JP2009212654A - System, method, and program for network operation equipment evaluation - Google Patents

System, method, and program for network operation equipment evaluation Download PDF

Info

Publication number
JP2009212654A
JP2009212654A JP2008051843A JP2008051843A JP2009212654A JP 2009212654 A JP2009212654 A JP 2009212654A JP 2008051843 A JP2008051843 A JP 2008051843A JP 2008051843 A JP2008051843 A JP 2008051843A JP 2009212654 A JP2009212654 A JP 2009212654A
Authority
JP
Japan
Prior art keywords
data
network
failure
traffic volume
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008051843A
Other languages
Japanese (ja)
Inventor
Akiko Yamashita
亜希子 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2008051843A priority Critical patent/JP2009212654A/en
Publication of JP2009212654A publication Critical patent/JP2009212654A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a network operation equipment evaluation system, determining the quality for existing equipments in a future instant, while assuming a situation such as occurrence of faults which have not occurred until now and increase of the number of users. <P>SOLUTION: The network operation equipment evaluation system includes a data collection means, a data storage means, a fault simulation means, a prediction data mining means, and an evaluation means. The data collection means collects data, including a traffic amount at least, for communication performance actually used or communication performance observed in an object network. The data storage means stores the data. The fault simulation means predicts a traffic amount at the time of faults for each pattern of faults which may occur in the object network, based on a traffic amount at the time of normal operation. The prediction data mining means predicts a traffic amount up to a some point in future, based on the data stored in the data storage means at least. The evaluation means evaluates the quality of equipments in the object network, based on the prediction result by the fault simulation means and the prediction result by the prediction data mining means. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、ネットワーク運用に係る設備を評価するネットワーク運用設備評価システム、ネットワーク運用設備評価方法およびネットワーク運用設備評価用プログラムに関する。   The present invention relates to a network operation facility evaluation system, a network operation facility evaluation method, and a network operation facility evaluation program for evaluating facilities related to network operation.

ネットワーク運用に係る施設の評価は、ネットワーク運用の熟練者の経験や感覚に依存して行っている場合が多い。例えば、トラフィックデータを収集してもデータ活用過程に特定の人のノウハウに依存している部分があったり、特定の技術者のみが行うことが可能といった技術の共有ができない等の問題がある。また、人手による作業では膨大な工数がかかるという問題もある。   In many cases, the evaluation of facilities related to network operation is performed depending on the experience and feeling of network operation experts. For example, there is a problem that even if traffic data is collected, there is a part that depends on the know-how of a specific person in the data utilization process, or the technology cannot be shared that only a specific engineer can perform. In addition, there is a problem that a large amount of man-hours are required for manual work.

ネットワーク運用に係る施設評価のシステム化に関し、例えば、特許文献1には、既に測定したトラフィック量とその測定時刻よりも後の時刻に測定されるトラフィック量との間の関係を表すデータを用いて、後の時刻におけるトラフィック量を推定し、推定されたトラフィック量に基づいてリソース不足を予測するトラフィック監視装置が記載されている。   Regarding systematization of facility evaluation related to network operation, for example, Patent Document 1 uses data representing a relationship between a traffic volume already measured and a traffic volume measured at a time later than the measurement time. A traffic monitoring device is described that estimates a traffic volume at a later time and predicts a resource shortage based on the estimated traffic volume.

また、特許文献2には、システム障害発生時に回線の状態をモニタする回線モニタリング機能と、各機器のエミュレーション試験機能、及びシステムの障害予測に利用するシステムの性能情報を収集するためのシステム性能計測機能を有する機器制御システムが記載されている。   Patent Document 2 discloses a system performance measurement for collecting a line monitoring function for monitoring a line state when a system failure occurs, an emulation test function for each device, and system performance information used for system failure prediction. A functional device control system is described.

特開2007−265245号公報JP 2007-265245 A 特開平07−023478号公報Japanese Patent Application Laid-Open No. 07-023478

しかし、特許文献1に記載されているトラフィック推定方法に基づく予測では、第1の時刻と第2の時刻との関係を固定的に表すデータしか生成されないため、例えば、障害がおきたときにリソース不足を生じるかどうかまでは予測しきれない。   However, in the prediction based on the traffic estimation method described in Patent Document 1, only data that represents a fixed relationship between the first time and the second time is generated. It is impossible to predict whether a shortage will occur.

また、特許文献2に記載されている機器制御システムでは、実際の制御チャネル上を流れる制御データを収集して、システムの障害箇所を特定したり、特定した障害箇所に対してシーケンス試験等を行うことにより、障害原因を解明することができるが、将来起こりうる障害についての情報を得ることについては何ら考慮されていない。   In addition, the device control system described in Patent Document 2 collects control data flowing on an actual control channel, identifies a fault location of the system, and performs a sequence test or the like on the identified fault location. Thus, the cause of the failure can be elucidated, but no consideration is given to obtaining information on a failure that may occur in the future.

仮に、過去に起きた障害情報を用いて、障害時のトラフィック量を元に推定したとしても、今までに起きていない障害に対する現状設備の良否については判断できないという問題がある。   Even if information on faults that have occurred in the past is used to estimate based on the traffic volume at the time of the fault, there is a problem in that it is impossible to determine whether the current equipment is good for faults that have not occurred.

そこで、本発明は、これまでに起きていない障害の発生やユーザ数の増加等の状況を想定しながら、将来の時点における現状設備の良否について判断することが可能なネットワーク運用設備評価システム、ネットワーク運用設備評価方法およびネットワーク運用設備評価用プログラムを提供することを目的とする。   Therefore, the present invention provides a network operation facility evaluation system and a network that can determine the quality of current facilities at a future point in time while assuming situations such as the occurrence of failures and an increase in the number of users that have not occurred so far. An object is to provide an operation facility evaluation method and a network operation facility evaluation program.

本発明のよるネットワーク運用設備評価システムは、ネットワークの運用に係る設備を評価するネットワーク運用設備評価システムであって、少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集するデータ収集手段と、少なくとも前記データ収集手段によって収集されたデータを蓄積しておくためのデータ記憶手段と、対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する障害シミュレーション手段と、少なくとも前記データ記憶手段に蓄積されている前記データ収集手段によって収集されたデータに基づき、将来のある時点までのトラフィック量を予測する予測データマイニング手段と、前記障害シミュレーション手段による予測結果と、前記予測データマイニング手段による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価する評価手段とを備えたことを特徴とする。   A network operation facility evaluation system according to the present invention is a network operation facility evaluation system for evaluating facilities related to network operation, and includes at least traffic volume, communication performance actually used in a network to be evaluated, or A data collection means for collecting data relating to the observed communication performance, a data storage means for storing at least the data collected by the data collection means, and a pattern of failures that may occur in the target network, Based on data collected by at least the data collection means stored in the data storage means, a failure simulation means for predicting the traffic volume when a failure occurs for each generated pattern based on the traffic volume at normal time The future is Based on the prediction data mining means for predicting the traffic volume to the point, the prediction result by the failure simulation means, and the prediction result by the prediction data mining means, the quality of the equipment related to the operation of the target network up to a certain time in the future And an evaluation means for evaluating.

本発明のよるネットワーク運用設備評価方法は、ネットワークの運用に係る設備を評価するためのネットワーク運用設備評価方法であって、少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集し、データ記憶装置に、少なくとも前記収集されたデータを蓄積しておき、対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する障害シミュレーション処理を行うとともに、少なくとも前記データ記憶手段に蓄積されている前記データ収集手段によって収集されたデータに基づき、将来のある時点までのトラフィック量を予測する予測データマイニング処理を行い、前記障害シミュレーション処理による予測結果と、前記予測データマイニング処理による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価することを特徴とする。   A network operation facility evaluation method according to the present invention is a network operation facility evaluation method for evaluating facilities related to network operation, and includes communication that is actually used in a network to be evaluated, including at least traffic volume. Collect data related to performance or observed communication performance, accumulate at least the collected data in a data storage device, generate a failure pattern that can occur in the target network, and generate a failure for each generated pattern. A failure simulation process for predicting the traffic volume in the case of occurrence of a failure based on the normal traffic volume, and at a certain time in the future based on at least the data collected by the data collection means stored in the data storage means Predict traffic volume to Performing measurement data mining processing, and evaluating the quality of equipment related to the operation of the target network up to a certain time in the future based on the prediction result by the failure simulation processing and the prediction result by the prediction data mining processing, To do.

本発明のよるネットワーク運用設備評価用プログラムは、ネットワークの運用に係る設備を評価するためのネットワーク運用設備評価用プログラムであって、コンピュータに、少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集するデータ収集処理、対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する障害シミュレーション処理、少なくとも所定のデータ記憶装置に蓄積されている前記収集されたデータに基づき、将来のある時点までのトラフィック量を予測する予測データマイニング処理、および前記障害シミュレーション処理による予測結果と、前記予測データマイニング処理による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価する評価処理を実行させることを特徴とする。   The network operation facility evaluation program according to the present invention is a network operation facility evaluation program for evaluating a facility related to network operation, and is actually included in a network to be evaluated including at least a traffic amount in a computer. Data collection processing that collects data related to the used communication performance or observed communication performance, generates a failure pattern that can occur in the target network, and normalizes the traffic volume when a failure occurs for each generated pattern Failure simulation processing for predicting based on traffic volume at the time, prediction data mining processing for predicting traffic volume up to a future point in time based on at least the collected data stored in a predetermined data storage device, and the failure Simulation A prediction result by tio down process, on the basis of the prediction result of the prediction data mining process, characterized in that to execute the evaluation process for evaluating the quality of the equipment according to the operation of the target network to some point in the future.

本発明によれば、これまでに起きていない障害の発生やユーザ数の増加等の状況を想定しながら、将来の時点における現状設備の良否について判断することができる。   According to the present invention, it is possible to determine whether or not the current equipment is good at a future point in time while assuming situations such as the occurrence of a failure that has not occurred so far and the increase in the number of users.

以下、本発明の実施形態を図面を参照して説明する。図1は、本発明によるネットワーク運用設備評価システムの構成例を示すブロック図である。図1に示すように、本発明によるネットワーク運用設備評価システムは、データ収集手段11と、データ記憶手段21と、障害シミュレーション手段12と、予測データマイニング手段13と、評価手段14とを備える。   Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing a configuration example of a network operation facility evaluation system according to the present invention. As shown in FIG. 1, the network operation facility evaluation system according to the present invention includes data collection means 11, data storage means 21, failure simulation means 12, prediction data mining means 13, and evaluation means 14.

データ収集手段11は、少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集する。データ収集手段11は、例えば、対象ネットワークがどのような機器および接続により構成されているかを示すネットワーク構成データと、対象ネットワークを構成している各機器で計測されたトラフィック量と、対象ネットワークを使用するユーザ数を示すユーザ数データとを収集してもよい。   The data collection unit 11 collects data relating to communication performance actually used or observed communication performance in the network to be evaluated, including at least traffic volume. The data collection unit 11 uses, for example, network configuration data indicating what kind of device and connection the target network is configured with, the amount of traffic measured by each device constituting the target network, and the target network User number data indicating the number of users to be collected may be collected.

また、データ記憶手段21は、少なくとも前記データ収集手段によって収集されたデータを蓄積しておく。   The data storage unit 21 stores at least the data collected by the data collection unit.

障害シミュレーション手段12は、対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する。障害シミュレーション手段12は、例えば、障害発生箇所としたノードまたはリンクに正常時に到達するトラフィック量を、迂回ルート側に加算することにより、障害時のトラフィック量を予測してもよい。   The failure simulation means 12 generates a pattern of failures that can occur in the target network, and predicts the traffic volume when a failure occurs for each of the generated patterns based on the normal traffic volume. The failure simulation means 12 may predict the amount of traffic at the time of failure, for example, by adding the amount of traffic that normally arrives at the node or link as the failure occurrence location to the detour route side.

予測データマイニング手段13は、少なくともデータ記憶手段21に蓄積されているデータ収集手段11によって収集されたデータに基づき、将来のある時点までのトラフィック量を予測する。予測データマイニング手段13は、例えば、日数経過によるトラフィック量の変化の、時間変動に基づく変化とユーザ数の増加との因果関係を規定する予測モデルを導出し、導出した予測モデルを用いて、将来のある時点までのトラフィック量を予測してもよい。ここで、時間変動に基づく変化とは、時刻や曜日、季節などにより生じる変化(いわゆる周期的な変化)をいう。   The predicted data mining means 13 predicts the traffic volume up to a future point in time based on at least the data collected by the data collecting means 11 accumulated in the data storage means 21. For example, the prediction data mining means 13 derives a prediction model that defines a causal relationship between a change in traffic volume due to the passage of days and a change based on time variation and an increase in the number of users. The amount of traffic up to a certain point in time may be predicted. Here, the change based on time fluctuation refers to a change (so-called periodic change) caused by time, day of the week, season, or the like.

評価手段14は、障害シミュレーション手段12による予測結果と、予測データマイニング手段13による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価する。   The evaluation unit 14 evaluates the quality of the facilities related to the operation of the target network up to a future time point based on the prediction result by the failure simulation unit 12 and the prediction result by the prediction data mining unit 13.

例えば、評価手段14は、障害シミュレーション手段12に、生成したパターン毎の、現時点で障害が発生した場合のトラフィック量を予測させ、その上で、予測データマイニング手段13に、データ記憶手段21に蓄積されているデータ収集手段によって収集されたデータと、障害シミュレーション手段12によって予測された障害時のトラフィック量とに基づいて、将来のある時点までの障害時のトラフィック量を予測させることにより、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価してもよい。なお、障害シミュレーション手段12は、そのような場合には、生成したパターン毎に、現時点で障害が発生した場合のトラフィック量を、現時点での正常時のトラフィック量に基づき予測すればよい。   For example, the evaluation unit 14 causes the failure simulation unit 12 to predict the amount of traffic for each generated pattern when a failure occurs at the current time, and then accumulates the prediction data mining unit 13 in the data storage unit 21. Based on the data collected by the collected data collecting means and the traffic volume at the time of failure predicted by the failure simulation means 12, the traffic volume at the time of failure up to a certain time in the future is predicted. You may evaluate the quality of the facilities which are related to the operation of the target network up to a certain point. In such a case, the failure simulation unit 12 may predict the traffic amount when a failure occurs at the present time for each generated pattern based on the current traffic amount at the normal time.

また、例えば、評価手段14は、予測データマイニング手段13に、データ記憶手段に蓄積されているデータ収集手段によって収集されたデータに基づき、将来のある時点までの正常時のトラフィック量を予測させ、その上で、障害シミュレーション手段12に、生成したパターン毎の、将来のある時点において対象ネットワークに障害が発生した場合のトラフィック量を予測させることにより、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価してもよい。なお、障害シミュレーション手段12は、そのような場合には、予測データマイニング手段13によって予測された将来のある時点までの正常時のトラフィック量に基づき予測すればよい。   Further, for example, the evaluation unit 14 causes the prediction data mining unit 13 to predict the normal traffic amount up to a certain time in the future based on the data collected by the data collection unit stored in the data storage unit. In addition, by causing the failure simulation unit 12 to predict the amount of traffic when a failure occurs in the target network at a certain future time for each generated pattern, the operation of the target network up to a certain future time is concerned. You may evaluate the quality of an installation. In such a case, the failure simulation unit 12 may perform prediction based on the normal traffic amount up to a certain time in the future predicted by the prediction data mining unit 13.

以下、より具体的な実施形態について説明する。図2は、本実施形態のネットワーク運用設備評価システムの構成例を示すブロック図である。図2に示すネットワーク運用設備評価システムは、データ収集機能部101と、障害シミュレーション機能部102と、予測データマイニング機能部103と、評価機能部104と、評価用データベース201とを備える。   Hereinafter, more specific embodiments will be described. FIG. 2 is a block diagram illustrating a configuration example of the network operation facility evaluation system according to the present embodiment. The network operation facility evaluation system shown in FIG. 2 includes a data collection function unit 101, a failure simulation function unit 102, a prediction data mining function unit 103, an evaluation function unit 104, and an evaluation database 201.

データ収集機能部101は、対象ネットワークにおける各種データを収集する。収集するデータは、ネットワーク構成情報データや、トラフィック量データ、ユーザ数データなど、対象ネットワークの現状での通信性能に関わる情報である。   The data collection function unit 101 collects various data in the target network. The data to be collected is information related to the current communication performance of the target network, such as network configuration information data, traffic volume data, and user count data.

ネットワーク構成情報データは、例えば、ネットワーク運用者が、各ルータやスイッチ等対象ネットワークを構成する各機器に設定をコンフィグ投入(設定値の登録)する際に、その内容を所定のデータベースに登録することにより保持される情報である。この情報により、対象ネットワークがどのような機器および接続により構成されているかが示される。   The network configuration information data, for example, when the network operator inputs a configuration to each device that configures the target network such as each router or switch (registration of setting values), the contents are registered in a predetermined database. It is information held by. This information indicates what device and connection the target network is configured with.

トラフィック量データは、例えば、対象ネットワークを構成している各機器(ルータやスイッチ等)でのトラフィック量を常時測定観測した結果を示す情報である。トラフィック量データは、例えば、ネットワークの負荷を監視するツールを用いて収集するようにしてもよい。本実施形態では、あるポイントにおける前日の最大トラフィック量をその前日のトラフィック量とする。例えば、2007年12月26日に、その前日(2007年12月25日)の最大トラフィック量を算出し、それを2007年12月15日のトラフィック長とする。各日のトラフィック量は、トラフィックデータファイルとして出力されるものとする。トラフィックデータファイルには、年月日とトラフィック量とを対応づけた情報が含まれる。データ収集機能部101は、トラフィック量データとともに、対象ネットワークで発生した障害の情報(機器故障やリンク障害)の情報を合わせて収集してもよい。   The traffic volume data is information indicating the result of constantly measuring and observing the traffic volume at each device (router, switch, etc.) constituting the target network, for example. The traffic volume data may be collected using, for example, a tool for monitoring the network load. In the present embodiment, the maximum traffic volume on the previous day at a certain point is set as the traffic volume on the previous day. For example, on December 26, 2007, the maximum traffic volume on the previous day (December 25, 2007) is calculated, and is set as the traffic length on December 15, 2007. The traffic volume for each day is output as a traffic data file. The traffic data file includes information associating the date with the traffic volume. The data collection function unit 101 may collect information on failure information (device failure or link failure) that has occurred in the target network together with traffic volume data.

ユーザ数データは、対象ネットワークを使用する使用者数に関する情報である。例えば、ネットワーク運用者によって、対象ネットワークの加入者数が所定のデータベースに登録されることにより保持される情報である。なお、対象ネットワークの加入者数は、加入予定者数を含んでいてもよい。ユーザ数データは、対象ネットワークの加入者数の変更に合わせて随時更新される。   The number-of-users data is information regarding the number of users who use the target network. For example, it is information held by the network operator registering the number of subscribers of the target network in a predetermined database. Note that the number of subscribers of the target network may include the number of planned subscribers. The number-of-users data is updated at any time according to the change in the number of subscribers of the target network.

データ収集機能部101は、例えば、予め定められた周期で、上記各データ(またはファイル)を保持しているデータベースにアクセスし、そのデータを読み込むことにより収集してもよい。なお、本実施形態では、データ収集機能部101は、収集したデータを評価用データベース201に記憶させる。なお、データ収集機能部101は、例えば、一日に一度のペースでデータ収集を行い、収集した日づけ情報と対応づけて、収集した情報(ネットワーク構成情報データ,トラフィック量データ,ユーザ数データ)を記憶するようにしてもよい。なお、ネットワーク構成情報データやユーザ数データについては、内容が変更になった場合にのみ新たに登録するようにし、内容が変更されていない場合には既に登録しておいたデータへの参照情報を関連づけるようにしてもよい。   For example, the data collection function unit 101 may collect data by accessing a database holding each of the data (or files) at a predetermined cycle and reading the data. In the present embodiment, the data collection function unit 101 stores the collected data in the evaluation database 201. The data collection function unit 101 collects data at a pace of once a day, for example, and collects information (network configuration information data, traffic volume data, user count data) in association with the collected date information. May be stored. Note that network configuration information data and user count data are newly registered only when the contents are changed, and when the contents are not changed, reference information to the already registered data is provided. You may make it relate.

障害シミュレーション機能部102は、データ収集機能部101によって収集されたトラフィック量データ,ネットワーク構成情報データを元に、障害発生時のトラフィック量をシミュレーションする。障害シミュレーション機能部102は、例えば、ネットワーク構成情報で示される対象ネットワークを構成している各機器の装置故障や各機器を接続するリンク障害など、当該ネットワークにおいて起こりうる障害のパターン(以下、障害パターンという。)を生成する。そして、生成した障害パターンから影響のおよぶ箇所を割り出し、収集されたトラフィック量データを元に障害時のトラフィック量を予測(算出)する。   The failure simulation function unit 102 simulates the traffic amount when a failure occurs based on the traffic amount data and network configuration information data collected by the data collection function unit 101. The failure simulation function unit 102, for example, a failure pattern that can occur in the network (hereinafter referred to as failure pattern) such as a device failure of each device constituting the target network indicated by the network configuration information or a link failure connecting each device. Is generated). Then, the affected part is determined from the generated failure pattern, and the traffic amount at the time of failure is predicted (calculated) based on the collected traffic amount data.

図3は、障害パターンによるシミュレーション結果の一例を示す説明図である。図3では、ノードAからノードBへの通信経路αについて、機器bの装置障害をシミュレーションした結果を示している。すなわち、機器bで障害が発生したと仮定すると、機器bを通る予定のトラフィック量(仮にxとする。)が例えば通信経路βのように迂回するため、迂回ルートとなる機器dでは、通常の最大トラフィック量(仮にyとする。)と機器bの障害により迂回してくる最大トラフィック量xの合計のトラフィック量が到達されると予測される。このように各障害パターン毎に障害により影響のある機器の障害時の最大予測トラフィック量を求めることにより、シミュレーションを行う。なお、具体的には、パターン毎に、迂回ルート側への最大トラフィック量の加算を行えばよい。なお、複数迂回ルートがある場合には、その分を割った値を加算すればよい。   FIG. 3 is an explanatory diagram illustrating an example of a simulation result based on a failure pattern. FIG. 3 shows a result of simulating a device failure of the device b for the communication path α from the node A to the node B. That is, assuming that a failure has occurred in the device b, the traffic amount scheduled to pass through the device b (assumed to be x) is detoured, for example, as in the communication path β. It is predicted that the total traffic amount of the maximum traffic amount (assuming y) and the maximum traffic amount x detoured due to the failure of the device b will be reached. As described above, the simulation is performed by obtaining the maximum predicted traffic amount at the time of failure of the device affected by the failure for each failure pattern. Specifically, the maximum traffic amount to the detour route side may be added for each pattern. If there are a plurality of detour routes, a value obtained by dividing the route may be added.

障害シミュレーション機能部102は、例えば、評価用データベース201に保持されているデータを用いて、週に一度(例えば、日曜日の早朝など)といった決められた周期で、上記シミュレーション(障害時の最大予測トラフィック量の算出処理)を行えばよい。シュミレーション結果は、例えば、シュミレーション結果データファイルとして、評価用データベース201に記憶する。シュミレーション結果データファイルには、シミュレーションを行った年月日と障害パターンを示す情報と最大予測トラフィック量とを対応づけた情報が含まれる。なお、障害パターンを示す情報は、例えば、仮定した障害発生箇所を特定できればよい。   The failure simulation function unit 102 uses the data held in the evaluation database 201, for example, with the above-described simulation (maximum predicted traffic at the time of failure) at a predetermined cycle such as once a week (for example, early morning on Sunday). Amount calculation processing) may be performed. The simulation result is stored in the evaluation database 201 as a simulation result data file, for example. The simulation result data file includes information in which the simulation date and information indicating the failure pattern are associated with the maximum predicted traffic volume. The information indicating the failure pattern only needs to be able to identify the assumed failure occurrence location, for example.

予測データマイニング機能部103は、各種データを組み合わせて、将来のある時点までのトラフィック量の推移の予兆(予測)を行う。本実施形態では、設定した未来の時点(例えば、2ヶ月先)までの、正常時のトラフィック量と障害シミュレーション時のトラフィック量とを、予測データマイニングエンジンを用いて予測する。ここで、予測データマイニングエンジンとは、予め定められたデータ解析手法を用いてデータ間の法則を導き出す手段をいう。なお、予測データマイニングエンジンとして、既存のデータマイニングツールを用いることも可能である。なお、本実施形態では、TrendLiner(トレンド分析エンジン)のように周期を理解してデータ間の関連性を求めることができることを要する。なお、TrendLinerは、時系列データの表現に確率モデルを用い、これを、長い周期性と短い周期性を個別にモデル化する階層化モデリング手法を用いて学習していくことで最適化モデルを導出し、将来を予測するツールエンジン(処理ソフトウェア)である。   The prediction data mining function unit 103 combines various data and performs a sign (prediction) of the transition of the traffic amount up to a certain point in the future. In the present embodiment, the traffic volume at the normal time and the traffic volume at the time of failure simulation up to a set future time point (for example, two months ahead) are predicted using the prediction data mining engine. Here, the predictive data mining engine refers to a means for deriving a law between data using a predetermined data analysis method. It is also possible to use an existing data mining tool as the prediction data mining engine. In the present embodiment, it is necessary to be able to determine the relationship between data by understanding the cycle as in TrendLiner (trend analysis engine). TrendLiner uses a probabilistic model to represent time-series data, and derives an optimization model by learning this using a hierarchical modeling method that individually models long periodicity and short periodicity. It is a tool engine (processing software) that predicts the future.

正常時のトラフィック量は、データ収集機能部101により収集した毎日のトラフィック量とユーザ数データとをもとに、予測データマイニング処理を行うことにより算出する。予測データマイニング処理では、毎日のトラフィック量の変化を、周期的変化とユーザ数の増加によるものとしてその因果関係を規定する予測モデルを導出し、それを元に、指定した未来の時点における正常時のトラフィック量を推定(算出)する。なお、既存のデータマイニングツールを用いる場合には、例えば、ある日のトラフィック量と、そのトラフィック量が観察された日の条件となる情報として曜日や季節とユーザ数とを関連づけた情報の集合を入力とし、設定した未来の時点の日の条件に対応するトラフィック量を出力させるようにすればよい。   The traffic volume at the normal time is calculated by performing a predicted data mining process based on the daily traffic volume collected by the data collection function unit 101 and the user count data. The forecast data mining process derives a forecast model that defines the causal relationship between daily changes in traffic volume as a result of periodic changes and an increase in the number of users, and based on that, the normal time at a specified future time point is derived. Estimate (calculate) the amount of traffic. In addition, when using an existing data mining tool, for example, a set of information that associates the day of the week and the season with the number of users as information on the traffic amount of a certain day and the condition on the day when the traffic amount is observed. As an input, a traffic amount corresponding to the set day condition at a future time point may be output.

また、障害時のトラフィック量は、障害シミュレーション手段13により算出された障害時のトラフィック量(ここでは、各パターンごとの毎週のトラフィック量)とユーザ数データとをもとに、予測データマイニング処理を行うことにより算出する。なお、障害時のトラフィック量の予測についても、毎週の障害時の最大予測トラフィック量の変化を、周期的変化とユーザ数の増加によるものとしてその因果関係を規定する予測モデルを導出し、それを元に、指定した未来の時点における障害時のトラフィック量を算出する。なお、障害時のトラフィック量の予測値を求める際に、まず実際に観測された障害の情報を入力として与え、障害発生頻度や、障害発生箇所に対する他の障害発生箇所またはトラフィック量の因果関係を規定する予測モデルを求め、その予測モデルを元に、設定した未来の時点において起こりうる障害発生パターンを導出し、その障害発生パターンと予め決められた条件での障害パターンについて、障害時のトラフィック量を算出するようにしてもよい。   The traffic volume at the time of failure is calculated based on the traffic volume at the time of failure calculated by the failure simulation means 13 (here, the weekly traffic volume for each pattern) and the number of users data. Calculate by doing. As for the prediction of traffic volume at the time of failure, a prediction model that defines the causal relationship as the change in the maximum predicted traffic volume at the time of failure every week due to the periodic change and the increase in the number of users is derived. Based on this, the traffic volume at the time of failure at the specified future time is calculated. When calculating the predicted value of traffic volume at the time of failure, first, information on the actually observed failure is given as an input, and the frequency of failure occurrence and the causal relationship between other failure occurrence locations or traffic volume with respect to the failure occurrence location are given. Obtain a prescribed prediction model, derive a failure occurrence pattern that can occur at a set future time point based on the prediction model, and calculate the traffic volume at the time of failure for the failure occurrence pattern and the failure pattern under a predetermined condition. May be calculated.

なお、予測データマイニング機能部103は、将来のある時点において発生する可能性の高い障害発生パターンを導出し、障害シミュレーション機能部102が、その障害発生パターンを含む所定の障害発生パターンについて、予測データマイニング機能部103によって得られた正常時のトラフィック量を用いてシミュレーションを行うことにより、将来のある時点における障害時のトラフィック量を算出することも可能である。   Note that the prediction data mining function unit 103 derives a failure occurrence pattern that is likely to occur at a certain time in the future, and the failure simulation function unit 102 uses the prediction data for a predetermined failure occurrence pattern including the failure occurrence pattern. By performing a simulation using the normal traffic volume obtained by the mining function unit 103, it is also possible to calculate the traffic volume at the time of failure at a certain time in the future.

評価機能部104は、障害シミュレーション機能部102によるシミュレーション結果および予測データマイニング機能部103による予測データマイニング結果により、予め定めておいた閾値との比較を行い、ネットワーク性能を評価する。閾値は、例えば、ネットワーク運用における各ポイントのトラフィック使用率(例えば、90%)で設定してもよい。また、予備閾値(例えば、80%)を設け、閾値越えによる警告の前に注意を促すようにしてもよい。評価機能部104は、例えば、閾値に対して危険なものの上位数パターンや、指定された期間において閾値もしくは予備閾値を超えると予測された障害パターンについて、その予測値を日数経過による状況の変化とともに表示することにより、ネットワーク運用者が視覚的に理解しやすいように通知してもよい。また、1ヶ月以内に閾値もしくは予備閾値を超えると予測されたものについては赤色、3ヶ月以内に閾値もしくは予備閾値を超えると予測されたものについては黄色など、色の区別によって危険度を合わせて知らせるようにしてもよい。   The evaluation function unit 104 evaluates the network performance by comparing with a predetermined threshold based on the simulation result by the failure simulation function unit 102 and the prediction data mining result by the prediction data mining function unit 103. The threshold value may be set, for example, as a traffic usage rate (for example, 90%) at each point in network operation. Also, a preliminary threshold value (for example, 80%) may be provided so that attention is urged before a warning due to exceeding the threshold value. The evaluation function unit 104, for example, for the top number pattern that is dangerous to the threshold, or the failure pattern predicted to exceed the threshold or the reserve threshold in the specified period, the predicted value along with the change of the situation due to the passage of days By displaying, notification may be made so that the network operator can easily understand visually. Also, adjust the degree of risk by distinguishing colors such as red for those predicted to exceed the threshold or reserve threshold within one month, and yellow for those predicted to exceed the threshold or reserve threshold within three months. You may make it inform.

なお、本実施形態において、データ収集機能部101,障害シミュレーション機能部102,予測データマイニング機能部103,評価機能部104は、例えば、プログラムに従って動作するCPUによって実現される。また、評価用データベース201は、例えば、記憶装置によって実現される。なお、該記憶装置に対するアクセスを行う制御装置を含むデータベースシステムによって実現されていてもよい。   In the present embodiment, the data collection function unit 101, the failure simulation function unit 102, the prediction data mining function unit 103, and the evaluation function unit 104 are realized by a CPU that operates according to a program, for example. The evaluation database 201 is realized by a storage device, for example. Note that it may be realized by a database system including a control device that accesses the storage device.

次に、本実施形態の動作について説明する。図4は、本実施形態のネットワーク運用設備評価システムの動作例を示すフローチャートである。図4に示す例では、まず、データ収集機能部101が、対象ネットワークから周期的に、所定のデータを収集する(ステップS101)。なお、データ収集機能部101は、例えば、対象ネットワークから常時データを収集するようにし、一日に一度といった周期で、収集データから測定ポイントの最大トラフィック量を算出するようにしてもよい。ここで収集したデータは、評価用データベース201に記憶しておく。   Next, the operation of this embodiment will be described. FIG. 4 is a flowchart showing an operation example of the network operation facility evaluation system of this embodiment. In the example shown in FIG. 4, first, the data collection function unit 101 periodically collects predetermined data from the target network (step S101). For example, the data collection function unit 101 may collect data from the target network at all times, and calculate the maximum traffic volume of the measurement point from the collected data in a cycle such as once a day. The data collected here is stored in the evaluation database 201.

次に、ステップS102において、予測データマイニング機能部103が、予め決められた周期(例えば、週に一度)で、評価用データベース201に保持されているデータを用い、正常時の予測データマイニング処理を行う。例えば、1日1度のペースでトラフィック量が収集される場合に、当該システムが稼働して2週間が経過していれば、過去11日分のトラフィック量を用いて、指定した未来の時点における正常時のトラフィック量を求める予測データマイニング処理を実行する。なお、予め過去何日分のデータを入力するかを定めておいてもよい。なお、どれくらい先の時点を指定するかは、設備投資が必要と判断された場合にその設備を用意するのに要する時間がもてればよい。例えば、ルータを手配するのに2ヶ月かかる見込むであれば、少なくとも2ヶ月先までを指定できるようにする。   Next, in step S102, the prediction data mining function unit 103 performs a normal prediction data mining process using data held in the evaluation database 201 at a predetermined cycle (for example, once a week). Do. For example, when traffic volume is collected at a pace of once a day, if two weeks have passed since the system was operating, the traffic volume for the past 11 days is used at the specified future time point. Predictive data mining is performed to determine the normal traffic volume. It may be determined in advance how many days in the past the data is to be input. It should be noted that it is sufficient for the time point to be specified to have the time required to prepare the equipment when it is determined that the equipment investment is necessary. For example, if it takes two months to arrange a router, at least two months ahead can be specified.

また、予測データマイニング機能部103は、予め決められた周期(例えば、週に一度)で、評価用データベース201に保持されているデータを用い、障害時の予測データマイニング処理を行う(ステップS103)。例えば、週に1度のペースで障害時のトラフィック量がシミュレーションにより算出される場合に、当該システムが稼働して2週間が経過していれば、2回分のシミュレーション結果を用いて、指定した未来の時点における障害時のトラフィック量を求める予測データマイニング処理を実行する。なお、予め過去何回分のデータを入力するかを定めておいてもよい。   Further, the prediction data mining function unit 103 performs prediction data mining processing at the time of failure using data held in the evaluation database 201 at a predetermined cycle (for example, once a week) (step S103). . For example, if the traffic volume at the time of failure is calculated at a pace of once a week by simulation, if the system has been operating and two weeks have passed, the future specified using the simulation results for two times Predictive data mining processing for obtaining the traffic volume at the time of failure at the time of is executed. Note that it may be determined in advance how many times data is input in the past.

次に、ステップS104において、障害シミュレーション機能部102が、予め決められた周期(例えば、週に一度)で、評価用データベース201に保持されているデータを用い、予め決められた条件での障害パターンについて、障害時のシミュレーションを行う。障害シミュレーション機能部102は、例えば、2箇所までの障害であれば帯域の保証をするといったネットワーク運用側での基準に応じて示される条件に基づき、シミュレーションを行うべき障害パターンを生成し、生成した各障害パターンについてシミュレーションを行う。この例では、1箇所障害および2箇所障害となる全パターンに対するシミュレーションを行う。   Next, in step S104, the failure simulation function unit 102 uses the data stored in the evaluation database 201 at a predetermined cycle (for example, once a week), and uses the data stored in the evaluation database 201 to determine a failure pattern under a predetermined condition. For the failure. The failure simulation function unit 102 generates and generates a failure pattern to be simulated based on the conditions indicated according to the criteria on the network operation side, such as guaranteeing the bandwidth if there are failures up to two places. A simulation is performed for each failure pattern. In this example, a simulation is performed for all patterns that cause a one-point fault and a two-point fault.

次に、ステップS105において、評価機能部104が、障害シミュレーション機能部102によるシミュレーション結果および予測データマイニング機能部103による予測データマイニング結果により、ネットワーク性能を評価する。そして、評価結果をネットワーク運用者に通知する(ステップS106)。なお、評価機能部104は、例えば、評価の結果、危険または注意が必要と判断された場合にのみ、その旨をネットワーク運用者に通知するようにしてもよい。   Next, in step S <b> 105, the evaluation function unit 104 evaluates the network performance based on the simulation result by the failure simulation function unit 102 and the prediction data mining result by the prediction data mining function unit 103. Then, the evaluation result is notified to the network operator (step S106). For example, the evaluation function unit 104 may notify the network operator only when it is determined that danger or caution is necessary as a result of the evaluation.

図5は、評価結果の表示例を示す説明図である。図5に示す例では、ある障害パターンについての障害時の予測値とともに正常時の予測値を、日付を軸にグラフで表示することにより、日数経過による状況の変化を表している。なお、図5に示す例は、ある月の16日(火)における評価結果の例である。すなわち、16日以前の実線で結ばれている各丸印は、正常時のトラフィック量の実測値である。そして、16日より先の点線で結ばれている各丸印は、予測データマイニング処理によって求めた正常時のトラフィック量の予測値である。また、三角印は、ある障害パターンについての障害発生時の最大トラフィック使用率を示している。   FIG. 5 is an explanatory diagram showing a display example of the evaluation result. In the example shown in FIG. 5, the predicted value at the time of failure and the predicted value at normal time for a certain failure pattern are displayed in a graph with the date as an axis, thereby representing a change in the situation due to the passage of days. In addition, the example shown in FIG. 5 is an example of the evaluation result on the 16th (Tue) of a certain month. In other words, each circle connected by a solid line before the 16th is an actual measurement value of the traffic amount at the normal time. Each circle connected by a dotted line after the 16th is a predicted value of the normal traffic amount obtained by the predicted data mining process. A triangle indicates the maximum traffic usage rate when a failure occurs for a certain failure pattern.

図5に示すでは、1週間の中で月曜日がやや多めで火曜日がそれよりも少なめ、水曜日〜金曜日にかけて上り調子になり、土日は極端に少ないといった1週間単位での周期変化が観測されている。また、それに加え、ユーザ数の増加により徐々にトラフィック量が右肩上がりになっているといった状況の変化が観測されている。また、26日(金)に障害時および正常時のトラフィック量が予備閾値を超える可能性があることが示されている。なお、図5に示す例では、わかりやすいように短期間で予備閾値を超える旨の予測がされた結果として示しているが、例えば、「2ヶ月先までの予兆を見る」といった設定がなされている場合には、少なくとも現在よりも2ヶ月先までを表示できるグラフを表示するようにする。また、一つのグラフに複数の障害パターンを表示することも可能である。なお、表示中の障害パターンで想定されている障害箇所の情報についても併せて表示するようにしてもよい。   As shown in FIG. 5, periodic changes are observed on a weekly basis, such that Monday is slightly more in one week, Tuesday is less than that, and it is in an upward tone from Wednesday to Friday, and Saturdays and Sundays are extremely few. In addition, a change in the situation has been observed in which the traffic volume gradually increases as the number of users increases. Further, it is shown that there is a possibility that the traffic volume at the time of failure and normal time may exceed the reserve threshold on the 26th (Friday). In the example shown in FIG. 5, for the sake of easy understanding, it is shown as a result of a prediction that the preliminary threshold value is exceeded in a short period of time. In some cases, a graph that can display at least two months ahead is displayed. It is also possible to display a plurality of failure patterns on one graph. In addition, you may make it display also about the information of the fault location assumed with the fault pattern currently displayed.

以上のように、本実施形態によれば、実ネットワークのデータおよび過去の蓄積データを根拠に、障害シミュレーション処理と予測データマイニング処理とを併用して、将来発生しうるトラフィック量を予測するので、これまでに起きていない障害の発生やユーザ数の増加等の状況を想定しながら、将来の時点における現状設備の良否について判断することができる。また、ネットワーク運用者が、人手による技術の偏り等を気にすることなく、将来のトラフィック傾向を把握でき、設備投資計画を容易に行うことができる。   As described above, according to the present embodiment, based on real network data and past accumulated data, the amount of traffic that can occur in the future is predicted by using both the failure simulation process and the predicted data mining process. It is possible to determine whether or not the current equipment is good at a future point in time while assuming a situation such as the occurrence of a failure that has not occurred so far and an increase in the number of users. In addition, the network operator can grasp the future traffic trend without worrying about the technical bias due to manual labor, and can easily perform the capital investment plan.

本発明は、通信キャリアのネットワークなどの大規模でユーザ数の増減が少なくないネットワークシステムに対しても好適に適用可能である。   The present invention can be suitably applied to a large-scale network system such as a communication carrier network in which the number of users does not increase or decrease.

本発明によるネットワーク運用設備評価システムの構成例を示すブロック図である。It is a block diagram which shows the structural example of the network operation equipment evaluation system by this invention. ネットワーク運用設備評価システムのより具体的な構成例を示すブロック図である。It is a block diagram which shows the more specific structural example of a network operation equipment evaluation system. 障害パターンによるシミュレーション結果の一例を示す説明図である。It is explanatory drawing which shows an example of the simulation result by a failure pattern. 本実施形態のネットワーク運用設備評価システムの動作例を示すフローチャートである。It is a flowchart which shows the operation example of the network operation equipment evaluation system of this embodiment. 評価結果の表示例を示す説明図である。It is explanatory drawing which shows the example of a display of an evaluation result.

符号の説明Explanation of symbols

11 データ収集手段
12 障害シミュレーション手段
13 予測データマイニング手段
14 評価手段
21 データ記憶手段
101 データ収集機能部
102 障害シミュレーション機能部
103 予測データマイニング機能部
104 評価機能部
201 評価用データベース
DESCRIPTION OF SYMBOLS 11 Data collection means 12 Failure simulation means 13 Prediction data mining means 14 Evaluation means 21 Data storage means 101 Data collection function part 102 Failure simulation function part 103 Prediction data mining function part 104 Evaluation function part 201 Evaluation database

Claims (9)

ネットワークの運用に係る設備を評価するネットワーク運用設備評価システムであって、
少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集するデータ収集手段と、
少なくとも前記データ収集手段によって収集されたデータを蓄積しておくためのデータ記憶手段と、
対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する障害シミュレーション手段と、
少なくとも前記データ記憶手段に蓄積されている前記データ収集手段によって収集されたデータに基づき、将来のある時点までのトラフィック量を予測する予測データマイニング手段と、
前記障害シミュレーション手段による予測結果と、前記予測データマイニング手段による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価する評価手段とを備えた
ことを特徴とするネットワーク運用設備評価システム。
A network operation equipment evaluation system for evaluating equipment related to network operation,
Data collection means for collecting data relating to communication performance actually used or observed in the network to be evaluated, including at least traffic volume;
Data storage means for storing at least the data collected by the data collection means;
A failure simulation means for generating a failure pattern that can occur in the target network, and predicting the traffic volume when a failure occurs for each generated pattern based on the traffic volume at normal time;
Predictive data mining means for predicting traffic volume up to a future time point based on data collected by the data collecting means accumulated at least in the data storage means;
Evaluation means for evaluating the quality of equipment related to operation of the target network up to a certain time in the future based on the prediction result by the failure simulation means and the prediction result by the prediction data mining means. Network operation facility evaluation system.
データ収集手段は、対象ネットワークがどのような機器および接続により構成されているかを示すネットワーク構成データと、対象ネットワークを構成している各機器で計測されたトラフィック量と、対象ネットワークを使用するユーザ数を示すユーザ数データとを収集し、
予測データマイニング手段は、日数経過によるトラフィック量の変化の、時間変動に基づく変化とユーザ数の増加との因果関係を規定する予測モデルを導出し、導出した予測モデルを用いて、将来のある時点までのトラフィック量を予測する
請求項1に記載のネットワーク運用設備評価システム。
The data collection means includes network configuration data indicating what devices and connections the target network is configured with, the amount of traffic measured by each device constituting the target network, and the number of users using the target network. User count data indicating
The prediction data mining means derives a prediction model that defines the causal relationship between the change in traffic volume due to the passage of days and the increase in the number of users based on changes in time, and uses the derived prediction model to The network operation facility evaluation system according to claim 1, wherein the traffic amount is predicted.
障害シミュレーション手段は、障害発生箇所としたノードまたはリンクに正常時に到達するトラフィック量を、迂回ルート側に加算することにより、障害時のトラフィック量を予測する
請求項1または請求項2に記載のネットワーク運用設備評価システム。
The network according to claim 1 or 2, wherein the failure simulation means predicts the traffic amount at the time of failure by adding, to the detour route side, the traffic amount that normally reaches the node or link as the failure occurrence point. Operational equipment evaluation system.
障害シミュレーション手段は、生成したパターン毎に、現時点で障害が発生した場合のトラフィック量を、現時点での正常時のトラフィック量に基づき予測し、
予測データマイニング手段は、データ記憶手段に蓄積されているデータ収集手段によって収集されたデータと、前記障害シミュレーション手段によって予測された障害時のトラフィック量とに基づいて、将来のある時点までの障害時のトラフィック量を予測する
請求項1から請求項3のうちのいずれか1項に記載のネットワーク運用設備評価システム。
The failure simulation means predicts the traffic volume when a failure occurs at the current time for each generated pattern based on the current traffic volume at the normal time,
The predicted data mining means is based on the data collected by the data collecting means accumulated in the data storage means and the traffic volume at the time of failure predicted by the failure simulation means, at the time of failure up to a certain point in the future. The network operation facility evaluation system according to any one of claims 1 to 3, wherein the traffic amount is predicted.
予測データマイニング手段は、データ記憶手段に蓄積されているデータ収集手段によって収集されたデータに基づき、将来のある時点までの正常時のトラフィック量を予測し、
障害シミュレーション手段は、生成したパターン毎に、将来のある時点において対象ネットワークに障害が発生した場合のトラフィック量を、前記予測データマイニング手段によって予測された将来のある時点までの正常時のトラフィック量に基づき予測する
請求項1から請求項3のうちのいずれか1項に記載のネットワーク運用設備評価システム。
The predictive data mining means predicts normal traffic volume up to a certain time in the future based on the data collected by the data collecting means accumulated in the data storage means,
The failure simulation means converts the traffic volume when a failure occurs in the target network at a future time point into the normal traffic volume up to a future time point predicted by the prediction data mining means for each generated pattern. The network operation facility evaluation system according to any one of claims 1 to 3, wherein the network operation facility evaluation system is predicted.
ネットワークの運用に係る設備を評価するためのネットワーク運用設備評価方法であって、
少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集し、
データ記憶装置に、少なくとも前記収集されたデータを蓄積しておき、
対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する障害シミュレーション処理を行うとともに、
少なくとも前記データ記憶手段に蓄積されている前記データ収集手段によって収集されたデータに基づき、将来のある時点までのトラフィック量を予測する予測データマイニング処理を行い、
前記障害シミュレーション処理による予測結果と、前記予測データマイニング処理による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価する
ことを特徴とするネットワーク運用設備評価方法。
A network operation facility evaluation method for evaluating facilities related to network operation,
Collect data related to the communication performance actually used or observed in the network to be evaluated, including at least the traffic volume,
Storing at least the collected data in a data storage device;
A failure simulation process that generates a failure pattern that can occur in the target network and predicts the traffic volume when a failure occurs based on the normal traffic volume for each generated pattern,
Based on at least the data collected by the data collection means stored in the data storage means, a prediction data mining process for predicting the traffic volume up to a certain time in the future is performed,
A network operation facility evaluation method characterized by evaluating the quality of facilities related to the operation of the target network up to a future time point based on the prediction result by the failure simulation processing and the prediction result by the prediction data mining processing.
対象ネットワークがどのような機器および接続により構成されているかを示すネットワーク構成データと、対象ネットワークを構成している各機器で計測されたトラフィック量と、対象ネットワークを使用するユーザ数を示すユーザ数データとを収集し、
予測データマイニング処理で、日数経過によるトラフィック量の変化の、時間変動に基づく変化とユーザ数の増加との因果関係を規定する予測モデルを導出し、導出した予測モデルを用いて、将来のある時点までのトラフィック量を予測する
請求項6に記載のネットワーク運用設備評価方法。
Network configuration data indicating what devices and connections the target network is configured with, traffic volume measured by each device that configures the target network, and user count data indicating the number of users using the target network And collect and
In the forecast data mining process, a forecast model that defines the causal relationship between the change in traffic volume due to the passage of days and the increase in the number of users based on changes in time is derived. The network operation facility evaluation method according to claim 6, wherein the traffic amount up to is predicted.
ネットワークの運用に係る設備を評価するためのネットワーク運用設備評価用プログラムであって、
コンピュータに、
少なくともトラフィック量を含む、評価対象とするネットワークにおいて実際に用いられている通信性能または観測された通信性能に関わるデータを収集するデータ収集処理、
対象ネットワークにおいて起こりうる障害のパターンを生成し、生成したパターン毎に、障害が発生した場合のトラフィック量を正常時のトラフィック量に基づき予測する障害シミュレーション処理、
少なくとも所定のデータ記憶装置に蓄積されている前記収集されたデータに基づき、将来のある時点までのトラフィック量を予測する予測データマイニング処理、および
前記障害シミュレーション処理による予測結果と、前記予測データマイニング処理による予測結果とに基づき、将来のある時点までの対象ネットワークの運用に係る設備の良否を評価する評価処理
を実行させるためのネットワーク運用設備評価用プログラム。
A network operation facility evaluation program for evaluating facilities related to network operation,
On the computer,
A data collection process that collects data related to the communication performance actually used or observed in the network to be evaluated, including at least the traffic volume,
A failure simulation process that generates a failure pattern that can occur in the target network and predicts the traffic volume when a failure occurs for each generated pattern based on the normal traffic volume,
Predictive data mining processing for predicting traffic volume up to a certain time in the future based on at least the collected data accumulated in a predetermined data storage device, prediction results by the failure simulation processing, and the predictive data mining processing A network operation facility evaluation program for executing an evaluation process to evaluate the quality of facilities related to the operation of the target network up to a certain point in the future based on the prediction results of
コンピュータに、
データ収集処理で、対象ネットワークがどのような機器および接続により構成されているかを示すネットワーク構成データと、対象ネットワークを構成している各機器で計測されたトラフィック量と、対象ネットワークを使用するユーザ数を示すユーザ数データとを収集させ、
予測データマイニング処理で、日数経過によるトラフィック量の変化の、時間変動に基づく変化とユーザ数の増加との因果関係を規定する予測モデルを導出させ、導出される予測モデルを用いて、将来のある時点までのトラフィック量を予測させる
請求項8に記載のネットワーク運用設備評価用プログラム。
On the computer,
Network configuration data that indicates what devices and connections the target network is configured in the data collection process, the amount of traffic measured by each device that makes up the target network, and the number of users using the target network User number data indicating
In the forecast data mining process, a forecast model that defines the causal relationship between the change in traffic volume due to the passage of days and the increase in the number of users based on the change in time is derived. The network operation facility evaluation program according to claim 8, wherein the traffic amount up to a point in time is predicted.
JP2008051843A 2008-03-03 2008-03-03 System, method, and program for network operation equipment evaluation Pending JP2009212654A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008051843A JP2009212654A (en) 2008-03-03 2008-03-03 System, method, and program for network operation equipment evaluation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008051843A JP2009212654A (en) 2008-03-03 2008-03-03 System, method, and program for network operation equipment evaluation

Publications (1)

Publication Number Publication Date
JP2009212654A true JP2009212654A (en) 2009-09-17

Family

ID=41185408

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008051843A Pending JP2009212654A (en) 2008-03-03 2008-03-03 System, method, and program for network operation equipment evaluation

Country Status (1)

Country Link
JP (1) JP2009212654A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010193011A (en) * 2009-02-16 2010-09-02 Kddi Corp Method and device for predicting communication traffic
JP2010193321A (en) * 2009-02-19 2010-09-02 Nippon Telegr & Teleph Corp <Ntt> Congestion influence degree evaluation apparatus, congestion influence degree evaluation method and program therefor
JP2011250237A (en) * 2010-05-28 2011-12-08 Hitachi Ltd Packet transfer device control method and controller
JP5698862B1 (en) * 2014-09-03 2015-04-08 ソフトバンクBb株式会社 Simulation apparatus and program
JP2016127360A (en) * 2014-12-26 2016-07-11 Kddi株式会社 Communication traffic prediction method, device and program
CN106254148A (en) * 2016-09-13 2016-12-21 广州中软信息技术有限公司 The method and device that operation/maintenance data processes
US11568313B2 (en) 2017-12-07 2023-01-31 Nec Corporation Control apparatus, analysis apparatus, communication system, data processing method, data transmission method, and non-transitory computer readable medium
WO2023157090A1 (en) * 2022-02-15 2023-08-24 日本電信電話株式会社 Dataset generation device, dataset generation method and program

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010193011A (en) * 2009-02-16 2010-09-02 Kddi Corp Method and device for predicting communication traffic
JP2010193321A (en) * 2009-02-19 2010-09-02 Nippon Telegr & Teleph Corp <Ntt> Congestion influence degree evaluation apparatus, congestion influence degree evaluation method and program therefor
JP2011250237A (en) * 2010-05-28 2011-12-08 Hitachi Ltd Packet transfer device control method and controller
JP5698862B1 (en) * 2014-09-03 2015-04-08 ソフトバンクBb株式会社 Simulation apparatus and program
JP2016127360A (en) * 2014-12-26 2016-07-11 Kddi株式会社 Communication traffic prediction method, device and program
CN106254148A (en) * 2016-09-13 2016-12-21 广州中软信息技术有限公司 The method and device that operation/maintenance data processes
CN106254148B (en) * 2016-09-13 2019-09-17 广州中软信息技术有限公司 The method and device of operation/maintenance data processing
US11568313B2 (en) 2017-12-07 2023-01-31 Nec Corporation Control apparatus, analysis apparatus, communication system, data processing method, data transmission method, and non-transitory computer readable medium
WO2023157090A1 (en) * 2022-02-15 2023-08-24 日本電信電話株式会社 Dataset generation device, dataset generation method and program

Similar Documents

Publication Publication Date Title
JP2009212654A (en) System, method, and program for network operation equipment evaluation
KR102169561B1 (en) Data cleansing system and method for inferring feed composition
Kim et al. Diagnosis and prediction of traffic congestion on urban road networks using Bayesian networks
US8321187B2 (en) Process simulation utilizing component-specific consumption data
Scarf et al. Block replacement policies for a two‐component system with failure dependence
JP2003162324A (en) Intelligent data-analyzing method for detecting abnormal use of utilities in buildings
Waddell et al. Characterizing traffic-signal performance and corridor reliability using crowd-sourced probe vehicle trajectories
JP5387779B2 (en) Operation management apparatus, operation management method, and program
JP5486939B2 (en) Road traffic situation analysis system
KR20160036710A (en) System for predicting future traffic situations
EP4283541A1 (en) Automatic machine learning based prediction of baseline energy consumption
CN113327174A (en) Distribution transformer load prediction method
JP2019096268A (en) Water treatment plant operation assisting system
Jamali et al. The effect of management decision processes on the management of bridges
CN113792421B (en) TPM equipment management data processing system and method based on digital twinning
CN109740191A (en) Prediction technique, device and the equipment of wind sensor remaining life
JP2019071017A (en) Road construction scheduling device and road construction scheduling program
JP5204075B2 (en) Driving condition analysis method and driving condition analysis system
Dervisoglu et al. Macroscopic freeway model calibration with partially observed data, a case study
Zarghami Prioritizing construction activities: addressing the flaws of schedule-based indexes
Kohn et al. Evaluation of modeling, simulation and optimization approaches for work flow management in semiconductor manufacturing
Kerin et al. Dynamic security assessment in system operation and planning—First experiences
Gerostathopoulos et al. Towards systematic live experimentation in software-intensive systems of systems
JP2005071136A (en) Delivery time management support system, its program, recording medium recording its program and delivery time management method for product
Zhang et al. Whole life cost modelling in infrastructure asset management