JP2010224889A - Project management supporting device - Google Patents

Project management supporting device Download PDF

Info

Publication number
JP2010224889A
JP2010224889A JP2009071706A JP2009071706A JP2010224889A JP 2010224889 A JP2010224889 A JP 2010224889A JP 2009071706 A JP2009071706 A JP 2009071706A JP 2009071706 A JP2009071706 A JP 2009071706A JP 2010224889 A JP2010224889 A JP 2010224889A
Authority
JP
Japan
Prior art keywords
man
change
difference
task
hour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009071706A
Other languages
Japanese (ja)
Other versions
JP5468282B2 (en
Inventor
Keiji Mori
敬二 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nomura Research Institute Ltd
Original Assignee
Nomura Research Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nomura Research Institute Ltd filed Critical Nomura Research Institute Ltd
Priority to JP2009071706A priority Critical patent/JP5468282B2/en
Publication of JP2010224889A publication Critical patent/JP2010224889A/en
Application granted granted Critical
Publication of JP5468282B2 publication Critical patent/JP5468282B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To support a supervisor of a project to efficiently comprehend influence of a change in a task implementation plan about the project wherein a plurality of tasks are to be operated. <P>SOLUTION: The project management supporting device 10 includes a Gantt chart storage part 12 storing data before a change and data after the change about a Gantt chart wherein a period and man-hours for each of the tasks of the project are defined; a difference calculation part 24 calculating a difference between man-hours for each task in the Gantt chart before the change and that after the change about a predetermined unit period; and a difference output part 26 outputting data showing the difference to the outside. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

この発明は、データ処理技術に関し、特に、複数のタスクが遂行されるべきプロジェクトの管理を支援する技術に関する。   The present invention relates to a data processing technique, and more particularly to a technique for supporting management of a project in which a plurality of tasks are to be performed.

システム開発等の様々なプロジェクトにおいて、そのプロジェクトにおいて実行されるべき複数のタスクと各タスクの実行期間とを示すガントチャートを用いた進捗状況の管理が広く行われている。   In various projects such as system development, progress management is widely performed using a Gantt chart indicating a plurality of tasks to be executed in the project and an execution period of each task.

特開2006−040211号公報JP 2006-040221 A

大規模システムの開発プロジェクトにおいては多数のタスクが実行される必要があり、一部のタスクの実行計画に変更が生じた場合でも、その影響は多数のタスクに及ぶことがある。その結果、実行計画変更後のガントチャートにおいては、多数のタスクについてその実行担当者や実行予定期間が変更されることがある。その一方で、プロジェクトの管理者が現実的に管理可能なタスク数には限界があるため、プロジェクトの管理者はタスクの実行計画変更の影響を効率的に把握する必要があると本発明者は考えた。   In a large-scale system development project, a large number of tasks need to be executed, and even if a change occurs in the execution plan of some tasks, the effect may affect a large number of tasks. As a result, in the Gantt chart after changing the execution plan, the person in charge of execution and the scheduled execution period may be changed for many tasks. On the other hand, since there is a limit to the number of tasks that can be managed practically by the project manager, the present inventor believes that the project manager needs to efficiently grasp the impact of changing the task execution plan. Thought.

本発明は、発明者の上記認識に基づきなされたものであり、その主たる目的は、複数のタスクが遂行されるべきプロジェクトについて、タスクの実行計画変更による影響をプロジェクトの管理者が効率的に把握できるよう支援する技術を提供することである。   The present invention has been made on the basis of the above-mentioned recognition of the inventor, and its main purpose is to enable the project manager to efficiently grasp the effects of changing the task execution plan for a project in which multiple tasks are to be performed. It is to provide the technology that supports it.

上記課題を解決するために、本発明のある態様のプロジェクト管理支援装置は、所定のプロジェクトにおいて遂行されるべき複数のタスクそれぞれについて、変更前の期間と工数とが定められた変更前のガントチャートを記憶する変更前情報記憶部と、複数のタスクそれぞれについて、変更後の期間と工数とが定められた変更後のガントチャートを記憶する変更後情報記憶部と、変更前のガントチャートを参照して所定の単位期間における各タスクの工数を変更前工数として算出し、変更後のガントチャートを参照して単位期間における各タスクの工数を変更後工数として算出し、変更前工数と変更後工数との差分を算出する差分算出部と、変更前工数と変更後工数との差分を示すデータを外部に出力する差分出力部と、を備える。   In order to solve the above-described problem, a project management support apparatus according to an aspect of the present invention provides a Gantt chart before change in which a period and man-hours before change are determined for each of a plurality of tasks to be performed in a predetermined project. Refer to the pre-change information storage unit for storing the information, the post-change information storage unit for storing the changed Gantt chart in which the changed period and man-hours are determined for each of a plurality of tasks, and the Gantt chart before the change. Calculate the man-hours for each task in a given unit period as pre-change man-hours, refer to the Gantt chart after change, calculate the man-hours for each task in the unit period as post-change man-hours, And a difference output unit for outputting data indicating the difference between the man-hour before change and the man-hour after change to the outside.

なお、以上の構成要素の任意の組合せ、本発明の表現を装置、方法、システム、プログラム、プログラムを格納した記録媒体などの間で変換したものもまた、本発明の態様として有効である。   It should be noted that any combination of the above-described constituent elements and a representation of the present invention converted between an apparatus, a method, a system, a program, a recording medium storing the program, and the like are also effective as an aspect of the present invention.

本発明によれば、複数のタスクが遂行されるべきプロジェクトについて、タスクの実行計画変更による影響をプロジェクトの管理者が効率的に把握できる。   According to the present invention, for a project in which a plurality of tasks are to be performed, the project manager can efficiently grasp the influence of the task execution plan change.

ガントチャートの抜粋を示す図である。It is a figure which shows the excerpt of a Gantt chart. リカバリプラン反映前のガントチャートを示す図である。It is a figure which shows the Gantt chart before a recovery plan reflection. リカバリプラン反映後のガントチャートを示す図である。It is a figure which shows the Gantt chart after recovery plan reflection. 本発明の実施の形態であるPJ管理支援装置の構成を示すブロック図である。It is a block diagram which shows the structure of the PJ management assistance apparatus which is embodiment of this invention. 第1の態様の変化量グラフを示す図である。It is a figure which shows the variation | change_quantity graph of a 1st aspect. 第2の態様の変化量グラフを示す図である。It is a figure which shows the variation | change_quantity graph of a 2nd aspect. 第3の態様の変化量グラフを示す図である。It is a figure which shows the variation | change_quantity graph of a 3rd aspect. 第4の態様の変化量グラフを示す図である。It is a figure which shows the variation | change_quantity graph of a 4th aspect. 第5の態様の変化量グラフを示す図である。It is a figure which shows the variation | change_quantity graph of a 5th aspect.

実施の形態の構成を説明する前にその概要を説明する。
図1は、ガントチャートの抜粋を示す。このガントチャートの縦軸は、プロジェクトにおいてプロジェクトのメンバーによって実行されるべき複数の項目(以下、適宜「タスク」とも呼ぶ。)を示し、横軸は時間軸である。ガントチャートの各レコードは、タスクが実行される予定の期間(以下、適宜「実行予定期間」とも呼ぶ。)と、タスクが実行された実績を示す期間(以下、適宜「実行実績期間」とも呼ぶ。)とを示している。
Before describing the configuration of the embodiment, an outline thereof will be described.
FIG. 1 shows an excerpt of a Gantt chart. The vertical axis of this Gantt chart indicates a plurality of items (hereinafter also referred to as “tasks” as appropriate) to be executed by the project members in the project, and the horizontal axis is the time axis. Each record of the Gantt chart is a period during which the task is scheduled to be executed (hereinafter also referred to as “execution scheduled period” as appropriate) and a period indicating the result of execution of the task (hereinafter also referred to as “execution result period as appropriate”). .).

また、ガントチャートの各レコードには、タスクを実行すべきプロジェクトのメンバー(以下、単に「担当者」とも呼ぶ。)と、タスクの完了までに担当者が実行すべき作業量として想定される工数(以下、適宜「予定工数」と呼ぶ。)と、その予定工数の進捗率とが対応づけて記録される。本実施の形態における予定工数の単位は、担当者1名による1日分の作業量を示す「人日」である。予定工数は担当者の作業量を示すため、そのタスクの実行予定期間とは必ずしも一致しない。すなわち、2人日のタスクであってもその実行予定期間は、3日間や4日間に設定されることもある。   Each record of the Gantt chart includes a project member (hereinafter, also simply referred to as “person in charge”) that should execute the task, and the man-hours that are assumed as the amount of work that the person in charge must perform before the task is completed. (Hereinafter referred to as “scheduled man-hour” as appropriate) and the progress rate of the scheduled man-hour are recorded in association with each other. The unit of the planned man-hour in the present embodiment is “person day” indicating the work amount for one day by one person in charge. Since the scheduled man-hour indicates the work amount of the person in charge, it does not necessarily match the scheduled execution period of the task. That is, even if the task is for two people, the scheduled execution period may be set to 3 days or 4 days.

なお、図1で示すタスク数は50程度であるが、タスクは進捗管理の対象となる単位であり、システムの機能単位やモジュール単位に設定されることもある。したがって、大規模システムの開発プロジェクトではタスク数が数百となることもある。   Although the number of tasks shown in FIG. 1 is about 50, the task is a unit that is a target of progress management, and may be set as a function unit or a module unit of the system. Thus, a large-scale system development project can have hundreds of tasks.

プロジェクトにおいては、タスクの実行状況の確認、すなわち進捗状況の確認が定期的に実施される。そして、予定からある程度以上の遅れが確認されると、その遅れを取り戻す、もしくは遅れがそれ以上拡大しないようにするためのリカバリプランが策定される。このリカバリプランは、ガントチャートにも反映される。以下、プロジェクトにおけるタスクの一部を示す図2および図3を用いて、リカバリプランの一例を説明する。   In the project, the task execution status is confirmed, that is, the progress status is regularly confirmed. When a delay of a certain degree or more is confirmed from the schedule, a recovery plan is formulated to recover the delay or prevent the delay from expanding further. This recovery plan is also reflected in the Gantt chart. Hereinafter, an example of the recovery plan will be described with reference to FIGS. 2 and 3 showing some of the tasks in the project.

図2は、リカバリプラン反映前のガントチャートを示す。同図は7月25日終了時点での進捗状況を示しており、各レコードの上段のバーがタスクの実行予定期間を、下段のバーがタスクの実行実績期間を示している。同図によれば、担当者HaがタスクTaの実行に時間を要して、タスクTcの実行が遅延していることが確認される。なお、タスクTd〜Tf間等における破線矢印は、タスク間の依存関係を示す。すなわち、タスクTfの実行にはタスクTdの完了が条件であり、タスクTdの完了前にタスクTfは実行できないことを示している。   FIG. 2 shows a Gantt chart before reflecting the recovery plan. The figure shows the progress at the end of July 25, with the upper bar of each record indicating the scheduled task execution period and the lower bar indicating the task execution performance period. According to the figure, it is confirmed that the person in charge Ha takes time to execute the task Ta and the execution of the task Tc is delayed. A broken line arrow between the tasks Td to Tf indicates a dependency relationship between the tasks. That is, it is indicated that the completion of the task Td is a condition for the execution of the task Tf, and the task Tf cannot be executed before the completion of the task Td.

図3は、リカバリプラン反映後のガントチャートを示す。同図には、進捗が遅れたタスクTcが8月28日〜30日に実行予定となるため、タスクTdやTf等の実行を先送りする、かつ、担当者HaにアサインされていたタスクTd等を新たに担当者Hcにアサインするリカバリプランが反映されている。また、タスクTdやTh等の予定工数も、担当者Ha等の現状の生産性を踏まえて当初の予定工数が見直され、より大きな値に変更されている。このように、進捗遅れをリカバリするためには、遅延原因を分析し、その対策を立案した上で、実現性の高い修正スケジュール、すなわちリカバリプランを作成する必要がある。この修正スケジュールでは、典型的には、当初予定していた後続タスクに加え、遅延分のタスクを継続して実行するため、当初予定以上のタスクを実施する必要がある。また、進捗遅れが担当者の生産性に起因する場合には、予定工数を大きくし、さらには担当者の交代や増員が必要になる。   FIG. 3 shows a Gantt chart after reflecting the recovery plan. In the figure, since the task Tc whose progress has been delayed is scheduled to be executed from August 28 to 30, the execution of the task Td, Tf, etc. is postponed and the task Td assigned to the person in charge Ha, etc. The recovery plan for newly assigning to the person in charge Hc is reflected. In addition, the scheduled man-hours for tasks Td, Th, etc. are revised to a larger value by reviewing the original man-hours based on the current productivity of the person in charge Ha and the like. As described above, in order to recover the progress delay, it is necessary to analyze the cause of the delay and formulate the countermeasure, and then create a highly feasible correction schedule, that is, a recovery plan. In this correction schedule, typically, in addition to the subsequent task that was originally scheduled, in order to continuously execute the tasks for the delay, it is necessary to perform a task that is more than originally scheduled. In addition, when the progress delay is caused by the productivity of the person in charge, it is necessary to increase the planned man-hours, and to change or increase the number of persons in charge.

なお、図3のタスクTd、Tf、Tiは、その実行予定期間が遅れたことに起因して、プロジェクト全体の遅延に直結するクリティカルパスを構成することとなったため、クリティカルパスを示す所定の表示態様で表されている。すなわち、リカバリプラン反映の結果、プロジェクト全体のクリティカルパスの一部は、図示しない前工程タスク、タスクTd、Tf、Ti、図示しない後工程タスクで構成されることになる。また、図2および図3には図示しないが、8月16日以降、ガントチャートの差異はないものとする。   Note that the tasks Td, Tf, and Ti in FIG. 3 constitute a critical path that is directly connected to the delay of the entire project due to the delay in the scheduled execution period, and therefore a predetermined display indicating the critical path. It is expressed in an embodiment. That is, as a result of reflecting the recovery plan, a part of the critical path of the entire project is composed of a pre-process task (not shown), tasks Td, Tf, Ti, and a post-process task (not shown). Although not shown in FIGS. 2 and 3, it is assumed that there is no difference in Gantt charts after August 16th.

ところで、プロジェクトの管理者であり、プロジェクトの完遂に責任を負うプロジェクトマネージャ(以下、適宜「PM」と呼ぶ。)は、リカバリプランの適用による影響を把握する必要がある。すなわち、工数や費用を考慮した上で、リカバリプランが適切なものか否かを判断する必要がある。また、工数や費用の変更内容によっては、システム開発を発注した顧客との調整が必要になることもある。しかしながら、図2および図3で示したように、ひとつのタスクの進捗遅れに対応するだけでも、多くの他のタスクにおける実行計画が変更になる。既述したように実際のプロジェクトでは何百ものタスクが存在しうるため、変更前のガントチャートと変更後のガントチャートとを見比べて、実行計画が変更された個々のタスクをPMが確認するのは、時間の制約等から困難である。   By the way, a project manager (hereinafter referred to as “PM” as appropriate), who is a project manager and responsible for the completion of the project, needs to grasp the impact of the application of the recovery plan. That is, it is necessary to determine whether or not the recovery plan is appropriate in consideration of man-hours and costs. Also, depending on the changes in man-hours and costs, it may be necessary to coordinate with the customer who ordered the system development. However, as shown in FIG. 2 and FIG. 3, the execution plan for many other tasks is changed only by dealing with the progress delay of one task. As mentioned earlier, there can be hundreds of tasks in an actual project, so PM will check each task whose execution plan has been changed by comparing the Gantt chart before the change with the Gantt chart after the change. Is difficult due to time constraints.

本実施の形態では、タスクの実行計画が変更されたガントチャートについて、その変更前と変更後との差異(以下、適宜「差分」とも呼ぶ。)を可視化するプロジェクト管理支援装置(以下、適宜「PJ管理支援装置」とも呼ぶ。)を提案する。このPJ管理支援装置は、PMが把握すべき情報として、特に、タスクの予定工数の差分(以下、適宜「差分工数」とも呼ぶ。)と、予定工数の差分により生じる費用の差分(以下、適宜「差分費用」とも呼ぶ。)とが可視化された情報を提供する。これによりPMは、タスクの実行計画が変更されたことによる影響を効率的に確認でき、その変更の妥当性や顧客との調整等に対する意思決定を迅速に行えるようになる。   In the present embodiment, a project management support device (hereinafter, referred to as “difference” as appropriate) that visualizes the difference (hereinafter also referred to as “difference”) before and after the change for the Gantt chart whose task execution plan has been changed. Also called “PJ management support device”. This PJ management support device, as information to be grasped by the PM, in particular, a difference in scheduled man-hours for tasks (hereinafter also referred to as “difference man-hours” as appropriate) and a difference in costs caused by differences in scheduled man-hours (hereinafter referred to as appropriate). It is also referred to as “differential cost”). As a result, the PM can efficiently confirm the influence of the change in the execution plan of the task, and can quickly make a decision on the validity of the change and the adjustment with the customer.

なお、PJ管理支援装置を含むシステム構成としては様々な態様が考えられる。典型的には、PJ管理支援装置はガントチャートにおける変更前後の差分を可視化するコンピュータプログラムがインストールされた装置である。例えば、ガントチャートを作成・変更するユーザの端末に上記プログラムがインストールされる場合には、ユーザ端末そのものがPJ管理支援装置であってもよい。また、PJ管理支援装置は、ユーザ端末とは物理的に異なる装置であってもよく、通信ネットワークを介してユーザ端末と接続され、ガントチャートの差分を可視化するサービスをユーザ端末に提供する装置であってもよい。   Note that various modes are conceivable as the system configuration including the PJ management support apparatus. Typically, the PJ management support apparatus is an apparatus in which a computer program for visualizing the difference before and after the change in the Gantt chart is installed. For example, when the above program is installed in a user terminal that creates / changes a Gantt chart, the user terminal itself may be a PJ management support apparatus. The PJ management support device may be a device that is physically different from the user terminal, and is a device that is connected to the user terminal via a communication network and provides a service for visualizing the difference of the Gantt chart to the user terminal. There may be.

図4は、本発明の実施の形態であるPJ管理支援装置の構成を示すブロック図である。PJ管理支援装置10は、ガントチャート記憶部12と、単価記憶部14と、指示受付部16と、ガントチャート表示部18と、ガントチャート更新部20と、クリティカルパス設定部22と、差分算出部24と、差分出力部26とを備える。   FIG. 4 is a block diagram showing the configuration of the PJ management support apparatus according to the embodiment of the present invention. The PJ management support apparatus 10 includes a Gantt chart storage unit 12, a unit price storage unit 14, an instruction reception unit 16, a Gantt chart display unit 18, a Gantt chart update unit 20, a critical path setting unit 22, and a difference calculation unit. 24 and a difference output unit 26.

本明細書のブロック図において示される各ブロックは、ハードウェア的には、コンピュータのCPUをはじめとする素子や機械装置で実現でき、ソフトウェア的にはコンピュータプログラム等によって実現されるが、ここでは、それらの連携によって実現される機能ブロックを描いている。したがって、これらの機能ブロックはハードウェア、ソフトウェアの組合せによっていろいろなかたちで実現できることは、当業者には理解されるところである。   Each block shown in the block diagram of the present specification can be realized in terms of hardware by an element such as a CPU of a computer or a mechanical device, and in terms of software, it can be realized by a computer program or the like. The functional block realized by those cooperation is drawn. Therefore, those skilled in the art will understand that these functional blocks can be realized in various forms by a combination of hardware and software.

ガントチャート記憶部12は、ガントチャートに設定された各種データが記憶される記憶領域である。ガントチャート記憶部12には、ユーザによる最新の変更が反映されたガントチャートのデータ(以下、適宜「変更後ガントチャート」とも呼ぶ。)と、最新の変更が反映される前のガントチャートのデータ(以下、適宜「変更前ガントチャート」とも呼ぶ。)とが少なくとも保持される。   The Gantt chart storage unit 12 is a storage area for storing various data set in the Gantt chart. The Gantt chart storage unit 12 includes Gantt chart data reflecting the latest changes by the user (hereinafter also referred to as “changed Gantt chart” as appropriate) and Gantt chart data before the latest changes are reflected. (Hereinafter also referred to as “a pre-change Gantt chart” as appropriate).

単価記憶部14は、タスクの実行を担当しうるプロジェクトメンバーについて、各プロジェクトメンバーの単位時間当たりの人件費(以下、適宜「単価」とも呼ぶ。)のデータが記憶される記憶領域である。単価は、各プロジェクトメンバーの単位工数当たりの人件費でもよい。以下の例では、担当者HaおよびHbの単価が5万円/人日、担当者Hcの単価が8万円/人日として記憶されていることとする。   The unit price storage unit 14 is a storage area in which data on personnel costs per unit time (hereinafter also referred to as “unit price” as appropriate) of each project member is stored for project members who can take charge of task execution. The unit price may be a labor cost per unit man-hour of each project member. In the following example, it is assumed that the unit prices of the persons in charge Ha and Hb are stored as 50,000 yen / person day, and the unit price of the person in charge Hc is stored as 80,000 yen / person day.

指示受付部16は、PJ管理支援装置10における各種情報処理を要求するデータをユーザ端末から受け付ける。例えば、PJ管理支援装置10が保持するガントチャートの出力要求、PJ管理支援装置10が保持するガントチャートの更新要求、変更前ガントチャートと変更後ガントチャートとの差分を所定態様で示す変化量データの出力要求を受け付ける。   The instruction receiving unit 16 receives data requesting various information processing in the PJ management support apparatus 10 from the user terminal. For example, a Gantt chart output request held by the PJ management support apparatus 10, a Gantt chart update request held by the PJ management support apparatus 10, and change amount data indicating a difference between the pre-change Gantt chart and the post-change Gantt chart in a predetermined manner The output request is accepted.

ガントチャート表示部18は、ガントチャートの出力要求が受け付けられたときに、ガントチャート記憶部12からガントチャートのデータを取得して、そのガントチャートを所定の表示装置に表示させる。なお、後述するクリティカルパス設定部22においてクリティカルパスを構成するタスクであることを示すためのデータが付加されたタスクについては、ガントチャートの確認者にその旨を把握させるための所定の態様で表示させる。ガントチャート表示部18は、例えば、図1、図2、図3の態様でガントチャートを表示させる。   When a Gantt chart output request is accepted, the Gantt chart display unit 18 acquires Gantt chart data from the Gantt chart storage unit 12 and displays the Gantt chart on a predetermined display device. In addition, a task to which data indicating that it is a task constituting a critical path is added in a critical path setting unit 22 to be described later is displayed in a predetermined mode for allowing the confirmer of the Gantt chart to recognize that fact. Let The Gantt chart display unit 18 displays the Gantt chart in the manner shown in FIGS. 1, 2, and 3, for example.

ガントチャート更新部20は、ガントチャートの更新要求が受け付けられたときに、ガントチャート記憶部12に記録されたガントチャートのデータ、典型的には各タスクのデータをその更新要求にしたがって更新する。この更新要求には、更新対象のタスクについてのタスク名と、担当者名と、予定工数と、進捗率と、実行予定期間と、実行実績期間と、依存関係、例えば実行の前提となるタスク名との少なくともいずれかが含まれる。ガントチャート更新部20によってタスクのデータが更新されたガントチャートは、ガントチャート記憶部12において変更後ガントチャートとして記憶される。   When a Gantt chart update request is received, the Gantt chart update unit 20 updates the Gantt chart data recorded in the Gantt chart storage unit 12, typically data of each task, according to the update request. The update request includes a task name, a person in charge name, a scheduled man-hour, a progress rate, an execution scheduled period, an execution result period, and a dependency, for example, a task name that is a premise of execution. Or at least one of them. The Gantt chart whose task data is updated by the Gantt chart updating unit 20 is stored in the Gantt chart storage unit 12 as a changed Gantt chart.

クリティカルパス設定部22は、ガントチャート更新部20においてガントチャートのデータが更新された際に、プロジェクトにおけるクリティカルパスを決定する。例えば、変更後ガントチャートを参照して、未実行タスクの実行予定期間と、未実行タスクの依存関係とにしたがって、各タスクの最早開始日と最遅開始日とを特定し、クリティカルパスを構成するタスクを特定してもよい。そして、クリティカルパスを構成するタスクに対して、その旨を示すための所定のデータを付加する。例えば、クリティカルパスを構成するタスクであることを示すための所定のフラグデータを付加してもよい。   The critical path setting unit 22 determines a critical path in the project when the Gantt chart update unit 20 updates the Gantt chart data. For example, refer to the changed Gantt chart, identify the earliest start date and latest start date of each task according to the scheduled execution period of the unexecuted task and the dependency of the unexecuted task, and configure the critical path The task to be performed may be specified. Then, predetermined data for indicating the fact is added to the task constituting the critical path. For example, predetermined flag data for indicating a task constituting a critical path may be added.

差分算出部24は、ガントチャートの変化量データの出力要求が受け付けられたときに、ガントチャート記憶部12を参照して、単位期間における変更前ガントチャートと変更後ガントチャートとの差分のデータを抽出する。差分出力部26は、変更前ガントチャートと変更後ガントチャートとの差分のデータにしたがって、差分工数や差分費用が可視化された所定態様のグラフ(以下、適宜「変化量グラフ」とも呼ぶ。)のデータを設定して所定の出力先に送信する。変化量グラフの態様には特に制限はなく、集合棒グラフ、積み上げ棒グラフであってもよい。また出力先は、ディスプレイ、印刷装置、変化量グラフを参照・編集等するための所定のアプリケーションであってもよい。   The difference calculation unit 24 refers to the Gantt chart storage unit 12 when the output request for the change amount data of the Gantt chart is received, and calculates difference data between the pre-change Gantt chart and the post-change Gantt chart in the unit period. Extract. The difference output unit 26 is a graph of a predetermined mode in which the difference man-hour and the difference cost are visualized according to the difference data between the pre-change Gantt chart and the post-change Gantt chart (hereinafter also referred to as “change amount graph” as appropriate). Data is set and transmitted to a predetermined output destination. There is no restriction | limiting in particular in the aspect of a variation | change_quantity graph, A collective bar graph and a stacked bar graph may be sufficient. The output destination may be a display, a printing apparatus, or a predetermined application for referring to / editing the change amount graph.

以下、差分出力部26から出力される具体的な変化量グラフを参照して、差分算出部24および差分出力部26をさらに詳細に説明する。なお、以降の図で示す変化量グラフは、図2のガントチャートを変更前ガントチャートとし、図3のガントチャートを変更後ガントチャートとし、差分算出の単位期間を1週間として設定されたものである。なお、7月25日終了時点での差分を算出することとする。   Hereinafter, the difference calculation unit 24 and the difference output unit 26 will be described in more detail with reference to a specific change amount graph output from the difference output unit 26. The change amount graphs shown in the following figures are set with the Gantt chart of FIG. 2 as the pre-change Gantt chart, the Gantt chart of FIG. 3 as the post-change Gantt chart, and the unit period of difference calculation as one week. is there. The difference at the end of July 25 is calculated.

図5は、第1の態様の変化量グラフを示す。同図の変化量グラフは、差分工数を示す集合棒グラフであり、7月21日からの5週間において、差分工数が「−1.5人日、−1.5人日、+4人日、+3人日、±0人日」と時系列に推移することを示している。   FIG. 5 shows a variation graph of the first aspect. The change amount graph in the figure is a collective bar graph showing the difference man-hours. In the five weeks from July 21, the difference man-hours are “−1.5 man-day, −1.5 man-day, +4 man-day, +3. It shows that the transition is in time series, “person day, ± 0 person day”.

第1の態様の変化量グラフを出力する際、差分算出部24は差分を算出する期間が過去日か未来日かで異なる処理を実行する。まず、差分工数の算出期間が過去日の場合を説明する。この場合、差分算出部24は、変更前ガントチャートにおける7月21日の週における各タスクの予定工数を合算する。その一方で、変更前ガントチャートにおける7月21日の週における各タスクの予定工数と進捗率との積により算出される実績工数を合算する。そして、7月21日の週における予定工数の合算と、実績工数との合算との差分を差分工数として算出する。図2においては、タスクTcの予定工数が2人日のところ、その進捗率が25%であるため、差分工数は−1.5人日となる。   When outputting the change amount graph of the first aspect, the difference calculation unit 24 executes different processing depending on whether the period for calculating the difference is the past date or the future date. First, a case where the difference man-hour calculation period is the past day will be described. In this case, the difference calculation unit 24 adds the scheduled man-hours for each task in the week of July 21 in the pre-change Gantt chart. On the other hand, the actual man-hours calculated by the product of the scheduled man-hour of each task and the progress rate in the week of July 21 in the pre-change Gantt chart are added up. Then, the difference between the sum of the scheduled man-hours in the week of July 21 and the sum of the actual man-hours is calculated as a difference man-hour. In FIG. 2, when the scheduled man-hour of the task Tc is 2 man-days, the progress rate is 25%, so the difference man-hour is -1.5 man-days.

次に、差分工数の算出期間が未来日の場合を説明する。この場合、差分算出部24は、変更前ガントチャートにおける7月28日の週、8月4日の週、8月11日の週、8月18日の週ごとに各タスクの予定工数を合算する。週ごとに合算されたタスクの予定工数を、以下、「週次工数」とも呼ぶこととする。この場合、7月28日の週、8月4日の週、8月11日の週それぞれの週次工数は、7人日、6人日、2人日となる。   Next, the case where the difference man-hour calculation period is a future date will be described. In this case, the difference calculation unit 24 adds up the scheduled man-hours for each task for the week of July 28, the week of August 4, the week of August 11, and the week of August 18 in the pre-change Gantt chart. To do. Hereinafter, the scheduled man-hours of the task added every week will be referred to as “weekly man-hours”. In this case, the weekly man-hours for the week of July 28, the week of August 4, and the week of August 11 are 7 days, 6 days, and 2 days, respectively.

また、差分算出部24は、変更後ガントチャートにおける7月28日の週、8月4日の週、8月11日の週、8月18日の週それぞれの週次工数を算出する。タスクTd等の週を跨って実行予定のタスクについては、その予定工数に対して実行予定期間による日割り計算を行う。すなわちタスクTdの予定工数は、7月28の週では2人日となり、8月3日の週では1人日となる。また、実績工数が算出されたタスク、例えばタスクTcについては、その予定工数に対する実績工数の差分を予定工数とする。したがって、タスクTcの7月28の週における予定工数は1.5人日となる。以上より、7月28日の週、8月4日の週、8月11日の週それぞれの週次工数は、5.5人日、10人日、5人日となる。   Further, the difference calculation unit 24 calculates the weekly man-hours for the week of July 28, the week of August 4, the week of August 11, and the week of August 18 in the changed Gantt chart. For tasks scheduled to be executed across weeks such as task Td, a daily calculation based on the scheduled execution period is performed for the scheduled man-hours. That is, the scheduled man-hour of the task Td is 2 person days in the week of July 28 and 1 person day in the week of August 3. For a task for which the actual man-hour is calculated, for example, the task Tc, the difference in the actual man-hour with respect to the planned man-hour is set as the planned man-hour. Therefore, the scheduled man-hour for the week of July 28 of task Tc is 1.5 man-days. From the above, the weekly man-hours for the week of July 28, the week of August 4, and the week of August 11 are 5.5 person days, 10 person days, and 5 person days.

さらに、差分算出部24は、変更前ガントチャートについて算出した週次工数と、変更後ガントチャートについて算出した週次工数との差分工数を算出する。既述したように、8月18日以降についてはガントチャートの差分が存在しないため、7月28日の週、8月4日の週、8月11日の週、8月18日の週それぞれにおける差分工数は、−1.5人日、+4人日、+3人日、±0人日となる。差分算出部24は、各週を特定するための日時データと各週の差分工数とを対応づけて差分出力部26に出力する。差分出力部26は、差分算出部24において算出された差分工数を、その差分工数に対応づけられた日時データにしたがって時系列に並べた集合棒グラフを変化量グラフとして設定する。   Further, the difference calculation unit 24 calculates a difference man-hour between the weekly man-hour calculated for the pre-change Gantt chart and the weekly man-hour calculated for the post-change Gantt chart. As already mentioned, since there is no difference in Gantt charts after August 18, the week of July 28, the week of August 4, the week of August 11, and the week of August 18 respectively The difference man-hours at −1.5 man days, +4 man days, +3 man days, and ± 0 man days. The difference calculation unit 24 associates the date / time data for specifying each week with the difference man-hours of each week and outputs the result to the difference output unit 26. The difference output unit 26 sets, as a change amount graph, a collective bar graph in which the difference man-hours calculated by the difference calculation unit 24 are arranged in time series according to the date and time data associated with the difference man-hours.

PMは、第1の態様の変化量グラフを参照することで、タスクの実行計画変更に伴う工数面での影響を効率的に確認できる。また、差分工数が時系列に示されるため、時間の経過に伴う差分工数の推移も効率的に確認できる。例えば、7月21日の週に発生した進捗遅れのタスクを、日数を要してでも完了させるために、7月28日の週までは当初の予定工数に対してマイナスの予定工数であることを把握できる。また、8月4日の週から当初の予定工数以上の予定工数となり、8月18日の週で当初の予定工数と合致するため、8月15日までに進捗遅れがリカバリされることを一目で把握できる。   By referring to the change amount graph of the first aspect, the PM can efficiently confirm the influence on the man-hours associated with the task execution plan change. Moreover, since the difference man-hours are shown in time series, the transition of the difference man-hours with the passage of time can be efficiently confirmed. For example, in order to complete a delayed task that occurred in the week of July 21 even if it takes days, the planned man-hour is negative with respect to the originally planned man-hour until the week of July 28. Can be grasped. In addition, since the scheduled man-hours will be more than the originally planned man-hours from the week of August 4 and will match the original man-hours in the week of August 18, it is easy to see that the delay in progress will be recovered by August 15 Can be grasped.

図6は、第2の態様の変化量グラフを示す。同図の変化量グラフは、差分工数とともに、差分工数が生じたタスクの内訳を要素として示す積み上げ棒グラフである。例えば、7月28の週については、担当者がHaのタスクTcの1.5人日分がプラスの差分工数として生じ、担当者がHaのタスクTfの3人日分がマイナスの差分工数として生じたことを示している。また、8月4日の週については、マイナスの差分工数が1人日で、プラスの差分工数が5人日であることを示している。第1の態様の変化量グラフにおける8月4日の週は、プラスとマイナスの差分工数が集約されて「+4人日」となっていた。なお、差分工数が生じない8月18の週については、グラフ上の値も0となるため、図6以降ではその記載を省略している。   FIG. 6 shows a change amount graph of the second mode. The change amount graph of FIG. 6 is a stacked bar graph showing, as elements, the breakdown of tasks in which the difference man-hours are generated along with the difference man-hours. For example, for the week of July 28, the person in charge of the task Tc of Ha has 1.5 man-days as a positive difference man-hour, and the person in charge of the task Tf of Ha has a difference man-hour of minus. Indicates that it has occurred. Further, for the week of August 4, the negative differential man-hour is 1 man-day and the positive differential man-hour is 5 man-days. In the week of August 4 in the change graph of the first mode, the positive and negative differential man-hours are aggregated to be “+4 man-days”. Note that the value on the graph is also 0 for the week of August 18 when no difference man-hours occur, so the description is omitted in FIG.

第2の態様の変化量グラフでは、タスク名が同一のタスクについては、その担当者が異なっても、同一のグラフの要素として集約される。例えば、8月4日の週について、タスクTiの予定工数は、変更前ガントチャートでは担当者Haで2人日であり、変更後ガントチャートでは担当者Hcで1人日である。第2の態様の変化量グラフでは、この予定工数が集約されて、タスクTiの差分工数が「−1人日」と示されている。   In the change amount graph of the second aspect, tasks having the same task name are aggregated as elements of the same graph even if the person in charge is different. For example, for the week of August 4, the scheduled man-hour of task Ti is 2 person days for the person in charge Ha in the Gantt chart before change, and 1 person day for the person in charge Hc in the Gantt chart after change. In the change amount graph of the second aspect, the scheduled man-hours are aggregated, and the difference man-hour of the task Ti is indicated as “−1 man-day”.

第2の態様の変化量グラフを出力する際、差分算出部24は差分を算出する期間が過去日か未来日かで異なる処理を実行する。まず、差分工数の算出期間が過去日の場合を説明する。この場合、差分算出部24は、変更前ガントチャートの7月21日の週に設定された各タスクについてその予定工数と実績工数との差分を差分工数として算出する。   When outputting the change amount graph of the second mode, the difference calculation unit 24 executes different processing depending on whether the period for calculating the difference is the past date or the future date. First, a case where the difference man-hour calculation period is the past day will be described. In this case, the difference calculation unit 24 calculates the difference between the scheduled man-hours and the actual man-hours as the difference man-hours for each task set in the week of July 21 of the pre-change Gantt chart.

次に、差分工数の算出期間が未来日の場合を説明する。この場合、差分算出部24は、7月28日の週、8月4日の週、8月11日の週、8月18日の週ごとに、変更前ガントチャートおよび変更後ガントチャートの各タスクの差分工数を算出する。具体的には、タスク名が同一のタスクが両方に存在すれば、それぞれの予定工数の差分を算出する。また、変更前ガントチャートにのみ存在するタスクについてはその予定工数をマイナスの差分工数とし、変更後ガントチャートにのみ存在するタスクについてはその予定工数をプラスの差分工数とする。   Next, the case where the difference man-hour calculation period is a future date will be described. In this case, the difference calculation unit 24 calculates the Gantt chart before change and the Gantt chart after change for each week of July 28, week of August 4, week of August 11, and week of August 18. Calculate the task difference man-hours. Specifically, if there are both tasks with the same task name, the difference between the respective scheduled man-hours is calculated. For tasks that exist only in the pre-change Gantt chart, the scheduled man-hour is set as a negative difference man-hour, and for tasks that exist only in the post-change Gantt chart, the planned man-hour is set as a positive difference man-hour.

差分算出部24は、週ごとに、差分工数が0以外のタスクに関するタスク名と、担当者名と、差分工数とを対応づけて差分出力部26に出力する。また、そのタスクにクリティカルパスを構成するタスクである旨を示すフラグデータが付加されているときには、そのタスクに関する上述のデータにそのフラグデータを付加して差分出力部26に出力する。   The difference calculation unit 24 associates a task name related to a task with a difference man-hour other than zero, a person in charge name, and the difference man-hour, and outputs the difference man-hour to the difference output unit 26 every week. Further, when flag data indicating that the task is a task constituting a critical path is added to the task, the flag data is added to the above-described data relating to the task and output to the difference output unit 26.

差分出力部26は、差分算出部24において算出された、週ごとタスクごとのプラスおよびマイナスの差分工数を、週ごとの積み上げ棒グラフの要素として設定し、週ごとの積み上げ棒グラフを時系列に並べた変化量グラフを設定する。また、積み上げ棒グラフの各要素には、タスク名と担当者名とを対応づけて設定する。   The difference output unit 26 sets the plus and minus difference manhours for each task calculated by the difference calculation unit 24 as elements of the weekly stacked bar graph, and arranges the weekly stacked bar graphs in time series. Set the change graph. In addition, a task name and a person in charge name are set in association with each element of the stacked bar graph.

差分出力部26は、クリティカルパスを構成するタスクである旨を示すフラグデータが付加されている場合には、そのタスクのデータを積み上げ棒グラフの要素として設定する際に、変化量グラフの確認者の注意を喚起させるための所定のデータを付加する。例えば、図6で示すように要素のデータを強調表示させるためのデータを付加してもよく、また所定の色や模様を示すデータを付加してもよい。   When flag data indicating that the task is a task constituting a critical path is added, the difference output unit 26 sets the data of the task as an element of the stacked bar graph. Add predetermined data to call attention. For example, as shown in FIG. 6, data for highlighting element data may be added, or data indicating a predetermined color or pattern may be added.

PMは、第2の態様の変化量グラフを参照することで、差分工数の内訳を効率的に把握できる。すなわち、先送りされたタスク、同時期に実行されるタスク、タスクの担当者等を把握できる。また、変更前ガントチャートと変更後ガントチャートとの間で特定の週において全体としては差分工数がない場合であっても、実施予定のタスクが異なれば差分として表示されるため、進捗遅れが発生したタスクの影響によってその他のタスクが先送りされた状態、すなわち実質的なプロジェクトの進捗遅れも把握しやすくなる。例えば、図6において、担当者Haが担当するタスクTcの進捗が遅れたため、7月28日に予定されていたタスクTfが先送りされること、および、そのリカバリが8月4日および11日の週で実行されることを一目で把握できる。   The PM can efficiently grasp the breakdown of the difference man-hours by referring to the change amount graph of the second mode. That is, the postponed task, the task executed at the same time, the person in charge of the task, etc. can be grasped. In addition, even if there is no difference man-hour between the Gantt chart before change and the Gantt chart after change in the specific week as a whole, if the scheduled task is different, it will be displayed as a difference, resulting in a delay in progress. It becomes easy to grasp the situation where other tasks have been postponed due to the influence of the task, that is, the actual progress delay of the project. For example, in FIG. 6, since the progress of the task Tc handled by the person in charge Ha is delayed, the task Tf scheduled for July 28 is postponed, and the recovery is performed on August 4th and 11th. You can see at a glance what will be done in a week.

さらにまた、クリティカルパスを構成するタスクについてはPMの注意を喚起する態様で表示されるため、クリティカルパスを構成するタスクの担当者が適切であるか否か等、そのタスクに対してPMは特に注意を払いやすくなる。さらにまた、後述する第3の態様の変化量グラフとは異なり、タスク名が同一のタスクについてはその差分工数が集約されるため、多くのタスクについてその担当者を変更するような大規模なリカバリプランが反映された場合であっても、変化量グラフの視認容易性は維持されやすい。   Furthermore, since the task that constitutes the critical path is displayed in a manner that alerts the PM, whether the person in charge of the task that constitutes the critical path is appropriate or not is particularly suitable for the task. It becomes easier to pay attention. Furthermore, unlike the change amount graph of the third aspect to be described later, since the difference man-hours are aggregated for tasks with the same task name, a large-scale recovery in which the person in charge is changed for many tasks. Even if the plan is reflected, the visibility of the change amount graph is easily maintained.

図7は、第3の態様の変化量グラフを示す。同図の変化量グラフは、第2の態様の変化量グラフと同様に、差分工数とともに、差分工数が生じたタスクの内訳を要素として示す積み上げ棒グラフである。ただし、第3の態様の変化量グラフでは、タスク名が同一のタスクであっても、その担当者が異なれば、異なるグラフの要素として取り扱われる点で第2の態様の変化量グラフとは異なる。例えば、8月4日の週におけるタスクTiは、変更前ガントチャートにおいて設定された担当者Haと、変更後ガントチャートにおいて設定された担当者Hcとが異なるため、異なるグラフの要素として取り扱われている。   FIG. 7 shows a variation graph of the third mode. Similar to the change amount graph of the second mode, the change amount graph of FIG. 5 is a stacked bar graph showing the breakdown of tasks in which the difference man-hours are generated as elements together with the difference man-hours. However, the change graph of the third mode differs from the change graph of the second mode in that even if the task name is the same, if the person in charge is different, it is handled as an element of a different graph. . For example, the task Ti in the week of August 4 is handled as an element of a different graph because the person in charge Ha set in the pre-change Gantt chart is different from the person in charge Hc set in the post-change Gantt chart. Yes.

第3の態様の変化量グラフを出力する際、差分算出部24は差分を算出する期間が過去日か未来日かで異なる処理を実行する。まず、差分工数の算出期間が過去日の場合を説明する。この場合、差分算出部24は、変更前ガントチャートの7月21日の週に設定された各タスクについてその予定工数と実績工数との差分を差分工数として算出する。   When outputting the change amount graph of the third aspect, the difference calculation unit 24 executes different processes depending on whether the period for calculating the difference is the past date or the future date. First, a case where the difference man-hour calculation period is the past day will be described. In this case, the difference calculation unit 24 calculates the difference between the scheduled man-hours and the actual man-hours as the difference man-hours for each task set in the week of July 21 of the pre-change Gantt chart.

次に、差分工数の算出期間が未来日の場合を説明する。この場合、差分算出部24は、7月28日の週、8月4日の週、8月11日の週、8月18日の週ごとに、変更前ガントチャートおよび変更後ガントチャートの各タスクの差分工数を算出する。具体的には、タスク名が同一かつ担当者名が同一のタスクが両方に存在すれば、それぞれの予定工数の差分を算出する。また、変更前ガントチャートにのみ存在するタスクについてはその予定工数をマイナスの差分工数とし、変更後ガントチャートにのみ存在するタスクについてはその予定工数をプラスの差分工数とする。この際には、担当者名が異なるタスクについては異なるタスクであることとして差分工数を特定する。以降の差分算出部24および差分出力部26の処理は、第2の態様の変化量グラフを設定する場合と同様である。   Next, the case where the difference man-hour calculation period is a future date will be described. In this case, the difference calculation unit 24 calculates the Gantt chart before change and the Gantt chart after change for each week of July 28, week of August 4, week of August 11, and week of August 18. Calculate the task difference man-hours. Specifically, if there are both tasks having the same task name and the same person-in-charge name, the difference between the respective scheduled man-hours is calculated. For tasks that exist only in the pre-change Gantt chart, the scheduled man-hour is set as a negative difference man-hour, and for tasks that exist only in the post-change Gantt chart, the planned man-hour is set as a positive difference man-hour. At this time, the difference man-hour is specified as a task having a different person-in-charge name as a different task. The subsequent processing of the difference calculation unit 24 and the difference output unit 26 is the same as the case of setting the change amount graph of the second mode.

PMは、第3の態様の変化量グラフを参照することで、差分工数の内訳をさらに詳細に把握できる。例えば、タスクの担当者が誰から誰に代わったかを把握でき、個々の担当者のスキルを踏まえ、その担当者変更が適切なものであるかを判断できる。   The PM can grasp the breakdown of the difference man-hours in more detail by referring to the change amount graph of the third mode. For example, the person in charge of a task can be grasped from whom and the person in charge can be determined based on the skill of each person in charge.

図8は、第4の態様の変化量グラフを示す。同図の変化量グラフは、差分費用を示す集合棒グラフであり、7月28日からの3週間において、差分費用が「−1.5万円、+35万円、+21万円」と時系列に推移することを示している。なお、本実施の形態における第4の態様の変化量グラフは、未来日における差分費用を示すものであることとする。   FIG. 8 shows a variation graph of the fourth aspect. The change amount graph in the figure is a collective bar graph showing the differential cost. In the three weeks from July 28, the differential cost is “−15,000 yen, +350,000 yen, +210,000 yen” in time series. It shows that it will change. Note that the change amount graph of the fourth aspect in the present embodiment indicates a differential cost on a future date.

第4の態様の変化量グラフを出力する際、差分算出部24は、第3の態様の変化量グラフを設定する場合と同様に、7月28日の週、8月4日の週、8月11日の週、8月18日の週ごとに、変更前ガントチャートおよび変更後ガントチャートの各タスクの差分工数を算出する。またこの際には、担当者名が異なるタスクについては異なるタスクであることとして差分工数を特定する。差分算出部24は、単価記憶部14を参照して、差分工数が生じた各タスクについてその担当者の単価と差分工数とを積算して、その結果を差分費用として算出する。この場合、プラスの差分工数からはプラスの差分費用が算出され、マイナスの差分工数からはマイナスの差分費用が算出される。   When the change amount graph of the fourth aspect is output, the difference calculation unit 24, as in the case of setting the change amount graph of the third aspect, the week of July 28, the week of August 4, The difference man-hours of each task of the pre-change Gantt chart and the post-change Gantt chart are calculated every week of month 11 and week of August 18. At this time, the difference man-hour is specified as a task having a different person-in-charge name as a different task. The difference calculation unit 24 refers to the unit price storage unit 14, adds up the unit price of the person in charge and the difference man-hour for each task in which the difference man-hour has occurred, and calculates the result as a difference cost. In this case, a positive differential cost is calculated from the positive differential man-hour, and a negative differential cost is calculated from the negative differential man-hour.

差分算出部24は、差分工数が生じた各タスクの差分費用について週ごとの合算値を、週ごとの差分費用として差分出力部26に出力する。差分出力部26は、差分算出部24において算出された週ごとの差分費用を時系列に並べた集合棒グラフを変化量グラフとして設定する。   The difference calculation unit 24 outputs the sum of each week for the difference cost of each task in which the difference man-hour has occurred to the difference output unit 26 as the weekly difference cost. The difference output unit 26 sets a collective bar graph in which the difference costs for each week calculated by the difference calculation unit 24 are arranged in a time series as a change amount graph.

PMは、第4の態様の変化量グラフを参照することで、タスクの実行計画変更に伴う費用面での影響を効率的に確認できる。例えば、進捗遅れをリカバリするために、差し引き54.5万円の追加費用が発生することを一目で把握できる。また、差分費用が時系列に示されるため、時間の経過に伴う差分費用の推移も効率的に確認できる。PMは確認結果に基づき、リカバリプランの実現性を費用面から検討できるとともに、追加費用に関する顧客との調整有無についても早期の意思決定が可能になる。また、顧客にとっては追加工数よりも追加費用の方がより重要であることが多いため、追加費用の額を顧客に提示する際にも第4の態様の変化量グラフは有用である。   By referring to the change amount graph of the fourth aspect, the PM can efficiently confirm the influence on the cost associated with the change of the task execution plan. For example, it can be understood at a glance that an additional cost of 545,000 yen will be incurred to recover the progress delay. In addition, since the differential costs are shown in time series, the transition of the differential costs over time can be efficiently confirmed. Based on the confirmation result, the PM can examine the feasibility of the recovery plan from the cost side, and can make an early decision on whether or not to adjust the additional cost with the customer. Further, since the additional cost is often more important than the additional man-hour for the customer, the change amount graph of the fourth aspect is useful also when the amount of the additional cost is presented to the customer.

図9は、第5の態様の変化量グラフを示す。同図の変化量グラフは、差分費用とともに、差分費用が生じたタスクの内訳を要素として示す積み上げ棒グラフである。例えば、8月4日の週については、マイナスの差分工数により生じたマイナスの差分費用が10万円であり、その一方で、プラスの差分工数により生じたプラスの差分費用が45万円であることを示している。第4の態様の変化量グラフにおける8月4日の週は、プラスとマイナスの差分費用が集約されて「+35万円」となっていた。   FIG. 9 shows a variation graph of the fifth aspect. The change amount graph in the figure is a stacked bar graph showing, as an element, a breakdown of tasks in which the differential cost has occurred, along with the differential cost. For example, for the week of August 4, the negative differential cost caused by the negative differential man-hour is 100,000 yen, while the positive differential cost caused by the positive differential man-hour is 450,000 yen. It is shown that. In the week of August 4 in the variation graph of the fourth mode, the positive and negative differential costs were aggregated to “+350,000 yen”.

第5の変化量グラフを出力する際、差分算出部24は、第4の態様の変化量グラフを出力する際と同様の処理を実行する。ただし、差分算出部24は、差分工数が生じた各タスクの差分費用を合算することなく、週ごとタスクごとの差分費用を差分出力部26に出力する。差分出力部26は、差分算出部24において算出された週ごとの各タスクの差分費用を、週ごとの積み上げ棒グラフの要素として設定し、週ごとの積み上げ棒グラフを時系列に並べた変化量グラフを設定する。積み上げ棒グラフの各要素には、タスク名と担当者名とを対応づけて設定する。なお、クリティカルパスを構成するタスクの強調設定は、第2の態様の変化量グラフにおける処理と同様である。   When outputting the fifth change amount graph, the difference calculation unit 24 performs the same processing as when outputting the change amount graph of the fourth aspect. However, the difference calculation unit 24 outputs the difference cost for each task to the difference output unit 26 without adding the difference costs of the tasks in which the difference man-hours occur. The difference output unit 26 sets the difference cost of each task calculated by the difference calculation unit 24 as an element of the weekly stacked bar graph, and displays a change amount graph in which the weekly stacked bar graphs are arranged in time series. Set. A task name and a person-in-charge name are associated with each element of the stacked bar graph. Note that the task emphasis setting that constitutes the critical path is the same as the processing in the change amount graph of the second mode.

PMは、第5の態様の変化量グラフを参照することで、差分費用の内訳を詳細に把握できる。例えば、タスクの担当者が誰から誰に代わったかを把握でき、その結果として生じた差分費用の大きさを把握できる。これにより、タスクの新たな担当者として適切な単価の担当者がアサインされたか否かを判断できる。   The PM can grasp the breakdown of the differential cost in detail by referring to the change amount graph of the fifth aspect. For example, it can be understood who the person in charge of the task has been replaced by whom, and the magnitude of the differential cost generated as a result. This makes it possible to determine whether or not a person in charge with an appropriate unit price has been assigned as a new person in charge of the task.

以上の構成による動作を以下説明する。プロジェクトにおける進捗管理者は、複数のタスクそれぞれの進捗状況を各担当者から取得する。進捗管理者がPJ管理支援装置10に対してガントチャートの出力要求を行うと、ガントチャート表示部18は進捗管理者の端末に最新のガントチャートを表示させる。進捗管理者は、各タスクの進捗状況に応じたリカバリプランを策定して、そのリカバリプランに基づいてガントチャートの各種データを変更する。進捗管理者がPJ管理支援装置10に対してガントチャートの更新要求を行うと、ガントチャート更新部20は変更されたガントチャートのデータを変更後ガントチャートとしてガントチャート記憶部12に記録する。また、変更前のガントチャートのデータは変更前ガントチャートとして継続して保持する。   The operation of the above configuration will be described below. The progress manager in the project acquires the progress of each of the plurality of tasks from each person in charge. When the progress manager makes a Gantt chart output request to the PJ management support apparatus 10, the Gantt chart display unit 18 displays the latest Gantt chart on the terminal of the progress manager. The progress manager formulates a recovery plan according to the progress of each task, and changes various data in the Gantt chart based on the recovery plan. When the progress manager requests the PJ management support apparatus 10 to update the Gantt chart, the Gantt chart update unit 20 records the changed Gantt chart data in the Gantt chart storage unit 12 as the changed Gantt chart. The data of the Gantt chart before the change is continuously held as the Gantt chart before the change.

クリティカルパス設定部22は、変更後ガントチャートにおけるクリティカルパスを特定して、クリティカルパスを構成するタスクに対しては、そのタスクのデータにクリティカルパスであることを示すデータを設定する。PMまたは進捗管理者は、PJ管理支援装置10に対して、第1から第5いずれかの態様を指定して、変更前ガントチャートと変更後ガントチャートとの差分データの出力要求を行う。差分算出部24は、指定された態様に応じて、変更前ガントチャートと変更後ガントチャート間における差分工数または差分費用を算出する。差分出力部26は、差分工数または差分費用のデータを、指定された態様の変化量グラフのデータに設定して、変化量グラフのデータを所定の出力先に出力する。   The critical path setting unit 22 identifies a critical path in the post-change Gantt chart, and sets data indicating that the path is a critical path to the task data. The PM or the progress manager designates one of the first to fifth aspects to the PJ management support apparatus 10 and requests output of difference data between the pre-change Gantt chart and the post-change Gantt chart. The difference calculation unit 24 calculates the difference man-hours or difference costs between the pre-change Gantt chart and the post-change Gantt chart according to the designated mode. The difference output unit 26 sets the difference manhour or difference cost data as the change amount graph data of the specified mode, and outputs the change amount graph data to a predetermined output destination.

本実施の形態のPJ管理支援装置10によれば、タスクの実行計画が変更されたガントチャートについて、差分工数および差分費用が可視化された変化量グラフをプロジェクトの管理者に提供することで、プロジェクトの管理者の意思決定を支援する。言い換えれば、PJ管理支援装置10によって、プロジェクトの管理者は、タスクの実行計画変更による影響内容を効率的に把握でき、その影響内容を踏まえて、変更内容が妥当か否か、顧客との調整が必要か否かについて適切な判断を下しやすくなる。   According to the PJ management support apparatus 10 of the present embodiment, for a Gantt chart whose task execution plan has been changed, the project manager is provided with a change amount graph in which the difference man-hours and the difference costs are visualized. To help managers make decisions. In other words, the PJ management support device 10 enables the project manager to efficiently grasp the contents of the effects of the task execution plan change, and based on the contents of the effects, whether or not the contents of the change are appropriate is adjusted with the customer. Makes it easier to make appropriate decisions about whether or not

以上、本発明を実施の形態をもとに説明した。この実施の形態は例示であり、それらの各構成要素や各処理プロセスの組合せにいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。以下変形例を示す。   The present invention has been described based on the embodiments. This embodiment is an exemplification, and it will be understood by those skilled in the art that various modifications can be made to combinations of the respective constituent elements and processing processes, and such modifications are also within the scope of the present invention. is there. A modification is shown below.

第1の変形例を説明する。上述した実施の形態においては、差分算出部24および差分出力部26は、各態様の変化量グラフを出力する際には、変化量グラフの態様ごとに独立した処理を実行した。変形例においては、いずれの態様の変化量グラフを出力する場合であっても、まず第3の態様の変化量グラフが一旦設定されて、第3の態様の変化量グラフから各態様の変化量グラフが設定されてもよい。   A first modification will be described. In the above-described embodiment, when the difference calculation unit 24 and the difference output unit 26 output the change amount graph of each aspect, the difference calculation unit 24 and the difference output unit 26 execute independent processing for each aspect of the change amount graph. In the modification, even when the change amount graph of any aspect is output, the change amount graph of the third aspect is first set once, and the change amount of each aspect is changed from the change amount graph of the third aspect. A graph may be set.

例えば、第1の態様の変化量グラフを出力する際には、第3の態様の変化量グラフにおけるプラスの差分工数とマイナスの差分工数とを週ごとに合算することで第1の態様の変化量グラフが設定できる。また、第2の態様の変化量グラフを出力する際には、第3の態様の変化量グラフにおける積み上げ棒グラフの要素であって、タスク名が同一の要素については差分工数を合算することで第2の態様の変化量グラフが設定できる。また、第5の態様の変化量グラフを出力する際には、第3の態様の変化量グラフにおける積み上げ棒グラフの要素を、その担当者の単価と差分工数との積算結果に置き換えることで第5の態様の変化量グラフが設定できる。また、第4の態様の変化量グラフを出力する際には、第5の態様の変化量グラフにおけるプラスの差分費用とマイナスの差分費用とを週ごとに合算することで第4の態様の変化量グラフが設定できる。   For example, when outputting the change amount graph of the first aspect, the change of the first aspect is performed by adding the positive difference man-hours and the negative difference man-hours in the change amount graph of the third aspect every week. A quantity graph can be set. Further, when outputting the change amount graph of the second aspect, the difference man-hour is added to the elements of the stacked bar graph in the change amount graph of the third aspect and having the same task name. The change amount graph of the second aspect can be set. Further, when the change amount graph of the fifth aspect is output, the element of the stacked bar graph in the change amount graph of the third aspect is replaced with the integration result of the unit price of the person in charge and the difference man-hour. The amount of change graph of the mode can be set. In addition, when the change amount graph of the fourth aspect is output, the change of the fourth aspect is obtained by adding the positive difference cost and the negative difference cost in the change amount graph of the fifth aspect every week. A quantity graph can be set.

第2の変形例を説明する。上述した実施の形態においては、PJ管理支援装置10から出力される変化量グラフの態様はユーザにより指定されたが、ユーザからの一の要求で全ての態様の変化量グラフが出力されてもよい。また、ユーザによるガントチャートの更新が検出された時点で、少なくとも1つの態様の変化量グラフが所定の出力先に出力されてもよい。   A second modification will be described. In the above-described embodiment, the mode of the change graph output from the PJ management support apparatus 10 is specified by the user. However, the change graph of all modes may be output by one request from the user. . In addition, when the update of the Gantt chart by the user is detected, the change amount graph of at least one aspect may be output to a predetermined output destination.

第3の変形例を説明する。PJ管理支援装置10には、差分工数および/または差分費用について、PMやガントチャートを設定するユーザに警告を通知するか否かを判定するための閾値が予め記憶されてもよい。差分出力部26は、その閾値以上の差分工数および/または差分費用を変化量グラフに設定する場合には、PMやユーザに警告を通知するための所定の警告データを変化量グラフにさらに設定してもよい。この閾値は、差分工数および/または差分費用がこれ以上になれば顧客との調整が必要であると想定される値であってもよい。   A third modification will be described. The PJ management support apparatus 10 may store in advance a threshold for determining whether or not to notify the user who sets the PM or Gantt chart about the difference man-hours and / or difference costs. The difference output unit 26 further sets predetermined warning data for notifying the PM and the user of a warning to the change amount graph when setting the difference man-hour and / or difference cost equal to or greater than the threshold in the change amount graph. May be. This threshold value may be a value that is assumed to require adjustment with the customer if the differential man-hours and / or differential costs become more than this.

第4の変形例を説明する。PJ管理支援装置10には、差分工数および/または差分費用の発生時期について、PMやガントチャートを設定するユーザに警告を通知するか否かを判定するための閾値が予め記憶されてもよい。差分出力部26は、その閾値が示す時期以降の単位期間について差分工数および/または差分費用を変化量グラフに設定する場合には、所定の警告データを変化量グラフにさらに設定してもよい。この閾値は、プロジェクトにおける所定のマイルストン、例えば内部設計フェーズ終了等の予め定められた節目の時期であってもよい。   A fourth modification will be described. The PJ management support apparatus 10 may store in advance a threshold for determining whether or not to notify the user who sets the PM or Gantt chart about the difference man-hours and / or the generation time of the difference cost. The difference output unit 26 may further set predetermined warning data in the change amount graph when setting the difference man-hour and / or the difference cost in the change amount graph for the unit period after the time indicated by the threshold. This threshold may be a predetermined milestone in the project, for example, a predetermined milestone such as the end of the internal design phase.

また、第3の変形例と第4の変形例とが組み合わされてもよく、差分出力部26は、上述の閾値を参照して、差分工数および/または差分費用の大きさおよびその発生時期の組み合わせに応じて、所定の警告データを変化量グラフにさらに設定してもよい。また、差分工数および/または差分費用の大きさの閾値は、プロジェクトの工程が後になるほど、つまり発生時期が後になるほど小さく設定されてもよい。   In addition, the third modification example and the fourth modification example may be combined, and the difference output unit 26 refers to the above-described threshold value, and calculates the difference man-hours and / or the difference cost and its generation time. Depending on the combination, predetermined warning data may be further set in the change amount graph. Further, the threshold of the difference man-hours and / or the difference cost may be set smaller as the project process is later, that is, as the generation time is later.

第5の変形例を説明する。第4および第5の態様の変化量グラフには、過去日における差分費用が含まれてもよい。ここでは7月21日の週を例として説明する。この場合、差分算出部24は、変更前ガントチャートの7月21日の週における各タスクの予定工数と各担当者の単価とを積算して予定費用を算出する。また、差分算出部24は、プロジェクトの担当者の稼働実績を管理する図示しない稼働管理システムから、7月21日の週における各担当者の稼働実績を取得して、その稼働実績と単価とを積算して実績費用を算出する。そして、予定費用と実績費用との差分を差分費用として算出してもよい。第4の態様の変化量グラフの場合には各タスクの差分費用を合算し、第5の態様の変化量グラフの場合には各タスクの差分費用を独立したものとして取り扱えばよい。本変形例によれば、差分費用について過去日からの時系列での推移を把握しやすくなり、リカバリプランの妥当性、実現可能性についての検討を支援できる。   A fifth modification will be described. The change amount graphs of the fourth and fifth aspects may include differential costs in the past days. Here, the week of July 21 will be described as an example. In this case, the difference calculation unit 24 calculates the scheduled cost by adding up the scheduled man-hours of each task and the unit price of each person in charge in the week of July 21 of the pre-change Gantt chart. Also, the difference calculation unit 24 acquires the operation results of each person in charge for the week of July 21 from the operation management system (not shown) that manages the operation results of the person in charge of the project, and calculates the operation results and unit price. Accumulate the actual cost. Then, the difference between the planned cost and the actual cost may be calculated as the differential cost. In the case of the variation graph of the fourth aspect, the differential costs of each task may be added up, and in the case of the variation graph of the fifth aspect, the differential costs of each task may be handled as independent. According to this modified example, it becomes easier to grasp the time-series transition from the past date for the differential cost, and it is possible to support examination of the validity and feasibility of the recovery plan.

上述した実施の形態および変形例の任意の組み合わせもまた本発明の実施の形態として有用である。組み合わせによって生じる新たな実施の形態は、組み合わされる実施の形態および変形例それぞれの効果をあわせもつ。   Any combination of the above-described embodiments and modifications is also useful as an embodiment of the present invention. The new embodiment generated by the combination has the effects of the combined embodiment and the modified examples.

請求項に記載の各構成要件が果たすべき機能は、実施の形態および変形例において示された各構成要素の単体もしくはそれらの連係によって実現されることも当業者には理解されるところである。   It should also be understood by those skilled in the art that the functions to be fulfilled by the constituent elements recited in the claims are realized by the individual constituent elements shown in the embodiments and the modified examples or by their linkage.

10 PJ管理支援装置、 12 ガントチャート記憶部、 14 単価記憶部、 16 指示受付部、 18 ガントチャート表示部、 20 ガントチャート更新部、 22 クリティカルパス設定部、 24 差分算出部、 26 差分出力部。   DESCRIPTION OF SYMBOLS 10 PJ management support apparatus, 12 Gantt chart memory | storage part, 14 Unit price memory | storage part, 16 Instruction reception part, 18 Gantt chart display part, 20 Gantt chart update part, 22 Critical path setting part, 24 Difference calculation part, 26 Difference output part

Claims (7)

所定のプロジェクトにおいて遂行されるべき複数のタスクそれぞれについて、変更前の期間と工数とが定められた変更前のガントチャートを記憶する変更前情報記憶部と、
前記複数のタスクそれぞれについて、変更後の期間と工数とが定められた変更後のガントチャートを記憶する変更後情報記憶部と、
前記変更前のガントチャートを参照して所定の単位期間における各タスクの工数を変更前工数として算出し、前記変更後のガントチャートを参照して前記単位期間における各タスクの工数を変更後工数として算出し、変更前工数と変更後工数との差分を算出する差分算出部と、
前記変更前工数と変更後工数との差分を示すデータを外部に出力する差分出力部と、
を備えることを特徴とするプロジェクト管理支援装置。
For each of a plurality of tasks to be performed in a predetermined project, a pre-change information storage unit that stores a pre-change Gantt chart in which a pre-change period and man-hours are determined;
For each of the plurality of tasks, a post-change information storage unit that stores a post-change Gantt chart in which a post-change period and man-hours are determined;
Calculate the man-hour of each task in a predetermined unit period with reference to the Gantt chart before the change as the man-hour before change, and refer to the Gantt chart after the change to the man-hour of each task in the unit period as the man-hour after change A difference calculation unit that calculates and calculates the difference between the man-hours before and after the change;
A difference output unit for outputting data indicating the difference between the man-hours before change and the man-hours after change to the outside;
A project management support apparatus comprising:
前記差分算出部は、複数の単位期間それぞれにおける変更前工数と変更後工数との差分を算出し、
前記差分出力部は、前記複数の単位期間それぞれについて算出された差分を時系列のデータとして出力することを特徴とする請求項1に記載のプロジェクト管理支援装置。
The difference calculation unit calculates the difference between the man-hour before change and the man-hour after change in each of a plurality of unit periods,
The project management support apparatus according to claim 1, wherein the difference output unit outputs a difference calculated for each of the plurality of unit periods as time-series data.
前記差分算出部は、前記変更前工数と変更後工数との差分が生じたタスクのIDをさらに特定し、
前記差分出力部は、前記変更前工数と変更後工数との差分を示すデータと、その差分が生じたタスクのIDとを対応づけて出力することを特徴とする請求項1または2に記載のプロジェクト管理支援装置。
The difference calculation unit further specifies an ID of a task in which a difference between the man-hour before change and the man-hour after change has occurred,
The said difference output part matches and outputs the data which show the difference of the said man-hour before a change, and the man-hour after a change, and ID of the task which the difference produced, It is characterized by the above-mentioned. Project management support device.
前記変更後のガントチャートにおいて前記プロジェクトのクリティカルパスを構成するタスクを特定するクリティカルパス特定部をさらに備え、
前記差分出力部は、前記変更前工数と変更後工数との差分を示すデータと、その差分が生じたタスクのIDとを対応づけて出力する際に、前記クリティカルパスを構成するタスクについてはその旨を示すための所定データをさらに対応づけて出力することを特徴とする請求項3に記載のプロジェクト管理支援装置。
Further comprising a critical path identifying unit for identifying a task constituting a critical path of the project in the changed Gantt chart,
When the difference output unit outputs the data indicating the difference between the man-hour before change and the man-hour after change and the ID of the task in which the difference has occurred in association with the task that constitutes the critical path, 4. The project management support apparatus according to claim 3, wherein predetermined data for indicating this is further output in association with each other.
前記変更後のガントチャートには、各タスクを遂行すべき担当者がさらに定められており、
前記差分算出部は、前記変更前工数と変更後工数との差分が生じたタスクを遂行すべき担当者をさらに特定し、
前記差分出力部は、前記変更前工数と変更後工数との差分を示すデータと、その差分が生じたタスクを遂行すべき担当者を示すデータとを対応づけて出力することを特徴とする請求項1から4のいずれかに記載のプロジェクト管理支援装置。
In the Gantt chart after the change, the person in charge to perform each task is further determined,
The difference calculation unit further specifies a person in charge who should perform the task in which the difference between the man-hour before change and the man-hour after change has occurred,
The difference output unit outputs data indicating a difference between the man-hour before change and the man-hour after change and data indicating a person in charge who should perform a task in which the difference occurs. Item 5. The project management support device according to any one of Items 1 to 4.
前記複数のタスクそれぞれの遂行を担当しうる担当者の単位期間当たりの人件費を単価として記憶する単価記憶部をさらに備え、
前記差分算出部は、前記変更前工数と前記変更後工数との差分と、その差分が生じたタスクを遂行すべき担当者の単価とにしたがって、前記変更前工数と変更後工数との差分により生じるプロジェクト費用の差分をさらに算出し、
前記差分出力部は、前記プロジェクト費用の差分を示すデータをさらに出力することを特徴とする請求項5に記載のプロジェクト管理支援装置。
A unit price storage unit for storing a labor cost per unit period of a person in charge who can take charge of each of the plurality of tasks as a unit price;
The difference calculation unit calculates the difference between the pre-change man-hours and the post-change man-hours according to the difference between the pre-change man-hours and the post-change man-hours and the unit price of the person in charge who should perform the task in which the difference occurred. Further calculate the difference in the resulting project costs,
The project management support apparatus according to claim 5, wherein the difference output unit further outputs data indicating a difference in the project cost.
所定のプロジェクトにおいて遂行されるべき複数のタスクそれぞれについて、変更前の期間と工数とが定められた変更前のガントチャートを所定の記憶装置に記憶させる機能と、
前記複数のタスクそれぞれについて、変更後の期間と工数とが定められた変更後のガントチャートを所定の記憶装置に記憶させる機能と、
前記変更前のガントチャートを参照して所定の単位期間における各タスクの工数を変更前工数として算出し、前記変更後のガントチャートを参照して前記単位期間における各タスクの工数を変更後工数として算出し、変更前工数と変更後工数との差分を算出する機能と、
前記変更前工数と変更後工数との差分を示すデータを外部に出力する機能と、
をコンピュータに実行させるためのコンピュータプログラム。
For each of a plurality of tasks to be performed in a predetermined project, a function for storing a pre-change Gantt chart in which a pre-change period and man-hours are determined in a predetermined storage device;
For each of the plurality of tasks, a function for storing a changed Gantt chart in which a changed period and man-hours are determined in a predetermined storage device;
Calculate the man-hour of each task in a predetermined unit period with reference to the Gantt chart before the change as the man-hour before change, and refer to the Gantt chart after the change to the man-hour of each task in the unit period as the man-hour after change A function to calculate and calculate the difference between the man-hours before and after the change,
A function of outputting data indicating the difference between the man-hour before change and the man-hour after change to the outside;
A computer program for causing a computer to execute.
JP2009071706A 2009-03-24 2009-03-24 Project management support device Expired - Fee Related JP5468282B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009071706A JP5468282B2 (en) 2009-03-24 2009-03-24 Project management support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009071706A JP5468282B2 (en) 2009-03-24 2009-03-24 Project management support device

Publications (2)

Publication Number Publication Date
JP2010224889A true JP2010224889A (en) 2010-10-07
JP5468282B2 JP5468282B2 (en) 2014-04-09

Family

ID=43042008

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009071706A Expired - Fee Related JP5468282B2 (en) 2009-03-24 2009-03-24 Project management support device

Country Status (1)

Country Link
JP (1) JP5468282B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012203702A (en) * 2011-03-25 2012-10-22 Nec Corp Business system change support system, business system change support program, and business system change support method
JP2012221404A (en) * 2011-04-13 2012-11-12 Mitsubishi Heavy Ind Ltd Analysis support device, analysis support method, and analysis support program
JP2013109503A (en) * 2011-11-18 2013-06-06 Hitachi Solutions East Japan Ltd Gantt chart difference display device
JP2016009360A (en) * 2014-06-25 2016-01-18 カシオ計算機株式会社 Process display device and program
JP2016076012A (en) * 2014-10-03 2016-05-12 三菱電機株式会社 Design diversion assist device, design diversion assist method, and program
CN114003831A (en) * 2021-10-21 2022-02-01 易协云(杭州)科技有限公司 Method and system for graphically displaying project progress by utilizing webpage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000181960A (en) * 1998-12-16 2000-06-30 Hitachi Ltd Information processing system
JP2002108434A (en) * 2000-10-02 2002-04-10 Toyota Motor Corp Production planning method
JP2005191571A (en) * 2003-12-23 2005-07-14 Asml Netherlands Bv Method of actuating lithographic device or lithographic processing cell, lithographic device and lithographic processing cell
JP2005275989A (en) * 2004-03-25 2005-10-06 Toshiba Solutions Corp Planning business management support system, and planning business management support program
JP2005301730A (en) * 2004-04-13 2005-10-27 Ricoh Co Ltd Project management method and project management program
JP2007310816A (en) * 2006-05-22 2007-11-29 Sharp Corp Work man-hour estimating device, work man-hour estimation program and computer readable recording medium with work man-hour estimation program recorded

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000181960A (en) * 1998-12-16 2000-06-30 Hitachi Ltd Information processing system
JP2002108434A (en) * 2000-10-02 2002-04-10 Toyota Motor Corp Production planning method
JP2005191571A (en) * 2003-12-23 2005-07-14 Asml Netherlands Bv Method of actuating lithographic device or lithographic processing cell, lithographic device and lithographic processing cell
JP2005275989A (en) * 2004-03-25 2005-10-06 Toshiba Solutions Corp Planning business management support system, and planning business management support program
JP2005301730A (en) * 2004-04-13 2005-10-27 Ricoh Co Ltd Project management method and project management program
JP2007310816A (en) * 2006-05-22 2007-11-29 Sharp Corp Work man-hour estimating device, work man-hour estimation program and computer readable recording medium with work man-hour estimation program recorded

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012203702A (en) * 2011-03-25 2012-10-22 Nec Corp Business system change support system, business system change support program, and business system change support method
JP2012221404A (en) * 2011-04-13 2012-11-12 Mitsubishi Heavy Ind Ltd Analysis support device, analysis support method, and analysis support program
JP2013109503A (en) * 2011-11-18 2013-06-06 Hitachi Solutions East Japan Ltd Gantt chart difference display device
JP2016009360A (en) * 2014-06-25 2016-01-18 カシオ計算機株式会社 Process display device and program
JP2016076012A (en) * 2014-10-03 2016-05-12 三菱電機株式会社 Design diversion assist device, design diversion assist method, and program
CN114003831A (en) * 2021-10-21 2022-02-01 易协云(杭州)科技有限公司 Method and system for graphically displaying project progress by utilizing webpage
CN114003831B (en) * 2021-10-21 2024-04-30 易协云(杭州)科技有限公司 Method and system for graphically displaying project progress by using webpage

Also Published As

Publication number Publication date
JP5468282B2 (en) 2014-04-09

Similar Documents

Publication Publication Date Title
US20200019907A1 (en) System and computer program for multi-party project schedule collaboration, synchronization and execution
JP5468282B2 (en) Project management support device
EP2024822A1 (en) Visual workflow process notation and layout
WO2011037987A2 (en) Process management system and method
US20150339619A1 (en) Automatically updating work schedules
US11727361B2 (en) System and method for managing events
JP4999051B2 (en) Asset management system, asset management method, and asset management program
Eshuis et al. An execution algorithm for UML activity graphs
US20110264593A1 (en) System and method for task management with sub-portions
JP6695673B2 (en) Plan generation device and plan generation method
JP4912850B2 (en) Project management device
US20100082405A1 (en) Multi-period-ahead Forecasting
JP5177762B2 (en) Information processing device
JP4865511B2 (en) Service management device
JP6802103B2 (en) Sales support device
JP2012203702A (en) Business system change support system, business system change support program, and business system change support method
JP2015207086A (en) Connected value chain support system and connected value chain support method
Pfeiffer et al. Simulation as one of the core technologies for digital enterprises: assessment of hybrid rescheduling methods
JP4327686B2 (en) Method and system for supporting construction of individual system based on EA
JP2008299496A (en) Operation simulator and program
JP5201559B2 (en) Information processing device
JP2014016805A (en) Production plan adjustment support device, production plan adjustment support method, and production plan adjustment support program
JP6695298B2 (en) Order control device
JP2008065790A (en) Operation and method of project risk management system, and project risk management program
JP2013117754A (en) Risk assessment apparatus and risk assessment program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120112

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130703

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130709

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130902

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140128

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140129

R150 Certificate of patent or registration of utility model

Ref document number: 5468282

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees