JP2008296304A - Ball screw, ball screw assembling device, and method of assembling ball screw using the same - Google Patents

Ball screw, ball screw assembling device, and method of assembling ball screw using the same Download PDF

Info

Publication number
JP2008296304A
JP2008296304A JP2007142983A JP2007142983A JP2008296304A JP 2008296304 A JP2008296304 A JP 2008296304A JP 2007142983 A JP2007142983 A JP 2007142983A JP 2007142983 A JP2007142983 A JP 2007142983A JP 2008296304 A JP2008296304 A JP 2008296304A
Authority
JP
Japan
Prior art keywords
ball
nut
screw
ball screw
balls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007142983A
Other languages
Japanese (ja)
Other versions
JP4871215B2 (en
Inventor
Morihisa Yoshioka
守久 吉岡
Toshiaki Enzo
俊明 圓増
Keisuke Kazuno
恵介 数野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTN Corp
Original Assignee
NTN Corp
NTN Toyo Bearing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTN Corp, NTN Toyo Bearing Co Ltd filed Critical NTN Corp
Priority to JP2007142983A priority Critical patent/JP4871215B2/en
Publication of JP2008296304A publication Critical patent/JP2008296304A/en
Application granted granted Critical
Publication of JP4871215B2 publication Critical patent/JP4871215B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a ball screw assembling device enhancing the durability of a ball screw by filling a nut with a sufficient quantity of balls, and also to provide a method of assembling the ball screw using the assembling device. <P>SOLUTION: The offset amount L between the center axis of a ball pusher 45 and the inscribed circle of the balls 4 put in the screw groove 3a of the nut 3 is, where the diameter of the balls is Dw, the requirement of Dw/2 < L < Dw is desirable. More desirably, the offset amount L is set as close to Dw/2 as possible. When the offset amount L is larger than Dw, the balls may remain between the end of the ball pusher 45 and the track of the screw groove 3a. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、ねじ軸とナットとボールを有するボールねじ、ボールねじの組立装置及びそれを用いたボールねじの組立方法に関する。   The present invention relates to a ball screw having a screw shaft, a nut and a ball, a ball screw assembling apparatus, and a ball screw assembling method using the same.

自動車等の車両の各種駆動部に使用される電動アクチュエータにおいて、電動モータの回転運動を軸方向の直線運動に変換する機構として、台形ねじあるいはラックアンドピニオン等の歯車機構が一般的に使用されている。これらの変換機構は、滑り接触部を伴うため動力損失が大きく、電動モータの大型化や消費電力の増大を余儀なくされている。そのため、より効率的なアクチュエータとしてボールねじ機構が採用されるようになってきた。   In electric actuators used in various drive units of vehicles such as automobiles, a gear mechanism such as a trapezoidal screw or a rack and pinion is generally used as a mechanism for converting the rotational movement of the electric motor into a linear linear movement. Yes. Since these conversion mechanisms involve a sliding contact portion, the power loss is large, and it is necessary to increase the size of the electric motor and increase the power consumption. Therefore, a ball screw mechanism has been adopted as a more efficient actuator.

このボールねじは、外周に螺旋状のボール転走溝が形成されたねじ軸と、円筒面内に螺旋状のボール転走溝が形成されたナットと、対向する両ボール転走溝で構成されたボール転動路内に転動自在に収容された多数のボールとからなり、ねじ軸あるいはナットの回転を軸方向の並進運動に変換する機械要素である。   This ball screw is composed of a screw shaft in which a spiral ball rolling groove is formed on the outer periphery, a nut in which a spiral ball rolling groove is formed in a cylindrical surface, and both opposing ball rolling grooves. It is a mechanical element that is composed of a large number of balls that are rotatably accommodated in the ball rolling path, and converts the rotation of the screw shaft or nut into translational motion in the axial direction.

このボールねじの組立方法としては、例えば、特許文献1に示されているような方法がある。この例では、こま部材を予めナットに固定または一体成形し、このナットにボール挿入治具を挿嵌して、ボール挿入治具からナット内面のねじ溝に向けて所定数のボールを供給している。このボール挿入治具には、循環列数と同数のボール供給孔が設けられており、このボール供給孔の出口を該当する循環列を形成するナット軌道溝の一番高い位置に設置して、各ボール供給孔に所定のボールを整列させて連続的に供給すると共に、自重で循環列軌道内に入りきらなかったボールを挿入ロッドにより押込んでナットにボールを充填している。
特開平5−138458号公報
As a method for assembling the ball screw, for example, there is a method as disclosed in Patent Document 1. In this example, the top member is fixed to the nut in advance or integrally formed, a ball insertion jig is inserted into the nut, and a predetermined number of balls are supplied from the ball insertion jig toward the thread groove on the inner surface of the nut. Yes. This ball insertion jig is provided with the same number of ball supply holes as the number of circulation rows, and the outlet of this ball supply hole is installed at the highest position of the nut raceway groove forming the corresponding circulation row, A predetermined ball is aligned and continuously supplied to each ball supply hole, and a ball that has not been able to enter the circulation train track by its own weight is pushed by an insertion rod to fill the nut with the ball.
JP-A-5-138458

しかしながら、従来のボールねじの組立方法においては、ボール供給孔に残ったボールを挿入ロッドでねじ溝内に押し込んでいるが、挿入ロッドの先端とねじ溝との間にすきまがあり、そのすきまにボールが残留し、ねじ溝に十分な数量のボールが充填されないおそれがあり、その場合には、ボールねじの耐久性が低下してしまう。   However, in the conventional ball screw assembling method, the ball remaining in the ball supply hole is pushed into the thread groove with the insertion rod, but there is a gap between the tip of the insertion rod and the thread groove. There is a possibility that the balls remain and the screw grooves are not filled with a sufficient number of balls, and in this case, the durability of the ball screw is lowered.

本発明は、このような事情に鑑みてなされたもので、ナットに十分な数量のボールを充填し、ボールねじの耐久性を向上できるボールねじ、ボールねじの組立装置及びそれを用いたボールねじの組立方法を提供することを目的としている。   The present invention has been made in view of such circumstances, and a ball screw, a ball screw assembling apparatus, and a ball screw using the ball screw that can fill a nut with a sufficient number of balls to improve the durability of the ball screw. It is an object to provide an assembly method.

係る目的を達成すべく、本発明は、外周面に螺旋状のねじ溝が形成されたねじ軸と、このねじ軸に外嵌され、内周面に螺旋状のねじ溝が形成されたナットと、対応する両ねじ溝により形成される転動路に収容された多数のボールを備えたボールねじの組立装置であって、前記ボールを前記ナットのねじ溝に供給するボール供給孔を有し、前記ナットに挿嵌されるボールガイドと、前記ボール供給孔に挿嵌され、前記ボール供給孔内の前記ボールを前記ナットのねじ溝内に押し込むボールプッシャを備え、前記ボールプッシャの中心軸と前記ナットのねじ溝に前記ボールを充填した状態の前記ボールの内接円のオフセット量Lは、ボール径をDwとすると、Dw/2<L<Dwに設定されている構成を採用した。   In order to achieve such an object, the present invention provides a screw shaft having a helical thread groove formed on the outer peripheral surface, a nut externally fitted to the screw shaft, and a spiral screw groove formed on the inner peripheral surface. An assembly device for a ball screw comprising a large number of balls accommodated in a rolling path formed by corresponding screw grooves, and having a ball supply hole for supplying the balls to the screw grooves of the nut, A ball guide that is inserted into the nut; a ball pusher that is inserted into the ball supply hole and pushes the ball in the ball supply hole into a screw groove of the nut; and a central axis of the ball pusher and the ball pusher The offset amount L of the inscribed circle of the ball in a state where the ball is filled in the thread groove of the nut is set such that Dw / 2 <L <Dw, where Dw is the ball diameter.

これにより、ボール供給孔とナットのねじ溝との間にボールが残留してしまうことがないので、ナットに十分な数量のボールを充填し、ボールねじの耐久性を向上できる。   Thereby, since the ball does not remain between the ball supply hole and the thread groove of the nut, the nut can be filled with a sufficient number of balls, and the durability of the ball screw can be improved.

また、本発明は、前記ボールガイドに対して水平方向にスライド可能に配置され、所定数量の前記ボールを保持するボール孔が形成された定配治具をさらに備えたので、予め所定数量のボールを定配治具で保持することができ、ナットに充填されるボールの数量を厳密に管理できる。   In addition, the present invention further includes a locating jig that is arranged to be slidable in the horizontal direction with respect to the ball guide and has a ball hole for holding a predetermined number of the balls. Can be held by a fixed jig, and the quantity of balls filled in the nut can be strictly controlled.

また、本発明は、前記定配治具のボール孔は、前記ナットの各循環列のボール組み込み個数にボール直径をかけた長さに設定されているので、簡単かつ正確に所定数量のボールをボール供給孔に供給できる。   Further, according to the present invention, since the ball hole of the fixed jig is set to a length obtained by multiplying the number of balls incorporated in each circulation row of the nut by the ball diameter, a predetermined number of balls can be easily and accurately applied. Can be supplied to the ball supply hole.

また、本発明は、前記ナットに挿嵌され、前記ボールガイドの先端の段付き部及び前記ねじ軸の先端の小径部に嵌合される円筒部を有する挿嵌軸をさらに備えたので、ボールガイド及びねじ軸の挿嵌をより確実に行うことができ、ボールねじの組立をより円滑に行うことができる。   In addition, the present invention further includes an insertion shaft having a cylindrical portion that is fitted to the nut and is fitted to a stepped portion at the tip of the ball guide and a small diameter portion at the tip of the screw shaft. The guide and screw shaft can be more securely inserted and the ball screw can be assembled more smoothly.

また、本発明は、上記ボールねじの組立装置を用いたボールねじの組立方法であって、前記ボールを前記ボールガイドのボール供給孔を介して前記ナットのねじ溝に供給する工程と、前記ボール供給孔内の前記ボールをボールプッシャで押し込む工程を備えたので、ナットに十分な数量のボールを充填し、ボールねじの耐久性を向上できる。   The present invention is also a ball screw assembling method using the ball screw assembling apparatus, the step of supplying the ball to the thread groove of the nut through the ball supply hole of the ball guide, and the ball Since the step of pushing the ball in the supply hole with a ball pusher is provided, a sufficient number of balls can be filled in the nut, and the durability of the ball screw can be improved.

また、本発明は、上記ボールねじの組立方法で組立てられた、外周面に螺旋状のねじ溝が形成されたねじ軸と、このねじ軸に外嵌され、内周面に螺旋状のねじ溝が形成されたナットと、対応する両ねじ溝により形成される転動路に収容された多数のボールを備えたので、ナットに十分な数量のボールを充填し、ボールねじの耐久性を向上できる。   The present invention also provides a screw shaft that is assembled by the above-described ball screw assembly method and that has a helical thread groove formed on the outer peripheral surface thereof, and is externally fitted to the screw shaft and has a helical thread groove formed on the inner peripheral surface thereof. And a large number of balls accommodated in the rolling path formed by the corresponding screw grooves, so that the nut can be filled with a sufficient number of balls and the durability of the ball screw can be improved. .

本発明に係るボールねじの組立装置は、外周面に螺旋状のねじ溝が形成されたねじ軸と、このねじ軸に外嵌され、内周面に螺旋状のねじ溝が形成されたナットと、対応する両ねじ溝により形成される転動路に収容された多数のボールを備えたボールねじの組立装置であって、前記ボールを前記ナットのねじ溝に供給するボール供給孔を有し、前記ナットに挿嵌されるボールガイドと、前記ボール供給孔に挿嵌され、前記ボール供給孔内の前記ボールを前記ナットのねじ溝内に押し込むボールプッシャを備え、前記ボールプッシャの中心軸と前記ナットのねじ溝に前記ボールを充填した状態の前記ボールの内接円のオフセット量Lは、ボール径をDwとすると、Dw/2<L<Dwに設定されているので、ナットに十分な数量のボールを充填し、ボールねじの耐久性を向上できる。   A ball screw assembling apparatus according to the present invention includes a screw shaft having a helical thread groove formed on an outer peripheral surface, and a nut externally fitted to the screw shaft and having a helical screw groove formed on an inner peripheral surface thereof. An assembly device for a ball screw comprising a large number of balls accommodated in a rolling path formed by corresponding screw grooves, and having a ball supply hole for supplying the balls to the screw grooves of the nut, A ball guide that is inserted into the nut; a ball pusher that is inserted into the ball supply hole and pushes the ball in the ball supply hole into a screw groove of the nut; and a central axis of the ball pusher and the ball pusher The offset amount L of the inscribed circle of the ball in a state where the ball is filled in the thread groove of the nut is set to Dw / 2 <L <Dw where Dw is the ball diameter. Filling the balls It is possible to improve the durability of the ball screw.

外周面に螺旋状のねじ溝が形成されたねじ軸と、このねじ軸に外嵌され、内周面に螺旋状のねじ溝が形成されたナットと、対応する両ねじ溝により形成される転動路に収容された多数のボールを備えたボールねじの組立装置であって、前記ボールを前記ナットのねじ溝に供給するボール供給孔を有し、前記ナットに挿嵌されるボールガイドと、前記ボール供給孔に挿嵌され、前記ボール供給孔内の前記ボールを前記ナットのねじ溝内に押し込むボールプッシャを備え、前記ボールプッシャの中心軸と前記ナットのねじ溝に前記ボールを充填した状態の前記ボールの内接円のオフセット量Lは、ボール径をDwとすると、Dw/2<L<Dwに設定されている。   A screw shaft having a spiral thread groove formed on the outer peripheral surface, a nut externally fitted to the screw shaft and having a spiral thread groove formed on the inner peripheral surface, and a roller formed by the corresponding both screw grooves. A ball screw assembling apparatus having a large number of balls accommodated in a moving path, having a ball supply hole for supplying the ball to the screw groove of the nut, and a ball guide inserted into the nut; A ball pusher that is inserted into the ball supply hole and pushes the ball in the ball supply hole into the screw groove of the nut, and the ball is filled in the central axis of the ball pusher and the screw groove of the nut The offset amount L of the inscribed circle of the ball is set to Dw / 2 <L <Dw where the ball diameter is Dw.

以下、本発明の実施の形態を図面に基づいて詳細に説明する。
図1は、本発明に係るボールねじの実施形態を示す図であり、(a)は平面図、(b)は側面図、(c)は縦断面図である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a view showing an embodiment of a ball screw according to the present invention, in which (a) is a plan view, (b) is a side view, and (c) is a longitudinal sectional view.

このボールねじ1は、外周面に螺旋状のねじ溝2aが形成されたねじ軸2と、このねじ軸2に外嵌され、内周面に螺旋状のねじ溝3aが形成されたナット3と、対向する両ねじ溝2a、3aにより形成された転動路に収容された多数のボール4と、これらボール4の循環用部材となる2つ以上の駒部材5とを備えている。なお、図では駒部材5は2つ示されているが、ナット3の複数箇所に配設することができる。また、この例では、ナット3の中央部にもネジ溝3aが形成されている例を示したが、本発明はこれに限定されるものではなく、中央部にネジ溝が形成されていないナットにも適用できる。   The ball screw 1 includes a screw shaft 2 having a helical screw groove 2a formed on the outer peripheral surface, and a nut 3 fitted on the screw shaft 2 and having a helical screw groove 3a formed on the inner peripheral surface. A large number of balls 4 accommodated in a rolling path formed by the opposing screw grooves 2a and 3a, and two or more piece members 5 serving as circulation members for the balls 4 are provided. In addition, although the two piece members 5 are shown in the figure, they can be arranged at a plurality of locations of the nut 3. Further, in this example, an example in which the screw groove 3a is formed also in the central portion of the nut 3 is shown, but the present invention is not limited to this, and the nut in which the screw groove is not formed in the central portion. It can also be applied to.

ねじ軸2とナット3の各ねじ溝2a、3aの断面形状は、サーキュラアーク形状であってもゴシックアーク形状であっても良いが、ここではボール4との接触角が大きくとれ、アキシアルすきまが小さく設定できるゴシックアーク形状に形成されている。これにより、軸方向荷重に対する剛性が高くなり、かつ振動の発生を抑制することができる。   The cross-sectional shape of each screw groove 2a, 3a of the screw shaft 2 and the nut 3 may be a circular arc shape or a gothic arc shape, but here the contact angle with the ball 4 can be taken large and the axial clearance is It is formed in a gothic arc shape that can be set small. Thereby, the rigidity with respect to an axial load becomes high and generation | occurrence | production of a vibration can be suppressed.

円筒状のナット3の胴部には、内外の周面に貫通してねじ溝3aの一部を切欠く断面略円形の2つの駒窓6が並んで穿設されている。それぞれの駒窓6には、ボール4の循環用部材となる駒部材5が嵌合されている。なお、駒窓は必ずしも円形である必要はなく、例えば、小判状であっても良い。なお、ボール循環方式は駒式に限らず、リターンチューブ式、エンドキャップ式、ガイドプレート式であっても良い。   Two cylindrical windows 6 having a substantially circular cross section are formed in the body of the cylindrical nut 3 so as to penetrate the inner and outer peripheral surfaces and cut out a part of the thread groove 3a. Each piece window 6 is fitted with a piece member 5 serving as a circulation member for the ball 4. Note that the piece window does not necessarily have a circular shape, and may be, for example, an oval shape. The ball circulation method is not limited to the piece type, but may be a return tube type, an end cap type, or a guide plate type.

駒部材5の内方には、ねじ溝3aの隣合う1周分同士を連結する連結溝5aが形成されている。これにより、連結溝5aとねじ溝3aの略1周の部分とでボール4が周回できるようになっている。つまり、対向する両ねじ溝2a、3aにより形成された転動路が周回経路(循環列)となる。転動路内の内外のねじ溝2a、3a間に介在された多数のボール4は、ねじ溝2a、3aに沿って転動し、そして、駒部材5の連結溝5aに案内され、ねじ軸2のねじ山を乗り越えて隣接するねじ溝3aに戻り、再びねじ溝2a、3aに沿って転動する。   A connecting groove 5a that connects adjacent one rounds of the screw groove 3a is formed inward of the piece member 5. Thereby, the ball | bowl 4 can go around by the connection groove | channel 5a and the part of the substantially 1 round of the thread groove 3a. That is, the rolling path formed by the opposing screw grooves 2a and 3a becomes a circulation path (circulation line). A large number of balls 4 interposed between the inner and outer screw grooves 2a and 3a in the rolling path roll along the screw grooves 2a and 3a, and are guided by the connecting groove 5a of the piece member 5 to be screw shafts. 2 over the thread 2 and return to the adjacent thread groove 3a, and roll along the thread grooves 2a and 3a again.

駒部材5の連結溝5aは、ナット3の隣接するねじ溝3a、3a間を滑らかに接続するようにS字状に湾曲して形成され、ねじ溝3aに滑らかに接続されている。また、連結溝5aの深さは、ボール4が連結溝5a内でねじ軸2におけるねじ溝2aのねじ山を越えることができる深さとされている。   The connecting groove 5a of the piece member 5 is formed to be curved in an S shape so as to smoothly connect the adjacent screw grooves 3a and 3a of the nut 3, and is smoothly connected to the screw groove 3a. The depth of the connecting groove 5a is set to a depth at which the ball 4 can exceed the thread of the screw groove 2a in the screw shaft 2 within the connecting groove 5a.

ナット3の外径端部には、切欠き部3bが形成されている。切欠き部3bは、ナット3の外径端部を平取りしたもので、ナット3の一端部にのみに形成されている。この切欠き部3bを形成することにより、結果的に、ナット3の側面は、略D字状に突出したD字状凸部3cとなる。このD字状凸部3cは、ナット台座27の略D字状のD字状凹部27c(図3参照)に嵌合され、ナット3のねじ溝3aとボールガイドのボール供給孔の開口部41d(図2参照)の位置合わせを行うことができる。なお、この切欠き部3bは、ナット3の円筒軸方向の片側端面側にのみに設けることが好ましい。例えば、切欠き部をナットの軸方向全部にわたって形成すると、ナットの断面形状は、どこをとっても略D字状となるが、ナットの両端面もD字状になってしまうので、ナットをナット台座の略D字状のD字状凹部に嵌め合わせる際に、上下が逆になるように取り付けられてしまう可能性がある。そうなると、ナットのねじ溝とボールガイドのボール供給孔の開口部の位置合わせが正確にできず、ボールを正常に組み込むことができなくなるからである。また、切欠き部3bを設けてあるので、ナット3を上下逆にナット台座に嵌め合わせた場合には、ナット3が浮いてしまうので、ナットの端面高さを安価なターゲットセンサなどで検出することにより、ナットの逆セットを検出することができ、組立不具合を防止することができる。   A notch 3 b is formed at the outer diameter end of the nut 3. The notch 3 b is a flattened outer diameter end of the nut 3, and is formed only at one end of the nut 3. By forming the cutout portion 3b, the side surface of the nut 3 becomes a D-shaped convex portion 3c protruding in a substantially D shape as a result. The D-shaped convex portion 3c is fitted into the substantially D-shaped concave portion 27c (see FIG. 3) of the nut base 27, and the screw groove 3a of the nut 3 and the opening 41d of the ball supply hole of the ball guide. (See FIG. 2). The notch 3b is preferably provided only on one end face side of the nut 3 in the cylindrical axis direction. For example, if the notch is formed over the entire axial direction of the nut, the cross-sectional shape of the nut is substantially D-shaped no matter where it is taken, but both end surfaces of the nut are also D-shaped. When fitted into the substantially D-shaped concave portion, there is a possibility that the upper and lower sides are attached upside down. In this case, the screw groove of the nut and the opening of the ball supply hole of the ball guide cannot be accurately aligned, and the ball cannot be normally assembled. Further, since the notch 3b is provided, when the nut 3 is fitted upside down on the nut pedestal, the nut 3 is lifted, so that the end face height of the nut is detected by an inexpensive target sensor or the like. As a result, it is possible to detect the reverse set of nuts and to prevent assembly problems.

駒部材5は金属粉末を可塑状に調整し、射出成形機で成形される焼結合金からなる。この射出成形に際しては、まず、金属粉と、プラスチックおよびワックスからなるバインダとを混練機で混練し、その混練物をペレット状に造粒する。造粒したペレットは、射出成形機のホッパに供給し、金型内に加熱溶融状態で押し込む、所謂MIM(Metal Injection Molding)により成形されている。こうしたMIMによって成形される焼結合金であれば、加工度が高く複雑な形状であっても容易に、かつ精度良く所望の形状・寸法に成形することができる。   The piece member 5 is made of a sintered alloy formed by an injection molding machine by adjusting the metal powder into a plastic shape. In this injection molding, first, metal powder and a binder made of plastic and wax are kneaded by a kneader, and the kneaded product is granulated into pellets. The granulated pellets are molded by so-called MIM (Metal Injection Molding), which is supplied to a hopper of an injection molding machine and pushed into a mold in a heated and melted state. A sintered alloy formed by such an MIM can be easily and accurately formed into a desired shape / dimension even if it has a high workability and a complicated shape.

次に、本発明に係るボールねじの組立装置の実施形態について説明する。
図2は、本発明に係るボールねじの組立装置の実施形態を示す正面図である。図3は、ナット台座の平面図である。図4は、ナット固定部の平面図である。
Next, an embodiment of a ball screw assembling apparatus according to the present invention will be described.
FIG. 2 is a front view showing an embodiment of a ball screw assembling apparatus according to the present invention. FIG. 3 is a plan view of the nut base. FIG. 4 is a plan view of the nut fixing portion.

図2に示すように、本発明に係るボールねじの組立装置10は、ナット3を載置するナット固定部11と、ナット固定部11の貫通孔に挿嵌する挿嵌軸12と、垂直方向にスライド可能で、ナット3にボールを供給するボール供給部13からなる。   As shown in FIG. 2, the ball screw assembly device 10 according to the present invention includes a nut fixing portion 11 on which a nut 3 is placed, an insertion shaft 12 to be inserted into a through hole of the nut fixing portion 11, and a vertical direction. And a ball supply unit 13 for supplying a ball to the nut 3.

ナット固定部11の下方には、中央部に孔を有する基台21が配置されている。基台21の上部には、中央部に孔を有するベース22が載置されている。ベース22の上部には、中央部に円形の孔を有し、下端にベース22に固定するためのフランジを有する全体として円筒状をした外筒23が設けられている。外筒23の内周面の上下2箇所には、転がり軸受24、25が配置されている。転がり軸受24、25の内周には、全体として円筒状をした内筒26が配置されている。内筒26は、外筒23に対して回転可能となっている。内筒26の上部には、ナット3を載置するナット台座27が固定されている。   A base 21 having a hole at the center is disposed below the nut fixing portion 11. On the upper part of the base 21, a base 22 having a hole in the center is placed. At the upper part of the base 22, there is provided an outer cylinder 23 having a circular shape at the center and a flange having a flange for fixing to the base 22 at the lower end as a whole. Roller bearings 24 and 25 are arranged at two locations on the inner peripheral surface of the outer cylinder 23, upper and lower. An inner cylinder 26 having a cylindrical shape as a whole is disposed on the inner circumference of the rolling bearings 24 and 25. The inner cylinder 26 is rotatable with respect to the outer cylinder 23. A nut base 27 on which the nut 3 is placed is fixed to the upper portion of the inner cylinder 26.

図3に示すように、ナット台座27の中央には、円形の孔27aが穿設されている。ナット台座27の上面には、ナット3を嵌め込むための所定の深さを有する穴27bが形成されている。穴27bの下面には、さらに略D字状のD字状凹部27cが形成されている。穴27bの下面の内、D字状凹部27cが形成されていない部分は、一段高さの高くなった凸部27dとなっている。円形の孔27aにナット3を嵌め合わせた際には、このD字状凹部27cにナット3のD字状凸部3cが嵌まり込み、凸部27dにナット3の切欠き部3bが嵌まり込むので、ナット3を上下逆に取り付けることを防止できると共に、ナット3の軸周りの位置合わせを行うこともできるので、ナット3のねじ溝とボールガイドのボール供給孔の先端の位置合わせが正確にでき、ナット3に正確にボールを供給することができる。   As shown in FIG. 3, a circular hole 27 a is formed in the center of the nut base 27. A hole 27 b having a predetermined depth for fitting the nut 3 is formed on the upper surface of the nut base 27. A substantially D-shaped concave portion 27c is further formed on the lower surface of the hole 27b. A portion of the lower surface of the hole 27b where the D-shaped concave portion 27c is not formed is a convex portion 27d that is one step higher. When the nut 3 is fitted into the circular hole 27a, the D-shaped convex portion 3c of the nut 3 is fitted into the D-shaped concave portion 27c, and the notched portion 3b of the nut 3 is fitted into the convex portion 27d. Therefore, the nut 3 can be prevented from being installed upside down, and the nut 3 can be aligned around the axis, so that the screw groove of the nut 3 and the tip of the ball supply hole of the ball guide are accurately aligned. The ball can be accurately supplied to the nut 3.

ベース22の側面には、モータ31を載置する断面L字状のモータ載置台32がボルトによって固定されている。モータ31の回転軸には、上端部にフランジを有する回転部材33が嵌合されている。回転部材33のフランジ部には、垂直方向に貫通した貫通孔が設けられている。回転部材33の貫通孔には、第1のカップリング34が回転可能に設けられている。第1のカップリング34の中央部には、水平方向に貫通する孔が設けられており、棒状のアーム35の一端部が挿嵌されている。アーム35の他端は、第1のカップリング34と同形状の第2のカップリング36の孔に回転可能に挿嵌されている。第2のカップリング36の下端には、断面L字状の連結部材37が回転可能に接続されている。連結部材37の他端は、内筒26の外周面にボルトによって固定されている。回転部材33、第1のカップリング34、アーム35、第2のカップリング36及び連結部材37でリンク機構38を構成している。   A motor mounting table 32 having an L-shaped cross section for mounting the motor 31 is fixed to the side surface of the base 22 with bolts. A rotating member 33 having a flange at the upper end is fitted to the rotating shaft of the motor 31. The flange portion of the rotating member 33 is provided with a through hole penetrating in the vertical direction. A first coupling 34 is rotatably provided in the through hole of the rotating member 33. A hole penetrating in the horizontal direction is provided at the center of the first coupling 34, and one end of a rod-like arm 35 is inserted. The other end of the arm 35 is rotatably fitted in a hole of a second coupling 36 having the same shape as the first coupling 34. A connecting member 37 having an L-shaped cross section is rotatably connected to the lower end of the second coupling 36. The other end of the connecting member 37 is fixed to the outer peripheral surface of the inner cylinder 26 with a bolt. The rotation member 33, the first coupling 34, the arm 35, the second coupling 36 and the connecting member 37 constitute a link mechanism 38.

このような構成により、図4にも示すように、モータ31とナット台座27をリンク機構38により接続したので、モータ31の回転軸が連続回転すると、回転部材33が回転し、第1のカップリング34がモータ31の回転軸回りに回動する。そして、連結部材37がナット台座27の中心軸周りに水平方向の移動を繰り返すことにより、ナット台座27は、その軸心周りを揺動する。これにより、揺動運動の度にナットのねじ溝軌道内にボールの未充填空間が繰返し発生し、その未充填空間にボールが入り込みやすくなり、短時間でボールを充填することが可能になる。また、揺動運動により、ナット3に振動が発生するので、ボールがねじ溝に沿って流れやすくなり、ナットねじ溝へのボールの充填が無理なく促進される。   With this configuration, as shown in FIG. 4, the motor 31 and the nut base 27 are connected by the link mechanism 38. Therefore, when the rotation shaft of the motor 31 is continuously rotated, the rotating member 33 is rotated and the first cup is rotated. The ring 34 rotates around the rotation axis of the motor 31. Then, when the connecting member 37 repeats horizontal movement around the central axis of the nut pedestal 27, the nut pedestal 27 swings around its axis. As a result, an unfilled space for the ball is repeatedly generated in the thread groove track of the nut each time the rocking motion is performed, and the ball can easily enter the unfilled space, and the ball can be filled in a short time. Further, since the vibration is generated in the nut 3 by the swinging motion, the ball can easily flow along the screw groove, and the filling of the ball into the nut screw groove is promoted without difficulty.

挿嵌軸12は、内筒26とナット台座27の中心に設けられた貫通孔に挿嵌される。挿嵌軸12の上部は、径の小さくなった段付き部となっており、そのさらに先は、外径が段付き部と同一の円筒部12aとなっている。円筒部12aは、ナット3にすきまを持って挿嵌される。円筒部12aの外径は、ナット3にボール4を充填したときのボール4の内接円よりも僅かに小径となっている。   The insertion shaft 12 is inserted into a through hole provided at the center of the inner cylinder 26 and the nut base 27. The upper portion of the insertion shaft 12 is a stepped portion having a reduced diameter, and further ahead is a cylindrical portion 12a having the same outer diameter as the stepped portion. The cylindrical portion 12a is inserted into the nut 3 with a clearance. The outer diameter of the cylindrical portion 12 a is slightly smaller than the inscribed circle of the ball 4 when the ball 4 is filled in the nut 3.

ボール供給部13の下端には、ナット3に挿嵌される軸状のボールガイド41が設けられている。ボールガイド41の内部の軸心から偏心した位置には、少なくとも1つの垂直方向に長く延びたボール供給孔41aが形成されている。ボール供給孔41aの下端は、ボールガイド41の側面に向けて開口する開口部41dとなっており、ボール供給孔41aからナット3のねじ溝3aにボール4を供給できるようになっている。ボールガイド41の下端には、径の小さくなった段付き部41bが形成されており、挿嵌軸12の円筒部12aに内嵌される。   A shaft-shaped ball guide 41 that is inserted into the nut 3 is provided at the lower end of the ball supply unit 13. At a position eccentric from the axial center inside the ball guide 41, at least one ball supply hole 41a extending in the vertical direction is formed. The lower end of the ball supply hole 41a is an opening 41d that opens toward the side surface of the ball guide 41, so that the ball 4 can be supplied from the ball supply hole 41a to the thread groove 3a of the nut 3. A stepped portion 41 b with a reduced diameter is formed at the lower end of the ball guide 41 and is fitted into the cylindrical portion 12 a of the insertion shaft 12.

ボールガイド41の上方の側面には、ナット3に供給されるボール4の通過個数をカウントするカウント用センサ42が配置されている。カウント用センサ42の先端からボール供給孔41aの側面にかけて水平方向に貫通孔41cが設けられている。この貫通孔41cを通して、カウント用センサ42は、ボール4の通過個数をカウントする。カウント用センサ42としては、例えば、透過形や拡散反射形の光電センサを例示できる。なお、透過形の場合には、ボール供給孔41aの側方に受光部を設ける必要がある。   A counting sensor 42 that counts the number of passing balls 4 supplied to the nut 3 is disposed on the side surface above the ball guide 41. A through hole 41c is provided in the horizontal direction from the tip of the counting sensor 42 to the side surface of the ball supply hole 41a. The counting sensor 42 counts the number of passing balls 4 through the through hole 41c. As the counting sensor 42, for example, a transmissive or diffuse reflection photoelectric sensor can be exemplified. In the case of the transmissive type, it is necessary to provide a light receiving portion on the side of the ball supply hole 41a.

ボールガイド41の上部には、ボール供給部材43がボルトによって固定されている。ボール供給部材43は、断面が略コの字状をしており、そのコの字状の凹部には、直方体形状の定配治具44が配置されている。定配治具44は、ボール供給部材43に対して水平方向にスライド可能となっている。ボール供給部材43及び定配治具44には、それぞれボール供給孔41aに連通するボール孔43a、43b、44aが垂直方向に貫通するように形成されている。ボール供給部材43の上部には、外部からボールが供給されるボール供給路43cがボール孔43bに平行かつ垂直方向に貫通するように形成されている。また、定配治具44のボール孔44aは、ナット3の各循環列のボール組み込み個数にボール直径をかけた長さに設定されているので、このボール孔44aに所定数量のボールを保持した状態で、定配治具44をスライドさせ、ボール孔44aとボール供給孔41aを連通させてボール供給孔41aからナット3のねじ溝3aにボールを供給することにより、ナット3の1つの循環列に正確な個数のボールを供給することができる。   A ball supply member 43 is fixed to the upper portion of the ball guide 41 with bolts. The ball supply member 43 has a substantially U-shaped cross section, and a rectangular parallelepiped-shaped fixing jig 44 is disposed in the U-shaped recess. The fixed jig 44 is slidable in the horizontal direction with respect to the ball supply member 43. Ball holes 43a, 43b, and 44a communicating with the ball supply holes 41a are formed in the ball supply member 43 and the fixed distribution jig 44 so as to penetrate in the vertical direction. In the upper part of the ball supply member 43, a ball supply path 43c through which a ball is supplied from the outside is formed so as to penetrate the ball hole 43b in a vertical direction. Further, since the ball holes 44a of the fixed jig 44 are set to a length obtained by multiplying the number of balls incorporated in each circulation row of the nut 3 by the ball diameter, a predetermined number of balls are held in the ball holes 44a. In this state, the fixed distribution jig 44 is slid, the ball hole 44a and the ball supply hole 41a are communicated, and the ball is supplied from the ball supply hole 41a to the thread groove 3a of the nut 3, whereby one circulation row of the nut 3 is provided. It is possible to supply an accurate number of balls.

図2において、ボール供給孔41a、ボール孔43a、43b、44aには、棒状のボールプッシャ45が挿嵌されている。ボールプッシャ45の先端は半球状に丸められており、ナット3にボール4を押し込む目的で使用される。ボールプッシャ45の上端部には、ボールプッシャ45を保持する保持部材45aが配置されている。   In FIG. 2, a rod-shaped ball pusher 45 is inserted into the ball supply hole 41a and the ball holes 43a, 43b, and 44a. The tip of the ball pusher 45 is rounded into a hemisphere, and is used for the purpose of pushing the ball 4 into the nut 3. A holding member 45 a that holds the ball pusher 45 is disposed at the upper end of the ball pusher 45.

次に、本発明に係るボールねじの組立方法について説明する。
図5は、ボールガイドを下降させた工程を示す装置の正面図である。図6は、定配治具をスライドさせた工程を示す装置の正面図である。図7は、ボールプッシャを下降させた工程を示す装置の正面図である。図8は、図7の要部拡大図である。図9は、ねじ軸をローディングした工程を示す装置の正面図である。図10は、ボールねじの組立が完了した時の装置の正面図である。
Next, the ball screw assembling method according to the present invention will be described.
FIG. 5 is a front view of the apparatus showing the process of lowering the ball guide. FIG. 6 is a front view of the apparatus showing a process of sliding the fixed jig. FIG. 7 is a front view of the apparatus showing the process of lowering the ball pusher. FIG. 8 is an enlarged view of a main part of FIG. FIG. 9 is a front view of the apparatus showing the process of loading the screw shaft. FIG. 10 is a front view of the apparatus when the assembly of the ball screw is completed.

本発明のボールねじの組立方法においては、まず、図2に示すように、ナット台座27にナット3を縦方向に載置する。このとき、ナット3のD字状凸部3cをナット台座27のD字状凹部27cに嵌め合わせることにより、ナット3の位置合わせを同時に行うことができる。また、挿嵌軸12をナット台座27等に挿嵌し、挿嵌軸12の円筒部12aをナット3の内周面に挿嵌しておく。   In the ball screw assembling method of the present invention, first, the nut 3 is placed on the nut base 27 in the vertical direction as shown in FIG. At this time, the nut 3 can be aligned at the same time by fitting the D-shaped convex portion 3 c of the nut 3 to the D-shaped concave portion 27 c of the nut base 27. Further, the insertion shaft 12 is inserted into the nut pedestal 27 and the like, and the cylindrical portion 12 a of the insertion shaft 12 is inserted into the inner peripheral surface of the nut 3.

次に、図5に示すように、ボール供給部13を下降させる。このとき、ボールガイド41の先端の段付き部41bが挿嵌軸12の円筒部12aに内嵌されて、ボールガイド41の下降とともに、挿嵌軸12も下降する。そうして、ボールガイド41がナット3に内嵌される。ボールガイド41の開口部41dが、ナット3のねじ溝3aの内、最下部の循環列のねじ溝3aに対向するように位置制御される。また、定配治具44は、ボール供給部材43に対して水平方向(図5の右方)にスライドし、ボール孔44aとボール供給路43cが連通され、ボール孔44aに所定数量のボールが保持される。さらに、ボール供給部13の下降に伴い、ボールプッシャ45は相対的にボール供給部13の上方に位置することとなる。このように、ボールプッシャ45を上方に配置することで、ナット3のねじ溝3aとボール供給孔41a、ボール孔43a、43b、44aを連通させることができ、ナット3のねじ溝3aにボールを供給することができる。   Next, as shown in FIG. 5, the ball supply unit 13 is lowered. At this time, the stepped portion 41 b at the tip of the ball guide 41 is fitted into the cylindrical portion 12 a of the insertion shaft 12, and the insertion shaft 12 is also lowered as the ball guide 41 is lowered. Then, the ball guide 41 is fitted into the nut 3. The position of the opening 41 d of the ball guide 41 is controlled so as to face the screw groove 3 a of the lowermost circulation row among the screw grooves 3 a of the nut 3. Further, the distribution jig 44 slides in the horizontal direction (rightward in FIG. 5) with respect to the ball supply member 43, the ball hole 44a and the ball supply path 43c are communicated, and a predetermined number of balls are placed in the ball hole 44a. Retained. Further, as the ball supply unit 13 is lowered, the ball pusher 45 is relatively positioned above the ball supply unit 13. Thus, by disposing the ball pusher 45 upward, the screw groove 3a of the nut 3 and the ball supply hole 41a and the ball holes 43a, 43b, 44a can be communicated, and the ball is inserted into the screw groove 3a of the nut 3. Can be supplied.

次に、図6に示すように、定配治具44をボール供給部材43に対して水平方向(図5の左方)にスライドさせることにより、ナット3のねじ溝3aとボール供給孔41a、ボール孔43a、44aを連通させることができ、ナット3のねじ溝3aにボール孔44aに保持した所定数量のボールを供給することができる。このとき、ボール孔44aからねじ溝3aに供給されるボールの個数をカウント用センサ42でカウントすることにより、ナット3に供給されるボールの個数をより正確に把握できる。また、ねじ溝3aにボールを供給する際には、モータ31を駆動し、ナット台座27を揺動運動させることにより、ボールのねじ溝3aへの充填を円滑に行うことができる。   Next, as shown in FIG. 6, the fixed jig 44 is slid in the horizontal direction (leftward in FIG. 5) with respect to the ball supply member 43, whereby the screw groove 3a of the nut 3 and the ball supply hole 41a, The ball holes 43 a and 44 a can be communicated, and a predetermined number of balls held in the ball hole 44 a can be supplied to the thread groove 3 a of the nut 3. At this time, by counting the number of balls supplied from the ball hole 44a to the screw groove 3a by the counting sensor 42, the number of balls supplied to the nut 3 can be grasped more accurately. Further, when the ball is supplied to the screw groove 3a, the motor 31 is driven and the nut pedestal 27 is caused to swing, whereby the ball can be smoothly filled into the screw groove 3a.

次に、図7に示すように、ナット3のねじ溝3aとボール供給孔41a、ボール孔43a、43b、44aを連通させた状態で、ボールプッシャ45を下降させ、ボール供給孔41aのボールをねじ溝3aに押し込む。ボールプッシャ45の位置は正確に制御されており、ボールプッシャ45の先端がボールガイド41の開口部41d近傍まで押し込まれるので、ボール供給孔41a内にボールが残ってしまうことなく、ボール供給孔41a内に供給されたボールは全てナット3のねじ溝3a内に充填される。   Next, as shown in FIG. 7, with the thread groove 3a of the nut 3 and the ball supply hole 41a and the ball holes 43a, 43b, and 44a in communication, the ball pusher 45 is lowered, and the ball in the ball supply hole 41a is removed. Push into the thread groove 3a. The position of the ball pusher 45 is accurately controlled, and the tip of the ball pusher 45 is pushed to the vicinity of the opening 41d of the ball guide 41, so that the ball does not remain in the ball supply hole 41a and the ball supply hole 41a. All the balls supplied inside are filled in the thread groove 3 a of the nut 3.

ここで、図8に示すように、ボールプッシャ45の中心軸とナット3のねじ溝3aにボール4を充填した状態のボール4の内接円のオフセット量Lは、ボール径をDwとすると、Dw/2<L<Dwとすることが好ましい。より好ましくは、オフセット量Lをできる限りDw/2に近づける。ここで、ボールガイド41の外径をナット3のねじ溝3aにボール4を充填した状態のボール4の内接円径とほぼ等しくしているので、このオフセット量LがDw/2よりも小さいと、ボール供給孔41a内のボール4がボールガイド41の外周面を突き破ってしまい、ボールガイド41の耐久性が確保できない。一方、オフセット量LがDwよりも大きいと、ボールプッシャ45の先端とねじ溝3aの軌道との間にボールが残留する可能性がある。   Here, as shown in FIG. 8, the offset amount L of the inscribed circle of the ball 4 in a state where the ball 4 is filled in the central axis of the ball pusher 45 and the thread groove 3a of the nut 3 is expressed as follows. It is preferable that Dw / 2 <L <Dw. More preferably, the offset amount L is as close to Dw / 2 as possible. Here, since the outer diameter of the ball guide 41 is substantially equal to the inscribed circle diameter of the ball 4 in a state where the thread groove 3a of the nut 3 is filled with the ball 4, this offset amount L is smaller than Dw / 2. Then, the ball 4 in the ball supply hole 41a breaks through the outer peripheral surface of the ball guide 41, and the durability of the ball guide 41 cannot be ensured. On the other hand, if the offset amount L is larger than Dw, the ball may remain between the tip of the ball pusher 45 and the track of the screw groove 3a.

上記の工程により、ナット3の1つの循環列にボール4が充填されるので、これらの工程をナット3の各循環列について行う。具体的には、1つの循環列の充填が終了したら、挿嵌軸12及びボールガイド41を1つの循環列分だけ上昇させ、定配治具44をスライドさせてボール孔44aに所定数量のボールを保持し、再び定配治具44をスライドさせてナット3のねじ溝3aとボール供給孔41a、ボール孔43a、44aを連通させる。そして、ボールプッシャ45を下降させてねじ溝3aにボール4を押し込む。これらの工程を繰り返し、ナット3の全ての循環列にボールが充填される。   Since the balls 4 are filled in one circulation row of the nut 3 by the above steps, these steps are performed for each circulation row of the nut 3. Specifically, when the filling of one circulation row is completed, the insertion shaft 12 and the ball guide 41 are raised by one circulation row, and the fixed jig 44 is slid to a predetermined number of balls in the ball hole 44a. Then, the distribution jig 44 is slid again so that the thread groove 3a of the nut 3 communicates with the ball supply hole 41a and the ball holes 43a and 44a. Then, the ball pusher 45 is lowered to push the ball 4 into the screw groove 3a. By repeating these steps, the balls are filled in all the circulation rows of the nut 3.

次に、図9に示すように、挿嵌軸12を上昇させ、挿嵌軸12の円筒部12aにボールガイド41の先端の段付き部41bを内嵌し、ボールガイド41と共に、ボール供給部13を上方に押し上げる。そうすると、ナット3に充填されたボール4の内部に挿嵌軸12の円筒部12aが嵌め合わされた状態になる。この状態からさらに、挿嵌軸12の円筒部12aに、ボールねじ1のねじ軸2の先端の小径部2bを内嵌させるようにして、ねじ軸2を挿嵌軸12上にローディングする。   Next, as shown in FIG. 9, the insertion shaft 12 is raised, a stepped portion 41 b at the tip of the ball guide 41 is fitted into the cylindrical portion 12 a of the insertion shaft 12, and the ball supply unit is connected together with the ball guide 41. Push 13 up. If it does so, it will be in the state by which the cylindrical part 12a of the insertion shaft 12 was fitted inside the ball | bowl 4 with which the nut 3 was filled. From this state, the screw shaft 2 is loaded onto the insertion shaft 12 such that the small diameter portion 2b at the tip of the screw shaft 2 of the ball screw 1 is fitted into the cylindrical portion 12a of the insertion shaft 12.

次に、図10に示すように、ナット3又はねじ軸2を軸周りに回転させることにより、ねじ軸2のねじ溝2aにナット3に充填されたボール4を介してナット3のねじ溝3aを螺合させることにより、ボールねじ1の組立を完了する。   Next, as shown in FIG. 10, by rotating the nut 3 or the screw shaft 2 around the axis, the screw groove 3 a of the nut 3 is inserted into the screw groove 2 a of the screw shaft 2 via the ball 4 filled in the nut 3. To complete the assembly of the ball screw 1.

以上、本発明の実施の形態について説明を行ったが、本発明はこうした実施の形態に何等限定されるものではなく、あくまで例示であって、本発明の要旨を逸脱しない範囲内において、さらに種々なる形態で実施し得ることは勿論のことであり、本発明の範囲は、特許請求の範囲の記載によって示され、さらに特許請求の範囲に記載の均等の意味、および範囲内のすべての変更を含む。   The embodiment of the present invention has been described above, but the present invention is not limited to such an embodiment, and is merely an example, and various modifications can be made without departing from the scope of the present invention. Of course, the scope of the present invention is indicated by the description of the scope of claims, and further, the equivalent meanings described in the scope of claims and all modifications within the scope of the scope of the present invention are included. Including.

本発明に係るボールねじ、ボールねじの組立装置及びそれを用いたボールねじの組立方法は、ねじ軸とナットとボールを有するボールねじ、ボールねじの組立装置及びそれを用いたボールねじの組立方法に適用できる。   A ball screw, a ball screw assembling apparatus and a ball screw assembling method using the same according to the present invention include a ball screw having a screw shaft, a nut and a ball, a ball screw assembling apparatus, and a ball screw assembling method using the same. Applicable to.

本発明に係るボールねじの実施形態を示す図であり、(a)は平面図、(b)は側面図、(c)は縦断面図である。It is a figure which shows embodiment of the ball screw which concerns on this invention, (a) is a top view, (b) is a side view, (c) is a longitudinal cross-sectional view. 本発明に係るボールねじの組立装置の実施形態を示す正面図である。It is a front view which shows embodiment of the assembly apparatus of the ball screw which concerns on this invention. ナット台座の平面図である。It is a top view of a nut base. ナット固定部の平面図である。It is a top view of a nut fixing | fixed part. ボールガイドを下降させた工程を示す装置の正面図である。It is a front view of the device showing the process of lowering the ball guide. 定配治具をスライドさせた工程を示す装置の正面図である。It is a front view of the apparatus which shows the process of sliding the fixed distribution jig. ボールプッシャを下降させた工程を示す装置の正面図である。It is a front view of the device showing the process of lowering the ball pusher. 図7の要部拡大図である。It is a principal part enlarged view of FIG. ねじ軸をローディングした工程を示す装置の正面図である。It is a front view of the apparatus which shows the process which loaded the screw shaft. ボールねじの組立が完了した時の装置の正面図である。It is a front view of an apparatus when the assembly of a ball screw is completed.

符号の説明Explanation of symbols

1・・・・・・ボールねじ
2・・・・・・ねじ軸
2a、3a・・ねじ溝
2b・・・・・小径部
3・・・・・・ナット
3b・・・・・切欠き部
3c・・・・・D字状凸部
4・・・・・・ボール
5・・・・・・駒部材
5a・・・・・連結溝
6・・・・・・駒窓
10・・・・・ボールねじの組立装置
11・・・・・ナット固定部
12・・・・・挿嵌軸
12a・・・・円筒部
13・・・・・ボール供給部
21・・・・・基台
22・・・・・ベース
23・・・・・外筒
24、25・・転がり軸受
26・・・・・内筒
27・・・・・ナット台座
27a・・・・円形の孔
27b・・・・穴
27c・・・・D字状凹部
27d・・・・凸部
31・・・・・モータ
32・・・・・モータ載置台
33・・・・・回転部材
34・・・・・第1のカップリング
35・・・・・アーム
36・・・・・第2のカップリング
37・・・・・連結部材
38・・・・・リンク機構
41・・・・・ボールガイド
41a・・・・ボール供給孔
41b・・・・段付き部
41c・・・・貫通孔
41d・・・・開口部
42・・・・・カウント用センサ
43・・・・・ボール供給部材
43a、43b、44a・・・・ボール孔
43c・・・・ボール供給路
44・・・・・定配治具
45・・・・・ボールプッシャ
45a・・・・保持部材
L・・・・・・オフセット量
Dw・・・・・ボール径
1 ······ Ball screw 2 ··· Screw shaft 2a, 3a ··· Screw groove 2b ··· Small diameter portion 3 ··· Nut 3b ··· Notch 3c ... D-shaped convex part 4 ... Ball 5 ... Piece member 5a ... Connection groove 6 ... Piece window 10 ... Ball screw assembly device 11 Nut fixing portion 12 Insertion shaft 12a Cylindrical portion 13 Ball supply portion 21 Base 22 .... Base 23 ... Outer cylinders 24, 25 ... Rolling bearing 26 ... Inner cylinder 27 ... Nut base 27a ... Round hole 27b ... Hole 27c ··· D-shaped concave portion 27d ··· convex portion 31 ··· motor 32 ··· motor mounting base 33 ··· rotating member 34 ··· first cup Ring 35 ... · Arm 36 ··· Second coupling 37 ··· Connection member 38 ··· Link mechanism 41 ··· Ball guide 41a ··· Ball supply hole 41b ··· Stepped portion 41c ... through hole 41d ... opening 42 ... counting sensor 43 ... ball supply members 43a, 43b, 44a ... ball hole 43c ...・ Ball supply passage 44... Fixed distribution jig 45... Ball pusher 45 a... Holding member L... Offset amount Dw.

Claims (6)

外周面に螺旋状のねじ溝が形成されたねじ軸と、このねじ軸に外嵌され、内周面に螺旋状のねじ溝が形成されたナットと、対応する両ねじ溝により形成される転動路に収容された多数のボールを備えたボールねじの組立装置であって、
前記ボールを前記ナットのねじ溝に供給するボール供給孔を有し、前記ナットに挿嵌されるボールガイドと、前記ボール供給孔に挿嵌され、前記ボール供給孔内の前記ボールを前記ナットのねじ溝内に押し込むボールプッシャを備え、前記ボールプッシャの中心軸と前記ナットのねじ溝に前記ボールを充填した状態の前記ボールの内接円のオフセット量Lは、ボール径をDwとすると、Dw/2<L<Dwに設定されていることを特徴とするボールねじの組立装置。
A screw shaft having a spiral thread groove formed on the outer peripheral surface, a nut externally fitted to the screw shaft and having a spiral thread groove formed on the inner peripheral surface, and a roller formed by the corresponding both screw grooves. A ball screw assembling apparatus having a large number of balls accommodated in a moving path,
A ball supply hole that supplies the ball to the thread groove of the nut; a ball guide that is inserted into the nut; and a ball guide that is inserted into the ball supply hole, and the ball in the ball supply hole is inserted into the nut The ball pusher is pushed into the thread groove, and the offset amount L of the inscribed circle of the ball in a state where the ball is filled in the center axis of the ball pusher and the thread groove of the nut is expressed as Dw / 2 <L <Dw. A ball screw assembling apparatus.
前記ボールガイドに対して水平方向にスライド可能に配置され、所定数量の前記ボールを保持するボール孔が形成された定配治具をさらに備えた請求項1に記載のボールねじの組立装置。   The ball screw assembling apparatus according to claim 1, further comprising a locating jig that is arranged to be slidable in a horizontal direction with respect to the ball guide and in which a ball hole for holding a predetermined number of balls is formed. 前記定配治具のボール孔は、前記ナットの各循環列のボール組み込み個数にボール直径をかけた長さに設定されている請求項2に記載のボールねじの組立装置。   The ball screw assembly apparatus according to claim 2, wherein the ball hole of the fixed jig is set to a length obtained by multiplying the number of balls incorporated in each circulation row of the nut by the ball diameter. 前記ナットに挿嵌され、前記ボールガイドの先端の段付き部及び前記ねじ軸の先端の小径部に嵌合される円筒部を有する挿嵌軸をさらに備えた請求項1乃至3いずれか1項に記載のボールねじの組立装置。   4. The insertion shaft according to claim 1, further comprising an insertion shaft that is inserted into the nut and has a cylindrical portion that is fitted into a stepped portion at the tip of the ball guide and a small diameter portion at the tip of the screw shaft. The ball screw assembling apparatus described in 1. 請求項1乃至4いずれか1項に記載のボールねじの組立装置を用いたボールねじの組立方法であって、
前記ボールを前記ボールガイドのボール供給孔を介して前記ナットのねじ溝に供給する工程と、前記ボール供給孔内の前記ボールをボールプッシャで押し込む工程を備えたことを特徴とするボールねじの組立装置を用いたボールねじの組立方法。
A ball screw assembling method using the ball screw assembling apparatus according to any one of claims 1 to 4,
Assembling the ball screw, comprising: supplying the ball to the screw groove of the nut through the ball supply hole of the ball guide; and pushing the ball in the ball supply hole with a ball pusher. A method of assembling a ball screw using the apparatus.
請求項5記載のボールねじの組立方法で組立てられた、外周面に螺旋状のねじ溝が形成されたねじ軸と、このねじ軸に外嵌され、内周面に螺旋状のねじ溝が形成されたナットと、対応する両ねじ溝により形成される転動路に収容された多数のボールを備えたボールねじ。   6. A screw shaft that is assembled by the ball screw assembling method according to claim 5 and that has a helical thread groove formed on the outer peripheral surface thereof, and is externally fitted to the screw shaft to form a helical thread groove on the inner peripheral surface. And a ball screw having a large number of balls accommodated in a rolling path formed by the corresponding screw grooves.
JP2007142983A 2007-05-30 2007-05-30 Ball screw assembling apparatus and ball screw assembling method using the same Expired - Fee Related JP4871215B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007142983A JP4871215B2 (en) 2007-05-30 2007-05-30 Ball screw assembling apparatus and ball screw assembling method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007142983A JP4871215B2 (en) 2007-05-30 2007-05-30 Ball screw assembling apparatus and ball screw assembling method using the same

Publications (2)

Publication Number Publication Date
JP2008296304A true JP2008296304A (en) 2008-12-11
JP4871215B2 JP4871215B2 (en) 2012-02-08

Family

ID=40170310

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007142983A Expired - Fee Related JP4871215B2 (en) 2007-05-30 2007-05-30 Ball screw assembling apparatus and ball screw assembling method using the same

Country Status (1)

Country Link
JP (1) JP4871215B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108136553A (en) * 2015-10-01 2018-06-08 Ntn株式会社 The assembling device of ball-screw and the assemble method of ball-screw
CN114799169A (en) * 2022-06-27 2022-07-29 成都虹波实业股份有限公司 Material pushing structure, forming device and forming method for manufacturing tungsten alloy ball powder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5577431A (en) * 1978-12-07 1980-06-11 Koyo Seiko Co Ltd Automatic roller dispatcher
JPH05138460A (en) * 1991-11-20 1993-06-01 Honda Motor Co Ltd Ball inserting device for ball screw
JPH05138458A (en) * 1991-11-20 1993-06-01 Honda Motor Co Ltd Ball screw assembling method
JPH09155661A (en) * 1995-12-05 1997-06-17 Honda Motor Co Ltd Ball counting feeder
JP2008286352A (en) * 2007-05-21 2008-11-27 Ntn Corp Assembling unit of ball screw and assembling method of ball screw using thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5577431A (en) * 1978-12-07 1980-06-11 Koyo Seiko Co Ltd Automatic roller dispatcher
JPH05138460A (en) * 1991-11-20 1993-06-01 Honda Motor Co Ltd Ball inserting device for ball screw
JPH05138458A (en) * 1991-11-20 1993-06-01 Honda Motor Co Ltd Ball screw assembling method
JPH09155661A (en) * 1995-12-05 1997-06-17 Honda Motor Co Ltd Ball counting feeder
JP2008286352A (en) * 2007-05-21 2008-11-27 Ntn Corp Assembling unit of ball screw and assembling method of ball screw using thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108136553A (en) * 2015-10-01 2018-06-08 Ntn株式会社 The assembling device of ball-screw and the assemble method of ball-screw
CN114799169A (en) * 2022-06-27 2022-07-29 成都虹波实业股份有限公司 Material pushing structure, forming device and forming method for manufacturing tungsten alloy ball powder
CN114799169B (en) * 2022-06-27 2022-09-16 成都虹波实业股份有限公司 Material pushing structure, forming device and forming method for manufacturing tungsten alloy ball powder

Also Published As

Publication number Publication date
JP4871215B2 (en) 2012-02-08

Similar Documents

Publication Publication Date Title
JP4845807B2 (en) Ball screw assembling apparatus and ball screw assembling method using the same
JP5737472B2 (en) Roller bearing assembly apparatus and assembly method
US8584546B2 (en) Ball screw mechanism
US20080163479A1 (en) Needle Roller Bearing Manufacturing Apparatus and Needle Roller Bearing Manufacturing Method
EP1775063A3 (en) Assembly apparatus for ball screw device, parts supply device and counter device
JP5398878B2 (en) transmission
JP4871215B2 (en) Ball screw assembling apparatus and ball screw assembling method using the same
CN103392082B (en) Multi-shaft drive device
CN103174810A (en) Roller screw
JP5146993B2 (en) Ball screw assembling apparatus and ball screw assembling method using the same
JP4995139B2 (en) Ball screw assembling apparatus and ball screw assembling method using the same
US20210017968A1 (en) Axial pump assemblies
JP6702586B2 (en) Bearings and reducers
KR101823280B1 (en) Tapered roller bearing assembling device and tapered roller bearing assembling method
JP2008296324A (en) Ball screw, assembly apparatus of ball screw, method of assembling ball screw using the apparatus
CN109139816A (en) Retarder
JP2008238332A (en) Needle roller assembling method and device
CN108136553B (en) Ball screw assembly device and ball screw assembly method
KR101097845B1 (en) Lifing apparatus capable of horizontality control
KR20130104955A (en) Bearing screw transferrer with adjustable function of concentricity
JP6040892B2 (en) Manufacturing method of helical gear
US20150233453A1 (en) Cycloid drive epicycloid planet gear cam
TWI593897B (en) Cycloid drive epicycloid planet gear cam
KR101617764B1 (en) Instrument for inserting balls in ball screw and method for assembling ball screw using the same
CN206802228U (en) A kind of Miniature ball lead screw pair

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100430

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110309

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110315

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110516

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111027

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111118

R150 Certificate of patent or registration of utility model

Ref document number: 4871215

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141125

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees