JP2010211477A - Facility management device and method - Google Patents

Facility management device and method Download PDF

Info

Publication number
JP2010211477A
JP2010211477A JP2009056456A JP2009056456A JP2010211477A JP 2010211477 A JP2010211477 A JP 2010211477A JP 2009056456 A JP2009056456 A JP 2009056456A JP 2009056456 A JP2009056456 A JP 2009056456A JP 2010211477 A JP2010211477 A JP 2010211477A
Authority
JP
Japan
Prior art keywords
data
period
specified period
storage unit
extracted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009056456A
Other languages
Japanese (ja)
Other versions
JP5420934B2 (en
Inventor
Hironori Fukushima
裕基 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Priority to JP2009056456A priority Critical patent/JP5420934B2/en
Publication of JP2010211477A publication Critical patent/JP2010211477A/en
Application granted granted Critical
Publication of JP5420934B2 publication Critical patent/JP5420934B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To allow a user to obtain the current status of a facility even in a period other than a determined period. <P>SOLUTION: A specified-period data processing part 105 extracts facility data in a specified period accepted by an instruction acceptance part 104 from a facility management data storage part 102 in response to an instruction of the instruction acceptance part 104, and generates specified-period tabulation data by tabulating the data of the specified period. The specified-period data processing part 105 generates comparison-period tabulation data by tabulating the facility data of the period corresponding to the accepted specified period from among the facility data prior to the accepted specified period, and displays each data on a display part 107. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、施設設備の現在の状態を監視することを可能とした施設管理装置および方法に関するものである。   The present invention relates to a facility management apparatus and method capable of monitoring the current state of facility equipment.

従来より、ビルなどの建物を管理する施設管理装置では、管理対象の施設の状態を、日報、月報、および年報などの定時報告データとして出力している。このような定時報告データの出力では、予め定められた期間で集計された結果を報告することを目的としており、計測されるデータ(計測データ)を、定められた期間当たりの集計データ(合計値,平均値,最大値,最小値)として出力している(特許文献1および特許文献2参照)。また、これらの技術においては、集計されたデータの傾向をグラフで表示している。このグラフ表示では、トレンドグラフとして、例えば1分単位のデータを表示可能としており、傾向分析が行えるようになっている。   2. Description of the Related Art Conventionally, facility management apparatuses that manage buildings such as buildings have output the status of facilities to be managed as scheduled report data such as daily reports, monthly reports, and annual reports. The purpose of this kind of scheduled report data output is to report the results that have been aggregated over a predetermined period, and the measured data (measurement data) can be used as the aggregated data (total value) for a predetermined period. , Average value, maximum value, minimum value) (see Patent Document 1 and Patent Document 2). In these techniques, the tendency of the aggregated data is displayed in a graph. In this graph display, as a trend graph, for example, data in units of one minute can be displayed, and trend analysis can be performed.

特開2005−234823号公報JP 2005-234823 A 特開2005−215845号公報JP 2005-215845 A

しかしながら、上述した施設管理装置では、例えば、月の中旬までのデータを集計した結果など、定められた期間以外の集計データを確認することができない。このため、定められた期間以外では、現状を把握することができないという問題があった。また、例えば中期の中旬の時点で、月末における状態を予測することができないという問題があった。   However, in the facility management apparatus described above, for example, it is not possible to check aggregated data other than a predetermined period such as a result of totaling data up to the middle of the month. For this reason, there existed a problem that the present condition was not able to be grasped | ascertained except the fixed period. In addition, for example, there is a problem that the state at the end of the month cannot be predicted at the middle of the middle period.

本発明は、以上のような問題点を解消するためになされたものであり、定められた期間以外であっても、設備の現状が把握できるようにすることを目的とする。   The present invention has been made to solve the above-described problems, and an object of the present invention is to make it possible to grasp the current state of equipment even outside a predetermined period.

本発明に係る施設管理装置は、管理対象の建物に設置されている設備から送られてくるデータを取得し、取得したデータを蓄積部に時系列に記憶するデータ取得手段と、操作者の操作による指定期間の指示を受け付ける指示受け付け手段と、この指示受け付け手段が受け付けた指定期間のデータを蓄積部より取り出し、取り出した指定期間のデータを集計した指定期間集計データを生成し、指定期間より過去の指定期間に対応する期間の設備データを蓄積部より取り出し、取り出したデータを集計した比較期間集計データを生成する指定期間データ処理手段と、指定期間集計データおよび比較期間集計データを表示する表示手段とを少なくとも備える。   The facility management apparatus according to the present invention acquires data sent from equipment installed in a building to be managed, and stores data acquired in time series in an accumulation unit, and operation by an operator An instruction accepting unit that accepts an instruction for a specified period of time and a data for a specified period accepted by the instruction accepting unit are extracted from the storage unit, and specified period aggregate data is generated by collecting the data for the specified period that has been extracted, and past the specified period The specified period data processing means for generating the comparison period aggregated data by taking out the facility data of the period corresponding to the specified period from the storage unit and totaling the extracted data, and the display means for displaying the specified period aggregated data and the comparative period aggregated data And at least.

上記施設管理装置において、指示受け付け手段が受け付けた指定期間と同じ前年の期間以降のデータを蓄積部より取り出し、この取り出したデータをもとに、指定期間以降のデータを予測して予測データを生成する予測処理手段を備え、表示手段は、予測データを表示するようにしてもよい。   In the facility management apparatus, the data after the same period as the previous specified period received by the instruction receiving unit is extracted from the storage unit, and the predicted data is generated by predicting the data after the specified period based on the extracted data. Prediction processing means may be provided, and the display means may display the prediction data.

また、本発明に係る施設管理方法は、管理対象の建物に設置されている設備から送られてくるデータを取得し、取得したデータを蓄積部に時系列に記憶するデータ取得ステップと、操作者の操作による指定期間の指示を受け付ける指示受け付けステップと、指定期間データ処理手段が、受け付けた指定期間のデータを蓄積部より取り出し、取り出した指定期間のデータを集計した指定期間集計データを生成し、指定期間より過去の指定期間に対応する期間の設備データを蓄積部より取り出し、取り出したデータを集計した比較期間集計データを生成する指定期間データ処理ステップと、指定期間集計データおよび比較期間集計データを表示する表示ステップとを少なくとも備える。   The facility management method according to the present invention includes a data acquisition step of acquiring data sent from equipment installed in a building to be managed, and storing the acquired data in a storage unit in time series, and an operator An instruction accepting step for accepting an instruction for a designated period by the operation, and a designated period data processing unit takes out data of the accepted designated period from the storage unit, and generates designated period aggregated data obtained by aggregating the retrieved designated period data; The specified period data processing step for generating the comparison period aggregated data by taking out the facility data of the period corresponding to the specified period before the specified period from the storage unit and totaling the extracted data, the specified period aggregated data and the comparison period aggregated data A display step for displaying.

上記施設管理方法において、指定期間と同じ前年の期間以降のデータを蓄積部より取り出し、この取り出したデータをもとに、指定期間以降のデータを予測して予測データを生成する予測処理ステップと、予測データを表示する表示ステップとを備えるようにしてもよい。   In the facility management method, a prediction processing step for extracting data from the storage unit after the same period as the specified period from the storage unit, predicting data after the specified period based on the extracted data, and generating prediction data; You may make it provide the display step which displays prediction data.

以上説明したように、本発明によれば、操作者の操作による指定期間の指示を受け付けて指定期間のデータを蓄積部より取り出し、取り出した指定期間のデータを集計した指定期間集計データを生成し、指定期間より過去の指定期間に対応する期間の設備データを蓄積部より取り出し、取り出したデータを集計した比較期間集計データを生成するようにしたので、定められた期間以外であっても、設備の現状が把握できるようになるという優れた効果が得られる。   As described above, according to the present invention, an instruction for a specified period by an operator's operation is accepted, data for a specified period is extracted from the storage unit, and specified period aggregate data is generated by aggregating the extracted specified period data. Since the equipment data of the period corresponding to the specified period in the past from the specified period is taken out from the storage unit, and the comparison period aggregated data is generated by collecting the extracted data, It is possible to obtain an excellent effect of being able to grasp the current state of

本発明の実施の形態における施設管理装置の構成例を示す構成図である。It is a block diagram which shows the structural example of the facility management apparatus in embodiment of this invention. 本発明の実施の形態における施設管理方法を説明するためのフローチャートである。It is a flowchart for demonstrating the facility management method in embodiment of this invention. 表示例を示す説明図である。It is explanatory drawing which shows the example of a display.

以下、本発明の実施の形態について図を参照して説明する。図1は、本発明の実施の形態における施設管理装置100の構成例を示す構成図である。施設管理装置100は、データ取得部101,施設管理データ蓄積部102,定期期間データ処理部103,指示受け付け部104,指定期間データ処理部105,予測処理部106,および表示部107を備える。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a configuration diagram illustrating a configuration example of a facility management apparatus 100 according to an embodiment of the present invention. The facility management apparatus 100 includes a data acquisition unit 101, a facility management data storage unit 102, a periodic period data processing unit 103, an instruction reception unit 104, a specified period data processing unit 105, a prediction processing unit 106, and a display unit 107.

データ取得部101は、管理対象の建築物に設置されている設備から送られてくるデータ(設備データ)を取得し、取得した設備データを、施設管理データ蓄積部102に時系列に記憶する。例えば、データ取得部101は、室温のデータおよび空調機の運転データなどの設備データを1分毎に取得する。また、データ取得部101は、これら設備データを単位時間毎の時系列データとして施設管理データ蓄積部102に記憶する。   The data acquisition unit 101 acquires data (equipment data) sent from equipment installed in a building to be managed, and stores the acquired equipment data in the facility management data storage unit 102 in time series. For example, the data acquisition unit 101 acquires facility data such as room temperature data and air conditioner operation data every minute. The data acquisition unit 101 stores the facility data in the facility management data storage unit 102 as time-series data for each unit time.

定期期間データ処理部103は、施設管理データ記憶部102に記憶されている設備データより、1ヶ月間および1年間などの設定されている期間の設備データを取り出し、取り出した設備データを集計した定期集計データを生成する。生成した定期集計データは、期間を示すデータ(期間データ)と共に施設管理データ蓄積部102に記録する。また、定期期間データ処理部103は、生成した定期集計データより、操作者に視認可能なグラフ表示データを生成する。生成したグラフ表示データは、施設管理データ蓄積部102に記録する。また、定期期間データ処理部103は、上述した定期集計データおよびグラフ表示データを、設定されている期間毎に、表示部107に表示する。   The periodic period data processing unit 103 retrieves equipment data for a set period such as one month and one year from the equipment data stored in the facility management data storage unit 102, and totals the retrieved equipment data. Generate aggregate data. The generated periodic total data is recorded in the facility management data storage unit 102 together with data indicating the period (period data). Further, the periodic period data processing unit 103 generates graph display data that can be visually recognized by the operator from the generated periodic total data. The generated graph display data is recorded in the facility management data storage unit 102. In addition, the periodic period data processing unit 103 displays the above-described periodic aggregation data and graph display data on the display unit 107 for each set period.

指示受け付け部104は、本装置の操作者の操作による指定期間の指示を受け付ける。例えば、操作者の操作により、当月の15日までを指定期間の指示として受け付ける。このようにして受け付けた指定期間の指示をもとに、指示受け付け部104は、指定期間データ処理部105の動作を制御する。   The instruction receiving unit 104 receives an instruction for a specified period by the operation of the operator of the apparatus. For example, up to the 15th of the current month is accepted as an instruction for the specified period by the operation of the operator. The instruction receiving unit 104 controls the operation of the specified period data processing unit 105 based on the instruction for the specified period received in this way.

指定期間データ処理部105は、指示受け付け部104の指示により、施設管理データ蓄積部102より、指示受け付け部104が受け付けた指定期間の施設データを取り出す。例えば、当月の1日より15日までの設備データを取り出す。また、取り出した指定期間のデータを集計した指定期間集計データを生成する。また、前述した定期集計データのグラフ表示データと同様のグラフ表示データを生成する。生成した各データは、例えば、施設管理データ蓄積部102に一時的に記憶される。また、生成した各データは、表示部107に表示する。   In response to an instruction from the instruction receiving unit 104, the designated period data processing unit 105 retrieves facility data of the specified period received by the instruction receiving unit 104 from the facility management data storage unit 102. For example, the facility data from the 1st to the 15th of the current month is taken out. Also, the specified period total data is generated by totaling the extracted data for the specified period. Moreover, the same graph display data as the graph display data of the periodic total data described above are generated. Each generated data is temporarily stored in the facility management data storage unit 102, for example. Each generated data is displayed on the display unit 107.

また、指定期間データ処理部105は、受け付けた指定期間より過去の設備データの中より、受け付けた指定期間に対応する期間の設備データを集計した比較期間集計データを生成する。例えば、指定された当月以前の各月の1日より15日までのデータを取り出して月毎に集計し、比較期間集計データとする。また、指定された期間が、当年の1月1日より当月である3月の15日までである場合、指定された当年以前の各年の1月1日より3月15日までのデータを取り出して年毎に集計し、比較期間集計データとする。また、各比較期間集計データより、前述同様のグラフ表示データを生成する。   Further, the designated period data processing unit 105 generates comparison period aggregated data obtained by aggregating equipment data in a period corresponding to the accepted designated period from among the equipment data past from the accepted designated period. For example, data from the 1st to the 15th of each month before the specified current month is taken out and aggregated every month to obtain comparison period aggregated data. If the specified period is from January 1 of the current year to 15th of March, which is the current month, the data from January 1 to March 15 of each year before the specified current year is displayed. The data is taken out and aggregated every year to obtain comparative period aggregated data. In addition, graph display data similar to that described above is generated from each comparison period aggregated data.

予測処理部106は、前年の同じ月における指定期間以降の設備データをもとに、当月の指定期間以降の設備データを予測して予測データを生成する。また、予測データより、前述同様のグラフ表示データを生成する。生成した各データは、例えば、施設管理データ蓄積部102に一時記憶される。また、生成した各データは、表示部107に表示する。これらの予測処理部106の動作は、予測の指示を受け付けた指示受け付け部104の制御により行われる。   The prediction processing unit 106 predicts the facility data after the specified period of the current month based on the facility data after the specified period in the same month of the previous year, and generates predicted data. Further, the same graph display data as described above is generated from the prediction data. Each generated data is temporarily stored in the facility management data storage unit 102, for example. Each generated data is displayed on the display unit 107. The operations of the prediction processing unit 106 are performed under the control of the instruction receiving unit 104 that has received a prediction instruction.

次に、本実施の形態における施設管理装置の動作例(施設管理方法)について、図2のフローチャートを用いて説明する。まず、図2(a)に示すように、ステップS201で、データ取得部101が、管理対象の建築物における設備から送られてくる設備データを取得し、施設管理データ蓄積部102に記憶する。例えば、データ取得部101は、室温のデータおよび空調機の運転データなどの設備データを1分毎に取得し、取得した設備データを施設管理データ蓄積部102に記憶する。   Next, an operation example (facility management method) of the facility management apparatus according to the present embodiment will be described with reference to the flowchart of FIG. First, as shown in FIG. 2A, in step S <b> 201, the data acquisition unit 101 acquires equipment data sent from the equipment in the building to be managed and stores it in the facility management data storage unit 102. For example, the data acquisition unit 101 acquires facility data such as room temperature data and air conditioner operation data every minute, and stores the acquired facility data in the facility management data storage unit 102.

次に、予め設定されている時期が来ると(ステップS202)、定期期間データ処理部103が、設定されている期間の設備データを施設管理データ蓄積部102より取り出し、設備データを集計した定期集計データを生成する(ステップS203)。例えば、集計時期として、月末が設定され、集計期間として1月が設定されている場合、月末の時点で、当月の月初より月末までの間に取得された設備管理データより、定期集計データを生成する。また、生成した定期集計データより、操作者に視認可能なグラフ表示データを生成する。   Next, when the preset time comes (step S202), the periodic period data processing unit 103 takes out the facility data of the set period from the facility management data storage unit 102, and totals the facility data. Data is generated (step S203). For example, if the end of the month is set as the total time and January is set as the total period, the periodic total data is generated from the facility management data acquired from the beginning of the current month to the end of the month at the end of the month. To do. Further, graph display data that can be visually recognized by the operator is generated from the generated periodic total data.

次に、ステップS204で、生成した定期集計データおよびグラフ表示データを、表示部107に表示する。以上のことを、処理終了の指示が入力されるまで継続する(ステップS205)。   Next, in step S <b> 204, the generated periodic tabulation data and graph display data are displayed on the display unit 107. The above is continued until a process end instruction is input (step S205).

一方、操作者の操作により本装置に対して指定期間の指示が入力されると、図2(b)に示すように、ステップS211で、入力された指示を指示受け付け部104が受け付ける。例えば、指示受け付け部104が、当月の当日(15日)までを指定期間として受け付ける。   On the other hand, when an instruction for a specified period is input to the apparatus by an operation of the operator, the instruction receiving unit 104 receives the input instruction in step S211 as shown in FIG. For example, the instruction accepting unit 104 accepts the current period (15th) of the current month as the designated period.

指示受け付け部104の指示受け付けにより、ステップS212で、指定期間データ処理部105が、まず、施設管理データ蓄積部102に記憶されている設備データより、指示受け付け部104が受け付けた指定期間(当月の15日まで)の設備データを取り出す。また、指定期間データ処理部105は、取り出した指定期間の設備データを集計した指定期間集計データを生成し、この集計データよりグラフ表示データを生成する。   In response to the instruction received by the instruction receiving unit 104, in step S212, the specified period data processing unit 105 first receives the specified period (of the current month) received by the instruction receiving unit 104 from the facility data stored in the facility management data storage unit 102. Equipment data for 15 days). Further, the designated period data processing unit 105 generates designated period aggregate data obtained by aggregating the extracted facility data of the designated period, and generates graph display data from the aggregated data.

次に、ステップS213で、指定期間データ処理部105が、受け付けた指定期間より過去の設備データの中より、受け付けた指定期間に対応する期間の設備データを集計した比較期間集計データ(比較情報)を生成し、この集計データよりグラフ表示データを生成する。本例では、指定期間データ処理部105は、当月以前の各月の15日までのデータを取り出して月毎に集計し、比較期間集計データとする。   Next, in step S213, the specified period data processing unit 105 totals the facility period data (comparison information) in which the facility data of the period corresponding to the accepted specified period is aggregated from the past facility data from the accepted specified period. And graph display data is generated from the aggregated data. In this example, the designated period data processing unit 105 takes out data up to the 15th of each month before the current month and totals the data for each month to obtain comparison period total data.

次に、操作者の操作により本装置に対して予測の指示が入力されると、ステップS214で、入力された予測指示を指示受け付け部104が受け付ける。指示受け付け部104の予測指示の受け付けにより、ステップS215で、予測処理部106が、前年の同じ月における指定期間以降の設備データをもとに、当月の指定期間以降の設備データを予測して予測データを生成し、このグラフ表示データを生成する。   Next, when a prediction instruction is input to the apparatus by an operation of the operator, the instruction receiving unit 104 receives the input prediction instruction in step S214. By receiving the prediction instruction from the instruction receiving unit 104, in step S215, the prediction processing unit 106 predicts the equipment data after the specified period of the current month based on the equipment data after the specified period in the same month of the previous year. Data is generated, and this graph display data is generated.

最後に、ステップS216で、指定期間データ処理部105などが生成した各データを表示部107に表示する。この表示により、指定期間集計データおよびこのグラフ表示データが、比較期間集計データおよびこのグラフ表示データと共に表示される。例えば、図3に示すように、今年度の今月(6月)の指定期間集計データのグラフ表示データが、前月までの各月の比較期間集計データのグラフ表示データと共に棒グラフとして、表示画面に表示される。また、予測の指示があった場合は、予測データと共にこのグラフ表示データが表示される。   Finally, in step S216, each data generated by the designated period data processing unit 105 or the like is displayed on the display unit 107. By this display, the specified period total data and the graph display data are displayed together with the comparison period total data and the graph display data. For example, as shown in FIG. 3, the graph display data of the specified period total data for this month (June) of this year is displayed on the display screen as a bar graph together with the graph display data of the comparison period total data for each month up to the previous month. Is done. When there is an instruction for prediction, the graph display data is displayed together with the prediction data.

なお、図3では、画面中に、「現状比較」と「予測」のボタンが表示されている。「現状比較」のボタンにより、図3に示す比較のグラフが表示される。これに対し、「予測」のボタンにより、予測データのグラフ(予測比較グラフ)が表示されるようになる。予測比較のグラフにおいては、当月の予測データが、前月までの月集計データと共に表示される。なお、上述では、月単位の設備データ処理を例に説明した。この場合、年内の月間の変化などが把握できるようになる。また、これに限るものではなく、日単位の設備データ処理により、月内の日間の変化などが把握できるようにしてもよい。   In FIG. 3, “current status comparison” and “prediction” buttons are displayed on the screen. The comparison graph shown in FIG. 3 is displayed by the “comparison of current conditions” button. On the other hand, the prediction data graph (prediction comparison graph) is displayed by the “prediction” button. In the prediction comparison graph, the prediction data for the current month is displayed together with the month total data up to the previous month. In the above description, the monthly unit data processing has been described as an example. In this case, it becomes possible to grasp the change of the month within the year. Moreover, it is not restricted to this, You may make it possible to grasp | ascertain the change of the day within a month, etc. by the equipment data process of a day unit.

以上に説明したように、本実施の形態によれば、設定されている定期期間の設備データ集計とは別に、受け付けられた指示による指定期間の設備データを生成し、この集計データと共に、指定期間に対応する過去の設備データより比較期間集計データを生成して表示するようにした。この結果、本実施の形態によれば、現時点までの状態(実績)が、過去の同じ期間の状態と比較して分析をすることが可能となる。また、現時点より先の状態を予測しているので、より詳細な現状分析検討が行えるようになる。このような分析が行えることにより、例えば、設備の制御状況やエネルギー使用量、炭素排出量などの現状を、即時的に評価することが可能となる。このような評価が可能となることにより、設備のより最適な調整が行えるようになる。   As described above, according to the present embodiment, the facility data for the specified period according to the received instruction is generated separately from the facility data aggregation for the set periodic period, and the specified period together with the aggregated data. The comparison period total data is generated and displayed from the past equipment data corresponding to. As a result, according to the present embodiment, it is possible to analyze the state (actual result) up to the present time in comparison with the state of the same period in the past. Moreover, since the state ahead of the present time is predicted, a more detailed analysis of the current situation can be performed. By being able to perform such an analysis, for example, it is possible to immediately evaluate the current state of equipment control status, energy usage, carbon emissions, and the like. By making such an evaluation possible, more optimal adjustment of the equipment can be performed.

なお、上述した装置は、CPUと主記憶装置と外部記憶装置とネットワーク接続装置となどを備えたコンピュータ機器であり、主記憶装置に展開されたプログラムによりCPUが動作することで、上述した各機能が実現される。また、各機能は、複数のコンピュータ機器に分散させるようにしてもよい。   Note that the above-described device is a computer device including a CPU, a main storage device, an external storage device, a network connection device, and the like. Each function described above is performed by the CPU operating according to a program developed in the main storage device. Is realized. Each function may be distributed among a plurality of computer devices.

100…施設管理装置、101…データ取得部、102…施設管理データ蓄積部、103…定期期間データ処理部、104…指示受け付け部、105…指定期間データ処理部、106…予測処理部、107…表示部。   DESCRIPTION OF SYMBOLS 100 ... Facility management apparatus, 101 ... Data acquisition part, 102 ... Facility management data storage part, 103 ... Periodic period data processing part, 104 ... Instruction reception part, 105 ... Designation period data processing part, 106 ... Prediction processing part, 107 ... Display section.

Claims (4)

管理対象の建物に設置されている設備から送られてくるデータを取得し、取得したデータを蓄積部に時系列に記憶するデータ取得手段と、
操作者の操作による指定期間の指示を受け付ける指示受け付け手段と、
この指示受け付け手段が受け付けた指定期間のデータを前記蓄積部より取り出し、取り出した指定期間のデータを集計した指定期間集計データを生成し、前記指定期間より過去の前記指定期間に対応する期間の設備データを前記蓄積部より取り出し、取り出したデータを集計した比較期間集計データを生成する指定期間データ処理手段と、
前記指定期間集計データおよび前記比較期間集計データを表示する表示手段と
を少なくとも備えることを特徴とする施設管理装置。
Data acquisition means for acquiring data sent from the equipment installed in the building to be managed, and storing the acquired data in time series in the storage unit;
An instruction receiving means for receiving an instruction for a specified period by an operation of the operator;
The specified period data received by the instruction receiving unit is extracted from the storage unit, and specified period total data is generated by totaling the extracted specified period data, and the equipment corresponding to the specified period past the specified period is generated. A specified period data processing means for generating data for comparison period totaling data extracted from the storage unit and totaling the extracted data;
A facility management apparatus comprising at least display means for displaying the specified period total data and the comparison period total data.
請求項1記載の施設管理装置において、
前記指示受け付け手段が受け付けた指定期間と同じ前年の期間以降のデータを前記蓄積部より取り出し、この取り出したデータをもとに、前記指定期間以降のデータを予測して予測データを生成する予測処理手段を備え、
前記表示手段は、前記予測データを表示する
ことを特徴とする施設管理装置。
The facility management apparatus according to claim 1,
Prediction processing in which data after the previous period same as the specified period received by the instruction receiving unit is extracted from the storage unit, and prediction data is generated by predicting data after the specified period based on the extracted data With means,
The facility management apparatus characterized in that the display means displays the prediction data.
管理対象の建物に設置されている設備から送られてくるデータを取得し、取得したデータを蓄積部に時系列に記憶するデータ取得ステップと、
操作者の操作による指定期間の指示を受け付ける指示受け付けステップと、
指定期間データ処理手段が、受け付けた指定期間のデータを前記蓄積部より取り出し、取り出した指定期間のデータを集計した指定期間集計データを生成し、前記指定期間より過去の前記指定期間に対応する期間の設備データを前記蓄積部より取り出し、取り出したデータを集計した比較期間集計データを生成する指定期間データ処理ステップと、
前記指定期間集計データおよび前記比較期間集計データを表示する表示ステップと
を少なくとも備えることを特徴とする施設管理方法。
A data acquisition step for acquiring data sent from the equipment installed in the building to be managed, and storing the acquired data in a time series in the storage unit;
An instruction receiving step for receiving an instruction for a specified period by an operation of the operator;
The specified period data processing means takes out the data of the received specified period from the storage unit, generates specified period aggregate data obtained by aggregating the extracted data of the specified period, and corresponds to the specified period past the specified period The specified period data processing step for generating the comparison period aggregated data obtained by extracting the facility data from the storage unit and totaling the extracted data;
A facility management method comprising at least a display step of displaying the specified period total data and the comparison period total data.
請求項3記載の施設管理方法において、
前記指定期間と同じ前年の期間以降のデータを前記蓄積部より取り出し、この取り出したデータをもとに、前記指定期間以降のデータを予測して予測データを生成する予測処理ステップと、
前記予測データを表示する表示ステップと
を備えることを特徴とする施設管理方法。
In the facility management method according to claim 3,
Prediction processing step of extracting data from the storage unit after the same period as the specified period from the storage unit, and predicting data after the specified period based on the extracted data,
A facility management method comprising: a display step of displaying the prediction data.
JP2009056456A 2009-03-10 2009-03-10 Facility management apparatus and method Expired - Fee Related JP5420934B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009056456A JP5420934B2 (en) 2009-03-10 2009-03-10 Facility management apparatus and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009056456A JP5420934B2 (en) 2009-03-10 2009-03-10 Facility management apparatus and method

Publications (2)

Publication Number Publication Date
JP2010211477A true JP2010211477A (en) 2010-09-24
JP5420934B2 JP5420934B2 (en) 2014-02-19

Family

ID=42971570

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009056456A Expired - Fee Related JP5420934B2 (en) 2009-03-10 2009-03-10 Facility management apparatus and method

Country Status (1)

Country Link
JP (1) JP5420934B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012190385A (en) * 2011-03-14 2012-10-04 Yokogawa Electric Corp Totaling and analysis support device, and computer program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005234746A (en) * 2004-02-18 2005-09-02 Matsushita Electric Ind Co Ltd Energy management system
JP2006244063A (en) * 2005-03-02 2006-09-14 Osaka Gas Co Ltd Supply and demand contract support system
JP2006309325A (en) * 2005-04-26 2006-11-09 Ohrin Planning:Kk Co2 reduction and power saving monitoring method, and its system
JP2008102708A (en) * 2006-10-18 2008-05-01 Toshiba Corp Energy management support device
JP2008236904A (en) * 2007-03-20 2008-10-02 Toshiba Corp Building energy management apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005234746A (en) * 2004-02-18 2005-09-02 Matsushita Electric Ind Co Ltd Energy management system
JP2006244063A (en) * 2005-03-02 2006-09-14 Osaka Gas Co Ltd Supply and demand contract support system
JP2006309325A (en) * 2005-04-26 2006-11-09 Ohrin Planning:Kk Co2 reduction and power saving monitoring method, and its system
JP2008102708A (en) * 2006-10-18 2008-05-01 Toshiba Corp Energy management support device
JP2008236904A (en) * 2007-03-20 2008-10-02 Toshiba Corp Building energy management apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012190385A (en) * 2011-03-14 2012-10-04 Yokogawa Electric Corp Totaling and analysis support device, and computer program

Also Published As

Publication number Publication date
JP5420934B2 (en) 2014-02-19

Similar Documents

Publication Publication Date Title
US10671503B2 (en) Mobile application interactive user interface for a remote computing device monitoring a test device
CN108063699B (en) Network performance monitoring method and device, electronic equipment and storage medium
JP2005346655A (en) Process control system, process control method, process control program and recording medium for program
US20130282333A1 (en) Service port explorer
JP2009086896A (en) Failure prediction system and failure prediction method for computer
JP2006064307A (en) Appliance diagnosis device, operation program therefor and appliance diagnosis method
CN110134913B (en) Data analysis method, data analysis device, and recording medium
JP6667664B2 (en) Plant management apparatus, plant management method, and program
JP2009009538A (en) Method and system for analyzing operating condition
JP5420934B2 (en) Facility management apparatus and method
JP2011081513A (en) Progress management device and progress management method
US10515533B2 (en) Alerting system and method
JP5803986B2 (en) Equipment management system
JP2016001442A (en) Map data processing of environment location evaluation and output system thereof, computer program product and method of the same
JP5177792B2 (en) Data aggregation method and data aggregation device
JP2011175593A (en) Device, method and program for managing project, and recording medium
JP2006018735A (en) Coding standard observance situation monitoring system
JP2010044780A (en) Method and system for analyzing operating condition
JP7435047B2 (en) Information management device and program
US10558346B2 (en) Alerting system and method
CN116467139A (en) System alarm repetition rate detection method, electronic equipment and readable storage medium
CN114219255A (en) Capability analysis method, device, equipment and readable storage medium
JP2019175055A (en) Data integration system and data integration method
JP2006011980A (en) Equipment/system diagnostic support device, equipment/system diagnostic support method, and equipment/system diagnostic support program
JP2006079555A (en) Project management device and system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130412

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130820

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131004

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131121

R150 Certificate of patent or registration of utility model

Ref document number: 5420934

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees