JP2008101419A - Connection between steel pipe column and flat slab - Google Patents

Connection between steel pipe column and flat slab Download PDF

Info

Publication number
JP2008101419A
JP2008101419A JP2006285869A JP2006285869A JP2008101419A JP 2008101419 A JP2008101419 A JP 2008101419A JP 2006285869 A JP2006285869 A JP 2006285869A JP 2006285869 A JP2006285869 A JP 2006285869A JP 2008101419 A JP2008101419 A JP 2008101419A
Authority
JP
Japan
Prior art keywords
steel pipe
pipe column
slab
flat slab
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006285869A
Other languages
Japanese (ja)
Other versions
JP5134228B2 (en
Inventor
Toshiyuki Fukumoto
敏之 福元
Shunpei Tanaka
俊平 田中
Naoki Tanaka
直樹 田中
Atsushi Kubota
淳 久保田
Yoshikazu Sawamoto
佳和 澤本
Kojiro Takei
幸次郎 武居
Yukimasa Ogiwara
行正 荻原
Hiroshi Fujimura
博 藤村
Shigeru Yoshigai
滋 吉貝
Masaya Taki
正哉 瀧
Kiyoshi Tsukamoto
清 塚本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2006285869A priority Critical patent/JP5134228B2/en
Publication of JP2008101419A publication Critical patent/JP2008101419A/en
Application granted granted Critical
Publication of JP5134228B2 publication Critical patent/JP5134228B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a connection between a steel pipe column and a flat slab, which is constructed by penetrating the steel pipe column into the flat slab having an almost even thickness over the entire area, wherein the amount of steel products necessary for reinforcing an area around the steel pipe column can be reduced, to thereby enhance pipe arrangement efficiency around the steel pipe column. <P>SOLUTION: According to the structure of the connection, shear reinforcements 2 are projected from a peripheral surface of the steel pipe column 1 in parallel with slab reinforcements 4 in the range of the thickness of the flat slab 3 to be connected to the steel pipe column 1, and then anchored into the flat slab 3. If necessary, strengthening reinforcements 5 each having an upper edge reinforcement 51 and a lower edge reinforcement 52 are arranged in the flat slab 3 around the steel pipe column 1. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は全面に亘ってほぼ一様な厚さのフラットスラブを鋼管柱が貫通する形式の鋼管柱とフラットスラブの接合部に関するものである。   The present invention relates to a joint between a steel pipe column and a flat slab in which the steel pipe column penetrates a flat slab having a substantially uniform thickness over the entire surface.

フラットスラブ構造は梁が不在であることで、階高が抑えられる利点を有する半面、床版スラブのパンチングシア破壊に対する安全性を確保するために、原則的には鋼管柱周囲の、フラットスラブの下面側に支板、またはキャピタルが形成されることが多い。しかしながら、支板等の形成は階高低減の効果が失われ、施工が煩雑になる不利益を伴うため、階高低減と施工性の面からは支板等を形成しないことが望ましい。   The flat slab structure has the advantage that the floor height is suppressed by the absence of beams, but in order to ensure the safety against punching shear failure of the floor slab, in principle, the flat slab structure around the steel pipe column A support plate or capital is often formed on the lower surface side. However, the formation of the support plate and the like loses the effect of reducing the floor height and is disadvantageous in that the construction becomes complicated. Therefore, it is desirable not to form the support plate or the like from the viewpoint of floor height reduction and workability.

また鋼管柱がフラットスラブを挟んで上下に分断される形式にすること(特許文献1参照)は接合部における水平せん断力に対する処理が難しくなり、鋼管柱の内部と外部に跨る補強は施工が著しく困難になる上、鋼管柱の断面欠損を考慮しなければならないため、いずれにも問題がある。   In addition, it is difficult to process the horizontal shearing force at the joints when the steel pipe column is divided into upper and lower parts with a flat slab sandwiched between them. In addition to difficulties, cross-sectional defects in steel pipe columns must be taken into account, both of which have problems.

以上のことから、総合的には接合部は全面に亘ってほぼ一様な厚さのフラットスラブを鋼管柱が貫通する形式で、且つ鋼管柱周りへの補強により完成する形式であることが合理的である。   From the above, it is reasonable that the joint is a type in which the steel pipe column penetrates the flat slab of almost uniform thickness over the entire surface and is completed by reinforcement around the steel pipe column. Is.

これらの条件を満たしつつ、接合部においてフラットスラブからの曲げモーメントとせん断力が鋼管柱に伝達されるようにする上では、通常は鋼管柱の周りに、フランジを有するブラケットを突設することが行われる(特許文献2、3参照)。ブラケットの内、水平な板(フランジ)はフラットスラブの上下面、もしくはその近傍に揃えられ、フラットスラブからの曲げモーメントとせん断力を鋼管柱に伝達する役目を持つ。   In order to transmit the bending moment and shearing force from the flat slab to the steel pipe column at the joint while satisfying these conditions, a bracket having a flange usually protrudes around the steel pipe column. (See Patent Documents 2 and 3). Among the brackets, horizontal plates (flanges) are aligned on the upper and lower surfaces of the flat slab or in the vicinity thereof, and have the role of transmitting the bending moment and shear force from the flat slab to the steel pipe column.

ところが、鋼管柱の周りにブラケットを突設することは多量の鋼材を使用することになるため、鋼管柱の製作コストが上昇する。またブラケットがフラットスラブ側へ張り出すことで、スラブ筋との取合いが制限されるため、ブラケットを貫通させてスラブ筋を配筋しなければならない等、現場でのスラブ筋の配筋作業が複雑になり、施工性が低下する可能性が高い。   However, projecting the bracket around the steel pipe column requires a large amount of steel material, which increases the manufacturing cost of the steel pipe column. In addition, the extension of the bracket to the flat slab side limits the connection with the slab muscle, so the slab reinforcement in the field is complicated, for example, the slab reinforcement must be laid through the bracket. Therefore, the workability is likely to deteriorate.

これに対し、鋼管柱の外周面に上下に並列するフランジ(鍔)を突設し、各フランジから放射状に鉄筋(連結筋等)を突設することによりスラブ筋との干渉を少なくし、スラブ筋の配筋作業への阻害を軽減する方法がある(特許文献4参照)。   On the other hand, flanges (鍔) that are vertically aligned on the outer peripheral surface of the steel pipe column are projected, and reinforcing bars (connecting bars, etc.) are projected radially from each flange to reduce interference with the slab bars. There is a method for reducing the inhibition of muscle placement work (see Patent Document 4).

特開2004−197389号公報(図1)JP 2004-197389 A (FIG. 1) 特開2000−160685号公報(請求項1、段落0021〜0022、図1、図2)JP 2000-160685 A (Claim 1, paragraphs 0021 to 0022, FIGS. 1 and 2) 特開2003−90097号公報(請求項1、段落0008〜0009、図1〜図5)JP 2003-90097 (Claim 1, paragraphs 0008 to 0009, FIGS. 1 to 5) 特開2002−70164号公報(請求項1、段落0009〜0013、図1〜図8)JP 2002-70164 A (Claim 1, paragraphs 0009 to 0013, FIGS. 1 to 8)

特許文献4において、鋼管柱の周囲に突設される連結筋等の鉄筋はコンクリート中に埋設されることで、フラットスラブとの間で曲げモーメントとせん断力を伝達する役目を持つ。しかしながら、鉄筋は鋼管柱から放射状に突出することから、スラブ筋からの引張力が全鉄筋の軸方向引張力として伝達されないため、鉄筋を介したフラットスラブと鋼管柱との間の応力伝達が十分に行われない可能性がある。このため、スラブ筋との間で引張力が伝達されるように、スラブ筋を連結筋等に係合させて配筋するような工夫が必要となる(図1、図5)。   In Patent Document 4, reinforcing bars such as connecting bars projecting around a steel pipe column are buried in concrete, thereby transmitting a bending moment and a shearing force with a flat slab. However, since the reinforcing bars protrude radially from the steel pipe column, the tensile force from the slab bars is not transmitted as the axial tensile force of all the reinforcing bars, so the stress transmission between the flat slab and the steel pipe column through the reinforcing bars is sufficient. May not be done. For this reason, it is necessary to devise arrangement of the slab muscles by engaging the connecting bars and the like so that a tensile force is transmitted between them (FIGS. 1 and 5).

また鉄筋による応力伝達を円滑にする目的で、鋼管柱から突出する鉄筋の量を多くすれば、鉄筋が鋼管柱寄りで混在するため、コンクリートの充填性を阻害し、コンクリート中に空隙を形成し易くなる。   In addition, if the amount of reinforcing bars protruding from the steel pipe column is increased for the purpose of smooth stress transmission by the reinforcing bars, the reinforcing bars will be mixed near the steel pipe columns, thereby inhibiting the filling of the concrete and forming voids in the concrete. It becomes easy.

本発明は上記背景より、使用鋼材量が少なく、鋼管柱周りにおける配筋作業性のよい鋼管柱とフラットスラブの接合部を提案するものである。   In view of the above background, the present invention proposes a joint between a steel pipe column and a flat slab that uses a small amount of steel material and has good barbing workability around the steel pipe column.

請求項1に記載の鋼管柱とフラットスラブの接合部は、鋼管柱に接合されるフラットスラブの厚さの範囲において、前記鋼管柱の外周面にせん断補強材がスラブ筋と平行に突設され、前記フラットスラブ中に定着されていることを構成要件とする。請求項1は全面に亘って実質的に一様な厚さを有し、支板やキャピタルのないフラットスラブを対象とする。   According to a first aspect of the present invention, in the joining portion between the steel pipe column and the flat slab, a shear reinforcing material projects in parallel with the slab bar on the outer peripheral surface of the steel pipe column in the range of the thickness of the flat slab joined to the steel pipe column. It is a constituent requirement that it is fixed in the flat slab. Claim 1 is directed to a flat slab having a substantially uniform thickness over the entire surface and having no support plate or capital.

せん断補強材は鋼管柱外周面の一箇所当たり、1本、もしくは複数本突設され、複数本の場合には高さ方向に間隔を置いて突設される。1本の場合にも、せん断補強材自体が例えばU字状に折り曲げられた形をする場合には、平行な部分が実質的に高さ方向に間隔を置いて突設される形になる。   One or a plurality of shear reinforcements are provided so as to protrude from the outer peripheral surface of the steel pipe column. In the case of a plurality of the shear reinforcements, they are provided at intervals in the height direction. Even in the case of one, when the shear reinforcing material itself is bent into, for example, a U shape, the parallel portions protrude substantially at intervals in the height direction.

せん断補強材はフラットスラブからのせん断力を鋼管柱に伝達する働きをすると共に、鋼管柱の外周面にスラブ筋と平行に突設されることで、スラブ筋からの引張力をコンクリートとの間の付着力を介し、せん断補強材が軸方向引張力として負担することができる。このため、各方向のスラブ筋からの引張力を鋼管柱に十分に伝達することが可能になり、コンクリートへのひび割れの発生を抑制することが可能になる。鋼管柱が角形鋼管の場合、各面毎に、その面に直交するスラブ筋と平行にせん断補強材が突設される。   The shear reinforcement acts to transmit the shearing force from the flat slab to the steel pipe column, and is provided on the outer peripheral surface of the steel pipe column in parallel with the slab bar, so that the tensile force from the slab bar is between the concrete and the concrete. Through the adhesive force, the shear reinforcement can bear as an axial tensile force. For this reason, it becomes possible to fully transmit the tensile force from the slab reinforcement of each direction to a steel pipe pillar, and it becomes possible to suppress generation | occurrence | production of the crack to concrete. When the steel pipe column is a square steel pipe, a shear reinforcement member is provided so as to protrude in parallel with a slab bar perpendicular to the surface for each surface.

せん断補強材がスラブ筋と平行であることで、水平方向に隣接するせん断補強材間の間隔を一定にすることができる。この結果、放射状に配置される場合のように鋼管柱寄りでせん断補強材が密集することがないため、コンクリートの充填性を阻害することがない。併せてスラブ筋との干渉を生じないようにせん断補強材を配置することができるため、フラットスラブのコンクリートを密実に充填することが可能である。   Since the shear reinforcement is parallel to the slab reinforcement, the interval between the shear reinforcements adjacent in the horizontal direction can be made constant. As a result, since the shear reinforcement material is not concentrated near the steel pipe column as in the case of radial arrangement, the filling property of the concrete is not hindered. In addition, since the shear reinforcement material can be arranged so as not to cause interference with the slab reinforcement, it is possible to fill the concrete of the flat slab densely.

加えて鋼管柱に対する補強はせん断補強材を突設することのみで済むことから、ブラケット等を突設する場合より使用鋼材量を低減することができるため、鋼管柱の製作コストが低減される。せん断補強材付き鋼管柱を製作する際には、鋼管柱の表面に対し、せん断補強材を個別に溶接するだけでよいため、複数種類の鋼材を溶接する場合や、鋼管柱を貫通させて鋼材を一体化させる場合のような煩雑な製作工程を経ることはない。   In addition, since the reinforcement for the steel pipe column only needs to be provided with a shear reinforcement, the amount of steel used can be reduced compared to the case where a bracket or the like is provided, so that the manufacturing cost of the steel pipe column is reduced. When manufacturing a steel pipe column with shear reinforcement, it is only necessary to weld the shear reinforcement individually to the surface of the steel pipe column, so when welding multiple types of steel materials or by penetrating the steel pipe columns There is no complicated manufacturing process as in the case of integrating them.

せん断補強材にはスタッドボルト、鉄筋、形鋼等が使用され、その形態は問われない。せん断補強材の鋼管柱への突設のみでは鋼管柱周りにおける補強が十分でない場合には、請求項2に記載のように、鋼管柱の周囲のフラットスラブ中に、上端筋と下端筋を有する補強鉄筋が配筋される。補強鉄筋はフラットスラブの上端主筋と下端主筋との間に配筋される。   A stud bolt, a reinforcing bar, a shape steel, etc. are used for a shear reinforcement material, The form is not ask | required. When the reinforcement around the steel pipe column is not sufficient only by projecting the shear reinforcement material to the steel pipe column, the flat slab around the steel pipe column has an upper end bar and a lower end bar as described in claim 2. Reinforcing bars are placed. The reinforcing steel bars are arranged between the upper and lower main bars of the flat slab.

水平せん断力等によるフラットスラブにおけるコンクリートのひび割れは平面上、4本の鋼管柱で区画された四辺形の対角線方向、あるいは隣接する鋼管柱の中心を結ぶ直線に対して45度、傾斜した方向に生ずる傾向がある。このことから、補強鉄筋はこの対角線方向、もしくは45度の方向のひび割れを発生させる引張力に抵抗するように配置されることが適切であり、補強鉄筋はこの引張力に抵抗することによりひび割れの発生を抑制する働きをする。   Cracks in concrete in a flat slab due to horizontal shearing force, etc. are on the plane, in a diagonal direction of a quadrilateral defined by four steel pipe columns, or in a direction inclined by 45 degrees with respect to a straight line connecting the centers of adjacent steel pipe columns. There is a tendency to occur. For this reason, it is appropriate that the reinforcing reinforcing bars are arranged so as to resist the tensile force that generates the cracks in the diagonal direction or 45 degrees, and the reinforcing reinforcing bars are resistant to cracking by resisting this tensile force. It works to suppress the occurrence.

せん断補強材が鉄筋である場合のように、フラットスラブ中に定着されるのに十分な長さを持ち、複数本集合してフラットスラブにひび割れを発生させる引張力に抵抗できるだけの領域を網羅する場合には、必ずしも補強鉄筋が付加される必要はない。   Covers an area that is long enough to be anchored in the flat slab and that can resist the tensile forces that cause the flat slab to crack together, as in the case where the shear reinforcement is a reinforcing bar. In some cases, it is not always necessary to add reinforcing bars.

せん断補強材に鉄筋が使用される場合、せん断補強材はスラブ筋との間で付着力等により引張力の伝達が十分に行われるように、スラブ筋に接続されることが適切である。例えばせん断補強材がスラブ筋の内、上端主筋と下端主筋に沿って配置される部分を有する場合には、請求項3に記載のようにせん断補強材がフラットスラブ中の上端主筋と下端主筋に重なることで、付着力によるスラブ筋とせん断補強材との間での引張力の伝達効果が上がるため、スラブ筋からの引張力の伝達が確実に行われ易くなる。   When a reinforcing bar is used as the shear reinforcement, it is appropriate that the shear reinforcement is connected to the slab bar so that the tensile force can be sufficiently transmitted to the slab bar by an adhesive force or the like. For example, in the case where the shear reinforcement material has a portion arranged along the upper and lower main bars of the slab reinforcement, the shear reinforcement material is applied to the upper and lower main reinforcements in the flat slab as described in claim 3. By overlapping, the transmission effect of the tensile force between the slab reinforcement and the shear reinforcement due to the adhesive force is increased, so that the transmission of the tensile force from the slab reinforcement is surely easily performed.

せん断補強材を鋼管柱の外周面にスラブ筋と平行に突設することで、フラットスラブからのせん断力を鋼管柱に伝達させると共に、スラブ筋からの引張力をせん断補強材に軸方向引張力として負担させることができるため、各方向のせん断力とスラブ筋からの引張力を鋼管柱に十分に伝達することできる。   By projecting the shear reinforcement material on the outer peripheral surface of the steel pipe column parallel to the slab bar, the shear force from the flat slab is transmitted to the steel pipe column and the tensile force from the slab bar is applied to the shear reinforcement in the axial direction. Therefore, the shearing force in each direction and the tensile force from the slab bar can be sufficiently transmitted to the steel pipe column.

また鋼管柱に対する補強がせん断補強材を突設するのみでよいため、ブラケット等を突設する場合より使用鋼材量を低減することができ、鋼管柱の製作コストを低減し、鋼管柱周りにおける配筋作業性を高めることができる。   In addition, since the steel pipe column only needs to be provided with a shear reinforcement material, the amount of steel used can be reduced compared to the case where a bracket or the like is provided, reducing the manufacturing cost of the steel tube column and arranging it around the steel tube column. Muscle workability can be improved.

以下、図面を用いて本発明を実施するための最良の形態を説明する。   Hereinafter, the best mode for carrying out the present invention will be described with reference to the drawings.

図1は鋼管柱1に接合されるフラットスラブ3の厚さの範囲において、鋼管柱1の外周面にせん断補強材2がスラブ筋4と平行に突設され、フラットスラブ3中に定着されている鋼管柱とフラットスラブの接合部の具体例を示す。(a)は平面図、(b)は(a)のA−A線の断面矢視図である。   In FIG. 1, in the range of the thickness of the flat slab 3 to be joined to the steel pipe column 1, a shear reinforcing material 2 protrudes in parallel with the slab bar 4 on the outer peripheral surface of the steel pipe column 1 and is fixed in the flat slab 3. A concrete example of the joint part between the steel pipe column and the flat slab is shown. (A) is a top view, (b) is a sectional arrow view of the AA line of (a).

せん断補強材2はスラブ筋4と平行に突設されることから、鋼管柱1の外周面に垂直に突設するための便宜より、鋼管柱1には主として角形鋼管が使用される。鋼管柱1内にはコンクリートやモルタル等が充填され、鋼管柱1はCFT柱を構成することもある。   Since the shear reinforcement material 2 is projected in parallel with the slab bar 4, a square steel pipe is mainly used for the steel pipe column 1 for the convenience of projecting perpendicularly to the outer peripheral surface of the steel pipe column 1. The steel pipe column 1 is filled with concrete, mortar, or the like, and the steel pipe column 1 may constitute a CFT column.

スラブ筋4は図1−(a)に示すように2方向に格子状に配筋され、せん断補強材2は各方向のスラブ筋4に平行な方向を向く。せん断補強材2はスラブ筋4との干渉が生じないように配置されるため、鋼管柱1と交わるスラブ筋4の先端を鋼管柱1の外周面近傍まで接近させることができる。この結果、せん断補強材2の鋼管柱1からの突出長さを大きく取らなくても、スラブ筋4とせん断補強材2との重複長さを確保することができ、スラブ筋4からせん断補強材2への引張力の伝達が図られ易い。   As shown in FIG. 1- (a), the slab bars 4 are arranged in a lattice pattern in two directions, and the shear reinforcement 2 faces in a direction parallel to the slab bars 4 in each direction. Since the shear reinforcement material 2 is disposed so as not to interfere with the slab bar 4, the tip of the slab bar 4 that intersects the steel pipe column 1 can be brought close to the vicinity of the outer peripheral surface of the steel pipe column 1. As a result, the overlap length between the slab reinforcement 4 and the shear reinforcement 2 can be secured without taking a large projecting length of the shear reinforcement 2 from the steel pipe column 1. It is easy to transmit the tensile force to 2.

図1は特にせん断補強材2としてスタッドボルトを使用した場合を示す。この場合、せん断補強材2は図1−(b)に示すように高さ方向に間隔を置き、スラブ筋4の上端主筋41のレベルと下端主筋42のレベル、及びその中間のレベルに突設される。図面ではせん断補強材2を上端主筋41と下端主筋42の中間のレベルに1本、突設しているが、せん断補強材2の高さ方向の配置数はせん断補強材2自身の太さとフラットスラブ3の厚さに応じて調整される。   FIG. 1 particularly shows the case where a stud bolt is used as the shear reinforcement 2. In this case, as shown in FIG. 1- (b), the shear reinforcement material 2 is spaced in the height direction, and protrudes at the level of the upper main bar 41 and the level of the lower main bar 42 of the slab bar 4 and the level between them. Is done. In the drawing, one shear reinforcement member 2 is provided at a level intermediate between the upper main bar 41 and the lower main bar 42, but the number of shear reinforcement members 2 arranged in the height direction is flat and flat with the thickness of the shear reinforcement member 2 itself. It is adjusted according to the thickness of the slab 3.

図面ではまた、フラットスラブ3のコンクリートの充填性を考慮し、平面上、隣接する上端主筋41、41(下端主筋42、42)間の間隔と、水平方向に隣接するせん断補強材2、2間の間隔を等しくし、せん断補強材2がスラブ筋4の中間に位置し、両者が交互に配列するようにしている。せん断補強材2とスラブ筋4との間に間隔が空くことで、コンクリートが充填され易く、両者のコンクリートとの付着力も得易くなる。   In the drawing, in consideration of the filling property of the concrete of the flat slab 3, the distance between the upper main bars 41 and 41 (lower main bars 42 and 42) adjacent to each other on the plane and the space between the shear reinforcements 2 and 2 adjacent in the horizontal direction are also shown. Are equal, the shear reinforcement 2 is positioned in the middle of the slab reinforcement 4, and both are arranged alternately. By providing a space between the shear reinforcement 2 and the slab reinforcement 4, the concrete is easily filled, and an adhesion force between the two concretes can be easily obtained.

図1の場合、せん断補強材2は鋼管柱1の各面、すなわち鋼管柱1の外周面に突き合わせられるスラブ筋4の各方向に付き、水平方向と高さ方向のそれぞれに複数本配置され、集合することで、フラットスラブ3からのせん断力と曲げモーメントを鋼管柱1に伝達する働きをする。   In the case of FIG. 1, the shear reinforcement material 2 is attached to each surface of the steel pipe column 1, that is, to each direction of the slab reinforcement 4 that is abutted against the outer peripheral surface of the steel pipe column 1, and a plurality of shear reinforcements 2 are arranged in each of the horizontal direction and the height direction By gathering, the shear force and bending moment from the flat slab 3 are transmitted to the steel pipe column 1.

上端主筋41と下端主筋42からの引張力はそれぞれの周りのコンクリートとの間の付着力を介してせん断補強材2に伝達され、フラットスラブ3から鋼管柱1に伝達される。引張力の伝達によりフラットスラブ3と鋼管柱1との間での曲げモーメントの伝達が図られる。   The tensile force from the upper main bar 41 and the lower main bar 42 is transmitted to the shear reinforcement member 2 through the adhesion force between the surrounding concrete and the flat slab 3 to the steel pipe column 1. By transmitting the tensile force, the bending moment can be transmitted between the flat slab 3 and the steel pipe column 1.

図1ではフラットスラブ3に発生し得るひび割れに対する補強のために、鋼管柱1の周りに上端筋51と下端筋52を有する補強鉄筋5を配筋している。上端筋51と下端筋52は鋼管柱1周辺のコンクリートを拘束し、フラットスラブ3のひび割れを抑制するために、上下で対になり、互いに拘束し合うように何らかの手段によって連結される。   In FIG. 1, reinforcing reinforcing bars 5 having upper end bars 51 and lower end bars 52 are arranged around the steel pipe column 1 in order to reinforce cracks that may occur in the flat slab 3. The upper end bars 51 and the lower end bars 52 restrain the concrete around the steel pipe column 1 and are connected by some means so as to form a pair in the upper and lower sides and restrain each other to restrain the cracks of the flat slab 3.

図1では(b)に示すように上端筋51と下端筋52間にラチス筋53を配置し、双方に溶接することにより上端筋51と下端筋52をつないでいるが、両端部が折り曲げられたフック筋を上端筋51と下端筋52に係合させる等、上端筋51と下端筋52の連結手段は問われない。図1−(b)では上端筋51と下端筋52の端部間の変形を拘束するためにつなぎ材54を架設している。補強鉄筋5は(a)に示すようにスラブ筋4に対し、交差して配置されることから、(b)に示すように上端筋51と下端筋52間の距離はフラットスラブ3の上端主筋41と下端主筋42間の距離より小さい。   In FIG. 1, as shown in FIG. 1B, the lattice line 53 is arranged between the upper end line 51 and the lower end line 52 and welded to both ends to connect the upper end line 51 and the lower end line 52, but both ends are bent. The connecting means of the upper end muscle 51 and the lower end line 52 is not limited, for example, the hook line is engaged with the upper end line 51 and the lower end line 52. In FIG. 1- (b), in order to constrain the deformation between the end portions of the upper end muscle 51 and the lower end muscle 52, a connecting member 54 is installed. Since the reinforcing steel bars 5 are arranged so as to intersect the slab bars 4 as shown in FIG. 4A, the distance between the upper bars 51 and the lower bars 52 is the upper main bars of the flat slab 3 as shown in FIG. It is smaller than the distance between 41 and the lower main reinforcement 42.

フラットスラブ3のひび割れは鋼管柱1から放射状に発生し易く、前記のように平面上、隣接する鋼管柱1、1を結ぶ直線(スラブ筋4の方向)に対して45度、傾斜した方向、もしくはそれに近い方向に顕著に現れる傾向があるため、原則として図1−(a)に示すように補強鉄筋5はこの45度の方向に直交する方向を向いて配置される。補強鉄筋5は全長に亘ってコンクリート中に定着されることで、単独でひび割れを発生させる引張力に抵抗できるため、直交する方向の補強鉄筋5、5の端部は必ずしも連結される必要はないが、連結されることもある。   Cracks of the flat slab 3 are easily generated radially from the steel pipe column 1 and, as described above, are inclined at 45 degrees with respect to a straight line (in the direction of the slab bar 4) connecting the adjacent steel pipe columns 1 and 1 on a plane. Or since it tends to appear prominently in a direction close to it, as a general rule, as shown in FIG. 1- (a), the reinforcing steel bars 5 are arranged in a direction perpendicular to the 45 degree direction. Since the reinforcing reinforcing bars 5 are fixed in the concrete over the entire length, they can resist the tensile force that causes cracking alone, so the ends of the reinforcing reinforcing bars 5 and 5 in the orthogonal direction do not necessarily have to be connected. May be linked.

図1では補強鉄筋5による補強効果を上げるために、鋼管柱1寄りから前記45度の方向に間隔を置いて複数本配置している。補強鉄筋5は上端筋51と下端筋52の軸方向の引張力に抵抗するため、平面上、直線状に形成される。   In FIG. 1, in order to increase the reinforcing effect by the reinforcing reinforcing bars 5, a plurality of wires are arranged at intervals in the direction of 45 degrees from the steel pipe column 1. The reinforcing reinforcing bars 5 are formed in a straight line on a plane in order to resist the tensile force in the axial direction of the upper and lower reinforcing bars 51 and 52.

図2はせん断補強材2として鉄筋を使用した場合を示す。この場合もせん断補強材2はスタッドボルトの場合と同様に鋼管柱1の外周面に突設され、鋼管柱1の各面について、水平方向と高さ方向のそれぞれに複数本集合することで、フラットスラブ3からのせん断力と曲げモーメントを鋼管柱1に伝達する。鉄筋の場合にはせん断補強材2の全長をスタッドボルトの場合より大きくすることができるため、上端主筋41と下端主筋42からの引張力のせん断補強材2への伝達効果を高めることができる。   FIG. 2 shows a case where a reinforcing bar is used as the shear reinforcement 2. Also in this case, the shear reinforcement material 2 is projected on the outer peripheral surface of the steel pipe column 1 as in the case of the stud bolt, and a plurality of each of the surfaces of the steel pipe column 1 are assembled in each of the horizontal direction and the height direction, Shear force and bending moment from the flat slab 3 are transmitted to the steel pipe column 1. In the case of a reinforcing bar, since the total length of the shear reinforcement member 2 can be made larger than that of a stud bolt, the effect of transmitting the tensile force from the upper end principal bar 41 and the lower end principal bar 42 to the shear reinforcement member 2 can be enhanced.

図2でも隣接する上端主筋41、41(下端主筋42、42)間の間隔と、水平方向に隣接するせん断補強材2、2間の間隔を等しくし、せん断補強材2が上端主筋41、41の中間に位置するようにしているが、図3のようにせん断補強材2が上端主筋41や下端主筋42に重なるように位置することもある。また高さ方向には図1と同様、せん断補強材2を3段に配置しているが、高さ方向の配置数はせん断補強材2自身の太さとフラットスラブ3の厚さに応じて調整される。   Also in FIG. 2, the interval between the adjacent upper main bars 41 and 41 (lower main bars 42 and 42) and the interval between the shear reinforcing materials 2 and 2 adjacent in the horizontal direction are made equal. However, the shear reinforcement material 2 may be positioned so as to overlap the upper main bar 41 and the lower main bar 42 as shown in FIG. As in FIG. 1, the shear reinforcements 2 are arranged in three stages in the height direction, but the number of arrangements in the height direction is adjusted according to the thickness of the shear reinforcement 2 itself and the thickness of the flat slab 3. Is done.

せん断補強材2として鉄筋を使用する場合には、図2−(a)に示すようにせん断補強材2の長さを図1の場合より大きくすることができるため、広範囲に亘ってフラットスラブ3のコンクリートを拘束し、補強することができる。従って図2の場合には補強鉄筋5を必ずしも配筋する必要はないが、図2に二点鎖線で示すように高さ方向中間部のせん断補強材2との干渉が生じない範囲で配筋することもある。   When a reinforcing bar is used as the shear reinforcement 2, the length of the shear reinforcement 2 can be made longer than that in FIG. 1 as shown in FIG. The concrete can be restrained and reinforced. Therefore, in the case of FIG. 2, it is not always necessary to arrange the reinforcing reinforcing bars 5. However, as shown by the two-dot chain line in FIG. Sometimes.

図3はせん断補強材2としてU字状に折り曲げられたU字鉄筋を使用した場合を示す。この場合、せん断補強材2は対向する脚部2a、2aとその間に位置する中間部2bからなり、中間部2bにおいて鋼管柱1の外周面に溶接される。せん断補強材2は上下の脚部2a、2aにフラットスラブ3からのせん断力、及び上端主筋41と下端主筋42からの引張力が伝達されるよう、鉛直面をなして配置される。図3の場合、平行な脚部2a、2aが高さ方向に間隔を置いて配列する形になる。   FIG. 3 shows a case where a U-shaped reinforcing bar bent in a U-shape is used as the shear reinforcement 2. In this case, the shear reinforcement material 2 is composed of opposing leg portions 2a, 2a and an intermediate portion 2b positioned therebetween, and is welded to the outer peripheral surface of the steel pipe column 1 at the intermediate portion 2b. The shear reinforcement member 2 is arranged in a vertical plane so that the shearing force from the flat slab 3 and the tensile force from the upper and lower main bars 41 and 42 are transmitted to the upper and lower legs 2a and 2a. In the case of FIG. 3, the parallel leg portions 2a and 2a are arranged at intervals in the height direction.

図3では脚部2aの長さが図2におけるせん断補強材2の長さより小さいことから、上端主筋41と下端主筋42からの引張力のせん断補強材2への伝達効果を上げるために、脚部2a、2aを上端主筋41と下端主筋42に重ね、重ね継手として接続されるようにしている。脚部2aは上端主筋41と下端主筋42に完全に重なる場合と幾らか離れる場合がある。脚部2aは図2に示すせん断補強材2と同等程度の長さを有する場合等には、水平方向に隣接する上端主筋41、41(下端主筋42、42)の中間に位置することもある。   In FIG. 3, since the length of the leg 2a is smaller than the length of the shear reinforcement 2 in FIG. 2, in order to increase the effect of transmitting the tensile force from the upper main bar 41 and the lower main bar 42 to the shear reinforcement 2, The portions 2a and 2a are overlapped with the upper main bar 41 and the lower main bar 42 so as to be connected as a lap joint. The leg 2a may be completely separated from the upper main bar 41 and the lower main bar 42 or may be somewhat separated. When the leg portion 2a has a length equivalent to that of the shear reinforcement member 2 shown in FIG. 2, the leg portion 2a may be positioned in the middle of the upper main bars 41 and 41 (lower main bars 42 and 42) adjacent in the horizontal direction. .

図3においても脚部2aが図2におけるせん断補強材2と同等程度の長さを持ち、図2におけるせん断補強材2としての鉄筋のような効果を発揮し得る場合には、補強鉄筋5を配筋する必要はないが、図3に二点鎖線で示すように補強鉄筋5を配筋することもある。補強鉄筋5を配筋する場合、図3では上下に対向する脚部2a、2a間が開放しているため、補強鉄筋5との干渉は回避される。   Also in FIG. 3, when the leg portion 2a has a length equivalent to that of the shear reinforcement member 2 in FIG. 2 and can exert the effect of a reinforcing bar as the shear reinforcement member 2 in FIG. Although it is not necessary to arrange the reinforcing bars, reinforcing reinforcing bars 5 may be arranged as shown by a two-dot chain line in FIG. When the reinforcing reinforcing bars 5 are arranged, interference with the reinforcing reinforcing bars 5 is avoided because the leg portions 2a and 2a facing each other in FIG. 3 are open.

図3の場合、せん断補強材2は図2におけるせん断補強材2に相当する脚部2aが高さ方向に2段に配置された形になるが、鋼管柱1の各面に付き、水平方向と高さ方向のそれぞれに複数本配置されるため、集合することで、フラットスラブ3からのせん断力と曲げモーメントを鋼管柱1に伝達する働きをする。   In the case of FIG. 3, the shear reinforcement member 2 has a shape in which legs 2 a corresponding to the shear reinforcement member 2 in FIG. 2 are arranged in two steps in the height direction. Since a plurality of them are arranged in each of the height directions, they gather to function to transmit the shearing force and bending moment from the flat slab 3 to the steel pipe column 1.

図4は図1に示す補強鉄筋5を2方向のスラブ筋4と平行に、水平方向に並列させて配筋した場合を示す。フラットスラブ3にひび割れを発生させる引張力は2方向のスラブ筋4と平行な成分に分けられるため、補強鉄筋5がスラブ筋4と平行な2方向に組み合わせられた形で配筋されることによっても、ひび割れを発生させる引張力に抵抗できることになる。   FIG. 4 shows a case where the reinforcing reinforcing bars 5 shown in FIG. 1 are arranged in parallel with the slab bars 4 in two directions and in parallel in the horizontal direction. Since the tensile force that generates cracks in the flat slab 3 is divided into components parallel to the slab bars 4 in two directions, the reinforcing bars 5 are arranged in a combined manner in two directions parallel to the slab bars 4. However, it will be able to resist the tensile force that causes cracks.

ひび割れを発生させる引張力に有効に抵抗させる上では、補強鉄筋5は図示するように鋼管柱1寄りに配置されることが適切であるが、せん断補強材2との干渉が生じないよう、鋼管柱1の外周面より距離を置いた位置に配置されることもある。ここでも補強鉄筋5は上端筋51と下端筋52からなるが、ラチス筋53はせん断補強材2との干渉の有無に応じ、前記したフック筋に置き換えられる。   In order to effectively resist the tensile force that generates cracks, it is appropriate that the reinforcing steel bars 5 are disposed closer to the steel pipe column 1 as shown in the figure, but the steel pipes are provided so as not to interfere with the shear reinforcement 2. It may be arranged at a position away from the outer peripheral surface of the column 1. Here, the reinforcing reinforcing bar 5 is composed of the upper reinforcing bar 51 and the lower reinforcing bar 52, but the lattice reinforcing bar 53 is replaced with the hook reinforcing bar according to the presence or absence of interference with the shear reinforcing material 2.

(a)はせん断補強材としてスタッドボルトを使用した場合の接合部の配筋状態を示した平面図、(b)は(a)のA−A線断面矢視図である。(A) is the top view which showed the reinforcement arrangement | positioning state of the junction part at the time of using a stud bolt as a shear reinforcement, (b) is the sectional view on the AA line of (a). (a)はせん断補強材として鉄筋を使用した場合の接合部の配筋状態を示した平面図、(b)は(a)のB−B線断面矢視図である。(A) is the top view which showed the bar arrangement state of the junction part at the time of using a reinforcing bar as a shear reinforcement, (b) is the BB sectional view taken on the line of (a). (a)はせん断補強材としてU字鉄筋を使用した場合の接合部の配筋状態を示した平面図、(b)は(a)のC−C線断面矢視図である。(A) is the top view which showed the bar arrangement state of the junction part at the time of using a U-shaped reinforcing bar as a shear reinforcement, (b) is CC sectional view taken on the line of (a). (a)は図1に示す補強鉄筋をスラブ筋と平行に配筋した場合の接合部の配筋状態を示した平面図、(b)は(a)のD−D線断面矢視図である。(A) is the top view which showed the reinforcement arrangement | positioning state of the junction part at the time of arranging the reinforcement reinforcing bar shown in FIG. 1 in parallel with a slab reinforcement, (b) is the DD sectional view taken on the line of (a). is there.

符号の説明Explanation of symbols

1………鋼管柱
2………せん断補強材
2a……脚部
2b……中間部
3………フラットスラブ
4………スラブ筋
41……上端主筋
42……下端主筋
5………補強鉄筋
51……上端筋
52……下端筋
53……ラチス筋
54……つなぎ材
1 ......... Steel column 2 ......... Shear reinforcement 2a ... Leg 2b ... Intermediate part 3 ......... Flat slab 4 ......... Slab reinforcement 41 ... Upper main bar 42 ... Lower end main bar 5 ......... Reinforcement Reinforcing bars 51 …… Top bars 52 …… Bottom bars 53 …… Lattice bars 54 …… Connecting material

Claims (3)

鋼管柱に接合されるフラットスラブの厚さの範囲において、前記鋼管柱の外周面にせん断補強材がスラブ筋と平行に突設され、前記フラットスラブ中に定着されていることを特徴とする鋼管柱とフラットスラブの接合部。   In the range of the thickness of the flat slab to be joined to the steel pipe column, a steel pipe is characterized in that a shear reinforcement is projected in parallel with the slab bar on the outer peripheral surface of the steel pipe column and fixed in the flat slab. Joint between column and flat slab. 前記鋼管柱の周囲の前記フラットスラブ中に、上端筋と下端筋を有する補強鉄筋が配筋されていることを特徴とする請求項1に記載の鋼管柱とフラットスラブの接合部。   The joint part of a steel pipe column and a flat slab according to claim 1, wherein reinforcing bars having upper and lower end bars are arranged in the flat slab around the steel pipe column. 前記せん断補強材は前記フラットスラブ中の上端主筋と下端主筋に重なっていることを特徴とする請求項1に記載の鋼管柱とフラットスラブの接合部。
The joint part of the steel pipe column and flat slab of Claim 1 with which the said shear reinforcement material has overlapped with the upper end main reinforcement and the lower end main reinforcement in the said flat slab.
JP2006285869A 2006-10-20 2006-10-20 Joint between steel pipe column and flat slab Expired - Fee Related JP5134228B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006285869A JP5134228B2 (en) 2006-10-20 2006-10-20 Joint between steel pipe column and flat slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006285869A JP5134228B2 (en) 2006-10-20 2006-10-20 Joint between steel pipe column and flat slab

Publications (2)

Publication Number Publication Date
JP2008101419A true JP2008101419A (en) 2008-05-01
JP5134228B2 JP5134228B2 (en) 2013-01-30

Family

ID=39435954

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006285869A Expired - Fee Related JP5134228B2 (en) 2006-10-20 2006-10-20 Joint between steel pipe column and flat slab

Country Status (1)

Country Link
JP (1) JP5134228B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101476731B1 (en) 2013-10-08 2014-12-26 황성섭 Concrete floor of the building process to increase
KR101476733B1 (en) 2013-10-08 2014-12-26 황성섭 Concrete floor of the building process to increase

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61261556A (en) * 1985-05-15 1986-11-19 株式会社竹中工務店 Reinforcement of connection part of pillar and beam/slab in inverse impact construction method
JPH03191149A (en) * 1989-12-19 1991-08-21 Mitsui Constr Co Ltd Structure for joining steel pipe column and slab in flat slab structure
JPH07233562A (en) * 1994-02-24 1995-09-05 Shimizu Corp Multi-layer building
JP2002070165A (en) * 2000-09-05 2002-03-08 Penta Ocean Constr Co Ltd Connecting structure for steel pipe column and flat slab and its connecting method
JP2003239386A (en) * 2002-02-12 2003-08-27 Taisei Corp Building structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61261556A (en) * 1985-05-15 1986-11-19 株式会社竹中工務店 Reinforcement of connection part of pillar and beam/slab in inverse impact construction method
JPH03191149A (en) * 1989-12-19 1991-08-21 Mitsui Constr Co Ltd Structure for joining steel pipe column and slab in flat slab structure
JPH07233562A (en) * 1994-02-24 1995-09-05 Shimizu Corp Multi-layer building
JP2002070165A (en) * 2000-09-05 2002-03-08 Penta Ocean Constr Co Ltd Connecting structure for steel pipe column and flat slab and its connecting method
JP2003239386A (en) * 2002-02-12 2003-08-27 Taisei Corp Building structure

Also Published As

Publication number Publication date
JP5134228B2 (en) 2013-01-30

Similar Documents

Publication Publication Date Title
KR102075165B1 (en) Concrete filled tubular column and connecting structure of the same and construction method thereof
JPWO2019074050A1 (en) H-section steel joint structure
JP2015214807A (en) Heterogeneous steel beam joint structure
JP6589922B2 (en) Beam reinforcement structure and beam reinforcement method
JP6173696B2 (en) Column / beam connection method
JP5134228B2 (en) Joint between steel pipe column and flat slab
JP5656065B2 (en) Structural member of steel plate concrete structure
JP5532852B2 (en) Steel pipe concrete pillar
JP7186017B2 (en) Joint structure between column and beam, and construction method for joint structure between column and beam
JP2009155850A (en) Connecting structure of precast floor slab and beam
JP5757510B1 (en) Steel column reinforcement structure
JP7070890B2 (en) Joint structure
JP6535704B2 (en) Column-beam frame
JP4943795B2 (en) Joint between steel pipe column and flat slab
JP6508866B2 (en) Column-beam frame
JP2009161984A (en) Corrugated steel plate earthquake-resisting wall
JP7156347B2 (en) Joint structure of steel wall and reinforced concrete floor slab
JP2018131770A (en) Junction structure of column and beam and construction method of junction structure of column and beam
JP6174984B2 (en) Steel beam
JP6353647B2 (en) Seismic isolation device joint structure
JP6871493B2 (en) Pile head reinforcement structure
JP2009030357A (en) Structure of welding and joining column and beam
JP4045502B2 (en) Structure
JP2006002427A (en) JOINT STRUCTURE OF FULL PRECAST CONCRETE (PCa) FLOORBOARD
JP5115012B2 (en) Column and beam welded joint structure

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080116

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090706

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110916

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111004

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120501

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120626

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121106

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121109

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151116

Year of fee payment: 3

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees