JP2012222860A - Power supply system - Google Patents

Power supply system Download PDF

Info

Publication number
JP2012222860A
JP2012222860A JP2011082956A JP2011082956A JP2012222860A JP 2012222860 A JP2012222860 A JP 2012222860A JP 2011082956 A JP2011082956 A JP 2011082956A JP 2011082956 A JP2011082956 A JP 2011082956A JP 2012222860 A JP2012222860 A JP 2012222860A
Authority
JP
Japan
Prior art keywords
power
amount
predicted
consumption
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011082956A
Other languages
Japanese (ja)
Other versions
JP5686024B2 (en
Inventor
Mitsuru Fujita
充 藤田
Hiroshige Asada
博重 浅田
Kazuyoshi Obayashi
和良 大林
Akira Ito
章 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2011082956A priority Critical patent/JP5686024B2/en
Publication of JP2012222860A publication Critical patent/JP2012222860A/en
Application granted granted Critical
Publication of JP5686024B2 publication Critical patent/JP5686024B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Abstract

PROBLEM TO BE SOLVED: To provide a power supply system capable of effectively utilizing a solar power generation amount even when a prediction value is different from an actual value by predicting a power consumption amount and the solar power generation amount.SOLUTION: A power supply system 10 can minimize a power storage amount in a midnight time zone which is a specified time zone by setting a prediction power storage amount using a prediction power amount and a prediction power generation amount. Also, for the case that the prediction is wrong, an actual measurement value and a prediction value are compared, as shown in step S23 in Figure 3. The system is controlled by a charging/discharging schedule control part 50 so that consumption of supply power is small when the difference of the values exceeds a tolerance, and so that distribution of a supply power amount to a wiring of a power generation amount of solar power and the power storage amount in a rechargeable battery 23 for facility and an on-vehicle rechargeable battery 30, and a power supply amount to the wiring of the rechargeable battery 23 for facility and the on-vehicle rechargeable battery 30 are determined.

Description

本発明は、太陽光発電手段の発電量と電力使用量に応じて蓄電手段の蓄電量を制御する電力供給システムに関する。   The present invention relates to a power supply system that controls the amount of power stored in a power storage unit according to the amount of power generated by a solar power generation unit and the amount of power used.

蓄電装置を搭載した車両、たとえばプラグインハイブリッド(PHV)自動車が増加すると、蓄電装置への充電時の電力負荷が時間的に集中することがある。充電時間が集中すると、系統電力からの電力供給の不足が懸念されるので、電力供給事業者は電力供給設備を増大する必要がある。   When the number of vehicles equipped with power storage devices, for example, plug-in hybrid (PHV) automobiles, power loads during charging of power storage devices may be concentrated over time. If the charging time is concentrated, there is a concern about the shortage of power supply from the grid power, so the power supply company needs to increase the power supply facilities.

このような充電時間の集中を防ぐ従来技術が、特許文献1に開示されている。特許文献1に記載の充電装置では、系統電力の消費量を少なくするために、先ず、設備内に設置される蓄電池に低電流で直流充電しておく。次に、充電時に、設備内蓄電池から車載用蓄電装置へ直流急速充電している。   A conventional technique for preventing such concentration of charging time is disclosed in Patent Document 1. In the charging device described in Patent Document 1, in order to reduce the consumption of system power, first, a storage battery installed in the facility is DC-charged with a low current. Next, during charging, direct current rapid charging is performed from the storage battery in the facility to the in-vehicle power storage device.

また特許文献2には、系統電力の消費を抑えるために、太陽光発電装置を用いる電力制御装置が開示されている。特許文献2に記載の電力制御装置では、電力負荷の消費電力予測と太陽電池の発電予測とに基づいて、設備内蓄電池に対する電力制御計画を作成する方式が示されている。   Patent Document 2 discloses a power control device using a solar power generation device in order to suppress the consumption of system power. In the power control device described in Patent Document 2, a method of creating a power control plan for an in-facility storage battery based on power consumption prediction of a power load and power generation prediction of a solar battery is shown.

特開平5−207668号公報JP-A-5-207668 特開2003−189477号公報JP 2003-189477 A

特許文献1に記載の技術では、系統電力の電力消費量が少なくなるが、車載用蓄電装置の台数が増えてくると、その増加にともなって設備内蓄電池への充電負荷そのものも増加する。設備内蓄電池への充電は系統電力が用いられるので、設備内蓄電池への充電のタイミングを制御しないと、結果として車載用蓄電装置の充電負荷抑制には直接貢献しないという問題がある。   In the technique described in Patent Document 1, the power consumption of the system power is reduced. However, when the number of on-vehicle power storage devices is increased, the charging load itself to the storage battery in the facility is also increased. Since system power is used for charging to the in-facility storage battery, there is a problem that unless charging timing to the in-facility storage battery is controlled, it does not directly contribute to suppression of the charging load of the in-vehicle power storage device.

また特許文献2に記載の技術では、太陽光発電装置によって系統電力の消費を抑制することができるが、消費電力予測および発電予測が現実と違った場合における制御については示されていない。したがって実際の発電量および消費電力量が予測と異なった場合に、何ら対応することができないという問題がある。   Further, in the technique described in Patent Document 2, the power consumption of the system power can be suppressed by the solar power generation device, but the control when the power consumption prediction and the power generation prediction are different from the actual is not shown. Therefore, there is a problem in that no action can be taken when the actual power generation amount and the power consumption amount are different from the predicted values.

そこで、本発明は前述の問題点を鑑みてなされたものであり、消費電力量および太陽光発電量を予測し、予測値と実際の値が異なっていた場合であっても、太陽光発電量を有効に利用することができる電力供給システムを提供することを目的とする。   Therefore, the present invention has been made in view of the above-described problems, and predicts the power consumption and the amount of photovoltaic power generation, and even if the predicted value and the actual value are different, the amount of photovoltaic power generation An object of the present invention is to provide a power supply system that can effectively use the power.

本発明は前述の目的を達成するために以下の技術的手段を採用する。   The present invention employs the following technical means in order to achieve the aforementioned object.

請求項1に記載の発明では、電力供給契約に基づいて電力供給元の電力系統(11)から建物に供給される供給電力を、配線(12)に接続された電気負荷(13)および蓄電手段(23,30)に給電可能な電力供給システム(10)であって、
太陽光によって発電を行う太陽光発電手段(40)と、
建物の配線に接続され、太陽光発電手段によって発電された太陽光電力および電力系統から供給される供給電力を充電可能であるとともに、蓄電された電力を配線へ放電可能な蓄電手段(23,30)と、
電力系統から供給される供給電力の消費を制御するとともに、太陽光電力の消費を、蓄電手段への蓄電による消費と、電気負荷による消費と、電力系統への逆潮流による消費とで制御する消費制御手段(50)と、
電気負荷の使用履歴に基づいて算出される予測期間の電気負荷の予測電力量、算出される予測期間における電気負荷の予測電力量の時間毎の推移を示す予測消費スケジュール、天候予測によって予測される予測期間の太陽光発電手段の予測発電量、および予測される予測期間における予測発電量の時間毎の推移を示す予測発電スケジュールを算出する予測量算出手段(50)と、
予測電力量が予測発電量よりも大きい場合、予測電力量と予測発電量の差である不足量を算出し、蓄電手段に蓄電される上限量である限界蓄電量が不足量以上の場合には、不足量を蓄電手段の蓄電後に蓄えられる量である予測蓄電量に設定し、限界蓄電量が不足量未満の場合には限界蓄電量を予測蓄電量に設定する蓄電量設定手段(50)と、
電気負荷における消費電力量を検出する消費電力量検出手段(14)と、
太陽光発電手段における発電量を検出する発電量検出手段(42)と、を含み、
消費制御手段は、
電力供給契約に基づいて定まる他の時間帯より電力コストが安価な特定時間帯において、蓄電手段の蓄電量が設定された予測蓄電量になるまで供給電力によって蓄電するように制御し、
予測消費スケジュールと検出された消費電力量とを比較し、予測消費スケジュールと検出された消費電力量との差が許容値を超えた時、または予測発電スケジュールと検出された発電量とを比較し、予測発電スケジュールと検出された発電量との差が許容値を超えた時には、供給電力の消費が少なくなるように、太陽光電力の発電量の配線への供給電力量と蓄電手段への蓄電量との配分、および蓄電手段の配線への供給電力量を決定することを特徴とする電力供給システムである。
According to the first aspect of the present invention, the electric power (13) connected to the wiring (12) and the power storage means are supplied from the power system (11) of the power supply source to the building based on the power supply contract. A power supply system (10) capable of supplying power to (23, 30),
Solar power generation means (40) for generating power by sunlight;
Power storage means (23, 30) connected to the wiring of the building and capable of charging the solar power generated by the solar power generation means and the supply power supplied from the power system and discharging the stored power to the wiring )When,
Controls the consumption of power supplied from the power grid, and also controls the consumption of solar power with consumption by power storage in the power storage means, consumption by electric loads, and consumption by reverse power flow to the power grid Control means (50);
Predicted by the predicted electric load of the electric load in the prediction period calculated based on the usage history of the electric load, the predicted consumption schedule indicating the hourly transition of the predicted electric load of the electric load in the calculated predictive period, and weather prediction A predicted power generation means (50) for calculating a predicted power generation schedule of the predicted power generation amount of the solar power generation means in the prediction period and the hourly transition of the predicted power generation amount in the predicted prediction period;
When the predicted power amount is larger than the predicted power generation amount, the shortage amount that is the difference between the predicted power amount and the predicted power generation amount is calculated, and when the limit power storage amount that is the upper limit amount stored in the power storage means is greater than or equal to the shortage amount A power storage amount setting means (50) for setting the shortage amount to a predicted power storage amount that is stored after power storage by the power storage means, and setting the limit power storage amount to the predicted power storage amount when the limit power storage amount is less than the shortage amount; ,
Power consumption detection means (14) for detecting the power consumption in the electrical load;
A power generation amount detection means (42) for detecting a power generation amount in the solar power generation means,
Consumption control means
In a specific time zone where the power cost is cheaper than other time zones determined based on the power supply contract, control is performed so as to store electricity with the supplied power until the storage amount of the storage means reaches the set predicted storage amount,
Compare the predicted consumption schedule with the detected power consumption, and compare the predicted power consumption schedule with the detected power generation when the difference between the predicted consumption schedule and the detected power consumption exceeds the allowable value. When the difference between the predicted power generation schedule and the detected power generation amount exceeds the allowable value, the amount of power supplied to the wiring of the power generation amount of solar power and the power storage to the power storage means are reduced so that the power consumption is reduced. The power supply system is characterized in that the distribution with the amount and the amount of power supplied to the wiring of the power storage means are determined.

請求項1に記載の発明に従えば、予測電力量と予測発電量とを用いて予測蓄電量を設定することによって、特定時間帯における蓄電量を最小化することができる。これによって蓄電手段に余剰分となるような電力が蓄電されることが防止され、電力コストを低減することができる。予測が外れるときもあるので、予測が外れた場合の制御が必要である。そこで本発明では、予測消費スケジュールと検出された消費電力量とを比較し、予測消費スケジュールと検出された消費電力量との差(以下、「消費差」ということがある)が許容値を超えた時、または予測発電スケジュールと検出された発電量とを比較し、予測発電スケジュールと検出された発電量との差(以下、「発電差」ということがある)が許容値を超えた時には、供給電力の消費が少なくなるように、太陽光電力の発電量の配線への供給電力量と蓄電手段への蓄電量との配分、および蓄電手段の配線への供給電力量を決定するように、消費制御手段によって制御される。比較することによって、予測が外れた時、すなわち消費差または発電差が許容値を超えた時がわかる。比較するタイミングは、随時であってもよく、定期的であってもよく、電気負荷によって電力が消費されている期間であってもよい。このような許容値を超えた時に、供給電力の消費が少なくなるように、発電量の配分、蓄電手段から配線への供給電力量を決定する。したがって予測が外れた時であっても、供給電力の消費を少なくするように修正することができる。これによって消費電力量および太陽光発電量を予測し、予測と実際の値が異なっていた場合であっても、太陽光発電量を有効に利用することができる電力供給システムを実現することができる。また二酸化炭素を発生しない発電方法によって発電された太陽光電力量を有効に利用することによって、二酸化炭素の発生を抑制することができる。   According to the first aspect of the present invention, the power storage amount in the specific time period can be minimized by setting the predicted power storage amount using the predicted power amount and the predicted power generation amount. As a result, it is possible to prevent electric power that is excessive from being stored in the power storage means, and to reduce power costs. Since there are times when the prediction is off, control is required when the prediction is off. Therefore, in the present invention, the predicted consumption schedule is compared with the detected power consumption, and the difference between the predicted consumption schedule and the detected power consumption (hereinafter sometimes referred to as “consumption difference”) exceeds an allowable value. Or when the predicted power generation schedule is compared with the detected power generation amount and the difference between the predicted power generation schedule and the detected power generation amount (hereinafter sometimes referred to as “power generation difference”) exceeds the allowable value, To determine the amount of power supplied to the wiring of the power storage means and the amount of power stored in the power storage means, and the amount of power supplied to the wiring of the power storage means, so that the consumption of the power supply is reduced. Controlled by consumption control means. By comparing, it is possible to know when the prediction is wrong, that is, when the consumption difference or the power generation difference exceeds the allowable value. The timing for comparison may be at any time, may be regular, or may be a period during which power is consumed by the electrical load. When such an allowable value is exceeded, the amount of power generation and the amount of power supplied from the power storage means to the wiring are determined so that the amount of power consumption is reduced. Therefore, even when the prediction is off, correction can be made to reduce the consumption of the supplied power. As a result, the power consumption system and the amount of photovoltaic power generation are predicted, and even if the actual value differs from the predicted value, a power supply system that can effectively use the amount of photovoltaic power generation can be realized. . Moreover, generation | occurrence | production of a carbon dioxide can be suppressed by utilizing effectively the solar energy generated with the power generation method which does not generate a carbon dioxide.

また請求項2に記載の発明では、消費制御手段は、予測消費スケジュールと検出された消費電力量との差が許容値を超えた時、または予測発電スケジュールと検出された発電量との差が許容値を超えた時であって、検出された消費電力量よりも発電量が多い時には、太陽光電力の電力系統への逆潮流量が多くなるように、太陽光電力の発電量の配線への供給電力量と蓄電手段への蓄電量との配分、および蓄電手段の配線への供給電力量を決定することを特徴とする。   In the invention according to claim 2, the consumption control means is configured such that the difference between the predicted consumption schedule and the detected power consumption exceeds an allowable value, or the difference between the predicted power generation schedule and the detected power generation is When the allowable value is exceeded and the amount of power generation is greater than the detected power consumption, to the solar power generation amount wiring so that the reverse power flow to the power system of solar power increases. The distribution of the amount of supplied power and the amount of power stored in the power storage means, and the amount of power supplied to the wiring of the power storage means are determined.

請求項2に記載の発明に従えば、消費差が許容値を超えた時、または発電差が許容値を超えた時であって、検出された消費電力量よりも発電量が多い時には、太陽光電力の電力系統への逆潮流量が多くなるように、各部が消費制御手段によって制御される。したがって予測が外れた時であって、消費電力量よりも発電量に余裕があるときには、供給電力の利用を抑制し、逆潮流量を多くすることによって、収益を得ることができる。これによって電力コストを低減することができる。   According to the invention described in claim 2, when the consumption difference exceeds the allowable value, or when the power generation difference exceeds the allowable value, and when the power generation amount is larger than the detected power consumption amount, Each unit is controlled by the consumption control means so that the reverse power flow rate of the optical power to the power system increases. Therefore, when the prediction is off, and there is a surplus in the amount of power generation than the amount of power consumption, profit can be obtained by suppressing the use of the supplied power and increasing the reverse flow rate. As a result, the power cost can be reduced.

さらに請求項3に記載の発明では、消費制御手段は、予測消費スケジュールと検出された消費電力量との差が許容値を超えた時、または予測発電スケジュールと検出された発電量との差が許容値を超えた時であって、検出された消費電力量よりも発電量が少ない時には、予測消費スケジュールを供給電力の消費を抑制するように予め設定された補正消費スケジュールに設定することを特徴とする。   Furthermore, in the invention according to claim 3, the consumption control means is configured such that the difference between the predicted consumption schedule and the detected power consumption exceeds an allowable value, or the difference between the predicted power generation schedule and the detected power generation is When the allowable value is exceeded and the power generation amount is smaller than the detected power consumption amount, the predicted consumption schedule is set to a correction consumption schedule set in advance so as to suppress the consumption of the supplied power. And

請求項3に記載の発明に従えば、消費差が許容値を超えた時、または発電差が許容値を超えた時であって、検出された消費電力量よりも発電量が少ない時には、予測消費スケジュールを供給電力の消費を抑制するように予め設定された補正消費スケジュールに設定する。これによって電力供給元が補正消費スケジュールを建物毎に調整することによって、供給電力の消費がある時間に集中することを防止することができる。これによって電力供給元から各建物への電力供給が不足することを抑制することができる。   According to the invention described in claim 3, when the consumption difference exceeds the allowable value, or when the power generation difference exceeds the allowable value and the power generation amount is smaller than the detected power consumption, the prediction is made. The consumption schedule is set to a correction consumption schedule set in advance so as to suppress the consumption of the supplied power. As a result, the power supply source adjusts the corrected consumption schedule for each building, thereby preventing the supply power consumption from being concentrated at a certain time. This can suppress the shortage of power supply from the power supply source to each building.

さらに請求項4に記載の発明では、予測量算出手段によって予測消費スケジュールと予測発電スケジュールとが算出される毎に、算出された予測消費スケジュールと予測発電スケジュールとを記憶する記憶手段をさらに含み、
予測量算出手段は、
予測消費スケジュールと検出された消費電力量との差が許容値を越えた時には、予測消費スケジュールを新たに算出し、
予測発電スケジュールと検出された発電量との差が許容値を越えた時には、予測発電スケジュールを新たに算出し、
消費制御手段は、比較するときには記憶手段に記憶される最新の予測消費スケジュールと予測発電スケジュールとを用いることを特徴とする。
Furthermore, the invention according to claim 4 further includes a storage unit that stores the calculated predicted consumption schedule and the predicted power generation schedule each time the predicted consumption calculation unit and the predicted power generation schedule are calculated by the predicted amount calculation unit,
The predicted amount calculation means
When the difference between the predicted consumption schedule and the detected power consumption exceeds the allowable value, a new predicted consumption schedule is calculated,
When the difference between the predicted power generation schedule and the detected power generation exceeds the allowable value, a new predicted power generation schedule is calculated,
The consumption control means uses the latest predicted consumption schedule and the predicted power generation schedule stored in the storage means for comparison.

請求項4に記載の発明に従えば、予測量算出手段は、消費差が許容値を越えた時には、予測消費スケジュールを新たに算出し、発電差が許容値を越えた時には、予測発電スケジュールを新たに算出する。そして記憶手段には、予測量算出手段によって予測消費スケジュールと予測発電スケジュールとが算出される毎に、算出された予測消費スケジュールと予測発電スケジュールとが記憶される。したがって記憶手段には、最新の各スケジュールが記憶されている。そして消費制御手段は、比較するときには記憶手段に記憶される最新の予測消費スケジュールと予測発電スケジュールとを用いる。したがって予測が適宜修正されるので、予測が外れる確率を少なくすることができる。したがって好適な消費および充電計画を実行することができる。   According to the invention of claim 4, the predicted amount calculating means newly calculates a predicted consumption schedule when the consumption difference exceeds the allowable value, and calculates the predicted power generation schedule when the power generation difference exceeds the allowable value. New calculation. The storage means stores the calculated predicted consumption schedule and the predicted power generation schedule every time the predicted consumption calculation and the predicted power generation schedule are calculated by the predicted amount calculation means. Therefore, the latest schedules are stored in the storage means. The consumption control means uses the latest predicted consumption schedule and the predicted power generation schedule stored in the storage means when comparing. Therefore, since the prediction is appropriately corrected, the probability that the prediction is lost can be reduced. A suitable consumption and charging plan can thus be implemented.

さらに請求項5に記載の発明では、消費制御手段は、定期的に比較をし、予測消費スケジュールと検出された消費電力量との差、および予測発電スケジュールと検出された発電量との差の少なくともいずれか一方が許容値を越えて大きくなるにつれて、比較する間隔を小さくするように制御することを特徴とする。   Furthermore, in the invention according to claim 5, the consumption control means periodically compares the difference between the predicted consumption schedule and the detected power consumption, and the difference between the predicted power generation schedule and the detected power generation amount. Control is performed so that the comparison interval is reduced as at least one of the values exceeds the allowable value.

請求項5に記載の発明に従えば、消費制御手段は、消費差および発電差の少なくともいずれか一方が許容値を超えて大きくなるにつれて、比較する間隔を小さくするように制御する。許容値を越えた場合は、より早い時点で修正することが好ましいので、比較する間隔を短くすることによって、早い時点で予測が外れた場合の制御を実施することができる。これによって予測が大きく外れた場合であっても、速やかに対応することができる。   According to the invention described in claim 5, the consumption control means controls so that the comparison interval is reduced as at least one of the consumption difference and the power generation difference exceeds the allowable value. If the allowable value is exceeded, it is preferable to correct it at an earlier time point. Therefore, by shortening the comparison interval, it is possible to perform control when the prediction is lost at an earlier time point. As a result, even when the prediction is greatly deviated, it is possible to respond promptly.

なお、前述の各手段の括弧内の符号は、後述する実施形態に記載の具体的手段との対応関係を示す一例である。   In addition, the code | symbol in the bracket | parenthesis of each above-mentioned means is an example which shows a corresponding relationship with the specific means as described in embodiment mentioned later.

第1実施形態の電力供給システム10の概略構成を示す模式図である。It is a mimetic diagram showing a schematic structure of power supply system 10 of a 1st embodiment. 充放電計画制御部50の深夜充電処理を示すフローチャートである。It is a flowchart which shows the midnight charge process of the charging / discharging plan control part 50. FIG. 充放電計画制御部50の昼間電力処理を示すフローチャートである。It is a flowchart which shows the daytime electric power process of the charging / discharging plan control part 50. FIG.

(第1実施形態)
本発明の第1実施形態に関して、図1〜図3を用いて説明する。図1は、第1実施形態における電力供給システム10の概略構成を示す模式図である。電力供給システム10は、電力供給契約に基づいて電力供給元の外部電力系統11から供給される供給電力を、建物内の交流電力線12に接続された電気負荷13に給電可能なシステムである。本実施形態の電力供給システム10では、深夜時間帯(23時から7時の時間帯)の電力コストが他の時間帯の電力コストよりも安価な1つの(単一の)電力供給契約を締結しており、電力会社の外部電力系統11から供給される購入電力(系統電力)を建物内に導入する交流電力線12には、時間帯別電力量計(図示せず)が配設されている。
(First embodiment)
A first embodiment of the present invention will be described with reference to FIGS. FIG. 1 is a schematic diagram illustrating a schematic configuration of a power supply system 10 according to the first embodiment. The power supply system 10 is a system that can supply power supplied from an external power system 11 as a power supply source to an electric load 13 connected to an AC power line 12 in a building based on a power supply contract. In the power supply system 10 of the present embodiment, one (single) power supply contract is concluded in which the power cost in the midnight time zone (the time zone from 23:00 to 7:00) is lower than the power cost in other time zones. The AC power line 12 for introducing purchased power (system power) supplied from the external power system 11 of the power company into the building is provided with a watt hour meter (not shown). .

電力供給システム10は、たとえば住宅である建物内に配線された交流電力線12と、交流電力線12に電気的に接続された蓄電ユニット20と、車両に交流電力線12からの電力を供給して車載用蓄電池30に充電するための充電スタンド21と、太陽光によって発電を行う発電システム40と、交流電力線12に電気的に接続された電気負荷13と、各部を制御する充放電計画制御部50と、各部を操作する操作表示器60と、を備えている。車両31は、比較的容量の大きな車載用蓄電池30を搭載した車両31、たとえば電気自動車である。   The power supply system 10 is for in-vehicle use, for example, an AC power line 12 wired in a building that is a house, a power storage unit 20 electrically connected to the AC power line 12, and a vehicle that supplies power from the AC power line 12 to the vehicle. A charging station 21 for charging the storage battery 30; a power generation system 40 that generates power by sunlight; an electric load 13 that is electrically connected to the AC power line 12; a charge / discharge plan control unit 50 that controls each part; And an operation indicator 60 for operating each part. The vehicle 31 is a vehicle 31, for example, an electric vehicle, on which an in-vehicle storage battery 30 having a relatively large capacity is mounted.

建物内に配線された交流電力線12は、たとえば単相3線式の(1本の中性線と2本の電圧線とからなる)電力線であって、電力会社の外部電力系統11の系統電力が分電盤(図示せず)を介して供給されるようになっている。分電盤には、図示は省略するが、主幹ブレーカ、および、各回路系統に流れる電流上限値を規制する漏電検知機能付きの電流ブレーカが配設されている。外部電力系統11からの交流電力線12は、第1に発電用電力制御回路41に、第2に蓄電池用電力制御回路22に、第3に電気負荷13に分岐している。   The AC power line 12 wired in the building is, for example, a single-phase three-wire type power line (consisting of one neutral line and two voltage lines), and the system power of the external power system 11 of the power company. Is supplied via a distribution board (not shown). Although not shown, the distribution board is provided with a main breaker and a current breaker with a leakage detection function that regulates an upper limit value of a current flowing through each circuit system. The AC power line 12 from the external power system 11 branches first to the power generation power control circuit 41, second to the storage battery power control circuit 22, and third to the electric load 13.

発電システム40は、太陽光発電手段であって、交流電力線12に系統外電力を供給する。発電システム40は、建物の屋根に太陽光パネル(図示せず)を設け、太陽光を利用して発電するものである。発電システム40は、発電した太陽光電力を発電用電力制御回路41に供給する。発電用電力制御回路41は、交流電力線12に電気的に接続され、発電システム40からの直流電力を交流電力に変換して、交流電力線12へ放電する。また交流電力線12には、発電用電力制御回路41から放電された電流の値を検出する発電量検出手段としての発電量計測器42が設けられる。発電量計測器42は、充放電計画制御部50に接続され、発電量計測器42が検出した電流値が充放電計画制御部50に出力される。   The power generation system 40 is a solar power generation means, and supplies off-system power to the AC power line 12. The power generation system 40 is provided with a solar panel (not shown) on the roof of a building and generates power using sunlight. The power generation system 40 supplies the generated solar power to the power generation power control circuit 41. The power generation control circuit 41 is electrically connected to the AC power line 12, converts DC power from the power generation system 40 into AC power, and discharges the AC power line 12. Further, the AC power line 12 is provided with a power generation amount measuring device 42 as a power generation amount detecting means for detecting the value of the current discharged from the power generation power control circuit 41. The power generation amount measuring device 42 is connected to the charge / discharge plan control unit 50, and the current value detected by the power generation amount measuring device 42 is output to the charge / discharge plan control unit 50.

また交流電力線12には、各種電気機器である電気負荷13にも接続される。したがって交流電力線12には、電気負荷13が接続可能となっており、これらの電気負荷13に給電可能となっている。この電気負荷13を流れる電流の値を検出する消費電力量検出手段としての消費電力量計測器14が設けられる。消費電力量計測器14は、充放電計画制御部50に接続され、消費電力量計測器14が検出した電流値が充放電計画制御部50に出力される。   The AC power line 12 is also connected to an electric load 13 that is various electric devices. Therefore, an electrical load 13 can be connected to the AC power line 12, and power can be supplied to these electrical loads 13. A power consumption meter 14 is provided as power consumption detection means for detecting the value of the current flowing through the electric load 13. The power consumption meter 14 is connected to the charge / discharge plan control unit 50, and the current value detected by the power consumption meter 14 is output to the charge / discharge plan control unit 50.

次に、蓄電ユニット20に関して説明する。交流電力線12には、たとえば建物の外部に設置された蓄電ユニット20(蓄電システムまたは「e−Station」と呼ばれることもある)が接続されている。蓄電ユニット20は、蓄電池用電力制御回路22、設備用蓄電池23、充放電制御回路24等を備えている。   Next, the power storage unit 20 will be described. For example, a power storage unit 20 (sometimes called a power storage system or “e-Station”) installed outside the building is connected to the AC power line 12. The power storage unit 20 includes a storage battery power control circuit 22, a facility storage battery 23, a charge / discharge control circuit 24, and the like.

蓄電池用電力制御回路22は、交流電力線12に電気的に接続され、設備用蓄電池23からの直流電力を交流電力に変換して、交流電力線12へ放電する。また蓄電池用電力制御回路22は、交流電力線12からの交流電力を直流電力に変換して設備用蓄電池23に蓄電(充電)する。   The storage battery power control circuit 22 is electrically connected to the AC power line 12, converts DC power from the facility storage battery 23 into AC power, and discharges the AC power line 12. Further, the storage battery power control circuit 22 converts AC power from the AC power line 12 into DC power and stores (charges) it in the facility storage battery 23.

充放電制御回路24は、蓄電池用電力制御回路22および充電スタンド21と接続される。充放電制御回路24は、さらに充放電計画制御部50に接続され、充放電計画制御部50の指示に従い、蓄電池用電力制御回路22および充電スタンド21の作動を制御する。充放電制御回路24は、設備用蓄電池23に搭載された蓄電池監視ECU(図示せず)と通信可能に接続されている。充放電制御回路24は、設備用蓄電池23に供給する電力、および車載用蓄電池30に供給する電力の振り分けを制御する。充放電制御回路24は、直流電力によって設備用蓄電池23および車載用蓄電池30への充電を行うように制御する。直流電力によって充電することによって、交流電力を用いる構成よりも、充電時間および充電量を高精度に制御することができる。   The charge / discharge control circuit 24 is connected to the storage battery power control circuit 22 and the charging stand 21. The charge / discharge control circuit 24 is further connected to the charge / discharge plan control unit 50, and controls the operation of the storage battery power control circuit 22 and the charge stand 21 in accordance with instructions from the charge / discharge plan control unit 50. The charge / discharge control circuit 24 is communicably connected to a storage battery monitoring ECU (not shown) mounted on the facility storage battery 23. The charge / discharge control circuit 24 controls the distribution of the power supplied to the facility storage battery 23 and the power supplied to the in-vehicle storage battery 30. The charge / discharge control circuit 24 performs control so as to charge the facility storage battery 23 and the in-vehicle storage battery 30 with DC power. By charging with DC power, it is possible to control the charging time and the charge amount with higher accuracy than the configuration using AC power.

設備用蓄電池23は、たとえばリチウムイオン電池等の二次電池からなる単位電池を複数組み合わせた集合体である。設備用蓄電池23は、蓄電池用電力制御回路22を介して交流電力線12に電気的に接続され、交流電力線12からの交流電力を充電したり、蓄電された直流電力を交流電力線12へ放電したりすることが可能となっている。   The storage battery 23 for facilities is an aggregate in which a plurality of unit batteries each made of a secondary battery such as a lithium ion battery are combined. The storage battery 23 for facilities is electrically connected to the AC power line 12 via the storage battery power control circuit 22, and charges AC power from the AC power line 12 or discharges stored DC power to the AC power line 12. It is possible to do.

次に、充電スタンド21に関して説明する。充電スタンド21は、たとえば建物の外部に、蓄電ユニット20とは別体で設置されている。充電スタンド21には、充放電制御回路24で分岐した充電電力線が接続されている。充電電力線は、充電スタンド21内にまで配設され、充電スタンド21の本体部から外部に延出する充放電ケーブル(図示せず)に接続している。充放電ケーブルの先端部には、接続端子部に相当する充放電コネクタが取付けられている。また充電スタンド21内には、図示は省略するが、制御ECU(Electronic Control Unit)などが配設されている。制御ECUは、充放電制御回路24と通信することにより、車載蓄電装置である車載用蓄電池30の充放電を制御する。   Next, the charging stand 21 will be described. The charging stand 21 is installed separately from the power storage unit 20, for example, outside the building. A charging power line branched by the charging / discharging control circuit 24 is connected to the charging stand 21. The charging power line is disposed up to the inside of the charging stand 21 and is connected to a charging / discharging cable (not shown) extending from the main body of the charging stand 21 to the outside. A charge / discharge connector corresponding to the connection terminal portion is attached to the tip of the charge / discharge cable. In addition, although not shown, a control ECU (Electronic Control Unit) is disposed in the charging stand 21. The control ECU controls charging / discharging of the in-vehicle storage battery 30 that is the in-vehicle power storage device by communicating with the charge / discharge control circuit 24.

車両31には、コネクタ(具体的には充放電コネクタの差込口)が設けられている。このコネクタに充電スタンド21の充放電コネクタを接続することにより、車載充放電器(図示せず)を介して、車載用蓄電池30を充放電することが可能となっている。車載用蓄電池30を充電する際には、コネクタに充放電制御回路24から交流電力が供給され、供給された交流電力を車載充放電器が直流電力に変換して、車載用蓄電池30に充電する。一方、車載用蓄電池30を放電する際には、車載用蓄電池30の蓄電している直流電力を車載充放電器が交流電力に変換して、コネクタから充放電コネクタへ放電する。   The vehicle 31 is provided with a connector (specifically, an insertion port for a charge / discharge connector). By connecting the charging / discharging connector of the charging stand 21 to this connector, the in-vehicle storage battery 30 can be charged / discharged via an in-vehicle charger / discharger (not shown). When charging the in-vehicle storage battery 30, AC power is supplied to the connector from the charge / discharge control circuit 24, and the in-vehicle charger / discharger converts the supplied AC power into DC power to charge the in-vehicle storage battery 30. . On the other hand, when discharging the in-vehicle storage battery 30, the in-vehicle charger / discharger converts the DC power stored in the in-vehicle storage battery 30 into AC power, and discharges from the connector to the charge / discharge connector.

次に、操作表示器60に関して説明する。操作表示器60は、たとえば建物内に配設される遠隔操作手段(所謂リモコン)である。操作表示器60は、充放電計画制御部50と電気的に接続される。操作表示器60は、報知手段に相当する表示部、および、各部を操作する操作スイッチを備えている。表示部には、たとえば設備用蓄電池23の蓄電状態、太陽電池の発電量、電気負荷13による使用電力量、車載用蓄電池30の充電状態、および外部電力系統11への逆潮流量などを表示する。また操作スイッチを操作することによって、設備用蓄電池23への蓄電指示、車載用蓄電池30への充電指示、および各種設定などを行うことができる。   Next, the operation display 60 will be described. The operation indicator 60 is a remote operation means (so-called remote control) disposed in a building, for example. The operation indicator 60 is electrically connected to the charge / discharge plan control unit 50. The operation indicator 60 includes a display unit corresponding to a notification unit and an operation switch for operating each unit. The display unit displays, for example, the storage state of the facility storage battery 23, the amount of power generated by the solar battery, the amount of power used by the electric load 13, the state of charge of the in-vehicle storage battery 30, and the reverse power flow to the external power system 11. . Further, by operating the operation switch, it is possible to perform a power storage instruction to the facility storage battery 23, a charge instruction to the in-vehicle storage battery 30, and various settings.

次に、充放電計画制御部50に関して説明する。充放電計画制御部50は、各部を制御する消費制御手段としての機能も有する。充放電計画制御部50は、各部と電気的に接続される。充放電計画制御部50は、操作表示器60の操作スイッチによって入力された指示に従って、各部が動作するように各部に制御指令を与える。また充放電計画制御部50は、各部の状態に応じた情報を表示するように、操作表示器60の表示部を制御する。   Next, the charge / discharge plan control unit 50 will be described. The charge / discharge plan control unit 50 also has a function as consumption control means for controlling each unit. The charge / discharge plan control unit 50 is electrically connected to each unit. The charging / discharging plan control unit 50 gives a control command to each unit so that each unit operates in accordance with an instruction input by the operation switch of the operation indicator 60. Moreover, the charging / discharging plan control part 50 controls the display part of the operation indicator 60 so that the information according to the state of each part may be displayed.

充放電計画制御部50は、構成の図示は省略するが、通信信号、大気圧センサ(図示せず)等からの外部情報70が入力される入力回路と、入力回路からの信号を用いて各種演算を実行するマイクロコンピュータと、マイクロコンピュータによる演算に基づいて各部を制御する制御信号を出力する出力回路と、を備えている。マイクロコンピュータは、大気圧等の各種のデータ、演算結果等を記憶する記憶手段としてのロム(Read-Only Memory:略称ROM)、ロム(Read-Only Memory:略称ROM)等を内蔵し、あらかじめ設定された制御プログラムや更新可能な制御プログラムを有し、後述する各処理を実行する。   The charge / discharge plan control unit 50 is not shown in the configuration, but various types of signals are input using an input circuit to which external information 70 is input from a communication signal, an atmospheric pressure sensor (not shown), and the like, and signals from the input circuit The microcomputer includes a microcomputer that executes a calculation, and an output circuit that outputs a control signal for controlling each unit based on the calculation performed by the microcomputer. The microcomputer has built-in ROM (Read-Only Memory: abbreviated ROM), ROM (Read-Only Memory: ROM) as storage means for storing various data such as atmospheric pressure, calculation results, etc. The control program and the control program that can be updated are executed, and each process described later is executed.

充放電計画制御部50は、電気負荷13の使用履歴に基づいて算出される翌日の電気負荷13の予測電力量と、天候予測によって予測される翌日の発電システム40の予測発電量と、を算出する予測量算出手段としての機能を有する。さらに充放電計画制御部50は、電気負荷13の使用履歴に基づいて算出される翌日の電気負荷13の消費電力量の時間毎の推移を示す予測消費スケジュールと、天候予測によって予測される翌日の発電システム40の発電量の時間毎の推移を示す予測発電スケジュールを算出する予測量算出手段としての機能を有する。各スケジュールにおける各値の時間毎の推移としては、たとえば時間単位および分単位などの推移である。   The charge / discharge plan control unit 50 calculates the predicted power amount of the next day's electric load 13 calculated based on the usage history of the electric load 13 and the predicted power amount of the power generation system 40 of the next day predicted by weather prediction. It has a function as a predicted amount calculation means. Furthermore, the charging / discharging plan control unit 50 calculates the hourly transition of the power consumption of the electric load 13 on the next day calculated based on the usage history of the electric load 13, and the next day predicted by the weather prediction. The power generation system 40 has a function as a predicted amount calculation unit that calculates a predicted power generation schedule that indicates a time-dependent transition of the power generation amount. The transition of each value in each schedule over time is, for example, transition in units of hours and minutes.

充放電計画制御部50は、記憶手段に記憶されている充放電計画に沿って、設備用蓄電池23および車載用蓄電池30へ充電するタイミングと、設備用蓄電池23および車載用蓄電池30から交流電力線12に放電するタイミングを制御する。充放電計画は、予測消費スケジュールおよび予測発電スケジュールによって決定される。   The charging / discharging plan control unit 50 charges the facility storage battery 23 and the in-vehicle storage battery 30 along the charging / discharging plan stored in the storage unit, and the AC power line 12 from the facility storage battery 23 and the in-vehicle storage battery 30. Control the timing of discharge. The charge / discharge plan is determined by the predicted consumption schedule and the predicted power generation schedule.

充放電計画制御部50は、外部情報70として大気圧センサにより検出される大気圧の検出値に応じて翌日の天候を予測し、この天候予測結果および過去の発電量実績に基づき翌日の発電システム40による発電量の予測発電量を算出する。また充放電計画制御部50は、予測電力量が予測発電量より大きい場合、予測電力量と予測発電量の差である不足量を算出する。そして充放電計画制御部50は、設備用蓄電池23に蓄電される上限量である満充電量(限界蓄電量)が不足量以上の場合には、不足量を設備用蓄電池23の蓄電後に蓄えられる量である予測蓄電量に設定し、限界蓄電量が不足量未満の場合には限界蓄電量を予測蓄電量に設定する蓄電量設定手段としての機能も有する。したがって充放電計画制御部50は、省エネルギ、低ランニングコストのため、天候を予測し、天候予測等に基づく昼間の太陽光発電量を予測し、この太陽光発電量と電気負荷13による予測電力量を加味して深夜料金時間帯の予測蓄電量を決定する。   The charging / discharging plan control unit 50 predicts the next day's weather according to the detected value of the atmospheric pressure detected by the atmospheric pressure sensor as the external information 70, and generates the next day's power generation system based on the weather prediction result and the past power generation result. The predicted power generation amount of the power generation amount by 40 is calculated. In addition, when the predicted power amount is larger than the predicted power generation amount, the charge / discharge plan control unit 50 calculates a shortage amount that is a difference between the predicted power amount and the predicted power generation amount. When the full charge amount (limit charge amount) that is the upper limit amount stored in the facility storage battery 23 is greater than or equal to the shortage amount, the charge / discharge plan control unit 50 stores the shortage amount after the storage of the facility storage battery 23. It also has a function as storage amount setting means for setting the amount of predicted electricity storage, which is an amount, and when the amount of limit electricity storage is less than the shortage amount, setting the amount of limit electricity storage to the amount of predicted electricity storage. Therefore, the charge / discharge plan control unit 50 predicts the weather for energy saving and low running cost, predicts the daytime solar power generation amount based on the weather prediction and the like, and predicts the solar power generation amount and the predicted power by the electric load 13. Taking into account the amount, determine the estimated amount of electricity stored in the late-night fee period.

予測蓄電量は、ユーザの過去の電気負荷13の使用実績による学習値から、設備用蓄電池23に残存する蓄電量と翌日の予測発電量(発電量の予測値)との合計を減算することにより算出されるものである。そして、充放電計画制御部50は、電力が安価な深夜時間帯に蓄電ユニット20を作動させ、算出した予測蓄電量に応じて蓄電を行わせることにより、新たな蓄電量が設備用蓄電池23に加わることになる。   The predicted power storage amount is obtained by subtracting the total of the power storage amount remaining in the facility storage battery 23 and the predicted power generation amount (predicted value of power generation amount) on the next day from the learned value based on the past use of the electric load 13 by the user. It is calculated. Then, the charging / discharging plan control unit 50 operates the power storage unit 20 in the midnight time zone when the power is low, and performs power storage according to the calculated predicted power storage amount. Will join.

また、充放電計画制御部50による天候予測演算は、検出された大気圧値、当該大気圧値の振動の割合、および当該大気圧値の変化率のパラメータに基づいて、翌日の太陽光発電量を決定する。たとえば、充放電計画制御部50は、天候予測演算に使用する所定のマップを記憶手段に記憶している。当該マップは、当該大気圧値の振動の割合が大きく2つに分類されており、この振動の割合の分類毎に大気圧値の変化率に関する不等式がさらに複数に分類され、当該変化率の分類毎にさらに大気圧値に関する不等式が割り当てられている。そして、当該マップに、大気圧値、当該振動の割合、および当該変化率の各パラメータを当てはめることにより、一の予測発電量を決定することができる。大気圧値としては、たとえば演算に現在の検出値を使用し、当該振動の割合および当該変化率としては4時間前から現在までの振動の割合および変化率を使用するものである。したがって充放電計画制御部50は、過去の大気圧データと過去の太陽光発電量との相関関係を示すマップを、記憶手段に記憶している。充放電計画制御部50は、大気圧に基づいて、マップを用いて翌日の太陽光発電量(予測発電量)を決定する。このようなマップは、たとえば過去の大気圧データと過去の発電量実績とを記録することによって、逐次更新することが有効である。   The weather prediction calculation by the charge / discharge plan control unit 50 is based on the detected atmospheric pressure value, the vibration rate of the atmospheric pressure value, and the parameters of the change rate of the atmospheric pressure value on the next day's solar power generation amount. To decide. For example, the charging / discharging plan control unit 50 stores a predetermined map used for weather prediction calculation in the storage unit. The map is classified into two categories with a large proportion of vibration of the atmospheric pressure value. For each classification of the proportion of vibration, the inequality related to the variation rate of the atmospheric pressure value is further classified into a plurality of classifications. Each is further assigned an inequality for the atmospheric pressure value. Then, one predicted power generation amount can be determined by fitting each parameter of the atmospheric pressure value, the vibration ratio, and the change rate to the map. As the atmospheric pressure value, for example, the current detection value is used for calculation, and the vibration ratio and change rate from 4 hours before to the present time are used as the vibration ratio and the change rate. Therefore, the charging / discharging plan control unit 50 stores a map indicating the correlation between the past atmospheric pressure data and the past photovoltaic power generation amount in the storage unit. The charge / discharge plan control unit 50 determines the photovoltaic power generation amount (predicted power generation amount) of the next day using a map based on the atmospheric pressure. It is effective to update such a map sequentially, for example, by recording past atmospheric pressure data and past power generation results.

次に、充放電計画制御部50による制御に関して説明する。図2は、充放電計画制御部50の深夜充電処理を示すフローチャートである。深夜充電処理は、深夜時間帯に設備用蓄電池23に蓄電する蓄電量を決定する処理である。図2に示すフローは、充放電計画制御部50が電源投入状態において実行される。   Next, control by the charge / discharge plan control unit 50 will be described. FIG. 2 is a flowchart showing the midnight charging process of the charging / discharging plan control unit 50. The midnight charging process is a process of determining the amount of power stored in the facility storage battery 23 in the midnight time zone. The flow shown in FIG. 2 is executed when the charge / discharge plan control unit 50 is in a power-on state.

フローが開始されると、ステップS11では、現在時刻が23時になったか否かが判定される。そして、23時であれば、ステップS12に進み、23時でなければステップS11の処理を繰返す。   When the flow starts, it is determined in step S11 whether or not the current time is 23:00. And if it is 23:00, it will progress to step S12, and if it is not 23:00, the process of step S11 is repeated.

ステップS12では、記憶手段に記憶されている過去の電気負荷13の使用電力量、使用電力量の推移、および過去の太陽光発電量、発電量の推移などのデータを読み込む処理を実行し、ステップS13に移る。過去の実績は、過去の予め定めた日数分の実績(たとえば日分の実績)であり、平日実績値と休日(土、日)実績値との二種類がある。読み込む際、読み込むときの曜日に応じて、いずれか1種類のデータが選択される。   In step S12, a process of reading data such as past power consumption of the electrical load 13 stored in the storage means, transition of power consumption, and past photovoltaic power generation amount, transition of power generation amount, etc. is executed. Move on to S13. The past achievements are past achievements for a predetermined number of days (for example, the achievements for the day), and there are two types, a weekday achievement value and a holiday (Saturday, Sunday) achievement value. When reading, one type of data is selected according to the day of the week when reading.

ステップS13では、読み込んだ使用電力量の実績に基づいて、使用電力量の偏差δを算出し、ステップS14に移る。ステップS14では、使用電力量の平均値と算出した偏差との合計を翌日の予測電力量および予測消費スケジュールとして、ステップS15に移る。したがって予測電力量および予測消費スケジュールは、使用電力量の実績を用いて、その平均値に偏差を加えた値となる。使用電力量の実績には、車両31に搭載される車載用蓄電池30の消費も含まれる。また予測する場合には、翌日の車両31の運行スケジュールを読込み、予測電力量および予測消費スケジュールを算出してもよい。また使用者の翌日の電気負荷13の使用予定が既知である場合には、使用予定を読み込んで予測電力量および予測消費スケジュールを算出してもよい。使用予定は、具体的な電気負荷13の使用予定だけでてなく、使用者の行動予定、たとえば本来、在宅しない曜日であるの、在宅することになった場合などの予定も含む。換言すると、使用電力の実績である消費電力の学習データは、季節、曜日、時刻、在宅有無および電気自動車の駐車状況に関する過去のデータから生成されている。   In step S13, the deviation δ of the used electric energy is calculated based on the read actual used electric energy, and the process proceeds to step S14. In step S14, the sum of the average value of the power consumption and the calculated deviation is set as the predicted power consumption and predicted consumption schedule for the next day, and the process proceeds to step S15. Therefore, the predicted power amount and the predicted consumption schedule are values obtained by adding deviations to the average value using the actual amount of power used. The actual amount of power used includes consumption of the in-vehicle storage battery 30 mounted on the vehicle 31. When predicting, the operation schedule of the vehicle 31 on the next day may be read to calculate the predicted power consumption and the predicted consumption schedule. When the use schedule of the electric load 13 on the next day of the user is known, the use schedule may be read to calculate the predicted power consumption and the predicted consumption schedule. The use schedule includes not only a specific use schedule of the electric load 13 but also a user's action schedule, for example, a schedule when the user is supposed to stay at home because it is a day of the week that is not originally at home. In other words, the learning data of the power consumption, which is the actual power consumption, is generated from the past data relating to the season, day of the week, time, presence / absence at home, and parking state of the electric vehicle.

ステップS15では、記憶手段に記憶されている大気圧データを読込み、ステップS16に移る。大気圧データは、記憶手段に記憶されており、たとえば現在時刻から4時間前までの全体の大気圧データを読み込む。なおステップS15では、4時間という時間幅であるが、これに限定するものではなく、予め定めた時間幅の全大気圧データを読み込むステップであってもよい。   In step S15, the atmospheric pressure data stored in the storage means is read, and the process proceeds to step S16. The atmospheric pressure data is stored in the storage means, and for example, the entire atmospheric pressure data from the current time to 4 hours before is read. In step S15, the time width is four hours. However, the present invention is not limited to this, and may be a step of reading all atmospheric pressure data having a predetermined time width.

ステップS16では、大気圧データに基づいて、翌日の予測発電量および予測発電スケジュールを算出し、ステップS17に移る。ステップS16では、記憶手段に記憶される大気圧と太陽光発電量との相関マップを用いて、読み込んだ大気圧値、大気圧値の振動の割合、および大気圧値の変化率の各パラメータを当てはめることにより、一の予測発電量および予測発電スケジュールを決定する。   In step S16, the predicted power generation amount and predicted power generation schedule for the next day are calculated based on the atmospheric pressure data, and the process proceeds to step S17. In step S16, using the correlation map between the atmospheric pressure and the amount of photovoltaic power stored in the storage unit, the parameters of the read atmospheric pressure value, the vibration rate of the atmospheric pressure value, and the change rate of the atmospheric pressure value are obtained. By applying, the predicted power generation amount and the predicted power generation schedule are determined.

ステップS17では、予測電力量と予測発電量とに基づいて、予測蓄電量を決定し、予測消費スケジュールと予測発電スケジュールとに基づいて、充放電計画を決定し、本フローを終了する。予測蓄電量を決定するために、前述したように先ず不足量を算出する。不足量は、予測電力量が予測発電量より大きい場合、予測電力量と予測発電量の差によって算出される。次に、設備用蓄電池23の限界蓄電量が不足量以上の場合には、不足量を予測蓄電量に設定し、限界蓄電量が不足量未満の場合には限界蓄電量を予測蓄電量に設定する。同様に、充放電計画を決定するために、予測消費スケジュールと予測発電スケジュールとを用い、時間毎の過不足量を算出する。時間毎の過不足量は、各スケジュールにおける同時間帯の予測電力量が同時間帯の予測発電量との差によって算出され、予測発電量が多い場合には正(プラス)の値とし、予測電力量が多い場合には負(マイナス)の値とし、時間の推移とともに算出する。   In step S17, a predicted power storage amount is determined based on the predicted power amount and the predicted power generation amount, a charge / discharge plan is determined based on the predicted consumption schedule and the predicted power generation schedule, and this flow ends. In order to determine the predicted power storage amount, the shortage amount is first calculated as described above. The shortage amount is calculated by the difference between the predicted power amount and the predicted power generation amount when the predicted power amount is larger than the predicted power generation amount. Next, when the limit storage amount of the facility storage battery 23 is not less than the shortage amount, the shortage amount is set as the predicted storage amount, and when the limit storage amount is less than the shortage amount, the limit storage amount is set as the predicted storage amount. To do. Similarly, in order to determine a charge / discharge plan, an excess / deficiency for each hour is calculated using a predicted consumption schedule and a predicted power generation schedule. The amount of excess or deficiency per hour is calculated based on the difference between the predicted power generation amount for the same time period in each schedule and the predicted power generation amount for the same time period. When the amount of electric power is large, the value is negative (minus) and is calculated with time.

このような深夜充電処理によって、深夜時間帯に蓄電すべき蓄電量として予測蓄電量が設定される。これによって充放電計画制御部50は、深夜時間帯に蓄電量が予測蓄電量になるように、各部を制御する。また翌日の充放電計画が設定される。本フローは、23時に実行される処理であるが、天候予測は逐次変化するものであるので、深夜時間帯に定期的に実行して、予測蓄電量を適宜更新設定してもよい。   By such a midnight charging process, a predicted power storage amount is set as a power storage amount to be stored in the midnight time zone. As a result, the charge / discharge plan control unit 50 controls each unit so that the storage amount becomes the predicted storage amount in the midnight time zone. The next day's charge / discharge plan is set. This flow is a process executed at 23:00, but since the weather prediction changes sequentially, it may be executed periodically in the midnight time zone to update and set the predicted power storage amount as appropriate.

次に、充放電計画制御部50による昼間時間帯(たとえば7時から23時)の制御に関して説明する。図3は、充放電計画制御部50の昼間電力処理を示すフローチャートである。図3に示すフローは、充放電計画制御部50が電源投入状態において実行される。   Next, the control in the daytime time zone (for example, from 7 o'clock to 23 o'clock) by the charge / discharge plan control unit 50 will be described. FIG. 3 is a flowchart showing the daytime power processing of the charge / discharge plan control unit 50. The flow shown in FIG. 3 is executed when the charge / discharge plan control unit 50 is in a power-on state.

フローが開始されると、ステップS21では、現在時刻が比較時刻になったか否かが判定される。そして、比較時刻であれば、ステップS22に進み、比較時刻でなければステップS21の処理を繰返す。比較時刻は、定期的または不定期な間隔をあけた時刻であり、たとえば午前7時から30分毎の時刻、および1時間毎の時刻が比較時刻である。   When the flow is started, in step S21, it is determined whether or not the current time is the comparison time. If it is the comparison time, the process proceeds to step S22, and if it is not the comparison time, the process of step S21 is repeated. The comparison time is a time at regular or irregular intervals. For example, a time every 30 minutes from 7:00 am and a time every hour are the comparison time.

ステップS22では、検出した使用電力量の履歴、検出した太陽光発電量の履歴、蓄電量の推移、予測消費スケジュール、予測発電スケジュール、および充放電計画などの各種データを読み込む処理を実行し、ステップS23に移る。   In step S22, a process of reading various data such as a history of detected power consumption, a history of detected photovoltaic power generation, a transition of power storage, a predicted consumption schedule, a predicted power generation schedule, and a charge / discharge plan is executed. The process moves to S23.

ステップS23では、読み込んだデータのうち、実測値と予測値との比較し、その差を算出して、ステップS24に移る。実測値は蓄電量の推移であり、予測値は充放電計画の値である。   In step S23, the measured value and the predicted value are compared among the read data, the difference is calculated, and the process proceeds to step S24. The actually measured value is the transition of the amount of stored electricity, and the predicted value is the value of the charge / discharge plan.

ステップS24では、算出した差が許容値内であるか否かを判断し、許容値内である場合には、予測が当たっているとして本フローを終了する。許容値内でなく許容値を超えた場合には、予測が外れたとして、ステップS25に移る。許容値は、適宜設定される値であり、誤差範囲と同義である。   In step S24, it is determined whether or not the calculated difference is within the allowable value. If the calculated difference is within the allowable value, it is determined that the prediction is correct, and the flow ends. If the allowable value is exceeded but not within the allowable value, it is determined that the prediction has been lost, and the process proceeds to step S25. The allowable value is a value set as appropriate and is synonymous with the error range.

ステップS25では、予測が外れているので、現在からの深夜電力時間帯までの予測消費スケジュールを再び算出し、ステップS26に移る。予測消費スケジュールの算出は、前述のステップS14と同様の処理である。   In step S25, since the prediction is off, the predicted consumption schedule from the present to the midnight power time zone is calculated again, and the process proceeds to step S26. The calculation of the predicted consumption schedule is the same process as in step S14 described above.

ステップS26では、予測が外れているので、現在からの深夜電力時間帯までの予測発電スケジュールを算出し、ステップS27に移る。予測発電スケジュールの算出は、前述のステップS16と同様の処理である。   In step S26, since the prediction is off, a predicted power generation schedule from the present to the midnight power time zone is calculated, and the process proceeds to step S27. The calculation of the predicted power generation schedule is the same process as in step S16 described above.

ステップS27では、新たに算出した予測消費スケジュールと予測発電スケジュールとに基づいて、充放電計画を新たに決定し、本フローを終了する。充放電計画の算出は、前述のステップS17と同様の処理である。   In step S27, a charge / discharge plan is newly determined based on the newly calculated predicted consumption schedule and predicted power generation schedule, and this flow ends. The calculation of the charge / discharge plan is the same process as in step S17 described above.

このような昼間電力処理によって、予測が外れた場合には、最新の実測値に基づいて充放電計画が決定される。したがって充放電計画は、たとえば供給電力の消費が少なくなるように、太陽光電力の発電量の交流電力線12への供給電力量と設置用蓄電池または車載用蓄電池30への蓄電量との配分、および設置用蓄電池または車載用蓄電池30の配線への供給電力量を決定することができる。   When the prediction is not satisfied by such daytime power processing, the charge / discharge plan is determined based on the latest measured value. Therefore, the charge / discharge plan, for example, distributes the amount of power supplied to the AC power line 12 of the amount of solar power generated and the amount of power stored in the storage battery for installation or in-vehicle storage battery 30 so that the consumption of the supplied power is reduced, and The amount of power supplied to the wiring of the installation storage battery or the in-vehicle storage battery 30 can be determined.

次に、具体的な充放電計画の算出方法に関して説明する。充放電計画は、予め設定される制御モードによって、その結果が異なる。制御モードには、たとえば電力コストを優先するコスト優先モード、二酸化炭素の排出量を最小にするエコモード、および希望電力需要パターンに沿うように制御する一定モードなどがある。   Next, a specific charging / discharging plan calculation method will be described. The result of the charge / discharge plan differs depending on the preset control mode. The control modes include, for example, a cost priority mode that prioritizes power costs, an eco mode that minimizes carbon dioxide emissions, and a constant mode that controls to follow a desired power demand pattern.

先ず、コスト優先モードに関して説明する。コスト優先モードは、検出された使用電力量よりも発電量が多い時には、太陽光電力の電力系統への逆潮流量が多くなるように制御する。ここで単位時間当たりの外部電力系統11に対する電力需要をWu、発電システム40の発電量をWp、電気負荷13の消費電力量をWc、設備用蓄電池23および車載用蓄電池30への蓄電量をWbとすると、
Wu+Wp=Wc+Wb …(式1)
で表される。ただし、Wb>0で充電、Wb<0で放電を表す。
First, the cost priority mode will be described. In the cost priority mode, when the power generation amount is larger than the detected power consumption amount, control is performed so that the reverse power flow rate of the solar power to the power system increases. Here, the power demand for the external power system 11 per unit time is Wu, the power generation amount of the power generation system 40 is Wp, the power consumption amount of the electric load 13 is Wc, and the power storage amount to the facility storage battery 23 and the in-vehicle storage battery 30 is Wb. Then,
Wu + Wp = Wc + Wb (Formula 1)
It is represented by However, Wb> 0 represents charging, and Wb <0 represents discharging.

電力コストCは、当該時間の電力単価をP(t)、蓄電池の充電量をB(t)とすると、
C=ΣWu(t)・P(t)
=Σ(Wc(t)−Wp(t)+Wb(t))・P(t) …(式2)
ここで、
B(t)=B(t−1)+Wb(t) …(式3)
ただし、
B(t)≧0 …(式4)
となる。充放電計画を決定するときには、Wc(t)とWp(t)の予測結果から電力コストCが最小になるようなWb(t)を求める。
The power cost C is P (t) for the unit price of power for the time and B (t) for the charge amount of the storage battery.
C = ΣWu (t) · P (t)
= Σ (Wc (t) −Wp (t) + Wb (t)) · P (t) (Formula 2)
here,
B (t) = B (t−1) + Wb (t) (Formula 3)
However,
B (t) ≧ 0 (Formula 4)
It becomes. When determining the charge / discharge plan, Wb (t) that minimizes the power cost C is obtained from the prediction results of Wc (t) and Wp (t).

消費電力Wc(t)の予測および発電量Wp(t)の予測は、前述のように図2および図3に示すフローにて予め行われている。   The prediction of the power consumption Wc (t) and the prediction of the power generation amount Wp (t) are performed in advance in the flow shown in FIGS. 2 and 3 as described above.

したがって図3に示すように、比較時間毎に消費電力および発電量を実測し、予測値の結果と比較し、この差分情報を用いて差分をいわば補正するように予測結果を更新する。これによって最新の情報を反映して、充放電計画を決定することができる。したがって電力コストCが最小、すなわち系統電力からの供給電力量が最小となるように制御することができる。   Therefore, as shown in FIG. 3, the power consumption and the power generation amount are measured at each comparison time, compared with the result of the predicted value, and the prediction result is updated so as to correct the difference using this difference information. This makes it possible to determine the charge / discharge plan reflecting the latest information. Therefore, control can be performed so that the power cost C is minimized, that is, the amount of power supplied from the system power is minimized.

次に、一定モードに関して説明する。一定モードでは、電力会社が希望する希望電力需要パターンと発電システム40の発電量の予測とに基づいて、希望電力需要パターン(補正消費スケジュール)に沿うように設備用蓄電池23および車載用蓄電池30への充電を計画する。たとえば検出された消費電力量(使用電力量)よりも太陽光発電量が少ない時には、予測消費スケジュールを供給電力の消費を抑制するように予め設定された希望電力需要パターンに設定する。   Next, the fixed mode will be described. In the fixed mode, based on the desired power demand pattern desired by the power company and the prediction of the power generation amount of the power generation system 40, the facility storage battery 23 and the in-vehicle storage battery 30 are aligned with the desired power demand pattern (corrected consumption schedule). Plan for charging. For example, when the amount of photovoltaic power generation is less than the detected power consumption (power consumption), the predicted consumption schedule is set to a desired power demand pattern that is set in advance so as to suppress the consumption of the supplied power.

希望電力需要パターンは、Wu(t)(t=0,1,2,…23)のようなパターンで供給側より需要側に外部情報70として充放電計画制御部50に予め配信される。ここで
Wu’(t)=Wc(t)−Wp(t)+Wb(t) …(式5)
で表される。
The desired power demand pattern is distributed in advance to the charge / discharge plan control unit 50 as external information 70 from the supply side to the demand side in a pattern such as Wu (t) (t = 0, 1, 2,... 23). Where Wu ′ (t) = Wc (t) −Wp (t) + Wb (t) (Formula 5)
It is represented by

Wc(t)とWp(t)との予測結果から、Wu’(t)が希望に合うようにWb(t)を制御する。ここで希望に合うようにという意味は、たとえば
Σ(Wu(t)−Wu’(t))
を最小にする。
From the prediction results of Wc (t) and Wp (t), Wb (t) is controlled so that Wu ′ (t) meets the request. Here, for example, Σ (Wu (t) −Wu ′ (t)) 2
To minimize.

これによって前述のコスト優先モードと同様に、最新の情報を反映して、希望電力需要パターンに沿うように設備用蓄電池23および車載用蓄電池30への充放電計画を決定することができる。したがって充放電計画制御部50は、供給側の平準化、需要側のピークカットなど目的を最大化するための設備内蓄電池への充電計画を生成することができる。   As a result, similar to the above-described cost priority mode, the latest information is reflected, and the charge / discharge plan for the facility storage battery 23 and the in-vehicle storage battery 30 can be determined so as to follow the desired power demand pattern. Therefore, the charge / discharge plan control unit 50 can generate a charge plan for the storage battery in the facility for maximizing the purpose such as leveling on the supply side and peak cut on the demand side.

以上説明したように本実施形態の電力供給システム10は、予測電力量と予測発電量とを用いて予測蓄電量を設定することによって、特定時間帯である深夜時間帯における蓄電量を最小化することができる。これによって設備用蓄電池23に余剰分となるような電力が蓄電されることが防止され、電力コストを低減することができる。予測が外れるときもあるので、予測が外れた場合の制御が必要である。そこで本実施形態では、図3のステップS23に示すように、実測値と予測値とを比較し、その差が許容値を超えた時、供給電力の消費が少なくなるように、太陽光電力の発電量の配線への供給電力量と設備用蓄電池23および車載用蓄電池30への蓄電量との配分、および設備用蓄電池23および車載用蓄電池30の配線への供給電力量を決定するように、充放電計画制御部50によって制御される。比較することによって、予測が外れた時、すなわち実測値と予測値との差が許容値を超えた時がわかる。このような許容値を超えた時に、供給電力の消費が少なくなるように、発電量の配分、設備用蓄電池23および車載用蓄電池30から配線への供給電力量を決定する。したがって予測が外れた時であっても、供給電力の消費を少なくするように充放電計画を修正することができる。これによって消費電力量および太陽光発電量を予測し、予測と実際の値が異なっていた場合であっても、太陽光発電量を有効に利用することができる電力供給システム10を実現することができる。また二酸化炭素を発生しない発電方法によって発電された太陽光電力量を有効に利用することによって、二酸化炭素の発生を抑制することができる。   As described above, the power supply system 10 of the present embodiment minimizes the amount of power stored in the midnight time zone, which is a specific time zone, by setting the predicted power storage amount using the predicted power amount and the predicted power generation amount. be able to. As a result, the power storage battery 23 is prevented from storing excessive power, and the power cost can be reduced. Since there are times when the prediction is off, control is required when the prediction is off. Therefore, in this embodiment, as shown in step S23 of FIG. 3, the measured value is compared with the predicted value, and when the difference exceeds the allowable value, the consumption of the solar power is reduced so that the consumption of the supplied power is reduced. In order to determine the distribution of the amount of power supplied to the wiring of the power generation amount and the amount of power stored in the facility storage battery 23 and the vehicle storage battery 30 and the amount of power supplied to the wiring of the facility storage battery 23 and the vehicle storage battery 30, It is controlled by the charge / discharge plan control unit 50. By comparing, it is possible to know when the prediction is lost, that is, when the difference between the actually measured value and the predicted value exceeds the allowable value. When such an allowable value is exceeded, the amount of power generation, the amount of power supplied to the wiring from the facility storage battery 23 and the in-vehicle storage battery 30 are determined so that the consumption of the supplied power is reduced. Therefore, even when the prediction is wrong, the charge / discharge plan can be corrected so as to reduce the consumption of the supplied power. Thus, it is possible to predict the power consumption and the amount of photovoltaic power generation, and to realize the power supply system 10 that can effectively use the amount of photovoltaic power generation even when the actual value differs from the predicted value. it can. Moreover, generation | occurrence | production of a carbon dioxide can be suppressed by utilizing effectively the solar energy generated with the power generation method which does not generate a carbon dioxide.

換言すると、本実施形態の電力供給システム10において、発電予測、電力需要予測に基づいて、設備内蓄電池への充電を計画する。計画は、系統電力の需要側ピークカット、系統電力の平準化などの目的に応じて決められる。これらの目的を満たすように制御しながら、リアルタイムで電力消費量、発電量を観測し、発電量、需要量を予測値とのずれを計測する。そして予測値とのずれを補正するように設備内蓄電池への充電計画を更新し、充電制御する。系統電力からの充電を効率的に管理することにより、地域全体での電力の効率的運用を可能にすることができる。   In other words, in the power supply system 10 of the present embodiment, the charging of the storage battery in the facility is planned based on the power generation prediction and the power demand prediction. The plan is determined according to the purpose such as demand-side peak cut of system power and leveling of system power. While controlling so as to satisfy these purposes, the power consumption and the power generation amount are observed in real time, and the deviation of the power generation amount and the demand amount from the predicted value is measured. Then, the charging plan for the storage battery in the facility is updated so as to correct the deviation from the predicted value, and charging control is performed. By efficiently managing charging from the grid power, it is possible to efficiently operate power throughout the region.

さらに換言すると、本実施形態の電力供給システム10は、設備内蓄電池の充電電流量を制御できるという点に着目し、電力の需要予測、発電予測から、蓄電量を制御する。そしてリアルタイムで消費電力および発電量を測定し、予測結果の誤差を補正するように計画を更新していく。   In other words, the power supply system 10 of the present embodiment pays attention to the fact that the charge current amount of the storage battery in the facility can be controlled, and controls the storage amount from the power demand prediction and the power generation prediction. Then, the power consumption and the amount of power generation are measured in real time, and the plan is updated to correct the error in the prediction result.

また本実施形態では、実測値と予測値との差が許容値を超えた時には、いわゆるコスト優先モードとして、供給電力の消費が最小であり、かつ太陽光電力の電力系統への逆潮流量が多くなるように、各部が充放電計画制御部50によって制御される。したがって予測が外れた時であって、たとえば消費電力量よりも発電量に余裕があるときには、供給電力の利用を抑制することができるので、供給電力の消費を最小となるように制御することによって、電力コストを低減することができる。また逆潮流量を多くすることによって、収益を得ることができ、さらに電力コストを低減することができる。   Further, in the present embodiment, when the difference between the actual measurement value and the predicted value exceeds the allowable value, the so-called cost priority mode is set such that the consumption of the supplied power is minimum and the reverse power flow to the power system of solar power is Each part is controlled by the charge / discharge plan control part 50 so that it may increase. Therefore, when it is out of prediction, for example, when there is a margin in the amount of power generation than the amount of power consumption, the use of the supplied power can be suppressed, so by controlling the consumption of the supplied power to the minimum , Power cost can be reduced. Further, by increasing the reverse flow rate, it is possible to obtain a profit and further reduce the power cost.

さらに本実施形態では、実測値と予測値との差が大きい時には、供給電力の消費が一定になるように、各部が充放電計画制御部50によって制御される。供給電力の消費が補正消費スケジュールである希望電力需要パターンになるように制御されるので、建物毎または地域毎に希望電力需要パターンを設定することによって、供給電力の消費がある時間に集中することを防止することができる。これによって電力供給元から各建物への電力供給が不足することを抑制することができる。   Furthermore, in this embodiment, when the difference between the actual measurement value and the predicted value is large, each unit is controlled by the charge / discharge plan control unit 50 so that the consumption of the supplied power becomes constant. Since the power consumption is controlled so that the desired power demand pattern, which is the corrected consumption schedule, is set, the desired power demand pattern is set for each building or region, so that the power consumption is concentrated at a certain time. Can be prevented. This can suppress the shortage of power supply from the power supply source to each building.

さらに本実施形態では、充放電計画制御部50は、実測値と予測値との差が許容値を越えた時には、図3のステップS27に示すように、充放電計画を新たに算出する。そして記憶手段には、充放電計画が算出される毎に、算出された充放電計画が記憶される。したがって記憶手段には、最新の充放電計画が記憶されている。そして充放電計画制御部50は、比較するときには記憶手段に記憶される最新の充放電計画を用いる。したがって予測が適宜修正されるので、予測が外れる確率を少なくすることができる。したがって好適な消費および充電計画を実行することができる。   Further, in the present embodiment, when the difference between the actual measurement value and the predicted value exceeds the allowable value, the charge / discharge plan control unit 50 newly calculates the charge / discharge plan as shown in step S27 of FIG. The storage unit stores the calculated charge / discharge plan every time the charge / discharge plan is calculated. Therefore, the latest charge / discharge plan is stored in the storage means. And the charging / discharging plan control part 50 uses the newest charging / discharging plan memorize | stored in a memory | storage means, when comparing. Therefore, since the prediction is appropriately corrected, the probability that the prediction is lost can be reduced. A suitable consumption and charging plan can thus be implemented.

(その他の実施形態)
以上、本発明の好ましい実施形態について説明したが、本発明は上述した実施形態に何ら制限されることなく、本発明の主旨を逸脱しない範囲において種々変形して実施することが可能である。
(Other embodiments)
The preferred embodiments of the present invention have been described above, but the present invention is not limited to the above-described embodiments, and various modifications can be made without departing from the spirit of the present invention.

前述の第1実施形態では、充放電計画を算出しているが、充放電計画を算出することなく、予測消費スケジュールと検出された消費電力量とを比較し、予測消費スケジュールと検出された消費電力量との差が許容値を超えた時、または予測発電スケジュールと検出された発電量とを比較し、予測発電スケジュールと検出された発電量との差が許容値を超えた時には、供給電力の消費が少なくなるように、太陽光電力の発電量の配線への供給電力量と蓄電手段への蓄電量との配分、および蓄電手段の配線への供給電力量を決定するように制御してもよい。換言すると、充放電計画は、予測消費スケジュールおよび予測消費スケジュールから算出されるものであるので、充放電計画を算出しなくとも同様の処理を実施することができる。   In the first embodiment described above, the charge / discharge plan is calculated, but without calculating the charge / discharge plan, the predicted consumption schedule is compared with the detected power consumption, and the predicted consumption schedule is detected. When the difference between the power generation amount exceeds the allowable value, or when the predicted power generation schedule is compared with the detected power generation amount, and the difference between the predicted power generation schedule and the detected power generation amount exceeds the allowable value, the supplied power Control to determine the distribution of the amount of power supplied to the wiring of the amount of photovoltaic power generation and the amount of power stored in the storage means, and the amount of power supplied to the wiring of the storage means Also good. In other words, since the charge / discharge plan is calculated from the predicted consumption schedule and the predicted consumption schedule, the same processing can be performed without calculating the charge / discharge plan.

また前述の第1実施形態では、比較時間の間隔は一定であったが、一定に限るものではなく、随時比較してもよく、断続的に比較してもよく、不定期に比較してもく、消費電力量が予め定めるしきい値よりも高い場合に比較してもよい。たとえば比較時間は、実測値と予測値との差が許容値を越えてよりも大きくなるにつれて、比較する間隔を小さくするように充放電計画制御部50が制御してもよい。許容値を越えた場合は、より早い時点で修正することが好ましいので、比較する間隔を短くすることによって、早い時点で予測が外れた場合の制御を実施することができる。これによって予測が大きく外れた場合であっても、速やかに対応することができる。換言すると、ずれ補正更新タイミングは、差の変化率をみながら可変とすることが好ましい。   In the first embodiment described above, the comparison time interval is constant. However, the comparison time interval is not limited to a constant value, and may be compared at any time, intermittently, or irregularly. Alternatively, the comparison may be made when the power consumption is higher than a predetermined threshold value. For example, the charge / discharge plan control unit 50 may control the comparison time so that the comparison interval becomes smaller as the difference between the actual measurement value and the predicted value becomes larger than the allowable value. If the allowable value is exceeded, it is preferable to correct it at an earlier time point. Therefore, by shortening the comparison interval, it is possible to perform control when the prediction is lost at an earlier time point. As a result, even when the prediction is greatly deviated, it is possible to respond promptly. In other words, it is preferable that the deviation correction update timing is variable while observing the change rate of the difference.

また前述の第1実施形態では、大気圧センサを用いて大気圧データを取得しているが、インターネットに接続する接続手段を設け、インターネット上から気象庁等による大気圧データを取得し、これを使用するようにしてもよい。また大気圧のデータに限らず、季節、天候および温度の過去のデータと天気予報のデータから
また前述の第1実施形態では、蓄電ユニット20と充電スタンド21とは別体であったが、一体であってもかまわない。蓄電ユニット20と充電スタンド21とが別体の場合には、それぞれのユニットの設置位置の自由度が向上する。一方、蓄電ユニット20と充電スタンド21とが一体の場合には、構成を簡素化することが可能である。
In the first embodiment described above, atmospheric pressure data is acquired using an atmospheric pressure sensor. However, connection means for connecting to the Internet is provided, and atmospheric pressure data obtained by the Japan Meteorological Agency, etc. is acquired from the Internet and used. You may make it do. In addition to the atmospheric pressure data, from the past data of season, weather and temperature and weather forecast data. In the first embodiment described above, the power storage unit 20 and the charging stand 21 are separate. It doesn't matter. In the case where the power storage unit 20 and the charging stand 21 are separate, the degree of freedom of the installation position of each unit is improved. On the other hand, when the power storage unit 20 and the charging stand 21 are integrated, the configuration can be simplified.

また前述の第1実施形態では、定置式の設備用蓄電池23、および、車載用蓄電池30は、いずれも二次電池であったが、これに限定されるものではない。充電可能および放電可能な蓄電手段であればよく、たとえばキャパシタ等を採用することも可能である。   In the first embodiment described above, the stationary storage battery 23 for equipment and the in-vehicle storage battery 30 are both secondary batteries, but are not limited thereto. Any power storage means that can be charged and discharged can be used. For example, a capacitor or the like can be employed.

また前述の第1実施形態では、建物は住宅であったが、これに限定されるものではない。たとえば、建物は、店舗、工場、倉庫等であってもかまわない。   In the first embodiment described above, the building is a house, but the present invention is not limited to this. For example, the building may be a store, a factory, a warehouse, or the like.

また前述の第1実施形態では、特定時間帯は、深夜時間帯(23時から7時の時間帯)であるが、このような時間帯に限るものではなく、電力供給契約によって適宜変更されるものである。また予測する期間は、翌日に限るものではなく、他の予測期間、たとえば現在から数時間などであってもよい。   In the first embodiment described above, the specific time zone is a midnight time zone (a time zone from 23:00 to 7 o'clock). However, the specific time zone is not limited to such a time zone and is appropriately changed according to the power supply contract. Is. Further, the prediction period is not limited to the next day, and may be another prediction period, for example, several hours from now.

また前述の第1実施形態では、車載用蓄電池30を搭載した車両31は電気自動車であったが、これに限定されるものではなく、たとえば、プラグハイブリッド(PHV)自動車であってもかまわない。また、設備用蓄電池23を搭載した車両31であれば、設備用蓄電池23に蓄えた電力を車両31の駆動に用いるものにも限定されるものではない。   In the first embodiment described above, the vehicle 31 on which the in-vehicle storage battery 30 is mounted is an electric vehicle. However, the vehicle 31 is not limited to this, and may be a plug hybrid (PHV) vehicle, for example. In addition, as long as the vehicle 31 is equipped with the facility storage battery 23, the vehicle 31 is not limited to one that uses the power stored in the facility storage battery 23 for driving the vehicle 31.

10…電力供給システム
11…外部電力系統(電力系統)
12…交流電力線(配線)
13…電気負荷
14…消費電力量計測器(消費電力量検出手段)
20…蓄電ユニット
21…充電スタンド
22…蓄電池用電力制御回路
23…設備用蓄電池(蓄電手段)
24…充放電制御回路
30…車載用蓄電池(蓄電手段)
31…車両
40…発電システム(太陽光発電手段)
41…発電用電力制御回路
42…発電量計測器(発電量検出手段)
50…充放電計画制御部(消費制御手段,予測量算出手段,蓄電量設定手段)
10 ... Power supply system 11 ... External power system (power system)
12 ... AC power line (wiring)
13 ... Electric load 14 ... Power consumption meter (Power consumption detector)
DESCRIPTION OF SYMBOLS 20 ... Power storage unit 21 ... Charging stand 22 ... Power control circuit for storage batteries 23 ... Storage battery for facilities (power storage means)
24 ... Charge / discharge control circuit 30 ... Vehicle storage battery (power storage means)
31 ... Vehicle 40 ... Power generation system (photovoltaic power generation means)
41 ... Power control circuit for power generation 42 ... Power generation amount measuring device (power generation amount detecting means)
50. Charge / discharge plan control unit (consumption control means, predicted amount calculation means, storage amount setting means)

Claims (5)

電力供給契約に基づいて電力供給元の電力系統(11)から建物に供給される供給電力を、配線(12)に接続された電気負荷(13)および蓄電手段(23,30)に給電可能な電力供給システム(10)であって、
太陽光によって発電を行う太陽光発電手段(40)と、
前記建物の前記配線に接続され、前記太陽光発電手段によって発電された太陽光電力および前記電力系統から供給される前記供給電力を充電可能であるとともに、蓄電された電力を前記配線へ放電可能な蓄電手段(23,30)と、
前記電力系統から供給される前記供給電力の消費を制御するとともに、前記太陽光電力の消費を、前記蓄電手段への蓄電による消費と、前記電気負荷による消費と、前記電力系統への逆潮流による消費とで制御する消費制御手段(50)と、
前記電気負荷の使用履歴に基づいて算出される予測期間の前記電気負荷の予測電力量、前記算出される前記予測期間における前記電気負荷の前記予測電力量の時間毎の推移を示す予測消費スケジュール、天候予測によって予測される前記予測期間の前記太陽光発電手段の予測発電量、および前記予測される前記予測期間における前記予測発電量の時間毎の推移を示す予測発電スケジュールを算出する予測量算出手段(50)と、
前記予測電力量が前記予測発電量よりも大きい場合、前記予測電力量と前記予測発電量の差である不足量を算出し、前記蓄電手段に蓄電される上限量である限界蓄電量が前記不足量以上の場合には、前記不足量を前記蓄電手段の蓄電後に蓄えられる量である予測蓄電量に設定し、前記限界蓄電量が前記不足量未満の場合には前記限界蓄電量を前記予測蓄電量に設定する蓄電量設定手段(50)と、
前記電気負荷における消費電力量を検出する消費電力量検出手段(14)と、
前記太陽光発電手段における発電量を検出する発電量検出手段(42)と、を含み、
前記消費制御手段は、
前記電力供給契約に基づいて定まる他の時間帯より電力コストが安価な特定時間帯において、前記蓄電手段の蓄電量が設定された前記予測蓄電量になるまで前記供給電力によって蓄電するように制御し、
前記予測消費スケジュールと前記検出された消費電力量とを比較し、前記予測消費スケジュールと前記検出された消費電力量との差が許容値を超えた時、または前記予測発電スケジュールと前記検出された発電量とを比較し、前記予測発電スケジュールと前記検出された発電量との差が許容値を超えた時には、前記供給電力の消費が少なくなるように、前記太陽光電力の発電量の前記配線への供給電力量と前記蓄電手段への蓄電量との配分、および前記蓄電手段の前記配線への供給電力量を決定することを特徴とする電力供給システム。
Based on the power supply contract, the supply power supplied to the building from the power system (11) of the power supply source can be supplied to the electrical load (13) and the storage means (23, 30) connected to the wiring (12) A power supply system (10),
Solar power generation means (40) for generating power by sunlight;
The solar power generated by the solar power generation means connected to the wiring of the building and the supply power supplied from the power system can be charged, and the stored power can be discharged to the wiring. Power storage means (23, 30);
While controlling the consumption of the supplied power supplied from the electric power system, the consumption of the solar power is caused by the electric power consumption in the electric power storage means, the electric load, and the reverse power flow to the electric power system. Consumption control means (50) for controlling by consumption;
A predicted consumption schedule indicating the predicted power consumption of the electrical load in the prediction period calculated based on the usage history of the electrical load, the hourly transition of the predicted power consumption of the electrical load in the calculated prediction period, Predicted power generation means for calculating a predicted power generation schedule of the predicted power generation amount of the photovoltaic power generation means in the prediction period predicted by weather prediction and the hourly transition of the predicted power generation amount in the predicted prediction period (50),
When the predicted power amount is larger than the predicted power generation amount, a shortage amount that is a difference between the predicted power amount and the predicted power generation amount is calculated, and a limit power storage amount that is an upper limit amount stored in the power storage unit is not enough. When the amount is not less than the amount, the shortage amount is set to a predicted amount of electricity that is stored after the electricity storage unit stores electricity, and when the limit amount of electricity is less than the shortage amount, the limit amount of electricity stored is the predicted amount of electricity stored. A storage amount setting means (50) for setting the amount;
Power consumption detection means (14) for detecting power consumption in the electric load;
A power generation amount detection means (42) for detecting a power generation amount in the solar power generation means,
The consumption control means includes
In a specific time zone where the power cost is cheaper than other time zones determined based on the power supply contract, control is performed so that power is stored by the supplied power until the power storage amount of the power storage means reaches the set predicted power storage amount. ,
The predicted consumption schedule and the detected power consumption are compared, and when the difference between the predicted consumption schedule and the detected power consumption exceeds an allowable value, or the predicted power generation schedule and the detected power consumption When the difference between the predicted power generation schedule and the detected power generation amount exceeds an allowable value, the wiring of the solar power generation amount is reduced so that the consumption of the supplied power is reduced. A power supply system that determines the distribution of the amount of power supplied to the power storage unit and the amount of power stored in the power storage unit, and the amount of power supplied to the wiring of the power storage unit.
前記消費制御手段は、前記予測消費スケジュールと前記検出された消費電力量との差が許容値を超えた時、または前記予測発電スケジュールと前記検出された発電量との差が許容値を超えた時であって、検出された前記消費電力量よりも前記発電量が多い時には、前記太陽光電力の前記電力系統への逆潮流量が多くなるように、前記太陽光電力の発電量の前記配線への供給電力量と前記蓄電手段への蓄電量との配分、および前記蓄電手段の前記配線への供給電力量を決定することを特徴とする請求項1に記載の電力供給システム。   When the difference between the predicted consumption schedule and the detected power consumption exceeds an allowable value, or the difference between the predicted power generation schedule and the detected power generation exceeds an allowable value. When the power generation amount is larger than the detected power consumption amount, the wiring of the solar power generation amount is so that the reverse power flow of the solar power to the power system increases. 2. The power supply system according to claim 1, wherein the distribution of the amount of power supplied to the power storage unit and the amount of power stored in the power storage unit and the amount of power supplied to the wiring of the power storage unit are determined. 前記消費制御手段は、前記予測消費スケジュールと前記検出された消費電力量との差が許容値を超えた時、または前記予測発電スケジュールと前記検出された発電量との差が許容値を超えた時であって、検出された前記消費電力量よりも前記発電量が少ない時には、前記予測消費スケジュールを前記供給電力の消費を抑制するように予め設定された補正消費スケジュールに設定することを特徴とする請求項1に記載の電力供給システム。   When the difference between the predicted consumption schedule and the detected power consumption exceeds an allowable value, or the difference between the predicted power generation schedule and the detected power generation exceeds an allowable value. When the power generation amount is smaller than the detected power consumption amount, the predicted consumption schedule is set to a correction consumption schedule set in advance so as to suppress the consumption of the supplied power. The power supply system according to claim 1. 前記予測量算出手段によって前記予測消費スケジュールと前記予測発電スケジュールとが算出される毎に、前記算出された前記予測消費スケジュールと前記予測発電スケジュールとを記憶する記憶手段をさらに含み、
前記予測量算出手段は、
前記予測消費スケジュールと前記検出された消費電力量との差が許容値を越えた時には、前記予測消費スケジュールを新たに算出し、
前記予測発電スケジュールと前記検出された発電量との差が許容値を越えた時には、前記予測発電スケジュールを新たに算出し、
前記消費制御手段は、前記比較するときには前記記憶手段に記憶される最新の前記予測消費スケジュールと前記予測発電スケジュールとを用いることを特徴とする請求項1〜3のいずれか1つに記載の電力供給システム。
A storage unit that stores the calculated predicted consumption schedule and the predicted power generation schedule each time the predicted consumption schedule and the predicted power generation schedule are calculated by the predicted amount calculation unit;
The predicted amount calculation means includes
When the difference between the predicted consumption schedule and the detected power consumption exceeds an allowable value, the predicted consumption schedule is newly calculated,
When the difference between the predicted power generation schedule and the detected power generation amount exceeds an allowable value, the predicted power generation schedule is newly calculated,
The power according to any one of claims 1 to 3, wherein the consumption control means uses the latest predicted consumption schedule and the predicted power generation schedule stored in the storage means when performing the comparison. Supply system.
前記消費制御手段は、定期的に前記比較をし、前記予測消費スケジュールと前記検出された消費電力量との差、および前記予測発電スケジュールと前記検出された発電量との差の少なくともいずれか一方が前記許容値を越えて大きくなるにつれて、前記比較する間隔を小さくするように制御することを特徴とする請求項1〜4のいずれか1つに記載の電力供給システム。   The consumption control means periodically performs the comparison, and at least one of a difference between the predicted consumption schedule and the detected power consumption, and a difference between the predicted power generation schedule and the detected power generation 5. The power supply system according to claim 1, wherein control is performed such that the comparison interval decreases as the value increases beyond the allowable value. 6.
JP2011082956A 2011-04-04 2011-04-04 Power supply system Active JP5686024B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011082956A JP5686024B2 (en) 2011-04-04 2011-04-04 Power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011082956A JP5686024B2 (en) 2011-04-04 2011-04-04 Power supply system

Publications (2)

Publication Number Publication Date
JP2012222860A true JP2012222860A (en) 2012-11-12
JP5686024B2 JP5686024B2 (en) 2015-03-18

Family

ID=47273831

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011082956A Active JP5686024B2 (en) 2011-04-04 2011-04-04 Power supply system

Country Status (1)

Country Link
JP (1) JP5686024B2 (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013190603A1 (en) * 2012-06-18 2013-12-27 日立コンシューマエレクトロニクス株式会社 Electric device control system
WO2014080667A1 (en) * 2012-11-21 2014-05-30 株式会社 東芝 Energy management system, energy management method, program, server device, and local server
JP2014236541A (en) * 2013-05-31 2014-12-15 株式会社Nttドコモ Control device, program
KR101474296B1 (en) 2013-06-04 2014-12-18 에이피전자산업 주식회사 Energy storage system for power plant and the control method thereof
WO2014208059A1 (en) * 2013-06-27 2014-12-31 パナソニック株式会社 Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
JP2015023605A (en) * 2013-07-16 2015-02-02 大阪瓦斯株式会社 Charging control device and power supply system
WO2015019584A1 (en) * 2013-08-09 2015-02-12 パナソニックIpマネジメント株式会社 Power adjustment device, power adjustment method, and program
WO2015019585A1 (en) * 2013-08-09 2015-02-12 パナソニックIpマネジメント株式会社 Power adjustment device, power adjustment method, and program
KR101529294B1 (en) * 2014-12-15 2015-06-19 주식회사 파워이십일 Power management system for controlling energy storage system
JP2015142460A (en) * 2014-01-29 2015-08-03 京セラ株式会社 Power control device, power control system, and power control method
JP2015211516A (en) * 2014-04-25 2015-11-24 富士電機株式会社 Charge/discharge control system for power storage device
JP2016082610A (en) * 2014-10-10 2016-05-16 株式会社デンソー Storage battery device
WO2016166836A1 (en) * 2015-04-15 2016-10-20 三菱電機株式会社 Equipment management apparatus, equipment management system, equipment management method, and program
JP2017034855A (en) * 2015-07-31 2017-02-09 パナソニックIpマネジメント株式会社 Group control method and group control device
JP2017050903A (en) * 2015-08-31 2017-03-09 シャープ株式会社 Energy management system, energy management apparatus, and energy management method
JP2017060398A (en) * 2014-02-27 2017-03-23 三菱重工業株式会社 Charge equipment management system, on-vehicle equipment and electric automobile
US9727929B2 (en) 2012-11-21 2017-08-08 Kabushiki Kaisha Toshiba Energy management system, energy management method, program, server apparatus, and local server
WO2017212506A1 (en) * 2016-06-07 2017-12-14 Nec Corporation Energy management system, guide server and energy management method
KR20180016015A (en) * 2016-08-05 2018-02-14 엘지전자 주식회사 Control device of home energy management system and control system including same
KR20180016014A (en) * 2016-08-05 2018-02-14 엘지전자 주식회사 Control device of home energy management system and method for operating thereof
JP2019030136A (en) * 2017-07-31 2019-02-21 Kddi株式会社 Charge control server, charge control system and program
JP2020178472A (en) * 2019-04-19 2020-10-29 株式会社豊田自動織機 In-facility charge/discharge control system
JP2021023024A (en) * 2019-07-26 2021-02-18 シャープ株式会社 Power storage control device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007295680A (en) * 2006-04-24 2007-11-08 Matsushita Electric Ind Co Ltd Load control device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007295680A (en) * 2006-04-24 2007-11-08 Matsushita Electric Ind Co Ltd Load control device

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013190603A1 (en) * 2012-06-18 2013-12-27 日立コンシューマエレクトロニクス株式会社 Electric device control system
WO2014080667A1 (en) * 2012-11-21 2014-05-30 株式会社 東芝 Energy management system, energy management method, program, server device, and local server
JP2014103811A (en) * 2012-11-21 2014-06-05 Toshiba Corp Energy management system, energy management method, program, server device, and local server
US9727929B2 (en) 2012-11-21 2017-08-08 Kabushiki Kaisha Toshiba Energy management system, energy management method, program, server apparatus, and local server
EP2924838A4 (en) * 2012-11-21 2016-11-16 Toshiba Kk Energy management system, energy management method, program, server device, and local server
JP2014236541A (en) * 2013-05-31 2014-12-15 株式会社Nttドコモ Control device, program
KR101474296B1 (en) 2013-06-04 2014-12-18 에이피전자산업 주식회사 Energy storage system for power plant and the control method thereof
EP3016229A4 (en) * 2013-06-27 2016-05-04 Panasonic Corp Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
WO2014208059A1 (en) * 2013-06-27 2014-12-31 パナソニック株式会社 Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
US10338622B2 (en) 2013-06-27 2019-07-02 Panasonic Corporation Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
JPWO2014208059A1 (en) * 2013-06-27 2017-02-23 パナソニック株式会社 Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
JP2015023605A (en) * 2013-07-16 2015-02-02 大阪瓦斯株式会社 Charging control device and power supply system
JP2015035917A (en) * 2013-08-09 2015-02-19 パナソニックIpマネジメント株式会社 Electric power regulator, electric power regulating method, and program
US10453154B2 (en) 2013-08-09 2019-10-22 Panasonic Intellectual Property Management Co., Ltd. Power adjustment system, power adjustment method, and computer program
US10339602B2 (en) 2013-08-09 2019-07-02 Panasonic Intellectual Property Management Co., Ltd. Power adjustment system, power adjustment method, and computer program
WO2015019584A1 (en) * 2013-08-09 2015-02-12 パナソニックIpマネジメント株式会社 Power adjustment device, power adjustment method, and program
WO2015019585A1 (en) * 2013-08-09 2015-02-12 パナソニックIpマネジメント株式会社 Power adjustment device, power adjustment method, and program
JPWO2015019584A1 (en) * 2013-08-09 2017-03-02 パナソニックIpマネジメント株式会社 Power adjustment apparatus, power adjustment method, and program
JP2015142460A (en) * 2014-01-29 2015-08-03 京セラ株式会社 Power control device, power control system, and power control method
JP2017060398A (en) * 2014-02-27 2017-03-23 三菱重工業株式会社 Charge equipment management system, on-vehicle equipment and electric automobile
JP2015211516A (en) * 2014-04-25 2015-11-24 富士電機株式会社 Charge/discharge control system for power storage device
US10084314B2 (en) 2014-10-10 2018-09-25 Denso Corporation Storage battery equipment
JP2016082610A (en) * 2014-10-10 2016-05-16 株式会社デンソー Storage battery device
KR101529294B1 (en) * 2014-12-15 2015-06-19 주식회사 파워이십일 Power management system for controlling energy storage system
WO2016166836A1 (en) * 2015-04-15 2016-10-20 三菱電機株式会社 Equipment management apparatus, equipment management system, equipment management method, and program
JP2017034855A (en) * 2015-07-31 2017-02-09 パナソニックIpマネジメント株式会社 Group control method and group control device
JP2017050903A (en) * 2015-08-31 2017-03-09 シャープ株式会社 Energy management system, energy management apparatus, and energy management method
WO2017212506A1 (en) * 2016-06-07 2017-12-14 Nec Corporation Energy management system, guide server and energy management method
JP2019520032A (en) * 2016-06-07 2019-07-11 日本電気株式会社 Energy management system, guide server and energy management method
KR20180016014A (en) * 2016-08-05 2018-02-14 엘지전자 주식회사 Control device of home energy management system and method for operating thereof
KR20180016015A (en) * 2016-08-05 2018-02-14 엘지전자 주식회사 Control device of home energy management system and control system including same
KR102625321B1 (en) * 2016-08-05 2024-01-15 엘지전자 주식회사 Control device of home energy management system and method for operating thereof
KR102625322B1 (en) * 2016-08-05 2024-01-15 엘지전자 주식회사 Control device of home energy management system and control system including same
JP2019030136A (en) * 2017-07-31 2019-02-21 Kddi株式会社 Charge control server, charge control system and program
JP2020178472A (en) * 2019-04-19 2020-10-29 株式会社豊田自動織機 In-facility charge/discharge control system
JP2021023024A (en) * 2019-07-26 2021-02-18 シャープ株式会社 Power storage control device
JP7353096B2 (en) 2019-07-26 2023-09-29 シャープ株式会社 Power storage control device

Also Published As

Publication number Publication date
JP5686024B2 (en) 2015-03-18

Similar Documents

Publication Publication Date Title
JP5686024B2 (en) Power supply system
JP5353957B2 (en) Power supply system
JP5672186B2 (en) Power supply system
JP2012175791A (en) Electric power supply system
JP5589890B2 (en) Power supply system
CN103620903B (en) Electric power supply system
JP5877479B2 (en) Power management system, power management method, program
US11271400B2 (en) Power control device, operation plan planning method, and recording medium
JP6107509B2 (en) Charge / discharge management system
US9331512B2 (en) Power control device and power control method for measuring open-circuit voltage of battery
EP2773008A1 (en) Load controller, program, load control system
JP6426922B2 (en) Electric power system, control device and charge / discharge control method
JP2012186950A (en) Electric power supply system
JPWO2015122196A1 (en) Home status determination device, delivery system, home status determination method, home status determination program, and delivery terminal
JP6676477B2 (en) Building power consumption prediction system, power storage device control system, and power storage device control method
CN112449735A (en) Charging/discharging device, charging/discharging system, and charging/discharging control method
JP2018038238A (en) Power control system and power control method
JP2010213507A (en) Natural energy integrated power storage system and natural energy integrated power storage method
US20150127181A1 (en) Energy management device, energy management method and program
JP6664479B2 (en) Control device, power management system, charge / discharge control method and program
JP2020061800A (en) Charging method and control device
JP2017225300A (en) Energy management system
JP2008136259A (en) Network system, power supply system control method of the network system, and control program thereof
JP2019068667A (en) Charge discharge control device
JP7254481B2 (en) power control system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130731

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140428

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140507

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140703

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140924

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141224

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150106

R151 Written notification of patent or utility model registration

Ref document number: 5686024

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250