JP2013025339A - 情報処理装置、還元処理装置、情報処理方法、還元処理方法および還元システム - Google Patents
情報処理装置、還元処理装置、情報処理方法、還元処理方法および還元システム Download PDFInfo
- Publication number
- JP2013025339A JP2013025339A JP2011156247A JP2011156247A JP2013025339A JP 2013025339 A JP2013025339 A JP 2013025339A JP 2011156247 A JP2011156247 A JP 2011156247A JP 2011156247 A JP2011156247 A JP 2011156247A JP 2013025339 A JP2013025339 A JP 2013025339A
- Authority
- JP
- Japan
- Prior art keywords
- power
- information
- reduction
- related information
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
Abstract
【解決手段】情報処理装置は、搭載または接続された機器に関する電力関連情報を取得する電力関連情報取得部と、電力関連情報取得部により取得した電力関連情報をネットワークを介して接続された還元処理装置に送信する通信部とを備える。還元処理装置は、機器に搭載または接続された情報処理装置から送信される電力関連情報をネットワークを介して受信する通信部と、電力関連情報に基づいて還元処理の基準となる還元基準を算出する還元基準算出部と、還元基準に基づいて所定の還元処理を行う還元処理部とを備える。
【選択図】図2
Description
<1.第1の実施の形態>
[1−1.還元システムの構成]
[1−2.情報処理装置の構成]
[1−3.還元処理サーバの構成]
[1−4.情報処理装置における処理]
[1−5.還元処理サーバにおける処理]
<2.第2の実施の形態>
<3.第3の実施の形態>
<4.第4の実施の形態>
<5.変形例>
[1−1.還元システムの構成]
図1は、本技術に係る還元システムを利用するための仕組みを示す構成図である。還元システムは、情報処理装置100と還元処理サーバ1000とから構成されている。情報処理装置100は、ユーザが所有する機器10に搭載または接続されることにより用いられる。なお、ユーザは情報処理装置100が搭載又は接続された機器10を1つに限らず、いくつ所有していてもよい。また、ユーザの数は何人であってもよい。還元処理サーバ1000はユーザが使用する機器10の製造元であるメーカー6000の管理のもと用いられる。還元処理サーバ1000は特許請求の範囲における還元処理装置に相当するものである。
次に、図2を参照して情報処理装置100の構成について説明する。図2は、情報処理装置100および還元処理サーバ1000の構成を示すブロック図である。情報処理装置100は、機器10に搭載または接続されることによって用いられる。情報処理装置100は、必ずしも予め機器10に搭載されている必要はなく、機器10に外部接続可能な専用のハードウェアとして構成されてもよい。また、機器1つに対して1つの情報処理装置を対応させるようにしてもよいし、1つの情報処理装置で複数の機器における処理を行ってもよい。情報処理装置100は、制御部110、使用時間計測部111、タイマー部112および通信部120とから構成されている。
次に、還元処理サーバ1000の構成について説明する。還元処理サーバ1000は、機器データベース1100、ユーザデータベース1200、通信部1300、制御部1400、使用電力算出部1401、使用電力累積部1402、電気料金算出部1403、第1還元処理部1404および第2還元処理部1405とから構成されている。還元処理サーバ1000は、特許請求の範囲における還元処理装置に相当するものである。
次に還元システムにおける処理について説明する。まず、情報処理装置100から還元処理サーバ1000への機器情報の送信について説明する。図5は機器情報の送信処理の詳細について説明するためのシーケンス図である。
次に図6を参照して、機器情報を受信した還元処理サーバ1000における処理について説明する。情報処理装置100から機器情報が送信されると、機器情報は通信部1300から制御部1400に供給される。
使用電力量=使用時間×消費電力
電力料金=総消費電力量×管轄電力会社の電力料金単価
次に、本技術の第2の実施の形態について説明する。図7は第2の実施の形態における情報処理装置200および還元処理サーバ1000の構成を示すブロック図である。第2の実施の形態は、情報処理装置200が電力測定部220を備え、使用時間計測部111を備えない点で第1の実施の形態と異なっている。なお、電力測定部220以外の情報処理装置200の構成は第1の実施の形態と同様であるため、その説明を省略する。
次に、本技術の第3の実施の形態について説明する。図8は第3の実施の形態における情報処理装置300の構成を示すブロック図である。第2の実施の形態は情報処理装置300が記憶部310を備える点で第1の実施の形態と異なっている。なお、記憶部310以外の情報処理装置300の構成は第1の実施の形態と同様であるため、その説明を省略する。また、還元処理サーバ1000の構成および処理は第1の実施の形態と同様であるため、その説明を省略する。
次に、本技術の第4の実施の形態について説明する。図10は第4の実施の形態における情報処理装置400の構成を示すブロック図である。第4の実施の形態は、情報処理装置400が記憶部420を備える点、制御部410がネットワーク接続検出部411として機能する点で第1の実施の形態と異なっている。なお、記憶部420およびネットワーク接続検出部411以外の情報処理装置400の構成は第1の実施の形態と同様であるため、その説明を省略する。また、還元処理サーバ1000の構成および処理は第1の実施の形態と同様であるため、その説明を省略する。
以上、本技術の一実施の形態について具体的に説明したが、本技術は上述の実施形態に限定されるものではなく、本技術の技術的思想に基づく各種の変形が可能である。
該電力関連情報取得部により取得した前記電力関連情報をネットワークを介して接続された還元処理装置に送信する通信部と
を備える情報処理装置。
前記電力関連情報取得部は、前記機器の電源がオンにされている時間を測定する
前記(1)に記載の情報処理装置。
前記(1)または(2)に記載の情報処理装置。
前記(1)から(3)のいずれかに記載の情報処理装置。
該記憶部は、前記機器の電源がオフにされた時点で前記電力関連情報取得部が取得していた前記電力関連情報を記憶し、
前記通信部は、前記機器の電源がオンにされた時点で前記記憶部に記憶された前記電力関連情報を前記還元処理装置に送信する
前記(1)から(4)のいずれかに記載の情報処理装置。
該記憶部は、前記通信部がネットワークに接続されていない場合に前記電力関連情報を記憶し、
前記通信部は、ネットワークに接続された時点で前記記憶部に記憶された前記電力関連情報を前記還元処理装置に送信する
前記(1)から(5)のいずれかに記載の情報処理装置。
前記電力関連情報取得部は、前記使用電力を測定する
前記(3)から(6)のいずれかに記載の情報処理装置。
前記電力関連情報取得部は、前記機器の電源がオンにされている時間を測定するとともに、前記機器が待機状態である時間を測定する
前記(1)から(7)のいずれかに記載の情報処理装置。
前記電力関連情報に基づいて還元処理の基準となる還元基準を算出する還元基準算出部と、
前記還元基準に基づいて所定の還元処理を行う還元処理部と
を備える還元処理装置。
前記還元基準算出部は、前記還元基準として、前記電力関連情報と前記機器の消費電力情報とに基づいて前記機器の使用電力量を算出し、
前記還元処理部は、前記機器の使用電力量に基づいて前記所定の還元処理を行う
前記(9)に記載の還元処理装置。
前記還元基準算出部は、前記機器型式情報に基づいて、前記機器ごとの消費電力情報を格納する機器データベースを参照することにより前記機器の前記消費電力情報を取得し、前記電力関連情報と前記機器の消費電力情報とに基づいて前記機器の使用電力量を算出する
前記(9)または(10)に記載の還元処理装置。
前記還元処理部は、前記累積使用電力量に基づいて、前記ユーザごとに前記所定の還元処理を行う
前記(9)から(11)のいずれかに記載の還元処理装置。
前記還元基準算出部は、前記機器識別情報に基づいて、前記機器のユーザ情報を格納するユーザデータベースを参照することにより、前記ユーザを特定し、該ユーザごとに前記使用電力量を累積して前記累積使用電力量を算出する
前記(9)から(12)のいずれかに記載の還元処理装置。
前記(9)から(13)のいずれかに記載の還元処理装置。
前記(9)から(14)のいずれかに記載の還元処理装置。
前記(9)から(14)のいずれかに記載の還元処理装置。
該電力関連情報をネットワークを介して接続された還元処理装置に送信する
情報処理方法。
前記電力関連情報に基づいて還元処理の基準となる還元基準を算出し、
前記還元基準に基づいて所定の還元処理を行う
還元処理方法。
該電力関連情報取得部により取得した前記電力関連情報をネットワークを介して接続された還元処理装置に送信する第1の通信部とを備える情報処理装置と、
前記情報処理装置から送信される電力関連情報をネットワークを介して受信する第2の通信部と、
前記電力関連情報に基づいて還元処理の基準となる還元基準を算出する還元基準算出部と、
前記還元基準に基づいて所定の還元処理を行う還元処理部と
を備える還元処理装置と
からなる還元システム。
111・・・・・・・使用時間計測部
220・・・・・・・電力測定部
120・・・・・・・通信部
100、200、300、400・・・・情報処理装置
310、410・・・記憶部
1300・・・・・・通信部
1401・・・・・・使用電力算出部
1402・・・・・・使用電力累積部
1403・・・・・・電気料金算出部
1404・・・・・・第1還元処理部
1405・・・・・・第2還元処理部
Claims (20)
- 搭載または接続された機器に関する電力関連情報を取得する電力関連情報取得部と、
該電力関連情報取得部により取得した前記電力関連情報をネットワークを介して接続された還元処理装置に送信する通信部と
を備える情報処理装置。 - 前記電力関連情報は、前記機器の電源がオンにされている時間を示し、
前記電力関連情報取得部は、前記機器の電源がオンにされている時間を測定する
請求項1に記載の情報処理装置。 - 前記送信部を介して、さらに、前記機器の型式を示す機器型式情報を送信する
請求項1に記載の情報処理装置。 - 前記送信部を介して、さらに、前記機器を識別するための機器識別情報を送信する
請求項1に記載の情報処理装置。 - 前記電力関連情報を記憶する記憶部をさらに備え、
該記憶部は、前記機器の電源がオフにされた時点で前記電力関連情報取得部が取得していた前記電力関連情報を記憶し、
前記通信部は、前記機器の電源がオンにされた時点で前記記憶部に記憶された前記電力関連情報を前記還元処理装置に送信する
請求項1に記載の情報処理装置。 - 前記電力関連情報を記憶する記憶部をさらに備え、
該記憶部は、前記通信部がネットワークに接続されていない場合に前記電力関連情報を記憶し、
前記通信部は、ネットワークに接続された時点で前記記憶部に記憶された前記電力関連情報を前記還元処理装置に送信する
請求項1に記載の情報処理装置。 - 前記電力関連情報は、前記機器の使用電力であり、
前記電力関連情報取得部は、前記使用電力を測定する
請求項1に記載の情報処理装置。 - 前記電力関連情報はさらに、前記機器が待機状態である待機時間を示し、
前記電力関連情報取得部は、前記機器の電源がオンにされている時間を測定するとともに、前記機器が待機状態である時間を測定する
請求項2に記載の情報処理装置。 - 機器に搭載または接続された情報処理装置から送信される電力関連情報をネットワークを介して受信する通信部と、
前記電力関連情報に基づいて還元処理の基準となる還元基準を算出する還元基準算出部と、
前記還元基準に基づいて所定の還元処理を行う還元処理部と
を備える還元処理装置。 - 前記電力関連情報は前記機器の電源がオンにされている時間を示し、
前記還元基準算出部は、前記還元基準として、前記電力関連情報と前記機器の消費電力情報とに基づいて前記機器の使用電力量を算出し、
前記還元処理部は、前記機器の使用電力量に基づいて前記所定の還元処理を行う
請求項9に記載の還元処理装置。 - 前記通信部は、前記情報処理装置から送信された前記機器の型式を示す機器型式情報を受信し、
前記還元基準算出部は、前記機器型式情報に基づいて、前記機器ごとの消費電力情報を格納する機器データベースを参照することにより前記機器の前記消費電力情報を取得し、前記電力関連情報と前記機器の消費電力情報とに基づいて前記機器の使用電力量を算出する
請求項10に記載の還元処理装置。 - 前記還元基準算出部は、前記還元基準として、前記使用電力量を前記機器のユーザごとに累積することにより累積使用電力量を算出し、
前記還元処理部は、前記累積使用電力量に基づいて、前記ユーザごとに前記所定の還元処理を行う
請求項10に記載の還元処理装置。 - 前記通信部は、前記情報処理装置から送信された、前記機器を識別するための機器識別情報を受信し、
前記還元基準算出部は、前記機器識別情報に基づいて、前記機器のユーザ情報を格納するユーザデータベースを参照することにより、前記ユーザを特定し、該ユーザごとに前記使用電力量を累積して前記累積使用電力量を算出する
請求項12に記載の還元処理装置。 - 前記還元基準算出部は、前記還元基準として、前記機器の使用電力量と電力料金単価とに基づいて前記機器の使用により生じる電力料金を算出する
請求項10に記載の還元処理装置。 - 前記還元処理部は、前記ユーザごとに前記還元基準に基づいて振り込み処理を行う
請求項9に記載の還元処理装置。 - 前記還元処理部は、前記還元基準に基づいてグリーン電力証書の購入処理を行う
請求項9に記載の還元処理装置。 - 前記還元基準に基づいて、発電設備による発電量を決定する発電量決定部をさらに備え、該発電量決定部により決定された発電量を前記発電設備に供給する
請求項9に記載の還元処理装置。 - 機器に関する電力関連情報を取得し、
該電力関連情報をネットワークを介して接続された還元処理装置に送信する
情報処理方法。 - 機器に搭載または接続された情報処理装置から送信される電力関連情報をネットワークを介して受信し、
前記電力関連情報に基づいて還元処理の基準となる還元基準を算出し、
前記還元基準に基づいて所定の還元処理を行う
還元処理方法。 - 搭載または接続された機器に関する電力関連情報を取得する電力関連情報取得部と、
該電力関連情報取得部により取得した前記電力関連情報をネットワークを介して接続された還元処理装置に送信する第1の通信部とを備える情報処理装置と、
前記情報処理装置から送信される電力関連情報をネットワークを介して受信する第2の通信部と、
前記電力関連情報に基づいて還元処理の基準となる還元基準を算出する還元基準算出部と、
前記還元基準に基づいて所定の還元処理を行う還元処理部と
を備える還元処理装置と
からなる還元システム。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011156247A JP6003016B2 (ja) | 2011-07-15 | 2011-07-15 | 還元処理装置、還元処理方法および還元システム |
US13/538,286 US10346855B2 (en) | 2011-07-15 | 2012-06-29 | Reducing electric energy consumption based on energy usage pattern |
CN201210237520.5A CN103093556B (zh) | 2011-07-15 | 2012-07-09 | 信息处理装置和方法以及返款处理装置、方法和系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011156247A JP6003016B2 (ja) | 2011-07-15 | 2011-07-15 | 還元処理装置、還元処理方法および還元システム |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2013025339A true JP2013025339A (ja) | 2013-02-04 |
JP2013025339A5 JP2013025339A5 (ja) | 2014-07-24 |
JP6003016B2 JP6003016B2 (ja) | 2016-10-05 |
Family
ID=47519455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011156247A Expired - Fee Related JP6003016B2 (ja) | 2011-07-15 | 2011-07-15 | 還元処理装置、還元処理方法および還元システム |
Country Status (3)
Country | Link |
---|---|
US (1) | US10346855B2 (ja) |
JP (1) | JP6003016B2 (ja) |
CN (1) | CN103093556B (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019067250A (ja) * | 2017-10-03 | 2019-04-25 | 東京瓦斯株式会社 | 環境価値取引システム、環境価値取引方法及び環境価値取引プログラム |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101669108B1 (ko) * | 2011-11-11 | 2016-11-10 | 통진엔지니어링(주) | 연약지반 기초파일 시공방법 |
DE102013220790A1 (de) * | 2013-10-15 | 2015-04-16 | Osram Opto Semiconductors Gmbh | Herstellung eines optoelektronischen Bauelements |
CN113743988B (zh) * | 2021-08-27 | 2024-03-12 | 国网天津市电力公司 | 电力市场交易中发电企业电价折算值获取方法及其应用 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002117183A (ja) * | 2000-10-11 | 2002-04-19 | Mitsubishi Electric Corp | 物資消費量関連サービス装置及び方法 |
JP2002259657A (ja) * | 2001-02-28 | 2002-09-13 | Square Co Ltd | 電化製品、ネットワークシステム、ネットワークを用いた電化製品の制御方法およびその方法を達成するプログラム列ならびにコンピュータ可読記憶媒体 |
JP2002304495A (ja) * | 2001-04-03 | 2002-10-18 | Nec Corp | 電気通信製品の回収支援システム、方法、電気通信機器及びプログラム |
JP2003271812A (ja) * | 2002-03-14 | 2003-09-26 | Sanyo Electric Co Ltd | 家電利用支援システム |
JP2004127630A (ja) * | 2002-09-30 | 2004-04-22 | Toshiba Lighting & Technology Corp | 家電機器用ネットワークシステム |
JP2011118705A (ja) * | 2009-12-03 | 2011-06-16 | Optim Corp | 電化製品の種別に応じた消費電力量を表示する消費電力量管理装置、システム、方法、プログラム |
Family Cites Families (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4401943A (en) * | 1975-06-19 | 1983-08-30 | Betty Ann Garrett | Electrical efficiency meter |
US4644320A (en) * | 1984-09-14 | 1987-02-17 | Carr R Stephen | Home energy monitoring and control system |
US5650771A (en) * | 1995-04-25 | 1997-07-22 | Lee; Chung-Cheng | Electrical socket with monitoring unit for monitoring operating conditions |
US6226600B1 (en) * | 1998-08-03 | 2001-05-01 | Rodenberg, Iii Ernest A. | Programmable electricity consumption monitor |
WO2002037433A2 (en) * | 2000-11-01 | 2002-05-10 | International Carbon Bank And Exchange | Method and system for banking and exchanging emission reduction credits |
US20020198629A1 (en) * | 2001-04-27 | 2002-12-26 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
US8082190B2 (en) * | 2004-06-15 | 2011-12-20 | Landis+Gyr, Inc. | Method for tracking components in a utility meter |
US7379791B2 (en) * | 2004-08-03 | 2008-05-27 | Uscl Corporation | Integrated metrology systems and information and control apparatus for interaction with integrated metrology systems |
US7360106B2 (en) * | 2004-08-05 | 2008-04-15 | Matsushita Electric Industrial Co., Ltd. | Power-saving processing unit, power-saving processing method and program record medium |
JP2009048536A (ja) | 2007-08-22 | 2009-03-05 | Ebara Corp | 燃料電池の燃料費の徴収方法、燃料電池の維持費の賦課方法、及び、燃料電池の燃料使用料金徴収システム |
US20100235008A1 (en) * | 2007-08-28 | 2010-09-16 | Forbes Jr Joseph W | System and method for determining carbon credits utilizing two-way devices that report power usage data |
US20110023045A1 (en) * | 2007-12-21 | 2011-01-27 | Positive Energy, Inc. | Targeted communication to resource consumers |
US8255090B2 (en) * | 2008-02-01 | 2012-08-28 | Energyhub | System and method for home energy monitor and control |
US20100235144A1 (en) * | 2008-04-24 | 2010-09-16 | David Mosberger-Tang | Method and system for automated monitoring of the production and/or consumption of meterable substances or thermodynamically quantifiable entities, including power and energy |
US20100076835A1 (en) * | 2008-05-27 | 2010-03-25 | Lawrence Silverman | Variable incentive and virtual market system |
US20100145885A1 (en) * | 2008-12-05 | 2010-06-10 | Lava Four, Llc | System for on-board metering of recharging energy consumption in vehicles equipped with electrically powered propulsion systems |
US20100211509A1 (en) * | 2009-02-17 | 2010-08-19 | Jacobs Richard B | Resource monitoring device |
US20100250440A1 (en) * | 2009-03-30 | 2010-09-30 | Eugene Wang | Web based monitoring, management and contest based on collected power consumption data |
US8754630B2 (en) * | 2009-05-08 | 2014-06-17 | Lanids+Gyr, Inc. | Apparatus and method for measuring real time clock accuracy in an electric meter |
US20100293045A1 (en) * | 2009-05-14 | 2010-11-18 | James Moeller Burns | Centralized Renewable Energy System With Fractional Ownership and a Method of Disaggregated Net Metering of its Renewable Energy Output Among Utility Customers Who Are Fractional Owners |
US20100333155A1 (en) * | 2009-06-30 | 2010-12-30 | Philip David Royall | Selectively using local non-volatile storage in conjunction with transmission of content |
CN201465232U (zh) * | 2009-07-14 | 2010-05-12 | 河南省电力公司信阳供电公司 | 电力缴费系统 |
US8138626B2 (en) * | 2009-10-25 | 2012-03-20 | Greenwave Reality, Pte Ltd. | Power node for energy management |
KR101310968B1 (ko) * | 2009-12-18 | 2013-09-23 | 한국전자통신연구원 | 대기 전력 제어 장치 및 제어 방법 |
JP5760179B2 (ja) * | 2010-04-23 | 2015-08-05 | パナソニックIpマネジメント株式会社 | 検知装置及び検知システム |
US20120226592A1 (en) * | 2011-03-01 | 2012-09-06 | Flynn Michael P | Approach For Producing And Managing Electricity |
JP5803248B2 (ja) * | 2011-05-06 | 2015-11-04 | ソニー株式会社 | 情報処理装置、情報処理方法、及びプログラム |
US9246334B2 (en) * | 2012-10-25 | 2016-01-26 | New Jersey Institute Of Technology | Alleviating solar energy congestion in the distribution grid via smart metering communications |
KR20150111813A (ko) * | 2014-03-26 | 2015-10-06 | 이지세이버 주식회사 | 전자기기의 동작 제어 장치 |
US20160274609A1 (en) * | 2015-03-18 | 2016-09-22 | Onzo Limited | Classifying utility consumption of consumers |
-
2011
- 2011-07-15 JP JP2011156247A patent/JP6003016B2/ja not_active Expired - Fee Related
-
2012
- 2012-06-29 US US13/538,286 patent/US10346855B2/en not_active Expired - Fee Related
- 2012-07-09 CN CN201210237520.5A patent/CN103093556B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002117183A (ja) * | 2000-10-11 | 2002-04-19 | Mitsubishi Electric Corp | 物資消費量関連サービス装置及び方法 |
JP2002259657A (ja) * | 2001-02-28 | 2002-09-13 | Square Co Ltd | 電化製品、ネットワークシステム、ネットワークを用いた電化製品の制御方法およびその方法を達成するプログラム列ならびにコンピュータ可読記憶媒体 |
JP2002304495A (ja) * | 2001-04-03 | 2002-10-18 | Nec Corp | 電気通信製品の回収支援システム、方法、電気通信機器及びプログラム |
JP2003271812A (ja) * | 2002-03-14 | 2003-09-26 | Sanyo Electric Co Ltd | 家電利用支援システム |
JP2004127630A (ja) * | 2002-09-30 | 2004-04-22 | Toshiba Lighting & Technology Corp | 家電機器用ネットワークシステム |
JP2011118705A (ja) * | 2009-12-03 | 2011-06-16 | Optim Corp | 電化製品の種別に応じた消費電力量を表示する消費電力量管理装置、システム、方法、プログラム |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019067250A (ja) * | 2017-10-03 | 2019-04-25 | 東京瓦斯株式会社 | 環境価値取引システム、環境価値取引方法及び環境価値取引プログラム |
Also Published As
Publication number | Publication date |
---|---|
JP6003016B2 (ja) | 2016-10-05 |
CN103093556A (zh) | 2013-05-08 |
US20130018717A1 (en) | 2013-01-17 |
US10346855B2 (en) | 2019-07-09 |
CN103093556B (zh) | 2017-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5899640B2 (ja) | 電力管理装置、電力管理方法および電力管理システム | |
JP5487994B2 (ja) | 電力管理装置、及び表示方法 | |
US8355965B2 (en) | Battery exchange service system and charging method therefor, and portable device | |
JP6846281B2 (ja) | 管理方法、サービス管理装置、サービス管理システム及びプログラム | |
US20110055036A1 (en) | Methods and systems for managing electricity delivery and commerce | |
JP2008021152A (ja) | 電気機器運転制御方法及びシステム | |
US20080294472A1 (en) | Server For a Distributed Power Generation Management System and Power Generation Management System Using the Same | |
JP6146939B2 (ja) | 節電行動誘発システム及びその方法 | |
JP2012252580A (ja) | 電力制御装置、電力管理装置および電力管理システム | |
WO2005107033A1 (ja) | 発電設備管理システム | |
JP2010128525A (ja) | グリーン電力の流通システム | |
JP6003016B2 (ja) | 還元処理装置、還元処理方法および還元システム | |
JP2011186875A (ja) | 共用駐車場用の電気自動車充電設備の管理システム及び管理方法 | |
US20160350734A1 (en) | Versatile, Real Time, Two-Ways Payment for Power and Utilities | |
JP2006285934A (ja) | エネルギー量計測システム及び課金システム | |
JP2015517695A (ja) | 再生可能で環境に優しいソースによって生成される電力の消費を管理するシステム及び方法 | |
JP2007295650A (ja) | 仮想電力貯蔵二次電池を用いた集合住宅戸別の電力管理システム、電力料金課金方法 | |
JP6554785B2 (ja) | 電力管理装置、電力システム、需要家装置、電力管理方法および電力管理プログラム | |
JP2008046926A (ja) | 二酸化炭素排出権取引システム | |
US20130166479A1 (en) | Method and apparatus for calculating energy revenues of electric power devices based on real time pricing | |
JP2011204045A (ja) | 電力量情報伝達システムおよび二酸化炭素削減量集計システム | |
US20120054017A1 (en) | Renewable energy consumption management using renewable energy consumption coupons | |
JP2012053721A (ja) | 電力小売支援システム | |
JP6403068B2 (ja) | 契約支援装置、契約支援システム、契約支援方法 | |
JP5748802B2 (ja) | 個別電源管理システムおよび該システム用のポータブルマイクロパワーメータ |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140610 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140610 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150130 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150217 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150410 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150908 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20151030 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20160329 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160614 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20160622 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160809 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20160822 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 6003016 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |