JP2011117230A - Foundation structure and method for manufacturing the same - Google Patents
Foundation structure and method for manufacturing the same Download PDFInfo
- Publication number
- JP2011117230A JP2011117230A JP2009277122A JP2009277122A JP2011117230A JP 2011117230 A JP2011117230 A JP 2011117230A JP 2009277122 A JP2009277122 A JP 2009277122A JP 2009277122 A JP2009277122 A JP 2009277122A JP 2011117230 A JP2011117230 A JP 2011117230A
- Authority
- JP
- Japan
- Prior art keywords
- auxiliary hole
- base
- reinforcing bar
- auxiliary
- forming member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Foundations (AREA)
Abstract
Description
本発明は、地盤沈下によって傾いたときでも引き上げて修復するのに適した構成を有する基礎構造物に関する。 The present invention relates to a foundation structure having a configuration suitable for lifting and repairing even when tilted due to ground subsidence.
従来、建物の重みによる地盤沈下によって建物が沈下し、基礎構造物であるベタ基礎全体を引き上げる必要がある場合には、アンダーピニングやジャッキアップ、薬液注入により引き上げて修復することが行われている。例えば、下記特許文献1には、アンダーピニングにより傾いた構造物基礎を引き上げることが開示されている。
Conventionally, when a building sinks due to ground subsidence due to the weight of the building and it is necessary to pull up the entire solid foundation, which is a foundation structure, it has been repaired by pulling it up by underpinning, jacking up, or injecting chemicals. . For example,
しかし、沈下が生じた構造物をアンダーピニング、ジャッキアップ、薬液注入等によって事後的に引き上げる場合には、引き上げる対象である基礎の下面にアクセスする必要があるため、基礎構造物の周囲の地盤を掘削しなければならない。特に、特許文献1に記載されているように、ベタ基礎の中央部分の下方にアクセスする場合には、トンネルを掘削する必要があり、作業負担が大きくコストもかかると共に、掘削による再沈下を招くことにもなりかねない。
However, when a structure with subsidence is lifted later by underpinning, jack-up, chemical injection, etc., it is necessary to access the lower surface of the foundation to be lifted. Have to drill. In particular, as described in
このような点に鑑み、下記特許文献2には、ベタ基礎の施工時に、その内側領域に予め引き上げ用のジャッキを設置するための貫通開口穴を形成しておき、地盤沈下が生じた場合には、この貫通開口穴を利用してジャッキアップを行うことが開示されている。 In view of such points, in Patent Document 2 below, when a solid foundation is formed, a through-opening hole for installing a jack for lifting in advance is formed in the inner region, and when ground subsidence occurs. Discloses that jack-up is performed using this through-opening hole.
よって、特許文献2に開示された構成によれば、地盤沈下が生じてしまった場合であっても、この貫通開口穴を利用することで、地盤にトンネルを掘削することなく、比較的容易に基礎構造物の引き上げを行うことができる。 Therefore, according to the configuration disclosed in Patent Document 2, even if ground subsidence occurs, it is relatively easy to use this through-opening hole without excavating a tunnel in the ground. The foundation structure can be lifted.
しかし、特許文献2に開示された貫通開口穴は、サイズの大きいジャッキを載置するための穴であるため、大きな穴をベタ基礎に形成する必要がある。また、特許文献2ではベタ基礎内の配筋との関係を全く考慮していないため、貫通開口穴を開けると、ベタ基礎の強度が大きく低下してしまうおそれがある。 However, since the through-opening hole disclosed in Patent Document 2 is a hole for placing a large jack, it is necessary to form a large hole on a solid base. Moreover, since the patent document 2 does not consider the relationship with the bar arrangement in the solid foundation at all, if the through-opening hole is opened, the strength of the solid foundation may be greatly reduced.
ジャッキアップにあたっては、リフトアップされる貫通開口穴の近辺に大きな力が加えられるが、強度の弱いベタ基礎の場合には、引き上げの力に耐えられず、破損してしまうことも考えられる。 When jacking up, a large force is applied in the vicinity of the through-opening hole to be lifted up. However, in the case of a solid foundation having a low strength, it may not be able to withstand the lifting force and may be damaged.
本発明は、このような課題に鑑みてなされたものであり、基礎構造物の強度を確保したうえで、沈下した際の引き上げを容易に行うことができる基礎構造物及びその製造方法を提供することを目的とする。 This invention is made | formed in view of such a subject, and after providing the intensity | strength of a foundation structure, the foundation structure which can be pulled up at the time of sinking, and its manufacturing method are provided. For the purpose.
上記課題を解決するための本発明に係る基礎構造物は、沈下補修用の構造を有する基礎構造物において、沈下補修時に用いられる貫通した補助孔が予め複数形成されたベース部であって、前記補助孔が形成された部分を除いて配筋されたベース鉄筋を有するベース部と、前記補助孔を形成するための補助孔形成部材であって、前記補助孔の周囲の前記ベース鉄筋を補強するために、前記補助孔の周りを囲んで設置されると共に、前記ベース鉄筋と接続される補助孔補強鉄筋を有する補助孔形成部材と、を備えることを特徴とする。 A foundation structure according to the present invention for solving the above problems is a base structure having a structure for subsidence repair, wherein a plurality of penetrating auxiliary holes used in subsidence repair are formed in advance. A base portion having a base reinforcing bar arranged excluding a portion in which the auxiliary hole is formed, and an auxiliary hole forming member for forming the auxiliary hole, the base reinforcing bar around the auxiliary hole being reinforced Therefore, the auxiliary hole forming member is provided so as to surround the auxiliary hole and has an auxiliary hole reinforcing bar connected to the base reinforcing bar.
また、本発明に係る基礎構造物の製造方法は、ベース部のベース鉄筋を配筋する配筋工程と、ベース部に沈下補修時に用いられる貫通した補助孔を形成するための補助孔形成部材であって、前記補助孔の周囲の前記ベース鉄筋を補強するための補助孔補強鉄筋を有する補助孔形成部材を、前記補助孔の周りを囲んで設置する補助孔形成部材設置工程と、前記ベース鉄筋と前記補助孔補強鉄筋を接続して固定する接続工程と、前記ベース部にコンクリートを打設する打設工程と、を備えることを特徴とする。 Moreover, the manufacturing method of the foundation structure which concerns on this invention is a reinforcement arrangement | positioning member for forming the penetration hole used for the subsidence repair in the base part, and the reinforcement arrangement | positioning process of arranging the base reinforcement of a base part. An auxiliary hole forming member installation step of installing an auxiliary hole forming member having an auxiliary hole reinforcing bar for reinforcing the base reinforcing bar around the auxiliary hole so as to surround the auxiliary hole, and the base reinforcing bar And a connecting step of connecting and fixing the auxiliary hole reinforcing steel bars, and a placing step of placing concrete on the base portion.
また、本発明に係る上記基礎構造物の製造方法で使用される補助孔形成部材は、前記補助孔を形成するために前記補助孔の側面を囲む筒形鋼管と、前記補助孔の周囲の前記ベース鉄筋を補強するための補助孔補強鉄筋であって、前記ベース鉄筋及び前記筒型鋼管に接続される補助孔補強鉄筋と、を備えることを特徴とする。 Further, the auxiliary hole forming member used in the method for manufacturing a substructure according to the present invention includes a cylindrical steel pipe surrounding a side surface of the auxiliary hole to form the auxiliary hole, and the surrounding of the auxiliary hole. An auxiliary hole reinforcing reinforcing bar for reinforcing a base reinforcing bar, comprising: an auxiliary hole reinforcing reinforcing bar connected to the base reinforcing bar and the tubular steel pipe.
本発明に係る基礎構造物によれば、沈下が生じた場合でも周囲を補強された補助孔を利用して容易に低コストで基礎構造物を引き上げることができる。 According to the foundation structure according to the present invention, even when subsidence occurs, the foundation structure can be easily pulled up at low cost by using the auxiliary hole whose periphery is reinforced.
以下、図面を参照しながら、本発明の実施形態に係る地盤沈下時の引き上げに適した構成の基礎構造物について説明する。なお、本実施形態では、ベタ基礎構造の木造住宅に本発明を適用した場合を例に挙げて説明する。図1は、本実施形態に係る基礎構造物の断面図、図2は、本実施形態に係る基礎構造物の平面図を示し、図2においては、ベタ基礎のコンクリートを除いて示している。 Hereinafter, with reference to the drawings, a foundation structure having a configuration suitable for lifting at the time of ground settlement according to an embodiment of the present invention will be described. In the present embodiment, a case where the present invention is applied to a solid wooden structure wooden house will be described as an example. FIG. 1 is a cross-sectional view of a foundation structure according to this embodiment, FIG. 2 is a plan view of the foundation structure according to this embodiment, and FIG. 2 shows a solid foundation except for concrete.
図1に示すように、基礎構造物1は、ベース部(土間スラブ)25、補助孔形成部材10、補助孔形成部材10の鋼管12内に充填されたコンクリート蓋20を備えている。ベース部25は、一般住宅のベタ基礎を構成するベース部25と同様の構成であり、強度補強のため内部にはベース鉄筋30が配筋されている。図2に示すように、本実施形態では、縦横それぞれの方向において、ほぼ20cm間隔で配筋されており、交差するベース鉄筋30同士は、結束線31で接続固定されている。
As shown in FIG. 1, the
ベース部25の補助孔形成部材10が設置される場所には、地盤沈下時に基礎構造物1の引き上げに利用される補助孔5が形成されている。この補助孔5の存在により、ベース鉄筋30が途切れることになるが、後述するように、補助孔形成部材10の補強鉄筋13とベース鉄筋30とを接続することで、ベース部25の補助孔5周囲の強度を確保している。
In the place where the auxiliary
続いて、補助孔形成部材10の構成について、図3及び図4を参照しながら説明する。図3は、本実施形態に係る補助孔形成部材の構成部品を示す斜視図であり、図3(a)は形成部材本体、図3(b)は、取っ手部材の斜視図である。図4は、本実施形態に係る補助孔形成部材の斜視図である。
Next, the configuration of the auxiliary
補助孔形成部材10は、形成部材本体11と取っ手部材15とを有している。形成部材本体11は、円筒形の鋼管12と、鋼管12の外周壁面に一端(根元側)が溶接固定され、放射線状に延在して設置された棒状の補強鉄筋13とから構成される。
The auxiliary
水平断面が円形の鋼管12の直径は、190mmであるが、補助孔5の大きさに合わせて適宜変更可能であることは言うまでもない。円筒形の鋼管12であれば、補助孔5も円形となり、角形の補助孔とした場合と比較して、補助孔5周囲のコンクリートへのひび割れ等を防止できる。また、補強鉄筋13は、四本の補強鉄筋13a,13b,13c,13dからなり、鋼管12の外周壁面に90°間隔で固定されている。
Although the diameter of the
補強鉄筋13は、鋼管12に接続された根元側よりも先端側のほうが高くなっている(図1参照)。このように、ベース部25のベース鉄筋30と接続される補強鉄筋13を水平ではなく傾けて設置しておけば、ベース部25のベース鉄筋30の高さが異なる様々な現場に対応することが可能となる。なお、補強鉄筋13を手で曲げられる鉄筋(D-10等)とすれば、補強鉄筋13を変形させることでも様々な高さに配筋されたベース鉄筋30に対応させることができる。
The reinforcing
取っ手部材15は、コンクリート蓋20を取り外す際の取っ手として機能する部材であり、十字型に溶接された二本の短い鉄筋16a,16bと、取っ手として機能する略U字形の針金17であって、両足端が鉄筋16bに結束線18で固定された針金17と、結束線18とから構成される。
The
この取っ手部材15は、ベース部25の配筋時に、図4に示すように、鋼管12の内部に位置した状態で設置され、針金17の上側半分が鋼管12から上方へ飛び出している。したがって、コンクリート蓋20が打設された後は、図1に示すように、針金17のみがコンクリートから飛び出しており、この飛び出した部分がコンクリート蓋20を取り外すための取っ手として機能する。
As shown in FIG. 4, the
また、図2に示すように、ベース鉄筋30は、補助孔5が形成された部分を除いて配筋されており、補助孔5が形成される箇所には、ベース鉄筋30が存在しないことになるが、補助孔5の箇所に設置される補助孔形成部材10の四方に延在する補強鉄筋13が、補助孔5の周囲に位置するベース鉄筋30と結束線22で接続・固定されている。補強鉄筋13の根元側は補助孔5の周囲を覆う鋼管12に固定されている。よって、補助孔5の周辺においても、ベース鉄筋30と、補助孔補強部材として作用する補強鉄筋13及び鋼管12によりベース部25の強度が確保されている。
In addition, as shown in FIG. 2, the
次に、基礎構造物1における補助孔の形成位置について説明する。図5は、本実施形態に係る基礎構造物における補助孔の形成位置を概略的に示す模式平面図である。同図に示すように、本実施形態では、ベタ基礎構造物1の外周立上げ部26の内側に沿った所定の位置に複数の補助孔5が形成されると共に、内部立上げ部27の脇の所定の位置にも複数の補助孔5が形成される。
Next, the formation position of the auxiliary hole in the
このように、立上げ部26,27の近傍に補助孔5を形成するのは、本実施形態では、後述するように、アンダーピニング工法により沈下補修をしており、アンダーピニング工法では、一般に立上げ部分の直下や脇において鋼管を地盤に圧入するからである。よって、他の引き上げ方法を採用する場合には、それらの工法に適した場所に補助孔5を形成すれば良い。
Thus, the
このように、複数の補助孔5をバランス良く配置することで、地盤沈下の発生による基礎構造物1の傾きがどの方向に発生したとしても、所定の補助孔5を利用した基礎構造物1の引き上げを行うことで、傾きを良好に修正することができる。
Thus, by arranging a plurality of
以上、本実施形態に係る基礎構造物1の構成について説明したが、続いて、基礎構造物1の施工方法(製造方法)について説明する。図6は、本実施形態に係る基礎構造物の製造方法の流れを示すフローチャートである。
The configuration of the
まず、S11において、補助孔形成部材10を設置する。具体的には、まず、基礎構造物1を施工する地面を必要に応じて水平にならしたり、地面に砕石・砂利等を敷いたり、捨てコンを打設したりした後に、図5に示した補助孔5の形成箇所にそれぞれ補助孔形成部材10を設置する。なお、補助孔形成部材10の鋼管12の高さは、ベース部25の高さと同じに設定されており、本実施形態では、ともに15cmである。
First, in S11, the auxiliary
続いて、S12では、ベース部25及び立上げ部26の配筋を行い、ベース鉄筋30を敷設する。このとき、補助孔形成部材10を設置した部分では、鋼管12の存在によりベース鉄筋30を敷設することができないため、補助孔形成部材10の設置位置に突き当たるライン上に設置されるベース鉄筋30については、図1及び図2に示すように、鋼管12の近傍まで延在するベース鉄筋30を敷設し、その先端を補助孔形成部材10の補強鉄筋13と結束線により接続・固定する(S13)。
Subsequently, in S <b> 12, the
S14では、基礎構造物1の枠組みとなる型枠を設置すると共に、まずベース部(土間スラブ)25にコンクリートを打設する。続いて、S15では、コンクリート蓋20として機能するように、補助孔形成部材10の鋼管12内にコンクリートを打設する。このとき、鋼管12内に流し込むコンクリートと鋼管12の内壁面とが強固に固着してしまうと、後でコンクリート蓋20を抜き取るのが面倒になるおそれもあるので、コンクリートを打設する前に、鋼管12内面にシールや油を塗っておくのが望ましい。
In S <b> 14, a formwork as a framework of the
また、S15のコンクリート蓋20の打設にあたっては、取っ手部材15の針金17の上半分がコンクリートから飛び出した状態となるように固定する必要があるため、取っ手部材15が所定の姿勢となるように把持した状態でコンクリートを流し込む必要がある。
Further, when placing the
続いて、ベース部25がある程度固まると、S16において、立上げ部26,27にもコンクリートを打設し、S17で養生させれば、基礎構造物1が完成する。なお、本実施形態では、先に補助孔形成部材10を配置してから、その配置場所を避けるように鉄筋20を配筋しているが、先に、通常通り鉄筋20を配筋してから、補助孔5形成場所の鉄筋20を切断して除去し、空いた場所に補助孔形成部材10を設置するようにしても良い。
Subsequently, when the
何れの場合であっても、補助孔5周りのコンクリート強度を低下させないように、補助孔5の周囲に補強鉄筋等の補助孔補強部材を設置し、この補助孔補強部材と鉄筋30とを接続固定しておく必要がある。
In any case, an auxiliary hole reinforcing member such as a reinforcing bar is installed around the
次に、地盤沈下の発生により基礎構造物の一部が沈下して傾きが発生した場合に、沈下した部分を引き上げて傾きを修正する引き上げ方法について、図面を参照しながら説明する。図7は、本実施形態に係る基礎構造物の引き上げ方法の流れを示すフローチャートである。図8は、本実施形態に係る基礎構造物の引き上げ時の状態を一部断面で概略的に示す模式断面図である。 Next, a description will be given, with reference to the drawings, of a pulling method in which, when a subsidence occurs due to the occurrence of ground subsidence and a tilt occurs, a tilt is generated and the tilt is corrected by lifting the sinked portion. FIG. 7 is a flowchart showing the flow of the substructure lifting method according to the present embodiment. FIG. 8 is a schematic cross-sectional view schematically showing, in partial cross-section, a state when the substructure according to the present embodiment is pulled up.
なお、本実施形態では、補助孔5を利用したアンダーピニング工法により基礎構造物1を引き上げる場合を説明する。また、図8では、基礎構造物1だけを断面で示している。
In the present embodiment, a case where the
地盤沈下が発生し、基礎構造物1が傾いた場合には、その傾きを修正するために望ましい場所を選定し、その近辺の補助孔5を用いて基礎構造物1の引き上げを行う。引き上げにあたっては、まず、S21において、引き上げに用いる補助孔5のコンクリート蓋20を取り外し、補助孔5を露わにする。
When ground subsidence occurs and the
続いて、鋼管を圧入するための駆動装置である油圧ジャッキ40を補助孔5の傍のベース部25の上に設置する。ここで、油圧ジャッキ40を設置する場所は床下であるため、床下の作業スペースは、通常35〜40cmに制限される。よって、本実施形態では、高さの低い油圧ジャッキ40を使用する必要がある。
Subsequently, a
続いて、S23では、油圧ジャッキ40の一方の荷重を基礎構造物1にかけるための二本の鉤(カギ)形部材42を設置する。図8に示すように、鉤形部材42はL字形の部材であり、上端側が油圧ジャッキ40の腕部分41に固定される。また、鉤形部材42の他端(下側端)は、外側に折り曲げられた引っ掛け部分の上面がベース部25の下面に引っ掛かるように設置される。
Subsequently, in S <b> 23, two hook-shaped
この状態で、S24において、油圧ジャッキ40を作動させ、圧入用鋼管45の地盤への圧入が開始されると、油圧ジャッキ40から圧入用鋼管45へ加えられた力の反力が鉤形部材42を介して基礎構造物1のベース部25の下面へと加えられる。
In this state, when the
このとき、圧入反力が加えられるベース部25下面の補助孔5周囲には、大きな荷重がかかることになる。しかし、本実施形態では、上述したように、ベース部25のベース鉄筋30を補助孔形成部材10の補助孔補強部材である補強鉄筋13と結束線で接続することで、ベース部25の補助孔5の周囲が補強されているので、大きな荷重にも十分に耐えることができる。
At this time, a large load is applied around the
本実施形態に係る圧入用鋼管45の長さは、床下作業スペースの高さ制限を考慮して、30cmであり、最初に圧入した圧入用鋼管45の先端が固い地盤である支持層に到達するまで、順次複数の圧入用鋼管45が互いに接続されながら地盤へと圧入される。なお、圧入用鋼管45の両端は、溶接しなくても他の圧入用鋼管45と接続可能な継手構造となっており、本実施形態では、床下の作業スペースにおける火を使う溶接作業が不要である。
The length of the press-
S24において、圧入用鋼管45の先端が支持層に到達すると、圧入用鋼管45はそれ以上地盤内へ貫入しないため、油圧ジャッキ40の作動により、ベース部25が持ち上げられることになる。よって、S25では、沈下したベース部25を所望の位置まで引き上げると、油圧ジャッキ40の作動を停止すると共に、圧入用鋼管45の上端がベース部25を支えるような状態で圧入用鋼管45をベース部25に対して固定する。
In S24, when the tip of the press-
このとき、ベース部25を所定の位置まで引き上げた状態で、補助孔5を介して、ベース部25の下方にセメントミルクや薬液を注入しておけば、以後の再沈下を確実に防止することができる。圧入用鋼管45を固定した後、油圧ジャッキ40を取り外し、必要に応じて、コンクリート蓋20を戻す等して、補助孔5を再度塞げば、沈下した基礎構造物1の引き上げが完了する。
At this time, if cement milk or a chemical solution is injected below the
以上、詳細に説明した本実施形態によれば、地盤沈下による構造物の沈下が発生した際の基礎構造物の引き上げを容易にする補助孔を、基礎構造物の施工時に形成しておくので、万が一、事後的に基礎構造物の沈下が発生したとしても、手軽に低コストで引き上げを行うことができる。もちろん、上記補助孔の形成は、補助孔形成部材を設置するという低コストで実現できる。 As described above, according to the present embodiment described in detail, since the auxiliary hole that facilitates lifting of the foundation structure when subsidence of the structure due to ground subsidence occurs, the auxiliary hole is formed at the time of construction of the foundation structure. Even if the subsidence of the foundation structure occurs later, it can be easily pulled up at low cost. Of course, the auxiliary hole can be formed at a low cost by installing an auxiliary hole forming member.
また、従来は、新築住宅の建築前の地盤調査により、将来的に少しでも地盤が沈下する可能性のある結果が出ると、ほとんどの施主は、不安を取り除くために高額な地盤改良を行っているが、実際に地盤沈下につながれることは稀であると考えられ、非常に無駄なコストとなっていた。 Also, in the past, if the ground survey before the construction of a new house revealed that there is a possibility that the ground will sink in the future, most owners have made expensive ground improvement to remove anxiety. However, it was considered rare that it was actually connected to land subsidence, which was a very wasteful cost.
これに対して、本実施形態によれば、新築住宅の施工時に地盤沈下の発生可能性があると出た場合であっても、上述した構成の基礎構造物を低コストで施工しておけば、万が一地盤沈下が発生した場合に手軽で低コストに沈下した基礎構造物の引き上げを行うことができるので、新築時に余計なコストをかけることなく、いざというときに対応することもできる。 On the other hand, according to the present embodiment, even if it is found that there is a possibility of ground subsidence during construction of a new house, if the foundation structure having the above-described configuration is constructed at low cost. In the unlikely event that land subsidence occurs, the subsidized foundation structure can be lifted easily and at low cost, so that it is possible to cope with emergencies without incurring extra costs during new construction.
また、本実施形態では、補助孔の周囲のベース部を補強するための補強鉄筋等の補助孔補強部材を設置しているので、貫通する補助孔を設けることによる基礎構造物の強度低下を抑えている。特に、沈下した基礎構造物を引き上げる際には、補助孔の周囲に大きな荷重がかかることになるが、本実施形態のように補助孔の周囲が、補助孔を取り囲んで設置された補強部材により補強された基礎構造物であれば、十分に耐えることができる。 Moreover, in this embodiment, since the auxiliary hole reinforcing member such as a reinforcing bar for reinforcing the base portion around the auxiliary hole is installed, a decrease in strength of the foundation structure due to the provision of the auxiliary hole penetrating is suppressed. ing. In particular, when the subsidence foundation is pulled up, a large load is applied to the periphery of the auxiliary hole. However, as in this embodiment, the periphery of the auxiliary hole is surrounded by the reinforcing member that surrounds the auxiliary hole. A reinforced foundation structure can withstand sufficiently.
また、本実施形態では、アンダーピニング工法による引き上げを行うための穴として補助孔を基礎構造物に形成しており、従来のジャッキを載置するための穴と比べて非常に小さな穴とすることができるため、これによっても基礎構造物の強度低下を抑えることができる。 Moreover, in this embodiment, the auxiliary hole is formed in the foundation structure as a hole for pulling up by the underpinning method, and it should be a very small hole compared to the hole for placing the conventional jack. Therefore, the strength reduction of the foundation structure can also be suppressed by this.
また、本実施形態では、補助孔を塞ぐためのコンクリート蓋を設置しているので、ベタ基礎に開けられた穴から土中の湿気等が基礎の上に上がってしまい、木造建物が損傷してしまうといったことを防止できる。 Moreover, in this embodiment, since the concrete lid for closing the auxiliary hole is installed, moisture in the soil rises on the foundation from the hole opened in the solid foundation, and the wooden building is damaged. Can be prevented.
なお、本発明の実施の形態は上記実施形態に限定されるものではなく、本発明の主旨を逸脱しない範囲内で種々の変形が可能であることは言うまでもない。例えば、上記実施形態では、基礎構造物として木造住宅のベタ基礎を例に挙げて説明したが、ベタ基礎以外の基礎構造物であっても良く、引き上げに必要な下面へのアクセスが難しい基礎構造物であれば、本発明により大きな作用効果を奏することができる。 The embodiment of the present invention is not limited to the above-described embodiment, and it goes without saying that various modifications can be made without departing from the gist of the present invention. For example, in the above embodiment, a solid foundation of a wooden house has been described as an example of a foundation structure, but a foundation structure other than a solid foundation may be used, and a foundation structure that is difficult to access the bottom surface required for lifting. If it is a thing, there can exist a big effect by this invention.
また、上記実施形態では、補助孔の形状を円筒形としたが、角筒形であっても良い。また、上記実施形態では、沈下した基礎構造物を、補助孔を利用して引き上げる方法として、アンダーピニング工法の場合を例に挙げて説明したが、薬液注入方法等、他の工法を用いても良いし、他の工法と組み合わせても良い。また、補助孔を利用しない引き上げ方法と組み合わせて用いても良い。 Moreover, in the said embodiment, although the shape of the auxiliary hole was made into the cylindrical shape, a rectangular tube shape may be sufficient. Moreover, in the said embodiment, although the case of the underpinning construction method was mentioned as an example and demonstrated as a method of pulling up the subsidence foundation structure using an auxiliary hole, other construction methods, such as a chemical solution injection method, may be used. It can be combined with other methods. Moreover, you may use in combination with the raising method which does not utilize an auxiliary hole.
また、上記実施形態において、コンクリート蓋の上に、さらに補助孔を覆うカバーをかけておけば、補助孔形成部材が空気に触れることによるサビの発生を防止することができる。また、補助孔を塞ぐ部材としては、コンクリート蓋に限らず、他のキャップや樹脂シートを被せるようにしても良い。 Moreover, in the said embodiment, if the cover which covers an auxiliary hole is further covered on a concrete cover, generation | occurrence | production of the rust by the auxiliary hole formation member touching air can be prevented. Moreover, as a member which plugs up an auxiliary hole, you may make it cover not only a concrete cover but another cap and a resin sheet.
続いて、上記実施形態の変形例について、図面を参照しながら説明する。図9は、本実施形態の変形例1に係る補助孔形成部材の構成を示す図であり、図9(a)はその断面図、図9(b)はその平面図を示している。図10は、本実施形態の変形例1に係る補助孔形成部材の設置状況を示す平面図である。変形例1に係る補助孔形成部材50は、上記実施形態に係る補助孔形成部材10の変形例である。
Next, a modification of the above embodiment will be described with reference to the drawings. FIG. 9 is a view showing a configuration of an auxiliary hole forming member according to
図9に示すように、補助孔形成部材50は、鋼管52、四つの取っ手鉄筋53a〜d、四本の補強鉄筋55を備えている。本変形例1では、補助孔形成部材の可搬性を考慮して、上記実施形態における補強鉄筋13の代わりに、補助孔補強鉄筋として機能する取っ手鉄筋53及び補強鉄筋55を設置したことを特徴としている。
As shown in FIG. 9, the auxiliary
取っ手鉄筋53は、略コの字形状をしており、両端が鋼管52の上端よりも少し下がった位置の外周面に溶接固定されており、四つの取っ手鉄筋53が、鋼管52の周方向において90°毎に設置されている。
The handle rebar 53 is substantially U-shaped, and both ends are welded and fixed to the outer peripheral surface at a position slightly lower than the upper end of the
四本の補強鉄筋55は、水平面において鋼管52を囲んで略♯形状に組み合わされており、直交して交差する補強鉄筋同士は結束線56によって接続・固定されている。また、四本の補強鉄筋55は、四つの取っ手鉄筋53ともそれぞれ二箇所で交差しており、この交差箇所においても補強鉄筋55と取っ手鉄筋53とは結束線56によって接続・固定されている。
The four reinforcing reinforcing
図10に示すように、補助孔形成部材50は、基礎構造物の補助孔が形成される位置に設置されるが、図中縦横に延在するベース鉄筋35と、補助孔形成部材50の補強鉄筋55とが45度で交差するように設置される。交差する補強鉄筋55とベース鉄筋35とは、結束線58により固定される。
As shown in FIG. 10, the auxiliary
本変形例1によれば、上記実施形態と同様の作用効果を奏すると共に、鋼管52には取っ手鉄筋53が設置されており、持ち運びが容易である。また、補強鉄筋55は、結束線56により取っ手鉄筋53に固定されるので、建築現場で調達して組み立てることができる。したがって、本変形例1では、取っ手鉄筋53付きの鋼管52の状態で現場に持ち込むことができるので、可搬性の優れた補助孔形成部材50を提供することができる。
According to the first modification, the same effect as that of the above embodiment is achieved, and the handle rebar 53 is installed in the
続いて、上記実施形態の変形例2について図面を参照しながら説明する。図11は、本変形例2に係るコンクリート蓋20’の構成を示す図であり、図11(a)はその平面図、図11(b)はその断面図である。本変形例2は、上記実施形態に係るコンクリート蓋20の変形例であり、沈下した基礎構造物の引き上げ時に蓋の取り外しを容易にしたことを特徴としている。
Next, Modification 2 of the above embodiment will be described with reference to the drawings. 11A and 11B are diagrams showing a configuration of a concrete lid 20 'according to the second modification, in which FIG. 11A is a plan view and FIG. 11B is a cross-sectional view thereof. The second modified example is a modified example of the
同図に示すように、コンクリート蓋20’は、コンクリート製のコンクリート部23と、ゴム、ウレタン、プラスチック等の樹脂製の仕切り部24とから構成される。樹脂製の仕切り部24は、一般的にコンクリートとの接着度が弱いため、容易に取り外すことができる。
As shown in the figure, the
したがって、本変形例2において、コンクリート蓋20’を外す際には、まず仕切り部24を取り外し、コンクリート蓋20’の中心に空洞を作成する。その後、空洞の両側に位置するコンクリート部23を中心に寄せるように外せば、上記実施形態に係るコンクリート蓋20の場合と比較して、容易にコンクリート部分を取り外すことができる。
Therefore, in the second modification, when removing the concrete lid 20 ', the
続いて、上記実施形態の変形例3について図面を参照しながら説明する。図12は、本変形例3に係る補助孔形成部材の平面図である。同図に示すように、本変形例3に係る補助孔形成部材60は、樹脂製円筒管62、正方形枠補強鉄筋63と、四本の補強鉄筋65とを備えている。
Subsequently, Modification 3 of the above embodiment will be described with reference to the drawings. FIG. 12 is a plan view of an auxiliary hole forming member according to the third modification. As shown in the figure, the auxiliary
本変形例3に係る樹脂製円筒管62は、補助孔を形成するための部材としては機能するが、上述した鋼管と比べて軟らかいため、補助孔周囲のベース部を補強する補強部材としては大して機能することができない。このため、本変形例3では、上記変形例1と比較してさらに補助孔の周囲を囲む正方形枠補強鉄筋63を設置したことを特徴としている。
The resin-made
四本の補強鉄筋65は、上記変形例1の補強鉄筋55と同様に略♯形状に組み合わされて結束線66により接続・固定されている。また、補強鉄筋65は、正方形枠補強鉄筋63の上に載置された状態で、交差部が結束線66で接続・固定されている。
The four reinforcing reinforcing
本変形例3によれば、樹脂製円筒管62が補強部材として機能できない分を、正方形枠補強鉄筋63及び補強鉄筋65の設置によりカバーしており、本変形例に3によっても補助孔周囲のベース部を確実に補強することが可能となる。なお、樹脂製円筒管62は、適宜他の材料を採用することができ、強度の制限が無いため、紙を材料としても良い。
According to the third modification, the portion in which the resin
1 基礎構造物
5 補助孔
10 補助孔形成部材
11 形成部材本体
12 鋼管
13 補強鉄筋
15 取っ手部材
20 コンクリート蓋
22 結束線
25 ベース部
26 外周立上げ部
27 内部立上げ部
30 ベース鉄筋
31 結束線
40 油圧ジャッキ
42 鉤形部材
45 圧入用鋼管
DESCRIPTION OF
Claims (6)
沈下補修時に用いられる貫通した補助孔が予め複数形成されたベース部であって、前記補助孔が形成された部分を除いて配筋されたベース鉄筋を有するベース部と、
前記補助孔を形成するための補助孔形成部材であって、前記補助孔の周囲の前記ベース鉄筋を補強するために、前記補助孔の周りを囲んで設置されると共に、前記ベース鉄筋と接続される補助孔補強鉄筋を有する補助孔形成部材と、
を備えることを特徴とする基礎構造物。 In the foundation structure having a structure for subsidence repair,
A base portion in which a plurality of through-holes to be used at the time of subsidence repair are formed in advance, the base portion having a base reinforcing bar arranged excluding the portion where the auxiliary holes are formed;
An auxiliary hole forming member for forming the auxiliary hole, wherein the auxiliary hole forming member is installed to surround the auxiliary hole and connected to the base reinforcing bar in order to reinforce the base reinforcing bar around the auxiliary hole. An auxiliary hole forming member having auxiliary hole reinforcing steel bars,
A foundation structure characterized by comprising:
ベース部に沈下補修時に用いられる貫通した補助孔を形成するための補助孔形成部材であって、前記補助孔の周囲の前記ベース鉄筋を補強するための補助孔補強鉄筋を有する補助孔形成部材を、前記補助孔の周りを囲んで設置する補助孔形成部材設置工程と、
前記ベース鉄筋と前記補助孔補強鉄筋を接続して固定する接続工程と、
前記ベース部にコンクリートを打設する打設工程と、
を備えることを特徴とする基礎構造物の製造方法。 A bar arrangement process to arrange the base rebar of the base part,
An auxiliary hole forming member for forming a penetrating auxiliary hole used for subsidence repair in the base portion, the auxiliary hole forming member having an auxiliary hole reinforcing bar for reinforcing the base reinforcing bar around the auxiliary hole. , An auxiliary hole forming member installation step for surrounding and installing the auxiliary hole;
A connecting step of connecting and fixing the base reinforcing bar and the auxiliary hole reinforcing reinforcing bar,
A placing step of placing concrete on the base portion;
The manufacturing method of the foundation structure characterized by providing.
前記補助孔を形成するために前記補助孔の側面を囲む筒形鋼管と、
前記補助孔の周囲の前記ベース鉄筋を補強するための補助孔補強鉄筋であって、前記ベース鉄筋及び前記筒型鋼管に接続される補助孔補強鉄筋と、
を備えることを特徴とする補助孔形成部材。 In the auxiliary hole forming member used in the method for manufacturing a substructure according to claim 5,
A tubular steel pipe surrounding a side surface of the auxiliary hole to form the auxiliary hole;
An auxiliary hole reinforcing bar for reinforcing the base reinforcing bar around the auxiliary hole, the auxiliary hole reinforcing bar connected to the base reinforcing bar and the tubular steel pipe;
An auxiliary hole forming member comprising:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009277122A JP2011117230A (en) | 2009-12-07 | 2009-12-07 | Foundation structure and method for manufacturing the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009277122A JP2011117230A (en) | 2009-12-07 | 2009-12-07 | Foundation structure and method for manufacturing the same |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2011117230A true JP2011117230A (en) | 2011-06-16 |
Family
ID=44282860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009277122A Pending JP2011117230A (en) | 2009-12-07 | 2009-12-07 | Foundation structure and method for manufacturing the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2011117230A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013079549A (en) * | 2011-10-05 | 2013-05-02 | Konguro Engineering Kk | Liquefaction countermeasure structure of mat foundation with steel pipe pile, and construction method for the mat foundation with the steel pipe pile |
JP2013091924A (en) * | 2011-10-24 | 2013-05-16 | Konguro Engineering Kk | Liquefaction measure structure for ground improvement mat foundation and ground improvement mat foundation construction method |
JP2015518931A (en) * | 2012-06-05 | 2015-07-06 | ブレー,チャールズ,コールダー | Modular foundation that can withstand ground movement |
KR102190480B1 (en) * | 2020-03-16 | 2020-12-11 | 조정래 | Implant pile pressing apparatus in architecture foundation system and a universal implant piling method |
KR102197107B1 (en) * | 2020-04-06 | 2020-12-30 | 조정래 | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it |
KR102197106B1 (en) * | 2020-04-06 | 2020-12-30 | 조정래 | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5145888B1 (en) * | 1972-01-08 | 1976-12-06 | ||
JPH0325720U (en) * | 1989-07-21 | 1991-03-15 | ||
JPH0762779A (en) * | 1993-08-23 | 1995-03-07 | Taisei Corp | Constitution of floor opened port part |
-
2009
- 2009-12-07 JP JP2009277122A patent/JP2011117230A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5145888B1 (en) * | 1972-01-08 | 1976-12-06 | ||
JPH0325720U (en) * | 1989-07-21 | 1991-03-15 | ||
JPH0762779A (en) * | 1993-08-23 | 1995-03-07 | Taisei Corp | Constitution of floor opened port part |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013079549A (en) * | 2011-10-05 | 2013-05-02 | Konguro Engineering Kk | Liquefaction countermeasure structure of mat foundation with steel pipe pile, and construction method for the mat foundation with the steel pipe pile |
JP2013091924A (en) * | 2011-10-24 | 2013-05-16 | Konguro Engineering Kk | Liquefaction measure structure for ground improvement mat foundation and ground improvement mat foundation construction method |
JP2015518931A (en) * | 2012-06-05 | 2015-07-06 | ブレー,チャールズ,コールダー | Modular foundation that can withstand ground movement |
KR102190480B1 (en) * | 2020-03-16 | 2020-12-11 | 조정래 | Implant pile pressing apparatus in architecture foundation system and a universal implant piling method |
WO2021187873A1 (en) * | 2020-03-16 | 2021-09-23 | 조정래 | Implant-type pile press-in apparatus in construction foundation system, and implant-type piling method using same |
KR102197107B1 (en) * | 2020-04-06 | 2020-12-30 | 조정래 | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it |
KR102197106B1 (en) * | 2020-04-06 | 2020-12-30 | 조정래 | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100788623B1 (en) | Top-down method using precast-concrete colum | |
KR100869815B1 (en) | Apparatus to upgrade end bearing capacity of pile and pile construction method | |
JP2011117230A (en) | Foundation structure and method for manufacturing the same | |
KR20090094555A (en) | Top-down underground construction method using prefabricated concrete column member as temporary bridge column | |
KR20060092552A (en) | The non-strut down framework construction method of having used cast in place concrete pile | |
JP2006328716A (en) | Structure and method for underpinning of existing structure and method of constructing new structure near existing structure | |
JP2013079511A (en) | Construction method of earth-retaining timbering, and earth-retaining timbering | |
KR20110041391A (en) | Pile structure | |
JP2009035927A (en) | Method of reinforcing existing structure foundation, and reinforcing structure | |
JP5131645B2 (en) | Construction method of steel tower foundation | |
KR20160000702A (en) | Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method | |
JP2006328666A (en) | Construction method for integrating pile with column | |
JP2006207265A (en) | Joining method of pile and column and its structure | |
JP2011236705A (en) | Foundation structure of structure and method of constructing the same | |
KR102223856B1 (en) | Foundation structure of waste landfill site and construction method thereof | |
KR100976621B1 (en) | Construction method for basement extention | |
JP4373824B2 (en) | Joining method of cast-in-place pile and steel pipe column | |
JP4611108B2 (en) | Integrated construction method of pile and column | |
KR20130075447A (en) | Constructing method of cast-in-place concrete pile using mold case tremi | |
JP6867664B1 (en) | Foundation structure of structure, foundation construction method, and support pipe material used for foundation | |
JP5169638B2 (en) | Construction method of underground structure | |
KR20080059951A (en) | Underground outer wall construction method using temporary retaining wall and connecting member strengthening shearing force therefor | |
JP5016521B2 (en) | Earth anchor and its removal method | |
JP7112939B2 (en) | Joint structure between pile and foundation concrete, precast concrete body, and construction method | |
KR20220099010A (en) | Foundation construction method with anchorage plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120202 |
|
A977 | Report on retrieval |
Effective date: 20121122 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20121129 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20130402 |