JP2008065790A - Operation and method of project risk management system, and project risk management program - Google Patents

Operation and method of project risk management system, and project risk management program Download PDF

Info

Publication number
JP2008065790A
JP2008065790A JP2006246140A JP2006246140A JP2008065790A JP 2008065790 A JP2008065790 A JP 2008065790A JP 2006246140 A JP2006246140 A JP 2006246140A JP 2006246140 A JP2006246140 A JP 2006246140A JP 2008065790 A JP2008065790 A JP 2008065790A
Authority
JP
Japan
Prior art keywords
project
information
risk
management
user terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006246140A
Other languages
Japanese (ja)
Inventor
Tomio Katahira
登美雄 片平
Yoshiyuki Tsuchida
義之 土田
Toshiko Adachi
利子 安達
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba System Technology Corp
Original Assignee
Toshiba Corp
Toshiba System Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba System Technology Corp filed Critical Toshiba Corp
Priority to JP2006246140A priority Critical patent/JP2008065790A/en
Publication of JP2008065790A publication Critical patent/JP2008065790A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To share information among members and among projects by electronized project management and to easily share grasping and measures at an early stage about rerunning and risks in a quality aspect in project management technology. <P>SOLUTION: This project risk management system comprises: a project risk retrieval processing part for retrieving corresponding risk information in risk information about a management object project to be an object of risk management by receiving an operation and outputting information with a user terminal as the other party through a communication network, wherein the project information includes the risk information about risks in a project; a project influence calculation processing part for calculating the influence of the risk on the project on the basis of the retrieved risk information; and a risk output processing part for outputting at least one between the risk information and the influence by receiving an operation and outputting information with the user terminal as the other party through the communication network. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、プロジェクト管理の技術の改良に関するもので、電子化されたプロジェクト管理によるメンバー間及びプロジェクト間の情報共有に加え、手戻りや品質上などのリスクに関する早期の把握と対策も容易に共有するようにしたプロジェクトリスク管理システムの運用と方法並びにプロジェクトリスク管理プログラムである。   The present invention relates to the improvement of project management technology. In addition to information sharing among members and projects by computerized project management, early grasp and countermeasures regarding risks such as rework and quality are easily shared. Operation and method of project risk management system and project risk management program.

従来、製造業務でのハードウェアやソフトウェア製品の開発や製造のプロジェクトにおける進捗や品質管理に対しコンピュータ支援を行う技術として、主としてプロジェクトの日程管理を行うプロジェクト管理システムがある。この種のプロジェクト管理は、特に多種少量のインデント製品や制御装置、システム製品の技術・設計・製造・品質管理に係るもので、そのようなプロジェクト管理を行うソフトウェアの代表例は、PERT法による管理ツールである。これは、プロジェクトを構成する全作業の先行、後続関係及び個々の作業開始、終了日程等のクリチカル(パス)を管理するものである。   2. Description of the Related Art Conventionally, there is a project management system that mainly manages project schedules as a technique for providing computer support for progress and quality control in development and manufacturing projects of hardware and software products in manufacturing operations. This type of project management is particularly related to technology, design, manufacturing, and quality control of a small amount of indented products, control devices, and system products. A typical example of software that performs such project management is management by the PERT method. Is a tool. This is to manage the critical (path) such as the predecessor, successor relationship, and individual work start and end schedules of all the works constituting the project.

しかし、上記のようなプロジェクト管理のソフトウェアでは、プロジェクトに含まれるある作業が完遂不可能となったような場合について、やり直しや、後戻りする作業の範囲や内容を特定することは出来ず、しかも、不適合情報や懸案事項などの情報を各関係者が共有する方法が無かった。このため、プロジェクト管理者は、やり直しや後戻りの発生リスクを把握することが困難という課題があった。   However, with the project management software as described above, it is not possible to specify the scope and content of the work to be redone or reverted when a certain work included in the project becomes impossible to complete, There was no way for each party to share information such as non-conformance information and concerns. For this reason, there has been a problem that it is difficult for the project manager to grasp the risk of occurrence of redo and reversion.

また、複数のシステムやプロジェクトから構成されるプロジェクト全体を効率よく進める為には、個別の各システムやその各プロジェクトを単位とした進捗状況管理においても、やり直しや後戻りの発生するリスクを最小限にする必要がある。   In addition, in order to efficiently advance the entire project consisting of multiple systems and projects, the risk of redoing and reversing is minimized in the progress management for each individual system and each project. There is a need to.

しかし、この点でも、従来では、実際のプロジェクト管理を漠然としたデータのみに依拠する運用であった。このため、各技術、設計、生産、製造および試験、出荷工程について、進捗状況、残件項目、懸案事項の確認、不適合情報等の品質状況、製品のリスク情報を詳細に把握することが困難であった。また、プロジェクトの実行過程で発生するであろうリスクを予め予測できない不可抗力の要因等によって、プロジェクトの完成の指定された期日を守れなかったり、予定された各工程作業の工数管理や生産性効率を正確に把握することが難しく、やり直しや後戻りのリスクの把握が困難であった。   However, in this respect as well, in the past, actual project management was based on vague data only. For this reason, it is difficult for each technology, design, production, manufacturing and testing, and shipping process to grasp in detail the progress status, remaining items, confirmation of issues, quality status such as nonconformity information, and product risk information. there were. In addition, due to factors such as force majeure that cannot predict in advance the risk that will occur in the course of project execution, the designated date for project completion cannot be observed, man-hour management and productivity efficiency of each scheduled process operation can be reduced. It was difficult to accurately grasp, and it was difficult to grasp the risk of redoing and reversion.

また、プロジェクトを進めていく際、進捗状況を管理する中で、例えプロジェクトを完全無欠で設計計画したとしても、仕様変更や資材等が計画通りに入荷しないなど、担当部門以外の不可抗力的な要因等も発生しうる。これら要因等によって、プロジェクト開始前における見積時点よりも各進捗ステップでの設計工数、製造工数、試験工数等のコストが増大し、かつ品質状況の不適合に対するフォローが不十分等の要因により、工程の遅延などの異常値になっても即座に認識できず、その対策やリカバリーをする施策の立案や実行に多大な時間を要していた。   In addition, when managing the progress of the project, even if the project is completely designed, even if the project is completely designed, there will be a force majeure factor other than the department in charge, such as specification changes and materials not coming in as planned. Etc. may also occur. Due to these factors, the cost of design man-hours, manufacturing man-hours, test man-hours, etc. at each progress step increased from the estimated time before the start of the project, and due to factors such as insufficient follow-up for non-conformance of quality status, Even if it becomes an abnormal value such as a delay, it cannot be immediately recognized, and it takes a lot of time to plan and execute a measure for the countermeasure and recovery.

ひいては、やり直しや後戻りの修正、不適合や指摘事項の対策に遅れをとり、後のステップでの工程に重大な支障をきたすなど問題点を残し、過去の不適合事項やリスクの問題等について水平展開に反映することが困難となり、予め事態の予想される危険性やリスクを有したまま出荷してしまったり、品質レベルが維持できない場合があった。また、将来において、類似した新規プロジェクトを受注した場合には、既設プロジェクトでの不適合や懸案項目、工程遅れ要因等の各種データを新規プロジェクトに水平展開することが困難となり、工数や製作期間等の計画工数等に反映するために有効に活用することが難しかった。   Eventually, there will be delays in redoing and revising corrections, countermeasures for nonconformities and points to be pointed out, leaving problems such as seriously hindering processes in later steps, and horizontal development of past nonconformities and risk issues. In some cases, it was difficult to reflect the situation, and it was shipped in advance with the risk and risk expected of the situation, or the quality level could not be maintained. In the future, if a similar new project is ordered, it will be difficult to horizontally deploy various data such as nonconformities in existing projects, pending items, process delay factors, etc. to the new project. It was difficult to use it effectively to reflect the planned man-hours.

さらに、運用面では、従来から各プロジェクト計画の進捗状況管理が、紙の媒体で作成したプロジェクト計画書に依拠していた。そしてその際、各々のプロジェクトの進捗状況を担当者が紙媒体の計画書に記入・作成し、同一部内のプロジェクト関係者だけで計画書の管理を行っていた。これにより、他部門や本社・支社等において営業・技術部門のプロジェクトに関係しているメンバーは、関連する他のプロジェクトの進捗状況を迅速に把握することが出来ず、必要とする欲しいプロジェクトの進捗情報や問題点について、その都度担当者から進捗・管理状況や問題点を確認する必要があった。   Further, in terms of operation, the progress management of each project plan has traditionally relied on a project plan created on paper media. At that time, the progress of each project was written and prepared by the person in charge on a paper plan, and only those involved in the project in the same department managed the plan. As a result, members who are involved in sales / technical department projects in other departments, headquarters / branches, etc. cannot quickly grasp the progress of other related projects, and the progress of the projects they want. Regarding information and problems, it was necessary to check the progress / management status and problems from the person in charge each time.

そのために、上記のような問題点に対応するにも、多大な時間のロスや後戻り作業が発生し、計画した期間内に製品や、システム製品の品質状況の確認も十分に確認できずに出荷してしまい、客先納入後に品質上の問題を発生させたり、後戻り作業の発生と生産性向上に寄与しない多大な工数を発生させたり、プロジェクト管理として見積り計画を超過し、客先からの信用失墜を招いてしまったり、さらに、その不適合対策に多大な時間と金と人数を要するなどの問題が生じがちであった。   For this reason, in order to deal with the above-mentioned problems, a great deal of time was lost and backtracking work occurred, and the quality status of products and system products could not be fully confirmed within the planned period. As a result, quality problems will occur after delivery to the customer, a large amount of man-hours will be generated that will not contribute to the improvement of productivity and the occurrence of backtracking work, the estimation plan will be exceeded as project management, and the trust from the customer There was a tendency to cause problems such as the loss of disappearance and the time and money and the number of people required to deal with the nonconformity.

また、従来の紙媒体で管理するプロジェクト進捗や管理を進めていくにあたり、各ステップでのプロジェクト検討会議の開催や、会議で指摘されたフォロー項目の一覧表示や議事録の発行、残件の件数管理や残件の進捗の塗りつぶし管理については、全て人間系により担当部門内の担当者で管理が行われてきた。したがって、実際にプロジェクトを計画する際に、予め上記した事態で発生するリスクを見込んで、そのリスクの管理を行い、不測事態が発生することを見込んで未然に防止するか、又は発生してもプロジェクトに対する影響を最小限に抑制する必要があるところ、担当者の情報量やリスク管理に対する感度の問題は個人差もあり、被害を最小限に抑えるにあたっての限界となっていた。   In addition, when proceeding with the progress and management of projects that are managed using conventional paper media, holding project review meetings at each step, displaying a list of follow-up items pointed out at the meeting, issuing minutes, and the number of remaining cases The management and the fill-in management of the progress of the remaining cases have all been managed by the person in charge in the department in charge by the human system. Therefore, when actually planning a project, the risk that occurs in the above situation is anticipated, the risk is managed, and it is anticipated that an unexpected situation will occur, or even if it occurs Where there is a need to minimize the impact on the project, there are individual differences in the amount of information in charge and the sensitivity to risk management, which has been the limit in minimizing damage.

具体的に説明すると、従来のプロジェクトでリスク管理を実施する場合、プロジェクト計画段階でリスク管理対象として、新技術、及び過去のプロジェクトで経験した問題点や懸案事項、不適合事項や周囲の技術責任者からの助言によって、大まかなリスク項目を洗い出し、プロジェクトの実行段階でリスクアイテムの監視を行い、そのリスクアイテムが問題化したときにその都度改善策を立てて、進行中のプロジェクトにおける後戻り発生リスクを最小限にする対応をしていた。   Specifically, when risk management is implemented in a conventional project, new technology, problems and concerns experienced in past projects, nonconformities, and surrounding technical managers are subject to risk management at the project planning stage. Based on the advice from the project, the risk items are roughly identified, the risk items are monitored at the project execution stage, and when each risk item becomes a problem, an improvement plan is made each time. I was trying to minimize it.

このような対応を技術的に支援する例は複数あり、例えば、先行例1(特許文献1:プロジェクトリスク管理支援装置)の技術は、プロジェクトデータベースに記憶された過去に実施された類似したリスクアイテムを用いることによって、リスク管理対象プロジェクトに含まれるリスクアイテムを抜けなく把握し、かつ、プロジェクトの管理者にとって、各リスクアイテムのリスク管理対象プロジェクトに対する影響度を定量的に把握することで、プロジェクト実行時における不測事態発生を極力抑制しようとしたものであった。   There are a plurality of examples of technical support for such correspondence. For example, the technology of the first example (Patent Document 1: Project Risk Management Support Device) is a similar risk item implemented in the past stored in the project database. By using, we can grasp the risk items included in the risk management target project without missing, and for the project manager, we can quantitatively understand the impact of each risk item on the risk management target project. It was an attempt to suppress the occurrence of unforeseen circumstances as much as possible.

上記特許文献1におけるプロジェクトリスク管理支援装置は、概略として、過去に実行された各プロジェクトにおける、プロジェクト属性、該当プロジェクトに含まれるリスクアイテム、及びこのリスクアイテムの該当プロジェクトに与える影響情報を含むプロジェクト情報を記憶するプロジェクト情報データベースと、リスク管理対象プロジェクトに類似したプロジェクトの全リスクアイテム及び影響情報をプロジェクト情報データベースから読み出すプロジェクト情報検索手段と、この読み出されたリスクアイテム及び影響情報をリスク管理対象プロジェクトに対応するリスクアイテム及び影響情報に編集するリスク編集手段と、この編集されたリスクアイテム及び影響情報からリスクアイテムがリスク管理対象プロジェクトに与える定量的な影響度を示すリスクインパクトを算出してグラフィック形式で出力するリスクインパクト算出手段を備えていた。   The project risk management support apparatus in Patent Document 1 generally includes project information including project attributes, risk items included in the corresponding project, and impact information of the risk item on the corresponding project in each project executed in the past. A project information database for storing information, a project information search means for reading all risk items and impact information of projects similar to the risk management target project from the project information database, and the read risk item and impact information for the risk management target project Risk editing means for editing the risk item and impact information corresponding to the risk item, and the risk item to the risk management target project from the edited risk item and impact information. Was equipped with a risk impact calculation means output in graphical form to calculate the risk impact showing the effect of.

このように構成されたプロジェクトリスク管理支援装置において、プロジェクト情報データベース内には、過去に実行された各プロジェクトにおけるプロジェクト属性、リスクアイテム、及び影響情報を含むプロジェクト情報が記憶されている。   In the project risk management support apparatus configured as described above, project information including project attributes, risk items, and impact information in each project executed in the past is stored in the project information database.

そして新規にリスク管理する必要があるリスク管理対象プロジェクトが生じると、プロジェクト情報データベースから類似したプロジェクトの全リストアイテム及び影響情報が読み出される。   When a new risk management target project that needs to be risk-managed is generated, all list items and influence information of similar projects are read from the project information database.

操作者が、この読み出されたリスクアイテム及び影響情報をリスク管理対象プロジェクトに対応するものに編集すると、編集後のリスクアイテム及び影響情報をもとに、各リスクアイテムがリスク管理対象プロジェクトに与える定量的な影響度が計算され、グラフィック表示される。これによって、操作者はリスク管理対象プロジェクトに含まれるリスクアイテム及び定量的な影響度を一瞥して把握可能になる。   When the operator edits the read risk item and impact information to correspond to the risk management target project, each risk item gives to the risk management target project based on the edited risk item and impact information. A quantitative influence is calculated and displayed graphically. As a result, the operator can grasp at a glance the risk items included in the risk management target project and the quantitative influence level.

先行例2(特許文献2:手戻りリスク評価システム)は、プロジェクト毎に完遂までに段階的に達成される小目標の系列をあらわすブレークダウン構造情報を格納する記憶手段を有していて、達成目標が不可能となった場合に、再検討処理に費やされる後戻り量を算出することを目的とするものである。   Prior Example 2 (Patent Document 2: Reversion Risk Evaluation System) has a storage means for storing breakdown structure information representing a series of small goals that are achieved step by step until completion for each project. The purpose is to calculate the amount of return to be spent on the review process when the target becomes impossible.

先行例3(特許文献3:プロジェクト品質管理システムの運用方法)では、複数のプロジェクト進捗の状況を迅速に把握すること、プロジェクトの進捗の遅延する事態を極力防止すること、各工程および担当者の進捗状況を詳細にまた各プロジェクトおよび担当者の作業生産性を把握すること、コストが増大する事態になった場合の対策を即座に実施すること、完了したプロジェクトのデータを新規プロジェクトの見積りや計画に有効に活用すること、が可能となる。   In Prior Example 3 (Patent Document 3: Project Quality Management System Operation Method), it is possible to quickly grasp the progress status of a plurality of projects, to prevent the delay of project progress as much as possible, Detailed progress status and work productivity of each project and person in charge, immediate countermeasures in case of cost increase, new project estimates and plans for completed projects It can be used effectively.

この先行例3では、また、設計、製造、試験の各工程毎の計画と承認状態(未承認、承認依頼中、承認済み)の情報を付加して承認されたデータを保護すると共に、画面上に各進捗状態を表示する構成をしている事から、紙ベースの承認を不要とし、管理を簡易に、且つ各工程毎に計画と実績をきめ細かく管理できると共に、画面上に承認状態を判り易く表示し、および承認情報のデータの保護を実現できる事をも目的としている。   In the preceding example 3, the plan and approval status (unapproved, approval requested, approved) for each process of design, manufacturing, and testing are added to protect the approved data and on the screen. Since each progress status is displayed on the screen, paper-based approval is not required, management is simple, detailed management of plans and results for each process is possible, and the approval status is easy to understand on the screen. It is also intended to be able to display and protect the data of approval information.

さらに、紙ベースでの媒体による承認を行う必要がなく、紙によるプロジェクト管理表の保管が必要となくなり、承認情報を更新する場合にも紙による媒体を通す事がなくなるので、データ内部の情報の変更だけで済み、承認行為の機能を電子化することで工程ごとのプロジェクト管理の完了、未完了を正確に判断することが出来る事を提供することを目的とするものである。   In addition, there is no need to approve paper-based media, no need to store paper-based project management tables, and no need to pass paper media when updating approval information. The purpose is to provide that it is possible to accurately determine whether or not project management has been completed or not completed for each process by digitizing the function of the approval act.

先行例4(特許文献4:プロジェクト管理装置)は、プロジェクトの計画および実績を管理するもので、作業毎に計画と実績の承認状態(未承認、承認依頼中、承認済み)の情報を付加して承認されたデータを保護するとともに線表画面上に状態を表示し、従来の紙ベースの承認を不要とし、管理を簡易且つ作業毎に計画と実績の状態をきめ細かく管理可能にするとともに線表画面上に承認状態を判り易く表示および承認情報の保護を実現することを目的とするものである。   Prior example 4 (patent document 4: project management device) manages the plan and results of a project, and adds information on the approval status (unapproved, approval requested, approved) for each work. In addition to protecting the approved data and displaying the status on the line table screen, the conventional paper-based approval is not required, the management is simple and the plan and actual status can be managed finely for each work, and the line table The purpose is to realize the display of the approval state on the screen in an easy-to-understand manner and the protection of the approval information.

先行例5(特許文献5:プロジェクト管理方法)は、製品の開発プロジェクトを管理するシステムであるために高度なセキュリィティ管理を必要とする場合のプロジェクト管理システムと、プロジェクトにおける作業効率を向上させることができるプロジェクト管理方法に関する。   Prior Example 5 (Patent Document 5: Project management method) is a system for managing product development projects, and therefore it can improve the work efficiency in a project management system and a project when a high level of security management is required. It relates to a project management method that can

先行例6(特許文献6:プロジェクト進捗管理方式)は、工程と品質の両面にわたる目標/実績対比評価に関するもので、プロジェクトの工程と品質の管理を関連付けて管理することが可能になり、ガイドの出力により、即座に目標未達成作業に対する積み残し作業量が定量的に得られる事を目的としたものである。   Prior Example 6 (Patent Document 6: Project Progress Management Method) relates to a target / result comparison evaluation covering both process and quality, and it is possible to manage the process and quality of the project in association with each other. The purpose is to obtain a quantitative amount of unloading work for the work that has not yet achieved the target.

特開2001−195483JP 2001-195383 A 特開2000−200303JP 2000-200303 A 特開2005−128796JP 2005-128796 A 特開平11−250125JP-A-11-250125 特開2002−288405JP 2002-288405 A 特開平06−332911Japanese Patent Laid-Open No. 06-332911 特開2004−246742JP 2004-246742 A

しかしながら、プロジェクトでのリスク管理に関する上記のような従来技術では、リスク管理対象のプロジェクトに含まれるリスクアイテムの洗い出しを、過去のプロジェクトにおいて経験した問題や技術責任者からの助言によって大まかに行っていたため、リスクの把握、対策やそれらの共有が効果的に行えず、より具体的には下記のような問題点があった。   However, in the above-mentioned conventional technologies related to risk management in a project, risk items included in a project subject to risk management are roughly identified based on problems experienced in past projects and advice from technical managers. However, it was not possible to grasp risks, take countermeasures and share them effectively, and more specifically, there were the following problems.

(1)プロジェクト情報データベースに記憶された類似化したプロジェクトのリスクアイテムを把握することが難しく、かつ、各リスクアイテムのリスク管理対象のプロジェクトに対する影響度を定量的に把握が困難で、プロジェクト実行時における不測事態発生を抑制する効果に限界があった。 (1) It is difficult to grasp the risk items of similar projects stored in the project information database, and it is difficult to quantitatively grasp the degree of impact of each risk item on the risk management target project. There was a limit to the effect of suppressing the occurrence of unforeseen circumstances.

(2)プロジェクト管理者による後戻り作業の発生リスクの管理が共有化になっていないことから、情報が可視化できず、プロジェクトを効率的に運営することが出来ない問題があった。 (2) There is a problem that information cannot be visualized and the project cannot be operated efficiently because the management of the risk of occurrence of backtracking work by the project manager is not shared.

(3)プロジェクトの進捗やリスクが定量的に管理できず、また、プロジェクトの難易度についても均質的に把握できないことから、生産、品質などのバラツキが出来、工程管理に問題点の反映が出来ず、プロジェクトを効率的に運営することが出来ない問題があった。 (3) The project progress and risk cannot be managed quantitatively, and the difficulty of the project cannot be grasped in a homogeneous manner, resulting in variations in production, quality, etc., which can be reflected in process management. Therefore, there was a problem that the project could not be managed efficiently.

(4)限られたプロジェクト担当者では、複数のプロジェクトのリスクと進捗の状況を迅速に把握することが困難で、プロジェクト完了の遅延を効果的防止が困難であった。 (4) It was difficult for a limited number of project managers to quickly grasp the risks and progress of multiple projects, and it was difficult to effectively prevent delays in project completion.

(5)担当者が工程の進捗状況を詳細管理することが不可能で、また、各プロジェクトおよび担当者の作業生産性のリスクを把握することも不可能の状態であった。 (5) The person in charge cannot manage the progress of the process in detail, and it is impossible to grasp the risk of work productivity of each project and person in charge.

(6)完了したプロジェクトのデータを新規プロジェクトの見積りや計画に有効に活用したい場合でも、データやリスク情報が各担当者の個人管理やファイル保管になっており、また、担当者の業務変更や部署異動等の場合はとりわけ、所有していた情報やデータが個人の管理になっていることから共有化を図ることが非常に困難であった。 (6) Even if you want to make effective use of completed project data for estimating and planning new projects, the data and risk information are personally managed and file storage for each person in charge. Especially in the case of department changes, it was very difficult to share information and data that was owned by individuals.

(7)紙ベースでの媒体によるプロジェクト管理計画表での運用では、設計、製造、試験の各工程毎の計画とリスク情報が、担当者や保管する部門の管理になっていることから、各工程毎に共通の認識で共有・管理することが困難であった。 (7) In the operation based on the paper-based project management plan table, the plan and risk information for each process of design, manufacturing, and testing are managed by the person in charge and the department to be stored. It was difficult to share and manage each process with a common recognition.

(8)紙ベースのプロジェクト管理の保管を各部門が管理することで、プロジェクトのリスク管理が担当者や特定の管理部門だけしか対象とできず、リスク管理の蓄積も困難であった。 (8) By managing the storage of paper-based project management by each department, project risk management can only be performed by persons in charge and specific management departments, and it is difficult to accumulate risk management.

(9)ブロジェクト検討会議でのリスク管理情報や、懸案項目、不適合情報項目、工程遅れなどの情報が共有化されていないことにより、関係部門からの問合せや検討事項や重大水平展開事項など見逃されがちになり、結局リスク指摘事項が製品に反映されないまま客先に出荷し、客先からの指摘や重大不適合の発生により、後戻り作業が発生し、見積りに含まれない多大な工数や金額が発生してしまい、生産高に影響を及ぼす場合もあった。 (9) Risk management information at the project review meeting, information on pending items, nonconformity information items, process delays, etc. are not shared, so overlooked inquiries from related departments, considerations, and significant horizontal development items In the end, the risk indications are shipped to the customer without being reflected in the product, and due to the customer's indication or the occurrence of a serious nonconformity, a return work occurs, and there is a lot of man-hours and money not included in the estimate. In some cases, this could have affected production.

(10)担当者が工程を確認しながら都度プロジェクトに関係するメンバーにタイムリーな情報や工程について確認しても、プロジェクトの業務が輻輳することにより、プロジェクトに係わっているメンバーの進捗状況を把握が困難な傾向があった。 (10) Even if the person in charge checks the timely information and processes of the members involved in the project while checking the processes, the progress of the members involved in the project is grasped due to the congestion of the project. Tended to be difficult.

(11)過去にプロジェクト管理の経験の無い新人プロジェクト管理者や技術責任者の経験によって同じリスクアイテムであっても、そのプロジェクトに対する影響や規模の判断が一定してなく、リスクアイテムの抽出で抜けていたり、リスクアイテムの規模を誤ったりする問題があった。 (11) Even if the risk items are the same due to the experience of new project managers or technical managers who have no experience in project management in the past, the impact and scale of the project are not consistent, and risk items cannot be extracted. And there was a problem that the scale of risk items was wrong.

なお、プロジェクトの進捗・品質管理を遂行するにあたっては、プロジェクトの進捗を管理することと、プロジェクトを遂行した結果を目的とする製品の品質が一定以上のものであるという品質が確保されることに注目されねばならない。それに対して、上記した問題点が存在するが、ソフトウェアやハードウェアの品質が初期の計画を達成しているかどうかは重要であって、両方の管理が成立することにより好ましいブロジェクト管理といえる。   In carrying out project progress and quality management, it is necessary to manage the progress of the project and to ensure that the quality of the product intended for the result of executing the project is above a certain level. It must be noted. On the other hand, although the above-mentioned problems exist, it is important whether the quality of the software and hardware achieves the initial plan, and it can be said that the management of both projects is preferable because both managements are established.

本発明は、上記のような従来技術の課題を解決するもので、その目的は、プロジェクト管理の技術において、電子化されたプロジェクト管理によるメンバー間及びプロジェクト間の情報共有に加え、手戻りや品質上などのリスクに関する早期の把握と対策も容易に共有することのできるプロジェクトリスク管理システムの運用と方法並びにプロジェクトリスク管理プログラムを提供することにある。   The present invention solves the problems of the prior art as described above, and its object is to provide rework and quality in project management technology, in addition to information sharing among members and projects by computerized project management. The object is to provide a project risk management system operation and method and a project risk management program that can easily share early understanding and countermeasures regarding the above risks.

より具体的には、本発明の目的は、プロジェクト管理での不測事態を未然に防止する為に、実行過程で発生すると思われるさまざまなリスク情報を一元化して情報共有を行い、プロジェクトリスク検索処理、プロジェクトリスク影響度算出処理、リスク影響度判定機能によりプロジェクトメンバー間でプロジェクトリスクを情報共有し、リスクの早期軽減を図ることである。   More specifically, the object of the present invention is to share information by unifying various risk information that may occur in the execution process in order to prevent unforeseen circumstances in project management, and to perform project risk search processing The project risk impact calculation process and the risk impact assessment function share project risk information among project members to reduce risk early.

また、本発明の他の目的は、各運用部門の管理者に対して、部門内のプロジェクトにおいてリスクの高いプロジェクトの早期発見と早期対策の為の情報提供を行い、複数のプロジェクト進捗状況を管理し、プロジェクト推進上の懸案事項、不適合問題、工程遅れ等のリスクの兆候を迅速、確実に捉えて、情報共有可能なレベルに加工して、プロジェクリスク管理の情報の共有化とプロジェクトにおけるリスク管理の精度向上を図ることである。   Another object of the present invention is to provide managers of each operational department with information for early detection and early countermeasures for high-risk projects in the departmental projects, and manage the progress of multiple projects. Project risk management information, project risk management, risk sharing such as project issues, nonconformities, and process delays are quickly and reliably captured and processed to a level where information can be shared. This is to improve the accuracy.

また、本発明の他の目的は、プロジェクリスク管理の情報の共有化とプロジェクトにおけるリスク管理の精度向上を図ることにより、リスクの高いプロジェクトについてもリスクの早期発見、早期対策を図り、製造業務における製品の品質の維持改善することである。   Another object of the present invention is to share information on project risk management and improve the accuracy of risk management in the project, so that early detection of risks and early countermeasures can be achieved even for high-risk projects. It is to maintain and improve product quality.

換言すれば、本発明の目的は、一又は二以上のプロジェクトを進めるにあたり、懸案事項や進捗状況やリスクの状況を迅速に把握することが出来、プロジェクトの進捗や完了の遅延を極力防止出来、また、各工程および担当者の工程進捗状況を詳細に、また、複数の各プロジェクトおよび担当者の作業生産性を把握することが出来、コストが増大する事態になった場合の対策を即座に実施することが出来、完了したプロジェクトのデータを新規プロジェクトの見積りや計画に有効に活用することが出来るプロジェクトリスク管理システムの技術を提供することである。   In other words, the object of the present invention is to promptly grasp the matters of concern, progress and risk when proceeding with one or more projects, and to prevent delays in project progress and completion as much as possible. In addition, it is possible to grasp the process progress status of each process and the person in charge in detail, and to understand the work productivity of each project and person in charge, and immediately take measures when the cost increases. It is possible to provide a project risk management system technology that can be used and the data of completed projects can be effectively used for estimation and planning of new projects.

また、本発明の他の目的は、設計、製造、試験の各工程毎の計画と紙ベースでの管理を不要とし、管理を簡易に、且つ各工程毎に計画と実績をきめ細かく管理できると共に、画面上にリスク状態を判り易く表示し、複数の管理システムを監視し、リスクの兆候を迅速に・確実に捉えて情報共有を可能とすることである。また、本発明の他の目的は、これらにより、紙ベースでの媒体による承認を行う必要を無くし、さらに、紙によるプロジェクト管理表の保管を不要とし、紙による媒体を通す事も無くすることにより、データ内部の情報の変更だけで済むようにし、工程ごとのプロジェクト管理の完了、未完了を正確に判断可能とすることである。   In addition, another object of the present invention is to eliminate the need for planning and paper-based management for each process of design, manufacturing, and testing, simplifying management, and finely managing the plan and results for each process, It is to display the risk status on the screen in an easy-to-understand manner, monitor a plurality of management systems, and quickly and surely capture the signs of the risk to enable information sharing. Another object of the present invention is to eliminate the need for paper-based media approval, eliminate the need for paper-based project management tables, and eliminate paper media. In other words, it is only necessary to change the information in the data, and it is possible to accurately determine whether the project management for each process is completed or not.

上記の目的を達成するため、本発明の一態様は、製品開発プロジェクトについて、リスクに関する情報を含むプロジェクト情報を、コンピュータを用いて管理するとともに、通信ネットワーク経由で接続されたユーザ端末のGUIインタフェースを介してプロジェクト品質管理の業務支援を行うプロジェクトリスク管理システムにおいて、複数のプロジェクトについてプロジェクトごとに、プロジェクト品質管理に関するプロジェクト情報を記憶するプロジェクト情報データベースと、前記ユーザ端末上で登録画面を表示してユーザから前記プロジェクト情報の登録を受け付ける情報登録管理手段と、前記ユーザ端末上で入力画面を表示してユーザから受け付ける検索条件または出力条件に基づき、該当する前記プロジェクト情報を当該ユーザ端末へ送信するデータ出力管理手段と、を有し、前記プロジェクト情報は、プロジェクトにおけるリスクに関するリスク情報を含み、前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、リスク管理の対象とする管理対象プロジェクトについて、前記リスク情報のうち該当するリスク情報を検索するプロジェクトリスク検索処理部と、検索した前記リスク情報に基づいて、そのリスクのプロジェクトへの影響度を算出するプロジェクト影響度算出処理部と、前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、前記リスク情報及び前記影響度の少なくとも一方を出力するリスク出力処理部と、を有することを特徴とする。   In order to achieve the above object, according to one aspect of the present invention, a product development project is managed using a computer for project information including risk information, and a GUI interface of a user terminal connected via a communication network is provided. Project risk management system that supports project quality management through a project information database that stores project information related to project quality management for each project for a plurality of projects, and a registration screen displayed on the user terminal. Information registration management means for accepting registration of the project information from the user, and a search condition or output condition that is received from the user by displaying an input screen on the user terminal. Data output management means to be transmitted to the terminal, and the project information includes risk information related to risk in the project, and is subject to risk management by accepting operation and outputting information to the user terminal via the communication network. Project risk search processing unit that searches for the relevant risk information among the risk information, and the project impact calculation that calculates the degree of impact of the risk on the project based on the searched risk information And a risk output processing unit that outputs at least one of the risk information and the degree of influence by receiving an operation and outputting information from the user terminal via the communication network.

以上のような本発明によれば、複数のプロジェクトに関し、基本情報、DR情報、出荷品質情報等の詳細なプロジェクト情報について、各担当者等のユーザ端末から登録受付して一元管理し閲覧利用にも応じることにより、メンバー間やプロジェクト間での情報共有と効果的管理を可能にするとともに、プロジェクトのリスクについても検索と影響度の算出まで行うので、手戻りや品質上などのリスクについて早期の把握や対策もGUIで容易に共有可能となる。   According to the present invention as described above, with respect to a plurality of projects, detailed project information such as basic information, DR information, and shipping quality information is registered and received from the user terminal of each person in charge for centralized management and browsing. To enable information sharing and effective management among members and between projects, as well as search and calculate impact on project risks. Grasping and countermeasures can be easily shared via the GUI.

以下、本発明のプロジェクトリスク管理システム(以下「本システム」と呼ぶ)と、本システムを用いるプロジェクトリスク管理方法(以下「本方法」と呼ぶ)を実施するための最良の実施形態(以下「本実施形態」と呼ぶ)について、図面にしたがって詳細に説明する。なお、説明の簡略化の観点から、各図を通して同等の構成要素には同一の符号を付し、背景技術や課題での説明と共通の前提事項は適宜省略する。   Hereinafter, a project risk management system of the present invention (hereinafter referred to as “the present system”) and a project risk management method using the present system (hereinafter referred to as “the present method”) are best implemented (hereinafter referred to as “the present”). The embodiment will be described in detail with reference to the drawings. Note that, from the viewpoint of simplifying the explanation, the same components are denoted by the same reference numerals throughout the drawings, and the assumptions common to the explanation in the background art and problems are omitted as appropriate.

〔1.構成〕
本システムは、製品開発プロジェクトについて、リスクに関する情報を含むプロジェクト情報を、コンピュータを用いて管理するとともに、プロジェクト品質管理の業務支援を行うプロジェクトリスク管理システムである。本システムは、パーソナルコンピュータなど適宜な種類のコンピュータを用いて実現可能であり、図1の機能ブロック図に示すような構成を、図2に示す概略的なハードウェア構成で実現するものである。
[1. Constitution〕
This system is a project risk management system that uses a computer to manage project information including risk-related information for product development projects, and also supports business operations for project quality management. This system can be realized by using an appropriate type of computer such as a personal computer, and implements the configuration shown in the functional block diagram of FIG. 1 with the schematic hardware configuration shown in FIG.

すなわち、図2に示すように、本システムは、システムバス1に対して、演算装置を司るCPU2と、マウスやタブレットなどのポインティングデバイスやキーボードなど公知の入力部3と、ディスプレイやスピーカなど公知の出力部4と、主記憶装置としてROM5及びRAM6と、外部記憶装置としてのハードディスク装置(HDD)7と、フレキシブルディスク装置(FDD)8と、光ディスク装置(ODD)9などを接続したものである。   That is, as shown in FIG. 2, the present system is connected to a system bus 1 with a CPU 2 serving as an arithmetic unit, a known input unit 3 such as a pointing device such as a mouse or a tablet, a keyboard, and a known device such as a display or a speaker. The output unit 4 is connected to a ROM 5 and a RAM 6 as main storage devices, a hard disk device (HDD) 7 as an external storage device, a flexible disk device (FDD) 8, an optical disk device (ODD) 9, and the like.

上記のようなハードウェア上に実現される本システムは、図1に示すように、機能の概略についてみれば、プロジェクト情報データベース10と、プロジェクトリスク検索処理部20と、プロジェクト影響度算出処理部30と、リスク出力処理部40と、例えばGUIなどを用いるユーザインターフェース50と、を有する。なお、ユーザインターフェース50は、登録画面を表示してユーザからプロジェクト情報の登録を受け付ける情報登録管理手段51と、入力画面を表示してユーザから受け付ける検索条件又は出力条件に基づき、該当するプロジェクト情報をユーザに送信するデータ出力管理手段52を備えている。   As shown in FIG. 1, the system implemented on the hardware as described above has a project information database 10, a project risk search processing unit 20, and a project impact calculation processing unit 30 as seen in the outline of functions. And a risk output processing unit 40 and a user interface 50 using, for example, a GUI. The user interface 50 displays the registration screen and displays the registration information of the project information from the user and the search condition or the output condition that displays the input screen and receives from the user. Data output management means 52 for transmitting to the user is provided.

〔1−1.プロジェクト情報データベース〕
このうち、プロジェクト情報データベース10内には、図3に示すように、過去に実施されたプロジェクト及び現在実行中の各プロジェクトごとに、プロジェクト情報11と、影響度定義テーブル12とが記憶されている。図中、42は客先製品リスク対策リストである。なお、影響度定義テーブル12の格納場所は、図1ではプロジェクト情報データベース10とは別に表しているが、これは説明の便宜上で、プロジェクト情報データベース10の内外いずれの実装例も考えられる。
[1-1. Project information database)
Among these, in the project information database 10, as shown in FIG. 3, project information 11 and an influence definition table 12 are stored for each project executed in the past and each project currently being executed. . In the figure, 42 is a customer product risk countermeasure list. Although the storage location of the impact definition table 12 is shown separately from the project information database 10 in FIG. 1, this is for convenience of explanation, and any implementation example inside or outside the project information database 10 can be considered.

各プロジェクト情報11は、プロジェクト品質管理に関する情報で、少なくとも開発製品のデザインレビュー(DR)出荷品質に関わるが、具体的には、客先製品情報13、DRプロジェクト情報14、中日程情報15、不適合情報16、パンチリスト情報17、予防保全情報18、手配品情報19を含む。より具体的には、客先製品情報13は、客先とその製品に関する情報で、図4(a)に示すように、該当プロジェクトの客先製品ID、客先製品名、プロジェクト名称、注番、出荷日、ステータスコード等を含む。   Each project information 11 is information relating to project quality management, and at least relates to design review (DR) shipment quality of a developed product. Specifically, customer product information 13, DR project information 14, medium schedule information 15, and nonconformity. Information 16, punch list information 17, preventive maintenance information 18, and arrangement information 19 are included. More specifically, the customer product information 13 is information about the customer and its product. As shown in FIG. 4A, the customer product ID, customer product name, project name, and order number of the corresponding project. Including shipping date, status code, etc.

また、DRプロジェクト情報14は、DR(デザインレビュー)の実施に関する情報で、図4(b)に示すように、該当プロジェクトの客先製品ID、課内管理番号、完了予定日、DR実施日、影響度区分コード、遅れ日数等を含むが、さらに次DRステップ開催予定日や、現DRステップ開催予定日を含むようにしてもよい。また、中日程情報15は、図4(c)に示すように、該当プロジェクトの客先製品ID、製番、予定日、完了日や、影響度区分コード、遅れ日数、回答日限、発生日等などのうち適宜な項目を含む。   The DR project information 14 is information related to the implementation of DR (design review). As shown in FIG. 4B, the customer product ID, the section management number, the scheduled completion date, the DR implementation date, the impact of the project concerned. The degree classification code, the number of days delayed, etc. are included, but the next DR step scheduled date or the current DR step scheduled date may also be included. Further, as shown in FIG. 4 (c), the medium schedule information 15 includes the customer product ID, the product number, the scheduled date, the completion date, the impact category code, the delay days, the response date limit, the occurrence date of the project. Etc., including appropriate items.

また、不適合情報16は、客先需要や他のシステムなどとの関係における製品の不適合に関する情報であり、図4(d)に示すように、該当プロジェクトの客先製品ID、不適合管理番号と、影響区分コードと、回答日限と、発生日と、予定日等を含む。また、パンチリスト情報17は、修正事項の情報で、図4(e)に示すように該当プロジェクトの客先製品ID、影響度区分コード、遅れ日数、対応日限、起草日等を含む。   Further, the nonconformity information 16 is information regarding product nonconformity in relation to customer demand or other systems, and as shown in FIG. 4D, the customer product ID, nonconformity management number of the corresponding project, Includes impact category code, response date limit, date of occurrence, and scheduled date. The punch list information 17 is information on correction items, and includes a customer product ID, an impact category code, a delay date, a corresponding date limit, a drafting date, and the like of the corresponding project as shown in FIG.

また、予防保全情報18は、製品の機能や安全の保全や危険の予防に関する情報であり、図4(f)に示すように、該当プロジェクトの客先製品ID、手配部品等を含む。また、手配品情報19は、部品の手配に関する情報で、図4(g)に示すように、該当プロジェクトの客先製品ID、手配部品、改廃情報、代替手配部品等を含む。   Further, the preventive maintenance information 18 is information relating to product functions, safety maintenance, and risk prevention, and includes a customer product ID, arrangement parts, and the like of the corresponding project as shown in FIG. Further, the arrangement product information 19 is information relating to the arrangement of parts, and includes a customer product ID, arrangement parts, revision / decommissioning information, alternative arrangement parts, etc. of the corresponding project as shown in FIG.

〔1−2.リスク値算出に関する影響度定義テーブル〕
次に、影響度定義テーブル12は、図5に示すように、影響度区分コードと、影響度とを対応付けて記憶したもので、これらはリスク値を算出するための数値である。また、影響度定義テーブル12は、このテーブル12を用いてリスク値を算出するためのリスク値算出式33を有し、この算出式においてリスク値を算出する影響度は、対応する影響度区分コードから求める。例えば、影響度区分コード=4は、影響度=1を示す。
[1-2. (Risk value calculation impact definition table)
Next, as shown in FIG. 5, the influence degree definition table 12 stores an influence degree classification code and an influence degree in association with each other, and these are numerical values for calculating a risk value. In addition, the influence degree definition table 12 has a risk value calculation formula 33 for calculating a risk value using the table 12, and the influence degree for calculating the risk value in this calculation formula is a corresponding influence degree classification code. Ask from. For example, the influence degree classification code = 4 indicates the influence degree = 1.

また、上記のようなテーブル12を用いるリスク値算出式33は、図6に示すように、前記DRプロジェクト情報の所定項目からリスク値を算出する算出式を表すDRプロジェクトリスク値情報と、前記不適合情報の所定項目からリスク値を算出する算出式を表す不適合リスク値情報と、前記中日程情報の所定項目からリスク値を算出する算出式を表す中日程リスク値情報と、前記パンチリスト情報の所定項目からリスク値を算出する算出式を表すパンチリストリスク値情報と、を含み、リスク値を算出するための算出式である。   The risk value calculation formula 33 using the table 12 as described above includes DR project risk value information representing a calculation formula for calculating a risk value from a predetermined item of the DR project information, as shown in FIG. Nonconformity risk value information representing a calculation formula for calculating a risk value from a predetermined item of information, medium schedule risk value information representing a calculation formula for calculating a risk value from the predetermined item of the medium schedule information, and a predetermined value of the punch list information This is a calculation formula for calculating a risk value, including punch list risk value information representing a calculation formula for calculating a risk value from an item.

例えば、DRプロジェクトリスク値情報の算出式は、

リスク値=(遅れ日数/(完了予定日−DR実施日))*影響度

中日程リスク値情報の算出式は、

リスク値 = 遅れ日数

不適合リスク値情報の算出式は、

リスク値=(遅れ日数/(回答日限−発生日))*影響度

パンチリストリスク値情報の算出式は、

リスク値=(遅れ日数/(対応日限−起草日))*影響度

である。
For example, the calculation formula for DR project risk value information is:

Risk value = (Delayed days / (Scheduled completion date-DR implementation date)) * Impact

The calculation formula for medium schedule risk value information is:

Risk value = days late

The formula for calculating nonconformity risk value information is

Risk value = (days of delay / (response date-occurrence date)) * impact

The formula for calculating punch list risk value information is:

Risk value = (days late / (response date-drafting date)) * impact

It is.

次に、リスク出力処理部40で用いるリスク影響度判定条件41は、図7に示すように、上記のようなリスク値算出式で算出したリスク値を、リスク度に振り分けるための条件である。このリスク度は、プロジェクトのリスクに対する対策をユーザ(操作者)に促すための内容を示し、軽度と、中程度と、重大と、最重大で出力される。   Next, the risk influence degree determination condition 41 used in the risk output processing unit 40 is a condition for distributing the risk value calculated by the risk value calculation formula as described above to the risk degree as shown in FIG. This risk level indicates the content for prompting the user (operator) to take measures against the risk of the project, and is output as light, medium, serious, and most serious.

この条件を用いて、プロジェクト影響度算出処理部30は、後述するように、影響度の算出において、リスク値算出式33で算出したリスク値を所定の閾値により、軽度と、中程度と、重大と、最重大のいずれか一つのリスク度に振り分けて判定出力する。具体的には、例えば、リスク値≦10の場合はリスク度は軽度、11≦リスク値≦50の場合はリスク度を中程度、51≦リスク値≦99の場合はリスク度を重大、リスク値≧100の場合はリスク度を最重大、として出力する。   Using this condition, as will be described later, the project impact calculation processing unit 30 uses a predetermined threshold value to calculate the risk value calculated by the risk value calculation formula 33 in the impact calculation. And output the decision by allocating to one of the most serious risks. Specifically, for example, when the risk value ≦ 10, the risk level is mild, when 11 ≦ risk value ≦ 50, the risk level is moderate, when 51 ≦ risk value ≦ 99, the risk level is significant, risk value When ≧ 100, the risk level is output as the most serious.

〔2.作用〕
上記のように構成された本実施形態は、以下のように作用する。
〔2−1.客先製品情報の検索〕
まず、プロジェクトリスク検索処理部20は、図8に示す処理手順により、プロジェクトリスク検索処理を行う。リスク検索の対象とするリスク管理対象プロジェクトの指定は、どのような情報項目から行うようにしてもよいが、典型的な一例としては、顧客情報からその顧客先の製品情報を検索する。
[2. Action)
The present embodiment configured as described above operates as follows.
[2-1. (Search for customer product information)
First, the project risk search processing unit 20 performs a project risk search process according to the processing procedure shown in FIG. Designation of a risk management target project as a risk search target may be performed from any information item, but as a typical example, product information of a customer destination is searched from customer information.

この場合、プロジェクトリスク検索処理部20は、まず、本システムのユーザ(操作者)からユーザインタフェース(GUI)50を介して、プロジェクトの顧客情報の入力を受け付け(ステップS1)、プロジェクト情報データベース10から、入力された顧客情報に該当するプロジェクトの情報すなわち客先製品情報を検索抽出し(ステップS2)、該当するプロジェクト情報11を出力する(ステップS3)。   In this case, the project risk search processing unit 20 first receives input of project customer information from the user (operator) of this system via the user interface (GUI) 50 (step S1), and from the project information database 10. Then, the project information corresponding to the input customer information, that is, customer product information is retrieved and extracted (step S2), and the corresponding project information 11 is output (step S3).

具体的には、図9に例示するように、客先製品部別リスク検索画面(図9上部)を表示して、ユーザ(操作者)に客先製品名及び注番等などを入力又は選択操作で選択させ、それに応じた検索結果を図9下部の客先製品部別リスク一覧画面に表示する。操作又は設定によっては、リスク管理対象プロジェクトに類似したプロジェクトについても情報を検索する。   Specifically, as illustrated in FIG. 9, the customer product division-specific risk search screen (upper part of FIG. 9) is displayed, and the customer (operator) inputs or selects the customer product name, order number, and the like. The search result corresponding to the selection is displayed on the risk list screen for each customer product section at the bottom of FIG. Depending on the operation or setting, information is also searched for projects similar to the risk management target project.

すなわち、プロジェクトリスク検索処理部20は、入力された客先製品名及び注番等で、プロジェクト情報データベース10から、該当する客先製品情報13(図4(a))や、該当するリスク管理対象プロジェクト11を検索抽出する。そして、客先情報検索結果出力(ステップS3)では、その読み出された客先製品情報13(図4(a))をもとに、図9下部に示す客先製品別リスク一覧を表示するとともに、その客先製品情報13を客先製品ID検索結果記憶部21へ格納する。   That is, the project risk search processing unit 20 uses the input customer product name and order number, etc., from the project information database 10 to the corresponding customer product information 13 (FIG. 4 (a)) and the corresponding risk management target. Search and extract the project 11. Then, in the customer information search result output (step S3), based on the read customer product information 13 (FIG. 4A), the customer product-specific risk list shown in the lower part of FIG. 9 is displayed. At the same time, the customer product information 13 is stored in the customer product ID search result storage unit 21.

この客先製品ID検索結果記憶部21においては、リスクを出力する該当プロジェクトの客先製品ID、客先製品名、プロジェクト名称、注番、出荷日、ステータスコードが記憶されていることとなる。   In the customer product ID search result storage unit 21, the customer product ID, customer product name, project name, order number, shipping date, and status code of the project that outputs the risk are stored.

〔2−2.リスク影響度の算出〕
次に、プロジェクトリスク影響度算出処理部30は、プロジェクトで管理しているリスク影響度を算出するために、客先製品情報(図4(a))から各プロジェクトのリスク値を、図6のリスク値算出式で算出し、客先製品IDリスク情報記憶部31に格納する。この客先製品IDリスク情報記憶部31には、図4(b)〜(c)の情報と、リスク値が設定される。
[2-2. (Risk impact calculation)
Next, the project risk impact calculation processing unit 30 calculates the risk value of each project from the customer product information (FIG. 4A) in order to calculate the risk impact managed by the project. Calculated by the risk value calculation formula and stored in the customer product ID risk information storage unit 31. The customer product ID risk information storage unit 31 is set with information shown in FIGS. 4B to 4C and a risk value.

具体的には、プロジェクトリスク影響度算出処理部30は、図10に示す流れ図に従って、プロジェクトリスク影響度算出処理を実施する。すなわち、まず、客先製品IDのDRプロジェクト情報から、リスク値算出式に従いリスク値を求めて出力する(ステップT1)。この処理では、客先製品ID検索結果記憶部21に設定された客先製品IDを用いて、プロジェクト情報データベース10のDRプロジェクト情報14(図4(b))から、客先製品IDと一致したDRプロジェクト情報のリスク値をリスク値算出式33で求めて客先製品IDリスク情報記憶部31に格納する。   Specifically, the project risk impact calculation processing unit 30 performs the project risk impact calculation processing according to the flowchart shown in FIG. That is, first, the risk value is obtained and output from the DR project information of the customer product ID according to the risk value calculation formula (step T1). In this process, the customer product ID set in the customer product ID search result storage unit 21 is matched with the customer product ID from the DR project information 14 (FIG. 4B) in the project information database 10. The risk value of the DR project information is obtained by the risk value calculation formula 33 and stored in the customer product ID risk information storage unit 31.

例えば、DRプロジェクトリスク値情報の算出は、

リスク値=(遅れ日数/(完了予定日−DR実施日))*影響度

で行う。
For example, the calculation of DR project risk value information is

Risk value = (Delayed days / (Scheduled completion date-DR implementation date)) * Impact

To do.

次に、プロジェクトリスク影響度算出処理部30は、客先製品IDの中日程情報からリスク値算出式に従いリスク値を求めて出力する(ステップT2)。この処理では、客先製品ID検索結果記憶部21に設定された客先製品IDを用いて、プロジェクト情報データベース10の中日程情報15(図4(c))から、客先製品IDと一致した中日程情報のリスク値をリスク値算出式33で求め、客先製品IDリスク情報記憶部31に格納する。   Next, the project risk impact calculation processing unit 30 obtains and outputs a risk value according to the risk value calculation formula from the medium schedule information of the customer product ID (step T2). In this process, the customer product ID set in the customer product ID search result storage unit 21 matches the customer product ID from the medium schedule information 15 (FIG. 4C) of the project information database 10. The risk value of the medium schedule information is obtained by the risk value calculation formula 33 and stored in the customer product ID risk information storage unit 31.

例えば、中日程リスク値情報の算出は、

リスク値 = 遅れ日数

で行う。
For example, calculation of medium schedule risk value information:

Risk value = days late

To do.

次に、プロジェクトリスク影響度算出処理部30は、客先製品IDの不適合情報からリスク値算出式に従いリスク値を求めて出力する(ステップT3)。この処理では、客先製品ID検索結果記憶部21に設定された客先製品IDを用いて、プロジェクト情報データベース10の不適合情報16(図4(d))から、客先製品IDと一致した不適合情報のリスク値をリスク値算出式33で求め、客先製品IDリスク情報記憶部31に格納する。   Next, the project risk impact calculation processing unit 30 obtains and outputs a risk value according to the risk value calculation formula from the nonconformity information of the customer product ID (step T3). In this process, using the customer product ID set in the customer product ID search result storage unit 21, the nonconformity that matches the customer product ID from the nonconformity information 16 (FIG. 4D) in the project information database 10. The risk value of the information is obtained by the risk value calculation formula 33 and stored in the customer product ID risk information storage unit 31.

例えば、不適合リスク値情報の算出は、

リスク値=(遅れ日数/(回答日限−発生日))*影響度

で行う。
For example, calculation of nonconformity risk value information

Risk value = (days of delay / (response date-occurrence date)) * impact

To do.

不適合情報16は、例えば特許文献7に例示するような不適合分析支援装置など、不適合に関する他の管理システムと連携をとり、プロジェクトリスト影響度に情報の提供を行っている。   The nonconformity information 16 cooperates with other management systems related to nonconformity, such as a nonconformity analysis support device as exemplified in Patent Document 7, and provides information on the project list influence degree.

前記不適合分析支援装置は、不適合情報を電子情報として共有化・一元化して蓄積・管理すると共に、蓄積した不適合情報を利用して水平展開等を考慮した不適合分析をネットワーク上で積極的に支援するものである。具体的には、不適合情報管理アプリケーションサ−バを、重要不適合分析支援装置、参照者端末、参照側簡易移動端末と、通信ネットワークを介して接続する。このサ−バ1が、前記通信ネットワークを通じて接続された各種の端末に対して、不適合情報の入力支援を行い、取得したデータに基づいて、データベース中の情報の更新または検索を行う。また、前記重要不適合分析支援装置は、ユーザに対して、重要不適合の真因追求または対策検討を行うために詳細な重要不適合分析を含むケ−ススタディを実施するための入力支援を行い、取得したデータに基づいて、重要不適合情報の分析データを作成する。   The nonconformity analysis support device shares and unifies nonconformance information as electronic information, accumulates and manages it, and actively supports nonconformity analysis in consideration of horizontal development etc. using the accumulated nonconformity information on the network. Is. Specifically, the nonconformity information management application server is connected to the important nonconformity analysis support device, the reference terminal, and the reference-side simple mobile terminal via a communication network. The server 1 supports input of nonconformity information to various terminals connected through the communication network, and updates or searches information in the database based on the acquired data. In addition, the important nonconformity analysis support device provides the user with input support for conducting a case study including detailed important nonconformity analysis in order to pursue the root cause of the important nonconformity or examine the countermeasure. Analytical data of important nonconformity information is created based on the obtained data.

次に、プロジェクトリスク影響度算出処理部30は、客先製品IDのパンチリスト情報からリスク値算出式に従いリスク値を求めて出力する(ステップT4)。この処理では、客先製品ID検索結果記憶部21に設定された客先製品IDを用いて、プロジェクト情報データベース10のパンチリスト情報17(図4(e))から、客先製品IDと一致したパンチリスト情報のリスク値をリスク値算出式33で求め、客先製品IDリスク情報記憶部31に格納する。   Next, the project risk impact calculation processing unit 30 calculates and outputs a risk value from the punch list information of the customer product ID according to the risk value calculation formula (step T4). In this process, the customer product ID set in the customer product ID search result storage unit 21 is matched with the customer product ID from the punch list information 17 (FIG. 4E) in the project information database 10. The risk value of the punch list information is obtained by the risk value calculation formula 33 and stored in the customer product ID risk information storage unit 31.

例えば、パンチリストリスク値情報の算出は、

リスク値=(遅れ日数/(対応日限−起草日))*影響度

で行う。
For example, the calculation of punch list risk value information is

Risk value = (days late / (response date-drafting date)) * impact

To do.

次に、プロジェクトリスク影響度算出処理部30は、客先製品IDの予防保全手配部品情報記憶部の改廃情報から製品中止品、使用禁止手配部品を出力する(ステップT5)において、特開平2003−281296に例示するような予防保全情報システムなど、他の管理システムと客先製品IDを用いて、図4(f)の情報から客先製品IDと一致した予防保全情報を客先製品ID手配部品情報記憶部32に格納する。   Next, the project risk impact calculation processing unit 30 outputs a product discontinued product and a use prohibition arranged component from the revision / decommission information in the preventive maintenance arranged component information storage unit of the customer product ID (step T5). Using other management systems and customer product IDs such as the preventive maintenance information system exemplified in 281296, customer product ID arrangement parts that match customer product IDs from the information of FIG. The information is stored in the information storage unit 32.

前記予防保全情報システムは、予防保全情報の共有化と一元化、適切な分類を実現し、関係者がデータの更新や検索を容易に行うことができるようにするものである。具体的には、前記予防保全情報管理システムは、Webシステムで構成され、そのうちの予防保全情報管理Webアプリケーションサーバは、その機能部により、通信ネットワークを介してユーザの端末と入力支援表示を通じてデータのやり取りを行い、端末から得られたデータにより、予防保全情報管理データサーバと連携してデータベース中の各情報ファイルを検索したり、データベース中の各情報ファイルを更新したりする。   The preventive maintenance information system realizes sharing and unification of preventive maintenance information, and appropriate classification, so that related parties can easily update and search data. Specifically, the preventive maintenance information management system is configured by a Web system, and the preventive maintenance information management Web application server includes a function unit that stores data through a user terminal and an input support display via a communication network. By exchanging data, the information obtained from the terminal is used to search each information file in the database or update each information file in the database in cooperation with the preventive maintenance information management data server.

また、Webアプリケーションサーバにおいて、共通情報管理部と既納品情報管理部は、顧客に出荷した製品に関する顧客情報と出荷製品情報、製品の予防保全業務に関する基本情報を管理し、定期保守結果情報管理部と水平展開結果情報管理部は、製品の予防保全業務の結果に関する結果情報を管理する。   In the Web application server, the common information management unit and the already-delivered product information management unit manage customer information and product information about products shipped to customers, and basic information about preventive maintenance work for products, and a periodic maintenance result information management unit The horizontal development result information management unit manages result information related to the result of the preventive maintenance work of the product.

〔2−3.リスクの出力〕
次に、リスク出力処理部40は、図11に示すような動作手順で、リスク出力処理を行う。この処理は、各プロジェクトや項目別の出力要求(ステップU1〜U7)に応じ、プロジェクトリスク影響度算出処理部30で得られた上記各リスク情報(リスク値や予防保全情報)を、客先製品IDリスク情報記憶部31や客先製品手配部品情報記憶部32から読み出してユーザインタフェース(GUI)50にリスト出力するものである。
[2-3. (Risk output)
Next, the risk output processing unit 40 performs the risk output process according to the operation procedure as shown in FIG. In this process, each risk information (risk value and preventive maintenance information) obtained by the project risk impact calculation processing unit 30 is converted into customer products according to output requests (steps U1 to U7) for each project or item. The information is read from the ID risk information storage unit 31 and the customer product arrangement part information storage unit 32 and is output as a list on the user interface (GUI) 50.

この処理では、まず、各プロジェクト別にリスクの出力要求を行うと(ステップU1)、そのプロジェクトについてどのようなリスク情報の項目が存在するかを、図12のリスク表示画面で表示する。この表示例では、プロジェクトの各項目(例えば「パンチリスト」「DR検討項目」など)ごとに、出力できるリスクの件数などを表示していて、ユーザ(操作者)が、この画面(図12)中の所望のプロジェクト項目に表示されているリスク件数を選択すると、各プロジェクト項目名に対応したリスクをリスク対策リスト42として出力する。   In this process, when a risk output request is made for each project (step U1), what risk information items exist for the project is displayed on the risk display screen of FIG. In this display example, the number of risks that can be output is displayed for each item of the project (for example, “punch list”, “DR examination item”, etc.), and the user (operator) displays this screen (FIG. 12). When the number of risks displayed in the desired project item is selected, the risk corresponding to each project item name is output as the risk countermeasure list 42.

すなわち、ユーザ(操作者)が、DRプロジェクトのリスク出力要求をすれば(ステップU3)、DRプロジェクト情報のリスク対策リストの出力を促す。同様に、中日程のリスク出力要求(ステップU4)に対しては、中日程情報のリスク対策リストの出力を、不適合のリスク出力要求(ステップU5)に対しては、不適合情報のリスク対策リストの出力を、パンチリストのリスク出力要求に対しては(ステップU6)、パンチリスト情報のリスク対策リストの出力を促す。   That is, if a user (operator) makes a risk output request for a DR project (step U3), the user is prompted to output a risk countermeasure list of DR project information. Similarly, the output of the risk countermeasure list of the medium schedule information is output for the risk output request of the middle schedule (step U4), and the risk countermeasure list of the nonconformance information is output for the risk output request of the nonconformity (step U5). In response to the punch list risk output request (step U6), the output of the risk countermeasure list of the punch list information is prompted.

また、製造中止品、使用禁止手配部品の出力要求(ステップU7)に対しては、製品中止品、使用禁止手配部品情報は、前記した特開平2003−281296の予防保全情報管理支援方法により、予防保全情報との連携をとり、客先製品手配部品チェックシート43に出力する。ステップU1〜U8の処理は、ユーザ(操作者)のリスクの出力要求が終了するまで(ステップU2)繰り返す。   Further, in response to an output request for a production discontinued product and use prohibited arrangement part (step U7), the product discontinuation product and use prohibited arrangement part information is prevented by the preventive maintenance information management support method described in JP-A-2003-281296. It cooperates with maintenance information and outputs it to the customer product arrangement parts check sheet 43. The processing of steps U1 to U8 is repeated until the user (operator) risk output request is completed (step U2).

〔2−4.リスク対策リストの出力〕
上記のように選択された各項目のリスクの出力は、形式は自由であるが、ここでは、リスク対策リストを作成して出力するものとする(ステップU8)。このリスク対策リストは、いくつかの部分ができていてもよく、この場合の個々の部分の出力例を図13〜16に示す。このうち、図13は、出力情報のうちDRプロジェクトに係る部分(DRプロジェクト出力部)の一例を示す。以下これに準じ、図14は中日程出力部の一例を、図15は不適合出力部の一例を、図16はパンチリスト出力部の一例を示す。
[2-4. (Output of risk countermeasure list)
The risk output of each item selected as described above can be of any format, but here, a risk countermeasure list is created and output (step U8). This risk countermeasure list may have several parts, and examples of output of individual parts in this case are shown in FIGS. Among these, FIG. 13 shows an example of a part (DR project output unit) related to the DR project in the output information. In the following, FIG. 14 shows an example of a medium schedule output unit, FIG. 15 shows an example of a nonconforming output unit, and FIG. 16 shows an example of a punch list output unit.

このようにユーザ(操作者)の要求に応じたリスク対策リストを出力をするため、客先製品IDリスク情報31に設定されたリスク値を基に、ユーザ(操作者)の要求がDRプロジェクト情報要求の場合は(ステップU3)、図13のDRプロジェクト出力部に、リスク対策のためのリスク値と、リスク影響度判定条件41から求めたリスク度を出力する。   In order to output the risk countermeasure list according to the request of the user (operator) in this way, the request of the user (operator) is the DR project information based on the risk value set in the customer product ID risk information 31. In the case of a request (step U3), the risk value for risk countermeasures and the risk level obtained from the risk impact determination condition 41 are output to the DR project output unit of FIG.

同様に、中日程情報要求の場合は(ステップU4)図14の中日程出力部に、不適合情報要求の場合は(ステップU5)図15の不適合出力部に、パンチリスト情報要求の場合は(ステップU6)図16のパンチリスト出力部に、それぞれのリスク値と、リスク影響度判定条件41から求めたリスク度を出力する。   Similarly, in the case of a middle schedule information request (step U4), in the middle schedule output part of FIG. 14, in the case of non-conformity information request (step U5), in the non-conformity output part of FIG. U6) Each risk value and the risk degree calculated from the risk influence degree determination condition 41 are output to the punch list output unit of FIG.

以上のような各部(図13〜図16)を出力する形式は自由で、例えば、一画面又は複数画面の構成やタブ切替画面構成などにより、リスク対策リスト42として出力する。なお、上記のようなリスク影響度判定条件の具体的内容も自由で、本実施形態では、リスク値≦10の時、リスク度を軽度、11≦リスク値≦50の時、リスク度を中程度、51≦リスク値≦99の時、リスク度を重大、リスク値≧100の時、リスク度を最重大で出力する、という例を用いたが、プロジェクトの対象分野などに応じて適宜変更可能である。   The format for outputting the respective units (FIGS. 13 to 16) as described above is arbitrary. For example, it is output as the risk countermeasure list 42 according to a configuration of one screen or a plurality of screens, a tab switching screen configuration, or the like. In addition, the specific contents of the risk influence degree determination conditions as described above are also free. In this embodiment, when the risk value ≦ 10, the risk degree is mild, and when 11 ≦ risk value ≦ 50, the risk degree is medium. , 51 ≦ risk value ≦ 99, the risk level is critical, and when the risk value ≧ 100, the risk level is the most serious output, but it can be changed according to the target field of the project. is there.

〔3.効果〕
以上のように、本実施形態によれば、複数のプロジェクトに関し、基本情報、DR情報、出荷品質情報等の詳細なプロジェクト情報について、各担当者等のユーザ端末から登録受付して一元管理し閲覧利用にも応じることにより、メンバー間やプロジェクト間での情報共有と効果的管理を可能にするとともに、プロジェクトのリスクについても検索と影響度の算出まで行うので、手戻りや品質上などのリスクについて早期の把握や対策もGUIで容易に共有可能となる。
[3. effect〕
As described above, according to the present embodiment, with respect to a plurality of projects, detailed project information such as basic information, DR information, and shipping quality information is registered from a user terminal such as each person in charge, and is centrally managed and viewed. By responding to usage, it is possible to share information and manage effectively between members and projects, as well as search and calculate the degree of impact on the project risk. Early grasp and countermeasures can be easily shared on the GUI.

より具体的には、下記のように問題点を改善する優れた効果が実現可能となる。
(1)本実施形態によれば、複数のプロジェクト進捗状況を迅速に把握することが出来、プロジェクトの完了の遅延する事態を極力防止することが出来ると共に、各工程および担当者の進捗状況を詳細に、また、各プロジェクトおよび担当者の作業生産性を把握することが出来て、完了遅延や仕様の追加によりコストが増大する事態になった場合の対策を即座に実施することが出来、完了したプロジェクトのデータを新規プロジェクトの見積りや計画に有効に活用することが出来るプロジェクト品質管理システムと方法を提供することが可能となる。
More specifically, an excellent effect of improving the problem can be realized as described below.
(1) According to the present embodiment, it is possible to quickly grasp the progress status of a plurality of projects, to prevent the delay of completion of the project as much as possible, and to detail the progress status of each process and the person in charge. In addition, it was possible to grasp the work productivity of each project and the person in charge, and it was possible to immediately implement countermeasures in case the cost increased due to completion delays or addition of specifications. It is possible to provide a project quality management system and method capable of effectively utilizing project data for estimating and planning a new project.

(2)また、本実施形態によれば設計、製造、試験の各工程毎の計画と承認状態(未承認、承認依頼中、承認済み)の情報を付加して承認されたデータを保護すると共に、線表画面上に各進捗状態を表示する構成をしている事から、従来の紙ベースの承認を不要とし、管理を簡易且つ各工程ごとに計画と実績をきめ細かく管理できると共に、画面上に承認状態を判り易く表示および承認情報のデータの保護を実現できる。 (2) Further, according to the present embodiment, the plan and the approval status (not approved, approval requested, approved) for each process of design, manufacturing, and testing are added to protect the approved data. Because it is configured to display each progress status on the line table screen, it eliminates the need for conventional paper-based approval, simplifies management and allows detailed management of plans and results for each process, and on the screen. The approval status can be easily understood, and the data of the display and approval information can be protected.

(3)また、本実施形態によればこれらにより、従来の紙ベースでの承認を行う必要がなく、紙によるプロジェクト管理表の保管が不要となり、承認情報を更新する場合にも紙による媒体を通す事がなくなるので、データ内部の情報の変更だけで済む。また、承認行為の機能を電子化することで工程ごとのプロジェクト管理の完了、未完了を正確に判断することが可能となる。 (3) Further, according to the present embodiment, it is not necessary to perform a conventional paper-based approval, it is not necessary to store a project management table in paper, and a paper medium is used even when the approval information is updated. Since there is no need to pass, only the information inside the data needs to be changed. In addition, by digitizing the function of the approval action, it is possible to accurately determine whether the project management for each process is completed or not.

(4)また、本実施形態によればこれらにより、プロジェクト管理計画表で、設計、製造、試験の各工程毎の計画と承認状態(未承認、承認依頼中、承認済み)の情報が共有化され、各工程毎に計画と実績を誰でもが共通の認識で共有・管理することが可能となる。 (4) In addition, according to the present embodiment, the plan and approval status (unapproved, approval requested, approved) for each process of design, manufacturing, and testing are shared in the project management plan table. Therefore, anyone can share and manage plans and results for each process with a common recognition.

(5)また、本実施形態によればこれらにより、プロジェクト計画・管理表を一括管理し、共有化することが出来、承認情報を更新する場合にデータ変更が容易になり、また、承認等の計画書の回付が迅速に行えることにより、プロジェクト管理の完了、未完了について情報の共有化が図られ、誰でもが正確に判断することが可能となる。 (5) Also, according to this embodiment, the project plan / management table can be collectively managed and shared by these, data can be easily changed when the approval information is updated, and the approval etc. By being able to circulate the plan quickly, it is possible to share information on the completion and incompleteness of project management, and anyone can make an accurate decision.

(6)また、本実施形態によればプロジェクト検討会議開催案内等の発行については、プロジェクト計画書に基づいた工程で開催案内を発行することにより、都合等で開催日が変更になったりした場合には迅速に対応が出来、予定していた出席メンバーに迅速に連絡することができ、担当者の負担を大幅に削減することが可能となる。 (6) In addition, according to the present embodiment, for the issuance of the project review meeting holding guidance, etc., when the holding date is changed due to circumstances, etc., by issuing the holding guidance in the process based on the project plan. It is possible to respond promptly and to promptly contact the attending members who have been scheduled, and the burden on the person in charge can be greatly reduced.

(7)また、本実施形態によればブロジェクト検討会議の議事録の発行においては、迅速に会議に出席したメンバーに配布し、議事録の共有化が行われ、関係部門からの問合せや議事録に記載された検討事項や重大水平展開事項などが共有化されることにより品質向上が図られる。 (7) Also, according to this embodiment, in issuing the minutes of the project review meeting, it is quickly distributed to the members who attended the meeting, and the minutes are shared, and inquiries and minutes from the related departments The quality can be improved by sharing the considerations and important horizontal development items described in the records.

(8)また、本実施形態によれば担当者が工程を確認しながら都度ブロジェクト検討会議開催などの準備をすすめる必要がなく、担当者への負担が非常に軽滅され、プロジェクトに関係するメンバーに情報や工程を共用することにより、プロジェクトに係わっているメンバーの進捗状況の把握が可能となる。 (8) Further, according to the present embodiment, it is not necessary for the person in charge to check the process and to make preparations such as holding a project review meeting each time, and the burden on the person in charge is extremely lightened and related to the project. By sharing information and processes with members, it is possible to grasp the progress of members involved in the project.

(9)また、本実施形態においてプロジェクト情報データベースに記憶された類似化したプロジェクトのリスクアイテムを用いて、且つ各リスクアイテムを定量化して出力し、プロジェクトリスク管理に含まれるリスクアイテムを100%把握することが出来、各リスクアイテムのリスク管理対象のプロジェクトに対する影響度を定量的に把握でき、プロジェクト実行時における不測事態発生を極力抑制することが可能となる。 (9) In addition, using the risk items of the similar project stored in the project information database in the present embodiment, quantifying and outputting each risk item, and grasping 100% of the risk items included in the project risk management It is possible to quantitatively grasp the degree of influence of each risk item on the risk management target project, and to suppress the occurrence of unforeseen circumstances at the time of project execution as much as possible.

(10)また、本実施形態によれば、プロジェクト管理者による後戻り作業の発生リスクの管理が可視化することから、プロジェクトを効率的に振興させることが出来る。 (10) Moreover, according to this embodiment, since the management of the risk of occurrence of backtracking work by the project manager is visualized, the project can be promoted efficiently.

(11)また、本実施形態においてプロジェクトの進捗が定量的に管理可能となり、又プロジェクトの難易度についても比較的均質的に把握でき、生産、品質などのバラツキを極力抑えることが出来る。 (11) Further, in the present embodiment, the progress of the project can be managed quantitatively, the degree of difficulty of the project can be grasped relatively homogeneously, and variations in production and quality can be suppressed as much as possible.

さらに以下、他の観点から整理すると、本実施形態では、リスクとの関係の深い複数種類の情報(客先製品情報、DRプロジェクト情報、中日程情報、不適合情報、パンチリスト情報、予防保全情報、手配品情報)をプロジェクト情報に含め、リスクの影響度判断の基礎とすることにより、リスクの把握をより効果的に行うことが可能となる。   Further, from the following viewpoint, in this embodiment, in this embodiment, multiple types of information (customer product information, DR project information, medium schedule information, nonconformity information, punch list information, preventive maintenance information, By including (arranged product information) in the project information and using it as the basis for determining the impact of the risk, it becomes possible to grasp the risk more effectively.

また、本実施形態では、客先製品情報として、製品名やプロジェクト名称など複数種類の情報を含めることにより、これら情報の一部からでも所望のプロジェクト情報を容易に特定したり、客先製品情報に関するリスクを網羅的に把握容易となり、客先の顧客満足度が改善できる。   In this embodiment, by including a plurality of types of information such as product names and project names as customer product information, desired project information can be easily specified from a part of these information, or customer product information It is easy to comprehensively understand the risks related to the customer, and the customer satisfaction of the customer can be improved.

また、本実施形態では、DR(デザインレビュー)プロジェクト情報として、遅れ日数や完了予定日など複数種類の情報を含めることにより、DRプロジェクト情報の一部からでも所望のプロジェクト情報を容易に特定したり、DRプロジェクト情報に関するリスクを網羅的に把握容易となり、デザインレビューの効果的活用が可能となる。   Further, in the present embodiment, by including a plurality of types of information such as the number of days delayed and the scheduled completion date as DR (design review) project information, desired project information can be easily specified from a part of the DR project information. This makes it easy to comprehensively understand the risks related to DR project information, and enables effective use of design reviews.

また、本実施形態では、中日程情報として、遅れ日数や予定日など複数種類の情報を含めることにより、中日程情報の一部からでも所望のプロジェクト情報を容易に特定したり、中日程情報に関するリスクを網羅的に把握容易となり、日程という客観性の高い要素に基づく効果的なリスク管理が可能となる。   Further, in the present embodiment, by including a plurality of types of information such as delay days and scheduled dates as medium schedule information, desired project information can be easily specified from a part of the medium schedule information, or Risks can be easily grasped comprehensively, and effective risk management based on highly objective elements such as schedules becomes possible.

また、本実施形態では、不適合情報として、不適合管理番号などの情報を含めることにより、不適合情報の一部からでも所望のプロジェクト情報を容易に特定したり、不適合情報に関するリスクを網羅的に把握容易となり、不適合が効果的に抑制可能となる。   In addition, in this embodiment, by including information such as a nonconformity management number as nonconformity information, it is possible to easily identify desired project information even from a part of the nonconformity information, and to easily grasp risks related to nonconformity information comprehensively. Thus, nonconformity can be effectively suppressed.

また、本実施形態では、パンチリスト情報として、遅れ日数や予定日など複数種類の情報を含めることにより、中日程情報の一部からでも所望のプロジェクト情報を容易に特定したり、中日程情報に関するリスクを網羅的に把握容易となり、不良修正のリスクを効果的に管理可能となる。   In the present embodiment, the punch list information includes a plurality of types of information such as the number of days delayed and the scheduled date, so that desired project information can be easily specified even from a part of the middle schedule information, or the middle schedule information It becomes easy to grasp the risk comprehensively, and the risk of defect correction can be effectively managed.

また、本実施形態では、予防保全情報として、手配部品などの情報を含めることにより、部品を手がかりとして予防保全情報から所望のプロジェクト情報を容易に特定したり、予防保全情報に関するリスクを網羅的に把握容易となり、安全品質が効果的に改善可能となる。   In addition, in this embodiment, by including information such as parts to be arranged as preventive maintenance information, desired project information can be easily identified from preventive maintenance information by using parts as a clue, and risks related to preventive maintenance information are comprehensively included. It becomes easy to grasp and safety quality can be effectively improved.

また、本実施形態では、手配品情報として、改廃情報や代替部品情報などの情報を含めることにより、部品の改廃や代替の場合も含めて手配品情報から所望のプロジェクト情報を容易に特定したり、手配品情報に関するリスクを網羅的に把握容易となり、部品手配をボトルネックとする遅延波及が効果的に抑制可能となる。   Also, in this embodiment, by including information such as revision / decommissioning information and replacement parts information as the arrangement product information, desired project information can be easily identified from the arrangement information including the case of parts renovation or replacement. Therefore, it becomes easy to comprehensively understand the risks related to the arranged product information, and it is possible to effectively suppress the delay propagation caused by the arrangement of parts as a bottleneck.

また、本実施形態では、影響度区分コードと、プロジェクトへの影響度の区分を予め対応付けたテーブル12の利用により、単純な判定処理で一貫した基準を確実に適用可能となる。   Further, in the present embodiment, by using the table 12 in which the impact degree classification code and the impact degree classification on the project are associated in advance, a consistent standard can be reliably applied with a simple determination process.

また、本実施形態では、プロジェクト情報に含まれる各情報の項目からリスク値を算出するために定式化した算出式33を予め用意することにより、プロジェクト管理の情報から少ない演算負担で迅速に安定したリスク把握を行うことが可能となる。   Further, in the present embodiment, by preparing in advance a calculation formula 33 formulated to calculate a risk value from each item of information included in the project information, it can be quickly and stably reduced from the project management information with a small calculation burden. It becomes possible to grasp the risk.

また、本実施形態では、また、算出したリスク値を、リスク影響度判定条件41により複数のリスク度に振り分け判定することにより、どれから優先して処理するかの判定が誰にとっても一見容易となり、プロジェクト管理業務の精度と効率が改善できる。   Further, in this embodiment, by assigning the calculated risk value to a plurality of risk degrees according to the risk impact determination condition 41, it becomes easy for anyone to determine which process is prioritized. , Improve the accuracy and efficiency of project management work.

また、本実施形態では、プロジェクトリスク検索処理部20が、客先製品情報の一部の入力を受けて、一致する客先製品情報や該当するプロジェクトの情報を検索出力することにより、客先を手がかりとしたリスクの把握が容易となり、顧客満足度が効果的に改善できる。   In this embodiment, the project risk search processing unit 20 receives a part of the customer product information and searches for and outputs matching customer product information and corresponding project information. This makes it easier to understand the risks used as clues and can effectively improve customer satisfaction.

〔4.他の実施形態〕
なお、上記実施形態は例示に過ぎず、本発明は以下に例示するもの及びそれ以外の他の実施形態を含むものである。例えば、上記実施形態に説明した装置は、記憶媒体に格納したプログラムをコンピュータに読み込ませ実行させることで実現可能である。
[4. Other embodiments]
In addition, the said embodiment is only an illustration and this invention includes what is illustrated below and other embodiment other than that. For example, the apparatus described in the above embodiment can be realized by causing a computer to read and execute a program stored in a storage medium.

ここで本発明における記憶媒体としては、磁気ディスク、フレキシブルディスク、ハードディスク、光ディスク(CD−ROM、CD−R、DVD等)、光磁気ディスク(MO等)、プログラム等を記憶でき、かつコンピュータが読み取り可能な記憶媒体であれば、その記憶形式は何れの形態であってもよい。   Here, as a storage medium in the present invention, a magnetic disk, a flexible disk, a hard disk, an optical disk (CD-ROM, CD-R, DVD, etc.), a magneto-optical disk (MO, etc.), a program, etc. can be stored and read by a computer. As long as it is a possible storage medium, the storage format may be any form.

また、記憶媒体からコンピュータにインストールされたプログラムの指示に基づきコンピュータ上で稼動しているOS(オペレーティングシステム)や、データベース管理ソフト、ネットワークソフト等のMW(ミドルウェア)等が本実施形態を実現するための各処理の一部を実行してもよい。   In addition, an OS (operating system) running on a computer based on an instruction of a program installed in the computer from a storage medium, MW (middleware) such as database management software, network software, or the like implements the present embodiment. A part of each process may be executed.

さらに、本発明における記憶媒体には、コンピュータと独立した媒体に限らず、LANやインターネット等により伝送されたプログラムを記憶または一時記憶した記憶媒体も含まれ、記憶媒体は1つに限らず、複数の媒体から本実施形態における処理が実行される場合も本発明における記憶媒体に含まれ、媒体構成は何らの構成であってもよい。   Furthermore, the storage medium in the present invention is not limited to a medium independent of a computer, but also includes a storage medium that stores or temporarily stores a program transmitted via a LAN, the Internet, or the like. The case where the processing in this embodiment is executed from this medium is also included in the storage medium in the present invention, and the medium configuration may be any configuration.

特に、ASP(Application Service Provider)構成のサーバシステムと、予め登録したサービス対象のユーザ端末とを、通信ネットワーク経由で接続することにより、請求項1から13のいずれか一項に記載のプロジェクトリスク管理システムを実現すれば、いろいろな部門や利用者群ごとに、個別のシステム開発やサーバの準備無しに、容易迅速安価にプロジェクトリスク管理を導入利用可能となる。   The project risk management according to any one of claims 1 to 13, in particular, by connecting a server system having an ASP (Application Service Provider) configuration and a pre-registered service target user terminal via a communication network. If the system is realized, project risk management can be introduced and used easily, quickly and inexpensively for various departments and user groups without individual system development and server preparation.

また、プロジェクト情報データベースの機能をASP構成のサーバとして実現し、通信ネットワーク経由で前記ユーザ端末又は他の情報処理システムからアクセス可能とすれば、データベースとそれにアクセスしての演算処理が分離できるので、システム改修や負荷分散が容易となってシステムの可用性やスループットが向上する。   In addition, if the function of the project information database is realized as an ASP-configured server and can be accessed from the user terminal or other information processing system via a communication network, the database and the arithmetic processing accessing it can be separated. System renovation and load balancing are facilitated, improving system availability and throughput.

さらに、所定の遠隔管理手段により、出力異常等の不具合を監視検出するとともに、そのような不具合の検出時には、前記通信ネットワーク経由で操作者又は所定の管理者に対し、警報や画面表示により報知するようにすれば、不具合の遠隔報知により迅速な障害対応が可能となり、プロジェクトリスクの管理業務が円滑に続行及び早期に再開可能となる。   Furthermore, a predetermined remote management means monitors and detects a fault such as an output abnormality, and when such a fault is detected, notifies the operator or a predetermined manager via the communication network by an alarm or a screen display. By doing so, it becomes possible to respond quickly to troubles by remote notification of defects, and project risk management work can be smoothly continued and resumed early.

なお、本発明におけるコンピュータは、記憶媒体に記憶されたプログラムに基づき、本実施形態における各処理を実行するものであって、パソコン等の1つからなる装置、複数の装置がネットワーク接続されたシステム等の何れかの構成であってもよい。   The computer according to the present invention executes each process according to the present embodiment based on a program stored in a storage medium, and includes a single device such as a personal computer or a system in which a plurality of devices are connected to a network. Any of these configurations may be used.

また、本発明におけるコンピュータとは、パソコンに限らず、情報処理装置に含まれる演算装置、マイコン等も含み、プログラムよって本発明の機能を実現可能な機器、装置を総称している。   The computer in the present invention is not limited to a personal computer, but includes a computing device, a microcomputer, and the like included in an information processing apparatus, and is a generic term for devices and apparatuses that can realize the functions of the present invention by a program.

本発明の実施形態の概略構成を示す機能ブロック図Functional block diagram showing a schematic configuration of an embodiment of the present invention 本発明の実施形態におけるプロジェクトリスク管理システムのハードウェア構成を例示する図The figure which illustrates the hardware constitutions of the project risk management system in embodiment of this invention 本発明の実施形態におけるプロジェクト情報データベースに記憶された、過去に実施された及び現在実行中の各プロジェクトのプロジェクト情報及び影響度定義テーブルを示す概念図The conceptual diagram which shows the project information and impact degree definition table of each project which were implemented in the past and are currently running memorize | stored in the project information database in embodiment of this invention 本発明の実施形態における各プロジェクト情報を示す図The figure which shows each project information in embodiment of this invention 本発明の実施形態における影響度定義テーブルの構成を示す図The figure which shows the structure of the influence degree definition table in embodiment of this invention. 本発明の実施形態におけるリスク値算出式を示す図The figure which shows the risk value calculation formula in embodiment of this invention. 本発明の実施形態におけるリスク影響度判定条件を示す図The figure which shows the risk influence degree determination condition in embodiment of this invention 本発明の実施形態におけるプロジェクトリスク検索処理の手順を示す図The figure which shows the procedure of the project risk search process in embodiment of this invention. 本発明の実施形態におけるプロジェクトリスク検索処理の画面表示例を示す図The figure which shows the example of a screen display of the project risk search process in embodiment of this invention 本発明の実施形態におけるプロジェクトリスク影響度算出処理の手順を示す図The figure which shows the procedure of the project risk influence degree calculation process in embodiment of this invention. 本発明の実施形態におけるリスク対策出力処理の手順を示す図The figure which shows the procedure of the risk countermeasure output process in embodiment of this invention 本発明の実施形態におけるリスク表示の画面例を示す図The figure which shows the example of a screen of the risk display in embodiment of this invention 本発明の実施形態におけるリスク出力のうち、DRプロジェクトに関する部分(DRプロジェクト出力部)を例示する図The figure which illustrates the part (DR project output part) regarding DR project among the risk outputs in the embodiment of the present invention 本発明の実施形態におけるリスク出力のうち、中日程に関する部分(中日程出力部)を例示する図The figure which illustrates the part (medium schedule output part) regarding a middle schedule among the risk outputs in embodiment of this invention. 本発明の実施形態におけるリスク出力のうち、不適合に関する部分(不適合出力部)を例示する図The figure which illustrates the part (nonconformity output part) regarding nonconformity among the risk outputs in embodiment of this invention 本発明の実施形態におけるリスク出力のうち、パンチリストに関する部分(パンチリスト出力部)を例示する図The figure which illustrates the part (punch list output part) regarding a punch list among the risk outputs in embodiment of this invention

符号の説明Explanation of symbols

1…システムバス
2…CPU
3…入力部
4…出力部
5…ROM
6…RAM
7…HDD
8…FDD
9…ODD
10…プロジェクト情報データベース
11…プロジェクト情報
12…影響度定義テーブル
13…客先製品情報
14…DRプロジェクト情報
15…中日程情報
16…不適合情報
17…パンチリスト情報
18…予防保全情報
19…手配品情報
20…プロジェクトリスク検索処理部
21…客先製品ID検索結果記憶部
30…プロジェクトリスク影響度算出処理部
31…客先製品IDリスク情報記憶部
32…客先製品ID手配部品情報記憶部
33…リスク値算出式
40…リスク出力処理部
41…リスク影響度判定条件
42…客先製品リスク対策リスト
43…客先製品手配品チェックシート
44…DRプロジェクト出力部
45…中日程出力部
46…不適合出力部
47…パンチリスト出力部
48…予防保全出力部
49…手配品出力部
50…ユーザインタフェース(GUI)
1 ... System bus 2 ... CPU
3 ... Input unit 4 ... Output unit 5 ... ROM
6 ... RAM
7 ... HDD
8 ... FDD
9 ... ODD
10 ... Project information database 11 ... Project information 12 ... Impact level definition table 13 ... Customer product information 14 ... DR project information 15 ... Medium schedule information 16 ... Nonconformity information 17 ... Punch list information 18 ... Preventive maintenance information 19 ... Arranged product information 20 ... Project risk search processing unit 21 ... Customer product ID search result storage unit 30 ... Project risk impact calculation processing unit 31 ... Customer product ID risk information storage unit 32 ... Customer product ID arrangement part information storage unit 33 ... Risk Value calculation formula 40 ... Risk output processing unit 41 ... Risk impact determination condition 42 ... Customer product risk countermeasure list 43 ... Customer product arrangement product check sheet 44 ... DR project output unit 45 ... Medium schedule output unit 46 ... Non-conforming output unit 47 ... Punch list output unit 48 ... Preventive maintenance output unit 49 ... Arranged product output unit 50 ... User interface Over scan (GUI)

Claims (15)

製品開発プロジェクトについて、リスクに関する情報を含むプロジェクト情報を、コンピュータを用いて管理するとともに、通信ネットワーク経由で接続されたユーザ端末のGUIインタフェースを介してプロジェクト品質管理の業務支援を行うプロジェクトリスク管理システムにおいて、
複数のプロジェクトについてプロジェクトごとに、プロジェクト品質管理に関するプロジェクト情報を記憶するプロジェクト情報データベースと、
前記ユーザ端末上で登録画面を表示してユーザから前記プロジェクト情報の登録を受け付ける情報登録管理手段と、
前記ユーザ端末上で入力画面を表示してユーザから受け付ける検索条件または出力条件に基づき、該当する前記プロジェクト情報を当該ユーザ端末へ送信するデータ出力管理手段と、
を有し、
前記プロジェクト情報は、プロジェクトにおけるリスクに関するリスク情報を含み、
前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、リスク管理の対象とする管理対象プロジェクトについて、前記リスク情報のうち該当するリスク情報を検索するプロジェクトリスク検索処理部と、
検索した前記リスク情報に基づいて、そのリスクのプロジェクトへの影響度を算出するプロジェクト影響度算出処理部と、
前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、前記リスク情報及び前記影響度の少なくとも一方を出力するリスク出力処理部と、
を有することを特徴とするプロジェクトリスク管理システム。
In a project risk management system that manages project information including information about risks for product development projects using a computer and supports project quality management through a GUI interface of a user terminal connected via a communication network ,
Project information database that stores project information related to project quality control for each project for multiple projects,
Information registration management means for displaying a registration screen on the user terminal and accepting registration of the project information from the user;
Data output management means for transmitting the relevant project information to the user terminal based on a search condition or an output condition received from the user by displaying an input screen on the user terminal;
Have
The project information includes risk information regarding risks in the project,
A project risk search processing unit that searches for relevant risk information among the risk information for a management target project that is subject to risk management by receiving operation and outputting information to the user terminal via the communication network;
A project impact calculation processing unit that calculates the impact of the risk on the project based on the searched risk information;
A risk output processing unit that outputs at least one of the risk information and the degree of influence by accepting operation and outputting information to the user terminal via the communication network;
A project risk management system characterized by comprising:
前記プロジェクト情報データベースは、過去に実施されたプロジェクト及び現在実行中の各プロジェクトごとの前記プロジェクト情報と、影響度定義テーブルと、を記憶し、
プロジェクトごとの前記プロジェクト情報は、
客先製品情報と、
DRプロジェクト情報と、
中日程情報と、
不適合情報と、
パンチリスト情報と、
予防保全情報と、
手配品情報と、
を含むことを特徴とする請求項1記載のプロジェクトリスク管理システム。
The project information database stores the project information for each project executed in the past and each project currently being executed, and an impact definition table.
The project information for each project is
Customer product information,
DR project information and
Medium schedule information,
Nonconformity information,
Punch list information and
Preventive maintenance information,
Arrangement information and
The project risk management system according to claim 1, comprising:
前記プロジェクト情報に含まれる前記客先製品情報は、
そのプロジェクトの客先製品IDと、
客先製品名と、
プロジェクト名称と、
注番と、
出荷日と、
ステータスコードと、
を含むことを特徴とする請求項2記載のプロジェクトリスク管理システム。
The customer product information included in the project information is:
Customer product ID of the project,
Customer product name,
Project name and
Note number and
Shipping date,
Status code,
The project risk management system according to claim 2, comprising:
前記プロジェクト情報に含まれる前記DRプロジェクト情報は、
プロジェクトの客先製品IDと、
遅れ日数と、
完了予定日と、
DR実施日と、
影響度区分コードと、
を含むことを特徴とする請求項2又は3記載のプロジェクトリスク管理システム。
The DR project information included in the project information is:
Customer product ID of the project,
With days late,
Scheduled completion date,
DR implementation date,
Impact classification code,
The project risk management system according to claim 2 or 3, characterized by comprising:
前記プロジェクト情報に含まれる前記中日程情報は、
プロジェクトの客先製品IDと、
遅れ日数と、
予定日と、
完了日と、
を含むことを特徴とする請求項2から4のいずれか一項に記載のプロジェクトリスク管理システム。
The medium schedule information included in the project information is:
Customer product ID of the project,
With days late
Scheduled date and
Completion date,
5. The project risk management system according to claim 2, wherein the project risk management system includes:
前記プロジェクト情報に含まれる前記不適合情報は、
プロジェクトの客先製品IDと、
不適合管理番号と、
影響区分コードと、
回答日限と、
発生日と、
予定日と、
を含むことを特徴とする請求項2から5のいずれか一項に記載のプロジェクトリスク管理システム。
The nonconformity information included in the project information is:
Customer product ID of the project,
Nonconformity control number,
Impact category code,
Answer date and
Date of occurrence,
Scheduled date and
The project risk management system according to any one of claims 2 to 5, characterized by comprising:
前記プロジェクト情報に含まれる前記パンチリスト情報は、
プロジェクトの客先製品IDと、
影響度区分コードと、
遅れ日数と、
対応日限と、
起草日と、
を含むことを特徴とする請求項2から6のいずれか一項に記載のプロジェクトリスク管理システム。
The punch list information included in the project information is:
Customer product ID of the project,
Impact classification code,
With days late,
Response time,
The drafting date,
The project risk management system according to any one of claims 2 to 6, characterized by comprising:
前記プロジェクト情報に含まれる前記予防保全情報は、
プロジェクトの客先製品IDと、
手配部品と、
を含むことを特徴とする請求項2から7のいずれか一項に記載のプロジェクトリスク管理システム。
The preventive maintenance information included in the project information is:
Customer product ID of the project,
Arrangement parts,
The project risk management system according to any one of claims 2 to 7, characterized by comprising:
前記プロジェクト情報に含まれる前記手配品情報は、
プロジェクトの客先製品IDと、
手配部品と、
改廃情報と、
代替手配部品と、
を含むことを特徴とする請求項2から8のいずれか一項に記載のプロジェクトリスク管理システム。
The arrangement information included in the project information is:
Customer product ID of the project,
Arrangement parts,
Reform information and
Replacement parts and
The project risk management system according to any one of claims 2 to 8, characterized by comprising:
前記影響度定義テーブルは、
リスク値を算出するための数値である影響度区分コードと、影響度を表す区分と、を対応付けたものであり、
前記影響度定義テーブルを用いてリスク値を算出するためのリスク値算出式を有する
ことを特徴とする請求項2から9のいずれか一項に記載のプロジェクトリスク管理システム。
The influence definition table is
An impact level code that is a numerical value for calculating the risk value is associated with a category that represents the impact level.
The project risk management system according to any one of claims 2 to 9, further comprising a risk value calculation formula for calculating a risk value using the influence degree definition table.
前記リスク値算出式は、
前記DRプロジェクト情報の所定項目からリスク値を算出する算出式を表すDRプロジェクトリスク値情報と、
前記不適合情報の所定項目からリスク値を算出する算出式を表す不適合リスク値情報と、
前記中日程情報の所定項目からリスク値を算出する算出式を表す中日程リスク値情報と、
前記パンチリスト情報の所定項目からリスク値を算出する算出式を表すパンチリストリスク値情報と、
を含むことを特徴とする請求項10記載のプロジェクトリスク管理システム。
The risk value calculation formula is:
DR project risk value information representing a calculation formula for calculating a risk value from predetermined items of the DR project information;
Nonconformity risk value information representing a calculation formula for calculating a risk value from a predetermined item of the nonconformity information,
Medium schedule risk value information representing a calculation formula for calculating a risk value from the predetermined items of the medium schedule information;
Punch list risk value information representing a calculation formula for calculating a risk value from a predetermined item of the punch list information;
The project risk management system according to claim 10, comprising:
前記プロジェクト影響度算出処理部は、前記影響度の算出において、リスク影響度判定条件として、前記リスク値算出式で算出したリスク値を所定の閾値により、軽度と、中程度と、重大と、最重大のいずれか一つのリスク度に振り分けて判定出力することを特徴とする請求項10又は11記載のプロジェクトリスク管理システム。   The project impact level calculation processing unit uses the risk value calculated by the risk value calculation formula as a risk impact level determination condition in the calculation of the impact level, with a predetermined threshold value, mild, moderate, serious, and maximum. 12. The project risk management system according to claim 10 or 11, wherein the project risk management system distributes the determination to any one of the serious risk levels and outputs the determination. 前記プロジェクトリスク検索処理部は、
リスク管理対象プロジェクトの客先製品情報についてユーザインタフェースを介して入力を受け付け、この入力内容に基づいて前記プロジェクト情報データベースから該当する客先製品情報又は該当するリスク管理対象プロジェクトの少なくとも一部を読み出す
ことを特徴とする請求項2から12のいずれか一項に記載のプロジェクトリスク管理システム。
The project risk search processing unit
Accept input via customer interface for customer product information of risk management target project, and read out relevant customer product information or at least part of relevant risk management target project from the project information database based on this input content. The project risk management system according to any one of claims 2 to 12, wherein
製品開発プロジェクトについて、リスクに関する情報を含むプロジェクト情報を、コンピュータを用いて管理するとともに、通信ネットワーク経由で接続されたユーザ端末のGUIインタフェースを介してプロジェクト品質管理の業務支援を行うプロジェクトリスク管理方法において、
複数のプロジェクトについてプロジェクトごとに、プロジェクト品質管理に関するプロジェクト情報を、所定のプロジェクト情報データベースに記憶し、
前記ユーザ端末上で登録画面を表示してユーザから前記プロジェクト情報の登録を受け付ける情報登録管理処理と、
前記ユーザ端末上で入力画面を表示してユーザから受け付ける検索条件または出力条件に基づき、該当する前記プロジェクト情報を当該ユーザ端末へ送信するデータ出力管理処理と、
を含み、
前記プロジェクト情報は、プロジェクトにおけるリスクに関するリスク情報を含み、
前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、リスク管理の対象とする管理対象プロジェクトについて、前記リスク情報のうち該当するリスク情報を検索するプロジェクトリスク検索処理と、
検索した前記リスク情報に基づいて、そのリスクのプロジェクトへの影響度を算出するプロジェクト影響度算出処理と、
前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、前記リスク情報及び前記影響度の少なくとも一方を出力するリスク出力処理と、
を含むことを特徴とするプロジェクトリスク管理方法。
In a project risk management method for managing product information including risk-related information for product development projects using a computer and supporting project quality management operations via a GUI interface of a user terminal connected via a communication network ,
For each project, project information related to project quality control is stored in a predetermined project information database for each project,
An information registration management process for displaying a registration screen on the user terminal and accepting registration of the project information from the user;
A data output management process for transmitting the corresponding project information to the user terminal based on a search condition or an output condition received from the user by displaying an input screen on the user terminal;
Including
The project information includes risk information regarding risks in the project,
Project risk search processing for searching for relevant risk information among the risk information for a management target project to be risk managed by operation reception and information output against the user terminal via the communication network;
Project impact calculation processing for calculating the impact of the risk on the project based on the searched risk information;
Risk output processing for outputting at least one of the risk information and the degree of influence by accepting operation and outputting information to the user terminal via the communication network;
A project risk management method characterized by including:
コンピュータの演算処理部を制御することにより、製品開発プロジェクトについて、リスクに関する情報を含むプロジェクト情報を管理させるとともに、通信ネットワーク経由で接続されたユーザ端末のGUIインタフェースを介してプロジェクト品質管理の業務支援を行わせるプロジェクトリスク管理プログラムにおいて、
複数のプロジェクトについてプロジェクトごとに、プロジェクト品質管理に関するプロジェクト情報を記憶する所定のプロジェクト情報データベースを用い、
前記プロジェクト情報は、プロジェクトにおけるリスクに関するリスク情報を含み、
前記プログラムは前記演算制御部を制御することにより、
前記ユーザ端末上で登録画面を表示してユーザから前記プロジェクト情報の登録を受け付けさせ、
前記ユーザ端末上で入力画面を表示してユーザから受け付ける検索条件または出力条件に基づき、該当する前記プロジェクト情報を当該ユーザ端末へ送信させ、
前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、リスク管理の対象とする管理対象プロジェクトについて、前記リスク情報のうち該当するリスク情報を検索させ、
検索した前記リスク情報に基づいて、そのリスクのプロジェクトへの影響度を算出させ、
前記通信ネットワークを介し前記ユーザ端末を相手として操作受付及び情報出力により、前記リスク情報及び前記影響度の少なくとも一方を出力させる
ことを特徴とするプロジェクトリスク管理プログラム。
By controlling the computer processing unit, project information including risk-related information is managed for product development projects, and project quality management work support is provided via the GUI interface of the user terminal connected via the communication network. In the project risk management program
For each project, use a predetermined project information database that stores project information related to project quality control for each project.
The project information includes risk information regarding risks in the project,
The program controls the arithmetic control unit,
Display a registration screen on the user terminal and accept registration of the project information from the user;
Based on search conditions or output conditions received from the user by displaying an input screen on the user terminal, the corresponding project information is transmitted to the user terminal,
By accepting operation and outputting information to the user terminal through the communication network, for the management target project to be risk management, let the relevant risk information search among the risk information,
Based on the retrieved risk information, the impact of the risk on the project is calculated,
A project risk management program characterized in that at least one of the risk information and the degree of influence is output by receiving an operation and outputting information from the user terminal via the communication network.
JP2006246140A 2006-09-11 2006-09-11 Operation and method of project risk management system, and project risk management program Pending JP2008065790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006246140A JP2008065790A (en) 2006-09-11 2006-09-11 Operation and method of project risk management system, and project risk management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006246140A JP2008065790A (en) 2006-09-11 2006-09-11 Operation and method of project risk management system, and project risk management program

Publications (1)

Publication Number Publication Date
JP2008065790A true JP2008065790A (en) 2008-03-21

Family

ID=39288432

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006246140A Pending JP2008065790A (en) 2006-09-11 2006-09-11 Operation and method of project risk management system, and project risk management program

Country Status (1)

Country Link
JP (1) JP2008065790A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018116330A (en) * 2017-01-16 2018-07-26 三菱電機株式会社 Project management supporting apparatus, project management supporting method and project management supporting program
CN110888625A (en) * 2019-11-05 2020-03-17 南方电网财务有限公司 Method for controlling code quality based on demand change and project risk
WO2021182531A1 (en) * 2020-03-10 2021-09-16 株式会社マネジメントソリューションズ Project management system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018116330A (en) * 2017-01-16 2018-07-26 三菱電機株式会社 Project management supporting apparatus, project management supporting method and project management supporting program
CN110888625A (en) * 2019-11-05 2020-03-17 南方电网财务有限公司 Method for controlling code quality based on demand change and project risk
WO2021182531A1 (en) * 2020-03-10 2021-09-16 株式会社マネジメントソリューションズ Project management system

Similar Documents

Publication Publication Date Title
A. Marley et al. Mitigating supply chain disruptions–a normal accident perspective
Conger Six sigma and business process management
Saputro et al. A comprehensive framework and literature review of supplier selection under different purchasing strategies
US20060259336A1 (en) Methods and systems for managing risks associated with a project
de Mast et al. Process improvement in healthcare: Overall resource efficiency
Saleem et al. Do effective risk management affect organizational performance
Rot IT risk assessment: Quantitative and qualitative approach
Khojasteh-Ghamari et al. Supply chain risk management: A comprehensive review
JP2012247964A (en) Progress management apparatus and progress management program
Framinan et al. Guidelines for the deployment and implementation of manufacturing scheduling systems
US20130197965A1 (en) Risk assessment and mitigation planning, systems and methods
Moon et al. Process-waste reduction in the construction supply chain using proactive information network
Gupta et al. Modeling lean maintenance metric using incidence matrix approach
Lyu et al. Combining an automatic material handling system with lean production to improve outgoing quality assurance in a semiconductor foundry
Yuan et al. Radio frequency identification–enabled monitoring and evaluating in the discrete manufacturing process
JP2004323162A (en) Maintenance business simulator, maintenance service planning support system and maintenance business support system
Ahmad et al. Value stream mapping with lean thinking model for effective non-value added identification, evaluation and solution processes
Ahmed et al. A multi-constrained maintenance scheduling optimization model for a hydrocarbon processing facility
JP2008065790A (en) Operation and method of project risk management system, and project risk management program
JP2007041799A (en) Project management support system
Borek et al. Towards a process for total information risk management.
JP4865511B2 (en) Service management device
Buehler et al. The Value for Insurers in Better Management of Non Financial Risk
JP2005128796A (en) Project quality management system, method, and program, and service method
JP2020113033A (en) Sales assisting device and sales assisting method