JP2009281102A - Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same - Google Patents
Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same Download PDFInfo
- Publication number
- JP2009281102A JP2009281102A JP2008136406A JP2008136406A JP2009281102A JP 2009281102 A JP2009281102 A JP 2009281102A JP 2008136406 A JP2008136406 A JP 2008136406A JP 2008136406 A JP2008136406 A JP 2008136406A JP 2009281102 A JP2009281102 A JP 2009281102A
- Authority
- JP
- Japan
- Prior art keywords
- grout
- precast concrete
- sleeve joint
- steel pipe
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
本発明は、対面して設置されたプレキャストコンクリート梁のうち、一方のプレキャストコンクリート梁の梁主筋に保持させたスリーブ継手を軸芯方向にスライドさせて、当該スリーブ継手を前記梁主筋と他方のプレキャストコンクリート梁の梁主筋に略半分ずつ嵌合させた状態とし、何れか一方のプレキャストコンクリート梁に形成されたグラウト充填孔からスリーブ継手の内部にグラウト注入を行い、他方のプレキャストコンクリート梁に形成されたグラウト確認孔からスリーブ継手内にグラウトが充填されたことを確認し、しかる後、両プレキャストコンクリート梁に形成されたスリーブ継手収納空間及び両プレキャストコンクリート梁の対向面間の隙間にグラウト注入を行って、両プレキャストコンクリート梁を接合するプレキャストコンクリート梁のスライド継手工法において、スリーブ継手内にグラウトが充填されたか否かを確認する技術に関する。 According to the present invention, among the precast concrete beams installed facing each other, a sleeve joint held by the beam main reinforcement of one precast concrete beam is slid in the axial direction, and the sleeve joint is connected to the beam main reinforcement and the other precast concrete beam. It was in a state where it was almost half-fitted to the beam main reinforcement of the concrete beam, grout was injected into the sleeve joint from the grout filling hole formed in one of the precast concrete beams, and formed in the other precast concrete beam After confirming that the grout is filled into the sleeve joint from the grout confirmation hole, grout is injected into the space between the sleeve joint storage space formed on both precast concrete beams and the opposing faces of both precast concrete beams. , Precast joining both precast concrete beams In the sliding joint construction method of the concrete beam, to a technique of grout into the sleeve joint confirms whether or not filled.
対面して設置されたプレキャストコンクリート梁のうち、一方のプレキャストコンクリート梁の梁主筋に保持させたスリーブ継手を軸芯方向にスライドさせて、当該スリーブ継手を前記梁主筋と他方のプレキャストコンクリート梁の梁主筋に略半分ずつ嵌合させた状態とし、何れか一方のプレキャストコンクリート梁に形成されたグラウト充填孔からスリーブ継手の内部にグラウト注入を行い、他方のプレキャストコンクリート梁に形成されたグラウト確認孔からスリーブ継手内にグラウトが充填されたことを確認し、しかる後、両プレキャストコンクリート梁に形成されたスリーブ継手収納空間及び両プレキャストコンクリート梁の対向面間の隙間にグラウト注入を行って、両プレキャストコンクリート梁を接合するプレキャストコンクリート梁のスライド継手工法は、特許文献1等によって既に知られている。 Of the precast concrete beams installed facing each other, slide the sleeve joint held in the beam main bar of one precast concrete beam in the axial direction, and connect the sleeve joint to the beam main bar and the beam of the other precast concrete beam. The grout filling hole formed in one of the precast concrete beams is injected into the inside of the sleeve joint, and the grout confirmation hole formed in the other precast concrete beam is used. After confirming that the grout was filled in the sleeve joint, grout was injected into the space between the sleeve joint storage space formed on both precast concrete beams and the opposing faces of both precast concrete beams, and both precast concrete Precast concrete to join beams Slide joint construction method DOO beams is already known by Patent Document 1 or the like.
このスライド継手工法においては、接合される二つのプレキャストコンクリート梁を対面して設置した後、一方のプレキャストコンクリート梁の端面に形成されたスリーブ継手収納空間からスリーブ継手を必要量引き出して、その先端側を相手側のプレキャストコンクリート梁の端面に形成されたスリーブ継手収納空間に差し込むことで、スリーブ継手を相対峙する梁主筋に略半分ずつ嵌合させた状態とし、この状態で、一方のプレキャストコンクリート梁に形成されたグラウト充填孔からスリーブ継手の内部にグラウト注入を行い、しかる後、両プレキャストコンクリート梁のスリーブ継手収納空間及び両プレキャストコンクリート梁の対向面間の隙間にグラウト注入を行って、二つのプレキャストコンクリート梁の接合を完了するので、プレキャストコンクリート梁同士を水平移動することなく接合できるという利点がある。 In this slide joint method, after installing two precast concrete beams to be joined facing each other, the required amount of sleeve joint is pulled out from the sleeve joint storage space formed on the end face of one of the precast concrete beams, and its tip side Is inserted into the sleeve joint storage space formed on the end surface of the precast concrete beam on the other side, so that the sleeve joint is fitted approximately half by half to the beam main bar that faces each other. Grout injection into the inside of the sleeve joint from the grout filling hole formed in, and then, grout injection into the sleeve joint storage space of both precast concrete beams and the gap between the opposing faces of both precast concrete beams, As we complete the joining of precast concrete beams, It can be advantageously joined without moving horizontally Les cast concrete beams each other.
また、両プレキャストコンクリート梁の端面にスリーブ継手収納空間を形成し、スリーブ継手の両端をこれらのスリーブ継手収納空間に位置させた状態で、相対峙する梁主筋同士を連結するので、両プレキャストコンクリート梁の対向面間の隙間が狭くて済み、グラウト充填のみで接合され、現場打ちコンクリートによる接合が不要であるいう利点を有する。 In addition, since the sleeve joint storage spaces are formed on the end faces of both precast concrete beams, and the opposite ends of the sleeve joints are positioned in these sleeve joint storage spaces, the main beam bars facing each other are connected to each other. There is an advantage that the gap between the facing surfaces of the steel plate is narrow, it is joined only by grout filling, and joining by in-situ concrete is unnecessary.
その反面、このスライド継手工法においては、スリーブ継手の両端がプレキャストコンクリート梁の端面に形成されたスリーブ継手収納空間の内部に位置し、スリーブ継手の一端に形成されているグラウト排出口がプレキャストコンクリート梁のコンクリート部分で視覚的に隠蔽されてしまうので、スリーブ継手へのグラウト注入時、プレキャストコンクリート梁に形成されているグラウト確認孔からはスリーブ継手のグラウト排出口に溢れ出
るグラウトを目視で確認できないといった問題点がある。
On the other hand, in this slide joint method, both ends of the sleeve joint are located inside the sleeve joint storage space formed on the end face of the precast concrete beam, and the grout discharge port formed at one end of the sleeve joint is the precast concrete beam. The grout overflowing into the grout discharge port of the sleeve joint cannot be visually confirmed from the grout confirmation hole formed in the precast concrete beam when the grout is injected into the sleeve joint. There is a problem.
そのため、従来では、スリーブ継手へのグラウト注入量を継手内空隙容積から算出し、それよりも多い量のグラウトを注入した後、プレキャストコンクリート梁に形成されているグラウト確認孔に棒状の確認用ゲージをスリーブ継手のグラウト排出口近くまで挿入し、確認用ゲージの先端にグラウトが付着する否かで、スリーブ継手に対するグラウトの充填状態を判断するといった煩雑な充填確認作業を必要とした。 Therefore, conventionally, the amount of grout injected into the sleeve joint is calculated from the void volume in the joint, and after a larger amount of grout is injected, the rod-shaped confirmation gauge is inserted into the grout confirmation hole formed in the precast concrete beam. Is inserted to the vicinity of the grout discharge port of the sleeve joint, and it is necessary to perform complicated filling confirmation work such as determining the grout filling state of the sleeve joint depending on whether or not the grout adheres to the tip of the confirmation gauge.
また、特許文献2に見られるように、スリーブ継手がプレキャストコンクリート部材に固定状態に埋め込まれている場合、スリーブ継手の両端部外周面に形成するグラウト注入・排出口とプレキャストコンクリート部材に形成するグラウト注入・排出径路とが直結されるので、グラウトの漏れは問題にならないが、上記のスライド継手工法においては、スリーブ継手がプレキャストコンクリート梁に対してスライド自在であり、プレキャストコンクリート梁に形成されたグラウト充填孔とスリーブ継手に形成されたグラウト注入口、プレキャストコンクリート梁に形成されたグラウト確認孔とスリーブ継手に形成されたグラウト排出口とが直結されていないので、スリーブ継手の内部にグラウト注入を行う際、スリーブ継手のグラウト注入口周りやスリーブ継手のグラウト排出口周りにグラウトが漏れ出ることがある。
Moreover, as seen in
ところで、両プレキャストコンクリート梁のスリーブ継手収納空間及び両プレキャストコンクリート梁の対向面間の隙間に対するグラウト注入は、スリーブ継手の内部に充填したグラウトがある程度まで硬化した後に行われるのが普通であり、一般的には、スリーブ継手に対するグラウト注入の翌日に行われる。そのため、スリーブ継手のグラウト注入口周りやスリーブ継手のグラウト排出口周りに漏れ出たグラウトが硬化し、これらが両プレキャストコンクリート梁のスリーブ継手収納空間に対するグラウト注入の妨げになる可能性があった。 By the way, the grout injection to the space between the sleeve joint storage space of both precast concrete beams and the opposing surfaces of both precast concrete beams is usually performed after the grout filled in the sleeve joint is hardened to some extent, Specifically, it is performed on the next day after the grouting for the sleeve joint. Therefore, the grout leaking around the grout inlet of the sleeve joint and the grout outlet of the sleeve joint is hardened, which may hinder grout injection into the sleeve joint storage space of both precast concrete beams.
本発明は、上記の点に留意して成されたものであって、その主たる目的とするところは、プレキャストコンクリート梁のスライド継手工法において、スリーブ継手の両端がプレキャストコンクリート梁の端面に形成されたスリーブ継手収納空間の内部に位置し、スリーブ継手のグラウト排出口がプレキャストコンクリート梁のコンクリート部分で視覚的に隠蔽されているにもかかわらず、スリーブ継手に対するグラウト充填確認を容易に行えるようにすることにある。 The present invention has been made in consideration of the above points, and the main object of the present invention is to form both ends of the sleeve joint on the end face of the precast concrete beam in the precast concrete beam slide joint method. It is located inside the sleeve joint storage space so that the grout filling of the sleeve joint can be easily confirmed even though the grout outlet of the sleeve joint is visually concealed by the concrete part of the precast concrete beam. It is in.
上記の目的を達成するために本発明が講じた技術的手段は、次の通りである。即ち、請求項1に記載の発明によるグラウト用冶具は、グラウト径路となる鋼製パイプの外側を伸縮性がある弾性材料で形成された弾性筒体で被覆し、弾性筒体を鋼製パイプに対して抜取り可能に構成して成るものである。 The technical means taken by the present invention in order to achieve the above object are as follows. That is, the grout jig according to the first aspect of the present invention coats the outer side of a steel pipe serving as a grout path with an elastic cylinder formed of an elastic material having elasticity, and the elastic cylinder is formed on the steel pipe. On the other hand, it is configured to be detachable.
請求項2に記載の発明は、対面して設置されたプレキャストコンクリート梁のうち、一方のプレキャストコンクリート梁の梁主筋に保持させたスリーブ継手を軸芯方向にスライドさせて、当該スリーブ継手を前記梁主筋と他方のプレキャストコンクリート梁の梁主筋に略半分ずつ嵌合させた状態とし、何れか一方のプレキャストコンクリート梁に形成されたグラウト充填孔からスリーブ継手の内部にグラウト注入を行い、他方のプレキャストコ
ンクリート梁に形成されたグラウト確認孔からスリーブ継手内にグラウトが充填されたことを確認し、しかる後、両プレキャストコンクリート梁に形成されたスリーブ継手収納空間及び両プレキャストコンクリート梁の対向面間の隙間にグラウト注入を行って、両プレキャストコンクリート梁を接合するプレキャストコンクリート梁のスライド継手工法におけるグラウト充填確認方法であって、前記グラウト確認孔に、請求項1に記載のグラウト用冶具を、鋼製パイプがスリーブ継手のグラウト排出口に連通し且つ弾性筒体が当該グラウト排出口と鋼製パイプの隙間を閉塞した状態に挿入し、鋼製パイプから溢れ出るグラウトを目視してスリーブ継手内にグラウトが充填されたことを確認するようにしたことを特徴としている。
The invention according to
請求項3に記載の発明は、請求項2に記載のプレキャストコンクリート梁のスライド継手工法におけるグラウト充填確認方法であって、グラウト充填孔に、請求項1に記載のグラウト用冶具を、鋼製パイプがスリーブ継手のグラウト注入口に連通し且つ弾性筒体が当該グラウト注入口と鋼製パイプの隙間を閉塞した状態に挿入し、グラウト用冶具の鋼製パイプを通してスリーブ継手内にグラウトを注入するようにしたことを特徴としている。
Invention of
請求項1に記載の発明によるグラウト用冶具は、グラウト径路となる鋼製パイプの外側を伸縮性がある弾性材料で形成された弾性筒体で被覆してあるので、プレキャストコンクリート梁に形成されたグラウト充填孔やグラウト確認孔にグラウト用冶具を挿入した際、弾性筒体の弾性復元力によって孔内にしっかりと固定できる。 The grouting jig according to the first aspect of the present invention is formed on a precast concrete beam because the outer side of a steel pipe that becomes a grouting path is covered with an elastic cylinder formed of an elastic material having elasticity. When a grout jig is inserted into the grout filling hole or the grout confirmation hole, it can be firmly fixed in the hole by the elastic restoring force of the elastic cylinder.
また、グラウト径路となる鋼製パイプをスリーブ継手に形成されたグラウト注入口やグラウト排出口に連通させた状態において、弾性筒体の先端をグラウト注入口やグラウト排出口に差し込むか、あるいは、グラウト注入口やグラウト排出口の周囲に押し付ける等することにより、弾性筒体の弾性復元力によるシール性能を発揮させることができ、それでいて、弾性筒体に挿通されている鋼製パイプによりグラウト径路の断面積を一定に保持することができる。従って、鋼製パイプを通してグラウト注入やグラウト排出を安定的に行えることになる。 In addition, in the state where the steel pipe that becomes the grout path is communicated with the grout inlet and the grout outlet formed in the sleeve joint, the tip of the elastic cylinder is inserted into the grout inlet and the grout outlet, or the grout The sealing performance by the elastic restoring force of the elastic cylinder can be exerted by pressing it around the inlet or the grout outlet, and the grout path is interrupted by the steel pipe inserted through the elastic cylinder. The area can be kept constant. Therefore, grout injection and grout discharge can be stably performed through the steel pipe.
しかも、弾性筒体が鋼製パイプに対して抜取り可能に構成されているので、スリーブ継手に注入したグラウトの硬化により鋼製パイプが抜取り回収できなくなった場合でも、弾性筒体を抜取り回収することが可能であり、プレキャストコンクリート梁の接合部に低強度の異物を残さないで済む。 In addition, since the elastic cylinder is configured to be removable from the steel pipe, the elastic cylinder can be extracted and recovered even when the steel pipe cannot be extracted and recovered due to the hardening of the grout injected into the sleeve joint. Therefore, it is not necessary to leave a low-strength foreign material at the joint of the precast concrete beam.
請求項2に記載の発明によれば、スリーブ継手の両端がプレキャストコンクリート梁の端面に形成されたスリーブ継手収納空間の内部に位置し、スリーブ継手のグラウト排出口がプレキャストコンクリート梁のコンクリート部分で視覚的に隠蔽されているにもかかわらず、スリーブ継手に対するグラウト充填確認を容易に行えるという効果がある。即ち、プレキャストコンクリート梁に形成されたグラウト確認孔に上述した構成のグラウト用冶具を挿入し、グラウト径路となる鋼製パイプをスリーブ継手に形成されたグラウト排出口に連通させ、弾性筒体の先端をグラウト排出口に差し込むか、あるいは、グラウト排出口の周囲に押し付ける等して、グラウト排出口と鋼製パイプの隙間を閉塞した状態で、プレキャストコンクリート梁に形成されたグラウト充填孔からスリーブ継手の内部にグラウト注入することにより、スリーブ継手のグラウト排出口から溢れ出たグラウトはグラウト用冶具の鋼製パイプを通って外部に溢れ出ることになる。従って、鋼製パイプから溢れ出るグラウトを目視することで、スリーブ継手の内部にグラウトが充填されたことを確認できる。 According to the second aspect of the present invention, both ends of the sleeve joint are located inside the sleeve joint storage space formed on the end face of the precast concrete beam, and the grout outlet of the sleeve joint is visually visible in the concrete portion of the precast concrete beam. In spite of being concealed, there is an effect that the grout filling confirmation for the sleeve joint can be easily performed. That is, the grout jig having the above-described configuration is inserted into the grout confirmation hole formed in the precast concrete beam, and the steel pipe serving as the grout path is communicated with the grout discharge port formed in the sleeve joint, and the tip of the elastic cylinder body Insert the sleeve into the grout outlet, or press it around the grout outlet to close the gap between the grout outlet and the steel pipe and close the sleeve joint from the grout filling hole formed in the precast concrete beam. By injecting grout into the inside, the grout overflowing from the grout discharge port of the sleeve joint overflows to the outside through the steel pipe of the grout jig. Therefore, by visually observing the grout overflowing from the steel pipe, it can be confirmed that the grout is filled in the sleeve joint.
また、グラウト用冶具の弾性筒体でグラウト排出口と鋼製パイプの隙間を閉塞するので
、グラウト排出口の周囲にグラウトが漏れ出ることがない。従って、漏れ出たグラウトがグラウト排出口の周囲に固まって、スリーブ継手収納空間に対するグラウト注入の障害になる恐れがない。
Further, since the gap between the grout outlet and the steel pipe is closed by the elastic cylinder of the grout jig, the grout does not leak around the grout outlet. Therefore, the leaked grout does not become a hindrance to the grout injection into the sleeve joint storage space by solidifying around the grout outlet.
請求項3に記載の発明によれば、プレキャストコンクリート梁に形成されたグラウト充填孔にも、上述した構成のグラウト用冶具を挿入し、グラウト径路となる鋼製パイプをスリーブ継手に形成されたグラウト注入口に連通させ、弾性筒体の先端をグラウト注入口に差し込むか、あるいは、グラウト注入口の周囲に押し付ける等して、グラウト注入口と鋼製パイプの隙間を閉塞した状態で、グラウト充填孔に挿入されたグラウト用冶具を通してスリーブ継手の内部にグラウト注入するので、上記の効果に加え、スリーブ継手に対するグラウト注入を確実に行えるという効果がある。
According to the invention described in
また、グラウト用冶具の弾性筒体でグラウト注入口と鋼製パイプの隙間を閉塞するので、グラウト注入口の周囲にグラウトが漏れ出ることがない。従って、漏れ出たグラウトがグラウト注入口の周囲に固まって、スリーブ継手収納空間に対するグラウト注入の障害になる恐れがない。 Moreover, since the gap between the grout inlet and the steel pipe is closed by the elastic cylinder of the grout jig, the grout does not leak around the grout inlet. Therefore, there is no possibility that the leaked grout is solidified around the grout inlet and becomes an obstacle to grout injection into the sleeve joint housing space.
以下、本発明の実施形態を図面に基づいて説明する。図1は、プレキャストコンクリート梁1、2を対面して設置した状態を示す。3はプレキャストコンクリート梁1、2を支持するプレキャストコンクリート柱である。下階のプレキャストコンクリート柱3におけるコンクリート部分の上端から突出させた柱主筋(図示せず)はプレキャストコンクリート梁1、2を貫通し、上階のプレキャストコンクリート柱3における柱主筋4とスリーブ継手(図示せず)を介して接続されている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 shows a state in which
プレキャストコンクリート梁1、2の接合はスライド継手工法によって行われる。先ず、図2、図3に示すように、一方のプレキャストコンクリート梁1の梁主筋5に保持させたスリーブ継手6を軸芯方向にスライドさせて、当該スリーブ継手6を前記梁主筋5と他方のプレキャストコンクリート梁2の梁主筋5に略半分ずつ嵌合させた状態とする。7はプレキャストコンクリート梁1、2の端面にスリーブ継手収納空間8を形成するシース管、9と10は、プレキャストコンクリート梁1、2に形成されたグラウト充填孔とグラウト確認孔である。
The
この状態で、図4、図7に示すように、一方のプレキャストコンクリート梁1のグラウト充填孔9と他方のプレキャストコンクリート梁2のグラウト確認孔10に、夫々、グラウト用冶具A、Aを挿入する。そして、グラウト充填孔9に挿入されたグラウト用冶具Aを通してスリーブ継手6にグラウトGを注入し、グラウト確認孔10に挿入されたグラウト用冶具Aを目視することによってスリーブ継手6にグラウトGが充填されたか否かを確認する。
In this state, as shown in FIGS. 4 and 7, grout jigs A and A are inserted into the
グラウト用冶具Aは、図8に示すように、グラウト径路となる鋼製パイプ11の外側をゴム、ウレタン等の伸縮性がある弾性材料によって形成された弾性筒体12で被覆し、弾性筒体12を鋼製パイプ11に対して抜取り可能に構成したものである。スリーブ継手6の両端部外周面にはグラウト注入口6aとグラウト排出口6bが形成され、両端開口部内面にはリング状のシールゴム6c、6cが設けられている。
As shown in FIG. 8, the grout jig A covers the outside of a
前記グラウト用冶具Aは、グラウト径路となる鋼製パイプ11の外側を伸縮性がある弾性材料で形成された弾性筒体12で被覆してあるので、グラウト充填孔9やグラウト確認孔10にグラウト用冶具Aを挿入した際、弾性筒体12の弾性復元力によって孔内にしっかりと固定される。
In the grout jig A, the outer surface of the
グラウト径路となる鋼製パイプ11をスリーブ継手6に形成されたグラウト注入口6aやグラウト排出口6bに連通させた状態においては、弾性筒体12の先端をグラウト注入口6aやグラウト排出口6bに差し込むことにより、弾性筒体12の弾性復元力によるシール性能が発揮されるので、グラウト注入口6aやグラウト排出口6bの周囲にグラウトGが漏れ出ることがない。それでいて、弾性筒体12に挿通されている鋼製パイプ11は変形せず、断面形状が一定しているので、グラウト径路の断面積を一定に保持することができる。
In a state where the
従って、グラウト充填孔9に挿入されたグラウト用冶具Aを通してスリーブ継手6の内部にグラウトGを容易かつ確実に注入することができる。スリーブ継手6に注入された余剰のグラウトGは、図8に示すように、鋼製パイプ11を経て外部に溢れ出るので、この溢れ出たグラウトGを目視することによってスリーブ継手6内にグラウトGが充填されたことを確認できる。
Accordingly, the grout G can be easily and reliably injected into the sleeve joint 6 through the grout jig A inserted into the
従って、スリーブ継手6の両端がプレキャストコンクリート梁1、2の端面に形成されたスリーブ継手収納空間8、8の内部に位置し、スリーブ継手6のグラウト排出口6bがプレキャストコンクリート梁2のコンクリート部分で視覚的に隠蔽されているにもかかわらず、スリーブ継手6に対するグラウト充填確認を容易に行えることになる。
Therefore, both ends of the sleeve joint 6 are located in the sleeve
スリーブ継手6に充填したグラウトGがある程度硬化した時点で、具体的には、スリーブ継手6へのグラウト注入の翌日、図5、図9に示すように、グラウト用冶具Aを抜取り回収した後、図6、図10に示すように、スリーブ継手収納空間8、8及び両プレキャストコンクリート梁1、2の対向面間の隙間にグラウトGを注入し、両プレキャストコンクリート梁1、2の接合を完了するのである。これらのグラウト注入時には、プレキャストコンクリート梁1、2の対向面間の隙間は、周囲三辺に配置したエアチューブ又は型枠13で閉塞される。
When the grout G filled in the
上記の構成によれば、弾性筒体12の先端をグラウト注入口6aやグラウト排出口6bに差し込むことにより、弾性筒体12の弾性復元力によるシール性能が発揮され、グラウト注入口6aやグラウト排出口6bの周囲にグラウトGが漏れ出ることがない。従って、漏れ出たグラウトが注入口6aやグラウト排出口6bの周囲に固まって、スリーブ継手収納空間8に対するグラウト注入の障害になる恐れがない。
According to said structure, the sealing performance by the elastic restoring force of the
また、弾性筒体12が鋼製パイプ11に対して抜取り可能に構成されているので、スリーブ継手6に注入したグラウトGの硬化により、図9に仮想線で示すように、鋼製パイプ11が抜取り回収できなくなった場合でも、弾性筒体12を抜取り回収することが可能であり、プレキャストコンクリート梁1、2の接合部に低強度の異物を残さないで済む。
Further, since the elastic
図11は、本発明の他の実施形態を示す。この実施形態は、鋼製パイプ11の内端に弾性筒体12の孔縁部に引っ掛かるフランジ部11aを設けて、鋼製パイプ11を引抜き回収する際、鋼製パイプ11のフランジ部11aで弾性筒体12を押し上げるように構成すると共に、前記グラウト充填孔9やグラウト確認孔10にグラウト用冶具Aを挿入した際、弾性筒体12の端面を前記グラウト充填孔9やグラウト確認孔10の周囲に押し付けて、弾性筒体12の弾性復元力によるシール性能が発揮されるように構成した点に特徴がある。
FIG. 11 shows another embodiment of the present invention. In this embodiment, a
この構成によれば、図11の(A)に示すように、グラウト確認孔10にグラウト用冶具Aを挿入した状態で、図示しないグラウト充填孔9に挿入したグラウト用冶具Aを経てスリーブ継手6にグラウトGを注入することにより、図11の(B)に示すように、余剰
のグラウトGがグラウト確認孔10に挿入されたグラウト用冶具Aの鋼製パイプ11に溢れ出るので、スリーブ継手6にグラウトGが充填されたことを容易に確認できる。
According to this configuration, as shown in FIG. 11A, the sleeve joint 6 passes through the grout jig A inserted into the grout filling hole 9 (not shown) in a state where the grout jig A is inserted into the
グラウトGがある程度硬化したら、スリーブ継手収納空間8へのグラウト注入に先立って、図11の(C)に示すように、鋼製パイプ11の外端部を引っ張ることにより、弾性筒体12がフランジ部11aで押し上げられ、弾性筒体12ごと引抜き回収することができる。万が一、鋼製パイプ11と接するグラウトGが硬くなり過ぎて、鋼製パイプ11を引抜き回収できなくなっても、弾性筒体12が鋼製パイプ11に対して抜取り可能に構成されており、しかも、弾性筒体12の端面をグラウト充填孔9やグラウト確認孔10の周囲に押し付ける構成であるため、弾性筒体12だけを容易に引抜き回収することができ、プレキャストコンクリート梁1、2の接合部に低強度の異物を残さないで済む。その他の構成、作用は、先の実施形態と同じであるため、説明を省略する。
When the grout G is hardened to some extent, as shown in FIG. 11C, before the grout is injected into the sleeve
尚、上述した各実施形態では、グラウト充填孔9にもグラウト用冶具Aを挿入しているが、グラウト確認孔10にだけグラウト用冶具Aを挿入し、グラウト充填孔9には、従来通り、グラウトポンプのチューブを挿入して、グラウト注入を行うようにしてもよい。また、弾性筒体12の抜取りが容易となるように、弾性筒体12周囲に剥離材を塗布して施工を行ってもよい。
In each of the above-described embodiments, the grout jig A is also inserted into the
A グラウト用冶具
G グラウト
1,2 プレキャストコンクリート梁
3 プレキャストコンクリート柱
4 柱主筋
5 梁主筋
6 スリーブ継手
7 シース管
8 スリーブ継手収納空間
9 グラウト充填孔
10 グラウト確認孔
11 鋼製パイプ
11a フランジ部
12 弾性筒体
13 型枠
A Grout
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008136406A JP2009281102A (en) | 2008-05-26 | 2008-05-26 | Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008136406A JP2009281102A (en) | 2008-05-26 | 2008-05-26 | Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2009281102A true JP2009281102A (en) | 2009-12-03 |
Family
ID=41451831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008136406A Pending JP2009281102A (en) | 2008-05-26 | 2008-05-26 | Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2009281102A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6108422B1 (en) * | 2016-07-08 | 2017-04-05 | 昭彦 三瓶 | Precast concrete member provided with joining means and method for joining precast concrete member using the same |
JP2017096059A (en) * | 2015-11-27 | 2017-06-01 | 三井住友建設株式会社 | Construction method of concrete member filled with grout, and method to fill grout into concrete member |
CN107687213A (en) * | 2017-10-16 | 2018-02-13 | 华东建筑设计研究院有限公司 | A kind of assembly concrete wall connecting node apparatus and construction method |
CN108037158A (en) * | 2017-12-29 | 2018-05-15 | 中冶建筑研究总院有限公司 | A kind of method and apparatus being detected using metal detection line to grouting material plumpness |
CN108872547A (en) * | 2018-05-11 | 2018-11-23 | 建研科技股份有限公司 | Device and method for detecting whether full grouting sleeve is full |
CN109339343A (en) * | 2018-09-27 | 2019-02-15 | 北京市建筑设计研究院有限公司 | Precast concrete grout sleeve |
JP2019167689A (en) * | 2018-03-22 | 2019-10-03 | 五洋建設株式会社 | Construction method of column beam joint structure and column beam joint structure |
CN110924523A (en) * | 2019-11-13 | 2020-03-27 | 中国矿业大学 | Steel plate interface flexible connection structure and connection method for reinforced concrete column and foundation |
US10988920B2 (en) * | 2017-02-15 | 2021-04-27 | Tindall Corporation | Methods and apparatuses for constructing a concrete structure |
US11951652B2 (en) | 2020-01-21 | 2024-04-09 | Tindall Corporation | Grout vacuum systems and methods |
-
2008
- 2008-05-26 JP JP2008136406A patent/JP2009281102A/en active Pending
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017096059A (en) * | 2015-11-27 | 2017-06-01 | 三井住友建設株式会社 | Construction method of concrete member filled with grout, and method to fill grout into concrete member |
WO2018008152A1 (en) * | 2016-07-08 | 2018-01-11 | 昭彦 三瓶 | Precast concrete member comprising connection means and method for connecting precast concrete member using same |
JP6108422B1 (en) * | 2016-07-08 | 2017-04-05 | 昭彦 三瓶 | Precast concrete member provided with joining means and method for joining precast concrete member using the same |
US11466444B2 (en) | 2017-02-15 | 2022-10-11 | Tindall Corporation | Methods and apparatuses for constructing a concrete structure |
US10988920B2 (en) * | 2017-02-15 | 2021-04-27 | Tindall Corporation | Methods and apparatuses for constructing a concrete structure |
CN107687213A (en) * | 2017-10-16 | 2018-02-13 | 华东建筑设计研究院有限公司 | A kind of assembly concrete wall connecting node apparatus and construction method |
CN108037158A (en) * | 2017-12-29 | 2018-05-15 | 中冶建筑研究总院有限公司 | A kind of method and apparatus being detected using metal detection line to grouting material plumpness |
JP6997657B2 (en) | 2018-03-22 | 2022-01-17 | 五洋建設株式会社 | Construction method of column-beam joint structure and column-beam joint structure |
JP2019167689A (en) * | 2018-03-22 | 2019-10-03 | 五洋建設株式会社 | Construction method of column beam joint structure and column beam joint structure |
CN108872547A (en) * | 2018-05-11 | 2018-11-23 | 建研科技股份有限公司 | Device and method for detecting whether full grouting sleeve is full |
CN108872547B (en) * | 2018-05-11 | 2024-06-04 | 中建研科技股份有限公司 | Device and method for detecting whether grouting of full grouting sleeve is full |
CN109339343A (en) * | 2018-09-27 | 2019-02-15 | 北京市建筑设计研究院有限公司 | Precast concrete grout sleeve |
CN110924523B (en) * | 2019-11-13 | 2021-01-19 | 中国矿业大学 | Steel plate interface flexible connection structure and connection method for reinforced concrete column and foundation |
CN110924523A (en) * | 2019-11-13 | 2020-03-27 | 中国矿业大学 | Steel plate interface flexible connection structure and connection method for reinforced concrete column and foundation |
US11951652B2 (en) | 2020-01-21 | 2024-04-09 | Tindall Corporation | Grout vacuum systems and methods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2009281102A (en) | Grout tool, and method for confirming grout filling in slide joint construction method of precast concrete beam using the same | |
JP5513867B2 (en) | Construction method of underground structure, underground structure, and precast concrete member therefor | |
JP4852378B2 (en) | Reinforced joint half sleeve, joint using the half sleeve, and precast reinforced concrete molded product | |
KR101582173B1 (en) | The structure assembly for building a tunnel and building method thereof | |
JP4630197B2 (en) | Element, element joining structure and element joining method | |
JP5688479B2 (en) | Tunnel construction method | |
JP2019143350A (en) | Press-in construction method | |
JP6279962B2 (en) | Precast concrete member joining method and precast concrete member | |
JP2009138453A (en) | Precast concrete beam joining structure | |
JP4434022B2 (en) | Steel shell element joint structure and tunnel construction method using the same | |
JP2011226105A (en) | Tunnel construction method and shield machine | |
JP2008144498A (en) | Method for sealing joint part of element in underground structure construction method | |
JP2020122297A (en) | Placing method for tunnel lining concrete | |
JP3765045B2 (en) | Shield tunnel construction method | |
JP5495874B2 (en) | Removal method of shield excavator | |
JP2005282181A (en) | Pc member and joining method therefor | |
KR101963571B1 (en) | Corrosion reinforcement repair link unit embedded in a concrete building and repair method of corrosion rebar using the link unit | |
JP5604266B2 (en) | Precast member connection hardware installation method | |
JP4047199B2 (en) | Water stop material injection method | |
KR20200064597A (en) | Pipe line renovation finishing structure and method thereof | |
JP2014224388A (en) | Bag and method for joining precast member | |
JP5604265B2 (en) | Precast member connection structure | |
JP2006307534A (en) | Water cutoff method for concrete structure | |
JP6019096B2 (en) | Concrete structure, method for constructing concrete structure | |
JP2012112215A (en) | Lining material and repair method of lining wall |