JP2011031295A - Reinforcing bar working equipment - Google Patents

Reinforcing bar working equipment Download PDF

Info

Publication number
JP2011031295A
JP2011031295A JP2009182730A JP2009182730A JP2011031295A JP 2011031295 A JP2011031295 A JP 2011031295A JP 2009182730 A JP2009182730 A JP 2009182730A JP 2009182730 A JP2009182730 A JP 2009182730A JP 2011031295 A JP2011031295 A JP 2011031295A
Authority
JP
Japan
Prior art keywords
reinforcing bar
conveyor
rebar
bending machine
processed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009182730A
Other languages
Japanese (ja)
Other versions
JP5446000B2 (en
Inventor
Masahiko Sowa
昌彦 宗和
Shigekazu Suzuki
繁和 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyo Kensetsu Kohki Co Ltd
Original Assignee
Toyo Kensetsu Kohki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Kensetsu Kohki Co Ltd filed Critical Toyo Kensetsu Kohki Co Ltd
Priority to JP2009182730A priority Critical patent/JP5446000B2/en
Publication of JP2011031295A publication Critical patent/JP2011031295A/en
Application granted granted Critical
Publication of JP5446000B2 publication Critical patent/JP5446000B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Press Drives And Press Lines (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To prevent the scale of equipment is enlarged and to reduce the number of staff required for the equipment. <P>SOLUTION: A reinforcing bar cutting machine 1 and a reinforcing bar bending machine 2 are provided. The reinforcing bar cutting machine 1 is provided with: a reinforcing bar feeder 5 for feeding unprocessed reinforcing bar to the reinforcing bar cutting machine 1; a first conveying conveyer 7 for taking out a first reinforcing bar after cutting and moving it away from the reinforcing bar cutting machine 1; a second conveying conveyer 8 for conveying the first worked reinforcing bar to the reinforcing bar bending machine 2 and a third conveying conveyer 11 for taking out the second bent reinforcing bar from the reinforcing bar bending machine 2 and discharging it to a discharging zone 10. The the reinforcing bar feeder 5, the reinforcing bar cutting machine 1 and the first conveying conveyer 7 are arranged in the longitudinal direction and the reinforcing bar bending machine 2 is arranged on the lateral side of the reinforcing bar cutting machine 1. The second conveying conveyer 8 is formed so as to convey the first reinforcing bar horizontally from the first conveying conveyer 7 to the reinforce bending machine 2 and the third conveying conveyer 11 is formed so as to convey the second worked reinforcing bar to the discharging zone 10 which is arranged on the lateral side of the reinforcing bar bending machine 2 and opposite side to the first conveying conveyer 7. <P>COPYRIGHT: (C)2011,JPO&amp;INPIT

Description

鉄筋を所定の長さに切断する鉄筋切断機を設けると共に、鉄筋の少なくとも一端側を曲げ加工する鉄筋曲げ機を設けてある鉄筋加工設備に関する。   The present invention relates to a reinforcing bar processing facility provided with a reinforcing bar cutting machine for cutting a reinforcing bar into a predetermined length and a reinforcing bar bending machine for bending at least one end of the reinforcing bar.

従来、鉄筋切断機と鉄筋曲げ機とは、別々に離して設置され、個別に使用されるのが一般的であった(周知技術であり文献を示すことができない)。   Conventionally, a rebar cutting machine and a rebar bending machine are generally installed separately and used individually (it is a well-known technique and literature cannot be shown).

上述した従来の鉄筋加工設備においては、鉄筋切断機により切断した第1加工鉄筋を、人力により取り出して鉄筋曲げ機に供給しなければならず、手間の多く掛かる設備であった。
そこで、鉄筋切断機による鉄筋の切断後に、引き続いて鉄筋曲げ機による曲げ加工を連続的に行うには、前記鉄筋切断機に未処理鉄筋を供給する鉄筋供給装置と、前記鉄筋切断機から切断後の第1加工鉄筋を取り出して前記鉄筋切断機から遠ざける第1搬送コンベアとを設け、前記鉄筋供給装置と前記鉄筋切断機と前記第1搬送コンベアとを鉄筋の長手方向に並べ、その第1搬送コンベアの延長線上に鉄筋曲げ機を配置することが考えられる。
この場合、設備全体が長くなり、設置場所の確保が困難になる虞があり、しかも、鉄筋切断機と鉄筋曲げ機の夫々に管理者を配置しなければならず、人手を多く要するという問題があった。
In the above-described conventional rebar processing equipment, the first processed rebar cut by the rebar cutting machine has to be taken out by human power and supplied to the rebar bending machine, which is laborious.
Therefore, in order to continuously perform the bending process by the reinforcing bar bending machine after the cutting of the reinforcing bar by the reinforcing bar cutting machine, the reinforcing bar supplying apparatus that supplies the unprocessed reinforcing bar to the reinforcing bar cutting machine, and after the cutting from the reinforcing bar cutting machine The first processed rebar is taken out and provided away from the rebar cutting machine. The rebar supply device, the rebar cutting machine, and the first transfer conveyor are arranged in the longitudinal direction of the rebar, and the first transfer is performed. It is possible to arrange a reinforcing bar bending machine on the extension line of the conveyor.
In this case, there is a possibility that the entire equipment becomes long and it is difficult to secure the installation location, and there is a problem that a manager must be arranged for each of the reinforcing bar cutting machine and the reinforcing bar bending machine, which requires a lot of manpower. there were.

従って、本発明の目的は、上記問題点を解消し、設備の長大化を防止すると共に、その設備に要する人員を少なく出来るようにする鉄筋加工設備を提供するところにある。   Accordingly, an object of the present invention is to provide a reinforcing bar processing facility that solves the above-described problems, prevents an increase in length of the facility, and reduces the number of personnel required for the facility.

本発明の第1の特徴構成は、鉄筋を所定の長さに切断する鉄筋切断機を設けると共に、鉄筋の少なくとも一端側を曲げ加工する鉄筋曲げ機を設けてある鉄筋加工設備であって、前記鉄筋切断機に未処理鉄筋を供給する鉄筋供給装置と、前記鉄筋切断機から切断後の第1加工鉄筋を取り出して前記鉄筋切断機から遠ざける第1搬送コンベアと、前記第1搬送コンベア上の第1加工鉄筋を前記鉄筋曲げ機に搬送する第2搬送コンベアと、前記鉄筋曲げ機から曲げ加工された第2加工鉄筋を取り出して排出ゾーンへ排出する第3搬送コンベアとを設け、前記鉄筋供給装置と前記鉄筋切断機と前記第1搬送コンベアとを鉄筋の長手方向に並べ、前記鉄筋曲げ機を前記鉄筋切断機の横側に配置すると共に、前記第1搬送コンベアから前記第1加工鉄筋を前記鉄筋曲げ機に横搬送するように前記第2搬送コンベアを形成し、前記第2加工鉄筋を前記鉄筋曲げ機の横側で前記第1コンベアとは反対側に配置した排出ゾーンへ搬送するように前記第3搬送コンベアを形成してあるところにある。   The first characteristic configuration of the present invention is a reinforcing bar processing facility provided with a reinforcing bar cutting machine that cuts a reinforcing bar into a predetermined length and a reinforcing bar bending machine that bends at least one end side of the reinforcing bar. A reinforcing bar supply device for supplying untreated reinforcing bars to the reinforcing bar cutting machine, a first conveying conveyor for taking out the first processed reinforcing bar after cutting from the reinforcing bar cutting machine and moving it away from the reinforcing bar cutting machine; and a first conveyor on the first conveying conveyor A second conveying conveyor that conveys one processed reinforcing bar to the reinforcing bar bending machine; and a third conveying conveyor that takes out the second processed reinforcing bar bent from the reinforcing bar bending machine and discharges the second processed reinforcing bar to a discharge zone. And the reinforcing bar cutting machine and the first transport conveyor are arranged in the longitudinal direction of the reinforcing bar, the reinforcing bar bending machine is arranged on the side of the reinforcing bar cutting machine, and the first processed reinforcing bar from the first transport conveyor. The second conveyor is formed so as to be laterally conveyed to the rebar bending machine, and the second processed rebar is conveyed to a discharge zone disposed on the side opposite to the first conveyor on the side of the reinforcing bar bending machine. The third conveying conveyor is formed in the area.

本発明の第1の特徴構成によれば、鉄筋供給装置と第1搬送コンベアと第2搬送コンベアと第3搬送コンベアとを設けることにより、鉄筋の切断から曲げ加工までを、人力を要せずに一連に行えると共に、鉄筋供給装置から第1搬送コンベアまでは、鉄筋はその長手方向に直線状に移動しながら切断され、その後、第1搬送コンベア上の第1加工鉄筋は、鉄筋切断機の横側に配置された鉄筋曲げ機に第2搬送コンベアにより横搬送され、曲げ加工後は、更に横方向の排出ゾーンへ第3搬送コンベアにより第2加工鉄筋が搬送されるようになっているために、設備全体として長大にならずに鉄筋の加工ができる。
その上、鉄筋切断機の横側に鉄筋曲げ機を配置することにより、一人の管理者が両者の機械の間に立って管理やオペレート操作ができ、そのために人員配置を少なくできる。
According to the first characteristic configuration of the present invention, by providing the reinforcing bar supply device, the first conveying conveyor, the second conveying conveyor, and the third conveying conveyor, from the cutting of the reinforcing bar to the bending process is not required. The reinforcing bars are cut while moving linearly in the longitudinal direction from the reinforcing bar supply device to the first conveyor, and then the first processed reinforcing bars on the first conveyor are Because the second processed rebar is transported by the second transport conveyor to the rebar bending machine arranged on the side, and after the bending, the second processed rebar is transported to the lateral discharge zone by the third transport conveyor. In addition, the rebar can be processed without making the entire facility long.
In addition, by arranging the rebar bending machine on the side of the rebar cutting machine, one manager can stand between the two machines and perform management and operation operations, thereby reducing personnel assignment.

本発明の第2の特徴構成は、前記第1搬送コンベアの横側で前記鉄筋曲げ機との間に、前記第2搬送コンベアで搬送する前記第1加工鉄筋の鉄筋滞留ゾーンを設けてあるところにある。   According to a second characteristic configuration of the present invention, a reinforcing bar staying zone of the first processed reinforcing bar to be conveyed by the second conveying conveyor is provided between the reinforcing bar bending machine on the side of the first conveying conveyor. It is in.

本発明の第2の特徴構成によれば、本発明の第1の特徴構成による上述の作用効果を叶えることができるのに加えて、一般的に、鉄筋曲げ機は鉄筋切断機よりも加工時間が長く掛かるために、鉄筋曲げ機の加工ペースに合わせて鉄筋切断機を作動させたとしても、鉄筋曲げ機にトラブル等の加工ペースの乱れに基づく装置全体の緊急停止が発生すれば、その後の再開時には、第1加工鉄筋の供給が間に合わず、生産性を落とすことになる。これに対し、本発明は、第1加工鉄筋の鉄筋滞留ゾーンを、第1搬送コンベアの横側で鉄筋曲げ機との間に設けることにより、鉄筋曲げ機のトラブルに基づく緊急停止や作動遅れがあったとしても、その間に、鉄筋滞留ゾーンに鉄筋切断機から第1搬送コンベア及び第2搬送コンベアによって運ばれてくる第1加工鉄筋は滞留され、鉄筋曲げ機の作動再開時には、迅速に鉄筋滞留ゾーンから第1加工鉄筋が鉄筋曲げ機に供給され、生産性の低下を抑えることができる。   According to the second characteristic configuration of the present invention, in addition to being able to achieve the above-described operational effects according to the first characteristic configuration of the present invention, in general, the reinforcing bar bending machine is longer in processing time than the reinforcing bar cutting machine. Because it takes a long time, even if the rebar cutting machine is operated in accordance with the processing pace of the rebar bending machine, if the entire apparatus is stopped urgently due to disturbance of the processing pace such as trouble, At the time of resumption, the supply of the first processed rebar is not in time, and productivity is lowered. On the other hand, the present invention provides an emergency stop or operation delay based on a trouble of the reinforcing bar bending machine by providing the reinforcing bar staying zone of the first processed reinforcing bar between the first conveying conveyor and the reinforcing bar bending machine. Even if there is, the first processed rebar carried by the first conveyor and the second conveyor from the rebar cutting machine is retained in the rebar retention zone. The first machined rebar is supplied from the zone to the rebar bending machine, and the decrease in productivity can be suppressed.

実施形態で説明する鉄筋加工装置の全体平面図である。1 is an overall plan view of a reinforcing bar processing apparatus described in an embodiment. 鉄筋切断機の正面図である。It is a front view of a rebar cutting machine. 鉄筋曲げ機の正面図である。It is a front view of a reinforcing bar bending machine. 第2搬送コンベアの要部縦断面である。It is a principal part longitudinal cross-section of a 2nd conveyance conveyor. 第2搬送コンベアの要部縦断面である。It is a principal part longitudinal cross-section of a 2nd conveyance conveyor. 第2搬送コンベアの要部縦断面である。It is a principal part longitudinal cross-section of a 2nd conveyance conveyor. 鉄筋曲げ機の要部縦断側面図である。It is a principal part vertical side view of a reinforcing bar bending machine. 鉄筋曲げ機の要部縦断側面図である。It is a principal part vertical side view of a reinforcing bar bending machine. 鉄筋曲げ機の要部縦断正面図である。It is a principal part vertical front view of a reinforcing bar bending machine. 鉄筋曲げ機の要部縦断正面図である。It is a principal part vertical front view of a reinforcing bar bending machine. (a)本数計測装置の平面図,(b)本数計測装置の縦断正面図である。(A) The top view of a number measuring device, (b) The longitudinal section front view of a number measuring device.

以下に本発明の実施の形態を図面に基づいて説明する。
図1に示すように、鉄筋を所定の長さに切断する鉄筋切断機1を設けると共に、鉄筋の一端側を下方に曲げ加工する鉄筋曲げ機2を設け、鉄筋束搭載部3から未処理鉄筋をコンベア上に移して、鉄筋切断機1に供給する鉄筋供給装置5と、鉄筋切断機1から切断後の第1加工鉄筋6を取り出して鉄筋切断機1から遠ざける第1搬送コンベア7と、第1搬送コンベア7上の第1加工鉄筋6を鉄筋曲げ機2に搬送する第2搬送コンベア8と、鉄筋曲げ機2から曲げ加工された第2加工鉄筋9を取り出して排出ゾーン10へ排出する第3搬送コンベア11とを設け、鉄筋供給装置5と鉄筋切断機1と第1搬送コンベア7とを鉄筋の長手方向に並べ、鉄筋曲げ機2を鉄筋切断機1の横側に配置すると共に、第1搬送コンベア7から第1加工鉄筋6を鉄筋曲げ機2に横搬送するように第2搬送コンベア8を形成し、第2加工鉄筋9を鉄筋曲げ機2の横側で第1搬送コンベア7とは反対側に配置した排出ゾーン10へ搬送するように第3搬送コンベア11を形成して、鉄筋を切断加工から曲げ加工までを全自動で処理でき、しかも、鉄筋切断機1と鉄筋曲げ機2との間にオペレータが立つことにより、一人で制御盤20及び全ての装置の生産管理ができるようになる鉄筋加工設備を構成してある。
Embodiments of the present invention will be described below with reference to the drawings.
As shown in FIG. 1, a reinforcing bar cutting machine 1 that cuts a reinforcing bar into a predetermined length is provided, and a reinforcing bar bending machine 2 that bends one end of the reinforcing bar downward is provided. On the conveyor, the rebar supply device 5 that supplies the rebar cutting machine 1, the first conveyor 7 that takes out the first processed rebar 6 after cutting from the rebar cutting machine 1 and moves away from the rebar cutting machine 1, A second conveyor 8 that conveys the first processed reinforcing bar 6 on the first conveyor 7 to the reinforcing bar bending machine 2 and a second processed reinforcing bar 9 that is bent from the reinforcing bar bending machine 2 are taken out and discharged to the discharge zone 10. 3 conveyor conveyor 11, reinforcing bar supply device 5, reinforcing bar cutter 1 and first conveyor 7 are arranged in the longitudinal direction of the reinforcing bar, reinforcing bar bending machine 2 is arranged on the side of reinforcing bar cutter 1, The first processed rebar 6 is ironed from one conveyor 7 The second conveyor 8 is formed so as to be laterally conveyed to the bending machine 2, and the second processed rebar 9 is conveyed to the discharge zone 10 disposed on the side opposite to the first conveyor 7 on the side of the reinforcing bar bending machine 2. In this way, the third conveyor 11 can be formed so that the rebar can be processed fully automatically from cutting to bending, and the operator stands between the rebar cutting machine 1 and the rebar bending machine 2, so that Reinforcing bar processing equipment that enables production control of the control panel 20 and all devices is configured.

前記鉄筋切断機1には、図1、図2に示すように、固定刃13とその固定刃13に対して上下に駆動昇降して鉄筋を剪断する可動刃14とを切断部15に設け、鉄筋供給装置5によって供給された鉄筋を、切断時に切断部15の前後において押えて保持する鉄筋押え16と補助鉄筋押え17とを設け、切断部15の直後には、第1搬送コンベア7により搬送されない短尺の鉄筋を、横側の短尺ストッカ18に排除する短尺材押し出し装置19を設けてある。また、鉄筋切断機1の横側部に、鉄筋加工設備全体の制御盤20を配設してある。   As shown in FIGS. 1 and 2, the rebar cutting machine 1 is provided with a fixed blade 13 and a movable blade 14 that drives and moves up and down with respect to the fixed blade 13 to shear the rebar, in the cutting portion 15. A reinforcing bar presser 16 and an auxiliary reinforcing bar presser 17 are provided to hold and hold the reinforcing bar supplied by the reinforcing bar supply device 5 before and after the cutting part 15 at the time of cutting, and immediately after the cutting part 15 is conveyed by the first conveyor 7. A short material extruding device 19 is provided for removing short rebars that are not used in the short stocker 18 on the lateral side. Further, a control panel 20 for the entire reinforcing bar processing equipment is disposed on the side of the reinforcing bar cutting machine 1.

前記第1搬送コンベア7は、図1、図2に示すように、第1昇降シリンダ21により昇降駆動操作する支持フレーム22に、複数の第1ベルトコンベアユニット23を所定間隔置きに並べて着脱自在に取付け、隣接する第1ベルトコンベアユニット23間夫々に第1横搬送チェーン24を配設してある。従って、支持フレーム22の上昇位置により、複数の第1ベルトコンベアユニット23によって第1加工鉄筋6をその長手方向に搬送できるようになり、支持フレーム22の下降位置により、第1横搬送チェーン24により第1加工鉄筋6を第1搬送コンベア7の横側に搬送できるように構成してある。   As shown in FIGS. 1 and 2, the first conveyor 7 is detachable by arranging a plurality of first belt conveyor units 23 at predetermined intervals on a support frame 22 that is driven up and down by a first elevating cylinder 21. A first horizontal conveying chain 24 is disposed between the adjacent first belt conveyor units 23 that are attached. Accordingly, the first processed rebar 6 can be conveyed in the longitudinal direction by the plurality of first belt conveyor units 23 depending on the raised position of the support frame 22, and the first horizontal conveying chain 24 can be conveyed by the lowered position of the support frame 22. The first processed rebar 6 is configured to be transported to the side of the first transport conveyor 7.

前記第2搬送コンベア8は、図1及び図3〜図6に示すように、第1搬送コンベア7の横側に鉄筋滞留ゾーン25と曲げ機供給ゾーン26とを併設し、鉄筋滞留ゾーン25には複数の第2横搬送チェーン27を設け、曲げ機供給ゾーン26には鉄筋の長手方向に複数の第2ベルトコンベアユニット29を、第1搬送コンベア7と同様に昇降駆動操作するように並べると共に、隣接する第2ベルトコンベアユニット29間の夫々に、第3横搬送チェーン28を配設してある。従って、第1搬送コンベア7上の第1加工鉄筋6は、第2搬送コンベア8の第2横搬送チェーン27と第3横搬送チェーン28とによって横搬送されると共に、第2ベルトコンベアユニット29の上昇により鉄筋曲げ機2に供給又は取出しできるように構成してある。   As shown in FIGS. 1 and 3 to 6, the second transfer conveyor 8 has a reinforcing bar staying zone 25 and a bending machine supply zone 26 on the side of the first transfer conveyor 7. Is provided with a plurality of second horizontal conveyor chains 27, and a plurality of second belt conveyor units 29 are arranged in the bending machine supply zone 26 in the longitudinal direction of the reinforcing bars so as to be driven up and down like the first conveyor 7. A third lateral conveying chain 28 is disposed between each adjacent second belt conveyor unit 29. Accordingly, the first processed rebar 6 on the first transport conveyor 7 is laterally transported by the second lateral transport chain 27 and the third lateral transport chain 28 of the second transport conveyor 8 and the second belt conveyor unit 29. It is configured so that it can be supplied to or removed from the reinforcing bar bending machine 2 by ascending.

前記第1ベルトコンベアユニット23と第2ベルトコンベアユニット29は、ユニット枠体30に取付けた駆動ローラ31と従動ローラ32とに亘って短尺の無端ベルト33を掛け回し、夫々のユニット枠体30が個別に支持フレーム22に着脱自在に取付けてある。そのために、メンテナンス時には全ての無端ベルト33を取り外さなくても一部の無端ベルト33を取り外すだけでよく、作業性と経済性は、良好である。   The first belt conveyor unit 23 and the second belt conveyor unit 29 hang a short endless belt 33 across a driving roller 31 and a driven roller 32 attached to the unit frame 30, and each unit frame 30 is It is individually detachably attached to the support frame 22. Therefore, at the time of maintenance, it is only necessary to remove some endless belts 33 without removing all the endless belts 33, and the workability and economy are good.

前記鉄筋曲げ機2は、図3〜図10に示すように、第1加工鉄筋6の入り口に上下揺動するベルトコンベア式の挟持搬送装置34を設け、その挟持搬送装置34と第2ベルトコンベアユニット29との挟持搬送により設定量挿入供給される鉄筋に対し、その長手方向と直行する方向に出退シリンダ35により出退動する(図7及び図8)支点軸36を設けると共に、支点軸36周りに駆動モータMにより回動する力点ローラ37とを設け、支点軸36よりも上方の図7及び図9の位置にある力点ローラ37が支点軸36の周りに下方へ回動移動することにより、図10に示すように、先端が曲がった第2加工鉄筋9を形成するようにしてある。   As shown in FIGS. 3 to 10, the reinforcing bar bending machine 2 is provided with a belt conveyor type holding and conveying device 34 that swings up and down at the entrance of the first processed reinforcing bar 6, and the holding and conveying device 34 and the second belt conveyor. A fulcrum shaft 36 is provided for the reinforcing bar inserted and supplied by the nipping conveyance with the unit 29 by a retracting cylinder 35 in a direction perpendicular to the longitudinal direction (FIGS. 7 and 8). A force point roller 37 that is rotated around the fulcrum shaft 36 by a drive motor M is provided, and the force point roller 37 located above the fulcrum shaft 36 in FIG. 7 and FIG. Thus, as shown in FIG. 10, the second processed rebar 9 having a bent tip is formed.

尚、前記鉄筋曲げ機2は、図3、図9、図10に示すように、枢支軸38周りに第2昇降シリンダ39により上下揺動するように構成すると共に、長さの異なる高さ調整ピン40の交換により、支点軸36の上下位置を設定変更できるように構成してある。つまり、径の異なる支点軸36を交換して鉄筋の曲げ曲率を変更する時は、支点軸36の軸心の高さが不変であれば、支点軸36で受ける鉄筋の高さが変化するために、支点軸36により受ける鉄筋の高さを変えないように、支点軸36の高さを第2昇降シリンダ39と高さ調整ピン40の長さ変更により、微調整できるようにしてある。   The rebar bending machine 2 is configured to swing up and down around the pivot shaft 38 by a second lifting cylinder 39 as shown in FIGS. 3, 9, and 10, and has different lengths. By changing the adjustment pin 40, the vertical position of the fulcrum shaft 36 can be set and changed. That is, when the fulcrum shaft 36 having a different diameter is replaced to change the bending curvature of the reinforcing bar, the height of the reinforcing bar received by the fulcrum shaft 36 changes if the height of the axis of the fulcrum shaft 36 is unchanged. In addition, the height of the fulcrum shaft 36 can be finely adjusted by changing the lengths of the second elevating cylinder 39 and the height adjustment pin 40 so that the height of the reinforcing bar received by the fulcrum shaft 36 is not changed.

前記第3搬送コンベア11は、鉄筋曲げ機2から取り出した第2加工鉄筋9を排出ゾーン10へ横搬送するようにチェーン式の搬送装置で構成してある。   The third transport conveyor 11 is constituted by a chain-type transport device so as to laterally transport the second processed rebar 9 taken out from the rebar bending machine 2 to the discharge zone 10.

第2搬送コンベア8から鉄筋曲げ機2に鉄筋が供給されて第3搬送コンベア11により排出されるまでの動作を説明すると、
1.第2横搬送チェーン27及び第3横搬送チェーン28により横搬送された第1加工鉄筋6は、上下出退するストッパー41により第2ベルトコンベアユニット29上で横移動が停止される(図4)。
2.第2ベルトコンベアユニット29が上昇すると共に、挟持搬送装置34は下降揺動して第1加工鉄筋6は挟持されて鉄筋曲げ機2に向けて搬送される(図5)。
3.突出した支点軸36上に第1加工鉄筋6が載った後(図7、図9)、力点ローラ37が下方に回動して第1加工鉄筋6は曲げられる(図8、図10)。
4.先端側が曲げ加工された第2加工鉄筋9は、支点軸36の引退後第2ベルトコンベアユニット29により引戻される(図6、図8)。
5.引戻された第2加工鉄筋9は、第3搬送コンベア11により排出ゾーン10へ排出される。
The operation until the reinforcing bars are supplied from the second conveyor 8 to the reinforcing bar bending machine 2 and discharged by the third conveyor 11 will be described.
1. The first processed rebar 6 horizontally transported by the second lateral transport chain 27 and the third lateral transport chain 28 is stopped laterally on the second belt conveyor unit 29 by the stopper 41 that moves up and down (FIG. 4). .
2. As the second belt conveyor unit 29 rises, the holding and conveying device 34 descends and swings, and the first processed rebar 6 is held and conveyed toward the reinforcing bar bending machine 2 (FIG. 5).
3. After the first processed rebar 6 is placed on the protruding fulcrum shaft 36 (FIGS. 7 and 9), the power roller 37 is rotated downward to bend the first processed rebar 6 (FIGS. 8 and 10).
4). The second processed rebar 9 whose tip side is bent is pulled back by the second belt conveyor unit 29 after the fulcrum shaft 36 is retracted (FIGS. 6 and 8).
5). The second machined reinforcing bar 9 withdrawn is discharged to the discharge zone 10 by the third conveyor 11.

前記第1搬送コンベア7または、第2搬送コンベア8の途中には、図11(a),(b)に示すように、鉄筋の本数計測装置42を設けてある。つまり、鉄筋を受ける載置部43を設けると共に、載置部43上の複数本の鉄筋を流体圧シリンダ44により引き寄せて挟持する一対の挟持凸部45を設け、それらの挟持凸部45間の距離を計測する計測部(図外)を設け、その計測部により計測した距離を、予め入力した鉄筋の径で除して鉄筋本数を算出する演算装置(図外)を設けてある。   In the middle of the first transport conveyor 7 or the second transport conveyor 8, as shown in FIGS. 11 (a) and 11 (b), a reinforcing bar number measuring device 42 is provided. In other words, the mounting portion 43 that receives the reinforcing bars is provided, and a pair of sandwiching convex portions 45 that pulls and sandwiches the plurality of reinforcing bars on the placing portion 43 by the fluid pressure cylinder 44 are provided, and between the sandwiching convex portions 45. A measuring unit (not shown) for measuring the distance is provided, and an arithmetic unit (not shown) for calculating the number of reinforcing bars by dividing the distance measured by the measuring unit by the diameter of the reinforcing bar inputted in advance is provided.

図1に示す前記鉄筋滞留ゾーン25は、曲げ機供給ゾーン26に第1加工鉄筋6が搬送される前に滞留できるようにして、鉄筋曲げ機2のトラブルに基づく緊急停止や作動遅れがあったとしても、その間に、鉄筋滞留ゾーン25に鉄筋切断機1から第1搬送コンベア7及び第2搬送コンベア8によって運ばれてくる第1加工鉄筋6は滞留され、鉄筋曲げ機2の作動再開時には、迅速に鉄筋滞留ゾーン25から第1加工鉄筋6が鉄筋曲げ機2に供給され、生産性の低下を抑えることができるようにしてある。   The rebar staying zone 25 shown in FIG. 1 is able to stay before the first processed rebar 6 is transported to the bending machine supply zone 26, so that there is an emergency stop or operation delay due to trouble of the rebar bending machine 2. In the meantime, the first processed rebar 6 carried by the first conveyor 7 and the second conveyor 8 from the reinforcing bar cutting machine 1 to the reinforcing bar staying zone 25 is retained, and when the operation of the reinforcing bar bending machine 2 is resumed, The first machined rebar 6 is quickly supplied from the reinforcing bar staying zone 25 to the reinforcing bar bending machine 2 so that a reduction in productivity can be suppressed.

前記第1搬送コンベア7の横側で、第2搬送コンベア8とは反対側には、切断した第1加工鉄筋6を、曲げ加工しない場合に排出してストックする第1加工鉄筋ストッカ46を設けてある。
〔別実施形態〕
以下に他の実施の形態を説明する。
A first processed rebar stocker 46 for discharging and stocking the cut first processed rebar 6 when it is not bent is provided on the side opposite to the second transfer conveyor 8 on the side of the first transfer conveyor 7. It is.
[Another embodiment]
Other embodiments will be described below.

〈1〉 前記鉄筋曲げ機2は、第1加工鉄筋6の一端側を曲げ加工するものを示したが、これに限らず、両端側を曲げ加工するものであったり、一端側を2回以上曲げ加工するものであっても良い。
〈2〉 前記鉄筋滞留ゾーン25は、必ずしも設けない場合であっても良い。
<1> Although the rebar bending machine 2 showed what bends the one end side of the 1st process reinforcing bar 6, it is not restricted to this, The both end side is bend | processed, or one end side is 2 times or more It may be bent.
<2> The reinforcing bar staying zone 25 may not necessarily be provided.

尚、上述のように、図面との対照を便利にするために符号を記したが、該記入により本発明は添付図面の構成に限定されるものではない。また、本発明の要旨を逸脱しない範囲において、種々なる態様で実施し得ることは勿論である。   In addition, as mentioned above, although the code | symbol was written in order to make contrast with drawing convenient, this invention is not limited to the structure of an accompanying drawing by this entry. In addition, it goes without saying that the present invention can be carried out in various modes without departing from the gist of the present invention.

1 鉄筋切断機
2 鉄筋曲げ機
5 鉄筋供給装置
6 第1加工鉄筋
7 第1搬送コンベア
8 第2搬送コンベア
9 第2加工鉄筋
10 排出ゾーン
11 第3搬送コンベア
25 鉄筋滞留ゾーン
DESCRIPTION OF SYMBOLS 1 Rebar cutting machine 2 Rebar bending machine 5 Rebar supply apparatus 6 1st processing reinforcing bar 7 1st conveyance conveyor 8 2nd conveyance conveyor 9 2nd processing reinforcement 10 Discharge zone 11 3rd conveyance conveyor 25 Reinforcing bar retention zone

Claims (2)

鉄筋を所定の長さに切断する鉄筋切断機を設けると共に、鉄筋の少なくとも一端側を曲げ加工する鉄筋曲げ機を設けてある鉄筋加工設備であって、前記鉄筋切断機に未処理鉄筋を供給する鉄筋供給装置と、前記鉄筋切断機から切断後の第1加工鉄筋を取り出して前記鉄筋切断機から遠ざける第1搬送コンベアと、前記第1搬送コンベア上の第1加工鉄筋を前記鉄筋曲げ機に搬送する第2搬送コンベアと、前記鉄筋曲げ機から曲げ加工された第2加工鉄筋を取り出して排出ゾーンへ排出する第3搬送コンベアとを設け、前記鉄筋供給装置と前記鉄筋切断機と前記第1搬送コンベアとを鉄筋の長手方向に並べ、前記鉄筋曲げ機を前記鉄筋切断機の横側に配置すると共に、前記第1搬送コンベアから前記第1加工鉄筋を前記鉄筋曲げ機に横搬送するように前記第2搬送コンベアを形成し、前記第2加工鉄筋を前記鉄筋曲げ機の横側で前記第1搬送コンベアとは反対側に配置した排出ゾーンへ搬送するように前記第3搬送コンベアを形成してある鉄筋加工設備。   A rebar processing facility provided with a rebar cutting machine for cutting a rebar into a predetermined length and a rebar bending machine for bending at least one end of the rebar, and supplying unprocessed rebar to the rebar cutting machine A reinforcing bar supply device, a first conveyor that takes out the first processed reinforcing bar after cutting from the reinforcing bar cutter and moves away from the reinforcing bar cutter, and a first processed reinforcing bar on the first conveyor conveys to the reinforcing bar bending machine And a third conveyor for taking out the second processed reinforcing bar bent from the reinforcing bar bending machine and discharging it to the discharge zone, and providing the reinforcing bar supplying device, the reinforcing bar cutting machine, and the first conveying unit. A conveyor is arranged in the longitudinal direction of the reinforcing bar, the reinforcing bar bending machine is arranged on the side of the reinforcing bar cutting machine, and the first processed reinforcing bar is horizontally transferred from the first conveyor to the reinforcing bar bending machine. The second conveyor is formed, and the third conveyor is formed so that the second processed reinforcing bar is conveyed to a discharge zone disposed on the side opposite to the first conveyor on the side of the reinforcing bar bending machine. Reinforcing bar processing equipment. 前記第1搬送コンベアの横側で前記鉄筋曲げ機との間に、前記第2搬送コンベアで搬送する前記第1加工鉄筋の鉄筋滞留ゾーンを設けてある請求項1に記載の鉄筋加工設備。   The reinforcing bar processing equipment according to claim 1, wherein a reinforcing bar staying zone of the first processed reinforcing bar conveyed by the second conveying conveyor is provided between the reinforcing bar bending machine and the side of the first conveying conveyor.
JP2009182730A 2009-08-05 2009-08-05 Rebar processing equipment Active JP5446000B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009182730A JP5446000B2 (en) 2009-08-05 2009-08-05 Rebar processing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009182730A JP5446000B2 (en) 2009-08-05 2009-08-05 Rebar processing equipment

Publications (2)

Publication Number Publication Date
JP2011031295A true JP2011031295A (en) 2011-02-17
JP5446000B2 JP5446000B2 (en) 2014-03-19

Family

ID=43760889

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009182730A Active JP5446000B2 (en) 2009-08-05 2009-08-05 Rebar processing equipment

Country Status (1)

Country Link
JP (1) JP5446000B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014159046A (en) * 2013-02-20 2014-09-04 Toyo Kensetsu Koki Kk Bar processing device
CN113059041A (en) * 2021-04-07 2021-07-02 杭州临安荣升机械有限公司 Automatic pipe bending equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6127134A (en) * 1984-07-18 1986-02-06 Mitsui Eng & Shipbuild Co Ltd Reinforcement feeding equipment
JPS61178322A (en) * 1985-01-31 1986-08-11 Mitsui Eng & Shipbuild Co Ltd Transverse feeder of bar
JP2000202558A (en) * 1999-01-19 2000-07-25 Toyo Kensetsu Koki Kk Bending machine for reinforcing bar

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6127134A (en) * 1984-07-18 1986-02-06 Mitsui Eng & Shipbuild Co Ltd Reinforcement feeding equipment
JPS61178322A (en) * 1985-01-31 1986-08-11 Mitsui Eng & Shipbuild Co Ltd Transverse feeder of bar
JP2000202558A (en) * 1999-01-19 2000-07-25 Toyo Kensetsu Koki Kk Bending machine for reinforcing bar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014159046A (en) * 2013-02-20 2014-09-04 Toyo Kensetsu Koki Kk Bar processing device
CN113059041A (en) * 2021-04-07 2021-07-02 杭州临安荣升机械有限公司 Automatic pipe bending equipment

Also Published As

Publication number Publication date
JP5446000B2 (en) 2014-03-19

Similar Documents

Publication Publication Date Title
KR100943532B1 (en) Cutting steel and bending device of four head steel automatic feeding system
KR100843764B1 (en) wood conveyor system
KR20110024653A (en) Branch Pipe Cutting Machine
CN109397513A (en) Plaster decoration line full-automation production line
JP5446000B2 (en) Rebar processing equipment
JP2010005738A (en) Reinforcement processing device
CN104192485B (en) A kind of handle feed mechanism of bottle blowing machine
CN105945433A (en) Plate laser cutting equipment and method
CN107758205A (en) The elevator Work sheet conveying device being adjusted flexibly
US9771799B2 (en) Conveyor bridge
CN207404346U (en) A kind of elevator Work sheet conveying device being adjusted flexibly
IT201900010557A1 (en) CUTTING SYSTEM, ADJUSTABLE SORTING EQUIPMENT AND RELATED METHOD
KR100958858B1 (en) Apparatus for manufacturing vertical frame of ladder
KR20090003427U (en) Transfer Apparatus for Reinforcing bar
KR102501795B1 (en) Apparatus and method for supplying rebar
KR20160000271U (en) Automatic Discharge Device for the Scrap Part of Extruded Aluminium Profile&#39;s Both Ends
KR101924178B1 (en) Shape steal cutting machine with improved workability
JP2007143489A (en) Apparatus for automatically feeding raw meat
JPS5986250A (en) Device for manufacturing semiconductor
CN104772382A (en) Casting mold air hole tapping method and device by means of gas needle board
CN206545034U (en) Automatic file quenching unit
CN110294309A (en) A kind of material arranging apparatus and its reason material method
KR200448670Y1 (en) Section shape steel processing apparatus
CN214263687U (en) Reinforcing bar conveying cutting device for site operation
CN215902634U (en) A reinforcing bar conveyer for reinforcing bar shearing production line

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120724

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130814

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130822

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131017

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131213

R150 Certificate of patent or registration of utility model

Ref document number: 5446000

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250