Prior art keywords
filling
valve
liquid level
liquefied gas
fuel tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009109397A
Other languages
Japanese (ja)
Inventor
Keiji Iwatsuki
恵司 岩月
Hideyuki Inagaki
秀幸 稲垣
Hiroyuki Amemori
宏之 雨森
Teruo Kasuya
晃夫 粕谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Motor Wheel Co Ltd
Tokico System Solutions Co Ltd
Original Assignee
Central Motor Wheel Co Ltd
Tokico Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Motor Wheel Co Ltd, Tokico Technology Ltd filed Critical Central Motor Wheel Co Ltd
Priority to JP2009109397A priority Critical patent/JP2010255809A/en
Publication of JP2010255809A publication Critical patent/JP2010255809A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Cooling, Air Intake And Gas Exhaust, And Fuel Tank Arrangements In Propulsion Units (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To reduce impact through a water hammer phenomenon when finishing filling of liquefied gas. <P>SOLUTION: The filling control unit 140 of a control circuit 90 has a valve opening control means 141, a liquid level position discriminating means 142 and a valve closing control means 143. The valve opening control means 141 starts the filling of the liquified gas to a fuel tank 30 by opening a first opening-closing valve V1, a third opening-closing valve V5 and a second opening-closing valve V4 through a filling starting signal. The liquid level position discriminating means 142 discriminates whether or not the liquid level of the fuel tank 30, based on liquid level detecting data, reaches a predetermined position lower than the excessive filling preventive position, by receiving the liquid level detecting data detected by a liquid level detecting means 190. The valve closing control means 143 reduces a filling flow rate to the fuel tank 30 by the throttling valve opening of the first opening-closing valve V1 or the second opening-closing valve V4 to the valve closing side or closing the valve, when discriminating that the liquid level of the fuel tank reaches the predetermined position. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は液化ガス充填システムに係り、特に液化ガスを燃料タンクに効率良く充填する液化ガス充填システムに関する。   The present invention relates to a liquefied gas filling system, and more particularly to a liquefied gas filling system that efficiently fills a fuel tank with liquefied gas.

自動車などの車両用燃料として使用される液化ガスとして、例えば、ブタン・プロパンなどを主成分とするLPG(Liquefied petroleum gas)、酸素含有率が高く黒煙が出ないディーゼル燃料として使用されるDME(ジメチルエーテル)がある。この種の液化ガスは、気体燃料を圧縮することにより液化できるため、タンク内においては、液相領域と気相領域とが併存する。   As a liquefied gas used as a fuel for vehicles such as automobiles, for example, LPG (Liquid Petroleum Gas) mainly composed of butane / propane, DME (diesel fuel having a high oxygen content and no black smoke) Dimethyl ether). Since this type of liquefied gas can be liquefied by compressing gaseous fuel, a liquid phase region and a gas phase region coexist in the tank.

上記液化ガスを充填するための液化ガス充填システムとしては、液化ガスの貯蔵元である液化ガス貯槽と被充填容器との間を充填ラインと均圧化ラインの2つの配管経路で連通して効率良く液化ガスを充填する方式が行なわれている(例えば、特許文献1参照)。   As the liquefied gas filling system for filling the liquefied gas, the liquefied gas storage tank, which is the storage source of the liquefied gas, and the filled container communicate with each other through two piping paths of a filling line and a pressure equalizing line. A method of filling liquefied gas well is performed (see, for example, Patent Document 1).

図1は、従来の充填方式を用いた液化ガス充填システムの系統図である。尚、図1に示す均圧充填方式は、特にプロパンやDMEのような温度上昇に伴う飽和蒸気圧力の上昇が大きい液化ガスを充填する場合に適した充填方式である。   FIG. 1 is a system diagram of a liquefied gas filling system using a conventional filling method. The pressure equalization filling method shown in FIG. 1 is a filling method particularly suitable for filling liquefied gas such as propane or DME, which has a large increase in saturated vapor pressure accompanying a temperature rise.

図1に示されるように、液化ガス充填システム10は、液化ガス貯槽20と、液化ガス充填配管経路(充填ライン)40と、気相領域均圧配管経路(均圧化ライン)50とを有する。液化ガス貯槽20は、液化ガスを貯蔵する容量の大きい大型タンクである。   As shown in FIG. 1, the liquefied gas filling system 10 includes a liquefied gas storage tank 20, a liquefied gas filling pipe path (filling line) 40, and a gas phase region pressure equalizing pipe path (pressure equalizing line) 50. . The liquefied gas storage tank 20 is a large tank with a large capacity for storing liquefied gas.

液化ガス充填配管経路40は、一端が液化ガス貯槽20の液相領域に接続され、他端が液化ガスを充填される燃料タンク30の液相側接続口32に接続される充填用接続カップリング34を有する。気相領域均圧配管経路50は、一端が液化ガス貯槽20の気相領域に接続され、他端が燃料タンク30の気相側接続口36に接続される均圧用接続カップリング38を有する。   The liquefied gas filling pipe path 40 has one end connected to the liquid phase region of the liquefied gas storage tank 20 and the other end connected to the liquid phase side connection port 32 of the fuel tank 30 filled with the liquefied gas. 34. The gas phase region equalizing pipe path 50 has a pressure equalizing connection coupling 38 having one end connected to the gas phase region of the liquefied gas storage tank 20 and the other end connected to the gas phase side connection port 36 of the fuel tank 30.

また、液化ガス充填配管経路40は、ディスペンサ60を介して燃料タンク30に接続されている。液化ガス貯槽20とディスペンサ60との間を連通する部分には、液化ガスを圧送する加圧手段としてのポンプ70が設けられている。上記液化ガス充填配管経路40と気相領域均圧配管経路50を用いた均圧充填方式の液化ガス充填システムでは、液化ガスが液化ガス充填配管経路40から燃料タンク30内に充填されると共に、燃料タンク30内の上部空間(気相領域)のベーパを気相領域均圧配管経路50から液化ガス貯槽20の気相領域に充填することにより、液化ガスを大流量で充填することが可能になる。   The liquefied gas filling piping path 40 is connected to the fuel tank 30 via the dispenser 60. A pump 70 serving as a pressurizing unit that pumps the liquefied gas is provided at a portion that communicates between the liquefied gas storage tank 20 and the dispenser 60. In the liquefied gas filling system of the pressure equalization method using the liquefied gas filling piping path 40 and the gas phase region pressure equalizing piping path 50, the liquefied gas is filled into the fuel tank 30 from the liquefied gas filling piping path 40, and By filling the vapor in the upper space (gas phase region) in the fuel tank 30 into the gas phase region of the liquefied gas storage tank 20 from the gas phase region equalizing piping path 50, it becomes possible to fill the liquefied gas at a large flow rate. Become.

また、燃料タンク30には、液面上昇による過充填を防止するため、液面が所定高さ位置に達した時点で閉弁するフロート弁からなる過充填防止弁31が設けられている。この過充填防止弁31は、液化ガス充填配管経路40の先端に接続されており、燃料タンク30の液面が満充填となる所定高さ位置(過充填防止位置)に達した場合に閉弁する。   Further, the fuel tank 30 is provided with an overfill prevention valve 31 comprising a float valve that closes when the liquid level reaches a predetermined height position in order to prevent overfilling due to the rise in the liquid level. This overfill prevention valve 31 is connected to the tip of the liquefied gas filling pipe path 40 and is closed when the liquid level of the fuel tank 30 reaches a predetermined height position (overfill prevention position) at which the fuel tank 30 is fully filled. To do.

また、ディスペンサ60の筐体内部には、セパレータ62と、容積式流量計64と、背圧弁66と、電磁弁からなる第1の開閉弁V1(充填用開閉弁)とが設けられている。セパレータ62は、液化ガス充填配管経路40により充填される液化ガスから気泡を分離する気液分離装置である。   In addition, a separator 62, a positive displacement flow meter 64, a back pressure valve 66, and a first on-off valve V1 (a filling on-off valve) including an electromagnetic valve are provided inside the dispenser 60. The separator 62 is a gas-liquid separator that separates bubbles from the liquefied gas filled by the liquefied gas filling piping path 40.

容積式流量計64は、液化ガス充填配管経路40により充填される液化ガスの流量を計測し、計測した容積流量に応じた流量パルスを出力する。また、容積式流量計64は、所謂ピストン式流量計とも呼ばれる流量計であり、例えば、特開平8−94408号公報にみられるように4つのピストンが90°の位相差で往復動し、各ピストンの往復動に伴う回転力が回転軸に伝達され、回転軸の回転角に応じた容積分(ピストンの移動により押し出された液化ガスの体積)に比例する流量パルスを生成する流量パルス生成部を有する。従って、回転軸の回転角に応じてピストンによって吐出された容積分の体積流量に比例する流量パルスを積算することにより液化ガスの充填量を演算することが可能になる。   The positive displacement flow meter 64 measures the flow rate of the liquefied gas filled by the liquefied gas filling pipe path 40 and outputs a flow rate pulse corresponding to the measured volume flow rate. The positive displacement flow meter 64 is a so-called piston flow meter. For example, as shown in JP-A-8-94408, four pistons reciprocate with a phase difference of 90 °. Rotational force generated by the reciprocating motion of the piston is transmitted to the rotary shaft, and a flow rate pulse generator that generates a flow rate pulse proportional to the volume corresponding to the rotational angle of the rotary shaft (volume of liquefied gas pushed out by the movement of the piston) Have Therefore, it is possible to calculate the filling amount of the liquefied gas by integrating the flow rate pulse proportional to the volume flow rate of the volume discharged by the piston according to the rotation angle of the rotating shaft.

充填用接続カップリング34は、ディスペンサ60から引き出された液化ガス充填配管経路40を構成する充填ホース42の先端(他端)に設けられている。また、均圧用接続カップリング38は、ディスペンサ60から引き出された気相領域均圧配管経路50を構成する均圧ホース52の先端(他端)に設けられている。そして、燃料タンク30が搭載された車両80には、液相側接続口32を開または閉とする手動式の開閉弁V2と、気相側接続口36を開または閉とする手動式の開閉弁V3とが設けられている。   The filling connection coupling 34 is provided at the tip end (the other end) of the filling hose 42 constituting the liquefied gas filling piping path 40 drawn from the dispenser 60. Further, the pressure equalizing connection coupling 38 is provided at the tip (the other end) of the pressure equalizing hose 52 constituting the gas phase region pressure equalizing pipe path 50 drawn from the dispenser 60. The vehicle 80 on which the fuel tank 30 is mounted has a manual on-off valve V2 that opens or closes the liquid-phase side connection port 32 and a manual opening and closing that opens or closes the gas-phase side connection port 36. A valve V3 is provided.

ここで、接続口32、36は、接続カップリング34、38が接続口32、36に接続されたとき、内部通路を開とし、一方、接続カップリング34、38が離脱されたときには、内部通路(開口部)を閉とする弁機構を有する。   Here, the connection ports 32 and 36 open the internal passage when the connection couplings 34 and 38 are connected to the connection ports 32 and 36, while the internal passages when the connection couplings 34 and 38 are disconnected. It has a valve mechanism that closes (opening).

背圧弁66は、気相領域均圧配管経路50から分岐された背圧管68を介して気相領域の均圧化された圧力が背圧として導入されており、均圧化された圧力よりポンプ70により加圧された液圧が大きくなったときに開弁するように構成されている。   The back pressure valve 66 has a pressure equalized in the gas phase region introduced as a back pressure through a back pressure pipe 68 branched from the gas phase region pressure equalizing piping path 50, and is pumped from the pressure equalized pressure. The valve is configured to open when the hydraulic pressure pressurized by 70 increases.

すなわち、背圧弁66は、液化ガス充填配管経路40により充填される液化ガスが容積式流量計64において気化しないように、ポンプ70により加圧された充填圧力が液化ガスの飽和蒸気圧力よりも上回る設定値以上になったとき開弁するように設定されている。   That is, the back pressure valve 66 is configured so that the filling pressure pressurized by the pump 70 exceeds the saturated vapor pressure of the liquefied gas so that the liquefied gas filled by the liquefied gas filling pipe path 40 is not vaporized in the positive displacement flow meter 64. It is set to open when the set value is exceeded.

ここで、上記のように構成された液化ガス充填システム10による液化ガスの充填終了後の流量演算について説明する。   Here, the calculation of the flow rate after completion of the liquefied gas filling by the liquefied gas filling system 10 configured as described above will be described.

充填終了に伴い作業員がディスペンサ60に設けられた充填停止スイッチ釦96を押してオンにする。制御回路90は、充填停止信号によりポンプ70を停止し、第1の開閉弁V1を閉弁する。次いで、制御回路90は、容積式流量計64より出力された流量パルスを読み込むことで燃料タンク30に充填された液化ガス(液)の流量を充填量として演算し、演算結果の充填量を記憶すると共に、流量表示器92に充填量を表示する。   Upon completion of filling, the worker presses a filling stop switch button 96 provided on the dispenser 60 to turn it on. The control circuit 90 stops the pump 70 by the filling stop signal and closes the first on-off valve V1. Next, the control circuit 90 reads the flow rate pulse output from the positive displacement flow meter 64 to calculate the flow rate of the liquefied gas (liquid) filled in the fuel tank 30 as the filling amount, and stores the filling amount as the calculation result. At the same time, the filling amount is displayed on the flow rate display 92.

この液化ガス充填システム10においては、充填開始前に液化ガス貯槽20の気相領域と燃料タンク30の気相領域との間が気相領域均圧配管経路50により連通されるため、液化ガス貯槽20と燃料タンク30との圧力差がなくなり、ポンプ70の吐出圧力を充填するための圧力として有効に活かせる。   In this liquefied gas filling system 10, since the gas phase region of the liquefied gas storage tank 20 and the gas phase region of the fuel tank 30 are communicated by the gas phase region equalizing piping path 50 before the start of filling, the liquefied gas storage tank The pressure difference between the fuel tank 20 and the fuel tank 30 is eliminated, and the pressure for filling the discharge pressure of the pump 70 can be effectively utilized.

また、ポンプ70の吐出圧力により液充填が行われると共に、充填量に等しい体積の燃料タンク30内のベーパが気相領域均圧配管経路50を介して液化ガス貯槽20に移動する。そのため、燃料タンク30の気相領域におけるベーパの液化は発生せず、ベーパの液化潜熱による内圧上昇は発生しない。従って、液化ガス貯槽20内の液化ガスを燃料タンク30に充填する過程における充填流量の低下は、防止されることになる。   Further, liquid filling is performed by the discharge pressure of the pump 70, and vapor in the fuel tank 30 having a volume equal to the filling amount moves to the liquefied gas storage tank 20 via the gas phase region equalizing pipe path 50. Therefore, vapor liquefaction in the gas phase region of the fuel tank 30 does not occur, and an increase in internal pressure due to vapor liquefaction latent heat does not occur. Therefore, a decrease in the filling flow rate in the process of filling the fuel tank 30 with the liquefied gas in the liquefied gas storage tank 20 is prevented.

液化ガスの充填は、燃料タンク30内に設けられた過充填防止弁31の所定充填量検知による弁閉止により終了する。   The filling of the liquefied gas is completed by closing the valve by detecting the predetermined filling amount of the overfilling prevention valve 31 provided in the fuel tank 30.

特開2000−291889号公報JP 2000-291889 A

しかしながら、上記従来の液化ガス充填システムでは、液化ガスの充填により、燃料タンク30の過充填防止弁31が液面上昇により閉弁動作した場合、所謂ウォーターハンマ(水撃)現象による衝撃が発生することにより、液化ガス充填配管経路40に配された充填制御を行なう各機器の故障を引き起こすおそれがある。   However, in the above-described conventional liquefied gas filling system, when the overfilling prevention valve 31 of the fuel tank 30 is closed due to rising of the liquid level due to filling of the liquefied gas, an impact due to a so-called water hammer phenomenon occurs. As a result, there is a risk of causing a failure of each device that performs the filling control arranged in the liquefied gas filling piping path 40.

このような所謂ウォーターハンマ(水撃)現象による衝撃を緩和する方法としては、例えば、過充填防止弁31が閉弁する前に液化ガスの充填流量を減少させることが考えられるが、燃料タンク30の液面位置が残量と充填流量との関係からどのように変化するのか分からないので、どのタイミングで液化ガスの充填流量を絞ると良いのかが不明である。例えば、充填流量を絞るタイミングが遅れると、所謂ウォーターハンマ(水撃)現象による衝撃を解消することができなくなり、充填流量を絞るタイミングが速すぎると、小流量による充填時間が長くなって燃料タンク30への充填完了が遅れるという問題が生じる。   As a method for mitigating the impact caused by the so-called water hammer phenomenon, for example, it is conceivable to reduce the filling flow rate of the liquefied gas before the overfilling prevention valve 31 is closed. Since it is not known how the liquid surface position changes from the relationship between the remaining amount and the filling flow rate, it is unclear at what timing the filling flow rate of the liquefied gas should be reduced. For example, if the timing for reducing the filling flow rate is delayed, it is impossible to eliminate the impact caused by the so-called water hammer phenomenon, and if the timing for reducing the filling flow rate is too fast, the filling time for the small flow rate becomes longer and the fuel tank There is a problem that the completion of filling 30 is delayed.

そこで、本発明は上記事情に鑑み、上記課題を解決した液化ガス充填システムを提供することを目的とする。   Then, in view of the said situation, this invention aims at providing the liquefied gas filling system which solved the said subject.

上記課題を解決するため、本発明は以下のような手段を有する。
(1)本発明は、液化ガスが充填される燃料タンクと、該燃料タンクの液面位置が過充填防止位置に達したときに閉弁する過充填防止弁と、前記燃料タンクの液面高さ位置を検出する液面検出手段と、該液面検出手段により検出された液面検出データを送信する送信手段とを有する車両と、液化ガスが貯蔵された液化ガス貯槽と、一端が該液化ガス貯槽の液相領域に接続され、他端が前記燃料タンクの液相領域に接続される液化ガス充填経路と、一端が前記液化ガス貯槽の気相領域に接続され、他端が前記燃料タンクの気相領域に接続される気相領域均圧化経路と、前記液化ガスを加圧することにより前記液化ガス貯槽内の液化ガスを前記液化ガス充填経路を介して前記燃料タンクへ供給する加圧手段と、前記液化ガス充填経路に配された充填用開閉弁と、前記気相領域均圧化経路に配された均圧用開閉弁と、前記送信手段により送信された液面検出データを受信する受信手段と、前記液化ガス貯槽の液化ガスを前記燃料タンクへ充填開始する際に操作される充填開始操作部と、前記燃料タンクに充填される液化ガスの充填量を制御する制御手段と、を備え、
前記制御手段は、
前記充填開始操作部からの充填開始信号により前記充填用開閉弁及び前記均圧用開閉弁を開弁させて前記燃料タンクへの液化ガス充填を開始する開弁制御手段と、前記液面検出手段により検出された液面検出データを受信し、前記液面検出データに基づく前記燃料タンクの液面が前記過充填防止位置よりも低い所定位置に達したか否かを判別する液面位置判別手段と、前記液面位置判別手段により前記燃料タンクの液面が前記所定位置に達したと判別された場合には、前記充填用開閉弁と前記均圧用開閉弁とのうち少なくとも何れか一方の弁開度を閉弁側に絞り、前記燃料タンクへの充填流量を減少させる閉弁制御手段と、を有することを特徴とする。
(2)前記閉弁制御手段は、前記液面検出データに基づく前記燃料タンクへの充填可能量が所定値未満になったとき、前記均圧用開閉弁を閉弁することを特徴とする。
In order to solve the above problems, the present invention has the following means.
(1) The present invention includes a fuel tank filled with liquefied gas, an overfill prevention valve that closes when the liquid level of the fuel tank reaches an overfill prevention position, and a liquid level of the fuel tank. A vehicle having a liquid level detection means for detecting the position and a transmission means for transmitting the liquid level detection data detected by the liquid level detection means, a liquefied gas storage tank in which liquefied gas is stored, and one end of the liquefied gas A liquefied gas filling path connected to the liquid phase region of the gas storage tank, the other end connected to the liquid phase region of the fuel tank, one end connected to the gas phase region of the liquefied gas storage tank, and the other end A gas phase region equalizing path connected to the gas phase region, and pressurization for supplying the liquefied gas in the liquefied gas storage tank to the fuel tank via the liquefied gas filling channel by pressurizing the liquefied gas Means and a charge disposed in the liquefied gas filling path On-off valve, a pressure equalizing on-off valve arranged in the gas-phase region equalizing path, a receiving means for receiving liquid level detection data transmitted by the transmitting means, and a liquefied gas in the liquefied gas storage tank A filling start operation unit operated when starting filling the fuel tank, and a control means for controlling a filling amount of the liquefied gas filled in the fuel tank,
The control means includes
A valve opening control means for opening the filling on-off valve and the pressure equalizing on-off valve in response to a filling start signal from the filling start operating section to start filling the fuel tank with liquefied gas; and the liquid level detecting means. Liquid level position determination means for receiving the detected liquid level detection data and determining whether or not the liquid level of the fuel tank based on the liquid level detection data has reached a predetermined position lower than the overfilling prevention position; When the liquid level position determining means determines that the liquid level of the fuel tank has reached the predetermined position, at least one of the filling on-off valve and the pressure equalizing on-off valve is opened. And a valve closing control means for restricting the degree to the valve closing side and reducing the filling flow rate into the fuel tank.
(2) The valve closing control means closes the pressure equalizing on / off valve when a fuel tank filling amount based on the liquid level detection data becomes less than a predetermined value.

本発明によれば、液面検出手段により検出された液面検出データを受信し、液面検出データに基づく燃料タンクの液面が過充填防止位置よりも低い所定位置に達したと判別された場合には、充填開閉弁と均圧開閉弁とのうち少なくとも何れか一方の弁開度を閉弁側に絞り、燃料タンクへの充填流量を減少させるため、燃料タンクの過充填防止弁の閉弁動作による所謂ウォーターハンマ(水撃)現象による衝撃を小さくして充填制御を行なう各機器が受ける衝撃による影響を軽減することが可能になる。   According to the present invention, the liquid level detection data detected by the liquid level detection means is received, and it is determined that the liquid level of the fuel tank based on the liquid level detection data has reached a predetermined position lower than the overfill prevention position. In this case, the overfill prevention valve of the fuel tank is closed to reduce the filling flow rate to the fuel tank by reducing the opening of at least one of the filling on-off valve and the pressure equalizing on-off valve to the valve closing side. It is possible to reduce the impact due to the impact received by each device that performs filling control by reducing the impact due to the so-called water hammer phenomenon caused by the valve operation.

また、本発明によれば、燃料タンクへの充填可能量が所定未満になったとき、均圧用開閉弁を閉弁するため、液充填と共に気相領域の圧力が徐々に上昇することにより、液充填を停止する場合よりも弁開度を制御することなく充填流量が徐々に減少することになり、所謂ウォーターハンマ(水撃)現象による衝撃を小さくできると共に、弁制御を簡略化することができる。   Further, according to the present invention, when the amount that can be charged into the fuel tank becomes less than a predetermined amount, the pressure equalizing on / off valve is closed, so that the pressure in the gas phase region gradually increases with liquid filling, The filling flow rate is gradually reduced without controlling the valve opening as compared with the case of stopping the filling, so that the impact caused by the so-called water hammer phenomenon can be reduced and the valve control can be simplified. .

従来の充填方式を用いた液化ガス充填システムの系統図である。It is a systematic diagram of the liquefied gas filling system using the conventional filling system. 本発明による液化ガス充填システムの一実施例を示す系統図である。It is a systematic diagram which shows one Example of the liquefied gas filling system by this invention. 制御回路が実行する制御処理を説明するためのフローチャートである。It is a flowchart for demonstrating the control processing which a control circuit performs.

以下、図面を参照して本発明を実施するための形態について説明する。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings.

図2は本発明による液化ガス充填システムの一実施例を示す系統図である。尚、図2において、前述した図1に示す部分と共通部分には、同一符号を付してその説明を省略する。図2に示されるように、液化ガス充填システム100は、ディスペンサ60の内部に配された液化ガス充填配管経路40に、容積式流量計64に流入する液化ガスの温度T1を検知する温度検知器110と、第1の開閉弁V1(充填用開閉弁)の上流側と下流側とをバイパスするバイパス管路44に配された電磁弁からなる第3の開閉弁V5(充填用開閉弁)とを有する。   FIG. 2 is a system diagram showing an embodiment of the liquefied gas filling system according to the present invention. In FIG. 2, the same parts as those shown in FIG. As shown in FIG. 2, the liquefied gas filling system 100 is a temperature detector that detects the temperature T1 of the liquefied gas flowing into the positive displacement flow meter 64 in the liquefied gas filling piping path 40 disposed inside the dispenser 60. 110, and a third on-off valve V5 (filling on-off valve) comprising an electromagnetic valve arranged in a bypass pipe 44 that bypasses the upstream side and the downstream side of the first on-off valve V1 (filling on-off valve). Have

また、第1の開閉弁V1と第3の開閉弁V5は、液化ガス充填配管経路40に並列接続されており、時間差をもって個別に開弁または閉弁するように開閉制御される。また、第3の開閉弁V5の流路(口径)は、第1の開閉弁V1よりも小径であるので、充填可能な流量Q5が第1の開閉弁V1の流量Q1よりも少ない(Q5<Q1)。   Further, the first on-off valve V1 and the third on-off valve V5 are connected in parallel to the liquefied gas filling piping path 40, and are controlled to open or close individually with a time difference. Further, since the flow path (port diameter) of the third on-off valve V5 is smaller than that of the first on-off valve V1, the chargeable flow rate Q5 is smaller than the flow rate Q1 of the first on-off valve V1 (Q5 < Q1).

そのため、燃料タンク30への液化ガスの充填開始時は、第3の開閉弁V5のみが開弁されて小流量Q5で充填され、所定時間経過後に第1の開閉弁V1に開弁すると流量が(Q5+Q1)に増大し、最大流量による充填が行なわれる。また、充填停止時は、第1の開閉弁V1が先に閉弁されて充填流量が最大流量(Q5+Q1)から小流量Q5に減少され、所定時間経過後に第3の開閉弁V5が閉弁されることで充填流量がゼロになる。よって、第1の開閉弁V1と第3の開閉弁V5の開弁及び閉弁のタイミングを所定時間ずつずらすことにより、段階的に充填流量を増大または減少させる二段開閉弁と同様な流量制御が行なわれる。   Therefore, at the start of filling of the liquefied gas into the fuel tank 30, only the third on-off valve V5 is opened and filled with a small flow rate Q5, and the flow rate is increased when the first on-off valve V1 is opened after a predetermined time has elapsed. It increases to (Q5 + Q1), and filling is performed with the maximum flow rate. When the filling is stopped, the first opening / closing valve V1 is closed first, the filling flow rate is reduced from the maximum flow rate (Q5 + Q1) to the small flow rate Q5, and the third opening / closing valve V5 is closed after a predetermined time has elapsed. As a result, the filling flow rate becomes zero. Therefore, the flow rate control similar to that of the two-stage on-off valve that gradually increases or decreases the filling flow rate by shifting the opening and closing timings of the first on-off valve V1 and the third on-off valve V5 by a predetermined time. Is done.

また、車両80の燃料タンク30には、液面センサからなる液面検出手段190が設けられている。液面検出手段190により計測された液面検出データは、例えば、無線装置(送信手段)200により無線信号で送信される。本実施例では、燃料タンク30の全容積に対して充填率85%が最大充填量である。そのため、液面検出手段190は、充填率75%に達したときに液面検出信号Lを出力し、充填率85%に達したときに液面検出信号Hを出力する。すなわち、液面検出手段190は、燃料タンク30の液面が過充填防止位置よりも低い所定位置(充填率75%)に達したときに液面検出信号Lを出力し、燃料タンク30の液面が過充填防止位置(充填率85%)に達したときに液面検出信号Hを出力する。   Further, the fuel tank 30 of the vehicle 80 is provided with a liquid level detecting means 190 including a liquid level sensor. The liquid level detection data measured by the liquid level detection unit 190 is transmitted as a radio signal by the radio apparatus (transmission unit) 200, for example. In this embodiment, the maximum filling amount is a filling rate of 85% with respect to the entire volume of the fuel tank 30. Therefore, the liquid level detection means 190 outputs the liquid level detection signal L when the filling rate reaches 75%, and outputs the liquid level detection signal H when the filling rate reaches 85%. That is, the liquid level detection means 190 outputs the liquid level detection signal L when the liquid level of the fuel tank 30 reaches a predetermined position (filling rate 75%) lower than the overfill prevention position, and the liquid level detection signal L is output. When the surface reaches the overfilling prevention position (filling rate 85%), the liquid level detection signal H is output.

制御回路90は、ディスペンサ60の上部に設けられた無線装置(受信手段)210により車両80の無線装置200から送信された燃料タンク30の液面検出データを受信し、受信した液面検出データに基づいて各開閉弁V1,V4,V5の弁開度を調節し、開弁または閉弁させる制御をすべく制御信号を出力する。   The control circuit 90 receives the liquid level detection data of the fuel tank 30 transmitted from the radio device 200 of the vehicle 80 by the radio device (reception means) 210 provided on the upper part of the dispenser 60, and converts the received liquid level detection data into the received liquid level detection data. Based on this, the opening degree of each of the on-off valves V1, V4, V5 is adjusted, and a control signal is output to control to open or close the valves.

制御回路90は、例えば、磁気ディスク装置あるいはICメモリなどの記憶手段を有する記憶部180に接続されており、記憶部180に格納された各制御プログラム及び各データやパラメータを読み込み、演算処理を行なう。   The control circuit 90 is connected to a storage unit 180 having storage means such as a magnetic disk device or an IC memory, for example, reads each control program, each data and parameter stored in the storage unit 180, and performs arithmetic processing. .

また、制御回路90は、充填用開閉弁としての第1の開閉弁V1、第3の開閉弁V5及び均圧用開閉弁としての第2の開閉弁V4を開閉制御することにより燃料タンク30への液化ガスの充填制御を行う充填制御部140と、容積式流量計64から出力される流量パルスを積算して燃料タンク30に充填された液化ガスの充填量を演算する充填量演算部150とを有する。   Further, the control circuit 90 controls the opening and closing of the first on-off valve V1, the third on-off valve V5 as the filling on-off valve, and the second on-off valve V4 as the pressure equalizing on-off valve, thereby controlling the fuel tank 30. A filling control unit 140 that performs filling control of the liquefied gas, and a filling amount calculation unit 150 that calculates the filling amount of the liquefied gas filled in the fuel tank 30 by integrating the flow rate pulses output from the positive displacement flow meter 64. Have.

さらに、充填制御部140は、開弁制御手段141と、液面位置判別手段142と、閉弁制御手段143とを有する。開弁制御手段141は、充填開始スイッチ釦94(充填開始操作部)からの充填開始信号により第1の開閉弁V1、第3の開閉弁V5(充填用開閉弁)及び第2の開閉弁V4(均圧用開閉弁)を段階的に開弁させて燃料タンク30への液化ガス充填を開始し、ガス充填流量を小流量から大流量に切替える。液面位置判別手段142は、液面検出手段190により検出された液面検出データを受信すると共に、当該液面検出データに基づく燃料タンク30の液面が過充填防止位置よりも低い所定位置(充填率75%)に達したか否かを判別する。   Further, the filling control unit 140 includes a valve opening control unit 141, a liquid level position determination unit 142, and a valve closing control unit 143. The valve opening control means 141 is operated by the first on-off valve V1, the third on-off valve V5 (filling on-off valve), and the second on-off valve V4 in response to a filling start signal from the filling start switch button 94 (filling start operation unit). The pressure equalizing on / off valve is opened stepwise to start filling the fuel tank 30 with liquefied gas, and the gas filling flow rate is switched from a small flow rate to a large flow rate. The liquid level position determination unit 142 receives the liquid level detection data detected by the liquid level detection unit 190, and the liquid level of the fuel tank 30 based on the liquid level detection data is lower than the overfilling prevention position (a predetermined position). It is determined whether or not the filling rate has reached 75%.

閉弁制御手段143は、液面位置判別手段142により燃料タンク30の液面が過充填防止位置よりも低い所定位置(充填率75%)に達したと判別された場合には、第1の開閉弁V1または第2の開閉弁V4の弁開度を閉弁側に絞り、または閉弁するための制御信号を出力し、燃料タンク30への充填流量を減少させる。このように、燃料タンク30への充填流量を減少させることにより、燃料タンク30の液面が過充填防止位置に(充填率85%)に達したときの過充填防止弁31の閉弁動作による所謂ウォーターハンマ(水撃)現象による衝撃を小さくできる。   When the liquid level position determining unit 142 determines that the liquid level of the fuel tank 30 has reached a predetermined position (filling rate 75%) lower than the overfill preventing position, the valve closing control unit 143 A control signal for restricting the valve opening degree of the on-off valve V1 or the second on-off valve V4 to the valve closing side or for closing the valve is output, and the filling flow rate to the fuel tank 30 is decreased. In this way, by reducing the filling flow rate to the fuel tank 30, the overfilling prevention valve 31 is closed when the liquid level of the fuel tank 30 reaches the overfilling prevention position (filling rate 85%). The impact due to the so-called water hammer phenomenon can be reduced.

また、閉弁制御手段143は、液面検出データに基づく燃料タンク30への充填可能量が所定値未満(充填率75%)になったとき、均圧用の第2の開閉弁V4を閉弁するための制御信号を出力する。このように、燃料タンク30の充填率75%で第2の開閉弁V4が閉弁することにより、燃料タンク30の気相領域のベーパが排出されなくなる。このため、この後の燃料タンク30においては、液化ガスの充填により液相領域の液面が上昇するのにつれて気相領域の圧力が徐々に上昇するため、燃料タンク30の圧力上昇によって液化ガスの充填圧力との圧力差が次第に減少する。よって、液化ガスの充填流量が徐々に減少するため、過充填防止弁31の閉弁動作による所謂ウォーターハンマ(水撃)現象による衝撃を緩和することができる。   Further, the valve closing control means 143 closes the pressure equalizing second on-off valve V4 when the fillable amount into the fuel tank 30 based on the liquid level detection data becomes less than a predetermined value (filling rate 75%). A control signal for outputting is output. As described above, when the second on-off valve V4 is closed at the filling rate of 75% of the fuel tank 30, vapor in the gas phase region of the fuel tank 30 is not discharged. For this reason, in the fuel tank 30 thereafter, the pressure in the gas phase region gradually increases as the liquid level in the liquid phase region rises due to the filling of the liquefied gas. The pressure difference from the filling pressure gradually decreases. Therefore, since the filling flow rate of the liquefied gas gradually decreases, the impact caused by the so-called water hammer phenomenon caused by the closing operation of the overfilling prevention valve 31 can be reduced.

ここで、液化ガス充填システム100において、燃料タンク30へ液化ガスを充填する際の操作手順及び制御処理について説明する。   Here, in the liquefied gas filling system 100, an operation procedure and control processing when the fuel tank 30 is filled with liquefied gas will be described.

車両80への液化ガスを充填する際の作業としては、まず、作業員が充填用接続カップリング34を燃料タンク30の液相側接続口32に接続し、さらに均圧用接続カップリング38を燃料タンク30の気相側接続口36に接続する。そして、作業員は、開閉弁V2,V3を開弁操作する。これで、液化ガス充填開始前の準備作業が終わり、異常がないことを確認してディスペンサ60の充填開始スイッチ釦94をオンに操作する。   As an operation for filling the vehicle 80 with the liquefied gas, first, an operator connects the filling connection coupling 34 to the liquid phase side connection port 32 of the fuel tank 30, and further connects the pressure equalization connection coupling 38 to the fuel. Connected to the gas phase side connection port 36 of the tank 30. Then, the worker opens the on-off valves V2 and V3. This completes the preparatory work before the start of liquefied gas filling, confirms that there is no abnormality, and turns on the filling start switch button 94 of the dispenser 60.

次に、ディスペンサ60の制御回路90が実行する液化ガス充填制御処理について説明する。図3はディスペンサ60の制御回路90が実行する液化ガス充填制御処理を説明するためのフローチャートである。尚、制御回路90では、車両80の液面検出手段190によって検出された液面検出データの受信処理も並行して行なっているが、その説明は省略する。   Next, the liquefied gas filling control process executed by the control circuit 90 of the dispenser 60 will be described. FIG. 3 is a flowchart for explaining the liquefied gas filling control process executed by the control circuit 90 of the dispenser 60. In the control circuit 90, reception processing of the liquid level detection data detected by the liquid level detection means 190 of the vehicle 80 is also performed in parallel, but the description thereof is omitted.

図3に示されるように、制御回路90は、S11において、ディスペンサ60の充填開始スイッチ釦94がオンに操作されると、S12に進み、第2の開閉弁V4(均圧用開閉弁)を開弁する(開弁制御手段)。続いて、S13に進み、ポンプ70を起動すると共に、液化ガス貯槽20の液化ガスを加圧して液化ガス充填配管経路40への液化ガス充填可能状態にする。   As shown in FIG. 3, when the charging start switch button 94 of the dispenser 60 is turned on in S11, the control circuit 90 proceeds to S12 and opens the second on-off valve V4 (pressure equalizing on-off valve). Valve (opening control means). Then, it progresses to S13, and while starting the pump 70, the liquefied gas of the liquefied gas storage tank 20 is pressurized, and the liquefied gas filling piping path | route 40 can be filled with the liquefied gas.

さらに、S14では、充填用副開閉弁としての第3の開閉弁V5を開弁する(開弁制御手段)。この第3の開閉弁V5は、流路が小径であるので、第3の開閉弁V5の開弁により燃料タンク30に対して小流量による液化ガスの充填が開始される。   Further, in S14, the third on-off valve V5 as the filling sub on-off valve is opened (valve opening control means). Since the flow path of the third on-off valve V5 is small, filling of the liquefied gas at a small flow rate into the fuel tank 30 is started by opening the third on-off valve V5.

次のS15では、充填開始からの経過時間が予め設定された所定時間に達したか否かをチェックする。S15において、充填開始からの経過時間が予め設定された所定時間に達していないときは、S16に進み、車両80の液面検出手段190により検出された充填率75%(燃料タンク30の容積に対する充填量の比率)の液面検出信号Lが無線装置200,210を介して入力されたか否かをチェックする(液面位置判別手段)。S16において、液面検出手段190により充填率75%の液面検出信号Lが入力されないときは、上記S15の処理に戻り、S15、S16の処理を繰り返す。   In next S15, it is checked whether or not the elapsed time from the start of filling has reached a predetermined time set in advance. In S15, when the elapsed time from the start of filling does not reach the predetermined time set in advance, the process proceeds to S16, and the filling rate detected by the liquid level detecting means 190 of the vehicle 80 is 75% (relative to the volume of the fuel tank 30). It is checked whether or not the liquid level detection signal L of the ratio of the filling amount is input via the wireless devices 200 and 210 (liquid level position determining means). In S16, when the liquid level detection signal L with a filling rate of 75% is not input by the liquid level detection means 190, the process returns to S15 and the processes of S15 and S16 are repeated.

また、S15において、充填開始からの経過時間が予め設定された所定時間に達したときは、S17に進み、充填用主開閉弁としての第1の開閉弁V1を開弁する(開弁制御手段)。これにより、燃料タンク30への充填流量が増大し、大流量による液化ガスの充填が行なわれる。   In S15, when the elapsed time from the start of filling reaches a predetermined time set in advance, the process proceeds to S17, and the first on-off valve V1 as the main on-off valve for filling is opened (valve opening control means). ). Thereby, the filling flow rate to the fuel tank 30 is increased, and the liquefied gas is filled with a large flow rate.

続いて、S18では、車両80の液面検出手段190により検出された充填率75%の液面検出信号Lが無線装置200,210を介して入力されたか否かをチェックする(液面位置判別手段)。S18において、充填率75%の液面検出信号Lが入力されるまで、大流量による液化ガスの充填が行なわれ、S17,S18の処理を繰り返す。   Subsequently, in S18, it is checked whether or not a liquid level detection signal L with a filling rate of 75% detected by the liquid level detection means 190 of the vehicle 80 is input via the wireless devices 200 and 210 (liquid level position determination). means). In S18, the liquefied gas is filled with a large flow rate until the liquid level detection signal L with a filling rate of 75% is input, and the processes in S17 and S18 are repeated.

また、S18において、充填率75%の液面検出信号Lが入力されると、S19に進み、均圧用の第2の開閉弁V4を閉弁する(閉弁制御手段)。このように燃料タンク30の充填率75%で第2の開閉弁V4を閉弁することにより、燃料タンク30の気相領域のベーパが排出されなくなるため、この後の燃料タンク30においては、液化ガスの充填により液相領域の液面が上昇するのにつれて気相領域の圧力が徐々に上昇する。そのため、燃料タンク30の圧力上昇によって液化ガスの充填圧力との圧力差が次第に減少することになり、液化ガスの充填流量が徐々に絞られる。よって、充填率の上昇と共に、液化ガスの充填流量は自動的に減少する。また、上記S19において、第2の開閉弁V4の弁開度を閉弁側に絞る(例えば、弁開度を100%から20%〜5%に変更する)ように切替えても良い。   In S18, when the liquid level detection signal L having a filling rate of 75% is input, the process proceeds to S19, where the second pressure equalizing second on-off valve V4 is closed (valve closing control means). Since the vapor in the gas phase region of the fuel tank 30 is not discharged by closing the second on-off valve V4 with the filling rate of 75% in the fuel tank 30 in this way, the liquefaction in the fuel tank 30 thereafter As the liquid level in the liquid phase region rises due to gas filling, the pressure in the gas phase region gradually increases. Therefore, the pressure difference from the filling pressure of the liquefied gas gradually decreases due to the pressure increase in the fuel tank 30, and the filling flow rate of the liquefied gas is gradually reduced. Therefore, the filling flow rate of the liquefied gas automatically decreases as the filling rate increases. In S19, the valve opening degree of the second on-off valve V4 may be switched to the valve closing side (for example, the valve opening degree is changed from 100% to 20% to 5%).

また、前述したS16において、充填率75%の液面検出信号Lが入力されたときは、第3の開閉弁V5のみによる小流量での充填により液面が所定充填位置(充填率75%の液面位置)に達したため、上記S17,S18の処理を省略してS19の処理を行なう。すなわち、燃料タンク30に残留していた液化ガスの液面位置が所定充填位置(充填率75%の液面位置)に近い場合には、第3の開閉弁V5のみによる充填でも充填率75%の液面検出信号Lが液面検出手段190より検出される。この場合も、前述したS18の場合と同様に、第2の開閉弁V4を閉弁することにより、燃料タンク30の気相領域のベーパが排出されなくなる。そのため、燃料タンク30においては、液化ガスの充填により液相領域の液面が上昇するのにつれて気相領域の圧力が徐々に上昇して液化ガスの充填圧力との圧力差が次第に減少することになり、液化ガスの充填流量が徐々に絞られる。よって、充填率の上昇と共に、液化ガスの充填流量は自動的に減少する。   When the liquid level detection signal L having a filling rate of 75% is input in S16 described above, the liquid level is filled at a predetermined filling position (filling rate of 75%) by filling with a small flow rate only by the third on-off valve V5. Since the liquid level position has been reached, the processes of S17 and S18 are omitted, and the process of S19 is performed. That is, when the liquid level position of the liquefied gas remaining in the fuel tank 30 is close to a predetermined filling position (liquid level position with a filling rate of 75%), the filling rate is 75% even when only the third on-off valve V5 is filled. The liquid level detection signal L is detected by the liquid level detection means 190. Also in this case, as in the case of S18 described above, the vapor in the gas phase region of the fuel tank 30 is not discharged by closing the second on-off valve V4. Therefore, in the fuel tank 30, as the liquid level in the liquid phase region rises due to the filling of the liquefied gas, the pressure in the gas phase region gradually increases and the pressure difference from the filling pressure of the liquefied gas gradually decreases. Thus, the filling flow rate of the liquefied gas is gradually reduced. Therefore, as the filling rate increases, the filling flow rate of the liquefied gas automatically decreases.

次のS20では、燃料タンク30の充填可能量が燃料タンク30の全容積に対する残りの充填率10%(燃料タンク30の最大充填率を85%とした場合の充填可能な残りの充填量)に低下したので、第1の開閉弁V1を閉弁とする(閉弁制御手段)。これにより、充填率75%から満充填となる充填率85%まで、第3の開閉弁V5のみの小流量による充填が行なわれる。   In the next S20, the refillable amount of the fuel tank 30 is set to the remaining filling rate of 10% with respect to the total volume of the fuel tank 30 (the remaining refillable amount when the maximum filling rate of the fuel tank 30 is 85%). Since it has decreased, the first on-off valve V1 is closed (valve closing control means). As a result, only the third on-off valve V5 is filled with a small flow rate from a filling rate of 75% to a full filling rate of 85%.

このように充填流量が小流量に減少しているので、例えば、第3の開閉弁V5のみの小流量による充填中に過充填防止弁31が閉弁動作しても所謂ウォーターハンマ(水撃)現象による衝撃が緩和される。また、S20において、第1の開閉弁V1の弁開度を閉弁側に絞る(例えば、弁開度を100%から20%〜5%に変更する)ように切替えても良い。   Thus, since the filling flow rate is reduced to a small flow rate, for example, even if the overfill prevention valve 31 is closed during filling with the small flow rate of only the third on-off valve V5, so-called water hammer (water hammer). Impact from the phenomenon is alleviated. In S20, the valve opening degree of the first on-off valve V1 may be switched to the valve closing side (for example, the valve opening degree is changed from 100% to 20% to 5%).

続いて、S21では、車両80の液面検出手段190により検出された充填率85%(燃料タンク30の容積に対する満充填量)の液面検出信号Hが無線装置200,210を介して入力されたか否かをチェックする。S21において、液面検出手段190により検出された充填率85%の液面検出信号Hが入力されるまで、液化ガスの充填を行なう。尚、燃料タンク30には、過充填防止弁31が設けられており、液面高さが充填率85%の液面に達すると共に、過充填防止弁31は閉弁動作する。この場合には、燃料タンク30への充填流量が既に絞られているので、過充填防止弁31の閉弁動作による所謂ウォーターハンマ(水撃)現象による衝撃が緩和される。   Subsequently, in S21, a liquid level detection signal H having a filling rate of 85% (full filling amount with respect to the volume of the fuel tank 30) detected by the liquid level detecting means 190 of the vehicle 80 is input via the radio devices 200 and 210. Check whether or not. In S21, the liquefied gas is charged until the liquid level detection signal H with the filling rate of 85% detected by the liquid level detecting means 190 is input. The fuel tank 30 is provided with an overfill prevention valve 31. The liquid level height reaches a liquid level with a filling rate of 85%, and the overfill prevention valve 31 is closed. In this case, since the filling flow rate to the fuel tank 30 has already been reduced, the impact caused by the so-called water hammer phenomenon caused by the closing operation of the overfill prevention valve 31 is mitigated.

そして、S21において、充填率85%の液面検出信号Hが入力されると、当該燃料タンク30の充填率が最大値に達したため、S22に進み、満充填完了と判断して第3の開閉弁V5を閉弁して小流量による充填を完了する(閉弁制御手段)。尚、過充填防止弁31がまだ閉弁動作していないときは、過充填防止弁31より第3の開閉弁V5が先に閉弁することになる。この場合でも燃料タンク30への充填流量が既に絞られているので、第3の開閉弁V5の閉弁動作による所謂ウォーターハンマ(水撃)現象による衝撃が緩和される。   In S21, when the liquid level detection signal H having a filling rate of 85% is input, the filling rate of the fuel tank 30 has reached the maximum value. The valve V5 is closed to complete filling with a small flow rate (valve closing control means). When the overfill prevention valve 31 is not yet closed, the third on-off valve V5 is closed before the overfill prevention valve 31. Even in this case, since the filling flow rate to the fuel tank 30 has already been reduced, the impact caused by the so-called water hammer phenomenon caused by the closing operation of the third on-off valve V5 is alleviated.

このように、燃料タンク30の液面が充填率85%の過充填防止位置に達して過充填防止弁31または第3の開閉弁V5を閉弁するときには、既に均圧用の第2の開閉弁V4が閉弁して充填流量が徐々に減少された状態であるので、過充填防止弁31または第3の開閉弁V5を閉弁させたときの所謂ウォーターハンマ(水撃)現象による衝撃が抑制され、充填制御を行なう各機器が受ける衝撃による影響を軽減することができる。   As described above, when the liquid level of the fuel tank 30 reaches the overfilling prevention position with the filling rate of 85% and the overfilling prevention valve 31 or the third on-off valve V5 is closed, the pressure equalizing second on-off valve is already provided. Since V4 is closed and the filling flow rate is gradually reduced, the impact caused by the so-called water hammer phenomenon when the overfill prevention valve 31 or the third on-off valve V5 is closed is suppressed. Thus, it is possible to reduce the influence of the impact received by each device that performs filling control.

上記実施例では、ポンプによって液化ガスを加圧して燃料タンクに充填する充填方式を例に挙げて説明したが、これに限らず、例えば、ポンプ以外の加圧手段(例えば、液化ガス貯槽20を高所に設置して位置エネルギを利用する方法や液化ガス貯槽20を加熱して気相領域の圧力を上昇させて圧力差により充填する充填方式など)を用いても良いのは勿論である。   In the above embodiment, the filling method in which the liquefied gas is pressurized by the pump and filled into the fuel tank has been described as an example. However, the present invention is not limited to this. For example, pressurizing means other than the pump (for example, the liquefied gas storage tank 20 Of course, a method of using the potential energy by installing at a high place, a filling method in which the liquefied gas storage tank 20 is heated to increase the pressure in the gas phase region and filled by a pressure difference, or the like may be used.

また、上記実施例では、液面検出手段190は、充填率75%に達したときに液面検出信号Lを出力し、充填率85%に達したときに液面検出信号Hを出力するものを採用しており、制御回路90は液面検出手段190より液面検出信号Lが入力されると、各開閉弁V1,V4,V5の弁開度を制御することにより燃料タンク30への充填流量を絞るようにしているが、本発明の液面検出手段190を充填率に応じた液面検出信号を出力するものに代えるとともに、制御回路90では液面検出手段190より入力される液面検出信号から充填率を判断し、この充填率が75%及び85%に達したと判断した時点で各開閉弁V1,V4,V5の弁開度を制御することにより燃料タンク30への充填流量を絞るようにしてもよい。   In the above embodiment, the liquid level detection means 190 outputs the liquid level detection signal L when the filling rate reaches 75%, and outputs the liquid level detection signal H when the filling rate reaches 85%. When the liquid level detection signal L is input from the liquid level detection means 190, the control circuit 90 fills the fuel tank 30 by controlling the valve openings of the on-off valves V1, V4, V5. Although the flow rate is reduced, the liquid level detection means 190 of the present invention is replaced with one that outputs a liquid level detection signal corresponding to the filling rate, and the liquid level input from the liquid level detection means 190 in the control circuit 90 The filling rate is determined from the detection signal, and when it is determined that the filling rate has reached 75% and 85%, the opening of each of the on-off valves V1, V4, V5 is controlled to thereby fill the fuel tank 30 with a filling flow rate. You may make it squeeze.

また、上記実施例では、液面検出手段190で検出された充填率が75%に達した時点で均圧用の第2の開閉弁V4と第1の開閉弁V1とを閉弁或いは弁開度を絞ることにより燃料タンク30への充填流量を絞るようにしているが、第2の開閉弁V4と第1の開閉弁V1との何れか一方を閉弁或いは弁開度を絞るようにしても良い。   In the above embodiment, when the filling rate detected by the liquid level detecting means 190 reaches 75%, the pressure equalizing second on-off valve V4 and the first on-off valve V1 are closed or opened. The filling flow rate into the fuel tank 30 is reduced by reducing the valve, but either the second on-off valve V4 or the first on-off valve V1 may be closed or the valve opening may be reduced. good.

更に、上記実施例では、液面検出手段190で検出された充填率が75%に達した時点で均圧用の第2の開閉弁V4と第1の開閉弁V1とを閉弁或いは弁開度を絞ることにより燃料タンク30への充填流量を絞るようにしているが、例えば充填率が65%に達した時点で燃料タンク30への充填流量を絞るようにしても良く、要は、燃料タンク30内へのガス充填が終了する際(燃料タンク30の液面が充填率85%の過充填防止位置に達して過充填防止弁31または第3の開閉弁V5を閉弁する際)の流量が所望の流量以下に低下するようになるように均圧用の第2の開閉弁V4と第1の開閉弁V1とを閉弁或いは弁開度を絞るタイミングを調節するようにしてもよい。   Further, in the above embodiment, when the filling rate detected by the liquid level detecting means 190 reaches 75%, the pressure equalizing second on-off valve V4 and the first on-off valve V1 are closed or opened. The filling flow rate into the fuel tank 30 is reduced by narrowing down, but for example, the filling flow rate into the fuel tank 30 may be reduced when the filling rate reaches 65%. 30 when the gas filling into the gas tank 30 is completed (when the liquid level of the fuel tank 30 reaches the overfilling prevention position where the filling rate is 85% and the overfilling prevention valve 31 or the third on-off valve V5 is closed). May be adjusted so that the pressure equalizing second on-off valve V4 and the first on-off valve V1 are closed or the valve opening is reduced.

30 燃料タンク
32 液相側接続口
36 気相側接続口
40 液化ガス充填配管経路
44 バイパス管路
50 気相領域均圧配管経路
60 ディスペンサ
64 容積式流量計
66 背圧弁
70 ポンプ
80 車両
90 制御回路
94 充填開始スイッチ釦
100 液化ガス充填システム
180 記憶部
190 液面検出手段
200 無線装置(送信手段)
210 無線装置(受信手段)
141 開弁制御手段
142 液面位置判別手段
143 閉弁制御手段
140 充填制御部
150 充填量演算部
30 Fuel tank 32 Liquid phase side connection port 36 Gas phase side connection port 40 Liquefied gas filling piping route 44 Bypass piping 50 Gas phase region equalization piping route 60 Dispenser 64 Positive displacement flow meter 66 Back pressure valve 70 Pump 80 Vehicle 90 Control circuit 94 Fill start switch button 100 Liquefied gas filling system 180 Storage unit 190 Liquid level detection means 200 Wireless device (transmission means)
210 Wireless device (receiving means)
141 Valve opening control unit 142 Liquid level position determining unit 143 Valve closing control unit 140 Filling control unit 150 Filling amount calculation unit

Claims (2)

液化ガスが充填される燃料タンクと、該燃料タンクの液面位置が過充填防止位置に達したときに閉弁する過充填防止弁と、前記燃料タンクの液面高さ位置を検出する液面検出手段と、該液面検出手段により検出された液面検出データを送信する送信手段とを有する車両と、
液化ガスが貯蔵された液化ガス貯槽と、
一端が該液化ガス貯槽の液相領域に接続され、他端が前記燃料タンクの液相領域に接続される液化ガス充填経路と、
一端が前記液化ガス貯槽の気相領域に接続され、他端が前記燃料タンクの気相領域に接続される気相領域均圧化経路と、
液化ガスを加圧することにより前記液化ガス貯槽内の液化ガスを前記燃料タンクへ供給する加圧手段と、
前記液化ガス充填経路に配された充填用開閉弁と、
前記気相領域均圧化経路に配された均圧用開閉弁と、
前記送信手段により送信された液面検出データを受信する受信手段と、
前記液化ガス貯槽の液化ガスを前記燃料タンクへ充填開始する際に操作される充填開始操作部と、
前記燃料タンクに充填される液化ガスの充填量を制御する制御手段と、を備え、
前記制御手段は、
前記充填開始操作部からの充填開始信号により前記充填用開閉弁及び前記均圧用開閉弁を開弁させて前記燃料タンクへの液化ガス充填を開始する開弁制御手段と、
前記液面検出手段により検出された液面検出データを受信し、前記液面検出データに基づく前記燃料タンクの液面が前記過充填防止位置よりも低い所定位置に達したか否かを判別する液面位置判別手段と、
前記液面位置判別手段により前記燃料タンクの液面が前記所定位置に達したと判別された場合には、前記充填開閉弁と前記均圧用開閉弁とのうち少なくとも何れか一方の弁開度を閉弁側に絞り、前記燃料タンクへの充填流量を減少させる閉弁制御手段と、
を有することを特徴とする液化ガス充填システム。
A fuel tank filled with liquefied gas; an overfill prevention valve that closes when the liquid level of the fuel tank reaches an overfill prevention position; and a liquid level that detects a liquid level height position of the fuel tank A vehicle having detection means and transmission means for transmitting the liquid level detection data detected by the liquid level detection means;
A liquefied gas storage tank in which liquefied gas is stored;
A liquefied gas filling path having one end connected to the liquid phase region of the liquefied gas storage tank and the other end connected to the liquid phase region of the fuel tank;
A gas phase region equalizing path in which one end is connected to the gas phase region of the liquefied gas storage tank and the other end is connected to the gas phase region of the fuel tank;
Pressurizing means for supplying the liquefied gas in the liquefied gas storage tank to the fuel tank by pressurizing the liquefied gas;
An on-off valve for filling disposed in the liquefied gas filling path;
A pressure equalizing on-off valve arranged in the gas phase region equalizing path;
Receiving means for receiving the liquid level detection data transmitted by the transmitting means;
A filling start operation unit operated when starting to fill the fuel tank with the liquefied gas in the liquefied gas storage tank;
Control means for controlling the filling amount of the liquefied gas filled in the fuel tank,
The control means includes
A valve opening control means for opening the filling on-off valve and the pressure equalizing on-off valve in accordance with a filling start signal from the filling start operation section to start filling the fuel tank with liquefied gas;
The liquid level detection data detected by the liquid level detection means is received, and it is determined whether or not the liquid level of the fuel tank based on the liquid level detection data has reached a predetermined position lower than the overfill prevention position. Liquid level position determining means;
When the liquid level position determining means determines that the liquid level of the fuel tank has reached the predetermined position, at least one of the filling on-off valve and the pressure equalizing on-off valve is opened. A valve closing control means for restricting to a valve closing side and reducing a filling flow rate to the fuel tank;
A liquefied gas filling system comprising:
前記閉弁制御手段は、前記液面検出データに基づく前記燃料タンクへの充填可能量が所定値未満になったとき、前記均圧用開閉弁を閉弁することを特徴とする請求項1に記載の液化ガス充填システム。   2. The valve closing control means closes the pressure equalizing on / off valve when a fuel tank filling amount based on the liquid level detection data becomes less than a predetermined value. Liquefied gas filling system.
JP2009109397A 2009-04-28 2009-04-28 Liquefied gas filling system Pending JP2010255809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009109397A JP2010255809A (en) 2009-04-28 2009-04-28 Liquefied gas filling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009109397A JP2010255809A (en) 2009-04-28 2009-04-28 Liquefied gas filling system

Publications (1)

Publication Number Publication Date
JP2010255809A true JP2010255809A (en) 2010-11-11

Family

ID=43316942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009109397A Pending JP2010255809A (en) 2009-04-28 2009-04-28 Liquefied gas filling system

Country Status (1)

Country Link
JP (1) JP2010255809A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012112487A (en) * 2010-11-26 2012-06-14 Isuzu Motors Ltd Fuel filling method, and fuel tank electric component
JP2014059040A (en) * 2012-09-19 2014-04-03 Tokiko Techno Kk Liquefied gas supply apparatus
CN114688446A (en) * 2020-12-29 2022-07-01 细美事有限公司 Pressure adjusting device and substrate processing apparatus provided with same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012112487A (en) * 2010-11-26 2012-06-14 Isuzu Motors Ltd Fuel filling method, and fuel tank electric component
JP2014059040A (en) * 2012-09-19 2014-04-03 Tokiko Techno Kk Liquefied gas supply apparatus
CN114688446A (en) * 2020-12-29 2022-07-01 细美事有限公司 Pressure adjusting device and substrate processing apparatus provided with same

Similar Documents

Publication Publication Date Title
WO2015170670A1 (en) Fuel gas filling system and fuel gas filling method
JP5138339B2 (en) Liquefied gas filling device
JP2007024152A (en) Gas supply device
JP6039312B2 (en) Liquefied gas supply system
JP2010255809A (en) Liquefied gas filling system
JP5461791B2 (en) Gas filling method and gas filling apparatus
JP2008025681A (en) High-pressure gas charging device
JP5466118B2 (en) Liquefied gas filling device
JP3628752B2 (en) Gas supply device
JP6133648B2 (en) Liquefied gas supply system
JP2012233493A (en) Device for storing liquefied fuel
JP5087356B2 (en) Liquefied gas filling system
JP4751014B2 (en) Gas filling device
JP3589753B2 (en) Gas supply device
JP5740688B2 (en) Gas supply device
JP2005127430A (en) Gas filling device
JP3904078B2 (en) Gas filling device
JP6429085B2 (en) Gas supply device
JP5243982B2 (en) Liquefied gas supply system
JP5706784B2 (en) Liquefied gas filling system
JP5656416B2 (en) Liquefied gas supply system
JP4612168B2 (en) Fuel filling device
JP4878809B2 (en) Gas supply device
JP2011247302A (en) Compressed natural gas filling device
JP4688539B2 (en) Gas supply device