JP2007122389A - System and method for providing contract information - Google Patents

System and method for providing contract information Download PDF

Info

Publication number
JP2007122389A
JP2007122389A JP2005313312A JP2005313312A JP2007122389A JP 2007122389 A JP2007122389 A JP 2007122389A JP 2005313312 A JP2005313312 A JP 2005313312A JP 2005313312 A JP2005313312 A JP 2005313312A JP 2007122389 A JP2007122389 A JP 2007122389A
Authority
JP
Japan
Prior art keywords
information
contract
transfer
contractor
host computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005313312A
Other languages
Japanese (ja)
Other versions
JP4714556B2 (en
Inventor
Mitsutoshi Saho
光俊 佐保
Nobuhiko Nishida
信彦 西田
Tatsuya Ichibayashi
竜也 市林
Atsushi Iwasaki
篤志 岩崎
Mitsuo Saito
光男 齋藤
Makoto Taniguchi
谷口  誠
Masanari Saito
存就 斉藤
Michi Kumada
美知 熊田
Takeshi Kakimoto
健 柿本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Denryoku Support Chugoku Co
Original Assignee
Chugoku Electric Power Co Inc
Energia Life and Access Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc, Energia Life and Access Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2005313312A priority Critical patent/JP4714556B2/en
Publication of JP2007122389A publication Critical patent/JP2007122389A/en
Application granted granted Critical
Publication of JP4714556B2 publication Critical patent/JP4714556B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To individually and specifically inform a contractor about contract information such as contract data and points to note. <P>SOLUTION: A host computer 2 (a host server 4) is connected to a power transmission remote controller 3 so as to be communicable with each other. The host computer 2 includes: a change information database 22 for storing the change information of each contractor; and a contract information generating program 241 for generating the contract information based on the change information. When the host computer 2 receives work completion information D2 from the power transmission remote controller 3, the host computer 2 acquires, from the change information database 22, the change information corresponding to the received work completion information D2, generates the contract information by the use of the contract information generating program 241 based on the acquired change information, and transmits the generated contract information to the contractor terminal 6 of the contractor by E-mail. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、電力、ガス、水道などの供給開始、供給停止が施工された際に、契約情報を契約者(需要家)に知らせる契約情報提供システムに関する。   The present invention relates to a contract information providing system that informs contractors (customers) of contract information when a supply start or a supply stop of power, gas, water supply, or the like is performed.

電力、ガスあるいは水道などのライフライン源の使用契約の申込があると、例えば、電力の場合、電力会社の施工者(作業員)が契約者宅に設置している積算電力計(メータ器)を操作するなどの施工を行い、電力の使用を可能にする。また、電力の供給開始、供給停止を任意の契約者に対して遠隔から行う送電遠隔制御装置も知られている(例えば、特許文献1参照。)。また、例えば、同一の電力会社の供給地域内で契約者が引越をする場合、引越前の契約を解除(廃止)するとともに、引越し先で新たな契約(再使用契約)を行う。このような場合も同様に、施工者による施工や遠隔制御(遠隔施工)によって、電力供給の停止および電力の使用が可能となる。そして、作業員による施工の場合も遠隔制御による場合も、電力の使用が可能となると、契約者による電力の使用が開始され、電力メータの検針や料金の支払請求などが行われていく。
特開2004−229400号公報
For example, in the case of electric power, a watt-hour meter (meter) installed at the contractor's house by the power company's contractor (worker) when applying for a contract to use a lifeline source such as power, gas or water It is possible to use electric power by performing construction such as operating. There is also known a power transmission remote control device that remotely starts and stops the supply of power to an arbitrary contractor (see, for example, Patent Document 1). For example, when a contractor moves within a supply area of the same electric power company, the contract before the move is canceled (removed) and a new contract (reuse contract) is made at the move destination. In such a case, similarly, the power supply can be stopped and the power can be used by the construction work or remote control (remote construction). In both cases of construction by a worker and remote control, when the use of electric power becomes possible, the use of electric power by the contractor is started, and meter reading of the electric power meter or bill payment is performed.
JP 2004-229400 A

ところで、上記のような施工(供給開始、供給停止)が完了した場合、契約開始日や料金支払方法などの契約諸元や、電気給湯機(温水器)に関する留意事項などの契約情報を、当該契約者に個別に知らせていなかった。あるいは、一般的なパンフレットなどのみで情報を知らせ、各契約者に合った個別具体的な情報を提供していなかった。このため、契約者が契約諸元や留意事項などの情報を確認できずに、あるいは、十分に理解できずに、次のような事態が生じる場合があった。例えば、支払請求書が契約者に届いた際に、契約者名の漢字が誤っていることや、再使用契約をした場合に、口座振替の継続処理が行われていないことなどを、契約者から指摘される場合がある。また、口座振替の継続処理が行われていても、振替日(引き落とし日)が変更する場合があるが、振替日が変更したことを知らずに、契約者が電力会社に問い合わせる場合などがある。特に、このような事態は、不動産会社や家主など契約者以外の第三者から使用契約の申し込みがあった場合に、発生することが比較的多い。   By the way, when the above construction (supply start, supply stop) is completed, contract information such as contract specifications such as the contract start date and fee payment method, notes on electric water heaters (water heaters), etc. The contractor was not notified individually. Alternatively, the information was communicated only with a general pamphlet, and individual specific information suitable for each contractor was not provided. For this reason, the contractor could not confirm the information such as contract specifications and points to be noted, or could not fully understand the following situation. For example, when a payment invoice arrives at the contractor, the contractor's name is in the wrong kanji, or if the contract is reused, the account transfer will not be continued. May point out. Even if the account transfer continuation process is being performed, the transfer date (withdrawal date) may change, but the contractor may inquire of the power company without knowing that the transfer date has changed. In particular, such a situation often occurs when an application for a use contract is made by a third party other than the contractor, such as a real estate company or a landlord.

さらに、電気給湯機を使用している契約者においては、屋内および電気給湯機本体のブレーカを「入」にすることの重要性や、時間帯別電灯対応型給湯機(例えば、主に夜11時から翌朝8時までの深夜電力の時間帯に湯を沸かし、昼間に湯を沸き増しすることができる給湯機)の場合に、リモコンの時刻設定の重要性などを知らずに、次のような事態が生じる場合がある。例えば、使用開始の申し込みをしたにもかかわらず湯を沸かせないことや、通電時間がずれてしまい昼間に湯が沸いてしまうこと、あるいは、使用開始日の当日から湯が使えると思っていたのに湯が沸いていない、といった事態が生じる。   Furthermore, in the case of a contractor who uses an electric water heater, it is important to set the breaker of the indoor and electric water heater body to “ON”, and the time-dependent electric water heater (for example, mainly at night 11 In the case of a hot water heater that can boil hot water during the night power hours from midnight to the next morning and boil water in the daytime, the following is necessary without knowing the importance of the remote control time setting: Things may happen. For example, I thought that I couldn't boil hot water even though I applied for the start of use, the hot water would boil in the daytime due to a shift in the energization time, or that I could use hot water from the day of the start of use. The hot water is not boiling.

そこで本発明は、電力、ガス、水道などの供給開始、供給停止が施工された際に、契約諸元や留意事項などの契約情報を個別具体的に契約者に知らせることができる契約情報提供システムを提供することを目的とする。   Accordingly, the present invention provides a contract information providing system capable of specifically informing a contractor of contract information such as contract specifications and points to be noted when a supply start or supply stop of power, gas, water supply or the like is performed. The purpose is to provide.

上記目的を達成するために請求項1に記載の発明は、電力、ガス、水道などのライフライン源の供給開始、供給停止が施工された際に、契約情報を契約者に知らせる契約情報提供システムであって、施工の完了を知らせる外部装置とホストコンピュータとが通信可能に接続され、ホストコンピュータに、契約番号毎に契約者の異動情報を記憶する異動情報データベースと、異動情報に基づいて契約情報を作成する契約情報作成手段と、この契約情報作成手段によって作成された契約情報を出力する情報出力手段とを備え、ホストコンピュータが外部装置から契約番号を含む施工完了情報を受信すると、受信した契約番号に対応した異動情報を異動情報データベースから取得し、この異動情報に基づいて契約情報作成手段によって契約情報を作成し、この契約情報を情報出力手段によって出力することを特徴としている。   In order to achieve the above object, the invention according to claim 1 is a contract information providing system for informing a contractor of contract information when a supply start or a supply stop of a lifeline source such as electric power, gas, and water is performed. An external device for notifying completion of construction and a host computer are communicably connected to each other, a change information database for storing change information of a contractor for each contract number in the host computer, and contract information based on the change information. A contract information creation means for creating the contract information and an information output means for outputting the contract information created by the contract information creation means. When the host computer receives the construction completion information including the contract number from the external device, the received contract The transfer information corresponding to the number is acquired from the transfer information database, and contract information is created by the contract information creating means based on the transfer information. And it is characterized by outputting the contract information by the information output means.

請求項2に記載の発明は、請求項1に記載の契約情報提供システムにおいて、外部装置が、ライフライン源の供給開始、供給停止を遠隔で行う遠隔制御装置、または、供給開始、供給停止を施工する施工者の施工者端末であることを特徴としている。   According to a second aspect of the present invention, in the contract information providing system according to the first aspect of the present invention, the external device is a remote control device for remotely starting and stopping the supply of the lifeline source, or starting and stopping the supply. It is characterized by being a contractor terminal for the contractor to be constructed.

請求項3に記載の発明は、請求項1または請求項2に記載の契約情報提供システムにおいて、異動情報データベースに、契約番号毎に契約者名と供給開始または供給停止の異動種別とが記憶され、ホストコンピュータに、施工完了情報に含まれている契約番号の異動種別が供給開始である場合に、契約番号の契約者名と同一の契約者名で異動種別が供給停止である他の契約番号を異動情報データベースから検索する停止検索手段を備え、この停止検索手段によって該当する他の契約番号が検索された場合に、異動情報データベースから当該他の契約番号に対応した異動情報を取得し、この異動情報にも基づいて契約情報を契約情報作成手段によって作成することを特徴としている。   According to a third aspect of the present invention, in the contract information providing system according to the first or second aspect, the transfer information database stores a contractor name and a supply start or supply stop change type for each contract number. When the change type of the contract number included in the construction completion information is supply start on the host computer, the other contract number with the same contractor name as the contract number of the contract number and the transfer type is supply stop When the other search number is searched by the stop search means, the transfer information corresponding to the other contract number is obtained from the transfer information database. It is characterized in that contract information is created by contract information creation means based on the transfer information.

請求項4に記載の発明は、請求項1から請求項3のいずれか1項に記載の契約情報提供システムにおいて、異動情報データベースに、契約番号毎に住所と料金支払方法とが記憶され、ホストコンピュータに、住所に基づいてメータ検針日を割り出す検針日割出手段と、メータ検針日に基づいて口座振替の振替日を割り出す振替日割出手段とを備え、施工完了情報に含まれている契約番号の住所に基づいて検針日割出手段によってメータ検針日を割り出し、このメータ検針日を含む契約情報を契約情報作成手段によって作成し、施工完了情報に含まれている契約番号の料金支払方法が口座振替の場合に、割り出されたメータ検針日に基づいて振替日割出手段によって振替日を割り出し、この振替日を含む契約情報を契約情報作成手段によって作成することを特徴としている。   According to a fourth aspect of the present invention, in the contract information providing system according to any one of the first to third aspects, an address and a fee payment method are stored for each contract number in the transfer information database. The contract includes a meter reading date indexing means for calculating the meter reading date based on the address and a transfer date indexing means for determining the transfer date for the account transfer based on the meter reading date, and is included in the construction completion information. The meter reading date is calculated by the meter reading date indexing means based on the address of the number, the contract information including this meter reading date is created by the contract information creating means, and the fee payment method for the contract number included in the construction completion information is In the case of direct debit, the transfer date indexing means determines the transfer date based on the meter reading date, and the contract information creation means creates contract information including this transfer date. It is characterized in that.

請求項5に記載の発明は、請求項1から請求項4のいずれか1項に記載の契約情報提供システムにおいて、ホストコンピュータに給湯機に関する留意事項が記憶され、異動情報データベースに契約番号毎に給湯機の有無が記憶され、施工完了情報に含まれている契約番号の給湯機が有りの場合に、留意事項を含む契約情報を契約情報作成手段によって作成することを特徴としている。   According to a fifth aspect of the present invention, in the contract information providing system according to any one of the first to fourth aspects, the host computer stores precautions regarding the water heater, and the transfer information database stores each contract number. The presence or absence of a hot water heater is stored, and when there is a hot water heater having a contract number included in the construction completion information, the contract information including the notice items is created by the contract information creating means.

請求項6に記載の発明は、請求項1から請求項5のいずれか1項に記載の契約情報提供システムにおいて、外部装置からメータ指示数を含む施工完了情報を受信すると、このメータ指示数を含む契約情報を契約情報作成手段によって作成することを特徴としている。   In the contract information providing system according to any one of claims 1 to 5, when the construction completion information including the meter instruction number is received from an external device, the invention described in claim 6 The contract information including the contract information is created by the contract information creating means.

請求項7に記載の発明は、請求項1から請求項6のいずれか1項に記載の契約情報提供システムにおいて、情報出力手段による出力が、契約情報の電子メールによる送信およびウェブページへの掲載の少なくとも一方によることを特徴としている。   According to a seventh aspect of the present invention, in the contract information providing system according to any one of the first to sixth aspects, the output by the information output means is transmission of contract information by e-mail and posting on a web page. It is characterized by being based on at least one of the above.

請求項8に記載の発明は、請求項1から請求項7のいずれか1項に記載の契約情報提供システムにおいて、契約申込者の申込者端末とホストコンピュータとが通信可能に接続され、ホストコンピュータに、申込者端末から異動情報を受信した際にその異動情報を契約番号と関連付けて異動情報データベースに記憶する情報記憶手段を備えたことを特徴としている。   The invention according to claim 8 is the contract information providing system according to any one of claims 1 to 7, wherein the applicant terminal of the contract applicant and the host computer are communicably connected to each other, and the host computer In addition, when the transfer information is received from the applicant terminal, the information storage means stores the transfer information in the transfer information database in association with the contract number.

請求項9に記載の発明は、請求項1から請求項8のいずれか1項に記載の契約情報提供システムにおいて、異動情報データベースに、契約番号毎に供給開始または供給停止の希望日が記憶され、ホストコンピュータに、希望日よりも所定日数前または同日に施工を指示する施工情報を外部装置に送信する施工情報送信手段を備えたことを特徴としている。   According to a ninth aspect of the present invention, in the contract information providing system according to any one of the first to eighth aspects, the desired date of supply start or supply stop is stored for each contract number in the transfer information database. The host computer is provided with construction information transmitting means for transmitting construction information for instructing construction to a predetermined number of days before or on the same day as the desired date.

請求項10に記載の発明は、電力、ガス、水道などのライフライン源の供給開始、供給停止が施工された際に、契約情報を契約者に知らせる契約情報提供方法であって、施工の完了を知らせる外部装置とホストコンピュータとが通信可能に接続され、ホストコンピュータに、契約番号毎に契約者の異動情報を記憶する異動情報データベースを備え、外部装置が契約番号を含む施工完了情報をホストコンピュータに送信し、ホストコンピュータが、受信した契約番号に対応した異動情報を異動情報データベースから取得し、この異動情報に基づいて契約情報を作成し、この契約情報を契約番号毎に出力することを特徴としている。   The invention according to claim 10 is a contract information providing method for notifying a contractor of contract information when a supply start or a supply stop of a lifeline source such as electric power, gas, and water is executed, and the completion of the execution An external device for informing the user and the host computer are communicably connected to each other, and the host computer is provided with a change information database for storing the change information of the contractor for each contract number. The host computer acquires transfer information corresponding to the received contract number from the transfer information database, creates contract information based on the transfer information, and outputs the contract information for each contract number. It is said.

請求項1に記載の発明によれば、ホストコンピュータが外部装置から施工完了情報を受信すると、契約番号に応じた異動情報に基づいて契約情報が作成され、この契約情報が出力される。このため、契約番号に応じた契約諸元や留意事項などの契約情報を作成し、この契約情報を契約番号毎、すなわち各契約者に個別具体的に知らせることが可能となる。また、契約者が必要とする契約諸元や留意事項などの内容に応じて、異動情報や契約情報作成手段を変更することで、より多種かつ個別具体的な契約情報を各契約者に知らせることが可能となる。   According to the first aspect of the present invention, when the host computer receives the construction completion information from the external device, the contract information is created based on the transfer information corresponding to the contract number, and the contract information is output. For this reason, it is possible to create contract information such as contract specifications and considerations according to the contract number, and notify the contract information individually for each contract number, that is, each contractor. In addition, by changing the transfer information and contract information creation method according to the contents of the contract specifications and points to be considered required by the contractor, various contract information can be notified to each contractor. Is possible.

請求項2に記載の発明によれば、遠隔制御装置または施工者端末からホストコンピュータに施工完了情報が送信されるため、ライフライン源の供給開始、供給停止が完了した時点で契約情報を各契約者に個別具体的に知らせることができ、迅速かつ的確な情報提供が可能となる。   According to the second aspect of the present invention, since the construction completion information is transmitted from the remote control device or the builder terminal to the host computer, the contract information is stored in each contract when the supply start and the supply stop of the lifeline source are completed. Can be notified individually and specifically, and information can be provided promptly and accurately.

請求項3に記載の発明によれば、異動情報データベースに同一の契約者名で供給開始と供給停止とが記憶されている場合、すなわち、引越しによって引越前の契約を解除して引越し先で新たな契約(再使用契約)を行う場合に、引越前(他の契約番号)の異動情報にも基づいて契約情報が作成される。このため、各契約者は、引越前の情報と引越し先の情報とを契約情報によって知ることができ、引越前後における契約諸元の変更などを容易かつ的確に把握することが可能となる。   According to the invention of claim 3, when the supply start and the supply stop are stored with the same contractor name in the transfer information database, that is, the contract before moving is canceled by moving and a new one is moved at the moving destination. When a simple contract (reuse contract) is made, contract information is created based on change information before moving (other contract numbers). Therefore, each contractor can know the information before moving and the information of the moving destination from the contract information, and can easily and accurately grasp the change of the contract specifications before and after the moving.

請求項4に記載の発明によれば、メータ検針日と、料金支払方法が口座振替の場合の振替日とを含む契約情報が作成、出力されるため、各契約者は、料金支払等に重要なメータ検針日と口座振替の振替日とを、個別具体的にかつより確実に知ることができる。   According to the invention described in claim 4, since contract information including the meter reading date and the transfer date when the fee payment method is account transfer is created and output, each contractor is important for fee payment etc. It is possible to know the meter reading date and the transfer date of account transfer individually and specifically.

請求項5に記載の発明によれば、給湯機が有りの場合には、給湯機に関する留意事項を含む契約情報が作成、出力されるため、各契約者は、当該留意事項を個別具体的にかつより確実に知ることができる。これにより、電気給湯機本体などのブレーカを「入」にすることを忘れたり、リモコンの時刻設定をし忘れたりすることが効果的に防止され、正常に給湯機を使用することが可能となる。   According to the fifth aspect of the present invention, when there is a water heater, since contract information including the notes regarding the water heater is created and output, each contractor individually specifies the notes. And you can know more reliably. This effectively prevents forgetting to turn on a breaker such as the main body of an electric water heater or forgetting to set the time on the remote controller, and the water heater can be used normally. .

請求項6に記載の発明によれば、メータ指示数を含む契約情報が作成、出力されるため、各契約者は、料金計算等に重要な供給開始の際のメータ指示数または、供給停止の際のメータ指示数を、個別具体的にかつより確実に知ることができる。   According to the sixth aspect of the present invention, since contract information including the number of meter instructions is created and output, each contractor can determine the number of meter instructions at the start of supply, which is important for charge calculation, etc. It is possible to know the number of meter indications at the time specifically and more specifically.

請求項7に記載の発明によれば、各契約者が、契約情報を電子メールによって受信したり、ウェブページに掲載された契約情報を閲覧することができるため、インターネット環境下であれば、各契約者は、いつでもどこででも、かつ迅速に契約情報を知得することができる。   According to the invention described in claim 7, each contractor can receive the contract information by e-mail or browse the contract information posted on the web page. The contractor can know the contract information anytime, anywhere and quickly.

請求項8に記載の発明によれば、情報記憶手段によって、申込者端末から受信した異動情報が契約番号と関連付けて異動情報データベースに記憶されため、異動情報の記憶が契約申込者からの送信に基づいて正確かつ迅速に行われる。   According to the invention described in claim 8, since the change information received from the applicant terminal is stored in the change information database in association with the contract number by the information storage means, the transfer information is stored in the transmission from the contract applicant. Done accurately and quickly on the basis.

請求項9に記載の発明によれば、施工情報送信手段によって希望日よりも所定日数前または同日に施工情報が外部装置に送信されるため、遠隔制御装置や施工者などは、この施工情報に基づいて供給開始または供給停止を行うことができ、供給開始および供給停止の施工管理が確実化される。   According to the ninth aspect of the invention, since the construction information is transmitted to the external device by the construction information transmitting means a predetermined number of days before or on the same day as the desired date, the remote control device, the installer, etc. Supply start or supply stop can be performed based on this, and construction management of supply start and supply stop is ensured.

請求項10に記載の発明によれば、請求項1に記載の発明と同様に、契約番号に応じた契約諸元や留意事項などの契約情報を、各契約者に個別具体的に知らせることが可能となる。   According to the invention described in claim 10, as in the invention described in claim 1, contract information such as contract specifications and notices corresponding to the contract number can be individually and specifically notified to each contractor. It becomes possible.

以下、本発明を図示の実施形態に基づいて説明する。   Hereinafter, the present invention will be described based on the illustrated embodiments.

図1は、本発明の実施形態に係わる契約情報提供システム1の概略構成図である。この契約情報提供システム1は、ホストコンピュータ2と送電遠隔制御装置3(外部装置、遠隔制御装置)とを備え、通信網N(インターネット通信網を含む)を介してホストコンピュータ2のホストサーバ4と送電遠隔制御装置3とが通信可能に接続されている。また、申込者端末5と契約者端末6(ともにクライアントコンピュータ)とが通信網Nを介してホストサーバ4にアクセス可能(通信可能)となっている。   FIG. 1 is a schematic configuration diagram of a contract information providing system 1 according to an embodiment of the present invention. The contract information providing system 1 includes a host computer 2 and a power transmission remote control device 3 (external device, remote control device), and a host server 4 of the host computer 2 via a communication network N (including the Internet communication network). The power transmission remote control device 3 is communicably connected. Further, the applicant terminal 5 and the contractor terminal 6 (both client computers) are accessible (communicable) to the host server 4 via the communication network N.

送電遠隔制御装置3は、各契約者宅の電力メータに取り付けられ、電力(ライフライン源)の供給開始、供給停止を契約者宅毎(契約毎)に遠隔で行うものであり、既知の装置であるため、ここでは詳細な説明を省略するが、概略次のような構成となっている。すなわち、ホストコンピュータ2(ホストサーバ4)と制御信号などを送受信するための通信手段と、送電系の無停電バイパス端子に接続され送電路を接続・遮断するための接離手段(リレー)と、ホストコンピュータ2からの制御信号に基づいて接離手段を制御する制御手段とを備えている。そして、ホストコンピュータ2から電力供給開始指令を受信した際には、接離手段によって送電路を接続し、電力供給停止指令を受信した際には、接離手段によって送電路を遮断するものである。また、ホストコンピュータ2との通信では、図2に示すような通信データ構成となっており、ホストコンピュータ2からは電力メータを識別するためのメータ番号D1aと、供給開始か供給停止かを示す施工種別D1bとを含む施工情報D1が送信される。一方、送電遠隔制御装置3からはメータ番号D2aと、開始完了か停止完了かを示す完了種別D2bと、電力メータの指示数を示すメータ指示数D2cとを含む施工完了情報D2が送信されるようになっている。また、後述するように、メータ番号D1a、D2aは契約番号と関連付けられ、メータ番号D1a、D2aから契約番号が割り出されるようになっている。すなわち、送電遠隔制御装置3からメータ番号D2aを付して施工完了情報D2を送信することで、契約番号を含む施工完了情報D2が送信されるようになっている。なお、電力メータ毎に送電遠隔制御装置3が取り付けられているため、メータ番号D1a、D2aによって送電遠隔制御装置3も識別できるようになっている。   The power transmission remote control device 3 is attached to an electric power meter at each contractor's house, and remotely starts and stops the supply of power (lifeline source) for each contractor's house (each contract). Therefore, detailed description is omitted here, but the configuration is roughly as follows. That is, a communication means for transmitting and receiving a control signal and the like with the host computer 2 (host server 4), a contact / separation means (relay) for connecting / disconnecting the power transmission path connected to the uninterruptible bypass terminal of the power transmission system, Control means for controlling the contacting / separating means based on a control signal from the host computer 2. When a power supply start command is received from the host computer 2, the power transmission path is connected by the contact / separation means, and when the power supply stop command is received, the power transmission path is blocked by the contact / separation means. . Further, the communication with the host computer 2 has a communication data configuration as shown in FIG. 2, and the host computer 2 has a meter number D1a for identifying a power meter and a construction indicating whether supply is started or stopped. The construction information D1 including the type D1b is transmitted. On the other hand, the power transmission remote control device 3 is configured to transmit construction completion information D2 including a meter number D2a, a completion type D2b indicating start completion or stop completion, and a meter instruction number D2c indicating the instruction number of the power meter. It has become. As will be described later, the meter numbers D1a and D2a are associated with the contract numbers, and the contract numbers are determined from the meter numbers D1a and D2a. That is, the construction completion information D2 including the contract number is transmitted by attaching the meter number D2a from the power transmission remote control device 3 and transmitting the construction completion information D2. Since the power transmission remote control device 3 is attached to each power meter, the power transmission remote control device 3 can be identified by the meter numbers D1a and D2a.

ホストコンピュータ2はホストサーバ4と通信可能に接続(LAN接続)され、入出力部21と、異動情報データベース22と、契約者データベース23と、各種プログラム241〜246と、メモリ25と、これらを制御する制御部26とを備えている。   The host computer 2 is communicably connected to the host server 4 (LAN connection), and controls the input / output unit 21, the transfer information database 22, the contractor database 23, various programs 241 to 246, the memory 25, and these. And a control unit 26.

異動情報データベース22は、後述するように、申込者端末5から送信(入力)された異動情報に基づいて記憶され、図3に示すようなデータ構成となっている。すなわち、契約番号222毎に異動ID221(識別番号)が付され、契約者名223、契約者連絡先224、申込者名225、申込者連絡先226、メータ番号227、異動種別228、契約種別229、住所22a、支払方法22b、希望日22c、引越日22d、給湯機22eおよびその他22fが記憶されている。そして、契約者名223には契約者の氏名が記憶され、契約者連絡先224には契約者の連絡先電話番号や電子メールアドレスが記憶され、申込者名225には申込者の氏名が記憶され、申込者連絡先226には申込者の連絡先電話番号や電子メールアドレスが記憶され、メータ番号227には供給開始または供給停止の対象となる住居などに設置されている電力メータのメータ番号が記憶され、異動種別228には供給開始または供給停止が記憶され、契約種別229には従量電灯Aなど契約された電力供給の種別が記憶され、住所22aには供給開始または供給停止の対象となる住居などの住所が記憶され、支払方法22bには口座振替、クレジットカード支払い、振込用紙支払いなどの料金の支払い方法が記憶され、さらに、請求書の送付の要否および、口座振替で希望日振替を望む場合にはその希望日が記憶されている。希望日22cには供給開始または供給停止の施工希望日が記憶され、引越日22dには入居日または出居日が記憶され、給湯機22eには電気給湯機の契約有無および契約している場合の契約種別が記憶される。   As will be described later, the change information database 22 is stored based on the change information transmitted (input) from the applicant terminal 5 and has a data configuration as shown in FIG. That is, a change ID 221 (identification number) is assigned to each contract number 222, and a contractor name 223, a contractor contact 224, an applicant name 225, an applicant contact 226, a meter number 227, a transfer type 228, and a contract type 229. Address 22a, payment method 22b, desired date 22c, moving date 22d, hot water heater 22e and others 22f are stored. The contractor name 223 stores the contractor's name, the contractor contact information 224 stores the contractor's contact telephone number and e-mail address, and the applicant name 225 stores the applicant's name. The applicant contact information 226 stores the contact telephone number and e-mail address of the applicant, and the meter number 227 is the meter number of the electric power meter installed in the residence to be supplied or stopped. The transfer type 228 stores supply start or supply stop, the contract type 229 stores the contracted power supply type such as metered lamp A, and the address 22a indicates the supply start or supply stop target. The address of the house, etc. is stored, and the payment method 22b stores the payment method of charges such as account transfer, credit card payment, payment form payment, etc. Necessity and with, the desired date is stored in the case of direct debit overlooking the desired date of transfer. When the desired start date of supply 22c is stored in the desired date 22c, the move-in date 22d is stored in the move-in date or the move-in date, and the hot water heater 22e is contracted for the presence or absence of an electric water heater. The contract type is stored.

契約者データベース23は、契約中(電力供給中)の契約者に関する情報を記憶するものであり、後述するように、供給開始の施工が完了すると異動情報データベース22の情報に基づいて記憶され、図4に示すようなデータ構成となっている。すなわち、契約番号231毎に、契約者名232、契約者連絡先233、メータ番号234、契約種別235、住所236、支払方法237、給湯機238およびその他239が記憶される。各記憶内容は異動情報データベース22と同様であるが、支払方法237には、口座振替の場合の振替日も記憶される。   The contractor database 23 stores information related to contractors under contract (during power supply). As will be described later, the contractor database 23 is stored based on the information in the transfer information database 22 when the construction for starting the supply is completed. The data structure is as shown in FIG. That is, for each contract number 231, the contractor name 232, the contractor contact information 233, the meter number 234, the contract type 235, the address 236, the payment method 237, the hot water heater 238, and others 239 are stored. Each stored content is the same as the transfer information database 22, but the payment method 237 also stores a transfer date in the case of account transfer.

契約情報作成プログラム241(契約情報作成手段)は、後述するように送電遠隔制御装置3から施工完了情報D2を受信した際に、異動情報データベース22に記憶された異動情報に基づいて契約情報を作成するプログラムであり、図5に示すフローチャートに基づいている。まず、送電遠隔制御装置3から送信された施工完了情報D2に含まれているメータ番号D2aから異動情報を取得する(ステップS1)。すなわち、メータ番号D2aと同値のメータ番号227を有する異動ID221を検索し、その異動情報を取得する。次に、異動種別228または完了種別D2bから供給開始か否かを判断し(ステップS2)、供給開始でない場合つまり供給停止の場合には、フォームCを取得し(ステップS3)、供給開始の場合には、契約者名223と同一の契約者名で異動種別228が供給停止である他の契約番号222が異動情報データベース22に含まれているか否かを、後述する停止検索プログラム242(停止検索手段)によって検索する(ステップS4)。そして、該当する他の契約番号222がある場合(ステップS5で「Y」の場合)にはフォームAを取得し(ステップS6)、該当する他の契約番号222がない場合(ステップS5で「N」の場合)にはフォームBを取得する(ステップS7)。ここで、契約情報は、予め記憶されたフォーム(書式)に基づいて作成され、本実施形態では、フォームA〜Cに基づいて作成されるようになっている。すなわち、フォームAは同一契約者に対して供給停止と供給開始とを行う場合、つまり同一の電力会社の供給地域内で契約者が引越をする場合に使用され、フォームBは供給開始のみを行う場合に使用され、フォームCは供給停止のみを行う場合に使用される書式である。   The contract information creation program 241 (contract information creation means) creates contract information based on the change information stored in the change information database 22 when receiving the construction completion information D2 from the power transmission remote control device 3 as will be described later. And is based on the flowchart shown in FIG. First, transfer information is acquired from the meter number D2a included in the construction completion information D2 transmitted from the power transmission remote control device 3 (step S1). That is, the change ID 221 having the same meter number 227 as the meter number D2a is searched, and the change information is acquired. Next, it is determined whether or not the supply is started from the change type 228 or the completion type D2b (step S2). If the supply is not started, that is, if the supply is stopped, the form C is acquired (step S3). Includes a stop search program 242 (stop search), which will be described later, as to whether or not another contract number 222 having the same contractor name as the contractor name 223 and the transfer type 228 is supply-stopped is included in the transfer information database 22. Means) (step S4). If there is another applicable contract number 222 (in the case of “Y” in step S5), the form A is acquired (step S6), and if there is no other applicable contract number 222 (“N” in step S5). "), Form B is acquired (step S7). Here, the contract information is created based on a form (format) stored in advance, and in the present embodiment, the contract information is created based on the forms A to C. That is, Form A is used when supply is stopped and started for the same contractor, that is, when the contractor moves within the supply area of the same power company, Form B only starts supply. Form C is a format used when only supplying is stopped.

次に、これらのフォームA〜Cに必要事項を入力(記入)し、契約情報を作成する(ステップS8)。ここでは、フォームAに必要事項を入力する場合について説明する。フォームAは、図6に示すような書式となっており、各必要事項(図6中の項目1〜14)へは異動情報などに基づいて入力される。すなわち、図7に示すように、契約者名(項目1)には契約者名223が入力され、営業所(項目2)には住所22aを管轄する営業所名が入力され、担当者(項目3)には住所22aを担当する担当者名が入力される。なお、管轄営業所と担当者とは、予め地域(住所)毎に割り当てられ、その割り当てリスト(表)がメモリ25に記憶されている。完了日(項目4)には希望日22cが記憶され、契約番号(項目5)には契約番号222が記憶される。契約開始日(項目6)には引越日22dが記憶され、開始指示数(項目7)には完了種別D2bが開始完了の施工完了情報D2のメータ指示数D2cが記憶される。契約種別(項目8)には契約種別229が記憶され、支払方法(項目9)には支払方法22bが記憶される。現在の振替日(項目10)には上記の他の契約番号222(契約者データベース23の231)の支払方法237に記憶されている振替日が記憶され、本契約の振替日(項目11)には後述する振替日割出プログラム244(振替日割出手段)によって割り出された振替日が記憶される。検針日(項目12)には後述する検針日割出プログラム243(検針日割出手段)によって割り出された検針日が記憶され、申込者(項目13)には申込者名225が記憶される。そして、廃止日(項目14)には上記の他の契約番号222の希望日22cが記憶されるものである。最後に、異動種別228が供給開始で、給湯機22eが契約有りか否かが判断され(ステップS9)、供給開始で契約有りの場合には、メモリ25に予め記憶されている給湯機に関する留意事項が取得される(ステップS10)。なお、上記のように契約情報作成プログラム241において振替日や検針日を割り出しているが、後述する情報記憶プログラム245(情報記憶手段)において割り出し、記憶するようにしてもよい。   Next, necessary information is entered (filled in) in these forms A to C to create contract information (step S8). Here, a case where necessary items are input to Form A will be described. The form A has a format as shown in FIG. 6, and is input to each necessary item (items 1 to 14 in FIG. 6) based on the transfer information. That is, as shown in FIG. 7, the contractor name 223 is input to the contractor name (item 1), the sales office name having jurisdiction over the address 22a is input to the sales office (item 2), and the person in charge (item In 3), the name of the person in charge in charge of the address 22a is input. The responsible sales office and the person in charge are assigned in advance for each region (address), and an assignment list (table) is stored in the memory 25. The desired date 22c is stored as the completion date (item 4), and the contract number 222 is stored as the contract number (item 5). The moving date 22d is stored in the contract start date (item 6), and the meter instruction number D2c of the construction completion information D2 in which the completion type D2b is start completion is stored in the start instruction number (item 7). The contract type (item 8) stores the contract type 229, and the payment method (item 9) stores the payment method 22b. In the current transfer date (item 10), the transfer date stored in the payment method 237 of the other contract number 222 (231 of the contractor database 23) is stored, and the transfer date (item 11) of this contract is stored. Stores the transfer date determined by the transfer date indexing program 244 (transfer date indexing means) described later. The meter reading date (item 12) stores the meter reading date calculated by the meter reading date indexing program 243 (meter reading date indexing means) described later, and the applicant name (item 13) stores the applicant name 225. . The desired date 22c of the other contract number 222 is stored as the abolition date (item 14). Finally, it is determined whether or not the transfer type 228 starts supply and the hot water heater 22e has a contract (step S9). When the supply starts and contract has been made, a note on the hot water heater stored in the memory 25 in advance is provided. Items are acquired (step S10). Although the transfer date and meter reading date are determined in the contract information creation program 241 as described above, they may be determined and stored in an information storage program 245 (information storage means) described later.

停止検索プログラム242は、受信した施工完了情報D2の完了種別D2bが開始完了(当該契約番号222の異動種別228が供給開始)である場合に、当該契約番号222の契約者名223と同一の契約者名で異動種別228が供給停止である他の契約番号222を異動情報データベース22から検索するプログラムであり、図8に示すフローチャートに基づいている。まず、異動情報データベース22から最初の異動ID221の異動情報を取得し(ステップS21)、その契約者名223が同一か否かを判断する(ステップS22)。そして、同一でない場合には、すべての異動ID221に対する検索が終了したか否かを判断し(ステップS23)、終了している場合には本プログラムを終了し、終了していない場合には次の異動ID221に進み(ステップS24)、同様の処理を繰り返す。一方、契約者名223が同一である場合には、その異動ID221の異動種別228が供給停止であるか否かを判断し(ステップS25)、供給停止でない場合には上記のステップS23に進む。また、供給停止である場合には、その異動ID221をバッファーにリターン値として記憶し(ステップS26)、本プログラムを終了するものである。なお、本実施形態では、このような停止検索プログラム242によって他の契約番号222を検索しているが、後述する情報記憶プログラム245において、供給開始の異動ID221のその他22fに、供給停止の異動ID221を記憶することで、他の契約番号222を検索(取得)できるようにしてもよい。   If the completion type D2b of the received construction completion information D2 is start completion (the transfer type 228 of the contract number 222 starts supplying), the stop search program 242 has the same contract as the contractor name 223 of the contract number 222 This is a program for searching the transfer information database 22 for another contract number 222 for which the transfer type 228 is the supply stop with the person name, and is based on the flowchart shown in FIG. First, the transfer information of the first transfer ID 221 is acquired from the transfer information database 22 (step S21), and it is determined whether or not the contractor name 223 is the same (step S22). If they are not the same, it is determined whether or not the search for all the change IDs 221 has been completed (step S23). If the search is completed, the program is terminated. The process proceeds to the change ID 221 (step S24), and the same processing is repeated. On the other hand, if the contractor name 223 is the same, it is determined whether or not the change type 228 of the change ID 221 is supply stop (step S25), and if not supply stop, the process proceeds to step S23. If the supply is stopped, the change ID 221 is stored in the buffer as a return value (step S26), and the program is terminated. In this embodiment, the other contract number 222 is searched by such a stop search program 242, but in the information storage program 245 described later, the supply stop change ID 221 is added to the other 22f of the supply start change ID 221. , The other contract number 222 may be searched (acquired).

検針日割出プログラム243は、住所22aに基づいて電力メータの検針日を割り出すプログラムであり、予め地域毎に割り当てられた検針日がメモリ25に記憶され、住所22aが該当する地域から検針日を割り出すものである。   The meter reading date indexing program 243 is a program for determining the meter reading date of the power meter based on the address 22a. The meter reading date assigned in advance for each region is stored in the memory 25, and the meter reading date is calculated from the region to which the address 22a corresponds. It is to be determined.

振替日割出プログラム244は、検針日に基づいて口座振替の振替日を割り出すプログラムであり、図9に示すフローチャートに基づいている。まず、支払方法22bから希望日振替を望むか否かを判断し(ステップS31)、望む場合にはその希望日での振替が可能か否かを判断する(ステップS32)。すなわち、本実施形態では、希望日が検針日+9日目から+20日目までの間の場合に、その希望日での振替を可能としている。そして、支払方法22bに記憶されている希望日と、検針日割出プログラム243によって割り出された検針日とによって、その希望日での振替が可能か否かを判断するものである。次に、希望日での振替が可能であると、振替日をその希望日としてバッファー(リターン値)に記憶する(ステップS33)。一方、希望日振替を望まない場合および、希望日での振替が可能でない場合には、支払方法22bから請求書の送付を要するか否かを判断する(ステップS34)。そして、請求書の送付を要する場合には、振替日を検針日+20日としてバッファーに記憶し(ステップS35)、請求書の送付を要しない場合には、振替日を検針日+9日としてバッファーに記憶する(ステップS36)ものである。   The transfer date indexing program 244 is a program for determining the transfer date of account transfer based on the meter reading date, and is based on the flowchart shown in FIG. First, it is determined whether or not desired date transfer is desired from the payment method 22b (step S31), and if desired, it is determined whether or not transfer on the desired date is possible (step S32). That is, in this embodiment, when the desired date is between the meter reading date + the ninth day to the + 20th day, the transfer on the desired date is enabled. Then, based on the desired date stored in the payment method 22b and the meter reading date determined by the meter reading date indexing program 243, it is determined whether or not transfer on the desired date is possible. Next, if transfer on the desired date is possible, the transfer date is stored in the buffer (return value) as the desired date (step S33). On the other hand, when the transfer on the desired date is not desired and the transfer on the desired date is not possible, it is determined whether or not it is necessary to send an invoice from the payment method 22b (step S34). If the invoice needs to be sent, the transfer date is stored in the buffer as the meter reading date + 20 days (step S35). If the invoice is not required to be sent, the transfer date is set as the meter reading date + 9 days in the buffer. This is stored (step S36).

情報記憶プログラム245は、申込者端末5から異動情報を受信した際にその異動情報を契約番号と関連付けて異動情報データベース22に記憶するプログラムである。具体的には、本実施形態では、申込者端末5がホストサーバ4にアクセスし、案内に従って図3に示すような異動情報が入力されると、図10に示すフローチャートに基づいて処理するものである。なお、申込者端末5からは、異動ID221とメータ番号227とは入力されず、また、異動種別228が供給開始の場合には新たな契約のため契約番号222が入力されないものとする。まず、申込者端末5から入力された異動情報を取得し(ステップS41)、異動ID221を取得(付与)する(ステップS42)。ここで、異動ID221は異動情報データベース22上の連番とする。次に、契約番号222が入力されていない場合(ステップS43で「N」の場合)には、契約番号を取得(付与)する(ステップS44)。ここで、契約番号は契約システム上の連番とする。続いて、異動種別228が供給停止の場合には、契約者データベース23からメータ番号234を取得し、異動種別228が供給開始の場合には、住所22aからメータ番号を取得する(ステップS45)。なお、メータ番号は、住所22a(電力メータの設置住居など)と関連付けてメモリ25に記憶されている。そして、これらの情報を異動情報データベース22に記憶する(ステップS46)ものである。   The information storage program 245 is a program for storing the transfer information in the transfer information database 22 in association with the contract number when the transfer information is received from the applicant terminal 5. Specifically, in this embodiment, when the applicant terminal 5 accesses the host server 4 and the change information as shown in FIG. 3 is input according to the guidance, the processing is performed based on the flowchart shown in FIG. is there. It should be noted that the change ID 221 and the meter number 227 are not input from the applicant terminal 5, and the contract number 222 is not input because the transfer type 228 is a new contract when supply is started. First, the change information input from the applicant terminal 5 is acquired (step S41), and the change ID 221 is acquired (given) (step S42). Here, the change ID 221 is a serial number on the change information database 22. Next, when the contract number 222 has not been input (in the case of “N” in step S43), the contract number is acquired (assigned) (step S44). Here, the contract number is a serial number on the contract system. Subsequently, when the change type 228 is supply stop, the meter number 234 is acquired from the contractor database 23, and when the change type 228 is supply start, the meter number is acquired from the address 22a (step S45). The meter number is stored in the memory 25 in association with the address 22a (such as a residence where the power meter is installed). These pieces of information are stored in the transfer information database 22 (step S46).

施工情報送信プログラム246(施工情報送信手段)は、異動情報データベース22に記憶されている希望日22cの同日に、該当する送電遠隔制御装置3に施工情報D1を送信するためのプログラムであり、毎日定刻に制御部26によって起動され、図11に示すフローチャートに基づいている。まず、異動情報データベース22から最初の異動ID221の異動情報を取得し(ステップS51)、その希望日22cが本日(当日)であるか否かを判断する(ステップS52)。そして、本日でない場合には、すべての異動ID221に対する検索が終了したか否かを判断し(ステップS55)、終了している場合には本プログラムを終了し、終了していない場合には次の異動ID221に進み(ステップS56)、同様の処理を繰り返す。一方、希望日22cが本日である場合には、施工情報D1を作成する(ステップS53)。すなわち、メータ番号D1aにメータ番号227を入力し、施工種別D1bに異動種別228を入力して、施工情報D1を作成する。そして、この施工情報D1を該当する送電遠隔制御装置3にホストサーバ4を介して送信し(ステップS54)、上記のステップS55に進むものである。なお、本実施形態では、希望日22cの当日に施工情報D1を送信しているが、希望日22cよりも所定日数前に送信するようにしてもよい。   The construction information transmission program 246 (construction information transmission means) is a program for transmitting the construction information D1 to the corresponding power transmission remote control device 3 on the same day as the desired date 22c stored in the transfer information database 22, and every day It is activated by the control unit 26 at regular intervals and is based on the flowchart shown in FIG. First, the transfer information of the first transfer ID 221 is acquired from the transfer information database 22 (step S51), and it is determined whether or not the desired date 22c is today (the current day) (step S52). If it is not today, it is determined whether or not the search for all the change IDs 221 has been completed (step S55). If the search has been completed, the program is terminated. The process proceeds to the change ID 221 (step S56), and the same processing is repeated. On the other hand, when the desired date 22c is today, the construction information D1 is created (step S53). That is, the meter number 227 is input to the meter number D1a, the change type 228 is input to the construction type D1b, and the construction information D1 is created. Then, the construction information D1 is transmitted to the corresponding power transmission remote control device 3 via the host server 4 (step S54), and the process proceeds to the above step S55. In the present embodiment, the construction information D1 is transmitted on the day of the desired date 22c, but may be transmitted a predetermined number of days before the desired date 22c.

ホストサーバ4は、情報出力手段や施工情報送信手段などとして機能し、送電遠隔制御装置3との間で施工情報D1および施工完了情報D2を送受信し、申込者端末5から異動情報を受信したり、契約者端末6に契約情報を送信し、または、ウェブページに契約情報を掲載したりするものである。また、申込者端末5は、異動(異動)に関する申し込みを行う申込者の情報端末器(パーソナルコンピュータや携帯電話など)で、契約者端末6は契約者の情報端末器で、申込者端末5と契約者端末6とは、同一である場合と同一でない場合とが想定される。例えば、不動産業者が申込者の場合には、申込者端末5と契約者端末6とが同一ではなく、契約者が申込者の場合には同一となる。   The host server 4 functions as an information output means, a construction information transmission means, etc., and transmits / receives construction information D1 and construction completion information D2 to / from the power transmission remote control device 3, and receives transfer information from the applicant terminal 5. The contract information is transmitted to the contractor terminal 6 or the contract information is posted on the web page. In addition, the applicant terminal 5 is an information terminal (such as a personal computer or a mobile phone) of an applicant who applies for transfer (transfer), and the contractor terminal 6 is an information terminal of the contractor. The contractor terminal 6 is assumed to be the same or not the same. For example, when the real estate agent is the applicant, the applicant terminal 5 and the contractor terminal 6 are not the same, and when the contractor is the applicant, they are the same.

次に、このような構成の契約情報提供システム1の動作を図12に示すフローチャートに基づいて説明する。なお、ここでは、上記と同様に、同一契約者に対し供給停止と供給開始とを行う場合、つまり同一の電力会社の供給地域内で契約者が引越をする(再使用契約を行う)場合を例にして説明する。   Next, the operation of the contract information providing system 1 having such a configuration will be described based on the flowchart shown in FIG. In addition, here, in the same way as described above, when stopping supply and starting supply to the same contractor, that is, when the contractor moves within the supply area of the same electric power company (reuse contract). An example will be described.

まず、申込者端末5からホストコンピュータ2(ホストサーバ4)に異動情報が送信されると(ステップS61)、上記の情報記憶プログラム245によって、異動情報が契約番号とともに異動情報データベース22に記憶され(ステップS62)、ホストコンピュータ2から申込者端末5に受付確認のメッセージが送信される(ステップS63)。次に、上記の施工情報送信プログラム246が起動され(ステップS64)、その日に施工すべき異動情報(希望日22c)があると、該当する送電遠隔制御装置3に施工情報D1が送信される(ステップS65)。そして、この施工情報D1を受信した送電遠隔制御装置3によって、施工種別D1bに従って送電路が接続または遮断され(ステップS66)、施工完了情報D2がホストコンピュータ2に送信される(ステップS67)。続いて、完了種別D2bが開始完了の場合には、上記のようにして契約者データベース23にデータが記憶されるとともに(ステップS68)、異動情報データベース22から当該異動情報が削除される。次に、上記の契約情報作成プログラム241によって契約情報が作成され(ステップS69)、この情報がウェブページに掲載されるとともに(ステップS70)、契約者端末6の電子メールアドレスが登録されている場合には、契約情報が当該電子メールアドレス宛に送信される(ステップS71)。なお、ウェブページに掲載された契約情報は、識別番号とパスワードとを入力しなければ、閲覧できないようになっている。ここで、契約情報は、上記の図6に示すようなフォームAに必要事項が入力されたものであり、上記のように異動種別228が供給開始で、給湯機22eが契約有りの場合には、図13に示すような留意事項も契約情報として掲載および送信される。   First, when transfer information is transmitted from the applicant terminal 5 to the host computer 2 (host server 4) (step S61), the transfer information is stored in the transfer information database 22 together with the contract number by the information storage program 245 ( In step S62), a reception confirmation message is transmitted from the host computer 2 to the applicant terminal 5 (step S63). Next, the construction information transmission program 246 is started (step S64), and when there is change information (desired date 22c) to be constructed on that day, the construction information D1 is transmitted to the corresponding power transmission remote control device 3 ( Step S65). Then, the power transmission remote control device 3 that has received the construction information D1 connects or blocks the power transmission path according to the construction type D1b (step S66), and the construction completion information D2 is transmitted to the host computer 2 (step S67). Subsequently, when the completion type D2b is start completion, the data is stored in the contractor database 23 as described above (step S68), and the transfer information is deleted from the transfer information database 22. Next, contract information is created by the contract information creation program 241 (step S69), this information is posted on the web page (step S70), and the e-mail address of the contractor terminal 6 is registered. The contract information is transmitted to the e-mail address (step S71). The contract information posted on the web page cannot be browsed unless an identification number and a password are input. Here, the contract information is information in which necessary items are entered in the form A as shown in FIG. 6, and when the transfer type 228 is started to be supplied and the water heater 22e has a contract as described above. Note items as shown in FIG. 13 are also posted and transmitted as contract information.

以上のように、本契約情報提供システム1によれば、ホストコンピュータ2が送電遠隔制御装置3から施工完了情報D2を受信すると、契約情報が作成され、この契約情報がインターネットを介して各契約者に個別具体的に知らされる。このため、各契約者は、自己の契約内容を確実に知得、確認することができる。しかも、送電遠隔制御装置3からホストコンピュータ2に施工完了情報D2が送信された時点で、契約情報が各契約者に個別具体的に知らされるため、迅速かつ的確な情報提供が可能となる。   As described above, according to the contract information providing system 1, when the host computer 2 receives the construction completion information D2 from the power transmission remote control device 3, the contract information is created, and this contract information is sent to each contractor via the Internet. Individually informed. For this reason, each contractor can know and confirm his / her contract contents with certainty. In addition, when the construction completion information D2 is transmitted from the power transmission remote control device 3 to the host computer 2, the contract information is specifically notified to each contractor, so that it is possible to provide information quickly and accurately.

また、契約情報に多種の情報が含まれているため、契約者への情報提供が充実される。すなわち、上記のように再使用契約を行う場合に、引越前の廃止情報や振替日情報なども契約情報に含まれるため、各契約者は、引越前の情報と引越し先の情報とを契約情報によって知ることができ、引越前後における契約諸元の変更などを容易かつ的確に把握することが可能となる。また、検針日と口座振替の振替日とが含まれるため、各契約者は、料金支払等に重要な検針日と振替日とを、個別具体的にかつより確実に知ることができる。さらに、メータ指示数が含まれているため、各契約者は、料金計算等に重要な供給開始の際のメータ指示数または、供給停止の際のメータ指示数を、個別具体的にかつより確実に知ることができる。加えて、給湯機が有りの場合には、給湯機に関する留意事項が含まれるため、各契約者は、当該留意事項を個別具体的にかつより確実に知ることができる。これにより、電気給湯機本体などのブレーカを「入」にすることを忘れたり、リモコンの時刻設定をし忘れたりすることが効果的に防止され、正常に給湯機を使用することが可能となる。このようにして、各契約者が必要とする契約諸元や留意事項などの内容に応じて、異動情報や契約情報作成プログラム241を変更することで、より多種かつ個別具体的な契約情報を各契約者に知らせることが可能となる。   In addition, since the contract information includes various kinds of information, provision of information to the contractor is enhanced. In other words, when a re-use contract is made as described above, since the abolition information and transfer date information before moving are also included in the contract information, each contractor uses the contract information as the information before moving and the information of the moving destination. This makes it possible to easily and accurately grasp changes in contract specifications before and after moving. In addition, since the meter reading date and the transfer date of account transfer are included, each contractor can know the meter reading date and the transfer date important for fee payment individually and more specifically. In addition, since the number of meter instructions is included, each contractor can specify the number of meter instructions at the start of supply or the number of meter instructions at the time of stoppage, which is important for charge calculation, etc. individually and more reliably. Can know. In addition, when there is a hot water heater, considerations regarding the hot water heater are included, so that each contractor can know the considerations individually and specifically. This effectively prevents forgetting to turn on a breaker such as the main body of an electric water heater or forgetting to set the time on the remote controller, and the water heater can be used normally. . In this way, by changing the transfer information and the contract information creation program 241 according to the contents of the contract specifications and notices required by each contractor, more various and individual specific contract information can be obtained. It becomes possible to inform the contractor.

しかも、契約情報を電子メールによって受信したり、ウェブページに掲載された契約情報を閲覧することができるため、インターネット環境下であれば、各契約者は、いつでもどこででも、かつ迅速に契約情報を知得することができる。また、情報記憶プログラム245によって、申込者端末5から受信した異動情報が異動情報データベース22に記憶されため、異動情報の記憶が契約申込者からの送信に基づいて正確かつ迅速に行われる。さらに、施工情報送信プログラム246によって、希望日22cの当日(同日)に施工情報D1が送電遠隔制御装置3に送信されるため、この施工情報D1に基づいて供給開始および供給停止が施工実施され、施工管理が確実化される。   Moreover, since contract information can be received by e-mail and contract information posted on a web page can be viewed, each contractor can quickly and easily receive contract information anytime, anywhere under the Internet environment. You can know. Further, since the change information received from the applicant terminal 5 is stored in the change information database 22 by the information storage program 245, the change information is stored accurately and quickly based on transmission from the contract applicant. Furthermore, since the construction information transmission program 246 transmits the construction information D1 to the power transmission remote control device 3 on the same day (the same day) of the desired date 22c, the supply start and the supply stop are performed based on the construction information D1, Construction management is ensured.

以上、この発明の実施形態について説明したが、具体的な構成は、本実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、本実施形態では、異動情報データベース22と契約者データベース23とを別に設けているが、1つのデータベースとしてもよく、また、インターネットを介して契約情報を出力しているが、契約情報を紙によって出力する出力手段であってもよい。さらに、外部装置を送電遠隔制御装置3としているが、供給開始、供給停止を施工する施工者の施工者端末としてもよい。この場合、施工情報送信プログラム246において、施工者端末の施工者が施工すべき異動ID221の施工情報D1(異動情報)が当該施工者端末に送信される。そして、施工が完了すると、この施工者端末から施工完了情報D2が送信され、契約情報が作成、送信されるものである。また、本実施形態では、ライフライン源が電力であるが、ガス、水道、通信などその他のライフライン源に対しても、本契約情報提供システム1を適用できることは勿論である。   Although the embodiment of the present invention has been described above, the specific configuration is not limited to the present embodiment, and design changes and the like within a scope not departing from the gist of the present invention are included in the present invention. It is. For example, in the present embodiment, the transfer information database 22 and the contractor database 23 are provided separately, but may be a single database, and contract information is output via the Internet. May be output means for outputting. Furthermore, although the external device is the power transmission remote control device 3, it may be a builder terminal of a builder who starts supplying and stopping supplying. In this case, in the construction information transmission program 246, construction information D1 (change information) of the change ID 221 to be executed by the builder of the builder terminal is transmitted to the builder terminal. And when construction is completed, construction completion information D2 is transmitted from this builder terminal, and contract information is created and transmitted. In the present embodiment, the lifeline source is electric power. However, the contract information providing system 1 can be applied to other lifeline sources such as gas, water, and communication.

本発明の実施形態に係わる契約情報提供システムの概略構成図。1 is a schematic configuration diagram of a contract information providing system according to an embodiment of the present invention. 本発明の実施形態に係わる契約情報提供システムにおけるホストコンピュータと送電遠隔制御装置との通信データ構成図。The communication data block diagram of the host computer and power transmission remote control apparatus in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける異動情報データベースのデータ構成図。The data block diagram of the change information database in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける契約者データベースのデータ構成図。The data block diagram of the contractor database in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける契約情報作成プログラムのフローチャート。The flowchart of the contract information creation program in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおいて、契約情報を作成するためのフォーム(書式)Aを示す図。The figure which shows the form (form) A for creating contract information in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおいて、フォーム(書式)Aに入力すべき必要事項の情報変換を示す図。The figure which shows the information conversion of the required matter which should be input into the form (form) A in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける停止検索プログラムのフローチャート。The flowchart of the stop search program in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける振替日割出プログラムのフローチャート。The flowchart of the transfer date indexing program in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける情報記憶プログラムのフローチャート。The flowchart of the information storage program in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおける施工情報送信プログラムのフローチャート。The flowchart of the construction information transmission program in the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムの動作を示すフローチャート。The flowchart which shows operation | movement of the contract information provision system concerning embodiment of this invention. 本発明の実施形態に係わる契約情報提供システムにおいて、給湯機の契約が有りの場合の留意事項を示す図。The figure which shows the notes in case there exists a contract of a water heater in the contract information provision system concerning embodiment of this invention.

符号の説明Explanation of symbols

1 契約情報提供システム
2 ホストコンピュータ
21 入出力部
22 異動情報データベース
23 契約者データベース
241 契約情報作成プログラム(契約情報作成手段)
242 停止検索プログラム(停止検索手段)
243 検針日割出プログラム(検針日割出手段)
244 振替日割出プログラム(振替日割出手段)
245 情報記憶プログラム(情報記憶手段)
246 施工情報送信プログラム(施工情報送信手段)
25 メモリ
26 制御部
3 送電遠隔制御装置(外部装置、遠隔制御装置)
4 ホストサーバ(情報出力手段、施工情報送信手段)
5 申込者端末
6 契約者端末
N 通信網
DESCRIPTION OF SYMBOLS 1 Contract information provision system 2 Host computer 21 Input-output part 22 Transfer information database 23 Contractor database 241 Contract information creation program (contract information creation means)
242 Stop search program (stop search means)
243 Meter reading day indexing program (meter reading day indexing means)
244 Transfer date indexing program (transfer date indexing means)
245 Information storage program (information storage means)
246 Construction information transmission program (construction information transmission means)
25 memory 26 control unit 3 power transmission remote control device (external device, remote control device)
4 Host server (information output means, construction information transmission means)
5 Applicant terminal 6 Contractor terminal N Communication network

Claims (10)

電力、ガス、水道などのライフライン源の供給開始、供給停止が施工された際に、契約情報を契約者に知らせる契約情報提供システムであって、
前記施工の完了を知らせる外部装置とホストコンピュータとが通信可能に接続され、前記ホストコンピュータに、契約番号毎に契約者の異動情報を記憶する異動情報データベースと、前記異動情報に基づいて契約情報を作成する契約情報作成手段と、この契約情報作成手段によって作成された契約情報を出力する情報出力手段とを備え、
前記ホストコンピュータが前記外部装置から契約番号を含む施工完了情報を受信すると、受信した契約番号に対応した異動情報を前記異動情報データベースから取得し、この異動情報に基づいて前記契約情報作成手段によって契約情報を作成し、この契約情報を前記情報出力手段によって出力する、
ことを特徴とする契約情報提供システム。
A contract information providing system that informs the contractor of contract information when the supply start or stop of supply of lifeline sources such as electric power, gas, and water is performed.
An external device for notifying completion of the construction and a host computer are communicably connected to each other, a change information database for storing change information of a contractor for each contract number in the host computer, and contract information based on the change information. A contract information creating means for creating, and an information output means for outputting the contract information created by the contract information creating means,
When the host computer receives the construction completion information including the contract number from the external device, the transfer information corresponding to the received contract number is acquired from the transfer information database, and a contract is created by the contract information creating means based on the transfer information. Creating information and outputting the contract information by the information output means;
A contract information provision system characterized by this.
前記外部装置が、前記ライフライン源の供給開始、供給停止を遠隔で行う遠隔制御装置、または、前記供給開始、供給停止を施工する施工者の施工者端末である、
ことを特徴とする請求項1に記載の契約情報提供システム。
The external device is a remote control device for remotely starting and stopping the supply of the lifeline source, or a contractor terminal of a contractor for constructing the supply start and supply stop.
The contract information providing system according to claim 1, wherein:
前記異動情報データベースに、契約番号毎に契約者名と供給開始または供給停止の異動種別とが記憶され、
前記ホストコンピュータに、前記施工完了情報に含まれている契約番号の異動種別が供給開始である場合に、当該契約番号の契約者名と同一の契約者名で異動種別が供給停止である他の契約番号を前記異動情報データベースから検索する停止検索手段を備え、
この停止検索手段によって該当する他の契約番号が検索された場合に、前記異動情報データベースから当該他の契約番号に対応した異動情報を取得し、この異動情報にも基づいて契約情報を前記契約情報作成手段によって作成する、
ことを特徴とする請求項1または請求項2に記載の契約情報提供システム。
In the transfer information database, the contractor name and the supply start or stop change type are stored for each contract number,
In the host computer, when the change type of the contract number included in the construction completion information is start of supply, the transfer type is the same as the contractor name of the contract number and the transfer type is supply stop. A stop search means for searching a contract number from the transfer information database;
When the corresponding other contract number is searched by the stop search means, the transfer information corresponding to the other contract number is acquired from the transfer information database, and the contract information is also obtained based on the transfer information. Create by creating means,
The contract information providing system according to claim 1 or claim 2, wherein
前記異動情報データベースに、契約番号毎に住所と料金支払方法とが記憶され、
前記ホストコンピュータに、住所に基づいてメータ検針日を割り出す検針日割出手段と、メータ検針日に基づいて口座振替の振替日を割り出す振替日割出手段とを備え、
前記施工完了情報に含まれている契約番号の住所に基づいて前記検針日割出手段によってメータ検針日を割り出し、このメータ検針日を含む契約情報を前記契約情報作成手段によって作成し、
前記施工完了情報に含まれている契約番号の料金支払方法が口座振替の場合に、前記割り出されたメータ検針日に基づいて前記振替日割出手段によって振替日を割り出し、この振替日を含む契約情報を前記契約情報作成手段によって作成する、
ことを特徴とする請求項1から請求項3のいずれか1項に記載の契約情報提供システム。
In the transfer information database, an address and a fee payment method are stored for each contract number,
The host computer includes a meter reading date indexing unit that calculates a meter reading date based on an address, and a transfer date indexing unit that calculates a transfer date for account transfer based on the meter reading date,
The meter reading date is calculated by the meter reading date indexing means based on the address of the contract number included in the construction completion information, and contract information including the meter reading date is created by the contract information creating means,
When the fee payment method for the contract number included in the construction completion information is account transfer, the transfer date indexing means calculates the transfer date based on the calculated meter reading date and includes this transfer date. Creating contract information by the contract information creating means;
The contract information providing system according to any one of claims 1 to 3, characterized in that:
前記ホストコンピュータに給湯機に関する留意事項が記憶され、前記異動情報データベースに契約番号毎に給湯機の有無が記憶され、前記施工完了情報に含まれている契約番号の給湯機が有りの場合に、前記留意事項を含む契約情報を前記契約情報作成手段によって作成する、
ことを特徴とする請求項1から請求項4のいずれか1項に記載の契約情報提供システム。
Precautions regarding hot water heaters are stored in the host computer, the presence or absence of a hot water heater is stored for each contract number in the transfer information database, and when there is a hot water heater with a contract number included in the construction completion information, Creating the contract information including the notice items by the contract information creating means;
The contract information providing system according to any one of claims 1 to 4, characterized in that:
前記外部装置からメータ指示数を含む施工完了情報を受信すると、このメータ指示数を含む契約情報を前記契約情報作成手段によって作成する、
ことを特徴とする請求項1から請求項5のいずれか1項に記載の契約情報提供システム。
Upon receiving construction completion information including the meter indication number from the external device, the contract information creation means creates contract information including the meter indication number,
The contract information providing system according to any one of claims 1 to 5, characterized in that:
前記情報出力手段による出力が、前記契約情報の電子メールによる送信およびウェブページへの掲載の少なくとも一方による、
ことを特徴とする請求項1から請求項6のいずれか1項に記載の契約情報提供システム。
Output by the information output means is due to at least one of transmission of the contract information by e-mail and posting on a web page,
The contract information providing system according to any one of claims 1 to 6, wherein the contract information providing system is provided.
契約申込者の申込者端末と前記ホストコンピュータとが通信可能に接続され、前記ホストコンピュータに、前記申込者端末から異動情報を受信した際にその異動情報を契約番号と関連付けて前記異動情報データベースに記憶する情報記憶手段を備えた、
ことを特徴とする請求項1から請求項7のいずれか1項に記載の契約情報提供システム。
The applicant terminal of the contract applicant and the host computer are communicably connected, and when the transfer information is received from the applicant terminal to the host computer, the transfer information is associated with a contract number in the transfer information database. Comprising information storage means for storing,
The contract information providing system according to any one of claims 1 to 7, wherein the contract information providing system is any one of claims 1 to 7.
前記異動情報データベースに、契約番号毎に前記供給開始または供給停止の希望日が記憶され、
前記ホストコンピュータに、前記希望日よりも所定日数前または同日に前記施工を指示する施工情報を前記外部装置に送信する施工情報送信手段を備えた、
ことを特徴とする請求項1から請求項8のいずれか1項に記載の契約情報提供システム。
In the transfer information database, the desired date of the supply start or supply stop is stored for each contract number,
The host computer is provided with construction information transmitting means for transmitting construction information instructing the construction to a predetermined number of days before or on the same day as the desired date.
9. The contract information providing system according to any one of claims 1 to 8, wherein
電力、ガス、水道などのライフライン源の供給開始、供給停止が施工された際に、契約情報を契約者に知らせる契約情報提供方法であって、
前記施工の完了を知らせる外部装置とホストコンピュータとが通信可能に接続され、前記ホストコンピュータに、契約番号毎に契約者の異動情報を記憶する異動情報データベースを備え、
前記外部装置が契約番号を含む施工完了情報を前記ホストコンピュータに送信し、前記ホストコンピュータが、受信した契約番号に対応した異動情報を前記異動情報データベースから取得し、この異動情報に基づいて契約情報を作成し、この契約情報を契約番号毎に出力する、
ことを特徴とする契約情報提供方法。
A contract information providing method for notifying contract information to a contractor when a supply start or supply stop of a lifeline source such as electric power, gas, and water is performed.
An external device for notifying completion of the construction and a host computer are communicably connected, and the host computer includes a change information database for storing change information of a contractor for each contract number,
The external device transmits construction completion information including a contract number to the host computer, and the host computer acquires transfer information corresponding to the received contract number from the transfer information database, and contract information based on the transfer information. And output this contract information for each contract number.
The contract information provision method characterized by this.
JP2005313312A 2005-10-27 2005-10-27 Contract information providing system and contract information providing method Expired - Fee Related JP4714556B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005313312A JP4714556B2 (en) 2005-10-27 2005-10-27 Contract information providing system and contract information providing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005313312A JP4714556B2 (en) 2005-10-27 2005-10-27 Contract information providing system and contract information providing method

Publications (2)

Publication Number Publication Date
JP2007122389A true JP2007122389A (en) 2007-05-17
JP4714556B2 JP4714556B2 (en) 2011-06-29

Family

ID=38146176

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005313312A Expired - Fee Related JP4714556B2 (en) 2005-10-27 2005-10-27 Contract information providing system and contract information providing method

Country Status (1)

Country Link
JP (1) JP4714556B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013254238A (en) * 2012-06-05 2013-12-19 Yoneda Keiji Contract support device, contract support system and program thereof
JP6840279B1 (en) * 2020-05-26 2021-03-10 東京瓦斯株式会社 Application reception system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002132871A (en) * 2000-10-24 2002-05-10 Iric:Kk Charge confirmation server system
JP2002203009A (en) * 2000-12-28 2002-07-19 Toho Gas Co Ltd System for issuing acknowledgement for meter check
JP2002245138A (en) * 2001-02-14 2002-08-30 Canon Sales Co Inc System and server for representatively performing move procedure, system and server for providing move information, method for controlling theses, computer readable memory and program
JP2003114973A (en) * 2001-10-03 2003-04-18 Idemitsu Gas & Life Co Ltd Information data control managing method and its system
JP2003187322A (en) * 2001-12-19 2003-07-04 Hitachi Ltd Flat rate power supply method and flat rate power supply service system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002132871A (en) * 2000-10-24 2002-05-10 Iric:Kk Charge confirmation server system
JP2002203009A (en) * 2000-12-28 2002-07-19 Toho Gas Co Ltd System for issuing acknowledgement for meter check
JP2002245138A (en) * 2001-02-14 2002-08-30 Canon Sales Co Inc System and server for representatively performing move procedure, system and server for providing move information, method for controlling theses, computer readable memory and program
JP2003114973A (en) * 2001-10-03 2003-04-18 Idemitsu Gas & Life Co Ltd Information data control managing method and its system
JP2003187322A (en) * 2001-12-19 2003-07-04 Hitachi Ltd Flat rate power supply method and flat rate power supply service system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013254238A (en) * 2012-06-05 2013-12-19 Yoneda Keiji Contract support device, contract support system and program thereof
JP6840279B1 (en) * 2020-05-26 2021-03-10 東京瓦斯株式会社 Application reception system
JP2021189538A (en) * 2020-05-26 2021-12-13 東京瓦斯株式会社 System for accepting application

Also Published As

Publication number Publication date
JP4714556B2 (en) 2011-06-29

Similar Documents

Publication Publication Date Title
JP6297008B2 (en) Transaction processing method and system based on real-time conversation
JP6153096B2 (en) Charger reservation system, charger reservation device, charger reservation method, and program
JP2010267110A (en) Electric vehicle charging system and method of providing charging support service
JP7088821B2 (en) Charging processing system
US20080172242A1 (en) Methods, systems, computer products and website for power maintenance and restoration
JP2015167459A (en) Charging system and charging control device for electric vehicle
US9582837B2 (en) Management system for gas cock opening and closing
CN105868939A (en) Automatic distribution method and system of delivery objects
JP2008271777A (en) Power supply method utilizing distributed power supply device
JPWO2016020997A1 (en) Information providing system, information device, information providing method, and display control apparatus
JP4714556B2 (en) Contract information providing system and contract information providing method
JP6573064B2 (en) Equipment registration system
CN106302804B (en) Interactive method and system for electric power field operation
JP2008052461A (en) Power distribution construction management system
KR20160113568A (en) Method, system and recording medium for transaction processing using real time conversation
JP2010093606A (en) Position information management system
JP2020022110A (en) Charge control system, application program and control method in charge control system
JP2016077080A (en) Power management device, power management system, terminal device, power management method, and program
JP6466017B1 (en) Service linkage system
JP2016019084A (en) controller
JP2018142120A (en) Information providing system, server and information providing method
JP6277479B2 (en) Registration system
JP2021192487A (en) Communication terminal and management server
JP2010134774A (en) Rental materials management system, and center computer and on-site computer used in the same
JP2013161435A (en) Meter reading work support system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081017

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110315

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110328

R150 Certificate of patent or registration of utility model

Ref document number: 4714556

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees