JP2013213357A - Soil impervious material placing device and placing method thereof - Google Patents

Soil impervious material placing device and placing method thereof Download PDF

Info

Publication number
JP2013213357A
JP2013213357A JP2012084453A JP2012084453A JP2013213357A JP 2013213357 A JP2013213357 A JP 2013213357A JP 2012084453 A JP2012084453 A JP 2012084453A JP 2012084453 A JP2012084453 A JP 2012084453A JP 2013213357 A JP2013213357 A JP 2013213357A
Authority
JP
Japan
Prior art keywords
pipe
soil
placing
rear end
placement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012084453A
Other languages
Japanese (ja)
Other versions
JP5439534B2 (en
Inventor
Koei Itashiki
幸栄 板敷
Yasuhiro Okada
康弘 岡田
Hiroshi Kawamura
洋 河村
Manabu Doi
学 土井
Shinichi Ishikawa
慎一 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOSHIN KENSETSU KK
Original Assignee
YOSHIN KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOSHIN KENSETSU KK filed Critical YOSHIN KENSETSU KK
Priority to JP2012084453A priority Critical patent/JP5439534B2/en
Publication of JP2013213357A publication Critical patent/JP2013213357A/en
Application granted granted Critical
Publication of JP5439534B2 publication Critical patent/JP5439534B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To early develop and provide a soil impervious material placing device in which a placing pipe is of a split type and each connection pipe is provided with an impervious material fall prevention device and which is excellent in safety, workability, maintainability, economical efficiency, etc., and a placing method of the soil impervious material placing device.SOLUTION: A soil impervious material placing device is constituted of a placing pipe with a pinch valve for a leading end, a plurality of intermediate placing pipes, and a bend pipe 3 with a force-feed high pressure hose for a rear end, in which these pipes are formed to be suitable the diameter size and the depth of a drilled hole for insertion of the placing piles and a plurality of fall prevention pins and buried plug caps are provided so as to be mounted in the horizontal direction of the lower end of each of the pipes for a leading end, for an intermediate, and for a rear end, respectively, so that a soil impervious material is prevented from falling with its own weight. Moreover, a hanging hook part capable of locking a hanging tool such as a wire rope is provided at a top end of the bend pipe for a rear end.

Description

この発明は、土質遮水材打設装置及びその打設工法に関するものである。     The present invention relates to a soil impermeable material placing device and a placing method thereof.

従来、生コンや泥土混合物等の土質遮水材料を用いて、管理型海面廃棄物処分場の側面や底面等、狭い場所に遮水材を打設する場合、1本の長い管を使用して打設作業を行っていた。その為、掘削穴の深度が大きくなると、それに伴って、管を吊り上げる為のクレーンが大きく成り、打設管を吊り込み時、打設管の撓み、及び、打設管に付属したホースが長くなる等の多くの問題があった。     Conventionally, when using a soil impermeable material such as ready-mixed concrete or a mud soil mixture to install a water shielding material in a narrow place such as the side or bottom of a managed sea surface waste disposal site, a single long pipe is used. Hauling work was underway. Therefore, as the depth of the excavation hole increases, the crane for lifting the pipe increases accordingly, and when the casting pipe is suspended, the bending of the casting pipe and the hose attached to the casting pipe become long. There were many problems.

従って、機械設備の大型化により、当然、安全性・作業性が悪くなるだけでなく、メンテナンス性や経済性や工期等に悪影響を及ぼしていた。     Therefore, the increase in the size of the mechanical equipment not only deteriorates safety and workability, but also adversely affects maintenance, economy, construction period, and the like.

そこで、上記の問題を解決するために、機械設備(打設装置)を小型化して、安全性・作業性・メンテナンス性・経済性等に優れた土質遮水材打設装置及びその打設工法を早期に開発することが望まれている。     Therefore, in order to solve the above-mentioned problems, the mechanical equipment (placement device) is downsized, and a soil impermeable material placement device excellent in safety, workability, maintainability, economy, etc., and its placement method It is hoped that early development will be possible.

これまでに出願されている土質遮水材に関する特許文献を参考の為、紹介する(特許文献1〜2参照)。
特開2008−093573 特開平11−226537
For reference, patent documents related to soil impermeable materials that have been filed so far are introduced (see Patent Documents 1 and 2).
JP2008-093573 JP-A-11-226537

そこで、上記課題を解決する為に、この発明は打設管を分割型にし、且つ、各接続管に遮水材の落下防止装置を設けて、安全性・作業性・メンテナンス性・経済性等に優れた、土質遮水材打設装置及びその打設工法を早期に開発・提供する事にある。     Therefore, in order to solve the above-mentioned problems, the present invention makes the casting tube into a split type, and a water blocking material fall prevention device is provided in each connecting pipe, so that safety, workability, maintenance, economy, etc. It is to develop and provide a soil impervious material placement device and its placement method that are excellent in the field.

この課題を解決する為の手段として、打設管を挿入する掘削穴の直径寸法及び深度に適合し、且つ、土質遮水材が自重により落下しないよう、先端用・中間用・後端用の、それぞれの管の下端部の水平方向に、複数の落下防止ピン、及び、埋栓用キャップをそれぞれ装着可能に設けた、先端用ピンチバルブ付打設管と、複数本の中間用打設管と、後端用圧送用高圧ホース付ベンド管から成るものである。     As a means to solve this problem, it is suitable for the tip, middle, and rear end so that it fits the diameter size and depth of the drilling hole into which the placement pipe is inserted and the soil impermeable material does not fall due to its own weight. In addition, in the horizontal direction at the lower end of each pipe, a plurality of fall prevention pins and a cap for embedding are provided so that each can be mounted, and a plurality of intermediate placement pipes And a bend pipe with a high-pressure hose for pressure feeding for the rear end.

又、後端用圧送用高圧ホース付ベンド管の上端部に、ワイヤーロープ等の吊り具を係止可能な、吊りフック部を設けたものである。     In addition, a suspension hook portion capable of locking a suspension tool such as a wire rope is provided at the upper end portion of the bend pipe with a high-pressure hose for pressure feeding for the rear end.

又、落下防止ピンの挿入穴の両端外周部には、埋栓用キャップを螺着可能なネジ部をそれぞれ形成して設け、且つ、土質遮水材打設時は、落下防止ピンの挿入穴の両端外周部に埋栓用キャップをそれぞれ螺着して設け、且つ、それぞれの管を接続時、又は、取り外し時は、管のフランジ部両端を一時仮置き固定用ストッパープレートで一時仮置き固定して行うものである。     In addition, the outer periphery of both ends of the insertion hole of the fall prevention pin is provided with a screw part to which a cap for embedding can be screwed, and when the soil water shielding material is placed, the insertion hole of the fall prevention pin is provided. Caps for embedding are provided on the outer periphery of both ends of the tube, and when connecting or removing each tube, both ends of the flange portion of the tube are temporarily fixed by temporary stopper fixing stopper plates. It is what you do.

又、土質遮水材を掘削穴部に打設挿入時は、ワイヤーロープ等の吊り具と、一時仮置き固定用ストッパープレートを使用して、掘削穴部に先端用ピンチバルブ付打設管、複数本の中間用打設管、後端用圧送用高圧ホース付ベンド管の順に、一時仮置き固定用ストッパーで一時仮置き固定した状態で、ボルト・ナット・ワッシャー等の係止部材で接続しながら挿入し、且つ、打設引抜時は、ワイヤーロープ等の吊り具を使用して装置全体を吊り上げ、且つ、管のフランジ部に一時仮置き固定用ストッパープレートを敷設して一時仮置き固定しながら、後端用圧送用高圧ホース付ベンド管、複数本の中間用打設管、先端用ピンチバルブ付打設管の順に後部からそれぞれ取り外しながら土質遮水材料を掘削穴部に充填するものである。     Also, when placing and inserting the soil impermeable material into the excavation hole, use a lifting tool such as a wire rope and a temporary temporary fixing stopper plate, and insert the pipe with a pinch valve for the tip into the excavation hole, Connect with multiple locking members such as bolts, nuts, and washers in the order of multiple intermediate placement pipes and bend pipes with high-pressure hose for feeding at the rear end in the state of temporary placement and fixing with the temporary placement fixing stopper. While inserting and pulling out, use a wire rope or other lifting tool to lift the entire device, and lay a temporary temporary fixing stopper plate on the flange of the pipe to temporarily fix it. However, it is to fill the excavation hole with soil impermeable material while removing each from the rear in the order of a bend pipe with a high-pressure hose for pressure feed for the rear end, a plurality of intermediate placement pipes, and a placement pipe with a pinch valve for the tip. is there.

この発明の効果として、打設管を挿入する掘削穴の直径寸法及び深度に適合し、且つ、土質遮水材が自重により落下しないよう、先端用・中間用・後端用のそれぞれの管の下端部の水平方向に複数の落下防止ピン、及び、埋栓用キャップをそれぞれ装着可能に設けた先端用ピンチバルブ付打設管と、複数本の中間用打設管と、後端用圧送用高圧ホース付ベンド管から成り、又、後端用ベンド管の上端部に、ワイヤーロープ等の吊り具を係止可能な、吊りフック部を設けて、打設管を分割型にし、且つ、各接続管に遮水材の落下防止装置を設けて、安全性・作業性・メンテナンス性・経済性等に優れる等、極めて有益なる効果を奏するものである。     As an effect of the present invention, each of the pipes for the front end, the intermediate end, and the rear end is adapted to the diameter size and depth of the excavation hole into which the placing pipe is inserted and the soil impermeable material does not fall due to its own weight. A plurality of anti-falling pins and a stopper tube with a pinch valve provided with a cap for embedding in the horizontal direction of the lower end, a plurality of intermediate driving tubes, and a pressure pump for the rear end It consists of a bend pipe with a high-pressure hose, and is provided with a hanging hook part that can hold a wire rope or other hanging tool at the upper end part of the rear end bend pipe. By providing a water barrier material fall prevention device in the connecting pipe, it has extremely beneficial effects such as excellent safety, workability, maintainability, economy, and the like.

この発明の一実施例を示し、(A)は遮水材落下防止用ピン挿着時の先端用ピンチバルブ付打設管の斜視図で、(B)は埋め栓螺着時の先端用ピンチバルブ付打設管の斜視図である。1 shows an embodiment of the present invention, in which (A) is a perspective view of a tube with a pinch valve for a tip when a pin for preventing a water shielding material from being dropped is inserted, and (B) is a pinch for a tip when a plug is screwed. It is a perspective view of an installation pipe with a valve. この発明の一実施例を示し、(A)は遮水材落下防止用ピン挿着時の中間用打設管の斜視図で、(B)は埋め栓螺着時の中間用打設管の斜視図である。1 shows an embodiment of the present invention, in which (A) is a perspective view of an intermediate placement tube when a water blocking material dropping prevention pin is inserted, and (B) is an intermediate placement tube when a plug is screwed. It is a perspective view. この発明の一実施例を示し、(A)は遮水材落下防止用ピン挿着時の後端用圧送用高圧ホース付ベンド管の斜視図で、(B)は埋め栓螺着時の後端用圧送用高圧ホース付ベンド管の斜視図である。1 shows an embodiment of the present invention, (A) is a perspective view of a bend pipe with a high-pressure hose for pressure feeding at the rear end when a water shielding material dropping prevention pin is inserted, and (B) is after a plug is screwed. It is a perspective view of a bend pipe with a high-pressure hose for end pressure feeding. この発明の一実施例を示し、(A)は先端部・中間部・後端部それぞれの各管の下端に設けたピン挿着部にキャップを螺着した時の平面図で、(B)は一部欠截側面図である。An embodiment of the present invention is shown, (A) is a plan view when a cap is screwed to a pin insertion portion provided at the lower end of each tube of the tip portion, the intermediate portion, and the rear end portion, (B) FIG. この発明の一実施例を示し、(A)先端部・中間部・後端部それぞれの各管の下端に設けたピン挿着時の平面図で、(B)は一部欠截側面図である。1A shows an embodiment of the present invention, and (A) is a plan view at the time of inserting a pin provided at the lower end of each of the tip, middle and rear ends, and (B) is a partially cutaway side view. is there. この発明の土質遮水材打設手順を示す側面図である。It is a side view which shows the soil impervious material placement procedure of this invention. この発明の土質遮水材の打設完了から打設開始までの作業手順を示す斜視図である。It is a perspective view which shows the operation | work procedure from the completion of placement of the soil impermeable material of this invention to the start of placement.

この発明を実施するための形態として、生コンや泥土混合物等の土質遮水材料を用いて管理型海面廃棄物処分場の側面や底面に遮水材を打設するクレイガード打設工事において、該打設工事用の装置は、打設管を挿入する掘削穴(H)の直径寸法(D)及び深度(L)に適合し、且つ、土質遮水材(SM)が自重により落下しないよう、先端用・中間用・後端用のそれぞれの管の下端部の水平方向に複数の落下防止ピン(1c)(2c)(3c)、及び、埋栓用キャップ(1b)(2b)(3b)をそれぞれ装着可能に設けた先端用ピンチバルブ(PV)付打設管(1)と、複数本の中間用打設管(2)と、後端用圧送用高圧ホース(4)付ベンド管(3)から成ることを特徴とする土質遮水材打設装置から構成される。     As a form for carrying out the present invention, in the clay guard placing work in which a water shielding material is placed on the side surface or bottom surface of the management-type sea surface waste disposal site using a soil water shielding material such as raw concrete or a mud mixture, The equipment for the installation work conforms to the diameter dimension (D) and depth (L) of the excavation hole (H) into which the installation pipe is inserted, and the soil impermeable material (SM) does not fall by its own weight. A plurality of fall prevention pins (1c), (2c), (3c) in the horizontal direction at the lower ends of the tubes for the distal end, the intermediate portion, and the rear end, and caps for embedding (1b) (2b) (3b) , A mounting tube (1) with a pinch valve (PV) for a tip, a plurality of intermediate mounting tubes (2), and a bend tube (4) with a high pressure hose (4) for rear end 3) It is comprised from the soil impervious material placement apparatus characterized by comprising.

又、後端用圧送用高圧ホース(4)付ベンド管(3)の上端部に、ワイヤーロープ等の吊り具を係止可能な、吊りフック部を設けたことを特徴とする土質遮水材打設装置から構成される。     Also, a soil water-impervious material, characterized in that a suspension hook portion capable of locking a suspension device such as a wire rope is provided at the upper end portion of the bend pipe (3) with a high pressure hose (4) for rear end pressure feeding. Consists of a driving device.

又、落下防止ピン(1c)(2c)(3c)の挿入穴の両端外周部には、埋栓用キャップを螺着可能なネジ部(1')(2')(3')をそれぞれ形成して設け、且つ、土質遮水材(SM)打設時は、落下防止ピンの挿入穴の両端外周部に埋栓用キャップをそれぞれ螺着して設け、且つ、それぞれの管を接続時、又は、取り外し時は、管のフランジ部両端を一時仮置き固定用ストッパープレート(5)で一時仮置き固定して行うことを特徴とする土質遮水材打設装置から構成される     In addition, screw portions (1 ′), (2 ′), and (3 ′) to which a cap for embedding can be screwed are formed on the outer peripheral portions of both ends of the insertion holes of the fall prevention pins (1c), (2c), and (3c). In addition, when placing a soil impermeable material (SM), caps for embedding are respectively screwed to both ends of the insertion hole of the fall prevention pin, and when each pipe is connected, Or, at the time of removal, it is constituted by a soil impervious material placing device characterized in that both ends of the flange portion of the pipe are temporarily placed and fixed by a temporary placement fixing stopper plate (5).

そこで、この発明の一実施例を図1〜図5に基づいて詳述すると、まず、図1は先端用ピンチバルブ付打設管(1)を示し、(A)は埋め栓用キャップ螺着時の斜視図で、(B)は落下防止ピン(1c)挿着時の斜視図である。又、図1(A)のa部詳細(落下防止ピン挿着部のキャップ螺着要領)は、図4(A)(B)と同様に設けられ、且つ、先端フランジは設けられていない。又、図1(B)のb部詳細についても、図5(A)(B)と同様に設けられ、且つ、先端フランジは設けられていない。又、先端用打設管(1)先端部には、遮水材の充填供給量を調整する為の、ピンチバルブ(PV)が設けられている。     Therefore, one embodiment of the present invention will be described in detail with reference to FIGS. 1 to 5. First, FIG. 1 shows a driving tube (1) with a pinch valve for a tip, and FIG. (B) is a perspective view when the fall prevention pin (1c) is inserted. Further, the details of the portion a in FIG. 1A (cap screwing procedure of the drop prevention pin insertion portion) are provided in the same manner as in FIGS. 4A and 4B, and the tip flange is not provided. 1B is also provided in the same manner as in FIGS. 5A and 5B, and no tip flange is provided. In addition, a pinch valve (PV) for adjusting a filling amount of the water shielding material is provided at a tip portion of the tip placing tube (1).

次に、図2(A)(B)は中間用打設管(2)を示し、図2(A)のa部詳細(落下防止ピン挿着部のキャップ螺着要領)も、前記の先端用ピンチバルブ付打設管と同様に、図4(A)(B)と同様に設けられている。     Next, FIGS. 2 (A) and 2 (B) show the intermediate placement tube (2), and the details of the part a in FIG. 2 (A) (the cap screwing procedure of the drop prevention pin insertion portion) are also shown in the above-mentioned tip. Similar to FIGS. 4A and 4B, it is provided in the same manner as the driving tube with a pinch valve.

続いて、図3(A)(B)は後端用圧送用高圧ホース付ベンド管(3)を示し、(A)は埋め栓用キャップ螺着時の斜視図で、(B)は落下防止ピン(1c)挿着時の斜視図である。又、図3(A)のa部詳細は、図4(A)(B)に示すように、落下防止ピン挿着部の外周には、埋め栓用キャップを螺着可能にするため、ネジ部が左右対称にそれぞれ設けられ、遮水材を充填時にそのネジ部に、埋め栓用キャップをそれぞれ螺着するものである。     3 (A) and 3 (B) show a bend pipe (3) with a high pressure hose for pumping the rear end, (A) is a perspective view when the cap for the plug is screwed, and (B) is a fall prevention. It is a perspective view at the time of pin (1c) insertion. 3A, the details of the part a are shown in FIGS. 4A and 4B. As shown in FIGS. 4A and 4B, the cap for embedding can be screwed around the outer periphery of the drop prevention pin insertion part. The portions are provided symmetrically, and a cap for embedding is screwed to the threaded portion when the water shielding material is filled.

図4(A)は後端用ベンド管(3)の遮水材落下防止ピン挿着部の埋め栓用キャップの螺着時の平面図で、(B)は一部欠截側面図である。尚、図示はしていないが、先端用ピンチバルブ付打設管(1)、及び、中間用打設管(2)にも、前記の後端用ベンド管(3)と同様に、6箇所の遮水材落下防止ピン挿着部の外周には、ネジ部(1')(2')がそれぞれ設けられ、そのネジ部には、埋め栓用キャップ(1b)(1b),(2b)(2b)をそれぞれ6箇所螺着可能に設けている。又、この埋め栓用キャップは、遮水材を充填時に使用するものである。     FIG. 4 (A) is a plan view of the rear end bend pipe (3) at the time of screwing of the plug for cap of the water shielding material fall prevention pin insertion portion, and FIG. 4 (B) is a partially cutaway side view. . In addition, although not shown in the drawing, the tipping tube with a pinch valve for the front end (1) and the intermediate placement tube (2) are also provided in the same manner as the rear end bend tube (3). Threaded portions (1 ′) and (2 ′) are respectively provided on the outer periphery of the water shielding material dropping prevention pin insertion portion, and the cap portions (1b), (1b), (2b) (2b) is provided so that it can be screwed into six places. Further, the cap for embedding is used when filling with a water shielding material.

図5(A)は後端用ベンド管(3)の遮水材落下防止ピン(3c)挿着時の平面図で、(B)は一部欠截側面図である。尚、図示はしていないが、先端用ピンチバルブ付打設管(1)、及び、中間用打設管(2)も、前記の後端用ベンド管(3)と同様に、遮水材落下防止ピン(1c)(2c)をそれぞれ設けている。又、この遮水材落下防止ピンは、打設管を切り離した際に、管の中の遮水材が自重によって落下する為、それを防止する為のものである。     FIG. 5 (A) is a plan view of the rear end bend pipe (3) when the water shielding material fall prevention pin (3c) is inserted, and FIG. 5 (B) is a partially cutaway side view. In addition, although not shown in the drawing, a water blocking material is also provided for the leading pipe with a pinch valve (1) and the intermediate pipe (2) in the same manner as the rear end bending pipe (3). Drop prevention pins (1c) and (2c) are provided. Further, this water shielding material fall prevention pin is for preventing the water shielding material in the pipe from dropping due to its own weight when the placing pipe is cut off.

続いて、図6は、土質遮水材の打設手順の一例を示すもので、遮水材打設時はワイヤーロープ等の吊り具(WR)を使用して、打設管を吊り下ろしながら、掘削穴部(H)に、直径φ100mm×全長約5mの先端用ピンチバルブ(PV)付打設管(1)1本と、複数本(5本)の中間用打設管の各接続フランジ部をボルト(B)・ナット(N)・ワッシャー(W)等の係止部材でそれぞれ締結し、連接しながら挿入していく。そして、最後に締結時はその都度、接続フランジの両端部に落下防止用のストッパープレート(5)を敷設しながら締結作業を行い、打設管を延長していく。そして、打設管の挿入作業が完了すると、引き続き、土質遮水材の打設作業に移る。     Next, FIG. 6 shows an example of a procedure for placing the soil impermeable material, and when the water shielding material is placed, a hanging tool (WR) such as a wire rope is used to suspend the placing pipe. In the excavation hole (H), each connection flange of one driving pipe (1) with a pinch valve (PV) for a tip having a diameter of 100 mm and a total length of about 5 m and a plurality of (5) intermediate driving pipes The parts are fastened with locking members such as bolts (B), nuts (N), and washers (W), and inserted while being connected. Finally, at the time of fastening, each time the fastening is performed, fastening work is performed while laying stopper plates (5) for preventing dropping at both ends of the connection flange, and the placing pipe is extended. Then, when the operation of inserting the placement pipe is completed, the operation continues to the placement work of the soil impermeable material.

そして、土質遮水材の打設作業は、遮水材を充填しながら、最後端に設けたワイヤーロープ等の吊り具(WR)で装置全体を吊り上げながら徐々に引き抜き、掘削穴の上面部に中間打設管(2)の下部フランジ(2a)が到達した時点で、落下防止用のストッパープレート(5)を、2本目の中間打設管(2)の接続フランジ下面部に敷設して仮置き固定し、更に、中間打設管(2)用の遮水材落下防止ピンを、それぞれ3本ずつ挿着して、遮水材の落下を防止し、後端用ベンド管(3)に接続された1本目の中間打設管(2)を、そのまま地上へ下ろし、後端用ベンド管(3)と1本目の中間打設管(2)を切り離す。そして、再度、切り離した後端用ベンド管(3)を吊り具(WR)で持ち上げ、仮置き固定された2本目の中間打設管(2)に接続する。こうした一連の作業を繰り返しながら、後端部から順番に1本ずつ打設管を引抜き、先端用ピンチバルブ(PV)付打設管(1)を引き抜いたら打設作業が完成する。この作業のポイントは、打設管を切り離した時、遮水材が自重によって落下するため、打設管を切り離す前に、その都度、6箇所の埋め栓用キャップを取り外し、且つ、3本の遮水材落下防止ピン(3c)(3c)(3c)をそれぞれ挿着して遮水材の落下を食い止めることにある。従って、打設管を分離型にしても遮水材が落下することはなく、安全、且つ、効率良く作業を行うことが可能である。     Then, the soil impervious material is placed by pulling it slowly while lifting the entire device with a wire rope or other hoisting tool (WR) provided at the end while filling the impermeable material. When the lower flange (2a) of the intermediate placing pipe (2) arrives, a stopper plate (5) for preventing the fall is laid on the lower surface of the connection flange of the second intermediate placing pipe (2). In addition, three water-blocking material fall prevention pins for the intermediate placing pipe (2) are inserted in each case to prevent the water-shielding material from falling, and to the rear end bend pipe (3). The connected first intermediate placement pipe (2) is lowered to the ground as it is, and the rear end bend pipe (3) and the first intermediate placement pipe (2) are separated. Then, the rear end bend pipe (3) separated again is lifted by a lifting tool (WR) and connected to the second intermediate placement pipe (2) fixed temporarily. While repeating such a series of operations, the driving tube is pulled out one by one in order from the rear end portion, and the driving tube is completed when the driving tube (1) with the pinch valve (PV) for leading end is pulled out. The point of this work is that when the casting tube is cut off, the water shielding material falls due to its own weight. Therefore, before cutting the casting tube, remove the caps for 6 plugs each time, and The water shielding material fall prevention pins (3c), (3c) and (3c) are respectively inserted to prevent the water shielding material from falling. Therefore, even if the placement pipe is separated, the water shielding material does not fall, and the work can be performed safely and efficiently.

この発明の土質遮水材打設装置及びその打設工法は、打設管を分割型にし、且つ、各接続管に遮水材の落下防止装置を設けて、安全性・作業性・メンテナンス性・経済性等に優れているため、製造・販売することで、多くの土木関係市場に寄与する点で産業上の利用可能性を有する。     According to the soil impervious material placing device and the placing method of the present invention, the placing pipe is divided, and each connecting pipe is provided with a water shielding material fall prevention device for safety, workability and maintainability.・ Because it is excellent in economic efficiency, it has industrial applicability in terms of contributing to many civil engineering-related markets by manufacturing and selling.

1 先端用ピンチバルブ付打設管
1' ネジ部
1a 接続フランジ
1b 埋栓用キャップ
1c 落下防止ピン
2 中間用打設管
2' ネジ部
2a 接続フランジ
2b 埋栓用キャップ
2c 落下防止ピン
3 後端用圧送用高圧ホース付ベンド管
3' ネジ部
3a 接続フランジ
3b 埋栓用キャップ
3c 落下防止ピン
3d 吊りフック部
4 圧送用高圧ホース
5 ストッパープレート
B ボルト
N ナット
PV ピンチバルブ
SM 土質遮水材
W ワッシャー
WR ワイヤーロープ等の吊り具
DESCRIPTION OF SYMBOLS 1 Ending pipe | tube with pinch valve for front ends 1 'Thread part 1a Connection flange 1b Cap for embedding 1c Fall prevention pin 2 Middle insertion pipe 2' Thread part 2a Connection flange 2b Cap for embedding 2c Fall prevention pin 3 Rear end 3 'Screw part 3a Connection flange 3b Cap for embedding 3c Fall prevention pin 3d Hanging hook part 4 High pressure hose for pumping 5 Stopper plate B Bolt N Nut PV Pinch valve SM Soil impermeable material W Washer WR Wire rope, etc.

Claims (4)

生コンや泥土混合物等の土質遮水材料を用いて管理型海面廃棄物処分場の側面や底面に遮水材を打設するクレイガード打設工事において、該打設工事用の装置は、打設管を挿入する掘削穴(H)の直径寸法(D)及び深度(L)に適合し、且つ、土質遮水材(SM)が自重により落下しないよう、先端用・中間用・後端用のそれぞれの管の下端部の水平方向に複数の落下防止ピン(1c)(2c)(3c)、及び、埋栓用キャップ(1b)(2b)(3b)をそれぞれ装着可能に設けた先端用ピンチバルブ(PV)付打設管(1)と、複数本の中間用打設管(2)と、後端用圧送用高圧ホース(4)付ベンド管(3)から成ることを特徴とする土質遮水材打設装置。     In clay guard placement work where a water shielding material is placed on the side or bottom of a managed sea surface waste disposal site using soil impermeable materials such as raw concrete or mud mixture, the equipment for the placement work is placed For the tip, middle, and rear end so that it fits the diameter (D) and depth (L) of the excavation hole (H) into which the pipe is inserted and the soil impermeable material (SM) does not fall under its own weight. A tip pinch provided with a plurality of fall prevention pins (1c), (2c), (3c) and embedding caps (1b), (2b), (3b) in the horizontal direction at the lower end of each tube so that they can be mounted. A soil material comprising a pipe (1) with a valve (PV), a plurality of intermediate pipes (2), and a bend pipe (3) with a high-pressure hose (4) for rear end. Water shielding material placing device. 後端用圧送用高圧ホース(4)付ベンド管(3)の上端部に、ワイヤーロープ等の吊り具を係止可能な、吊りフック部(3d)を設けたことを特徴とする請求項1記載の土質遮水材打設装置。     A suspension hook portion (3d) capable of engaging a suspension device such as a wire rope is provided at the upper end portion of the bend pipe (3) with a pressure feeding high-pressure hose (4) for the rear end. The soil impermeable material placement device as described. 落下防止ピン(1c)(2c)(3c)の挿入穴の両端外周部には、埋栓用キャップを螺着可能なネジ部(1')(2')(3')をそれぞれ形成して設け、且つ、土質遮水材(SM)打設時は、落下防止ピンの挿入穴の両端外周部に埋栓用キャップをそれぞれ螺着して設け、且つ、それぞれの管を接続時、又は、取り外し時は、管のフランジ部両端を一時仮置き固定用ストッパープレート(5)で一時仮置き固定して行うことを特徴とする請求項1記載の土質遮水材打設装置。     Screw parts (1 ′), (2 ′) and (3 ′) to which the caps for embedding can be screwed are formed on the outer peripheral parts at both ends of the insertion holes of the fall prevention pins (1c), (2c) and (3c). At the time of installation and soil impervious material (SM) casting, caps for embedding are respectively screwed to the outer peripheral portions at both ends of the insertion hole of the fall prevention pin, and each pipe is connected, or The soil impervious material placing device according to claim 1, wherein both ends of the flange portion of the pipe are temporarily placed and fixed with a temporary placement fixing stopper plate (5). 生コンや泥土混合物等の土質遮水材料を用いて管理型海面廃棄物処分場の側面や底面に遮水材を打設するクレイガード打設工事において、土質遮水材(SM)を掘削穴部(H)に打設挿入時は、ワイヤーロープ等の吊り具(WR)と、一時仮置き固定用ストッパープレート(5)を使用して、掘削穴(H)部に先端用ピンチバルブ(PV)付打設管(1)、複数本の中間用打設管(2)、後端用圧送用高圧ホース(4)付ベンド管(3)の順に、一時仮置き固定用ストッパー(5)で一時仮置き固定した状態で、ボルト(B)・ナット(N)・ワッシャー(W)等の係止部材で接続しながら挿入し、且つ、打設引抜時は、ワイヤーロープ(WR)等の吊り具を使用して装置全体を吊り上げ、且つ、管のフランジ部に一時仮置き固定用ストッパープレート(5)を敷設して一時仮置き固定しながら、後端用圧送用高圧ホース(4)付ベンド管(3)、複数本の中間用打設管(2)、先端用ピンチバルブ(PV)付打設管(1)の順に後部からそれぞれ取り外しながら土質遮水材料(SM)を掘削穴(H)部に充填することを特徴とする土質遮水材の打設工法。
Drilling holes for soil impermeable material (SM) in clay guard installation work where a water impermeable material is placed on the side or bottom of a managed sea surface waste disposal site using soil impermeable material such as raw concrete or mud mixture When inserting into (H), use a lifting tool (WR) such as a wire rope and a temporary fixing stopper plate (5), and use a pinch valve (PV) for the tip in the excavation hole (H). Temporary temporary placement fixing stopper (5) in the order of attached pipe (1), a plurality of intermediate pipes (2), a high pressure hose (4) for rear end feeding and a bend pipe (3) Inserted while connected with locking members such as bolts (B), nuts (N), and washers (W) in a temporarily fixed state, and when pulling out, hanging tools such as wire ropes (WR) Suspend the entire device using the and temporarily stop fixing stopper on the flange part of the pipe While laying and temporarily fixing the plate (5), a bend pipe (3) with a high-pressure hose (4) for rear end pressure feeding, a plurality of intermediate placement pipes (2), a pinch valve for front end (PV ) A method for placing a soil impermeable material, comprising filling the excavation hole (H) with a soil impermeable material (SM) while removing each from the rear portion in the order of the attached placing pipe (1).
JP2012084453A 2012-04-03 2012-04-03 Soil impermeable material placement device and its placement method Active JP5439534B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012084453A JP5439534B2 (en) 2012-04-03 2012-04-03 Soil impermeable material placement device and its placement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012084453A JP5439534B2 (en) 2012-04-03 2012-04-03 Soil impermeable material placement device and its placement method

Publications (2)

Publication Number Publication Date
JP2013213357A true JP2013213357A (en) 2013-10-17
JP5439534B2 JP5439534B2 (en) 2014-03-12

Family

ID=49586871

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012084453A Active JP5439534B2 (en) 2012-04-03 2012-04-03 Soil impermeable material placement device and its placement method

Country Status (1)

Country Link
JP (1) JP5439534B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63189525A (en) * 1987-01-30 1988-08-05 Shimizu Constr Co Ltd Underwater concrete placing device
JP2001348862A (en) * 2000-04-07 2001-12-21 Nippon Steel Corp Cut-off structure for steel sheet pile joint part, impervious revetment structure and construction method
JP2003113608A (en) * 2001-07-19 2003-04-18 Penta Ocean Constr Co Ltd Impervious wall structure and impervious bank protection structure using the same
JP2003138564A (en) * 2001-11-01 2003-05-14 Fudo Constr Co Ltd Device for placing high-fluidity reclamation material in water

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63189525A (en) * 1987-01-30 1988-08-05 Shimizu Constr Co Ltd Underwater concrete placing device
JP2001348862A (en) * 2000-04-07 2001-12-21 Nippon Steel Corp Cut-off structure for steel sheet pile joint part, impervious revetment structure and construction method
JP2003113608A (en) * 2001-07-19 2003-04-18 Penta Ocean Constr Co Ltd Impervious wall structure and impervious bank protection structure using the same
JP2003138564A (en) * 2001-11-01 2003-05-14 Fudo Constr Co Ltd Device for placing high-fluidity reclamation material in water

Also Published As

Publication number Publication date
JP5439534B2 (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN101736746B (en) Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
CN100535261C (en) Pile extractor and construction method thereof
US7381010B2 (en) System and method for removal of buried objects
EP1857597A2 (en) Method and pile-driving device for inserting foundation piles into the ground
CN105350540A (en) Pile bottom slag removal device and method during rotary drilling filling pile construction
CN108978661B (en) Construction method for removing cast-in-situ bored pile
JP6417291B2 (en) Placing device and placing method
CN101929159B (en) Protective method of pipelines in natural gas pipeline full-section excavation construction
JP5390919B2 (en) Removal method of earth retaining members
JP5439534B2 (en) Soil impermeable material placement device and its placement method
CN204282364U (en) A kind of for beating short-circuit device
CN209855737U (en) Light drill bit fisher for pile foundation punching engineering
KR101364586B1 (en) Nail assembly, reinforcement installation for method of slope reinforcement
CN202865757U (en) Flexible protective screening
CN204298820U (en) A kind of single sleeve pile pulling device
CN105256785A (en) Device capable of repeatedly utilizing pore water pressure gauges and manufacturing method of device
KR101199514B1 (en) Apparatus for preventing tunnel-caving in
CN205975610U (en) Insert precast pile anchor clamps
CN113089654B (en) Construction process of hole digging pile in complex soil layer and steel casing for construction
CN209975518U (en) Device for centering in anchor bar pile hole
CN209873807U (en) Suspension structure of deep foundation pit engineering underground socket concrete pipe
CN204551442U (en) A kind of reinforcing bar cage hoisting movable hook
EP3425119B1 (en) Demolishing an offshore jacket
CN108842776B (en) Combined pile hammer for fishing hammer and hammer fishing method
CN208088827U (en) The detachable earth anchor of iron on floor beam

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131216

R150 Certificate of patent or registration of utility model

Ref document number: 5439534

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250