JP2010275034A - Crane rope fitting structure - Google Patents

Crane rope fitting structure Download PDF

Info

Publication number
JP2010275034A
JP2010275034A JP2009127246A JP2009127246A JP2010275034A JP 2010275034 A JP2010275034 A JP 2010275034A JP 2009127246 A JP2009127246 A JP 2009127246A JP 2009127246 A JP2009127246 A JP 2009127246A JP 2010275034 A JP2010275034 A JP 2010275034A
Authority
JP
Japan
Prior art keywords
drum
sheave
trolley
rope
ropes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009127246A
Other languages
Japanese (ja)
Other versions
JP5529438B2 (en
Inventor
Shinya Kashiwasuga
信哉 栢菅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP2009127246A priority Critical patent/JP5529438B2/en
Publication of JP2010275034A publication Critical patent/JP2010275034A/en
Application granted granted Critical
Publication of JP5529438B2 publication Critical patent/JP5529438B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To suppress any sway of a container or provide a lifting sling during the traveling motion and the traverse motion, and to rapidly skew the container or the lifting sling with high accuracy. <P>SOLUTION: Two congruent triangles are formed of one set of two ropes 71, 72 (75, 76) drawn from a drum 16 on first and second virtual surfaces assumed on an end in the longitudinal direction of a lifting sling 8. Two congruent triangles are formed of one set of two ropes 74, 78 (73, 77) drawn from a drum on third and fourth virtual surfaces assumed on an end in the transverse direction of the lifting sling 8 while oblique lines x1, x2 (x5, x6) being directed in the separating direction. Oblique lines x4, x8 (x3, x7) are opposite to each other, and ropes 73, 74 on the drum side arranged on third and fourth virtual surfaces are attached to a link 151 on the drum side of a parallel link type skew compensation device 150 provided on a trolley, and ropes 77, 78 on the counter-drum side arranged on the virtual surface are attached to a link 152 on the counter drum side. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、コンテナヤードにてコンテナの蔵置作業を行うクレーン(トランスファークレーン)のロープ掛け構造に関するものである。   The present invention relates to a rope hanging structure of a crane (transfer crane) that performs container storage work in a container yard.

コンテナヤードにてコンテナの蔵置作業を行うクレーンのロープ掛け構造としては、逆ピラミッド形の側面を構成する4つのロープ巻き掛け仮想面にそれぞれロープをV字状に配置したクレーンのワイヤリービング構造(例えば、特許文献1参照。)、或いは、直方体形の側面を構成する4つのロープ巻き掛け仮想面にそれぞれロープをX字状に配置した荷役昇降装置が知られている(例えば、特許文献2参照。)。   As a rope hanging structure of a crane that performs container storage work in a container yard, a crane wire-leaving structure in which ropes are arranged in a V shape on each of four rope-wrapping virtual surfaces constituting the side surface of an inverted pyramid (for example, , Or refer to Patent Document 1.) Alternatively, a cargo handling lifting device in which ropes are respectively arranged in an X shape on four rope-wrapping virtual surfaces constituting a rectangular parallelepiped side surface is known (see, for example, Patent Document 2). ).

しかし、特許文献1は、V字状に配置したロープの剛性を利用して走行及び横行時のコンテナの揺れを抑制するようにしているに過ぎない。他方、特許文献2は、コンテナをリフト及びスキューさせる手段を備えているが、油圧を使って複数のアクチュエータを外部から連動して操作する必要があり、操作を精密に行なわないと、ロープ張力のアンバランス、或いは、コンテナの振れが発生する欠点がある。   However, Patent Document 1 merely uses the rigidity of the rope arranged in a V shape to suppress the shaking of the container during traveling and traversing. On the other hand, Patent Document 2 includes means for lifting and skewing the container, but it is necessary to operate a plurality of actuators in conjunction with each other by using hydraulic pressure. There is a disadvantage that unbalance or container runout occurs.

特許第3268224号明細書Japanese Patent No. 3268224 特表平10−507435号公報Japanese National Patent Publication No. 10-507435

本発明は、走行及び横行時のコンテナ又は吊り具の揺れを抑制する一方、構造が簡単であるにも関わらず、コンテナ又は吊り具を速やかに、かつ、精度高くスキューさせることができるクレーンのロープ掛け構造を提供することにある。   The present invention suppresses the swing of a container or a suspension tool during traveling and traversing, while the structure of the crane or rope can be quickly and accurately skewed despite its simple structure. It is to provide a hanging structure.

(1)本発明に係るクレーンのロープ掛け構造は、一つのドラムから引き出した複数のロープによって吊り具を吊支するクレーンにおいて、吊り具の長手方向の端部に想定した第1、第2のロープ巻き掛け仮想面では、ドラムより引き出した2本1組のロープを、吊り具とトロリーの間で三角形を形成すると共に各斜辺が互いに離反する方向を向くように掛け渡し、他方、吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面では、ドラムより引き出した2本1組のロープを、吊り具とトロリーの間で三角形を形成すると共に各斜辺が互いに向き合うように掛け渡して全ての三角形を合同とし、
更に、トロリー上に平行リンク式のスキュー補償装置を設け、該スキュー補償装置のドラム側のリンクに第3、第4のロープ巻き掛け仮想面に配置したドラム側のロープを装着し、反ドラム側のリンクに第3、第4のロープ巻き掛け仮想面に配置した反ドラム側のロープを装着することを特徴とするものである。
(1) The crane rope hanging structure according to the present invention is a crane in which a hanging tool is suspended by a plurality of ropes drawn from a single drum. On the virtual wrapping surface of the rope, a set of two ropes pulled out from the drum is passed so as to form a triangle between the suspender and the trolley so that the respective hypotenuses face away from each other. In the third and fourth rope-wrapping virtual surfaces assumed at the ends in the transverse direction, a pair of ropes drawn from the drum forms a triangle between the lifting device and the trolley, and each hypotenuse faces each other. So that all triangles are congruent,
Furthermore, a parallel link type skew compensation device is provided on the trolley, and drum-side ropes arranged on the third and fourth rope winding virtual surfaces are attached to the drum-side link of the skew compensation device, and the anti-drum side The third drum and the fourth rope wrapping rope are mounted on the link, and the rope on the side opposite to the drum arranged on the virtual surface is mounted.

(2)本発明のクレーンのロープ掛け構造は、上記(1)において、トロリーの一端部に設けたドラムと、軸芯がドラムの軸芯と直交する方向で且つ吊り具の長手方向の端部中央に設けた第一シーブ群と、軸芯が第一シーブ群のシーブの軸芯と平行で且つトロリーの四隅に設けた第二シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの反ドラム側に設けた第三シーブ群と、軸芯が第一シーブ群のシーブの軸芯と直交し且つ吊り具の四隅に設けた第四シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの中央に設けた第五シーブ群を備え、
前記ドラムから第一、第二シーブ群を経由して吊り具を吊支する第1、第2の1組のロープで吊り具の長手方向の端部に想定した第1のロープ巻き掛け仮想面に三角形を形成し、前記ドラムから第三、第一、第二シーブ群を経由して吊り具を吊支する第5、第6の1組のロープで吊り具の長手方向の端部に想定した第2のロープ巻き掛け仮想面に三角形を形成し、前記ドラムから第四、第五シーブ群及び第三、第四、第五シーブ群を経由して吊り具を吊支する第4、第8及び第3、第7の各1組のロープで吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面に三角形を形成すると共に全ての三角形を合同にすることを特徴とするものである。
(2) The rope hanging structure of the crane according to the present invention is the above-described (1), wherein the drum provided at one end of the trolley and the end of the suspension tool in the direction perpendicular to the axis of the drum and in the longitudinal direction of the hoist The first sheave group provided in the center, the second sheave group whose shaft core is parallel to the shaft core of the sheave of the first sheave group and four corners of the trolley, the shaft core is parallel to the shaft core of the drum and the trolley A third sheave group provided on the opposite side of the drum, a fourth sheave group whose axis is orthogonal to the sheave axis of the first sheave group and provided at the four corners of the lifting device, and the axis is the axis of the drum. A fifth sheave group provided in parallel and in the center of the trolley,
A first virtual wrapping virtual surface assumed at the end in the longitudinal direction of the hanger with a first and second set of ropes that suspend the hanger from the drum via the first and second sheave groups. A triangular shape is formed on the end of the lifting device in the longitudinal direction with a fifth and sixth set of ropes that support the lifting device from the drum via the third, first, and second sheave groups. Forming a triangle on the second rope wrapping virtual surface, and suspending a hanging tool from the drum via the fourth, fifth sheave group and the third, fourth, fifth sheave group. Form a triangle on the third and fourth rope wrapping virtual planes assumed at the end in the transverse direction of the hanger with a pair of ropes of 8 and 3rd and 7th and make all triangles congruent It is characterized by.

(3)本発明のクレーンのロープ掛け構造は、上記(1)において、トロリーの中央部に設けたドラムと、軸芯がドラムの軸芯と直交する方向で且つ吊り具の長手方向の端部中央に設けた第一シーブ群と、軸芯が第一シーブ群のシーブの軸芯と平行で且つトロリーの四隅に設けた第二シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの両端部に設けた第三シーブ群と、軸芯が第一シーブ群のシーブの軸芯と直交し且つ吊り具の四隅に設けた第四シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの中央に設けた第五シーブ群とを備え、
前記ドラムから第三、第一、第二シーブ群を経由して吊り具を吊支する第1、第2及び第5、第6の各1組のロープで吊り具の長手方向の端部に想定した第1、第2のロープ巻き掛け仮想面に三角形を形成し、前記ドラムから第三、第四、第五シーブ群を経由して吊り具を吊支する第4、第8及び第3、第7の各1組のロープで吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面に三角形を形成すると共に全ての三角形を合同にすることを特徴とするものである。
(3) The rope hanging structure of the crane according to the present invention includes the drum provided at the center of the trolley in the above (1), and the end of the suspension tool in the direction perpendicular to the axis of the drum and in the longitudinal direction of the suspension The first sheave group provided in the center, the second sheave group whose shaft core is parallel to the shaft core of the sheave of the first sheave group and four corners of the trolley, the shaft core is parallel to the shaft core of the drum and the trolley A third sheave group provided at both ends of the first sheave group, a fourth sheave group whose shaft core is orthogonal to the shaft core of the sheave of the first sheave group and provided at the four corners of the lifting device, and the shaft core is parallel to the shaft core of the drum And a fifth sheave group provided in the center of the trolley,
A pair of first, second, fifth, and sixth ropes that suspend the suspension device from the drum via the third, first, and second sheave groups at the longitudinal end of the suspension device. 4th, 8th and 3rd which form a triangle in the assumed 1st, 2nd rope winding virtual surface, and suspend a suspension tool from the said drum via the 3rd, 4th, 5th sheave group. The third and fourth rope wrapping imaginary planes assumed at the lateral ends of the hanger with each of the seventh pair of ropes form a triangle, and all the triangles are congruent. Is.

(4)本発明のクレーンのロープ掛け構造は、上記(1)〜(3)において、トロリーと吊り具の間に掛け渡したロープによって形成された全ての三角形の底辺をトロリー側に位置させることを特徴とするものである。   (4) In the rope hanging structure of the crane of the present invention, in the above (1) to (3), all the triangle bases formed by the rope spanned between the trolley and the suspension are positioned on the trolley side. It is characterized by.

本発明は、一つのドラムから引き出した複数のロープによって吊り具を吊支するクレーンにおいて、吊り具の長手方向の端部に想定した第1、第2のロープ巻き掛け仮想面では、ドラムより引き出した2本1組のロープを、吊り具とトロリーの間で三角形を形成すると共に各斜辺が互いに離反する方向を向くように掛け渡し、他方、吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面では、ドラムより引き出した2本1組のロープを、吊り具とトロリーの間で三角形を形成すると共に各斜辺が互いに向き合うように掛け渡して全ての三角形を合同とするので、吊り具の周囲に想定した四つのロープ巻き掛け仮想面に含まれる8本(2本×4組)のロープが全てトラス構造となり、コンテナ又は吊り具の走行及び横行方向の揺れを抑制する抑制力がより向上するようになった。   The present invention relates to a crane in which a suspension tool is supported by a plurality of ropes drawn from one drum, and the first and second rope-wrapping virtual surfaces assumed at the longitudinal ends of the suspension tool are drawn from the drum. In addition, a pair of two ropes is formed so as to form a triangle between the hanger and the trolley so that the hypotenuses are directed away from each other. In the fourth rope wrapping virtual plane, a set of two ropes drawn from the drum is formed so that a triangle is formed between the hanger and the trolley so that each hypotenuse faces each other. Therefore, all of the 8 ropes (2 x 4 sets) included in the four rope wrapping virtual planes assumed around the suspension have truss structure, and the container or the suspension Suppressor for suppressing force les is now improved.

更に、本発明は、トロリー上に平行リンク式のスキュー補償装置を設け、該スキュー補償装置のドラム側のリンクに第3、第4のロープ巻き掛け仮想面に配置したドラム側のロープを装着し、反ドラム側のリンクに第3、第4のロープ巻き掛け仮想面に配置した反ドラム側のロープを装着するので、傾転装置115,116の動作と協調してコンテナ又は吊り具を速やかに、かつ、精度高くスキューさせることができる。   Further, according to the present invention, a parallel link type skew compensation device is provided on the trolley, and the drum side ropes arranged on the third and fourth rope winding virtual surfaces are attached to the drum side link of the skew compensation device. Since the anti-drum side ropes arranged on the third and fourth rope wrapping virtual surfaces are attached to the anti-drum side link, the container or the suspension tool can be quickly moved in cooperation with the operation of the tilting devices 115 and 116. In addition, it is possible to skew with high accuracy.

トランスファークレーンの斜視図である。It is a perspective view of a transfer crane. 本発明に係るロープ掛け構造を示す斜視図である。It is a perspective view which shows the rope hanging structure which concerns on this invention. 本発明におけるスキュー制御装置の平面図である。It is a top view of the skew control apparatus in this invention. 本発明におけるスキュー制御装置の側面図である。It is a side view of the skew control apparatus in this invention. 単頭シリンダ式の傾転装置の側面図である。It is a side view of a single-head cylinder type tilting device. 双頭シリンダ式の傾転装置の側面図である。It is a side view of a double-headed cylinder type tilting device. 図2を矢印A方向から見た場合のロープ掛け構造の模式図である。It is a schematic diagram of the rope hanging structure when FIG. 2 is viewed from the direction of arrow A. 図2を矢印B方向から見た場合のロープ掛け構造の模式図である。FIG. 3 is a schematic diagram of a rope hanging structure when FIG. 2 is viewed from an arrow B direction. (a)〜(d)は三角形のパターン図である。(A)-(d) is a triangular pattern figure. 本発明におけるスキュー補償装置の動作説明図である。It is operation | movement explanatory drawing of the skew compensation apparatus in this invention.

以下、本発明に係る実施の形態を図面を用いて説明する。
図1に示すように、本発明に関連するトランスファークレーン(以下、クレーンと称する。)1は、クレーン本体2が門形に形成され、その脚部3に設けた前後左右の4組の走行輪4によってコンテナ蔵置ゾーンを矢印Eの方向に前進する。また、このクレーン1は、クレーン本体2上部のガーダ5上を矢印Fの方向に前進するトロリー6を有すると共に、トロリー6上のドラム(図示せず)から引き出した複数のワイヤーロープ(以下、ロープと称する。)7によって吊り具8を吊下するようになっている。尚、クレーン1は、矢印Eの反対方向に後進し、トロリー6は、矢印Fの反対方向に後進する。符号9は、コンテナを示している。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
As shown in FIG. 1, a transfer crane (hereinafter referred to as a crane) 1 related to the present invention has a crane body 2 formed in a portal shape, and four sets of front and rear, left and right traveling wheels provided on the legs 3 thereof. 4 advances the container storage zone in the direction of arrow E. The crane 1 also has a trolley 6 that moves forward in the direction of arrow F on the girder 5 above the crane body 2 and a plurality of wire ropes (hereinafter, ropes) drawn from a drum (not shown) on the trolley 6. The hanger 8 is suspended by 7). The crane 1 moves backward in the direction opposite to the arrow E, and the trolley 6 moves backward in the direction opposite to the arrow F. Reference numeral 9 denotes a container.

図2に示すように、トロリー6は、8本(2本×4組)のロープを備えた一本のドラム16と、軸芯が第一シーブ群10の軸芯と平行で且つトロリー6の四隅に設けた第二シーブ群20と、軸芯がドラム16の軸芯と平行で且つトロリー6の反ドラム側に設けた第三シーブ群30と、軸芯がドラム16の軸芯と平行で且つトロリー6の中央に設けた第五シーブ群50と、トロリー6の中央に設けたスキュー制御装置150を備えている。   As shown in FIG. 2, the trolley 6 includes one drum 16 having eight (2 × 4 sets) ropes, an axis that is parallel to the axis of the first sheave group 10, and the trolley 6. A second sheave group 20 provided at the four corners, a third sheave group 30 provided with an axis parallel to the axis of the drum 16 and on the opposite side of the trolley 6, and an axis parallel to the axis of the drum 16. A fifth sheave group 50 provided in the center of the trolley 6 and a skew control device 150 provided in the center of the trolley 6 are provided.

他方、吊り具8は、軸芯がドラム16の軸芯と直交する方向で且つ吊り具8の長手方向の両端中央に設けた第一シーブ群10と、軸芯が第一シーブ群10のシーブ軸芯と直交し且つ吊り具8の四隅に設けた第四シーブ群40を備えている。   On the other hand, the lifting tool 8 includes a first sheave group 10 provided in the center of both ends in the longitudinal direction of the lifting tool 8 in a direction in which the shaft core is orthogonal to the shaft core of the drum 16, and a sheave whose shaft core is the first sheave group 10. A fourth sheave group 40 provided at the four corners of the hanger 8 and orthogonal to the axis is provided.

第5シーブ群50は、トロリー6の前進側に設けた第1,第2シーブ51,52と、トロリー6の後進側に設けた第3,第4シーブ53,54との二つのシーブ群により構成されている。尚、第1,第2シーブ51,52及び第3,第4シーブ53,54は、それぞれ、同一又は共通の軸で支持されているが、所望により、第1,第3シーブ51,53と第2,第4シーブ52,54とを吊り具8の長手方向に離反させても良い。   The fifth sheave group 50 includes two sheave groups of first and second sheaves 51 and 52 provided on the forward side of the trolley 6 and third and fourth sheaves 53 and 54 provided on the reverse side of the trolley 6. It is configured. The first and second sheaves 51 and 52 and the third and fourth sheaves 53 and 54 are respectively supported by the same or common shaft, but if desired, the first and third sheaves 51 and 53 and The second and fourth sheaves 52 and 54 may be separated from each other in the longitudinal direction of the hanger 8.

更に、トロリー6は、ドラム16側に単頭シリンダ式の傾転装置115を設け、反ドラム側に単頭シリンダ式の傾転装置116を設けている。前者は、第1,第2ロープ71,72の接続部に設けたアーム123をドラム16と平行にスライドさせ、後者は、第5,第6ロープ75,76の接続部に設けたアーム123をドラム16と平行にスライドさせるようになっている。   Further, the trolley 6 is provided with a single-head cylinder type tilting device 115 on the drum 16 side and a single-head cylinder type tilting device 116 on the non-drum side. The former slides the arm 123 provided at the connection portion of the first and second ropes 71 and 72 in parallel with the drum 16, and the latter includes the arm 123 provided at the connection portion of the fifth and sixth ropes 75 and 76. The drum 16 is slid in parallel.

単頭シリンダ式の傾転装置115,116は、図5に示すように、電動モーター121によって単頭シリンダ122を二頭矢印方向にスライドさせるようになっている。尚、単頭シリンダ式の傾転装置115,116の代わりに双頭シリンダ式の傾転装置111を使用しても良い。双頭シリンダ式の傾転装置111は、図6に示すように、電動モーター119によって双頭シリンダ120を二頭矢印方向にスライドさせ、スキュー動作を行うようになっている。   As shown in FIG. 5, the single-head cylinder type tilting devices 115 and 116 are configured to slide the single-head cylinder 122 in the double-headed arrow direction by the electric motor 121. Note that a double-headed cylinder tilting device 111 may be used instead of the single-headed cylinder tilting devices 115 and 116. As shown in FIG. 6, the double-head cylinder type tilting device 111 slides the double-head cylinder 120 in the double-headed arrow direction by an electric motor 119 to perform a skew operation.

更に、トロリー6は、図2に示すように、ほぼ中央に独立制御タイプのスキュー補償装置150を備えている。スキュー補償装置150は、平行リンク式であり、ドラム16と平行に配置され、かつ、同一水平面内で回動する長短2本のリンク151,152と、これらのリンク151,152が平行になるように設けた連結リンク153と、連結リンク153と平行になるように長尺のリンク151の自由端に装着した電動シリンダ154より構成されている。その上、ドラム側の長尺リンク151に第3、第4のロープ73,74の先端を装着し、反ドラム側の短尺リンク152に第7、第8のロープ77,78の先端を装着している。   Further, as shown in FIG. 2, the trolley 6 is provided with an independent control type skew compensation device 150 at substantially the center. The skew compensation device 150 is of a parallel link type, and is arranged in parallel with the drum 16 and has two long and short links 151 and 152 that rotate in the same horizontal plane, and these links 151 and 152 are parallel to each other. And an electric cylinder 154 attached to the free end of the long link 151 so as to be parallel to the connection link 153. In addition, the tips of the third and fourth ropes 73 and 74 are attached to the long link 151 on the drum side, and the tips of the seventh and eighth ropes 77 and 78 are attached to the short link 152 on the counter drum side. ing.

更に詳しく説明すると、図3に示すように、長短2本のリンク151,152は、それぞれ、支持軸156によって回動自在に軸支されている。更に、この2本のリンク151,152は、互いに平行になるように連結リンク153によって連結されている。連結リンク153は、二つ支持軸156,156を結ぶ直線157と平行になるようにボルト158によって軸支されている。また、電動シリンダ154もボルト158によって長尺リンク151に軸支されている。尚、第3、第4のロープ73,74は、取付け金具159によってドラム側の長尺リンク151に装着され、第7、第8のロープ77,78は、取付け金具159によって反ドラム側の短尺リンク152に装着されている。また、取付け金具159の取り付けもボルト158を使用している。   More specifically, as shown in FIG. 3, the long and short links 151 and 152 are pivotally supported by a support shaft 156, respectively. Further, the two links 151 and 152 are connected by a connecting link 153 so as to be parallel to each other. The connection link 153 is pivotally supported by a bolt 158 so as to be parallel to a straight line 157 connecting the two support shafts 156 and 156. The electric cylinder 154 is also pivotally supported on the long link 151 by a bolt 158. The third and fourth ropes 73 and 74 are attached to the long drum link 151 on the drum side by a mounting bracket 159, and the seventh and eighth ropes 77 and 78 are short on the non-drum side by the mounting bracket 159. It is attached to the link 152. The mounting bracket 159 is also attached using bolts 158.

上記ドラム16は、図2に示すように、吊り具8の長手方向の前端部に対応するトロリー6の一側端部に設置されている。このドラム16は、第一、第二シーブ群10及び20を経由して吊り具8を吊支する第1、第2の1組のロープ71及び72、第三、第一及び第二シーブ群30,10及び20を経由して吊り具8を吊支する第5、第6の1組のロープ75及び76、第四、第五、第六シーブ群40,50及び60並びに第三、第四及び第五シーブ群30,40及び50を経由して吊り具8を吊支する第4、第8の1組のロープ74及び78、同じく第四、第五、第六シーブ群40,50及び60並びに第三、第四及び第五シーブ群30,40及び50を経由して吊り具8を吊支する第3、第7の2本1組のロープ73及び77を備えている。   As shown in FIG. 2, the drum 16 is installed at one end of the trolley 6 corresponding to the front end in the longitudinal direction of the hanger 8. The drum 16 includes a first and a second set of ropes 71 and 72, and a third, a first and a second sheave group that support the hoist 8 via the first and second sheave groups 10 and 20. The fifth and sixth sets of ropes 75 and 76, the fourth, fifth and sixth sheave groups 40, 50 and 60, and the third and fourth A fourth and eighth set of ropes 74 and 78 for supporting the lifting tool 8 via the fourth and fifth sheave groups 30, 40 and 50, and also the fourth, fifth and sixth sheave groups 40 and 50. , 60 and third, fourth, and fifth sheave groups 30, 40, and 50, and third and seventh two sets of ropes 73 and 77 that support the hanging tool 8.

(1)更に詳しく説明すると、矢印Aの方向から見た場合、第1のロープ71は、第一シーブ群10の前端側の後方シーブ12及び第二シーブ群20の前方左端シーブ21を経由して第2のロープ72と接続され、吊り具8の長手方向の前端部に想定した第1のロープ巻き掛け仮想面(図示せず)に三角形aを形成する。   (1) More specifically, when viewed from the direction of arrow A, the first rope 71 passes through the rear sheave 12 on the front end side of the first sheave group 10 and the front left end sheave 21 of the second sheave group 20. The triangle a is formed on the first rope wrapping virtual surface (not shown) that is connected to the second rope 72 and assumed at the front end in the longitudinal direction of the hanger 8.

(2)第2のロープ72は、第一シーブ群10の前端側の前方シーブ11及び第二シーブ群20の前方右端シーブ22を経由して第1のロープ71に接続され、吊り具8の長手方向の前端部に想定した第1のロープ巻き掛け仮想面(図示せず)に三角形bを形成する。   (2) The second rope 72 is connected to the first rope 71 via the front sheave 11 on the front end side of the first sheave group 10 and the front right end sheave 22 of the second sheave group 20. A triangle b is formed on a first rope-wrapping virtual surface (not shown) assumed at the front end in the longitudinal direction.

(3)第5のロープ75は、第三シーブ群30の中央部のシーブ31、第一シーブ群10の後端側の前方シーブ13及び第二シーブ群20の後方左端シーブ23を経由して第6のロープ76と接続され、吊り具8の長手方向の後端部に想定した第2のロープ巻き掛け仮想面(図示せず)に三角形cを形成する。   (3) The fifth rope 75 passes through the central sheave 31 of the third sheave group 30, the front sheave 13 on the rear end side of the first sheave group 10, and the rear left end sheave 23 of the second sheave group 20. A triangle c is formed on a second rope-wrapping virtual surface (not shown) connected to the sixth rope 76 and assumed at the rear end portion in the longitudinal direction of the hanger 8.

(4)第6のロープ76は、第三シーブ群30の中央部のシーブ32、第一シーブ群10の後端側の後方シーブ14及び第二シーブ群20の後方右端シーブ24を経由して第5のロープ75に接続され、吊り具8の長手方向の前端部に想定した第2のロープ巻き掛け仮想面(図示せず)に三角形dを形成する。   (4) The sixth rope 76 passes through the central sheave 32 of the third sheave group 30, the rear sheave 14 on the rear end side of the first sheave group 10, and the rear right end sheave 24 of the second sheave group 20. A triangle d is formed on a second rope-wrapping virtual surface (not shown) that is connected to the fifth rope 75 and assumed at the front end in the longitudinal direction of the hanger 8.

(5)他方、矢印Bの方向から見た場合、第4のロープ74は、第四シーブ群40の前端側の右端シーブ42、第五シーブ群50の第2シーブ52を経由してスキュー補償装置150の長尺横桁151に接続され、吊り具8の横手方向の前端部に想定した第3のロープ巻き掛け仮想面(図示せず)に三角形fを形成する。   (5) On the other hand, when viewed from the direction of arrow B, the fourth rope 74 is skew compensated via the right end sheave 42 on the front end side of the fourth sheave group 40 and the second sheave 52 of the fifth sheave group 50. A triangle f is formed on a third rope-wrapping virtual surface (not shown) that is connected to the long cross beam 151 of the device 150 and is assumed at the front end portion of the hanger 8 in the lateral direction.

(6)第8のロープ78は、第三シーブ群30の左端シーブ34、第四シーブ群40の前端側の左端シーブ41及び第五シーブ群50の第1シーブ51を経由してスキュー補償装置150の短尺横桁152に接続され、吊り具8の横手方向の前端部に想定した第3のロープ巻き掛け仮想面(図示せず)に三角形eを形成する。   (6) The eighth rope 78 is skew compensated via the left end sheave 34 of the third sheave group 30, the left end sheave 41 on the front end side of the fourth sheave group 40, and the first sheave 51 of the fifth sheave group 50. A triangle e is formed on a third rope-wrapping virtual surface (not shown) that is connected to the 150 short cross beams 152 and is assumed at the front end of the hanger 8 in the lateral direction.

(7)第3のロープ73は、第四シーブ群40の後端側の右端シーブ44、第五シーブ群50の第4シーブ54を経由してスキュー補償装置150の長尺横桁151に接続され、吊り具8の横手方向の後端部に想定した第4のロープ巻き掛け仮想面(図示せず)に三角形hを形成する。   (7) The third rope 73 is connected to the long cross beam 151 of the skew compensation device 150 via the right end sheave 44 on the rear end side of the fourth sheave group 40 and the fourth sheave 54 of the fifth sheave group 50. Then, a triangle h is formed on a fourth rope-wrapping virtual surface (not shown) assumed at the rear end of the hanger 8 in the transverse direction.

(8)第7のロープ77は、第三シーブ群30の右端シーブ33、第四シーブ群40の後端側の左端シーブ43、第五シーブ群50の第3シーブ53を経由してスキュー補償装置150の短尺横桁152に接続され、吊り具8の横手方向の後端部に想定した第4のロープ巻き掛け仮想面(図示せず)に三角形gを形成する。   (8) The seventh rope 77 is skew compensated via the right end sheave 33 of the third sheave group 30, the left end sheave 43 on the rear end side of the fourth sheave group 40, and the third sheave 53 of the fifth sheave group 50. A triangle g is formed on a fourth rope-wrapping virtual surface (not shown) that is connected to the short transverse beam 152 of the device 150 and is assumed at the rear end of the hanger 8 in the transverse direction.

(1)上記三角形a〜hについて、更に詳しく説明する。図7に示すように、三角形aは、吊り具8側のシーブ12とトロリー6側のシーブ21に支持された斜辺x1、トロリー6側のシーブ21に支持された底辺y1、吊り具8側のシーブ12に支持された鉛直辺z1により形成される。p1は、底辺y1と鉛直辺z1の見掛け上の交点を示す。   (1) The triangles a to h will be described in more detail. As shown in FIG. 7, the triangle a has a hypotenuse x1 supported by the sheave 12 on the hanger 8 side and a sheave 21 on the trolley 6 side, a base y1 supported on the sheave 21 on the trolley 6 side, and a hanger 8 side. It is formed by the vertical side z1 supported by the sheave 12. p1 represents an apparent intersection of the base y1 and the vertical side z1.

(2)三角形bは、吊り具8側のシーブ11とトロリー6側のシーブ22に支持された斜辺x2、トロリー6側のシーブ21に支持された底辺y2、吊り具8側のシーブ12に支持された鉛直辺z2により形成される。p2は、底辺y2と鉛直辺z2の見掛け上の交点を示す。   (2) The triangle b is supported by the slant side x2 supported by the sheave 11 on the hanging tool 8 side and the sheave 22 on the trolley 6 side, the bottom side y2 supported by the sheave 21 on the trolley 6 side, and the sheave 12 on the hanging tool 8 side. Formed by the vertical side z2. p2 represents an apparent intersection of the base y2 and the vertical side z2.

(3)三角形cは、吊り具8側のシーブ13とトロリー6側のシーブ23に支持された斜辺x5、トロリー6側のシーブ23に支持された底辺y5、吊り具8側のシーブ13に支持された鉛直辺z5により形成される。p5は、底辺y5と鉛直辺z5の見掛け上の交点を示す。   (3) The triangle c is supported by the oblique side x5 supported by the sheave 13 on the suspension 8 side and the sheave 23 on the trolley 6 side, the bottom y5 supported by the sheave 23 on the trolley 6 side, and the sheave 13 on the suspension 8 side. The vertical side z5 is formed. p5 indicates an apparent intersection of the base y5 and the vertical side z5.

(4)三角形dは、吊り具8側のシーブ14とトロリー6側のシーブ24に支持された斜辺x6、トロリー6側のシーブ24に支持された上辺y6、吊り具8側のシーブ14に支持された鉛直辺z6により形成される。p6は、底辺y6と鉛直辺z6の見掛け上の交点を示す。   (4) The triangle d is supported by the sheave 14 on the suspension 8 side and the oblique side x6 supported by the sheave 24 on the trolley 6 side, the upper side y6 supported by the sheave 24 on the trolley 6 side, and the sheave 14 on the suspension 8 side. The vertical side z6 is formed. p6 indicates an apparent intersection of the base y6 and the vertical side z6.

(5)更に、図8に示すように、三角形eは、吊り具8側のシーブ41とトロリー6側のシーブ51に支持された斜辺x8、トロリー6側のシーブ51に支持された上辺y8、吊り具8側のシーブ41に支持された鉛直辺z8により形成される。p8は、底辺y8と鉛直辺z8の見掛け上の交点を示す。   (5) Further, as shown in FIG. 8, the triangle e has an oblique side x8 supported by the sheave 41 on the suspension 8 side and a sheave 51 on the trolley 6 side, an upper side y8 supported by the sheave 51 on the trolley 6 side, It is formed by the vertical side z8 supported by the sheave 41 on the hanging tool 8 side. p8 indicates an apparent intersection of the base y8 and the vertical side z8.

(6)三角形fは、吊り具8側のシーブ42とトロリー6側のシーブ52に支持された斜辺x4、トロリー6側のシーブ52に支持された上辺y4、吊り具8側のシーブ42に支持された鉛直辺z4により形成される。p4は、底辺y4と鉛直辺z4の見掛け上の交点を示す。   (6) The triangle f is supported by the sheave 42 on the suspension 8 side and the oblique side x4 supported by the sheave 52 on the trolley 6 side, the upper side y4 supported by the sheave 52 on the trolley 6 side, and the sheave 42 on the suspension 8 side. Formed by the vertical side z4. p4 indicates an apparent intersection of the base y4 and the vertical side z4.

(7)三角形gは、吊り具8側のシーブ43とトロリー6側のシーブ53に支持された斜辺x7、トロリー6側のシーブ53に支持された上辺y7、吊り具8側のシーブ43に支持された鉛直辺z7により形成される。p7は、底辺y7と鉛直辺z7の見掛け上の交点を示す。   (7) The triangle g is supported by the sheave 43 on the suspension 8 side and the oblique side x7 supported by the sheave 53 on the trolley 6 side, the upper side y7 supported by the sheave 53 on the trolley 6 side, and the sheave 43 on the suspension 8 side. Formed by the vertical side z7. p7 indicates an apparent intersection of the base y7 and the vertical side z7.

(8)三角形hは、吊り具8側のシーブ44とトロリー6側のシーブ54に支持された斜辺x3、トロリー6側のシーブ54に支持された上辺y3、吊り具8側のシーブ44に支持された鉛直辺z3により形成される。p3は、底辺y3と鉛直辺z3の見掛け上の交点を示す。   (8) The triangle h is supported by the sheave 44 on the suspension 8 side and the oblique side x3 supported by the sheave 54 on the trolley 6 side, the upper side y3 supported by the sheave 54 on the trolley 6 side, and the sheave 44 on the suspension 8 side. Formed by the vertical side z3. p3 indicates an apparent intersection of the base y3 and the vertical side z3.

しかも、上記三角形a〜hは、次式(1)〜(3)を満足するように形成されているため、互いに合同である。その上、底辺y1〜y8は、全てトロリー6側に面している。
x1=x2=x3=x4=x5=x6=x7=x8 ・・・・ (1)
y1=y2=y3=y4=y5=y6=y7=y8 ・・・・ (2)
z1=z 2=z3=z4=z5=z6=z7=z8 ・・・・ (3)
Moreover, since the triangles a to h are formed so as to satisfy the following expressions (1) to (3), they are congruent with each other. In addition, the bases y1 to y8 all face the trolley 6 side.
x1 = x2 = x3 = x4 = x5 = x6 = x7 = x8 (1)
y1 = y2 = y3 = y4 = y5 = y6 = y7 = y8 (2)
z1 = z 2 = z3 = z4 = z5 = z6 = z7 = z8 (3)

図9(a)は三角形a及びcをパターン化した図、図9(b)は三角形b及びdをパターン化した図、図9(c)は三角形e及びgをパターン化した図、図9(d)は三角形f及びhをパターン化した図である。   9A is a diagram in which triangles a and c are patterned, FIG. 9B is a diagram in which triangles b and d are patterned, FIG. 9C is a diagram in which triangles e and g are patterned, and FIG. (D) is the figure which patterned the triangles f and h.

上記のように、この発明は、吊り具8の周囲に想定した四つのロープ巻き掛け仮想面(図示せず)に配置した8本(2本×4組)のロープ71〜78によって形成された8個の三角形a〜hが全てトラス構造となるため、走行及び横行時のコンテナの揺れを抑制することができる。特に、吊り具8の長手方向の前端部中央では、2本のロープ71,72が同一軸のシーブ11,12を両側から挟むように掛けられ、吊り具8の長手方向の後端部中央では、2本のロープ75,76が同一軸のシーブ13,14を両側から挟むように掛けられているので、吊り具8の横手方向(横行方向)の振れを抑制する抑制力が高くなる。   As described above, the present invention is formed by eight (2 × 4 sets) ropes 71 to 78 arranged on four rope-wrapping virtual surfaces (not shown) assumed around the hanger 8. Since all the eight triangles a to h have a truss structure, it is possible to suppress the shaking of the container during traveling and traversing. In particular, at the center of the front end of the hanging tool 8 in the longitudinal direction, the two ropes 71 and 72 are hung so as to sandwich the sheaves 11 and 12 of the same axis from both sides, and at the center of the rear end of the hanging tool 8 in the longitudinal direction. Since the two ropes 75 and 76 are hung so as to sandwich the sheaves 13 and 14 having the same axis from both sides, the restraining force for suppressing the swing of the hanger 8 in the transverse direction (transverse direction) is increased.

次に、スキュー補償装置150の動作を説明する。図10に示すように、スキュー補償装置150の電動シリンダ154のロッド154aを矢印Rの方向に伸長すると、長短両リンク151及び152が支持軸156を中心にして二点鎖線のように回動する。   Next, the operation of the skew compensation device 150 will be described. As shown in FIG. 10, when the rod 154a of the electric cylinder 154 of the skew compensation device 150 is extended in the direction of the arrow R, the long and short links 151 and 152 rotate around the support shaft 156 like a two-dot chain line. .

このため、第4ロープ74及び第7ロープ77が矢印s方向に引き込まれ、第3ロープ73及び第8ロープ78が矢印t方向に引き出され、吊り具8が軸芯Oを中心にして時計方向(矢印方向)にスキューする。   For this reason, the fourth rope 74 and the seventh rope 77 are drawn in the direction of the arrow s, the third rope 73 and the eighth rope 78 are drawn out in the direction of the arrow t, and the hoist 8 is clockwise around the axis O. Skew in the direction of the arrow.

尚、スキュー補償装置150の電動シリンダ154のロッド154aを、矢印Rと逆の方向に収縮させると、吊り具8が軸芯Oを中心に反時計方向にスキューする。   When the rod 154a of the electric cylinder 154 of the skew compensation device 150 is contracted in the direction opposite to the arrow R, the hanger 8 skews counterclockwise about the axis O.

ところで、全ての三角形a〜hの斜辺x1〜x8の両端に位置するシーブは、トロリー6側のシーブ直径及び吊り具8側のシーブ直径をそれぞれ同一とすることが望ましい。また、トロリー6側のシーブ21〜24及び51〜54の直径が吊り具8側のシーブ11〜14及び41〜44の直径よりも小さいか又は同一とすることが望ましい。   By the way, it is desirable that the sheaves located at both ends of the hypotenuses x1 to x8 of all the triangles a to h have the same sheave diameter on the trolley 6 side and the sheave diameter on the hanging tool 8 side. Moreover, it is desirable that the diameters of the sheaves 21 to 24 and 51 to 54 on the trolley 6 side are smaller than or equal to the diameters of the sheaves 11 to 14 and 41 to 44 on the hanging tool 8 side.

トロリー側のシーブ21〜24及び51〜54は、イコライザーシーブであり、吊り具8又はコンテナ9の昇降時におけるロープの通過がほとんど無いため、トロリー6側のシーブ21〜24及び51〜54の直径を吊り具8側のシーブ11〜14及び41〜44の直径より小さくしてもロープ寿命等に悪影響を及ぼすことがない。その上、軽量化が図れる。   The sheaves 21 to 24 and 51 to 54 on the trolley side are equalizer sheaves, and there is almost no passage of the rope when the lifting device 8 or the container 9 is raised or lowered, so the diameter of the sheaves 21 to 24 and 51 to 54 on the trolley 6 side Even if the diameter is smaller than the diameter of the sheaves 11 to 14 and 41 to 44 on the hanging tool 8 side, the rope life and the like are not adversely affected. In addition, the weight can be reduced.

尚、ロープ71及び72の張力差分の力、並びにロープ75及び76の張力差分の力で吊り具8を横手方向にシフト可能であるから、単頭シリンダ式の傾転装置115,116の小型化が可能となる。   In addition, since the suspension tool 8 can be shifted in the lateral direction by the force of the differential tension of the ropes 71 and 72 and the force of the differential tension of the ropes 75 and 76, the downsizing of the single-head cylinder type tilting devices 115 and 116 is reduced. Is possible.

以上の説明では、ドラム16をトロリー6の一端に片寄らせて設けた場合について説明したが、ドラム16をトロリー6の中央に設置することもできる。この場合は、ドラム16の前方側に、第三シーブ群30として、反ドラム側に設けたシーブ31〜34に対向する4個のシーブを追加で設けて第1〜第4のロープ71〜74をそれぞれ支持させる。   In the above description, the case where the drum 16 is provided so as to be offset toward one end of the trolley 6 has been described, but the drum 16 may be installed at the center of the trolley 6. In this case, four sheaves facing the sheaves 31 to 34 provided on the non-drum side as the third sheave group 30 are additionally provided on the front side of the drum 16 to provide first to fourth ropes 71 to 74. To support each.

8 吊具
16 ドラム
71,72(75,76),74,78(73,77) 2本1組のロープ
x1,x2(x5,x6),x4,x8(x3,x7) 斜辺
150 平行リンク式のスキュー補償装置
151 ドラム側のリンク
152 反ドラム側のリンク
8 Suspension 16 Drum 71, 72 (75, 76), 74, 78 (73, 77) One set of two ropes x1, x2 (x5, x6), x4, x8 (x3, x7) hypotenuse 150 parallel link type Skew Compensator 151 Drum Side Link 152 Non-Drum Side Link

Claims (4)

一つのドラムから引き出した複数のロープによって吊り具を吊支するクレーンにおいて、吊り具の長手方向の端部に想定した第1、第2のロープ巻き掛け仮想面では、ドラムより引き出した2本1組のロープを、吊り具とトロリーの間で三角形を形成すると共に各斜辺が互いに離反する方向を向くように掛け渡し、他方、吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面では、ドラムより引き出した2本1組のロープを、吊り具とトロリーの間で三角形を形成すると共に各斜辺が互いに向き合うように掛け渡して全ての三角形を合同とし、
更に、トロリー上に平行リンク式のスキュー補償装置を設け、該スキュー補償装置のドラム側のリンクに第3、第4のロープ巻き掛け仮想面に配置したドラム側のロープを装着し、反ドラム側のリンクに第3、第4のロープ巻き掛け仮想面に配置した反ドラム側のロープを装着することを特徴とするクレーンのロープ掛け構造。
In a crane that suspends a hanging tool by a plurality of ropes drawn from one drum, the first and second rope wrapping virtual surfaces assumed at the longitudinal ends of the hanging tool are two drawn from the drum 1 A pair of ropes are formed so as to form a triangle between the hanger and the trolley so that the respective hypotenuses face away from each other. On the rope wrapping virtual surface, a pair of ropes drawn from the drum forms a triangle between the hanger and the trolley and hangs so that each hypotenuse faces each other, making all the triangles congruent,
Furthermore, a parallel link type skew compensation device is provided on the trolley, and drum-side ropes arranged on the third and fourth rope winding virtual surfaces are attached to the drum-side link of the skew compensation device, and the anti-drum side A rope hanging structure for a crane, wherein a rope on the opposite side of the drum arranged on the third and fourth rope wrapping virtual surfaces is attached to the link.
トロリーの一端に設けたドラムと、軸芯がドラムの軸芯と直交する方向で且つ吊り具の長手方向の端部中央に設けた第一シーブ群と、軸芯が第一シーブ群のシーブの軸芯と平行で且つトロリーの四隅に設けた第二シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの反ドラム側に設けた第三シーブ群と、軸芯が第一シーブ群のシーブの軸芯と直交し且つ吊り具の四隅に設けた第四シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの中央に設けた第五シーブ群とを備え、
前記ドラムから第一、第二シーブ群を経由して吊り具を吊支する第1、第2の1組のロープで吊り具の長手方向の端部に想定した第1のロープ巻き掛け仮想面に三角形を形成し、前記ドラムから第三、第一、第二シーブ群を経由して吊り具を吊支する第5、第6の1組のロープで吊り具の長手方向の端部に想定した第2のロープ巻き掛け仮想面に三角形を形成し、前記ドラムから第四、第五シーブ群及び第三、第四、第五シーブ群を経由して吊り具を吊支する第4、第8及び第3、第7の各1組のロープで吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面に三角形を形成すると共に全ての三角形を合同にすることを特徴とする請求項1記載のクレーンのロープ掛け構造。
A drum provided at one end of the trolley, a first sheave group in which the axis is perpendicular to the axis of the drum and at the center of the end of the longitudinal direction of the lifting device, and a shaft is a sheave of the first sheave group. A second sheave group provided parallel to the shaft core and at the four corners of the trolley, a third sheave group provided with the shaft core parallel to the drum core and on the opposite side of the trolley, and the shaft core serving as the first sheave group A fourth sheave group that is orthogonal to the shaft core of the sheave and provided at the four corners of the lifting device, and a fifth sheave group that the shaft core is parallel to the shaft core of the drum and provided in the center of the trolley,
A first virtual wrapping virtual surface assumed at the end in the longitudinal direction of the hanger with a first and second set of ropes that suspend the hanger from the drum via the first and second sheave groups. A triangular shape is formed on the end of the lifting device in the longitudinal direction with a fifth and sixth set of ropes that support the lifting device from the drum via the third, first, and second sheave groups. Forming a triangle on the second rope wrapping virtual surface, and suspending a hanging tool from the drum via the fourth, fifth sheave group and the third, fourth, fifth sheave group. Form a triangle on the third and fourth rope wrapping virtual planes assumed at the end in the transverse direction of the hanger with a pair of ropes of 8 and 3rd and 7th and make all triangles congruent The crane rope hanging structure according to claim 1.
トロリーの中央に設けたドラムと、軸芯がドラムの軸芯と直交する方向で且つ吊り具の長手方向の端部中央に設けた第一シーブ群と、軸芯が第一シーブ群のシーブの軸芯と平行で且つトロリーの四隅に設けた第二シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの両端部に設けた第三シーブ群と、軸芯が第一シーブ群のシーブの軸芯と直交し且つ吊り具の四隅に設けた第四シーブ群と、軸芯がドラムの軸芯と平行で且つトロリーの中央に設けた第五シーブ群とを備え、
前記ドラムから第三、第一、第二シーブ群を経由して吊り具を吊支する第1、第2及び第5、第6の各1組のロープで吊り具の長手方向の端部に想定した第1、第2のロープ巻き掛け仮想面に三角形を形成し、前記ドラムから第三、第四、第五シーブ群を経由して吊り具を吊支する第4、第8及び第3、第7の各1組のロープで吊り具の横手方向の端部に想定した第3、第4のロープ巻き掛け仮想面に三角形を形成すると共に全ての三角形を合同にすることを特徴とする請求項1記載のクレーンのロープ掛け構造。
A drum provided in the center of the trolley, a first sheave group in which the axis is perpendicular to the axis of the drum and in the center of the end in the longitudinal direction of the lifting device, and a shaft is a sheave of the first sheave group. A second sheave group parallel to the shaft core and provided at the four corners of the trolley, a third sheave group whose shaft core is parallel to the shaft core of the drum and provided at both ends of the trolley, and the shaft core of the first sheave group. A fourth sheave group orthogonal to the shaft core of the sheave and provided at the four corners of the lifting device, and a fifth sheave group provided in the center of the trolley with the shaft core parallel to the shaft core of the drum,
A pair of first, second, fifth, and sixth ropes that suspend the suspension device from the drum via the third, first, and second sheave groups at the longitudinal end of the suspension device. 4th, 8th and 3rd which form a triangle in the assumed 1st, 2nd rope winding virtual surface, and suspend a suspension tool from the said drum via the 3rd, 4th, 5th sheave group. The third and fourth rope wrapping imaginary planes assumed at the lateral ends of the hanger with each of the seventh pair of ropes form a triangle, and all the triangles are congruent. The crane rope hanging structure according to claim 1.
トロリーと吊り具の間に掛け渡したロープによって形成された全ての三角形の底辺をトロリー側に位置させることを特徴とする請求項1〜3のいずれか1項に記載のクレーンのロープ掛け構造。   The crane rope hanging structure according to any one of claims 1 to 3, wherein the bases of all triangles formed by a rope hung between the trolley and the suspension are positioned on the trolley side.
JP2009127246A 2009-05-27 2009-05-27 Crane rope hanging structure Active JP5529438B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009127246A JP5529438B2 (en) 2009-05-27 2009-05-27 Crane rope hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009127246A JP5529438B2 (en) 2009-05-27 2009-05-27 Crane rope hanging structure

Publications (2)

Publication Number Publication Date
JP2010275034A true JP2010275034A (en) 2010-12-09
JP5529438B2 JP5529438B2 (en) 2014-06-25

Family

ID=43422377

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009127246A Active JP5529438B2 (en) 2009-05-27 2009-05-27 Crane rope hanging structure

Country Status (1)

Country Link
JP (1) JP5529438B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013145963A1 (en) * 2012-03-30 2013-10-03 三井造船株式会社 Crane anti-sway device
CN103803412A (en) * 2014-02-24 2014-05-21 润邦卡哥特科工业有限公司 Crane trim mounting fixture
JP2014223984A (en) * 2013-05-17 2014-12-04 Jfeスチール株式会社 Hoist apparatus of crane

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4890363U (en) * 1972-01-31 1973-10-30
JPS58100083A (en) * 1981-12-10 1983-06-14 三菱重工業株式会社 Center rest device
JPS6413395A (en) * 1987-08-01 1989-01-18 Mitsubishi Metal Corp Crane handling method through remote control
JPH03100279U (en) * 1989-09-29 1991-10-21
JPH07291576A (en) * 1994-04-27 1995-11-07 Mitsubishi Heavy Ind Ltd Apparatus for controllably stopping sway of hung load
JPH10507435A (en) * 1995-06-09 1998-07-21 タックス イーエムベーハー Load lifting device
JPH10203774A (en) * 1997-01-20 1998-08-04 Mitsubishi Heavy Ind Ltd Wire leaving structure of crane
JP2002362879A (en) * 2001-06-06 2002-12-18 Tcm Corp Cargo handling device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4890363U (en) * 1972-01-31 1973-10-30
JPS58100083A (en) * 1981-12-10 1983-06-14 三菱重工業株式会社 Center rest device
JPS6413395A (en) * 1987-08-01 1989-01-18 Mitsubishi Metal Corp Crane handling method through remote control
JPH03100279U (en) * 1989-09-29 1991-10-21
JPH07291576A (en) * 1994-04-27 1995-11-07 Mitsubishi Heavy Ind Ltd Apparatus for controllably stopping sway of hung load
JPH10507435A (en) * 1995-06-09 1998-07-21 タックス イーエムベーハー Load lifting device
JPH10203774A (en) * 1997-01-20 1998-08-04 Mitsubishi Heavy Ind Ltd Wire leaving structure of crane
JP2002362879A (en) * 2001-06-06 2002-12-18 Tcm Corp Cargo handling device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013145963A1 (en) * 2012-03-30 2013-10-03 三井造船株式会社 Crane anti-sway device
JP2013209213A (en) * 2012-03-30 2013-10-10 Mitsui Eng & Shipbuild Co Ltd Anti-vibration apparatus of crane
JP2014223984A (en) * 2013-05-17 2014-12-04 Jfeスチール株式会社 Hoist apparatus of crane
CN103803412A (en) * 2014-02-24 2014-05-21 润邦卡哥特科工业有限公司 Crane trim mounting fixture

Also Published As

Publication number Publication date
JP5529438B2 (en) 2014-06-25

Similar Documents

Publication Publication Date Title
JP4303777B1 (en) Crane rope hanging structure
WO2012055255A1 (en) Hoisting mechanism for container crane and container crane
JP5991187B2 (en) Method and apparatus for suppressing vibration of cargo handling machine
JP6174510B2 (en) crane
JP5529438B2 (en) Crane rope hanging structure
JP5394793B2 (en) Crane rope hanging structure
JP5457060B2 (en) Crane rope hanging structure
JP5529444B2 (en) Container crane rope hanging structure
JP2010235236A (en) Rope hooking structure for crane
JP7372851B2 (en) Cranes and crane rope tensioning methods
JP2017171507A (en) crane
JP6787645B1 (en) Spreader anti-vibration device
JP2001114492A (en) Crane device
JP5964550B2 (en) Hoist
WO2023032067A1 (en) Crane and method for providing rope in crane
JP5934011B2 (en) Crane brace
JP3024966B1 (en) Crane equipment
JP6996695B2 (en) Trolley and cargo handling method by trolley
JP2009242082A (en) Container crane
JP2003171082A (en) Tilt-rolling device and crane provided with the tilt- rolling device
JP2013177240A (en) Vibration restraining method and device of cargo handling machine
JPH1017268A (en) Skew swing preventive method and device of crane suspending cargo
JP7447613B2 (en) working machine
JP6919858B2 (en) Trolley and trolley transportation method
JP2023027375A (en) Connection beam fitting method for crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120307

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130614

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130702

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130902

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140318

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140417

R150 Certificate of patent or registration of utility model

Ref document number: 5529438

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250