JP2012116304A - Protection apparatus for mooring line - Google Patents

Protection apparatus for mooring line Download PDF

Info

Publication number
JP2012116304A
JP2012116304A JP2010267036A JP2010267036A JP2012116304A JP 2012116304 A JP2012116304 A JP 2012116304A JP 2010267036 A JP2010267036 A JP 2010267036A JP 2010267036 A JP2010267036 A JP 2010267036A JP 2012116304 A JP2012116304 A JP 2012116304A
Authority
JP
Japan
Prior art keywords
mooring
side wall
protection device
mooring line
wall portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2010267036A
Other languages
Japanese (ja)
Inventor
Yoshio Shimazu
吉雄 島津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP2010267036A priority Critical patent/JP2012116304A/en
Publication of JP2012116304A publication Critical patent/JP2012116304A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a protection apparatus for a mooring line capable of securing safety of an operator or the like even when an accident such as breakage of a mooring line occurs.SOLUTION: The protection apparatus 1 for the mooring line is installed near the mooring line 2 for securing a ship to a pier. The protection apparatus 1 includes a sidewall 10 substantially parallel to the mooring line 2 and a rolling wall 11 extending in a direction separated from the mooring line 2 from the vicinity of an end of the sidewall 10. The protection apparatus 1 includes a protected area that is a space formed by the sidewall 10 and the rolling wall 11.

Description

本発明は、船舶を係留する係船索の破断事故から作業者の安全を守る係船索用保護装置に関するものである。   The present invention relates to a protection device for a mooring line that protects the safety of an operator from a breakage accident of a mooring line mooring a ship.

船舶又は洋上プラットホーム等を、岸壁又は浮体構造物等に係留する場合、船舶等が岸壁等から離れないように係船索でつないでいる。図6に、船舶を岸壁に係留する際の様子を示す。船舶3は、揚錨機兼ムアリングウィンチ、又はムアリングウィンチと呼ばれるウィンチ6を有している。このウィンチ6には、係船索2(繊維索又は鋼索)を巻きつけている。なお、4は船首、5は船尾を示している。   When a ship or offshore platform is moored to a quay or a floating structure, the ship is connected by a mooring line so that it does not leave the quay. FIG. 6 shows a state when the ship is moored on the quay. The ship 3 has a winch 6 called a dredger and mooring winch or a mooring winch. A mooring cable 2 (fiber cable or steel cable) is wound around the winch 6. Note that 4 indicates the bow and 5 indicates the stern.

次に、係船作業について説明する。船舶3が岸壁31に接岸した際、まず、ウィンチ6から、係船索2を長めに繰り出す。岸壁側の作業者は、繰り出した係船索2を受け取り、ビット32と呼ばれる突起物に結束する。その後、ウィンチ6で係船索2のたるみをとり、更に予め定めた強さの張力を係船索2に与える。複数の係船索2に対して、同様の作業を繰り返し、船舶3を岸壁31に固定して、係船作業を完了する。   Next, mooring work will be described. When the ship 3 touches the quay 31, first, the mooring rope 2 is extended from the winch 6. An operator on the quay side receives the mooring rope 2 that has been fed out and binds it to a projection called a bit 32. Thereafter, the slack of the mooring rope 2 is taken by the winch 6, and a tension having a predetermined strength is applied to the mooring rope 2. The same work is repeated for the plurality of mooring lines 2 to fix the ship 3 to the quay 31 and complete the mooring work.

この係船作業を行う場合、少なくともウィンチ6を操作する作業者(以下、操作者という)と、係船索2の状態を監視しながらウィンチ6の操作者に指示を出す作業者(以下、監視者という)と、岸壁側の作業者が必要となる。なお、係船索2は、貨物船等の大型船舶の場合、直径が50〜65mm程度の繊維索(繊維ロープ)や、直径が30〜40mm程度の鋼索(ワイヤーロープ)を使用している。   When performing the mooring work, at least an operator who operates the winch 6 (hereinafter referred to as an operator) and an operator who instructs the operator of the winch 6 while monitoring the state of the mooring rope 2 (hereinafter referred to as a monitor). ) And a worker on the quay side is required. In the case of a large ship such as a cargo ship, the mooring rope 2 uses a fiber rope (fiber rope) having a diameter of about 50 to 65 mm and a steel cable (wire rope) having a diameter of about 30 to 40 mm.

係船索2には、潮流、潮位の変化や風等の影響で揺動する船舶により多大な荷重がかかる。この係船索2に過大な張力が作用すると、破断し、大事故につながる可能性がある。この係船索2の破断を防止するために、係船索2の張力を監視する監視装置を設置する構成が開示されている(例えば特許文献1参照)。この構成により、係船索2の破断をある程度防止することができる。   A large load is applied to the mooring line 2 by a ship that swings under the influence of a tidal current, a change in tide level, wind, or the like. If excessive tension acts on the mooring line 2, it may break and lead to a major accident. In order to prevent the mooring rope 2 from being broken, a configuration is disclosed in which a monitoring device for monitoring the tension of the mooring rope 2 is installed (see, for example, Patent Document 1). With this configuration, breakage of the mooring rope 2 can be prevented to some extent.

上記の係船索の監視装置は、いくつかの問題点を有している。第1に、係船索の劣化等による破断事故を防止することができないという問題を有している。つまり、劣化等により係船索の耐えられる張力が小さくなった場合、この係船索の破断を防止することができない。なお、事前に係船索の劣化の状態を把握することは困難である。   The above-described mooring rope monitoring device has several problems. First, there is a problem that a breakage accident due to deterioration of the mooring line cannot be prevented. That is, when the tension that the mooring line can withstand becomes small due to deterioration or the like, the mooring line cannot be broken. It is difficult to grasp the state of mooring line deterioration in advance.

第2に、係船作業を行っているときに発生する係船索の破断事故を防止することができない。つまり、特許文献1に記載の係船索の監視装置を作動した状態で、係船作業を行うことは困難である。これは、係船作業時には、係船索に瞬間的に多大な張力がかかる場合が多々あるからである。なお、係船作業の際は、多くの作業者が係船索周辺で作業を行うため、係船索が破断する事故が発生すると、大事故につながる可能性が高い。   Secondly, it is not possible to prevent a breakage accident of the mooring line that occurs during mooring work. That is, it is difficult to perform mooring work in a state in which the mooring rope monitoring device described in Patent Document 1 is operated. This is because, during mooring work, there is often a case where a great tension is instantaneously applied to the mooring line. During mooring work, many workers work around the mooring line, so if an accident that breaks the mooring line occurs, there is a high possibility that it will lead to a major accident.

特開2002−211478号公報JP 2002-21478 A

本発明は、上記の問題を鑑みてなされたものであり、その目的は、係船索が破断する事
故が発生した場合であっても、作業者(特に監視者)の安全を確保することができる係船索用保護装置を提供することである。
The present invention has been made in view of the above-described problems, and the purpose of the present invention is to ensure the safety of an operator (especially a supervisor) even when an accident occurs in which a mooring line breaks. It is to provide a protection device for mooring lines.

上記の目的を達成するための本発明に係る係船索用保護装置は、船舶を岸壁に固定する係船索の近傍に設置する係船索用保護装置であって、前記保護装置は、前記係船索と略平行となる側壁部と、前記側壁部の端部近傍から前記係船索と離間する方向に延伸した巻込み壁部を有しており、前記保護装置が、前記側壁部と前記巻込み壁部で形成した空間である保護領域を有することを特徴とする。   A mooring rope protection device according to the present invention for achieving the above object is a mooring rope protection device installed in the vicinity of a mooring rope that fixes a ship to a quay, and the protection device includes the mooring rope and the mooring rope. A side wall portion that is substantially parallel; and a winding wall portion that extends in the direction away from the mooring line from the vicinity of the end portion of the side wall portion, and the protection device includes the side wall portion and the winding wall portion. It has the protection area | region which is the space formed by.

この構成により、係船索が破断した場合であっても、保護領域で係船索の状態を監視している作業者(監視者)に、破断した係船索が到達することを防止することができる。これは、保護装置が、破断した係船索が到達できない保護領域を有しているためである。従って、作業者の安全性を向上することができる。   With this configuration, even when the mooring line breaks, it is possible to prevent the broken mooring line from reaching the worker (monitoring person) who monitors the state of the mooring line in the protection area. This is because the protection device has a protection area where the broken mooring line cannot reach. Therefore, the safety of the worker can be improved.

上記の係船索用保護装置において、前記側壁部が、支柱と、前記支柱に固定した側壁板を有しており、前記巻込み壁部が、支柱と、前記支柱に固定した巻込み壁板を有していることを特徴とする。この構成により、上記と同様の作用効果を得ることができる。   In the mooring rope protection apparatus, the side wall portion includes a support column and a side wall plate fixed to the support column, and the entrainment wall unit includes a support column and the entrainment wall plate fixed to the support column. It is characterized by having. With this configuration, the same effects as described above can be obtained.

上記の係船索用保護装置において、少なくとも前記支柱に対して前記側壁板又は前記巻込み壁版を着脱自在に構成したことを特徴とする。この構成により、係船作業時以外は、船舶のデッキ上から保護装置を取り除くことができるため、デッキ上での荷役作業等の作業性の低下を抑制することができる。   In the mooring rope protection apparatus, the side wall plate or the entraining wall plate is configured to be detachable from at least the support column. With this configuration, since the protective device can be removed from the ship deck except during mooring work, it is possible to suppress deterioration in workability such as cargo handling work on the deck.

本発明に係る係船索用保護装置によれば、係船索が破断する事故が発生した場合であっても、作業者等の安全を確保することができる係船索用保護装置を提供することができる。   According to the protection device for mooring lines according to the present invention, it is possible to provide a protection device for mooring lines that can ensure the safety of workers and the like even when an accident occurs in which the mooring line breaks. .

本発明に係る実施の形態の係船索用保護装置を船舶に配置した際の概略図である。It is the schematic at the time of arrange | positioning the protection apparatus for mooring ropes of embodiment which concerns on this invention on the ship. 本発明に係る実施の形態の係船索用保護装置を示した概略図である。It is the schematic which showed the protection device for mooring lines of embodiment which concerns on this invention. 本発明に係る実施の形態の係船索用保護装置の平面を示した平面図である。It is the top view which showed the plane of the protection device for mooring lines of embodiment which concerns on this invention. 異なる実施の形態の係船索用保護装置の平面を示した平面図である。It is the top view which showed the plane of the protection apparatus for mooring lines of different embodiment. 本発明に係る実施の形態の係船索用保護装置を分解した状態を示した概略図である。It is the schematic which showed the state which decomposed | disassembled the protection device for mooring lines of embodiment which concerns on this invention. 船舶を岸壁に係留した状態を示した平面図である。It is the top view which showed the state which moored the ship to the quay.

以下、本発明に係る実施の形態の係船索用保護装置について、図面を参照しながら説明する。図1に、船舶3の船首4の部分拡大図を示す。船舶3は、係船索2を巻きつけたウィンチ6と、揚錨機7を有している。この係船索2に沿うように保護装置1を設置している。   Hereinafter, a protection device for a mooring line according to an embodiment of the present invention will be described with reference to the drawings. In FIG. 1, the elements on larger scale of the bow 4 of the ship 3 are shown. The ship 3 has a winch 6 around which the mooring cable 2 is wound and a lifting machine 7. A protection device 1 is installed along the mooring line 2.

図2に、保護装置1の概略を示す。保護装置1は、係船索2に沿って設置した側壁部10と、側壁部10の端部に接続し、且つ係船索2から離れる方向に延長した巻込み壁部11を有している。側壁部10は、船舶3のデッキ上に立設した支柱16と、支柱16に固定した側壁板12を有している。巻込み壁部11は、支柱16と、支柱に固定した巻込み壁板(第1巻込み壁板14及び第2巻込み壁板15)を有している。また、側壁板12及
び巻込み壁板14、15に、監視孔13を形成している。この監視孔13は、側壁部10と巻込み壁部11が形成する空間内で待機する作業者(監視者)が、係船索2の状態の監視を行うためのものである。更に、側壁部10と巻き込み壁部11は、破断した係船索2が監視者に到達しないように、配置している。なお、側壁板12、巻込み壁板14、15及び支柱16は、鋼板等の金属材料を使用することができる。また、側壁板12等の重量を低減するために、側壁板12等に複数の貫通孔である軽目孔を形成してもよい。この軽目孔は、監視孔13としても使用することができる。つまり、側壁板12等に形成した貫通孔を、監視孔13及び軽目孔として利用することができる。更に、保護装置1は、縦0.5〜1.5m、横1.0〜2m、高さ1.7〜2.0m程度とすることが望ましい。特に、保護装置1の高さは、監視者の頭部が露出しない高さとする。
FIG. 2 shows an outline of the protection device 1. The protection device 1 has a side wall 10 installed along the mooring rope 2 and a winding wall 11 connected to the end of the side wall 10 and extending in a direction away from the mooring rope 2. The side wall part 10 has a column 16 standing on the deck of the ship 3 and a side wall plate 12 fixed to the column 16. The winding wall part 11 has a support column 16 and a winding wall plate (first winding wall plate 14 and second winding wall plate 15) fixed to the support column. Moreover, the monitoring hole 13 is formed in the side wall plate 12 and the entraining wall plates 14 and 15. The monitoring hole 13 is for an operator (monitoring person) waiting in the space formed by the side wall part 10 and the entraining wall part 11 to monitor the state of the mooring rope 2. Further, the side wall portion 10 and the entraining wall portion 11 are arranged so that the broken mooring rope 2 does not reach the observer. In addition, metal materials, such as a steel plate, can be used for the side wall board 12, the surrounding wall boards 14 and 15, and the support | pillar 16. Further, in order to reduce the weight of the side wall plate 12 or the like, a plurality of light holes as through holes may be formed in the side wall plate 12 or the like. This light hole can also be used as the monitoring hole 13. That is, the through holes formed in the side wall plate 12 and the like can be used as the monitoring holes 13 and the light holes. Furthermore, the protective device 1 is desirably about 0.5 to 1.5 m in length, about 1.0 to 2 m in width, and about 1.7 to 2.0 m in height. In particular, the height of the protection device 1 is set to a height at which the head of the observer is not exposed.

図3に、保護装置1の平面図を示す。保護装置1の側壁部10を、係船索2と略平行となるように配置している。第1巻込み壁板14及び第2巻込み壁板15で構成する巻込み壁部11は、側壁部10の端部に接続し、且つ係船索2から離間する方向に配置している。ここで、第1巻込み壁板14は、係船索2に対して略直交する方向に配置し、第2巻込み壁部15は、係船索2に対して略平行となるように配置している。なお、巻込み壁部11の配置は、上記に限定されない。   FIG. 3 shows a plan view of the protection device 1. The side wall 10 of the protection device 1 is arranged so as to be substantially parallel to the mooring rope 2. The winding wall portion 11 constituted by the first winding wall plate 14 and the second winding wall plate 15 is connected to the end portion of the side wall portion 10 and arranged in a direction away from the mooring rope 2. Here, the first entraining wall plate 14 is disposed in a direction substantially orthogonal to the mooring rope 2, and the second entraining wall portion 15 is disposed so as to be substantially parallel to the mooring rope 2. Yes. In addition, arrangement | positioning of the winding wall part 11 is not limited above.

次に、係船作業について説明する。係船作業を行う際、監視者は、側壁部10と巻込み壁部11により形成した保護領域Rから係船索2の監視を行い、ウィンチ6の操作者に指
示を出す。監視者は、側壁板12、第1及び第2巻込み壁板14、15に形成した監視孔(又は軽目孔)13(図2参照)から、係船索2の状態を監視することができる。なお、側壁板12、巻込み壁板14、15を、ポリカーボネートやアクリル樹脂等の透明な材料で形成し、監視孔13を設けない構成としてもよい。
Next, mooring work will be described. When the mooring work is performed, the supervisor monitors the mooring rope 2 from the protection region R formed by the side wall portion 10 and the entraining wall portion 11 and gives an instruction to the operator of the winch 6. The monitor can monitor the state of the mooring rope 2 from the monitoring hole (or light hole) 13 (see FIG. 2) formed in the side wall plate 12 and the first and second entraining wall plates 14 and 15. . Note that the side wall plate 12 and the entraining wall plates 14 and 15 may be formed of a transparent material such as polycarbonate or acrylic resin, and the monitoring hole 13 may not be provided.

上記の構成により、係船作業時に、係船索2が破断した場合であっても、監視者の安全を確保することができる。これは、破断した係船索2が、保護装置1内(保護領域R)の監視者に到達しないためである。なお、図3に示す破線は、破断した係船索2が保護装置1に衝突する際の位置を示している。側壁板12、巻込み壁板14、15及び支柱16等は、破断した係船索2が衝突するため、この衝突に耐え得る強度を有するように構成する。   With the configuration described above, the safety of the supervisor can be ensured even when the mooring rope 2 is broken during mooring work. This is because the broken mooring rope 2 does not reach the supervisor in the protection device 1 (protection region R). A broken line shown in FIG. 3 indicates a position when the broken mooring rope 2 collides with the protection device 1. Since the broken mooring rope 2 collides, the side wall plate 12, the entraining wall plates 14, 15 and the column 16 are configured to have a strength that can withstand this collision.

図4に、異なる実施の形態の保護装置1Aの平面図を示す。この保護装置1Aは、巻込み壁部11Aを湾曲した形状に構成している。また、側壁部10と巻込み壁部11Aを連結せず、別体として構成している。巻込み壁部11、11Aの形状は、前述の構成に限らず、監視者を保護する十分な保護領域Rを形成できる形状であればよい。   In FIG. 4, the top view of 1 A of protection apparatuses of different embodiment is shown. This protective device 1A is configured such that the entraining wall portion 11A is curved. Moreover, the side wall part 10 and the entraining wall part 11A are not connected, but are configured as separate bodies. The shape of the entraining wall portions 11 and 11A is not limited to the above-described configuration, and may be any shape that can form a sufficient protection region R that protects the observer.

図5に、保護装置1を分解した際の1例を示す。図5を参照し、保護装置1の分解作業について説明する。まず、側壁板12、第1巻込み壁板14等を支柱16から上方に引き抜く。その後、残った支柱16を船舶3のデッキ内に収納する。以上により、保護装置1を容易に分解することができる。なお、保護装置1から側壁板12等を取外す方法は上記に限られず、側方に引き抜く又は取外すなど、任意に決定することができる。   FIG. 5 shows an example when the protective device 1 is disassembled. With reference to FIG. 5, the disassembling work of the protective device 1 will be described. First, the side wall plate 12, the first winding wall plate 14, and the like are pulled out from the support column 16. Thereafter, the remaining support column 16 is stored in the deck of the ship 3. As described above, the protection device 1 can be easily disassembled. Note that the method of removing the side wall plate 12 and the like from the protective device 1 is not limited to the above, and can be arbitrarily determined by pulling out or removing the side plate.

上記の構成により、以下の作用効果を得ることができる。第1に、係船作業時のみ、保護装置1を設置して使用することができる。そのため、係船作業時以外は、デッキ上での作業者の移動が容易となる。   With the above configuration, the following operational effects can be obtained. First, the protective device 1 can be installed and used only during mooring work. Therefore, the worker can easily move on the deck except during mooring work.

第2に、船舶3の接岸方向により、保護装置1の設置位置を変更することができる。そのため、船舶上に大量の保護装置1を設置する必要がなくなる。   Secondly, the installation position of the protection device 1 can be changed according to the berthing direction of the ship 3. Therefore, it is not necessary to install a large amount of protection device 1 on the ship.

第3に、保護装置1の設置位置を変更しながら、係船作業を行うことができる。つまり、監視者の移動に合わせて、保護装置1を移動することができる。そのため、保護装置1は、少なくとも監視者の人数分だけ準備すればよい。   Thirdly, mooring work can be performed while changing the installation position of the protection device 1. That is, the protection device 1 can be moved in accordance with the movement of the supervisor. Therefore, it is sufficient to prepare the protective device 1 for at least the number of supervisors.

なお、支柱16をデッキから取外せるように構成してもよい。このとき、支柱16とデッキの接合は、ネジ式又はツイストロック(コンテナ固縛装置)式などを採用することができる。また、支柱16を起倒式として、デッキ上に倒して収納する方式、保護装置1全体をたたみ、デッキ上に倒して収納する方式等を採用することができる。   In addition, you may comprise so that the support | pillar 16 can be removed from a deck. At this time, for the joining of the support column 16 and the deck, a screw type or a twist lock (container lashing device) type can be adopted. Further, it is possible to adopt a system in which the support column 16 is tilted up and stored on the deck, and a system in which the entire protection device 1 is folded and stored on the deck.

また、側壁板12等を1枚の板で構成してもよい。更に、保護装置1をFRP又はアクリル板等で一体に成型して構成してもよい。この構成により、保護装置を軽量とすることができる。そのため、監視者が保護装置を容易に移動させながら、監視作業を行うことができる。また、保護装置1を木製とすることもできる。   Moreover, you may comprise the side wall board 12 grade | etc., With one board. Furthermore, you may comprise the protection apparatus 1 by shape | molding integrally with FRP or an acrylic board. With this configuration, the protective device can be reduced in weight. Therefore, the monitoring person can perform the monitoring work while easily moving the protection device. The protection device 1 can also be made of wood.

以上より、係船作業時の作業者(監視者)の安全性を向上することができる。なお、保護装置は、船舶上と同様に、岸壁側にも設置することが望ましい。   From the above, it is possible to improve the safety of the worker (monitoring person) at the time of mooring work. It is desirable to install the protective device on the quay side as well as on the ship.

1 係船索用保護装置(保護装置)
2 係船索
3 船舶
10 側壁部
11 巻込み壁部
12 側壁板
13 監視孔、軽目孔
14 第1巻込み壁版
15 第2巻込み壁版
16 支柱
R 保護領域
31 岸壁
1. Protection device for mooring lines (protection device)
2 Mooring line 3 Ship 10 Side wall part 11 Entrainment wall part 12 Side wall plate 13 Monitoring hole, light hole 14 First entrainment wall plate 15 Second entrainment wall plate 16 Column R Protection area 31 Quay

Claims (3)

船舶を岸壁に固定する係船索の近傍に設置する係船索用保護装置であって、
前記保護装置は、前記係船索と略平行となる側壁部と、前記側壁部の端部近傍から前記係船索と離間する方向に延伸した巻込み壁部を有しており、前記保護装置が、前記側壁部と前記巻込み壁部で形成した空間である保護領域を有することを特徴とする係船索用保護装置。
A protective device for mooring lines installed in the vicinity of the mooring lines that fix the ship to the quay,
The protection device includes a side wall portion that is substantially parallel to the mooring line, and a winding wall portion that extends in a direction away from the mooring line from the vicinity of an end of the side wall portion, and the protection device includes: A protection device for a mooring line, comprising a protection region which is a space formed by the side wall portion and the entraining wall portion.
前記側壁部が、支柱と、前記支柱に固定した側壁板を有しており、
前記巻込み壁部が、支柱と、前記支柱に固定した巻込み壁板を有していることを特徴とする請求項1に記載の係船索用保護装置。
The side wall portion has a column and a side wall plate fixed to the column,
The mooring rope protection device according to claim 1, wherein the entraining wall portion includes a support column and an entraining wall plate fixed to the support column.
少なくとも前記支柱に対して前記側壁板又は前記巻込み壁版を着脱自在に構成したことを特徴とする請求項1又は2に記載の係船索用保護装置。   The mooring rope protection device according to claim 1 or 2, wherein the side wall plate or the entraining wall plate is detachable from at least the support column.
JP2010267036A 2010-11-30 2010-11-30 Protection apparatus for mooring line Withdrawn JP2012116304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010267036A JP2012116304A (en) 2010-11-30 2010-11-30 Protection apparatus for mooring line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010267036A JP2012116304A (en) 2010-11-30 2010-11-30 Protection apparatus for mooring line

Publications (1)

Publication Number Publication Date
JP2012116304A true JP2012116304A (en) 2012-06-21

Family

ID=46499692

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010267036A Withdrawn JP2012116304A (en) 2010-11-30 2010-11-30 Protection apparatus for mooring line

Country Status (1)

Country Link
JP (1) JP2012116304A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017137016A (en) * 2016-02-05 2017-08-10 三井造船株式会社 Mooring structure and protection method of operator of deck machine
JP2017140917A (en) * 2016-02-10 2017-08-17 三井造船株式会社 Mooring structure and crew protection method in mooring structure
WO2018046549A1 (en) * 2016-09-08 2018-03-15 Thyssenkrupp Marine Systems Gmbh Mobile device for protection against firing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017137016A (en) * 2016-02-05 2017-08-10 三井造船株式会社 Mooring structure and protection method of operator of deck machine
JP2017140917A (en) * 2016-02-10 2017-08-17 三井造船株式会社 Mooring structure and crew protection method in mooring structure
WO2018046549A1 (en) * 2016-09-08 2018-03-15 Thyssenkrupp Marine Systems Gmbh Mobile device for protection against firing

Similar Documents

Publication Publication Date Title
EP2477927B1 (en) Hoisting device
KR101984917B1 (en) Fender Davit Device
KR20120097827A (en) Mooring apparatus with electromagnet for ship
KR101762832B1 (en) Mooring apparatus for ship
JP2012116304A (en) Protection apparatus for mooring line
CN104828219A (en) Movable rubber fender device used for ship-to-ship barge transport operation
KR20150065442A (en) Movable mooring system and the ship having it
KR102400054B1 (en) Spread mooring system of floating production storge offloading constructure and fpso constructure containing the same
JP2020023233A (en) Removal method for taut mooring type floating body structure
WO2019069076A1 (en) A semi submersible vessel
JP6607065B2 (en) Mooring structure and crew member protection method in mooring structure
KR102295240B1 (en) Fender Davit Device
KR200468323Y1 (en) Fender for mooring a ship
KR20160000290U (en) Mooring apparatus arrangement structure of vessel
JP2017144851A (en) Mooring rope restriction mechanism and mooring structure body
KR20120058262A (en) Side by side mooring apparatus
KR102662433B1 (en) Spread mooring method for weather vaning
JP3148744U (en) Mooring equipment
KR101446587B1 (en) Winch for laying cables in the ship
NO336080B1 (en) Vessels and method for underwater towing of heavy loads
KR102678284B1 (en) Rope guide system
KR101616837B1 (en) Mooring apparatus
JP2014108735A (en) Work barge
KR20140049258A (en) Semi submergible rig having towing system
KR20120132943A (en) Deck crane for ship

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20140204