JP2010285745A - Greening construction method for mortared/concreted slope - Google Patents

Greening construction method for mortared/concreted slope Download PDF

Info

Publication number
JP2010285745A
JP2010285745A JP2009137927A JP2009137927A JP2010285745A JP 2010285745 A JP2010285745 A JP 2010285745A JP 2009137927 A JP2009137927 A JP 2009137927A JP 2009137927 A JP2009137927 A JP 2009137927A JP 2010285745 A JP2010285745 A JP 2010285745A
Authority
JP
Japan
Prior art keywords
planting
slope
mat body
mortar
greening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009137927A
Other languages
Japanese (ja)
Other versions
JP4452316B1 (en
Inventor
Katsuji Tanno
勝治 丹野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TANKATSU KK
Tankatsu Corp
Original Assignee
TANKATSU KK
Tankatsu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TANKATSU KK, Tankatsu Corp filed Critical TANKATSU KK
Priority to JP2009137927A priority Critical patent/JP4452316B1/en
Application granted granted Critical
Publication of JP4452316B1 publication Critical patent/JP4452316B1/en
Publication of JP2010285745A publication Critical patent/JP2010285745A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a greening construction method which does not involve separation of existing mortar and discharge of industrial wastes, prevents a bedrock material from flowing out, and enables early and long-sustained greening of a concrete surface. <P>SOLUTION: According to the greening construction method for a mortared slope using a planting mat to achieve long-sustained greening, in a greening range on the slope covered with mortar and concrete, a proper number of anchor bolts for bolting the planting mat are set in place, and water-supply holes for supplying water from a natural ground to the planting mat are formed in place. The slope in the greening range is covered with a root-preventing sheet for preventing intruding roots from blocking the water-supply holes, and then is coated with a layer of carried-in soil 3 cm in thickness. The planting mat carrying seeds is bolted with the anchor bolts as planting mats with planting cases are fixed at intervals of 1 to 5 square meters. Hence mixed planting involving European lawn grass, shrubs, and perennial plants is carried out for early greening of the slope. The edge of the greening range is covered with a protective cover for preventing the outflow of carried-in soil and ingress of wind. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、モルタル法面・コンクリート法面に植栽マット体を固定し、自然景観の復元と環境負荷の軽減を目的とした緑化工法に関する技術である。   The present invention is a technique related to a greening method for fixing a planting mat body to a mortar slope / concrete slope to restore a natural landscape and reduce environmental load.

急傾斜地等の法面をモルタルやコンクリートで覆い崩落防止を図っている現場が多数見受けるが、モルタルやコンクリートで覆われた景観は、その表面が長く緑化されることなく、非常に殺風景であるとともに、これらの法面は太陽光を照り返すことによって温暖化の一原因となると言われる等環境に対する影響が批判を浴びるようになっている。   There are many sites where the slopes of steep slopes etc. are covered with mortar and concrete to prevent collapse, but the landscape covered with mortar and concrete is very murderous without the surface greening for a long time. These slopes have been criticized for their impact on the environment, such as being said to cause warming by reflecting sunlight.

そこで、緑化の必要性が高まるとともに、この要請に応える緑化工法として、モルタル面を剥離し植生基材による吹付緑化方法と、モルタル面を剥離せずモルタル面に崩落防止金具(ソイルストッパー)を取付け、金網で覆った上に土壌基盤材を混練泥状化したものを吹付ける緑化工法(特許文献1参照)やコンクリート面にネットを張りツタ類を這わせ緑化する工法が行われている。   Therefore, the need for greening has increased, and as a greening method to meet this demand, the mortar surface is peeled off and the spraying greening method using a vegetation base, and the fall prevention metal fitting (soil stopper) is attached to the mortar surface without peeling off the mortar surface. A greening method (see Patent Document 1) in which a soil base material is kneaded and muddy is sprayed after being covered with a wire mesh, and a method of greening by putting a net on a concrete surface and causing ivy to grow.

しかし、モルタル面を剥離し植生基材吹付による緑化方法は、モルタルの剥離に多大な労力とコストが掛かり、剥離した大量のモルタルは、産業廃棄物として処理を必要とする
。また、特許文献1参照の崩落防止金具(ソイルストッパー)を使い法面を金網で覆い、その上から土壌基盤材を吹付ける工法では、吹付けされた基盤材の滑落防止にソイルストッパーを取付けるので、雨水等により土壌基盤材の流落が懸念される。さらにコンクリート面にネット等を張り、ツタを這わす緑化工法では、コストは抑えられるがツタの生長が遅く、コンクリート面全体を覆うには、施工面積によっては数年〜複数年かかる問題点がある。
特開平9−250134号公報
However, the greening method by peeling the mortar surface and spraying the vegetation substrate requires a great deal of labor and cost for peeling the mortar, and the large amount of peeled mortar requires processing as industrial waste. In addition, in the construction method in which the slope is covered with a wire mesh using the metal fittings (soil stopper) of Patent Document 1 and the soil base material is sprayed from above, the soil stopper is attached to prevent the sprayed base material from slipping. There is a concern that the soil base material will be washed away by rainwater. In addition, the tree planting method that stretches nets on the concrete surface and spreads the ivy reduces costs, but the growth of ivy is slow, and covering the entire concrete surface has the problem of several years to several years depending on the construction area .
JP-A-9-250134

そこで本発明は、従来の緑化工法の持つ課題に鑑み、既設モルタルを剥離することなく基盤材の流出を防止し、コンクリート面の早期緑化と長期維持緑化工法を提供することを目的とする。   Then, in view of the subject which the conventional tree planting method has, this invention prevents the outflow of a base material, without peeling existing mortar, and aims at providing the early greening of a concrete surface and a long-term maintenance greening method.

本発明は、モルタルやコンクリートで被覆形成されている法面の緑化範囲に、植栽マット体を固定する適数のアンカーボルトを適所に取付け、更に地山から植栽マット体に水分を補給する給水孔を適所に設け、給水孔内が侵入根で塞がれるのを防止するため防根シートで塞いだ後、植栽マット体を敷設する箇所に客土を約3cm厚で塗りつけ、該アンカーボルトに種子付植栽マット体を また1〜5平方メートルの間隔に植栽ケース付植栽マット体を固定し、洋芝に低木や宿根草を交えて早期緑化を図るとともに、マット体によりモルタル面の保護を図るモルタル法面緑化工法である。   In the present invention, an appropriate number of anchor bolts for fixing the planting mat body are attached at appropriate positions in the greening range of the slope that is covered with mortar or concrete, and water is supplied from the natural ground to the planting mat body. After setting up the water supply holes in the appropriate place and blocking the inside of the water supply holes with the roots, the anchoring sheet is applied to the place where the planting mat body is laid, and the anchor is applied. Fix the planting mat body with seeds to the bolts and the planting mat body with the planting case at an interval of 1 to 5 square meters. It is a mortar slope revegetation method to protect.

植生マット体と植栽ケース付植生マット体を設置した縁周りの上部部分を除いた縁周りに客土流出防止と風侵入防止の防護カバーを取付け、長期緑化を図る。また、凹凸が多く点在するモルタル法面にて、植栽マット体と植栽マット体の間に空く空間部を施工箇所に合った植栽マット体を現場で包成形し、設置することによりモルタル法面を植栽マット体で覆うことのできるモルタル法面緑化工法。   Attach a protective cover for preventing soil outflow and preventing wind intrusion around the edge except for the upper part around the edge where the vegetation mat body and the vegetation mat body with a planting case are installed. In addition, on the mortar slope with many irregularities, a space is created between the planting mat body and the planting mat body, and a planting mat body that fits the construction site is encapsulated and installed on site. Mortar slope revegetation method that can cover the mortar slope with a planting mat.

従来法面に種子付の植生ネットや植生マット等を設置する場合、施工性や緑化速度等を勘案し、法面に敷設した植生ネット等の上からアンカーピンを打設し、植生ネット等を法面に固定する緑化工法が試みられていたが、削孔しなければアンカーピンの打設ができない岩盤・モルタル・コンクリート法面等では、削孔するドリルにネットやマット等が絡みつき施工が不可能であり、やむを得ず基盤材吹付による緑化工法がとられていた。この発明では、植栽マット体を該植栽マットの上からアンカーボルトを打設して法面に押さえるのではなく、予め法面に打設したアンカーボルトに植栽マット体を押さえつけて、ナットで固定するので、ドリルに対するネットやマット等の絡みもなく、削孔を必要とする岩盤・モルタル・コンクリート法面に安全に植栽マット体を設置できて、確実に早期緑化ができる。さらに基盤材吹付の場合、豪雨等の雨水で基盤材が流出しがちであるが、腐植しにくい材質で形成された植栽マット体内の基盤材は流出することなく長期に渡り保持される。また、給水孔と客土層や防護カバーを形成したことにより保水性が高まり、自然水での長期緑化が可能となり植栽マット体を設置したモルタル面は緑に覆われ、老朽化したモルタル面の剥落防止ができる。従って既存のモルタル法面を壊除去することなく経済的で様々な環境負荷の軽減が可能となります。なお、上記モルタル法面緑化工法に散水設備を設置すれば擁壁等の直壁でも緑化することが可能となります。   When installing vegetation nets with seeds or vegetation mats, etc. on the conventional slope, anchor pins are placed on the vegetation nets laid on the slope in consideration of workability and greening speed, etc. Attempts have been made to plant trees on the slope, but anchor pins cannot be installed unless drilling is performed. It was possible, and a greening method was unavoidably taken by spraying the base material. In the present invention, the planting mat body is not pressed against the slope by placing anchor bolts on the planting mat, but the planting mat body is pressed against the anchor bolts previously placed on the slope, and the nut Since it is fixed by, it can be safely installed on the bedrock, mortar, and concrete slopes that require drilling without entanglement of the net or mat to the drill, and early greening can be surely performed. Furthermore, in the case of spraying the base material, the base material tends to flow out due to rainwater such as heavy rain, but the base material in the planting mat formed of a material that is difficult to humus is retained for a long time without flowing out. In addition, water retention is enhanced by the formation of water supply holes, customer soil layers and protective covers, enabling long-term greening with natural water, and the mortar surface where the planting mat body is installed is covered with green and the aging mortar surface Can be prevented. Therefore, it is economical and can reduce various environmental loads without destroying the existing mortar slope. In addition, if watering equipment is installed in the above mortar slope revegetation method, it will be possible to plant trees even on straight walls such as retaining walls.

以下、本発明の緑化工法の実施形態について、図に基づいて詳細に説明する。
図1のイ)は、特願2007−061222で公知の植栽マット体1の斜視図であり、ロ)は、植栽マット体1の構造を示す断面図である。構成は、下部より植物の根を通すポリエチレン製平織ネット状シート1a、植物の根を通すポリエステル製不織布1bの順に重ねて底部を形成し、その底部上に植生基盤土1c(ココピート、水苔、バーク堆肥、ピートモス、黒土の混合土に芝種子、有機肥料、遅効性肥料、化成肥料を添加した人工土壌)を4cm〜10cm厚で敷き詰め圧縮して2cm〜5cm厚の植生基盤土に形成し、その上に植物の芽・根を通すレーヨン製不織布1d、植物の芽・根を通すポリエチレン製平織ネット状シート1a、の順に重ねて上部を形成し、底部と上部が一体化し植生基盤土の植生基盤体内移動を抑え、構造体を堅持するように縦横所定間隔で腐蝕しにくい縫い糸1eを用いて縫製して植栽マット体1とする。
Hereinafter, embodiments of the greening method of the present invention will be described in detail with reference to the drawings.
1) is a perspective view of a planting mat body 1 known from Japanese Patent Application No. 2007-062212, and (b) is a cross-sectional view showing the structure of the planting mat body 1. FIG. The composition is formed by layering a polyethylene plain woven net sheet 1a through which plant roots pass from the bottom and a polyester nonwoven fabric 1b through which plant roots are passed in this order to form a bottom, and vegetation base soil 1c (cocopyt, moss, Bark compost, peat moss, black soil mixed with turf seeds, organic fertilizer, slow-acting fertilizer, and artificial fertilizer) are spread over 4 cm to 10 cm thick and formed into 2 cm to 5 cm thick vegetation base soil, On top of that, a rayon nonwoven fabric 1d through which plant buds and roots pass, and a polyethylene plain woven net-like sheet 1a through which plant buds and roots pass are formed in this order to form the upper part, and the bottom part and upper part are integrated to form a vegetation of vegetation base soil The planting mat body 1 is formed by sewing with a sewing thread 1e that is less likely to be corroded at predetermined intervals in the vertical and horizontal directions so as to suppress movement within the base body and to hold the structure.

図1は、始めにモルタル法面に設置する植栽マット体設置位置の計測から、植栽マット体を設置固定するまでの手順を説明するものである。
イ)は、モルタル面2に、縦1m×横1m×厚さ5cmの植栽マット体を固定するためのアンカーボルト打設孔3を、約50cm間隔でアンカーボルトの直径に合せた大きさの9孔と モルタル層を突き抜け地山から植栽マット体に水を導く直径20ミリ前後の水孔4を4孔標準としてドリルにて穿孔する。
ロ)は、イのアンカーボルト打設孔3に露出部分が約8cm・挿入長が約7cmのアンカーボルト5を打設固定し、植物の根が浸入し、水孔内を塞ぐことを防止するため、水は通すが根が通しにくい防根シート6を水孔口に粘着剤を用い粘着する。
FIG. 1 explains the procedure from the measurement of the planting mat body installation position first installed on the mortar slope to the installation and fixing of the planting mat body.
B) The size of the anchor bolt placement hole 3 for fixing the planting mat body of 1 m long × 1 m wide × 5 cm thick on the mortar surface 2 is adjusted to the diameter of the anchor bolt at intervals of about 50 cm. Drill the 9 holes and the mortar layer with a drill with 4 holes of water holes 4 with a diameter of around 20 mm leading water from the natural ground to the planting mat body.
B) The anchor bolt 5 having an exposed portion of about 8 cm and an insertion length of about 7 cm is placed and fixed in the anchor bolt placement hole 3 of the a to prevent the root of the plant from entering and closing the water hole. Therefore, the root-proof sheet 6 that allows water to pass but difficult to pass through the root is adhered to the water hole mouth using an adhesive.

図2のハ)は、水分を吸水する特性を持っているモルタル面と植栽マット体の間に客土を施し、植栽マット体内から水分吸引防止と保水力向上を図り、また生育基盤土層として3cm前後の厚さで客土7(良質土・バーク堆肥・保水剤・粘着剤・水混合にて練土)を塗りつけ、植栽マット体設置の下地とする。
ニ)は、露出しているアンカーボルトに合せ植栽マット体1を押し当て貫通させ、アンカーボルトにワッシャー付ボルトナット8を取付け、これを締め付けて該植栽マット体1をモルタル法面に固定する。
(C) in Fig. 2 shows that the soil is absorbed between the mortar surface and the planting mat body, which absorbs moisture, to prevent moisture suction from the planting mat body and to improve the water retention capacity. As a layer, apply soil 7 (high quality soil, bark compost, water retention agent, adhesive, mixed with water) with a thickness of about 3 cm, and use it as the foundation for planting mat body installation.
D) Press the planting mat body 1 against the exposed anchor bolts to pass through them, attach the bolt nuts 8 with washers to the anchor bolts, and tighten them to fix the planting mat body 1 to the mortar slope. To do.

図3は、固定具のアンカーボルトと植栽マット体を貫通できるアンカーボルトカバーを示す斜視図である。
イ)は、固定金具のアンカーボルト5を示す斜視図で、下部に切り込み5cが数本入っており、上部には該切り込み部分を押し広げる挿入杭5aが挿入されており、アンカーボルト上部にはネジ5bが切られている。このアンカーボルトの設置方法は、モルタル法面等にドリルでアンカーボルトが挿入できる孔を開けアンカーボルトを差し込みロ)で示すように頭部部分の挿入杭5aを打込むと打込まれた挿入杭がアンカーボルトの下部切り込み5c部分を押し広げモルタル内部に固定される。
FIG. 3 is a perspective view showing an anchor bolt cover that can penetrate the anchor bolt and the planting mat body of the fixture.
(B) is a perspective view showing the anchor bolt 5 of the fixing bracket, and there are several notches 5c in the lower part, and an insertion pile 5a that pushes the notch part is inserted in the upper part. The screw 5b is cut. This anchor bolt is installed by inserting a hole in the mortar slope or the like into which the anchor bolt can be inserted with a drill, and inserting the anchor bolt. Pushes the lower notch 5c portion of the anchor bolt and is fixed inside the mortar.

図3のハ)は、モルタル法面に固定されたアンカーボルトに植栽マット体を貫通させるアンカーボルトカバーを示す斜視図で、アンカーボルトを覆う太さと長さを持ち先端が鋭角に形成されたアンカーボルトカバー9である。
ニ)は、モルタル法面に固定されたアンカーボルト5にアンカーボルトカバー9を装着した状態を示した斜視図である。
(C) in FIG. 3 is a perspective view showing an anchor bolt cover that allows the planting mat body to pass through the anchor bolt fixed to the mortar slope, and has a thickness and length covering the anchor bolt, and the tip is formed at an acute angle. An anchor bolt cover 9 is shown.
(D) is a perspective view showing a state where the anchor bolt cover 9 is attached to the anchor bolt 5 fixed to the mortar slope.

図4のイ)は、モルタル面2の適所に適数のアンカーボルト5を固定し、モルタル面2の上に客土7を施し該アンカーボルト5にアンカーボルトカバー9を設置後、その上に植栽マット体1を押し当てて該植栽マット体1を貫いた状態を示した断面図である。なお、適所とは凹凸面の凹の部分を指し、適数とは1平方メートル当たり9本を標準とし、植栽マット体をモルタル法面に密着固定するアンカーボルトの数である。   In FIG. 4 a), an appropriate number of anchor bolts 5 are fixed at appropriate positions on the mortar surface 2, a soil 7 is applied on the mortar surface 2, an anchor bolt cover 9 is installed on the anchor bolt 5, and then on the anchor bolt cover 9. It is sectional drawing which showed the state which pressed the planting mat body 1 and penetrated the planting mat body 1. FIG. In addition, an appropriate place refers to the concave part of an uneven surface, and an appropriate number is the number of the anchor bolts which make 9 plants per square meter as standard, and fix the planting mat body in close contact with the mortar slope.

ロ)は、植栽マット体1をモルタル法面2に密着固定する状態を示した説明図である。
イ)で示した手順で植栽マット体1を貫いたアンカーボルトカバーを外し、アンカーボルト上部のネジ山にワッシャー付ボルトナット8を取付け該ワッシャー付ナットを締め付け
、当該植栽マット体1をモルタル法面2に客土7を挟み込み密着固定する。
(B) is an explanatory view showing a state in which the planting mat body 1 is closely fixed to the mortar slope 2.
B) Remove the anchor bolt cover that has penetrated the planting mat body 1 by the procedure shown in (b), attach the bolt nut 8 with a washer to the thread on the upper part of the anchor bolt, tighten the nut with the washer, and fix the planting mat body 1 to the mortar. The customer's soil 7 is sandwiched between the slopes 2 and fixed firmly.

図5は、モルタル法面に従来の洋芝だけでなく樹木等を交えた緑化を図るため、植栽マット体に植栽ケースを組み込んだ植栽ケース付植栽マット体を形成するため、植栽ケース内に低木や宿根草を植栽して景観改善型の植栽緑化を図る植栽ケース付植栽マット体を示した説明図である。イ)は、樹脂系ネット10に不織布11・ラッセル平織ネット12を重ね合せ縫製し、植栽ケースの外周部材と底部部材を形成する。ロ)は、外周部材と底部部材を植栽ケース13に組立てる。ハ)は、組立てた植栽ケース13を植栽マット体1にボルト14とナット15を用いて固定した状態を示す断面図である。ニ)は、モルタル面状に1〜5平方メートルの間隔に設置して、樹木等を交えた植栽緑化を図る植栽ケース付植栽マット体16である。   FIG. 5 shows a planting mat body with a planting case in which a planting case is incorporated into a planting mat body in order to plant trees in addition to conventional turf on the mortar slope. It is explanatory drawing which showed the planting mat body with a planting case which plantes a shrub and perennial grass in a planting case, and plans planting green of landscape improvement type. A) Overlays the nonwoven fabric 11 and the Russell plain weave net 12 on the resin net 10, and forms an outer peripheral member and a bottom member of the planting case. B) Assemble the outer peripheral member and the bottom member in the planting case 13. (C) is a cross-sectional view showing a state in which the assembled planting case 13 is fixed to the planting mat body 1 using bolts 14 and nuts 15. (D) is a planting mat body 16 with a planting case that is installed in a mortar plane at intervals of 1 to 5 square meters to plant trees with trees and the like.

図6は、既存のモルタル法面の場合、年月が立つに連れてモルタル滑落の一因となる隙間や空洞17が雨水等により地山18とモルタル面2の間に生じていることが多い、このような危険性を含んだ既存モルタル面に4平方メートル当りに1本の割合を標準とし、植栽マット体同士が接する四つ角に太さ13ミリ・長さ0.5m〜1mのネジ山が設けられているアンカーピン19でモルタル面2を貫き地山18に打設固定し、頭部ネジ山にメッシュ状押え盤19aを通し、ボルトナット19bを取付これを締め付け再度地山とモルタル面を一体化する。なお、打設されるアンカーピンは、引抜け防止を図るため削孔された穿孔内に摩擦力を高める形として、くの字に変形したアンカーピン19を打設固定し、モルタル面と地山を一体化する。   FIG. 6 shows that in the case of the existing mortar slope, as the years go by, gaps and cavities 17 that contribute to mortar sliding often occur between the ground 18 and the mortar surface 2 due to rainwater or the like. The existing mortar surface containing such dangers has a standard ratio of 1 piece per 4 square meters, and a thread with a thickness of 13 mm and a length of 0.5 m to 1 m at the four corners where the planting mat bodies touch each other. The anchor pin 19 is provided to penetrate the mortar surface 2 and is fixed to the ground 18, and the mesh-type presser 19 a is passed through the head screw thread, and the bolt nut 19 b is attached and tightened again. Integrate. In order to prevent pull-out, the anchor pin to be placed is fixed in place by anchoring the anchor pin 19 deformed into a U-shape so as to increase the frictional force in the drilled hole. Is integrated.

図7は、図2から図5の手順で緑化範囲に設置した植栽マット体の上部を除く縁廻りに風雨等による客土の流出防止とマット体底部に吹き込む風によるマット内水分の蒸発防止を図る防護カバーを取付けた状態を示す平面図である。防護カバー20は腐食しにくい塩ビシートで幅20cm・長さ4mを標準とし、左右両端に太さ2〜3ミリのステンレスワイヤー20bと20cm前後間隔で結束バンドが通るハトメ20aが付いた孔が形成されている。設置方法は、植栽マット体1や植栽ケース付植栽マット体16の縁廻りに添って防護カバー20を10cm前後被せ各植栽マット体表面のポリエチレン製平織ネット状シートと該防護カバー20のハトメ20aに結束バンド21を通し、結束して縁周りを覆う。モルタル面側には、ハトメ20a位置付近に掛止フックが付いた止金具22をモルタル面に粘着固定し、結束バンド21にて該ハトメ20aと止金具22を結束固定し、防護カバー20内に形成されているステンレスワイヤー20bを両端から張り詰めた状態でモルタル面に固定ボルト23で固定設置する。   Fig. 7 shows the prevention of outflow of customer soil due to wind and rain and the evaporation of moisture in the mat by the wind blown to the bottom of the mat body around the edge except the top of the planting mat body installed in the greening area according to the procedure of Figs. It is a top view which shows the state which attached the protective cover which aims at. Protective cover 20 is a PVC sheet that is resistant to corrosion and is standard 20cm in width and 4m in length, and has a stainless steel wire 20b with a thickness of 2 to 3mm on both left and right ends, and a hole with eyelet 20a through which a binding band passes at 20cm intervals. Has been. As for the installation method, a protective cover 20 is placed about 10 cm along the periphery of the planting mat body 1 and the planting mat body 16 with a planting case, and the polyethylene plain woven net-like sheet on the surface of each planting mat body and the protective cover 20. The banding band 21 is passed through the eyelet 20a and is bound to cover the periphery. On the mortar surface side, a fastener 22 with a hook hook near the position of the eyelet 20a is adhesively fixed to the mortar surface, and the eyelet 20a and the fastener 22 are bound and fixed by a binding band 21, and the inside of the protective cover 20 is secured. The formed stainless wire 20b is fixedly installed on the mortar surface with fixing bolts 23 in a state of being stretched from both ends.

図8は、既存のモルタル法面を壊すことなく、モルタル面の風化防止を図りながら、モルタル法面に短草洋芝24種子入りの植栽マット体と 短草洋芝種子入りの他に低木25や宿根草26を植栽した植栽ケース付植栽マット体を固定した植栽緑化工法による緑化状況を示す完成断面図である。   Figure 8 shows the planting mat body with 24 seeds of short grass turf on the mortar slope and shrubs with short grass turf seeds while preventing the weathering of the mortar face without breaking the existing mortar slope. It is completion sectional drawing which shows the greening condition by the planting greening method which fixed the planting mat body with a planting case which planted 25 and perennial grass 26.

植栽マット体を示す斜視図と断面図である。It is the perspective view and sectional drawing which show the planting mat body. モルタル法面に植栽マット体を固定する手順を示す説明図である。It is explanatory drawing which shows the procedure which fixes a planting mat body to a mortar slope. 固定具のアンカーボルトとアンカーボルトカバーを示す斜視図である。It is a perspective view which shows the anchor bolt and anchor bolt cover of a fixing tool. アンカーボルトに植栽マット体を設置固定する説明図である。It is explanatory drawing which installs and fixes a planting mat body to an anchor bolt. 植栽ケース付植栽マット体を示す説明図である。It is explanatory drawing which shows a planting mat body with a planting case. 既存モルタル面と地山をアンカーピンで再度一体化した状態を示す断面図である。It is sectional drawing which shows the state which integrated the existing mortar surface and the natural ground again with the anchor pin. 植栽マット体の縁廻りに防護カバーを取付けた状態を示す平面図である。It is a top view which shows the state which attached the protective cover around the edge of the planting mat body. モルタル法面を芝草と低木で緑化した実例を示す断面図である。It is sectional drawing which shows the example which greened the mortar slope with the turf grass and the shrub.

1 植栽マット体
1a ポリエチレン製平織ネット状シート
1b ポリエステル製不織布
1c 植生基盤土
1d レーヨン製不織布
1e 縫い糸
2 モルタル面
3 アンカーボルト打設孔
4 水孔
5 アンカーボルト
5a 挿入杭
5b ネジ
5c 切り込み
6 防根シート
7 客土
8 ワッシャー付ボルトナット
9 アンカーボルトカバー
10 樹脂系ネット
11 不織布
12 ラッセル平織ネット
13 植栽ケース
14 ボルト
15 ナット
16 植栽ケース付植栽マット体
17 空洞
18 地山
19 アンカーピン
19a メッシュ状押え盤
19b ボルトナット
20 防護カバー
20a ハトメ
20b ステンレスワイヤー
21 結束バンド
22 止金具
23 固定ボルト
24 短草洋芝
25 低木
26 宿根草
DESCRIPTION OF SYMBOLS 1 Planting mat body 1a Polyethylene plain woven net-like sheet 1b Polyester nonwoven fabric 1c Vegetation base soil 1d Rayon nonwoven fabric 1e Sewing thread 2 Mortar surface 3 Anchor bolt placement hole 4 Water hole 5 Anchor bolt 5a Insert pile 5b Screw 5c Notch 6 Prevention Root sheet 7 Customer soil 8 Bolt nut with washer 9 Anchor bolt cover 10 Resin net 11 Non-woven fabric 12 Russell plain weave net 13 Planting case 14 Bolt 15 Nut 16 Planting mat body with planting case 17 Cavity 18 Ground mountain 19 Anchor pin 19a Mesh presser 19b Bolt nut 20 Protective cover 20a Eyelet 20b Stainless steel wire 21 Binding band 22 Fastener 23 Fixing bolt 24 Short grass turf 25 Shrub 26 Perennial grass

Claims (3)

モルタルやコンクリートで被覆形成されている法面の適所に適数のアンカーボルトを取付け、適所に防根シートで覆い植物根の侵入を防止し、給水孔を設け、全体に約3cm厚の客土を施し、先端に鋭角なボルトカバーをセットした該アンカーボルトに植栽マット体を押し当ててマット体を貫き後、ワッシャー付ボルトナットにより、当該植生マット体を法面に固定することを特徴としたモルタル法面緑化工法。   Attach an appropriate number of anchor bolts at the appropriate location on the slope that is covered with mortar or concrete, cover with the root-proof sheet at the appropriate location to prevent the invasion of plant roots, provide water supply holes, and the land is approximately 3 cm thick. The planted mat body is pressed against the anchor bolt with an acute bolt cover set at the tip to penetrate the mat body, and then the vegetation mat body is fixed to the slope with a bolt nut with a washer. Mortar slope revegetation method. 請求項1に記載のアンカーボルトで植栽マット体を固定するモルタル法面緑化工法において、任意間隔に植栽ケース付植栽マット体を設置し、低木や宿根草を交えた緑化を図り
、設置した植栽マット体の上部部分を除いた縁周りに風除け防護カバーを取付けたことを特徴とするモルタル法面緑化工法。
In the mortar slope revegetation method for fixing the planting mat body with the anchor bolt according to claim 1, the planting mat body with a planting case was installed at an arbitrary interval, and the planting was performed with shrubs and perennial grasses. A mortar slope revegetation method characterized by attaching a windbreak protection cover around the edge of the planting mat body excluding the upper part.
請求項1と請求項2に記載のモルタル法面緑化工法において植栽マット体と植栽マット体の間に空間が空く凹凸が多く点在する法面の場合、現場状況に合せ、現場で包形成した植栽マット体を敷設することを特徴としたモルタル法面緑化工法。   In the mortar slope revegetation method according to claim 1 and claim 2, in the case of a slope with a space between the planting mat body and the planting mat body, there are many irregularities scattered, Mortar slope planting method characterized by laying the formed plant mat body.
JP2009137927A 2009-06-09 2009-06-09 Tree planting method for mortar and concrete slope Active JP4452316B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009137927A JP4452316B1 (en) 2009-06-09 2009-06-09 Tree planting method for mortar and concrete slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009137927A JP4452316B1 (en) 2009-06-09 2009-06-09 Tree planting method for mortar and concrete slope

Publications (2)

Publication Number Publication Date
JP4452316B1 JP4452316B1 (en) 2010-04-21
JP2010285745A true JP2010285745A (en) 2010-12-24

Family

ID=42260207

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009137927A Active JP4452316B1 (en) 2009-06-09 2009-06-09 Tree planting method for mortar and concrete slope

Country Status (1)

Country Link
JP (1) JP4452316B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522164A (en) * 2017-01-04 2017-03-22 广州华隧威预制件有限公司 Shrub planting type ecological concrete component and preparing method thereof
CN115045305B (en) * 2022-07-18 2024-03-29 安徽厚普建设工程有限公司 Ecological side slope system of municipal road

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63300116A (en) * 1987-05-29 1988-12-07 Sato Kogyo Co Ltd Constructing work of vegetating base
JPH09250134A (en) * 1996-03-15 1997-09-22 Fujishiyou:Kk Greening method on slope
JPH10338934A (en) * 1997-06-06 1998-12-22 Tesac Corp Method of greening construction of soilless slope face
JPH11193530A (en) * 1997-12-27 1999-07-21 Nisshoku Corp Greening method of slope
JP2002335762A (en) * 2001-05-23 2002-11-26 Unitika Ltd Root-preventive material and root-preventive vessel using the same
JP2003199427A (en) * 2002-01-09 2003-07-15 Tadashi Inoue Vegetation mat having inorganic antimicrobial agent or vegetation unit
JP2009102833A (en) * 2007-10-22 2009-05-14 Tankatsu:Kk Greening method of mortar slope and concrete slope

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63300116A (en) * 1987-05-29 1988-12-07 Sato Kogyo Co Ltd Constructing work of vegetating base
JPH09250134A (en) * 1996-03-15 1997-09-22 Fujishiyou:Kk Greening method on slope
JPH10338934A (en) * 1997-06-06 1998-12-22 Tesac Corp Method of greening construction of soilless slope face
JPH11193530A (en) * 1997-12-27 1999-07-21 Nisshoku Corp Greening method of slope
JP2002335762A (en) * 2001-05-23 2002-11-26 Unitika Ltd Root-preventive material and root-preventive vessel using the same
JP2003199427A (en) * 2002-01-09 2003-07-15 Tadashi Inoue Vegetation mat having inorganic antimicrobial agent or vegetation unit
JP2009102833A (en) * 2007-10-22 2009-05-14 Tankatsu:Kk Greening method of mortar slope and concrete slope

Also Published As

Publication number Publication date
JP4452316B1 (en) 2010-04-21

Similar Documents

Publication Publication Date Title
CN206859237U (en) A kind of double nets of a plate exempt to conserve ecological slope protection structure
JP2008127810A (en) Slope frame planting and greening method
JP4452316B1 (en) Tree planting method for mortar and concrete slope
KR100756375B1 (en) Method of protecting slope using wire-net and apparatus thereof
JP2010213622A (en) Planting mat for wall surface, and method for greening wall surface
JP6750343B2 (en) Mat for greening
JP5960759B2 (en) Tree planting method to columnar body
KR20120036006A (en) Structure of vegetation mat and execution process
JP4524003B2 (en) Greening method for mortar slope and concrete slope.
JP2008054611A (en) Wall-surface greening device, and wall-surface greening construction method using the same
JP2008154506A (en) Water storage container-type planting greening device
KR100873750B1 (en) It has a capsule form lifestyle space the lifestyle mat and manufacturing method thereof
CN212506332U (en) Slope anchor hanging net structure
JP2000170169A (en) Structure for installing frame for greening slope, and slope face greening method
DE2758441C2 (en) Wind throw protection of large trees on planting sites without connection with the natural soil (roof gardens)
JP2008125404A (en) Buried mattress for vegetation planting
KR200167805Y1 (en) A rice-straw mat for erosion control
JP5964367B2 (en) Tree planting method on retaining wall
KR101129005B1 (en) Green Wall System
JP2008057262A (en) Planting and greening method using covering type rock fall prevention net
JP5827938B2 (en) Vegetation guidance method
CN210562230U (en) High steep slope planting technique structure
JP2002235327A (en) Greening system, greening method thereby and corner member used therefor
JP3170480B2 (en) Greening method of slope
JP2717368B2 (en) Slope planting method

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100126

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100129

R150 Certificate of patent or registration of utility model

Ref document number: 4452316

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130205

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130205

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20200205

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250