JP2012128582A - Design information management operation system, design information management operation method and design information management operation program - Google Patents

Design information management operation system, design information management operation method and design information management operation program Download PDF

Info

Publication number
JP2012128582A
JP2012128582A JP2010278409A JP2010278409A JP2012128582A JP 2012128582 A JP2012128582 A JP 2012128582A JP 2010278409 A JP2010278409 A JP 2010278409A JP 2010278409 A JP2010278409 A JP 2010278409A JP 2012128582 A JP2012128582 A JP 2012128582A
Authority
JP
Japan
Prior art keywords
information
item
bom
design
storage unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2010278409A
Other languages
Japanese (ja)
Inventor
Keiji Chono
桂司 蝶野
Koji Nakayama
浩二 中山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2010278409A priority Critical patent/JP2012128582A/en
Publication of JP2012128582A publication Critical patent/JP2012128582A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To suppress generation of useless costs for stock management or delivery by efficiently generating production information considering production-side convenience on the basis of design-side design information.SOLUTION: A computer executes processing for receiving item information 123 and BOM information 124 as design information of a product from an information processing apparatus 115 in a design department and storing the received information in a storage section 106, for receiving from a predetermined terminal designation about unnecessary information at a production side among information contained in the item information 123 and storing data of a designated event in the storage section 106 correspondingly to the relevant information in the item information 123, and for specifying the unnecessary information to which the data of the designated event are made correspondent in the item information 123 in the storage section 106, executing processing of excluding or non-displaying the unnecessary information from the BOM information 124, and transmitting the processed BOM information to an information processing apparatus 131 in a production department.

Description

本発明は、設計情報管理運用システム、設計情報管理運用方法、および設計情報管理運用プログラムに関するものであり、具体的には、設計側の設計情報に基づき生産側都合に配慮した生産情報を効率的に生成し、在庫管理や調達の無駄なコストの発生を抑制する技術に関する。   The present invention relates to a design information management and operation system, a design information management and operation method, and a design information management and operation program. Specifically, the present invention efficiently relates production information in consideration of production side convenience based on design information on the design side. This technology relates to a technology that suppresses generation of unnecessary costs for inventory management and procurement.

製品開発に際し取り扱われる設計や生産に関する情報の管理技術が従来より提案されている。例えば、生産システムの設計変更において、変更前の部品を出来るだけ使い切った後に、変更後の部品へ切替えるための、部品切替えの有効開始日を自動設定する設計変更自動化システムを提供するとの課題の下、以下のような発明が提案されている。   Conventionally, a management technology for information on design and production handled in product development has been proposed. For example, in the design change of a production system, after using up the parts before the change as much as possible, the problem of providing a design change automation system that automatically sets the effective start date of the part change to switch to the part after the change. The following inventions have been proposed.

すなわち、部品の属性情報を持つ品目マスタと、該品目マスタにある部品の相関を示すBOM(Bill Of Materials)と、該BOMに対する設計変更を日付で管理しその日付の変更が可能な変更マスタと、生産計画から各部品の所要量展開を行うMRP(Material Requirements Planning)とを有する生産システムの設計変更自動化システムであって、前記BOMにある部品を別な部品に切替える設計変更の際、生産計画も含めた在庫消費予測日から自動的に切替えるように前記変更マスタを管理するRC(ランニングチェンジ)データベースを有することを特徴とする設計変更自動化システム(特許文献1参照)といった発明である。   That is, an item master having attribute information of parts, a BOM (Bill Of Materials) indicating the correlation of the parts in the item master, a change master capable of managing design changes to the BOM by date and changing the date , A design change automation system for a production system having MRP (Material Requirements Planning) that expands the required amount of each part from the production plan, and at the time of the design change to switch the part in the BOM to another part It is an invention such as a design change automation system (refer to Patent Document 1) characterized by having an RC (running change) database for managing the change master so as to automatically switch from the estimated stock consumption date including the date.

特開2005−25495号公報JP 2005-25495 A

ところで、事業拠点が分散している企業においては、製品開発に伴う設計情報と生産情報とを異なるシステムにて管理運用するケースは多い。このような場合、設計段階で登録された品目・BOM情報といった各種設計情報をもとに、生産側にて各生産工程で必要となる情報を付加して管理運用がなされることとなる。   By the way, in companies where business bases are dispersed, there are many cases where design information and production information associated with product development are managed and operated by different systems. In such a case, based on various design information such as item / BOM information registered at the design stage, information necessary for each production process is added on the production side, and management operation is performed.

しかしながら、設計情報として登録された前記設計情報に、生産側都合では不要な部品等に関する情報や他部品への置換えが生じる部品等に関する情報が含まれてしまっている場合、この設計情報を元に、生産工程にてそれら情報の削除・置換え作業が必要になる。   However, if the design information registered as design information includes information on parts that are not necessary for production reasons or information on parts that are replaced with other parts, the design information is used as a basis. Therefore, it is necessary to delete and replace such information in the production process.

例えば、製造・生産時に必要となる補材情報(例:ネジや止め輪など)は、生産側で調達・管理されるのが一般的であり、設計段階では部材在庫や新規調達の要否などについてタイムリーに把握、判断ができない場合が多い。その為、設計段階では、必要となる部品情報は全て品目登録し、BOMの構成に含めることになる。   For example, auxiliary material information (eg screws, retaining rings, etc.) required during manufacturing and production is generally procured and managed by the production side. In the design stage, it is necessary to stock parts and whether new procurement is required. In many cases, it is not possible to grasp and judge timely. Therefore, at the design stage, all necessary parts information is registered as items and included in the BOM configuration.

また、開発/設計側からは購入部品(外作)として認識され設計情報に品目登録した部品であるが、製造/生産側においては、その部品自体を自社で内作する場合や、生産が間に合わない場合に対応して他社部品に置き換えて(外作)生産調整するケースもある。このような場合、設計情報における品目・BOM情報に関して、生産側都合にてその都度、内作/外作等の変更作業が伴うことになる。   In addition, it is a part that is recognized as a purchased part (outside work) from the development / design side and is registered as an item in the design information. On the manufacturing / production side, the part itself is produced in-house or production is in time. There are cases where production adjustments are made by replacing with parts from other companies (outside work). In such a case, the item / BOM information in the design information is accompanied by a change operation such as in-house / outside work, etc. each time due to production side convenience.

上述したように、設計側から提供される設計情報に、生産側にとって不要な情報、実際の生産現場での事情にそぐわない情報が含まれている場合、例えば、既に自社で確保していたり内作出来るにもかかわらず、不要な補材について過剰発注を行って、部材の在庫管理コストや調達コストを徒に増大させる事態を招く恐れもある。また、生産側で設計情報の詳細なチェックや変更を逐次行っていく作業が発生し、作業にかかる手間や時間は無視できないものであった。   As described above, when the design information provided by the design side includes information that is not necessary for the production side or information that does not match the actual situation at the production site, for example, In spite of being able to do so, there is a risk of over-ordering unnecessary auxiliary materials and increasing the inventory management cost and procurement cost of the members. In addition, the production side has sequentially performed detailed checks and changes of design information, and the labor and time required for the work cannot be ignored.

そこで本発明の目的は、設計側の設計情報に基づき生産側都合に配慮した生産情報を効率的に生成し、在庫管理や調達の無駄なコストの発生を抑制する技術を提供することにある。   Accordingly, an object of the present invention is to provide a technique for efficiently generating production information in consideration of production-side convenience based on design information on the design side and suppressing generation of wasteful costs for inventory management and procurement.

上記課題を解決する本発明の設計情報管理運用システムは、他装置と通信する通信部、および各種データを格納する記憶部と、製品の設計情報である品目情報およびBOM情報を設計部門の情報処理装置より受け付けて、記憶部に格納する処理と、前記品目情報の含む情報のうち生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記品目情報における該当情報に対応付けて記憶部に格納する処理と、記憶部の前記品目情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理を実行する演算部と、を備えることを特徴とする。   The design information management and operation system of the present invention that solves the above problems includes a communication unit that communicates with other devices, a storage unit that stores various data, and item information and BOM information, which are product design information, information processing of the design department. A process of receiving from the device and storing it in the storage unit and a specification regarding unnecessary information on the production side among the information included in the item information is received from a predetermined terminal, and the data of the specified event is associated with the corresponding information in the item information The unnecessary information associated with the data of the specified event in the item information in the storage unit, and the process of excluding or hiding the unnecessary information from the BOM information, And a calculation unit that executes a process of transmitting the processed BOM information to an information processing apparatus in a production department.

また、本発明の設計情報管理運用方法は、他装置と通信する通信部、各種データを格納する記憶部、および演算部を備えたコンピュータが、製品の設計情報である品目情報およびBOM情報を設計部門の情報処理装置より受け付けて、記憶部に格納する処理と、前記品目情報の含む情報のうち生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記品目情報における該当情報に対応付けて記憶部に格納する処理と、記憶部の前記品目情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、を実行することを特徴とする。   In addition, in the design information management and operation method of the present invention, a computer having a communication unit that communicates with other devices, a storage unit that stores various data, and a calculation unit designs item information and BOM information that are product design information. Receive from the information processing device of the department, store in the storage unit, and specify from the specified terminal regarding the unnecessary information on the production side out of the information included in the item information, the data of the specified event corresponding to the item information A process of storing the information in association with information in the storage unit, a process of identifying unnecessary information associated with the specified event data in the item information of the storage unit, and excluding or hiding the unnecessary information from the BOM information And processing for transmitting the processed BOM information to the information processing apparatus in the production department.

また、本発明の設計情報管理運用プログラムは、他装置と通信する通信部、各種データを格納する記憶部、および演算部を備えたコンピュータに、製品の設計情報である品目情報およびBOM情報を設計部門の情報処理装置より受け付けて、記憶部に格納する処理と、前記品目情報の含む情報のうち生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記品目情報における該当情報に対応付けて記憶部に格納する処理と、記憶部の前記品目情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、を実行させることを特徴とする。   The design information management and operation program of the present invention designs product information and BOM information, which are product design information, on a computer having a communication unit that communicates with other devices, a storage unit that stores various data, and a calculation unit. Receive from the information processing device of the department, store in the storage unit, and specify from the specified terminal regarding the unnecessary information on the production side out of the information included in the item information, the data of the specified event corresponding to the item information A process of storing the information in association with information in the storage unit, a process of identifying unnecessary information associated with the specified event data in the item information of the storage unit, and excluding or hiding the unnecessary information from the BOM information And processing for transmitting the processed BOM information to the information processing apparatus in the production department.

本発明によれば、設計側の設計情報に基づき生産側都合に配慮した生産情報を効率的に生成し、在庫管理や調達の無駄なコストの発生を抑制することができる。   ADVANTAGE OF THE INVENTION According to this invention, the production information which considered production side convenience was efficiently produced | generated based on the design information on the design side, and generation | occurrence | production of useless cost of inventory management and procurement can be suppressed.

本実施形態の設計情報管理運用システムを含むネットワーク構成例を示す図である。It is a figure which shows the network structural example containing the design information management operation system of this embodiment. 本実施形態における各種情報のデータ構成例1を示す図である。It is a figure which shows the data structural example 1 of the various information in this embodiment. 本実施形態における各種情報のデータ構成例2を示す図である。It is a figure which shows the data structural example 2 of the various information in this embodiment. 本実施形態における概念例を示す図である。It is a figure which shows the example of a concept in this embodiment. 本実施形態の設計情報管理運用方法の処理手順例1を示すフロー図である。It is a flowchart which shows the process procedure example 1 of the design information management operation method of this embodiment. 本実施形態の設計情報管理運用方法の処理手順例2を示すフロー図である。It is a flowchart which shows the process procedure example 2 of the design information management operation method of this embodiment. 本実施形態における設計BOMから生産BOMへの遷移例1を示す図である。It is a figure which shows the example 1 of a transition from design BOM in this embodiment to production BOM. 本実施形態における設計BOMから生産BOMへの遷移例2を示す図である。It is a figure which shows the example 2 of a transition from design BOM in this embodiment to production BOM. 本実施形態の設計情報管理運用方法の処理手順例3を示すフロー図である。It is a flowchart which shows the process procedure example 3 of the design information management operation method of this embodiment.

−−−システム構成−−−
以下に本発明の実施形態について図面を用いて詳細に説明する。図1は、本実施形態の設計情報管理運用システムを含むネットワーク構成図である。図1に示す設計情報管理運用システム102は、設計側の設計情報に基づき生産側都合に配慮した生産情報を効率的に生成し、在庫管理や調達の無駄なコストの発生を抑制するコンピュータシステムである。
--- System configuration ---
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a network configuration diagram including the design information management and operation system of this embodiment. The design information management and operation system 102 shown in FIG. 1 is a computer system that efficiently generates production information in consideration of production convenience based on design information on the design side, and suppresses generation of wasteful costs for inventory management and procurement. is there.

本実施形態の設計情報管理運用システム102は、例えば、設計部門と生産部門ないし調達部門との間にあって、製品開発に伴う設計情報と生産情報とのいわば自動変換を担うサーバ装置を想定できる。また、設計部門、生産部門、調達部門等の中で、製品の開発、設計〜部品調達、製品製造といった各プロセスについて電子的に業務管理を行う、いわゆるワークフローシステムが構築されている状況も想定できる。   The design information management and operation system 102 of this embodiment can be assumed to be a server device that is between a design department and a production department or a procurement department, and is responsible for automatic conversion of design information and production information associated with product development. It is also possible to assume a situation where a so-called workflow system has been established that electronically manages operations for each process from product development, design to parts procurement, and product manufacturing in the design department, production department, procurement department, etc. .

前記設計情報管理運用システム102は、本実施形態の設計情報管理運用方法を実行するためのプログラム109をハードディスクドライブ等で構成される記憶部106に保持しており、CPU等で構成される演算部104が前記プログラム109を読み出して実行し、必要な機能を実装することになる。また、設計情報管理運用システム102は、外部からの入力を受け付けるインターフェイスたる入力部103、外部へ送出する情報の管理を担う出力部107、およびネットワーク101を介した外部装置との通信処理を担う通信部108を備えている。   The design information management and operation system 102 holds a program 109 for executing the design information management and operation method of the present embodiment in a storage unit 106 configured by a hard disk drive or the like, and an arithmetic unit configured by a CPU or the like. 104 reads and executes the program 109, and implements necessary functions. In addition, the design information management and operation system 102 includes an input unit 103 that is an interface that receives input from the outside, an output unit 107 that manages information to be sent to the outside, and communication that performs communication processing with external devices via the network 101. Part 108 is provided.

なお、記憶部106には、前記プログラム109の他に、メーカ部品情報121、図面ファイル情報122、品目情報123、BOM情報124、設計変更情報125、ユーザ情報126を記憶するものとする。これら各種情報121〜126のデータ構造例については後述する。   In addition to the program 109, the storage unit 106 stores manufacturer part information 121, drawing file information 122, item information 123, BOM information 124, design change information 125, and user information 126. Examples of the data structure of these various types of information 121 to 126 will be described later.

また、前記設計情報管理運用システム102は、ネットワーク101を介して、外部端末115、組込制御部110、伝送プログラム111、および生産情報管理システム131らと通信可能に結ばれている。なお、前記組み込み制御部110は設計情報管理運用システム102の概念に含まれるものとし、当該設計情報管理運用システム102と一体に協働する適宜な端末に実装されていることが想定できる。図1に例示したネットワーク構成が全て1つの企業内で完結する場合、前記ネットワーク101は社内ネットワークとなる。勿論、インターネット等の公衆回線網であってもよい。なお、設計情報管理運用システム102は、例えばネットワーク101および伝送プログラム111を介して、生産情報管理システム131とのデータ授受が可能であるとする。また、この生産情報管理システム131は部品発注システム133と接続可能とする。   The design information management and operation system 102 is connected to the external terminal 115, the built-in control unit 110, the transmission program 111, the production information management system 131, and the like via the network 101. The embedded control unit 110 is assumed to be included in the concept of the design information management and operation system 102, and can be assumed to be mounted on an appropriate terminal that cooperates integrally with the design information management and operation system 102. When all of the network configurations illustrated in FIG. 1 are completed within one company, the network 101 is an in-house network. Of course, it may be a public line network such as the Internet. It is assumed that the design information management operation system 102 can exchange data with the production information management system 131 via the network 101 and the transmission program 111, for example. The production information management system 131 can be connected to the parts ordering system 133.

続いて、本実施形態の設計情報管理運用システム102が備える機能について説明する。上述したように、以下に説明する機能は、例えば設計情報管理運用システム102が備えるプログラム109を実行することで実装される機能と言える。   Next, functions provided in the design information management operation system 102 of this embodiment will be described. As described above, the functions described below can be said to be functions implemented by executing the program 109 provided in the design information management and operation system 102, for example.

前記設計情報管理運用システム102は、製品の設計情報である品目情報123およびBOM情報124を設計部門の情報処理装置、例えば、前記ネットワーク101に接続された外部端末115より受け付けて、記憶部106に格納する機能を有する。   The design information management and operation system 102 receives item information 123 and BOM information 124, which are product design information, from an information processing apparatus of a design department, for example, an external terminal 115 connected to the network 101, and stores it in the storage unit 106. Has the function of storing.

また、前記設計情報管理運用システム102は、前記品目情報123の含む情報のうち生産側での不要情報に関する指定を所定端末、例えば、生産部門担当者の端末140ないし調達部門担当者の端末150より受け付け、該指定事象のデータ(例えば、所定テキストやフラグといったキーデータ)を前記品目情報123における該当情報に対応付けて記憶部106に格納する機能を有する。   In addition, the design information management and operation system 102 designates unnecessary information on the production side from the information included in the item information 123 from a predetermined terminal, for example, the terminal 140 of the person in charge of the production department or the terminal 150 of the person in charge of the procurement department. It has a function of accepting and storing the data of the designated event (for example, key data such as a predetermined text and a flag) in the storage unit 106 in association with the corresponding information in the item information 123.

また、前記設計情報管理運用システム102は、記憶部106の前記品目情報123において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報124から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報124を、生産部門の情報処理装置、すなわち前記生産情報管理システム131に送信する機能を有する。前記不要情報の除外ないし非表示の処理は、例えば、該当情報自体の削除の他、生産情報管理システム131に対する、該当情報が含む文字の文字色を「透明」ないし「背景色」とする表示指示、該当情報の表示に際して所定色の領域で覆うといったマスキング指示、などが想定できる。   In addition, the design information management and operation system 102 identifies unnecessary information associated with the specified event data in the item information 123 of the storage unit 106, and excludes or hides the unnecessary information from the BOM information 124. It has a function of executing the process and transmitting the processed BOM information 124 to the information processing apparatus in the production department, that is, the production information management system 131. The unnecessary information exclusion or non-display processing includes, for example, a display instruction for deleting the corresponding information itself and setting the character color of the character included in the corresponding information to “transparent” or “background color” to the production information management system 131 A masking instruction such as covering with a predetermined color area when displaying the corresponding information can be assumed.

また、前記設計情報管理運用システム102は、生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置、例えば前記外部端末115より受け付けて、記憶部106における該当製品に関する品目情報123に格納し、前記該当製品に関するBOM情報124において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる機能を有する。   In addition, the design information management and operation system 102 designs both information on an item in the case of an external work and an item in the case of an internal work for one part that can be either an external work or an internal work at the time of production or procurement. The information is received from the information processing apparatus of the department, for example, the external terminal 115, and stored in the item information 123 related to the corresponding product in the storage unit 106. In the BOM information 124 related to the corresponding product, Both the information corresponding to the item of the product and the information corresponding to the item of the product are subordinated.

また、前記設計情報管理運用システム102は、前記BOM情報123における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末、例えば前記生産部門担当者の端末140ないし調達部門担当者の端末150より受け付け、該指定事象のデータ(例えば、所定値“0”を示すフラグ)を前記BOM情報123における該当情報に対応付けて記憶部106に格納する機能を有する。   In addition, the design information management and operation system 102 designates the information regarding the unnecessary information on the production side among the information of each item of the internal work and the external work related to the one part in the BOM information 123, for example, in charge of the production department The data of the designated event (for example, a flag indicating a predetermined value “0”) is stored in the storage unit 106 in association with the corresponding information in the BOM information 123. It has a function.

また、前記設計情報管理運用システム102は、記憶部106の前記BOM情報123において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報123から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報123を、生産部門の情報処理装置たる前記生産情報管理システム131に送信する機能を有する。   Further, the design information management and operation system 102 identifies unnecessary information associated with the data of the specified event in the BOM information 123 of the storage unit 106, and excludes or hides the unnecessary information from the BOM information 123. It has a function of executing processing and transmitting the processed BOM information 123 to the production information management system 131 which is an information processing apparatus in the production department.

なお、設計情報管理運用システム102は、前記生産側での不要情報に関する指定に代えて、前記生産側での必要情報に関する指定を受け付けて、該指定事象のデータ(例えば、所定値“1”を示すフラグ)を前記BOM情報123における該当情報に対応付けて記憶部106に格納するとしてもよい。この場合、設計情報管理運用システム102は、記憶部106の前記BOM情報123において前記指定事象のデータが対応付いている必要情報を特定し、前記BOM情報123において、前記1の部品に関する内作および外作の各品目の情報うち必要情報だけを残す処理を実行し、該処理済みのBOM情報123を、生産部門の情報処理装置たる前記生産情報管理システム131に送信するとしてもよい。   The design information management and operation system 102 accepts designation regarding necessary information on the production side instead of designation regarding unnecessary information on the production side, and sets the specified event data (for example, a predetermined value “1”). May be stored in the storage unit 106 in association with the corresponding information in the BOM information 123. In this case, the design information management and operation system 102 specifies necessary information associated with the data of the designated event in the BOM information 123 of the storage unit 106, and the BOM information 123 includes an internal work and It is also possible to execute a process of leaving only necessary information among the information of each item of the external work, and transmit the processed BOM information 123 to the production information management system 131 which is an information processing apparatus of the production department.

また、前記設計情報管理運用システム102は、予めユーザ毎のID、パスワード等が登録されたユーザ情報126に基づき、ネットワーク101を介してアクセスしてきた外部端末115に対しID、パスワードの要求を行い、当該要求に応じて取得した情報をユーザ情報126で照合し、アクセス時の認証処理を行う。   The design information management and operation system 102 requests the ID and password to the external terminal 115 accessed via the network 101 based on the user information 126 in which the ID and password for each user are registered in advance. The information acquired in response to the request is collated with the user information 126, and authentication processing at the time of access is performed.

また、前記設計情報管理運用システム102は、前記入力部103において専用Viewerを具備しており、前記外部端末115からの要求に応じ、記憶部106で管理される各情報の検索や検索結果の表示処理をする機能を具備している。   In addition, the design information management and operation system 102 includes a dedicated viewer in the input unit 103, and in response to a request from the external terminal 115, searches for information managed by the storage unit 106 and display of search results. It has a function to process.

また、前記専用Viewerは、外部端末115からの新規情報の登録や、前記検索にて表示した各情報の追加、変更、カスタマイズを可能とし、新規登録やカスタマイズ等の対象情報を、記憶部106の各情報に登録・変更する機能を具備する。   The dedicated viewer can register new information from the external terminal 115 and add, change, and customize each information displayed in the search, and stores target information such as new registration and customization in the storage unit 106. It has a function to register and change each information.

また、前記専用Viewerは、ワークフロー機能を具備し、後述する設計変更情報のステータス情報を変更する機能を有する。またワークフロー機能には、サインオフ処理(承認・却下)を有し、設計変更情報に承認済みであるか否かを設定することを可能にする。また、ワークフロー機能は、前記サインオフ処理にて承認済みである場合のみ、後述するリリース処理を実行可とし、却下処理された場合はリリース処理を不可とする機能を具備する。   The dedicated viewer has a workflow function and a function of changing status information of design change information described later. The workflow function has a sign-off process (approval / rejection), and it is possible to set whether or not the design change information has been approved. Further, the workflow function includes a function that allows a release process described later to be executed only when it has been approved in the sign-off process, and disables the release process when it is rejected.

また、前記設計情報管理運用システム102は、前記出力部107において、伝送用記憶部105を有している。設計情報管理運用システム102は、ネットワーク101を介して接続する組込制御部110からの制御命令に応じて、演算部104の制御をトリガーに、記憶部106に登録された各種情報を抽出/加工し、当該伝送用記憶部105に伝送データを生成する機能を具備する。また、前記設計情報管理運用システム102は、前記伝送用記憶部105に生成された伝送データに対し、生成処理が完了したことを意味する所定の完了フラグを付加する。   In addition, the design information management and operation system 102 includes a transmission storage unit 105 in the output unit 107. The design information management and operation system 102 extracts / processes various types of information registered in the storage unit 106 in response to a control command from the embedded control unit 110 connected via the network 101, triggered by the control of the calculation unit 104. The transmission storage unit 105 has a function of generating transmission data. Further, the design information management and operation system 102 adds a predetermined completion flag indicating that the generation process is completed to the transmission data generated in the transmission storage unit 105.

なお、前記伝送プログラム111は、前記出力部107が有する伝送用記憶部105を常時監視する機能を有するとともに、前記伝送用記憶部105に生成された伝送データのうち完了フラグがたっているものを、定期的に外部媒体、例えば前記生産情報管理システム131へ伝送する機能を具備する。   The transmission program 111 has a function of constantly monitoring the transmission storage unit 105 of the output unit 107, and the transmission data generated in the transmission storage unit 105 has a completion flag. A function of periodically transmitting to an external medium, for example, the production information management system 131 is provided.

一方、前記生産情報管理システム131は、前記設計情報管理運用システム102の伝送用記憶部105から伝送プログラム111を介し伝送されるデータを、一時的に格納する一時記憶部135を有している。また前記生産情報管理システム131は、この一時記憶部135に定期的且つ自動的にアクセスし、格納されている情報を生産情報132へ反映する機能を具備する。   On the other hand, the production information management system 131 has a temporary storage unit 135 that temporarily stores data transmitted from the transmission storage unit 105 of the design information management operation system 102 via the transmission program 111. Further, the production information management system 131 has a function of regularly and automatically accessing the temporary storage unit 135 and reflecting the stored information in the production information 132.

また前記生産情報管理システム131は、前記設計情報管理運用システム102から伝送された各種情報を生産情報132として取り込み、参照および加工する機能を具備する。また、生産情報管理システム131は、前記生産情報132を参照しながら、部品の在庫管理や発注機能を具備する部品発注システム133にアクセスすることを可能とする。   Further, the production information management system 131 has a function of taking various information transmitted from the design information management and operation system 102 as production information 132, referring to and processing the information. Further, the production information management system 131 can access the part ordering system 133 having parts inventory management and ordering functions while referring to the production information 132.

−−−データ構造例−−−
次に、本実施形態の設計情報管理運用システム102が前記記憶部106にて備えるデータの構造例について説明する。前記設計情報管理運用システム102は、自身の備える、或いはネットワーク経由で利用可能なハードディスクドライブなどの不揮発性記憶装置において、前記各情報121〜126を備えている。
--- Data structure example ---
Next, an example of the data structure provided in the storage unit 106 in the design information management and operation system 102 of this embodiment will be described. The design information management and operation system 102 includes the information 121 to 126 in its own or a non-volatile storage device such as a hard disk drive that can be used via a network.

図2は本実施形態における各種情報のデータ構成例1を示す図であり、図3は本実施形態における各種情報のデータ構成例2を示す図である。図2および図3に示すように、例えば、品目に関わる情報は品目情報123に、この品目情報123に関連付けたいメーカ部品に関する情報はメーカ部品情報121に、品目情報123やメーカ部品情報121に関連付けたい図面やファイルに関する情報は図面ファイル情報122に各々登録される。当然これらの関連付けに際しては、各情報間で共通のデータ項目をキーにレコード同士が関連付けされている。   FIG. 2 is a diagram showing a data configuration example 1 of various information in the present embodiment, and FIG. 3 is a diagram showing a data configuration example 2 of various information in the present embodiment. As shown in FIG. 2 and FIG. 3, for example, information relating to an item is associated with item information 123, information regarding a maker part to be associated with this item information 123 is associated with maker part information 121, and item information 123 or maker part information 121. Information about the desired drawing and file is registered in the drawing file information 122, respectively. Of course, in association with each other, records are associated with each other using a data item common to each information as a key.

このうち前記品目情報123は、例えば各品目毎の品目No、品目タイプ、品名、確定したRev.(リビジョン)、メーカ部品、補材キー(不要情報に関する指定事象のデータ)、ファイルNo.など、品目に関わる各情報が含まれるレコードの集合体である。この品目情報123における前記品目タイプとしては、製品、半製品、部品などのタイプに分けられる。また、前記補材キーすなわち不要情報に関する指定事象のデータは、前記品目タイプ毎に、登録可能か否か予め決まっている。本実施形態では、一例として、品目タイプ「部品」についてのみ補材キーを登録出来るものとしている。   Among these items, the item information 123 includes, for example, the item number, item type, item name, and confirmed Rev. for each item. (Revision), manufacturer part, auxiliary material key (specified event data regarding unnecessary information), file No. For example, it is a collection of records including information related to items. The item types in the item information 123 are classified into types such as products, semi-finished products, and parts. In addition, it is determined in advance whether or not the data of the designated event related to the auxiliary material key, that is, the unnecessary information, can be registered for each item type. In this embodiment, as an example, it is assumed that the auxiliary material key can be registered only for the item type “part”.

また、前記メーカ部品情報121は、前記品目情報123との関連づけキーとなるメーカ部品(形名)、該当部品の取引先名、認定Status、環境Statusなど、メーカ部品に関わる情報を含んだレコードの集合体である。   The maker part information 121 is a record including information related to the maker part, such as a maker part (model name), which is an association key with the item information 123, a supplier name of the corresponding part, an authorized status, and an environmental status. It is an aggregate.

また、前記図面ファイル情報122は、前記品目情報123との関連づけキーとなるファイルNo、該当ファイルの説明、ファイル名称など、品目情報123のレコードで必要に応じて品目毎に指定されている、部品等に関する図面やファイルの情報を含むレコードの集合体である。   In addition, the drawing file information 122 is specified for each item as necessary in a record of the item information 123, such as a file No. as a key associated with the item information 123, a description of the corresponding file, and a file name. This is a collection of records that contain drawing and file information related to, etc.

また、前記BOM情報124は、親品目毎に子品目側の品目No、Rev.などのデータを含み、親品目の構成情報として、接続する子品目毎の行番号、数量、Category、コメントなどの情報を含むレコードの集合体である。換言すると、前記品目情報123のレコードを、その親子関係に応じてツリー上に配置したのがBOM(Bill of Materials)情報124とも言える。   Further, the BOM information 124 includes, for each parent item, the item number, Rev. This is a set of records including information such as line number, quantity, category, and comment for each connected child item as the configuration information of the parent item. In other words, it can be said that the BOM (Bill of Materials) information 124 is that the records of the item information 123 are arranged on the tree according to the parent-child relationship.

また、前記ユーザ情報126は、設計情報管理運用システム102に対し所定の端末等を介しアクセスするユーザの認証用情報が格納されたテーブルであり、各ユーザのユーザIDとパスワードとが対応付けされたレコードの集合体である。   The user information 126 is a table in which authentication information for users accessing the design information management operation system 102 via a predetermined terminal or the like is stored, and the user ID and password of each user are associated with each other. A collection of records.

また、設計変更情報(図3)は、上記各情報121〜124の登録・管理するための情報であり、変更指示のキーとなる変更番号、新規登録または設計変更する対象品目、BOM変更、メーカ部品変更、図面ファイル変更の各情報が含まれている。   The design change information (FIG. 3) is information for registering and managing each of the above-mentioned information 121 to 124. The change number is a key for change instruction, the target item to be newly registered or changed, BOM change, manufacturer Each information of part change and drawing file change is included.

対象品目設定の情報としは、新規登録または設計変更の対象となる品目毎の品目No、確定済みのRev/Statusとして旧Rev、旧Status、新規登録または変更後のRev/Statusとして新Rev、新Status、生産部門等に生産開始を指示する為の有効開始日などの情報が含まれる。   The target item setting information includes the item number for each item that is the subject of new registration or design change, the old Rev as the Rev / Status that has been confirmed, the old Status, the new Rev as the Rev / Status after the new registration or change, and the new Information such as an effective start date for instructing the start of production to Status, a production department, or the like is included.

また、BOM変更設定の情報としては、新規BOM登録またはBOM変更対象となる品目毎に、構成対象となる子品目毎の処理区分、品目No、その構成情報として行番号、数量、Category、コメントなどの情報が含まれる。   In addition, as information on the BOM change setting, for each item to be registered as a new BOM or BOM change, a processing classification for each child item to be configured, an item number, and its configuration information such as line number, quantity, category, comment, etc. Information is included.

また、メーカ部品変更設定の情報としては、新規に関連づけまたは変更対象となる品目毎の処理区分、メーカ形名、取引先名、認定Status、環境Statusなどの情報が含まれる。また、図面ファイル変更設定の情報としては、新規に関連付けまたは変更対象となる品目毎の処理区分、ファイルNo、ファイル説明、ファイル名称などの情報が含まれる。   Further, information on the manufacturer part change setting includes information such as a processing category, a manufacturer model name, a supplier name, an authorized status, and an environmental status for each item to be newly associated or changed. In addition, the drawing file change setting information includes information such as a processing classification, a file number, a file description, and a file name for each item to be newly associated or changed.

−−−処理手順例1−−−
以下、本実施形態における設計情報管理運用方法の実際手順について図に基づき説明する。以下で説明する設計情報管理運用方法に対応する各種動作は、前記設計情報管理運用システム102のメモリ等に読み出して実行するプログラムによって実現される。そして、このプログラムは、以下に説明される各種の動作を行うためのコードから構成されている。
--- Example of processing procedure 1 ---
Hereinafter, an actual procedure of the design information management operation method according to the present embodiment will be described with reference to the drawings. Various operations corresponding to the design information management and operation method described below are realized by a program that is read into the memory or the like of the design information management and operation system 102 and executed. And this program is comprised from the code | cord | chord for performing the various operation | movement demonstrated below.

まずは本実施形態における、BOMの構成がリビジョンに応じて変更される状況について図4に基づき具体例を説明する。図4にて示すように、この事例では、「Rev.1」のBOM情報124が示す構成に対し、「Rev.2」のBOM情報124が示す構成へ変更がなされる際の処理について想定している。例えば、品目情報123における製品「S001」の情報は、図4の「Rev.1」のBOM構成にて示すように、半製品「SA01」を構成に含んでいる。また、半製品「SA01」は、部品「A001」から構成されている。また、図4および図2の品目情報123にて示したように、前記部品「A001」は、メーカ部品「ABC001」と図面ファイル「F−A001」に関連づけられ、「Rev.1」として確定しているとする。   First, a specific example of the situation in which the BOM configuration in the present embodiment is changed according to the revision will be described with reference to FIG. As shown in FIG. 4, in this case, it is assumed that the process when the configuration indicated by the BOM information 124 of “Rev. 1” is changed to the configuration indicated by the BOM information 124 of “Rev. 2” is assumed. ing. For example, the information on the product “S001” in the item information 123 includes the semi-finished product “SA01” as shown in the BOM configuration “Rev. 1” in FIG. The semi-finished product “SA01” is composed of a part “A001”. 4 and 2, the part “A001” is associated with the manufacturer part “ABC001” and the drawing file “F-A001”, and is confirmed as “Rev. 1”. Suppose that

こうしたBOM構成より、製品「S001」に変更が生じ、半製品「SA02」を新規に追加するものとする。尚、半製品「SA02」は、図4の「Rev.2」のBOM構成に示すように、部品「A002」と部品「A003」より構成されている。また、前記部品「A002」は、図2の品目情報123にて示したように、メーカ部品「ABC002」と図面ファイル「F−A002」が関連づけされている。また同様に、部品「A003」はメーカ部品「DEF001」と図面ファイル「A003」が関連づけされている。 図5は、本実施形態における設計情報管理運用方法の処理手順例1を示すフロー図である。   It is assumed that the product “S001” is changed due to such a BOM configuration, and the semi-finished product “SA02” is newly added. The semi-finished product “SA02” is composed of a part “A002” and a part “A003” as shown in the BOM configuration “Rev. 2” in FIG. Further, as shown in the item information 123 of FIG. 2, the part “A002” is associated with the manufacturer part “ABC002” and the drawing file “F-A002”. Similarly, the part “A003” is associated with the manufacturer part “DEF001” and the drawing file “A003”. FIG. 5 is a flowchart showing a processing procedure example 1 of the design information management operation method according to the present embodiment.

このような、設計情報すなわち品目情報123やBOM情報124における、新規情報の生成処理、および既存情報の変更処理について説明する。図5は、本実施形態の設計情報管理運用方法の処理手順例1を示すフロー図である。尚、品目情報123(図2(a))と、BOM情報124(図2(d)については、設計変更情報125(図3)のリリース処理前後の状態に分けて説明する。ここで言う「リリース」は内容の承認を適宜なプロセスで受けてリビジョンが確定することを指す。つまり「リリース」がなされるとその内容で生産部門や調達部門等は該当製品製造に向けて稼働することとなる。   A process for generating new information and a process for changing existing information in design information, that is, item information 123 and BOM information 124 will be described. FIG. 5 is a flowchart showing a processing procedure example 1 of the design information management operation method of the present embodiment. The item information 123 (FIG. 2A) and the BOM information 124 (FIG. 2D) will be described separately before and after the release process of the design change information 125 (FIG. 3). “Release” means that the content is approved through an appropriate process and the revision is confirmed.In other words, when “Release” is made, the production department, procurement department, etc. operate for the production of the corresponding product. .

まずは設計変更情報125のリリース処理までの各工程について説明する。この場合、前記設計情報管理運用システム102は、品目情報123やBOM情報124等において変更がされる対象品目が新規品目か否かを判別する(s100)。この判別は、前記入力部103の専用Viewerが有する検索機能を用い、ユーザの操作する例えば外部端末115から受け付けた変更対象の品目Noなどのキー情報を検索キーとして、対象品目が記憶部106の各情報に登録済みであるか否か確認することで実行する。この検索の結果、対象品目が登録されていなければ(s100:Y)、前記設計情報管理運用システム102は、対象品目が新規品目と認識し、処理を次のステップs101に進める。他方、前記検索の結果、対象品目が登録されていれば(s100:N)、前記設計情報管理運用システム102は、対象品目が既存品目と認識し、処理をステップs106に進める。   First, each process until the release process of the design change information 125 will be described. In this case, the design information management and operation system 102 determines whether the target item to be changed in the item information 123, the BOM information 124, or the like is a new item (s100). For this determination, the search function of the dedicated viewer of the input unit 103 is used, and the target item is stored in the storage unit 106 using, for example, key information such as the item number to be changed received from the external terminal 115 operated by the user as a search key. It is executed by checking whether or not each information has been registered. If the target item is not registered as a result of the search (s100: Y), the design information management and operation system 102 recognizes that the target item is a new item, and advances the processing to the next step s101. On the other hand, if the target item is registered as a result of the search (s100: N), the design information management system 102 recognizes that the target item is an existing item, and advances the process to step s106.

本事例で、この新規品目情報生成のステップ(s101)における設計情報管理運用システム102は、製品「S001」に関する品目情報123に関し、半製品「SA02」、部品「A002」、部品「A003」の各情報の入力をユーザから受け付けて、これら情報を追加することとなる。   In this example, the design information management and operation system 102 in the new item information generation step (s101) relates to the item information 123 related to the product “S001”, each of the semi-product “SA02”, the part “A002”, and the part “A003”. The input of information is accepted from the user, and this information is added.

次に、設計情報管理運用システム102は、メーカ部品情報や図面ファイルの要否に関して確認要求を前記外部端末115に送り、当該外部端末115からその指示を受け付ける(s102)。ここで受け付けた指示が「必要」とのものであれば(s102:Y)、これに応じた設計情報管理運用システム102は、前記外部端末115からの指示に応じて、メーカ部品情報121や図面ファイル情報122において新たなレコードの生成を実行する(s103)。この時、前記設計情報管理運用システム102は、前記品目情報123における前記新規品目が示すメーカー部品の名称等をキーとして、予め記憶部106で保持するメーカー部品情報中から該当情報を抽出し、メーカー部品情報121のレコードに設定する(=品目接続)。例えば、メーカ部材を購入して設計する、いわゆる品目タイプが「部品」である品目情報に関して、設計者等は設計情報管理運用システム102の記憶部106に予め必要となるメーカ部品情報を登録しておく。また、メーカ部品の購入仕様書や半製品の組立設計仕様書など、いわゆる「図面」や「ファイル」を、ユーザが品目情報123と一緒に管理したい場合、ユーザは予め必要となる図面ファイル情報122を設計情報管理運用システム102の記憶部106に登録しておき、前記品目接続に備えることができる。   Next, the design information management operation system 102 sends a confirmation request to the external terminal 115 regarding whether or not the manufacturer part information and the drawing file are necessary, and receives the instruction from the external terminal 115 (s102). If the received instruction is “necessary” (s102: Y), the design information management and operation system 102 according to the instruction receives the manufacturer part information 121 and the drawing according to the instruction from the external terminal 115. A new record is generated in the file information 122 (s103). At this time, the design information management and operation system 102 extracts the relevant information from the manufacturer part information stored in the storage unit 106 in advance using the name of the manufacturer part indicated by the new item in the item information 123 as a key. It is set in the record of the component information 121 (= item connection). For example, with respect to item information in which a so-called item type is “parts” for purchasing and designing a manufacturer member, a designer or the like registers necessary manufacturer part information in the storage unit 106 of the design information management operation system 102 in advance. deep. In addition, when the user wants to manage so-called “drawings” and “files” such as purchase specifications of manufacturer parts and assembly design specifications of semi-finished products together with the item information 123, the user needs drawing file information 122 required in advance. Can be registered in the storage unit 106 of the design information management operation system 102 to prepare for the item connection.

なお、前記ステップs102において、前記外部端末115から受け付けた指示が「不要」とのものであれば(s102:N)、設計情報管理運用システム102は処理をステップs104に進める。   If the instruction received from the external terminal 115 is “unnecessary” in step s102 (s102: N), the design information management system 102 advances the process to step s104.

本事例の設計情報管理運用システム102は、前記メーカ部品/図面ファイル情報生成・品目接続のステップs103にて、部品「A002」に接続するメーカ部品「ABC002」の情報と、部品「A003」に接続するメーカ部品「DEF001」の情報を、メーカ部品情報121に追加生成する。また同様に、部品「A002」に接続する図面ファイル「F−A002」の情報と、部品「A003」に接続する図面ファイル「F−A003」の情報を、図面ファイル情報122に追加生成するものとする。   The design information management and operation system 102 in this example is connected to the information of the manufacturer part “ABC002” connected to the part “A002” and the part “A003” in step s103 of the manufacturer part / drawing file information generation / item connection. Information of the manufacturer part “DEF001” to be added is additionally generated in the manufacturer part information 121. Similarly, information on the drawing file “F-A002” connected to the part “A002” and information on the drawing file “F-A003” connected to the part “A003” are additionally generated in the drawing file information 122. To do.

続いて、設計情報管理運用システム102は、前記新規品目のBOM情報124への追加要否について前記外部端末115に確認要求する(s104)。外部端末115からの指示が「必要」であれば(s104:Y)、設計情報管理運用システム102は、新規BOM情報の生成を実施する(s105)。例えば、前記新規品目が、複数の部品を組立して構成する半製品であった場合、その半製品を親品目とし、これを構成する各部品をその子品目に、いわゆるBOM構成として登録することができる。本事例の設計情報管理運用システム102は、前記ステップs105にて、BOM情報124に対し、親品目が半製品「SA02」、子品目が部品「A002」と部品「A003」となるBOM構成を追加生成する。他方、前記ステップs104において、外部端末115からの指示が「不要」であれば(s104:N)、設計情報管理運用システム102は、処理をステップs106に進める。   Subsequently, the design information management and operation system 102 requests the external terminal 115 to confirm whether or not the new item needs to be added to the BOM information 124 (s104). If the instruction from the external terminal 115 is “necessary” (s104: Y), the design information management operation system 102 generates new BOM information (s105). For example, when the new item is a semi-finished product formed by assembling a plurality of parts, the semi-finished product may be registered as a parent item, and each part constituting the semi-finished product may be registered as a so-called BOM configuration. it can. In step s105, the design information management and operation system 102 in this example adds a BOM configuration in which the parent item is a semi-finished product “SA02” and the child items are a part “A002” and a part “A003” to the BOM information 124. Generate. On the other hand, if the instruction from the external terminal 115 is “unnecessary” in step s104 (s104: N), the design information management operation system 102 advances the process to step s106.

次に、設計情報管理運用システム102は変更情報の生成を実施する(s106)。本事例の設計情報管理運用システム102は、当該ステップs106にて、前記設計変更情報125での対象品目設定として、変更対象となる製品「S001」に関して、新規追加対象となる半製品「SA02」、部品「A002」、部品「A003」の各情報を生成・設定する。また、前記設計情報管理運用システム102は、設計変更情報125でのBOM変更設定として、半製品「SA02」を前記製品「S001」の子品目として新たに生成・設定し、更に前記半製品「SA02」を構成する部品「A002」と部品「A003」を新たに生成・設定する。   Next, the design information management operation system 102 generates change information (s106). In step s106, the design information management and operation system 102 of the present case, as the target item setting in the design change information 125, with respect to the product “S001” to be changed, the semi-product “SA02” to be newly added, Each information of the part “A002” and the part “A003” is generated and set. Further, the design information management and operation system 102 newly generates and sets a semi-product “SA02” as a child item of the product “S001” as a BOM change setting in the design change information 125, and further, the semi-product “SA02”. "A002" and part "A003" are newly generated and set.

また、前記設計情報管理運用システム102は、前記設計変更情報125でのメーカ部品変更設定として、前記部品「A002」に新規に関連づけするメーカ部品「ABC002」と、前記部品「A003」に新規に関連づけするメーカ部品「DEF001」の情報を生成・設定する。   Further, the design information management and operation system 102 newly associates the manufacturer part “ABC002” newly associated with the part “A002” and the part “A003” as the manufacturer part change setting in the design change information 125. Information of the manufacturer part “DEF001” to be generated is set.

また、前記設計情報管理運用システム102は、前記設計変更情報125での図面ファイル変更設定として、前記半製品「SA02」に新規に関連付けするファイル「F−SA02」の情報を生成・設定し、前記部品「A002」に新規に関連付けするファイル「F−A002」の情報を生成・設定し、前記部品「A003」に新規に関連付けするファイル「F−A003」の情報を生成・設定する。また、その他、上記各設定で必要となる新Revの情報等を生成・設定する。当然ながら、新規に部品が追加され、BOMの構成も変化した前記製品「S001」に関するRevはそれまでの値から1つインクリメントした値となる。   Further, the design information management and operation system 102 generates and sets information of the file “F-SA02” newly associated with the semi-finished product “SA02” as the drawing file change setting in the design change information 125, and Information of the file “F-A002” newly associated with the component “A002” is generated and set, and information of the file “F-A003” newly associated with the component “A003” is generated and set. In addition, new Rev information necessary for each setting is generated and set. Naturally, Rev regarding the product “S001” in which a part is newly added and the configuration of the BOM is changed is a value incremented by one from the previous value.

次に、設計情報管理運用システム102は、入力部103の専用Viewerが具備するワークフロー機能を用い、前記設計変更情報125に関する審査処理を実施する(s107)。このワークフロー機能には、品目等の新規登録・設計変更が生じる際に、所定ユーザの端末に審査依頼を送る承認依頼機能と、依頼されたユーザによる承認・却下の設定を受け付けるサインオフ機能を有する。   Next, the design information management / operation system 102 uses the workflow function of the dedicated viewer of the input unit 103 to perform a review process on the design change information 125 (s107). This workflow function has an approval request function that sends an examination request to a predetermined user's terminal when a new registration or design change of an item or the like occurs, and a sign-off function that accepts approval / rejection settings by the requested user .

この処理では、前記生成した設計変更情報125について、予め取り決めている審査対応ユーザの端末に情報精査を依頼し、その精査結果が問題無い事を示すものであれば(s107:承認)、設計情報管理運用システム102は、該当設計変更情報125に対して承認処理を実施し、前記ワークフロー機能中でのステータスを「承認」とすることで、該設計変更情報125のリリース処理(s109)を可能とするものとなる。   In this process, if the generated design change information 125 is requested to be examined in advance by the terminal of the user corresponding to the examination that has been decided in advance and the result of the examination indicates that there is no problem (s107: approval), the design information The management operation system 102 performs the approval process on the corresponding design change information 125 and sets the status in the workflow function to “approval”, thereby enabling the release process (s109) of the design change information 125. To be.

他方、前記設計変更情報125について、部品スペックの誤りや、登録した各情報に不備があった場合など、何らかの不具合があり、審査対応ユーザの端末からの精査結果が問題を示すものであれば(s107:却下)、設計情報管理運用システム102は前記設計変更情報125に関して却下処分とする。このように「却下」とされた場合、設計変更情報125はリリース処理が不可となる。そこで設計情報管理運用システム102は、前記精査結果が示す指摘内容を前記外部端末115等に送り、該当箇所に関する修正を受け付ける(s108)。このステップs108の処理は、設計変更情報125のリリース処理が可能な状態になるまで繰り返す。   On the other hand, if the design change information 125 has some trouble such as an error in the part specifications or incompleteness of each registered information, and the examination result from the terminal corresponding to the examination user indicates a problem ( s107: Rejection), the design information management operation system 102 rejects the design change information 125. In this way, when “rejected”, the design change information 125 cannot be released. Therefore, the design information management and operation system 102 sends the indication content indicated by the scrutinization result to the external terminal 115 or the like, and accepts correction regarding the corresponding part (s108). The process of step s108 is repeated until the design change information 125 can be released.

一方、設計変更情報125のリリース処理が可能な状態になった場合、設計情報管理運用システム102は変更情報リリース処理(s109)を実施する。設計情報管理運用システム102は、このリリース処理を実行することで、図2(a)および(d)の<変更リリース後>に示すように、各品目情報およびBOM情報で各々Rev情報を確定させるのである。   On the other hand, when the release process of the design change information 125 is possible, the design information management operation system 102 executes the change information release process (s109). By executing this release process, the design information management and operation system 102 determines Rev information for each item information and BOM information as shown in <After release> in FIGS. 2 (a) and 2 (d). It is.

−−−処理手順例2−−−
続いて、設計情報管理運用システム102から生産情報管理システム131への伝送データを自動生成する処理について説明する。図6は、本実施形態における設計情報管理運用方法の処理手順例2を示すフロー図である。上述のステップs109(変更情報リリース処理)をトリガーにして、前記組込制御部110は、設計情報管理運用システム102から生産情報管理システム131への伝送データを自動生成し、出力部107が有する伝送用記憶部105に格納することになる。なお、既に述べたがこの組み込み制御部110は、設計情報管理運用システム102に含まれるものとする。
--- Processing procedure example 2 ---
Next, a process for automatically generating transmission data from the design information management operation system 102 to the production information management system 131 will be described. FIG. 6 is a flowchart showing a processing procedure example 2 of the design information management operation method according to the present embodiment. Using the above-described step s109 (change information release process) as a trigger, the built-in control unit 110 automatically generates transmission data from the design information management operation system 102 to the production information management system 131, and the output unit 107 has the transmission. The data is stored in the storage unit 105. As described above, the built-in control unit 110 is included in the design information management system 102.

この場合、組み込み制御部110は、前記ステップs109(変更情報リリース処理)にて確定された設計変更情報125より、その対象品目として設定された品目、すなわち図3の例の場合、「S001」らについて、品目情報123より対応する情報を抽出し、出力部107が有する伝送用記憶部105に伝送データとして格納する(s200)。   In this case, the embedded control unit 110 determines the item set as the target item based on the design change information 125 determined in step s109 (change information release process), that is, “S001” and the like in the example of FIG. Is extracted from the item information 123 and stored as transmission data in the transmission storage unit 105 of the output unit 107 (s200).

次に、組み込み制御部110は、前記ステップs109(変更情報リリース処理)にて確定された設計変更情報125より、そのBOM変更として設定されたBOM構成の情報、すなわち「S001」、「SA02」の情報を抽出し、出力部107が有する伝送用記憶部105に追加格納する(s201)。   Next, the built-in control unit 110 uses the design change information 125 determined in step s109 (change information release process) to determine the BOM configuration information set as the BOM change, that is, “S001” and “SA02”. Information is extracted and additionally stored in the transmission storage unit 105 of the output unit 107 (s201).

次に、組み込み制御部110は、上記ステップs200で抽出した品目情報について、各レコードの示す品目タイプが補材対象の品目タイプ、例えば「部品」であるか否か判別し(s202)、補材対象でない場合(s202:N)、設計変更情報生成(s205)へ処理を進める。   Next, the built-in control unit 110 determines whether or not the item type indicated by each record is the item type to be supplemented, for example, “part”, for the item information extracted in step s200 (s202). If it is not the target (s202: N), the process proceeds to design change information generation (s205).

他方、補材対象であった場合(s202:Y)、組み込み制御部110は更に、該当レコードの補材キーの情報が"Y"か否か判別する(s203)。この判別で補材キーの情報が"Y"であった場合(s203:Y)、組み込み制御部110は、該当レコードについて、伝送用記憶部105に既に格納している伝送データより削除し、BOM構成での他の品目等との接続設定を削除する(s204)。他方、補材キーの情報が"Y"でない場合(s203:N)、組み込み制御部110は処理を設計変更情報生成s205へ進める。   On the other hand, when the target is a supplement (s202: Y), the incorporation control unit 110 further determines whether or not the supplementary key information of the record is “Y” (s203). If the auxiliary material key information is “Y” in this determination (s203: Y), the embedding control unit 110 deletes the corresponding record from the transmission data already stored in the transmission storage unit 105, and BOM The connection setting with other items in the configuration is deleted (s204). On the other hand, if the auxiliary material key information is not “Y” (s203: N), the incorporation control unit 110 advances the process to the design change information generation s205.

続いて組み込み制御部110は、前記変更情報リリース処理(s109)にて確定された設計変更情報125より、品目毎に設定された有効開始日など、生産工程に必要となる設計情報を抽出し、前記伝送用記憶部105に追加格納する(s205)。また組み込み制御部110は、前記ステップs205までで前記伝送用記憶部105に情報を逐次格納し生成した伝送データに対し、生成完了フラグを立てる(s206)。伝送データは、前記設計変更情報125の含む品目のうち品目情報123にて補材キーが付帯するものを削除し、品目情報123、BOM情報124を構成した情報と言える。   Subsequently, the embedded control unit 110 extracts design information necessary for the production process, such as an effective start date set for each item, from the design change information 125 determined in the change information release process (s109). It is additionally stored in the transmission storage unit 105 (s205). Further, the embedded control unit 110 sets a generation completion flag for the transmission data generated by sequentially storing information in the transmission storage unit 105 up to step s205 (s206). The transmission data can be said to be information that comprises the item information 123 and the BOM information 124 by deleting the items included in the design change information 125 that are accompanied by the auxiliary material key in the item information 123.

一方、設計情報管理運用システム102と生産情報管理システム131との間のデータ授受を仲介する伝送プログラム111は、前記伝送用記憶部105を常時監視しており、伝送用記憶部105に格納され、且つ生成完了フラグが立った伝送データを、定期的に生産情報管理システム131へ伝送する。この時、生産情報管理システム131は、伝送されてきた伝送データを一時記憶部135に一時的に格納する。また、生産情報管理システム131は、一時記憶部135に保持している伝送データを定期的に生産情報132へ反映することになる。なお、前記伝送プログラム111は、設計情報管理運用システム102の概念に含まれるものとする。また、設計情報管理運用システム102と一体に協働する所定の端末がこの伝送プログラム111を実装している状況を想定できる。   On the other hand, a transmission program 111 that mediates data exchange between the design information management operation system 102 and the production information management system 131 constantly monitors the transmission storage unit 105 and is stored in the transmission storage unit 105. The transmission data with the generation completion flag set is periodically transmitted to the production information management system 131. At this time, the production information management system 131 temporarily stores the transmitted transmission data in the temporary storage unit 135. In addition, the production information management system 131 periodically reflects the transmission data held in the temporary storage unit 135 in the production information 132. Note that the transmission program 111 is included in the concept of the design information management and operation system 102. In addition, it is possible to assume a situation where a predetermined terminal that cooperates with the design information management and operation system 102 implements the transmission program 111.

以上により、設計情報管理運用システム102から生産情報管理システム131へ送られる伝送データの自動生成と、生産情報管理システム131への自動伝送が実行された。この結果、図7に示すように、設計情報管理運用システム102にて生成されたBOM情報124=設計BOM501の構成と、生産情報管理システム131にて生成された生産情報132=生産BOM502の構成とは、生産側の都合を配慮した上で異なることになる。生産システム側で利用するBOMの構成から、不要となる補材情報等の除外処理が不要となっているのである。   Thus, automatic generation of transmission data sent from the design information management operation system 102 to the production information management system 131 and automatic transmission to the production information management system 131 are executed. As a result, as shown in FIG. 7, the BOM information 124 generated by the design information management and operation system 102 = the configuration of the design BOM 501 and the production information 132 generated by the production information management system 131 = the configuration of the production BOM 502 Will differ depending on the convenience of the production side. Because of the configuration of the BOM used on the production system side, an unnecessary process of excluding auxiliary material information or the like is unnecessary.

なお、従来では、例えば設計段階で登録される品目情報やBOM情報に紐付けて、自動的に部材発注処理を実施する場合、設計段階で構成した品目情報やBOM情報をそのまま生産工程に繋げている為、生産部門での部材の在庫状況如何では、BOM情報から発注不要な品目情報を削除したり、調達計画の調整が必要となるケースも少なくなかった。だが、例えば、予め生産部門等のユーザに対し、設計変更情報125や設計段階の品目情報123やBOM情報124を事前通知しておくとすれば、前記伝送データとして受け取った情報には含まれていないが、必要となる補材情報についてはその部位や量を予め把握することも可能である。この場合、設計情報がリリースされる前に、生産部門等のユーザは部品発注システムにアクセスし、補材の確認/手配調達について事前対応することも可能となる。従って生産システム側が利用する生産情報132(品目情報、BOM情報等)より補材情報等の外し漏れによる補材過剰発注を抑制し、当初の生産計画に応じた部材在庫管理/調達計画も可能にする。   In the past, for example, in the case of automatically performing a member ordering process in association with item information and BOM information registered at the design stage, the item information and BOM information configured at the design stage are directly connected to the production process. Therefore, depending on the stock status of parts in the production department, there are not a few cases in which item information that does not require ordering is deleted from the BOM information and the procurement plan needs to be adjusted. However, for example, if the design change information 125, the item information 123 at the design stage, and the BOM information 124 are notified in advance to a user such as a production department, the information received as the transmission data is included in the information. Although there is no need, it is also possible to grasp in advance the parts and amounts of necessary supplement information. In this case, before the design information is released, a user in the production department or the like can access the parts ordering system and make a preliminary response to the confirmation / arrangement procurement of the auxiliary material. Therefore, it is possible to control parts stock management / procurement plan according to the original production plan by suppressing over-ordering of supplementary material due to missing leakage of supplementary material information from production information 132 (item information, BOM information, etc.) used by the production system side. To do.

−−−処理手順例3−−−
なお本実施形態では、生産側都合で切替管理したい品目情報123やBOM情報124の構成を、設計・開発段階にて設計BOMに組込み、自動処理にて生産BOM情報を生成する仕組みを提案することもできる。図8は、本実施形態における設計BOMから生産BOMへの遷移例2を示す図である。また、図9は、本実施形態の設計情報管理運用方法の処理手順例3を示すフロー図である。
--- Processing procedure example 3 ---
In the present embodiment, a configuration is proposed in which the configuration of the item information 123 and BOM information 124 to be switched and managed for production convenience is incorporated into the design BOM at the design / development stage, and production BOM information is generated by automatic processing. You can also. FIG. 8 is a diagram illustrating a transition example 2 from the design BOM to the production BOM in the present embodiment. FIG. 9 is a flowchart showing a processing procedure example 3 of the design information management operation method of the present embodiment.

この場合、設計情報管理運用システム102は、生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置、例えば外部端末115より受け付けて、記憶部106における該当製品に関する品目情報123に格納する(s300)。図8の例であれば、品目群(品目情報123)のうち、「XBCDE002(外作)」、「XBCDE003(内作)」の情報のセットは、および、「YBCDE002(外作)」、「YBCDE003(内作)」の情報のセットは、いずれも1の部品に関する内作と外作の両情報にあたる。   In this case, the design information management and operation system 102 designs both information of the item in the case of the external work and the item in the case of the internal work for one part that can be either the external work or the internal work at the time of production or procurement. The information is received from the information processing apparatus of the department, for example, the external terminal 115, and stored in the item information 123 regarding the corresponding product in the storage unit 106 (s300). In the example of FIG. 8, the set of information of “XBCDE002 (outside work)” and “XBCDE003 (inside work)” in the item group (item information 123), and “YBCDE002 (outside work)”, “ Each set of information of “YBCDE003 (internal work)” corresponds to both internal work and external work information on one part.

また、設計情報管理運用システム102は、前記該当製品に関するBOM情報124において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理を行うことになる(s301)。図8の例であれば、設計BOM(BOM情報124)において、親部品「ABCDE002」に対して、子部品として「XBCDE002(外作)」、「XBCDE003(内作)」が従属し、親部品「ABCDE003」に対して、子部品として「YBCDE002(外作)」、「YBCDE003(内作)」が従属している。   In addition, in the BOM information 124 related to the corresponding product, the design information management and operation system 102 selects either the information corresponding to the in-house item or the information corresponding to the outside item for the parent part of the one part. Is also performed (s301). In the example of FIG. 8, in the design BOM (BOM information 124), “XBCDE002 (external work)” and “XBCDE003 (internal work)” are subordinate to the parent part “ABCDE002”. “YBCDE002 (external work)” and “YBCDE003 (internal work)” are subordinate to “ABCDE003”.

続いて、設計情報管理運用システム102は、前記BOM情報124における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末、例えば、生産部門担当者端末140ないし調達部門担当者端末150より受け付け、該指定事象のデータを前記BOM情報124における該当情報に対応付けて記憶部106に格納する(s302)。図8の例であれば、設計BOM(BOM情報124)において、「XBCDE002(外作)」に対して、「BOMフラグ」の“0”が、「XBCDE003(内作)」に対して「BOMフラグ」の“1”が設定され、「YBCDE002(外作)」に対して「BOMフラグ」の“1”が、「YBCDE003(内作)」に対して「BOMフラグ」の“0”が設定されている。このBOMフラグは、“1”の場合は、「必要情報」を意味し、“0”の場合は、「不要情報」を意味する。   Subsequently, the design information management and operation system 102 designates information relating to unnecessary information on the production side among the information on each item of the internal work and external work related to the one part in the BOM information 124, for example, in charge of the production department. The data of the designated event is stored in the storage unit 106 in correspondence with the corresponding information in the BOM information 124 (s302). In the example of FIG. 8, in the design BOM (BOM information 124), “0” of the “BOM flag” is “BOM flag” for “XBCDE002 (external work)” and “BOM is“ XBCDE003 (internal work) ”. “1” of “Flag” is set, “1” of “BOM flag” is set for “YBCDE002 (external work)”, and “0” of “BOM flag” is set for “YBCDE003 (internal work)” Has been. When this BOM flag is “1”, it means “necessary information”, and when it is “0”, it means “unnecessary information”.

次に、設計情報管理運用システム102は、記憶部106の前記BOM情報124において前記指定事象のデータ、すなわちBOMフラグの“0”が対応付いている不要情報を特定し、前記BOM情報124から前記不要情報の除外ないし非表示の処理を実行する(s303)。上記の例であれば、「BOMフラグ」の“0”が設定されている「XBCDE002(外作)」、「YBCDE003(内作)」が前記除外ないし非表示の処理対象となる。当然、設計側で使用するBOM情報について変更が生じないよう、前記BOM情報124の複製データに対して上記除外ないし非表示の処理を実行するとすればよい。また、前記設計情報管理運用システム102(の伝送プログラム111)は、前記除外ないし非表示の処理済みのBOM情報124(のコピー)を含む伝送データを、生産情報管理システム131に送信する(s304)。   Next, the design information management and operation system 102 identifies the specified event data in the BOM information 124 of the storage unit 106, that is, unnecessary information associated with the BOM flag “0”. Processing for excluding or hiding unnecessary information is executed (s303). In the above example, “XBCDE002 (external work)” and “YBCDE003 (internal work)” in which “0” of the “BOM flag” is set are subject to the exclusion or non-display processing. Naturally, the above exclusion or non-display process may be executed on the duplicated data of the BOM information 124 so that the BOM information used on the design side does not change. Further, the design information management operation system 102 (the transmission program 111) transmits the transmission data including the processed BOM information 124 (excluded or hidden) to the production information management system 131 (s304). .

このように、設計情報管理運用システム102で管理するBOM情報124に、予め内外作用の両品目・BOMおよびメーカ部品情報などを登録しておき、生産側や所定管理者等からの指示に応じて前記BOMフラグを所定値に設定し、その上で前記リリース処理をすることで、生産情報管理システム131には、BOMフラグ"1"が設定された品目しか構成に含まれないBOM情報が提供されることになる。   In this way, both the internal / external action item / BOM and maker part information are registered in advance in the BOM information 124 managed by the design information management operation system 102, and in response to an instruction from the production side or a predetermined manager. By setting the BOM flag to a predetermined value and then performing the release process, the production information management system 131 is provided with BOM information that includes only items for which the BOM flag “1” is set. Will be.

開発・設計と製造・生産とが複数拠点に跨って行われている状況において、開発・設計側からは購入部品(外作)として設計情報に品目登録するが、製造・生産側においては、その部品自体を自社で内作する場合や、生産が間に合わない場合に応じて他社部品に置き換えて(外作)生産調整するケースがある。こうしたケースが生じる都度、生産側ではBOM情報の修正作業が生じてしまう。しかし、上記した本実施形態のような処理を実現することで当該課題も解決される。   In the situation where development / design and manufacturing / production are performed across multiple bases, the development / design side registers items in the design information as purchased parts (outside work). On the manufacturing / production side, There are cases where the parts themselves are produced in-house or when the production is not in time, the parts are replaced with other companies' parts (outside work) and production is adjusted. Every time such a case occurs, the production side needs to correct the BOM information. However, the subject can be solved by realizing the processing as in the present embodiment.

以上、本発明を実施するための最良の形態などについて具体的に説明したが、本発明はこれに限定されるものではなく、その要旨を逸脱しない範囲で種々変更可能である。   Although the best mode for carrying out the present invention has been specifically described above, the present invention is not limited to this, and various modifications can be made without departing from the scope of the invention.

こうした本実施形態によれば、開発や設計の部門で作成された設計情報をベースに、調達や生産の部門での都合を考慮した、BOMデータ等の生産情報が自動生成できる。その結果、例えば生産部門等で利用するBOMデータから、不要な補材情報となる品目のデータを生産側で外すといった作業は不要となる。そのため、BOMデータからの、こうした不要物の外し漏れによる補材情報の過剰発注が抑制される。   According to this embodiment, production information such as BOM data can be automatically generated in consideration of the circumstances in the procurement and production departments based on the design information created in the development and design departments. As a result, for example, the production side does not need to remove data on items that are unnecessary auxiliary material information from BOM data used in the production department or the like. Therefore, excessive ordering of auxiliary material information due to leakage of such unnecessary materials from BOM data is suppressed.

また、設計段階から、生産側都合を配慮した、設計情報における部品等に関する内作/外作の切替指定が可能となり、設計から生産に至る業務において無駄が低減され、業務全体が効率的となる。   In addition, from the design stage, it is possible to specify switching between in-house / outside work related to parts, etc. in the design information in consideration of production convenience, reducing waste in operations from design to production and making the entire operation more efficient. .

したがって、設計側の設計情報に基づき生産側都合に配慮した生産情報を効率的に生成し、在庫管理や調達の無駄なコストの発生を抑制することが出来る。   Therefore, it is possible to efficiently generate production information in consideration of production convenience based on the design information on the design side, and to suppress generation of useless costs for inventory management and procurement.

本明細書の記載により、少なくとも次のことが明らかにされる。すなわち、前記設計情報管理運用システムにおいて、前記演算部は、生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置より受け付けて、記憶部における該当製品に関する品目情報に格納し、前記該当製品に関するBOM情報において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理と、前記BOM情報における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記BOM情報における該当情報に対応付けて記憶部に格納する処理と、記憶部の前記BOM情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理を実行するものである、としてもよい。   At least the following will be clarified by the description of the present specification. In other words, in the design information management and operation system, the calculation unit determines whether an item for an external work and an item for an internal work for one part that can be either an external work or an internal work at the time of production or procurement. Both pieces of information are received from the information processing device of the design department, stored in the item information related to the corresponding product in the storage unit, and the BOM information related to the corresponding product corresponds to the item of the in-house work for the parent part of the one part Processing to make both the information to be processed and the information corresponding to the item of the external work subordinate, and designation of unnecessary information on the production side among the information of each item of the internal work and the external work related to the one part in the BOM information Receiving from the predetermined terminal, storing the data of the specified event in the storage unit in association with the corresponding information in the BOM information, and in the BOM information of the storage unit The unnecessary information associated with the fixed event data is identified, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is transmitted to the information processing apparatus in the production department. The process may be executed.

また、前記設計情報管理運用方法において、前記コンピュータが、生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置より受け付けて、記憶部における該当製品に関する品目情報に格納し、前記該当製品に関するBOM情報において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理と、前記BOM情報における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記BOM情報における該当情報に対応付けて記憶部に格納する処理と、記憶部の前記BOM情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、を実行するとしてもよい。   Further, in the design information management and operation method, both one item for external work and one for internal work may be used for one part that the computer may be either an external work or an internal work at the time of production or procurement. The information is received from the information processing device of the design department, stored in the item information related to the corresponding product in the storage unit, and the BOM information related to the corresponding product corresponds to the item of the in-house work for the parent part of the one part. A process for making both the information and the information corresponding to the external work item subordinate, and designation of unnecessary information on the production side out of the information on each of the internal work and external work items related to the one part in the BOM information are predetermined. Receiving from the terminal, storing the specified event data in the storage unit in association with the corresponding information in the BOM information, and in the BOM information of the storage unit Processing for identifying unnecessary information associated with event data, performing processing for excluding or hiding the unnecessary information from the BOM information, and transmitting the processed BOM information to the information processing apparatus in the production department And may be executed.

また、前記設計情報管理運用プログラムにおいて、前記コンピュータに、生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置より受け付けて、記憶部における該当製品に関する品目情報に格納し、前記該当製品に関するBOM情報において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理と、前記BOM情報における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記BOM情報における該当情報に対応付けて記憶部に格納する処理と、記憶部の前記BOM情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、を実行させるとしてもよい。   In the design information management and operation program, both one item for external work and one for internal work are stored in the computer for one part that can be either an external work or an internal work. The information is received from the information processing device of the design department, stored in the item information related to the corresponding product in the storage unit, and the BOM information related to the corresponding product corresponds to the item of the in-house work for the parent part of the one part. A process for making both the information and the information corresponding to the external work item subordinate, and designation of unnecessary information on the production side out of the information on each of the internal work and external work items related to the one part in the BOM information are predetermined. In the process of receiving from the terminal and storing the data of the designated event in the storage unit in association with the corresponding information in the BOM information, in the BOM information of the storage unit The unnecessary information associated with the specified event data is identified, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is transmitted to the information processing apparatus in the production department It is also possible to execute the processing.

101 ネットワーク
102 設計情報管理運用システム
103 入力部
104 演算部
105 伝送用記憶部
106 記憶部
107 出力部
108 通信部
109 プログラム
110 組込制御部
111 伝送プログラム
115 外部端末(設計部門の情報処理装置)
121 メーカ部品情報
122 図面ファイル情報
123 品目情報
124 BOM情報
125 設計変更情報
126 ユーザ情報
131 生産情報管理システム(生産部門の情報処理装置)
132 生産情報
133 部品発注システム
135 一時記憶部
DESCRIPTION OF SYMBOLS 101 Network 102 Design information management operation system 103 Input part 104 Operation part 105 Transmission memory part 106 Storage part 107 Output part 108 Communication part 109 Program 110 Embedded control part 111 Transmission program 115 External terminal (Information processing apparatus of a design department)
121 Manufacturer parts information 122 Drawing file information 123 Item information 124 BOM information 125 Design change information 126 User information 131 Production information management system (information processing device of production department)
132 Production Information 133 Parts Ordering System 135 Temporary Storage Unit

Claims (6)

他装置と通信する通信部、および各種データを格納する記憶部と、
製品の設計情報である品目情報およびBOM情報を設計部門の情報処理装置より受け付けて、記憶部に格納する処理と、
前記品目情報の含む情報のうち生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記品目情報における該当情報に対応付けて記憶部に格納する処理と、
記憶部の前記品目情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理を実行する演算部と、
を備えることを特徴とする設計情報管理運用システム。
A communication unit that communicates with other devices, and a storage unit that stores various data;
Processing for receiving item information and BOM information, which are product design information, from an information processing device of a design department and storing them in a storage unit;
A process of receiving designation regarding unnecessary information on the production side from information included in the item information from a predetermined terminal, and storing data of the designation event in a storage unit in association with corresponding information in the item information;
The unnecessary information associated with the specified event data is identified in the item information in the storage unit, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is produced. An arithmetic unit that executes processing to be transmitted to the information processing device of the department;
A design information management and operation system characterized by comprising:
前記演算部は、
生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置より受け付けて、記憶部における該当製品に関する品目情報に格納し、前記該当製品に関するBOM情報において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理と、
前記BOM情報における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記BOM情報における該当情報に対応付けて記憶部に格納する処理と、
記憶部の前記BOM情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理を実行するものである、
ことを特徴とする請求項1に記載の設計情報管理運用システム。
The computing unit is
For one part that can be either an external work or an internal work at the time of production or procurement, both information of the item for the external work and the item for the internal work is received from the information processing device of the design department, and the storage unit In the BOM information related to the corresponding product, both the information corresponding to the internal work item and the information corresponding to the external work item are stored in the BOM information related to the corresponding product. Subordinate processing,
Among the information of each item of the internal work and the external work related to the one part in the BOM information, a specification regarding unnecessary information on the production side is received from a predetermined terminal, and the data of the specified event is associated with the corresponding information in the BOM information. Processing to store in the storage unit,
The unnecessary information associated with the specified event data is identified in the BOM information of the storage unit, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is produced. It performs processing to be sent to the information processing device in the department.
The design information management and operation system according to claim 1.
他装置と通信する通信部、各種データを格納する記憶部、および演算部を備えたコンピュータが、
製品の設計情報である品目情報およびBOM情報を設計部門の情報処理装置より受け付けて、記憶部に格納する処理と、
前記品目情報の含む情報のうち生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記品目情報における該当情報に対応付けて記憶部に格納する処理と、
記憶部の前記品目情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、
を実行することを特徴とする設計情報管理運用方法。
A computer having a communication unit that communicates with other devices, a storage unit that stores various data, and an arithmetic unit,
Processing for receiving item information and BOM information, which are product design information, from an information processing device of a design department and storing them in a storage unit;
A process of receiving designation regarding unnecessary information on the production side from information included in the item information from a predetermined terminal, and storing data of the designation event in a storage unit in association with corresponding information in the item information;
The unnecessary information associated with the specified event data is identified in the item information in the storage unit, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is produced. Processing to be sent to the information processing device of the department;
A design information management operation method characterized by executing
前記コンピュータが、
生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置より受け付けて、記憶部における該当製品に関する品目情報に格納し、前記該当製品に関するBOM情報において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理と、
前記BOM情報における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記BOM情報における該当情報に対応付けて記憶部に格納する処理と、
記憶部の前記BOM情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、
を実行することを特徴とする請求項3に記載の設計情報管理運用方法。
The computer is
For one part that can be either an external work or an internal work at the time of production or procurement, both information of the item for the external work and the item for the internal work is received from the information processing device of the design department, and the storage unit In the BOM information related to the corresponding product, both the information corresponding to the internal work item and the information corresponding to the external work item are stored in the BOM information related to the corresponding product. Subordinate processing,
Among the information of each item of the internal work and the external work related to the one part in the BOM information, a specification regarding unnecessary information on the production side is received from a predetermined terminal, and the data of the specified event is associated with the corresponding information in the BOM information. Processing to store in the storage unit,
The unnecessary information associated with the specified event data is identified in the BOM information of the storage unit, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is produced. Processing to be sent to the information processing device of the department;
The design information management and operation method according to claim 3, wherein:
他装置と通信する通信部、各種データを格納する記憶部、および演算部を備えたコンピュータに、
製品の設計情報である品目情報およびBOM情報を設計部門の情報処理装置より受け付けて、記憶部に格納する処理と、
前記品目情報の含む情報のうち生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記品目情報における該当情報に対応付けて記憶部に格納する処理と、
記憶部の前記品目情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、
を実行させることを特徴とする設計情報管理運用プログラム。
In a computer equipped with a communication unit that communicates with other devices, a storage unit that stores various data, and a calculation unit,
Processing for receiving item information and BOM information, which are product design information, from an information processing device of a design department and storing them in a storage unit;
A process of receiving designation regarding unnecessary information on the production side from information included in the item information from a predetermined terminal, and storing data of the designation event in a storage unit in association with corresponding information in the item information;
The unnecessary information associated with the specified event data is identified in the item information in the storage unit, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is produced. Processing to be sent to the information processing device of the department;
A design information management and operation program characterized in that
前記コンピュータに、
生産ないし調達時に外作と内作のいずれの場合もありうる1の部品について、外作の場合の品目と内作の場合の品目の両情報を設計部門の情報処理装置より受け付けて、記憶部における該当製品に関する品目情報に格納し、前記該当製品に関するBOM情報において、前記1の部品の親部品に対し、前記内作の品目に対応する情報と前記外作の品目に対応する情報のいずれも従属させる処理と、
前記BOM情報における前記1の部品に関する内作および外作の各品目の情報うち、生産側での不要情報に関する指定を所定端末より受け付け、該指定事象のデータを前記BOM情報における該当情報に対応付けて記憶部に格納する処理と、
記憶部の前記BOM情報において前記指定事象のデータが対応付いている不要情報を特定し、前記BOM情報から前記不要情報の除外ないし非表示の処理を実行し、該処理済みのBOM情報を、生産部門の情報処理装置に送信する処理と、
を実行させることを特徴とする請求項5に記載の設計情報管理運用プログラム。
In the computer,
For one part that can be either an external work or an internal work at the time of production or procurement, both information of the item for the external work and the item for the internal work is received from the information processing device of the design department, and the storage unit In the BOM information related to the corresponding product, both the information corresponding to the internal work item and the information corresponding to the external work item are stored in the BOM information related to the corresponding product. Subordinate processing,
Among the information of each item of the internal work and the external work related to the one part in the BOM information, a specification regarding unnecessary information on the production side is received from a predetermined terminal, and the data of the specified event is associated with the corresponding information in the BOM information. Processing to store in the storage unit,
The unnecessary information associated with the specified event data is identified in the BOM information of the storage unit, the unnecessary information is excluded or hidden from the BOM information, and the processed BOM information is produced. Processing to be sent to the information processing device of the department;
The design information management operation program according to claim 5, wherein:
JP2010278409A 2010-12-14 2010-12-14 Design information management operation system, design information management operation method and design information management operation program Pending JP2012128582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010278409A JP2012128582A (en) 2010-12-14 2010-12-14 Design information management operation system, design information management operation method and design information management operation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010278409A JP2012128582A (en) 2010-12-14 2010-12-14 Design information management operation system, design information management operation method and design information management operation program

Publications (1)

Publication Number Publication Date
JP2012128582A true JP2012128582A (en) 2012-07-05

Family

ID=46645547

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010278409A Pending JP2012128582A (en) 2010-12-14 2010-12-14 Design information management operation system, design information management operation method and design information management operation program

Country Status (1)

Country Link
JP (1) JP2012128582A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015114900A (en) * 2013-12-12 2015-06-22 三菱重工業株式会社 Production information management device, production information management method and program
JP2020140303A (en) * 2019-02-27 2020-09-03 富士ゼロックス株式会社 Information processing device and program

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015114900A (en) * 2013-12-12 2015-06-22 三菱重工業株式会社 Production information management device, production information management method and program
JP2020140303A (en) * 2019-02-27 2020-09-03 富士ゼロックス株式会社 Information processing device and program
JP7225905B2 (en) 2019-02-27 2023-02-21 富士フイルムビジネスイノベーション株式会社 Information processing device and program

Similar Documents

Publication Publication Date Title
US10664771B2 (en) Product development management system and method
CN101937463B (en) Method for automatically generating form for workflow model
KR101614908B1 (en) System and method for providing of ERP service
JP2003132094A (en) Design change support system, program and recording medium
US20080270477A1 (en) Workflow method, system, and data structure
CN103593174A (en) Adaptable business object
CN1755719A (en) Method and system for providing cross project commitments
CN110249356B (en) Sharing method and system for user-defined ERP function
US20110264251A1 (en) Electronic work instruction configured for isa-95 standard
US20080040125A1 (en) Apparatus for Revising Corporate Checklist
JP2010535366A (en) Parts inventory management
CN101753619B (en) Method and system for extending service model
CN111523812A (en) Model life cycle management method and system, equipment and storage medium
US20090312860A1 (en) Method for automated creation and display of assembly documentation for custom hearing aid manufacturing
KR101725142B1 (en) Strategy map management method and device, and storage media storing the same
EP2249295A2 (en) Using composite systems to improve functionality
KR20200060022A (en) Integrated management system
JP4912850B2 (en) Project management device
CN109784595A (en) One kind serving enterprises software development quality management system
JP2005284385A (en) Project management method and project management program
JP2012128582A (en) Design information management operation system, design information management operation method and design information management operation program
JP4997886B2 (en) Workflow linkage program and workflow management system
KR101354026B1 (en) System and method of managing master data based on task
JP2012159998A (en) Business application configuration device
US20090248469A1 (en) Method and system of integrated mine planning