JP2013002143A - Installation device and installation method - Google Patents

Installation device and installation method Download PDF

Info

Publication number
JP2013002143A
JP2013002143A JP2011134389A JP2011134389A JP2013002143A JP 2013002143 A JP2013002143 A JP 2013002143A JP 2011134389 A JP2011134389 A JP 2011134389A JP 2011134389 A JP2011134389 A JP 2011134389A JP 2013002143 A JP2013002143 A JP 2013002143A
Authority
JP
Japan
Prior art keywords
lifting
arm
base
clamp
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011134389A
Other languages
Japanese (ja)
Other versions
JP5772273B2 (en
Inventor
Takumi Suzuki
巧 鈴木
Seido Oba
誠道 大場
Takashi Saito
隆 齋藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2011134389A priority Critical patent/JP5772273B2/en
Publication of JP2013002143A publication Critical patent/JP2013002143A/en
Application granted granted Critical
Publication of JP5772273B2 publication Critical patent/JP5772273B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an installation device and an installation method which can install a reinforcement member on the lower face side of an upper structure of a deteriorated bridge and others without applying a load at the time of construction.SOLUTION: An installation device 1 comprises a base 2, an elevating base 8 installed at the upper part of the base 2 so as to be elevated, elevating means 9 for elevating the elevating base 8, at least one pair of movable carriages 14 which are installed at the upper part of the elevating base 8 and which can move in the direction of nearing to each other by following the elevation of the elevation base 8 while moving in the direction of separating from each other by following the descent of the elevation base 8, and movable fixing means 22 which switches between the state in which the movable carriage 14 is moved at the upper part of the elevating base 8 and the state in which the movable carriage 14 is fixed at the upper part of the elevating base 8.

Description

本発明は、据付装置及び据付方法に関し、特に、既設の水上構造物の下面側に補強部材を設置するのに有効な据付装置及び据付方法に関する。   The present invention relates to an installation apparatus and an installation method, and more particularly to an installation apparatus and an installation method effective for installing a reinforcing member on the lower surface side of an existing water structure.

一般に、人や車両等の通行のために川や海等を跨いだ状態に設置されている橋梁等を老朽化や腐食等によって補強する場合、人や車両等の通行を許容した状態で橋梁等の上部構造(床版、横桁、縦桁等)を下面側から補強することが行われている。   In general, when a bridge or the like installed across a river or the sea for the passage of people or vehicles is reinforced by aging or corrosion, the bridge etc. in a state that allows passage of people or vehicles, etc. The upper structure (floor slabs, horizontal girders, vertical girders, etc.) is reinforced from the lower surface side.

例えば、既設の橋梁等の上部構造の下面側の隣接する2本の縦桁の上部間に複数本の補強桁を設置し、補強桁と上部構造の床版との間に充填材を充填することにより、上部構造を下面側から補強する補強構造を構築している。   For example, a plurality of reinforcing girders are installed between the upper portions of two adjacent vertical girders on the lower surface side of an upper structure such as an existing bridge, and a filler is filled between the reinforcing girders and the upper structure floor slab. Thus, a reinforcing structure for reinforcing the upper structure from the lower surface side is constructed.

また、特許文献1には、橋梁構造物の主桁等で構成された橋体の下面及び側面にパネルを設置することにより、橋梁構造物の防食性を向上させるように構成した補強構造が記載されている。   Patent Document 1 describes a reinforcing structure configured to improve the corrosion resistance of a bridge structure by installing panels on the lower surface and side surface of the bridge body composed of the main girders and the like of the bridge structure. Has been.

特許文献1に記載の補強構造は、橋梁構造物の主桁等で構成された橋体下面に、幅員方向に長く橋軸方向に短いパネルを、短手方向の両端部に形成した凹接合部と凸接合部とを嵌合させるとともに、このパネルの接合部を横断する方向(橋軸方向)に間隔をおいて縦梁を配置し、この縦梁と各パネルの接合部とを固定具で固定し、さらに、パネルに固定した縦梁を直交方向に適宜間隔ごとに配置した横梁に固定し、この横梁を橋梁の主桁の下フランジに支持材によって支持することにより、橋体の下面を覆う下面パネルカバーを構成している。また、橋体の側面に、パネルの上端部を橋梁の路肩部の地覆に固定し、下端部
を下面パネルカバーのパネルの端部に接合し、中間部を橋梁構造物に一端が支持されたフレームに支持することにより、側面パネルカバーを構成している。
The reinforcing structure described in Patent Document 1 is a concave joint formed by forming panels, which are long in the width direction and short in the direction of the bridge axis, on both ends in the short direction on the lower surface of the bridge body constituted by the main girder of the bridge structure. And the convex joints are fitted together, and vertical beams are arranged at intervals in the direction crossing the panel joints (bridge axis direction). Then, the vertical beam fixed to the panel is fixed to the horizontal beam arranged at appropriate intervals in the orthogonal direction, and this horizontal beam is supported on the lower flange of the main girder of the bridge by the support material. The lower panel cover is covered. Also, on the side of the bridge body, the upper end of the panel is fixed to the ground cover of the road shoulder of the bridge, the lower end is joined to the end of the panel of the bottom panel cover, and the middle is supported at one end by the bridge structure. The side panel cover is constructed by supporting the frame.

ところで、既設の橋梁等の上部構造の下面側の隣接する2本の縦桁の上部間に複数本の補強桁を設置する方法では、既設の橋梁にガイドレールを取り付け、ガイドレールにホイストクレーンを取り付け、台船等によって橋梁等の補強部分の下方に搬入した新設の補強桁をホイストクレーンで吊り上げ、ホイストクレーンをガイドレールに沿って移動させることにより、上部構造の下面側の補強部分に設置している。   By the way, in the method of installing a plurality of reinforcing girders between the upper parts of two adjacent vertical girders on the lower surface side of an existing superstructure such as a bridge, a guide rail is attached to the existing bridge, and a hoist crane is attached to the guide rail. Installed on the reinforcement part on the lower surface side of the superstructure by lifting the new reinforcement girder carried down below the reinforcement part of the bridge etc. with a hoist crane and moving the hoist crane along the guide rail ing.

このため、既設の橋梁等にホイストクレーン、ガイドレール等による施工時荷重が作用することになり、既設の橋梁等に悪影響を与えるおそれがある。また、新設の補強桁の設置後に、ホイストクレーン、ガイドレール等を撤去する作業が必要になり、しかも、その作業を、新設の補強桁の設置後に上部構造との間に形成される狭い空間を利用して行わなければならないため、その作業に非常に手間がかかる。   For this reason, the load at the time of construction by a hoist crane, a guide rail, etc. acts on the existing bridge etc., and there exists a possibility of having a bad influence on the existing bridge etc. In addition, it is necessary to remove the hoist crane, guide rails, etc. after installing the new reinforcement girder, and the work is performed in a narrow space formed between the upper structure after the installation of the new reinforcement girder. Because it has to be done using it, the work is very laborious.

また、特許文献1に記載の補強構造は、橋梁構造物の橋体にホイストクレーン等を取り付け、このホイストクレーン等を橋脚等に設けた作業ステージ上で操作することにより、台船等によって橋体の下方に搬入したパネルを吊り上げ、このパネルを作業ステージ上で順次接合しながら、パネル側に取り付けた走行ローラを橋体側に取り付けたガイドレールに沿って走行させることにより、橋体の橋軸の方向に移動させている。このため、橋梁構造物にホイストクレーン、ガイドレール、走行ローラ等による施工時荷重が作用することになり、橋梁構造物に悪影響を与えるおそれがある。さらに、パネルの設置後に、ホイストクレーン、ガイドレール等を撤去する作業が必要になり、しかも、その作業を、パネルの設置後の橋体との間に形成される狭い空間を利用して行わなければならないため、その作業に非常に手間がかかる。   In addition, the reinforcing structure described in Patent Document 1 is provided with a hoist crane or the like attached to a bridge body of a bridge structure, and the hoist crane or the like is operated on a work stage provided on a pier or the like so that a bridge body or the like can be used. By lifting the panel that has been loaded below and moving the roller attached to the panel side along the guide rail attached to the bridge body while sequentially joining the panels on the work stage, the bridge shaft of the bridge body It is moved in the direction. For this reason, the load at the time of construction by a hoist crane, a guide rail, a traveling roller, etc. will act on a bridge structure, and there is a possibility of having a bad influence on a bridge structure. In addition, it is necessary to remove hoist cranes, guide rails, etc. after the panel is installed, and this operation must be performed using a narrow space formed between the bridge body after the panel is installed. Therefore, the work is very troublesome.

特開2004−324230号公報JP 2004-324230 A

本発明は、上記のような従来の問題に鑑みなされたものであって、老朽化した水上構造物に施工時荷重を作用させることなく、老朽化した水上構造物を下面側から補強する補強部材を容易に設置することができる、据付装置及び据付方法を提供することを目的とする。   The present invention has been made in view of the above-mentioned conventional problems, and is a reinforcing member that reinforces an aged water structure from the lower surface side without applying a load during construction to the aged water structure. It is an object of the present invention to provide an installation device and an installation method that can be installed easily.

上記のような課題を解決するために、本発明は、以下のような手段を採用している。
すなわち、本発明は、基台と、該基台の上部に昇降可能に設けられる昇降台と、該昇降台を昇降させる昇降手段と、前記昇降台の上部に設けられるとともに、前記昇降台の上昇に追従して互いに接近する方向に移動可能、かつ前記昇降台の下降に追従して互いに離間する方向に移動可能な少なくとも一対の移動台と、該移動台を前記昇降台の上部で移動させる状態と、前記昇降台の上部に固定する状態とに切り替える移動固定手段とを備えていることを特徴とする。
In order to solve the above problems, the present invention employs the following means.
That is, the present invention is provided with a base, a lift provided on the top of the base so as to be movable up and down, a lifting means for moving the lift up and down, an upper part of the lift and the lift of the lift At least a pair of movable bases that can move in a direction approaching each other and follow the lowering of the lifting platform, and a state in which the movable platform is moved above the lifting platform And a movement fixing means for switching to a state of fixing to the upper part of the lifting platform.

本発明の据付装置によれば、例えば、一対の移動台の上部に2本の補強部材を載置し、昇降手段により昇降台を昇降させることにより、昇降台の下降に追従させて、一対の移動台を互いに離間する方向に移動させ、移動台の上部の2本の補強部材間の間隔を調整することができる。
従って、補強部材を一旦上昇させて、補強部材を下降させながら補強部材間の間隔を拡げるような使い方ができるので、橋梁の上部構造の隣接する2本の縦桁の上部間に2本の補強部材(補強桁)を所定の間隔で設置するような場合に適用できる。
According to the installation apparatus of the present invention, for example, two reinforcing members are placed on the upper part of the pair of moving bases, and the lifting base is moved up and down by the lifting means to follow the lowering of the lifting base. The distance between the two reinforcing members at the upper part of the moving table can be adjusted by moving the moving table in a direction away from each other.
Therefore, the reinforcing member can be lifted once and the interval between the reinforcing members can be expanded while the reinforcing member is lowered, so that two reinforcing members are provided between the upper portions of two adjacent vertical beams of the bridge upper structure. This can be applied to the case where members (reinforcing girders) are installed at predetermined intervals.

また、本発明において、前記昇降手段は、第1アームと第2アームとをX状に交差させるとともに、両アームを交差部を中心として回動可能に連結した昇降アームと、該昇降アームの両アームを回動させるアクチュエータとを備え、前記昇降アームの両アームの上部に前記昇降台が設けられ、前記両アームの回動に追従して前記昇降台が昇降可能に構成されていることとしてもよい。   In the present invention, the elevating means crosses the first arm and the second arm in an X shape and connects both the arms so as to be rotatable about the intersecting portion. An actuator for rotating the arm, the lifting platform is provided above the arms of the lifting arm, and the lifting platform can be moved up and down following the rotation of the arms. Good.

本発明の据付装置によれば、アクチュエータにより、昇降アームの第1アーム及び第2アームを交差部を中心として一方又は他方に回動させることにより、昇降アームの回動に追従して昇降台を昇降させることができる。   According to the installation device of the present invention, the actuator is rotated by moving the first arm and the second arm of the lifting arm to one or the other around the intersection, thereby following the rotation of the lifting arm. Can be moved up and down.

さらに、本発明において、前記移動固定手段は、前記昇降台に移動可能に支持されるとともに、前記一対の移動台のうちの一方に連結される第1索条と、前記昇降台に移動可能に支持されるとともに、前記一対の移動台のうちの他方に連結される第2索条と、前記第1索条を前記昇降台に固定可能な第1クランプと、前記第2索条を前記昇降台に固定可能な第2索条と、前記第1アームに設けられるとともに、前記第1索条を前記第1アームに固定可能な第3クランプと、前記第2アームに設けられるとともに、前記第2索条を前記第2アームに固定可能な第4クランプとを備え、前記第1クランプ及び前記第2クランプを介して前記第1索条及び前記第2索条を前記昇降台に固定することにより、前記少なくとも一対の移動台が前記昇降台の上部に固定され、前記第3クランプ及び第4クランプを介して前記第1索条及び前記第2索条を前記第1アーム及び前記第2アームに固定することにより、前記両アームの回動に追従して、前記移動台が前記昇降台の上部で互いに接近又は離間する方向に移動することとしてもよい。   Further, in the present invention, the movement fixing means is supported movably on the lifting platform, and is movable to the first platform connected to one of the pair of moving platforms, and to the lifting platform. A second strip supported and connected to the other of the pair of movable bases, a first clamp capable of fixing the first strip to the lift base, and the second strip being lifted and lowered A second rope that can be fixed to a base; a third clamp that can be fixed to the first arm; a third clamp that can fix the first rope to the first arm; A fourth clamp capable of fixing two strips to the second arm, and fixing the first strip and the second strip to the lifting platform via the first clamp and the second clamp; The at least one pair of moving platforms is the lifting platform By fixing the first rope and the second rope to the first arm and the second arm via the third clamp and the fourth clamp, the both arms can be rotated. It is good also as following and the said moving stand moving to the direction which mutually approaches or separates in the upper part of the said lifting platform.

本発明の据付装置によれば、移動固定手段の第1クランプを介して第1索条を昇降台に固定し、第2クランプを第2索条を介して昇降台に固定することにより、移動台を昇降台の上部に固定することができ、移動台の上部の補強部材間の間隔を固定することができる。また、第3クランプを介して第1索条を第1アームに固定し、第4クランプを介して第2索条を第2アームに固定することにより、両アームの回動に追従して、両索条を介して移動台を互いに接近又は離間する方向に移動させることができ、移動台の上部の補強部材間の間隔を拡げ、又は狭めることができる。   According to the installation apparatus of the present invention, the first rope is fixed to the lifting platform via the first clamp of the movement fixing means, and the second clamp is fixed to the lifting platform via the second rope, thereby moving The table can be fixed to the upper part of the lifting table, and the interval between the reinforcing members on the upper part of the movable table can be fixed. In addition, by fixing the first rope to the first arm via the third clamp and fixing the second rope to the second arm via the fourth clamp, following the rotation of both arms, The movable table can be moved in the direction of approaching or separating from each other via the two cords, and the interval between the reinforcing members on the upper portion of the movable table can be widened or narrowed.

さらに、本発明は、水上構造物の上部構造の隣接する2本の縦桁の上部間に少なくとも2本の補強部材を設置する据付方法であって、台船の上部に、基台と、該基台の上部に昇降可能に設けられる昇降台と、該昇降台を昇降させる昇降手段と、前記昇降台の上部に設けられるとともに、前記昇降台の上昇に追従して互いに接近する方向に移動可能、かつ前記昇降台の下降に追従して互いに離間する方向に移動可能な少なくとも一対の移動台と、該移動台を前記昇降台の上部で移動させる状態と、前記昇降台の上部に固定する状態とに切り替える移動固定手段とを備えた据付装置を設置し、該据付装置の前記移動台の上部に前記少なくとも2本の補強部材を載置する工程と、前記台船を前記隣接する2本の縦桁を支持する杭間を通じて、前記2本の補強部材を設置する補強部分の下方に進入させる工程と、前記昇降手段により前記昇降台と一体に前記移動台を上昇させて、前記補強部材を前記2本の縦桁よりも上方の高い位置まで上昇させる工程と、前記昇降手段により前記昇降台を下降させながら、前記移動固定手段により前記移動台を互いに離間する方向に移動させて、前記少なくとも2本の補強部材間の間隔を拡げる工程とを備えていることを特徴とする。   Furthermore, the present invention is an installation method in which at least two reinforcing members are installed between the upper portions of two adjacent stringers of an upper structure of a floating structure, and a base is provided on an upper part of a carriage. A lifting platform that can be lifted up and down on the upper part of the base, a lifting and lowering means for lifting and lowering the lifting platform, and provided at the upper part of the lifting platform and movable in a direction approaching each other following the rising of the lifting platform And at least a pair of movable tables that can move in a direction away from each other following the descending of the lifting platform, a state in which the moving platform is moved at the upper portion of the lifting platform, and a state that is fixed to the upper portion of the lifting platform And a step of placing the at least two reinforcing members on the upper part of the moving table of the installation device; and 2 between the piles supporting the stringer A step of allowing the reinforcing member to enter a lower part of the reinforcing member, and the moving means is lifted integrally with the lifting platform by the lifting means so that the reinforcing member is positioned higher than the two stringers. Increasing the distance between the at least two reinforcing members by moving the moving table in a direction away from each other by the moving fixing unit while lowering the lifting table by the lifting unit. It is characterized by having.

本発明の据付方法によれば、まず、移動台の上部に少なくとも2本の補強部材を載置し、台船を隣接する2本の縦桁を支持する杭間を通じて、2本の補強部材を設置する補強部分の下方に進入させ、昇降手段により昇降台と一体に移動台を上昇させて、移動台の上部の2本の補強部材を2本の縦桁よりも上方に位置させ、昇降手段により昇降台と一体に移動台を下降させながら、移動固定手段により移動台を互いに離間する方向に移動させて、移動台の上部の補強部材間の間隔を拡げることにより、補強部材間の間隔を調整することができ、補強部材を隣接する2本の縦桁の上部間に所定の間隔で設置することができる。   According to the installation method of the present invention, first, at least two reinforcing members are placed on the upper part of the moving table, and the two reinforcing members are passed through the piles supporting the two vertical beams adjacent to the carriage. The lower part is inserted below the reinforcing portion to be installed, the moving base is lifted integrally with the lifting base by the lifting means, and the two reinforcing members on the upper part of the moving base are positioned above the two stringers, and the lifting means While moving the moving table together with the lifting table, the moving table is moved away from each other by the movement fixing means, and the interval between the reinforcing members at the upper part of the moving table is widened. The reinforcing member can be adjusted, and the reinforcing member can be installed at a predetermined interval between the upper portions of two adjacent stringers.

また、本発明において、前記基台の上部に回転台が回動可能に設けられるとともに、該回転台の上部に前記昇降台が設けられ、前記台船を前記2本の縦桁を支持する杭間を通じて前記補強部分の下方に進入させる際に、前記回転台を回転させることにより、前記2本の補強部材の向きを前記両縦桁と平行となるように調整し、前記昇降手段により、前記両補強部材を前記両縦桁よりも上方の高い位置に上昇させた後に、前記回転台を回転させることにより、前記両補強部材の向きを前記両縦桁と直交するように調整することとしてもよい。   Further, in the present invention, a turntable is rotatably provided on the upper part of the base, and the lift is provided on the upper part of the turntable, and the pile supports the two vertical girders. When entering the lower part of the reinforcing part through the gap, the direction of the two reinforcing members is adjusted to be parallel to the two stringers by rotating the turntable. After raising both reinforcing members to a higher position above both stringers, the direction of both reinforcing members may be adjusted to be orthogonal to both stringers by rotating the turntable. Good.

本発明の据付方法によれば、補強部材が2本の縦桁を支持する杭間の間隔よりも長い場合には、回転台を回転させて、2本の補強部材の向きを両縦桁と平行となるように調整して、台船を補強部分の下方に進入させ、昇降手段により、両補強部材を両縦桁よりも上方の高い位置に上昇させた後に、回転台を回転させて、両補強部材の向きを両縦桁を直交するように調整することにより、両縦桁間に両補強部材を設置することができる。   According to the installation method of the present invention, when the reinforcing member is longer than the interval between the piles supporting the two stringers, the turntable is rotated so that the directions of the two reinforcing members are the two stringers. Adjust so that it is parallel, let the carriage enter below the reinforcing part, raise both reinforcing members to a higher position above both stringers by lifting means, then rotate the turntable, By adjusting the directions of the two reinforcing members so that the two vertical beams are orthogonal to each other, the two reinforcing members can be installed between the two vertical beams.

以上、説明したように、本発明の据付装置及び据付方法によれば、例えば、橋梁等の水上構造物の上部構造を下面側から補強する場合に、上部構造の下面側の隣接する2本の縦梁間に2本の補強部材を容易に設置することができる。   As described above, according to the installation apparatus and the installation method of the present invention, for example, when the upper structure of a floating structure such as a bridge is reinforced from the lower surface side, two adjacent two on the lower surface side of the upper structure are disposed. Two reinforcing members can be easily installed between the vertical beams.

本発明による据付装置の一実施の形態を示した平面図であって、図2のA−A矢視図である。It is the top view which showed one Embodiment of the installation apparatus by this invention, Comprising: It is the AA arrow line view of FIG. 図1の正面図(B−B矢視図)である。It is a front view (BB arrow view) of FIG. 図2のD−D矢視図である。FIG. 3 is a DD arrow view of FIG. 2. 図2のC−C矢視図である。It is CC arrow line view of FIG. 本発明による据付方法の一実施の形態を示した平面図であって、補強桁と杭との関係を示した平面図である。It is the top view which showed one Embodiment of the installation method by this invention, Comprising: It is the top view which showed the relationship between a reinforcement girder and a pile. 図5の正面図である。FIG. 6 is a front view of FIG. 5. 図6のA−A線に沿って見た断面図である。It is sectional drawing seen along the AA line of FIG. 本発明による据付方法の一実施の形態を示した平面図であって、補強部分への進入前の状態を示した概略平面図である。It is the top view which showed one Embodiment of the installation method by this invention, Comprising: It is the schematic plan view which showed the state before approaching to a reinforcement part. 補強部分への進入後の状態を示した概略平面図である。It is the schematic plan view which showed the state after approaching to a reinforcement part. 図8及び図9の正面図である。FIG. 10 is a front view of FIGS. 8 and 9. 昇降台と共に移動台を上昇させた状態を示した概略正面図である。It is the schematic front view which showed the state which raised the movable stand with the raising / lowering stand. 昇降台と共に移動台を回転させた状態を示した概略正面図である。It is the schematic front view which showed the state which rotated the movable stand with the raising / lowering stand. 図12の平面図である。FIG. 13 is a plan view of FIG. 12. 図12の右側面図である。It is a right view of FIG. 昇降台と共に移動台を下降させた状態を示した概略正面図である。It is the schematic front view which showed the state which lowered the movable stand with the raising / lowering stand. 図15の平面図である。FIG. 16 is a plan view of FIG. 15. 図15の右側面図である。FIG. 16 is a right side view of FIG. 15. 昇降台と共に移動台を再上昇させた状態を示した概略図である。It is the schematic which showed the state which raised the moving stand with the raising / lowering stand again. 昇降台と共に移動台を再下降させた状態を示した概略図である。It is the schematic which showed the state which lowered the moving stand with the raising / lowering stand. 本発明による据付装置の他の実施の形態を示した概略図である。It is the schematic which showed other embodiment of the installation apparatus by this invention. 図20の系統図である。FIG. 21 is a system diagram of FIG. 20.

以下、図面を参照しながら本発明の実施の形態について説明する。
図1〜図4には、本発明による据付装置の一実施の形態が示されている。本実施の形態では、人や車両等の通行のために川や海等を跨いだ状態に設置される老朽化した水上構造物としての既設の橋梁を対象としている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
1 to 4 show an embodiment of an installation apparatus according to the present invention. The present embodiment is intended for an existing bridge as an aged water structure that is installed in a state of straddling a river or the sea for the passage of people, vehicles, and the like.

橋梁は、例えば、人や車両等を支持する車道や歩道を備えた床版、床版を支持する主桁(縦桁、横桁)等からなる上部構造と、梁(縦梁、横梁)等からなる下部構造と、上部構造、人、車両、及び下部構造からの荷重を地盤に伝達させる複数本の杭とから構成されている。   Bridges are, for example, floor structures with roadways and sidewalks that support people and vehicles, superstructures such as main girders (vertical girders, horizontal girders) that support the floor slabs, beams (vertical beams, horizontal beams), etc. And a plurality of piles that transmit the load from the upper structure, the person, the vehicle, and the lower structure to the ground.

本実施の形態では、図2に示すように、橋梁の上部構造40の隣接する2本の縦桁41a、41bの上部間に補強部材としての補強桁45a、45b(図5〜図7参照)を設置するのに本発明の据付装置1及び据付方法を適用している。   In this embodiment, as shown in FIG. 2, reinforcing girders 45a and 45b as reinforcing members between the upper portions of two adjacent vertical girders 41a and 41b of the bridge upper structure 40 (see FIGS. 5 to 7). The installation apparatus 1 and the installation method of the present invention are applied to the installation.

具体的には、図5〜図7に示すように、上部構造40の隣接する2本の縦桁41a、41bを支持する4本の杭42a〜42dによって囲まれる部分(以下、補強部分44という。)の上部間に、2本の補強桁45a、45bを受台48a、48bを介して設置するのに本発明の据付装置1及び据付方法を適用している。   Specifically, as shown in FIGS. 5 to 7, a portion surrounded by four piles 42 a to 42 d that support two adjacent stringers 41 a and 41 b of the upper structure 40 (hereinafter referred to as a reinforcing portion 44). .)), The installation apparatus 1 and the installation method of the present invention are applied to install the two reinforcing beams 45a and 45b via the receiving bases 48a and 48b.

各補強桁45a、45bは、図6及び図7に示すように、アーチ状をなすものであって、両端部の下面が先端に向かって順次下方に傾斜する傾斜面46に形成され、この傾斜面46の中央部に各補強桁45a、45bの長手方向に延びる断面三角形状の凹部47が設けられている。   Each of the reinforcing girders 45a and 45b has an arch shape as shown in FIGS. 6 and 7, and is formed on an inclined surface 46 in which the lower surfaces of both end portions are inclined downward toward the tip. A concave portion 47 having a triangular cross section extending in the longitudinal direction of each reinforcing beam 45a, 45b is provided at the center of the surface 46.

各受台48a、48bは、略台形台状をなすものであって、上面が両側から中央に向かって順次下方に傾斜する傾斜面49に形成され、各傾斜面49の中央部に各補強桁45a、45bの長手方向に延びる断面三角形状の凸部50が設けられている。各受台48a、48bは、各補強部分44の各縦桁41a、41bの上部にボルト等を介して固定されている。   Each of the pedestals 48a and 48b has a substantially trapezoidal trapezoidal shape, and an upper surface is formed on an inclined surface 49 that is sequentially inclined downward from both sides toward the center. The convex part 50 of the cross-sectional triangle shape extended in the longitudinal direction of 45a, 45b is provided. Each cradle 48a, 48b is being fixed to the upper part of each stringer 41a, 41b of each reinforcement part 44 via the volt | bolt.

各補強桁45a、45bは、各補強部分44の縦桁41a、41bの上部間に架け渡し、各補強桁45a、45bの両端の下面側の凹部47と各縦桁41a、41bの上部に固定した各受台48a、48bの上面側の凸部50とを相互に嵌合させることにより、各補強部分44の縦桁41a、41bの上部間に設置される。   The reinforcing girders 45a and 45b are bridged between the upper portions of the vertical girders 41a and 41b of the reinforcing portions 44, and are fixed to the concave portions 47 on the lower surfaces of both ends of the reinforcing girders 45a and 45b and the upper portions of the vertical girders 41a and 41b. By fitting the raised portions 50 on the upper surface side of the receiving bases 48a and 48b to each other, they are installed between the upper portions of the stringers 41a and 41b of the reinforcing portions 44.

本実施の形態の据付装置1は、図1〜図4に示すように、基台2と、基台2の上部に回転可能に設けられる回転台3と、回転台3を回転させる回転手段5と、回転台3の上部に昇降可能に設けられる昇降台8と、昇降台8を昇降させる昇降手段9と、昇降台8の上部に移動可能に設けられる移動台14と、移動台14を移動させ、又は昇降台8に固定させる移動固定手段22と、回転台3、昇降台8、及び移動台14の全体を昇降させる補助昇降手段35とを備えている。   As shown in FIGS. 1 to 4, the installation apparatus 1 according to the present embodiment includes a base 2, a turntable 3 that is rotatably provided on the top of the base 2, and a rotating unit 5 that rotates the turntable 3. The elevator 8 provided on the upper part of the rotary table 3 so as to be movable up and down, the lifting means 9 for raising and lowering the elevator 8, the movable table 14 provided on the upper part of the elevator 8 and the movable table 14. Or a moving / fixing means 22 for fixing to the lifting / lowering base 8, and an auxiliary lifting / lowering means 35 for lifting / lowering the entire rotary base 3, the lifting / lowering base 8, and the moving base 14.

基台2は、四角形板状をなすものであって、箱形状の台船38の上部にボルト等を介して固定され、この基台2の上部に回転手段5を介して回転台3が回転可能に設けられている。台船38は、橋梁の隣接する2本の杭42a、42b間に進入可能な大きさに形成されている。なお、基台2を介さずに、台船38の上部に直接に回転手段5を介して回転台3を回転可能に設けてもよい。   The base 2 has a rectangular plate shape, and is fixed to the upper part of a box-shaped base ship 38 with bolts or the like, and the rotary base 3 is rotated on the upper part of the base 2 via a rotating means 5. It is provided as possible. The trolley 38 is formed in a size capable of entering between two adjacent piles 42a and 42b of the bridge. Instead of the base 2, the turntable 3 may be rotatably provided directly on the upper part of the carriage 38 via the rotation means 5.

回転手段5は、基台2の上部中央部に円環状に設けられるレール6と、レール6の上部に走行可能に設けられる複数台(本実施の形態では4台)の走行台車7a〜7dと、走行台車7a〜7dをレール6に沿って走行させるアクチュエータ(図示せず)とから構成されている。   The rotating means 5 includes a rail 6 provided in an annular shape in the upper center portion of the base 2, and a plurality of (four in the present embodiment) traveling carts 7 a to 7 d provided on the upper portion of the rail 6. And an actuator (not shown) for causing the traveling carriages 7a to 7d to travel along the rail 6.

回転台3は、鋼材を四方枠組みして角環状に形成した枠材3aと、枠材3aの下面側の四隅に設けられる三角形板状の補強板3bから構成され、各補強板3bの下面側にそれぞれ走行台車7a〜7dが設けられている。アクチュエータにより、走行台車7a〜7dをレール6に沿って走行させることにより回転台3を回転させることができる。   The turntable 3 is composed of a frame member 3a formed of a steel material in a square ring shape in a square ring shape, and triangular plate-shaped reinforcing plates 3b provided at four corners on the lower surface side of the frame member 3a, and the lower surface side of each reinforcing plate 3b. Are respectively provided with traveling carriages 7a to 7d. The turntable 3 can be rotated by running the running carriages 7a to 7d along the rails 6 by the actuator.

昇降手段9は、支持軸11の両端に2本のアーム(第1アーム12及び第2アーム13)をX状に交差させた状態でそれぞれ設け、各2本のアーム(第1アーム12及び第2アーム13)を支持軸11を中心として図中矢印方向に回動可能(開閉可能)に連結した昇降アーム10と、昇降アーム10の各2本のアーム(第1アーム12及び第2アーム13)を回動させるアクチュエータ(図示せず)とから構成されている。昇降アーム10の両アーム12、13の下端が、回転台3の上面に設けられた一対の支持レール3cによって図2中左右方向に移動可能に支持されることで両者が逆向きに移動して、第1アーム12及び第2アーム13からなる昇降アーム10が回動可能(開閉可能)となっている。なお、支持レール3cの両端に設けられたストッパー4a〜4bに両アーム12、13の下端が当接することにより昇降アーム10の回動角度(開閉角度)が制限されている。   The elevating means 9 is provided with two arms (first arm 12 and second arm 13) crossing each other in the X shape at both ends of the support shaft 11, and each of the two arms (first arm 12 and first arm 12). 2 arms 13) that are connected to each other so as to be pivotable (openable and closable) in the direction of the arrow about the support shaft 11, and two arms (first arm 12 and second arm 13) of the lifting arm 10 respectively. ) To rotate the actuator (not shown). The lower ends of the arms 12 and 13 of the elevating arm 10 are supported by a pair of support rails 3c provided on the upper surface of the turntable 3 so as to be movable in the left-right direction in FIG. The elevating arm 10 composed of the first arm 12 and the second arm 13 is rotatable (openable and closable). In addition, the rotation angle (opening-closing angle) of the raising / lowering arm 10 is restrict | limited by the lower ends of both arms 12 and 13 contacting stopper 4a-4b provided in the both ends of the support rail 3c.

昇降アーム10の両第1アーム12及び第2アーム13の上部には、四角形板状の昇降台8が設けられ、アクチュエータによって、両第1アーム12及び第2アーム13を開閉させて昇降アーム10の全高を調整することで、昇降アーム10に追従して昇降台8を昇降させることができる。   A rectangular plate-like lifting platform 8 is provided on the upper portions of both the first arm 12 and the second arm 13 of the lifting arm 10, and both the first arm 12 and the second arm 13 are opened and closed by an actuator by the actuator. By adjusting the overall height, the lifting platform 8 can be moved up and down following the lifting arm 10.

昇降台8の上部に設置された移動台14は、第1移動台15と第2移動台18の2つの移動台から構成され、昇降台8の上部中央部に両移動台15、18が設けられている。第1移動台15及び第2移動台18は、後述する移動固定手段22によって互いに接近、又は離間する方向に移動可能、かつ、昇降台8の上部に固定可能に構成されている。第1移動台15及び第2移動台18の上部に上記の補強桁45a、45bがそれぞれ載置される。   The moving table 14 installed at the upper part of the lifting / lowering table 8 is composed of two moving tables, a first moving table 15 and a second moving table 18, and both moving tables 15 and 18 are provided at the upper center of the lifting / lowering table 8. It has been. The first moving table 15 and the second moving table 18 are configured to be movable toward and away from each other by a movement fixing means 22 described later, and can be fixed to the upper part of the lifting table 8. The reinforcing girders 45a and 45b are placed on the first moving table 15 and the second moving table 18, respectively.

第1移動台15及び第2移動台18は、長方形板状の本体16、19と、本体16、19の下面側の四隅に設けられる車輪17、20とから構成され、本体16、19の長手方向が昇降台8の幅方向と直交するように、昇降台8の上部中央部に設けられている。   The first moving table 15 and the second moving table 18 include rectangular plate-shaped main bodies 16 and 19 and wheels 17 and 20 provided at four corners on the lower surface side of the main bodies 16 and 19. It is provided in the upper center portion of the lifting platform 8 so that the direction is orthogonal to the width direction of the lifting platform 8.

移動固定手段22は、図1〜図3に示すように、昇降台8の周囲を囲むように設けられるとともに、昇降台8の周囲を周回可能な第1索条23と、昇降台8の周囲を囲むように設けられるとともに、昇降台8の周囲を周回可能な第2索条24と、昇降台8の下面側に設けられるとともに、第1索条23をクランプして昇降台8に固定可能な第1クランプ26と、昇降台8の下面側に設けられるとともに、第2索条24をクランプして昇降台8に固定可能な第2クランプ27と、昇降手段9の昇降アーム10の第1アーム12の上端に設けられるとともに、第2索条24をクランプして第1アーム12に固定可能な第3クランプ28と、昇降手段9の昇降アーム10の第2アーム13の上端に設けられるとともに、第1索条23をクランプして第2アーム13に固定可能な第4クランプ29と、第1クランプ26、第2クランプ27、第3クランプ28、及び第4クランプ29をそれぞれ開閉させるアクチュエータ(図示せず)とから構成されている。   As shown in FIGS. 1 to 3, the movement fixing means 22 is provided so as to surround the periphery of the lifting platform 8, and the first rope 23 that can circulate around the lifting platform 8, and the periphery of the lifting platform 8 Is provided on the lower surface side of the lifting / lowering base 8 and can be fixed to the lifting / lowering base 8 by clamping the first rope 23. The first clamp 26, the second clamp 27 that is provided on the lower surface side of the lifting platform 8, can clamp the second rope 24 and can be fixed to the lifting platform 8, and the first of the lifting arms 10 of the lifting means 9. Provided at the upper end of the arm 12, provided at the upper end of the second arm 13 of the elevating arm 10 of the elevating means 9, and the third clamp 28 that can clamp the second strip 24 and fix it to the first arm 12. Clamp the first rope 23 A fourth clamp 29 can be secured to the second arm 13, the first clamp 26, second clamp 27 is constructed from an actuator for opening and closing the third clamp 28 and the fourth clamp 29, respectively (not shown).

第1索条23は、例えば、ワイヤロープであって、昇降台8の上面側の両端、及び下面側の両端の4箇所に設けられた4つの支持ローラ25a〜25dにより、昇降台8の周囲に周回可能に支持されている。第1索条23は、第2移動台18を貫通した状態で両端が第1移動台15の図1中左右端に連結されている。第1索条23を昇降台8の周囲に周回させることにより、第1索条23に追従して第1移動台15を昇降台8の上部で移動させることができる。   The first rope 23 is, for example, a wire rope, and is surrounded by four support rollers 25a to 25d provided at four positions on both ends on the upper surface side and both ends on the lower surface side. It is supported so that it can go around. Both ends of the first rope 23 are connected to the left and right ends of the first moving table 15 in FIG. By rotating the first rope 23 around the lifting platform 8, the first moving table 15 can be moved on the lifting platform 8 following the first rope 23.

第2索条24は、例えば、ワイヤロープであって、昇降台8の上面側の両端、及び下面側の両端の4箇所に設けられた4つの支持ローラ25a〜25dにより、昇降台8の周囲に周回可能に支持されている。第2索条24は、第1移動台15を貫通した状態で両端が第2移動台18の図1中左右端に連結されている。第2索条24を昇降台8の周囲に周回させることにより、第2索条24に追従して第2移動台18を昇降台8の上部で移動させることができる。   The second rope 24 is, for example, a wire rope, and is surrounded by four support rollers 25a to 25d provided at four positions on both the upper surface side and the lower surface side of the lifting table 8. It is supported so that it can go around. Both ends of the second rope 24 are connected to the left and right ends of the second moving table 18 in FIG. 1 while penetrating the first moving table 15. By rotating the second strip 24 around the lifting platform 8, the second moving platform 18 can be moved on the lifting platform 8 following the second strip 24.

また、第1クランプ26で第1索条23をクランプして第1索条23を昇降台8に固定し、第2クランプ27で第2索条24をクランプして第2索条24を昇降台8に固定し、第3クランプ28及び第4クランプ29を非クランプ状態とすることにより、第1移動台15及び第2移動台18を昇降台8の上部に固定することができ、両移動台15、18の間隔を固定した状態で、昇降台8の昇降に追従して両移動台15、18を昇降させることができる。   Further, the first rope 23 is clamped by the first clamp 26 to fix the first rope 23 to the lifting platform 8, and the second rope 24 is clamped by the second clamp 27 to raise and lower the second rope 24. The first moving table 15 and the second moving table 18 can be fixed to the upper part of the lifting table 8 by fixing the third clamp 28 and the fourth clamp 29 to the unclamped state. In a state where the distance between the bases 15 and 18 is fixed, both the mobile bases 15 and 18 can be lifted and lowered following the lifting and lowering of the lift base 8.

さらに、第1クランプ26及び第2クランプ27を非クランプ状態とし、第3クランプ28で第2索条24をクランプして第2索条24を第1アーム12に固定し、第4クランプ29で第1索条23をクランプして第1索条23を第2アーム13に固定することにより、第1移動台15及び第2移動台18を昇降台8の上部で移動可能な状態とすることができ、昇降台8の上昇に追従して両移動台15、18を互いに接近する方向に移動させ、昇降台8の下降に追従して両移動台15、18を互いに離間する方向に移動させることができる。   Further, the first clamp 26 and the second clamp 27 are brought into an unclamped state, the second rope 24 is clamped by the third clamp 28, the second rope 24 is fixed to the first arm 12, and the fourth clamp 29 is By clamping the first rope 23 and fixing the first rope 23 to the second arm 13, the first moving table 15 and the second moving table 18 can be moved in the upper part of the lifting platform 8. The two moving bases 15 and 18 are moved in a direction approaching each other following the ascent of the lifting base 8, and the two moving bases 15 and 18 are moved in a direction separating from each other following the lowering of the lifting base 8. be able to.

具体的には、昇降手段9の昇降アーム10の第1アーム12及び第2アーム13を閉じる方向に回動させて昇降台8を上昇させると、昇降アーム10の第1アーム12に追従して、第3クランプ28を介して第2索条24が昇降台8の周囲を反時計回りに移動して、第2索条24と一体に第2移動台18が図1及び図2の左方向に移動し、第4クランプ29を介して第1索条23が昇降台8の周囲を時計回りに移動して、第1索条23と一体に第1移動台15が図1及び図2の右方向に移動し、両移動台15、18が互いに接近する方向に移動する。   Specifically, when the first arm 12 and the second arm 13 of the lifting arm 10 of the lifting means 9 are rotated in the closing direction to raise the lifting platform 8, the first arm 12 of the lifting arm 10 follows. The second strip 24 moves counterclockwise around the lifting platform 8 via the third clamp 28, and the second movable platform 18 is integrated with the second strip 24 in the left direction in FIGS. 1, the first rope 23 moves clockwise around the lifting platform 8 via the fourth clamp 29, and the first movable base 15 is integrated with the first rope 23 in FIGS. 1 and 2. It moves in the right direction and moves in a direction in which both moving platforms 15 and 18 approach each other.

また、昇降手段9の昇降アーム10の第1アーム12及び第2アーム13を開く方向に回動させて昇降台8を下降させると、昇降アーム10の第1アーム12に追従して、第3クランプ28を介して第2索条24が昇降台8の周囲を時計回りに移動して、第2索条24と一体に第2移動台18が図1及び図2の右方向に移動し、第4クランプ29を介して第1索条23が昇降台8の周囲を反時計回りに移動して、第1索条23と一体に第1移動台15が図1及び図2の左方向に移動し、両移動台15、18が互いに離間する方向に移動する。   Further, when the first arm 12 and the second arm 13 of the lifting / lowering means 9 of the lifting / lowering means 9 are rotated in the opening direction to lower the lifting / lowering base 8, the third arm 12 follows the first arm 12 of the lifting / lowering arm 10. The second strip 24 moves clockwise around the lifting platform 8 via the clamp 28, and the second moving platform 18 moves to the right in FIGS. 1 and 2 integrally with the second strip 24, The first strip 23 moves counterclockwise around the lifting platform 8 via the fourth clamp 29, and the first movable platform 15 is integrated with the first strip 23 in the left direction in FIGS. The two moving platforms 15 and 18 move in directions away from each other.

なお、本実施の形態においては、図1〜図3に示すように、第1移動台15及び第2移動台18の長手方向の両端部に対応するように、昇降台8の長手方向の両端部に第1索条23及び第2索条24をそれぞれ設け、各第1索条23及び各第2索条24に対応するように、第1クランプ26、第2クランプ27、第3クランプ28、及び第4クランプ29をそれぞれ設けている。   In the present embodiment, as shown in FIGS. 1 to 3, both ends in the longitudinal direction of the lifting platform 8 so as to correspond to both ends in the longitudinal direction of the first moving table 15 and the second moving table 18. The first rope 23 and the second rope 24 are provided in the section, and the first clamp 26, the second clamp 27, and the third clamp 28 are provided so as to correspond to the first rope 23 and the second rope 24, respectively. , And a fourth clamp 29 are provided.

補助昇降手段35は、例えば、油圧ジャッキ36であって、図2及び図4に示すように、回転台3と各走行台車7a7dとの間に介装されている。補助昇降手段35は、昇降手段9による昇降台8の昇降だけでは高さが不足する場合に、その不足分を補うために用いられる。従って、昇降手段9のみで十分な場合には、用いる必要はないものである。   The auxiliary lifting means 35 is, for example, a hydraulic jack 36, and is interposed between the rotary base 3 and each traveling carriage 7a7d as shown in FIGS. The auxiliary lifting / lowering means 35 is used to compensate for the shortage when the height is insufficient only by lifting / lowering the lifting platform 8 by the lifting / lowering means 9. Therefore, when only the lifting means 9 is sufficient, it is not necessary to use it.

次に、本実施の形態の据付方法について説明する。
まず、図8及び図10に示すように、据付装置1の移動固定手段22のアクチュエータにより、第1クランプ26及び第2クランプ27を非クランプ状態とし、第3クランプ28及び第4クランプ29をクランプ状態とする。そして、昇降手段9のアクチュエータにより、昇降アーム10の第1アーム12及び第2アーム13を開閉させることにより、第1アーム12及び第2アーム13に追従して、第1索条23及び第2索条24を昇降台8の周囲を周回させて、第1索条23及び第2索条24に追従して、第1移動台15及び第2移動台18を移動させ、両移動台15、18を昇降台8の中央部に位置決めする。
Next, the installation method of this Embodiment is demonstrated.
First, as shown in FIGS. 8 and 10, the first clamp 26 and the second clamp 27 are brought into an unclamped state and the third clamp 28 and the fourth clamp 29 are clamped by the actuator of the movement fixing means 22 of the installation apparatus 1. State. The first arm 23 and the second arm 13 follow the first arm 12 and the second arm 13 by opening and closing the first arm 12 and the second arm 13 of the lifting arm 10 by the actuator of the lifting means 9. The cable 24 is made to circulate around the lifting platform 8, and the first moving table 15 and the second moving table 18 are moved following the first cable 23 and the second cable 24. 18 is positioned at the center of the lift 8.

次に、移動固定手段22のアクチュエータにより、第3クランプ28及び第4クランプ29を非クランプ状態とするとともに、第1クランプ26及び第2クランプ27をクランプ状態とすることにより、第1索条23及び第2索条24を第1クランプ26及び第2クランプ27を介して昇降台8に固定し、第1索条23及び第2索条24を介して第1移動台15及び第2移動台18を昇降台8の中央部に固定する。   Next, the third clamp 28 and the fourth clamp 29 are brought into the unclamped state and the first clamp 26 and the second clamp 27 are brought into the clamped state by the actuator of the movement fixing means 22, whereby the first strip 23 And the 2nd rope 24 is fixed to the raising / lowering stand 8 via the 1st clamp 26 and the 2nd clamp 27, and the 1st moving stand 15 and the 2nd moving stand via the 1st rope 23 and the 2nd rope 24 18 is fixed to the central part of the lifting platform 8.

次に、第1移動台15及び第2移動台18を固定したまま、昇降手段9のアクチュエータにより、昇降アーム10の第1アーム12及び第2アーム13を開く方向に回動させて、両アーム12、13に追従して昇降台8を下降端まで下降させ、この状態で、第1移動台15及び第2移動台18の上部に台木51等を介して補強桁45a、45bをそれぞれ載置させる。   Next, while the first moving table 15 and the second moving table 18 are fixed, the first arm 12 and the second arm 13 of the elevating arm 10 are rotated in the opening direction by the actuator of the elevating means 9, and both arms are moved. 12 and 13, the lifting platform 8 is lowered to the lower end, and in this state, the reinforcing girders 45 a and 45 b are mounted on the first moving table 15 and the second moving table 18 via the rootstock 51 and the like, respectively. Let me put it.

次に、回転手段5のアクチュエータにより、回転台3を回転させることにより、第1移動台15及び第2移動台18の上部の各補強桁45a、45bの向きを、橋梁の上部構造40の縦桁41a、41bに対して平行となるように調整する。そして、図8に矢印で示すように、台船38を橋梁の隣接する2本の杭42a、42b間に進入させ、図9に示すように、4本の杭42a〜42dによって囲まれた補強部分44の上部構造40の下方に2本の補強桁45a、45bを位置決めする。
なお、図8〜図10においては、移動固定手段22の図示は省略している。また、回転台3を回転させる途中の過程は省略している。
Next, by rotating the turntable 3 with the actuator of the rotation means 5, the direction of the reinforcing girders 45a and 45b on the top of the first moving table 15 and the second moving table 18 is changed to the vertical structure of the bridge upper structure 40. Adjustment is made so as to be parallel to the girders 41a and 41b. Then, as shown by the arrows in FIG. 8, the carriage 38 is made to enter between two adjacent piles 42a and 42b of the bridge, and as shown in FIG. 9, the reinforcement surrounded by the four piles 42a to 42d. Two reinforcing beams 45a and 45b are positioned below the upper structure 40 of the portion 44.
8 to 10, the illustration of the movement fixing means 22 is omitted. Further, a process in the middle of rotating the turntable 3 is omitted.

次に、図11に示すように、昇降手段9のアクチュエータにより、昇降アーム10の第1アーム12及び第2アーム13を閉じる方向に回動させることにより昇降台8を上昇させ、第1移動台15及び第2移動台18の上部の補強桁45a、45bを隣接する2本の縦桁41a、41bの上部の受台48a、48bよりも上方の高い位置まで上昇させる。なお、昇降アーム10の上昇ストロークが足りない場合には、図2及び図4に示す補助昇降手段35のジャッキ36を作動させる。なお、図11においては、受台48a、48bの図示は省略している。   Next, as shown in FIG. 11, the elevator 8 is lifted by rotating the first arm 12 and the second arm 13 of the lifting arm 10 in the closing direction by the actuator of the lifting means 9. 15 and the upper reinforcing girders 45a and 45b of the second moving table 18 are raised to a higher position above the upper receiving tables 48a and 48b of the two adjacent vertical girders 41a and 41b. In addition, when the raising stroke of the raising / lowering arm 10 is insufficient, the jack 36 of the auxiliary raising / lowering means 35 shown in FIG.2 and FIG.4 is operated. In FIG. 11, the cradles 48a and 48b are not shown.

次に、図12〜図14に示すように、回転手段5のアクチュエータにより、回転台3を回転させることにより、回転台3と一体に第1移動台15及び第2移動台18を回転させて、第1移動台15及び第2移動台18の上部の2本の補強桁45a、45bを回転させ、2本の補強桁45a、45bを縦桁41a、41bの上方に両縦桁41a、41bと直交する向きにする。   Next, as shown in FIGS. 12 to 14, the first moving table 15 and the second moving table 18 are rotated together with the rotating table 3 by rotating the rotating table 3 by the actuator of the rotating means 5. The two reinforcing girders 45a and 45b above the first moving table 15 and the second moving table 18 are rotated, and the two reinforcing girders 45a and 45b are placed above the vertical girders 41a and 41b. The direction is orthogonal to

次に、移動固定手段22の各アクチュエータにより、第1クランプ26及び第2クランプ27を非クランプ状態とするとともに、第3クランプ28及び第4クランプ29をクランプ状態とし、昇降アーム10の第1アーム12及び第2アーム13の上端に第3クランプ28及び第4クランプ29を介して第1索条23及び第2索条24を固定する(図2及び図3参照)。   Next, the first clamp 26 and the second clamp 27 are brought into an unclamped state and the third clamp 28 and the fourth clamp 29 are brought into a clamped state by the respective actuators of the movement fixing means 22. The first rope 23 and the second rope 24 are fixed to the upper ends of the 12 and the second arm 13 via the third clamp 28 and the fourth clamp 29 (see FIGS. 2 and 3).

次に、図15〜図17に示すように、昇降手段22のアクチュエータにより、昇降アーム10の第1アーム12及び第2アーム13を開く方向に回動させることにより、昇降アーム10に追従して昇降台8を下降させ、昇降台8とともに第1移動台15及び第2移動台18の上部の2本の補強桁45a、45bを下降させる。   Next, as shown in FIGS. 15 to 17, the first arm 12 and the second arm 13 of the elevating arm 10 are rotated in the opening direction by the actuator of the elevating means 22 to follow the elevating arm 10. The elevator 8 is lowered, and the two reinforcing beams 45a and 45b at the top of the first moving table 15 and the second moving table 18 are lowered together with the elevator 8.

この場合、昇降アーム10の第1アーム12及び第2アーム13の動きに追従して、第1索条23が昇降台8の周囲を反時計回り移動し、第2索条24が昇降台8の周囲を時計回りに移動し、第1索条23、第2索条に追従して、第1移動台15及び第2移動台18が互いに離間する方向に移動し、両移動台15、18間の間隔が拡げられ、両移動台15、18の上部の2本の補強桁45a、45b間の間隔が拡げられる。   In this case, following the movement of the first arm 12 and the second arm 13 of the lifting arm 10, the first rope 23 moves counterclockwise around the lifting platform 8, and the second rope 24 is moved to the lifting platform 8. The first moving base 15 and the second moving base 18 move away from each other in accordance with the first rope 23 and the second rope, and the two mobile stands 15 and 18 are moved in the clockwise direction. The space between the two reinforcing girders 45a and 45b at the upper part of both the moving bases 15 and 18 is widened.

そして、昇降台8を下降させながら、両移動台15、18間の間隔を調整し、両移動台15、18の上部の2本の補強桁45a、45b間の間隔を各縦桁45a、45bの上部の受台48a、48b間の間隔(図7参照)に合わせる。   Then, while lowering the lifting platform 8, the distance between the two moving tables 15, 18 is adjusted, and the distance between the two reinforcing beams 45 a, 45 b at the upper part of both moving tables 15, 18 is set to each vertical beam 45 a, 45 b. To the interval between the upper cradles 48a and 48b (see FIG. 7).

そして、2本の補強桁45a、45b間の間隔を各縦桁41a、41bの上部の受台48a、48b間の間隔に合わせた後に、移動固定手段22の各アクチュエータにより、第3クランプ28及び第4クランプ29を非クランプ状態とし、第1クランプ26及び第2クランプ27をクランプ状態とし、第1クランプ26及び第2クランプ27を介して第1索条23及び第2索条24を昇降台8に固定することにより、第1索条23及び第2索条24を介して第1移動台15及び第2移動台18を昇降台8に固定し、2本の補強桁45a、45b間の間隔を固定する。   Then, after the interval between the two reinforcing beams 45a and 45b is adjusted to the interval between the upper bases 48a and 48b of the vertical beams 41a and 41b, the third clamp 28 and The fourth clamp 29 is set in an unclamped state, the first clamp 26 and the second clamp 27 are set in a clamped state, and the first rope 23 and the second rope 24 are lifted and lowered via the first clamp 26 and the second clamp 27. 8, the first moving base 15 and the second moving base 18 are fixed to the lifting base 8 via the first rope 23 and the second rope 24, and the two reinforcing beams 45 a and 45 b are fixed. Fix the interval.

そして、この状態で、昇降手段9のアクチュエータにより、昇降アーム10の第1アーム12及び第2アーム13を開く方向に回動させて、昇降アーム10に追従して昇降台8を下降させることで、昇降台8と共に第1移動台15及び第2移動台18を下降させて、第1移動台15及び第2移動台18の上部の2本の補強桁45a、45bの両端を隣接する2本の縦桁41a、41bの受台48a、48bの上部間に、各補強桁45a、45bの両端の下面側の凹部47と各受台48a、48bの上面側の凸部50とが相互に嵌合するように載置させる(図6、図7参照)。   In this state, the first arm 12 and the second arm 13 of the elevating arm 10 are rotated in the opening direction by the actuator of the elevating means 9, and the elevating platform 8 is lowered following the elevating arm 10. The first moving table 15 and the second moving table 18 are lowered together with the lifting table 8, and the two adjacent reinforcing girders 45 a and 45 b on the first moving table 15 and the second moving table 18 are adjacent to each other. Between the upper portions of the pedestals 48a and 48b of the vertical girders 41a and 41b, the concave portions 47 on the lower surface side of both ends of the reinforcing girders 45a and 45b and the convex portions 50 on the upper surface side of the respective pedestals 48a and 48b are fitted to each other. (See FIGS. 6 and 7).

なお、昇降台8を1回下降させただけでは、第1移動台15と第2移動台18との間の間隔(2本の補強桁45a、45b間の間隔)を縦桁41a、41bの上部の受台48a、48b間の間隔に合わせることができない場合には、図18に示すように、移動固定手段22により、両移動台15、18を昇降台8に固定した状態で昇降台8を再上昇させるとともに、図19に示すように、移動固定手段22により、両移動台15、18を移動可能な状態として、昇降台8を再下降させながら、両移動台15、18を互いに離間する方向に移動させることを繰り返すことにより、両移動台15、18間の間隔(補強桁45a、45b間の間隔)を受台48a、48a間の間隔に合わせることができる。   Note that the space between the first moving table 15 and the second moving table 18 (the distance between the two reinforcing beams 45a and 45b) can be reduced by simply lowering the lifting table 8 once. If the distance between the upper pedestals 48a and 48b cannot be adjusted, as shown in FIG. 18, the lifting platform 8 with the movable platforms 15 and 18 fixed to the lifting platform 8 by the movement fixing means 22 is used. As shown in FIG. 19, the movable fixing units 22 make the movable tables 15 and 18 movable and the movable platforms 15 and 18 are separated from each other while the elevator 8 is lowered again. By repeating the movement in the moving direction, the distance between the two moving tables 15 and 18 (the distance between the reinforcing beams 45a and 45b) can be adjusted to the distance between the receiving tables 48a and 48a.

そして、上記のような作業を各補強部分44に対して繰り返し行うことにより、各補強部分44の隣接する2本の縦桁41a、41b間にそれぞれ2本の補強桁45a、45bを設置する。そして、各補強部分44の隣接する2本の縦桁41a、41b間に2本の補強桁45a、45bをそれぞれ設置した後に、各補強部分44の2本の補強桁45a、45bと上部構造40の床版との間にそれぞれ充填材を充填することにより、上部構造40の下面側の全体を補強することができる。   Then, by repeating the above-described operation for each reinforcing portion 44, two reinforcing girders 45a and 45b are installed between two adjacent vertical girders 41a and 41b of each reinforcing portion 44, respectively. Then, after two reinforcing beams 45a and 45b are respectively installed between two adjacent vertical beams 41a and 41b of each reinforcing portion 44, the two reinforcing beams 45a and 45b of each reinforcing portion 44 and the upper structure 40 are disposed. The entire lower surface side of the upper structure 40 can be reinforced by filling the space between the floor slabs.

なお、昇降台8の下降だけでは、下降ストロークが足りない場合には、補助昇降手段35のジャッキ36を作動させて、据付装置1全体を下げることにより、或いは、台船38にバラストを投入して、据付装置1全体を下げることにより、2本の補強桁45a、45bを隣接する2本の縦桁21a、21bの上部の受台48a、48b間に設置する。   In addition, when the lowering stroke is not enough only by the lowering of the lifting platform 8, the jack 36 of the auxiliary lifting means 35 is operated to lower the entire installation device 1, or the ballast is thrown into the carriage 38. Thus, by lowering the entire installation device 1, the two reinforcing beams 45a and 45b are installed between the upper bases 48a and 48b of the adjacent two vertical beams 21a and 21b.

上記のように構成した本実施の形態の据付装置1及び据付方法にあっては、台船38の上部に据付装置1を設置し、据付装置1の移動台14の第1移動台15及び第2移動台18の上部に2本の補強桁45a、45bを載置し、台船38を橋梁の上部構造40の補強部分44の下方に進入させて、据付装置1を作動させることにより、補強部分44の隣接する2本の縦桁41a、41bの上部間に2本の補強桁45a、45bを設置するように構成したので、施工時荷重を与えることなく、老朽化した橋梁の上部構造40の下面側の隣接する2本の縦桁41a、41bの上部間に補強桁45a、45bを設置することができる。   In the installation device 1 and the installation method of the present embodiment configured as described above, the installation device 1 is installed on the upper part of the carriage 38, and the first moving table 15 and the first moving table 15 of the moving table 14 of the installation device 1 are installed. (2) Two reinforcing girders 45a and 45b are placed on the upper part of the moving base 18, and the base ship 38 is moved below the reinforcing portion 44 of the upper structure 40 of the bridge to operate the installation device 1 to reinforce. Since the two reinforcing girders 45a and 45b are installed between the upper portions of the two adjacent vertical girders 41a and 41b of the portion 44, the superstructure 40 of the aged bridge without applying a load at the time of construction. Reinforcing girders 45a and 45b can be installed between the upper parts of two adjacent vertical girders 41a and 41b on the lower surface side of the.

また、補強桁45a、45bを上部構造40の隣接する2本の縦桁41a、41bの上部間に設置するために、ガイドレール、ホイストクレーン等を取り付ける必要がないので、補強桁45a、45bの設置後にガイドレール、ホイストクレーン等を取り外す作業が不要となり、補強桁45a、45bの取付作業に要する手間を大幅に削減することができる。   Moreover, since it is not necessary to attach a guide rail, a hoist crane, etc. in order to install the reinforcement girders 45a and 45b between the upper parts of two adjacent vertical girders 41a and 41b of the upper structure 40, the reinforcement girders 45a and 45b The operation of removing guide rails, hoist cranes, and the like after installation is not necessary, and the labor required for mounting the reinforcing girders 45a and 45b can be greatly reduced.

さらに、補強桁45a、45bの全長が隣接する2本の縦桁41a、41bを支持する隣接する2本の杭42a、42b間の間隔よりも大きい場合に、据付装置1の回転台3を回転させて、両補強桁45a、45bの向きを両縦桁41a、41bと平行となるように調整し、この状態で、2本の杭42a、42b間を通して上部構造40の補強部分44の下方に搬入し、その位置において、昇降台8を上昇させて両補強桁45a、45bを両縦桁41a、41bの上方の両縦桁41a、41bと干渉しない位置に位置決めし、回転台8を回転させて、両補強桁45a、45bの向きを縦桁41a、41bと直交するように調整し、この状態で、昇降台8を下降させながら、移動台14の第1移動台15及び第2移動台18に追従して、両補強桁45a、45b間の間隔を拡げることができる。   Further, when the total length of the reinforcing girders 45a and 45b is larger than the interval between the two adjacent piles 42a and 42b that support the two adjacent vertical girders 41a and 41b, the turntable 3 of the installation device 1 is rotated. Then, the direction of the two reinforcing girders 45a and 45b is adjusted to be parallel to the two vertical girders 41a and 41b, and in this state, between the two piles 42a and 42b, below the reinforcing portion 44 of the upper structure 40. At that position, the lifting platform 8 is raised so that both the reinforcing beams 45a and 45b are positioned so as not to interfere with the vertical beams 41a and 41b above the vertical beams 41a and 41b, and the turntable 8 is rotated. Then, the direction of both reinforcing beams 45a and 45b is adjusted to be orthogonal to the vertical beams 41a and 41b, and in this state, the first moving table 15 and the second moving table of the moving table 14 are lowered while the lifting table 8 is lowered. Follow 18 and reinforce both 45a, it is possible to widen the distance between 45b.

従って、補強桁45a、45bの全長が上部構造40の隣接する2本の縦桁41a、41bを支持する隣接する2本の杭42a、42b間の間隔よりも大きい場合であっても、上部構造40の各補強部分44に容易に補強桁45a、45bを設置することができるので、上部構造40の補強作業に要する手間を大幅に削減することができる。   Therefore, even if the total length of the reinforcing girders 45a and 45b is larger than the interval between the two adjacent piles 42a and 42b supporting the two adjacent vertical girders 41a and 41b of the upper structure 40, the upper structure Since the reinforcing girders 45a and 45b can be easily installed in the respective reinforcing portions 44 of 40, the labor required for the reinforcing work of the upper structure 40 can be greatly reduced.

さらに、移動固定手段22のアクチュエータにより、第1クランプ26、第2クランプ27、第3クランプ28、及び第4クランプ29を非クランプ状態又はクランプ状態とすることにより、昇降台8の昇降に追従させて、第1移動台15及び第2移動台18を昇降台8上で互いに接近する方向又は離れる方向に移動させることができるので、両補強桁45a、45bを下降させながら、両補強桁45a、45b間の間隔を拡げることができ、両補強桁45a、45bを隣接する2本の縦桁41a、41bの上部間に容易に設置することができる。   Furthermore, the first clamp 26, the second clamp 27, the third clamp 28, and the fourth clamp 29 are brought into an unclamped state or a clamped state by the actuator of the movement fixing means 22 so as to follow the lifting and lowering of the lifting platform 8. Thus, the first moving table 15 and the second moving table 18 can be moved toward or away from each other on the lifting table 8, so that both the reinforcing girders 45a, 45b are lowered while both the reinforcing girders 45a, 45b are lowered. The space | interval between 45b can be expanded and both reinforcement girder 45a, 45b can be easily installed between the upper part of the adjacent two vertical girder 41a, 41b.

なお、前記の説明において、第3クランプ28及び第4クランプ29をクランプ状態とすることにより、昇降アーム10の第1アーム12及び第2アーム13の開閉に追従して、第3クランプ28及び第4クランプ29を介して第1索条23及び第2索条24を周回させ、第2索条23及び第2索条24に追従して第1移動台15及び第2移動台18を互いに接近する方向又は離れる方向に移動させたが、第3クランプ28又は第4クランプ29の何れか一方をクランプ状態とし、何れか他方を非クランプ状態として、第1索条23又は第2索条24の何れか一方を周回させることにより、第1移動台15又は第2移動台18の何れか一方を移動させるように構成してもよい。   In the above description, by setting the third clamp 28 and the fourth clamp 29 to the clamped state, the third clamp 28 and the second clamp 13 follow the opening and closing of the first arm 12 and the second arm 13 of the lifting arm 10. The first rope 23 and the second rope 24 are circulated through the four clamps 29, and the first movable table 15 and the second movable table 18 approach each other following the second rope 23 and the second rope 24. The first cable 23 or the second cable 24 is moved in the direction in which the first cable 23 or the second cable 24 is moved, but one of the third clamp 28 and the fourth clamp 29 is in a clamped state and the other is in an unclamped state. Any one of the first moving table 15 and the second moving table 18 may be moved by rotating one of them.

図20及び図21には、本発明による据付装置の他の実施の形態が示されている。本実施の形態の据付装置1は、移動固定手段22として、ラック30とピニオン31とを用い、ラック30a、30bを昇降アーム10の第1アーム12及び第2アーム13の上端にそれぞれ取り付け、ピニオン31a、31bを第1移動台15及び第2移動台18の車輪17、20にそれぞれクラッチ32a、32bを介して取り付け、各ピニオン31a、31bを各ラック30a、30bに噛合させたものである。   20 and 21 show another embodiment of the installation apparatus according to the present invention. The installation apparatus 1 according to the present embodiment uses a rack 30 and a pinion 31 as the movement fixing means 22, and attaches the racks 30a and 30b to the upper ends of the first arm 12 and the second arm 13 of the lifting arm 10, respectively. 31a and 31b are attached to the wheels 17 and 20 of the first moving table 15 and the second moving table 18 via clutches 32a and 32b, respectively, and the pinions 31a and 31b are engaged with the racks 30a and 30b.

本実施の形態の据付装置1によれば、各クラッチ32a、32bをONにして、各移動台15、18の車輪17、20とピニオン31a、31bとをクラッチ32a、32bを介して連結し、この状態で、昇降アーム10の第1アーム12及び第2アーム13を開閉させることにより、第1アーム12及び第3アーム13と一体に各ラック30a、30bを図16中矢印方向に移動させることができ、各ラック30a、30bの移動に追従して各ピニオン31a、31bを回転させて、各移動台15、18を昇降台8上で移動させることができる。   According to the installation device 1 of the present embodiment, the respective clutches 32a and 32b are turned on, and the wheels 17 and 20 of the respective moving bases 15 and 18 and the pinions 31a and 31b are connected via the clutches 32a and 32b. In this state, by opening and closing the first arm 12 and the second arm 13 of the elevating arm 10, the racks 30a and 30b are moved in the direction of the arrow in FIG. Each pinion 31a, 31b can be rotated following the movement of each rack 30a, 30b, and each moving table 15, 18 can be moved on the lift table 8.

また、各クラッチ32a、32bをOFFにして、各移動台15、18の車輪17、20とピニオン31a、31bとのクラッチ32a、32bを介しての連結状態を解除し、各ピニオン31a、31bをフリーの状態とすることにより、昇降アーム10の第1アーム12及び第2アーム13を開閉させて、第1アーム12及び第2アーム13と一体に各ラック30a、30bを移動させても、各ラック30a、30b上で各ピニオン31a、31bがフリーの状態で回転することにより、各移動台15、18を昇降台8の上部に停止させた状態に固定することができる。   Moreover, each clutch 32a, 32b is turned off, the connection state via the clutches 32a, 32b of the wheels 17, 20 of each movable base 15, 18 and the pinions 31a, 31b is released, and each pinion 31a, 31b is released. Even if the first arm 12 and the second arm 13 of the elevating arm 10 are opened and closed and the racks 30a and 30b are moved together with the first arm 12 and the second arm 13 by setting the free state, By rotating the pinions 31a and 31b on the racks 30a and 30b in a free state, the movable bases 15 and 18 can be fixed in a state of being stopped at the upper part of the lift base 8.

そして、本実施の形態の据付装置1にあっても、前記実施の形態に示すものと同様の作用効果を奏する。   And even if it exists in the installation apparatus 1 of this Embodiment, there exists an effect similar to what is shown in the said embodiment.

なお、前記各実施の形態においては、昇降台8の上部に一対(第1移動台15及び第2移動台18)の移動台を設けたが、二対以上の移動台を設けて、各対の各移動台にそれぞれ索条を連結するように構成してもよい。   In the above-described embodiments, a pair of moving tables (the first moving table 15 and the second moving table 18) is provided on the upper part of the lifting table 8. However, two or more moving tables are provided, and each pair of moving tables is provided. You may comprise so that a rope may be connected with each each mobile stand.

1 据付装置
2 基台
3 回転台
3a 枠材
3b 補強板
3c 支持レール
4 ストッパー(4a、4b)
5 回転手段
6 レール
7 走行台車(7a〜7d)
8 昇降台
9 昇降手段
10 昇降アーム
11 支持軸
12 第1アーム
13 第2アーム
14 移動台
15 第1移動台
16 本体
17 車輪
18 第2移動台
19 本体
20 車輪
22 移動固定手段
23 第1索条
24 第2索条
25 支持ローラ(25a〜25d)
26 第1クランプ
27 第2クランプ
28 第3クランプ
29 第4クランプ
30 ラック(30a、30b)
31 ピニオン(31a、31b)
32 クラッチ(32a、32b)
35 補助昇降手段
36 ジャッキ
38 台船
40 上部構造
41 縦桁(41a、41b)
42 杭(42a〜42d)
44 補強部分
45 補強桁(45a、45b)
46 傾斜面
47 凹部
48 受台(48a、48b)
49 傾斜面
50 凸部
51 台木
DESCRIPTION OF SYMBOLS 1 Installation apparatus 2 Base 3 Turntable 3a Frame material 3b Reinforcement plate 3c Support rail 4 Stopper (4a, 4b)
5 Rotating means 6 Rail 7 Traveling cart (7a-7d)
DESCRIPTION OF SYMBOLS 8 Lifting base 9 Lifting means 10 Lifting arm 11 Support shaft 12 First arm 13 Second arm 14 Moving base 15 First moving base 16 Main body 17 Wheel 18 Second moving base 19 Main body 20 Wheel 22 Moving fixing means 23 First rope 24 2nd rope 25 Support roller (25a-25d)
26 1st clamp 27 2nd clamp 28 3rd clamp 29 4th clamp 30 Rack (30a, 30b)
31 pinion (31a, 31b)
32 Clutch (32a, 32b)
35 Auxiliary lifting means 36 Jack 38 Cargo ship 40 Superstructure 41 String (41a, 41b)
42 piles (42a-42d)
44 Reinforcement part 45 Reinforcement girder (45a, 45b)
46 Inclined surface 47 Recessed portion 48 Receiving base (48a, 48b)
49 Inclined surface 50 Convex 51 Rootstock

Claims (5)

基台と、該基台の上部に昇降可能に設けられる昇降台と、該昇降台を昇降させる昇降手段と、前記昇降台の上部に設けられるとともに、前記昇降台の上昇に追従して互いに接近する方向に移動可能、かつ前記昇降台の下降に追従して互いに離間する方向に移動可能な少なくとも一対の移動台と、該移動台を前記昇降台の上部で移動させる状態と、前記昇降台の上部に固定する状態とに切り替える移動固定手段とを備えていることを特徴とする据付装置。   A base, a lift provided on an upper part of the base, a lifting means for raising and lowering the lift, and provided on an upper part of the lift and approaching each other following the rise of the lift At least a pair of movable bases that are movable in a moving direction and move in a direction away from each other following the descending of the lifting base, a state in which the movable base is moved above the lifting base, and An installation apparatus comprising: a movement fixing means for switching to a state of being fixed to the upper part. 前記昇降手段は、第1アームと第2アームとをX状に交差させるとともに、両アームを交差部を中心として回動可能に連結した昇降アームと、該昇降アームの両アームを回動させるアクチュエータとを備え、
前記昇降アームの両アームの上部に前記昇降台が設けられ、前記両アームの回動に追従して前記昇降台が昇降可能に構成されていることを特徴とする請求項1に記載の据付装置。
The elevating means intersects the first arm and the second arm in an X shape, and is connected to an elevating arm that is pivotable about the intersecting portion, and an actuator that rotates both arms of the elevating arm. And
The installation device according to claim 1, wherein the lifting platform is provided at an upper portion of both arms of the lifting arm, and the lifting platform is configured to be able to move up and down following the rotation of the arms. .
前記移動固定手段は、前記昇降台に移動可能に支持されるとともに、前記一対の移動台のうちの一方に連結される第1索条と、前記昇降台に移動可能に支持されるとともに、前記一対の移動台のうちの他方に連結される第2索条と、前記第1索条を前記昇降台に固定可能な第1クランプと、前記第2索条を前記昇降台に固定可能な第2索条と、前記第1アームに設けられるとともに、前記第1索条を前記第1アームに固定可能な第3クランプと、前記第2アームに設けられるとともに、前記第2索条を前記第2アームに固定可能な第4クランプとを備え、
前記第1クランプ及び前記第2クランプを介して前記第1索条及び前記第2索条を前記昇降台に固定することにより、前記少なくとも一対の移動台が前記昇降台の上部に固定され、
前記第3クランプ及び第4クランプを介して前記第1索条及び前記第2索条を前記第1アーム及び前記第2アームに固定することにより、前記両アームの回動に追従して、前記移動台が前記昇降台の上部で互いに接近又は離間する方向に移動することを特徴とする請求項2に記載の据付装置。
The movement fixing means is movably supported by the lifting platform, and is supported by the first platform connected to one of the pair of moving platforms, and is movably supported by the lifting platform, A second rope coupled to the other of the pair of movable bases; a first clamp capable of fixing the first rope to the lift; and a second clamp capable of fixing the second rope to the lift. A second clamp, provided on the first arm, a third clamp capable of fixing the first rope to the first arm, and a second clamp provided on the second arm; A fourth clamp that can be fixed to two arms,
By fixing the first rope and the second rope to the lifting platform via the first clamp and the second clamp, the at least one pair of moving platforms is fixed to the upper part of the lifting platform,
By fixing the first rope and the second rope to the first arm and the second arm via the third clamp and the fourth clamp, following the rotation of the both arms, The installation apparatus according to claim 2, wherein the moving base moves in a direction approaching or separating from each other at an upper portion of the lifting base.
水上構造物の上部構造の隣接する2本の縦桁の上部間に少なくとも2本の補強部材を設置する据付方法であって、
台船の上部に、基台と、該基台の上部に昇降可能に設けられる昇降台と、該昇降台を昇降させる昇降手段と、前記昇降台の上部に設けられるとともに、前記昇降台の上昇に追従して互いに接近する方向に移動可能、かつ前記昇降台の下降に追従して互いに離間する方向に移動可能な少なくとも一対の移動台と、該移動台を前記昇降台の上部で移動させる状態と、前記昇降台の上部に固定する状態とに切り替える移動固定手段とを備えた据付装置を設置し、該据付装置の前記移動台の上部に前記少なくとも2本の補強部材を載置する工程と、
前記台船を前記隣接する2本の縦桁を支持する杭間を通じて、前記2本の補強部材を設置する補強部分の下方に進入させる工程と、
前記昇降手段により前記昇降台と一体に前記移動台を上昇させて、前記補強部材を前記2本の縦桁よりも上方の高い位置まで上昇させる工程と、
前記昇降手段により前記昇降台を下降させながら、前記移動固定手段により前記移動台を互いに離間する方向に移動させて、前記少なくとも2本の補強部材間の間隔を拡げる工程とを備えていることを特徴とする据付方法。
An installation method for installing at least two reinforcing members between the upper portions of two adjacent stringers of a superstructure of a floating structure,
A base on the upper part of the trolley, a lift provided on the top of the base so as to be movable up and down, a lifting means for raising and lowering the lift, and a lift on the lift. At least a pair of movable bases that can move in a direction approaching each other and follow the lowering of the lifting platform, and a state in which the movable platform is moved above the lifting platform And a step of installing an installation device comprising a movement fixing means for switching to a state of being fixed to the upper portion of the lifting platform, and placing the at least two reinforcing members on the upper portion of the movement table of the installation device; ,
A step of allowing the base boat to enter below the reinforcing portion where the two reinforcing members are installed through the piles supporting the two adjacent stringers;
Raising the moving table integrally with the lifting platform by the lifting means to raise the reinforcing member to a higher position above the two stringers;
A step of widening the interval between the at least two reinforcing members by moving the moving base in a direction away from each other by the moving fixing means while lowering the lifting base by the lifting means. Characteristic installation method.
前記基台の上部に回転台が回動可能に設けられるとともに、該回転台の上部に前記昇降台が設けられ、前記台船を前記2本の縦桁を支持する杭間を通じて前記補強部分の下方に進入させる際に、前記回転台を回転させることにより、前記2本の補強部材の向きを前記両縦桁と平行となるように調整し、前記昇降手段により、前記両補強部材を前記両縦桁よりも上方の高い位置に上昇させた後に、前記回転台を回転させることにより、前記両補強部材の向きを前記両縦桁と直交するように調整することを特徴とする請求項4に記載の据付方法。   A turntable is rotatably provided on the upper part of the base, and the lifting table is provided on the upper part of the turntable, and the carriage is connected to the reinforcement portion through the piles supporting the two stringers. When entering the lower part, the direction of the two reinforcing members is adjusted to be parallel to the two stringers by rotating the turntable, and the two reinforcing members are adjusted by the lifting means. 5. The direction of the two reinforcing members is adjusted to be orthogonal to the two stringers by rotating the turntable after being raised to a higher position above the stringers. The installation method described.
JP2011134389A 2011-06-16 2011-06-16 Installation apparatus and installation method Expired - Fee Related JP5772273B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011134389A JP5772273B2 (en) 2011-06-16 2011-06-16 Installation apparatus and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011134389A JP5772273B2 (en) 2011-06-16 2011-06-16 Installation apparatus and installation method

Publications (2)

Publication Number Publication Date
JP2013002143A true JP2013002143A (en) 2013-01-07
JP5772273B2 JP5772273B2 (en) 2015-09-02

Family

ID=47671010

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011134389A Expired - Fee Related JP5772273B2 (en) 2011-06-16 2011-06-16 Installation apparatus and installation method

Country Status (1)

Country Link
JP (1) JP5772273B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101469496B1 (en) * 2014-04-18 2014-12-05 유림건설(주) Lifting method and bridge repairing for integrated scaffolding
JP2017044141A (en) * 2015-08-26 2017-03-02 三井造船株式会社 Offshore wind turbine construction method
JP2017160679A (en) * 2016-03-09 2017-09-14 Jfeエンジニアリング株式会社 Bridge pier construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780666B (en) * 2016-05-09 2017-11-14 张伟 Creeping formwork wall-attaching equipment and creeping formwork

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58123908A (en) * 1982-01-20 1983-07-23 ピ−・エス・コンクリ−ト株式会社 Transferring of gate-shaped crane
JPS58131209A (en) * 1982-01-29 1983-08-05 日本国有鉄道 Extrusion construction of bridge
JP2005133324A (en) * 2003-10-28 2005-05-26 Tokyu Construction Co Ltd Bridge fall preventive block mounting device
JP2007113239A (en) * 2005-10-19 2007-05-10 Sankyu Inc Conveyance-placing method of heavy load and its system
JP2007120077A (en) * 2005-10-26 2007-05-17 Okkusu Jack Kk Erection method of elevated road bridge, and its facility

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58123908A (en) * 1982-01-20 1983-07-23 ピ−・エス・コンクリ−ト株式会社 Transferring of gate-shaped crane
JPS58131209A (en) * 1982-01-29 1983-08-05 日本国有鉄道 Extrusion construction of bridge
JP2005133324A (en) * 2003-10-28 2005-05-26 Tokyu Construction Co Ltd Bridge fall preventive block mounting device
JP2007113239A (en) * 2005-10-19 2007-05-10 Sankyu Inc Conveyance-placing method of heavy load and its system
JP2007120077A (en) * 2005-10-26 2007-05-17 Okkusu Jack Kk Erection method of elevated road bridge, and its facility

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101469496B1 (en) * 2014-04-18 2014-12-05 유림건설(주) Lifting method and bridge repairing for integrated scaffolding
JP2017044141A (en) * 2015-08-26 2017-03-02 三井造船株式会社 Offshore wind turbine construction method
JP2017160679A (en) * 2016-03-09 2017-09-14 Jfeエンジニアリング株式会社 Bridge pier construction method

Also Published As

Publication number Publication date
JP5772273B2 (en) 2015-09-02

Similar Documents

Publication Publication Date Title
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
KR101287455B1 (en) System and method for launching upper structure of bridege
RU2381326C1 (en) Device for lifting and erecting units of superstructure
JP6701362B2 (en) STS Multi Trolley Portal Gantry Container Crane
JP5507383B2 (en) Heavy load erection machine and heavy load erection method
JP2009191458A (en) Construction apparatus for bridge, construction method for floor slab, and construction method for bridge
JP5253976B2 (en) Steel structure construction method
JP5772273B2 (en) Installation apparatus and installation method
JP5184311B2 (en) Steel structure construction method
JP5890060B1 (en) Bridge dismantling method using erection girder
CN104060543A (en) Installation device of prefabricated bridge deck
JP5769961B2 (en) Construction method and removal method of structure
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
KR101160273B1 (en) Straddle carrier for bridge construction
JP5702640B2 (en) Bridge crane, bridge erection method, and bridge removal method
JP5473294B2 (en) Overhead crane installation method and installation system
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
KR100895475B1 (en) Slip way lift system
KR101213377B1 (en) A bridge deck lift-launching contruction method and a lift-launching device for the same
JP2021021252A (en) Viaduct replacing method
KR101162346B1 (en) Launching box using l-box structure and moving appratus and bridge construction method
JPH033616Y2 (en)
JP6618116B2 (en) Construction method of pier
CN203960753U (en) A kind of erecting device of prefabricated bridge
JP7330411B2 (en) Floor slab moving method and floor slab moving device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140520

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150324

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150507

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150602

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150615

R150 Certificate of patent or registration of utility model

Ref document number: 5772273

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees