JP2014043738A - Construction method of heavy-section tunnel - Google Patents

Construction method of heavy-section tunnel Download PDF

Info

Publication number
JP2014043738A
JP2014043738A JP2012187748A JP2012187748A JP2014043738A JP 2014043738 A JP2014043738 A JP 2014043738A JP 2012187748 A JP2012187748 A JP 2012187748A JP 2012187748 A JP2012187748 A JP 2012187748A JP 2014043738 A JP2014043738 A JP 2014043738A
Authority
JP
Japan
Prior art keywords
shield
tunnel
outer shell
main
circumferential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012187748A
Other languages
Japanese (ja)
Other versions
JP5958754B2 (en
Inventor
Kiyoto Kanemaru
清人 金丸
Shigeyuki Kono
重行 河野
Toshimitsu Aso
利光 阿曽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2012187748A priority Critical patent/JP5958754B2/en
Publication of JP2014043738A publication Critical patent/JP2014043738A/en
Application granted granted Critical
Publication of JP5958754B2 publication Critical patent/JP5958754B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To prevent a construction period from being prolonged or cost from being increased, by reducing an underground occupant area of a starting portion of an outer shell shield tunnel which is constructed outside of a main-track shield tunnel in construction of an underground cavity part.SOLUTION: According to a construction method of a heavy-section tunnel, a main-track shield tunnel 1 is constructed, a circumferential shield starting base 3 is constructed by enlarging a portion of the main-track shield tunnel 1, and a ring-shaped outer shell shield starting base 4 is constructed by performing circumferential excavation from the circumferential shield starting base 3 along an outer circumferential surface 1a of the main-track shield tunnel 1 by means of a circumferential shield machine. A plurality of outer shell shield tunnels 2 are constructed by starting an outer shell shield machine 6 from a sidewall part 41B of the outer shell shield starting base 4, and the outer shield tunnel 2 is started from the outer shell shield starting base 4 in parallel with the main-track shield tunnel 1 and directed away from the main-track shield tunnel 1 to the radial outside gradually with progress of excavation.

Description

本発明は、本線シールドトンネルの外側を拡幅することで設け地中空洞部を施工するための大断面トンネルの施工方法に関する。   The present invention relates to a method for constructing a large-section tunnel for constructing an underground cavity provided by widening the outside of a main shield tunnel.

従来、地中を掘削して地中空洞部を施工する際には、地中空洞の施工予定位置の外側に複数の外殻シールドトンネルを所定間隔で配列した状態で施工して、施工予定位置を取り囲むシールドルーフ先受工を構築する工法が知られている。
このようなシールドルーフ先受工を採用することによって地中空洞部を施工する方法では、地中空洞部の必要空間を包含する筒型覆工壁が例えば外径4m程度の外殻シールドトンネルにより構成され、先行して施工されるシールドトンネルより複数の外殻シールドトンネルを発進させている(例えば、特許文献1参照)。
Conventionally, when excavating the underground and constructing underground cavities, the construction is performed in a state where a plurality of outer shell shield tunnels are arranged at predetermined intervals outside the planned construction position of the underground cavity. There is a known method of constructing a shield roof tip receiving work that surrounds the roof.
In the method of constructing the underground cavity by adopting such shield roof tip receiving construction, the cylindrical lining wall including the necessary space of the underground cavity is formed by, for example, an outer shell shield tunnel having an outer diameter of about 4 m. A plurality of outer shield tunnels are started from shield tunnels that are configured and preceded (see, for example, Patent Document 1).

特許文献1には、本線シールドトンネルとランプシールドトンネル同士の分岐合流部を施工するに際し、本線シールドトンネルよりもランプシールドトンネルを先行掘進し、ランプシールドトンネルの先端部付近からルーフシールド機を発進させ、多数のルーフシールドトンネル(外殻シールドトンネル)を分岐合流部の外側にその輪郭に沿って密に配列した状態で施工することにより、分岐合流部を取り囲むシールドルーフ先受工を構築する方法について開示されている。   In Patent Document 1, when constructing a branch and junction between the main shield tunnel and the lamp shield tunnel, the lamp shield tunnel is advanced ahead of the main shield tunnel, and the roof shield machine is started from the vicinity of the tip of the lamp shield tunnel. A method of constructing a shield roof tip receiving work that surrounds a branch junction by constructing a number of roof shield tunnels (outer shell shield tunnels) in a state of being closely arranged along the contour of the junction outside the branch junction It is disclosed.

特許第4803428号公報Japanese Patent No. 4803428

しかしながら、上述した従来の大断面トンネルの施工方法では、以下のような問題があった。
すなわち、特許文献1の場合、先行するシールドトンネルの外周面からトンネル軸方向に並行な方向に発進させることが困難なため、トンネル外周面から径方向の外側に向けて発進させた直後に、シールド機を急旋回させる急曲線区間を設けて目的の方向、例えば先行するシールドトンネルと平行な方向に掘進の向きを変えている。そのため、発進直後の急曲線区間が先行するシールドトンネルよりも径方向で外側に向けて広がることから、都市部などで用地の占有制限が厳しい場合において、施工に制限を受けるうえ、区分地上権の設定に時間がかかり、工期が長くなり、且つコストが増大する虞があるという問題があった。
However, the conventional large-section tunnel construction method described above has the following problems.
That is, in the case of Patent Document 1, since it is difficult to start from the outer peripheral surface of the preceding shield tunnel in a direction parallel to the tunnel axial direction, the shield immediately after starting from the outer peripheral surface of the tunnel toward the outside in the radial direction. A sharply curved section that turns the machine rapidly is provided to change the direction of excavation in a target direction, for example, a direction parallel to the preceding shield tunnel. For this reason, the sharply curved section immediately after the start spreads outward in the radial direction from the preceding shield tunnel, so if the land occupational restrictions are severe in urban areas etc., the construction is restricted and the section ground rights There are problems that it takes time to set, the construction period becomes long, and the cost may increase.

本発明は、上述する問題点に鑑みてなされたもので、地中空洞部の施工において、本線シールドトンネルの外側に施工される外殻シールドトンネルの発進部分の地下占有面積を小さくすることができ、工期が長くなることやコストの増大を抑えることができる大断面トンネルの施工方法を提供することを目的とする。   The present invention has been made in view of the above-mentioned problems, and in the construction of underground cavities, it is possible to reduce the underground occupation area of the start portion of the outer shell shield tunnel constructed outside the main shield tunnel. An object of the present invention is to provide a method for constructing a large-section tunnel capable of suppressing an increase in construction period and cost.

上記目的を達成するため、本発明に係る大断面トンネルの施工方法では、地中を掘削して地中空洞部を施工するに際して、地中空洞部の掘削予定位置の外側に、予め複数の外殻シールドトンネルを配列した状態で施工することにより、それら外殻シールドトンネルによって掘削予定位置を取り囲む外殻体を構築し、外殻体の内側を掘削する大断面トンネルの施工方法であって、本線シールドトンネルを施工する工程と、本線シールドトンネルの周方向の一部分を切り広げた円周シールド発進部を施工する工程と、円周シールド発進部から円周シールド機によって本線シールドトンネルの外周面に沿って周方向に掘削してリング状の外殻シールド発進部を施工する工程と、外殻シールド発進部における本線シールドトンネルのトンネル軸方向に直交する平面を有する側壁部より外殻シールド機を発進させて、複数の外殻シールドトンネルを施工する工程と、を有し、外殻シールドトンネルは、外殻シールド発進部から本線シールドトンネルと平行に発進させると共に、掘進するに従って漸次、本線シールドトンネルから径方向の外側に離れる方向に向けて掘進することで施工されることを特徴としている。   In order to achieve the above object, in the construction method of a large cross-section tunnel according to the present invention, when excavating the underground and constructing the underground cavity, a plurality of external tunnels are previously placed outside the planned excavation position of the underground cavity. A construction method of a large-section tunnel that constructs an outer shell body that surrounds the planned excavation position with the outer shell shield tunnel by constructing the shell shield tunnel in an array, and excavates the inside of the outer shell body. A process of constructing a shield tunnel, a process of constructing a circumferential shield starting part that is a part of the circumferential direction of the main shield tunnel, and a circumferential shield machine from the circumferential shield starting part along the outer peripheral surface of the main shield tunnel Drilling in the circumferential direction and constructing the ring-shaped outer shell shield starting part, and the tunnel axis direction of the main shield tunnel at the outer shell shield starting part Starting a shell shield machine from a side wall portion having intersecting planes and constructing a plurality of shell shield tunnels, and the shell shield tunnel is parallel to the main shield shield tunnel from the shell shield start portion It is characterized by being constructed by digging in the direction away from the main shield tunnel in the radial direction gradually as it digs up.

本発明では、本線シールドトンネルの任意の位置における周方向の一部分に円周シールド発進部を形成し、その円周シールド発進部から円周シールド機を用いて本線シールドトンネルの外周面に沿ってリング状に掘削された部分を外殻シールド機の発進基地(外殻シールド発進部)とすることができる。この外殻シールド発進部の側壁部に掘削面を向けた外殻シールド機を配置させ、その外殻シールド機を本線シールドトンネルに沿って直線的に発進させて、本線シールドトンネルと平行となる方向に掘進させることができる。そして、発進直後は、適宜な位置で本線シールドトンネルから径方向の外側に離れる曲線部を形成させて掘進することで、本線シールドトンネルの外周側に複数の外殻シールドトンネルを形成することができる。
そのため、周方向に隣り合う外殻シールドトンネル同士を適宜な連結手段により一体的に結合することで外殻体を築造することが可能となり、この外殻体が本線シールドトンネルの外側を覆うルーフシールドを構成するので、外殻体の内部を掘削して大断面の地中空洞部を構築することができる。
In the present invention, a circumferential shield starting portion is formed in a part of the circumferential direction at an arbitrary position of the main shield tunnel, and a ring is formed along the outer peripheral surface of the main shield tunnel from the circumferential shield starting portion using a circumferential shield machine. The part excavated in the shape can be used as a starting base (outer shield starting part) of the outer shell shield machine. The outer shell shield machine with the excavation surface facing the side wall of the outer shell shield starting part is placed, and the outer shell shield machine is linearly started along the main shield tunnel and parallel to the main shield tunnel Can dig into. Then, immediately after the start, a plurality of outer shell shield tunnels can be formed on the outer periphery side of the main shield tunnel by forming a curved portion that is separated from the main shield tunnel in the radial direction at an appropriate position. .
Therefore, it becomes possible to build an outer shell body by integrally connecting the outer shell shield tunnels adjacent in the circumferential direction by an appropriate connecting means, and this outer shell body covers the outside of the main shield tunnel. Therefore, it is possible to excavate the inside of the outer shell body and construct an underground cavity with a large cross section.

また、本発明では、リング状に形成される外殻シールド発進部の径方向の高さ寸法は、外殻シールド機が配置できる程度、すなわち外殻シールド機の掘削径(直径)よりわずかに大きい寸法が確保されればよく、また外殻シールド発進部から掘進される外殻シールド機の発進坑口が外殻シールド発進部の側壁部となる。そのため、外殻シールド機の発進部分の施工領域は、外殻シールド発進部の径寸法よりも拡大することがなくなる。   Further, in the present invention, the height dimension in the radial direction of the outer shell shield starting part formed in a ring shape is slightly larger than the extent that the outer shell shield machine can be arranged, that is, the excavation diameter (diameter) of the outer shell shield machine. It is only necessary to ensure the dimensions, and the starting pit of the outer shell shield machine that is excavated from the outer shell shield starting portion becomes the side wall portion of the outer shell shield starting portion. Therefore, the construction area of the starting part of the outer shell shield machine does not expand beyond the diameter dimension of the outer shell starting part.

このように本発明では、本線シールドトンネルの外周面より径方向の外側に向けて発進させる必要がなくなり、且つ外殻シールド発進部の大きさを最小限とすることができるので、外殻シールド機の発進部分における施工領域の拡大を抑えた施工が可能となり、従来のように外殻シールド機を急旋回させる必要もなく、効率的な施工が可能となる。   Thus, in the present invention, it is not necessary to start from the outer peripheral surface of the main shield tunnel to the outside in the radial direction, and the size of the outer shell shield starting portion can be minimized. Construction that suppresses the expansion of the construction area in the starting part of the can be made, and it is not necessary to turn the outer shell shield machine rapidly as in the prior art, and efficient construction is possible.

また、本発明に係る大断面トンネルの施工方法では、外殻シールド発進部において周方向に沿って複数の外殻シールド機が配置され、それら複数の外殻シールド機を同時に掘進させるようにしてもよい。   Further, in the construction method of the large-section tunnel according to the present invention, a plurality of shell shield machines are arranged along the circumferential direction in the shell shield starting part, and the shell shield machines are dug simultaneously. Good.

本発明の大断面トンネルの施工方法によれば、外殻シールド発進部がリング状に形成されているので、その外殻シールド発進部の周方向に沿って複数の外殻シールド機を配置することが可能であり、これら複数の外殻シールド機を同時に発進させて、複数の外殻シールドトンネルを同時に施工することができ、工期を短くすることができる。   According to the construction method of the large-section tunnel of the present invention, since the outer shell shield starting part is formed in a ring shape, a plurality of outer shell shield machines are arranged along the circumferential direction of the outer shell shield starting part. The plurality of shell shield machines can be started at the same time to construct a plurality of shell shield tunnels at the same time, thereby shortening the construction period.

本発明の大断面トンネルの施工方法によれば、地中空洞部の施工において、本線シールドトンネルの外側に施工される外殻シールドトンネルの発進部分の地下占有面積を小さくすることができ、工期が長くなることやコストの増大を抑えることができる。   According to the construction method of the large section tunnel of the present invention, in the construction of the underground cavity, the underground occupation area of the starting portion of the outer shield tunnel constructed outside the main shield tunnel can be reduced, and the construction period is The increase in length and cost can be suppressed.

本発明の実施の形態による大断面トンネルの施工方法の概要を示す斜視図である。It is a perspective view which shows the outline | summary of the construction method of the large section tunnel by embodiment of this invention. 図1に示す施工方法の側断面図である。It is a sectional side view of the construction method shown in FIG. 図2に示すA−A線断面図である。It is the sectional view on the AA line shown in FIG. 円周シールド機により外殻シールド発進基地を施工する状態を示す斜視図である。It is a perspective view which shows the state which constructs an outer shell shield start base with a circumferential shield machine.

以下、本発明の実施の形態による大断面トンネルの施工方法について、図面に基づいて説明する。   Hereinafter, the construction method of the large section tunnel by embodiment of this invention is demonstrated based on drawing.

図1および図2に示すように、本実施の形態による大断面トンネルの施工方法は、例えば大断面の道路トンネルなどの地中空洞部10を施工するに際して、その地中空洞部10の掘削予定位置の内側に本線シールドトンネル1を予め施工しておき、その本線シールドトンネル1の外側に複数の外殻シールドトンネル2を施工することにより、それら外殻シールドトンネル2によって本線シールドトンネル1を取り囲む外殻体20を構築し、該外殻体20の内側を掘削して地中空洞部10を構築するものである。ここで、本線シールドトンネル1おとび外殻シールドトンネル2は、在来のシールド工法により施工されるものである。
ここで、本線シールドトンネル1におけるトンネル軸方向を符号Xで示す。
なお、図1では、見易くするために複数の外殻シールドトンネル2のうち一部(紙面手前側に位置するもの)を省略している。
As shown in FIG. 1 and FIG. 2, the construction method of the large section tunnel according to the present embodiment is intended to excavate the underground cavity 10 when constructing the underground cavity 10 such as a road tunnel having a large section, for example. The main shield tunnel 1 is preliminarily constructed inside the position, and a plurality of outer shield tunnels 2 are constructed outside the main shield shield 1 so that the outer shield tunnel 1 surrounds the main shield tunnel 1. The shell 20 is constructed, and the underground cavity 10 is constructed by excavating the inside of the outer shell 20. Here, the main line shield tunnel 1 and the outer shell shield tunnel 2 are constructed by a conventional shield method.
Here, the tunnel axis direction in the main shield tunnel 1 is indicated by a symbol X.
In FIG. 1, a part of the plurality of outer shell shield tunnels 2 (located on the front side in the drawing) is omitted for easy viewing.

本実施の形態の地中空洞部10の施工方法は、本線シールドトンネル1を施工する工程と、本線シールドトンネル1における発進基地部1Aにおいて周方向の一部分を切り広げた円周シールド発進基地3(円周シールド発進部)を施工する工程と、円周シールド発進基地3から円周シールド機5(図4参照)によって本線シールドトンネル1の外周面1aに沿って周方向に掘削してリング状の外殻シールド発進基地4(外殻シールド発進部)を施工する工程と、外殻シールド発進基地4における本線シールドトンネル1のトンネル軸方向Xに直交する平面を有する側壁部41Bより外殻シールド機6を発進させて、複数(図3の図示例では16本)の外殻シールドトンネル2を施工する工程と、を有している。   The construction method of the underground hollow portion 10 of the present embodiment includes a step of constructing the main shield tunnel 1 and a circumferential shield start base 3 (a portion of the start base portion 1A in the main shield tunnel 1 which is widened in the circumferential direction). (Circumferential shield start part) and a ring-shaped excavation in the circumferential direction along the outer peripheral surface 1a of the main shield tunnel 1 from the peripheral shield start base 3 by the peripheral shield machine 5 (see FIG. 4) The process of constructing the outer shell shield starting base 4 (outer shell starting section) and the outer shell shield machine 6 from the side wall 41B having a plane perpendicular to the tunnel axis direction X of the main shield tunnel 1 in the outer shell starting base 4 , And a plurality of (16 in the illustrated example of FIG. 3) outer shell shield tunnels 2 are constructed.

外殻シールドトンネル2は、外殻シールド発進基地4から本線シールドトンネル1と平行に発進させると共に、掘進するに従って漸次、本線シールドトンネル1から径方向の外側に離れる方向に向けて掘進されている。
また、外殻シールドトンネル2は、外殻シールド発進基地4において周方向に沿って配置される複数の外殻シールド機6を同時、あるいは適宜な順番で掘進させることにより、施工される。
The outer shell shield tunnel 2 is started in parallel with the main shield tunnel 1 from the outer shield start base 4, and is gradually dug in a direction away from the main shield tunnel 1 in the radial direction as it is dug.
The outer shell shield tunnel 2 is constructed by digging a plurality of outer shell shield machines 6 arranged along the circumferential direction in the outer shell start base 4 simultaneously or in an appropriate order.

なお、本実施の形態では本線シールドトンネル1の直径がたとえば16m程度、円周シールド機5の掘進により形成される外殻シールド発進基地4の外径が28m程度で且つ径方向の高さ寸法が6m程度であり、また外殻シールド発進基地4のトンネル軸方向の長さ(外殻シールド発進基地4の中心軸に平行な方向の長さ)が12.3m程度であることを想定している。   In this embodiment, the diameter of the main shield tunnel 1 is about 16 m, for example, the outer diameter of the outer shield starting base 4 formed by excavation of the circumferential shield machine 5 is about 28 m, and the height in the radial direction is It is assumed that the length in the tunnel axis direction of the outer shield start base 4 (the length in the direction parallel to the central axis of the outer shield start base 4) is about 12.3 m. .

次に、上記大断面トンネルの施工方法について、図面に基づいてさらに詳しく説明する。
本実施の形態では、図4に示すように、本線シールドトンネル1が所定の予定位置に達した時点で、解体することを考慮した一次セグメントとガイドリング51A、51Bを組み立てた後、さらに掘進を続ける。そして、本線シールドトンネル1の発進基地部1Aにおいて、円周シールド機5により、本線シールドトンネル1の周囲にドーナツ状(リング状)の外殻シールド発進基地4(図1参照)を築造し、この発進基地内部より外殻シールド機6(図2参照)を発進させる。
Next, the construction method of the large section tunnel will be described in more detail based on the drawings.
In the present embodiment, as shown in FIG. 4, when the main shield tunnel 1 reaches a predetermined predetermined position, after assembling the primary segment and the guide rings 51A and 51B in consideration of dismantling, further excavation is performed. to continue. Then, in the start base part 1A of the main shield tunnel 1, a donut-shaped (ring-shaped) outer shield start base 4 (see FIG. 1) is built around the main shield tunnel 1 by the circumferential shield machine 5. The outer shell shield machine 6 (see FIG. 2) is started from inside the departure base.

具体的には、図4に示すように、先ず本線シールドトンネル1における発進基地部1Aの掘進時において、円周シールド機5を案内させるための一対のリング状のガイドリング51A、51Bを外周面1aに沿って延在するように設けておく。なお、これらガイドリング51A、51B同士の間における本線シールドトンネル1の発進基地部1Aには、円周シールド発進基地3、および円周シールド機5の掘進に伴うセグメント撤去作業を容易にするため、多分割セグメント11により組み立てられている。   Specifically, as shown in FIG. 4, a pair of ring-shaped guide rings 51 </ b> A and 51 </ b> B for guiding the circumferential shield machine 5 at the time of excavation of the starting base portion 1 </ b> A in the main shield tunnel 1 It is provided so as to extend along 1a. In addition, in order to facilitate the segment removal work accompanying the excavation of the circumferential shield launch base 3 and the circumferential shield machine 5 in the launch base portion 1A of the main shield tunnel 1 between the guide rings 51A and 51B, The multi-segment segment 11 is assembled.

次に、ガイドリング51A、51B同士の間における本線シールドトンネル1の底部において、多分割セグメント11を解体、撤去し、山留めを行いながら掘削することにより、ボックス形状の円周シールド発進基地3を形成する。そして、円周シールド発進基地3内において、円周シールド機5を組み立てて設置する。   Next, at the bottom of the main shield tunnel 1 between the guide rings 51A and 51B, the multi-segment segment 11 is disassembled, removed, and excavated while being piled to form a box-shaped circumferential shield start base 3. To do. Then, the circumferential shield machine 5 is assembled and installed in the circumferential shield start base 3.

ここで、円周シールド機5は、矩形断面の掘削面板52およびスキンプレート53を備えている。スキンプレート53の内周板53A(本線シールドトンネル1側)と外周板53Bとは、本線シールドトンネル1と同軸の円弧板状をなしている。内周板53Aのトンネル軸方向Xの前後縁端部には、ガイドリング51A、51Bに移動可能に係合する摺動部54A、54Bが設けられている。つまり、円周シールド機5は、ガイドリング51A、51Bに摺動部54A、54Bを案内させながら、本線シールドトンネル1の外周面1aに沿って掘進し、円周シールド機5のテール内において、断面視でコの字形の円周セグメント41を順次組み立てて覆工を行うことにより、本線シールドトンネル1の外周面1aに沿うリング状の外殻シールド発進基地4を施工する。   Here, the circumferential shield machine 5 includes an excavation face plate 52 and a skin plate 53 having a rectangular cross section. The inner peripheral plate 53 </ b> A (the main shield tunnel 1 side) and the outer peripheral plate 53 </ b> B of the skin plate 53 form an arc plate shape coaxial with the main shield shield 1. Sliding portions 54A and 54B that are movably engaged with the guide rings 51A and 51B are provided at front and rear edge ends in the tunnel axial direction X of the inner peripheral plate 53A. That is, the circumferential shield machine 5 digs along the outer peripheral surface 1a of the main shield tunnel 1 while guiding the sliding portions 54A and 54B to the guide rings 51A and 51B, and in the tail of the circumferential shield machine 5, The ring-shaped outer shield start base 4 along the outer peripheral surface 1a of the main shield tunnel 1 is constructed by sequentially assembling the U-shaped circumferential segments 41 in a cross-sectional view and performing lining.

外殻シールド発進基地4を構成する円周セグメント41は、本線シールドトンネル1と同軸をなすトンネル円周方向に組み立てられる円周壁部41Aと、この円周壁部41Aのトンネル軸方向Xの前後両端と本線シールドトンネル1の外周面1aとの間の開口を塞ぐ側壁部41B、41Cと、からなる(図1参照)。ここで、側壁部41B、41Cの径方向の高さ寸法は、外殻シールド機6の径寸法よりも大きく設定され、図1および図2に示す外殻シールド機6が掘進方向をトンネル軸方向Xと平行に向けた状態で発進可能な寸法とされる。   The circumferential segment 41 constituting the outer shell shield starting base 4 includes a circumferential wall portion 41A assembled in the tunnel circumferential direction coaxial with the main shield tunnel 1, and both front and rear ends in the tunnel axial direction X of the circumferential wall portion 41A. It consists of side wall parts 41B and 41C which block the opening between the outer peripheral surface 1a of the main line shield tunnel 1 (refer FIG. 1). Here, the height dimension in the radial direction of the side walls 41B and 41C is set to be larger than the radial dimension of the outer shell shield machine 6, and the outer shell shield machine 6 shown in FIG. 1 and FIG. The dimension is such that the vehicle can start in a state parallel to X.

次に、円周シールド機5の切羽前面の山留めを撤去し、円周シールド機5の掘進を開始し、裏込め注入を行い、円周セグメント41の組み立てるとともに、本線シールドトンネル1の撤去可能な多分割セグメント11の撤去を繰り返し、本線シールドトンネル1の外側を周方向に略一周、掘進させることで、その本線シールドトンネル1の周方向全周にわたって延在する外殻シールド発進基地4を築造する。   Next, the mountain shield on the front face of the circumferential shield machine 5 is removed, the excavation of the circumferential shield machine 5 is started, backfilling is performed, the circumferential segment 41 is assembled, and the main shield tunnel 1 can be removed. By repeatedly removing the multi-segmented segment 11 and digging the outer side of the main shield tunnel 1 in the circumferential direction, the outer shield start base 4 extending over the entire circumference of the main shield tunnel 1 is constructed. .

次に、図2に示すように、外殻シールド発進基地4内において、複数の円形断面の外殻シールド機6を、その掘削面板61を円周セグメント41のトンネル軸方向Xの前側の側壁部41Bに対向させて設置し、トンネル軸方向Xに平行に発進させることにより、複数の外殻シールドトンネル2を施工し、本線シールドトンネル1の周囲に、複数本の外殻シールドトンネル2からなる外殻体20を築造する。   Next, as shown in FIG. 2, in the outer shell shield starting base 4, the outer shell shield machine 6 having a plurality of circular cross sections, the excavation face plate 61 of the circumferential segment 41, and the side wall portion on the front side in the tunnel axial direction X are provided. A plurality of outer shield tunnels 2 are constructed by being installed opposite to 41B and started parallel to the tunnel axial direction X, and the outer periphery of the main shield tunnel 1 is composed of a plurality of outer shield tunnels 2. Build the shell 20.

すなわち、発進した外殻シールドトンネル2は、発進直後においてトンネル軸方向Xにほぼ平行に掘進させて第1直線部2Aを形成し、適宜な距離を掘進した時点、例えば外殻シールド機6の機体全体が外殻シールド発進基地4から地盤内に進出したときに、本線シールドトンネル1から径方向の外側に離れるように曲げながら掘進させて曲線部2Bを形成し、本線シールドトンネル1に対して所定の径方向の位置で本線シールドトンネル1と平行な第2直線部2Cを形成することで1本の外殻シールドトンネル2を構築する。   That is, the outer shell shield tunnel 2 that has started is dug almost parallel to the tunnel axis direction X immediately after the start to form the first straight portion 2A, and when the appropriate distance is dug, for example, the body of the outer shell shield machine 6 When the entire unit advances from the outer shell shield starting base 4 into the ground, it is dug away from the main shield tunnel 1 while bending away from the main shield tunnel 1 to form a curved portion 2B. A single outer shield tunnel 2 is constructed by forming a second straight portion 2C parallel to the main shield tunnel 1 at a position in the radial direction.

次に、施工された複数本の外殻シールドトンネル2のうち周方向に隣り合う外殻シールドトンネル2、2同士の間を、凍結工法、薬液注入工法等により地盤改良を行った後、切開き構造体として接続することにより一体化を図り、これにより支保機能、及び止水機能を有する外殻体20を形成する。この外殻体20は、本線シールドトンネル1の前記発進基地部1Aから進行方向に向かうに従って漸次拡大し、所定の径に達した時点で第2直線部2Cを形成する。この場合、内部空間の必要性によっては第2直線部2Cを形成しなくても良い。
なお、外殻シールド機6は、外殻シールドトンネル2を掘進し、分岐拡幅部の褄壁予定地点に到達させて解体、回収し、再び外殻シールド発進基地4で組み立てて発進させ、別の外殻シールドトンネル2を施工するように繰り返し使用するようにしても良い。
Next, between the outer shell shield tunnels 2 and 2 that are adjacent to each other in the circumferential direction among the plurality of outer shell shield tunnels 2 that have been constructed, the ground is improved by a freezing method, a chemical injection method, etc. Integration is achieved by connecting as a structure, thereby forming an outer shell 20 having a support function and a water stop function. The outer shell 20 gradually expands from the departure base portion 1A of the main shield tunnel 1 toward the traveling direction, and forms a second straight portion 2C when reaching a predetermined diameter. In this case, the second straight portion 2C may not be formed depending on the necessity of the internal space.
In addition, the outer shell shield machine 6 excavates the outer shield tunnel 2, reaches the anchor wall planned point of the branch widening part, disassembles and collects it, and then assembles and starts again at the outer shell shield starting base 4. You may make it use repeatedly so that the outer shell shield tunnel 2 may be constructed.

その後、褄壁予定地点の本線シールドトンネル1の褄壁付近のセグメントを解体、撤去して褄壁を構築しながら、外殻体20の内側を掘削するとともに、本線シールドトンネル1のシールドルーフ内の残りのセグメントを解体、撤去し、地中空洞部10を形成する。   After that, while dismantling and removing the segment near the anchorage wall of the main shield tunnel 1 at the planned anchor wall site, excavating the inside of the outer shell 20 while constructing the anchor wall, the inside of the shield roof of the main shield tunnel 1 The remaining segments are disassembled and removed to form the underground cavity 10.

次に、上述した大断面トンネルの施工方法の作用について、図面に基づいて詳細に説明する。
図4に示すように、本実施の形態では、本線シールドトンネル1の任意の位置における周方向の一部分に円周シールド発進基地3を形成し、その円周シールド発進基地3から円周シールド機5を用いて本線シールドトンネル1の外周面1aに沿ってリング状に掘削された部分を外殻シールド機6の外殻シールド発進基地4とすることができる。図1および図2に示すように、外殻シールド発進基地4の側壁部41Bに掘削面を向けた外殻シールド機6を配置させ、その外殻シールド機6を本線シールドトンネル1に沿って直線的に発進させて、本線シールドトンネル1と平行となる方向に掘進させることができる。
そして、発進直後は、適宜な位置で本線シールドトンネル1から径方向の外側に離れる曲線部2Bを形成させて掘進することで、本線シールドトンネル1の外周側に複数の外殻シールドトンネル2を形成することができる。
Next, the effect | action of the construction method of the large cross-sectional tunnel mentioned above is demonstrated in detail based on drawing.
As shown in FIG. 4, in the present embodiment, a circumferential shield start base 3 is formed at a part in the circumferential direction at an arbitrary position of the main shield tunnel 1, and the circumferential shield machine 5 is connected to the circumferential shield start base 3. The portion excavated in a ring shape along the outer peripheral surface 1 a of the main shield tunnel 1 can be used as the outer shield starting base 4 of the outer shell shield machine 6. As shown in FIGS. 1 and 2, an outer shell shield machine 6 with the excavation surface facing the side wall 41 </ b> B of the outer shell shield start base 4 is arranged, and the outer shell shield machine 6 is straight along the main shield tunnel 1. It is possible to start the vehicle in a direction parallel to the main shield tunnel 1.
Then, immediately after the start, a plurality of outer shell shield tunnels 2 are formed on the outer peripheral side of the main shield tunnel 1 by forming a curved portion 2B that is separated from the main shield tunnel 1 in the radial direction at an appropriate position. can do.

そのため、周方向に隣り合う外殻シールドトンネル2同士の間を適宜な補助工法、すなわち上述した凍結工法か薬液注入工法などにより地盤改良を行った後、切開き構造体として接続することにより一体的に結合することで外殻体20を築造することが可能となり、この外殻体20が本線シールドトンネル1の外側を覆うルーフシールドを構成するので、外殻体20の内部を掘削して大断面の地中空洞部10を構築することができる。   For this reason, the outer shell shield tunnels 2 adjacent to each other in the circumferential direction are integrated by connecting them as a slit structure after performing ground improvement by an appropriate auxiliary method, that is, the above-described freezing method or chemical injection method. It is possible to build the outer shell 20 by connecting to the outer shell 20, and this outer shell 20 constitutes a roof shield that covers the outside of the main line shield tunnel 1, so that the inside of the outer shell 20 is excavated to have a large cross section. The underground cavity 10 can be constructed.

また、リング状に形成される外殻シールド発進基地4の径方向の高さ寸法は、外殻シールド機6が配置できる程度、すなわち外殻シールド機6の掘削径(直径)よりわずかに大きい寸法が確保されればよく、また外殻シールド発進基地4から掘進される外殻シールド機6の発進坑口が外殻シールド発進基地4の側壁部41Bとなる。そのため、外殻シールド機6の発進部分の施工領域は、外殻シールド発進基地4の径寸法よりも拡大することがなくなる。   The height of the outer shield shield base 4 formed in a ring shape in the radial direction is such that the outer shield machine 6 can be disposed, that is, a dimension slightly larger than the excavation diameter (diameter) of the outer shield machine 6. And the start pit of the outer shell shield machine 6 excavated from the outer shield start base 4 becomes the side wall 41B of the outer shield start base 4. Therefore, the construction area of the start part of the outer shell shield machine 6 does not expand beyond the diameter dimension of the outer shield start base 4.

このように本実施の形態では、本線シールドトンネル1の外周面1aより径方向の外側に向けて発進させる必要がなくなり、且つ外殻シールド発進基地4の大きさを最小限とすることができるので、外殻シールド機6の発進部分における施工領域の拡大を抑えた施工が可能となり、従来のように外殻シールド機6を急旋回させる必要もなく、効率的な施工が可能となる。   Thus, in this embodiment, it is not necessary to start from the outer peripheral surface 1a of the main shield tunnel 1 to the outside in the radial direction, and the size of the outer shell shield starting base 4 can be minimized. Thus, it is possible to perform construction while suppressing the expansion of the construction area in the starting part of the outer shell shield machine 6, and it is not necessary to make the outer shell shield machine 6 turn sharply as in the prior art, and efficient construction is possible.

また、外殻シールド発進基地4がリング状に形成されているので、外殻シールド発進基地4の周方向に沿って複数の外殻シールド機6を配置することが可能であり、これら複数の外殻シールド機6を同時に発進させて、複数の外殻シールドトンネル2を同時に施工することができ、施工効率を向上させることができる。   Further, since the outer shell shield starting base 4 is formed in a ring shape, a plurality of outer shell shield machines 6 can be arranged along the circumferential direction of the outer shell shield starting base 4. The shell shield machine 6 can be started at the same time to construct a plurality of outer shield tunnels 2 at the same time, and the construction efficiency can be improved.

上述のように本実施の形態による大断面トンネルの施工方法では、地中空洞部10の施工において、本線シールドトンネル1の外側に施工される外殻シールドトンネル2の発進部分の地下占有面積を小さくすることができ、工期が長くなることやコストの増大を抑えることができる。   As described above, in the construction method of the large section tunnel according to the present embodiment, in the construction of the underground cavity 10, the underground occupation area of the starting portion of the outer shield tunnel 2 constructed outside the main shield tunnel 1 is reduced. It is possible to suppress the increase in construction period and cost.

以上、本発明による大断面トンネルの施工方法の実施の形態について説明したが、本発明は上記の実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、本実施の形態では、外殻シールド機6の掘進方向を本線シールドトンネル1の掘進方向と同一方向の前方としているが、この方向に限定されることはなく、外殻シールド発進部より後方に向けて発進させるようにしてもよい。すなわち、外殻シールド発進部の前方側または後方側に外殻シールドトンネル2を設けることが可能である。要は、外殻シールド機6が外殻シールド発進基地4の側壁部41Bを発進坑口として発進する方法であればよいのである。
As mentioned above, although embodiment of the construction method of the large section tunnel by this invention was described, this invention is not limited to said embodiment, In the range which does not deviate from the meaning, it can change suitably.
For example, in this embodiment, the digging direction of the outer shell shield machine 6 is set to the front in the same direction as the digging direction of the main shield tunnel 1, but is not limited to this direction, and is behind the outer shell shield starting portion. You may make it start toward. That is, the outer shell shield tunnel 2 can be provided on the front side or the rear side of the outer shell shield starting portion. In short, any method may be used as long as the outer shell shield machine 6 starts using the side wall portion 41B of the outer shell shield starting base 4 as a starting pit.

また、円周シールド発進基地3、外殻シールド発進基地4の位置、大きさ等は、本線シールドトンネル1の外径などの条件に応じて適宜変更可能である。さらに、円周シールド機5の構成や、外殻シールド機の台数、外径などの構成についても本実施の形態に制限されることはなく、任意に決定することができる。   The positions, sizes, etc. of the circumferential shield start base 3 and the outer shield start base 4 can be changed as appropriate according to conditions such as the outer diameter of the main shield tunnel 1. Furthermore, the configuration of the circumferential shield machine 5, the number of outer shell shield machines, and the configuration of the outer diameter are not limited to the present embodiment, and can be arbitrarily determined.

また、本実施の形態では大断面の道路トンネルを施工する場合の適用例であるが、上記地中空洞部を有する様々な規模、用途、形態のトンネルを施工する場合全般に広く適用できるものであるし、施工対象のトンネルにおける地中空洞部の規模や形態に応じて、また周辺環境等の諸条件を考慮して様々な設計的変更が可能である。   In this embodiment, it is an application example when constructing a road tunnel with a large cross section, but it can be widely applied to constructing tunnels of various scales, uses, and forms having the above-mentioned underground cavity. In addition, various design changes can be made in accordance with the size and form of the underground cavity in the tunnel to be constructed and in consideration of various conditions such as the surrounding environment.

また、隣り合う外殻シールドトンネル2同士の間に一体に形成する凍結工法などによる地盤改良部の範囲、形態やその施工方法、その他の各工程の細部についても、本発明の要旨を逸脱しない範囲で最適設計すれば良く、必要に応じて適宜の補助工法を採用しても勿論良い。   Moreover, the range of the ground improvement part by the freezing method etc. which are integrally formed between adjacent outer shell shield tunnels 2, the form and the construction method, and other details of each process are within the scope not departing from the gist of the present invention. In this case, an optimum auxiliary method may be adopted as necessary.

さらに、本実施の形態の円周シールド機5は開放型としているが、矩形密閉型の円周シールド機と、それに対応した円周セグメントを用いることも可能である。   Furthermore, although the circumferential shield machine 5 of the present embodiment is an open type, it is also possible to use a rectangular sealed circumferential shield machine and a corresponding circumferential segment.

その他、本発明の趣旨を逸脱しない範囲で、上記した実施の形態における構成要素を周知の構成要素に置き換えることは適宜可能である。   In addition, it is possible to appropriately replace the components in the above-described embodiments with known components without departing from the spirit of the present invention.

1 本線シールドトンネル
1A 発進基地部
1a 外周面
2 外殻シールドトンネル
2A 第1直線部
2B 曲線部
2C 第2直線部
3 円周シールド発進基地(円周シールド発進部)
4 外殻シールド発進基地(外殻シールド発進部)
5 円周シールド機
6 外殻シールド機
10 地中空洞部
11 多分割セグメント
20 外殻体
41 円周セグメント
41B、41C 側壁部
51A、51B ガイドリング
X トンネル軸方向
1 main shield tunnel 1A start base 1a outer peripheral surface 2 outer shell shield tunnel 2A first straight part 2B curved part 2C second straight part 3 circumferential shield start base (circumferential shield start part)
4 Outer Shield Start Base (Outer Shield Start)
5 Circumferential shield machine 6 Outer shell shield machine 10 Underground cavity part 11 Multi-segment segment 20 Outer shell body 41 Circumferential segment 41B, 41C Side wall part 51A, 51B Guide ring X Tunnel axial direction

Claims (2)

地中を掘削して地中空洞部を施工するに際して、該地中空洞部の掘削予定位置の外側に、予め複数の外殻シールドトンネルを配列した状態で施工することにより、それら外殻シールドトンネルによって前記掘削予定位置を取り囲む外殻体を構築し、該外殻体の内側を掘削する大断面トンネルの施工方法であって、
本線シールドトンネルを施工する工程と、
前記本線シールドトンネルの周方向の一部分を切り広げた円周シールド発進部を施工する工程と、
前記円周シールド発進部から円周シールド機によって前記本線シールドトンネルの外周面に沿って周方向に掘削してリング状の外殻シールド発進部を施工する工程と、
前記外殻シールド発進部における前記本線シールドトンネルのトンネル軸方向に直交する平面を有する側壁部より外殻シールド機を発進させて、複数の外殻シールドトンネルを施工する工程と、
を有し、
前記外殻シールドトンネルは、前記外殻シールド発進部から前記本線シールドトンネルと平行に発進させると共に、掘進するに従って漸次、前記本線シールドトンネルから径方向の外側に離れる方向に向けて掘進することで施工されることを特徴とする大断面トンネルの施工方法。
When constructing underground cavities by excavating underground, the outer shield tunnels are constructed by arranging a plurality of outer shield tunnels outside the planned excavation position of the underground cavities. A construction method of a large-section tunnel that constructs an outer shell body that surrounds the planned excavation position and excavates the inside of the outer shell body,
The process of constructing the main line shield tunnel,
A process of constructing a circumferential shield starting portion obtained by cutting out a part of the circumferential direction of the main shield tunnel;
A step of constructing a ring-shaped outer shell shield starting portion by excavating in a circumferential direction along an outer peripheral surface of the main shield tunnel by a circumferential shield machine from the circumferential shield starting portion;
Starting a shell shield machine from a side wall portion having a plane perpendicular to the tunnel axis direction of the main shield tunnel in the shell shield starting portion, and constructing a plurality of shell shield tunnels;
Have
The outer shell shield tunnel starts from the outer shell shield starting portion in parallel with the main shield tunnel, and gradually digs in a direction away from the main shield tunnel in the radial direction as it digs. The construction method of the large section tunnel characterized by being done.
前記外殻シールド発進部において周方向に沿って複数の前記外殻シールド機が配置され、それら複数の外殻シールド機を同時に掘進させることを特徴とする請求項1に記載の大断面トンネルの施工方法。   The construction of a large section tunnel according to claim 1, wherein a plurality of said outer shield machines are arranged along a circumferential direction in said outer shield starting part, and these outer shell shield machines are dug simultaneously. Method.
JP2012187748A 2012-08-28 2012-08-28 Construction method of large section tunnel Active JP5958754B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012187748A JP5958754B2 (en) 2012-08-28 2012-08-28 Construction method of large section tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012187748A JP5958754B2 (en) 2012-08-28 2012-08-28 Construction method of large section tunnel

Publications (2)

Publication Number Publication Date
JP2014043738A true JP2014043738A (en) 2014-03-13
JP5958754B2 JP5958754B2 (en) 2016-08-02

Family

ID=50395199

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012187748A Active JP5958754B2 (en) 2012-08-28 2012-08-28 Construction method of large section tunnel

Country Status (1)

Country Link
JP (1) JP5958754B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5605522B1 (en) * 2014-06-24 2014-10-15 株式会社大林組 Construction method of large section tunnel
JP2016084681A (en) * 2014-10-29 2016-05-19 西松建設株式会社 Transport device and transport method
JP2016153601A (en) * 2014-11-05 2016-08-25 前田建設工業株式会社 Construction method for underground widened part
JP2017089379A (en) * 2017-01-31 2017-05-25 大成建設株式会社 Underground structure construction method and underground structure
JP2017089190A (en) * 2015-11-09 2017-05-25 大成建設株式会社 Underground structure construction method
JP2017150174A (en) * 2016-02-23 2017-08-31 清水建設株式会社 Freezing method
JP2017166189A (en) * 2016-03-15 2017-09-21 清水建設株式会社 Construction method of large cross-section underground space, and outer shell shield starting base
JP2017172117A (en) * 2016-03-18 2017-09-28 清水建設株式会社 Traffic line shield tunnel and construction method of large cross-section underground space
JP2017218878A (en) * 2016-06-11 2017-12-14 株式会社大林組 Starting area construction method of small-diameter shield
JP2018025008A (en) * 2016-08-09 2018-02-15 株式会社大林組 Large cross-sectional tunnel construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112065A (en) * 2004-10-13 2006-04-27 Taisei Corp Element pipe, bulkhead, and construction method for bulkhead
JP2007217910A (en) * 2006-02-15 2007-08-30 Shimizu Corp Underground cavity construction method and tunnel construction method
JP2010043440A (en) * 2008-08-11 2010-02-25 Ohbayashi Corp Method of increasing width of shield tunnel
JP2010084395A (en) * 2008-09-30 2010-04-15 Ihi Corp Excavating system for tunnel enlargement and method for excavating for tunnel enlargement
JP2011184898A (en) * 2010-03-05 2011-09-22 Shimizu Corp Shield roof construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006112065A (en) * 2004-10-13 2006-04-27 Taisei Corp Element pipe, bulkhead, and construction method for bulkhead
JP2007217910A (en) * 2006-02-15 2007-08-30 Shimizu Corp Underground cavity construction method and tunnel construction method
JP2010043440A (en) * 2008-08-11 2010-02-25 Ohbayashi Corp Method of increasing width of shield tunnel
JP2010084395A (en) * 2008-09-30 2010-04-15 Ihi Corp Excavating system for tunnel enlargement and method for excavating for tunnel enlargement
JP2011184898A (en) * 2010-03-05 2011-09-22 Shimizu Corp Shield roof construction method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016008425A (en) * 2014-06-24 2016-01-18 株式会社大林組 Construction method for large section tunnel
JP5605522B1 (en) * 2014-06-24 2014-10-15 株式会社大林組 Construction method of large section tunnel
JP2016084681A (en) * 2014-10-29 2016-05-19 西松建設株式会社 Transport device and transport method
JP2016153601A (en) * 2014-11-05 2016-08-25 前田建設工業株式会社 Construction method for underground widened part
JP2017089190A (en) * 2015-11-09 2017-05-25 大成建設株式会社 Underground structure construction method
JP2017150174A (en) * 2016-02-23 2017-08-31 清水建設株式会社 Freezing method
JP2017166189A (en) * 2016-03-15 2017-09-21 清水建設株式会社 Construction method of large cross-section underground space, and outer shell shield starting base
WO2017159605A1 (en) * 2016-03-15 2017-09-21 清水建設株式会社 Large cross-section underground space constructing method and outer shell shield starting base
TWI698575B (en) * 2016-03-15 2020-07-11 日商清水建設股份有限公司 Method of constructing very large underground space and outer shield tunnel
JP2017172117A (en) * 2016-03-18 2017-09-28 清水建設株式会社 Traffic line shield tunnel and construction method of large cross-section underground space
JP2017218878A (en) * 2016-06-11 2017-12-14 株式会社大林組 Starting area construction method of small-diameter shield
JP2018025008A (en) * 2016-08-09 2018-02-15 株式会社大林組 Large cross-sectional tunnel construction method
JP2017089379A (en) * 2017-01-31 2017-05-25 大成建設株式会社 Underground structure construction method and underground structure

Also Published As

Publication number Publication date
JP5958754B2 (en) 2016-08-02

Similar Documents

Publication Publication Date Title
JP5958754B2 (en) Construction method of large section tunnel
JP2007217910A (en) Underground cavity construction method and tunnel construction method
WO2017159605A1 (en) Large cross-section underground space constructing method and outer shell shield starting base
JP4566927B2 (en) Construction method of underground structure
JP6675637B2 (en) Freezing method
JP6108769B2 (en) Underground space construction method
JP2016017393A (en) Construction method for tunnel having large cross-section
JP4641283B2 (en) Construction method of underground structure
JP2016008426A (en) Construction method for large-cross-section tunnel
JP2004250957A (en) Construction method of large sectional tunnel
JP6268523B2 (en) Construction method of large section tunnel
JP4074210B2 (en) Shield tunnel and shield tunnel connection method
JP3740620B2 (en) Shield machine
JP2016020564A (en) Construction method of large cross-sectional tunnel
JP5158631B2 (en) Construction method of tunnel junction
JP6751260B2 (en) Construction method of large section tunnel
JP5274328B2 (en) Parent-child shield machine and tunnel construction method
JP2010077605A (en) Construction method for widening tunnel
JP2009235719A (en) Shield machine and tunnel construction method
JPH0868293A (en) Underground tunnel joint method and segment
JP2014025293A (en) Shield machine
JP6829825B2 (en) How to build a starting area for a small-diameter shield
JP6268521B2 (en) Widening part formation method of shield tunnel
JP2006322271A (en) Construction method for underground structure
JP2005048433A (en) Shielding machine and method of constructing reamed section of shield tunnel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20151009

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160608

R150 Certificate of patent or registration of utility model

Ref document number: 5958754

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150