JP2013133701A - Binding wire for reinforcement work - Google Patents
Binding wire for reinforcement work Download PDFInfo
- Publication number
- JP2013133701A JP2013133701A JP2011290779A JP2011290779A JP2013133701A JP 2013133701 A JP2013133701 A JP 2013133701A JP 2011290779 A JP2011290779 A JP 2011290779A JP 2011290779 A JP2011290779 A JP 2011290779A JP 2013133701 A JP2013133701 A JP 2013133701A
- Authority
- JP
- Japan
- Prior art keywords
- binding
- binding wire
- reinforcing bar
- wire
- length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
本発明は鉄筋組立に際し配筋の交叉部分および継手部分を緊結するために用いる鉄筋工事用結束線に関するものである。The present invention relates to a binding wire for reinforcing bar construction used for tightly connecting a crossing portion and a joint portion of reinforcing bars when assembling reinforcing bars.
現在の鉄筋組立時には、鉄筋配筋時の交叉部分および継手部分の緊結のため、図4に図示しているように極細鋼線を適当な長さに調節して、両端の揃った二つ折りにした鉄筋工事用結束線が使用されており、このような鉄筋工事用結束線を図5に図示しているように複数本束ねておきこの束から一本ずつ抜き取って、この抜き取られた結束線の折り曲げ部分に結束治具であるハッカーの爪を引っ掛け、図6(A)に図示されているようにこの結束線を鉄筋配筋の交叉部分および継手部分に巻き付けている。その結果が図7に図示される状態である。At the time of rebar assembly, to adjust the cross section and joint part during rebar reinforcement, adjust the ultrafine steel wire to an appropriate length as shown in Fig. As shown in FIG. 5, a plurality of binding wires for reinforcing bar construction are used, and a plurality of such binding wires are bundled and removed one by one from the bundle. A hacker's claw, which is a binding jig, is hooked on the bent portion of the wire, and the binding wire is wound around the crossing portion and the joint portion of the reinforcing bar as shown in FIG. The result is the state shown in FIG.
このような鉄筋工事用結束線は例えば特開2000−336844号公報に図示されている。Such a binding wire for reinforcing bars is shown in, for example, Japanese Patent Application Laid-Open No. 2000-336844.
熟練の鉄筋工は鉄筋配筋時の交叉部分および継手部分を緊結する際に、鉄筋工事用結束線の端部を、図6(B)に図示されているように鉄筋の交叉部分の内側に折り込んでいる。When an expert reinforcing bar ties the crossover part and the joint part at the time of reinforcing bar arrangement, the end of the binding wire for rebar construction is placed inside the crossover part of the reinforcing bar as shown in FIG. 6 (B). It is folded.
しかし、最近の鉄筋工は鉄筋の交叉部分の内側に折り込む作業が十分でなく、現在の建設現場では図6(A)に図示されているように跳ね出した状態で鉄筋配筋時の交叉部分および継手部分を緊結するための結束作業が完了している。However, recent rebars are not enough to fold inside the crossover part of the rebar, and at the current construction site, the crossover part at the time of rebar reinforcement in the state of jumping as shown in FIG. And the bundling work for fastening the joint part is completed.
ところが、図6(A)に図示されているように鉄筋工事用結束線が鉄筋の交叉部分および継手部分の巻き付けられた位置から跳ね出した状態のままで、躯体コンクリ−トを打設すると打設した躯体コンクリートの表面に跳ね出した端部が残り、その結果躯体コンクリート表面への結露に起因して発▲錆▼、汚れが生じてしまう。However, as shown in FIG. 6 (A), when the reinforced concrete binding wire jumps out of the position where the reinforcing bar crossing part and the joint part are wound, it is struck. The end part which jumped out on the surface of the installed concrete remains, and as a result, rust and dirt are generated due to condensation on the surface of the concrete.
このため、躯体コンクリートを打設する前に型枠の立て込みを行う前の設計者またはゼネコンによる鉄筋組立配筋検査において、鉄筋配筋時の交叉部分および継手部分に巻き付けられた図6(A)のように結束位置から跳ね出した部分の両端部分が型枠に接触するため、その接触部分が躯体コンクリート打設後に結露等により発▲錆▼する事があるため図6(B)のように鉄筋結束後、鉄筋の交叉部分の内側に折り込むように設計者またはゼネコンからの是正指示が出る。For this reason, in the reinforcing bar assembly bar arrangement inspection by the designer or general contractor before setting up the formwork before placing the concrete frame, FIG. 6 (A As shown in Fig. 6 (B), both ends of the part that jumps out from the binding position contact the formwork as shown in Fig. 6 (B). After the reinforcing bars are bound, a correction instruction from the designer or a general contractor is issued so that they are folded inside the crossing portion of the reinforcing bars.
また、従来使用されている図4に図示されている鉄筋工事用結束線は図6(A)に図示されているように、鉄筋組立に際した鉄筋配筋の交叉部分および継手部分を緊結すると、鉄筋工事用結束線の両端が結束位置から跳ね出した状態になるが、その跳ね出した長さは非常に長い状態で残っている。Moreover, as shown in FIG. 6 (A), the conventionally used binding wire for rebar construction shown in FIG. 4 is formed by tightening the crossover portion and the joint portion of the reinforcing bar arrangement during rebar assembly. Both ends of the binding wire for rebar construction are in a state of jumping out from the binding position, but the length of the jumping out remains very long.
したがって、型枠立て込み前に鉄筋工事用結束線を鉄筋交叉部分の内側に折り込む必要があるのだが、鉄筋の交叉部分および継手部分の折り込む箇所数や本数が多くなるため作業効率が悪く、また鉄筋工事用結束線の結束位置から跳ね出した部分に結束操作に必要のない長さが生じている。Therefore, it is necessary to fold the reinforcing wire binding wire inside the reinforcing bar crossing part before setting up the formwork, but the number and number of the reinforcing bar crossing part and joint part to be folded increases, so the work efficiency is poor. A length that is not necessary for the bundling operation is generated in the portion of the bundling wire for the reinforcing bar projecting from the binding position.
本発明の目的は、躯体コンクリート打設前の鉄筋組立後の設計者およびゼネコンの鉄筋組立配筋検査で是正指示がでる図6(A)で図示されているような鉄筋工事用結束線の両端が、結束位置から跳ね出した部分を折り込む箇所数や跳ね出した部分の折り込む本数を少なくし、かつ従来使用されている鉄筋工事用結束線の結束操作に必要のない部分を取り除き、同じ結束操作性を維持しながらかつ省資源化(コスト削減)に対応するための鉄筋工事用結束線を提供することにある。The object of the present invention is to provide both ends of a binding wire for reinforcing bar construction as shown in FIG. 6 (A), in which a correction instruction is given by a designer after rebar assembly before placing concrete and a general contractor reinforcing bar assembly inspection. However, the same bundling operation can be performed by reducing the number of parts that fold out from the bundling position and the number of folds in the bounced part, and removing the parts that are not necessary for bundling the conventional binding wires for rebar construction. It is to provide a binding wire for reinforcing bars to maintain resource and save resources (cost reduction).
上記の課題を解決するための本発明の鉄筋工事用結束線は、鉄筋組立に際し鉄筋配筋の交叉部分および継手部分を緊結するための鉄筋工事用結束線であって、その鉄筋工事用結束線はほぼ直線状の極細鋼線を二つ折りにして結束治具であるハッカーを用いて緊結する鉄筋工事用結束線において、二つ折り部分の一方は鉄筋配筋の交叉部分または継手部分を緊結できる長さとし、他方を一方の長さに対して1/3以上7/8以下の段違いの形に形成したことを特徴とする。A binding wire for reinforcing bar construction according to the present invention for solving the above-mentioned problem is a binding wire for reinforcing bar construction for binding a crossover portion and a joint portion of a reinforcing bar arrangement when assembling the reinforcing bar, and the binding wire for reinforcing bar construction Is a reinforcing wire binding wire that folds an almost straight ultra-fine steel wire in half and fastens it using a hacker that is a binding tool. The other is formed in a stepped shape of 1/3 or more and 7/8 or less with respect to one length.
また、鉄筋工事用結束線にはメッキを施していることを特徴とする。In addition, the binding wire for reinforcing bars is plated.
本発明の鉄筋工事用結束線は、鉄筋組立に際し鉄筋配筋時の交叉部分および継手部分を緊結するため、一方は二つ折りにして用いる従来の両端が揃った鉄筋工事用結束線の結束操作に必要のない部分を取り除き、結束操作性を維持するための長さを確保しながら、他方はコスト削減と鉄筋組立後型枠に接触しない長さにするため更に短くし結果的に段違い形状にし、従来の鉄筋工事用結束線の長さを全体的に短くした点である。The binding wire for reinforcing bar construction of the present invention is used to bind a crossover portion and a joint portion when reinforcing bars are assembled during rebar assembly. While removing the unnecessary part and securing the length to maintain the bundling operability, the other is further shortened to make it a length that does not contact the formwork after rebar assembly, resulting in a stepped shape, It is the point which shortened the length of the conventional binding wire for reinforcing bars.
この結果、例えば図6(A)に図示されている従来の鉄筋工事用結束線の結束位置から跳ね出した部分は、二本とも折り込む必要があるが、本発明の鉄筋工事用結束線は一方は短いので型枠に接触することはなく他方も従来の鉄筋工事用結束線より短くなっているため結束位置から跳ね出した部分の折り込む箇所数や跳ね出した部分の折り込む本数が、従来の鉄筋工事用結束線に比べて半減している。As a result, for example, the two portions of the conventional reinforcing bar binding wire shown in FIG. 6 (A) that protrude from the binding position need to be folded, but the reinforcing bar binding wire of the present invention is one side. Is short and does not come into contact with the formwork, and the other is shorter than the conventional binding wire for rebar construction, so the number of parts that fold out from the binding position and the number of folds in the protruding part are Compared to cable ties for construction, it is halved.
したがって、本発明の鉄筋工事用結束線によれば従来の鉄筋工事用結束線によって緊結された結束位置から跳ね出した端部の箇所数および本数がより少なくなるため型枠に接触する部分が半分になり鉄筋組立後に行われる設計者およびゼネコンによる鉄筋組立配筋検査の是正指示にともなう、鉄筋交叉部分の結束位置から跳ね出した部分の折り込む箇所数および本数が半減することにより作業効率が良くなる。Therefore, according to the binding wire for reinforcing bar construction of the present invention, the number of ends and the number of the ends protruding from the binding position tightly bound by the conventional reinforcing wire binding wire are reduced, so that the portion contacting the mold is half. The work efficiency is improved by halving the number of folds and the number of parts that jump out from the binding position of the reinforcing bar crossing part in accordance with the correction instruction of the reinforcing bar assembly inspection by the designer and general contractor that is performed after the reinforcing bar is assembled. .
また、従来の鉄筋工事用結束線よりも使用している極細鋼線の全長が短くなっているので、生産性の面から見てもかなりのコスト削減になる。Moreover, since the total length of the ultra-fine steel wire used is shorter than the conventional binding wire for reinforcing bars construction, the cost can be reduced considerably from the viewpoint of productivity.
以下、図面を参照して本発明の実施の形態の一例につき詳細に説明する。Hereinafter, an example of an embodiment of the present invention will be described in detail with reference to the drawings.
図1は、本発明による鉄筋工事用結束線の実施形態の一例を示す平面図である。鉄筋工事用結束線1は鉄筋組立に際し配筋の交叉部分を緊結するために用いるものであり、二つ折りにした極細鋼線を一方1Bの長さLは他方1Aの長さL1より長い形状に形成されている。FIG. 1 is a plan view showing an example of an embodiment of a binding wire for reinforcing bar construction according to the present invention. Reinforcing
例えば、鉄筋の太さが呼び径D13mmどうしの鉄筋の交叉部分を緊結するために現在使用されている図4の結束線3は、極細鋼線の全長が350mmになっており二つ折りにされた両端の足の長さは約160mmずつの振り分けた長さで折り曲げられている。For example, the
しかし、本発明の鉄筋工事用結束線図1は鉄筋の太さが呼び径D13mmどうしの鉄筋の交叉部分を図4の鉄筋工事用結束線3と同程度の結束操作性を維持させるためLの長さは約140mmとしL1は約120mmとして極細鋼線の全長を270mmとした形に形成されている。However, the binding wire diagram for reinforcing bar construction of the present invention is shown in FIG. 1 in order to maintain the bundling operability at the same level as that of the binding wire for reinforcing
また、図4の鉄筋工事用結束線3は二つ折りにした折れ点の曲げ部分が大きいが図1の鉄筋工事用結束線1は二つ折りにした折れ点の曲げ部分を小さくしたのが特徴でもありこれにより、全長も短くすることができている。Further, the
本発明の鉄筋工事用結束線は一方1Bの長さLは操作性と結束性を考え、約140mm以上でないといけない。なぜならば、140mm以下にすると操作性がそこなわれ結束性において無理が生じる事になる。また本発明は他方1Aの長さL1が一方1Bの長さLに対して1/3から7/8の長さの形状にしている。1/3以下になると結束治具であるハッカーの操作性が損なわれ7/8以上になると省資源効果が少なくなる。On the other hand, the length L of 1B of the binding wire for reinforcing bar construction of the present invention should be about 140 mm or more in consideration of operability and binding properties. This is because if it is 140 mm or less, the operability will be lost and the cohesion will be unreasonable. In the present invention, the length L1 of the other 1A is 1/3 to 7/8 of the length L of the other 1B. If it becomes 1/3 or less, the operability of the hacker as a binding jig is impaired, and if it becomes 7/8 or more, the resource saving effect is reduced.
図1では、鉄筋工事用結束線1を一本だけ示しているが、実際には図1に示す如く構成された鉄筋工事用結束線1を図2に示される如くして複数本束ね、この鉄筋工事用結束線8から鉄筋工事用結束線1を一本ずつ抜き取って使用する。In FIG. 1, only one reinforcing
図7には、図1に示した鉄筋工事用結束線1を用いて緊結された鉄筋組立体10が示されている。鉄筋組立体10は、縦横に直交するように配置された鉄筋11の交叉部分のうちのいくつかを図1に示した鉄筋工事用結束線1によって緊結して成っている。FIG. 7 shows a
鉄筋工事用結束線1は、緊結されて跳ね出した端部が図3のように一方は長く跳ね出しているが他方は極端に短くなっているため、図6(B)で図示しているように図4の鉄筋工事用結束線3の緊結されて跳ね出した端部の折り曲げる本数が半減することになる。この結果鉄筋組立後の設計者およびゼネコンの鉄筋組立配筋検査で是正指示が出る、図6(A)のように緊結されて跳ね出した端部を図6(B)のように緊結部の内側に折り曲げる箇所数や本数が半減することにより作業効率が良くなる。The
これにより、鉄筋工事用結束線1を緊結する作業に使用する事による図1のLの長さよりL1の長さを短くしたため、L2の結束操作に必要のない長さを無くすことにより鉄筋工事用結束線1の使用材料である極細鋼線の全長を短くできることになり、コスト削減により鉄筋工事用結束線を購入して使用している鉄筋工事業者にも従来の鉄筋工事用結束線の図4の3を購入して使用するよりも単価面でのコスト削減になる。As a result, the length of L1 is shortened from the length of L in FIG. 1 by using the
1 本発明の鉄筋工事用結束線
1A 本発明の鉄筋工事用結束線の結束操作に最低限必要な長さ部分
1B 本発明の鉄筋工事用結束線の結束操作を維持するための長さ部分
L 1Bの長さ
L1 1Aの長さ
L2 1Bから1Aを除いた部分の長さDESCRIPTION OF
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011290779A JP2013133701A (en) | 2011-12-22 | 2011-12-22 | Binding wire for reinforcement work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011290779A JP2013133701A (en) | 2011-12-22 | 2011-12-22 | Binding wire for reinforcement work |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2013133701A true JP2013133701A (en) | 2013-07-08 |
Family
ID=48910584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011290779A Pending JP2013133701A (en) | 2011-12-22 | 2011-12-22 | Binding wire for reinforcement work |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2013133701A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102510850B1 (en) * | 2022-08-17 | 2023-03-16 | 더베스트테크 주식회사 | Fixed Grid Structure for Earth Filling Part Reinforcement, and Blast-Stone Wall Construction Method by Using This |
-
2011
- 2011-12-22 JP JP2011290779A patent/JP2013133701A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102510850B1 (en) * | 2022-08-17 | 2023-03-16 | 더베스트테크 주식회사 | Fixed Grid Structure for Earth Filling Part Reinforcement, and Blast-Stone Wall Construction Method by Using This |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6636262B2 (en) | Reinforcement structure and method of reinforced concrete beam | |
JP5715503B2 (en) | Reinforcing bar clip, closed type reinforcing bar using the same, and manufacturing method of the closed type reinforcing bar | |
JP2013133701A (en) | Binding wire for reinforcement work | |
CN111691603B (en) | V-shaped strip steel bar assembly | |
JP3151714U (en) | Reinforcing tool | |
JP5780829B2 (en) | Reinforcement structure and reinforcement method in reinforced concrete structures | |
JP5985799B2 (en) | Reinforcement structure with joint metal parts and openings | |
JP2016011573A (en) | Reinforcement binding auxiliary tool | |
JP5652959B2 (en) | Reinforcement structure of unit rebar | |
JP2012026088A (en) | Connection method and connection structure of precast floor slab with loop-like joint | |
JP5659096B2 (en) | Reinforcing bar temporary assembly tool for reinforced concrete | |
JP6324105B2 (en) | Concrete splicing method | |
KR101697010B1 (en) | Structure of reinforced bar of beam-column joint | |
JP6411836B2 (en) | Joining method and structure between existing structure and replacement member | |
JP4474669B2 (en) | Unit rebar connection method | |
TWI644006B (en) | Seismic reinforcing structure of composite spiral reinforcement and method for producing thereof | |
JP2009167760A (en) | Supporting frame for beam upper end main reinforcement, and beam reinforcement assembling method | |
JP6069075B2 (en) | Formwork for legal frame | |
JP2004232373A (en) | Reinforcement binder | |
KR100262119B1 (en) | Coupler for uniting reinforcing bar | |
KR101362978B1 (en) | Structure for Reinforcing Tensile Stress of Tendon Anchorage | |
CN211572254U (en) | Easily-disassembled stirrup | |
JP5952095B2 (en) | Rebar connection method and rebar joint | |
JP2006322273A (en) | Connecting structure | |
JP2004300871A (en) | Buckling inhibiting method and structure of main steel member in concrete construction |