or an outdoor ground in order to supply power from a substation or the like.

このようなスイッチギヤは、電力ケーブルや遮断器、継電器等の各電気機器を内部に収容する箱体を備える。箱体の内部は、ケーブル室、遮断器室、継電器室等に区画され、区画された各室にそれぞれ、電力ケーブルや遮断器、継電器等の各電気機器が収容される(例えば、特許文献1を参照)。   Such a switchgear is provided with the box which accommodates each electric equipment, such as a power cable, a circuit breaker, and a relay, inside. The inside of the box is partitioned into a cable room, a circuit breaker room, a relay room, and the like, and each electric device such as a power cable, a circuit breaker, and a relay is accommodated in each of the partitioned rooms (for example, Patent Document 1). See).

図4(a)で示すように、変電所等の施設の屋内に設置されたスイッチギヤ100は、物体の重量を床面A上で分散するチャンネルベース102の上に配置される。スイッチギヤ100は略2.4m程度の高さを有することから、スイッチギヤ100の上部100Aと施設の天井部Sとの間の距離が近接する。   As shown in FIG. 4A, the switchgear 100 installed indoors in a facility such as a substation is disposed on a channel base 102 that distributes the weight of an object on the floor surface A. Since the switchgear 100 has a height of about 2.4 m, the distance between the upper part 100A of the switchgear 100 and the ceiling S of the facility is close.

このスイッチギヤ100のケーブル室101の底部100Bには、ケーブル開口部101Aが形成されている。ケーブル開口部101Aを介して、床面Aに敷設された電力ケーブル104の端部が起立せしめられた状態で、電力ケーブル104がケーブル室100a内に下方から収容され、図示しない遮断器に接続されている。   A cable opening 101 </ b> A is formed at the bottom 100 </ b> B of the cable chamber 101 of the switch gear 100. With the end portion of the power cable 104 laid on the floor surface A standing up via the cable opening 101A, the power cable 104 is accommodated from below in the cable chamber 100a and connected to a circuit breaker (not shown). ing.

このスイッチギヤ100が長年の使用によって劣化したり、不具合が発生したりした場合は、電力ケーブル104を床面Aの近傍で切断し、スイッチギヤ100の底部100Bと床面Aとの間にコロ等を介在させて、矢線Fで示すスイッチギヤの水平方向に移動させて劣化あるいは不具合の発生したスイッチギヤ100ごと撤去して、新たなスイッチギヤ100と交換する。   When the switchgear 100 is deteriorated due to long-term use or malfunction occurs, the power cable 104 is cut near the floor surface A, and the switchgear 100 is rolled between the bottom 100B and the floor surface A. Etc., the switch gear 100 indicated by the arrow F is moved in the horizontal direction, and the switch gear 100 that has deteriorated or malfunctioned is removed and replaced with a new switch gear 100.

一方、図4(b)で示すように、変電所等の施設の屋外に設置されたスイッチギヤ100は、物体の重量を地面B上で分散するチャンネルベース102の上に配置される。   On the other hand, as shown in FIG. 4B, the switchgear 100 installed outdoors in a facility such as a substation is arranged on a channel base 102 that distributes the weight of an object on the ground B.

屋外に設置されたスイッチギヤ100を撤去する場合は、電力ケーブル104と遮断器との接続を解除してスイッチギヤ100をクレーン110で吊り上げて、底部100Bのケーブル開口部101Aから電力ケーブル104を抜いて、劣化あるいは不具合の発生したスイッチギヤ100ごと撤去して、新たなスイッチギヤ100と交換する。   When removing the switchgear 100 installed outdoors, the connection between the power cable 104 and the circuit breaker is released, the switchgear 100 is lifted by the crane 110, and the power cable 104 is removed from the cable opening 101A of the bottom 100B. Then, the switchgear 100 that has deteriorated or malfunctioned is removed and replaced with a new switchgear 100.

ケーブル開口部101Aから電力ケーブル104を抜く際には、スイッチギヤ100を吊り上げた状態で底部100Bとチャンネルベース102との間に支持部材120を介在させてスイッチギヤ100を支持しておき、このときに作業員Mが底部100Aとチャンネルベース102との間に入り込んで、電力ケーブル104を支持する等の作業を行う必要がある。   When unplugging the power cable 104 from the cable opening 101A, the switch gear 100 is supported by interposing a support member 120 between the bottom 100B and the channel base 102 while the switch gear 100 is lifted. In addition, it is necessary for the worker M to enter between the bottom portion 100 </ b> A and the channel base 102 to perform work such as supporting the power cable 104.

特開2011−004543号公報JP 2011-004543 A

屋内に設置されたスイッチギヤ100を撤去する場合は、スイッチギヤ100の上部100Aと施設の天井部Sとの間の距離が近接し、上部100Aと施設の天井部Sとの間にクレーン110を導入してスイッチギヤ100を吊り上げることができないことから、劣化あるいは不具合が発生していない電力ケーブル104であっても、床面Aの近傍で切断して床面Aから撤去しなければならなくなる。従って、新たなスイッチギヤ100を設置するためには、新たな電力ケーブル104を改めて床面Aに敷設する必要がある。その結果、電力ケーブル104の撤去及び敷設による作業負担の増大、更に、本来不要であるはずの、新たな電力ケーブル104を敷設するための作業コストがかかることとなる。   When removing the switchgear 100 installed indoors, the distance between the upper part 100A of the switchgear 100 and the ceiling part S of the facility is close, and the crane 110 is placed between the upper part 100A and the ceiling part S of the facility. Since the switch cable 100 cannot be lifted after being introduced, even the power cable 104 that has not deteriorated or malfunctioned must be cut near the floor surface A and removed from the floor surface A. Therefore, in order to install a new switch gear 100, it is necessary to lay a new power cable 104 on the floor surface A again. As a result, the work burden due to the removal and laying of the power cable 104 is increased, and the work cost for laying the new power cable 104, which is supposed to be unnecessary, is increased.

一方、屋外に設置されたスイッチギヤ100を撤去する場合は、クレーン120で吊り上げられたスイッチギヤ100の底部100Bとチャンネルベース102との間に作業員Mが入り込んで、電力ケーブル104を支持する等の作業を行う必要がある。従って、吊り上げられた状態の不安定な重量物であるスイッチギヤ100の下で作業員Mが作業を行うことから、高度の作業安全性が要求される。その結果、作業負担が増大することが想定される。   On the other hand, when the switchgear 100 installed outdoors is removed, the worker M enters between the bottom 100B of the switchgear 100 lifted by the crane 120 and the channel base 102 to support the power cable 104, etc. It is necessary to do the work. Therefore, since the worker M performs work under the switch gear 100 that is an unstable heavy object in a suspended state, a high degree of work safety is required. As a result, it is assumed that the work load increases.

また、スイッチギヤ100を吊り上げるクレーン110や、吊り上げられたスイッチギヤ100を支持する支持部材120等が必要となることから、作業コストが増大することも想定される。   Further, since a crane 110 that lifts the switch gear 100, a support member 120 that supports the lifted switch gear 100, and the like are required, it is assumed that the operation cost increases.

本発明は、上記課題に鑑みてなされたものであり、その目的は、作業の安全性を確保し、作業負担及び作業コストを抑えたうえで、撤去及び設置を容易に行うことができるスイッチギヤ及びこのスイッチギヤの撤去方法を提供することにある。 The present invention has been made in view of the above problems, and an object of the present invention is to provide a switchgear that can be easily removed and installed while ensuring work safety and reducing work burden and work cost. And providing a method for removing the switchgear .

上記目的を達成するための請求項1に記載の発明は、起立させたテーブルの端部を挿通可能なケーブル開口部が形成された底部を有する箱体を、前記起立させたケーブルの端部の上方から前記ケーブル開口部に前記ケーブルの端部を挿通して設置するスイッチギヤにおいて、前記箱体は、前記設置状態で該箱体を水平方向に移動させることで前記ケーブルの端部を該箱体の外方に位置させる開放通路を備え、該開放通路は、前記ケーブル開口部が前記底部の一方の端縁まで開放し、かつ前記箱体の内壁及び外壁に該箱体を水平方向に移動させる際に前記起立させたケーブルの端部が通過可能な開口部が設けられて形成されたことを特徴とする。 In order to achieve the above object, according to the first aspect of the present invention, there is provided a box having a bottom portion formed with a cable opening through which an end of an upright table can be inserted. In a switchgear that is installed by inserting the end of the cable from above into the cable opening, the box moves the box in the horizontal direction in the installed state so that the end of the cable is moved to the box. An open passage located on the outside of the body , wherein the cable opening opens to one edge of the bottom and moves the box horizontally on the inner and outer walls of the box An opening is formed through which the end of the raised cable can pass when the cable is raised .

この構成によれば、スイッチギヤは箱体によって構成され、この箱体の底部にはケーブル開口部が形成されている。このケーブル開口部を底部の一方の端縁まで開放するとともに、箱体の内壁及び外壁に、箱体を水平方向に移動させる際に起立させたケーブルの端部が通過可能な開口部を設けるという簡易な構成によって、開放通路が形成されていることから、劣化あるいは不具合が発生したスイッチギヤを撤去する際に、箱体を水平方向に移動させることによって、ケーブルの端部を開放通路内に通過させて、スイッチギヤを撤去することができる。 According to this configuration, the switch gear is constituted by a box, and the cable opening is formed at the bottom of the box. The cable opening is opened to one end edge of the bottom, and an opening through which the end of the cable erected when the box is moved in the horizontal direction is provided on the inner wall and the outer wall of the box. Since the open passage is formed with a simple configuration, when removing the switch gear that has deteriorated or malfunctioned, the end of the cable passes through the open passage by moving the box horizontally. The switchgear can be removed.

これにより、スイッチギヤを吊り上げることなく、かつスイッチギヤを吊り上げることができない場合にケーブルの端部を切断することなく、スイッチギヤを撤去することができる。従って、作業負担及び作業コストを抑制してスイッチギヤを撤去し、新たなスイッチギヤを設置することができる。   Thus, the switch gear can be removed without lifting the switch gear and without cutting the end of the cable when the switch gear cannot be lifted. Therefore, the work load and work cost can be suppressed, the switch gear can be removed, and a new switch gear can be installed.

請求項に記載のスイッチギヤは、請求項1に記載のスイッチギヤにおいて、前記内壁及び外壁の開口部に着脱可能に形成され、該開口部に装着された状態で該開口部の一部または全部を閉鎖する補強材を備えることを特徴とする。 A switchgear according to a second aspect is the switchgear according to the first aspect , wherein the switchgear is detachably formed in the opening portions of the inner wall and the outer wall, and a part of the opening portion is attached to the opening portion. It is provided with the reinforcing material which closes all.

この構成によれば、内壁及び外壁の開口部を閉鎖する補強材を取り付けることによって、重量物であるスイッチギヤの支持剛性を向上させることができる。一方、スイッチギヤを撤去する場合は、補強材が着脱可能に形成されていることから、補強材を開口部から取り外してスイッチギヤを容易に撤去することができる。   According to this configuration, the support rigidity of the switch gear, which is a heavy object, can be improved by attaching the reinforcing member that closes the openings of the inner wall and the outer wall. On the other hand, when the switchgear is removed, the reinforcing material is formed so as to be detachable. Therefore, the switchgear can be easily removed by removing the reinforcing material from the opening.

請求項に記載のスイッチギヤの撤去方法は、請求項1または2に記載のスイッチギヤを撤去する方法であって、前記ケーブルと該ケーブルと接続された前記箱体内の電気機器との接続を解除する接続解除工程と、該接続解除工程の後に、前記ケーブルの端部が前記開放通路内を移動するように前記箱体を水平方向に移動させて前記ケーブルの端部を前記箱体から外部に露出させる箱体水平移動工程と、を備えることを特徴とする。 Removing method of switchgear according to claim 3 is a method for removing the switchgear according to claim 1 or 2, the connection between the cable and the cable and connected to said box body of the electrical device A connection releasing step for releasing, and after the connection releasing step, the box is moved horizontally so that the end of the cable moves in the open passage, and the end of the cable is externally connected to the outside of the box. And a box horizontal movement step to be exposed to the surface.

この構成によれば、ケーブルと電気機器との接続を解除したうえで、箱体を水平方向に移動する。これにより、ケーブルが開放通路を通過してケーブルを箱体の外方に位置させることができることから、スイッチギヤを撤去することができる。   According to this configuration, the box is moved in the horizontal direction after the connection between the cable and the electric device is released. Thereby, since a cable can pass an open channel | path and a cable can be located in the outer side of a box, a switchgear can be removed.

従って、スイッチギヤを吊り上げることなく、かつスイッチギヤを吊り上げることができない場合にケーブルの端部を切断することなくスイッチギヤを撤去することができる。これにより、作業負担及び作業コストを抑制してスイッチギヤを撤去することができる。   Therefore, the switch gear can be removed without lifting the end of the cable without lifting the switch gear and when the switch gear cannot be lifted. Thereby, a work load and work cost can be controlled and a switchgear can be removed.

この発明によれば、箱体を水平方向に移動させる簡易な動作によって、スイッチギヤを容易に撤去することができる。従って、屋外に設置されたスイッチギヤを撤去する場合に、スイッチギヤを吊り上げる必要がなくなる。これにより、スイッチギヤを吊り上げることにより生じる作業負担及び作業コストを削減することができるとともに、吊り上げた際にスイッチギヤの下に作業員が入り込んで撤去作業を行う必要がなくなることから、作業安全性を確保することができる。   According to the present invention, the switch gear can be easily removed by a simple operation of moving the box in the horizontal direction. Therefore, it is not necessary to lift the switchgear when removing the switchgear installed outdoors. As a result, it is possible to reduce the work burden and work cost caused by lifting the switch gear, and it is not necessary to perform the removal work by entering the work under the switch gear when the switch gear is lifted. Can be secured.

更に、ケーブルの端部を切断することなくスイッチギヤを撤去することができる。これにより、健全なケーブルを切断する必要がなくなり、新たなスイッチギヤを設置する場合に、既設のケーブルを継続して使用することができる。従って、スイッチギヤを撤去して新たなスイッチギヤを設置する際の作業負担及び作業コストを抑制することができる。   Furthermore, the switch gear can be removed without cutting the end of the cable. Thereby, it is not necessary to cut a healthy cable, and when installing a new switchgear, the existing cable can be used continuously. Therefore, it is possible to reduce the work load and work cost when removing the switch gear and installing a new switch gear.

本実施の形態に係るスイッチギヤの概略を説明する図である。It is a figure explaining the outline of the switchgear which concerns on this Embodiment. 同じく、本実施の形態に係るスイッチギヤの概略を説明する断面図である。Similarly, it is sectional drawing explaining the outline of the switchgear which concerns on this Embodiment. 本実施の形態に係るスイッチギヤを撤去する場合の概略を説明する図である。It is a figure explaining the outline in the case of removing the switchgear which concerns on this Embodiment. 従来のスイッチギヤの撤去方法の概略を説明する図であり(a)はスイッチギヤが屋内に設置されている場合、(b)はスイッチギヤが屋外に設置されている場合の撤去方法を説明する図である。It is a figure explaining the outline of the removal method of the conventional switchgear, (a) is the case where the switchgear is installed indoors, (b) explains the removal method when the switchgear is installed outdoors. FIG.

次に、本発明の実施の形態について、図1〜図3に基づいて説明する。なお、図1〜図3において、図4と同様の構成要素には同一の符号を付して、その詳細な説明を省略する。   Next, an embodiment of the present invention will be described with reference to FIGS. 1 to 3, the same components as those in FIG. 4 are denoted by the same reference numerals, and detailed description thereof is omitted.

図1は本実施の形態に係るスイッチギヤ10の概略を説明する図であり、図2は、スイッチギヤ10の概略を説明する断面図である。図示のように、スイッチギヤ10は、金属製の箱体20を備え、遮断器等の電気機器を複数収容する金属閉鎖型に形成される。   FIG. 1 is a diagram for explaining the outline of the switch gear 10 according to the present embodiment, and FIG. 2 is a cross-sectional view for explaining the outline of the switch gear 10. As illustrated, the switchgear 10 includes a metal box 20 and is formed in a metal closed type that accommodates a plurality of electrical devices such as circuit breakers.

箱体20は、起立させた電力ケーブル104の端部104aを挿通するケーブル開口部22が形成された底部20Aを有し、電力ケーブル104の端部104aを内部に収容する。   The box 20 has a bottom portion 20A formed with a cable opening 22 through which the end portion 104a of the raised power cable 104 is inserted, and accommodates the end portion 104a of the power cable 104 therein.

箱体20は、箱体20を水平方向に移動させることで電力ケーブル104を箱体20の外方に位置させる開放通路21を備える。この開放通路21は、本実施の形態では、底部20Aの端縁20Aaまで開放して形成されたケーブル開口部22、箱体20の内壁及び外壁に設けられた開口部となる第1開口部24及び第2開口部26によって構成される。   The box 20 includes an open passage 21 that moves the box 20 in the horizontal direction to position the power cable 104 outside the box 20. In this embodiment, the open passage 21 is a cable opening 22 formed to open to the end edge 20Aa of the bottom 20A, and a first opening 24 serving as an opening provided in the inner wall and the outer wall of the box 20. And the second opening 26.

次に、本実施の形態におけるスイッチギヤ10の各部の具体的構成について説明する。   Next, a specific configuration of each part of the switchgear 10 in the present embodiment will be described.

箱体20は、底部20A及び底部20Aから立設された側部20B、同じく底部20Aから立設されるとともに側部20Bの後端縁と連続する後部20Cを備え、後部20Cと対向する前部20Dに、前部20Dの下端縁であって底部20Aの端縁20Aaから上方に向かって切り欠かれて外部に開放して形成された第1開口部24を備える。   The box body 20 includes a bottom portion 20A and a side portion 20B that is erected from the bottom portion 20A, a rear portion 20C that is also erected from the bottom portion 20A and continues to the rear end edge of the side portion 20B, and is opposed to the rear portion 20C. 20D is provided with a first opening 24 that is a lower end edge of the front portion 20D and is notched upward from the end edge 20Aa of the bottom portion 20A and opened to the outside.

一方、箱体20は、側部20Bの上端縁、後部20C及び前部20Dの上端縁から連続して底部20Aと対向する上部20Eを有し、底部20A、側部20B、後部20C、前部20D及び上部20Eによって立方体状に形成される。これら側部20B、後部20C及び前部20Dによって外壁が構成される。   On the other hand, the box 20 has an upper portion 20E that is continuous from the upper end edge of the side portion 20B, the rear portion 20C, and the upper end edge of the front portion 20D and faces the bottom portion 20A, and has a bottom portion 20A, a side portion 20B, a rear portion 20C, and a front portion. 20D and upper part 20E form a cube. These side portions 20B, rear portion 20C and front portion 20D constitute an outer wall.

この箱体20は、各種の電気機器をそれぞれ収容可能となるように内部が複数の室に区画され、矢線Lで示す方向から矢線Rで示す方向に向かって、図示しない継電器を収容する継電器室30、電力ケーブル104を収容するケーブル室32が順に配置されている。   The box 20 is partitioned into a plurality of chambers so that various electric devices can be accommodated, and accommodates a relay (not shown) from the direction indicated by the arrow L toward the direction indicated by the arrow R. The relay chamber 30 and the cable chamber 32 that houses the power cable 104 are arranged in this order.

一方、ケーブル室32に隣接して図示しない第1遮断器を収容する第1遮断器室34が配置され、第1遮断器室34の下方に図示しない母線を収容する母線室36、母線室36の下方に図示しない第2遮断器を収容する第2遮断器室38が配置されている。   On the other hand, a first circuit breaker chamber 34 that houses a first circuit breaker (not shown) is disposed adjacent to the cable chamber 32, and a bus bar chamber 36 that houses a bus bar (not shown) and a bus bar chamber 36 below the first circuit breaker chamber 34. The 2nd circuit breaker chamber 38 which accommodates the 2nd circuit breaker which is not illustrated below is arrange | positioned.

これら継電器室30〜第2遮断器室38は、継電器室30とケーブル室32との間が内壁40Aによって区画され、ケーブル室32と第1遮断器室34、母線室36、第2遮断器室38との間が内壁40Bによって区画される。一方、第1遮断器室34と母線室36との間が内壁40Cによって区画され、母線室36と第2遮断器室38との間が内壁40Dによって区画される。継電器室30とケーブル室32との間を区画する内壁40Aには、下端縁40Aaから上方に向かって切り欠かれた第2開口部26が形成されている。   The relay chamber 30 to the second breaker chamber 38 are partitioned by the inner wall 40A between the relay chamber 30 and the cable chamber 32, and the cable chamber 32, the first breaker chamber 34, the busbar chamber 36, and the second breaker chamber. 38 is partitioned by the inner wall 40B. On the other hand, the space between the first circuit breaker chamber 34 and the busbar chamber 36 is partitioned by the inner wall 40C, and the space between the busbar chamber 36 and the second circuit breaker chamber 38 is partitioned by the inner wall 40D. On the inner wall 40A that partitions the relay chamber 30 and the cable chamber 32, a second opening 26 is formed by notching upward from the lower end edge 40Aa.

ケーブル開口部22は、箱体20の内方に向かって切り欠かれた凹状に形成され、底部20Aにおける箱体20の内方から底部20Aの端縁20Aaまで開放して形成されている。このケーブル開口部22は、本実施の形態では、その切欠幅が、底部20Aの幅に近接する幅広さを有して形成されている。
The cable opening 22 is formed in a concave shape cut out inward of the box 20 and is formed to open from the inside of the box 20 to the end edge 20Aa of the bottom 20A in the bottom 20A. In the present embodiment, the cable opening 22 is formed with a notch width that is close to the width of the bottom portion 20A.

第1開口部24及び第2開口部26は、収容した電力ケーブル104の端部104aが水平方向に通過することを許容する大きさを有して外部に開口して形成されており、この第1開口部24及び第2開口部26の下方側はケーブル開口部22によって開放して形成されている。第1開口部24には、図3で示す外扉60が第1開口部24に対して開閉自在に設けられている。   The first opening 24 and the second opening 26 have a size that allows the end 104a of the accommodated power cable 104 to pass in the horizontal direction, and are formed to open to the outside. The lower side of the first opening 24 and the second opening 26 is formed open by the cable opening 22. An outer door 60 shown in FIG. 3 is provided in the first opening 24 so as to be openable and closable with respect to the first opening 24.

外扉60が開扉された状態で、第1開口部24を介して外部と継電器室30とが連通し、内壁40Aに設けられた第2開口部26を介して継電器室30とケーブル室32とが連通する。すなわち、箱体20は、ケーブル室32と外部とが継電器室30を介して連通して形成される。   With the outer door 60 opened, the outside communicates with the relay chamber 30 through the first opening 24, and the relay chamber 30 and the cable chamber 32 through the second opening 26 provided on the inner wall 40A. And communicate. That is, the box 20 is formed by connecting the cable chamber 32 and the outside via the relay chamber 30.

上記構成を有する箱体20は、物体の重量を床面Aまたは地面B上で分散するチャンネルベース102の上に配置されて、施設の屋内または屋外に設置される。本実施の形態では、床面Aまたは地面Bに敷設された電力ケーブル104の端部104aが起立せしめられてチャンネルベース102から突出しており、電力ケーブル104の端部104aが箱体20のケーブル室32に収容されるように、箱体20がチャンネルベース102の上に配置される。   The box 20 having the above configuration is disposed on the channel base 102 that distributes the weight of the object on the floor surface A or the ground surface B, and is installed indoors or outdoors in the facility. In the present embodiment, the end 104 a of the power cable 104 laid on the floor surface A or the ground B is raised and protrudes from the channel base 102, and the end 104 a of the power cable 104 is in the cable chamber of the box 20. The box 20 is disposed on the channel base 102 so as to be accommodated in the channel 32.

本実施の形態では、箱体20とチャンネルベース102との間に補強板50を介在させた状態で、箱体20がチャンネルベース102上に配置される。この補強板50は、チャンネルベース102から突出する電力ケーブル104の端部104aを挿通するとともに、箱体20の底部20Aと重ね合わせられた状態でケーブル開口部22と連通する連通部50aを有して形成される。更に、この補強板50には、図示しない制御ケーブルを挿通する制御ケーブル挿通部50bが形成されている。   In the present embodiment, the box 20 is disposed on the channel base 102 with the reinforcing plate 50 interposed between the box 20 and the channel base 102. The reinforcing plate 50 has a communication portion 50a that is inserted through the end portion 104a of the power cable 104 protruding from the channel base 102 and communicates with the cable opening 22 in a state of being overlapped with the bottom portion 20A of the box 20. Formed. Further, the reinforcing plate 50 is formed with a control cable insertion portion 50b through which a control cable (not shown) is inserted.

このように、チャンネルベース102の上に補強板50が配置され、その上に箱体20が配置された状態で、第2開口部26の下部に、板状の下部補強材52が取り付けられ、第1開口部24の下部に、前部補強材54が取り付けられ、第1開口部24及び第2開口部26の一部を閉鎖するように構成されている。   In this way, with the reinforcing plate 50 disposed on the channel base 102 and the box 20 disposed thereon, a plate-like lower reinforcing member 52 is attached to the lower portion of the second opening 26, A front reinforcing member 54 is attached to the lower portion of the first opening 24 and is configured to close a part of the first opening 24 and the second opening 26.

この補強板50、下部補強材52及び前部補強材54によって、金属閉鎖型の重量物であるスイッチギヤ10の支持剛性を向上させることができる。一方、小動物がスイッチギヤ10内に侵入したり、湿気によってスイッチギヤ10が発錆したりすることを抑制することもできる。   With the reinforcing plate 50, the lower reinforcing member 52, and the front reinforcing member 54, it is possible to improve the support rigidity of the switchgear 10 which is a metal-closed heavy object. On the other hand, small animals can also be prevented from entering the switch gear 10 and rusting of the switch gear 10 due to moisture.

次に、本実施の形態に係るスイッチギヤ10を撤去する場合について説明する。   Next, the case where the switchgear 10 which concerns on this Embodiment is removed is demonstrated.

図3は、本実施の形態に係るスイッチギヤ10を撤去する場合の概略を説明する図である。図3(a)で示すように、施設の屋内または屋外に設置されたスイッチギヤ10の外扉60を開扉して、下部補強材52及び前部補強材54を取り外す。これにより、ケーブル室32から継電器室30を経て外部までが連通する。その後、電力ケーブル104の端部104aと図示しない遮断器との接続を解除する(接続解除工程)。このとき、電力ケーブル104は、遮断器との接続が解除されても、起立した状態が保持される。   FIG. 3 is a diagram for explaining the outline when the switchgear 10 according to the present embodiment is removed. As shown in FIG. 3A, the outer door 60 of the switchgear 10 installed indoors or outdoors in the facility is opened, and the lower reinforcing member 52 and the front reinforcing member 54 are removed. Thereby, the cable chamber 32 communicates with the outside through the relay chamber 30. Thereafter, the connection between the end 104a of the power cable 104 and the circuit breaker (not shown) is released (connection release step). At this time, the power cable 104 is kept standing even if the connection with the circuit breaker is released.

接続解除工程の後、スイッチギヤ10をジャッキ等で持ち上げて、図3(b)で示すように、箱体20の底部20Aと床面Aまたは地面Bとの間にコロ130を介在させて、スイッチギヤ10を矢線Fで示す水平方向、すなわち第1開口部24及び第2開口部26の開口する方向と反対の方向に移動させる。スイッチギヤ10を水平方向Fへ移動させると、電力ケーブル104の端部104aが第2開口部26を通過するとともに第1開口部24を通過し、電力ケーブル104の端部104aが、外部に露出する(箱体水平移動工程)。   After the disconnection process, the switchgear 10 is lifted with a jack or the like, and a roller 130 is interposed between the bottom 20A of the box 20 and the floor A or the ground B as shown in FIG. The switch gear 10 is moved in the horizontal direction indicated by the arrow F, that is, in the direction opposite to the direction in which the first opening 24 and the second opening 26 are opened. When the switch gear 10 is moved in the horizontal direction F, the end 104a of the power cable 104 passes through the second opening 26 and the first opening 24, and the end 104a of the power cable 104 is exposed to the outside. (Box horizontal movement process).

このように、本実施の形態のスイッチギヤ10によると、スイッチギヤ10が屋内に設置されている場合に、健全な電力ケーブル104を切断することなく、スイッチギヤ10を、第1開口部24及び第2開口部26の開口する方向と反対の水平方向Fに向かって移動させることによって、劣化あるいは不具合が発生したスイッチギヤ10を容易に撤去することができる。   Thus, according to the switchgear 10 of the present embodiment, when the switchgear 10 is installed indoors, the switchgear 10 can be connected to the first opening 24 and the sound without cutting the healthy power cable 104. By moving toward the horizontal direction F opposite to the direction in which the second opening 26 opens, the switchgear 10 in which deterioration or malfunction has occurred can be easily removed.

従って、新たなスイッチギヤ10を設置する場合であっても、新たな電力ケーブル104を敷設する必要がなく、既設の電力ケーブル104を継続して使用できることから、劣化したスイッチギヤ10の撤去及び新たなスイッチギヤ10の設置の際の作業負担及び作業コストを軽減することができる。   Therefore, even when a new switchgear 10 is installed, it is not necessary to install a new power cable 104, and the existing power cable 104 can be used continuously. It is possible to reduce the work burden and work cost when installing the switch gear 10.

一方、スイッチギヤ10が屋外に設置されている場合に、スイッチギヤ10をクレーン等で吊り上げたり、吊り上げられた状態の不安定なスイッチギヤ10を支持部材等で支持したり、支持した状態でスイッチギヤ10の下に入り込んで作業員が作業を行ったりする必要がない。   On the other hand, when the switchgear 10 is installed outdoors, the switchgear 10 is lifted by a crane or the like, the unstable switchgear 10 in a lifted state is supported by a support member or the like, and the switchgear 10 is in a supported state. There is no need for the operator to enter under the gear 10 to perform work.

従って、作業安全性を確保したうえで、作業負担及び作業コストを削減して屋外に設置された劣化したスイッチギヤ10を撤去し、新たなスイッチギヤ10を設置することができる。   Therefore, after ensuring work safety, the work load and work cost can be reduced, the deteriorated switchgear 10 installed outdoors can be removed, and a new switchgear 10 can be installed.

更に、本実施の形態では、ケーブル開口部22は、切欠幅W1が底部20Aの幅W2に近接する幅広さを有して形成されていることから、スイッチギヤ10を水平方向Fに移動させて第1開口部22及び第2開口部24に電力ケーブル104の端部104aを通過させる際に、起立された電力ケーブル104の端部104aにスイッチギヤ10の底部20Aが衝突することを回避することができ、電力ケーブル104の破損を防止することができる。   Further, in the present embodiment, the cable opening 22 is formed so that the notch width W1 has a width close to the width W2 of the bottom portion 20A, so that the switch gear 10 is moved in the horizontal direction F. When the end 104a of the power cable 104 is passed through the first opening 22 and the second opening 24, the bottom 20A of the switch gear 10 is prevented from colliding with the end 104a of the standing power cable 104. Thus, the power cable 104 can be prevented from being damaged.

新たなスイッチギヤ10を設置する場合は、スイッチギヤ10の箱体20の底部20Aと床面Aまたは地面Bとの間にコロ130を介在させて、スイッチギヤ10を矢線Fで示す水平方向と反対方向、すなわち第1開口部24及び第2開口部26の開口する方向に移動させる。スイッチギヤ10を水平方向Fと反対の方向へ移動させると、電力ケーブル104の端部104aが第1開口部24を通過するとともに第2開口部26を通過し、電力ケーブル104の端部104aが、ケーブル室32内に下方から収容される。その後、電力ケーブル104の端部104aと図示しない遮断器とを接続する。   When a new switchgear 10 is installed, a roller 130 is interposed between the bottom 20A of the box 20 of the switchgear 10 and the floor A or the ground B, and the switchgear 10 is shown in the horizontal direction indicated by the arrow F. The first opening 24 and the second opening 26 are moved in the opposite direction. When the switch gear 10 is moved in a direction opposite to the horizontal direction F, the end 104a of the power cable 104 passes through the first opening 24 and the second opening 26, and the end 104a of the power cable 104 The cable chamber 32 is accommodated from below. Thereafter, the end 104a of the power cable 104 and a circuit breaker (not shown) are connected.

箱体20の底部20Aに設けられたケーブル開口部22は、板状の部材や粘土の部材によって閉塞され、下部補強材52及び前部補強材54が取り付けられる。   The cable opening 22 provided in the bottom 20A of the box 20 is closed by a plate-like member or a clay member, and the lower reinforcing member 52 and the front reinforcing member 54 are attached thereto.

なお、本発明は上記実施の形態に限定されることはなく、発明の趣旨を逸脱しない範囲で種々変更可能である。上記実施の形態では、箱体20と補強板50とを別体として形成した場合を説明したが、補強板50の連通孔50aを電力ケーブル104の端部104aが水平方向に通過することが可能な形状に形成することによって、箱体20の底部20Aと補強板50とを溶接等によって重ね合わせて一体に形成することができる。   In addition, this invention is not limited to the said embodiment, A various change is possible in the range which does not deviate from the meaning of invention. Although the case where the box 20 and the reinforcing plate 50 are formed separately has been described in the above embodiment, the end 104a of the power cable 104 can pass through the communication hole 50a of the reinforcing plate 50 in the horizontal direction. By forming in a simple shape, the bottom portion 20A of the box 20 and the reinforcing plate 50 can be overlapped and formed integrally by welding or the like.

上記実施の形態では、第2開口部26の一部を閉鎖するように下部補強材52を取り付け、第1開口部24の一部を閉鎖するように前部補強材54を取り付ける場合を説明したが、例えば、前部補強材54及び下部補強材52を、第1開口部24位及び第2開口部26の全部を閉鎖するように構成してもよい。   In the above embodiment, the case where the lower reinforcing member 52 is attached so as to close a part of the second opening 26 and the front reinforcing member 54 is attached so as to close a part of the first opening 24 has been described. However, for example, the front reinforcing member 54 and the lower reinforcing member 52 may be configured to close all of the first opening portion 24 and the second opening portion 26.

10 スイッチギヤ
20 箱体
20A 底部
20B 側部
20D 前部
21 開放通路
22 ケーブル開口部
24 第1開口部
26 第2開口部
30 継電器室
32 ケーブル室
40a 内壁
50 補強板
52 下部補強材
54 前部補強材
104 電力ケーブル(ケーブル)
104a 端部
DESCRIPTION OF SYMBOLS 10 Switchgear 20 Box 20A Bottom part 20B Side part 20D Front part 21 Open passage 22 Cable opening part 24 First opening part 26 Second opening part 30 Relay room 32 Cable room 40a Inner wall 50 Reinforcement plate 52 Lower reinforcement material 54 Front part reinforcement Material 104 Power cable (cable)
104a end

Claims (3)

起立させたテーブルの端部を挿通可能なケーブル開口部が形成された底部を有する箱体を、前記起立させたケーブルの端部の上方から前記ケーブル開口部に前記ケーブルの端部を挿通して設置するスイッチギヤにおいて、
前記箱体は、
前記設置状態で該箱体を水平方向に移動させることで前記ケーブルの端部を該箱体の外方に位置させる開放通路を備え、
該開放通路は、
前記ケーブル開口部が前記底部の一方の端縁まで開放し、かつ前記箱体の内壁及び外壁に該箱体を水平方向に移動させる際に前記起立させたケーブルの端部が通過可能な開口部が設けられて形成されたことを特徴とするスイッチギヤ。
A box having a bottom formed with a cable opening through which the end of the raised table can be inserted is inserted into the cable opening from above the end of the raised cable. In the switchgear to be installed,
The box is
With an open passage to position the end portion of said cable outwardly of the box body by moving the the box body in a horizontal direction in the installed state,
The open passage is
The cable opening is open to one end edge of the bottom and the opening through which the end of the raised cable can pass when moving the box horizontally to the inner wall and the outer wall of the box A switchgear characterized by being provided .
前記内壁及び外壁の開口部に着脱可能に形成され、該開口部に装着された状態で該開口部の一部または全部を閉鎖する補強材を備えることを特徴とする請求項1に記載のスイッチギヤ。 2. The switch according to claim 1, further comprising a reinforcing member that is detachably formed in the opening portions of the inner wall and the outer wall and closes part or all of the opening portion while being attached to the opening portion. gear. 請求項1または2に記載のスイッチギヤを撤去する方法であって、
前記ケーブルと該ケーブルと接続された前記箱体内の電気機器との接続を解除する接続解除工程と、
該接続解除工程の後に、前記ケーブルの端部が前記開放通路内を移動するように前記箱体を水平方向に移動させて前記ケーブルの端部を前記箱体から外部に露出させる箱体水平移動工程と、
を備えることを特徴とするスイッチギヤの撤去方法。
A method for removing the switchgear according to claim 1 or 2 ,
A connection releasing step for releasing the connection between the cable and the electrical device in the box connected to the cable;
After the disconnection step, the box is horizontally moved so that the end of the cable moves in the open direction so that the end of the cable moves in the open passage and the end of the cable is exposed to the outside from the box. Process,
A method for removing the switchgear.
JP2012133495A 2012-06-13 2012-06-13 Switch gear and method for removing the switch gear Active JP5547240B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012133495A JP5547240B2 (en) 2012-06-13 2012-06-13 Switch gear and method for removing the switch gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012133495A JP5547240B2 (en) 2012-06-13 2012-06-13 Switch gear and method for removing the switch gear

Publications (2)

Publication Number Publication Date
JP2013258838A JP2013258838A (en) 2013-12-26
JP5547240B2 true JP5547240B2 (en) 2014-07-09

Family

ID=49954796

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012133495A Active JP5547240B2 (en) 2012-06-13 2012-06-13 Switch gear and method for removing the switch gear

Country Status (1)

Country Link
JP (1) JP5547240B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6345360B2 (en) * 2016-01-15 2018-06-20 三菱電機株式会社 Switchgear

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS599703U (en) * 1982-07-05 1984-01-21 株式会社明電舎 closed switchboard
JPH0287909A (en) * 1988-09-26 1990-03-28 Toshiba Corp Housing base device

Also Published As

Publication number Publication date
JP2013258838A (en) 2013-12-26

Similar Documents

Publication Publication Date Title
EP3617127B1 (en) Jump elevator and jumping method
JP5707217B2 (en) Switchgear
CA2585425A1 (en) Transformer substation
JP5547240B2 (en) Switch gear and method for removing the switch gear
JP2010208764A (en) Control device for elevator
JP5856124B2 (en) Control device replacement method and control device mount
CN209766951U (en) Distribution box for industrial automation equipment
CN101267090B (en) Transformer station and method for installing a transformer station
KR101371679B1 (en) transparent distribution box
JP5495834B2 (en) Switchgear
JP6798189B2 (en) Furniture with electric lift top plate
CN108963862B (en) Sliding open-close type insulator shielding cover
JP2017046458A (en) Control device replacement method
JPH0318569A (en) Control panel for elevator
CN108777448B (en) Insulator shielding cover
CN102217155A (en) A method of manufacturing a switchgear panel
JP6658581B2 (en) Switchgear with lifting function
JP2007189758A (en) Transformer cable installation method and transformer equipment
KR101570788B1 (en) Module type distribution board having cable tray
KR102217065B1 (en) A lifter for power appliance of swichboard
KR200482929Y1 (en) Lifter for Circuit Breaker
CN102292755B (en) Accessible control panel for overhead electrical apparatus in a suspended ceiling system
JP5468663B1 (en) Emergency power supply equipment
KR200410591Y1 (en) Lift apparatus for construction
CN219779474U (en) Combined power distribution cabinet

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140430

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140514

R150 Certificate of patent or registration of utility model

Ref document number: 5547240

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250