JP2014029099A - Loader work machine - Google Patents

Loader work machine Download PDF

Info

Publication number
JP2014029099A
JP2014029099A JP2012172962A JP2012172962A JP2014029099A JP 2014029099 A JP2014029099 A JP 2014029099A JP 2012172962 A JP2012172962 A JP 2012172962A JP 2012172962 A JP2012172962 A JP 2012172962A JP 2014029099 A JP2014029099 A JP 2014029099A
Authority
JP
Japan
Prior art keywords
hose
boom
guide
working machine
work tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012172962A
Other languages
Japanese (ja)
Other versions
JP5843724B2 (en
Inventor
Ryoichi Nishi
良一 西
Naotoshi Miyata
尚稔 宮田
Koji Saito
甲侍 齋藤
Shuichi Takeshita
修一 竹下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2012172962A priority Critical patent/JP5843724B2/en
Publication of JP2014029099A publication Critical patent/JP2014029099A/en
Application granted granted Critical
Publication of JP5843724B2 publication Critical patent/JP5843724B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Shovels (AREA)
  • Component Parts Of Construction Machinery (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce the oscillation of hydraulic hoses along with the vertical movement of booms.SOLUTION: A loader work machine comprises: a pair of right and left side frames 2; booms B pivotally supported at their base parts on the upper parts of the pair of right and left side frames 2 via a horizontal shaft 30 and provided via boom cylinders 3 in a vertically movable manner; work tools 5 provided at the front ends of the right and left booms B via work tool cylinders 4 in a vertically turnable manner; and hose connectors 9 connected to control valves 6 which supplies pressure oil to the right and left boom cylinders 3 and the work tool cylinders 4, respectively. In one of the right and left booms B, pipes 7 are provided which are connected to the boom cylinder 3 and the work tool cylinder 4. The pipes 7 are connected to the hose connector 9 via a hydraulic hose 8. Near the horizontal shaft 30, a hose guide G is provided which has a main guide part G1 for route-guiding the middle of the hydraulic hose 8 and a retracting guide part G3 for placing and holding the hydraulic hose 8 at its connection side isolated from the hose connector 9.

Description

本発明は、フロントローダ、トラクタ・ローダ・バックホー(TLB)、ホイールローダ等のローダ作業機に関する。   The present invention relates to a loader working machine such as a front loader, a tractor / loader / backhoe (TLB), or a wheel loader.

フロントローダ等のローダ作業機は、特許文献1に開示されているように、左右一対のサイドフレームと、この左右各サイドフレームにブームシリンダを介して昇降自在に設けたブームと、左右ブームの先端に作業具シリンダを介して上下回動自在に設けた作業具と、前記左右ブームシリンダ及び作業具シリンダに圧油を供給する制御バルブ及びこの制御バルブに接続されたホース接続具とを備え、この配管とホース接続具とを油圧ホースで接続している。   As disclosed in Patent Document 1, a loader working machine such as a front loader includes a pair of left and right side frames, a boom provided to the left and right side frames via a boom cylinder, and a tip of the left and right booms. And a control valve for supplying pressure oil to the left and right boom cylinders and the work tool cylinder, and a hose connector connected to the control valve. The piping and the hose connector are connected by a hydraulic hose.

前記ホース接続具を一方のブームを支持するサイドフレームの左右内面側に配置し、前記配管をブームの左右内面に固定し、前記油圧ホースを制御バルブから下向き湾曲状に弛ませて配管に接続している。   The hose connector is arranged on the left and right inner surfaces of the side frame that supports one boom, the piping is fixed to the left and right inner surfaces of the boom, and the hydraulic hose is bent downwardly from the control valve and connected to the piping. ing.

特開2001−140276号公報JP 2001-140276 A

前記油圧ホースはホース接続具から配管まで下向き湾曲状に弛ませているので、油圧ホースは前方視界の妨げになることはないが、ブームの昇降に伴って上下又は左右に大きく揺動することがある。また、油圧ホースはホース接続具から離脱したときに、油圧ホースの基端側が垂れ、油垂れが生じることがある。
本発明は、このような従来技術の問題点を解決できるようにしたローダ作業機を提供することを目的とする。
Since the hydraulic hose is slacked downward from the hose connector to the pipe, the hydraulic hose does not hinder the front view, but it can swing greatly up and down or left and right as the boom moves up and down. is there. Further, when the hydraulic hose is detached from the hose connector, the base end side of the hydraulic hose may sag and oil dripping may occur.
It is an object of the present invention to provide a loader working machine that can solve such problems of the prior art.

本発明は、油圧ホースの中途部をルート案内するとともに、ホース接続具から離脱したときに、油圧ホースの基端側を載置保持しておけるようにしたローダ作業機を提供することを目的とする。   It is an object of the present invention to provide a loader working machine that guides the route of the middle part of a hydraulic hose and that can keep the base end side of the hydraulic hose placed and held when the hydraulic hose is detached from the hose connector. To do.

本発明における課題解決のための具体的手段は、次の通りである。
第1に、左右一対のサイドフレーム2と、この左右各サイドフレーム2の上部に横軸30を介して基部が枢支されかつブームシリンダ3を介して昇降自在に設けたブームBと、左右ブームBの先端に作業具シリンダ4を介して上下回動自在に設けた作業具5と、前記左右ブームシリンダ3及び作業具シリンダ4に圧油を供給する制御バルブ6に接続されたホース接続具9とを備え、左右一方のブームBにブームシリンダ3及び作業具シリンダ4と接続される配管7を設け、この配管7とホース接続具9とを油圧ホース8で接続したローダ作業機であって、
前記横軸30の近傍に、油圧ホース8の中途部をルート案内する主案内部G1と、ホース接続具9から離脱した油圧ホース8の接続側を載置保持する退避案内部G3とを有するホースガイドGを設けていることを特徴とする。
Specific means for solving the problems in the present invention are as follows.
First, a pair of left and right side frames 2, a boom B in which a base is pivotally supported on the upper part of each of the left and right side frames 2 via a horizontal shaft 30 and can be raised and lowered via a boom cylinder 3, and left and right booms A work tool 5 provided at the tip of B via a work tool cylinder 4 so as to be rotatable up and down, and a hose connector 9 connected to the left and right boom cylinders 3 and a control valve 6 for supplying pressure oil to the work tool cylinder 4. A loader working machine in which a pipe 7 connected to the boom cylinder 3 and the work tool cylinder 4 is provided on the left and right boom B, and the pipe 7 and the hose connector 9 are connected by a hydraulic hose 8,
A hose having a main guide part G1 for guiding the route of the middle part of the hydraulic hose 8 and a retracting guide part G3 for placing and holding the connection side of the hydraulic hose 8 separated from the hose connector 9 in the vicinity of the horizontal shaft 30. A guide G is provided.

第2に、前記ホースガイドGは、主案内部G1と退避案内部G3とを一体的に形成していることを特徴とする。
第3に、前記ホースガイドGは、主案内部G1の上方に退避案内部G3を有し、主案内部G1の前側に油圧ホース8の配管7との接続側をルート案内する副案内部G2を有することを特徴とする。
Secondly, the hose guide G is characterized in that a main guide part G1 and a retraction guide part G3 are integrally formed.
Thirdly, the hose guide G has a retraction guide part G3 above the main guide part G1, and a sub-guide part G2 that provides route guidance on the connection side of the hydraulic hose 8 with the pipe 7 on the front side of the main guide part G1. It is characterized by having.

第4に、前記油圧ホース8は、ホース接続具9との接続端から上向き弛みTを形成した後に主案内部G1に上側から下側へ挿通し、主案内部G1の下側で湾曲部Wを形成した後に副案内部G2に下側から上側へ挿通して配管7に至っていることを特徴とする。
第5に、前記ホース接続具9を一方のブームBを支持するサイドフレーム2の側面に配置し、前記ホースガイドGを、一方のブームBの側面に固定される取付材11と、この取付材11に連結されかつブームBの側面からホース接続具9の前方へ張り出した棒材12とで形成していることを特徴とする。
Fourth, the hydraulic hose 8 is inserted into the main guide portion G1 from the upper side to the lower side after forming an upward slack T from the connection end with the hose connector 9, and the curved portion W is below the main guide portion G1. After being formed, the auxiliary guide part G2 is inserted from the lower side to the upper side to reach the pipe 7.
Fifth, the hose connector 9 is arranged on the side surface of the side frame 2 that supports one boom B, and the hose guide G is fixed to the side surface of the one boom B, and the mounting material. 11 and a bar 12 projecting from the side of the boom B to the front of the hose connector 9.

第6に、前記ホースガイドGは、一方のブームBに固定の取付材11にループ状の棒材12の両端を連結しており、前記棒材12は取付材11から側方へ突出して退避案内部G3を形成し、この退避案内部G3の端部から下向きに突出して下部でブームBから離れる方向に膨出した主案内部G1を形成し、この主案内部G1の前部から前方へ突出して副案内部G2を形成し、副案内部G2から上方へ延びかつブームBに向かって屈曲して取付材11に至っていることを特徴とする。   Sixth, the hose guide G connects both ends of a loop-shaped bar 12 to a mounting member 11 fixed to one boom B, and the bar 12 protrudes from the mounting member 11 to the side and retracts. A guide part G3 is formed, a main guide part G1 protruding downward from the end of the retraction guide part G3 and bulging in a direction away from the boom B at the lower part is formed, and forward from the front part of the main guide part G1 It protrudes to form a sub-guide part G2, extends upward from the sub-guide part G2, and bends toward the boom B to reach the attachment material 11.

第7に、前記ホースガイドGの退避案内部G3は、ホース接続具9の上方でかつ主案内部G1の前下方に位置していることを特徴とする。
第8に、前記ホースガイドGを1本の棒材12で形成し、この棒材12の後端を一方のサイドフレーム2の側面上部に固定し、この後端から前方へかつサイドフレーム2から離れる方向へ膨出した主案内部G1を形成し、この主案内部G1の前部から正面視略L字形状の退避案内部G3を下方突出していることを特徴とする。
Seventh, the retraction guide part G3 of the hose guide G is located above the hose connector 9 and in front of and below the main guide part G1.
Eighth, the hose guide G is formed by a single bar 12, and the rear end of the bar 12 is fixed to the upper side of one side frame 2, forward from the rear end and from the side frame 2. A main guide portion G1 bulging in a direction away from the main guide portion G1 is formed, and a retracting guide portion G3 having a substantially L shape in front view projects downward from the front portion of the main guide portion G1.

本発明によれば、油圧ホースの中途部をルート案内するとともに、ホース接続具から離脱したときに、油圧ホースの基端側を載置保持しておくことができる。
即ち、請求項1に係る発明は、横軸30の近傍に、油圧ホース8の中途部をルート案内する主案内部G1と、ホース接続具9から離脱した油圧ホース8の接続側を載置保持する退避案内部G3とを形成したホースガイドGを設けているので、油圧ホース8の中途部を湾曲してルート案内することができ、ブームBの昇降に伴う油圧ホース8の揺動を減少することができ、かつ油圧ホース8をホース接続具9から離脱したときに、油圧ホース8の基端側を退避案内部G3に退避収納しておくことができ、油圧ホースの垂れ下がり及び油垂れが防止できる。
According to the present invention, it is possible to route the middle part of the hydraulic hose and to place and hold the proximal end side of the hydraulic hose when the hydraulic hose is detached from the hose connector.
That is, in the invention according to claim 1, in the vicinity of the horizontal shaft 30, the main guide portion G1 for route guiding the middle portion of the hydraulic hose 8 and the connection side of the hydraulic hose 8 separated from the hose connector 9 are placed and held. Since the hose guide G formed with the retraction guide part G3 to be provided is provided, the middle part of the hydraulic hose 8 can be curved to guide the route, and the swinging of the hydraulic hose 8 accompanying the raising and lowering of the boom B is reduced. When the hydraulic hose 8 is detached from the hose connector 9, the proximal end side of the hydraulic hose 8 can be retracted and stored in the retraction guide part G3, and the hydraulic hose can be prevented from drooping and dripping. it can.

請求項2に係る発明は、ホースガイドGは、主案内部G1と退避案内部G3とを一体的に形成しているので、安価に製作できる。
請求項3に係る発明は、ホースガイドGは、主案内部G1の上方に退避案内部G3を有し、主案内部G1の前側に油圧ホース8の配管7との接続側をルート案内する副案内部G2を有するので、油圧ホース8の中途部をルート案内するだけでなく、油圧ホース8の配管接続側もルート案内することができ、ブームBの昇降に伴って油圧ホース8の上下動を適正かつ容易に追従させることができる。
In the invention according to claim 2, since the hose guide G integrally forms the main guide portion G1 and the retraction guide portion G3, it can be manufactured at low cost.
In the invention according to claim 3, the hose guide G has a retraction guide part G3 above the main guide part G1, and a sub-guide for route guidance of the connection side with the pipe 7 of the hydraulic hose 8 on the front side of the main guide part G1. Since the guide part G2 is provided, not only the route of the middle part of the hydraulic hose 8 can be routed, but also the pipe connection side of the hydraulic hose 8 can be routed and the hydraulic hose 8 can be moved up and down as the boom B moves up and down. It can be followed appropriately and easily.

請求項4に係る発明は、油圧ホース8は、ホース接続具9との接続端から上向き弛みTを形成した後に主案内部G1に上側から下側へ挿通し、主案内部G1の下側で湾曲部Wを形成した後に副案内部G2に下側から上側へ挿通して配管7に至っているので、ホース接続具9の前方の最適な位置で油圧ホース8を案内することができる。
請求項5に係る発明は、ホース接続具9を一方のブームBを支持するサイドフレーム2の側面に配置し、前記ホースガイドGを、一方のブームBの側面に固定される取付材11と、この取付材11に連結されかつブームBの側面からホース接続具9の前方へ張り出した棒材12とで形成しているので、取り付け容易でかつ安価に製作できる。
In the invention according to claim 4, the hydraulic hose 8 is inserted into the main guide portion G1 from the upper side to the lower side after forming an upward slack T from the connection end with the hose connector 9, and below the main guide portion G1. After forming the curved portion W, the hydraulic hose 8 can be guided at an optimal position in front of the hose connector 9 because the sub guide portion G2 is inserted from the lower side to the upper side to reach the pipe 7.
The invention which concerns on Claim 5 arrange | positions the hose connector 9 in the side surface of the side frame 2 which supports one boom B, The attachment material 11 fixed to the side surface of one boom B, and the hose guide G, Since it is formed with the bar 12 connected to the mounting member 11 and projecting from the side surface of the boom B to the front of the hose connector 9, it can be easily mounted and manufactured at low cost.

請求項6に係る発明は、ホースガイドGは、一方のブームBに固定の取付材11にループ状の棒材12の両端を連結しており、前記棒材12は取付材11から側方へ突出して退避案内部G3を形成し、この退避案内部G3の端部から下向きに突出して下部でブームBから離れる方向に膨出した主案内部G1を形成し、この主案内部G1の前部から前方へ突出して副案内部G2を形成し、副案内部G2から上方へ延びかつブームBに向かって屈曲して取付材11に至っているので、安価に製作でき、かつ油圧ホース8を左右方向及び前後方向にルート案内することができる。   In the invention according to claim 6, the hose guide G has both ends of the loop-shaped bar 12 connected to the mounting material 11 fixed to one boom B, and the bar 12 is laterally moved from the mounting material 11. A retraction guide part G3 is projected to form a main guide part G1 projecting downward from the end of the retraction guide part G3 and bulging in a direction away from the boom B at the lower part, and the front part of the main guide part G1 Projecting forward to form a sub-guide portion G2, extending upward from the sub-guide portion G2 and bent toward the boom B to reach the mounting material 11, so that it can be manufactured at low cost and the hydraulic hose 8 can be And route guidance in the front-rear direction.

請求項7に係る発明は、ホースガイドGの退避案内部G3は、ホース接続具9の上方でかつ主案内部G1の前下方に位置しているので、ホース接続具9の上方の最適な位置で油圧ホース8をルート案内することができる。
請求項8に係る発明は、ホースガイドGを1本の棒材12で形成し、この棒材12の後端を一方のサイドフレーム2の側面上部に固定し、この後端から前方へかつサイドフレーム2から離れる方向へ膨出した主案内部G1を形成し、この主案内部G1の前部から正面視略L字形状の退避案内部G3を下方突出しているので、安価に製作でき、かつ油圧ホース8を横軸30の外側方を通してルート案内することができる。
In the invention according to claim 7, since the retraction guide part G3 of the hose guide G is located above the hose connector 9 and in front of and below the main guide part G1, the optimum position above the hose connector 9 The route of the hydraulic hose 8 can be routed.
In the invention according to claim 8, the hose guide G is formed by one bar 12, the rear end of the bar 12 is fixed to the upper part of the side surface of one side frame 2, the front end from the rear end and the side The main guide part G1 bulging in a direction away from the frame 2 is formed, and the retracting guide part G3 having a substantially L-shape in front view projects downward from the front part of the main guide part G1, so that it can be manufactured at low cost, and It is possible to route the hydraulic hose 8 through the outside of the horizontal shaft 30.

本発明の第1実施形態を示す使用状態の要部の斜視図である。It is a perspective view of the principal part of the use condition which shows 1st Embodiment of this invention. 油圧ホースを退避収納した側面図である。It is the side view which retracted and stored the hydraulic hose. 油圧ホースを退避収納した斜視図である。It is the perspective view which retracted and stored the hydraulic hose. 油圧ホースを退避収納した平面図である。It is the top view which retracted and stored the hydraulic hose. 油圧ホースを退避収納した要部の斜視図である。It is a perspective view of the principal part which retracted and stored the hydraulic hose. ホースガイドを前上方から見た斜視図である。It is the perspective view which looked at the hose guide from the front upper direction. ホースガイドを後側方から見た斜視図である。It is the perspective view which looked at the hose guide from the back side. ホースガイドの正面図である。It is a front view of a hose guide. ホースガイドの平面図である。It is a top view of a hose guide. ローダ作業機の全体側面図である。It is a whole side view of a loader work machine. 本発明の第2実施形態を示すローダ作業機の要部の斜視図である。It is a perspective view of the principal part of the loader work machine which shows 2nd Embodiment of this invention. 同ローダ作業機の全体側面図である。It is a whole side view of the loader work machine. 同ホースガイドの斜視図である。It is a perspective view of the hose guide. 作業具装着装置を示す背面図である。It is a rear view which shows a working tool mounting apparatus. 作業具装着装置の断面側面図である。FIG.

以下、本発明の実施の形態を図面に基づいて説明する。
図10において、ローダ作業機1Aは走行車体20に装着されたフロントローダで例示している。走行車体20としてのトラクタはエンジン21の後部にミッションケース22を連結し、エンジン21から前方へ前フレーム23を突出し、この前フレーム23に前輪24を懸架し、エンジン21を覆うボンネット25を装着しており、エンジン21及びミッションケース22の左右側部にフロントローダ装着用の装着フレーム27を取り付けている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
In FIG. 10, the loader working machine 1 </ b> A is illustrated as a front loader attached to the traveling vehicle body 20. A tractor as a traveling vehicle body 20 has a transmission case 22 connected to the rear portion of the engine 21, a front frame 23 protrudes forward from the engine 21, a front wheel 24 is suspended on the front frame 23, and a bonnet 25 covering the engine 21 is mounted. A mounting frame 27 for mounting a front loader is attached to the left and right sides of the engine 21 and the transmission case 22.

前記装着フレーム27は走行車体20の左右側面にボルト固定された装着板27Aから左右外方へ円筒状の装着筒27Bを固着し、この装着筒27Bの外端部から受持板27Cを立設し、この受持板27Cに受け凹部28aと装着ピン孔28bとを設けている。
フロントローダ1は、左右サイドフレーム2と、この左右各サイドフレーム2の上部に横軸30を介して基部が枢支されたブームBと、左右ブームBの先端に枢軸31を介して枢支された作業具装着体40と、この作業具装着体40に装着された作業具(バケット)5と、左右各ブームBの前後中途部とサイドフレーム2の下部との間に連結されたブームシリンダ3と、左右各ブームBの前後中途部と作業具装着体40との間に設けられた作業具上下回動用の作業具シリンダ(バケットシリンダ)4とを有している。
The mounting frame 27 has a cylindrical mounting cylinder 27B fixed to the left and right outwards from a mounting plate 27A bolted to the left and right side surfaces of the traveling vehicle body 20, and a support plate 27C is erected from the outer end of the mounting cylinder 27B. The receiving plate 27C is provided with a receiving recess 28a and a mounting pin hole 28b.
The front loader 1 is pivotally supported by a left and right side frame 2, a boom B whose base is pivotally supported on the left and right side frames 2 via a horizontal shaft 30, and a pivot 31 on a distal end of the left and right boom B. The working tool mounting body 40, the working tool (bucket) 5 mounted on the working tool mounting body 40, and the boom cylinder 3 connected between the front and rear halfway parts of the left and right booms B and the lower part of the side frame 2. And a work tool cylinder (bucket cylinder) 4 for rotating the work tool up and down provided between the front and rear halfway parts of the left and right booms B and the work tool mounting body 40.

前記左右各サイドフレーム2は、下端に設けたピン状係合部32が受持板27Cの上下中途部に設けた受け凹部28aに係合され、上下中途部に設けた連結ピン孔と受持板27Cの上部に設けた装着ピン孔28bとに装着ピン33を挿入することにより、装着フレーム27に着脱自在に装着される。
図1〜10に示す第1実施形態のローダ作業機1Aにおいて、前記ブームBは側面視くの字形状であって左右一対を中間連結部材35で連結され、この左右ブームBの先端に枢軸31を介して作業具装着体40の下部が枢支され、作業具装着体40の中途部が作業具シリンダ4のシリンダロッド先端と支軸34を介して連結されている。
Each of the left and right side frames 2 has a pin-like engaging portion 32 provided at the lower end engaged with a receiving recess 28a provided in the upper and lower middle portion of the receiving plate 27C, and a receiving pin hole and a receiving pin hole provided in the upper and lower middle portion. By inserting the mounting pin 33 into the mounting pin hole 28b provided in the upper part of the plate 27C, the mounting frame 27 is detachably mounted.
In the loader working machine 1A according to the first embodiment shown in FIGS. 1 to 10, the boom B is shaped like a side view, and a pair of left and right is connected by an intermediate connecting member 35. The lower part of the work tool mounting body 40 is pivotally supported via the, and the middle part of the work tool mounting body 40 is connected to the tip of the cylinder rod of the work tool cylinder 4 via the support shaft 34.

前記作業具装着体40に作業具5が着脱自在に装着されており、これらによって作業具装着装置Sが構成されている。
左右各作業具シリンダ4は左右各ブームBの前上側に対向して配置されており、伸縮動作によって作業具装着体40を枢軸31廻りに回動して作業具5を上下回動することができ、収縮することにより作業具5を掬い動作をさせ、伸張することにより作業具5をダンプ動作させる。
The work tool 5 is detachably mounted on the work tool mounting body 40, and the work tool mounting apparatus S is configured by these.
Each of the left and right work tool cylinders 4 is disposed opposite to the front upper side of each of the left and right booms B, and the work tool mounting body 40 can be rotated around the pivot 31 by the expansion and contraction operation to rotate the work tool 5 up and down. The work tool 5 can be scooped by contracting, and the work tool 5 can be dumped by stretching.

図1〜5、10において、前記左右ブームBの一方(実施形態では右ブームB)の内部には4本の金属製パイプで形成された配管7が配置されている。この配管7は、左右ブームシリンダ3用の2本と、左右作業具シリンダ4用の2本とであり、右ブームB内から分岐した配管7が中間連結部材35に沿って配置されており、各配管7の先端は油圧ホースを介して各シリンダに接続されている。   1 to 5 and 10, a pipe 7 formed of four metal pipes is arranged inside one of the left and right booms B (right boom B in the embodiment). The pipes 7 are two for the left and right boom cylinders 3 and two for the left and right work tool cylinders 4, and the pipes 7 branched from the right boom B are arranged along the intermediate connecting member 35. The tip of each pipe 7 is connected to each cylinder via a hydraulic hose.

4本の金属製配管7の基端側は、右ブームBの基部の下面から突出され、4本の端部がブームBに沿って前後に配列されており、左右ブームシリンダ3及び作業具シリンダ4に圧油を供給する制御バルブ6及びこの制御バルブ6に接続されたホース接続具9と油圧ホース8で接続されている。
ホース接続具9は制御バルブ6に一体的に取り付けられ、制御バルブ6及びホース接続具9は受持板27Cの背面から上方へかつ走行車体20に近づく方向に突出したステー36に取り付けられており、油圧ホース8との接続部分は右サイドフレーム2の内側面(走行車体20に対面する左側面)に位置し、右サイドフレーム2と前後方向でオーバラップしており、バルブ切換操作用の操作レバー6Aは右サイドフレーム2より後方で上方に突出され、走行車体20上から操作可能になっている。
The base end side of the four metal pipes 7 protrudes from the lower surface of the base portion of the right boom B, and the four end portions are arranged back and forth along the boom B. The left and right boom cylinders 3 and the work implement cylinder A hydraulic control hose 8 is connected to a control valve 6 that supplies pressure oil to 4 and a hose connector 9 that is connected to the control valve 6.
The hose connector 9 is integrally attached to the control valve 6, and the control valve 6 and the hose connector 9 are attached to a stay 36 protruding upward from the back surface of the support plate 27 </ b> C and approaching the traveling vehicle body 20. The connecting portion with the hydraulic hose 8 is located on the inner side surface of the right side frame 2 (the left side surface facing the traveling vehicle body 20) and overlaps with the right side frame 2 in the front-rear direction. The lever 6A protrudes upward behind the right side frame 2 and can be operated from the traveling vehicle body 20.

フロントローダ1を装着フレーム27から離脱するとき、制御バルブ6及びホース接続具9は装着フレーム27側に残り、油圧ホース8はフロントローダ1側に預けられる。
図1〜9において、前記一方(右側)のブームBの基部の内側面には、横軸30の近傍に、油圧ホース8をルート案内するホースガイドGが設けられている。
ホースガイドGは帯板製の取付材11と、この取付材11の背面の長手方向両端にその両端が連結された棒材12とで形成されており、取付材11がブームBの内側面にボルト等の固定具を介して固定されている。
When the front loader 1 is detached from the mounting frame 27, the control valve 6 and the hose connector 9 remain on the mounting frame 27 side, and the hydraulic hose 8 is left on the front loader 1 side.
1 to 9, a hose guide G for route guiding the hydraulic hose 8 is provided in the vicinity of the horizontal shaft 30 on the inner side surface of the base portion of the boom B on the one side (right side).
The hose guide G is formed by an attachment material 11 made of a strip and a rod 12 having both ends connected to both longitudinal ends of the back surface of the attachment material 11, and the attachment material 11 is formed on the inner surface of the boom B. It is fixed via a fixture such as a bolt.

棒材12は1本の棒の両端を取付材11に固定することによりループ形状になっていて、ブームBの内側面からホース接続具9の前方へ張り出している。
この棒材12は左右、上下、前後に屈曲して、油圧ホース8のホース接続具9との接続側をルート案内する主案内部G1と、油圧ホース8の配管7との接続側をルート案内する副案内部G2と、主案内部G1より上方にホース接続具9から離脱した油圧ホース8の基端側を載置保持する退避案内部G3とが形成されている。
The bar 12 has a loop shape by fixing both ends of one bar to the mounting member 11 and projects from the inner surface of the boom B to the front of the hose connector 9.
This bar 12 is bent left and right, up and down, and back and forth, and the main guide portion G1 that guides the route of the connection side of the hydraulic hose 8 to the hose connector 9 and the route side of the connection side of the piping 7 of the hydraulic hose 8 are route-guided. And a retraction guide portion G3 for placing and holding the proximal end side of the hydraulic hose 8 separated from the hose connector 9 above the main guide portion G1.

即ち、棒材12は図6〜9に示すように、取付材11に固定された後端から横に延びて水平部12aとなり、この水平部12aの端部から上方に延びて立ち上がり部12bとなり、前記水平部12aと立ち上がり部12bとで退避案内部G3を形成しており、離脱した油圧ホース8の基端側を水平部12aに載置し、立ち上がり部12bとブームBとで挟むことによって水平部12aからズレ落ちないように保持する。   That is, as shown in FIGS. 6 to 9, the bar 12 extends horizontally from the rear end fixed to the mounting member 11 to become a horizontal portion 12a, and extends upward from the end of the horizontal portion 12a to become a rising portion 12b. The horizontal portion 12a and the rising portion 12b form a retraction guide portion G3, and the base end side of the detached hydraulic hose 8 is placed on the horizontal portion 12a and sandwiched between the rising portion 12b and the boom B. It is held so as not to be displaced from the horizontal portion 12a.

前記立ち上がり部12bの上端から下外横向きに傾斜した後に下内横向きに傾斜して横向き山形状の前区画部12cとなり、この前区画部12cの下端から外横向きに延びかつ下向きに屈曲して後区画部12dとなり、この後区画部12dの下端から外横向きにかつ前側へ膨出して平面視略C字状の円弧部12eとなり、前記前区画部12cと後区画部12dと円弧部12eとで主案内部G1を形成しており、油圧ホース8のホース接続具9との接続側が、ブームBの昇降時に前後に移動するのを前区画部12cと後区画部12dとで規制し、ブームBから離れる方向に移動するのを円弧部12eで規制し、油圧ホース8のホース接続具9との接続側が前後及び左方に移動しないように規制してルート案内をする。   After tilting downward from the upper end of the rising portion 12b to the lower inner side, the lower inner side is inclined to form a front mountain-shaped front partitioning portion 12c, extending from the lower end of the front partitioning portion 12c to the outer side and bent downward. It becomes a partition portion 12d, and bulges outward and laterally from the lower end of the rear partition portion 12d to form a substantially C-shaped arc portion 12e in plan view. The front partition portion 12c, the rear partition portion 12d, and the arc portion 12e The front guide part 12c and the rear partition part 12d restrict the movement of the connection side of the hydraulic hose 8 to the hose connector 9 forward and backward when the boom B is raised and lowered. The movement away from the direction is restricted by the arc portion 12e, and the route guide is performed by restricting the connection side of the hydraulic hose 8 to the hose connector 9 from moving back and forth and to the left.

前記円弧部12eの前端から前方向に直線状に延出して左右仕切部12fとなり、この左右仕切部12fの前端から上方へ延びかつ屈曲してブームBに向かって取付材11の前部に固定されて連結部12gとなり、前記円弧部12eの前部と左右仕切部12fと連結部12gとによって副案内部G2を形成しており、油圧ホース8の配管7との接続側が、ブームBの昇降時に後方に移動して油圧ホース8のホース接続具9との接続側に近づくのを、また上方へ移動するのを円弧部12eの前部で規制し、ブームBに近づく方向に移動するのを左右仕切部12fで規制し、油圧ホース8の配管7との接続側が後方及び右方に移動しないように規制してルート案内をする。   From the front end of the arc portion 12e, it extends linearly in the forward direction to form a left and right partition portion 12f. The left and right partition portions 12f extend upward from the front end and bend and are fixed to the front portion of the mounting material 11 toward the boom B. Thus, the connecting portion 12g is formed, and the front portion of the arc portion 12e, the left and right partitioning portions 12f, and the connecting portion 12g form a sub-guide portion G2, and the connection side of the hydraulic hose 8 to the pipe 7 is the lifting and lowering of the boom B. Occasionally it moves backward and approaches the connection side of the hydraulic hose 8 to the hose connector 9, and the upward movement is restricted at the front part of the arc part 12 e and moved in the direction approaching the boom B. The route guidance is performed by restricting the left and right partition portions 12f so that the connection side of the hydraulic hose 8 with the pipe 7 does not move rearward and rightward.

使用時の油圧ホース8は、図1に実線で、図2に2点鎖線で示すように、ホース接続具9に接続された基端部から、前上方に延びて横軸30の側方でU字状の上向き弛みTを形成し、弛みTの形成後に主案内部G1に上側から下側へ挿通し、主案内部G1の下方でU字状の湾曲部Wを形成してから副案内部G2を下側から上側に抜けており、左右方向の移動規制は円弧部12e及び左右仕切部12fによって行われ、前後方向の移動規制は円弧部12e及び後区画部12dによって行われ、ブームBの昇降によって油圧ホース8の配管7との接続側が上下動するとき、基端部のU字状の弛みTが伸縮変形してブームBの動きに追従し、前区画部12cが弛みTの前方膨出を規制する。   In use, the hydraulic hose 8 extends from the base end connected to the hose connector 9 to the front and upper side as shown by a solid line in FIG. 1 and a two-dot chain line in FIG. A U-shaped upward slack T is formed, and after the slack T is formed, the main guide portion G1 is inserted from the upper side to the lower side, and the U-shaped curved portion W is formed below the main guide portion G1, and then the auxiliary guide is formed. The part G2 passes through from the lower side to the upper side, the movement restriction in the left and right direction is performed by the arc part 12e and the left and right partition part 12f, and the movement restriction in the front and rear direction is performed by the arc part 12e and the rear partition part 12d. When the connecting side of the hydraulic hose 8 to the pipe 7 moves up and down due to the up and down movement, the U-shaped slack T of the base end part expands and contracts to follow the movement of the boom B, and the front partition part 12 c is in front of the slack T. Regulate bulging.

ホースガイドGの主案内部G1及び副案内部G2はホース接続具9の前方に位置し、油圧ホース8を左右方向にできるだけ曲げないで案内できるようにしており、退避案内部G3は油圧ホース8の基端の接続具をブームBの側面にできるだけ近づけて保持できるようにしている。
なお、前記ローダ作業機1Aは、制御バルブ6及びホース接続具9を右サイドフレーム2の外側面側に配置し、ホースガイドGを右ブームBの外側面又はサイドフレーム2の外側面で横軸30の近傍に設けてもよい。
The main guide portion G1 and the sub-guide portion G2 of the hose guide G are positioned in front of the hose connector 9, so that the hydraulic hose 8 can be guided as much as possible in the left-right direction, and the retraction guide portion G3 is provided with the hydraulic hose 8 The base end connector can be held as close to the side surface of the boom B as possible.
In the loader work machine 1A, the control valve 6 and the hose connector 9 are arranged on the outer surface side of the right side frame 2, and the hose guide G is placed on the outer surface of the right boom B or the outer surface of the side frame 2 on the horizontal axis. You may provide in the vicinity of 30.

また、前記ホースガイドGは、棒材12の立ち上がり部12bの上端から下方へ鉛直部を形成し、その鉛直部の下端に左右仕切部12fの後端を後方へ延長して接続し、この左右仕切部12fの後方延長部分に平面視C形状の別部材を固着して、この円く囲まれた部分で主案内部G1を形成するようにしてもよい。
図11〜13はローダ作業機の第2実施形態を示している。
Further, the hose guide G forms a vertical portion downward from the upper end of the rising portion 12b of the bar 12, and connects the rear end of the left and right partitioning portions 12f to the lower end of the vertical portion by extending backward. Another member having a C shape in a plan view may be fixed to the rearward extension portion of the partition portion 12f, and the main guide portion G1 may be formed by the circled portion.
FIGS. 11-13 has shown 2nd Embodiment of the loader work machine.

ローダ作業機1Bは、制御バルブ6とホース接続具9とが別体に構成され、制御バルブ6は走行車体20に設けられ、ホース接続具9は装着フレーム27の受持板27Cの側面から外側方へ突出したステー36に取り付けられており、制御バルブ6とホース接続具9とはホース9Aによって接続されている。
前記左右ブームBの一方(実施形態では右ブームB)の外側部には4本の金属製パイプで形成された配管7が配置されている。この配管7は、左右ブームシリンダ3用の2本と、左右作業具シリンダ4用の2本とであり、作業具装着体40のロック・解除を油圧駆動するロックシリンダ用、又は、バケットの代わりに装着されるサムを駆動するためのシリンダ用、もしくはその他の作業具を駆動するためのサービスポート用の配管が設けられることもある。
In the loader work machine 1B, the control valve 6 and the hose connector 9 are configured separately, and the control valve 6 is provided in the traveling vehicle body 20, and the hose connector 9 is located outside the side surface of the support plate 27C of the mounting frame 27. The control valve 6 and the hose connector 9 are connected to each other by a hose 9A.
A pipe 7 formed of four metal pipes is disposed on the outer side of one of the left and right booms B (the right boom B in the embodiment). The pipes 7 are two for the left and right boom cylinders 3 and two for the left and right work tool cylinders 4, and are used for lock cylinders that hydraulically drive the lock / release of the work tool mounting body 40, or instead of buckets. Piping for a cylinder for driving a thumb mounted on the machine or a service port for driving other working tools may be provided.

4本の配管7は右ブームB内から分岐して中間連結部材35に沿って配置されており、各配管7の先端は油圧ホースを介して各シリンダに接続されている。
金属製配管7の基端側は、右ブームBの基部の下面から外側方へ突出され、4本の端部がブームBに沿って前後に配列されており、左右ブームシリンダ3及び作業具シリンダ4に圧油を供給する制御バルブ6に接続されたホース接続具9と油圧ホース8で接続されている。
The four pipes 7 are branched from the right boom B and disposed along the intermediate connecting member 35, and the ends of the pipes 7 are connected to the cylinders via hydraulic hoses.
The base end side of the metal pipe 7 protrudes outward from the lower surface of the base portion of the right boom B, and four end portions are arranged back and forth along the boom B. The left and right boom cylinders 3 and the work implement cylinder A hydraulic hose 8 is connected to a hose connector 9 connected to a control valve 6 that supplies pressure oil to 4.

ホース接続具9と油圧ホース8との接続部分は、右サイドフレーム2の外側面(走行車体20に対面する側と反対の右側面)に位置し、右サイドフレーム2と前後方向でオーバラップしている。
フロントローダ1を装着フレーム27から離脱するとき、ホース接続具9は装着フレーム27側に残り、油圧ホース8はフロントローダ1側に預けられる。
The connecting portion between the hose connector 9 and the hydraulic hose 8 is located on the outer side surface of the right side frame 2 (the right side surface opposite to the side facing the traveling vehicle body 20) and overlaps the right side frame 2 in the front-rear direction. ing.
When the front loader 1 is detached from the mounting frame 27, the hose connector 9 remains on the mounting frame 27 side, and the hydraulic hose 8 is left on the front loader 1 side.

前記右側サイドフレーム2の上部の外側面の横軸30の近傍には、油圧ホース8をルート案内するホースガイドGが設けられている。
ホースガイドGは1本の棒材12のみで形成されており、後端がサイドフレーム2の外側面上部に直接的に固定されており、油圧ホース8の中途部をルート案内する主案内部G1と、ホース接続具9から離脱した油圧ホース8の接続側を載置保持する退避案内部G3とを有する。
A hose guide G that guides the route of the hydraulic hose 8 is provided in the vicinity of the horizontal shaft 30 on the outer surface of the upper portion of the right side frame 2.
The hose guide G is formed of only one bar 12, the rear end is directly fixed to the upper part of the outer side surface of the side frame 2, and the main guide part G <b> 1 guides the route of the middle part of the hydraulic hose 8. And a retraction guide part G3 for placing and holding the connection side of the hydraulic hose 8 detached from the hose connector 9.

即ち、棒材12の後端を一方のサイドフレーム2の側面上部に固定し、この後端から前方へかつサイドフレーム2から離れる方向へ平面視略コ字形状に膨出した主案内部G1を形成し、この主案内部G1の前部から直線部を経た後に下向き屈曲し、正面視略L字形状の退避案内部G3を下方突出している。
この退避案内部G3は、ホース接続具9の上方でかつ主案内部G1の前下方に位置しており、先端側にホース脱落防止用の上向き立ち上がり部分G3aが形成されている。
That is, the rear end of the bar 12 is fixed to the upper part of the side surface of one side frame 2, and the main guide portion G1 bulging in a substantially U-shape in plan view in a direction away from the rear frame forward and from the rear end. It is formed, bent downward after passing through a straight line portion from the front portion of the main guide portion G1, and protrudes a retraction guide portion G3 having a substantially L shape in front view.
The retraction guide part G3 is located above the hose connector 9 and in front of and below the main guide part G1, and an upward rising part G3a for preventing the hose from falling off is formed on the tip side.

使用時の油圧ホース8は、図11に実線で示すように、ホース接続具9に接続された基端部から、前上方に延びて後方側に屈曲して主案内部G1に下側から上側へ挿通し、これによって横軸30の外側方を通過するU字状の後上向き弛みTを形成し、主案内部G1の前上方で山形状の湾曲部Wを形成してから配管7に上側から接続されている。
フロントローダ1を装着フレーム27から離脱するとき、図12に示すように、油圧ホース8の基部側をホース接続具9から離脱し、その基部を退避案内部G3に載置する。油圧ホース8は配管7から後上方へ湾曲部Wを形成し、U字状の中途部が主案内部G1に上から下へ挿通してルート案内され、その先の基部が退避案内部G3に載置される。油圧ホース8の基部側は、退避案内部G3の先端の上向き立ち上がり部分G3aによって、退避案内部G3からの脱落が防止される。
The hydraulic hose 8 in use, as shown by a solid line in FIG. 11, extends from the base end connected to the hose connector 9 to the front upper side and bends rearward to the main guide part G1 from the lower side to the upper side. A U-shaped rearward upward slack T passing through the outer side of the horizontal shaft 30 is formed, and a mountain-shaped curved portion W is formed in front of the main guide portion G1, and then the upper side of the pipe 7 is formed. Connected from.
When the front loader 1 is detached from the mounting frame 27, as shown in FIG. 12, the base portion side of the hydraulic hose 8 is detached from the hose connector 9, and the base portion is placed on the retraction guide portion G3. The hydraulic hose 8 forms a curved portion W rearward and upward from the pipe 7, the U-shaped midway portion is inserted through the main guide portion G1 from the top to the bottom, and route guidance is performed, and the base portion beyond that is guided to the retraction guide portion G3. Placed. The base side of the hydraulic hose 8 is prevented from falling off the retraction guide part G3 by the upward rising portion G3a at the tip of the retraction guide part G3.

離脱時の油圧ホース8はU字状の中途部が主案内部G1の後部で支えられ、接続側の基部が退避案内部G3で支えられるので、接続側の基部の先端を前上向きに保持して油垂れを防止することも可能になる。
なお、前記ローダ作業機1Bは、制御バルブ6及びホース接続具9を右サイドフレーム2の内側面側に配置し、ホースガイドGを右ブームBの内側面又はサイドフレーム2の内側面で横軸30の近傍に設けてもよい。
The hydraulic hose 8 at the time of detachment is supported by the rear part of the main guide part G1 in the middle part of the U-shape and the base part on the connection side is supported by the retraction guide part G3, so that the tip of the base part on the connection side is held forward and upward. It is also possible to prevent oil dripping.
In the loader work machine 1B, the control valve 6 and the hose connector 9 are arranged on the inner surface side of the right side frame 2, and the hose guide G is placed on the inner surface of the right boom B or the inner surface of the side frame 2 on the horizontal axis. You may provide in the vicinity of 30.

図14、15は、作業具装着体40に作業具5を装着した作業具装着装置Sの1例を示している。なお、上下、前後は図12のバケットの底壁5aが接地した状態を基準にしており、作業具シリンダ4のシリンダロッドは作業具装着体40に直接連結されていてもよいが、ここではシリンダロッドの先端に押し引きリンク4aと姿勢制御リンクとを連結し、押し引きリンク4aを作業具装着体40に連結し、かつ姿勢制御リンクをブームBの先端近傍に連結する形式のものを例示している。   FIGS. 14 and 15 show an example of a work tool mounting apparatus S in which the work tool 5 is mounted on the work tool mounting body 40. Note that the top, bottom, front and back are based on the state where the bottom wall 5a of the bucket in FIG. 12 is grounded, and the cylinder rod of the work tool cylinder 4 may be directly connected to the work tool mounting body 40. The push-pull link 4a and the posture control link are connected to the tip of the rod, the push-pull link 4a is connected to the work implement mounting body 40, and the posture control link is connected to the vicinity of the tip of the boom B. ing.

作業具5はバケットを例示していて、バケットは、底壁5aと、背壁5bと、それらの左右両端の側壁5cとを有し、上部に略全幅に亘る上板45を設け、背壁5bの背面の左右には当て板46とガイド板47とを設け、底壁5aから背壁5bの当て板46の下部まで下板48を設けている。
前記作業具5は背面に被係合部41を有している。この被係合部41は、上板45が当て板46の上部より後方に突出することにより左右側部に上被係合部41Uを形成し、当て板46下部が後方に突出することにより下被係合部41Dを形成している。
The working tool 5 is exemplified as a bucket, and the bucket has a bottom wall 5a, a back wall 5b, and side walls 5c at both right and left ends thereof, and an upper plate 45 extending over the entire width is provided at the upper portion. A pad 46 and a guide plate 47 are provided on the left and right sides of the back surface of 5b, and a lower plate 48 is provided from the bottom wall 5a to the lower part of the pad 46 on the back wall 5b.
The work tool 5 has an engaged portion 41 on the back surface. The engaged portion 41 is formed by forming an upper engaged portion 41U on the left and right side portions when the upper plate 45 protrudes rearward from the upper portion of the abutting plate 46, and lowering the lower portion of the engaging plate 46 rearwardly. An engaged portion 41D is formed.

左右ガイド板47は左右当て板46の左右外側に配置され、後部が後方末広がり状に傾斜しており、後方からガイド板47に近づく作業具装着体40の左右位置を案内するようになっている。
前記作業具装着体40は、作業具5の背面に添接して被係合部41と係合する係合部42を有する添接体43と、添接体43の背面に設けられていて前記枢軸31を支持する左右一対の連結部50と、添接体43に支持されていて係合部42と被係合部41との係合をロック・解除する左右一対のロック手段51とを有している。
The left and right guide plates 47 are disposed on the left and right outer sides of the left and right abutting plates 46, and the rear portion is inclined so as to widen backward, so that the left and right positions of the work implement mounting body 40 approaching the guide plate 47 from behind are guided. .
The work tool mounting body 40 is provided on the back surface of the attachment body 43, the attachment body 43 having an engagement portion 42 that is in contact with the back surface of the work tool 5 and engages the engaged portion 41. A pair of left and right connecting portions 50 that support the pivot 31 and a pair of left and right locking means 51 that are supported by the attachment body 43 and lock and release the engagement between the engaging portion 42 and the engaged portion 41 are provided. doing.

添接体43は、左右各当て板46に対向する左右幅に形成した左右一対の添接板43Aと、この左右添接板43Aを連結するパイプ製の連結部材43Bとで形成している。
前記添接板43Aには、上部をくの字状に屈曲して上被係合部41Uの下面側に入って係合する上係合部42Uと、下部をくの字状に屈曲して下被係合部41Dの上面側に載置されて係合する下係合部42Dとが形成され、下被係合部41Dと下係合部42Dとには重合した状態で合致するロックピン穴49a、49bが形成されている。
The attachment body 43 is formed by a pair of left and right attachment plates 43A formed in a lateral width facing the left and right contact plates 46, and a pipe connection member 43B that connects the left and right attachment plates 43A.
The attachment plate 43A has an upper engagement portion 42U that is bent into a dogleg shape at the upper part and enters the lower surface side of the upper engaged portion 41U, and a lower portion that is bent into a dogleg shape. A lower engaging portion 42D is formed on the upper surface side of the lower engaged portion 41D to be engaged therewith, and the lower engaged portion 41D and the lower engaged portion 42D are aligned with each other in a superposed state. Holes 49a and 49b are formed.

左右一対の添接板43Aのそれぞれには左右両側にブラケット44Aが立設され、連結部44を形成している。左右ブラケット44Aの下部には枢軸31の両端を支持するボス部が形成され、その左右ボス部の間にブームBの先端が配置され、上下方向の中途部には支軸34の両端を支持するボス部が形成され、その左右ボス部の間に作業具シリンダ4の押し引きリンク4aが配置されている。   Each of the pair of left and right attachment plates 43A is provided with brackets 44A on both the left and right sides to form a connecting portion 44. Boss portions that support both ends of the pivot 31 are formed in the lower portion of the left and right brackets 44A, the tip of the boom B is disposed between the left and right boss portions, and both ends of the support shaft 34 are supported in the middle in the vertical direction. A boss portion is formed, and a push-pull link 4a of the work tool cylinder 4 is disposed between the left and right boss portions.

左右各ロック手段51は左右ブラケット44Aの間に位置しており、添接板43Aの背面に固定の筒ガイド49にロックピン52が上下動自在に支持され、このロックピン52の上部にピンを介してリンク53の下部が連結され、このリンク53の上部に摺動部材56及びスプリング55が設けられ、この摺動部材56のピン部にロックレバー54が連結されている。   Each of the left and right lock means 51 is located between the left and right brackets 44A, and a lock pin 52 is supported by a cylindrical guide 49 fixed to the back surface of the attachment plate 43A so as to be movable up and down. The lower part of the link 53 is connected to the upper part of the link 53, the sliding member 56 and the spring 55 are provided on the upper part of the link 53, and the lock lever 54 is connected to the pin part of the sliding member 56.

ロックレバー54は手動操作可能であって、添接板43Aに固定の支持ピン43Cに枢支されており、左右のロックレバー54は1人の作業員が左右両手で同時に揺動操作可能な位置に配置されている。
前記左右ロックレバー54の下端部間には油圧シリンダ58が設けられ、油圧シリンダ58の伸縮により、ロックレバー54を揺動してロック及びロック解除を行うようにしている。
The lock lever 54 can be manually operated, and is pivotally supported by a support pin 43C fixed to the attachment plate 43A. The left and right lock levers 54 can be swung simultaneously by one operator with both left and right hands. Is arranged.
A hydraulic cylinder 58 is provided between the lower end portions of the left and right lock levers 54, and the lock lever 54 is rocked and unlocked by expansion and contraction of the hydraulic cylinder 58.

この油圧シリンダ58は、前記作業具シリンダ4等と同様に、配管及びホースを介してホース接続具9によって操作可能になっており、配管は右ブームB内に配置され、その先端から油圧ホース60を介して圧油が供給される。
油圧ホース60は油圧シリンダ58のボトム側とロッド側とに接続された2本が束ねられていて、油圧シリンダ58と配管との間で、連結部材43Bに設けた掛止部材62に掛止された弾性案内体61によって案内されている。
The hydraulic cylinder 58 can be operated by a hose connector 9 via a pipe and a hose similarly to the work tool cylinder 4 and the like, and the pipe is disposed in the right boom B, and the hydraulic hose 60 is provided from the tip thereof. Pressure oil is supplied through
Two hydraulic hoses 60, which are connected to the bottom side and the rod side of the hydraulic cylinder 58, are bundled together, and are latched between the hydraulic cylinder 58 and the pipe by a latching member 62 provided on the connecting member 43B. It is guided by the elastic guide body 61.

弾性案内体61は引っ張りスプリングで形成されており、油圧ホース60に左右方向の弛みを形成して、作業具装着体40の掬い・ダンプ動作に伴う油圧シリンダ58の移動に油圧ホース60が追従するようになっている。
前記油圧ホース60は弛みが弾性案内体61によって左右方向に引っ張られることにより、上下方向の弛みが減少し、作業具5を掬い姿勢にしたときでも、油圧ホース60が地面に接地するのが防止できる。
The elastic guide body 61 is formed of a tension spring, forms a slack in the left-right direction in the hydraulic hose 60, and the hydraulic hose 60 follows the movement of the hydraulic cylinder 58 accompanying the scooping / dumping operation of the work implement mounting body 40. It is like that.
The slack of the hydraulic hose 60 is pulled in the left-right direction by the elastic guide body 61, so that the slack in the vertical direction is reduced, and the hydraulic hose 60 is prevented from contacting the ground even when the working tool 5 is in a scooping position. it can.

油圧シリンダ58を伸張して又は手動操作で、ロックレバー54をロック解除状態から図11のロック状態へ揺動することにより、ロックレバー54の一端は摺動部材56を介してスプリング55を圧縮しながらリンク53を押動し、ロックピン52を下降させ、ロックピン52の先端を筒ガイド49及び下係合部42Dのロックピン穴39aから突出して、下被係合部41Dのロックピン穴39bに挿入し、下係合部42Dからの下被係合部41Dの離脱を阻止し、作業具5の装着をロックする。   By extending the hydraulic cylinder 58 or manually operating the lock lever 54 from the unlocked state to the locked state shown in FIG. 11, one end of the lock lever 54 compresses the spring 55 via the sliding member 56. While pushing the link 53, the lock pin 52 is lowered, the tip of the lock pin 52 projects from the lock pin hole 39a of the cylinder guide 49 and the lower engagement portion 42D, and the lock pin hole 39b of the lower engagement portion 41D. To prevent the lower engagement portion 41D from being detached from the lower engagement portion 42D and lock the mounting of the work tool 5.

なお、本発明は前記実施形態における各部材の形状及びそれぞれの前後・左右・上下の位置関係は、図1〜10に示すように構成することが最良である。しかし、前記実施形態に限定されるものではなく、部材、構成を種々変形したり、組み合わせを変更したりすることもできる。
例えば、走行車体20からステーを出してホース接続具9を取り付けたり、ホース接続具9、配管7、油圧ホース8、ホースガイドG等を左ブームB側に配置したりしてもよい。
In the present invention, the shape of each member and the positional relationship between the front, rear, left, and right in the embodiment are best configured as shown in FIGS. However, it is not limited to the said embodiment, A member, a structure can be variously deformed, and a combination can also be changed.
For example, the stay may be taken out from the traveling vehicle body 20, and the hose connector 9 may be attached, or the hose connector 9, the pipe 7, the hydraulic hose 8, the hose guide G, and the like may be disposed on the left boom B side.

ローダ作業機1は、トラクタ・ローダ・バックホー(TLB)、ホイールローダ等でもよく、作業具装着体40を設けずに、ブームBの先端及び作業具シリンダ4の先端を作業具5に直接連結してもよく、また、作業具5はフォーク、サム等でもよい。
ホースガイドGは、主案内部G1と退避案内部G3とを別体に形成して、それぞれを横軸30の近傍でブームB又はサイドフレーム2に取り付けてもよい。
The loader work machine 1 may be a tractor / loader / backhoe (TLB), a wheel loader, or the like, and directly connects the tip of the boom B and the work tool cylinder 4 to the work tool 5 without providing the work tool mounting body 40. The work tool 5 may be a fork, a thumb, or the like.
In the hose guide G, the main guide portion G1 and the retraction guide portion G3 may be formed separately, and each may be attached to the boom B or the side frame 2 in the vicinity of the horizontal shaft 30.

1 ローダ作業機(フロントローダ)
2 サイドフレーム
3 ブームシリンダ
4 作業具シリンダ
5 作業具
6 制御バルブ
7 配管
8 油圧ホース
11 取付材
12 棒材
B ブーム
G ホースガイド
G1 案内部
G2 案内部
G3 退避案内部
1 Loader working machine (front loader)
2 Side frame 3 Boom cylinder 4 Work tool cylinder 5 Work tool 6 Control valve 7 Piping 8 Hydraulic hose 11 Mounting material 12 Bar B Boom G Hose guide G1 Guide part G2 Guide part G3 Retraction guide part

Claims (8)

左右一対のサイドフレーム(2)と、この左右各サイドフレーム(2)の上部に横軸(30)を介して基部が枢支されかつブームシリンダ(3)を介して昇降自在に設けたブーム(B)と、左右ブーム(B)の先端に作業具シリンダ(4)を介して上下回動自在に設けた作業具(5)と、前記左右ブームシリンダ(3)及び作業具シリンダ(4)に圧油を供給する制御バルブ(6)に接続されたホース接続具(9)とを備え、左右一方のブーム(B)にブームシリンダ(3)及び作業具シリンダ(4)と接続される配管(7)を設け、この配管(7)とホース接続具(9)とを油圧ホース(8)で接続したローダ作業機であって、
前記横軸(30)の近傍に、油圧ホース(8)の中途部をルート案内する主案内部(G1)と、ホース接続具(9)から離脱した油圧ホース(8)の接続側を載置保持する退避案内部(G3)とを有するホースガイド(G)を設けていることを特徴とするローダ作業機。
A pair of left and right side frames (2) and a boom (not shown) whose base is pivotally supported on the top of each of the left and right side frames (2) via a horizontal shaft (30) and which can be raised and lowered via a boom cylinder (3) ( B), a work tool (5) provided at the tip of the left and right booms (B) via a work tool cylinder (4) so as to be rotatable up and down, and the left and right boom cylinders (3) and the work tool cylinder (4). A hose connector (9) connected to a control valve (6) for supplying pressure oil, and piping connected to the boom cylinder (3) and the work tool cylinder (4) to the left and right booms (B) ( 7), a loader working machine in which the pipe (7) and the hose connector (9) are connected by a hydraulic hose (8),
Placed in the vicinity of the horizontal axis (30) is a main guide portion (G1) for route guidance of a midway portion of the hydraulic hose (8) and a connection side of the hydraulic hose (8) separated from the hose connector (9). A loader working machine comprising a hose guide (G) having a retraction guide portion (G3) for holding.
前記ホースガイド(G)は、主案内部(G1)と退避案内部(G3)とを一体的に形成していることを特徴とする請求項1に記載のローダ作業機。   The loader working machine according to claim 1, wherein the hose guide (G) integrally forms a main guide part (G1) and a retraction guide part (G3). 前記ホースガイド(G)は、主案内部(G1)の上方に退避案内部(G3)を有し、主案内部(G1)の前側に油圧ホース(8)の配管(7)との接続側をルート案内する副案内部(G2)を有することを特徴とする請求項1又は2に記載のローダ作業機。   The hose guide (G) has a retraction guide part (G3) above the main guide part (G1), and is connected to the pipe (7) of the hydraulic hose (8) on the front side of the main guide part (G1). The loader working machine according to claim 1 or 2, further comprising a sub-guide unit (G2) for guiding the route. 前記油圧ホース(8)は、ホース接続具(9)との接続端から上向き弛み(T)を形成した後に主案内部(G1)に上側から下側へ挿通し、主案内部(G1)の下側で湾曲部(W)を形成した後に副案内部(G2)に下側から上側へ挿通して配管(7)に至っていることを特徴とする請求項3に記載のローダ作業機。   The hydraulic hose (8) is inserted into the main guide part (G1) from the upper side to the lower side after forming an upward slack (T) from the connection end with the hose connector (9), and the main hose part (G1) 4. The loader working machine according to claim 3, wherein after forming the curved portion (W) on the lower side, the loader working machine is inserted into the auxiliary guide portion (G2) from the lower side to the upper side to reach the pipe (7). 前記ホース接続具(9)を一方のブーム(B)を支持するサイドフレーム(2)の側面に配置し、前記ホースガイド(G)を、一方のブーム(B)の側面に固定される取付材(11)と、この取付材(11)に連結されかつブーム(B)の側面からホース接続具(9)の前方へ張り出した棒材(12)とで形成していることを特徴とする請求項1〜4のいずれか1項に記載のローダ作業機。   The hose connector (9) is disposed on the side surface of the side frame (2) that supports one boom (B), and the hose guide (G) is fixed to the side surface of the one boom (B). (11) and a bar member (12) connected to the attachment member (11) and projecting forward from the side surface of the boom (B) to the front of the hose connector (9). Item 5. The loader work machine according to any one of Items 1 to 4. 前記ホースガイド(G)は、一方のブーム(B)に固定の取付材(11)にループ状の棒材(12)の両端を連結しており、前記棒材(12)は取付材(11)から側方へ突出して退避案内部(G3)を形成し、この退避案内部(G3)の端部から下向きに突出して下部でブーム(B)から離れる方向に膨出した主案内部(G1)を形成し、この主案内部(G1)の前部から前方へ突出して副案内部(G2)を形成し、副案内部(G2)から上方へ延びかつブーム(B)に向かって屈曲して取付材(11)に至っていることを特徴とする請求項5に記載のローダ作業機。   The hose guide (G) has both ends of a loop-shaped bar (12) connected to an attachment (11) fixed to one boom (B), and the bar (12) is attached to the attachment (11). ) Projecting sideways to form a retraction guide part (G3), projecting downward from the end of this retraction guide part (G3), and bulging in a direction away from the boom (B) at the lower part (G1) ), Projecting forward from the front portion of the main guide portion (G1) to form a sub-guide portion (G2), extending upward from the sub-guide portion (G2) and bending toward the boom (B). The loader working machine according to claim 5, wherein the loader working machine reaches the mounting member (11). 前記ホースガイド(G)の退避案内部(G3)は、ホース接続具(9)の上方でかつ主案内部(G1)の前下方に位置していることを特徴とする請求項1又は2に記載のローダ作業機。   The retraction guide portion (G3) of the hose guide (G) is located above the hose connector (9) and in front of and below the main guide portion (G1). The loader working machine described. 前記ホースガイド(G)を1本の棒材(12)で形成し、この棒材(12)の後端を一方のサイドフレーム(2)の側面上部に固定し、この後端から前方へかつサイドフレーム(2)から離れる方向へ膨出した主案内部(G1)を形成し、この主案内部(G1)の前部から正面視略L字形状の退避案内部(G3)を下方突出していることを特徴とする請求項1、2又は7に記載のローダ作業機。   The hose guide (G) is formed of a single bar (12), the rear end of the bar (12) is fixed to the upper side of one side frame (2), and from the rear end to the front A main guide portion (G1) that bulges away from the side frame (2) is formed, and a retracting guide portion (G3) having a substantially L-shape in front view projects downward from the front portion of the main guide portion (G1). The loader working machine according to claim 1, 2 or 7, wherein
JP2012172962A 2012-07-04 2012-08-03 Loader working machine Active JP5843724B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012172962A JP5843724B2 (en) 2012-07-04 2012-08-03 Loader working machine

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2012150483 2012-07-04
JP2012150483 2012-07-04
JP2012172962A JP5843724B2 (en) 2012-07-04 2012-08-03 Loader working machine

Publications (2)

Publication Number Publication Date
JP2014029099A true JP2014029099A (en) 2014-02-13
JP5843724B2 JP5843724B2 (en) 2016-01-13

Family

ID=50201818

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012172962A Active JP5843724B2 (en) 2012-07-04 2012-08-03 Loader working machine

Country Status (1)

Country Link
JP (1) JP5843724B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016180258A (en) * 2015-03-24 2016-10-13 コベルコ建機株式会社 Wire arrangement structure of construction machine

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58115554U (en) * 1982-01-29 1983-08-06 井関農機株式会社 Front loader hydraulic hose locking device
JPS63167818A (en) * 1986-12-23 1988-07-11 ディ−ア・アンド・カンパニー Method and apparatus for mounting and detaching loader with respect to tractor
JPH07180177A (en) * 1993-12-21 1995-07-18 Hitachi Constr Mach Co Ltd Construction machine
JPH11200409A (en) * 1998-01-14 1999-07-27 Komatsu Ltd Structure for placing flexible pipe of swing type working machine
JP2000204583A (en) * 1999-01-14 2000-07-25 Yanmar Agricult Equip Co Ltd Front loader
JP2005113380A (en) * 2003-10-02 2005-04-28 Kubota Corp Revolving work machine
JP2005307522A (en) * 2004-04-20 2005-11-04 Hitachi Constr Mach Co Ltd Swivel type construction machinery
US20090294603A1 (en) * 2008-05-29 2009-12-03 Clark Equipment Company Quick Release Hose Guide
JP2010037810A (en) * 2008-08-05 2010-02-18 Kubota Corp Loader work device
JP2011017204A (en) * 2009-07-09 2011-01-27 Kubota Corp Front loader

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58115554U (en) * 1982-01-29 1983-08-06 井関農機株式会社 Front loader hydraulic hose locking device
JPS63167818A (en) * 1986-12-23 1988-07-11 ディ−ア・アンド・カンパニー Method and apparatus for mounting and detaching loader with respect to tractor
JPH07180177A (en) * 1993-12-21 1995-07-18 Hitachi Constr Mach Co Ltd Construction machine
JPH11200409A (en) * 1998-01-14 1999-07-27 Komatsu Ltd Structure for placing flexible pipe of swing type working machine
JP2000204583A (en) * 1999-01-14 2000-07-25 Yanmar Agricult Equip Co Ltd Front loader
JP2005113380A (en) * 2003-10-02 2005-04-28 Kubota Corp Revolving work machine
JP2005307522A (en) * 2004-04-20 2005-11-04 Hitachi Constr Mach Co Ltd Swivel type construction machinery
US20090294603A1 (en) * 2008-05-29 2009-12-03 Clark Equipment Company Quick Release Hose Guide
JP2010037810A (en) * 2008-08-05 2010-02-18 Kubota Corp Loader work device
JP2011017204A (en) * 2009-07-09 2011-01-27 Kubota Corp Front loader

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016180258A (en) * 2015-03-24 2016-10-13 コベルコ建機株式会社 Wire arrangement structure of construction machine

Also Published As

Publication number Publication date
JP5843724B2 (en) 2016-01-13

Similar Documents

Publication Publication Date Title
JP3822155B2 (en) Excavator for swivel work machine
JP4713516B2 (en) Construction machinery
JP2006316589A (en) Tractor installation type back hoe
JP2014005690A (en) Loader work machine
JP4431124B2 (en) Work machine
JP5016573B2 (en) Loader working machine
JP5843724B2 (en) Loader working machine
JP2010059734A5 (en)
JP4490751B2 (en) Outrigger hydraulic cylinder
JP2010163752A (en) Construction machine
JP6374821B2 (en) Working machine
JP4663599B2 (en) Loader working device
JP3910837B2 (en) Hydraulic piping structure of work equipment
JP6436836B2 (en) Swivel work machine
JP6135627B2 (en) Excavator attachment piping structure
JP6570925B2 (en) Work equipment mounting bracket
JP2006097348A (en) Work tool installing device
JP7374831B2 (en) construction machinery
JP4219878B2 (en) Working machine
JP2009133084A (en) Offset boom type front device
JP3622626B2 (en) Hydraulic piping of excavator
JP4808604B2 (en) Arm telescopic structure of work equipment
JP5188431B2 (en) Backhoe
JP5168178B2 (en) Work machine
JP6015739B2 (en) Construction machinery

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140925

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150731

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150811

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151005

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151117

R150 Certificate of patent or registration of utility model

Ref document number: 5843724

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150