JP2008106507A - Anchor bolt holding fixture for concrete form - Google Patents

Anchor bolt holding fixture for concrete form Download PDF

Info

Publication number
JP2008106507A
JP2008106507A JP2006289972A JP2006289972A JP2008106507A JP 2008106507 A JP2008106507 A JP 2008106507A JP 2006289972 A JP2006289972 A JP 2006289972A JP 2006289972 A JP2006289972 A JP 2006289972A JP 2008106507 A JP2008106507 A JP 2008106507A
Authority
JP
Japan
Prior art keywords
anchor bolt
holding plate
concrete
holding
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006289972A
Other languages
Japanese (ja)
Inventor
Yoshimori Ueda
義守 植田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2006289972A priority Critical patent/JP2008106507A/en
Publication of JP2008106507A publication Critical patent/JP2008106507A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an anchor bolt holding fixture for a concrete form, which can erect and hold a plurality of anchor bolts in the concrete form, along a longitudinal direction of the concrete form at accurate intervals. <P>SOLUTION: The anchor bolt holding fixture is formed of a holding plate 6 which is laid astride both upper edges 2a, 4a of the form 1 such that both edges thereof are laterally constricted, and has a through hole 8 bored at the center thereof, the through hole having a diameter larger than that of the anchor bolt 10; and a pair of nuts 12, 14 which are screwed onto the anchor bolt 10 inserted into the through hole 8 bored in the holding plate 6, for pinching the same from upper and lower surfaces. The nut 14 for fastening the upper surface of the holding plate 6 has a circular boss formed on a fastening surface thereof, for fitting into the through hole 8. The boss has a diameter smaller than that of an inscribed circle of the nut 14 and a height from the fastening surface, equal to or smaller than a plate thickness of the holding plate 6, and a tip corner portion of the boss is chamfered. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、コンクリート型枠用アンカーボルト保持治具の改良に関する。   The present invention relates to an improvement of an anchor bolt holding jig for concrete formwork.

従来より、コンクリート基礎を施工する際にコンクリートの打設時に使用するコンクリート型枠内に所定間隔毎にアンカーボルトを立設保持するコンクリート型枠用アンカーボルト保持治具301として、図5、図6に示すように中央部にアンカーボルト302の挿通部304Aを有し、かつ両端部が左右のコンクリート型枠303の天端に載置される保持板304と、挿通部304Aに挿通されたアンカーボルト302に螺合され、かつ、保持板304を上下方向から挟持する一対のナット305とを備えており、保持板304の両端部には、上記型枠303の左右の天端303A近傍に左右方向から係合可能な位置決め部材306を設けたものが知られている(例えば、特許文献1参照)。   Conventionally, as an anchor bolt holding jig 301 for concrete molds for standing and holding anchor bolts at predetermined intervals in a concrete mold used for placing concrete when constructing a concrete foundation, FIG. 5 and FIG. As shown in FIG. 2, the holding plate 304 having the insertion portion 304A of the anchor bolt 302 at the center and both ends being placed on the top ends of the left and right concrete molds 303, and the anchor bolt inserted into the insertion portion 304A 302 and a pair of nuts 305 that sandwich the holding plate 304 from above and below, and at both ends of the holding plate 304 in the left-right direction near the left and right top ends 303A of the mold 303 Is provided with a positioning member 306 that can be engaged (see, for example, Patent Document 1).

図5は、従来のコンクリート型枠用間隔保持治具であって、アンカーボルト保持治具の設置状態を示すコンクリート型枠の断面図、図6は従来のアンカーボルト保持治具の設置状態を示すコンクリート型枠の平面図である。   FIG. 5 is a cross-sectional view of a concrete formwork showing a conventional concrete mold interval holding jig, and shows an installation state of an anchor bolt holding jig, and FIG. 6 shows an installation state of a conventional anchor bolt holding jig. It is a top view of a concrete formwork.

図5、図6に示す保持板304は、両端部が下方に折り曲げられた長方形の鉄板により構成され、保持板304の挿通部304Aは、アンカーボルト302の直径より若干大きい直径を有する円形孔として構成され、上記保持板304の両端部には、左右の天端303Aに釘打ち可能とする小孔304Bが各2個形成されており、上記保持板304両端部の折曲げ部306Aと両端部付近の下面に溶接されたアングル材306Bによって溝が形成されている。   The holding plate 304 shown in FIGS. 5 and 6 is composed of a rectangular iron plate whose both ends are bent downward, and the insertion portion 304A of the holding plate 304 is a circular hole having a diameter slightly larger than the diameter of the anchor bolt 302. The holding plate 304 is formed with two small holes 304B that can be nailed to the left and right top ends 303A at both ends of the holding plate 304, and the bent portions 306A and both ends of the holding plate 304 at both ends are formed. A groove is formed by an angle member 306B welded to the lower surface in the vicinity.

このようにして構成されたコンクリート型枠用アンカーボルト保持治具301は、コンクリートの打設前に設置されるが、この設置作業に際してアンカーボルト302の上端から下部のナット305を螺挿してこれを保持板304の下面側から挿通部304Aに挿通し、保持板304の上面側から突出したアンカーボルト302の上端側から上部ナット305を螺挿して締め上げることにより、保持板304の上下に配置された一対のナット305で保持板304を上下方向から挟持する。   The concrete form anchor bolt holding jig 301 configured in this way is installed before placing concrete. In this installation operation, the lower nut 305 is screwed from the upper end of the anchor bolt 302 to fix it. By inserting the upper nut 305 from the upper end side of the anchor bolt 302 that protrudes from the lower surface side of the holding plate 304 into the insertion portion 304A and protrudes from the upper surface side of the holding plate 304 and tightens it, the upper and lower sides of the holding plate 304 are arranged. The holding plate 304 is clamped by the pair of nuts 305 from above and below.

続いて、アンカーボルト302が装着された保持板4両端部を型枠303左右の天端に載置して保持板304両端部の溝によって型枠303左右の天端近傍を挟持し、保持板304両端部の小孔304Bを通して型枠303の天端303Aに釘打ちすることで保持板304を型枠303に対し上下方向に仮り止めする。   Subsequently, both ends of the holding plate 4 to which the anchor bolts 302 are mounted are placed on the top and the bottom of the mold 303, and the vicinity of the top and bottom of the mold 303 is sandwiched between the grooves on the both ends of the holding plate 304. The holding plate 304 is temporarily fixed to the mold 303 in the vertical direction by nailing to the top end 303A of the mold 303 through the small holes 304B at both ends of the 304.

そこで、アンカーボルト保持治具301が設置された左右の型枠303内にコンクリートAを打設し、これを所定時間養生させることで、アンカーボルト302が植設されたコンクリート基礎が構築され、構築後は、保持板304の上方に位置するナット305をアンカーボルト302から取外し、最後に残った下部ナット305をアンカーボルト302から取外すことで基礎の施工が完成するようになっている。   Therefore, concrete A is placed in the left and right molds 303 on which the anchor bolt holding jig 301 is installed, and is cured for a predetermined time, whereby a concrete foundation in which the anchor bolts 302 are planted is constructed. After that, the nut 305 positioned above the holding plate 304 is removed from the anchor bolt 302, and the last remaining lower nut 305 is removed from the anchor bolt 302, whereby the foundation construction is completed.

特開2000−104263号公報JP 2000-104263 A

ところで、上記のようなコンクリート型枠用アンカーボルト保持治具301では、保持板304の挿通部304Aは、アンカーボルト302の直径より若干大きい直径を有する円形孔として構成されているので、アンカーボルト302を保持板304に保持した状態で上記コンクリート型枠303の長手方向に一定間隔毎に配置した際に、アンカーボルト302は、挿通部304Aの直径差により遊びが生じることから図6に示すように基準点0から一定間隔X1,X2,X3…毎に長手方向に累積誤差が生じる。   By the way, in the concrete form anchor bolt holding jig 301 as described above, the insertion portion 304A of the holding plate 304 is configured as a circular hole having a diameter slightly larger than the diameter of the anchor bolt 302. As shown in FIG. 6, the anchor bolt 302 has play due to the diameter difference of the insertion portion 304 </ b> A when it is arranged at regular intervals in the longitudinal direction of the concrete mold 303 while being held by the holding plate 304. Accumulated errors occur in the longitudinal direction at regular intervals X1, X2, X3,.

このため、複数列設したアンカーボルト302の間隔に誤差が生じると、予め工場内で製作された土台のアンカーボルト302取り付け孔の間隔がアンカーボルト302の間隔に合わないため大掛かりな補修作業が余儀なくされ、建築施工期間が大幅に遅延するだけでなく施工費用が増大する問題を有していた。   For this reason, if an error occurs in the interval between the anchor bolts 302 arranged in a plurality of rows, the interval between the mounting holes of the anchor bolts 302 that are manufactured in the factory in advance does not match the interval between the anchor bolts 302, so a large repair work is unavoidable. As a result, the construction work period is not only significantly delayed but also the construction cost is increased.

本発明は、このような問題点に着目してなされたもので、コンクリート型枠内に複数のアンカーボルトを長手方向に沿って正確な間隔で立設保持することができるコンクリート型枠用アンカーボルト保持治具を提供することを目的とする。   The present invention has been made paying attention to such problems, and a concrete mold anchor bolt capable of standing and holding a plurality of anchor bolts in a concrete mold frame at a precise interval in the longitudinal direction. An object is to provide a holding jig.

上記目的を解決するために、本発明の請求項1に記載のコンクリート型枠用アンカーボルト保持治具Jは、コンクリートCが打設される型枠1内に所定間隔毎に複数のアンカーボルト10を立設保持するコンクリート型枠用アンカーボルト保持治具Jに於いて、上記型枠1の上端部2a,4a間に両端が幅方向規制された状態で跨設保持され中央部に上記アンカーボルト10の直径より大径の挿通孔8を穿設した保持板6と、該保持板6の挿通孔8に挿通したアンカーボルト10に螺挿し上記保持板6の上下面を挟持する一対のナット12,14とから構成されて成り、少なくとも上記保持板6の上面を締め付けるナット14の締め付け面には、上記挿通孔8に嵌合する円形のボス16が突設され、該ボス16は、その直径が上記ナット14の内接円の直径より小径で且つ上記締め付け面からの高さが上記保持板6の板厚以内に形成され、先端角部には面取り18が施されていることを特徴とするコンクリート型枠用アンカーボルト保持治具である。
上記のコンクリート型枠用アンカーボルト保持治具Jによれば、型枠1内に複数のアンカーボルト10を立設保持する際に、予めナット12を螺挿したアンカーボルト10を保持板6の下方から大径の挿通孔8を挿通して上記保持板6の両端を型枠1の上端2a,4aに跨設保持して幅方向を規制し、上記保持板6の上部に突出したアンカーボルト10の上端からナット14を螺挿して上記ナット14の円形状ボス16を上記保持板6の大径挿通孔8に嵌合し、この状態で上記保持板6の上下両面を上記一対のナット12,14で挟持することでアンカーボルト10が型枠1内に立設保持される。
In order to solve the above-mentioned object, a concrete mold anchor bolt holding jig J according to claim 1 of the present invention includes a plurality of anchor bolts 10 at predetermined intervals in a mold 1 in which concrete C is placed. In an anchor bolt holding jig J for a concrete formwork that stands upright and holds, the anchor bolt is stretched and held between the upper end portions 2a and 4a of the formwork 1 in a state where both ends thereof are regulated in the width direction. And a pair of nuts 12 that are screwed into anchor bolts 10 inserted through the insertion holes 8 of the holding plate 6 and sandwich the upper and lower surfaces of the holding plate 6. , 14, and at least a nut 14 for tightening the upper surface of the holding plate 6 is provided with a circular boss 16 that fits into the insertion hole 8, and the boss 16 has a diameter thereof. Is the nut 14 For concrete molds characterized in that the diameter is smaller than the diameter of the inscribed circle, the height from the clamping surface is formed within the thickness of the holding plate 6, and the chamfer 18 is applied to the corner of the tip. An anchor bolt holding jig.
According to the concrete mold anchor bolt holding jig J described above, when the plurality of anchor bolts 10 are erected and held in the mold 1, the anchor bolts 10 into which the nuts 12 are screwed in advance are placed below the holding plate 6. An anchor bolt 10 that protrudes from the upper part of the holding plate 6 by inserting the large-diameter insertion hole 8 therethrough and holding both ends of the holding plate 6 across the upper ends 2 a and 4 a of the mold 1 to regulate the width direction. The nut 14 is screwed from the upper end of the nut 14 so that the circular boss 16 of the nut 14 is fitted into the large-diameter insertion hole 8 of the holding plate 6, and in this state, the upper and lower surfaces of the holding plate 6 are placed on the pair of nuts 12, The anchor bolt 10 is erected and held in the mold 1 by being sandwiched by 14.

本発明は以下の効果を奏する。   The present invention has the following effects.

請求項1に記載の発明によれば、保持板の下面から大径の挿通孔を挿通して上部に突出したアンカーボルトに螺挿したナットのボスを上記大径挿通孔に嵌合した状態で保持板の両端を型枠上端に跨設保持し、上記保持板の上下両面を上記一対のナットで挟持することで複数のアンカーボルトをコンクリート型枠内に長手方向に沿って正確な間隔で立設保持することができる。   According to the first aspect of the present invention, in a state in which the boss of the nut screwed into the anchor bolt protruding through the large-diameter insertion hole from the lower surface of the holding plate is fitted into the large-diameter insertion hole. By holding both ends of the holding plate straddling the upper end of the formwork and sandwiching the upper and lower surfaces of the holding plate with the pair of nuts, a plurality of anchor bolts are set up in the concrete formwork at an accurate interval along the longitudinal direction. Can be held.

本発明の実施例を以下に説明する。   Examples of the present invention will be described below.

図1〜図4には、本発明の実施例が示されている。図1は本発明に係るコンクリート型枠用アンカーボルト保持治具を使用してコンクリート型枠内にアンカーボルトを立設保持した状態を示す斜視図、図2は本発明に係るコンクリート型枠用アンカーボルト保持治具を使用してアンカーボルトをコンクリート型枠内に立設保持した状態を示す断面図、図3は本発明に係るコンクリート型枠用アンカーボルト保持治具の要部拡大断面図、図4は本発明に係るコンクリート型枠用アンカーボルト保持治具の一部を構成するナットの斜視図である。   1 to 4 show an embodiment of the present invention. FIG. 1 is a perspective view showing a state in which an anchor bolt is erected and held in a concrete form using the anchor bolt holding jig for concrete form according to the present invention, and FIG. 2 is an anchor for concrete form according to the present invention. FIG. 3 is a sectional view showing a state in which an anchor bolt is erected and held in a concrete mold using a bolt holding jig. FIG. 3 is an enlarged sectional view of a main part of an anchor bolt holding jig for a concrete mold according to the present invention. 4 is a perspective view of a nut constituting a part of the anchor bolt holding jig for concrete formwork according to the present invention.

図1において、1はコンクリート型枠であって、このコンクリート型枠(以下型枠1と称する)は、後述する間隔保持具を使用してベースコンクリートBC上に立設状態に保持されている。   In FIG. 1, 1 is a concrete formwork, and this concrete formwork (hereinafter referred to as formwork 1) is held in a standing state on a base concrete BC using a spacing holder described later.

上記型枠1は、折り曲げ成形された鋼鈑を使用した溶接構造物で構成され、所定間隔で対向配置される内枠2と外枠4とから構成されており、これら内枠2と外枠4は、間隔保持具5を使用してベースコンクリートBC上に立設状態で個別に保持されるようになっており、接続部Tを介して所定長さに接続されるようになっている。   The mold 1 is composed of a welded structure using a bent steel plate, and is composed of an inner frame 2 and an outer frame 4 arranged to face each other at a predetermined interval. The inner frame 2 and the outer frame 4 is individually held in a standing state on the base concrete BC using the interval holder 5, and is connected to a predetermined length via the connecting portion T.

図2において内枠2と外枠4は、薄板鋼鈑で短冊状に形成された間隔保持具5を介して一定間隔離間した状態で立設保持され、上記内枠2と外枠4の内側には長手方向に沿ってアンカーボルト10が後述する本発明に係るコンクリート型枠用アンカーボルト保持治具(以下アンカーボルト保持治具Jと称する)を使用して所定間隔毎に立設保持されるようになっている。   In FIG. 2, the inner frame 2 and the outer frame 4 are erected and held in a state of being spaced apart from each other by a distance holder 5 formed in a strip shape with a thin steel plate, and inside the inner frame 2 and the outer frame 4. The anchor bolt 10 is erected and held at predetermined intervals along a longitudinal direction using a concrete form anchor bolt holding jig (hereinafter referred to as an anchor bolt holding jig J) according to the present invention which will be described later. It is like that.

このアンカーボルト保持治具Jは、上記型枠1の上端部である天端面2a,4a間に両端が幅方向規制された状態で跨設保持され、中央部に上記アンカーボルト10の直径より大径の挿通孔8を穿設した保持板6と、この保持板6の挿通孔8に挿通したアンカーボルト10に螺挿し上記保持板6の上下面を挟持する一対のナット12,14とから構成されている。   The anchor bolt holding jig J is stretched and held between the top end surfaces 2a and 4a, which are the upper end portions of the mold 1, in a state where both ends are regulated in the width direction, and is larger than the diameter of the anchor bolt 10 in the center portion. A holding plate 6 having a diameter insertion hole 8 and a pair of nuts 12 and 14 which are screwed into anchor bolts 10 inserted into the insertion holes 8 of the holding plate 6 and sandwich the upper and lower surfaces of the holding plate 6. Has been.

上記内枠2と外枠4の天端面2a,4aには、薄板状の鋼鈑をコ字状に折曲した保持板6が跨設保持されて図示しない保持具(クランパー等)により仮り止めされるようになっている。この保持板6は、帯板状に形成されて折曲された両端に上記内枠2と外枠4の天端面2a,4a両外側端に係止する一対の係止部6a,6bが形成され、中央部には上記アンカーボルト10の直径より大径の挿通孔8が穿設されている。   On the top end surfaces 2a and 4a of the inner frame 2 and the outer frame 4, a holding plate 6 formed by bending a thin steel plate in a U-shape is stretched and held, and temporarily fixed by a holding tool (clamper or the like) not shown. It has come to be. The holding plate 6 has a pair of locking portions 6a and 6b that are locked to both outer ends of the top end surfaces 2a and 4a of the inner frame 2 and the outer frame 4 at both ends formed in a band plate shape and bent. An insertion hole 8 having a diameter larger than the diameter of the anchor bolt 10 is formed in the center portion.

上記内枠2と外枠4の天端面2a,4a上に跨設保持された保持板6の大径挿通孔8を挿通したアンカーボルト10は、これを螺挿した一対のナット12,14を介して保持板6に立設保持されている。   The anchor bolt 10 inserted through the large-diameter insertion hole 8 of the holding plate 6 straddled and held on the top end surfaces 2a and 4a of the inner frame 2 and the outer frame 4 has a pair of nuts 12 and 14 into which the bolts are screwed. Through the holding plate 6.

詳しくは、図3、図4に示すように上記保持板6の上面を締め付けるナット14の締め付け面には、上記挿通孔8に嵌合する円形のボス16が突設しており、上記ボス16は、その直径が当該ナット14の内接円の直径より小径で且つ上記ナット14の締め付け面からの高さが保持板6の板厚以内の寸法で形成されており、上記ボス16の先端角部には面取り18が施されている。   Specifically, as shown in FIGS. 3 and 4, a circular boss 16 that fits into the insertion hole 8 protrudes from the tightening surface of the nut 14 that tightens the upper surface of the holding plate 6. The diameter of the boss 16 is smaller than the diameter of the inscribed circle of the nut 14, and the height from the tightening surface of the nut 14 is within the thickness of the holding plate 6. The part is chamfered 18.

そこで、アンカーボルト10を上記型枠1内に立設する際は、予め下方に位置するナット12をアンカーボルト10の上端から螺挿した状態で上記保持板6の下方から大径の挿通孔8を挿通して上方に突出させ、当該保持板6の両端を上記内枠2と外枠4の天端面2a,4a間に跨設保持して幅方向の動きが規制されるようになっている。   Therefore, when the anchor bolt 10 is erected in the mold 1, a large-diameter insertion hole 8 is formed from below the holding plate 6 in a state where a nut 12 positioned in advance is screwed from the upper end of the anchor bolt 10. Is inserted and protruded upward, and both ends of the holding plate 6 are held between the top end surfaces 2a and 4a of the inner frame 2 and the outer frame 4 to restrict movement in the width direction. .

次に、上記保持板6の上部に突出したアンカーボルト10の上端から次のナット14を螺挿して、上記ナット14の円形状ボス16を上記保持板6の大径挿通孔8に嵌合し、このナット14と最初に螺挿したナット12によって上記保持板6の上下両面を挟持することでアンカーボルト10が型枠1の内部に立設保持される。   Next, the next nut 14 is screwed from the upper end of the anchor bolt 10 protruding above the holding plate 6, and the circular boss 16 of the nut 14 is fitted into the large-diameter insertion hole 8 of the holding plate 6. The anchor bolt 10 is erected and held inside the mold 1 by sandwiching the upper and lower surfaces of the holding plate 6 with the nut 14 and the nut 12 screwed first.

このようにすることで、複数のアンカーボルト10を基準点から上記型枠1内に墨だしされた一定の間隔毎に正確に立設保持することができる。また、アンカーボルト10のボス16は、外径が上記保持板6の大径挿通孔8の内径と略同一に形成されているが、ボス16の先端角部には面取り18が施されているので、上記大径挿通孔8内に円滑に挿嵌することができる。   In this way, the plurality of anchor bolts 10 can be accurately erected and held at regular intervals drawn in the mold 1 from the reference point. The boss 16 of the anchor bolt 10 has an outer diameter that is substantially the same as the inner diameter of the large-diameter insertion hole 8 of the holding plate 6, but a chamfer 18 is applied to the tip corner of the boss 16. Therefore, it can be smoothly inserted into the large-diameter insertion hole 8.

次に、アンカーボルト10が型枠1内に一定の間隔毎に立設保持されると、上記型枠1内にコンクリートCが打設されて所定時間養生後に複数のアンカーボルト2が一定間隔毎に正確に立設保持されたコンクリート基礎が構築される。   Next, when the anchor bolts 10 are erected and held in the mold frame 1 at regular intervals, the concrete C is placed in the mold frame 1 and after curing for a predetermined time, the plurality of anchor bolts 2 are spaced at regular intervals. A concrete foundation that is erected and held accurately is constructed.

このように、コンクリート型枠用アンカーボルト保持治具を使用することで、複数のアンカーボルト2を型枠1内に長手方向に沿って正確な間隔で立設保持することができるので、建築施工期間を短縮することができ、施工費用を低減することができる。   Thus, by using the anchor bolt holding jig for concrete formwork, a plurality of anchor bolts 2 can be erected and held in the formwork 1 along the longitudinal direction at an accurate interval. The period can be shortened and the construction cost can be reduced.

コンクリート基礎が構築されたのちは、アンカーボルト2から保持板6上のナット14を取外したのち、全ての保持板6がアンカーボルト2から取外される。アンカーボルト2から上記保持板6を取外す際は、挿通孔8がアンカーボルト10の直径より十分に大径に形成されているので保持板6をアンカーボルト10から容易に抜き出すことができ、最後に残ったナット12をアンカーボルト10から取外すことで複数のアンカーボルト2を正確な間隔で立設保持したコンクリート基礎の施工が完成する。   After the concrete foundation is constructed, the nut 14 on the holding plate 6 is removed from the anchor bolt 2, and then all the holding plates 6 are removed from the anchor bolt 2. When removing the holding plate 6 from the anchor bolt 2, the insertion hole 8 is formed with a diameter sufficiently larger than the diameter of the anchor bolt 10, so that the holding plate 6 can be easily extracted from the anchor bolt 10. The removal of the remaining nut 12 from the anchor bolt 10 completes the construction of the concrete foundation in which the plurality of anchor bolts 2 are erected and held at an accurate interval.

本発明に係るコンクリート型枠用アンカーボルト保持治具を使用してコンクリート型枠内にアンカーボルトを立設保持した状態を示す斜視図である。It is a perspective view which shows the state which used the anchor bolt holding jig for concrete molds which concerns on this invention, and stood and hold | maintained the anchor bolt in the concrete mold. 本発明に係るコンクリート型枠用アンカーボルト保持治具を使用してアンカーボルトをコンクリート型枠内に立設保持した状態を示す断面図である。It is sectional drawing which shows the state which used the anchor bolt holding jig for concrete forms which concerns on this invention, and stood and hold | maintained the anchor bolt in the concrete formwork. 本発明に係るコンクリート型枠用アンカーボルト保持治具の要部拡大断面図である。It is a principal part expanded sectional view of the anchor bolt holding jig for concrete molds concerning this invention. 本発明に係るコンクリート型枠用アンカーボルト保持治具の一部を構成するナットの斜視図である。It is a perspective view of the nut which constitutes a part of anchor bolt holding jig for concrete formwork concerning the present invention. 従来のコンクリート型枠用間隔保持治具であって、アンカーボルト保持治具の設置状態を示すコンクリート型枠の断面図である。FIG. 10 is a cross-sectional view of a concrete formwork, showing a conventional concrete formwork spacing holding jig and showing an installation state of an anchor bolt holding jig. 従来のアンカーボルト保持治具の設置状態を示すコンクリート型枠の平面図である。It is a top view of the concrete formwork which shows the installation state of the conventional anchor bolt holding jig.

符号の説明Explanation of symbols

1 コンクリート型枠(型枠)
2 内枠
2a,4a 天端面
4 外枠
6 保持板
6a,6b 係止部
8 挿通孔
10 アンカーボルト
12,14 ナット
16 ボス
18 面取り
BC ベースコンクリート
C コンクリート
J アンカーボルト保持治具
1 Concrete formwork (formwork)
2 Inner frame 2a, 4a Top end surface 4 Outer frame 6 Holding plate 6a, 6b Locking portion 8 Insertion hole 10 Anchor bolt 12, 14 Nut 16 Boss 18 Chamfered BC Base concrete C Concrete J Anchor bolt holding jig

Claims (1)

コンクリートCが打設される型枠1内に所定間隔毎に複数のアンカーボルト10を立設保持するコンクリート型枠用アンカーボルト保持治具Jに於いて、
上記型枠1の上端部2a,4a間に両端が幅方向規制された状態で跨設保持され中央部に上記アンカーボルト10の直径より大径の挿通孔8を穿設した保持板6と、該保持板6の挿通孔8に挿通したアンカーボルト10に螺挿し上記保持板6の上下面を挟持する一対のナット12,14とから構成されて成り、
少なくとも上記保持板6の上面を締め付けるナット14の締め付け面には、上記挿通孔8に嵌合する円形のボス16が突設され、該ボス16は、その直径が上記ナット14の内接円の直径より小径で且つ上記締め付け面からの高さが上記保持板6の板厚以内に形成され、先端角部には面取り18が施されていることを特徴とするコンクリート型枠用アンカーボルト保持治具。
In a concrete form anchor bolt holding jig J for holding a plurality of anchor bolts 10 upright at predetermined intervals in a form 1 in which concrete C is placed,
A holding plate 6 straddlingly held in a state where both ends are regulated in the width direction between the upper end portions 2a, 4a of the mold 1 and having a through hole 8 having a diameter larger than the diameter of the anchor bolt 10 in the center portion; It is composed of a pair of nuts 12 and 14 which are screwed into anchor bolts 10 inserted into the insertion holes 8 of the holding plate 6 and sandwich the upper and lower surfaces of the holding plate 6.
A circular boss 16 that fits into the insertion hole 8 protrudes from at least a fastening surface of the nut 14 that fastens the upper surface of the holding plate 6, and the diameter of the boss 16 is an inscribed circle of the nut 14. The anchor bolt holding jig for concrete formwork, characterized in that the diameter is smaller than the diameter and the height from the tightening surface is formed within the thickness of the holding plate 6 and a chamfer 18 is applied to the corner of the tip. Ingredients.
JP2006289972A 2006-10-25 2006-10-25 Anchor bolt holding fixture for concrete form Pending JP2008106507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006289972A JP2008106507A (en) 2006-10-25 2006-10-25 Anchor bolt holding fixture for concrete form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006289972A JP2008106507A (en) 2006-10-25 2006-10-25 Anchor bolt holding fixture for concrete form

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2009005505U Continuation JP3154621U (en) 2009-08-04 2009-08-04 Anchor bolt holding jig for concrete formwork

Publications (1)

Publication Number Publication Date
JP2008106507A true JP2008106507A (en) 2008-05-08

Family

ID=39440104

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006289972A Pending JP2008106507A (en) 2006-10-25 2006-10-25 Anchor bolt holding fixture for concrete form

Country Status (1)

Country Link
JP (1) JP2008106507A (en)

Similar Documents

Publication Publication Date Title
KR100763886B1 (en) An Apparatus for Fixing Curtain Wall
JP6388180B1 (en) Metal anchor ruler
JP5105551B2 (en) Column rebar assembling jig, column rebar assembling jig set, and method for manufacturing reinforced concrete column
JP3154621U (en) Anchor bolt holding jig for concrete formwork
JP2008106507A (en) Anchor bolt holding fixture for concrete form
JP6161778B1 (en) Anchor template
JP3941831B1 (en) Insulation foundation
JP4195922B2 (en) Anchor bolt mounting structure
JP2009299419A (en) Construction method for preventing displacement of form, and installment tool
JP6031149B2 (en) Building unit positioning member, building unit positioning structure, and building unit installation method
JP2005315021A (en) Anchor bolt supporting device for foundation
JP7220578B2 (en) anchor bolt retainer
JPH08189189A (en) Jig for correcting upper part of form
JP2009167689A (en) Anchor bolt setting jig and anchor bolt setting method
JP4494839B2 (en) Rebar or anchor bolt fixing template
JP2013083108A (en) Jig for mounting segment joint fitting to mold
JPH0679837U (en) Anchor bolt fixing device for construction
JP5147068B2 (en) Base plate construction method for attaching a seismic isolation device, and reinforcing bars for base plate installation used in the construction method
JP5784892B2 (en) Building unit positioning member and building unit installation method using the same
JP2005330797A (en) Anchor bolt holder
JP2002180474A (en) Sheath pipe holding jig
JP2005036646A (en) Foundation structure for steel frame column
JP3048981B2 (en) Width stopper for foundation concrete formwork
JP2017115455A (en) Form supporter
JPS6329786Y2 (en)

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090106

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090217

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090227

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090324

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090622