JP2014026403A - 発変電機器修繕計画支援システム及びその修繕計画支援方法 - Google Patents
発変電機器修繕計画支援システム及びその修繕計画支援方法 Download PDFInfo
- Publication number
- JP2014026403A JP2014026403A JP2012165291A JP2012165291A JP2014026403A JP 2014026403 A JP2014026403 A JP 2014026403A JP 2012165291 A JP2012165291 A JP 2012165291A JP 2012165291 A JP2012165291 A JP 2012165291A JP 2014026403 A JP2014026403 A JP 2014026403A
- Authority
- JP
- Japan
- Prior art keywords
- repair
- equipment
- importance
- repair work
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
【解決手段】データベース10、重要度設定手段22、周期・期日判定手段23と表示・期日データ生成手段24を備え、重要度設定手段22により、修繕工事の重要度が設定され、設定された修繕工事の重要度が、周期・期日判定手段23によりランク別にその周期・期日に規則違反、運用周期違反がないか否かについて判定され、判定された修繕工事について、表示・期日データ生成手段24によりランク別に表示されて、修繕計画支援処理が終了するシステムである。
【選択図】図1
Description
次の修繕重要度Cランクは、社内全体での修繕工事の共通基準を示す「維持基準」や、個々の設備の修繕工事で都度設定するもので重要度の高い「都度(重)」や、本社からの指示により個々に行う修繕工事のうち重要度の高い「指示通達(重)」が根拠とされる。
軽微な修繕の修繕重要度Dランクは、個々の設備の修繕工事でその都度設定するもので軽微な「都度(軽)」や、本社からの指示により個々に行う修繕工事のうち軽微な「指示通達(軽)」が根拠とされる
その他の軽微な修繕工事は修繕重要度Eランクである。
前記周期・期日設定手段(23)により設定された計画時期と周期・期日に規則違反があったときに警告を発する警告発生手段(26)を、更に備えることができる。
修繕工事の重要度ランクに応じた修繕計画支援システムでの周期・期日変更・計画変更の承認者が明確になるため、適切な周期/時期の変更等を行なうことができ、法令違反・社内基準違反発生することを確実に防止することができる。
修繕工事の規則周期は法律・社内基準が変わらない限り、その周期は変わらないが、運用周期は設備状況により適宜変えることができる。そこで、本発明では、実際の運用周期に応じて、周期変更の際に規則周期と照合することで周期超過をより確実に防止することができる。
図1は実施例1の修繕工事の重要度に応じてランクを設けた発変電機器修繕計画支援システムを示すブロック図である。
実施例1の修繕重要度に応じてランクを設けた発変電機器修繕計画支援システム100は、図1に示すように、データベース10、機種・仕様入力手段21、重要度設定手段22、周期・期日判定手段23および責任者決定手段25を主な構成要素としている。機種・仕様入力手段21、重要度設定手段22、周期・期日判定手段23および責任者決定手段25は、コンピュータシステムおよびその周辺機器により構成され、コンピュータシステムおよびその周辺機器がアプリケーションプログラムに従って動作することにより、各手段の機能を発揮するようになっている。
上記したデータベース10には、図2に示すような修繕工事種別に関する情報が格納される。この修繕工事種別情報を示す表は、その左から設備区分、修繕工事種別、修繕重要度、重要度根拠、周期区分、規則周期、運用周期、対策期日と承認者から成る。
「承認者」としては、課長、電気主任技術者などが該当する。
なお、表1で示した「E」即ち「その他の軽微な修繕の修繕重要度Eランク」が図2には表示されていない。しかし、実際にEランクが表示される場合がある。なお、この修繕重要度Eランクのときは、修繕の周期・期日の変更承認者と計画承認者としてその部署の課長が担当する。
修繕重要度に応じてランクを設けた発変電機器修繕計画支援システム100は、データベース10との間でデータを送受信することにより、修繕する設備区分・機器・修繕工事種別に応じた重要度が設定される。設備区分・機器修繕工事種別に応じた重要度が設定され、規則周期と運用周期が設定される。このように設定された修繕工事の計画周期について、周期・期日判定手段23によりその周期・期日に規則違反、運用周期違反がないか否かについて判定される。
また、設定された規則周期・運用周期・期日について、修繕計画の変更があるか否かについて判断され、変更があるときは変更後の修繕計画を再度入力する。
その後、各責任者の承認を得て修繕計画作業が完了する。
実施例1の修繕重要度に応じてランクを設けた発変電機器修繕計画支援システム100では、修繕工事の重要度データを有し、重要度をランク付けした。図4、図5に示すように、修繕工事の重要性が高いAランク(重要度A)から、Bランク(重要度B)、Cランク(重要度C)、Dランク(重要度D)と低くなるようにした。
修繕重要度「C」、「D」と「E」は、修繕工事の周期・期日の変更承認者と計画承認者としてその部署の課長が担当するようになっている。
10 データベース
11 設備区分・修繕工事種別情報データベース
13 規則周期情報データベース
14 運用周期情報データベース
12 重要度情報データベース
15 責任者情報データベース
20 処理装置
22 重要度設定手段
23 周期・期日判定手段
24 表示・期日データ生成手段
25 責任者決定手段
26 警告発生手段
30 入力装置
40 表示装置・警告装置
Claims (4)
- 発変電所に備えられた発変電機器の設備、機器について修繕工事をする周期計画を設定する発変電機器修繕計画支援システム(100)であって、
修繕工事種別に応じた重要度の設定が必要な設備・機器に関する設備区分・修繕工事種別情報データベース(11)、法令等による規則上の修繕工事周期に関する規則周期情報データベース(13)、機器の不調等により規則周期よりも短い周期で修繕工事をする周期に関する運用周期情報データベース(14)、修繕工事種別の重要度に関する修繕工事種別の重要度情報データベース(12)および周期・期日の承認をする者に関する責任者情報データベース(15)が格納されたデータベース(10)と、
前記データベース(10)の情報の演算処理を行う処理装置(20)と、入力装置(30)とから成り、
前記データベース(10)との間でデータを送受信することにより、修繕工事をする設備・機器の修繕工事種別に応じた重要度を設定する重要度設定手段(22)と、
設定された修繕工事の計画周期・期日について、その周期・期日に規則違反、運用周期違反がないか否かについて判定する周期・期日判定手段(23)と、
前記周期・期日設定手段(23)により設定された計画時期と周期・期日データを作成し、表示する表示・期日データ生成手段(24)と、を備え、
操作者により、入力装置(30)を用いて修繕計画情報が設備区分・修繕工事種別情報データベース(11)に格納され、
修繕計画情報が規則周期情報データベース(13)と運用周期情報データベース(14)に格納されると、重要度設定手段(22)により、修繕工事の重要度が設定され、
設定された修繕工事の重要度が、周期・期日判定手段(23)によりランク別にその周期・期日に規則違反、運用周期違反がないか否かについて判定され、
判定された修繕工事について、表示・期日データ生成手段(24)によりランク別に表示されて、修繕工事支援処理が終了する、ことを特徴とする発変電機器修繕計画支援システム。 - 前記重要度設定手段(22)によりランク分けされた修繕工事について、そのランクに応じて計画の変更、計画の承認を決定する責任者決定手段(25)を、更に備えた、ことを特徴とする請求項1の発変電機器修繕計画支援システム。
- 前記周期・期日設定手段(23)により設定された計画時期と周期・期日に規則違反があったときに警告を発する警告発生手段(26)を、更に備えた、ことを特徴とする請求項1の発変電機器修繕計画支援システム。
- 発変電所に備えられた発変電機器の設備、機器について修繕工事をする周期計画を設定する発変電機器修繕計画支援方法であって、
修繕工事種別に応じた重要度の設定が必要な設備・機器に関する設備区分・修繕工事種別情報(11)、法令等による規則上の修繕周期に関する規則周期情報(13)、機器の不調等により規則周期よりも短い周期で修繕工事をする周期に関する運用周期情報(14)、修繕工事種別の重要度に関する修繕工事種別の重要度情報(12)および周期・期日・計画の承認をする者に関する責任者情報(15)が記憶されるデータベース(10)を作成し、
発変電機器の修繕計画を策定する際に、前記データベース(10)を参照し、その修繕工事の重要度を設定し、
設定された修繕計画の重要度について、ランク別にその周期・期日に規則違反、運用周期違反がないか否かについて判断し、
判断した修繕計画について、ランク別に表示する、ことを特徴とする発変電機器修繕計画支援方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012165291A JP2014026403A (ja) | 2012-07-26 | 2012-07-26 | 発変電機器修繕計画支援システム及びその修繕計画支援方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012165291A JP2014026403A (ja) | 2012-07-26 | 2012-07-26 | 発変電機器修繕計画支援システム及びその修繕計画支援方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2014026403A true JP2014026403A (ja) | 2014-02-06 |
Family
ID=50200003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012165291A Pending JP2014026403A (ja) | 2012-07-26 | 2012-07-26 | 発変電機器修繕計画支援システム及びその修繕計画支援方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2014026403A (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111815182A (zh) * | 2020-07-10 | 2020-10-23 | 积成电子股份有限公司 | 一种基于深度学习的电网停电检修计划编排方法 |
CN113421062A (zh) * | 2021-06-25 | 2021-09-21 | 国网山东省电力公司汶上县供电公司 | 一种电力调度计划流程时间辅助提醒系统 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009217718A (ja) * | 2008-03-12 | 2009-09-24 | Toshiba Corp | 保守計画支援システム |
JP2010165024A (ja) * | 2009-01-13 | 2010-07-29 | Chugoku Electric Power Co Inc:The | 点検計画作成システム |
-
2012
- 2012-07-26 JP JP2012165291A patent/JP2014026403A/ja active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009217718A (ja) * | 2008-03-12 | 2009-09-24 | Toshiba Corp | 保守計画支援システム |
JP2010165024A (ja) * | 2009-01-13 | 2010-07-29 | Chugoku Electric Power Co Inc:The | 点検計画作成システム |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111815182A (zh) * | 2020-07-10 | 2020-10-23 | 积成电子股份有限公司 | 一种基于深度学习的电网停电检修计划编排方法 |
CN113421062A (zh) * | 2021-06-25 | 2021-09-21 | 国网山东省电力公司汶上县供电公司 | 一种电力调度计划流程时间辅助提醒系统 |
CN113421062B (zh) * | 2021-06-25 | 2023-05-23 | 国网山东省电力公司汶上县供电公司 | 一种电力调度计划流程时间辅助提醒系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6678222B2 (ja) | 設備管理システム及び設備管理方法 | |
US20130138482A1 (en) | Capital asset planning system | |
JP2010073121A (ja) | プラント機器の補修工事スケジュール作成方法、および、補修工事スケジュール作成システム | |
Hugo et al. | The strategic value of human factors engineering in control room modernization | |
JP5868688B2 (ja) | 発変電機器修繕計画支援システム及びその修繕計画支援方法 | |
Siong et al. | The contribution of management of change to process safety accident in the chemical process industry | |
JP2014026403A (ja) | 発変電機器修繕計画支援システム及びその修繕計画支援方法 | |
Wan et al. | Knowledge management for maintenance, repair and service of manufacturing system | |
JP5171715B2 (ja) | 発変電機器点検・停電計画支援システム及びその計画支援方法 | |
Kay et al. | Impact of improper installation, maintenance and servicing of electrical equipment in forest products industries | |
Mahmoudi et al. | A maintenance optimzation policy for an electric power distribution system: case of the HV/MV substations | |
JP2013012133A (ja) | 発変電機器修繕費用算定支援システム及びその算定支援方法 | |
Ferreira et al. | Obsolescence management for offshore oil and gas production facility life extension | |
Airoboman et al. | On the centralization of reliability in maintenance practices in the Nigeria power system network: A review | |
Gondim et al. | Reimbursement procedure due to electrical damages: the subject relevance, juridical fundamentals, agency standards, analysis procedures and trends | |
Buddingh et al. | New life for old thyristor power rectifiers using contemporary digital control | |
Ruiz Flores et al. | Reliability of power electric systems in Pemex Refining: experiences and realities | |
Adoghe | Reliability centered maintenance (RCM) for asset management in electric power distribution system | |
Manna et al. | Ten years of lessons learned from operating experience in nuclear power plants | |
Yong et al. | Development and application of an off-site maintenance system in the petrochemical industry | |
Khalyasmaa et al. | Service Lifetime Analysis of Grid Companies’ Plant Assets | |
Davoudi et al. | Commissioning of electrical systems: Commissioning of electrical systems has become an integral and well-established part of the building design and construction process. However, as cities and states increasingly pass more stringent energy legislation while new technologies continue to present countless possibilities, building systems will get smarter and more interconnected | |
Chowdhury et al. | Quantitative transmission-system-reliability assessment | |
Coullon et al. | Flexible analytics for management of grid assets | |
Tjernberg et al. | Lifetime extension options for electrical equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20150624 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160406 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160412 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160531 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160902 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20161025 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20170309 |