JP2012202092A - Face containment device - Google Patents

Face containment device Download PDF

Info

Publication number
JP2012202092A
JP2012202092A JP2011067047A JP2011067047A JP2012202092A JP 2012202092 A JP2012202092 A JP 2012202092A JP 2011067047 A JP2011067047 A JP 2011067047A JP 2011067047 A JP2011067047 A JP 2011067047A JP 2012202092 A JP2012202092 A JP 2012202092A
Authority
JP
Japan
Prior art keywords
balloon
tunnel
face
containment device
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011067047A
Other languages
Japanese (ja)
Other versions
JP5662854B2 (en
Inventor
Tomonobu Ishiyama
知伸 石山
Makoto Kobayashi
誠 小林
Akira Nakamura
亮 中村
Masahiko Kobayashi
雅彦 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Toko Inc
Original Assignee
Obayashi Corp
Toko Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Toko Inc filed Critical Obayashi Corp
Priority to JP2011067047A priority Critical patent/JP5662854B2/en
Publication of JP2012202092A publication Critical patent/JP2012202092A/en
Application granted granted Critical
Publication of JP5662854B2 publication Critical patent/JP5662854B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a face containment device for exhausting polluted air while preventing the polluted air generated near a face during constructing a tunnel from spreading into the tunnel.SOLUTION: The face containment device for preventing the spread of polluted air during constructing the tunnel where an exhaust pipe is installed comprises: a balloon formed by a bagged body; and a gate-shaped balloon truck on which the balloon is installed. With air flowing in and out of the bagged body, the expansion and shrinkage of the balloon are controlled. In the state that the balloon expands, the balloon has close contact with the exhaust pipe installed in the tunnel and with the ceiling wall face and the inner wall side face of the tunnel to close openings near the ceiling, side parts and center of the tunnel. Moving means installed on the right and left columns of the balloon truck can move the balloon truck.

Description

本発明は、トンネル工事において切羽付近から発生する汚染空気が、トンネル内に拡散することを防止し、それを排出する切羽封じ込め装置に関する。
The present invention relates to a face containment device that prevents contaminated air generated from the vicinity of a face during tunnel construction from diffusing into the tunnel and discharges it.

トンネル工事では、爆薬による発破や重機による掘削などのさまざまな作業が行われることから、とくに切羽付近では大量の粉塵や、重機の排気ガス、発破によるガスなどの汚染空気が発生する。発生した汚染空気はトンネル内において拡散し、充満するので、速やかにそれを除去・排出することが望まれる。   In tunnel construction, various operations such as blasting with explosives and excavation with heavy machinery are performed, so a large amount of dust, heavy machinery exhaust gas, and polluted air such as gas from blasting are generated, especially near the face. The generated contaminated air diffuses and fills in the tunnel, so it is desirable to remove and discharge it quickly.

そのため、トンネル内に遮蔽物を設けることで、汚染空気を切羽から遮蔽物の間に閉じ込め、集塵機でそれらを除去・排出することが行われている。これらを下記特許文献1乃至特許文献10に示す。   For this reason, by providing a shield in the tunnel, the contaminated air is confined between the shield and the shield, and they are removed and discharged by a dust collector. These are shown in Patent Document 1 to Patent Document 10 below.

特開昭61−294100号公報JP-A 61-294100 実開昭62−172800号公報Japanese Utility Model Publication No. 62-172800 特開平1−239300号公報JP-A-1-239300 実公平3−6719号公報No. 3-6719 実公平3−48320号公報Japanese Utility Model Publication No. 3-48320 特開平10−252400号公報JP-A-10-252400 特開2002−276300号公報JP 2002-276300 A 特開2002−349199号公報JP 2002-349199 A 特開2003−314200号公報JP 2003-314200 A 特開2004−204539号公報JP 2004-204539 A

上記の特許文献1乃至特許文献10に記載の装置、方法では、汚染空気の遮蔽方法として遮蔽カーテンや遮蔽シート、防音壁などを用いている。しかし、上記特許文献に記載の装置、方法の場合、基本的に、トンネル内の所定位置に固定的に設置される。そのため、掘削が進むと、かかる装置を取り外し、新たな位置に再度、固定設置する必要がある。   In the apparatuses and methods described in Patent Document 1 to Patent Document 10, a shielding curtain, a shielding sheet, a soundproof wall, and the like are used as a method for shielding contaminated air. However, in the case of the apparatus and method described in the above-mentioned patent document, the apparatus and method are basically fixedly installed at a predetermined position in the tunnel. Therefore, when excavation progresses, it is necessary to remove such a device and fix it again at a new position.

また、切羽側の空気が換気により清浄になった場合、すぐに作業を行うために、出来るだけ早く工事機械が出入りできる状況を確保したいという現場の要求がある。さらに、遮蔽をしていない状態では、測量作業等のために、坑口側から切羽側が極力見通せる必要がある。   In addition, when the air on the face side is cleaned by ventilation, there is a demand from the site to ensure that the construction machine can enter and exit as soon as possible in order to perform work immediately. Furthermore, in the state where it is not shielded, it is necessary to see the face side from the wellhead side as much as possible for surveying work and the like.

以上のような課題があるが、従来の装置、方法の場合、固定設置が原則であることから、装置の取り外し、固定設置のたびに手間および時間を要してしまう。また従来の装置、方法では固定設置が原則であるため、移動可能とすることは困難である。仮に移動可能とした場合、高い遮蔽効果を発揮することが出来ない。さらに、遮蔽と開口とを容易に行える必要があるが、従来の装置、方法ではそれを行うことが困難である。   Although there are problems as described above, in the case of the conventional apparatus and method, since the fixed installation is a principle, it takes time and effort each time the apparatus is removed and fixedly installed. In addition, in the conventional apparatus and method, since fixed installation is a principle, it is difficult to make it movable. If it is possible to move, a high shielding effect cannot be exhibited. Further, it is necessary to easily perform shielding and opening, but it is difficult to do so with conventional devices and methods.

本発明者は上記課題に鑑み、切羽封じ込め装置を発明した。   In view of the above problems, the present inventors have invented a face containment device.

第1の発明は、排気管が設置されたトンネル工事における汚染空気の拡散を防止する切羽封じ込め装置であって、袋体により形成されるバルーンと、前記バルーンが設置される門形状のバルーン台車と、を有しており、前記バルーンの前記袋体への空気の流入、流出により膨張、収縮を制御し、前記バルーンが膨らんだ状態において、前記バルーンが、前記トンネル内に設置される排気管と、前記トンネルの天井壁面および内壁側面とに密着することで、前記トンネルの天井部、側面部および中心付近の開口部を閉塞し、前記バルーン台車に設置された移動手段によって、前記バルーン台車が移動可能である、切羽封じ込め装置である。   A first aspect of the present invention is a face containment device that prevents diffusion of contaminated air in tunnel construction in which an exhaust pipe is installed, and includes a balloon formed by a bag body, a gate-shaped balloon carriage on which the balloon is installed, And inflating and deflating the balloon by inflow and outflow of air into the bag body, and in a state where the balloon is inflated, the balloon is an exhaust pipe installed in the tunnel; The balloon carriage is moved by means of moving means installed on the balloon carriage so as to close the ceiling, the side face and the opening near the center of the tunnel by being in close contact with the ceiling wall surface and the inner wall side face of the tunnel. A face containment device that is possible.

本発明の構成の切羽封じ込め装置では、各バルーンに空気を流入、流出させることでバルーンによる閉塞状態を制御しているので、閉塞状態、開放状態の制御が容易となる。そのため、バルーンを収縮すれば、トンネルの中心付近を車両が通行可能となり、工事機械や車両の出入りを行うことが出来る。また、前方への見通しが確保でき、トンネル工事における測量作業の支障にもならない。さらに、本発明では、バルーンを用いることから軽量化を図ることも出来る。その結果、バルーンを設置したバルーン台車を移動可能とすることも出来る。   In the face containment device having the configuration of the present invention, since the closed state by the balloon is controlled by flowing air into and out of each balloon, the closed state and the open state can be easily controlled. Therefore, if the balloon is deflated, the vehicle can pass near the center of the tunnel, and the construction machine and the vehicle can enter and exit. In addition, a forward view can be secured, and it does not hinder surveying work in tunnel construction. Furthermore, in the present invention, the use of a balloon can reduce the weight. As a result, the balloon carriage on which the balloon is installed can be made movable.

上述の発明において、
前記バルーンは、前記トンネルの天井部を閉塞するアーチバルーンを有しており、前記アーチバルーンは、前記アーチバルーンが膨らんだ状態において、前記トンネルの天井付近に設置される前記排気管および前記トンネルの天井壁面に密着することで、前記トンネルの天井部を閉塞し、前記アーチバルーンに設けられたガイド手段が、前記バルーン台車に固定された保持棒に通されることで、前記アーチバルーンが膨らむまたは縮む際に、前記ガイド手段が前記保持棒に沿って上下に移動する、切羽封じ込め装置のように構成することもできる。
In the above invention,
The balloon has an arch balloon that closes a ceiling portion of the tunnel, and the arch balloon has the exhaust pipe and the tunnel installed near the ceiling of the tunnel in a state where the arch balloon is inflated. The arch balloon is inflated by closing the ceiling portion of the tunnel by being in close contact with the ceiling wall surface, and the guide means provided on the arch balloon is passed through a holding rod fixed to the balloon carriage. It can also be configured as a face containment device in which the guide means moves up and down along the holding rod when shrinking.

また、上述の発明において、前記バルーンは、前記トンネルの天井部を閉塞するアーチバルーンを有しており、前記アーチバルーンは、複数の前記袋体が鉛直方向に重なることで形成される、切羽封じ込め装置のように構成することもできる。   In the above-mentioned invention, the balloon has an arch balloon that closes the ceiling of the tunnel, and the arch balloon is formed by overlapping a plurality of the bags in the vertical direction. It can also be configured like a device.

これらの発明のように構成することで、天井付近に排気管が設置される場合であっても、天井に設置された排気管の周囲を的確に取り囲み、天井部を閉塞することが出来る。また、バルーン、特にアーチバルーンは膨張、収縮を繰り返すことで、その位置がずれやすくなるが、本発明のように構成することで、膨張、収縮に伴う位置のずれを抑えることが出来る。たとえば、バルーン台車から天井方向に向かって保持棒を固定し、バルーンに取り付けたガイド手段を保持棒に沿って移動させれば、膨張、収縮時のルートを固定することが出来る。   By configuring as in these inventions, even if the exhaust pipe is installed near the ceiling, the periphery of the exhaust pipe installed on the ceiling can be accurately surrounded and the ceiling portion can be closed. In addition, the position of a balloon, particularly an arch balloon, can be easily shifted by repeatedly expanding and contracting. However, by configuring as in the present invention, it is possible to suppress a shift in position due to expansion and contraction. For example, if the holding rod is fixed from the balloon carriage toward the ceiling and the guide means attached to the balloon is moved along the holding rod, the route during expansion and contraction can be fixed.

上述の発明において、前記トンネルの天井付近には、切羽と前記切羽封じ込め装置との間に空気を送り込む送気管がさらに設置されており、前記送気管からの送気量よりも前記排気管による排気量が多い、切羽封じ込め装置のように構成することもできる。   In the above-described invention, an air supply pipe for sending air between the face and the face containment device is further installed near the ceiling of the tunnel, and the exhaust pipe exhausts more than the air supply amount from the air supply pipe. It can also be configured like a face containment device with a large amount.

切羽側に送気管を設置して送気することで新鮮な空気を切羽側に供給することができる。その結果、切羽と切羽封じ込め装置との間の汚染空気の排出をより迅速に行うことが出来る。また、出願人の実験によれば、切羽と切羽封じ込め装置との間の空間を負圧にした場合、切羽封じ込め装置で開口部を形成した状態であっても、トンネル断面の全面を閉塞した状態と同様の換気効果があることが判明した。その結果、本発明のように、切羽と切羽封じ込め装置との間の空間を負圧とすることで、切羽封じ込め装置に開口部を形成したまま集塵作業を行うことが出来る。これにより、集塵作業と車両の通行、すなわち工事での作業とを両立することが可能となる。   Fresh air can be supplied to the face side by installing an air pipe on the face side and supplying air. As a result, the polluted air can be discharged more quickly between the face and the face containment device. Further, according to the applicant's experiment, when the space between the face and the face containment device is set to a negative pressure, even when the opening is formed by the face containment device, the entire surface of the tunnel cross-section is blocked. It was found that there was a similar ventilation effect. As a result, as shown in the present invention, by setting the space between the face and the face containment device to a negative pressure, the dust collection operation can be performed while the opening is formed in the face containment device. This makes it possible to achieve both dust collection work and vehicle traffic, that is, work in construction.

上述の発明において、前記バルーンは、前記トンネルの天井部を閉塞するアーチバルーンと、前記トンネルの右側側面部を閉塞する右側側面バルーンと、前記トンネルの左側側面部を閉塞する左側側面バルーンと、を有しており、前記右側側面バルーンおよび前記左側側面バルーンは、前記トンネルの内壁側面と密着する側部の袋体と、前記開口部を形成する扉部の袋体と、仕切ファスナーとを備え、前記仕切ファスナーを前記側部の袋体と扉部の袋体との間に設けることで、前記側部の袋体と扉部の袋体とを分離または結合させる、切羽封じ込め装置のように構成することもできる。   In the above invention, the balloon comprises: an arch balloon that closes the ceiling of the tunnel; a right side balloon that closes the right side of the tunnel; and a left side balloon that closes the left side of the tunnel. And the right side balloon and the left side balloon include a side bag closely contacting the inner wall side of the tunnel, a door bag forming the opening, and a partition fastener, The partition fastener is provided between the side bag and the door bag so that the side bag and the door bag are separated or joined together. You can also

本発明のように構成することで、バルーンの構成を簡略化しても確実にトンネルを閉塞することが出来、かつ送風機の数を少なく抑えることが出来る。また、必要に応じて、仕切ファスナーによって側部の袋体と扉部の袋体を仕切れば、扉部の袋体を収縮させておき開口部を形成することも可能となる。   By configuring as in the present invention, the tunnel can be reliably closed even if the balloon configuration is simplified, and the number of blowers can be reduced. If necessary, if the side bag and the door bag are partitioned by a partition fastener, the door bag can be contracted to form an opening.

上述の発明において、前記切羽封じ込め装置は、前記トンネルの内壁側面またはセントルに設置した支持部材にレールを設置し、前記レール上を前記移動手段が移動することで、前記バルーン台車の設置位置が変更可能である、切羽封じ込め装置のように構成することもできる。   In the above-described invention, the face containment device is configured such that a rail is installed on a support member installed on an inner wall side surface or a centle of the tunnel, and the installation position of the balloon carriage is changed by moving the moving means on the rail. It can also be configured as a face containment device that is possible.

本発明のように構成することで、トンネルの床面の掘削仕上げを行う前、行っている状態でもレールを先行設置し、切羽封じ込め装置を用いることが可能となる。   By configuring as in the present invention, it is possible to install the rail in advance and use the face containment device even before the tunnel floor surface is excavated and finished.

また、トンネル工事の換気方法としては、以下のように構成することができる。すなわち、排気管が設置されたトンネル工事における汚染空気の拡散を防止する換気方法であって、袋体により形成されるバルーンと、前記バルーンが設置される門形状のバルーン台車と、を備えた切羽封じ込め装置を前記トンネル内に設置し、前記バルーンに空気を流入させることで、前記バルーンを、前記トンネルの天井壁面および内壁側面に密着させるまで膨張させて前記トンネルの天井部および側面部を閉塞させ、前記トンネルの中心付近は閉塞せず、前記切羽封じ込め装置または前記切羽封じ込め装置よりも切羽側に設置された排気管で前記汚染空気の集塵を行う、換気方法とすることができる。   Moreover, the tunnel construction ventilation method can be configured as follows. That is, a ventilation method for preventing the diffusion of contaminated air in tunnel construction in which an exhaust pipe is installed, comprising a balloon formed by a bag and a gate-shaped balloon carriage in which the balloon is installed By installing a containment device in the tunnel and allowing air to flow into the balloon, the balloon is inflated until it is in close contact with the ceiling wall surface and the inner wall side surface of the tunnel, thereby closing the ceiling portion and the side surface portion of the tunnel. In the ventilation method, the vicinity of the center of the tunnel is not blocked, and the contaminated air is collected by the face containment device or an exhaust pipe installed closer to the face than the face containment device.

このような換気方法を用いることで、トンネル工事の工事機械や車両、作業員が出入りするトンネル中心付近を開放状態に維持したまま、集塵作業を行うことも出来る。   By using such a ventilation method, it is also possible to perform dust collection work while maintaining the vicinity of the tunnel center where tunneling construction machines, vehicles, and workers enter and leave in an open state.

本発明によって、閉塞状態、開放状態の制御が容易な切羽封じ込め装置が可能となる。この切羽封じ込め装置ではバルーンを用いて閉塞状態を制御しているので、開口部のバルーンを収縮すれば、トンネルの中心付近を車両が通行可能となり、工事機械や車両の出入りを行うことが出来る。また、すべてのバルーンを収縮すれば、前方への見通しが確保でき、トンネル工事における測量作業の支障にもならない。さらに、バルーンを用いることから軽量化を図ることも出来るので、その結果、バルーンを設置したバルーン台車を移動可能とすることも出来る。   According to the present invention, it is possible to provide a face containment device that can easily control the closed state and the open state. In this face containment device, since the closed state is controlled using a balloon, if the balloon at the opening is contracted, the vehicle can pass near the center of the tunnel, and the construction machine and the vehicle can enter and exit. Moreover, if all the balloons are deflated, a forward view can be secured, and the surveying work in tunnel construction will not be hindered. Furthermore, since the weight can be reduced by using the balloon, the balloon carriage on which the balloon is installed can be moved as a result.

切羽封じ込め装置の正面図である。It is a front view of a face containment device. バルーン台車の正面図である。It is a front view of a balloon carriage. バルーン台車の側面図である。It is a side view of a balloon carriage. バルーン台車の上面図である。It is a top view of a balloon carriage. 車輪受け部の一例である。It is an example of a wheel receiving part. バルーン台車と各バルーンとの関係を模式的に示す図である。It is a figure which shows typically the relationship between a balloon trolley and each balloon. 右側バルーン、左側バルーン、アーチバルーンのそれぞれに空気を充填させた状態の切羽封じ込め装置の正面図である。It is a front view of the face containment device in the state where each of the right balloon, the left balloon, and the arch balloon is filled with air. 右側バルーン、左側バルーンのファスナー付近の拡大図である。It is an enlarged view near the fastener of the right balloon and the left balloon. 開口部が形成された切羽封じ込め装置の正面図である。It is a front view of the face containment device in which the opening part was formed. アーチバルーンが膨らんだ状態を模式的に示す図である。It is a figure which shows typically the state which the arch balloon inflated. 3層の袋体からなるアーチバルーンが膨らむ状態を模式的に示す図である。It is a figure which shows typically the state which the arch balloon which consists of a three-layer bag body expands. 3層の袋体からなるアーチバルーンが収縮する状態を模式的に示す図である。It is a figure which shows typically the state which the arch balloon which consists of a 3 layer bag body shrink | contracts. アーチバルーンが水平部に固定される状態の拡大図である。It is an enlarged view of the state where an arch balloon is fixed to a horizontal part. アーチバルーンの収縮・膨張した状態を示す図である。It is a figure which shows the state which the arch balloon contracted and expanded. 切羽封じ込め装置がトンネルに設置される状態を模式的に示す図である。It is a figure which shows typically the state in which a face containment apparatus is installed in a tunnel. 切羽封じ込め装置がトンネルに設置される状態を模式的に示す図である。It is a figure which shows typically the state in which a face containment apparatus is installed in a tunnel. トンネルの内壁側面に、車輪受け部をブラケット状にアンカー固定した状態を示す図である。It is a figure which shows the state which fixed the wheel receiving part in the bracket shape to the inner wall side surface of the tunnel. 図17(b)のA部の拡大図である。It is an enlarged view of the A section of FIG. 車輪受け部のほかの一例を示す図である。It is a figure which shows another example of a wheel receiving part. 図19の車輪受け部を用いた切羽封じ込め装置の一例を示す図である。It is a figure which shows an example of the face containment apparatus using the wheel receiving part of FIG.

本発明の切羽封じ込め装置1は、主に、バルーン台車2、車輪受け部3、バルーン4、保持棒5を備えている。切羽封じ込め装置1の正面図を図1に示す。   The face containment device 1 of the present invention mainly includes a balloon carriage 2, a wheel receiving portion 3, a balloon 4, and a holding rod 5. A front view of the face containment device 1 is shown in FIG.

バルーン台車2を図2乃至図4に示す。図2はバルーン台車2の正面図である。図3はバルーン台車2の側面図である。図4はバルーン台車2の上面図である。バルーン台車2は、トンネル内部に設置する部材であって、左右の支柱部21、22、および左右の支柱部21、22の上方とそれぞれ接合する水平部23とにより、門形状が形成されている。左右の支柱部21、22、水平部23の構造は、図1ではトラス構造の場合を示したが、さまざまな構造を採ることができ、バルーン4を支持することが出来る構造であれば如何なる構造であっても良い。   The balloon carriage 2 is shown in FIGS. FIG. 2 is a front view of the balloon carriage 2. FIG. 3 is a side view of the balloon carriage 2. FIG. 4 is a top view of the balloon carriage 2. The balloon carriage 2 is a member installed inside the tunnel, and a gate shape is formed by the left and right support columns 21 and 22 and the horizontal portion 23 joined to the upper sides of the left and right support columns 21 and 22, respectively. . The structure of the left and right support columns 21, 22 and the horizontal portion 23 is shown in FIG. 1 as a truss structure. However, any structure can be used as long as it can take various structures and can support the balloon 4. It may be.

バルーン台車2の水平部23の下方において、左右にわたりカーテンレール26が設置されており、そのカーテンレール26には、カーテンレール26上を左右に移動可能な複数の滑車27が取り付けられている。この滑車27に、後述する左側バルーン43および右側バルーン42が取り付けられることで、左側バルーン43、右側バルーン42が、カーテンレール26に沿って左右に移動可能となる。またバルーン台車2の水平部23の横断面は凹字形状をしており、その底面は鋼材がはしご状に接合している。後述するアーチバルーン41が収縮した場合に、凹字の窪み部分(水平部23の底面上)に収容される。   Below the horizontal portion 23 of the balloon carriage 2, a curtain rail 26 is installed on the left and right, and a plurality of pulleys 27 that can move left and right on the curtain rail 26 are attached to the curtain rail 26. By attaching a left balloon 43 and a right balloon 42, which will be described later, to the pulley 27, the left balloon 43 and the right balloon 42 can move left and right along the curtain rail 26. Further, the horizontal section 23 of the balloon carriage 2 has a concave cross section, and the bottom surface is joined with a steel material in a ladder shape. When an arch balloon 41 described later is deflated, the arch balloon 41 is accommodated in a concave portion (on the bottom surface of the horizontal portion 23).

バルーン台車2の幅は、トンネル内に設置できる幅であって、バルーン台車2に後述する右側バルーン42および左側バルーン43を取り付け、膨らませた状態において、右側バルーン42、左側バルーン43がそれぞれトンネルの内壁側面Wsと密着可能な幅である。また、水平部23の位置は、アーチバルーン41を水平部23の底面に設置し、アーチバルーン41を膨らませた状態においてトンネルの天井壁面Wuに密着可能な位置になっている。   The width of the balloon carriage 2 is a width that can be installed in the tunnel, and when the right balloon 42 and the left balloon 43 described later are attached to the balloon carriage 2 and inflated, the right balloon 42 and the left balloon 43 are respectively connected to the inner wall of the tunnel. It is a width that can be in close contact with the side surface Ws. In addition, the position of the horizontal portion 23 is a position where the arch balloon 41 is placed on the bottom surface of the horizontal portion 23 and can be in close contact with the ceiling wall surface Wu of the tunnel when the arch balloon 41 is inflated.

バルーン台車2の右支柱部21、左支柱部22の底面には車輪25が設けられており、バルーン台車2をトンネルに対して前後方向に移動可能としている。なお車輪25の個数には制限がないが、好ましくは右支柱部21、左支柱部22の前後方向にそれぞれ一つずつ、合計2個ずつが一例としてある。   Wheels 25 are provided on the bottom surfaces of the right support column 21 and the left support column 22 of the balloon carriage 2 so that the balloon carriage 2 can be moved in the front-rear direction with respect to the tunnel. The number of wheels 25 is not limited, but preferably one in each of the right and left struts 21 and 22 in the front-rear direction, for a total of two.

バルーン台車2は、トンネル内の床面(地面など)に設置された車輪受け部3上に車輪25を介して設置される。図5に車輪受け部3の一例を示す。   The balloon carriage 2 is installed via a wheel 25 on a wheel receiving portion 3 installed on a floor surface (such as the ground) in the tunnel. FIG. 5 shows an example of the wheel receiver 3.

図5では、車輪受け部3として溝形鋼であるレール32を用いた場合である。レール32の溝に沿って車輪25が移動することで、バルーン台車2は車輪受け部3上を移動可能となる。そのため、レール32の溝は、車輪25の幅よりも広い必要がある。   In FIG. 5, a rail 32 made of channel steel is used as the wheel receiving portion 3. As the wheel 25 moves along the groove of the rail 32, the balloon carriage 2 can move on the wheel receiving portion 3. Therefore, the groove of the rail 32 needs to be wider than the width of the wheel 25.

車輪受け部3の長手方向の長さは、バルーン台車2の右支柱部21、左支柱部22の前後の車輪25の間隔よりも長くなっていることが必要であり、好ましくは、2倍以上あるとよい。   The length in the longitudinal direction of the wheel receiving part 3 needs to be longer than the distance between the wheel 25 before and after the right support part 21 and the left support part 22 of the balloon carriage 2, preferably twice or more. There should be.

なお上述ではバルーン台車2には車輪25が設けられた場合を説明したが、車輪25以外の移動手段を用いても良い。たとえば無限軌道を用いても良い。また、コロを配置して移動手段としても良い。   In the above description, the case where the wheel 25 is provided on the balloon carriage 2 has been described, but moving means other than the wheel 25 may be used. For example, an endless track may be used. Further, a roller may be arranged as a moving means.

バルーン4は、バルーン台車2に設置される。バルーン4は、好ましくは右側バルーン42、左側バルーン43、アーチバルーン41からなるが、本発明は、これに限定されるものではない。バルーン4は、空気をその内部に流入させることにより膨張させ、各バルーン4がトンネルの内壁側面Wsと天井壁面Wuと密着しトンネルを閉塞させることで切羽と坑口との空間を区切る一方、空気をその内部から流出させることにより収縮させ、内壁側面Wsと天井壁面Wuから離間すると、切羽と坑口との空間が連通する役割を果たす。   The balloon 4 is installed on the balloon carriage 2. The balloon 4 preferably includes a right balloon 42, a left balloon 43, and an arch balloon 41, but the present invention is not limited to this. The balloon 4 is inflated by allowing air to flow into the inside thereof, and each balloon 4 is in close contact with the inner wall side surface Ws of the tunnel and the ceiling wall surface Wu to block the tunnel, thereby separating the space between the face and the wellhead. When contracted by flowing out from the inside and separated from the inner wall side surface Ws and the ceiling wall surface Wu, the space between the face and the wellhead serves as a communication.

図6に切羽封じ込め装置1と各バルーン4との関係を模式的に示す。図6(a)がバルーン台車2および車輪受け部3の正面図、図6(b)が右側バルーン42の正面図、図6(c)が左側バルーン43の正面図、図6(d)がアーチバルーン41の正面図、図6(e)が各バルーン4をバルーン台車2に取り付けた状態(バルーン4が収縮した状態)を示す図である。   FIG. 6 schematically shows the relationship between the face containment device 1 and each balloon 4. 6A is a front view of the balloon carriage 2 and the wheel receiver 3, FIG. 6B is a front view of the right balloon 42, FIG. 6C is a front view of the left balloon 43, and FIG. FIG. 6E is a front view of the arch balloon 41, and shows a state in which each balloon 4 is attached to the balloon carriage 2 (a state in which the balloon 4 is deflated).

右側バルーン42、左側バルーン43は、縦長の袋体が左右方向に複数連結しており、各袋体の連結部の所定箇所に設けられた通気孔を介して連通している。従って、この通気孔を通じて隣接する袋体同士で空気の行き来が可能となる。また右側バルーン42、左側バルーン43の上方先端部付近には、複数のハトメ420、430がそれぞれ設けられている。このハトメ420、430に、カーテンレール26上の滑車27に取り付けられたフック体を吊下することで、右側バルーン42、左側バルーン43がそれぞれ、カーテンレール26に沿って左右方向に移動可能となる。このように、右側バルーン42、左側バルーン43の2つのバルーン4を用いる場合には、各バルーン42、43の横方向の長さは、各バルーン42、43に空気を充填させた状態において、外側の端部がトンネルの内壁側面Wsに密接する大きさであることが好ましい。また各バルーン42、43の高さは、各バルーン42、43に空気を充填させた状態において、トンネルの床面からカーテンレール26に到達し、アーチバルーン41が膨らんだ状態において、アーチバルーン41の下面と密着する程度の高さであることが好ましい。また、右側バルーン42、左側バルーン43は、空気を充填させた状態において、トンネルの内壁側面Wsに密着することから、右側バルーン42、左側バルーン43のトンネル中心側に位置する袋体よりも、トンネルの内壁側面Ws側に位置する袋体の高さが低くなっていても良い。   The right balloon 42 and the left balloon 43 have a plurality of vertically long bags connected in the left-right direction, and communicate with each other via a vent hole provided at a predetermined position of the connecting portion of each bag. Therefore, it is possible for air to pass back and forth between the adjacent bag bodies through this vent hole. A plurality of eyelets 420 and 430 are provided in the vicinity of the upper ends of the right balloon 42 and the left balloon 43, respectively. By suspending a hook attached to the pulley 27 on the curtain rail 26 to the eyelets 420 and 430, the right balloon 42 and the left balloon 43 can move in the left-right direction along the curtain rail 26, respectively. . Thus, when the two balloons 4 of the right balloon 42 and the left balloon 43 are used, the lateral lengths of the balloons 42 and 43 are outside in the state where the balloons 42 and 43 are filled with air. It is preferable that the end portion of the slab be close to the inner wall side surface Ws of the tunnel. In addition, the height of each balloon 42, 43 is such that the balloon 42, 43 is filled with air, reaches the curtain rail 26 from the floor of the tunnel, and the arch balloon 41 is inflated. It is preferable that the height be in close contact with the lower surface. Further, since the right balloon 42 and the left balloon 43 are in close contact with the inner wall side surface Ws of the tunnel in a state of being filled with air, the tunnel is more than the bag body located on the tunnel center side of the right balloon 42 and the left balloon 43. The height of the bag body located on the inner wall side surface Ws side may be low.

なお右側バルーン42、左側バルーン43はさらに扉部の袋体422、432と側部の袋体421、431とに分かれており、ファスナー423、433で仕切られている。ここで側部の袋体421、431は、右側バルーン42、左側バルーン43のうち、トンネル内壁側面Wsから所定数の袋体である。一方、扉部の袋体422、432は、右側バルーン42、左側バルーン43のうち、側部の袋体421、431以外の袋体であって、トンネルの中心方向に位置する袋体である。図7に右側バルーン42、左側バルーン43、アーチバルーン41のそれぞれに空気を充填させた状態の切羽封じ込め装置1を示す。   The right balloon 42 and the left balloon 43 are further divided into door bag bodies 422 and 432 and side bag bodies 421 and 431, which are partitioned by fasteners 423 and 433. Here, the side bag bodies 421 and 431 are a predetermined number of bag bodies from the tunnel inner wall side surface Ws of the right balloon 42 and the left balloon 43. On the other hand, the door bag bodies 422 and 432 are bag bodies other than the side bag bodies 421 and 431 of the right balloon 42 and the left balloon 43 and are located in the center of the tunnel. FIG. 7 shows the face containment device 1 in a state where each of the right balloon 42, the left balloon 43, and the arch balloon 41 is filled with air.

図8にバルーン42、43の拡大図を示す。図8(a)は左側バルーン43の拡大図であり、図8(b)は右側バルーン42の拡大図である。なお、左側バルーン43と右側バルーン42は左右対称で同じ構造であることが好ましい。右側バルーン42、左側バルーン43の扉部の袋体422、432と側部の袋体421、431とは、その境目の連結部分がファスナー423、433にて仕切られているので、仕切ファスナー423、433を閉じると、扉部の袋体422、432と側部の袋体421、431との間で空気の流通が遮断される。また仕切ファスナー423、433を開くと、扉部の袋体422、432と側部の袋体421、431との間で空気の流通が可能となる。   FIG. 8 shows an enlarged view of the balloons 42 and 43. 8A is an enlarged view of the left balloon 43, and FIG. 8B is an enlarged view of the right balloon. The left balloon 43 and the right balloon 42 are preferably bilaterally symmetrical and have the same structure. Since the bag portions 422 and 432 of the door portion of the right balloon 42 and the left balloon 43 and the bag portions 421 and 431 of the side portion are partitioned by the fasteners 423 and 433, the partition fastener 423, When 433 is closed, air flow is blocked between the bag bodies 422 and 432 of the door portion and the side bag bodies 421 and 431. When the partition fasteners 423 and 433 are opened, air can be circulated between the bag bodies 422 and 432 of the door portion and the bag bodies 421 and 431 of the side portion.

側部の袋体421、431、扉部の袋体422、432の所定箇所には、空気を流出させるための開口部が設けられており、開口部はファスナー424、425、434、435で開閉が可能である。図8(a)に示す左側バルーン43では、仕切ファスナー433を閉めた状態で、扉部ファスナー435を開けると、左側バルーン43のうち、扉部の袋体432の空気のみが流出し、側部の袋体431は空気が充填された状態を維持することが出来る。また側部ファスナー434を開けると、側部の袋体431の空気を流出させることも出来る。なお左側バルーンのみならず右側バルーン42にも、仕切ファスナー423、側部ファスナー424、扉部ファスナー425が備えられ、同様の機能を果たす。   Openings for allowing air to flow out are provided at predetermined locations on the side bags 421 and 431 and the door bags 422 and 432, and the openings are opened and closed by fasteners 424, 425, 434, and 435, respectively. Is possible. In the left balloon 43 shown in FIG. 8A, when the door fastener 435 is opened with the partition fastener 433 closed, only the air in the bag body 432 of the door out of the left balloon 43 flows out, The bag body 431 can maintain a state filled with air. Further, when the side fastener 434 is opened, the air in the side bag body 431 can be discharged. Not only the left balloon but also the right balloon 42 is provided with a partition fastener 423, a side fastener 424, and a door fastener 425 and performs the same function.

このように開口部を、ファスナー424、425、434、435を用いて空気の流出を制御することで、側部の袋体421,431、扉部の袋体422、432を収縮させる場合には、迅速に空気を流出させることが出来る。なお、ファスナー424、425、434、435の代わりに、開口部に蓋材を面ファスナーで固定、取り外しすることで空気の流出を制御しても良い。   In this way, in the case of contracting the side bag bodies 421 and 431 and the door bag bodies 422 and 432 by controlling the outflow of the air using the fasteners 424, 425, 434 and 435, , Can quickly let out the air. In addition, instead of the fasteners 424, 425, 434, and 435, the outflow of air may be controlled by fixing and removing a lid member from the opening with a surface fastener.

側部ファスナー424、434、扉部ファスナー425、435は、各袋体のそれぞれに設けられていても良いし、側部の袋体421、431、扉部の袋体422、432に一つずつ、あるいは複数ずつ設けられていても良い。   The side fasteners 424 and 434 and the door fasteners 425 and 435 may be provided in each of the bags, or one each for the side bags 421 and 431 and the door bags 422 and 432. Alternatively, a plurality of them may be provided.

このような右側バルーン42、左側バルーン43をバルーン台車2に取り付けることで、側部の袋体421、431、扉部の袋体422、432のそれぞれに空気を充填させ、かつカーテンレール26上を右側バルーン42、左側バルーン43をそれぞれ移動させ、密着させることで、図7に示すように、切羽と坑口との間の空間を区切ることが出来る。   By attaching the right balloon 42 and the left balloon 43 to the balloon carriage 2, the side bag bodies 421 and 431 and the door bag bodies 422 and 432 are filled with air, and the curtain rail 26 is moved over the curtain rail 26. By moving the right balloon 42 and the left balloon 43 in close contact with each other, the space between the face and the wellhead can be partitioned as shown in FIG.

また、右側バルーン42、左側バルーン43の仕切ファスナー423、433を閉め、扉部ファスナー425、435を開けることで、扉部の袋体422、432の空気が流出する。また、扉部の袋体422、432の空気が流出して、収縮させて、それぞれ側部の袋体421、431側にカーテンレール26に沿って移動させると、車両が通行可能な空間(開口部8)を形成することが出来る。これを模式的に示すのが図9である。   In addition, by closing the partition fasteners 423 and 433 of the right balloon 42 and the left balloon 43 and opening the door fasteners 425 and 435, the air in the bag bodies 422 and 432 of the door flows out. Further, when the air in the bag bodies 422 and 432 of the door portion flows out and contracts and moves along the curtain rail 26 to the side of the bag bodies 421 and 431 on the side portions, a space (opening) Part 8) can be formed. This is schematically shown in FIG.

なお、上述の右側バルーン42、左側バルーン43は、側部の袋体421、432と、扉部の袋体422、432が、仕切ファスナー423、433により仕切られている状態であったが、仕切ファスナー423、433を設ける代わりに、それぞれが独立した袋体であってもよい。すなわち、右側バルーン42は、側部の袋体421と扉部の袋体422とからなり、それぞれが分離・独立しており、空気を充填させた状態で側部の袋体421と扉部の袋体422とが密着することで、閉塞状態を作り出しても良い。左側バルーン43についても同様に、側部の袋体431と扉部の袋体432とからなり、それぞれが分離・独立しており、空気を充填させた状態で側部の袋体431と扉部の袋体432とが密着することで、閉塞状態を作り出しても良い。   The right balloon 42 and the left balloon 43 described above are in a state where the side bag bodies 421 and 432 and the door bag bodies 422 and 432 are partitioned by the partition fasteners 423 and 433. Instead of providing the fasteners 423 and 433, each may be an independent bag. That is, the right side balloon 42 includes a side bag body 421 and a door bag body 422, which are separated and independent from each other, and are filled with air in the side bag body 421 and the door portion. A closed state may be created by closely contacting the bag body 422. Similarly, the left side balloon 43 includes a side bag body 431 and a door bag body 432, which are separated and independent from each other, and are filled with air in the side bag body 431 and the door section. A closed state may be created by closely contacting the bag body 432.

図10に、アーチバルーン41が膨らんだ状態を模式的に示す。図10(a)はアーチバルーン41が膨らんだ状態を示す斜視図である。図10(b)はアーチバルーン41が膨らんだ状態のアーチバルーン41と保持棒5の正面図である。図10(c)はアーチバルーン41が膨らんだ状態のアーチバルーン41と保持棒5の側面図である。   FIG. 10 schematically shows a state where the arch balloon 41 is inflated. FIG. 10A is a perspective view showing a state where the arch balloon 41 is inflated. FIG. 10B is a front view of the arch balloon 41 and the holding rod 5 in a state where the arch balloon 41 is inflated. FIG. 10C is a side view of the arch balloon 41 and the holding rod 5 with the arch balloon 41 inflated.

アーチバルーン41はバルーン台車2の水平部23に設置され、図10に詳細を示すように、横長の袋体が上下方向に複数連結しており、各袋体の連結部の所定箇所に設けられた通気孔415を介して連通している。従って、この通気孔415を通じて隣接する袋体同士で空気の行き来が可能となる。また、アーチバルーン41は、水平部23上に設置されることから、バルーン台車2の水平部23よりも上方に対して膨張することとなる。そのため、アーチバルーン41の袋体のうち、トンネルの天井壁面Wu側よりもトンネルの中心側(水平部23側)に位置する袋体の方が長さが長くなっている。   The arch balloon 41 is installed in the horizontal part 23 of the balloon carriage 2 and, as shown in detail in FIG. 10, a plurality of horizontally long bags are connected in the vertical direction, and are provided at predetermined positions of the connecting parts of the bags. The air holes 415 communicate with each other. Therefore, air can be passed between the adjacent bag bodies through the vent hole 415. Further, since the arch balloon 41 is installed on the horizontal portion 23, the arch balloon 41 is inflated upward from the horizontal portion 23 of the balloon carriage 2. Therefore, in the bag body of the arch balloon 41, the length of the bag body located on the center side (horizontal portion 23 side) of the tunnel is longer than that on the ceiling wall surface Wu side of the tunnel.

またアーチバルーン41は、膨らんだ状態における略半月形状のうち、左右から1/3程度の位置に、略円柱形状の空間411を形成するために左右から挟み込む形で密着部412が形成される。これは、バルーン台車2の水平部23よりも上方には、切羽付近の汚染空気を集塵・排気するため、送気管6、第1の排気管7がトンネルの天井壁面Wuから吊下固定されているためである。すなわち、アーチバルーン41は膨らんだ状態において、送気管6、第1の排気管7およびそれらの吊下部材であるターンバックルなどと密着可能なように、送気管6、第1の排気管7とほぼ同形状に空間411が形成されている。そのため、天井壁面Wuから吊下された送気管6、第1の排気管7、吊下部材に、アーチバルーン41が膨らんだ状態で密着し、閉塞することが出来る。なお、第1の排気管7のみの場合には、その位置のみに略円柱状の空間411、密着部412が形成されていても良い。   The arch balloon 41 is formed with a close contact portion 412 so as to be sandwiched from the left and right to form a substantially cylindrical space 411 at a position about 1/3 from the left and right of the substantially half-moon shape in the inflated state. This is because the air supply pipe 6 and the first exhaust pipe 7 are suspended and fixed from the tunnel ceiling wall Wu above the horizontal portion 23 of the balloon carriage 2 in order to collect and exhaust the contaminated air near the face. This is because. That is, when the arch balloon 41 is inflated, the air supply pipe 6, the first exhaust pipe 7, the turnbuckle that is a suspension member of the air supply pipe 6, the first exhaust pipe 7, etc. A space 411 is formed in substantially the same shape. Therefore, the arch balloon 41 can be in close contact with the air supply pipe 6, the first exhaust pipe 7, and the suspension member suspended from the ceiling wall surface Wu and closed. In the case of only the first exhaust pipe 7, a substantially cylindrical space 411 and a close contact portion 412 may be formed only at the position.

水平部23の略中央部付近には、垂直方向に延設される保持棒5の下端が固定される。この保持棒5は、アーチバルーン41の略中央部付近に設けられた複数の円環状のフック414に通される。これによって、アーチバルーン41が膨張する段階においてフック414が保持棒5に沿って上方に移動し、アーチバルーン41の中心がずれないように保持したまま膨張させることが可能となる。このようにフック414などのガイド手段が保持棒5に沿って上下移動することで、膨張・収縮時のずれを抑止することが出来る。なお、ガイド手段としては、フック414に限定されるものではない。   Near the substantially central portion of the horizontal portion 23, the lower end of the holding rod 5 extending in the vertical direction is fixed. The holding bar 5 is passed through a plurality of annular hooks 414 provided in the vicinity of the substantially central portion of the arch balloon 41. As a result, when the arch balloon 41 is inflated, the hook 414 moves upward along the holding rod 5 and can be inflated while being held so that the center of the arch balloon 41 is not displaced. As described above, the guide means such as the hook 414 moves up and down along the holding rod 5, so that the displacement at the time of expansion / contraction can be suppressed. Note that the guide means is not limited to the hook 414.

また、アーチバルーン41の所定箇所(好ましくは最下層の袋体)にはファスナーが設けられており、開閉が可能となる。ファスナーが閉まっている状態で送風機24cからアーチバルーン41内に空気が送られると、アーチバルーン41内に空気が充填され、ファスナーが開いている状態ではアーチバルーン41から空気が流出する。   In addition, a fastener is provided at a predetermined position (preferably, the lowermost bag body) of the arch balloon 41 so that the arch balloon 41 can be opened and closed. When air is sent from the blower 24c into the arch balloon 41 while the fastener is closed, the arch balloon 41 is filled with air, and the air flows out from the arch balloon 41 when the fastener is open.

図11に3層の袋体からなるアーチバルーン41が膨らむ状態を模式的に示す。アーチバルーン41が膨らむ場合には、アーチバルーン41の最下層の袋体に取り付けられた送風機24cから空気が袋体に送り込まれる(図11(a1)、(a2))。最下層の袋体が空気で充填されると、その上の袋体(2層目の袋体)と連通している通気孔415を通じて、2層目の袋体に空気が最下層の袋体を介して送風機24cから送り込まれる(図11(b1)、(b2))。そして2層目の袋体が空気で充填されると、その上の袋体(3層目の袋体)と連通している通気孔415を通じて、3層目の袋体に空気が最下層の袋体、2層目の袋体を介して送風機24cから送り込まれる(図11(c1)、(c2))。そして3層目の袋体まで空気が充填されると、アーチバルーン41の空気が充填された状態となり、天井壁面Wu、送気管6、第1の排気管7、吊下部材に密着することが出来る(図11(d1)、(d2))。   FIG. 11 schematically shows a state where the arch balloon 41 composed of three layers of bags is inflated. When the arch balloon 41 is inflated, air is sent into the bag body from the blower 24c attached to the lowermost bag body of the arch balloon 41 (FIGS. 11 (a1) and (a2)). When the lowermost bag body is filled with air, the second lower layer bag body is filled with air through the vent hole 415 communicating with the upper bag body (second layer bag body). Through the blower 24c (FIGS. 11 (b1) and (b2)). When the second-layer bag body is filled with air, the air flows into the third-layer bag body through the vent holes 415 communicating with the upper-layer bag body (third-layer bag body). It is sent from the blower 24c through the bag body and the second layer bag body (FIG. 11 (c1), (c2)). When the third layer bag is filled with air, the arch balloon 41 is filled with air, and can be in close contact with the ceiling wall surface Wu, the air supply pipe 6, the first exhaust pipe 7, and the suspension member. (FIG. 11 (d1), (d2)).

図12に3層の袋体からなるアーチバルーン41が収縮する状態を模式的に示す。アーチバルーン41の各袋体の空気が充填されている状態(図12(a1)、(a2))から、アーチバルーン41の所定箇所(好ましくは最下層の袋体)に設けられたファスナーを開放することによって、自重により最下層の袋体内の空気が、開放されたファスナー部から流出する(図12(b1)、(b2))。最下層の袋体の空気が流出すると、2層目の袋体内の空気が、最下層の袋体と連通している通気孔415を通じて、ファスナー部から流出する(図12(c1)、(c2))。そして2層目の袋体の空気が流出すると、3層目の袋体内の空気が、2層目の袋体、最下層の袋体と連通している通気孔415を通じて、ファスナー部から流出する(図12(d1)、(d2))。   FIG. 12 schematically shows a state where the arch balloon 41 composed of three layers of bags is deflated. From the state in which each bag body of the arch balloon 41 is filled with air (FIGS. 12 (a1) and (a2)), the fastener provided at a predetermined position (preferably the lowermost bag body) of the arch balloon 41 is released. By doing so, the air in the lowermost bag body flows out of the opened fastener portion by its own weight (FIGS. 12B1 and 12B2). When the air in the lowermost bag body flows out, the air in the second-layer bag body flows out from the fastener portion through the vent holes 415 communicating with the lowermost bag body (FIGS. 12C1 and 12C2). )). When the air in the second-layer bag body flows out, the air in the third-layer bag body flows out from the fastener portion through the vent hole 415 communicating with the second-layer bag body and the lowermost-layer bag body. (FIG. 12 (d1), (d2)).

以上のように、アーチバルーン41の膨張、収縮の際には、フック414が保持棒5に沿って上下移動することで、アーチバルーン41の中心がずれずに膨張/収縮を繰り返すことが出来る。   As described above, when the arch balloon 41 is inflated and deflated, the hook 414 moves up and down along the holding rod 5 so that the center of the arch balloon 41 can be repeatedly inflated / contracted without shifting.

図13に示すように、アーチバルーン41の下方には複数のさる環413が設けられている。このさる環413と水平部23の鋼材とが紐416で結束されることで、アーチバルーン41が水平部23に固定される。図13(a)はアーチバルーン41のさる環413付近の横断面図であり、図13(b)は、図13(a)のA部の拡大図である。すなわち、さる環413と水平部23とを紐416で結び固定することで、アーチバルーン41をバルーン台車2の水平部23に固定することが出来る。また図14に、アーチバルーン41の収縮・膨張した状態を示す。図14(a)はアーチバルーン41が膨張した状態であり、図14(b)はアーチバルーン41が収縮した状態である。   As shown in FIG. 13, a plurality of monkey rings 413 are provided below the arch balloon 41. The arch balloon 41 is fixed to the horizontal portion 23 by binding the ring 413 and the steel material of the horizontal portion 23 with a string 416. 13A is a cross-sectional view of the vicinity of the ring 413 around the arch balloon 41, and FIG. 13B is an enlarged view of a portion A in FIG. 13A. That is, the arch balloon 41 can be fixed to the horizontal portion 23 of the balloon carriage 2 by connecting and fixing the monkey ring 413 and the horizontal portion 23 with the string 416. FIG. 14 shows the arch balloon 41 in a contracted / expanded state. FIG. 14A shows a state where the arch balloon 41 is inflated, and FIG. 14B shows a state where the arch balloon 41 is deflated.

図14に示すように、アーチバルーン41に空気が充填された状態であっても、空気が流出してなくなった状態であってもアーチバルーン41と水平部23の鋼材とが紐416で結束されていることから、アーチバルーン41の底面を水平部23に固定することが出来る。   As shown in FIG. 14, the arch balloon 41 and the steel material of the horizontal portion 23 are bound by the string 416 even when the arch balloon 41 is filled with air or when the air is no longer flowing out. Therefore, the bottom surface of the arch balloon 41 can be fixed to the horizontal portion 23.

また上述のアーチバルーン41、右側バルーン42、左側バルーン43の素材としてはナイロンタフタなどを用いることが出来るが、軽量で耐久性があればこれに限定されない。たとえば素材としてナイロンタフタを用いた場合、1mあたり0.5kgの重量であることから、アーチバルーン41が20m、右側バルーン42および左側バルーン43がそれぞれ30mであったとした場合、アーチバルーン41の重量は10kg、右側バルーン42および左側バルーン43の重量はそれぞれ15kgとなり、80mの断面積のトンネルの閉塞に用いるナイロンタフタの重量は70kgで足り、軽量化を実現できる。また、各バルーン4を形成する袋体は、二重構造、多重構造になっていても良く、それぞれに各ファスナーが取り付けられていても良い。なお、本明細書で説明する袋体としては、一定の空気を貯留させることが可能な袋体であって、圧力をかけた状態では若干の空気が抜けていく袋体であるが、圧力をかけた状態で機密性を維持する機密性袋体であっても良い。 Nylon taffeta or the like can be used as a material for the arch balloon 41, the right balloon 42, and the left balloon 43, but the material is not limited to this as long as it is lightweight and durable. For example, when nylon taffeta is used as a material, the weight is 0.5 kg per 1 m 2. Therefore, when the arch balloon 41 is 20 m 2 , and the right balloon 42 and the left balloon 43 are 30 m 2 , the arch balloon 41 The weight of the right balloon 42 and the left balloon 43 is 15 kg, and the weight of nylon taffeta used to close the tunnel having a cross-sectional area of 80 m 2 is 70 kg. Thus, the weight can be reduced. Moreover, the bag which forms each balloon 4 may have a double structure or a multiple structure, and each fastener may be attached to each. Note that the bag body described in this specification is a bag body capable of storing a certain amount of air, and is a bag body in which some air escapes when pressure is applied. It may be a confidential bag body that maintains the confidentiality when it is worn.

つぎに本発明の切羽封じ込め装置1の使用の仕方を説明する。切羽封じ込め装置1がトンネル内の所定箇所に設置された状態を模式的に示すのが図15である。このようにすべてのバルーン4が収縮している状態であれば、切羽封じ込め装置1は、ほぼバルーン台車2だけになるので、前方の測量作業の支障とならない。   Next, how to use the face containment device 1 of the present invention will be described. FIG. 15 schematically shows a state in which the face containment device 1 is installed at a predetermined location in the tunnel. If all the balloons 4 are in a deflated state in this way, the face containment device 1 is substantially only the balloon carriage 2 and therefore does not hinder the front surveying work.

まずトンネル工事における切羽から所定距離付近、たとえば切羽から30メートルや50メートル付近の位置に、車輪受け部3を左右の内壁側面Ws付近に、バルーン台車2の右支柱21、左支柱22の車輪25の位置に合わせて設置する。そして車輪受け部3のレール32に、バルーン台車2の車輪25を乗せ、バルーン台車2がレール32に沿って移動可能とする。   First, at a position near a predetermined distance from the working face in tunnel construction, for example, at a position near 30 or 50 meters from the working face, the wheel receiving portion 3 is placed near the left and right inner wall side surfaces Ws, and the wheels 25 of the right support 21 and the left support 22 of the balloon carriage 2 are used. Install according to the position. Then, the wheel 25 of the balloon carriage 2 is placed on the rail 32 of the wheel receiving portion 3 so that the balloon carriage 2 can move along the rail 32.

そしてバルーン台車2のカーテンレール26上の滑車27に取り付けられたフック体に、バルーン台車2に向かって右側に、右側バルーン42のハトメ420を、向かって左側に、左側バルーン43のハトメ430を吊下することで、右側バルーン42および左側バルーン43をバルーン台車2に取り付ける。   Then, on the hook body attached to the pulley 27 on the curtain rail 26 of the balloon carriage 2, the eyelet 420 of the right balloon 42 is hung on the right side toward the balloon carriage 2, and the eyelet 430 of the left balloon 43 is hung on the left side. The right balloon 42 and the left balloon 43 are attached to the balloon carriage 2 by lowering.

また、アーチバルーン41をバルーン台車2の水平部23に取り付ける。具体的には、まずアーチバルーン41におけるフック414を水平部23の保持棒5に通す。またアーチバルーン41の下方に複数設けられたさる環413と水平部23のトラス構造の金属部材とを紐416で結び、固定する。   Further, the arch balloon 41 is attached to the horizontal portion 23 of the balloon carriage 2. Specifically, first, the hook 414 in the arch balloon 41 is passed through the holding rod 5 of the horizontal portion 23. Further, a plurality of the ring 413 provided below the arch balloon 41 and the metal member of the truss structure of the horizontal portion 23 are connected by a string 416 and fixed.

以上のようにすることで、バルーン台車2にアーチバルーン41、右側バルーン42および左側バルーン43を取り付けることが出来る。なお、これらの取り付け方法は一例に過ぎず、異なる順番で行っても良いし、異なる方法で行っても良い。また、バルーン台車2にアーチバルーン41、右側バルーン42および左側バルーン43を取り付けた上でバルーン台車2を車輪受け部3に乗せても良い。   By doing so, the arch balloon 41, the right balloon 42 and the left balloon 43 can be attached to the balloon carriage 2. In addition, these attachment methods are only examples, and may be performed in a different order or may be performed by different methods. Alternatively, the balloon carriage 2 may be mounted on the wheel receiving portion 3 after the arch balloon 41, the right balloon 42, and the left balloon 43 are attached to the balloon carriage 2.

またアーチバルーン41、右側バルーン42および左側バルーン43に空気を送り込むため、それぞれの所定箇所に送風機24a、24b、24cが取り付けられ、それらがバルーン台車2に固定される。また、送風機24a、24b、24cは右側バルーン42、左側バルーン43、アーチバルーン41にそれぞれセットされる。   Further, in order to send air into the arch balloon 41, the right balloon 42, and the left balloon 43, blowers 24a, 24b, 24c are attached to the respective predetermined locations, and these are fixed to the balloon carriage 2. The blowers 24a, 24b, and 24c are set on the right balloon 42, the left balloon 43, and the arch balloon 41, respectively.

以上のようにして切羽封じ込め装置1がトンネル内の所定箇所に設置される。図16では、実際のトンネル工事における状態を示す。図16(a)は切羽封じ込め装置1が設置されたトンネルの縦断面図であり、図16(b)は切羽封じ込め装置1が設置されたトンネル内の上方からの図である。また図16(c)は図16(a)におけるA−A線の断面図である。   As described above, the face containment device 1 is installed at a predetermined location in the tunnel. FIG. 16 shows a state in actual tunnel construction. 16A is a longitudinal sectional view of the tunnel in which the face containment device 1 is installed, and FIG. 16B is a view from above in the tunnel in which the face containment device 1 is installed. FIG. 16C is a cross-sectional view taken along line AA in FIG.

切羽から切羽封じ込め装置1までの空気を換気するため、トンネルの天井壁面Wu付近に送気管6、第1の排気管7、第2の排気管71が設置される。この際に、送気管6および第1の排気管7は、切羽封じ込め装置1と同じ位置あるいは切羽封じ込め装置1よりも切羽側に、その一端の開口部が設置される。また第1の排気管7は他の一端で、切羽封じ込め装置1と坑口との間の集塵機9に連結しており、集塵機9での集塵作用によって、切羽と切羽封じ込め装置1との空間における汚染空気などを集塵・排気する。集塵機9には集塵後の空気をトンネルから排気するため、さらに第2の排気管71が連結している。第2の排気管71の集塵機9と連結していない他の一端は、トンネルの坑口から外部に位置している。送気管6、第1の排気管7および第2の排気管71はトンネルの天井付近の天井壁面Wuから吊下固定される。図16では、送気管6の他の一端は、トンネル内の所定箇所に設けられた送風口Hから、トンネル外部に設置された送風機61に連結しており、送風機61からの送風によって、切羽付近に送風する。   In order to ventilate the air from the face to the face containment device 1, an air supply pipe 6, a first exhaust pipe 7, and a second exhaust pipe 71 are installed near the ceiling wall surface Wu of the tunnel. At this time, the air supply pipe 6 and the first exhaust pipe 7 are provided with an opening at one end thereof at the same position as the face containment device 1 or on the face side of the face containment device 1. The first exhaust pipe 7 is connected to the dust collector 9 between the face containment device 1 and the wellhead at the other end. In the space between the face and the face containment device 1 by the dust collecting action of the dust collector 9. Collect and exhaust contaminated air. A second exhaust pipe 71 is further connected to the dust collector 9 in order to exhaust the air after dust collection from the tunnel. The other end of the second exhaust pipe 71 not connected to the dust collector 9 is located outside from the tunnel entrance. The air supply pipe 6, the first exhaust pipe 7, and the second exhaust pipe 71 are suspended and fixed from the ceiling wall surface Wu near the ceiling of the tunnel. In FIG. 16, the other end of the air supply pipe 6 is connected to a blower 61 installed outside the tunnel from a blower opening H provided at a predetermined location in the tunnel, and near the face by blowing from the blower 61. To blow.

以上のように配管することで、送気管6は切羽と切羽封じ込め装置1との間の空間に送風が出来、第1の排気管7は切羽と切羽封じ込め装置1との間の汚染空気を集塵・排気することが出来る。また集塵機9で集塵したあとの空気は、第2の排気管71からトンネルの外部に排気される。   By piping as described above, the air supply pipe 6 can blow air into the space between the face and the face containment device 1, and the first exhaust pipe 7 collects contaminated air between the face and the face containment device 1. Dust and exhaust are possible. The air collected by the dust collector 9 is exhausted from the second exhaust pipe 71 to the outside of the tunnel.

以上のように送気管6、第1の排気管7および第2の排気管71などが設置された後、バルーン台車2の各バルーン4に空気を送り込むことで、切羽と坑口との間の空間を区切る。具体的には、バルーン台車2の所定箇所に設置された送風機24からアーチバルーン41、右側バルーン42および左側バルーン43に対して、送風機24a、24bで空気を送り込むことで、各バルーンを膨張させる。   After the air supply pipe 6, the first exhaust pipe 7, the second exhaust pipe 71 and the like are installed as described above, air is sent into each balloon 4 of the balloon carriage 2 so that the space between the face and the wellhead is obtained. Is separated. Specifically, each balloon is inflated by sending air from the blower 24 installed at a predetermined location of the balloon carriage 2 to the arch balloon 41, the right balloon 42, and the left balloon 43 by the blowers 24a and 24b.

このようにバルーン4に空気を送り込むことで、図7に示すように、切羽封じ込め装置1が設置された位置で、トンネルの断面を各バルーン4で区切ることが出来る。なお、各バルーン4の大きさは、各バルーン4がトンネルの内壁側面Ws、天井壁面Wuに密着する大きさまで膨張させられればよい。またトンネルの内壁側面Ws、天井壁面Wuが、凹凸のある吹き付け面となっていることがあるが、バルーン4で空間を区切る構造とすることで、バルーン4と内壁側面Ws、天井壁面Wuとを密着させることができ、汚染空気を切羽から切羽封じ込め装置1の間に封じ込めることが出来る。   By sending air to the balloon 4 in this way, the cross section of the tunnel can be divided by each balloon 4 at the position where the face containment device 1 is installed as shown in FIG. The size of each balloon 4 may be inflated to such a size that each balloon 4 is in close contact with the inner wall side surface Ws and the ceiling wall surface Wu of the tunnel. Further, the inner wall side surface Ws and the ceiling wall surface Wu of the tunnel may be an uneven spraying surface. However, the balloon 4 is separated from the space by the balloon 4 so that the balloon 4 can be separated from the inner wall side surface Ws and the ceiling wall surface Wu. It can be made to adhere, and polluted air can be contained between the face and the face containment device 1.

このようにして切羽から切羽封じ込め装置1の空間と、切羽封じ込め装置1から坑口までの空間とを区切ると、切羽から発生する汚染空気がトンネル内全体に拡散することがなくなる。すなわち、汚染空気は、切羽から切羽封じ込め装置1の空間に滞留するが、それを集塵機9が第1の排気管7を通して集塵していることから、切羽から切羽封じ込め装置1の空間の汚染空気を集塵・排気することとなる。   When the space from the face to the face containment device 1 and the space from the face containment device 1 to the wellhead are partitioned in this way, the contaminated air generated from the face does not diffuse throughout the tunnel. That is, the contaminated air stays in the space of the face containment device 1 from the face, but since the dust collector 9 collects the dust through the first exhaust pipe 7, the contaminated air in the space of the face containment device 1 from the face. Will be collected and exhausted.

なお、集塵の際には、送気管6からの送風量と第1の排気管7での排気量とでは、排気量が多くなるようにする。すなわち切羽から切羽封じ込め装置1の空間が負圧となるようにすることが好ましい。   Note that, when collecting dust, the exhaust amount is increased by the amount of air blown from the air supply pipe 6 and the exhaust amount of the first exhaust pipe 7. That is, it is preferable that the space from the face to the face containment device 1 is negative.

また本発明の切羽封じ込め装置1では、集塵を行いながら、トンネル工事の作業を行うことができる。その場合、車両がトンネル内を通過する必要がある。車両が通行する場合には、そのままでは切羽封じ込め装置1がトンネルの空間をバルーンで閉鎖していることから、車両は通行できない。そこで、切羽封じ込め装置1における右側バルーン42および左側バルーン43のそれぞれの仕切ファスナー433を閉じた上で、扉部ファスナー435を開け、側部の袋体421、431の空気を排出させる。また、扉部の袋体422、432の空気が排出後、扉部の袋体422、432をカーテンレール26に沿って左右に移動させることで、トンネルの中心部付近に開口部8を形成することが出来る。すなわち、図9に示すように、トンネルの内壁側面Ws、天井壁面Wu付近は、アーチバルーン41、右側バルーン42の側部の袋体421、431および左側バルーン43の側部の袋体422、432が設置されたまま、中心部付近は車両が通行可能となる。   Moreover, in the face containment apparatus 1 of the present invention, tunnel construction work can be performed while collecting dust. In that case, the vehicle needs to pass through the tunnel. When the vehicle passes, the vehicle cannot pass as it is because the face containment device 1 closes the tunnel space with a balloon. Then, after closing each partition fastener 433 of the right side balloon 42 and the left side balloon 43 in the face containment apparatus 1, the door part fastener 435 is opened, and the air of the side bag bodies 421 and 431 is discharged. Moreover, after the air of the bag bodies 422 and 432 of the door portion is discharged, the opening portions 8 are formed near the center portion of the tunnel by moving the bag bodies 422 and 432 of the door portion left and right along the curtain rail 26. I can do it. That is, as shown in FIG. 9, in the vicinity of the inner wall side surface Ws and the ceiling wall surface Wu of the tunnel, the arch balloon 41, the side bag bodies 421 and 431 of the right side balloon 42, and the side bag bodies 422 and 432 of the left side balloon 43. With the installed, the vehicle can pass near the center.

本発明の切羽封じ込め装置1では、負圧となるように送気管6からの送風量と第1の排気管7での排気量を調整しているため、開口部8を開けたままでも汚染空気を封じ込める効果が高い。   In the face containment apparatus 1 according to the present invention, the amount of air blown from the air supply pipe 6 and the amount of exhaust air from the first exhaust pipe 7 are adjusted so as to be negative pressure. Highly effective in containment.

なお、トンネルの掘削作業が進行すると、切羽が前方に移動する。その場合には、一旦、各バルーン4から空気を排気して収縮させた後、車輪受け部3のレール32に沿ってバルーン台車2を前方に移動させることで、容易に、切羽封じ込め装置1を前方に移動させられる。   Note that as the excavation work of the tunnel proceeds, the face moves forward. In that case, once the air is exhausted from each balloon 4 and contracted, the balloon carriage 2 is moved forward along the rails 32 of the wheel receiving portion 3, so that the face containment device 1 can be easily moved. Moved forward.

また、車輪受け部3のレール32の先端部までバルーン台車2が到達した場合には、車輪受け部3であるレール32をその先端部の先にさらに設置することで、移動を行える。   Further, when the balloon carriage 2 reaches the tip end of the rail 32 of the wheel receiving part 3, the rail 32 that is the wheel receiving part 3 is further installed at the tip of the tip part, so that the movement can be performed.

なお、トンネル床面の掘削が続行中等の理由でトンネル内の床面の凹凸が激しい場合には、トンネル内に車輪受け部3が設置できない。そこで、このような場合には、ブラケット状の支持部31’とレール32’とを有する車輪受け部3’を、トンネルの内壁側面Wsにアンカー固定することも出来る。これを模式的に示すのが図17である。図17(a)は車輪受け部3’をトンネルの内壁側面Wsに支持部31’を水平方向にアンカー固定した場合の正面図、図17(b)は、切羽封じ込め装置1の上方からの図である。図18は図17(b)のA部の拡大図である。なお支持部31’としては、鋼材などを用いることが出来る。   In addition, when the unevenness | corrugation of the floor surface in a tunnel is intense because the excavation of a tunnel floor surface is continuing, the wheel receiving part 3 cannot be installed in a tunnel. Therefore, in such a case, the wheel receiving portion 3 ′ having the bracket-like support portion 31 ′ and the rail 32 ′ can be anchored to the inner wall side surface Ws of the tunnel. This is schematically shown in FIG. 17A is a front view when the wheel receiving portion 3 ′ is anchored to the inner wall side surface Ws of the tunnel and the support portion 31 ′ is anchored in the horizontal direction, and FIG. 17B is a view from above the face containment device 1. It is. FIG. 18 is an enlarged view of a portion A in FIG. As the support portion 31 ′, a steel material or the like can be used.

支持部31’はトンネルの左右の内壁側面Wsに水平にアンカー固定されている。また支持部31’の上面には、レール32’が設置されており、レール32’の溝に、バルーン台車2の右支柱部21、左支柱部22の各車輪25が乗せられる。従って、レール32の溝に沿ってバルーン台車2を前後方向に移動可能となる。なおトンネルの左右の内壁側面Wsに設置された支持部31’上のレール32’は、バルーン台車2の右支柱21、左支柱22の車輪25の間隔に合わせて設置される。   The support portion 31 ′ is anchored horizontally to the left and right inner wall side surfaces Ws of the tunnel. A rail 32 'is installed on the upper surface of the support portion 31', and the wheels 25 of the right column portion 21 and the left column portion 22 of the balloon carriage 2 are placed in the groove of the rail 32 '. Accordingly, the balloon carriage 2 can be moved in the front-rear direction along the groove of the rail 32. The rails 32 ′ on the support portions 31 ′ installed on the left and right inner wall side surfaces Ws of the tunnel are installed in accordance with the distance between the right column 21 of the balloon carriage 2 and the wheels 25 of the left column 22.

またトンネルの掘削作業が進行し、切羽が前方に移動した場合には、それに合わせて新たな支持部31’をトンネルの左右の内壁側面Wsにアンカー固定することで、トンネルの床面に車輪受け部3を設置できない場合にも、それらの位置まで切羽封じ込め装置1を移動、設置することが出来る。これは、切羽封じ込め装置1が、バルーン台車2と各バルーン4で構成されており、軽量であるために可能な構成である。なお、トンネルの左右の内壁側面Wsにアンカー固定するほか、セントルにブラケット状に設置をしても良い。このような車輪受け部3’とすることで、トンネルの床面の掘削仕上げを行っている状態、あるいは掘削仕上げを行う前の状態でも、レール32’の先行設置が可能となる。   Further, when the excavation work of the tunnel progresses and the face moves forward, a new support portion 31 ′ is anchored to the inner wall side surface Ws on the left and right sides of the tunnel accordingly, so that the wheel support is received on the tunnel floor. Even when the part 3 cannot be installed, the face containment device 1 can be moved and installed to those positions. This is possible because the face containment device 1 is composed of the balloon carriage 2 and each balloon 4 and is lightweight. In addition to anchoring to the left and right inner wall side surfaces Ws of the tunnel, it may be installed in the shape of a bracket on the center. By using such a wheel receiving portion 3 ′, the rail 32 ′ can be installed in advance even in a state where excavation finishing is performed on the floor surface of the tunnel or before excavation finishing is performed.

さらに上述とは異なる形態として、車輪受け部3’’を、図19に示すように、架台31およびレール32から構成することも出来る。レール32は、少なくとも2以上の架台31の上面に設置する。このレール32の溝に、車輪25が載置されることで、車輪25が溝に沿って移動可能となる。図20に車輪受け部3’’にバルーン台車2が設置された状態を示す。なお、図19では、架台31は、トラス構造である台形状で示したが、それ以外であっても良い。   Furthermore, as a form different from that described above, the wheel receiving portion 3 ″ may be constituted by a gantry 31 and a rail 32 as shown in FIG. The rail 32 is installed on the upper surface of at least two pedestals 31. Since the wheel 25 is placed in the groove of the rail 32, the wheel 25 can move along the groove. FIG. 20 shows a state where the balloon carriage 2 is installed on the wheel receiving portion 3 ″. In FIG. 19, the gantry 31 is shown in a trapezoidal shape that is a truss structure, but may be other than that.

また車輪受け部3’’のレール32の先端部までバルーン台車2が到達した場合には、架台31をうって返し、レール32を盛り代えて移動を行う。   Further, when the balloon carriage 2 reaches the tip of the rail 32 of the wheel receiving portion 3 ″, the balloon carriage 2 is turned over, and the rail 32 is replaced and moved.

なお車輪受け部3は、上述のように、レール32の溝に車輪25を載置する構成のほか、鉄道の軌条のように、車輪に設けられた溝に、レールを嵌合させて移動可能なように構成することもできる。   In addition to the configuration in which the wheel 25 is placed in the groove of the rail 32 as described above, the wheel receiving portion 3 can be moved by fitting the rail into the groove provided in the wheel like a railroad rail. It can also be configured as follows.

上述の実施例における切羽封じ込め装置1では、右側バルーン42および左側バルーン43が、側部の機密性袋体421、431と、扉部の機密性袋体422、432とが仕切ファスナー423、433で空気の流通が制御される構造となっているが、側部の機密性袋体421、431と、扉部の機密性袋体422、432とを独立したバルーン4として構成しても良い。すなわち右側バルーン42および左側バルーン43を、2以上の独立したバルーンから構成しても良い。   In the face containment device 1 in the above-described embodiment, the right side balloon 42 and the left side balloon 43 are divided into side confidential bag bodies 421 and 431 and door side confidential bag bodies 422 and 432 by partition fasteners 423 and 433, respectively. Although the air flow is controlled, the side confidential bag bodies 421 and 431 and the door confidential bag bodies 422 and 432 may be configured as independent balloons 4. That is, the right balloon 42 and the left balloon 43 may be composed of two or more independent balloons.

また、上述の実施例におけるバルーン4について、アーチバルーン41と右側バルーン42と左側バルーン43とが一体的に形成されていても良い。   In addition, the arch balloon 41, the right balloon 42, and the left balloon 43 may be integrally formed with the balloon 4 in the above-described embodiment.

本発明によって、閉塞状態、開放状態の制御が容易な切羽封じ込め装置が可能となる。この切羽封じ込め装置ではバルーンを用いて閉塞状態を制御しているので、開口部のバルーンを収縮すれば、トンネルの中心付近を車両が通行可能となり、工事機械や車両の出入りを行うことが出来る。また、すべてのバルーンを収縮すれば、前方への見通しが確保でき、トンネル工事における測量作業の支障にもならない。さらに、バルーンを用いることから軽量化を図ることも出来るので、その結果、バルーンを設置したバルーン台車を移動可能とすることも出来る。   According to the present invention, it is possible to provide a face containment device that can easily control the closed state and the open state. In this face containment device, since the closed state is controlled using a balloon, if the balloon at the opening is contracted, the vehicle can pass near the center of the tunnel, and the construction machine and the vehicle can enter and exit. Moreover, if all the balloons are deflated, a forward view can be secured, and the surveying work in tunnel construction will not be hindered. Furthermore, since the weight can be reduced by using the balloon, the balloon carriage on which the balloon is installed can be moved as a result.

1:切羽封じ込め装置
2:バルーン台車
3:車輪受け部
4:バルーン
5:保持棒
6:送気管
7:第1の排気管
8:開口部
9:集塵機
21:右支柱部
22:左支柱部
23:水平部
24:送風機
25:車輪
26:カーテンレール
27:滑車
31:架台
31’:支持部
32、32’:レール
41:アーチバルーン
42:右側バルーン
43:左側バルーン
61:送風機
71:第2の排気管
411:略円柱形の空間
412:密着部
413:さる環
414:フック
415:通気孔
416:紐
420、430:ハトメ
421、431:側部の袋体
422、432:扉部の袋体
433:仕切ファスナー
434:側部ファスナー
435:扉部ファスナー
Ws:トンネルの内壁側面
Wu:トンネルの天井壁面
H:送風口
1: Face confinement device 2: Balloon carriage 3: Wheel receiving part 4: Balloon 5: Holding rod 6: Air supply pipe 7: First exhaust pipe 8: Opening part 9: Dust collector 21: Right support part 22: Left support part 23 : Horizontal part 24: blower 25: wheel 26: curtain rail 27: pulley 31: mount 31 ': support 32, 32': rail 41: arch balloon 42: right balloon 43: left balloon 61: blower 71: second Exhaust pipe 411: substantially cylindrical space 412: contact portion 413: monkey ring 414: hook 415: vent hole 416: string 420, 430: eyelet 421, 431: side bag body 422, 432: door bag body 433: Partition fastener 434: Side fastener 435: Door fastener Ws: Tunnel inner wall side surface Wu: Tunnel ceiling wall surface H: Blower

Claims (7)

排気管が設置されたトンネル工事における汚染空気の拡散を防止する切羽封じ込め装置であって、
袋体により形成されるバルーンと、
前記バルーンが設置される門形状のバルーン台車と、を有しており、
前記バルーンの前記袋体への空気の流入、流出により膨張、収縮を制御し、
前記バルーンが膨らんだ状態において、前記バルーンが、前記トンネル内に設置される排気管と、前記トンネルの天井壁面および内壁側面とに密着することで、前記トンネルの天井部、側面部および中心付近の開口部を閉塞し、
前記バルーン台車に設置された移動手段によって、前記バルーン台車が移動可能である、
ことを特徴とする切羽封じ込め装置。
A face containment device that prevents the diffusion of contaminated air in tunnel construction where an exhaust pipe is installed,
A balloon formed by a bag,
A gate-shaped balloon carriage on which the balloon is installed,
Control the expansion and contraction by the inflow and outflow of air to the bag body of the balloon,
In a state where the balloon is inflated, the balloon is in close contact with an exhaust pipe installed in the tunnel and a ceiling wall surface and an inner wall side surface of the tunnel, so that Close the opening,
The balloon carriage is movable by moving means installed on the balloon carriage.
A face containment device characterized by that.
前記バルーンは、前記トンネルの天井部を閉塞するアーチバルーンを有しており、
前記アーチバルーンは、
前記アーチバルーンが膨らんだ状態において、前記トンネルの天井付近に設置される前記排気管および前記トンネルの天井壁面に密着することで、前記トンネルの天井部を閉塞し、
前記アーチバルーンに設けられたガイド手段が、前記バルーン台車に固定された保持棒に通されることで、前記アーチバルーンが膨らむまたは縮む際に、前記ガイド手段が前記保持棒に沿って上下に移動する、
ことを特徴とする請求項1に記載の切羽封じ込め装置。
The balloon has an arch balloon that closes the ceiling of the tunnel,
The arch balloon is
In the state where the arch balloon is inflated, by closely contacting the exhaust pipe and the ceiling wall surface of the tunnel installed near the ceiling of the tunnel, the ceiling portion of the tunnel is closed,
Guide means provided on the arch balloon is passed through a holding rod fixed to the balloon carriage so that the guide means moves up and down along the holding rod when the arch balloon is inflated or contracted. To
The face containment device according to claim 1.
前記バルーンは、前記トンネルの天井部を閉塞するアーチバルーンを有しており、
前記アーチバルーンは、
複数の前記袋体が鉛直方向に重なることで形成される、
ことを特徴とする請求項1または請求項2に記載の切羽封じ込め装置。
The balloon has an arch balloon that closes the ceiling of the tunnel,
The arch balloon is
Formed by overlapping the plurality of bags in the vertical direction;
The face containment device according to claim 1 or claim 2, wherein
前記トンネルの天井付近には、切羽と前記切羽封じ込め装置との間に空気を送り込む送気管がさらに設置されており、
前記送気管からの送気量よりも前記排気管による排気量が多い、
ことを特徴とする請求項1から請求項3のいずれかに記載の切羽封じ込め装置。
Near the ceiling of the tunnel, there is further installed an air pipe for sending air between the face and the face containment device,
The exhaust amount by the exhaust pipe is larger than the air supply amount from the air supply pipe.
The face containment device according to any one of claims 1 to 3, characterized in that:
前記バルーンは、
前記トンネルの天井部を閉塞するアーチバルーンと、前記トンネルの右側側面部を閉塞する右側側面バルーンと、前記トンネルの左側側面部を閉塞する左側側面バルーンと、を有しており、
前記右側側面バルーンおよび前記左側側面バルーンは、前記トンネルの内壁側面と密着する側部の袋体と、前記開口部を形成する扉部の袋体と、仕切ファスナーとを備え、
前記仕切ファスナーを前記側部の袋体と扉部の袋体との間に設けることで、前記側部の袋体と扉部の袋体とを分離または結合させる、
ことを特徴とする請求項1に記載の切羽封じ込め装置。
The balloon is
An arch balloon that closes the ceiling of the tunnel, a right side balloon that closes the right side of the tunnel, and a left side balloon that closes the left side of the tunnel,
The right side balloon and the left side balloon include a side bag that is in close contact with the inner wall side of the tunnel, a door bag that forms the opening, and a partition fastener,
By providing the partition fastener between the side bag body and the door bag body, the side bag body and the door bag body are separated or combined,
The face containment device according to claim 1.
前記切羽封じ込め装置は、
前記トンネルの内壁側面またはセントルに設置した支持部材にレールを設置し、
前記レール上を前記移動手段が移動することで、前記バルーン台車の設置位置が変更可能である、
ことを特徴とする請求項1から請求項5のいずれかに記載の切羽封じ込め装置。
The face containment device is:
Install the rail on the inner wall side of the tunnel or the support member installed on the centle,
When the moving means moves on the rail, the installation position of the balloon carriage can be changed.
The face containment device according to any one of claims 1 to 5, wherein:
排気管が設置されたトンネル工事における汚染空気の拡散を防止する換気方法であって、
袋体により形成されるバルーンと、前記バルーンが設置される門形状のバルーン台車と、を備えた切羽封じ込め装置を前記トンネル内に設置し、
前記バルーンに空気を流入させることで、前記バルーンを、前記トンネルの天井壁面および内壁側面に密着させるまで膨張させて前記トンネルの天井部および側面部を閉塞させ、前記トンネルの中心付近は閉塞せず、
前記切羽封じ込め装置または前記切羽封じ込め装置よりも切羽側に設置された排気管で前記汚染空気の集塵を行う、
ことを特徴とする換気方法。
A ventilation method for preventing diffusion of contaminated air in tunnel construction where an exhaust pipe is installed,
A face confining device including a balloon formed by a bag and a gate-shaped balloon carriage on which the balloon is installed is installed in the tunnel,
By allowing air to flow into the balloon, the balloon is inflated until it is in close contact with the ceiling wall surface and the inner wall side surface of the tunnel to close the ceiling portion and side surface portion of the tunnel, and the vicinity of the center of the tunnel is not blocked. ,
Collecting the contaminated air with the exhaust pipe installed on the face side of the face containment device or the face containment device,
Ventilation method characterized by that.
JP2011067047A 2011-03-25 2011-03-25 Face containment device Active JP5662854B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011067047A JP5662854B2 (en) 2011-03-25 2011-03-25 Face containment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011067047A JP5662854B2 (en) 2011-03-25 2011-03-25 Face containment device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2014228008A Division JP5859096B2 (en) 2014-11-10 2014-11-10 Face containment device

Publications (2)

Publication Number Publication Date
JP2012202092A true JP2012202092A (en) 2012-10-22
JP5662854B2 JP5662854B2 (en) 2015-02-04

Family

ID=47183381

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011067047A Active JP5662854B2 (en) 2011-03-25 2011-03-25 Face containment device

Country Status (1)

Country Link
JP (1) JP5662854B2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306702A (en) * 2013-06-28 2013-09-18 中铁十七局集团第三工程有限公司 Inflatable isolating device for tunnel ventilation construction
JP2014227786A (en) * 2013-05-24 2014-12-08 株式会社大林組 Protection device for tunnel blasting
JP2014227787A (en) * 2013-05-24 2014-12-08 株式会社大林組 Protection device for tunnel blasting
JP2014231723A (en) * 2013-05-30 2014-12-11 株式会社大林組 Diffusion prevention device for tunnel
JP2017036552A (en) * 2015-08-07 2017-02-16 西松建設株式会社 Movable blasting protective device
WO2017064343A1 (en) * 2015-10-14 2017-04-20 Obras Subterraneas, S.A. Means and method for controlling the working atmosphere in tunnels
JP2018127846A (en) * 2017-02-10 2018-08-16 鉄建建設株式会社 Silencer for tunnel and silencer system
JP2019183398A (en) * 2018-04-02 2019-10-24 鹿島建設株式会社 Scattering prevention device and scattering prevention method
CN112901244A (en) * 2021-01-19 2021-06-04 山西天地赛福蒂科技有限公司 Roadway system and operation method thereof
CN113482702A (en) * 2021-07-23 2021-10-08 辽宁科技大学 Rock burst prevention rescue escape trolley based on drilling and blasting method and using method
CN113982658A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Temporary support device for tunnel face
JP7149725B2 (en) 2018-04-03 2022-10-07 株式会社フジタ Crusher equipped with a bag device for opening and closing the tunnel cross section

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005090146A (en) * 2003-09-19 2005-04-07 Nishimatsu Constr Co Ltd Curing method and curing balloon of lining concrete
JP2005299323A (en) * 2004-04-15 2005-10-27 Nishimatsu Constr Co Ltd Lining concrete curing device
JP2006183403A (en) * 2004-12-28 2006-07-13 Kajima Corp Ventilating device in tunnel
JP2008163681A (en) * 2006-12-28 2008-07-17 Techno Pro Kk Tunnel sound insulating wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005090146A (en) * 2003-09-19 2005-04-07 Nishimatsu Constr Co Ltd Curing method and curing balloon of lining concrete
JP2005299323A (en) * 2004-04-15 2005-10-27 Nishimatsu Constr Co Ltd Lining concrete curing device
JP2006183403A (en) * 2004-12-28 2006-07-13 Kajima Corp Ventilating device in tunnel
JP2008163681A (en) * 2006-12-28 2008-07-17 Techno Pro Kk Tunnel sound insulating wall

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014227786A (en) * 2013-05-24 2014-12-08 株式会社大林組 Protection device for tunnel blasting
JP2014227787A (en) * 2013-05-24 2014-12-08 株式会社大林組 Protection device for tunnel blasting
JP2014231723A (en) * 2013-05-30 2014-12-11 株式会社大林組 Diffusion prevention device for tunnel
CN103306702A (en) * 2013-06-28 2013-09-18 中铁十七局集团第三工程有限公司 Inflatable isolating device for tunnel ventilation construction
JP2017036552A (en) * 2015-08-07 2017-02-16 西松建設株式会社 Movable blasting protective device
WO2017064343A1 (en) * 2015-10-14 2017-04-20 Obras Subterraneas, S.A. Means and method for controlling the working atmosphere in tunnels
JP2018127846A (en) * 2017-02-10 2018-08-16 鉄建建設株式会社 Silencer for tunnel and silencer system
JP2019183398A (en) * 2018-04-02 2019-10-24 鹿島建設株式会社 Scattering prevention device and scattering prevention method
JP7009287B2 (en) 2018-04-02 2022-01-25 鹿島建設株式会社 Anti-scattering device and anti-scattering method
JP7149725B2 (en) 2018-04-03 2022-10-07 株式会社フジタ Crusher equipped with a bag device for opening and closing the tunnel cross section
CN112901244A (en) * 2021-01-19 2021-06-04 山西天地赛福蒂科技有限公司 Roadway system and operation method thereof
CN113482702A (en) * 2021-07-23 2021-10-08 辽宁科技大学 Rock burst prevention rescue escape trolley based on drilling and blasting method and using method
CN113982658A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Temporary support device for tunnel face
CN113982658B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Temporary supporting device for tunnel face

Also Published As

Publication number Publication date
JP5662854B2 (en) 2015-02-04

Similar Documents

Publication Publication Date Title
JP5662854B2 (en) Face containment device
KR101322765B1 (en) Repair and ventilation facilities of utility-pipe conduit
KR101224880B1 (en) Tunneling Method and related Apparatus for TBM Excavation and Blasting for enlargement, using the Protector and the Muck Car
KR101014779B1 (en) Construction method by concrete lining in parallel with excavation, working platform for reinforcement and waterproofing work and lining form for pouring lining concrete
KR102109969B1 (en) A work bogie for tunnel work
JP5859096B2 (en) Face containment device
JP2004052529A (en) Suction duct device
JP7009287B2 (en) Anti-scattering device and anti-scattering method
CN110454174A (en) A kind of isolated development machine and isolated pumping method for highly gassy mine
JP3706878B2 (en) Expansion method for existing tunnels
JP4634351B2 (en) Dust removal apparatus and dust removal method
JP6514902B2 (en) Tunnel ventilator and ventilation method
JP6572053B2 (en) Mobile blast protection device
JP6872813B2 (en) Tunnel construction equipment and tunnel construction method
JP3996818B2 (en) Work truck for tunnel widening work
JP6851845B2 (en) Tunnel silencer and silencer system
JP6843001B2 (en) Reinforcing bar cage built-in system
JP5757758B2 (en) How to contain the face
JP2004339780A (en) Ventilation method and ventilating device for tunnel inside of a pit
JP4173758B2 (en) Support device for continuous belt conveyor for tunnel construction
CN108331590B (en) Loading type tunnel double-side-wall pilot pit trolley and operation method
KR101458003B1 (en) 2-Arch Tunnel Having Emergency Pathway in Center-Support Structure and Its Constructing Method
JP4215907B2 (en) Inclined trolley
JP2005120746A (en) Conveyor supporting device for tunnel construction work facility
JP2011196135A (en) Shield tunnel and construction method of the same

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20140120

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140123

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140827

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140916

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141110

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141205

R150 Certificate of patent or registration of utility model

Ref document number: 5662854

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250