JP2009128998A - Member receipt/delivery plan management device and receipt/delivery plan management method in production management - Google Patents

Member receipt/delivery plan management device and receipt/delivery plan management method in production management Download PDF

Info

Publication number
JP2009128998A
JP2009128998A JP2007300496A JP2007300496A JP2009128998A JP 2009128998 A JP2009128998 A JP 2009128998A JP 2007300496 A JP2007300496 A JP 2007300496A JP 2007300496 A JP2007300496 A JP 2007300496A JP 2009128998 A JP2009128998 A JP 2009128998A
Authority
JP
Japan
Prior art keywords
order information
production
date
receipt
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007300496A
Other languages
Japanese (ja)
Inventor
Kazumi Kobayashi
和美 小林
Shozo Imai
将造 今井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
REED REX KK
Original Assignee
REED REX KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by REED REX KK filed Critical REED REX KK
Priority to JP2007300496A priority Critical patent/JP2009128998A/en
Publication of JP2009128998A publication Critical patent/JP2009128998A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a receipt/delivery plan management device and a receipt/delivery plan management method for managing a member receipt/delivery plan in a production management, capable of achieving MRP management performed for each product number. <P>SOLUTION: A quantity used of members designated by the production plan, a present quantity of inventory, and a scheduled receiving quantity of members are acquired from a production plan managed for each product number, inventory information, and an ordering quantity. Shortage and excess of the members on each day is calculated by developing the information to the MRP and creating a receipt/delivery plan. In the case that a day with a lack of the members is detected, a scheduled receiving date is updated so as to advance an order if there is any ordering information of an unprocessed order capable of compensating the shortage quantity by retrieving a receiving schedule on and after the day when the shortage occurs, not by immediately adding new ordering information. In a case that ordering information capable of compensating the shortage quantity is already processed, a warning for urging delivery adjustment is notified. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、生産管理において、調達が必要な部材の受払計画を管理するための受払計画管理装置及び受払計画の管理方法に関するものである。   The present invention relates to a receipt / payment plan management apparatus and a receipt / payment plan management method for managing a receipt / payment plan for components that need to be procured in production management.

製造業において用いられている生産管理システムでは、納期短縮や生産コスト削減のために効率的な部材管理の仕組みが求められるが、部材の調達等の受払計画を管理する方式としては、製品の製番に部材を紐付けて管理する製番管理と、製番に関わらず部材の在庫全体の総量を管理するMRP管理が知られている。   Production management systems used in the manufacturing industry require an efficient parts management mechanism to shorten delivery times and reduce production costs. There are known production number management in which members are associated with numbers, and MRP management in which the total amount of the entire inventory of members is managed regardless of the production number.

製番管理の方式では、在庫や調達予定の部材にはそれぞれその部材を使用する予定となる製品の製番が引当てられるため、生産計画と部材の対応関係が把握しやすいというメリットがある一方で、急な注文により生産計画が変更された場合には製番の割当てを変更する作業が発生するという問題点を有している。一方、MRP管理の方式では、ある時点における部材の所要数量と在庫数量から調達が必要な数量を生産計画全体で管理するため、生産計画の変更には比較的対応しやすいものの、部材と製品との関係が特定されないために、部材の調達計画と実績に差が生じてしまった場合の生産計画に対する影響が把握しにくいという問題点を有している。   The production number management method has the advantage that it is easy to grasp the correspondence between the production plan and the parts because the production numbers of the products that will use the parts are allocated to the parts to be stocked or procured. However, when the production plan is changed due to an abrupt order, there is a problem that an operation for changing the assignment of the product number occurs. On the other hand, in the MRP management method, the quantity that needs to be procured from the required quantity and inventory quantity at a certain point in time is managed in the entire production plan. Since the relationship is not specified, there is a problem that it is difficult to grasp the influence on the production plan when a difference occurs between the procurement plan and the actual result of the member.

上記のような2つの方式の特徴を考慮すると、2つの方式を併用してそれぞれの強みを活かすことが望ましい。併用方式の一例として、例えば、製番管理をベースに定期的に在庫等に引当てられた製番を外した上で、MRPによりその時点での数量を見直し、再度製番引当を見直す行う方法がある。この方式の場合は、MRPの実施頻度を高めるためにMRPを高速化することが技術的な課題となっている(特許文献1の段落0008〜0010参照)。   Considering the characteristics of the two methods as described above, it is desirable to use the strengths of the two methods in combination. As an example of the combined use method, for example, a method in which a production number regularly allocated to inventory etc. is removed based on production number management, the quantity at that time is reviewed by MRP, and a production number allocation is reviewed again There is. In the case of this method, it is a technical problem to increase the MRP speed in order to increase the frequency of MRP implementation (see paragraphs 0008 to 0010 of Patent Document 1).

併用方式の他の例として、MRP管理等によって総量で管理されている部材を部材毎に適切なタイミングで製番を引当てて製番管理に移行する方式や(特許文献1の段落0045〜0046等参照)、製造工程に応じて製番管理とMRP管理を切り換える方式(非特許文献1参照)などが提案されている。   As another example of the combined use method, a method in which a member managed in the total amount by MRP management or the like allocates a production number for each member at an appropriate timing and shifts to production management (paragraphs 0045 to 0046 of Patent Document 1). Etc.), a method of switching between production number management and MRP management according to the manufacturing process (see Non-Patent Document 1) and the like.

特開2003−316416号公報JP 2003-316416 A 株式会社リード・レックス、R−PiCSホームページ「Linux版/MRP管理&製番管理」 、[2007年11月13日検索]、インターネット<URL: http://www.r-pics.com/linux/mrp.htm>Reed Rex Co., Ltd., R-PiCS homepage "Linux version / MRP management & serial number management" [Search November 13, 2007], Internet <URL: http://www.r-pics.com/linux/ mrp.htm>

上記のような併用方式の他に、通常であれば工場単位や倉庫単位で行うMRP管理について、生産計画で割り当てられた製番単位で行う方式が考えられる。このような方式によると、製番管理の特徴を生かしながら、製番の枠内での受払計画を作成して部材の過不足をMPR管理によって速やかに把握することが可能になる。   In addition to the combined method as described above, a method of performing MRP management that is normally performed in units of factories or warehouses in units of product numbers assigned in the production plan is conceivable. According to such a method, it is possible to create a receipt / payment plan within the frame of the product number while taking advantage of the feature of the product number management and quickly grasp the excess or deficiency of the members by the MPR management.

ところが、MRP管理はある枠内での部材を総量で把握し、不足が生じるタイミングでは調達の計画を追加することによって過不足のないように部材を管理する仕組みになっているため、製品と部材を過不足なく割り当てた製番の枠内でMRP管理を行うと、追加で調達した部材は最終的に余剰となってしまうという問題が生じる。製番管理方式のシステムでは、製番に引当てられた部材は他の製番に流用されないことが原則であるため、余った部材は再度他の製番に引当てるための追加作業が発生してしまうことになる。   However, MRP management has a mechanism to grasp the total amount of members within a certain frame and manage the members so that there is no excess or deficiency by adding a procurement plan when the shortage occurs. If the MRP management is performed within the frame of the serial number assigned without excess or deficiency, there arises a problem that the additionally procured members will eventually become surplus. In the production number management system, the member allocated to the production number is in principle not diverted to other production numbers. Therefore, the extra member has to be reassigned to another production number. It will end up.

本発明は、このような課題に対応するためになされたものであり、製番別にMRP管理を行うことを実現することが可能な、生産管理における部材の受払計画を管理するための受払計画管理装置及び受払計画の管理方法を提供することを目的とするものである。   The present invention has been made to cope with such a problem, and it is possible to realize MRP management for each product number, and it is possible to realize a payment plan management for managing a material payment plan in production management. An object of the present invention is to provide a device and a management method for a payment plan.

このような課題を解決する本発明は、生産計画における部材の受払計画を管理する受払計画管理装置であって、製品の製造計画に基づいて使用する各日の部材の使用数量を製番と関連付けて記憶する製造計画記憶手段と、前記部材の在庫数量を製番と関連付けて記憶する在庫情報記憶手段と、前記部材の調達予定について受入予定日と受入数量と発注済又は発注未済の別とが指定された発注情報を製番と関連付けて記憶する発注情報記憶手段と、一の製番に対応する使用数量を前記製造計画記憶手段から、前記製番に対応する在庫数量を在庫情報記憶手段から、前記製番に対応する発注情報を前記発注情報記憶手段からそれぞれ読み出して、各日における前記使用数量に対する前記製番における部材の数量の過不足を、前記在庫数量と前記発注情報に含まれる受入数量から時系列に従って演算する受払計画演算手段と、前記受払計画演算手段によって前記部材の数量が不足する日が検出されると、受入予定日が翌日以降と指定された発注情報を受入予定日の時系列順に検索して、前記不足する日における不足数量に足りる受入数量が指定された発注情報を特定する発注情報特定手段と、前記発注情報特定手段の特定した発注情報に発注未済と指定されている場合には、前記発注情報に指定された受入予定日を前記部材が不足する日以前の日に更新する発注情報更新手段と、を備えることを特徴とする受払計画管理装置である。   The present invention that solves such a problem is a receipt / payment plan management apparatus that manages a receipt / payment plan for parts in a production plan, and associates the quantity of parts used on each day based on the production plan of the product with a production number. Manufacturing plan storage means for storing the information, inventory information storage means for storing the stock quantity of the member in association with the product number, and whether the planned procurement date, the received quantity, and ordered or not ordered for the procurement schedule of the member Order information storage means for storing the specified order information in association with the product number, the used quantity corresponding to one product number from the manufacturing plan storage means, and the inventory quantity corresponding to the product number from the inventory information storage means Then, the order information corresponding to the product number is read from the order information storage means, and the excess and deficiency of the number of members in the product number with respect to the used quantity on each day Order receiving information for which the planned receipt date is designated as the next day or later when the date when the quantity of the member is insufficient is detected by the receipt / payment plan calculation means, and the receipt / payment plan calculation means calculates the received quantity included in the information in time series Ordering information specifying means for specifying ordering information for which the receiving quantity sufficient for the shortage quantity on the lacking day is specified, and ordering for the ordering information specified by the ordering information specifying means Order receipt information updating means for updating the planned receipt date specified in the order information on a date before the date when the member is insufficient, if specified as incomplete. It is.

また、本発明は、前記発注情報特定手段の特定した発注情報に発注済と指定されている場合には、前記発注情報による発注の納期調整又は製品の生産調整が必要であることを示す警告を出力装置に出力させる納期調整警告手段を備えることを特徴とすることもできる。   Further, the present invention provides a warning indicating that it is necessary to adjust the delivery date of the order or the production adjustment of the product according to the ordering information when the ordering information specified by the ordering information specifying unit is designated as ordered. Delivery date adjustment warning means for outputting to the output device may be provided.

さらに、本発明は、前記発注情報特定手段によって前記製番に対応する全ての発注情報を検索しても、受入数量が前記不足数量に足りない場合には、前記不足数量に足りる受入数量が指定された新たな発注情報を生成して、前記発注情報記憶手段に記憶させる発注情報生成手段を備えることを特徴としてもよい。   Further, according to the present invention, when all the order information corresponding to the product number is searched by the order information specifying unit, if the received quantity is insufficient for the shortage quantity, the received quantity that is sufficient for the shortage quantity is designated. Order information generating means for generating the new order information and storing it in the order information storage means may be provided.

以上のように、本発明においては、製番毎に管理された製造計画、在庫情報、発注情報から、部材の使用数量、在庫数量と受入数量をMRPに展開することによって各日の部材の過不足を演算し、部材の不足が生じる日が検出された場合は直ちに新たな発注を追加するのではなく、不足が生じる日以降の調達予定を前倒しするよう構成することによって、製番の枠内で部材の余剰が生じることを回避し、製番別にMRP管理を行うことを実現している。   As described above, according to the present invention, by using the production plan, inventory information, and ordering information managed for each product number, the used quantity of the member, the inventory quantity, and the received quantity are expanded in the MRP, so that the excess of the member for each day. If a shortage is calculated and a day when a shortage of parts is detected, a new order is not added immediately. Therefore, it is possible to avoid the surplus of members and to perform MRP management for each product number.

尚、本発明における部材とは、組立工程においてそのままの形で組み込まれる部品のみでなく、加工工程において加工することによって形状や属性が変わる材料も含むものとする。また、本発明において発注情報に記録される部材の調達予定には、社外からの部材の調達に限られるものではなく、社内工程における他部門等からの調達も含まれる。発注情報に指定される発注済又は発注未済の別についても、社外への発注に限られず、社内工程の加工、組立等の作業指示も含まれるものである。   The members in the present invention include not only parts that are incorporated as they are in the assembling process but also materials whose shape and attributes are changed by machining in the machining process. In the present invention, the procurement schedule of members recorded in the ordering information is not limited to procurement of components from outside the company, but includes procurement from other departments in the in-house process. Whether the order is specified or not yet specified in the order information is not limited to the ordering from the outside, but also includes work instructions such as processing and assembly in the in-house process.

また、本発明は、本発明にかかる受払計画管理装置によって実行される受払計画の管理方法として特定することもできる。   The present invention can also be specified as a payment plan management method executed by the payment plan management apparatus according to the present invention.

本発明にかかる受払計画の管理方法は、製品の製造計画に基づいて使用する各日の部材の使用数量を製番と関連付けて記憶する製造計画記憶手段と、前記部材の在庫数量を製番と関連付けて記憶する在庫情報記憶手段と、前記部材の調達予定について受入予定日と受入数量と発注済又は発注未済の別とが指定された発注情報を製番と関連付けて記憶する発注情報記憶手段とを備えるコンピュータによって実行される、生産計画における部材の受払計画を管理する受払計画の管理方法であって、前記コンピュータが、一の製番に対応する使用数量を前記製造計画記憶手段から、前記製番に対応する在庫数量を在庫情報記憶手段から、前記製番に対応する発注情報を前記発注情報記憶手段からそれぞれ読み出して、各日における前記使用数量に対する前記製番における部材の数量の過不足を、前記在庫数量と前記発注情報に含まれる受入数量から時系列に従って演算する受払計画演算ステップと、前記コンピュータが、前記受払計画演算ステップにおいて前記部材の数量が不足する日が検出されると、受入予定日が翌日以降と指定された発注情報を受入予定日の時系列順に検索して、前記不足する日における不足数量に足りる受入数量が指定された発注情報を特定する発注情報特定ステップと、前記コンピュータが、前記発注情報特定ステップで特定した発注情報に発注未済と指定されている場合には、前記発注情報に指定された受入予定日を前記部材が不足する日以前の日に更新する発注情報更新ステップと、を有することを特徴とする受払計画の管理方法である。   A method for managing a payment plan according to the present invention includes a manufacturing plan storage means for storing a used quantity of a member for each day based on a manufacturing plan of a product in association with a manufacturing number, and an inventory quantity of the member as a manufacturing number. Inventory information storage means for storing in association with each other, and ordering information storage means for storing the ordering information in which the planned receipt date, the received quantity, and whether the order has been ordered or not yet ordered is specified in association with the product number A management method for managing a receipt / payment plan for a member in a production plan, which is executed by a computer comprising the manufacturing plan storage unit, wherein the computer receives a used quantity corresponding to a production number from the production plan storage means. The stock quantity corresponding to the product number is read from the stock information storage means and the order information corresponding to the product number is read from the order information storage means, respectively, and A receipt / payment plan calculating step for calculating an excess or deficiency of the number of members in the production number according to a time series from the received quantity included in the inventory quantity and the ordering information; and the computer, in the receipt / payment plan calculating step, When a shortage date is detected, the order information specified as the next day after the next day is searched in time-series order, and the received quantity sufficient for the shortage date is specified. An ordering information specifying step for specifying ordering information; and if the ordering information specified in the ordering information specifying step specifies that the order has not been completed, the computer receives the scheduled receipt date specified in the ordering information as the member And a purchase order information updating step for updating the order information on a date before the date when the payment is insufficient.

また、本発明にかかる受払計画の管理方法は、前記コンピュータが、前記発注情報特定ステップで特定した発注情報に発注済と指定されている場合には、前記発注情報による発注の納期調整又は製品の生産調整が必要であることを示す警告を出力装置に出力させる納期調整警告ステップを有することを特徴とすることもできる。   In addition, according to the method for managing a payment plan according to the present invention, when the computer is designated as ordered in the ordering information specified in the ordering information specifying step, the delivery date adjustment of the ordering based on the ordering information or the product A delivery date adjustment warning step for causing the output device to output a warning indicating that production adjustment is necessary may be provided.

本発明にかかる受払計画の管理方法は、前記コンピュータが、前記発注情報特定ステップにおいて前記製番に対応する全ての発注情報を検索しても、受入数量が前記不足数量に足りない場合には、前記不足数量に足りる受入数量が指定された新たな発注情報を生成して、前記発注情報記憶手段に記憶させる発注情報生成ステップを有することを特徴としてもよい。   In the management method of the payment plan according to the present invention, when the computer retrieves all the order information corresponding to the product number in the order information specifying step, if the received quantity is insufficient for the shortage quantity, There may be provided an order information generation step of generating new order information in which the received quantity sufficient for the shortage quantity is designated and storing the new order information in the order information storage means.

本発明によって、製番別に部材数量のMRP管理を行う場合において、使用予定数量以上に部材を調達することを回避して、製番管理とMRP管理の併用を実現することができる。その結果、生産計画と部材の対応関係を把握しやすいという製番管理のメリットを生かしながら、生産計画の変更に対応しやすいというMRP管理のメリットも享受することができるので、生産管理における部材管理の効率性の向上に資することができる。   According to the present invention, when performing the MRP management of the member quantity for each product number, it is possible to avoid the procurement of a member more than the scheduled use quantity and to realize the combined use of the product number management and the MRP management. As a result, it is possible to enjoy the advantages of MRP management that makes it easy to respond to changes in the production plan, while taking advantage of the production number management that makes it easy to grasp the correspondence between the production plan and the members. Can contribute to the improvement of efficiency.

本発明を実施するための最良の形態について、図面を用いて以下に詳細に説明する。尚、以下の説明は、本発明の実施形態の一例を示したものであって、本発明は以下の実施形態に限定されるものではない。   The best mode for carrying out the present invention will be described below in detail with reference to the drawings. The following description shows an example of an embodiment of the present invention, and the present invention is not limited to the following embodiment.

図1は、本発明にかかる受払計画管理装置の構成の一例を示すブロック図である。図2は、本発明にかかる受払計画管理装置における製造計画記憶部の一例を示す図である。図3は、本発明にかかる受払計画管理装置における在庫情報記憶部の一例を示す図である。図4は、本発明にかかる受払計画管理装置における発注情報記憶部の一例を示す図である。図5は、本発明にかかる受払計画管理装置において部材の受払計画をMPP展開した第1の例(在庫に不足が生じている状態)を示す図である。図6は、本発明にかかる受払計画管理装置において部材の受払計画をMPP展開した第2の例(未発注の受入予定を前倒しした状態)を示す図である。図7は、本発明にかかる受払計画管理装置において部材の受払計画をMPP展開した第3の例(発済済の受入予定であるため前倒しできない状態)を示す図である。図8は、本発明にかかる受払計画管理装置によって部材の受払計画をMPP展開するフローを示したフローチャートである。図9は、本発明にかかる受払計画管理装置によってMPP展開した受払計画で部材の不足が発生した場合のフローを示したフローチャートである。   FIG. 1 is a block diagram showing an example of the configuration of a payment plan management apparatus according to the present invention. FIG. 2 is a diagram illustrating an example of the manufacturing plan storage unit in the payment plan management apparatus according to the present invention. FIG. 3 is a diagram showing an example of an inventory information storage unit in the payment plan management apparatus according to the present invention. FIG. 4 is a diagram showing an example of an order information storage unit in the payment plan management apparatus according to the present invention. FIG. 5 is a diagram showing a first example (a state in which there is a shortage in inventory) in which the member payment plan is developed by MPP in the payment plan management apparatus according to the present invention. FIG. 6 is a diagram showing a second example (a state in which an unordered receipt schedule is advanced) in which the receipt / payment plan for members according to the present invention is developed by MPP. FIG. 7 is a diagram showing a third example (a state in which it is an accepted receipt plan that has already been issued and cannot be moved forward) in which the member receipt / payment plan is developed by MPP in the receipt / payment plan management apparatus according to the present invention. FIG. 8 is a flowchart showing a flow of MPP development of a member payment plan by the payment plan management apparatus according to the present invention. FIG. 9 is a flowchart showing a flow when a shortage of members occurs in a payment plan developed by MPP by the payment plan management apparatus according to the present invention.

図1において、本発明にかかる受払計画管理装置は、生産管理システム10の一部の機能から構成されている。生産管理システム10を構成するコンピュータは、スタンドアロンで用いられるものであってもよいし、LAN等のネットワークにおいてクライアントサーバ型で用いられるものであってもよい。前者の場合は、入出力装置20にはスタンドアロンで用いられるコンピュータの入力装置(キーボードやマウス)や出力装置(ディスプレイやプリンタ)が対応し、後者の場合は、入出力装置20にはLAN等のネットワークに接続可能なクライアント端末が、生産管理システム10はクライアント端末からアクセス可能なサーバが対応することになる。   In FIG. 1, the payment plan management apparatus according to the present invention is constituted by a part of functions of a production management system 10. The computer constituting the production management system 10 may be used stand-alone, or may be used in a client server type in a network such as a LAN. In the former case, the input / output device 20 corresponds to a stand-alone computer input device (keyboard or mouse) or output device (display or printer). In the latter case, the input / output device 20 includes a LAN or the like. The client terminal that can be connected to the network corresponds to the server that can be accessed from the client terminal in the production management system 10.

生産管理システム10は、CPU、メインメモリ、HDDを少なくとも備えたコンピュータである。製番管理部11、受払計画部12、警告通知部13は、いずれも機能的に特定されるものであって、各々の機能を実行するためアプリケーションプログラムがHDDから読み出され、メインメモリ等のメモリ領域をアプリケーションプログラムのワークエリアとして機能させながら、CPUが演算処理を行うことによって、各々の機能が実行される。   The production management system 10 is a computer including at least a CPU, a main memory, and an HDD. The product number management unit 11, the payment plan unit 12, and the warning notification unit 13 are all functionally specified, and an application program is read from the HDD to execute each function, and the main memory, etc. Each function is executed by the CPU performing arithmetic processing while the memory area functions as a work area for the application program.

構成マスタ記憶部14、製造計画記憶部15、在庫情報記憶部16、発注情報記憶部17には、それぞれ生産管理システム10のHDDにおいて所定の記憶領域が割り当てられるが、これらの記憶部の全部又は一部が、生産管理システム10と接続されたデータベースサーバ等の他のコンピュータに設けられるものであってもよい。   A predetermined storage area is allocated in the HDD of the production management system 10 to each of the configuration master storage unit 14, the manufacturing plan storage unit 15, the inventory information storage unit 16, and the order information storage unit 17. A part may be provided in another computer such as a database server connected to the production management system 10.

構成マスタ記憶部14には、製品の製造に使用する部材の数量等のデータが記憶されている。製造計画記憶部15に製品の製造計画を登録する場合には、製番管理部11が起動され、製品の製造数量や製造日等の製造予定に関する情報が指定されると、製品の所定の単位毎に製番が割り当てられ、構成マスタ記憶部14を参照して各々の製番において使用する部材の数量が特定される。これらの情報から、図2に例示したような製造計画が展開される。   The configuration master storage unit 14 stores data such as the number of members used for manufacturing products. When a product production plan is registered in the production plan storage unit 15, when the production number management unit 11 is activated and information relating to the production schedule such as the product production quantity and production date is designated, a predetermined unit of the product is designated. A production number is assigned every time, and the number of members to be used in each production number is specified with reference to the configuration master storage unit 14. From these pieces of information, a production plan as illustrated in FIG. 2 is developed.

製造計画記憶部15には、製番管理部11によって割り当てられた製番毎に、製造予定に従って使用する部材の数量に関するデータが記憶されている。ここに記憶されるデータの形式は特に限定されるものではないが、例えば、図2に示したように、製番毎に使用する部材の品目コードが指定され、各々の部材について各日毎に使用する部材の数量が記録されている。これらのデータから、製番毎に各日において使用する部材の数量を把握することができる。   The production plan storage unit 15 stores data relating to the number of members to be used according to the production schedule for each production number assigned by the production number management unit 11. The format of the data stored here is not particularly limited. For example, as shown in FIG. 2, the item code of the member used for each product number is specified, and each member is used every day. The number of members to be recorded is recorded. From these data, it is possible to grasp the quantity of members used on each day for each product number.

在庫情報記憶部16に記憶されるデータの形式も特に限定されるものではないが、図3に例示したように、工場や資材倉庫等の施設毎に保管されている部材の数量が記憶されている。これらの部材について、所定のタイミングで製番管理部11によって使用する製番が引当てられると、引当てられた製番が対応するレコードに記録される(引当前の部材には製番が記録されていない)。   The format of data stored in the inventory information storage unit 16 is not particularly limited, but as illustrated in FIG. 3, the quantity of members stored for each facility such as a factory or a material warehouse is stored. Yes. For these members, when the production number used by the production number management unit 11 is allocated at a predetermined timing, the allocated production number is recorded in the corresponding record (the production number is recorded in the member before allocation). It has not been).

発注情報記憶部17に記憶されるデータの形式も特に限定されるものではないが、図4に例示したように、部材の調達予定について、部材の注文単位で数量や受入予定日などに関するデータが記憶されている。また、各々の注文について発注が行われているかどうかを示すステイタスも記録されている。これらの注文によって受け入れられる予定となる部材について、所定のタイミングで製番管理部11によって使用する製番が引当てられると、引当てられた製番が対応するレコードに記録される(引当前の注文には製番が記録されていない)。   The format of the data stored in the order information storage unit 17 is not particularly limited, but as illustrated in FIG. 4, regarding the procurement schedule of the member, there is data regarding the quantity, the expected date of receipt, etc. in the unit order of the member. It is remembered. In addition, a status indicating whether an order has been placed for each order is also recorded. When the production number used by the production number management unit 11 is allocated at a predetermined timing for the members to be accepted by these orders, the allocated production number is recorded in the corresponding record (before the allocation). The production number is not recorded in the order).

尚、発注情報記憶部17に記憶される部材の調達予定の対象は、社外からの部材調達に限られるものではなく、社内工程における他部門等からの調達も含まれるものとする。発注情報に指定されるステイタスについても、社外への発注に限られず、社内工程の加工、組立等の作業指示も対象とした済又は未済のステイタスを示すものである。   It should be noted that the target of material procurement scheduled to be stored in the order information storage unit 17 is not limited to material procurement from outside the company, but also includes procurement from other departments in an in-house process. The status specified in the ordering information is not limited to the ordering from the outside, but indicates a status that has been completed or not yet targeted for work instructions such as processing and assembly of internal processes.

製造計画において、部材の受払計画を作成して使用する部材に過不足がないか等を確認したい場合には、入出力装置20から製番を指定して受払計画作成の操作を行い、受払計画部12を起動する。受払計画部12では、製造計画記憶部15、在庫情報記憶部16、発注情報記憶部17から指定された製番に対応する受払計画の演算に必要なデータを読み出し、これらのデータを時系列に従ってMRPに展開して、図5に例示したような受払計画を作成する。   In the production plan, if you want to check whether there are excess or deficiency in the parts used in the production plan, specify the product number from the input / output device 20 and perform the operation to create the payment plan. The unit 12 is activated. The receipt / payment plan unit 12 reads out data necessary for calculation of the receipt / payment plan corresponding to the designated product number from the production plan storage unit 15, the inventory information storage unit 16, and the order information storage unit 17, and these data are read in time series. Expanding to MRP, a payment plan as illustrated in FIG. 5 is created.

製造計画記憶部15からは、指定された製番における各々の部材について各日の使用数量に関するデータを読み出す。例えば、図2の製番「#001」の品目コード「001」については、10月1日以降の各日にそれぞれ3、4、3、4、3個を使用する予定となっており、このデータを読み出して図5に示した「使用予定」の各々の使用予定日の欄に使用数量を記録する。   From the production plan storage unit 15, data relating to the used quantity for each day is read for each member in the designated production number. For example, for the product code “001” of the product number “# 001” in FIG. 2, 3, 4, 3, 4, 3 are scheduled to be used on each day after October 1, The data is read out and the used quantity is recorded in the respective scheduled use date column of “scheduled use” shown in FIG.

在庫情報記憶部16からは、指定された製番における各々の部材について現在の在庫数量に関するデータを読み出す。例えば、図3の製番「#001」の品目コード「001」については、施設コード「A111」に10個の在庫が存在するので、このデータを読み出して図5に示した「当日」の「在庫残」の欄に記録する。同じ製番の部材について、2以上の施設に在庫が存在する場合には、それらの在庫数量の合計値が記録される。   From the inventory information storage unit 16, data relating to the current inventory quantity is read for each member in the designated production number. For example, for the item code “001” of the product number “# 001” in FIG. 3, since there are 10 stocks in the facility code “A111”, this data is read out and “of the day” shown in FIG. Record in the “Out of stock” column. In the case where stocks exist in two or more facilities for members with the same product number, the total value of those stock quantities is recorded.

発注情報記憶部17からは、指定された製番における各々の部材について、調達が予定されている各日の受入数量に関するデータを読み出す。例えば、図4の製番「#001」の品目コード「001」については、注文コード「001−01」と「001−02」の発注情報が該当するので、これらの発注情報から受入予定日と受入数量に関するデータを読み出して、図5に示した「受入予定」の各々の受入予定日の欄に受入数量を記録する。尚、受入数量については、注文が発注済のステイタスにあるものを識別できるように記録することが好ましい(図5の例では、カッコ内の数量が発注済の内数となっている)。   From the order information storage unit 17, data relating to the received quantity on each day scheduled for procurement is read out for each member in the designated production number. For example, the item code “001” of the product number “# 001” in FIG. 4 corresponds to the order information of the order codes “001-01” and “001-02”. Data relating to the received quantity is read out, and the received quantity is recorded in each of the scheduled receipt date columns of “scheduled to receive” shown in FIG. It should be noted that the received quantity is preferably recorded so that it can be identified that the order is in the ordered status (in the example of FIG. 5, the quantity in parentheses is the ordered quantity).

以上のように、「受入予定」、「使用予定」、「当日」の「在庫残」にそれぞれデータが書き込まれると、図5の例のように、各日における「在庫」と「在庫残」の数量を自動的に計算することができる。このように、部材の過不足についてのMRP展開が行われると、通常のMRP管理による生産管理システムであれば、不足が発生した日には不足数量を調達するための計画追加が自動的に行われるよう構成されている。図5の例であれば、10月4日に2個の不足が発生するため、10月4日に品目コード「001」の部材を2個受け入れるための新規の発注情報が自動作成される。   As described above, when the data is written in the “schedule for receipt”, “schedule for use”, and “stock remaining” on the “current day”, as shown in the example of FIG. The quantity of can be calculated automatically. As described above, when the MRP deployment for the excess and shortage of members is performed, if the production management system is based on the normal MRP management, a plan for procuring a shortage quantity is automatically added on the day when the shortage occurs. It is configured to be In the example of FIG. 5, since two shortages occur on October 4, new ordering information for accepting two members of the item code “001” is automatically created on October 4.

ところが、本発明においては製番単位でMRP展開を行っているため、製番毎に製造計画における使用予定と在庫及び受入予定は、過不足のないように紐付けられていることになる。従って、上記のように不足分の計画追加を自動的に行うと、計画追加により調達した数量が最終的に余剰となってしまうことになるが、受入予定の部材は製番の引当が行われてしまっているため、他の製番に流用するためには製番を外して再度割り当てる作業が生じてしまうことになる。   However, in the present invention, since MRP expansion is performed in units of product numbers, the use schedule, the inventory, and the acceptance schedule in the production plan are linked so as not to be excessive or insufficient for each product number. Therefore, if the shortage of the plan is automatically added as described above, the quantity procured by the addition of the plan will eventually become surplus, but the parts to be received will be allocated production numbers. Therefore, in order to use it for another product number, the work of removing the product number and assigning it again occurs.

そこで、本発明においては、在庫残に不足が発生してしまう場合に不足を生じさせることのないように、発注未済のステイタスにある受入予定を前倒しすることとしている。すなわち、図6に示したように、10月4日の在庫残の数量がマイナスとなっていることが検出されると、10月5日以降の受入予定を順に検索する。その結果、10月5日の発注未済のステイタスにある5個の受入予定がヒットするため、これを在庫残がマイナスとなる日である10月4日以前の日、この例では10月4日に前倒しするために、10月5日の5個の受入予定に対応する図2における発注情報記憶部17の注文コード「001−02」の発注情報について、受入予定日を10月4日に更新する。かかる更新が行われたことについては、警告通知部13を起動して入出力装置20に計画変更を通知する画面等を表示させることが好ましい。在庫残が不足する日の翌日分に該当する発注情報がヒットしない場合は、在庫の不足数量に達するまで、翌々日以降の受入予定を順に検索する。   Therefore, in the present invention, in order to prevent a shortage from occurring when there is a shortage in the remaining inventory, the acceptance schedule in the status of unordered is advanced. That is, as shown in FIG. 6, when it is detected that the remaining inventory quantity on October 4 is negative, the acceptance schedules after October 5 are searched in order. As a result, the five acceptance schedules in the status for which orders have not been placed on October 5 will be hit, so this is the day before October 4, which is the day when the remaining inventory is negative, in this example, October 4 2 for the order information of the order code “001-02” in the order information storage unit 17 in FIG. 2 corresponding to the five acceptance schedules on October 5th. To do. Regarding such an update, it is preferable to activate the warning notification unit 13 to display a screen for notifying the input / output device 20 of the plan change. If the ordering information corresponding to the next day on the day when the remaining inventory is short does not hit, the receiving schedule after the next day is searched in order until the shortage quantity in stock is reached.

一方、図7に示したように、10月5日以降の受入予定を検索してヒットしたもののステイタスが発注済である場合には、発注済のものは既に調達先へも受入予定日が指定されているため(社内工程において受入予定日を指定した加工、組立等の作業指示となる場合もある)、発注情報を自動的に書き換えることができない。そこで、直近の発注となる10月5日の5個の受入予定について納期調整を行うか、あるいは10月4日の製造数量を調整することを促す警告を通知する画面等を、警告通知部13を起動して入出力装置20に表示させる。   On the other hand, as shown in FIG. 7, when the acceptance schedule after October 5 is searched and the status is hit but the status is already ordered, the planned receipt date is already specified to the procurement source. Therefore, the order information cannot be automatically rewritten. Therefore, a warning notification unit 13 displays a screen or the like for notifying a warning prompting to adjust the delivery date for the five receiving schedules on October 5 which are the latest orders or to adjust the production quantity on October 4. Is activated and displayed on the input / output device 20.

尚、受入予定を検索した結果、先にヒットするもののステイタスが発注済であって、その後にステイタスが発注未済のものが存在する場合に、いずれを優先するかについて特に限定されるものではない。先にヒットした発注済のものを対象に納期調整等の警告を通知することとしてもよいし、後にヒットした発注未済のものを前倒しする処理を行うこととしてもよい。又は、双方を選択肢として表示して、ユーザが発注未済のものを選択した場合に前倒しの処理を行うこととしてもよい。   In addition, as a result of searching the acceptance schedule, when the status of the first hit is already ordered and there is an unordered status after that, there is no particular limitation as to which is prioritized. A warning about adjustment of delivery date or the like may be notified to an already-ordered item that has been hit first, or processing may be performed to advance an unordered item that has been hit later. Alternatively, both may be displayed as options, and when the user selects an item that has not been ordered, the advance processing may be performed.

また、図6の例では、最初にヒットした受入予定を前倒しすることで在庫不足を解消できることとなっているが、ヒットした受入予定を前倒ししても在庫残の不足数量に足りない場合には、さらに翌日以降の発注情報について在庫残の不足数量に足りるまで検索を継続する。複数の発注情報に指定された受入数量によって在庫残の不足数量に足りることとなった場合には、これらの発注情報全てを対象に受入予定日の更新処理を行う。   In addition, in the example of FIG. 6, it is possible to solve the shortage of inventory by advancing the schedule of receiving the first hit, but if there is not enough inventory remaining even if the planned schedule of receiving the hit is advanced, Further, the search is continued until the shortage quantity of the remaining inventory is sufficient for the order information after the next day. When the received quantity specified in the plurality of pieces of ordering information is sufficient for the shortage of the remaining inventory, the scheduled receipt date is updated for all of the ordering information.

逆に、翌日以降の発注情報を全て検索しても在庫残の不足数量に足りることとならない場合には、総量として部材が不足していることとなるため、不足分について新たに部材を発注する(又は社内工程において加工、組立等の作業を指示する)ための発注情報を生成して、発注情報記憶手段17に記憶させる。尚、この段階では、ステイタスには発注未済と記録される。ここで生成する発注情報には、対象となる製番のほか、受入数量には在庫残がマイナスとなる日に不足する数量以上の数量が、受入予定日には在庫残がマイナスとなる日以前の日が、それぞれ自動的に指定される。   Conversely, if all the order information from the next day is searched, if there is not enough inventory remaining, there will be a shortage of total parts, so a new part will be ordered for the shortage. Order information is generated for (or instructing work such as processing and assembly in an in-house process) and stored in the order information storage means 17. At this stage, the status is recorded as not yet ordered. In the order information generated here, in addition to the target product number, the quantity received is more than the quantity that is insufficient on the day when the inventory is negative, and the date before the inventory is negative on the scheduled receipt date. Each day is automatically specified.

図8のフローチャートを用いて、本発明にかかる受払計画管理装置によって部材の受払計画をMPP展開するフローについて説明する。まず、製番を指定した受払計画の作成を受け付けると、受け付けた製番を特定して(S01)、部材の品目毎に、製造計画から該製番に対応する部材の使用数量に関するデータを(S02)、在庫情報から該製番に対応する部材の在庫数量に関するデータを(S03)、発注情報から該製番に対応する調達予定の部材の受入数量に関するデータを読み出す(S04)。   With reference to the flowchart of FIG. 8, a flow for MPP development of a member payment plan by the payment plan management apparatus according to the present invention will be described. First, when the creation of a payment plan specifying a product number is accepted, the accepted product number is identified (S01), and for each item of the member, data related to the used quantity of the member corresponding to the product number is obtained from the production plan ( S02), data relating to the inventory quantity of the member corresponding to the production number is read from the inventory information (S03), and data relating to the received quantity of the member scheduled to be procured corresponding to the production number is read from the ordering information (S04).

このように読み出した使用数量、在庫数量、受入数量を時系列に従ってMRPに展開して(S05)、当日の在庫数量に翌日の受入数量を加算、使用数量を減算して翌日の在庫残の数量を演算する(S06)。翌日の在庫残がマイナスにならないかを確認し(S07)、在庫残がマイナスにならなければ、使用数量が指定された最終の使用予定日までの各日の在庫数量と在庫残の数量について、上記と同様の演算処理を繰り返す(S08)。最終の使用予定日まで在庫残がマイナスとなる日がなければ、MRP展開された受払計画をディスプレイやプリンタに出力する(S09)。   The read used quantity, inventory quantity, and received quantity are expanded to MRP according to the time series (S05), the received quantity of the next day is added to the inventory quantity on the current day, and the remaining quantity on the next day is subtracted by subtracting the used quantity. Is calculated (S06). Check whether the remaining inventory of the next day will be negative (S07). If the residual inventory does not become negative, the inventory quantity of each day and the quantity of inventory remaining until the final scheduled use date when the usage quantity is specified. The same arithmetic processing as described above is repeated (S08). If there is no day when the remaining inventory is negative until the final scheduled use date, the MRP-developed payment plan is output to a display or printer (S09).

在庫残がマイナスとなる日が検出されると、図9のフローチャートに示したフローによる処理が行われる。在庫残がマイナスとなる翌日以降を対象に、受入予定を順に検索する(S10)。受入予定を最後まで検索しても在庫残に足りない場合には(S11)、新規の発注予定を生成する処理を実行する(S12)。   When a day on which the remaining inventory is negative is detected, processing according to the flow shown in the flowchart of FIG. 9 is performed. The receiving schedule is searched in order for the next day and after that the remaining inventory is negative (S10). If there is not enough inventory remaining after searching the acceptance schedule to the end (S11), a process for generating a new ordering schedule is executed (S12).

在庫残に足りることとなる受入予定がヒットする場合には(S11)、該受入予定に対応する発注情報のステイタスが発注済となっているかを確認する(S12)。発注済となっている場合には、部材調達の納期調整や製品の生産調整を促す警告をディスプレイやプリンタに出力する(S13)。ステイタスが発注未済となっている場合には、発注情報の受入予定日を在庫残がマイナスとなる日以前の日に更新する(S14)。ここでも、受入予定日が更新された通知をディスプレイやプリンタに出力することとしてもよい。   If the acceptance schedule that will suffice for the remaining inventory is hit (S11), it is confirmed whether the status of the ordering information corresponding to the acceptance schedule has been ordered (S12). If the order has been placed, a warning prompting adjustment of delivery date for material procurement and production adjustment of the product is output to the display or printer (S13). If the status has not yet been ordered, the scheduled receipt date of the ordering information is updated to a date before the date when the remaining inventory is negative (S14). In this case as well, a notification that the scheduled date of acceptance has been updated may be output to a display or a printer.

本発明にかかる受払計画管理装置の構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置における製造計画記憶部の一例を示す図である。It is a figure which shows an example of the manufacturing plan memory | storage part in the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置における在庫情報記憶部の一例を示す図である。It is a figure which shows an example of the inventory information memory | storage part in the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置における発注情報記憶部の一例を示す図である。It is a figure which shows an example of the order information storage part in the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置において部材の受払計画をMPP展開した第1の例を示す図である。It is a figure which shows the 1st example which carried out MPP expansion | deployment of the member payment plan in the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置において部材の受払計画をMPP展開した第2の例を示す図である。It is a figure which shows the 2nd example which carried out MPP expansion | deployment of the member payment plan in the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置において部材の受払計画をMPP展開した第3の例を示す図である。It is a figure which shows the 3rd example which carried out MPP expansion | deployment of the member payment plan in the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置によって部材の受払計画をMPP展開するフローを示したフローチャートである。It is the flowchart which showed the flow which carries out MPP expansion | deployment of the member payment plan by the payment plan management apparatus concerning this invention. 本発明にかかる受払計画管理装置によってMPP展開した受払計画で部材の不足が発生した場合のフローを示したフローチャートである。It is the flowchart which showed the flow when the shortage of members generate | occur | produces in the payment plan developed by MPP by the payment plan management apparatus concerning this invention.

符号の説明Explanation of symbols

10 生産管理システム
11 製番管理部
12 受払計画部
13 警告通知部
14 構成マスタ記憶部
15 製造計画記憶部
16 在庫情報記憶部
17 発注情報記憶部
20 入出力装置
DESCRIPTION OF SYMBOLS 10 Production management system 11 Production number management part 12 Payment / receipt plan part 13 Warning notification part 14 Configuration master memory | storage part 15 Manufacturing plan memory | storage part 16 Inventory information memory | storage part 17 Order information memory | storage part 20 Input / output device

Claims (6)

生産計画における部材の受払計画を管理する受払計画管理装置であって、
製品の製造計画に基づいて使用する各日の部材の使用数量を製番と関連付けて記憶する製造計画記憶手段と、
前記部材の在庫数量を製番と関連付けて記憶する在庫情報記憶手段と、
前記部材の調達予定について受入予定日と受入数量と発注済又は発注未済の別とが指定された発注情報を製番と関連付けて記憶する発注情報記憶手段と、
一の製番に対応する使用数量を前記製造計画記憶手段から、前記製番に対応する在庫数量を在庫情報記憶手段から、前記製番に対応する発注情報を前記発注情報記憶手段からそれぞれ読み出して、各日における前記使用数量に対する前記製番における部材の数量の過不足を、前記在庫数量と前記発注情報に含まれる受入数量から時系列に従って演算する受払計画演算手段と、
前記受払計画演算手段によって前記部材の数量が不足する日が検出されると、受入予定日が翌日以降と指定された発注情報を受入予定日の時系列順に検索して、前記不足する日における不足数量に足りる受入数量が指定された発注情報を特定する発注情報特定手段と、
前記発注情報特定手段の特定した発注情報に発注未済と指定されている場合には、前記発注情報に指定された受入予定日を前記部材が不足する日以前の日に更新する発注情報更新手段と、
を備えることを特徴とする受払計画管理装置。
A receipt / payment plan management device for managing a receipt / payment plan for parts in a production plan,
A production plan storage means for storing the used quantity of each day member based on the production plan of the product in association with the production number;
Stock information storage means for storing the stock quantity of the member in association with the product number;
Order information storage means for storing, in association with a product number, order information in which a planned receipt date, a received quantity, and an ordered or unordered item are specified for the procurement schedule of the member;
The used quantity corresponding to one production number is read from the production plan storage means, the inventory quantity corresponding to the production number is read from the inventory information storage means, and the order information corresponding to the production number is read from the order information storage means, respectively. A payment plan calculation means for calculating an excess or deficiency of the quantity of the member in the production number with respect to the used quantity on each day according to a time series from the received quantity included in the inventory quantity and the ordering information;
When a date when the quantity of the member is insufficient is detected by the receipt / payment plan calculation means, the purchase date is searched in order of the receipt date in the time series in which the planned receipt date is specified as the next day or later. Order information identifying means for identifying order information with a received quantity that is sufficient for the quantity;
Order information update means for updating the scheduled receipt date specified in the order information to a date before the date when the members are insufficient when the order information specified by the order information specifying means is specified as not yet ordered. ,
A payment plan management apparatus comprising:
前記発注情報特定手段の特定した発注情報に発注済と指定されている場合には、前記発注情報による発注の納期調整又は製品の生産調整が必要であることを示す警告を出力装置に出力させる納期調整警告手段を備えること
を特徴とする請求項1記載の受払計画管理装置。
If the order information specified by the order information specifying means specifies that the order has been completed, a delivery date for causing the output device to output a warning indicating that it is necessary to adjust the delivery date of the order based on the order information or the production adjustment of the product 2. The payment plan management apparatus according to claim 1, further comprising an adjustment warning unit.
前記発注情報特定手段によって前記製番に対応する全ての発注情報を検索しても、受入数量が前記不足数量に足りない場合には、前記不足数量に足りる受入数量が指定された新たな発注情報を生成して、前記発注情報記憶手段に記憶させる発注情報生成手段を備えること
を特徴とする請求項1又は2記載の受払計画管理装置。
Even if all the order information corresponding to the product number is searched by the order information specifying unit, if the received quantity is insufficient for the shortage quantity, new order information in which the accepted quantity sufficient for the shortage quantity is designated. 3. The payment plan management apparatus according to claim 1, further comprising: order information generating means for generating the order information and storing the order information in the order information storage means.
製品の製造計画に基づいて使用する各日の部材の使用数量を製番と関連付けて記憶する製造計画記憶手段と、前記部材の在庫数量を製番と関連付けて記憶する在庫情報記憶手段と、前記部材の調達予定について受入予定日と受入数量と発注済又は発注未済の別とが指定された発注情報を製番と関連付けて記憶する発注情報記憶手段とを備えるコンピュータによって実行される、生産計画における部材の受払計画を管理する受払計画の管理方法であって、
前記コンピュータが、一の製番に対応する使用数量を前記製造計画記憶手段から、前記製番に対応する在庫数量を在庫情報記憶手段から、前記製番に対応する発注情報を前記発注情報記憶手段からそれぞれ読み出して、各日における前記使用数量に対する前記製番における部材の数量の過不足を、前記在庫数量と前記発注情報に含まれる受入数量から時系列に従って演算する受払計画演算ステップと、
前記コンピュータが、前記受払計画演算ステップにおいて前記部材の数量が不足する日が検出されると、受入予定日が翌日以降と指定された発注情報を受入予定日の時系列順に検索して、前記不足する日における不足数量に足りる受入数量が指定された発注情報を特定する発注情報特定ステップと、
前記コンピュータが、前記発注情報特定ステップで特定した発注情報に発注未済と指定されている場合には、前記発注情報に指定された受入予定日を前記部材が不足する日以前の日に更新する発注情報更新ステップと、
を有することを特徴とする受払計画の管理方法。
Manufacturing plan storage means for storing the usage quantity of each member used on the basis of the production plan of the product in association with the production number, inventory information storage means for storing the inventory quantity of the member in association with the production number, and In a production plan, which is executed by a computer comprising ordering information storage means for storing the ordering information in which the planned receiving date, the received quantity, and whether ordered or not ordered are specified in association with the product number A method for managing a payment plan for managing a payment plan for parts,
The computer uses the production plan storage means for the quantity used corresponding to one production number, the inventory information storage means for the inventory quantity corresponding to the production number, and the order information storage means for the order information corresponding to the production number. A payment plan calculation step for calculating the excess and deficiency of the number of members in the production number with respect to the used quantity on each day according to a time series from the inventory quantity and the received quantity included in the ordering information;
When the computer detects a date on which the quantity of the member is insufficient in the receipt / payment plan calculation step, the computer searches for order information in which the planned receipt date is specified as the next day or later in the time series of the planned receipt date, and the shortage An order information identifying step for identifying order information with a received quantity sufficient for a shortage quantity on
If the computer specifies that the order has not been received in the ordering information specified in the ordering information specifying step, the order for updating the scheduled receipt date specified in the ordering information to a date before the date when the member is insufficient An information update step;
A method for managing a payment plan, characterized by comprising:
前記コンピュータが、前記発注情報特定ステップで特定した発注情報に発注済と指定されている場合には、前記発注情報による発注の納期調整又は製品の生産調整が必要であることを示す警告を出力装置に出力させる納期調整警告ステップを有すること
を特徴とする請求項4記載の受払計画の管理方法。
When the ordering information specified in the ordering information specifying step is designated as already ordered, the computer outputs a warning indicating that an order delivery time adjustment or a product production adjustment based on the ordering information is necessary 5. The method for managing a payment plan according to claim 4, further comprising a delivery date adjustment warning step to be outputted to the customer.
前記コンピュータが、前記発注情報特定ステップにおいて前記製番に対応する全ての発注情報を検索しても、受入数量が前記不足数量に足りない場合には、前記不足数量に足りる受入数量が指定された新たな発注情報を生成して、前記発注情報記憶手段に記憶させる発注情報生成ステップを有すること
を特徴とする請求項4又は5記載の受払計画の管理方法。
Even if the computer retrieves all the order information corresponding to the product number in the order information specifying step, if the received quantity is insufficient for the shortage quantity, the received quantity sufficient for the shortage quantity is designated. 6. The payment plan management method according to claim 4, further comprising an order information generation step of generating new order information and storing the order information in said order information storage means.
JP2007300496A 2007-11-20 2007-11-20 Member receipt/delivery plan management device and receipt/delivery plan management method in production management Pending JP2009128998A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007300496A JP2009128998A (en) 2007-11-20 2007-11-20 Member receipt/delivery plan management device and receipt/delivery plan management method in production management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007300496A JP2009128998A (en) 2007-11-20 2007-11-20 Member receipt/delivery plan management device and receipt/delivery plan management method in production management

Publications (1)

Publication Number Publication Date
JP2009128998A true JP2009128998A (en) 2009-06-11

Family

ID=40819894

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007300496A Pending JP2009128998A (en) 2007-11-20 2007-11-20 Member receipt/delivery plan management device and receipt/delivery plan management method in production management

Country Status (1)

Country Link
JP (1) JP2009128998A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016099640A (en) * 2014-11-18 2016-05-30 株式会社日立製作所 Component order placement device and program

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000330621A (en) * 1999-05-20 2000-11-30 Nec Corp Production managing device and method and storage medium

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000330621A (en) * 1999-05-20 2000-11-30 Nec Corp Production managing device and method and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016099640A (en) * 2014-11-18 2016-05-30 株式会社日立製作所 Component order placement device and program

Similar Documents

Publication Publication Date Title
JP2010269867A (en) Transportation schedule planning support system and transportation schedule planning support method
JP6869166B2 (en) Production planning equipment and production planning method
JP2010282353A (en) Dynamic maintenance planning apparatus
JP7310143B2 (en) Information processing device and program
JP5145547B2 (en) Multi-variety low-volume electronic equipment production support system and multi-product low-volume electronic equipment production support program
JP2009157690A (en) Manufacturing process management apparatus, manufacturing process management method, program and recording medium for the same
JP6186797B2 (en) Manufacturing management program, manufacturing management apparatus, and manufacturing management method
JP2009128998A (en) Member receipt/delivery plan management device and receipt/delivery plan management method in production management
JP2006085646A (en) Prediction model selection device, prediction model selection method and program
JP6547304B2 (en) Shipping management device and program
JP2008299393A (en) Computer/system for managing ordering of parts
JP6409268B2 (en) Production management method and production management apparatus
JP2010218339A (en) Production management system, alternative bom configuration deployment method, and program
JP2005242816A (en) Order reception bargaining support method by computer
JP2008165597A (en) Business parameter determination system
JP5058739B2 (en) Production management system, production management method, and production management program
JPH1125181A (en) Material requirement development system
JP2002073142A (en) Production schedule generating device and recording medium with recorded production schedule generating program of production schedule generating device
JP6713963B2 (en) Method and apparatus for generating initial inventory information for supply chain operation simulation
JP2003288110A (en) Method for planning amount of material required
JP6613617B2 (en) Information processing apparatus, information processing method, and program
JP2014002428A (en) Production plan adjusting apparatus
JP2000322119A (en) Substitutive lot determination system
JP2003237946A (en) Inventory allocation method
JP2000305617A (en) Method and device for processing data and information storage medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101021

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120606

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20121009