JP2014010668A - Bim system, server device, terminal device, method, and program - Google Patents

Bim system, server device, terminal device, method, and program Download PDF

Info

Publication number
JP2014010668A
JP2014010668A JP2012147376A JP2012147376A JP2014010668A JP 2014010668 A JP2014010668 A JP 2014010668A JP 2012147376 A JP2012147376 A JP 2012147376A JP 2012147376 A JP2012147376 A JP 2012147376A JP 2014010668 A JP2014010668 A JP 2014010668A
Authority
JP
Japan
Prior art keywords
bim
bim model
integrated
terminal device
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012147376A
Other languages
Japanese (ja)
Other versions
JP5623466B2 (en
Inventor
Junji Adachi
純治 安達
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2012147376A priority Critical patent/JP5623466B2/en
Publication of JP2014010668A publication Critical patent/JP2014010668A/en
Application granted granted Critical
Publication of JP5623466B2 publication Critical patent/JP5623466B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Software Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a BIM system, a server device, a terminal device, a method, and a program that, in proposing a facility plan of an elevator, are capable of displaying a state where the elevator is installed in a building in an easily visually understandable manner.SOLUTION: A BIM system is communicably connected to a server device and a terminal device. The server device creates BIM parts of an elevator corresponding to a creation condition transmitted from the terminal device using parts information stored in a storage unit, and transmits the created BIM parts of the elevator to the terminal device. The terminal device creates an integrated BIM model obtained by integrating the BIM parts transmitted from the server device into a BIM model of a building stored in the storage unit, generates a layout screen including the created integrated BIM model, and displays the generated layout screen on a display unit.

Description

本発明の実施形態は、BIMシステム、サーバ装置、端末装置、方法及びプログラムに関する。   Embodiments described herein relate generally to a BIM system, a server device, a terminal device, a method, and a program.

従来、昇降機メーカの担当者は、昇降機を備える建築物を設計する客先に対して、平面図や断面図等の二次元図面およびカタログや納入実績等の写真を使用して、昇降機の設備計画を提案していた。そこで、近年、昇降機の設備計画を提案する際、建築物に昇降機を組み込んだ状態を視覚的に分かりやすく表示する技術が求められていた。   Conventionally, the person in charge of the elevator manufacturer has used the two-dimensional drawings such as the plan view and the cross-sectional view and the catalog and the delivery results etc. for the customer who designs the building equipped with the elevator to plan the equipment for the elevator. Had proposed. Therefore, in recent years, when proposing an equipment plan for an elevator, there has been a demand for a technique for visually displaying a state in which the elevator is incorporated in a building.

特開2010−262580号公報JP 2010-262580 A

本発明が解決しようとする課題は、昇降機の設備計画を提案する際、建築物に昇降機を組み込んだ状態を視覚的に分かりやすく表示することができるBIMシステム、サーバ装置、端末装置、方法及びプログラムを提供することである。   The problem to be solved by the present invention is a BIM system, a server device, a terminal device, a method, and a program capable of visually displaying a state in which a lift is incorporated in a building when a facility plan for the lift is proposed. Is to provide.

実施形態のBIMシステムは、制御部と記憶部とを少なくとも備えたサーバ装置、および、制御部と記憶部と表示部とを少なくとも備えた端末装置、を通信可能に接続したBIMシステムである。前記サーバ装置の前記記憶部は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段、を備える。前記サーバ装置の前記制御部は、前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、前記昇降機モデリング手段により作成された前記BIMパーツを前記端末装置へ送信する情報提供手段と、を備える。前記端末装置の前記記憶部は、前記BIMモデルを記憶するBIMモデル記憶手段、を備える。前記端末装置の前記制御部は、前記情報提供手段により前記サーバ装置から送信された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段と、前記統合モデリング手段により作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成手段と、前記画面生成手段により生成された前記レイアウト画面を前記表示部に表示させる画面表示手段と、を備える。   The BIM system of the embodiment is a BIM system in which a server device including at least a control unit and a storage unit, and a terminal device including at least a control unit, a storage unit, and a display unit are communicably connected. The storage unit of the server device includes a part information storage unit that stores part information for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. The control unit of the server device creates an elevator modeling unit that creates the BIM part corresponding to a creation condition transmitted from the terminal device using the part information stored in the part information storage unit, and the elevator Information providing means for transmitting the BIM part created by the modeling means to the terminal device. The storage unit of the terminal device includes a BIM model storage unit that stores the BIM model. The control unit of the terminal device is an integrated modeling unit that creates an integrated BIM model in which the BIM part transmitted from the server device by the information providing unit is incorporated in the BIM model stored in the BIM model storage unit Screen generation means for generating a layout screen including the integrated BIM model created by the integrated modeling means, and screen display means for displaying the layout screen generated by the screen generation means on the display unit. Prepare.

図1は、建築物の設計図書およびBIMモデルの一例を示す概念図である。FIG. 1 is a conceptual diagram showing an example of a building design book and a BIM model. 図2は、第1の実施形態におけるBIMシステムの構成の一例を示すブロック図である。FIG. 2 is a block diagram showing an example of the configuration of the BIM system in the first embodiment. 図3は、第1の実施形態における処理の一例を示すフローチャートである。FIG. 3 is a flowchart illustrating an example of processing in the first embodiment. 図4は、昇降機のBIMパーツの一例を示す図である。FIG. 4 is a diagram illustrating an example of a BIM part of an elevator. 図5は、BIMモデルにBIMパーツを組み込んだ統合BIMモデルの一例を示す図である。FIG. 5 is a diagram illustrating an example of an integrated BIM model in which BIM parts are incorporated into the BIM model. 図6は、レイアウト画面の一例を示す図である。FIG. 6 is a diagram illustrating an example of a layout screen. 図7は、レイアウト画面の一例を示す図である。FIG. 7 is a diagram illustrating an example of a layout screen. 図8は、レイアウト画面の一例を示す図である。FIG. 8 is a diagram illustrating an example of a layout screen. 図9は、レイアウト画面の一例を示す図である。FIG. 9 is a diagram illustrating an example of a layout screen. 図10は、レイアウト画面の一例を示す図である。FIG. 10 is a diagram illustrating an example of a layout screen. 図11は、レイアウト画面の一例を示す図である。FIG. 11 is a diagram illustrating an example of a layout screen. 図12は、建築物の設計図書の一例を示す図である。FIG. 12 is a diagram illustrating an example of a building design book. 図13は、図12に対応するレイアウト画面の一例を示す図である。FIG. 13 is a diagram showing an example of a layout screen corresponding to FIG. 図14は、図13の一部に対応するレイアウト画面の一例を示す図である。FIG. 14 is a diagram showing an example of a layout screen corresponding to a part of FIG. 図15は、図13の一部に対応するレイアウト画面の一例を示す図である。FIG. 15 is a diagram showing an example of a layout screen corresponding to a part of FIG. 図16は、図13の一部に対応するレイアウト画面の一例を示す図である。FIG. 16 is a diagram showing an example of a layout screen corresponding to a part of FIG. 図17は、第2の実施形態におけるBIMシステムの構成の一例を示すブロック図である。FIG. 17 is a block diagram illustrating an example of the configuration of the BIM system in the second embodiment. 図18は、第2の実施形態におけるBIMシステムの処理の一例を示すフローチャートである。FIG. 18 is a flowchart illustrating an example of processing of the BIM system in the second embodiment. 図19は、第3の実施形態におけるBIMシステムの構成の一例を示すブロック図である。FIG. 19 is a block diagram illustrating an example of the configuration of the BIM system in the third embodiment. 図20は、第3の実施形態におけるBIMシステムの処理の一例を示すフローチャートである。FIG. 20 is a flowchart illustrating an example of processing of the BIM system in the third embodiment.

以下に、実施形態にかかるBIMシステム、サーバ装置、端末装置、方法、および、プログラムの実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。   Embodiments of a BIM system, a server device, a terminal device, a method, and a program according to embodiments will be described below in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

ここで、図1を参照して、実施形態において利用されるBIM(ビルディングインフォーメーションモデリング)の概要について説明する。図1は、建築物の設計図書およびBIMモデルの一例を示す概念図である。図1では、建築物の設計図書による設計方法とBIMによる設計方法との違いを表している。図1の左側に示すように、建築物の設計図書による設計方法では、建築物の設計に関わる各業種が個々に専門図面を作成しているため、各々が関連性および整合性を各々とる必要がある。つまり、建築物の設計図書による設計方法では、例えば関連する設計図書の修正が必要となり、また、その整合性のチェックも必要となる。一方、図1の右側に示すBIMによる設計方法では、各業種にて建物全体データである建築物の3次元モデル(すなわち、建築物のBIMモデル)を共有することができるので、1個のデータ上で関連性および整合性の確認を行うことができる。以下の実施形態では、このBIMを使用した昇降機客先提案システムについて説明する。   Here, with reference to FIG. 1, an outline of BIM (building information modeling) used in the embodiment will be described. FIG. 1 is a conceptual diagram showing an example of a building design book and a BIM model. FIG. 1 shows a difference between a design method based on a building design book and a design method based on BIM. As shown on the left side of FIG. 1, in the design method based on the building design document, each industry involved in building design individually creates specialized drawings, so each must have relevance and consistency. There is. In other words, in a design method using a building design book, for example, it is necessary to correct the related design book and to check its consistency. On the other hand, the BIM design method shown on the right side of FIG. 1 can share a three-dimensional model of a building (that is, a BIM model of a building) that is data for the entire building in each type of business. You can check relevance and consistency above. The following embodiment demonstrates the elevator customer proposal system which uses this BIM.

以下、実施形態の構成および処理について、第1の実施形態(BIMシステム(機能分散型))、第2の実施形態(BIMシステム(サーバ主導型))、第3の実施形態(BIMシステム(スタンドアロン型))の順にて詳細に説明する。   Hereinafter, with regard to the configuration and processing of the embodiment, the first embodiment (BIM system (function distributed type)), the second embodiment (BIM system (server-driven type)), and the third embodiment (BIM system (stand-alone) The details will be described in the order of type)).

[第1の実施形態]
最初に、第1の実施形態について、図2乃至図16を参照して以下に説明する。なお、第1の実施形態で例示するBIMシステムにおけるサーバ側と端末側の機能分散の形態は以下に限られず、同様の効果や機能を奏し得る範囲において、任意の単位で機能的または物理的に分散・統合して構成することができる。
[First Embodiment]
First, the first embodiment will be described below with reference to FIGS. 2 to 16. The form of function distribution on the server side and terminal side in the BIM system exemplified in the first embodiment is not limited to the following, and functionally or physically in arbitrary units within a range where the same effects and functions can be achieved. It can be configured to be distributed and integrated.

[第1の実施形態におけるBIMシステムの構成]
まず、第1の実施形態におけるBIMシステムの構成の一例について、図2を参照して以下に説明する。図2は、第1の実施形態におけるBIMシステムの構成の一例を示すブロック図であり、該構成のうち主要な部分を概念的に示している。なお、本実施形態においては、通信型のBIMシステムを具体例として説明するが、これに限ることなく、スタンドアロン型のBIMシステムなどにも適用可能である。
[Configuration of BIM System in First Embodiment]
First, an example of the configuration of the BIM system in the first embodiment will be described below with reference to FIG. FIG. 2 is a block diagram showing an example of the configuration of the BIM system in the first embodiment, and conceptually shows main parts of the configuration. In this embodiment, a communication-type BIM system will be described as a specific example. However, the present invention is not limited to this, and can be applied to a stand-alone BIM system.

図2に示すように、第1の実施形態のBIMシステムは、概略的に、昇降機の3次元モデル(すなわち、昇降機のBIMパーツ)等の情報を提供できるサーバ装置200、および、単数または複数のBIMアプリケーション等を搭載した端末装置100、を通信可能に接続して構成される。ここで、図2に示すように、通信には、一例として、ネットワーク300を介した有線・無線通信等の遠隔通信等を含む。また、これらBIMシステムの各部は任意の通信路を介して通信可能に接続されている。   As shown in FIG. 2, the BIM system of the first embodiment schematically includes a server device 200 that can provide information such as a three-dimensional model of an elevator (that is, a BIM part of the elevator), and one or more A terminal device 100 equipped with a BIM application or the like is configured to be communicably connected. Here, as shown in FIG. 2, the communication includes, as an example, remote communication such as wired / wireless communication via the network 300. Each part of these BIM systems is communicably connected via an arbitrary communication path.

図2に示すように、第1の実施形態のBIMシステムにおいて、サーバ装置200は、概略的に、制御部202と記憶部206とを少なくとも備えており、端末装置100は、出力部(表示部114および音声出力部116)と入力部118と制御部102と記憶部106とを少なくとも備える。   As shown in FIG. 2, in the BIM system of the first embodiment, the server device 200 schematically includes at least a control unit 202 and a storage unit 206, and the terminal device 100 includes an output unit (display unit). 114, the audio output unit 116), the input unit 118, the control unit 102, and the storage unit 106.

[サーバ装置200の構成]
ここで、図2において、サーバ装置200は、端末装置100から送信される作成条件に対応する建築物のBIMモデルに組込可能な昇降機のBIMパーツを、記憶部206に記憶されたパーツ情報を用いて作成し、作成されたBIMパーツを端末装置100へ送信する等の機能を有する。サーバ装置200は、通信制御インターフェース部204を介してネットワーク300を経由し、端末装置100と相互に通信可能に接続されており、制御部202と記憶部206とを備える。制御部202は、各種処理を行う制御手段である。通信制御インターフェース部204は、通信回線や電話回線等に接続されるアンテナやルータ等の通信装置(図示せず)に接続されるインターフェースであり、サーバ装置200とネットワーク300との間における通信制御を行う機能を有する。すなわち、通信制御インターフェース部204は、端末装置100等と通信回線を介してデータを通信する機能を有している。記憶部206は、HDD(Hard Disk Drive)等の固定ディスク装置またはSSD(Solid State Drive)等のストレージ手段であり、各種のデータベースやテーブル(パーツ情報データベース206a等)を格納する。
[Configuration of Server Device 200]
Here, in FIG. 2, the server device 200 uses the BIM parts of the elevator that can be incorporated into the BIM model of the building corresponding to the creation conditions transmitted from the terminal device 100, and the parts information stored in the storage unit 206. It has a function of creating and transmitting the created BIM part to the terminal device 100. The server device 200 is connected to the terminal device 100 through the communication control interface unit 204 via the network 300 so as to be able to communicate with each other, and includes a control unit 202 and a storage unit 206. The control unit 202 is a control unit that performs various processes. The communication control interface unit 204 is an interface connected to a communication device (not shown) such as an antenna or a router connected to a communication line or a telephone line, and performs communication control between the server device 200 and the network 300. Has the function to perform. That is, the communication control interface unit 204 has a function of communicating data with the terminal device 100 or the like via a communication line. The storage unit 206 is a fixed disk device such as an HDD (Hard Disk Drive) or a storage unit such as an SSD (Solid State Drive), and stores various databases and tables (part information database 206a and the like).

これら記憶部206の各構成要素のうち、パーツ情報データベース206aは、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段である。本実施形態において、昇降機は、エレベータおよび乗客コンベアを含む概念であり、乗客コンベアは、エスカレータおよび動く歩道を含む。ここで、パーツ情報は、利用者が建築物のBIMモデルに組み込む昇降機のBIMパーツを設計する上で必要となるあらゆる情報を含む。パーツ情報としては、例えば、用途、定員、積載量、動作速度、色、機種等といった昇降機の仕様、昇降機を建築物に設置する際に必要とされるスペース、寸法、各種付属設備に関する情報、昇降機を構成する必要部材の部材強度、価格、寸法、質量、色、素材、固有振動数といった情報の他、納期、在庫状況、据付時間、仕上げ材、耐用年数、メーカ情報、品番型番などが挙げられるが、これに限定されない。   Among these components of the storage unit 206, the part information database 206a is a part information storage unit that stores part information for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. In the present embodiment, the elevator is a concept including an elevator and a passenger conveyor, and the passenger conveyor includes an escalator and a moving sidewalk. Here, the parts information includes all information necessary for the user to design the elevator BIM parts to be incorporated into the BIM model of the building. Parts information includes, for example, elevator specifications such as usage, capacity, loading capacity, operating speed, color, model, etc., space and dimensions required when installing elevators in buildings, information on various accessories, elevators In addition to information such as member strength, price, dimensions, mass, color, material, and natural frequency of the necessary components that make up the product, delivery date, inventory status, installation time, finishing material, service life, manufacturer information, product model number, etc. However, it is not limited to this.

より具体的には、本実施形態において、パーツ情報は、後述の制御部102の処理によりBIMパーツの動作を解析する際に用いられるBIMパーツの動作パラメータを含む。ここで、動作パラメータは、昇降機の動作速度、動作パターン等を規定するパラメータである。また、パーツ情報は、後述の制御部102の処理によりBIMパーツの搬入経路を生成する際に用いられるBIMパーツのサイズ情報を含む。ここで、BIMパーツのサイズ情報は、BIMパーツを構成する各ユニットのサイズ情報も含む。BIMパーツを構成する各ユニットとしては、例えば、本実施形態のように昇降機がエスカレータである場合には、トラス、踏段、踏段チェーン、移動手摺、乗降板、欄干、駆動装置、機械室、制御盤、電源設備、各種配管・配線等が挙げられる。また、BIMパーツを構成する各ユニットとしては、例えば、昇降機がエレベータである場合には、昇降路、乗りかご、カウンタウェイト、メインロープ、巻上機、ガイドレール、乗り場ホール関連品、機械室、制御盤、電源設備、各種配管・配線等が挙げられる。また、パーツ情報は、後述の制御部102の処理よりBIMパーツを変更する際に用いられる設定パラメータを含む。ここで、設定パラメータは、BIMパーツを構成する各ユニットのサイズ、色、材質等を規定するパラメータを含む。なお、BIMパーツは、典型的なBIMモデルと同様に、このBIMパーツ自体に対象の昇降機に関連するパーツ情報等の属性情報を含んでいる。   More specifically, in the present embodiment, the part information includes an operation parameter of the BIM part used when analyzing the operation of the BIM part by processing of the control unit 102 described later. Here, the operation parameter is a parameter that defines an operation speed, an operation pattern, and the like of the elevator. The part information includes BIM part size information used when generating a BIM parts carry-in route by processing of the control unit 102 described later. Here, the size information of the BIM part includes size information of each unit constituting the BIM part. As each unit constituting the BIM part, for example, when the elevator is an escalator as in this embodiment, a truss, a step, a step chain, a moving handrail, a boarding board, a railing, a driving device, a machine room, a control panel , Power supply equipment, various piping and wiring. In addition, as each unit constituting the BIM part, for example, when the elevator is an elevator, the elevator, the car, the counter weight, the main rope, the hoisting machine, the guide rail, the landing hall related products, the machine room, Examples include control panels, power supply facilities, various piping and wiring. Further, the part information includes setting parameters used when changing the BIM part by processing of the control unit 102 described later. Here, the setting parameters include parameters that define the size, color, material, and the like of each unit constituting the BIM part. The BIM part includes attribute information such as part information related to the target elevator in the BIM part itself, as in a typical BIM model.

また、制御部202は、OS(Operating System)等の制御プログラムや、各種の処理手順等を規定したプログラム、および、所要データを格納するための内部メモリを有する。そして、制御部202は、これらのプログラム等により、種々の処理を実行するための情報処理を行う。制御部202は、機能概念的に、作成条件受信部202a、昇降機モデリング部202b、および、情報提供部202cを備える。   The control unit 202 has an internal memory for storing a control program such as an OS (Operating System), a program that defines various processing procedures, and necessary data. And the control part 202 performs the information processing for performing various processes with these programs. The control unit 202 includes a creation condition receiving unit 202a, an elevator modeling unit 202b, and an information providing unit 202c in terms of functional concept.

このうち、作成条件受信部202aは、端末装置100から送信される作成条件を受信する作成条件受信手段である。ここで、作成条件は、利用者が所望する昇降機の仕様を示す条件である。つまり、作成条件は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するための条件を指定する。作成条件にはこの他、希望の価格、納期等を含んでもよい。また、作成条件は、利用者により端末装置100において入力部118を介して入力されたものであってもよいし、予め作成条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。   Among these, the creation condition receiving unit 202 a is a creation condition receiving unit that receives a creation condition transmitted from the terminal device 100. Here, the creation conditions are conditions indicating the specifications of the elevator desired by the user. That is, the creation condition specifies a condition for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. In addition, the creation conditions may include a desired price, a delivery date, and the like. The creation conditions may be input by the user via the input unit 118 in the terminal device 100, or read from an external storage device (not shown) in which the creation conditions are stored in advance. It may be.

また、昇降機モデリング部202bは、作成条件受信部202aにより受信された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース206aに記憶されたパーツ情報を用いて作成する昇降機モデリング手段である。ここで、昇降機モデリング部202bは、作成した昇降機のBIMパーツを記憶部206に格納して、BIMパーツデータベース(図示せず)を構築してもよい。   The elevator modeling unit 202b is an elevator modeling unit that creates elevator BIM parts corresponding to the creation conditions received by the creation condition receiving unit 202a using the part information stored in the part information database 206a. Here, the elevator modeling unit 202b may store the created BIM parts of the elevator in the storage unit 206 to construct a BIM parts database (not shown).

また、情報提供部202cは、昇降機モデリング部202bにより作成された昇降機のBIMパーツを端末装置100へ送信する情報提供手段である。   The information providing unit 202 c is an information providing unit that transmits the BIM parts of the elevator created by the elevator modeling unit 202 b to the terminal device 100.

[端末装置100の構成]
また、図2において、端末装置100は、サーバ装置200から送信された昇降機のBIMパーツを、記憶部106に記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成し、作成された統合BIMモデルを含むレイアウト画面を生成し、生成されたレイアウト画面を表示部114に表示させる等の機能を有する。端末装置100は、例えば、一般に市販されるデスクトップ型またはノート型のパーソナルコンピュータ等の情報処理装置、携帯電話、スマートフォン、PHS、およびPDA等の携帯端末装置等である。ここで、端末装置100は、インターネットブラウザ等を搭載していてもよく、BIMアプリケーション等を搭載していてもよい。また、端末装置100は、表示部114と音声出力部116とを少なくとも含む出力部を備えていてもよい。また、端末装置100は、データ入力等を行う入力部118を備えていてもよい。
[Configuration of Terminal Device 100]
In FIG. 2, the terminal device 100 creates an integrated BIM model in which the BIM part of the elevator transmitted from the server device 200 is incorporated into the BIM model of the building stored in the storage unit 106, and the created integration A layout screen including the BIM model is generated, and the generated layout screen is displayed on the display unit 114. The terminal device 100 is, for example, a commercially available information processing device such as a desktop or notebook personal computer, a mobile terminal device such as a mobile phone, a smartphone, a PHS, and a PDA. Here, the terminal device 100 may be equipped with an Internet browser or the like, or may be equipped with a BIM application or the like. Further, the terminal device 100 may include an output unit including at least the display unit 114 and the audio output unit 116. The terminal device 100 may include an input unit 118 that performs data input and the like.

ここで、表示部114は、アプリケーション等の表示画面を表示する表示手段(例えば、液晶または有機EL等から構成されるディスプレイ、モニタ、および、タッチパネル等)であってもよい。また、音声出力部116は、音声情報を音声として出力する音声出力手段(例えば、スピーカ等)であってもよい。また、入力部118は、例えば、キー入力部、タッチパネル、コントロールパッド(例えば、タッチパッド、および、ゲームパッド等)、マウス、キーボード、および、マイク等であってもよい。また、入出力制御インターフェース部108は、表示部114、音声出力部116、および、入力部118等の制御を行う。   Here, the display unit 114 may be display means for displaying a display screen of an application or the like (for example, a display, a monitor, a touch panel, or the like configured by liquid crystal or organic EL). The audio output unit 116 may be an audio output unit (for example, a speaker) that outputs audio information as audio. The input unit 118 may be, for example, a key input unit, a touch panel, a control pad (for example, a touch pad and a game pad), a mouse, a keyboard, and a microphone. The input / output control interface unit 108 controls the display unit 114, the audio output unit 116, the input unit 118, and the like.

また、通信制御インターフェース部104は、通信回線や電話回線等に接続されるアンテナやルータ等の通信装置(図示せず)に接続されるインターフェースであり、端末装置100とネットワーク300との間における通信制御を行う機能を有する。すなわち、通信制御インターフェース部104は、サーバ装置200等と通信回線を介してデータを通信する機能を有している。また、ネットワーク300は、端末装置100およびサーバ装置200と、外部機器または外部システムとを相互に接続する機能を有し、例えば、インターネット、電話回線網(携帯端末回線網および一般電話回線網等)、イントラネット、または、電力線通信(PLC)等であってもよい。   The communication control interface unit 104 is an interface connected to a communication device (not shown) such as an antenna or a router connected to a communication line, a telephone line, etc., and communicates between the terminal device 100 and the network 300. It has a function to perform control. That is, the communication control interface unit 104 has a function of communicating data with the server device 200 or the like via a communication line. The network 300 has a function of mutually connecting the terminal device 100 and the server device 200 to an external device or an external system. For example, the Internet, a telephone line network (a mobile terminal line network, a general telephone line network, etc.) Intranet or power line communication (PLC) may be used.

また、記憶部106は、HDDやSSD等の大容量のストレージ手段、および/または、SRAM(Static Random Access Memory)等を用いて構成される小容量高速メモリ(例えば、キャッシュメモリ)等のストレージ手段であり、各種のデータベースやファイルやテーブル(BIMモデルデータベース106a、オブジェクト情報データベース106b等)を格納してもよい。ここで、記憶部106は、各種のファイル等を一時的に記憶するものであってもよい。   The storage unit 106 is a storage unit such as a large-capacity storage unit such as an HDD or an SSD and / or a small-capacity high-speed memory (for example, a cache memory) configured using an SRAM (Static Random Access Memory) or the like. Various databases, files, and tables (BIM model database 106a, object information database 106b, etc.) may be stored. Here, the storage unit 106 may temporarily store various files and the like.

また、BIMモデルデータベース106aは、建築物のBIMモデルを記憶するBIMモデル記憶手段である。本実施形態において、BIMモデルデータベース106aには、予め設計者により設計された建築物のBIMモデルが格納されている。ここで、BIMモデルには、例えば、建物形状、空間関係、地理情報、建物部材の数量や特性、部材強度、固有振動数、耐用年数等の構造情報が含まれるが、これに限定されない。本実施形態において、後述の制御部102により昇降機のBIMパーツを設置する設置位置までの搬入経路を生成する際、上述の構造情報が参照される。   The BIM model database 106a is a BIM model storage unit that stores a BIM model of a building. In the present embodiment, the BIM model database 106a stores a BIM model of a building designed in advance by a designer. Here, the BIM model includes structural information such as building shape, spatial relationship, geographic information, quantity and characteristics of building members, member strength, natural frequency, and useful life, but is not limited thereto. In this embodiment, when the below-mentioned control part 102 produces | generates the carrying-in path | route to the installation position which installs the BIM part of an elevator, the above-mentioned structure information is referred.

オブジェクト情報データベース106bは、建築物のBIMモデル内で移動可能なヒトオブジェクトに関するオブジェクト情報を記憶するオブジェクト情報記憶手段である。オブジェクト情報は、所定条件に従って移動可能なヒトを模した3次元モデルを定義する情報である。オブジェクト情報は、ヒトを模した3次元モデルを構築するための形状データの他、各ヒトオブジェクトについて出発地と目的地と少なくとも含む移動条件を含む。ここで、移動条件は、経由地、移動手段(例えば、階段利用、昇降機(エレベータ、乗客コンベア(エスカレータまたは動く歩道を含む)利用等)、出発時刻、経由時刻、到着時刻、および、移動速度のうち少なくとも1つを含んでいてもよい。また、オブジェクト情報は、BIMモデルデータベース106aに記憶された建築物のBIMモデル内の経路網を規定するネットワークデータとしてBIMモデル内ネットワークデータを更に含む。BIMモデル内ネットワークデータは、例えば、建築物内の店舗、会社、事務所、およびトイレ等の出入口、エレベータおよびエスカレータの乗降口、階段の出入口等の、通路等を接続する結節点であるノードのノードデータと、ノード間を接続する通路、階段、動く歩道、エスカレータ、および、エレベータ等であるリンクのリンクデータとの組み合わせによって表現されるネットワークデータである。   The object information database 106b is object information storage means for storing object information relating to a human object that can move within the BIM model of a building. The object information is information that defines a three-dimensional model imitating a human who can move according to a predetermined condition. The object information includes, in addition to shape data for constructing a three-dimensional model imitating a human, a moving condition including at least a starting point and a destination for each human object. Here, the moving conditions are transit points, moving means (for example, use of stairs, elevators (including elevators, passenger conveyors (including escalators or moving walkways)), departure time, via time, arrival time, and movement speed. The object information may further include network data in the BIM model as network data defining a route network in the BIM model of the building stored in the BIM model database 106a. The network data in the model is a node of a node that is a node that connects passages such as entrances and exits of stores, companies, offices, and toilets in buildings, entrances and exits of elevators and escalators, entrances and exits of stairs, etc. Data, passages connecting nodes, stairs, moving walkways, escalators, and A network data expressed by a combination of links of the link data is elevators like.

また、制御部102は、OS(Operating System)等の制御プログラムや、各種の処理手順等を規定したプログラム、および、所要データを格納するための内部メモリを有する。そして、制御部102は、これらのプログラム等により、種々の処理を実行するための情報処理を行う。制御部102は、機能概念的に、作成条件送信部102a、統合モデリング部102b、画面生成部102c、画面表示部102d、動作解析部102e、移動経路生成部102f、搬入経路生成部102g、変更部102h、および、エラー出力部102iを備える。   The control unit 102 also has an internal memory for storing a control program such as an OS (Operating System), a program defining various processing procedures, and necessary data. And the control part 102 performs the information processing for performing various processes by these programs. The control unit 102 is functionally conceptually composed of a creation condition transmission unit 102a, an integrated modeling unit 102b, a screen generation unit 102c, a screen display unit 102d, an operation analysis unit 102e, a movement route generation unit 102f, a carry-in route generation unit 102g, and a change unit. 102h and an error output unit 102i.

このうち、作成条件送信部102aは、利用者により入力される作成条件をサーバ装置200へ送信する作成条件送信手段である。ここで、作成条件は、利用者が所望する昇降機の仕様を示す条件である。上述のように作成条件には希望の価格、納期等を含めてもよい。つまり、作成条件は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するための条件を指定する。また、作成条件は、利用者により入力部118を介して入力されたものであってもよいし、予め作成条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。   Among these, the creation condition transmission unit 102 a is a creation condition transmission unit that transmits the creation condition input by the user to the server apparatus 200. Here, the creation conditions are conditions indicating the specifications of the elevator desired by the user. As described above, the creation conditions may include a desired price, delivery date, and the like. That is, the creation condition specifies a condition for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. The creation conditions may be input by the user via the input unit 118, or may be read from an external storage device (not shown) in which the creation conditions are stored in advance. Good.

また、統合モデリング部102bは、サーバ装置200から送信された昇降機のBIMパーツを、BIMモデルデータベース106aに記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段である。ここで、統合モデリング部102bは、作成した統合BIMモデルを記憶部106に格納して、統合BIMモデルデータベース(図示せず)を構築してもよい。   The integrated modeling unit 102b is an integrated modeling unit that creates an integrated BIM model in which the BIM part of the elevator transmitted from the server device 200 is incorporated in the BIM model of the building stored in the BIM model database 106a. Here, the integrated modeling unit 102b may store the created integrated BIM model in the storage unit 106 to construct an integrated BIM model database (not shown).

また、画面生成部102cは、統合モデリング部102bにより作成された統合BIMモデルを含むレイアウト画面を生成する画面生成手段である。ここで、画面生成部102cは、後述の移動経路生成部102fにより生成された移動経路を更に含むレイアウト画面を生成してもよい。また、画面生成部102cは、後述の搬入経路生成部102gにより生成された搬入経路を更に含むレイアウト画面を生成してもよい。また、画面生成部102cは、後述の変更部102hにより変更された昇降機のBIMパーツを含むレイアウト画面を生成してもよい。   The screen generation unit 102c is a screen generation unit that generates a layout screen including the integrated BIM model created by the integrated modeling unit 102b. Here, the screen generation unit 102c may generate a layout screen further including a movement route generated by a movement route generation unit 102f described later. The screen generation unit 102c may generate a layout screen that further includes a carry-in route generated by a carry-in route generation unit 102g described later. Further, the screen generation unit 102c may generate a layout screen including the elevator BIM parts changed by the changing unit 102h described later.

また、画面表示部102dは、画面生成部102cにより生成されたレイアウト画面を表示部114に表示させる画面表示手段である。   The screen display unit 102d is a screen display unit that causes the display unit 114 to display the layout screen generated by the screen generation unit 102c.

また、動作解析部102eは、画面表示部102dにより表示されたレイアウト画面上で昇降機のBIMパーツの動作をシミュレーションする動作解析手段である。具体的には、動作解析部102eは、昇降機のBIMパーツに含まれるパーツ情報が示すBIMパーツの動作パラメータに基づいて昇降機のBIMパーツの動作をシミュレーションする。ここで、動作パラメータは、昇降機の動作速度、動作パターン等を規定するパラメータである。また、動作解析部102eは、オブジェクト情報データベース106bに記憶されたオブジェクト情報に基づいてヒトオブジェクトを統合BIMモデル内で移動させながら、昇降機のBIMパーツの動作をシミュレーションしてもよい。この場合、動作解析部102eは、後述の移動経路生成部102fにより生成された移動経路上でヒトオブジェクトを移動させながら、昇降機のBIMパーツの動作をシミュレーションする。また、動作解析部102eは、利用者に入力される移動条件に応じて、ヒトオブジェクトの数、移動速度、および利用移動経路のうち少なくとも1つを変更してもよい。   The motion analysis unit 102e is a motion analysis unit that simulates the operation of the BIM parts of the elevator on the layout screen displayed by the screen display unit 102d. Specifically, the operation analysis unit 102e simulates the operation of the BIM part of the elevator based on the operation parameter of the BIM part indicated by the part information included in the BIM part of the elevator. Here, the operation parameter is a parameter that defines an operation speed, an operation pattern, and the like of the elevator. Further, the motion analysis unit 102e may simulate the motion of the BIM part of the elevator while moving the human object in the integrated BIM model based on the object information stored in the object information database 106b. In this case, the motion analysis unit 102e simulates the motion of the BIM part of the elevator while moving the human object on the movement route generated by the movement route generation unit 102f described later. In addition, the motion analysis unit 102e may change at least one of the number of human objects, the movement speed, and the use movement route according to the movement condition input to the user.

また、移動経路生成部102fは、オブジェクト情報データベース106bに記憶されたオブジェクト情報に基づいて、統合BIMモデル内で移動するヒトオブジェクトの移動経路を生成する移動経路生成手段である。具体的には、移動経路生成部102fは、オブジェクト情報に含まれる移動条件およびBIMモデル内ネットワークデータを用いて、各ヒトオブジェクトの出発地と目的地と少なくとも含む移動条件を満たす出発地から目的地までの移動経路を生成する。ここで、移動条件は、経由地、移動手段(例えば、階段利用、昇降機(エレベータ、乗客コンベア(エスカレータまたは動く歩道を含む)利用等)、出発時刻、経由時刻、到着時刻、および、移動速度のうち少なくとも1つを含んでいてもよい。移動条件は、利用者により入力部118を介して入力されたものであってもよいし、予め移動条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。   The movement path generation unit 102f is a movement path generation unit that generates a movement path of a human object that moves in the integrated BIM model based on the object information stored in the object information database 106b. Specifically, the movement route generation unit 102f uses the movement condition included in the object information and the network data in the BIM model, from the departure point that satisfies the movement condition including at least the departure point and the destination of each human object. Generate a travel route to Here, the moving conditions are transit points, moving means (for example, use of stairs, elevators (including elevators, passenger conveyors (including escalators or moving walkways)), departure time, via time, arrival time, and movement speed. The moving condition may be input by the user via the input unit 118, or an external storage device (not shown) in which the moving condition is stored in advance. It may be read from.

また、搬入経路生成部102gは、BIMモデルデータベース106aに記憶された建築物のBIMモデル、および、サーバ装置200から送信された昇降機のBIMパーツに基づいて、統合BIMモデル内の設置位置まで昇降機のBIMパーツを搬入するための搬入経路を生成する搬入経路生成手段である。具体的には、搬入経路生成部102gは、建築物のBIMモデルに含まれる建築物の構造情報、および、昇降機のBIMパーツに含まれるパーツ情報が示す昇降機のBIMパーツのサイズ情報に基づいて、昇降機のBIMパーツを設置する設置位置までの搬入経路を生成する。ここで、昇降機のBIMパーツのサイズ情報は、当該昇降機のBIMパーツを構成する各ユニットのサイズ情報を含む。搬入経路生成部102gは、昇降機のBIMパーツを構成する各ユニットのサイズ情報に基づいて、昇降機のBIMパーツを設置する設置位置までの搬入経路を、ユニットごとに生成してもよい。搬入経路を生成する方法はこれに限定されないが、搬入経路生成部102gは、例えば、構造情報が規定する建築物の空間において、サイズ情報が規定する各ユニットのサイズが干渉しない状態で当該ユニットが通過可能な最短距離を搬入経路として生成する。また、例えば、ユニット単位では干渉しない搬入経路が特定できない場合、搬入経路生成部102gは、当該ユニットをさらに細かい部品単位に分解した状態で搬入経路を生成するようにしてもよい。   Further, the carry-in route generation unit 102g, based on the BIM model of the building stored in the BIM model database 106a and the BIM part of the elevator transmitted from the server device 200, reaches the installation position in the integrated BIM model. It is a carrying-in path | route production | generation means which produces | generates the carrying-in path | route for carrying in a BIM part. Specifically, the carry-in route generation unit 102g is based on the structure information of the building included in the BIM model of the building and the size information of the BIM part of the elevator indicated by the part information included in the BIM part of the elevator. A carry-in route to the installation position for installing the elevator BIM parts is generated. Here, the size information of the BIM part of the elevator includes the size information of each unit constituting the BIM part of the elevator. The carry-in route generation unit 102g may generate, for each unit, a carry-in route to the installation position where the BIM part of the elevator is installed based on the size information of each unit constituting the BIM part of the elevator. Although the method for generating the carry-in route is not limited to this, the carry-in route generation unit 102g, for example, in the building space defined by the structure information, the unit does not interfere with the size of each unit specified by the size information. The shortest distance that can be passed is generated as a carry-in route. Further, for example, when a carry-in route that does not interfere with each unit cannot be specified, the carry-in route generation unit 102g may generate a carry-in route in a state where the unit is broken down into smaller parts.

また、変更部102hは、画面表示部102dにより表示されたレイアウト画面上でBIMパーツを変更する変更手段である。具体的には、変更部102hは、利用者により入力される変更条件に応じてBIMパーツに含まれるパーツ情報の設定パラメータを変更することで、当該BIMパーツを変更する。設定パラメータは、BIMパーツを構成する各ユニットのサイズ、色、材質等を規定するパラメータを含む。   The changing unit 102h is a changing unit that changes BIM parts on the layout screen displayed by the screen display unit 102d. Specifically, the changing unit 102h changes the BIM part by changing the setting parameter of the part information included in the BIM part according to the changing condition input by the user. The setting parameters include parameters that define the size, color, material, etc. of each unit constituting the BIM part.

また、エラー出力部102iは、統合モデリング部102bが統合BIMモデルを作成できない場合、エラー情報を出力するエラー出力手段である。具体的には、エラー出力部102iは、統合モデリング部102bが昇降機のBIMパーツを設置するBIMモデル内の設置位置にて当該昇降機のBIMパーツを組み込めない場合、当該状況を利用者に通知するエラー情報を出力する。本実施形態において、統合モデリング部102bが統合BIMモデルを作成できない場合とは、BIMパーツをBIMモデル内の設置位置に組み込めない場合に加え、BIMパーツをBIMモデル内の設置位置に組み込めたものの、意図した設置状態でない場合も含む。ここで、エラー情報は、文字データであってもよいし、音声データであってもよい。更に、エラー出力部102iは、統合モデリング部102bがどのような条件であればBIMモデル内の設置位置にて昇降機のBIMパーツを組み込めるかを示すガイド情報をエラー情報として出力してもよい。ガイド情報は、昇降機のBIMパーツの仕様を示す情報であってもよい。   The error output unit 102i is an error output unit that outputs error information when the integrated modeling unit 102b cannot create an integrated BIM model. Specifically, if the integrated modeling unit 102b cannot install the elevator BIM part at the installation position in the BIM model where the integrated modeling unit 102b installs the elevator BIM part, the error output unit 102i is an error that notifies the user of the situation. Output information. In the present embodiment, the case where the integrated modeling unit 102b cannot create the integrated BIM model means that the BIM part cannot be incorporated at the installation position in the BIM model, and the BIM part can be incorporated at the installation position in the BIM model. This includes cases where the installation is not intended. Here, the error information may be character data or voice data. Further, the error output unit 102i may output, as error information, guide information indicating that under what conditions the integrated modeling unit 102b can incorporate the BIM part of the elevator at the installation position in the BIM model. The guide information may be information indicating the specifications of the BIM parts of the elevator.

以上で、第1の実施形態におけるBIMシステムの構成の一例の説明を終える。   Above, description of an example of a structure of the BIM system in 1st Embodiment is finished.

[第1の実施形態におけるBIMシステムの処理]
次に、このように構成された第1の実施形態におけるBIMシステムの処理の一例について、以下に図3乃至図16を参照して詳細に説明する。図3は、第1の実施形態におけるBIMシステムの処理の一例を示すフローチャートである。
[Process of BIM System in First Embodiment]
Next, an example of processing of the BIM system in the first embodiment configured as described above will be described in detail with reference to FIGS. FIG. 3 is a flowchart illustrating an example of processing of the BIM system in the first embodiment.

図3に示すように、端末装置100の作成条件送信部102aは、利用者により入力される作成条件をサーバ装置200へ送信する(ステップSA−1)。   As illustrated in FIG. 3, the creation condition transmission unit 102a of the terminal device 100 transmits the creation condition input by the user to the server device 200 (step SA-1).

そして、サーバ装置200の作成条件受信部202aは、ステップSA−1にて作成条件送信部102aの処理により送信される作成条件を受信する(ステップSA−2)。   Then, the creation condition receiving unit 202a of the server device 200 receives the creation condition transmitted by the process of the creation condition transmitting unit 102a in step SA-1 (step SA-2).

そして、サーバ装置200の昇降機モデリング部202bは、ステップSA−2にて作成条件受信部202aの処理により受信された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース206aに記憶されたパーツ情報を用いて作成する(ステップSA−3)。例えば、昇降機モデリング部202bは、図4に示すようなエスカレータのBIMパーツを作成する。ここで、図4は、昇降機のBIMパーツの一例を示す図である。図4では、機種別に作成された3台のエスカレータのBIMパーツが示されている。ここで、ステップSA−3において、昇降機モデリング部202bは、作成条件を満たす複数の昇降機のBIMパーツを作成してもよい。   Then, the elevator modeling unit 202b of the server device 200 stores the BIM parts of the elevator corresponding to the creation condition received by the process of the creation condition receiving unit 202a in step SA-2, in the part information database 206a. (Step SA-3). For example, the elevator modeling unit 202b creates BIM parts of an escalator as shown in FIG. Here, FIG. 4 is a figure which shows an example of the BIM part of an elevator. FIG. 4 shows BIM parts of three escalators created for each model. Here, in step SA-3, the elevator modeling unit 202b may create a plurality of elevator BIM parts that satisfy the creation conditions.

そして、サーバ装置200の情報提供部202cは、ステップSA−3にて昇降機モデリング部202bの処理により作成された昇降機のBIMパーツを端末装置100へ送信する(ステップSA−4)。   And the information provision part 202c of the server apparatus 200 transmits the BIM part of the elevator produced by the process of the elevator modeling part 202b in step SA-3 to the terminal device 100 (step SA-4).

そして、端末装置100の制御部102は、ステップSA−4にて情報提供部202cの処理により送信された昇降機のBIMパーツを受信する(ステップSA−5)。   And the control part 102 of the terminal device 100 receives the BIM part of the elevator transmitted by the process of the information provision part 202c in step SA-4 (step SA-5).

そして、端末装置100の統合モデリング部102bは、ステップSA−5にて制御部102の処理により受信された単数または複数の昇降機のBIMパーツを、BIMモデルデータベース106aに記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成する(ステップSA−6)。例えば、統合モデリング部102bは、図5に示すようなエスカレータのBIMパーツを建築物のBIMモデルの組み込んだ統合BIMモデルを作成する。ここで、図5は、BIMモデルにBIMパーツを組み込んだ統合BIMモデルの一例を示す図である。図5では、建築物の完成時におけるエスカレータの設置状態を示す統合BIMモデルの一部が示されている。ここで、ステップSA−6において、統合モデリング部102bは、複数の昇降機のBIMパーツから、作成条件に合致する順位にて建築物のBIMモデルに組み込んだ複数の統合BIMモデルを作成してもよい。また、ステップSA−6において、エラー出力部102iは、統合モデリング部102bが統合BIMモデルを作成できない場合、例えば図7に例示するようにエラー情報を出力する。その後、作成条件を変更するためにステップSA−1の処理に戻り、本処理を繰り返してもよい。   Then, the integrated modeling unit 102b of the terminal device 100 stores the BIM model of the building stored in the BIM model database 106a with the BIM parts of the elevator or elevators received by the processing of the control unit 102 in step SA-5. An integrated BIM model incorporated in the above is created (step SA-6). For example, the integrated modeling unit 102b creates an integrated BIM model in which BIM parts of an escalator as shown in FIG. 5 are incorporated into a BIM model of a building. Here, FIG. 5 is a diagram illustrating an example of an integrated BIM model in which BIM parts are incorporated into the BIM model. FIG. 5 shows a part of the integrated BIM model showing the installation state of the escalator when the building is completed. Here, in step SA-6, the integrated modeling unit 102b may create a plurality of integrated BIM models incorporated in the BIM model of the building from the BIM parts of the plurality of elevators in the order that matches the creation conditions. . In step SA-6, if the integrated modeling unit 102b cannot create an integrated BIM model, the error output unit 102i outputs error information as exemplified in FIG. Thereafter, in order to change the creation condition, the process may return to the process of step SA-1 to repeat this process.

そして、画面生成部102cは、ステップSA−6にて統合モデリング部102bの処理により作成された統合BIMモデルを含むレイアウト画面を生成する(ステップSA−7)。ここで、ステップSA−7において、移動経路生成部102fは、オブジェクト情報データベース106bに記憶されたオブジェクト情報に基づいて、例えば図14〜図16に例示するように統合BIMモデル内で移動するヒトオブジェクトの移動経路を生成してもよい。この場合、画面生成部102cは、移動経路生成部102fの処理により生成された移動経路を更に含むレイアウト画面を生成する。また、ステップSA−7において、搬入経路生成部102gは、BIMモデルデータベース106aに記憶された建築物のBIMモデル、および、ステップSA−5にて制御部102の処理により受信された昇降機のBIMパーツに基づいて、例えば図13に例示するように統合BIMモデル内の設置位置まで昇降機のBIMパーツを搬入するための搬入経路を生成してもよい。この場合、画面生成部102cは、搬入経路生成部102gの処理により生成された搬入経路を更に含むレイアウト画面を生成する。   Then, the screen generation unit 102c generates a layout screen including the integrated BIM model created by the processing of the integrated modeling unit 102b in Step SA-6 (Step SA-7). Here, in step SA-7, the movement path generation unit 102f, based on the object information stored in the object information database 106b, for example, a human object that moves within the integrated BIM model as illustrated in FIGS. It is also possible to generate a movement route. In this case, the screen generation unit 102c generates a layout screen that further includes the movement route generated by the processing of the movement route generation unit 102f. Further, in step SA-7, the carry-in route generation unit 102g receives the BIM model of the building stored in the BIM model database 106a and the BIM part of the elevator received by the processing of the control unit 102 in step SA-5. For example, as illustrated in FIG. 13, a carry-in route for carrying in the BIM parts of the elevator to the installation position in the integrated BIM model may be generated. In this case, the screen generation unit 102c generates a layout screen that further includes the carry-in route generated by the process of the carry-in route generation unit 102g.

そして、画面表示部102dは、ステップSA−7にて画面生成部102cの処理により生成されたレイアウト画面を表示部114に表示させる(ステップSA−8)。例えば、画面表示部102dは、以下に説明する図6〜図11、図13〜図16に示すようなレイアウト画面を表示部114に表示させる。   Then, the screen display unit 102d causes the display unit 114 to display the layout screen generated by the process of the screen generation unit 102c in Step SA-7 (Step SA-8). For example, the screen display unit 102d causes the display unit 114 to display layout screens as illustrated in FIGS. 6 to 11 and FIGS. 13 to 16 described below.

ここで、図6〜11、図13〜図16を参照して、ステップSA−8にて画面表示部102dの処理により表示されたレイアウト画面にて利用者がエスカレータと建築物との取り合いを立体的に確認する例について説明する。   Here, with reference to FIGS. 6 to 11 and FIGS. 13 to 16, the user makes a solid relationship between the escalator and the building on the layout screen displayed by the processing of the screen display unit 102 d in step SA-8. An example to be confirmed will be described.

まず、図6および図7が示す一例について説明する。図6が示すレイアウト画面において、利用者は、エスカレータ側面と建築物の躯体との取り合い(すなわち、隙間)を確認することができる(図6の(a)参照)。また、図7が示すレイアウト画面において、利用者は、エスカレータの架設部と建築物の鉄骨との取り合いを確認することができる(図7の(b)参照)。更に図7が示すレイアウト画面上には、エスカレータの架設部と建築物の鉄骨との取り合いに干渉があることを通知するエラー情報が表示されている。このように、画面表示部102dが三次元の建築躯体データ上にエスカレータを配置した状態の図6および図7のレイアウト画面を表示するので、利用者は、梁や柱との干渉確認やトラス架設方法の詳細検討や、隙間処理の検討、安全対策の検討、法定寸法の確認を行うことができる。その結果、利用者は、トラス架設計画段階において立体的に関連業種との問題点の早期に発見することができるので、事前にこれらの問題点を解決することが可能になる。   First, an example shown in FIGS. 6 and 7 will be described. In the layout screen shown in FIG. 6, the user can confirm the contact (that is, the gap) between the side surface of the escalator and the building frame (see FIG. 6A). Further, on the layout screen shown in FIG. 7, the user can confirm the connection between the escalator construction and the steel frame of the building (see FIG. 7B). Further, on the layout screen shown in FIG. 7, error information for notifying that there is an interference in the connection between the escalator installation part and the steel frame of the building is displayed. As described above, the screen display unit 102d displays the layout screens of FIGS. 6 and 7 in a state where the escalator is arranged on the three-dimensional building frame data, so that the user can confirm the interference with the beams and columns and install the truss. Detailed examination of the method, examination of clearance processing, examination of safety measures, and confirmation of legal dimensions can be performed. As a result, the user can detect problems with the related industries three-dimensionally at the truss rack design stage at an early stage, so that these problems can be solved in advance.

次に、図8および図9が示す一例について説明する。図8が示すレイアウト画面において、利用者は、安全対策用品として設置されたエスカレータ手前の手摺の高さを確認し(図8の(c)参照)、エスカレータと自動運転装置までの必要寸法を確認し(図8の(d)参照)、床の仕上げ材とエスカレータとの取り合いを確認することができる(図8の(e)参照)。また、図9が示すレイアウト画面において、利用者は、エスカレータ側に取付けられた手摺と建築物の躯体側に取付けられた手摺との取り合いを確認し(図9の(f)参照)、壁の仕上げ材とエスカレータの外装パネルとの取り合いを確認することができる(図9の(g)参照)。このように、画面表示部102dが表示する図8および図9のレイアウト画面により、エスカレータ架設後において、エスカレータと手摺との取合い確認や外装仕上げ済みの建築物とエスカレータの外装パネルとの取り合いの確認が可能となる。したがって、利用者は、エスカレータの設置状態について、関連業者間での詳細に検討および確認を立体的に行うことができるので、その結果、施工段階での取合い不備の発生を防止することができる。更に、利用者は、建物の仕上げ設計において、取合い確認不足による再製作時の無駄なコストを抑制できる。   Next, an example shown in FIGS. 8 and 9 will be described. In the layout screen shown in FIG. 8, the user confirms the height of the handrail before the escalator installed as a safety measure (see FIG. 8 (c)), and confirms the necessary dimensions to the escalator and the automatic driving device. (See (d) of FIG. 8), it is possible to confirm the contact between the floor finish and the escalator (see (e) of FIG. 8). In addition, in the layout screen shown in FIG. 9, the user confirms the connection between the handrail attached on the escalator side and the handrail attached on the housing side of the building (see FIG. 9 (f)). The contact between the finishing material and the exterior panel of the escalator can be confirmed (see (g) of FIG. 9). 8 and 9 displayed on the screen display unit 102d in this way, after the escalator is installed, confirmation of the connection between the escalator and the handrail and confirmation of the connection between the exterior finished building and the exterior panel of the escalator Is possible. Therefore, since the user can three-dimensionally examine and confirm the details of the installed state of the escalator between related contractors, it is possible to prevent the occurrence of deficiencies in the construction stage. Furthermore, the user can suppress the useless cost at the time of remanufacturing due to insufficient confirmation of the connection in the finish design of the building.

続いて、図10および図11が示す一例について説明する。図10が示すレイアウト画面において、利用者は、エスカレータのリニューアルに際し、既存エスカレータと新設エスカレータ間で、エレベータの手摺の段差を確認することができる(図10の(h)参照)。また、図11に示すレイアウト画面において、利用者は、改修後のイメージを確認することができる。図11において、(i)が示す2台のエレベータは既存機であり、(j)が示す2台のエレベータ新設機である。このように、画面表示部102dが表示する図10および図11のレイアウト画面により、建物の改修時における既存エスカレータと新設エスカレータとの違いや改修後のイメージの提案が可能となる。したがって、利用者は改修計画のより詳細な立案を行うことができる。   Next, an example shown in FIGS. 10 and 11 will be described. On the layout screen shown in FIG. 10, the user can check the level difference of the elevator handrail between the existing escalator and the new escalator when the escalator is renewed (see (h) in FIG. 10). Further, on the layout screen shown in FIG. 11, the user can confirm the image after the modification. In FIG. 11, two elevators indicated by (i) are existing machines, and two elevator new machines indicated by (j). As described above, the layout screens of FIGS. 10 and 11 displayed by the screen display unit 102d enable the proposal of the difference between the existing escalator and the newly established escalator at the time of renovation of the building and the image after the renovation. Therefore, the user can make a more detailed repair plan.

なお、ステップSA−8にて画面表示部102dの処理によりレイアウト画面を表示した後、変更部102hは、画面表示部102dの処理により表示されたレイアウト画面上でBIMパーツを変更してもよい。この場合、図示しないが、上述のステップSA−7の処理に戻り、画面生成部102cは、変更部102hの処理により変更された昇降機のBIMパーツを含むレイアウト画面を生成し、その後、ステップSA−8の処理へ進む。   In addition, after displaying a layout screen by the process of the screen display part 102d in step SA-8, the change part 102h may change a BIM part on the layout screen displayed by the process of the screen display part 102d. In this case, although not shown, the process returns to the process of step SA-7 described above, and the screen generation unit 102c generates a layout screen including the BIM parts of the elevator changed by the process of the change unit 102h. Proceed to step 8.

再び図3に戻り、動作解析部102eは、ステップSA−8にて画面表示部102dの処理により表示されたレイアウト画面上で昇降機のBIMパーツの動作をシミュレーションする(ステップSA−9)。ここで、ステップSA−9において、動作解析部102eは、以下に説明する図13〜図16に示すように、オブジェクト情報データベース106bに記憶されたオブジェクト情報に基づいてヒトオブジェクトを統合BIMモデル内で移動させながら、エスカレータのBIMパーツの動作をシミュレーションしてもよい。   Returning to FIG. 3 again, the motion analysis unit 102e simulates the operation of the BIM parts of the elevator on the layout screen displayed by the processing of the screen display unit 102d in step SA-8 (step SA-9). Here, in step SA-9, as shown in FIGS. 13 to 16 described below, the motion analysis unit 102e moves the human object in the integrated BIM model based on the object information stored in the object information database 106b. The movement of the BIM part of the escalator may be simulated while moving.

ここで、図12〜図16を参照して、動作解析部102eによるシミュレーションの一例について説明する。ここで、図12は、建築物の設計図書の一例を示す図である。図13は、図12に対応するレイアウト画面の一例を示す図である。図14〜図16は、図13の一部に対応するレイアウト画面の一例を示す図である。   Here, an example of simulation by the motion analysis unit 102e will be described with reference to FIGS. Here, FIG. 12 is a figure which shows an example of the design book of a building. FIG. 13 is a diagram showing an example of a layout screen corresponding to FIG. 14 to 16 are diagrams showing examples of layout screens corresponding to a part of FIG.

以下の例では、上述のステップSA−6において統合モデリング部102bの処理により、図12の建築物の設計図書に対応する図13の統合BIMモデルが作成された場合を想定している。ここで、図13が示すレイアウト画面上の(1)〜(3)地点の付近にはヒトオブジェクトが配置されている。更に図13が示すレイアウト画面上には、エレベータのBIMパーツを設置する設置位置までの搬入経路が表示されている。図13に示した状態において、動作解析部102eは、オブジェクト情報データベース106bに記憶されたオブジェクト情報に基づいてヒトオブジェクトを統合BIMモデル内で移動させながら、昇降機のBIMパーツの動作をシミュレーションする。例えば、図13に示された(1)〜(3)の各地点にそれぞれ対応する図14〜図16に示すように、動作解析部102eは、移動経路生成部102fにより生成された移動経路上でヒトオブジェクトを移動させながら、昇降機(図14〜図16において、エスカレータ)のBIMパーツの動作をシミュレーションする。ここで、動作解析部102eは、利用者に入力される移動条件に応じて、ヒトオブジェクトの数、移動速度、および利用移動経路のうち少なくとも1つを変更してもよい。このように、動作解析部102eは、建物竣工後における利用者の誘導導線や利用環境を可視化するので、利用者は、所定の条件に合わせてエスカレータの運転方向の検証および提案を行うことができる。   In the following example, it is assumed that the integrated BIM model of FIG. 13 corresponding to the building design document of FIG. 12 is created by the processing of the integrated modeling unit 102b in step SA-6. Here, human objects are arranged in the vicinity of points (1) to (3) on the layout screen shown in FIG. Furthermore, on the layout screen shown in FIG. 13, a carry-in route to the installation position where the elevator BIM parts are installed is displayed. In the state shown in FIG. 13, the motion analysis unit 102e simulates the motion of the BIM parts of the elevator while moving the human object in the integrated BIM model based on the object information stored in the object information database 106b. For example, as shown in FIGS. 14 to 16 corresponding to the points (1) to (3) shown in FIG. 13, the motion analysis unit 102e is on the movement route generated by the movement route generation unit 102f. The movement of the BIM parts of the elevator (escalator in FIGS. 14 to 16) is simulated while moving the human object. Here, the motion analysis unit 102e may change at least one of the number of human objects, the movement speed, and the use movement route according to the movement condition input to the user. In this way, the motion analysis unit 102e visualizes the user's guide wire and usage environment after the building is completed, so that the user can verify and propose the driving direction of the escalator in accordance with predetermined conditions. .

以上で、第1の実施形態におけるBIMシステムの処理の一例の説明を終える。   Above, description of an example of the process of the BIM system in 1st Embodiment is finished.

[第2の実施形態]
続いて、第2の実施形態について、図17および図18を参照して以下に説明する。ここで、図17は、第2の実施形態におけるBIMシステムの構成の一例を示すブロック図であり、該構成のうち本実施形態に関係する部分を概念的に示している。
[Second Embodiment]
Next, a second embodiment will be described below with reference to FIGS. 17 and 18. Here, FIG. 17 is a block diagram showing an example of the configuration of the BIM system in the second embodiment, and conceptually shows a part related to the present embodiment in the configuration.

なお、第2の実施形態においては、サーバ装置200側で統合BIMモデルを作成し、当該統合BIMモデルを端末装置100へ送信している。このように、第2の実施形態は、サーバ装置200にてサーバ主導で処理を行う点が、その他の実施形態と異なる。   In the second embodiment, an integrated BIM model is created on the server device 200 side, and the integrated BIM model is transmitted to the terminal device 100. As described above, the second embodiment is different from the other embodiments in that the server apparatus 200 performs processing led by the server.

[第2の実施形態におけるBIMシステムの構成]
まず、第2の実施形態におけるBIMシステムの構成の一例について、図17を参照して以下に説明する。
[Configuration of BIM System in Second Embodiment]
First, an example of the configuration of the BIM system in the second embodiment will be described below with reference to FIG.

図17に示すように、第2の実施形態のサーバ装置200は、出力部(表示部114および音声出力部116)と入力部118と制御部102とを少なくとも備えた端末装置100に通信可能に接続され、制御部202と記憶部206とを少なくとも備える。通信には、一例として、ネットワーク300を介した有線・無線通信等の遠隔通信等を含む。また、これらサーバ装置200および端末装置100の各部は任意の通信路を介して通信可能に接続されている。   As illustrated in FIG. 17, the server device 200 according to the second embodiment can communicate with a terminal device 100 including at least an output unit (display unit 114 and audio output unit 116), an input unit 118, and a control unit 102. It is connected and includes at least a control unit 202 and a storage unit 206. As an example, the communication includes remote communication such as wired / wireless communication via the network 300. Each unit of the server device 200 and the terminal device 100 is communicably connected via an arbitrary communication path.

図17において、サーバ装置200は、端末装置100から送信される作成条件に対応する昇降機のBIMパーツを、記憶部206に記憶されたパーツ情報を用いて作成し、作成された昇降機のBIMパーツを、記憶部206に記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成し、作成された統合BIMモデルを端末装置100へ送信することにより、端末装置100において、当該統合BIMモデルを含むレイアウト画面を表示部114に表示させる等の機能を有する。   In FIG. 17, the server device 200 creates elevator BIM parts corresponding to the creation conditions transmitted from the terminal device 100 using the part information stored in the storage unit 206, and creates the elevator BIM parts thus created. The terminal device 100 includes the integrated BIM model by creating an integrated BIM model incorporated in the BIM model of the building stored in the storage unit 206 and transmitting the generated integrated BIM model to the terminal device 100. A function of displaying a layout screen on the display unit 114 is provided.

なお、サーバ装置200における通信制御インターフェース部204および記憶部206(パーツ情報データベース206a、BIMモデルデータベース206b、および、オブジェクト情報データベース206c等)の機能、また、端末装置100における表示部114、音声出力部116、および、入力部118の機能は、第1の実施形態と同様であるため説明を省略する。   Note that the functions of the communication control interface unit 204 and the storage unit 206 (part information database 206a, BIM model database 206b, object information database 206c, etc.) in the server device 200, the display unit 114 in the terminal device 100, and the audio output unit Since the functions of 116 and the input unit 118 are the same as those in the first embodiment, the description thereof is omitted.

また、図17において、制御部202は、OS等の制御プログラムや、各種の処理手順等を規定したプログラム、および、所要データを格納するための内部メモリを有する。そして、制御部202は、これらのプログラム等により、種々の処理を実行するための情報処理を行う。制御部202は、機能概念的に、作成条件受信部202a、昇降機モデリング部202b、情報提供部202c、統合モデリング部202d、移動経路生成部202e、搬入経路生成部202f、および、エラー出力部202gを備える。なお、作成条件受信部202aおよび昇降機モデリング部202bの機能は、第1の実施形態と同様であるため説明を省略する。以下、説明を簡単にするため、統合モデリング部202d〜エラー出力部202gを先に説明し、情報提供部202cを最後に説明する。   In FIG. 17, the control unit 202 includes an internal memory for storing a control program such as an OS, a program defining various processing procedures, and necessary data. And the control part 202 performs the information processing for performing various processes with these programs. The control unit 202 includes a creation condition receiving unit 202a, an elevator modeling unit 202b, an information providing unit 202c, an integrated modeling unit 202d, a movement route generation unit 202e, a carry-in route generation unit 202f, and an error output unit 202g in terms of functions. Prepare. Note that the functions of the creation condition receiving unit 202a and the elevator modeling unit 202b are the same as those in the first embodiment, and a description thereof will be omitted. Hereinafter, in order to simplify the description, the integrated modeling unit 202d to the error output unit 202g will be described first, and the information providing unit 202c will be described last.

このうち、統合モデリング部202dは、昇降機モデリング部202bにより作成された昇降機のBIMパーツを、BIMモデルデータベース206bに記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段である。ここで、統合モデリング部202dは、作成した統合BIMモデルを記憶部206に格納して、統合BIMモデルデータベース(図示せず)を構築してもよい。   Among them, the integrated modeling unit 202d is an integrated modeling unit that creates an integrated BIM model in which the BIM part of the elevator created by the elevator modeling unit 202b is incorporated in the BIM model of the building stored in the BIM model database 206b. . Here, the integrated modeling unit 202d may store the created integrated BIM model in the storage unit 206 to construct an integrated BIM model database (not shown).

また、移動経路生成部202eは、オブジェクト情報データベース206cに記憶されたオブジェクト情報に基づいて、統合BIMモデル内で移動するヒトオブジェクトの移動経路を生成する移動経路生成手段である。具体的には、移動経路生成部202eは、オブジェクト情報に含まれる移動条件およびBIMモデル内ネットワークデータを用いて、端末装置100から入力された各ヒトオブジェクトの出発地と目的地と少なくとも含む移動条件、を満たす出発地から目的地までの移動経路を生成する。ここで、移動条件は、経由地、移動手段(例えば、階段利用、昇降機(エレベータ、乗客コンベア(エスカレータまたは動く歩道を含む)利用等)、出発時刻、経由時刻、到着時刻、および、移動速度のうち少なくとも1つを含んでいてもよい。また、移動条件は、利用者により入力部118を介して入力されたものであってもよいし、予め移動条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。   The movement route generation unit 202e is movement route generation means for generating a movement route of a human object that moves within the integrated BIM model based on the object information stored in the object information database 206c. Specifically, the movement route generation unit 202e uses the movement condition included in the object information and the network data in the BIM model, and the movement condition including at least the starting point and the destination of each human object input from the terminal device 100. , A travel route from the starting point to the destination that satisfies the above is generated. Here, the moving conditions are transit points, moving means (for example, use of stairs, elevators (including elevators, passenger conveyors (including escalators or moving walkways)), departure time, via time, arrival time, and movement speed. The movement condition may be input by the user via the input unit 118, or an external storage device (not shown) in which the movement condition is stored in advance. It may be read from

また、搬入経路生成部202fは、BIMモデルデータベース206bに記憶された建築物のBIMモデル、および、昇降機モデリング部202bにより作成された昇降機のBIMパーツに基づいて、統合BIMモデル内の設置位置まで昇降機のBIMパーツを搬入するための搬入経路を生成する搬入経路生成手段である。具体的には、搬入経路生成部202fは、建築物のBIMモデルに含まれる建築物の構造情報、および、昇降機のBIMパーツに含まれるパーツ情報が示す昇降機のBIMパーツのサイズ情報に基づいて、昇降機のBIMパーツを設置するBIMモデル内の設置位置までの搬入経路を生成する。ここで、昇降機のBIMパーツのサイズ情報は、当該昇降機のBIMパーツを構成する各ユニットのサイズ情報を含む。搬入経路生成部202fは、昇降機のBIMパーツを構成する各ユニットのサイズ情報に基づいて、昇降機のBIMパーツを設置するBIMモデル内の設置位置までの搬入経路を、ユニットごとに生成してもよい。   Further, the carry-in route generation unit 202f is based on the BIM model of the building stored in the BIM model database 206b and the BIM part of the elevator created by the elevator modeling unit 202b. It is a carrying-in path | route production | generation means which produces | generates the carrying-in path | route for carrying in BIM parts. Specifically, the carry-in route generation unit 202f is based on the structure information of the building included in the BIM model of the building and the size information of the BIM part of the elevator indicated by the part information included in the BIM part of the elevator. A carry-in route to the installation position in the BIM model for installing the BIM parts of the elevator is generated. Here, the size information of the BIM part of the elevator includes the size information of each unit constituting the BIM part of the elevator. The carry-in route generation unit 202f may generate, for each unit, a carry-in route to the installation position in the BIM model in which the BIM part of the elevator is installed based on the size information of each unit that configures the BIM part of the elevator. .

また、エラー出力部202gは、統合モデリング部202dが統合BIMモデルを作成できない場合、エラー情報を端末装置100へ送信することで出力するエラー出力手段である。具体的には、エラー出力部202gは、統合モデリング部202dが昇降機のBIMパーツを設置するBIMモデル内の設置位置にて当該昇降機のBIMパーツを組み込めない場合、当該状況を利用者に通知するエラー情報を端末装置100へ送信することで出力する。エラー情報は、文字データであってもよいし、音声データであってもよい。更に、エラー出力部202gは、統合モデリング部202dがどのような条件であればBIMモデル内の設置位置にて昇降機のBIMパーツを組み込めるかを示すガイド情報をエラー情報として出力してもよい。ガイド情報は、昇降機のBIMパーツの仕様を示す情報であってもよい。   The error output unit 202g is an error output unit that outputs error information to the terminal device 100 when the integrated modeling unit 202d cannot create an integrated BIM model. Specifically, when the integrated modeling unit 202d cannot install the BIM part of the elevator at the installation position in the BIM model where the integrated modeling unit 202d installs the BIM part of the elevator, the error output unit 202g notifies the user of the situation. Information is output by transmitting it to the terminal device 100. The error information may be character data or voice data. Furthermore, the error output unit 202g may output, as error information, guide information that indicates under what conditions the integrated modeling unit 202d can incorporate the BIM part of the elevator at the installation position in the BIM model. The guide information may be information indicating the specifications of the BIM parts of the elevator.

また、情報提供部202cは、統合モデリング部202dにより作成された統合BIMモデルを端末装置100へ送信する情報提供手段である。ここで、情報提供部202cは、移動経路生成部202により作成された移動経路、および、搬入経路生成部202fにより作成された搬入経路のうち少なくとも1つを、統合BIMモデルとともに送信してもよい。ここで、統合BIMモデルはヒトオブジェクトを含む。   The information providing unit 202 c is an information providing unit that transmits the integrated BIM model created by the integrated modeling unit 202 d to the terminal device 100. Here, the information providing unit 202c may transmit at least one of the movement route created by the movement route generation unit 202 and the carry-in route created by the carry-in route generation unit 202f together with the integrated BIM model. . Here, the integrated BIM model includes a human object.

なお、図17において、端末装置100の制御部102は、図示しないが第1の実施形態と同様に、画面生成手段、画面表示手段、変更手段、動作解析手段を備えている。第2の実施形態では、端末装置100が備える画面生成手段がサーバ装置200から受信した統合BIMモデルを含むレイアウト画面を生成する点を除き、各手段の機能は第1の実施形態と同様であるため説明を省略する。   In FIG. 17, the control unit 102 of the terminal device 100 includes a screen generation unit, a screen display unit, a change unit, and an operation analysis unit, which are not illustrated, as in the first embodiment. In the second embodiment, the function of each unit is the same as that of the first embodiment, except that the screen generation unit included in the terminal device 100 generates a layout screen including the integrated BIM model received from the server device 200. Therefore, explanation is omitted.

以上で、第2の実施形態におけるBIMシステムの構成の一例の説明を終える。   Above, description of an example of a structure of the BIM system in 2nd Embodiment is finished.

[第2の実施形態におけるBIMシステムの処理]
次に、このように構成された第2の実施形態におけるBIMシステムの処理の一例について、以下に図18を参照して詳細に説明する。図18は、第2の実施形態におけるBIMシステムの処理の一例を示すフローチャートである。
[Process of BIM System in Second Embodiment]
Next, an example of processing of the BIM system in the second embodiment configured as described above will be described in detail with reference to FIG. FIG. 18 is a flowchart illustrating an example of processing of the BIM system in the second embodiment.

図18に示すように、まず、端末装置100の制御部102は、利用者により入力される作成条件をサーバ装置200へ送信する(ステップSB−1)。   As shown in FIG. 18, first, the control unit 102 of the terminal device 100 transmits a creation condition input by the user to the server device 200 (step SB-1).

そして、サーバ装置200の作成条件受信部202aは、ステップSB−1にて制御部102の処理により送信される作成条件を受信する(ステップSB−2)。   Then, the creation condition receiving unit 202a of the server device 200 receives the creation condition transmitted by the process of the control unit 102 in step SB-1 (step SB-2).

そして、サーバ装置200の昇降機モデリング部202bは、ステップSB−2にて作成条件受信部202aの処理により受信された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース206aに記憶されたパーツ情報を用いて作成する(ステップSB−3)。例えば、昇降機モデリング部202bは、上述の図4に示すようなエスカレータのBIMパーツを作成する。ここで、ステップSB−3において、昇降機モデリング部202bは、作成条件を満たす複数の昇降機のBIMパーツを作成してもよい。   Then, the elevator modeling unit 202b of the server device 200 stores the BIM part of the elevator corresponding to the creation condition received by the process of the creation condition receiving unit 202a in step SB-2, in the part information database 206a. (Step SB-3). For example, the elevator modeling unit 202b creates an escalator BIM part as shown in FIG. Here, in step SB-3, the elevator modeling unit 202b may create BIM parts of a plurality of elevators that satisfy the creation condition.

そして、サーバ装置200の統合モデリング部202dは、ステップSB−3にて昇降機モデリング部202bの処理により作成された昇降機のBIMパーツを、BIMモデルデータベース206bに記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成する(ステップSB−4)。例えば、統合モデリング部202dは、上述の図5に示すようなエスカレータのBIMパーツを建築物のBIMモデルの組み込んだ統合BIMモデルを作成する。ここで、ステップSB−4において、移動経路生成部202eは、オブジェクト情報データベース206cに記憶されたオブジェクト情報に基づいて、上述の図14〜図16に示すような統合BIMモデル内で移動するヒトオブジェクトの移動経路を生成してもよい。また、ステップSB−4において、搬入経路生成部202fは、BIMモデルデータベース206bに記憶された建築物のBIMモデル、および、ステップSB−3にて昇降機モデリング部202bの処理により作成された昇降機のBIMパーツに基づいて、上述の図13に示すような統合BIMモデル内の設置位置まで昇降機のBIMパーツを搬入するための搬入経路を生成してもよい。また、ステップSB−4において、統合モデリング部202dは、複数の昇降機のBIMパーツから、作成条件に合致する順位にて建築物のBIMモデルに組み込んだ複数の統合BIMモデルを作成してもよい。また、ステップSB−4において、エラー出力部202gは、統合モデリング部202dが統合BIMモデルを作成できない場合、エラー情報を端末装置100へ送信することで出力する。   Then, the integrated modeling unit 202d of the server device 200 incorporates the elevator BIM part created by the processing of the elevator modeling unit 202b in Step SB-3 into the BIM model of the building stored in the BIM model database 206b. An integrated BIM model is created (step SB-4). For example, the integrated modeling unit 202d creates an integrated BIM model in which the BIM part of the escalator as shown in FIG. 5 is incorporated into the BIM model of the building. Here, in step SB-4, the movement path generation unit 202e moves based on the object information stored in the object information database 206c in the integrated BIM model as shown in FIGS. 14 to 16 described above. It is also possible to generate a movement route. Further, in step SB-4, the carry-in route generation unit 202f displays the building BIM model stored in the BIM model database 206b, and the elevator BIM created by the processing of the elevator modeling unit 202b in step SB-3. Based on the parts, a carry-in route for carrying the BIM parts of the elevator to the installation position in the integrated BIM model as shown in FIG. 13 may be generated. Further, in step SB-4, the integrated modeling unit 202d may create a plurality of integrated BIM models incorporated in the BIM model of the building from the BIM parts of the plurality of elevators in the order that matches the creation conditions. In step SB-4, if the integrated modeling unit 202d cannot create an integrated BIM model, the error output unit 202g outputs error information by transmitting it to the terminal device 100.

そして、サーバ装置200の情報提供部202cは、ステップSB−4にて統合モデリング部202dの処理により作成された統合BIMモデルを端末装置100へ送信する(ステップSB−5)。ここで、ステップSB−5において、情報提供部202cは、ステップSB−4にて移動経路生成部202eの処理により作成された移動経路、および、ステップSB−4にて搬入経路生成部202fの処理により作成された搬入経路のうち少なくとも1つを、統合BIMモデルとともに送信する。   Then, the information providing unit 202c of the server device 200 transmits the integrated BIM model created by the processing of the integrated modeling unit 202d in Step SB-4 to the terminal device 100 (Step SB-5). Here, in step SB-5, the information providing unit 202c processes the movement route created by the processing of the movement route generation unit 202e in step SB-4, and the processing of the carry-in route generation unit 202f in step SB-4. At least one of the carry-in routes created by the above is transmitted together with the integrated BIM model.

そして、端末装置100の制御部102は、ステップSB−5にて情報提供部202cの処理によりサーバ装置200から送信された統合BIMモデルを受信する(ステップSB−6)。ここで、ステップSB−6において、制御部102は、ステップSB−5にて情報提供部202cの処理によりサーバ装置200から送信された移動経路および搬入経路を受信する。   And the control part 102 of the terminal device 100 receives the integrated BIM model transmitted from the server apparatus 200 by the process of the information provision part 202c in step SB-5 (step SB-6). Here, in step SB-6, the control unit 102 receives the movement route and the carry-in route transmitted from the server device 200 by the processing of the information providing unit 202c in step SB-5.

そして、端末装置100の制御部102は、ステップSB−6にて制御部102の処理により受信された統合BIMモデルを含むレイアウト画面を生成する(ステップSB−7)。ここで、ステップSB−7において、制御部102は、ステップSB−6にて制御部102の処理により受信された移動経路を更に含むレイアウト画面を生成する。また、ステップSB−7において、制御部102は、ステップSB−6にて制御部102の処理により受信された搬入経路を更に含むレイアウト画面を生成する。   And the control part 102 of the terminal device 100 produces | generates the layout screen containing the integrated BIM model received by the process of the control part 102 in step SB-6 (step SB-7). Here, in step SB-7, the control unit 102 generates a layout screen further including the movement route received by the process of the control unit 102 in step SB-6. In step SB-7, the control unit 102 generates a layout screen further including the carry-in route received by the process of the control unit 102 in step SB-6.

そして、端末装置100の制御部102は、ステップSB−7にて制御部102の処理により生成されたレイアウト画面を表示部114に表示させる(ステップSB−8)。例えば、制御部102は、上述の図6〜図11、図13〜図16に示すようなレイアウト画面を表示部114に表示させる。   And the control part 102 of the terminal device 100 displays the layout screen produced | generated by the process of the control part 102 in step SB-7 on the display part 114 (step SB-8). For example, the control unit 102 causes the display unit 114 to display layout screens such as those shown in FIGS. 6 to 11 and 13 to 16 described above.

そして、端末装置100の制御部102は、ステップSB−8にて制御部102の処理により表示されたレイアウト画面上で昇降機のBIMパーツの動作をシミュレーションする(ステップSB−9)。ここで、ステップSB−9において、制御部102は、上述の図13〜図16に示すように、統合BIMモデル内の含まれるヒトオブジェクトを統合BIMモデル内で移動させながら、エスカレータのBIMパーツの動作をシミュレーションしてもよい。   And the control part 102 of the terminal device 100 simulates operation | movement of the BIM part of an elevator on the layout screen displayed by the process of the control part 102 in step SB-8 (step SB-9). Here, in step SB-9, as shown in FIGS. 13 to 16, the control unit 102 moves the human objects included in the integrated BIM model in the integrated BIM model, and moves the BIM parts of the escalator. The operation may be simulated.

以上で、第2の実施形態におけるBIMシステムの処理の一例の説明を終える。   Above, description of an example of the process of the BIM system in 2nd Embodiment is finished.

[第3の実施形態]
続いて、第3の実施形態について、図19および図20を参照して以下に説明する。ここで、図19は、第3の実施形態におけるBIMシステムの構成の一例を示すブロック図であり、該構成のうち本実施形態に関係する部分を概念的に示している。ここで、第3の実施形態におけるBIMシステムは、スタンドアロン型に構成され単独で処理を行うBIM装置400により実現される。
[Third Embodiment]
Next, a third embodiment will be described below with reference to FIGS. 19 and 20. Here, FIG. 19 is a block diagram showing an example of the configuration of the BIM system in the third embodiment, and conceptually shows a part related to the present embodiment in the configuration. Here, the BIM system in the third embodiment is realized by the BIM device 400 configured as a stand-alone type and performing processing alone.

なお、第3の実施形態においては、全ての機能をBIM装置400に集約し、当該BIM装置400は、利用者により入力される作成条件に対応するBIMパーツを記憶部406に記憶されたパーツ情報を用いて作成し、作成されたBIMパーツを記憶部406に記憶されたBIMモデルに組み込んだ統合BIMモデルを作成し、作成された統合BIMモデルを含むレイアウト画面を生成し、生成されたレイアウト画面を表示部414に表示させる等の機能を有する。このように、第3の実施形態は、BIM装置400がスタンドアロン型に構成され単独で処理を行う点がその他の実施形態と異なる。   Note that in the third embodiment, all functions are integrated into the BIM device 400, and the BIM device 400 stores the BIM parts corresponding to the creation conditions input by the user in the storage unit 406. An integrated BIM model is created by using the BIM part and the created BIM part is incorporated into the BIM model stored in the storage unit 406, a layout screen including the created integrated BIM model is generated, and the generated layout screen is generated. And the like are displayed on the display portion 414. Thus, the third embodiment differs from the other embodiments in that the BIM device 400 is configured as a stand-alone type and performs processing alone.

[第3の実施形態におけるBIMシステムの構成]
まず、第3の実施形態におけるBIMシステムの構成の一例について、図19を参照して以下に説明する。
[Configuration of BIM System in Third Embodiment]
First, an example of the configuration of the BIM system in the third embodiment will be described below with reference to FIG.

図19に示すように、第3の実施形態のBIM装置400は、出力部(表示部414および音声出力部416)と入力部418と制御部402と記憶部406とを少なくとも備える。これらBIM装置400の各部は任意の通信路を介して通信可能に接続されてもよい。BIM装置400は、例えば、PND(Portable Navigation Device)等の各種情報処理端末、ノート型のパーソナルコンピュータ等の各種情報処理装置、または、携帯電話やPHSやPDA等の携帯端末装置等であってもよい。また、BIM装置400は、通信制御インターフェース部(図示せず)を介してネットワークを経由し、外部装置と相互に通信可能に接続されていてもよい。   As illustrated in FIG. 19, the BIM device 400 according to the third embodiment includes at least an output unit (display unit 414 and audio output unit 416), an input unit 418, a control unit 402, and a storage unit 406. Each unit of these BIM devices 400 may be connected to be communicable via an arbitrary communication path. The BIM device 400 may be, for example, various information processing terminals such as a PND (Portable Navigation Device), various information processing devices such as a notebook personal computer, or a mobile terminal device such as a mobile phone, PHS, or PDA. Good. Further, the BIM device 400 may be connected to an external device so as to be able to communicate with each other via a communication control interface unit (not shown).

図19において、入出力制御インターフェース部408、表示部414、音声出力部416、および、入力部418の各機能は、第1の実施形態と同様であるため説明を省略する。また、記憶部406の各部(パーツ情報データベース406a、BIMモデルデータベース406b、および、オブジェクト情報データベース406c等)についても、サーバ装置200ではなくBIM装置400に備えられている点を除き、各機能が第1の実施形態と同様であるため説明を省略する。   In FIG. 19, the functions of the input / output control interface unit 408, the display unit 414, the audio output unit 416, and the input unit 418 are the same as those in the first embodiment, and thus description thereof is omitted. In addition, each function of the storage unit 406 (part information database 406a, BIM model database 406b, object information database 406c, etc.) is the same except that it is provided in the BIM device 400 instead of the server device 200. Since it is the same as that of 1 embodiment, description is abbreviate | omitted.

また、制御部402の各部については、本実施形態のBIM装置400がスタンドアロン型であり、制御部402が各送信部を備えていない点を除き、各機能は第1の実施形態と基本的に同様である。   As for each part of the control unit 402, each function is basically the same as that of the first embodiment, except that the BIM device 400 of the present embodiment is a stand-alone type and the control unit 402 does not include each transmission unit. It is the same.

また、図19において、制御部402は、OS等の制御プログラムや、各種の処理手順等を規定したプログラム、および、所要データを格納するための内部メモリを有する。そして、制御部402は、これらのプログラム等により、種々の処理を実行するための情報処理を行う。制御部402は、機能概念的に、作成条件設定部402a、昇降機モデリング部402b、統合モデリング部402c、画面生成部402d、画面表示部402e、動作解析部402f、移動経路生成部402g、搬入経路生成部402h、変更部402i、および、エラー出力部402jを備える。   In FIG. 19, the control unit 402 has an internal memory for storing a control program such as an OS, a program that defines various processing procedures, and required data. And the control part 402 performs the information processing for performing various processes with these programs. The control unit 402 has a functional concept in terms of a creation condition setting unit 402a, an elevator modeling unit 402b, an integrated modeling unit 402c, a screen generation unit 402d, a screen display unit 402e, a motion analysis unit 402f, a movement route generation unit 402g, and a carry-in route generation. Unit 402h, changing unit 402i, and error output unit 402j.

このうち、作成条件設定部402aは、利用者により入力される作成条件を設定する作成条件設定手段である。ここで、作成条件は、利用者が所望する昇降機の仕様を示す条件である。つまり、作成条件は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するための条件を指定する。また、作成条件は、利用者により入力部418を介して入力されたものであってもよいし、予め作成条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。   Among these, the creation condition setting unit 402a is creation condition setting means for setting a creation condition input by the user. Here, the creation conditions are conditions indicating the specifications of the elevator desired by the user. That is, the creation condition specifies a condition for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. The creation conditions may be input by the user via the input unit 418, or may be read from an external storage device (not shown) in which the creation conditions are stored in advance. Good.

また、昇降機モデリング部402bは、作成条件設定部402aにより設定された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース406aに記憶されたパーツ情報を用いて作成する昇降機モデリング手段である。ここで、昇降機モデリング部402bは、作成した昇降機のBIMパーツを記憶部406に格納して、BIMパーツデータベース(図示せず)を構築してもよい。   The elevator modeling unit 402b is an elevator modeling unit that creates elevator BIM parts corresponding to the creation conditions set by the creation condition setting unit 402a using the part information stored in the part information database 406a. Here, the elevator modeling unit 402b may store the created BIM parts of the elevator in the storage unit 406 to construct a BIM parts database (not shown).

また、統合モデリング部402cは、昇降機モデリング部402bにより作成された昇降機のBIMパーツを、BIMモデルデータベース406bに記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段である。ここで、統合モデリング部402cは、作成した統合BIMモデルを記憶部406に格納して、統合BIMモデルデータベース(図示せず)を構築してもよい。   The integrated modeling unit 402c is an integrated modeling unit that creates an integrated BIM model in which the elevator BIM parts created by the elevator modeling unit 402b are incorporated into the building BIM model stored in the BIM model database 406b. Here, the integrated modeling unit 402c may store the created integrated BIM model in the storage unit 406 to construct an integrated BIM model database (not shown).

また、画面生成部402dは、統合モデリング部402cにより作成された統合BIMモデルを含むレイアウト画面を生成する画面生成手段である。ここで、画面生成部402dは、後述の移動経路生成部402gにより生成された移動経路を更に含むレイアウト画面を生成してもよい。また、画面生成部402dは、後述の搬入経路生成部402hにより生成された搬入経路を更に含むレイアウト画面を生成してもよい。また、画面生成部402dは、後述の変更部402iにより変更された昇降機のBIMパーツを含むレイアウト画面を生成してもよい。   The screen generation unit 402d is a screen generation unit that generates a layout screen including the integrated BIM model created by the integrated modeling unit 402c. Here, the screen generation unit 402d may generate a layout screen further including a movement route generated by a movement route generation unit 402g described later. The screen generation unit 402d may generate a layout screen that further includes a carry-in route generated by a carry-in route generation unit 402h described later. Moreover, the screen generation unit 402d may generate a layout screen including the elevator BIM parts changed by the changing unit 402i described later.

また、画面表示部402eは、画面生成部402dにより生成されたレイアウト画面を表示部414に表示させる画面表示手段である。   The screen display unit 402e is a screen display unit that causes the display unit 414 to display the layout screen generated by the screen generation unit 402d.

また、動作解析部402fは、画面表示部402eにより表示されたレイアウト画面上で昇降機のBIMパーツの動作をシミュレーションする動作解析手段である。具体的には、動作解析部402fは、昇降機のBIMパーツに含まれるパーツ情報が示すBIMパーツの動作パラメータに基づいて昇降機のBIMパーツの動作をシミュレーションする。ここで、動作解析部402fは、オブジェクト情報データベース406cに記憶されたオブジェクト情報に基づいてヒトオブジェクトを統合BIMモデル内で移動させながら、昇降機のBIMパーツの動作をシミュレーションしてもよい。この場合、動作解析部402fは、後述の移動経路生成部402gにより生成された移動経路上でヒトオブジェクトを移動させながら、昇降機のBIMパーツの動作をシミュレーションする。また、動作解析部402fは、利用者に入力される移動条件に応じて、ヒトオブジェクトの数、移動速度、および利用移動経路のうち少なくとも1つを変更してもよい。   The motion analysis unit 402f is a motion analysis unit that simulates the operation of the BIM parts of the elevator on the layout screen displayed by the screen display unit 402e. Specifically, the operation analysis unit 402f simulates the operation of the BIM part of the elevator based on the operation parameter of the BIM part indicated by the part information included in the BIM part of the elevator. Here, the motion analysis unit 402f may simulate the motion of the BIM parts of the elevator while moving the human object in the integrated BIM model based on the object information stored in the object information database 406c. In this case, the motion analysis unit 402f simulates the motion of the BIM parts of the elevator while moving the human object on the movement route generated by the movement route generation unit 402g described later. In addition, the motion analysis unit 402f may change at least one of the number of human objects, the movement speed, and the use movement route according to the movement condition input to the user.

また、移動経路生成部402gは、オブジェクト情報データベース406cに記憶されたオブジェクト情報に基づいて、統合BIMモデル内で移動するヒトオブジェクトの移動経路を生成する移動経路生成手段である。具体的には、移動経路生成部402gは、オブジェクト情報に含まれる移動条件およびBIMモデル内ネットワークデータを用いて、各ヒトオブジェクトの出発地と目的地と少なくとも含む移動条件を満たす出発地から目的地までの移動経路を生成する。ここで、移動条件は、経由地、移動手段(例えば、階段利用、昇降機(エレベータ、乗客コンベア(エスカレータまたは動く歩道を含む)利用等)、出発時刻、経由時刻、到着時刻、および、移動速度のうち少なくとも1つを含んでいてもよい。移動条件は、利用者により入力部418を介して入力されたものであってもよいし、予め移動条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。   The movement path generation unit 402g is a movement path generation unit that generates a movement path of a human object that moves in the integrated BIM model based on the object information stored in the object information database 406c. Specifically, the movement route generation unit 402g uses the movement condition included in the object information and the network data in the BIM model, from the departure point that satisfies the movement condition including at least the departure point and the destination of each human object. Generate a travel route to Here, the moving conditions are transit points, moving means (for example, use of stairs, elevators (including elevators, passenger conveyors (including escalators or moving walkways)), departure time, via time, arrival time, and movement speed. The movement condition may be input by the user via the input unit 418, or an external storage device (not shown) in which the movement condition is stored in advance. It may be read from.

また、搬入経路生成部402hは、BIMモデルデータベース406bに記憶された建築物のBIMモデル、および、昇降機モデリング部402bにより作成された昇降機のBIMパーツに基づいて、統合BIMモデル内の設置位置まで昇降機のBIMパーツを搬入するための搬入経路を生成する搬入経路生成手段である。具体的には、搬入経路生成部402hは、建築物のBIMモデルに含まれる建築物の構造情報、および、昇降機のBIMパーツに含まれるパーツ情報が示す昇降機のBIMパーツのサイズ情報に基づいて、昇降機のBIMパーツを設置する設置位置までの搬入経路を生成する。ここで、昇降機のBIMパーツのサイズ情報は、当該昇降機のBIMパーツを構成する各ユニットのサイズ情報を含む。搬入経路生成部402hは、昇降機のBIMパーツを構成する各ユニットのサイズ情報に基づいて、昇降機のBIMパーツを設置する設置位置までの搬入経路を、ユニットごとに生成してもよい。   Further, the carry-in route generation unit 402h is based on the BIM model of the building stored in the BIM model database 406b and the BIM part of the elevator created by the elevator modeling unit 402b, and moves up and down to the installation position in the integrated BIM model. It is a carrying-in path | route production | generation means which produces | generates the carrying-in path | route for carrying in BIM parts. Specifically, the carry-in route generation unit 402h is based on the structure information of the building included in the BIM model of the building and the size information of the BIM part of the elevator indicated by the part information included in the BIM part of the elevator. A carry-in route to the installation position for installing the elevator BIM parts is generated. Here, the size information of the BIM part of the elevator includes the size information of each unit constituting the BIM part of the elevator. The carry-in route generation unit 402h may generate, for each unit, a carry-in route to the installation position where the BIM part of the elevator is installed based on the size information of each unit constituting the BIM part of the elevator.

また、変更部402iは、画面表示部402eにより表示されたレイアウト画面上でBIMパーツを変更する変更手段である。具体的には、変更部402iは、利用者により入力される変更条件に応じてBIMパーツに含まれるパーツ情報の設定パラメータを変更することで、当該BIMパーツを変更する。設定パラメータは、BIMパーツを構成する各ユニットのサイズ、色、材質等を規定するパラメータを含む。   The changing unit 402i is a changing unit that changes the BIM parts on the layout screen displayed by the screen display unit 402e. Specifically, the changing unit 402i changes the BIM part by changing the setting parameter of the part information included in the BIM part according to the changing condition input by the user. The setting parameters include parameters that define the size, color, material, etc. of each unit constituting the BIM part.

また、エラー出力部402jは、統合モデリング部402cが統合BIMモデルを作成できない場合、エラー情報を出力するエラー出力手段である。具体的には、エラー出力部402jは、統合モデリング部402cが昇降機のBIMパーツを設置するBIMモデル内の設置位置にて当該昇降機のBIMパーツを組み込めない場合、当該状況を利用者に通知するエラー情報を出力する。エラー情報は、文字データであってもよいし、音声データであってもよい。更に、エラー出力部402jは、統合モデリング部402cがどのような条件であればBIMモデル内の設置位置にて昇降機のBIMパーツを組み込めるかを示すガイド情報をエラー情報として出力してもよい。ガイド情報は、昇降機のBIMパーツの仕様を示す情報であってもよい。   The error output unit 402j is an error output unit that outputs error information when the integrated modeling unit 402c cannot create an integrated BIM model. Specifically, if the integrated modeling unit 402c cannot incorporate the BIM part of the elevator at the installation position in the BIM model where the integrated modeling unit 402c installs the BIM part of the elevator, the error output unit 402j notifies the user of the situation. Output information. The error information may be character data or voice data. Further, the error output unit 402j may output, as error information, guide information that indicates under what conditions the integrated modeling unit 402c can incorporate the BIM part of the elevator at the installation position in the BIM model. The guide information may be information indicating the specifications of the BIM parts of the elevator.

以上で、第3の実施形態におけるBIMシステムの構成の一例の説明を終える。   Above, description of an example of a structure of the BIM system in 3rd Embodiment is finished.

[第3の実施形態におけるBIMシステムの処理]
次に、このように構成された第3の実施形態におけるBIMシステムの処理の一例について、以下に図20を参照して詳細に説明する。図20は、第3の実施形態におけるBIMシステムの処理の一例を示すフローチャートである。
[Process of BIM System in Third Embodiment]
Next, an example of processing of the BIM system in the third embodiment configured as described above will be described in detail with reference to FIG. FIG. 20 is a flowchart illustrating an example of processing of the BIM system in the third embodiment.

図20に示すように、まず、作成条件設定部402aは、利用者により入力される作成条件を設定する(ステップSC−1)。   As shown in FIG. 20, the creation condition setting unit 402a first sets a creation condition input by the user (step SC-1).

そして、昇降機モデリング部402bは、ステップSC−1にて作成条件設定部402aの処理により設定された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース406aに記憶されたパーツ情報を用いて作成する(ステップSC−2)。例えば、昇降機モデリング部402bは、上述の図4に示すようなエスカレータのBIMパーツを作成する。ここで、ステップSC−2において、昇降機モデリング部402bは、作成条件を満たす複数の昇降機のBIMパーツを作成してもよい。   Then, the elevator modeling unit 402b creates a BIM part of the elevator corresponding to the creation condition set by the process of the creation condition setting unit 402a in step SC-1 using the part information stored in the part information database 406a. (Step SC-2). For example, the elevator modeling unit 402b creates an escalator BIM part as shown in FIG. Here, in step SC-2, the elevator modeling unit 402b may create a plurality of elevator BIM parts that satisfy the creation conditions.

そして、統合モデリング部402cは、ステップSC−2にて昇降機モデリング部402bの処理により作成された昇降機のBIMパーツを、BIMモデルデータベース406bに記憶された建築物のBIMモデルに組み込んだ統合BIMモデルを作成する(ステップSC−3)。例えば、統合モデリング部402cは、上述の図5に示すようなエスカレータのBIMパーツを建築物のBIMモデルの組み込んだ統合BIMモデルを作成する。ここで、ステップSC−3において統合モデリング部402cは、複数の昇降機のBIMパーツから、作成条件に合致する順位にて建築物のBIMモデルに組み込んだ複数の統合BIMモデルを作成してもよい。また、ステップSC−3において、エラー出力部402jは、統合モデリング部402cが統合BIMモデルを作成できない場合、上述の図7で例示したようにエラー情報を出力する。その後、作成条件を変更するためにステップSC−1の処理に戻り、本処理を繰り返してもよい。   The integrated modeling unit 402c then integrates the BIM part of the elevator created by the processing of the elevator modeling unit 402b in Step SC-2 into the BIM model of the building stored in the BIM model database 406b. Create (step SC-3). For example, the integrated modeling unit 402c creates an integrated BIM model in which BIM parts of an escalator as shown in FIG. 5 are incorporated into a BIM model of a building. Here, in step SC-3, the integrated modeling unit 402c may create a plurality of integrated BIM models incorporated in the BIM model of the building in an order that matches the creation conditions from the BIM parts of the plurality of elevators. In step SC-3, if the integrated modeling unit 402c cannot create an integrated BIM model, the error output unit 402j outputs error information as illustrated in FIG. Thereafter, the processing may be repeated by returning to the processing of step SC-1 in order to change the creation conditions.

そして、画面生成部402dは、ステップSC−3にて統合モデリング部402cの処理により作成された統合BIMモデルを含むレイアウト画面を生成する(ステップSC−4)。ここで、ステップSC−4において、移動経路生成部402gは、オブジェクト情報データベース406cに記憶されたオブジェクト情報に基づいて、上述の図14〜図16に示すような統合BIMモデル内で移動するヒトオブジェクトの移動経路を生成してもよい。この場合、画面生成部402dは、移動経路生成部402gの処理により生成された移動経路を更に含むレイアウト画面を生成する。また、ステップSC−4において、搬入経路生成部402hは、BIMモデルデータベース406bに記憶された建築物のBIMモデル、および、ステップSC−2にて昇降機モデリング部402bの処理により作成された昇降機のBIMパーツに基づいて、上述の図13に示すような統合BIMモデル内の設置位置まで昇降機のBIMパーツを搬入するための搬入経路を生成してもよい。この場合、画面生成部402dは、搬入経路生成部402hの処理により生成された搬入経路を更に含むレイアウト画面を生成する。   Then, the screen generation unit 402d generates a layout screen including the integrated BIM model created by the process of the integrated modeling unit 402c in step SC-3 (step SC-4). Here, in step SC-4, the movement path generation unit 402g moves based on the object information stored in the object information database 406c, and moves in the integrated BIM model as shown in FIGS. It is also possible to generate a movement route. In this case, the screen generation unit 402d generates a layout screen that further includes the movement route generated by the processing of the movement route generation unit 402g. Further, in step SC-4, the carry-in route generation unit 402h displays the building BIM model stored in the BIM model database 406b, and the elevator BIM created by the processing of the elevator modeling unit 402b in step SC-2. Based on the parts, a carry-in route for carrying the BIM parts of the elevator to the installation position in the integrated BIM model as shown in FIG. 13 may be generated. In this case, the screen generation unit 402d generates a layout screen that further includes the carry-in route generated by the process of the carry-in route generation unit 402h.

そして、画面表示部402eは、ステップSC−4にて画面生成部402dの処理により生成されたレイアウト画面を表示部414に表示させる(ステップSC−5)。例えば、画面表示部402eは、上述の図6〜図11、図13〜図16に示すようなレイアウト画面を表示部414に表示させる。   Then, the screen display unit 402e causes the display unit 414 to display the layout screen generated by the process of the screen generation unit 402d in Step SC-4 (Step SC-5). For example, the screen display unit 402e causes the display unit 414 to display layout screens such as those shown in FIGS. 6 to 11 and FIGS. 13 to 16 described above.

なお、ステップSC−5にて画面表示部402eの処理によりレイアウト画面を表示した後、変更部402iは、画面表示部402dの処理により表示されたレイアウト画面上でBIMパーツを変更してもよい。この場合、図示しないが、上述のステップSC−4の処理に戻り、画面生成部402dは、変更部402iの処理により変更された昇降機のBIMパーツを含むレイアウト画面を生成し、その後、ステップSC−6の処理へ進む。   In addition, after displaying a layout screen by the process of the screen display part 402e in step SC-5, the change part 402i may change a BIM part on the layout screen displayed by the process of the screen display part 402d. In this case, although not shown, the process returns to the process of step SC-4 described above, and the screen generation unit 402d generates a layout screen including the BIM parts of the elevator changed by the process of the change unit 402i. Proceed to step 6.

そして、動作解析部402fは、ステップSC−5にて画面表示部402eの処理により表示されたレイアウト画面上で昇降機のBIMパーツの動作をシミュレーションする(ステップSC−6)。ここで、ステップSC−6において、動作解析部402fは、上述の図13〜図16に示すように、オブジェクト情報データベース406cに記憶されたオブジェクト情報に基づいてヒトオブジェクトを統合BIMモデル内で移動させながら、エスカレータのBIMパーツの動作をシミュレーションしてもよい。   Then, the motion analysis unit 402f simulates the operation of the BIM parts of the elevator on the layout screen displayed by the process of the screen display unit 402e in Step SC-5 (Step SC-6). Here, in step SC-6, the motion analysis unit 402f moves the human object within the integrated BIM model based on the object information stored in the object information database 406c, as shown in FIGS. However, the operation of the BIM part of the escalator may be simulated.

以上で、第3の実施形態におけるBIMシステムの処理の一例の説明を終える。   Above, description of an example of the process of the BIM system in 3rd Embodiment is finished.

このように、上述した第1〜第3の実施形態によれば、利用者により入力される作成条件に対応するBIMパーツをパーツ情報を用いて作成し、作成されたBIMパーツをBIMモデルに組み込んだ統合BIMモデルを作成し、作成された統合BIMモデルを含むレイアウト画面を生成し、生成されたレイアウト画面を表示させるので、利用者は、昇降機の設備計画を提案する際、建築物に昇降機を組み込んだ状態を視覚的に分かりやすく表示することができる。また、利用者は、昇降機を設置する建築物の設計段階から施工、竣工後、改修時等の全体を通したシミュレーションを行うことができる。これにより、利用者は、昇降機を設置する建築物の設計において、全体的な管理および確認を行えるので、客先の要望をより良く反映した提案が容易となる。その結果、本実施形態によれば、利用者は、打合せ時間を短縮でき、不具合発生率を低減でき、更に、再製作時等のコストを抑制することができる。   As described above, according to the first to third embodiments described above, the BIM part corresponding to the creation condition input by the user is created using the part information, and the created BIM part is incorporated into the BIM model. An integrated BIM model is created, a layout screen including the created integrated BIM model is generated, and the generated layout screen is displayed. Therefore, when a user proposes an equipment plan for an elevator, the user installs the elevator on the building. The built-in state can be displayed visually and clearly. In addition, the user can perform a simulation through construction, construction, completion, and renovation from the design stage of the building where the elevator is installed. Thereby, since the user can perform overall management and confirmation in the design of the building where the elevator is installed, it is easy to make a proposal that better reflects the customer's request. As a result, according to the present embodiment, the user can shorten the meeting time, can reduce the defect occurrence rate, and can further suppress the cost at the time of remanufacturing.

[他の実施の形態]
本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
[Other embodiments]
Although several embodiments of the present invention have been described, these embodiments are presented by way of example and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.

例えば、上述の実施形態では、昇降機としてエスカレータを例について説明したが、エレベータ、動く歩道等の乗客コンベアについても同様に本発明を適用できる。   For example, in the above-described embodiment, an escalator has been described as an example of an elevator. However, the present invention can be similarly applied to passenger conveyors such as elevators and moving walkways.

また、実施の形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。   In addition, among the processes described in the embodiment, all or part of the processes described as being automatically performed can be performed manually, or the processes described as being performed manually can be performed. All or a part can be automatically performed by a known method.

このほか、上記文献中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。   In addition, unless otherwise specified, the processing procedures, control procedures, specific names, information including registration data for each processing, parameters such as search conditions, screen examples, and database configurations shown in the above documents and drawings Can be changed arbitrarily.

また、端末装置100、サーバ装置200、および、BIM装置400に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。   Further, regarding the terminal device 100, the server device 200, and the BIM device 400, the illustrated components are functionally conceptual, and need not be physically configured as illustrated.

例えば、端末装置100、サーバ装置200、および、BIM装置400の各装置が備える処理機能、特に制御部102、制御部202、および、制御部402にて行われる各処理機能については、その全部または任意の一部を、CPU(Central Processing Unit)および当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、後述する記録媒体に記録されており、必要に応じて端末装置100、サーバ装置200、および、BIM装置400に機械的に読み取られる。すなわち、ROMまたはHDDなどの記憶部106、記憶部206、および、記憶部406などには、OS(Operating System)と協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。   For example, the processing functions provided in each device of the terminal device 100, the server device 200, and the BIM device 400, in particular, the processing functions performed by the control unit 102, the control unit 202, and the control unit 402 are all or An arbitrary part may be realized by a CPU (Central Processing Unit) and a program interpreted and executed by the CPU, or may be realized as hardware by wired logic. The program is recorded on a recording medium to be described later, and is mechanically read by the terminal device 100, the server device 200, and the BIM device 400 as necessary. That is, in the storage unit 106 such as a ROM or HDD, the storage unit 206, and the storage unit 406 are recorded with a computer program for giving instructions to the CPU and performing various processes in cooperation with the OS (Operating System). Has been. This computer program is executed by being loaded into the RAM, and constitutes a control unit in cooperation with the CPU.

また、このコンピュータプログラムは、端末装置100、サーバ装置200、および、BIM装置400に対して任意のネットワーク300を介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。   The computer program may be stored in an application program server connected to the terminal device 100, the server device 200, and the BIM device 400 via an arbitrary network 300, and all of them may be stored as necessary. It is also possible to download a part.

また、本発明に係るプログラムを、コンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USBメモリ、SDカード、フレキシブルディスク、光磁気ディスク、ROM、EPROM、EEPROM、CD−ROM、MO、DVD、および、Blu−ray Disc等の任意の「可搬用の物理媒体」を含むものとする。   In addition, the program according to the present invention may be stored in a computer-readable recording medium, and may be configured as a program product. Here, the “recording medium” is any memory card, USB memory, SD card, flexible disk, magneto-optical disk, ROM, EPROM, EEPROM, CD-ROM, MO, DVD, Blu-ray Disc, etc. Of “portable physical media”.

また、「プログラム」とは、任意の言語や記述方法にて記述されたデータ処理方法であり、ソースコードやバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OS(Operating System)に代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施の形態に示した各装置において記録媒体を読み取るための具体的な構成、読み取り手順、あるいは、読み取り後のインストール手順等については、周知の構成や手順を用いることができる。   The “program” is a data processing method described in an arbitrary language or description method, and may be in any format such as source code or binary code. The “program” is not necessarily limited to a single configuration, but is distributed in the form of a plurality of modules and libraries, or in cooperation with a separate program represented by an OS (Operating System). Including those that achieve the function. Note that a well-known configuration and procedure can be used for a specific configuration for reading a recording medium, a reading procedure, an installation procedure after reading, and the like in each device described in the embodiment.

記憶部106、記憶部206、および、記憶部406に格納される各種のデータベース等(BIMモデルデータベース106a、オブジェクト情報データベース106b、パーツ情報データベース206a、BIMモデルデータベース206b、オブジェクト情報データベース206c、パーツ情報データベース406a、BIMモデルデータベース406b、および、オブジェクト情報データベース406c)は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。   Various databases stored in the storage unit 106, the storage unit 206, and the storage unit 406 (BIM model database 106a, object information database 106b, parts information database 206a, BIM model database 206b, object information database 206c, parts information database) 406a, BIM model database 406b, and object information database 406c) are storage means such as a memory device such as a RAM and a ROM, a fixed disk device such as a hard disk, a flexible disk, and an optical disk. Stores various programs, tables, databases, web page files, and the like used for.

また、端末装置100、サーバ装置200、および、BIM装置400は、既知のパーソナルコンピュータ、ワークステーション等の情報処理装置として構成してもよく、また、該情報処理装置に任意の周辺装置を接続して構成してもよい。また、端末装置100、サーバ装置200、および、BIM装置400は、該情報処理装置に本発明の方法を実現させるソフトウェア(プログラム、データ等を含む)を実装することにより実現してもよい。   Further, the terminal device 100, the server device 200, and the BIM device 400 may be configured as an information processing device such as a known personal computer or workstation, and an arbitrary peripheral device is connected to the information processing device. May be configured. Further, the terminal device 100, the server device 200, and the BIM device 400 may be realized by installing software (including programs, data, and the like) that causes the information processing apparatus to realize the method of the present invention.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じて、または、機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。   Furthermore, the specific form of distribution / integration of the devices is not limited to that shown in the figure, and all or a part of them may be functional or physical in arbitrary units according to various additions or according to functional loads. Can be distributed and integrated. That is, the above-described embodiments may be arbitrarily combined and may be selectively implemented.

以上で説明した実施形態、変形例に係るBIMシステム、サーバ装置、端末装置、BIM装置、方法及びプログラムによれば、昇降機の設備計画を提案する際、建築物に昇降機を組み込んだ状態を視覚的に分かりやすく表示することができる。   According to the BIM system, the server device, the terminal device, the BIM device, the method, and the program according to the embodiment and the modification described above, when the elevator equipment plan is proposed, the state in which the elevator is incorporated in the building is visually Can be displayed in an easy-to-understand manner.

100 端末装置
102 制御部
102a 作成条件送信部
102b 統合モデリング部
102c 画面生成部
102d 画面表示部
102e 動作解析部
102f 移動経路生成部
102g 搬入経路生成部
102h 変更部
102i エラー出力部
104 通信制御インターフェース部
106 記憶部
106a BIMモデルデータベース
106b オブジェクト情報データベース
108 入出力制御インターフェース部
114 表示部
116 音声出力部
118 入力部
200 サーバ装置
202 制御部
202a 作成条件受信部
202b 昇降機モデリング部
202c 情報提供部
202d 統合モデリング部
202e 移動経路生成部
202f 搬入経路生成部
202g エラー出力部
204 通信制御インターフェース部
206 記憶部
206a パーツ情報データベース
206b BIMモデルデータベース
206c オブジェクト情報データベース
300 ネットワーク
400 BIM装置
402 制御部
402a 作成条件設定部
402b 昇降機モデリング部
402c 統合モデリング部
402d 画面生成部
402e 画面表示部
402f 動作解析部
402g 移動経路生成部
402h 搬入経路生成部
402i 変更部
402j エラー出力部
406 記憶部
406a パーツ情報データベース
406b BIMモデルデータベース
406c オブジェクト情報データベース
408 入出力制御インターフェース部
414 表示部
416 音声出力部
418 入力部
100 terminal device 102 control unit
102a Creation condition transmitter
102b Integrated modeling unit
102c screen generator
102d screen display
102e Motion analysis unit
102f Movement route generation unit
102g carry-in route generator
102h change part
102i Error output unit 104 Communication control interface unit 106 Storage unit
106a BIM model database
106b Object information database 108 Input / output control interface unit 114 Display unit 116 Audio output unit 118 Input unit 200 Server device 202 Control unit
202a Creation condition receiver
202b Elevator modeling unit
202c Information provision department
202d Integrated Modeling Department
202e travel route generator
202f carry-in route generation unit
202g error output unit 204 communication control interface unit 206 storage unit
206a Parts information database
206b BIM model database
206c Object information database 300 Network 400 BIM device 402 Control unit
402a Creation condition setting section
402b Elevator modeling unit
402c Integrated modeling unit
402d Screen generator
402e Screen display section
402f Motion analysis unit
402g travel route generator
402h Carry-in route generation unit
402i change part
402j Error output unit 406 Storage unit
406a Parts information database
406b BIM model database
406c Object information database 408 Input / output control interface unit 414 Display unit 416 Audio output unit 418 Input unit

Claims (25)

制御部と記憶部とを少なくとも備えたサーバ装置、および、制御部と記憶部と表示部とを少なくとも備えた端末装置、を通信可能に接続したBIMシステムであって、
前記サーバ装置の前記記憶部は、
建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段、
を備え、
前記サーバ装置の前記制御部は、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、
前記昇降機モデリング手段により作成された前記BIMパーツを前記端末装置へ送信する情報提供手段と、
を備え、
前記端末装置の前記記憶部は、
前記BIMモデルを記憶するBIMモデル記憶手段、
を備え、
前記端末装置の前記制御部は、
前記情報提供手段により前記サーバ装置から送信された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段と、
前記統合モデリング手段により作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成手段と、
前記画面生成手段により生成された前記レイアウト画面を前記表示部に表示させる画面表示手段と、
を備えたことを特徴とするBIMシステム。
A BIM system in which a server device including at least a control unit and a storage unit, and a terminal device including at least a control unit, a storage unit, and a display unit are communicably connected,
The storage unit of the server device is
Parts information storage means for storing part information for creating BIM parts of an elevator that can be incorporated into a BIM model of a building;
With
The control unit of the server device includes:
Elevator modeling means for creating the BIM part corresponding to the creation condition transmitted from the terminal device using the parts information stored in the parts information storage means;
Information providing means for transmitting the BIM part created by the elevator modeling means to the terminal device;
With
The storage unit of the terminal device is
BIM model storage means for storing the BIM model;
With
The control unit of the terminal device is
Integrated modeling means for creating an integrated BIM model in which the BIM part transmitted from the server device by the information providing means is incorporated in the BIM model stored in the BIM model storage means;
Screen generating means for generating a layout screen including the integrated BIM model created by the integrated modeling means;
Screen display means for causing the display section to display the layout screen generated by the screen generation means;
A BIM system comprising:
前記端末装置の前記制御部は、
前記画面表示手段により表示された前記レイアウト画面上で前記BIMパーツの動作をシミュレーションする動作解析手段、
を更に備えたことを特徴とする請求項1に記載のBIMシステム。
The control unit of the terminal device is
Motion analysis means for simulating the motion of the BIM parts on the layout screen displayed by the screen display means;
The BIM system according to claim 1, further comprising:
前記端末装置の前記記憶部は、
前記BIMモデル内で移動可能なヒトオブジェクトに関するオブジェクト情報を記憶するオブジェクト情報記憶手段、
を更に備え、
前記動作解析手段は、
前記オブジェクト情報記憶手段に記憶された前記オブジェクト情報に基づいて前記ヒトオブジェクトを前記統合BIMモデル内で移動させながら、前記BIMパーツの動作をシミュレーションすることを特徴とする請求項2に記載のBIMシステム。
The storage unit of the terminal device is
Object information storage means for storing object information relating to a human object movable within the BIM model;
Further comprising
The motion analysis means includes
3. The BIM system according to claim 2, wherein the operation of the BIM part is simulated while moving the human object in the integrated BIM model based on the object information stored in the object information storage unit. .
前記端末装置の前記制御部は、
前記オブジェクト情報記憶手段に記憶された前記オブジェクト情報に基づいて、前記統合BIMモデル内で移動する前記ヒトオブジェクトの移動経路を生成する移動経路生成手段を更に備え、
前記画面生成手段は、
前記移動経路生成手段により生成された前記移動経路を更に含む前記レイアウト画面を生成することを特徴とする請求項3に記載のBIMシステム。
The control unit of the terminal device is
Further comprising a movement path generation means for generating a movement path of the human object moving in the integrated BIM model based on the object information stored in the object information storage means;
The screen generation means includes
The BIM system according to claim 3, wherein the layout screen further including the movement route generated by the movement route generation unit is generated.
前記端末装置の前記制御部は、
前記BIMモデル記憶手段に記憶された前記BIMモデル、および、前記情報提供手段により前記サーバ装置から送信される前記BIMパーツに基づいて、前記統合BIMモデル内の設置位置まで前記BIMパーツを搬入するための搬入経路を生成する搬入経路生成手段を更に備え、
前記画面生成手段は、
前記搬入経路生成手段により生成された前記搬入経路を更に含む前記レイアウト画面を生成することを特徴とする請求項1から4のうちいずれか一項に記載のBIMシステム。
The control unit of the terminal device is
Based on the BIM model stored in the BIM model storage unit and the BIM part transmitted from the server device by the information providing unit, the BIM part is carried to the installation position in the integrated BIM model. The apparatus further comprises a delivery route generation means for generating a delivery route of
The screen generation means includes
The BIM system according to any one of claims 1 to 4, wherein the layout screen further including the carry-in route generated by the carry-in route generation unit is generated.
前記端末装置の前記制御部は、
前記画面表示手段により表示された前記レイアウト画面上で前記BIMパーツを変更する変更手段と、
を更に備え、
前記画面生成手段は、
前記変更手段により変更された前記BIMパーツを含む前記レイアウト画面を生成することを特徴とする請求項1から5のうちいずれか一項に記載のBIMシステム。
The control unit of the terminal device is
Changing means for changing the BIM parts on the layout screen displayed by the screen display means;
Further comprising
The screen generation means includes
6. The BIM system according to claim 1, wherein the layout screen including the BIM part changed by the changing unit is generated.
前記端末装置の前記制御部は、
前記統合モデリング手段が前記統合BIMモデルを作成できない場合、エラー情報を出力するエラー出力手段、
を更に備えたことを特徴とする請求項1から6のうちいずれか一項に記載のBIMシステム。
The control unit of the terminal device is
An error output means for outputting error information when the integrated modeling means cannot create the integrated BIM model;
The BIM system according to any one of claims 1 to 6, further comprising:
制御部と記憶部とを少なくとも備えたサーバ装置、および、制御部と表示部とを少なくとも備えた端末装置、を通信可能に接続したBIMシステムであって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記サーバ装置の前記制御部は、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、
前記昇降機モデリング手段により作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段と、
前記統合モデリング手段により作成された前記統合BIMモデルを前記端末装置へ送信する情報提供手段と、
を備え、
前記端末装置の前記制御部は、
前記情報提供手段により前記サーバ装置から送信された前記統合BIMモデルを含むレイアウト画面を生成する画面生成手段と、
前記画面生成手段により生成された前記レイアウト画面を前記表示部に表示させる画面表示手段と、
を備えたことを特徴とするBIMシステム。
A BIM system in which a server device including at least a control unit and a storage unit, and a terminal device including at least a control unit and a display unit are communicably connected,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
The control unit of the server device includes:
Elevator modeling means for creating the BIM part corresponding to the creation condition transmitted from the terminal device using the parts information stored in the parts information storage means;
Integrated modeling means for creating an integrated BIM model in which the BIM part created by the elevator modeling means is incorporated into the BIM model stored in the BIM model storage means;
Information providing means for transmitting the integrated BIM model created by the integrated modeling means to the terminal device;
With
The control unit of the terminal device is
Screen generating means for generating a layout screen including the integrated BIM model transmitted from the server device by the information providing means;
Screen display means for causing the display section to display the layout screen generated by the screen generation means;
A BIM system comprising:
制御部と記憶部と表示部を少なくとも備えたBIMシステムであって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記制御部は、
利用者により入力される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、
前記昇降機モデリング手段により作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段と、
前記統合モデリング手段により作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成手段と、
前記画面生成手段により生成された前記レイアウト画面を前記表示部に表示させる画面表示手段と、
を備えたことを特徴とするBIMシステム。
A BIM system including at least a control unit, a storage unit, and a display unit,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
The controller is
Elevator modeling means for creating the BIM part corresponding to the creation condition input by the user using the part information stored in the part information storage means;
Integrated modeling means for creating an integrated BIM model in which the BIM part created by the elevator modeling means is incorporated into the BIM model stored in the BIM model storage means;
Screen generating means for generating a layout screen including the integrated BIM model created by the integrated modeling means;
Screen display means for causing the display section to display the layout screen generated by the screen generation means;
A BIM system comprising:
表示部を少なくとも備えた端末装置に通信可能に接続された、制御部と記憶部とを少なくとも備えたサーバ装置であって、
前記記憶部は、
建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段、
を備え、
前記制御部は、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、
前記昇降機モデリング手段により作成された前記BIMパーツを前記端末装置へ送信する情報提供手段と、
を備え、
前記端末装置において、前記BIMパーツが前記BIMモデルに組み込まれた統合BIMモデルを含むレイアウト画面が前記表示部にて表示されることを特徴とするサーバ装置。
A server device including at least a control unit and a storage unit, connected to a terminal device including at least a display unit so as to be able to communicate,
The storage unit
Parts information storage means for storing part information for creating BIM parts of an elevator that can be incorporated into a BIM model of a building;
With
The controller is
Elevator modeling means for creating the BIM part corresponding to the creation condition transmitted from the terminal device using the parts information stored in the parts information storage means;
Information providing means for transmitting the BIM part created by the elevator modeling means to the terminal device;
With
The server device according to claim 1, wherein a layout screen including an integrated BIM model in which the BIM parts are incorporated in the BIM model is displayed on the display unit.
表示部を少なくとも備えた端末装置に通信可能に接続された、制御部と記憶部とを少なくとも備えたサーバ装置であって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記制御部は、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、
前記昇降機モデリング手段により作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段と、
前記統合モデリング手段により作成された前記統合BIMモデルを前記端末装置へ送信する情報提供手段と、
を備え、
前記端末装置において、前記統合BIMモデルを含むレイアウト画面が前記表示部にて表示されることを特徴とするサーバ装置。
A server device including at least a control unit and a storage unit, connected to a terminal device including at least a display unit so as to be able to communicate,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
The controller is
Elevator modeling means for creating the BIM part corresponding to the creation condition transmitted from the terminal device using the parts information stored in the parts information storage means;
Integrated modeling means for creating an integrated BIM model in which the BIM part created by the elevator modeling means is incorporated into the BIM model stored in the BIM model storage means;
Information providing means for transmitting the integrated BIM model created by the integrated modeling means to the terminal device;
With
The server apparatus according to claim 1, wherein a layout screen including the integrated BIM model is displayed on the display unit.
サーバ装置に通信可能に接続された、制御部と記憶部と表示部とを少なくとも備えた端末装置であって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段、
を備え、
前記制御部は、
前記端末装置より送信した作成条件に対応する、前記BIMモデルに組込可能な昇降機のBIMパーツを、前記サーバ装置から受信し、当該BIMパーツを前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリング手段と、
前記統合モデリング手段により作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成手段と、
前記画面生成手段により生成された前記レイアウト画面を前記表示部に表示させる画面表示手段と、
を備えたことを特徴とする端末装置。
A terminal device including at least a control unit, a storage unit, and a display unit that is communicably connected to the server device,
The storage unit
BIM model storage means for storing the BIM model of the building,
With
The controller is
A BIM part of an elevator that can be incorporated into the BIM model corresponding to the creation condition transmitted from the terminal device is received from the server device, and the BIM part is stored in the BIM model stored in the BIM model storage unit. An integrated modeling means for creating an integrated BIM model;
Screen generating means for generating a layout screen including the integrated BIM model created by the integrated modeling means;
Screen display means for causing the display section to display the layout screen generated by the screen generation means;
A terminal device comprising:
サーバ装置に通信可能に接続された、制御部と表示部とを少なくとも備えた端末装置であって、
前記制御部は、
前記端末装置より送信した作成条件に対応する、建築物のBIMモデルに組込可能な昇降機のBIMパーツを前記BIMモデルに組み込んだ統合BIMモデルを、前記サーバ装置から受信し、当該統合BIMモデルを含むレイアウト画面を生成する画面生成手段と、
前記画面生成手段により生成された前記レイアウト画面を前記表示部に表示させる画面表示手段と、
を備えたことを特徴とする端末装置。
A terminal device including at least a control unit and a display unit, connected to the server device so as to be communicable,
The controller is
An integrated BIM model in which a BIM part of an elevator that can be incorporated in a BIM model of a building corresponding to a creation condition transmitted from the terminal device is incorporated into the BIM model is received from the server device, and the integrated BIM model is received. Screen generation means for generating a layout screen including:
Screen display means for causing the display section to display the layout screen generated by the screen generation means;
A terminal device comprising:
制御部と記憶部とを少なくとも備えたサーバ装置、および、制御部と記憶部と表示部とを少なくとも備えた端末装置、を通信可能に接続したBIMシステムにおいて実行される方法であって、
前記サーバ装置の前記記憶部は、
建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段、
を備え、
前記端末装置の前記記憶部は、
前記BIMモデルを記憶するBIMモデル記憶手段、
を備え、
前記サーバ装置の前記制御部において実行される、前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記サーバ装置の前記制御部において実行される、前記昇降機モデリングステップにて作成された前記BIMパーツを前記端末装置へ送信する情報提供ステップと、
前記端末装置の前記制御部において実行される、前記情報提供ステップにて前記サーバ装置から送信された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記端末装置の前記制御部において実行される、前記統合モデリングステップにて作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記端末装置の前記制御部において実行される、前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を含むことを特徴とする方法。
A method executed in a BIM system in which a server device including at least a control unit and a storage unit and a terminal device including at least a control unit, a storage unit, and a display unit are communicably connected,
The storage unit of the server device is
Parts information storage means for storing part information for creating BIM parts of an elevator that can be incorporated into a BIM model of a building;
With
The storage unit of the terminal device is
BIM model storage means for storing the BIM model;
With
Elevator modeling step of creating the BIM part corresponding to the creation condition transmitted from the terminal device, using the part information stored in the part information storage unit, executed in the control unit of the server device; ,
An information providing step of transmitting the BIM part created in the elevator modeling step to the terminal device, which is executed in the control unit of the server device;
An integrated BIM model is created by incorporating the BIM part transmitted from the server device in the information providing step executed in the control unit of the terminal device into the BIM model stored in the BIM model storage unit An integrated modeling step to
A screen generation step for generating a layout screen including the integrated BIM model created in the integrated modeling step, which is executed in the control unit of the terminal device;
A screen display step of causing the display unit to display the layout screen generated in the screen generation step, which is executed in the control unit of the terminal device;
A method comprising the steps of:
制御部と記憶部とを少なくとも備えたサーバ装置、および、制御部と表示部とを少なくとも備えた端末装置、を通信可能に接続したBIMシステムにおいて実行される方法であって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記サーバ装置の前記制御部において実行される、前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記サーバ装置の前記制御部において実行される、前記昇降機モデリングステップにて作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記サーバ装置の前記制御部において実行される、前記統合モデリングステップにて作成された前記統合BIMモデルを前記端末装置へ送信する情報提供ステップと、
前記端末装置の前記制御部において実行される、前記情報提供ステップにて前記サーバ装置から送信された前記統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記端末装置の前記制御部において実行される、前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を含むことを特徴とする方法。
A method executed in a BIM system in which a server device including at least a control unit and a storage unit, and a terminal device including at least a control unit and a display unit are communicably connected,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
Elevator modeling step of creating the BIM part corresponding to the creation condition transmitted from the terminal device, using the part information stored in the part information storage unit, executed in the control unit of the server device; ,
Integrated modeling step of creating an integrated BIM model in which the BIM part created in the elevator modeling step is incorporated in the BIM model stored in the BIM model storage unit, which is executed in the control unit of the server device When,
An information providing step of transmitting the integrated BIM model created in the integrated modeling step to the terminal device, which is executed in the control unit of the server device;
A screen generation step of generating a layout screen including the integrated BIM model transmitted from the server device in the information providing step, executed in the control unit of the terminal device;
A screen display step of causing the display unit to display the layout screen generated in the screen generation step, which is executed in the control unit of the terminal device;
A method comprising the steps of:
制御部と記憶部と表示部を少なくとも備えたBIMシステムにおいて実行される方法であって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記制御部において実行される、
利用者により入力される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記昇降機モデリングステップにて作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記統合モデリングステップにて作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を含むことを特徴とする方法。
A method executed in a BIM system including at least a control unit, a storage unit, and a display unit,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
Executed in the control unit,
Elevator modeling step for creating the BIM part corresponding to the creation condition input by the user using the part information stored in the part information storage unit;
An integrated modeling step of creating an integrated BIM model in which the BIM part created in the elevator modeling step is incorporated into the BIM model stored in the BIM model storage unit;
A screen generation step for generating a layout screen including the integrated BIM model created in the integrated modeling step;
A screen display step for displaying the layout screen generated in the screen generation step on the display unit;
A method comprising the steps of:
表示部を少なくとも備えた端末装置に通信可能に接続された、制御部と記憶部とを少なくとも備えたサーバ装置において実行される方法であって、
前記記憶部は、
建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段、
を備え、
前記制御部において実行される、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記昇降機モデリングステップにて作成された前記BIMパーツを前記端末装置へ送信する情報提供ステップと、
を含み、
前記端末装置において、前記BIMパーツが前記BIMモデルに組み込まれた統合BIMモデルを含むレイアウト画面が前記表示部にて表示されることを特徴とする方法。
A method that is executed in a server device that includes at least a control unit and a storage unit, and is communicably connected to a terminal device that includes at least a display unit,
The storage unit
Parts information storage means for storing part information for creating BIM parts of an elevator that can be incorporated into a BIM model of a building;
With
Executed in the control unit,
Elevator modeling step of creating the BIM part corresponding to the creation condition transmitted from the terminal device using the part information stored in the part information storage unit;
An information providing step of transmitting the BIM part created in the elevator modeling step to the terminal device;
Including
In the terminal device, a layout screen including an integrated BIM model in which the BIM parts are incorporated in the BIM model is displayed on the display unit.
表示部を少なくとも備えた端末装置に通信可能に接続された、制御部と記憶部とを少なくとも備えたサーバ装置において実行される方法であって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記制御部において実行される、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記昇降機モデリングステップにて作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記統合モデリングステップにて作成された前記統合BIMモデルを前記端末装置へ送信する情報提供ステップと、
を含み、
前記端末装置において、前記統合BIMモデルを含むレイアウト画面が前記表示部にて表示されることを特徴とする方法。
A method that is executed in a server device that includes at least a control unit and a storage unit, and is communicably connected to a terminal device that includes at least a display unit,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
Executed in the control unit,
Elevator modeling step of creating the BIM part corresponding to the creation condition transmitted from the terminal device using the part information stored in the part information storage unit;
An integrated modeling step of creating an integrated BIM model in which the BIM part created in the elevator modeling step is incorporated into the BIM model stored in the BIM model storage unit;
An information providing step of transmitting the integrated BIM model created in the integrated modeling step to the terminal device;
Including
In the terminal device, a layout screen including the integrated BIM model is displayed on the display unit.
サーバ装置に通信可能に接続された、制御部と記憶部と表示部とを少なくとも備えた端末装置において実行される方法であって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段、
を備え、
前記制御部において実行される、
前記端末装置より送信した作成条件に対応する、前記BIMモデルに組込可能な昇降機のBIMパーツを、前記サーバ装置から受信し、当該BIMパーツを前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記統合モデリングステップにて作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を含むことを特徴とする方法。
A method that is executed in a terminal device that is connected to a server device in a communicable manner and includes at least a control unit, a storage unit, and a display unit,
The storage unit
BIM model storage means for storing the BIM model of the building,
With
Executed in the control unit,
A BIM part of an elevator that can be incorporated into the BIM model corresponding to the creation condition transmitted from the terminal device is received from the server device, and the BIM part is stored in the BIM model stored in the BIM model storage unit. An integrated modeling step to create an integrated BIM model;
A screen generation step for generating a layout screen including the integrated BIM model created in the integrated modeling step;
A screen display step for displaying the layout screen generated in the screen generation step on the display unit;
A method comprising the steps of:
サーバ装置に通信可能に接続された、制御部と表示部とを少なくとも備えた端末装置において実行される方法であって、
前記制御部において実行される、
前記端末装置より送信した作成条件に対応する、建築物のBIMモデルに組込可能な昇降機のBIMパーツを前記BIMモデルに組み込んだ統合BIMモデルを、前記サーバ装置から受信し、当該統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を含むことを特徴とする方法。
A method that is executed in a terminal device that is connected to a server device in a communicable manner and includes at least a control unit and a display unit,
Executed in the control unit,
An integrated BIM model in which a BIM part of an elevator that can be incorporated in a BIM model of a building corresponding to a creation condition transmitted from the terminal device is incorporated into the BIM model is received from the server device, and the integrated BIM model is received. A screen generation step for generating a layout screen including:
A screen display step for displaying the layout screen generated in the screen generation step on the display unit;
A method comprising the steps of:
制御部と記憶部と表示部を少なくとも備えたBIMシステムに実行させるためのプログラムであって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記制御部において、
利用者により入力される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記昇降機モデリングステップにて作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記統合モデリングステップにて作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を実行させるためのプログラム。
A program for causing a BIM system including at least a control unit, a storage unit, and a display unit to execute the program,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
In the control unit,
Elevator modeling step for creating the BIM part corresponding to the creation condition input by the user using the part information stored in the part information storage unit;
An integrated modeling step of creating an integrated BIM model in which the BIM part created in the elevator modeling step is incorporated into the BIM model stored in the BIM model storage unit;
A screen generation step for generating a layout screen including the integrated BIM model created in the integrated modeling step;
A screen display step for displaying the layout screen generated in the screen generation step on the display unit;
A program for running
表示部を少なくとも備えた端末装置に通信可能に接続された、制御部と記憶部とを少なくとも備えたサーバ装置に実行させるためのプログラムであって、
前記記憶部は、
建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段、
を備え、
前記制御部において、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記昇降機モデリングステップにて作成された前記BIMパーツを前記端末装置へ送信する情報提供ステップと、
を実行させ、
前記端末装置において、前記BIMパーツが前記BIMモデルに組み込まれた統合BIMモデルを含むレイアウト画面が前記表示部にて表示されることを特徴とするプログラム。
A program for causing a server device provided with at least a control unit and a storage unit to be communicably connected to a terminal device provided with at least a display unit,
The storage unit
Parts information storage means for storing part information for creating BIM parts of an elevator that can be incorporated into a BIM model of a building;
With
In the control unit,
Elevator modeling step of creating the BIM part corresponding to the creation condition transmitted from the terminal device using the part information stored in the part information storage unit;
An information providing step of transmitting the BIM part created in the elevator modeling step to the terminal device;
And execute
In the terminal device, the display unit displays a layout screen including an integrated BIM model in which the BIM parts are incorporated in the BIM model.
表示部を少なくとも備えた端末装置に通信可能に接続された、制御部と記憶部とを少なくとも備えたサーバ装置に実行させるためのプログラムであって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記制御部において、
前記端末装置から送信される作成条件に対応する前記BIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記昇降機モデリングステップにて作成された前記BIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記統合モデリングステップにて作成された前記統合BIMモデルを前記端末装置へ送信する情報提供ステップと、
を実行させ、
前記端末装置において、前記統合BIMモデルを含むレイアウト画面が前記表示部にて表示されることを特徴とするプログラム。
A program for causing a server device provided with at least a control unit and a storage unit to be communicably connected to a terminal device provided with at least a display unit,
The storage unit
BIM model storage means for storing a BIM model of a building;
Parts information storage means for storing parts information for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
In the control unit,
Elevator modeling step of creating the BIM part corresponding to the creation condition transmitted from the terminal device using the part information stored in the part information storage unit;
An integrated modeling step of creating an integrated BIM model in which the BIM part created in the elevator modeling step is incorporated into the BIM model stored in the BIM model storage unit;
An information providing step of transmitting the integrated BIM model created in the integrated modeling step to the terminal device;
And execute
In the terminal device, the layout screen including the integrated BIM model is displayed on the display unit.
サーバ装置に通信可能に接続された、制御部と記憶部と表示部とを少なくとも備えた端末装置に実行させるためのプログラムであって、
前記記憶部は、
建築物のBIMモデルを記憶するBIMモデル記憶手段、
を備え、
前記制御部において、
前記端末装置より送信した作成条件に対応する、前記BIMモデルに組込可能な昇降機のBIMパーツを、前記サーバ装置から受信し、当該BIMパーツを前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ統合BIMモデルを作成する統合モデリングステップと、
前記統合モデリングステップにて作成された前記統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を実行させるためのプログラム。
A program for causing a terminal device provided with at least a control unit, a storage unit, and a display unit to be communicably connected to a server device,
The storage unit
BIM model storage means for storing the BIM model of the building,
With
In the control unit,
A BIM part of an elevator that can be incorporated into the BIM model corresponding to the creation condition transmitted from the terminal device is received from the server device, and the BIM part is stored in the BIM model stored in the BIM model storage unit. An integrated modeling step to create an integrated BIM model;
A screen generation step for generating a layout screen including the integrated BIM model created in the integrated modeling step;
A screen display step for displaying the layout screen generated in the screen generation step on the display unit;
A program for running
サーバ装置に通信可能に接続された、制御部と表示部とを少なくとも備えた端末装置に実行させるためのプログラムであって、
前記制御部において、
前記端末装置より送信した作成条件に対応する、建築物のBIMモデルに組込可能な昇降機のBIMパーツを前記BIMモデルに組み込んだ統合BIMモデルを、前記サーバ装置から受信し、当該統合BIMモデルを含むレイアウト画面を生成する画面生成ステップと、
前記画面生成ステップにて生成された前記レイアウト画面を前記表示部に表示させる画面表示ステップと、
を実行させるためのプログラム。
A program for causing a terminal device including at least a control unit and a display unit connected to a server device to be communicable,
In the control unit,
An integrated BIM model in which a BIM part of an elevator that can be incorporated in a BIM model of a building corresponding to a creation condition transmitted from the terminal device is incorporated into the BIM model is received from the server device, and the integrated BIM model is received. A screen generation step for generating a layout screen including:
A screen display step for displaying the layout screen generated in the screen generation step on the display unit;
A program for running
JP2012147376A 2012-06-29 2012-06-29 BIM system, method and program Active JP5623466B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012147376A JP5623466B2 (en) 2012-06-29 2012-06-29 BIM system, method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012147376A JP5623466B2 (en) 2012-06-29 2012-06-29 BIM system, method and program

Publications (2)

Publication Number Publication Date
JP2014010668A true JP2014010668A (en) 2014-01-20
JP5623466B2 JP5623466B2 (en) 2014-11-12

Family

ID=50107317

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012147376A Active JP5623466B2 (en) 2012-06-29 2012-06-29 BIM system, method and program

Country Status (1)

Country Link
JP (1) JP5623466B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5489310B1 (en) * 2012-12-20 2014-05-14 東芝エレベータ株式会社 BIM system and method
CN105540355A (en) * 2015-12-31 2016-05-04 百川伟业(天津)建筑科技股份有限公司 Elevator running monitoring system based on BIM
WO2018189849A1 (en) * 2017-04-13 2018-10-18 三菱電機株式会社 Plant design assistance system
JP2020095311A (en) * 2018-12-10 2020-06-18 東芝エレベータ株式会社 Modeling device of lift and modeling method
JP2021534051A (en) * 2018-08-24 2021-12-09 インベンテイオ・アクテイエンゲゼルシヤフトInventio Aktiengesellschaft How to modernize an existing passenger transportation system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7171111B1 (en) 2022-08-12 2022-11-15 株式会社W Frozen food storage bag and manufacturing method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1139367A (en) * 1997-07-22 1999-02-12 Hitachi Ltd Physical distribution warehouse design supporting method/system and recording medium recording physical distribution warehouse design supporting program
JP2006024073A (en) * 2004-07-09 2006-01-26 Hitachi Plant Eng & Constr Co Ltd Construction plan expression method, construction plan expression system, and method for displaying object involving shape change
JP2006048278A (en) * 2004-08-03 2006-02-16 Fukui Computer Kk Moving path setting device and moving path setting program
JP2011107770A (en) * 2009-11-12 2011-06-02 Hitachi Ltd Indoor space data creation support system and indoor space data creation support method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1139367A (en) * 1997-07-22 1999-02-12 Hitachi Ltd Physical distribution warehouse design supporting method/system and recording medium recording physical distribution warehouse design supporting program
JP2006024073A (en) * 2004-07-09 2006-01-26 Hitachi Plant Eng & Constr Co Ltd Construction plan expression method, construction plan expression system, and method for displaying object involving shape change
JP2006048278A (en) * 2004-08-03 2006-02-16 Fukui Computer Kk Moving path setting device and moving path setting program
JP2011107770A (en) * 2009-11-12 2011-06-02 Hitachi Ltd Indoor space data creation support system and indoor space data creation support method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JPN6013044128; 河野 良坪 他: '建築環境CAEツールにおけるBIM連携化とCFDパーツ化に関する研究開発' 空気調和・衛生工学会論文集 第174号, 20110905, 第15-21頁, 社団法人空気調和・衛生工学会 *
JPN6013044130; 織田 瑞夫, 瀧澤 重志, 河村 廣, 谷 明勲: 'エージェントモデルによる連続的空間における人間行動シミュレータの構築及び建築計画への応用' 日本建築学会計画系論文集 第558号, 20020830, 第315-322頁, 社団法人日本建築学会 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5489310B1 (en) * 2012-12-20 2014-05-14 東芝エレベータ株式会社 BIM system and method
CN105540355A (en) * 2015-12-31 2016-05-04 百川伟业(天津)建筑科技股份有限公司 Elevator running monitoring system based on BIM
WO2018189849A1 (en) * 2017-04-13 2018-10-18 三菱電機株式会社 Plant design assistance system
JPWO2018189849A1 (en) * 2017-04-13 2019-11-07 三菱電機株式会社 Plant design support system
JP2021534051A (en) * 2018-08-24 2021-12-09 インベンテイオ・アクテイエンゲゼルシヤフトInventio Aktiengesellschaft How to modernize an existing passenger transportation system
JP7322138B2 (en) 2018-08-24 2023-08-07 インベンテイオ・アクテイエンゲゼルシヤフト How to modernize existing passenger transport systems
JP2020095311A (en) * 2018-12-10 2020-06-18 東芝エレベータ株式会社 Modeling device of lift and modeling method

Also Published As

Publication number Publication date
JP5623466B2 (en) 2014-11-12

Similar Documents

Publication Publication Date Title
JP5591881B2 (en) BIM system, server device, terminal device, method and program
JP5623466B2 (en) BIM system, method and program
JP5489310B1 (en) BIM system and method
JP5591878B2 (en) BIM system, server device, terminal device, method and program
JP5591877B2 (en) BIM system, method and program
JP5645315B2 (en) BIM system, method and program
JP5623573B2 (en) BIM system and method
JP2014174620A (en) Bim system and method
JP5619126B2 (en) BIM system
JP5518945B2 (en) BIM system, server device, terminal device, method and program
JP6321076B2 (en) BIM system, method and program
JP5489307B1 (en) BIM system, method and program
JP6199365B2 (en) BIM system, method and program
JP5354629B1 (en) BIM system, server device, terminal device, method and program
JP5619113B2 (en) BIM system
JP5388076B1 (en) BIM system, server device, terminal device, method and program
JP5506004B1 (en) BIM system and method
JP5518943B2 (en) BIM system and method
JP5596195B2 (en) BIM system and method
JP5642232B1 (en) BIM system, method and program
JP5542877B2 (en) BIM system, method and program
JP6212167B1 (en) BIM system, method and program
JP5591879B2 (en) BIM system, server device, terminal device, method and program
JP5619114B2 (en) BIM system
JP5559256B2 (en) BIM system, server device, terminal device, method and program

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140520

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140717

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140826

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140924

R150 Certificate of patent or registration of utility model

Ref document number: 5623466

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150