CN205975610U - Insert precast pile anchor clamps - Google Patents

Insert precast pile anchor clamps Download PDF

Info

Publication number
CN205975610U
CN205975610U CN201620849795.8U CN201620849795U CN205975610U CN 205975610 U CN205975610 U CN 205975610U CN 201620849795 U CN201620849795 U CN 201620849795U CN 205975610 U CN205975610 U CN 205975610U
Authority
CN
China
Prior art keywords
steel pipe
hydraulically operated
prefabricated pile
vibration hammer
operated fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620849795.8U
Other languages
Chinese (zh)
Inventor
朱怀甫
马晓华
占宏
郭峰
沈杰超
陈云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY Co Ltd filed Critical ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY Co Ltd
Priority to CN201620849795.8U priority Critical patent/CN205975610U/en
Application granted granted Critical
Publication of CN205975610U publication Critical patent/CN205975610U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a building construction tool, in particular to insert precast pile anchor clamps, vibration hammer including upper portion connects long with the hydraulically operated fixture of lower part and the steel pipe of being connected between hydraulically operated fixture and vibration hammer, the steel pipe connects long top can dismantle with the vibration hammer to be connected, can to dismantle with the hydraulically operated fixture bottom the steel pipe connects long and be connected, the hydraulically operated fixture is including outside fixed component and inside hydraulic pressure movable clamp plate alive. The utility model discloses the steel pipe connects long, and hammer into shape with the vibration and the hydraulically operated fixture all adopts to dismantle and is connected for it makes things convenient for dismouting transportation, and the convenient steel pipe of changing different length connects long moreover, can effectively insert the designed elevation with precast pile (H shaped steel or steel sheet pile), has not only solved the problem of inserting the precast pile below ground, can ensure moreover that the precast pile inserts the accuracy nature of elevation, makes the precast pile satisfy the designed elevation requirement, not only beautifully but also can guarantee construction quality.

Description

A kind of slotting prefabricated pile fixture
Technical field
This utility model is related to a kind of construction instrument, particularly to a kind of slotting prefabricated pile fixture.
Background technology
At present, the application in Foundation Pit Support Engineering such as steel sheet pile, SMW engineering method is more and more extensive, especially building enclosure The building enclosure form of bottom SMW engineering method or steel sheet pile etc. is combined with more and more using top slope.Such foundation ditch, needs By prefabricated pile(H profile steel or steel sheet pile)Insertion below ground number meter, some prefabricated pile stake top buried depths reach 5 ~ 6m.If prefabricated pile is inserted Fashionable do not take certain ancillary method, easily cause prefabricated pile stake top absolute altitude and differ, or even prefabricated pile insertion depth cannot be met Require;Sometimes it is also adopted by excavating groove or prior ground is excavated to after prefabricated pile absolute altitude is implemented again, not only can affect fender post Construction period, and the safety to the construction equipment working below the number meter of ground affects.
Content of the invention
This utility model provides one kind for existing Practical Project can be effectively by prefabricated pile(H profile steel or steel sheet pile)Insertion To designed elevation, not only solve the problem that prefabricated pile is inserted below ground, and may insure that prefabricated pile inserts absolute altitude Accuracy, makes prefabricated pile meet designed elevation and requires, slotting prefabricated pile fixture that is not only attractive in appearance but also can ensure that construction quality.
The technical solution of the utility model:A kind of slotting prefabricated pile fixture, the vibration hammer including top and the hydraulic clip of bottom Has and is connected to the steel pipe extension piece between hydraulically operated fixture and vibration hammer, described steel pipe extension piece top is detachable with vibration hammer Connect, steel pipe extension piece bottom is detachably connected with hydraulically operated fixture, described hydraulically operated fixture includes the fixing component of outside, inside Hydraulic pressure ambulatory splint and the hydraulic means controlling hydraulic pressure ambulatory splint action.
Preferably, be connected by high-strength bolt between described vibration hammer and steel pipe extension piece top, described fixing component with Steel pipe extension piece is connected by high-strength bolt between bottom.
Preferably, described vibration hammer and hydraulically operated fixture are all cylindrical.
This kind of structure facilitates it to squeeze in soil.
Preferably, described hydraulic pressure ambulatory splint inner surface indention.
Preferably, described hydraulic means is hydraulic cylinder, and described hydraulic cylinder is fixed on vibration hammer side, described hydraulic pressure activity folder Plate is connected with hydraulic cylinder by fluid pressure line.
Preferably, described vibration hammer crown center is provided with suspension ring.
Hydraulic pressure ambulatory splint inner surface indention, by the design of the saw-tooth-type structures of clamping plate can effectively improve fixture with pre- The frictional force of stake processed, to prevent prefabricated pile from slipping with fixture.
This utility model steel pipe extension piece and vibration hammer and hydraulically operated fixture are all using being detachably connected so that its easy disassembly Transport, and it is convenient for changing the steel pipe extension piece of different length, can be effectively by prefabricated pile(H profile steel or steel sheet pile)It is inserted into and set Meter absolute altitude, not only solves the problem that prefabricated pile inserts below ground, and may insure that prefabricated pile inserts the accurate of absolute altitude Property, make prefabricated pile meet designed elevation and require, not only attractive in appearance but also can ensure that construction quality.
This utility model steel pipe extension piece is connected by high-strength bolt with vibration hammer and hydraulically operated fixture, and sound construction is reliable, work When making, stability is high.
Steel pipe extension piece in this utility model can according to construction of prefabricated piles depth need select different length so as will Prefabricated pile sends into corresponding absolute altitude;And steel pipe extension piece has enough rigidity and intensity, made a reservation for guaranteeing to send into prefabricated pile Absolute altitude.
Hydraulic pressure ambulatory splint in this utility model is controlled its clamping and unclamps by hydraulic means.
The beneficial effects of the utility model are:1st, solve the problems, such as that stake top absolute altitude locates below ground level the insertion of prefabricated pile, Guarantee that prefabricated pile absolute altitude can meet designed elevation and require;2nd, adopt dismountable steel pipe extension piece, in order to meet different buried depth Prefabricated pile inserts, and dismounting is flexible;3rd, adopt hydraulic clamp, can flexibly clamp and unclamp, construction controllability is good;4th, press from both sides Tool inner surface is in that saw-tooth-type structures design, and effectively improves the frictional force of fixture and prefabricated pile, prevents prefabricated pile from slipping with fixture.
Brief description
Fig. 1 plugs in the schematic diagram of prefabricated pile fixture for this utility model;
Fig. 2,3 be insert prefabricated pile working state schematic representation;
Fig. 4 is to insert prefabricated pile work completion statuses schematic diagram;
Fig. 5 is the structural representation of hydraulically operated fixture in this utility model;
In figure 1. vibration hammer, 2. steel pipe extension piece, 3. hydraulically operated fixture, 4. high-strength bolt, 5. hydraulic pressure ambulatory splint, 6. hangs Ring, 7. prefabricated component, 8. steel wire rope, 9. fixing component.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail, but is not that model is protected to this utility model The restriction enclosed.
A kind of slotting prefabricated pile fixture, as shown in figure 1, described slotting prefabricated pile fixture is in integrally cylinder, including top Vibration hammer 1 and the hydraulically operated fixture 3 of bottom, are steel pipe extension piece 2 between hydraulically operated fixture 3 and vibration hammer 1, the removable shipment of top and the bottom component Defeated, and connected by high-strength bolt 4 when working, described hydraulically operated fixture 3 is by outside fixing component 9 and internal hydraulic pressure activity folder Plate 5 is constituted, middle steel pipe extension piece 2 can according to construction of prefabricated piles depth need select different length so that prefabricated pile is sent Enter corresponding absolute altitude.
Stake top absolute altitude according to prefabricated pile determines steel pipe extension piece 2 length needing;Described steel pipe extension piece 2 has foot Enough rigidity and intensity, to guarantee for prefabricated pile to send into predetermined absolute altitude.
Hydraulic pressure ambulatory splint 5 is clamped by hydraulic means and unclamps.
Hydraulic pressure ambulatory splint 5 inner surface indention, by the design of the saw-tooth-type structures of clamping plate 5 can effectively improve fixture with The frictional force of prefabricated pile, to prevent prefabricated pile from slipping with fixture.
Vibration hammer top is provided with suspension ring 6.
Slotting prefabricated pile fixture work process of the present utility model is as follows:
As shown in Fig. 2 with, after the hydraulic pressure ambulatory splint 5 clamping prefabricated pile 7 of hydraulically operated fixture 3, passing through steel wire rope 8 He with loop wheel machine Hydraulically operated fixture 3 is sling together with prefabricated pile 7 by suspension ring 6.
As shown in figure 3, under acting on by the vibration hammer 1 on top, prefabricated pile 7 is inserted underground, until being inserted into design mark Height, as shown in Figure 4.

Claims (6)

1. a kind of slotting prefabricated pile fixture it is characterised in that:It includes the hydraulically operated fixture of the vibration hammer on top and bottom and is connected Steel pipe extension piece between hydraulically operated fixture and vibration hammer, described steel pipe extension piece top is detachably connected with vibration hammer, steel pipe Extension piece bottom and hydraulically operated fixture are detachably connected, and described hydraulically operated fixture includes the fixing component of outside, the activity of internal hydraulic pressure Clamping plate and the hydraulic means controlling hydraulic pressure ambulatory splint action.
2. a kind of slotting prefabricated pile fixture according to claim 1 it is characterised in that:Described vibration hammer and steel pipe extension piece top Connected by high-strength bolt between portion, be connected by high-strength bolt between described fixing component and steel pipe extension piece bottom.
3. a kind of slotting prefabricated pile fixture according to claim 1 it is characterised in that:Described vibration hammer and hydraulically operated fixture are in all Cylindric.
4. a kind of slotting prefabricated pile fixture according to claim 1 it is characterised in that:Described hydraulic pressure ambulatory splint inner surface is in Zigzag.
5. a kind of slotting prefabricated pile fixture according to claim 1 it is characterised in that:Described hydraulic means is hydraulic cylinder, institute State hydraulic cylinder and be fixed on vibration hammer side, described hydraulic pressure ambulatory splint is connected with hydraulic cylinder by fluid pressure line.
6. a kind of slotting prefabricated pile fixture according to claim 1 it is characterised in that:Described vibration hammer crown center is provided with and hangs Ring.
CN201620849795.8U 2016-08-08 2016-08-08 Insert precast pile anchor clamps Active CN205975610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620849795.8U CN205975610U (en) 2016-08-08 2016-08-08 Insert precast pile anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620849795.8U CN205975610U (en) 2016-08-08 2016-08-08 Insert precast pile anchor clamps

Publications (1)

Publication Number Publication Date
CN205975610U true CN205975610U (en) 2017-02-22

Family

ID=58029649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620849795.8U Active CN205975610U (en) 2016-08-08 2016-08-08 Insert precast pile anchor clamps

Country Status (1)

Country Link
CN (1) CN205975610U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237327A (en) * 2017-07-28 2017-10-10 广东水电二局股份有限公司 A kind of sleeve clip type prefabricated tubular pile vibroflotation fixture
CN112878327A (en) * 2021-01-19 2021-06-01 鞍山紫竹高科装备制造有限公司 Hoisting method suitable for piling machinery steel sheet pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237327A (en) * 2017-07-28 2017-10-10 广东水电二局股份有限公司 A kind of sleeve clip type prefabricated tubular pile vibroflotation fixture
CN112878327A (en) * 2021-01-19 2021-06-01 鞍山紫竹高科装备制造有限公司 Hoisting method suitable for piling machinery steel sheet pile

Similar Documents

Publication Publication Date Title
CN101550697A (en) Pulling-out method of underground piles by sleeving, vibrating and punching
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
JP2016084690A (en) Base type foundation unit
CN103437346A (en) Steel pipe pile with burrs and construction method
CN205975610U (en) Insert precast pile anchor clamps
CN1963044A (en) Construction method for withdrawal of waste pile
CN204185845U (en) A kind of water-proof pile board wall supporting and protection structure
CN103485333A (en) Corrugated hollow steel pipe friction pile and construction method thereof
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN102345287A (en) Construction method of large-diameter cast-in-situ thin-wall concrete composite pile and special hole forming device
CN206736920U (en) A kind of internal-expansion type pipe drawing device
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
CN206570813U (en) Diaphram wall toe of wall grouting behind shaft or drift lining constructing device
CN202467152U (en) Clamp type embedded part structure of shape steel overhanging scaffold
CN206319319U (en) Steel pipe Larsen steel plate combination fender post constructing structure
CN214783958U (en) Foundation ditch stagnant water curtain structure
CN108643189A (en) Outer anchor head fixed structure, foundation pit support system and construction method
CN204780894U (en) Can dismantle steel protects wound packages and puts
JP6385753B2 (en) Caisson press-fitting method using jack structure
CN210049235U (en) Industrial and civil foundation construction reinforcing device
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN206418492U (en) It is a kind of to be used for miniature steel pipe pile and the quick pile of light well point, the pile cover of pile pulling
CN205975636U (en) Larsen supporting device who possesses big space
CN107780420B (en) The construction method of hydraulic piston well under casting machine
CN205399398U (en) Underground continuous wall's prestressing force device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant