JP2007120721A - Shallow burying method of underground structure by geotextile - Google Patents

Shallow burying method of underground structure by geotextile Download PDF

Info

Publication number
JP2007120721A
JP2007120721A JP2005317188A JP2005317188A JP2007120721A JP 2007120721 A JP2007120721 A JP 2007120721A JP 2005317188 A JP2005317188 A JP 2005317188A JP 2005317188 A JP2005317188 A JP 2005317188A JP 2007120721 A JP2007120721 A JP 2007120721A
Authority
JP
Japan
Prior art keywords
geotextile
underground structure
groove
backfill material
excavation groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005317188A
Other languages
Japanese (ja)
Other versions
JP3995166B2 (en
Inventor
Shigeyuki Mouri
栄征 毛利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Agriculture and Food Research Organization
Original Assignee
National Agriculture and Food Research Organization
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Agriculture and Food Research Organization filed Critical National Agriculture and Food Research Organization
Priority to JP2005317188A priority Critical patent/JP3995166B2/en
Publication of JP2007120721A publication Critical patent/JP2007120721A/en
Application granted granted Critical
Publication of JP3995166B2 publication Critical patent/JP3995166B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To positively improve floatation resistance of an underground structure even in a shallow ditch with a thin soil covered layer regardless of the structure of an excavated ditch. <P>SOLUTION: A ditch 3 excavated without timbering is formed in a first process. In a second process, a pipeline 2 is disposed on a bottom face 5 of the ditch 3 excavated without timbering, and sandbags 6 are arranged between the pipeline 2 and the wall surfaces 3A, 3B of the ditch excavated without timbering. In a third process, both ends in the ditch width direction of a geotextile 10 are left over to put the geotextile 10 along the pipeline 2, the support ground C and the inner side faces of the sandbags 6. In a fourth process, a backfilling material 7 is supplied, and loading of the sandbags 6 and the supply of the backfilling material 7 are repeated to supply the backfilling material 7 up to a predetermined height L1. In a fifth process, both end leftover parts 10B, 10C of the geotextile 10 are opened and connected to wrap in the backfilling material 7 surrounded by the geotextile 10. In a sixth process, the backfilling material 7 is backfilled onto the geotextile 10 to backfill the ditch 3 excavated without timbering. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、地中構造物をジオテキスタイルを用いて地中に埋設するジオテキスタイルによる地中構造物の浅埋設工法に関するものである。   The present invention relates to a method for shallowly embedding underground structures by a geotextile that embeds underground structures in the ground using a geotextile.

一般に、地中に埋設されるパイプラインや水路、マンホールなどの地中構造物を地盤の浅い位置に設置する場合、地中構造物に作用する浮力に抵抗するための対策としてジオテキスタイルを用いた地盤補強技術や施工方法が知られている。地盤に埋設される構造物は、地下水や豪雨による浮力を受けるので、浮上に対する安全性を確保するため所定の土被りを設ける必要がある。このため、埋設施工に必要な溝の掘削も大規模になり、工期の長期化や経費の増大の原因となっている。地中構造物の浮上を防止するためには、地中構造物に対し、浮力に見合った鉛直下向きの力を作用させる必要がある。方法としては、土被りを大きくする他に、構造物の重量の増大化をはかったり、構造物上部にコンクリートブロックなどの浮力防止パネルを設置する等の技術が知られている。しかしながら、土被りを大きくするためには、掘削溝の深度を深く取らなければならず、構造物重量の増大化をはかったり浮上抵抗に応じて大量のパネルを設置すると、コストアップを招くという問題がある。このため、本発明者は、掘削溝の両側壁に矢板を打ち込み、この両側を土留め用の矢板で保護した上で、掘削溝に地中構造物を配置し、ジオテキスタイルを敷設して埋め戻し材を投入し、埋め戻し材を包み込んだジオテキスタイルにより地中構造物の浮上抵抗力を抑制する地中構造物の埋設工法を提案した(特許文献1参照)。   In general, when underground structures such as pipelines, waterways, and manholes that are buried in the ground are installed at shallow positions in the ground, the ground using geotextiles as a countermeasure to resist buoyancy acting on the underground structures Reinforcement techniques and construction methods are known. Since the structure buried in the ground receives buoyancy due to groundwater and heavy rain, it is necessary to provide a predetermined earth covering to ensure safety against levitation. For this reason, the excavation of a groove required for burial construction is also large-scale, which causes a long construction period and an increase in costs. In order to prevent the underground structure from rising, it is necessary to apply a vertically downward force corresponding to the buoyancy to the underground structure. As a method, in addition to increasing the earth covering, techniques such as increasing the weight of the structure or installing a buoyancy prevention panel such as a concrete block on the upper part of the structure are known. However, in order to increase the earth covering, it is necessary to increase the depth of the excavation groove. If the structure weight is increased or a large number of panels are installed according to the floating resistance, the cost increases. There is. For this reason, the present inventor puts sheet piles on both side walls of the excavation groove, protects both sides with a sheet pile for earth retaining, arranges underground structures in the excavation groove, lays geotextile and backfills An underground construction method was proposed that suppresses the floating resistance of an underground structure by using a geotextile in which a material is introduced and the backfill material is wrapped (see Patent Document 1).

特許第3314191号公報(第3−5頁、図3)Japanese Patent No. 3314191 (page 3-5, FIG. 3)

しかしながら、上記従来の埋設工法では、矢板を用いて掘削溝の両側壁を保護しつつ埋設を行うため、掘削溝が深くしかも大きい規模の施工には適するものの、地理的な制約や環境などの状況などにより掘削溝を浅い深度とせざるを得ない場合や、矢板の打ち込みができない素堀溝の場合など、施工が困難になるという問題がある。このため、掘削溝に土留め用矢板を打ち込むことができない素堀溝であったり、浅い深度の素堀溝では、上記従来の埋設工法が適用しにくいという問題がある。   However, the above-mentioned conventional embedding method uses a sheet pile to protect the both sides of the excavation groove and is suitable for large-scale construction where the excavation groove is deep and large. There is a problem that the construction becomes difficult, for example, when the excavation groove has to be made shallow due to the above, or when the excavation groove cannot be driven with a sheet pile. For this reason, there is a problem that it is difficult to apply the above-mentioned conventional burying method to a trench that cannot be driven into the excavation trench or a shallow trench that has a shallow depth.

本発明は、上記課題を解決するためになされたもので、埋設用の溝が土留め用矢板が打ち込まれた掘削溝であっても、矢板を打ち込むことができない素堀溝であっても、溝の構造に関係なく、また、土被り層の厚さを薄くせざるを得ないきわめて浅い溝であっても、確実に浮上抵抗力を向上させ、かつ、施工性の良好なジオテキスタイルによる地中構造物の浅埋設工法を得ることを目的とする。   The present invention has been made in order to solve the above-described problem. Even if the buried groove is an excavation groove in which a sheet pile for earth retaining is driven, a grooved groove in which a sheet pile cannot be driven, Regardless of the structure of the earth, even in extremely shallow grooves where the thickness of the earth covering layer has to be reduced, the underground structure with geotextile that improves floating resistance surely and has good workability The purpose is to obtain a shallow burial method.

請求項1に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第2の工程と、地中構造物と溝底面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えたものである。   The shallow embedding method of an underground structure by geotextile according to claim 1 includes a first step of excavating the ground to form an excavation groove, an underground structure disposed on the bottom of the excavation groove, and an underground structure A geotextile covering the second step of disposing a support wall material between at least one of the wall and the wall surface of the excavation groove, and the underground structure, the bottom surface of the groove, and the inner surface of the support wall material; The third step of leaving both ends in the groove width direction, the fourth step of extending the excess portion of the geotextile both ends according to the input of the backfill material, the backfill material is input, the both ends of the geotextile are embedded, and the excavation groove is formed And a fifth step of backfilling.

請求項1に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第2の工程と、地中構造物と溝底面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えたことにより、ジオテキスタイルで埋戻し材を囲むことにより埋戻し材の剛性が高まり、埋戻し材が地中構造物に対してアンカー機能を果たすので、ジオテキスタイル上側に投入される土被りとしての埋め戻し材層の厚みを薄くすることができる。このため、浅い素堀溝でも確実に地中構造物の浮上を抑制することができる。また、埋設されたジオテキスタイルの溝幅方向側面には支持壁材が配置されているので、ジオテキスタイルの溝幅方向側面が変形されることなく保持され、ジオテキスタイルに囲まれた埋め戻し材の剛性が確実に確保され、設計通りのアンカー機能を得ることができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 1, the first step of excavating the ground to form the excavation groove, disposing the underground structure on the bottom surface of the excavation groove, A geotextile covering the second step of disposing a support wall material between at least one of the wall and the wall surface of the excavation groove, and the underground structure, the bottom surface of the groove, and the inner surface of the support wall material; The third step of leaving both ends in the groove width direction, the fourth step of extending the excess portion of the geotextile both ends according to the input of the backfill material, the backfill material is input, the both ends of the geotextile are embedded, and the excavation groove is formed By providing the fifth step of backfilling, the backfilling material has increased rigidity by surrounding the backfilling material with geotextile, and the backfilling material performs an anchoring function for the underground structure. · The it is possible to reduce the thickness of the backfill material layer as overburden is put into style upper. For this reason, it is possible to reliably suppress the floating of the underground structure even in a shallow trench. In addition, since the support wall material is arranged on the side surface of the buried geotextile in the groove width direction, the side surface of the geotextile in the groove width direction is held without being deformed, and the backfill material surrounded by the geotextile has a certain rigidity. The anchor function as designed can be obtained.

請求項2に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第4の工程と、地中構造物と埋め戻し材上面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第6の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第7の工程とを備えたものである。   The shallow embedding method of the underground structure by the geotextile according to claim 2 includes a first step of excavating the ground to form an excavation groove, a second step of disposing the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material into the excavation groove in which the underground structure is arranged to expose a part of the underground structure on the backfill material; and A fourth step of arranging the supporting wall material in at least one of the gaps, covering the geotextile along the underground structure, the backfill material upper surface, and the inner side surface of the supporting wall material, and the groove width direction of this geotextile A fifth step of leaving both ends, a sixth step of extending the excess portion of both ends of the geotextile in response to the introduction of the backfill material, and a seventh step of introducing the backfill material, filling both ends of the geotextile and backfilling the excavation groove The process is provided.

請求項2に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第4の工程と、地中構造物と埋め戻し材上面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第6の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第7の工程とを備えたことにより、地中構造物は配置後最初に埋め戻し材が投入され、一部が埋め戻し材に埋められるので、作業中に変位することがなく、確実に施工を行うことができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 2, a first step of excavating the ground to form the excavation groove, a second step of arranging the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material into the excavation groove in which the underground structure is arranged to expose a part of the underground structure on the backfill material; and A fourth step of arranging the supporting wall material in at least one of the gaps, covering the geotextile along the underground structure, the backfill material upper surface, and the inner side surface of the supporting wall material, and the groove width direction of this geotextile A fifth step of leaving both ends, a sixth step of extending the excess portion of both ends of the geotextile in response to the introduction of the backfill material, and a seventh step of introducing the backfill material, filling both ends of the geotextile and backfilling the excavation groove By having the process of Creature is first backfill material after placement on, since a part is buried in backfill material, without being displaced during operation, can be performed reliably construction.

請求項3に係るジオテキスタイルによる地中構造物の浅埋設工法では、埋め戻し材を、配置された支持壁材まで投入しては、支持壁材上に他の支持壁材を積み上げてジオテキスタイルの余り部を引き上げ、積み上げと埋め戻しと余り部の引き上げを繰り返し、投入された埋め戻し材内に積み上げた支持壁材により支持壁を形成するとともに、所定の高さまで埋め戻し材を投入することを特徴とするものである。   In the shallow embedding method of the underground structure by geotextile according to claim 3, the backfill material is thrown up to the arranged support wall material, and the other support wall material is stacked on the support wall material, and the remainder of the geotextile The part is pulled up, stacked and backfilled, and the surplus part is lifted up repeatedly to form a support wall with the stacked support wall material in the input backfill material, and the backfill material is input to a predetermined height. It is what.

請求項4に係るジオテキスタイルによる地中構造物の浅埋設工法は、地中構造物と支持壁材との間に、埋め戻し材が所定の嵩を確保するように空隙を設けたことを特徴とするものである。   The shallow embedding method of the underground structure by the geotextile according to claim 4 is characterized in that a gap is provided between the underground structure and the supporting wall material so that the backfilling material has a predetermined bulk. To do.

請求項5に係るジオテキスタイルによる地中構造物の浅埋設工法では、支持壁材は、地中構造物の溝幅方向両側に設けられることを特徴とするものである。   In the shallow embedding method of the underground structure by the geotextile according to claim 5, the supporting wall material is provided on both sides of the underground structure in the groove width direction.

請求項6に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第2の工程と、地中構造物と溝底面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第4の工程と、抜き板を引き抜く第5の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えたものである。   A shallow embedding method of an underground structure by geotextile according to claim 6 includes a first step of excavating the ground to form an excavation groove, an underground structure disposed on the bottom of the excavation groove, and an underground structure. A geotextile covering the second step of standing a blanking plate between at least one of the wall and the wall of the excavation groove, and the underground structure, the groove bottom surface, and the inner surface of the blanking plate. A third step of leaving both ends of the groove width direction, a fourth step of extending the excess portion of the geotextile at both ends in accordance with the input of the backfill material, and pulling up the punching plate; and a fifth step of pulling out the punching plate; And a sixth step of filling back the excavation groove by filling the both ends of the geotextile with a backfill material into the groove from which the punch plate has been pulled out.

請求項6に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第2の工程と、地中構造物と溝底面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第4の工程と、抜き板を引き抜く第5の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えたことにより、ジオテキスタイルで埋戻し材を囲むことにより埋戻し材の剛性が高まり、埋戻し材が地中構造物に対してアンカー機能を果たすので、ジオテキスタイル上側に投入される土被りとしての埋め戻し材層の厚みを薄くすることができる。このため、浅い素堀溝でも確実に地中構造物の浮上を抑制することができる。また、抜き板を引き上げながら埋め戻し材を投入することができるので、深くて狭い掘削溝でも確実にジオテキスタイルにより埋め戻し材を囲むことができる。さらに、埋設されたジオテキスタイルの溝幅方向側面には抜き板が配置され、埋め戻し材の投入量の増大に応じて抜き板が引き抜かれるので、ジオテキスタイルの溝幅方向側面が変形されることなく平面状に保持され、ジオテキスタイルに囲まれた埋め戻し材の剛性が確実に確保され、設計通りのアンカー機能を得ることができる。また、抜き板を引き抜いて素堀溝を埋め戻すようにしているので、埋め戻された溝には、抜き板や他の部材を埋め殺しする必要がなくなる。   In the shallow embedding method of the underground structure by the geotextile according to claim 6, the first step of excavating the ground to form the excavation groove, placing the underground structure at the bottom of the excavation groove, A geotextile covering the second step of standing a blanking plate between at least one of the wall and the wall of the excavation groove, and the underground structure, the groove bottom surface, and the inner surface of the blanking plate. A third step of leaving both ends of the groove width direction, a fourth step of extending the excess portion of the geotextile at both ends in accordance with the input of the backfill material, and pulling up the punching plate; and a fifth step of pulling out the punching plate; A backfilling material is provided by surrounding the backfilling material with the geotextile by introducing a backfilling material into the groove from which the punching plate has been pulled out, and a sixth step of backfilling the excavation groove by embedding both ends of the geotextile. Increased stiffness, since backfill material plays an anchor function for underground structures, it is possible to reduce the thickness of the backfill material layer as overburden is put into geotextile upper. For this reason, it is possible to reliably suppress the floating of the underground structure even in a shallow trench. Further, since the backfilling material can be introduced while pulling up the punched plate, the backfilling material can be reliably surrounded by the geotextile even in a deep and narrow excavation groove. Furthermore, a punching plate is arranged on the side surface of the buried geotextile in the groove width direction, and the punching plate is pulled out in accordance with an increase in the amount of backfill material, so that the side surface of the geotextile in the groove width direction is not deformed. The backfill material that is held in the shape and surrounded by the geotextile is ensured in rigidity, and the designed anchor function can be obtained. Further, since the blanking groove is backfilled by pulling out the blanking plate, it is not necessary to bury the blanking plate or other members in the backfilled groove.

請求項7に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第4の工程と、地中構造物と埋め戻し材上面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第6の工程と、抜き板を引き抜く第7の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第8の工程とを備えたものである。   The shallow embedding method of the underground structure by the geotextile according to claim 7 includes a first step of excavating the ground to form an excavation groove, a second step of disposing the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material into the excavation groove in which the underground structure is arranged to expose a part of the underground structure on the backfill material; and A fourth step of standing a blank plate at least one of the gaps, and covering the geotextile along the underground structure, the back surface of the backfill material, and the inner surface of the blank plate, both ends of the geotextile in the groove width direction A fifth step of extending the excess portion of the geotextile in accordance with the backfilling material, a sixth step of pulling up the punch plate, a seventh step of pulling out the punch plate, Insert backfill material into the removed groove, Embed the ends of the Le is obtained and a eighth step of backfilling the excavation.

請求項7に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第4の工程と、地中構造物と埋め戻し材上面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第6の工程と、抜き板を引き抜く第7の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第8の工程とを備えたことにより、地中構造物は配置後最初に埋め戻し材が投入され、一部が埋め戻し材に埋められるので、作業中に変位することがなく、確実に施工を行うことができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 7, a first step of excavating the ground to form the excavation groove, a second step of arranging the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material into the excavation groove in which the underground structure is arranged to expose a part of the underground structure on the backfill material; and A fourth step of standing a blank plate at least one of the gaps, and covering the geotextile along the underground structure, the back surface of the backfill material, and the inner surface of the blank plate, both ends of the geotextile in the groove width direction A fifth step of extending the excess portion of the geotextile in accordance with the backfilling material, a sixth step of pulling up the punch plate, a seventh step of pulling out the punch plate, Put backfill material into the removed groove and geotextile Since the underground structure is provided with the eighth step of filling the both ends of the pile and backfilling the excavation groove, the backfill material is first input after placement, and part of the underground structure is buried in the backfill material. There is no displacement inside, and construction can be performed reliably.

請求項8に係るジオテキスタイルによる地中構造物の浅埋設工法では、地中構造物の配置後、埋め戻し材を投入しては、抜き板を徐々に引き上げ、埋め戻しと抜き板の引き上げとを繰り返すことを特徴とするものである。   In the shallow embedding method of the underground structure by the geotextile according to claim 8, after placing the underground structure, the backfilling material is introduced, and the punching plate is gradually lifted, and the backfilling and lifting of the punching plate are performed. It is characterized by repetition.

請求項9に係るジオテキスタイルによる地中構造物の浅埋設工法は、地中構造物と抜き板との間に、埋め戻し材が所定の嵩を確保するように空隙を設けたことを特徴とするものである。   The shallow embedding method of the underground structure by the geotextile according to claim 9 is characterized in that a gap is provided between the underground structure and the punch plate so that the backfilling material has a predetermined bulk. Is.

請求項10に係るジオテキスタイルによる地中構造物の浅埋設工法では、抜き板は、地中構造物の溝幅方向両側に設けられることを特徴とするものである。   In the shallow embedding method of the underground structure by the geotextile according to claim 10, the punched plates are provided on both sides of the underground structure in the groove width direction.

請求項11に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物と溝底面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えたものである。   The shallow embedding method of the underground structure by geotextile according to claim 11 includes a first step of excavating the ground to form an excavation groove, a second step of disposing the underground structure on the bottom of the excavation groove, A third step of covering the geotextile along the underground structure, the bottom surface of the groove, and the wall surface of the excavation groove, leaving the both ends of the geotextile in the width direction of the groove, and the wall surface of the groove according to the input of backfill material at both ends of the geotextile And a fifth step in which a backfilling material is introduced and both ends of the geotextile are buried to refill the excavation groove.

請求項11に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物と溝底面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えたことにより、地中構造物の配置後直ちにジオテキスタイルを被せて埋め戻し材を投入することができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 11, a first step of excavating the ground to form the excavation groove, a second step of arranging the underground structure on the bottom surface of the excavation groove, A third step of covering the geotextile along the underground structure, the bottom surface of the groove, and the wall surface of the excavation groove, leaving the both ends of the geotextile in the width direction of the groove, and the wall surface of the groove according to the input of backfill material at both ends of the geotextile The fourth step of spreading along the line and the fifth step of introducing backfilling material and filling the both ends of the geotextile to backfill the excavation trenches enable the geotextile immediately after the underground structure is placed. The backfilling material can be put on.

請求項12に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と埋め戻し材上面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第4の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第5の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えたものである。   The shallow embedding method of the underground structure by geotextile according to claim 12 includes a first step of excavating the ground to form an excavation groove, a second step of disposing the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material to expose a part of the underground structure on the backfill material, and covering the geotextile along the underground structure, the top surface of the backfill material and the wall surface of the excavation groove, The fourth step of leaving the both ends of the geotextile in the groove width direction, the fifth step of spreading the surplus portions at both ends of the geotextile along the groove wall surface according to the input of the backfill material, and the backfilling material are added to the geotextile. And a sixth step of backfilling the excavation groove.

請求項12に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と埋め戻し材上面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第4の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第5の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えたことにより、ジオテキスタイルで埋戻し材を囲むことにより埋戻し材の剛性が高まり、埋戻し材が地中構造物に対してアンカー機能を果たすので、ジオテキスタイル上側に投入される土被りとしての埋め戻し材層の厚みを薄くすることができる。このため、浅い素堀溝でも確実に地中構造物の浮上を抑制することができる。また、地中構造物は配置後に埋め戻し材が投入され、一部が埋め戻し材に埋められるので、作業中に変位することがなく、確実に施工を行うことができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 12, a first step of excavating the ground to form the excavation groove, a second step of disposing the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material to expose a part of the underground structure on the backfill material, and covering the geotextile along the underground structure, the top surface of the backfill material and the wall surface of the excavation groove, The fourth step of leaving the both ends of the geotextile in the groove width direction, the fifth step of spreading the surplus portions at both ends of the geotextile along the groove wall surface according to the input of the backfill material, and the backfilling material are added to the geotextile. And the sixth step of refilling the excavation trenches by embedding both ends of the backfill, and by surrounding the backfill material with geotextile, the rigidity of the backfill material is increased, and the backfill material is anchored to the underground structure. Function Because be, it is possible to reduce the thickness of the backfill material layer as overburden is put into geotextile upper. For this reason, it is possible to reliably suppress the floating of the underground structure even in a shallow trench. In addition, since the backfilling material is thrown into the underground structure and a part thereof is buried in the backfilling material, the construction can be reliably performed without being displaced during the work.

請求項13に係るジオテキスタイルによる地中構造物の浅埋設工法は、ジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせて埋め戻し材を投入した後、埋め戻し材が所定の高さに達すると、上記ジオテキスタイルの余り部を投入された埋め戻し材上に被せて接続し埋め戻し材を包むようにしたものである。   In the shallow embedding method of the underground structure by geotextile according to claim 13, after the geotextile is covered and the backfill material is thrown in by leaving both ends in the groove width direction of the geotextile, the backfill material reaches a predetermined height. Then, the surplus part of the geotextile is put on the backfill material that has been thrown in and connected to wrap the backfill material.

請求項13に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせて埋め戻し材を投入した後、埋め戻し材が所定の高さに達すると、上記ジオテキスタイルの余り部を投入された埋め戻し材上に被せて接続し埋め戻し材を包むようにしたことにより、ジオテキスタイルで埋戻し材を包み込むことにより埋戻し材の剛性がより高まり、埋戻し材が地中構造物に対して果たすアンカー機能が向上する。このため、包み込む埋め戻し材の量を少なくすることができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 13, after the geotextile is covered and the backfilling material is thrown in by leaving both ends of the geotextile in the groove width direction, the backfilling material reaches a predetermined height. Then, the remainder of the geotextile is put on the backfill material that has been thrown in and connected to wrap the backfill material, so that the backfill material is wrapped with the geotextile to increase the rigidity of the backfill material. The anchor function that the material performs for the underground structure is improved. For this reason, the amount of the backfilling material to be wrapped can be reduced.

請求項14に係るジオテキスタイルによる地中構造物の浅埋設工法は、掘削溝の壁面に土留め用矢板を設け、掘削溝を埋め戻す際、矢板を引き抜くようにしたものである。   In the shallow underground construction method for underground structures by geotextile according to claim 14, a pile sheet pile is provided on the wall surface of the excavation groove, and when the excavation groove is refilled, the sheet pile is pulled out.

請求項14に係るジオテキスタイルによる地中構造物の浅埋設工法では、掘削溝の壁面に土留め用矢板を設け、掘削溝を埋め戻す際、矢板を引き抜くようにしたことにより、掘削溝を掘削する場所が例え軟弱地盤であっても溝側壁が矢板により保護される。また、掘削溝を深く掘削しなければならない場所でも溝側壁が確実に保護される。   In the shallow embedding method of the underground structure by the geotextile according to claim 14, the earth retaining sheet pile is provided on the wall surface of the excavation groove, and the excavation groove is excavated by pulling out the sheet pile when filling the excavation groove. Even if the place is soft ground, the groove side wall is protected by the sheet pile. In addition, the groove sidewall is reliably protected even in a place where the excavation groove has to be deeply excavated.

請求項15に係るジオテキスタイルによる地中構造物の浅埋設工法は、埋め戻し材を囲んだジオテキスタイルの外側には、溝掘削により生じた掘削土を用いることを特徴とするものである。   The shallow embedding method for underground structures by geotextile according to claim 15 is characterized in that excavated soil generated by trench excavation is used outside the geotextile surrounding the backfill material.

請求項16に係るジオテキスタイルによる地中構造物の浅埋設工法は、掘削溝底面に地盤材料を投入して支持地盤を形成し、この支持地盤上に地中構造物を配置することを特徴とするものである。   A shallow embedding method of underground structure by geotextile according to claim 16 is characterized in that a ground material is thrown into a bottom surface of the excavation groove to form a supporting ground, and the underground structure is disposed on the supporting ground. Is.

請求項17に係るジオテキスタイルによる地中構造物の浅埋設工法は、地盤材料に埋め戻し材を用いたことを特徴とするものである。   The shallow embedding method of the underground structure by the geotextile according to claim 17 is characterized by using a backfill material as the ground material.

請求項18に係るジオテキスタイルによる地中構造物の浅埋設工法は、掘削溝の壁面に土留め用矢板を設け、上記支持壁材を土留め用矢板に沿って配置するとともに、掘削溝を埋め戻す際、矢板を引き抜くようにしたものである。   A shallow embedding method of an underground structure by geotextile according to claim 18 is provided with earth retaining sheet piles on the wall surface of the excavation groove, and the support wall material is disposed along the earth retaining sheet pile, and the excavation groove is refilled. At the time, the sheet pile is pulled out.

請求項1に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第2の工程と、地中構造物と溝底面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えるようにしているので、埋設用の溝が矢板を有する掘削溝であっても素堀溝であっても溝の形式に関係なく、地中構造物を浅い位置に埋設することができる。このため、施工効率を向上させることができるとともに、施工コストを低減することができる。また、ジオテキスタイルで囲む埋め戻し材の領域や嵩を浮上抵抗に応じて必要最小限とすることができるので、購入する埋め戻し材の量を抑えることができ、コストダウンを図ることができる。さらに、ジオテキスタイルを溝側壁まで伸ばす必要がないので、大きな掘削断面を要する素堀施工の場合でも、浮上抵抗に打ち勝つ最小限の領域にジオテキスタイルを敷設するだけで済みコストダウンを図ることができるとともに施工効率が向上する。   In the shallow embedding method of the underground structure by the geotextile according to claim 1, the first step of excavating the ground to form the excavation groove, disposing the underground structure on the bottom surface of the excavation groove, A geotextile covering the second step of disposing a support wall material between at least one of the wall and the wall surface of the excavation groove, and the underground structure, the bottom surface of the groove, and the inner surface of the support wall material; The third step of leaving both ends in the groove width direction, the fourth step of extending the excess portion of the geotextile both ends according to the input of the backfill material, the backfill material is input, the both ends of the geotextile are embedded, and the excavation groove is formed The fifth step of backfilling is provided so that the underground structure can be brought into a shallow position regardless of the type of the groove, regardless of whether the groove for burying is a digging groove having a sheet pile or a bare grooving groove. Can be buried . For this reason, while being able to improve construction efficiency, construction cost can be reduced. Moreover, since the area | region and bulk of the backfilling material enclosed with geotextile can be made into the minimum required according to floating resistance, the quantity of the backfilling material to purchase can be restrained and cost reduction can be aimed at. In addition, since it is not necessary to extend the geotextile to the groove side wall, even in the case of open pit construction that requires a large excavation section, it is only necessary to lay the geotextile in the minimum area that overcomes the floating resistance, and the cost can be reduced. Efficiency is improved.

請求項2に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第4の工程と、地中構造物と埋め戻し材上面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第6の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第7の工程とを備えるようにしているので、上記効果に加え、地中構造物は埋め戻し材の投入により、一部が埋め戻し材に埋められるので、作業中に地中構造物が変位することがなく、確実に施工を行うことができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 2, a first step of excavating the ground to form the excavation groove, a second step of arranging the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material into the excavation groove in which the underground structure is arranged to expose a part of the underground structure on the backfill material; and A fourth step of arranging the supporting wall material in at least one of the gaps, covering the geotextile along the underground structure, the backfill material upper surface, and the inner side surface of the supporting wall material, and the groove width direction of this geotextile A fifth step of leaving both ends, a sixth step of extending the excess portion of both ends of the geotextile in response to the introduction of the backfill material, and a seventh step of introducing the backfill material, filling both ends of the geotextile and backfilling the excavation groove With the process of In addition to the above effects, the underground structure is partially buried in the backfill material by introducing the backfill material, so that the underground structure will not be displaced during the work, and construction can be performed reliably. it can.

請求項6に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第2の工程と、地中構造物と溝底面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第4の工程と、抜き板を引き抜く第5の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えるようにしているので、埋設用の溝が矢板を有する掘削溝であっても素堀溝であっても溝の形式に関係なく、地中構造物を浅い位置に埋設することができる。このため、施工効率を向上させることができるとともに、施工コストを低減することができる。また、ジオテキスタイルで囲む埋め戻し材の領域や嵩を浮上抵抗に応じて必要最小限とすることができるので、購入する埋め戻し材の量を抑えることができ、コストダウンを図ることができる。さらに、ジオテキスタイルを溝側壁まで伸ばす必要がないので、大きな掘削断面を要する素堀施工の場合でも、浮上抵抗に打ち勝つ最小限の領域にジオテキスタイルを敷設するだけで済みコストダウンを図ることができるとともに施工効率が向上する。また、たとえ素堀溝が深くても、抜き板を用いることにより埋め戻し材をジオテキスタイルで確実に包み込むことができる。さらに、抜き板を引き抜いて素堀溝を埋め戻すようにしているので、埋め戻された溝には、抜き板や他の部材を埋め殺しする必要がなくなりコストダウンを図ることができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 6, the first step of excavating the ground to form the excavation groove, placing the underground structure at the bottom of the excavation groove, A geotextile covering the second step of standing a blanking plate between at least one of the wall and the wall of the excavation groove, and the underground structure, the groove bottom surface, and the inner surface of the blanking plate. A third step of leaving both ends of the groove width direction, a fourth step of extending the excess portion of the geotextile at both ends in accordance with the input of the backfill material, and pulling up the punching plate; and a fifth step of pulling out the punching plate; Since the backfilling material is put into the groove from which the punching plate has been pulled out and the both ends of the geotextile are embedded, and the excavation groove is backfilled, the embedding groove is an excavation groove having a sheet pile. Even so Regardless of the form of the grooves even in Horimizo can be buried underground structure at a shallow position. For this reason, while being able to improve construction efficiency, construction cost can be reduced. Moreover, since the area | region and bulk of the backfilling material enclosed with geotextile can be made into the minimum required according to floating resistance, the quantity of the backfilling material to purchase can be restrained and cost reduction can be aimed at. In addition, since it is not necessary to extend the geotextile to the groove side wall, even in the case of open pit construction that requires a large excavation section, it is only necessary to lay the geotextile in the minimum area that overcomes the floating resistance, and the cost can be reduced. Efficiency is improved. Moreover, even if the trench is deep, the backfilling material can be reliably wrapped with geotextile by using the punched plate. Furthermore, since the blanking groove is backfilled by pulling out the punching plate, it is not necessary to fill the backfilled groove with a punching plate or other members, thereby reducing the cost.

請求項7に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第4の工程と、地中構造物と埋め戻し材上面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第6の工程と、抜き板を引き抜く第7の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第8の工程とを備えるようにしているので、上記効果に加え、地中構造物は埋め戻し材の投入により、一部が埋め戻し材に埋められるので、作業中に地中構造物が変位することがなく、確実に施工を行うことができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 7, a first step of excavating the ground to form the excavation groove, a second step of arranging the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material into the excavation groove in which the underground structure is arranged to expose a part of the underground structure on the backfill material; and A fourth step of standing a blank plate at least one of the gaps, and covering the geotextile along the underground structure, the back surface of the backfill material, and the inner surface of the blank plate, both ends of the geotextile in the groove width direction A fifth step of extending the excess portion of the geotextile in accordance with the backfilling material, a sixth step of pulling up the punch plate, a seventh step of pulling out the punch plate, Put backfill material into the removed groove and geotextile In addition to the above-described effects, the underground structure is partially filled with the backfill material in addition to the above effect. Therefore, the underground structure is not displaced during the work, and the construction can be performed reliably.

請求項11に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物と溝底面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えるようにしているので、地中構造物の配置後直ちにジオテキスタイルを被せて埋め戻し材を投入することができる。このため、施工効率を向上させることができる   In the shallow embedding method of the underground structure by the geotextile according to claim 11, a first step of excavating the ground to form the excavation groove, a second step of arranging the underground structure on the bottom surface of the excavation groove, A third step of covering the geotextile along the underground structure, the bottom surface of the groove, and the wall surface of the excavation groove, leaving the both ends of the geotextile in the width direction of the groove, and the wall surface of the groove according to the input of backfill material at both ends of the geotextile Immediately after the placement of the underground structure, and a fifth step of filling back and filling the excavation trench by filling the both ends of the geotextile with the fourth step The backfill material can be thrown in over the geotextile. For this reason, construction efficiency can be improved.

請求項12に係るジオテキスタイルによる地中構造物の浅埋設工法では、地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と埋め戻し材上面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第4の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第5の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えるようにしているので、埋設用の溝が矢板を有する掘削溝であっても素堀溝であっても溝の形式に関係なく、地中構造物を浅い位置に埋設することができる。このため、施工効率を向上させることができるとともに、施工コストを低減することができる。また、ジオテキスタイルで囲む埋め戻し材の領域や嵩を浮上抵抗に応じて必要最小限とすることができるので、購入する埋め戻し材の量を抑えることができ、コストダウンを図ることができる。   In the shallow embedding method of the underground structure by the geotextile according to claim 12, a first step of excavating the ground to form the excavation groove, a second step of disposing the underground structure on the bottom surface of the excavation groove, A third step of introducing backfill material to expose a part of the underground structure on the backfill material, and covering the geotextile along the underground structure, the top surface of the backfill material and the wall surface of the excavation groove, The fourth step of leaving the both ends of the geotextile in the groove width direction, the fifth step of spreading the surplus portions at both ends of the geotextile along the groove wall surface according to the input of the backfill material, and the backfilling material are added to the geotextile. The sixth step of burying the both ends of the groove and refilling the excavation groove is provided regardless of the type of the groove, regardless of whether the burying groove is a excavation groove having a sheet pile or an underground trench. Underground structures buried in shallow positions Rukoto can. For this reason, while being able to improve construction efficiency, construction cost can be reduced. Moreover, since the area | region and bulk of the backfilling material enclosed with geotextile can be made into the minimum required according to floating resistance, the quantity of the backfilling material to purchase can be restrained and cost reduction can be aimed at.

素堀溝であっても、また、浅い溝であっても、確実に地中構造物の浮上抵抗を抑えるという目的を、地中構造物と溝側壁との間に支持壁材または抜き板を配置してジオテキスタイルを敷設し、埋め戻し材を投入し、投入された埋め戻し材が所定の高さに達するまで支持壁材を積み上げるか、抜き板を徐々に引き上げた後引き抜き、ジオテキスタイルで埋め戻し材を包むことにより実現した。   A support wall or blank plate is placed between the underground structure and the side wall of the groove in order to reliably suppress the floating resistance of the underground structure, whether it is a trench or shallow groove. Then, lay the geotextile, put backfill material, pile up the supporting wall material until the backfill material reached the predetermined height, or pull up the pulling plate gradually and pull out, backfill material with geotextile Realized by wrapping.

以下図面に示す実施例により本発明を説明する。図1は、本発明の第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図、図2の(A)ないし(E)、図3の(F)ないし(I)および図4の(J)ないし(M)はそれぞれ、この実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。本実施例に係るジオテキスタイルによる地中構造物の浅埋設工法について説明する。まず初めに、パイプライン(地中構造物)2を埋設する素堀溝(掘削溝)3は、埋設予定現場の地盤4(図2の(A)参照)に所定の溝幅を確保して、素堀により形成される(第1の工程、図2の(B)参照)。この素堀溝3は、素堀で形成されるため、両側壁は上方にゆくに従い拡開するよう傾斜して形成される。素堀溝3の底面5の地盤上には、砂や砕石などの支持力の高い地盤材料を投入して支持地盤Cが形成される。   The present invention will be described below with reference to embodiments shown in the drawings. FIG. 1 is a cross-sectional view showing a state in which an underground structure is embedded in the ground by a shallow embedding method of the underground structure using a geotextile according to the first embodiment of the present invention, and FIG. ), (F) through (I) in FIG. 3 and (J) through (M) in FIG. 4, respectively, bring the underground structure into the ground by the shallow underground construction method using the geotextile according to this embodiment. It is explanatory drawing which shows the process of embedding in order. A shallow embedding method for underground structures using geotextiles according to the present embodiment will be described. First, the underground trench (excavation trench) 3 in which the pipeline (underground structure) 2 is embedded secures a predetermined groove width in the ground 4 (see (A) of FIG. 2) at the site where the pipeline is planned to be embedded, It is formed by a moat (see the first step, FIG. 2B). Since the moat groove 3 is formed by a moat, both side walls are inclined so as to expand upward. On the ground of the bottom surface 5 of the moat groove 3, a ground material having a high supporting force such as sand and crushed stone is introduced to form a supporting ground C.

次に、図2の(D)および(E)に示すように、形成された支持地盤C上のほぼ中央にパイプライン2を配置し、パイプライン2と素堀溝3の壁面3A、3Bとの間に土嚢(支持壁材)6を配置する(第2の工程)。これら土嚢6とパイプライン2との間には、所定の空隙S1(図1参照)が設けられるようになっており、この空隙S1に投入される後述する埋め戻し材が浮上抵抗力を確保するのに必要な嵩(容量)を得られるようになっている。土嚢6と壁面3A、3Bとの間にも、空間S2が設けられる。   Next, as shown in (D) and (E) of FIG. 2, the pipeline 2 is arranged at the substantially center on the formed support ground C, and the pipeline 2 and the wall surfaces 3 </ b> A and 3 </ b> B of the moat groove 3 are arranged. A sandbag (support wall material) 6 is disposed between them (second step). A predetermined gap S1 (see FIG. 1) is provided between the sandbag 6 and the pipeline 2, and a backfill material, which will be described later, thrown into the gap S1 ensures floating resistance. The volume (capacity) necessary for the above can be obtained. A space S2 is also provided between the sandbag 6 and the wall surfaces 3A and 3B.

次に、図3の(F)に示すように、ジオテキスタイル10の溝幅方向両端を余らせるようにしてパイプライン2と支持地盤Cと土嚢6の内側面とに沿ってジオテキスタイル10を被せる(第3の工程)。ジオテキスタイル10は、いくつかの長片からなり、非透水性のシート材等、あるいは透水性の編物、麻布等で構成される。本実施例では、麻布を用いている。ジオテキスタイル10は、中央部10Aがパイプライン2の管頂部を覆うようにして被せられ、そのまま管底部側に向かって降ろされ、さらに、支持地盤C上面を通り、続いて土嚢6の内側面に沿って立ち上げられ、巻き回された両端の余り部10B、10Cが土嚢6の上面に載せられるか、上方で図示しない保持手段により保持されるようになっている。このように、ジオテキスタイル10は、パイプライン2の露出部をほぼ覆い、パイプライン2と土嚢6との間の支持地盤C上面に敷かれるとともに、土嚢6のパイプライン2側に向く面に沿って立ち上げられ、両端余り部10B、10Cは、素堀溝3の両側壁3A、3Bに達することなく、土嚢6上に載せられるようになっている。   Next, as shown in FIG. 3 (F), the geotextile 10 is covered along the pipeline 2, the supporting ground C, and the inner surface of the sandbag 6 so as to leave both ends of the geotextile 10 in the groove width direction (first). Step 3). The geotextile 10 is composed of several long pieces, and is composed of a non-permeable sheet material or the like, or a permeable knitted fabric, linen or the like. In this embodiment, linen is used. The geotextile 10 is placed so that the central portion 10A covers the top of the pipe 2 and is lowered toward the bottom of the pipe as it is, and further passes through the upper surface of the supporting ground C and then along the inner side of the sandbag 6. The surplus portions 10B and 10C at both ends that are started up and wound are placed on the upper surface of the sandbag 6 or are held by holding means (not shown) above. As described above, the geotextile 10 substantially covers the exposed portion of the pipeline 2, is laid on the upper surface of the support ground C between the pipeline 2 and the sandbag 6, and is along the surface of the sandbag 6 facing the pipeline 2 side. The both end surplus portions 10B and 10C are placed on the sandbag 6 without reaching the side walls 3A and 3B of the moat groove 3.

次に、図3の(G)に示すように、パイプライン2と土嚢6との間の、支持地盤C上面に敷かれたジオテキスタイル10上と、土嚢6と素堀溝両側壁3A、3Bとの間とに、埋め戻し材7を投入する。埋め戻し材7は、土嚢6の上面に達するまで投入される(第4の工程)。埋め戻し材7は素堀により発生した掘削土でもよいし、改良土でもよい。埋め戻し材7は、ジオテキスタイル10により包み込まれた際、アンカー機能を果たす剛性を発揮する材料であれば良く、土砂だけでなく、砂、礫、砂利あるいはこれらの混合材であってもよい。   Next, as shown in FIG. 3G, between the pipeline 2 and the sandbag 6 on the geotextile 10 laid on the upper surface of the supporting ground C, and between the sandbag 6 and the side walls 3A and 3B of the moat groove. In between, the backfill material 7 is thrown. The backfilling material 7 is input until it reaches the upper surface of the sandbag 6 (fourth step). The backfill material 7 may be excavated soil generated by bare moat or improved soil. The backfilling material 7 may be any material that exhibits rigidity to fulfill the anchor function when wrapped by the geotextile 10, and may be not only earth and sand but also sand, gravel, gravel, or a mixture thereof.

次に、図3の(H)に示すように、埋め戻し材7に溝幅方向両側が埋められた各土嚢6A、6Aの上に別の土嚢6B、6Bを積み上げ、ジオテキスタイルの両端余り部10B、10Cを積み上げられた土嚢6B、6B上に載せる。そして、再び、パイプライン2と積み重ねられた土嚢6B、6Bとの間の、向き合うジオテキスタイル10間と、積み重ねられた土嚢6B、6Bと素堀溝両側壁3A、3Bとの間とに、埋め戻し材7を新たに積み上げられた各土嚢6B、6Bの上面に達するまで投入する(図3の(I)参照)。このようにして、土嚢6A、6B・・・6Nの積み重ねと、埋め戻し材7の投入を繰り返し、図4の(J)に示すように、土嚢6A、6B・・・6Nの積み重ねと埋め戻し材7の投入は、埋め戻し材7がパイプライン2のアンカー機能を発揮する高さL1に達するまで行われる。本実施例では、土嚢を5個積み上げ、高さL1はパイプライン2の上方に達している。こうして、ジオテキスタイルの10の溝幅方向外側には、土嚢6A、6B・・・6Nの積み重ねにより支持壁6A−6Nが形成される。次に、図4の(K)に示すように、ジオテキスタイル10の両端余り部10B、10Cを回し開いて伸ばした後、両者10B、10Cを接続し、ジオテキスタイル10で囲まれた埋め戻し材7を包み込む(第5の工程)。このジオテキスタイルの10の接続により、埋め戻し材7はアンカー機能を果たすことになる。また、ジオテキスタイル10は、土嚢6A、6B・・・6Nが積み上げられるごとに、土嚢6A、6B・・・6Nの内側面に沿って余り部10B、10Cが上方に引き上げられるので、パイプライン10の長手方向に沿った面が崩れることなく、確実に保持される。なお、土嚢6A、6B・・・6Nの積み重ねと、埋め戻し材7の投入は、土嚢を1つ積み重ねるごとに行ってもよいし、複数の土嚢を積み重ねて、複数の土嚢分の高さに埋め戻し材を投入してもよい。   Next, as shown in FIG. 3 (H), another sandbag 6B, 6B is stacked on each sandbag 6A, 6A in which both sides in the groove width direction are buried in the backfill material 7, and both ends 10B of the geotextile are left. 10C is placed on the piled sandbags 6B and 6B. And again, the backfill material between the geotextiles 10 facing each other between the pipeline 2 and the stacked sandbags 6B and 6B, and between the stacked sandbags 6B and 6B and the side walls 3A and 3B of the moat groove. 7 is thrown in until it reaches the upper surface of each newly piled sandbag 6B, 6B (see (I) of FIG. 3). In this way, the sandbags 6A, 6B... 6N are repeatedly stacked and the backfill material 7 is repeatedly charged, and the sandbags 6A, 6B... 6N are stacked and backfilled as shown in FIG. The material 7 is charged until the backfill material 7 reaches a height L1 at which the anchor function of the pipeline 2 is exhibited. In this embodiment, five sandbags are stacked, and the height L1 reaches the upper side of the pipeline 2. Thus, on the outer side in the groove width direction of the geotextile 10, the support walls 6A-6N are formed by stacking the sandbags 6A, 6B... 6N. Next, as shown in (K) of FIG. 4, both ends 10 </ b> B and 10 </ b> C of the geotextile 10 are turned open and extended, and then the backfill material 7 surrounded by the geotextile 10 is connected by connecting both 10 </ b> B and 10 </ b> C. Wrapping (fifth step). With this connection of the geotextiles 10, the backfilling material 7 fulfills an anchor function. In addition, each time the sandbags 6A, 6B,... 6N are stacked, the geotextile 10 has the surplus portions 10B, 10C raised upward along the inner surface of the sandbags 6A, 6B,. The surface along the longitudinal direction is securely held without breaking. The sandbags 6A, 6B,... 6N and the backfill material 7 may be stacked each time one sandbag is stacked, or a plurality of sandbags may be stacked to obtain a height of a plurality of sandbags. A backfill material may be introduced.

次に、図4の(L)、(M)に示すように、ジオテキスタイル10の上面に達する位置まで土嚢6N、6Nの積み上げが完了し、これら土嚢6N、6Nと両端が接続されたジオテキスタイル10との上に、埋め戻し材7が埋め戻され、素堀溝3は埋め戻しが完了する(第6の工程)。   Next, as shown in FIGS. 4 (L) and 4 (M), the sandbags 6N and 6N are stacked up to a position reaching the upper surface of the geotextile 10, and the sandbags 6N and 6N are connected to the geotextile 10 connected at both ends. Then, the backfill material 7 is backfilled, and the backfill groove 3 is completely backfilled (sixth step).

上記実施例では、ジオテキスタイルを麻布で構成しているがこれに限られるものではなく、この工法に用いられるジオテキスタイルは、織布、不織布および編物、あるいはジオグリッド、ジオネットおよびメンブレンなどジオテキスタイル関連製品を含むものと定義される。例えば、種類として、ジオウォーブン(織物、織布、geowoven, woven geotextile)、ジオノンウォーブン(不織布、geononwoven, nonwoven geotextile)、ジオニット(緬物、geoknitted, knitted geotextile)、ジオグリッド(geogrid)、ジオネット(geonet)、ジオテキスタイル関連製品(geotextile-related product)、ジオコンポジット(複合製品、geocomposite)等がある。ジオウォーブンとは、縦糸と横糸を用いて織った織物で、土木などの用途に使用される製品である。ジオノンウォーブンとは、規則的または不規則的に配列した繊維を製織せずに機械的、化学的または熱的方法によって結合した不織布で、土木などの用途に使用される製品である。繊維の長さにより長い繊維と短繊維のものに大別できる。ジオユニットとは、連続した糸、繊維などによって緬目で構成した編物で、土木などの用途に使用される製品である。ジオグリッドとは、引張抵抗性のある構成要素が連結した規則的な格子構造からなるシート状のもので、主に高分子材料からなる製品である。ジオネットとは、開国部が構成要素の占める面積より大きい網目構造を持つシート状のもので、土木などの用途に使用される高分子材料の製品である。交点部は結節あるいは一体となっており、一般のジオウォーブン、ジオニットとは区別されている。ジオテキスタイル関連製品とは、狭義のジオテキスタイル、ジオグリッドおよびジオネット以外で、シート状または帯状の高分子材料からなる土木用途に使用される製品である。ジオコンポジットとは、狭義のジオテキスタイル、ジオグリッド、ジオネットなどを任意に組み合わせて一体とした複合製品である。単一製品の長所をお互い組み合わせて必要な機能を発揮させるため複合されている。   In the above embodiment, the geotextile is made of linen cloth, but is not limited to this, and the geotextile used in this construction method is woven fabric, non-woven fabric and knitted fabric, or geotextile related products such as geogrid, geonet and membrane. Defined as including. For example, as types, geowoven, woven geotextile, geononwoven, nonwoven geotextile, geonit, knitted geotextile, geogrid, geonet (Geonet), geotextile-related product, geocomposite (composite product, geocomposite), etc. Geowoven is a fabric woven using warp and weft, and is a product used for civil engineering. A geonon-woven is a non-woven fabric in which regularly or irregularly arranged fibers are bonded by a mechanical, chemical or thermal method without weaving, and is a product used for civil engineering. Depending on the length of the fiber, it can be roughly divided into long fibers and short fibers. A geounit is a knitted fabric composed of continuous threads, fibers, etc., and is a product used for civil engineering. A geogrid is a sheet-like product having a regular lattice structure in which components having tensile resistance are connected, and is a product mainly made of a polymer material. The geonet is a sheet-like material having a mesh structure larger than the area occupied by the components of the opening country, and is a product of a polymer material used for civil engineering. The intersection part is knotted or integrated, and is distinguished from general geo-warven and geo-knit. A geotextile-related product is a product used for civil engineering applications made of a sheet-like or strip-like polymer material other than the narrowly defined geotextile, geogrid and geonet. Geocomposite is a composite product in which narrowly defined geotextiles, geogrids, geonets, etc. are combined in any combination. Combined to combine the strengths of a single product with each other to perform the necessary functions.

次に、上記第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法の作用について説明する。まず、第1の工程で、地盤4を掘削して素堀溝3を形成し、この第1の工程後、第2の工程で、素堀溝3の底面5に地盤材料を投入して支持地盤Cを形成する。そして、支持地盤C上にパイプライン2を配置するとともに、このパイプライン2と素堀溝壁面3A、3Bとの間に土嚢6を配置する。これら土嚢6とパイプライン2との間には、埋め戻し材7が浮上抵抗力を確保するのに必要な嵩を得られるように、所定の空隙S1(図1参照)が設けられる。次に、第2の工程後、第3の工程で、長片のジオテキスタイル10の溝幅方向両端を余らせるようにしてパイプライン2と支持地盤Cと土嚢6の内側面とに沿ってジオテキスタイル10を被せる。ジオテキスタイル10は、パイプライン2の露出部をほぼ覆い、パイプライン2と土嚢6との間の支持地盤C上面に敷かれるとともに、土嚢6のパイプライン2側に向く面に沿って立ち上げられ、両端余り部10B、10Cは、素堀溝3の両側壁3A、3Bに達することなく、土嚢10上に載せられるようになっている。次に、第3の工程後、第4の工程で、パイプライン2と土嚢6との間の、支持地盤C上面に敷かれたジオテキスタイル10上と、土嚢6と素堀溝両側壁3A、3Bとの間とに、埋め戻し材7を投入する。埋め戻し材7は、土嚢6の上面に達するまで投入される。土嚢6の積み上げと埋め戻し材7の投入を繰り返し、埋め戻し材7がパイプライン2のアンカー機能を発揮する高さL1まで達すると、土嚢6の積み重ねは終了する。積み重ねられた土嚢6A、6B・・・6Nにより支持壁6A−6Nが形成される。次に、第4の工程後、第5の工程で、ジオテキスタイル10の両端余り部10B、10Cを開いて接続し、ジオテキスタイル10で囲まれた埋め戻し材7を包み込む。このジオテキスタイルの10の接続により、埋め戻し材7はアンカー機能を果たすことになる。次に、この第5の工程後、第6の工程で、積み重ねが完了した土嚢6N、6Nと両端が接続されたジオテキスタイル10との上に、埋め戻し材7が埋め戻され、素堀溝3は埋め戻しが完了する。   Next, the operation of the shallow embedding method for underground structures by the geotextile according to the first embodiment will be described. First, in the first step, the ground 4 is excavated to form the bare groove 3, and after this first step, the ground material is introduced into the bottom surface 5 of the bare groove 3 in the second step, thereby supporting ground C Form. And while arranging the pipeline 2 on the support ground C, the sandbag 6 is arrange | positioned between this pipeline 2 and the moat groove wall surface 3A, 3B. A predetermined gap S1 (see FIG. 1) is provided between the sandbag 6 and the pipeline 2 so that the bulk necessary for the backfill material 7 to secure the floating resistance can be obtained. Next, after the second step, in the third step, the geotextile 10 along the pipeline 2, the supporting ground C, and the inner surface of the sandbag 6 so as to leave both ends in the groove width direction of the long piece of geotextile 10. Put on. The geotextile 10 substantially covers the exposed portion of the pipeline 2, is laid on the upper surface of the support ground C between the pipeline 2 and the sandbag 6, and is raised along the surface of the sandbag 6 facing the pipeline 2 side, The both end surplus portions 10B and 10C are placed on the sandbag 10 without reaching the side walls 3A and 3B of the moat groove 3. Next, after the third step, in the fourth step, between the pipeline 2 and the sandbag 6 on the geotextile 10 laid on the upper surface of the support ground C, and the sandbag 6 and the both sides of the moat grooves 3A and 3B In between, the backfill material 7 is thrown. The backfill material 7 is introduced until it reaches the upper surface of the sandbag 6. When the sandbag 6 is repeatedly stacked and the backfill material 7 is charged and the backfill material 7 reaches the height L1 at which the anchor function of the pipeline 2 is exhibited, the stacking of the sandbag 6 is completed. Support walls 6A-6N are formed by the sandbags 6A, 6B,. Next, after the fourth step, in the fifth step, both ends 10B and 10C of the geotextile 10 are opened and connected, and the backfilling material 7 surrounded by the geotextile 10 is wrapped. With this connection of the geotextiles 10, the backfilling material 7 fulfills an anchor function. Next, after this fifth step, in the sixth step, the backfill material 7 is backfilled on the sandbags 6N, 6N that have been stacked and the geotextile 10 to which both ends are connected. The backfill is complete.

このように、第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル10で埋戻し材7を包み込むことにより埋戻し材7の剛性が高まり、埋戻し材7がパイプライン10に対してアンカー機能を果たすので、ジオテキスタイル10上側に投入される土被りとしての埋め戻し材7層の厚みを薄くすることができる。このため、浅い素堀溝3でも確実にパイプライン10等の地中構造物の浮上を抑制することができる。また、埋設されたジオテキスタイル10の溝幅方向側面には支持壁材6A−6Nが配置されているので、ジオテキスタイル10の溝幅方向側面が変形されることなく保持され、ジオテキスタイル10に包まれた埋め戻し材7の剛性が確実に確保され、設計通りのアンカー機能を得ることができる。ジオテキスタイル10に包み込まれる埋戻し材7は砂より砕石が好ましく、より浮上抵抗力を増大させる。さらに、埋戻し材7にソイルセメントや流動化処理土を用いると、ジオテキスタイル10と一体化しより浮上抵抗力を増大させる。   As described above, in the shallow embedding method of the underground structure by the geotextile according to the first embodiment, the backfill material 7 is increased in rigidity by wrapping the backfill material 7 in the geotextile 10, and the backfill material 7 is pipelined. Since the anchor function is performed with respect to 10, the thickness of the backfill material 7 layer as the earth covering thrown into the geotextile 10 upper side can be made thin. For this reason, it is possible to reliably suppress the floating of underground structures such as the pipeline 10 even in the shallow trench 3. Further, since the supporting wall material 6A-6N is disposed on the side surface of the buried geotextile 10 in the groove width direction, the side surface in the groove width direction of the geotextile 10 is held without being deformed, and the buried buried in the geotextile 10 The rigidity of the return material 7 is ensured reliably, and the designed anchor function can be obtained. The backfill material 7 wrapped in the geotextile 10 is preferably crushed stone rather than sand, and increases the resistance to floating. Further, when soil cement or fluidized soil is used for the backfill material 7, it is integrated with the geotextile 10 to increase the floating resistance.

次に、本発明の第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法について説明する。図5は、上記第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図、図6の(A)ないし(E)、図7の(F)ないし(I)および図8の(J)ないし(M)はそれぞれ、この実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。この第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法は、上記第1の実施例が、ジオテキスタイル10に包み込まれる埋め戻し材7をアンカー機能を果たす高さL1まで投入する際、土嚢6の積み重ねと埋め戻し材7の投入とを繰り返すようにしているのに対し、土嚢6に代えて抜き板9を用いる点が異なる他はほぼ同じ構成を有している。すなわち、まず初めに、パイプライン2を埋設する素堀溝3が、埋設予定現場の地盤4(図6(A)参照)に形成される(第1の工程、図6の(B)参照)。素堀溝3の底面5の地盤上には、砂や砕石などの支持力の高い地盤材料を投入して支持地盤Cが形成される(図6の(C)参照)。   Next, a method for embedding underground structures using geotextiles according to the second embodiment of the present invention will be described. FIG. 5 is a cross-sectional view showing a state in which the underground structure is embedded in the ground by the shallow embedding method of the underground structure by the geotextile according to the second embodiment, and (A) to (E) in FIG. 7 (F) to (I) and FIG. 8 (J) to (M) respectively embed the underground structure in the ground by the shallow burying method of the underground structure by the geotextile according to this embodiment. It is explanatory drawing which shows a process later on. In the shallow embedding method of the underground structure by the geotextile according to the second embodiment, when the backfill material 7 wrapped in the geotextile 10 is charged to the height L1 that fulfills the anchor function, While the stacking of the sandbags 6 and the introduction of the backfill material 7 are repeated, the construction is almost the same except that a punching plate 9 is used instead of the sandbag 6. That is, first, the underground trench 3 in which the pipeline 2 is embedded is formed on the ground 4 (see FIG. 6A) at the site where the pipeline is scheduled to be embedded (first step, see FIG. 6B). On the ground of the bottom surface 5 of the moat groove 3, a ground material having a high supporting force such as sand and crushed stone is introduced to form a supporting ground C (see FIG. 6C).

次に、図6の(D)および(E)に示すように、支持地盤C上のほぼ中央にパイプライン2を配置し、パイプライン2と素堀溝3の壁面3A、3Bとの間に抜き板9を配置する(第2の工程)。抜き板9は長方形状に形成された一枚板でパイプライン2に沿って支持地盤C上に引き抜き可能に立てられる。これら抜き板9とパイプライン2との間には、上記第1の実施例と同様に、所定の空隙S1(図5参照)が設けられる。この空隙S1には埋め戻し材7が投入され、パイプライン2に対する浮上抵抗力を確保するようになっている。抜き板9と壁面3A、3Bとの間にも、空間が設けられる。   Next, as shown in FIGS. 6D and 6E, the pipeline 2 is arranged at the approximate center on the supporting ground C, and is removed between the pipeline 2 and the wall surfaces 3A and 3B of the moat groove 3. The plate 9 is disposed (second step). The extraction plate 9 is a single plate formed in a rectangular shape, and is erected on the support ground C along the pipeline 2 so as to be extracted. A predetermined gap S1 (see FIG. 5) is provided between the punched plate 9 and the pipeline 2 as in the first embodiment. A backfill material 7 is introduced into the gap S1 to ensure a floating resistance against the pipeline 2. A space is also provided between the punch plate 9 and the wall surfaces 3A and 3B.

次に、図7の(F)に示すように、ジオテキスタイル10の溝幅方向両端を余らせるようにしてパイプライン2と支持地盤Cと抜き板9の内側面とに沿ってジオテキスタイル10を被せる(第3の工程)。ジオテキスタイル10は、中央部10Aがパイプライン2の管頂部を覆うようにして被せられ、そのまま管底部側に向かって降ろされ、さらに、支持地盤C上面を通り、続いて抜き板9の内側面に沿って立ち上げられ、巻き回された両端の余り部10B、10Cが抜き板9の上面に載せられるか、上方で図示しない保持手段により保持されるようになっている。このように、ジオテキスタイル10は、パイプライン2の露出部をほぼ覆い、パイプライン2と抜き板9との間の支持地盤C上面に敷かれるとともに、抜き板9のパイプライン2側に向く面に沿って立ち上げられ、両端余り部10B、10Cは、素堀溝3の両側壁3A、3Bに達することなく、抜き板9上に載せられるようになっている。   Next, as shown in FIG. 7F, the geotextile 10 is covered along the pipeline 2, the supporting ground C, and the inner surface of the punched plate 9 so as to leave both ends of the geotextile 10 in the groove width direction ( (3rd process). The geotextile 10 is covered so that the central portion 10A covers the top of the pipeline 2 and is lowered as it is toward the bottom of the tube, and further passes through the upper surface of the support ground C, and subsequently on the inner surface of the blank plate 9. The surplus portions 10B and 10C which are raised and wound along the both ends are placed on the upper surface of the punching plate 9, or are held by holding means (not shown) above. As described above, the geotextile 10 substantially covers the exposed portion of the pipeline 2 and is laid on the upper surface of the support ground C between the pipeline 2 and the punching plate 9 and on the surface of the punching plate 9 facing the pipeline 2 side. The both end surplus portions 10B and 10C are placed on the punching plate 9 without reaching the both side walls 3A and 3B of the moat groove 3.

次に、図7の(G)に示すように、パイプライン2と抜き板9との間の、支持地盤C上面に敷かれたジオテキスタイル10上と、抜き板9と素堀溝両側壁3A、3Bとの間とに、埋め戻し材7を投入する。埋め戻し材7は、抜き板9の上部が露出する位置まで投入される。次に、図7の(H)に示すように、抜き板9の一方をL2分の高さ引き上げ、立ったまま下部が埋め戻し材7に埋まった状態となるようにする。次に、他方の抜き板9も同様にL2分引き上げ、立った状態に保持する。抜き板9の引き抜きは、抜き板9の引き抜き抵抗に応じてマンパワーで行ってもよいし器具を用いて行ってもよい。両方の抜き板9、9が引き上げられると、再び、埋め戻し材7を投入する(図7の(I)参照)。埋め戻し材7は、抜き板9の上部が露出する位置まで投入される。こうして、抜き板9、9の引き上げと、埋め戻し材7の投入を繰り返し、図8の(J)に示すように、埋め戻し材7がパイプライン2のアンカー機能を発揮する高さL1に達するまで行われる(第4の工程)。そして、埋め戻し材7が高さL1に達すると、図8の(K)に示すように、ジオテキスタイル10の両端余り部10B、10Cを回し開いて接続し、ジオテキスタイル10で囲まれた埋め戻し材7を包み込む(第5の工程)。   Next, as shown in FIG. 7G, on the geotextile 10 laid on the upper surface of the support ground C between the pipeline 2 and the punching plate 9, and the punching plate 9 and both sides of the grooved grooves 3A and 3B. In between, the backfill material 7 is thrown. The backfilling material 7 is thrown to a position where the upper part of the punching plate 9 is exposed. Next, as shown in FIG. 7H, one side of the punching plate 9 is pulled up to a height of L2 so that the lower part is buried in the backfilling material 7 while standing. Next, the other punching plate 9 is similarly raised by L2 and held in a standing state. The extraction of the extraction plate 9 may be performed by manpower or using an instrument depending on the extraction resistance of the extraction plate 9. When both of the punching plates 9 and 9 are pulled up, the backfill material 7 is again introduced (see (I) in FIG. 7). The backfilling material 7 is thrown to a position where the upper part of the punching plate 9 is exposed. In this way, the pulling plates 9 and 9 are repeatedly pulled up and the backfill material 7 is introduced, and the backfill material 7 reaches a height L1 at which the anchor function of the pipeline 2 is exhibited, as shown in FIG. (4th process). When the backfilling material 7 reaches the height L1, as shown in FIG. 8K, the both ends 10B and 10C of the geotextile 10 are turned open and connected, and the backfilling material surrounded by the geotextile 10 is connected. 7 is wrapped (fifth step).

次に、図8の(L)に示すように、ジオテキスタイル10の溝幅方向両面に接した抜き板9を上方に引き抜く(第6の工程)。これら第5の工程および第6の工程は順序が逆でもよい。次に、抜き板9が引き抜かれ、ジオテキスタイル10が接続された素堀溝3に埋め戻し材7が埋め戻され、素堀溝3は埋め戻しが完了する(第7の工程)。   Next, as shown in FIG. 8L, the punching plates 9 that are in contact with both sides of the geotextile 10 in the groove width direction are pulled upward (sixth step). The order of these fifth and sixth steps may be reversed. Next, the punching plate 9 is pulled out, the backfill material 7 is backfilled in the trenches 3 to which the geotextile 10 is connected, and the trenches 3 are completely backfilled (seventh step).

次に、第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法の作用について説明する。第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、第1の工程で地盤4を掘削して素堀溝3を形成し、この第1の工程後、素堀溝5の底面5に形成された支持地盤Cにパイプライン2を配置するとともに、パイプライン2と素堀溝壁面3A、3Bとの間に抜き板9を立設し、第2の工程後、第3の工程で、パイプライン2と支持地盤Cと抜き板9の内側面とに沿ってジオテキスタイル10を被せ、このジオテキスタイル10の両端を余らせ、第3の工程後、第4の工程で、埋め戻し材7を投入して抜き板9を上方に引き上げ、次に、第5の工程で、投入される埋め戻し材7が所定の高さL1に達すると、上記ジオテキスタイル10の余り部10A、10Bを埋め戻し材7上に被せて接続し埋め戻し材を包み、第6の工程で、抜き板9を引き抜き、第7の工程で、抜き板9が引き抜かれジオテキスタイル10が接続された素堀溝3に、埋め戻し材7を投入し、素堀溝3を埋め戻すようにしている。このため、第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル10で埋戻し材7を包み込むことにより埋戻し材7の剛性が高まり、埋戻し材7が地中構造物としてのパイプライン2に対してアンカー機能を果たすので、ジオテキスタイル10の上側に投入される土被りとしての埋め戻し材層の厚みを薄くすることができる。従って、浅い素堀溝でも確実に地中構造物の浮上を抑制することができる。また、抜き板9を引き上げながら埋め戻し材7を投入することができるので、溝幅が短く深い掘削溝でも確実にジオテキスタイル10により埋め戻し材7を包み込むことができる。さらに、埋設されたジオテキスタイル10の溝幅方向側面には抜き板9が配置され、埋め戻し材7の投入量の増大に応じて抜き板9が引き抜かれるので、ジオテキスタイル10の溝幅方向側面が変形されることなく平面状に保持され、ジオテキスタイル10に包まれた埋め戻し材7の剛性が確実に確保され、設計通りのアンカー機能を得ることができる。また、抜き板9を引き抜いて素堀溝を埋め戻すようにしているので、埋め戻された溝には、抜き板9や土嚢6など他の部材を埋め殺しする必要がなくなる。   Next, the operation of the shallow embedding method for underground structures using the geotextile according to the second embodiment will be described. In the shallow embedding method of the underground structure by geotextile according to the second embodiment, the ground groove 4 is formed by excavating the ground 4 in the first step, and after this first step, the bottom surface 5 of the ground groove 5 is formed. The pipeline 2 is arranged on the support ground C formed in the above, and a blanking plate 9 is erected between the pipeline 2 and the trench wall surfaces 3A, 3B. After the second step, in the third step, Place the geotextile 10 along the pipeline 2, the supporting ground C, and the inner surface of the punched plate 9, leave the ends of the geotextile 10, and after the third step, put backfill material 7 in the fourth step Then, the punching plate 9 is lifted upward, and when the backfill material 7 to be input reaches a predetermined height L1 in the fifth step, the surplus portions 10A and 10B of the geotextile 10 are filled with the backfill material 7. Cover the top and wrap the backfill material. In, pull out the vent plate 9, in the seventh step, the element Horimizo 3 geotextile 10 vent plate 9 is withdrawn is connected, the backfill material 7 is turned so that backfill containing Horimizo 3. For this reason, in the shallow embedding method of the underground structure by the geotextile according to the second embodiment, the backfill material 7 is increased in rigidity by wrapping the backfill material 7 in the geotextile 10, and the backfill material 7 becomes the underground structure. Since the pipeline 2 as an object has an anchor function, the thickness of the backfill material layer as the earth covering put on the upper side of the geotextile 10 can be reduced. Therefore, the floating of the underground structure can be reliably suppressed even in a shallow trench. Further, since the backfilling material 7 can be introduced while pulling up the punched plate 9, the backfilling material 7 can be reliably wrapped by the geotextile 10 even in a deep excavation groove with a short groove width. Further, a punching plate 9 is arranged on the side surface of the buried geotextile 10 in the groove width direction, and the punching plate 9 is pulled out as the amount of backfill material 7 increases, so that the side surface of the geotextile 10 in the groove width direction is deformed. Accordingly, the backfill material 7 that is held in a flat shape and is wrapped in the geotextile 10 is ensured in rigidity, and an anchor function as designed can be obtained. Further, since the blanking groove 9 is pulled back by filling the blanking plate 9, it is not necessary to bury other members such as the blanking plate 9 and the sandbag 6 in the filled groove.

図9の(A)ないし(F)は、第2の実施例の変形例を示すもので、上記第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、素堀溝3のほぼ中央に1本のパイプライン2を配置しているのに対し、支持地盤C上に複数のパイプライン2A、2Bを所定の間隙を隔てて横に並べて配置し、埋め戻し材7Aを所定の高さL3(この変形例の場合、パイプライン2A、2Bのほぼ半分の高さ)まで投入して抜き板9を用いる点が異なる他はほぼ同じ構成を備えている。   FIGS. 9A to 9F show modified examples of the second embodiment. In the shallow embedding method of the underground structure by the geotextile according to the second embodiment described above, Whereas one pipeline 2 is arranged in the center, a plurality of pipelines 2A and 2B are arranged side by side with a predetermined gap on the support ground C, and the backfill material 7A is arranged at a predetermined height. The structure is substantially the same except that the length L3 (in the case of this modification, approximately half the height of the pipelines 2A and 2B) is used and the punching plate 9 is used.

次に、本発明の第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法について説明する。図10の(A)ないし(D)は、第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。この第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法は、上記第1および第2の実施例が、パイプライン2と素堀溝3の側壁3A、3Bとの間に、土嚢6や抜き板9を介在させて、ジオテキスタイル10に埋め戻し材7を包み込むようにしているのに対し、土嚢6や抜き板9等の介在物を介在させず、長片のジオテキスタイル10を敷設する際、両端余り部10B、10Cを素堀溝3の側壁3A、3Bまで伸ばし広げ、被せられたジオテキスタイル10上に埋め戻し材7を投入し、埋め戻し材7がアンカー機能を果たす所定の高さL1に達すると、ジオテキスタイル10の両端を接続し、埋め戻し材7を包み込むようにした点が異なる他はほぼ同じ構成を有している。   Next, a shallow embedding method for underground structures using geotextiles according to a third embodiment of the present invention will be described. (A) thru | or (D) of FIG. 10 is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on 3rd Example. . According to the third embodiment of the geotextile shallow embedding method, the first and second embodiments are configured such that the sandbag 6 is located between the pipeline 2 and the side walls 3A and 3B of the trench 3. In the case where the backfilling material 7 is wrapped in the geotextile 10 with the gap 9 and the blank plate 9 interposed, while the long piece of the geotextile 10 is laid without the inclusions such as the sandbag 6 and the blank plate 9. Then, both end surplus parts 10B and 10C are extended to the side walls 3A and 3B of the trench 3 and the backfill material 7 is put on the covered geotextile 10, and the backfill material 7 has a predetermined height L1 that fulfills the anchor function. When it reaches, both ends of the geotextile 10 are connected to each other, and the backfill material 7 is wrapped.

すなわち、まず初めに、第1の工程で、地盤4を掘削して素堀溝3を形成し、第2の工程で、素堀溝3の底面5に支持地盤Cを形成し、パイプライン2A、2Bを横に並べて配置する。次に、第3の工程で、埋め戻し材7Aを所定の高さL3まで投入して、パイプライン2A、2Bの上部を埋め戻し材7A上に露出させる。次に、第4の工程で、パイプライン2A、2Bと埋め戻し材7A上面と素堀溝壁面3A、3Bとに沿ってジオテキスタイル10を被せ、このジオテキスタイル10の両端の余り部10A、10Bを壁面3A、3B上に配置する。第5の工程で、埋め戻し材7を投入し、投入量の増大に応じてジオテキスタイル10の両端の余り部10A、10Bを壁面3A、3Bに沿って敷き伸ばし、埋め戻し材7が所定の高さL1に達すると、ジオテキスタイル10の余り部10B、10Cを投入された埋め戻し材7上に被せて接続し埋め戻し材7を包み込む。次に、第6の工程で、埋め戻し材7を投入し、素堀溝3を埋め戻すようになっている。   That is, first, in the first step, the ground 4 is excavated to form the grooved groove 3, and in the second step, the supporting ground C is formed on the bottom surface 5 of the grooved groove 3, and the pipelines 2A, 2B are formed. Are placed side by side. Next, in the third step, the backfill material 7A is introduced to a predetermined height L3, and the upper portions of the pipelines 2A and 2B are exposed on the backfill material 7A. Next, in a fourth step, the geotextile 10 is covered along the pipelines 2A, 2B, the back surface of the backfilling material 7A, and the trench wall surfaces 3A, 3B, and the surplus portions 10A, 10B at both ends of the geotextile 10 are covered with the wall surface 3A. 3B. In the fifth step, the backfill material 7 is introduced, and the surplus portions 10A and 10B at both ends of the geotextile 10 are spread along the wall surfaces 3A and 3B according to the increase of the input amount so that the backfill material 7 has a predetermined height. When the length reaches L1, the surplus portions 10B and 10C of the geotextile 10 are put on the backfill material 7 that has been put in and connected, and the backfill material 7 is wrapped. Next, in the sixth step, the backfilling material 7 is introduced, and the bare trench 3 is backfilled.

このように、第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル10で埋戻し材7を包み込むことにより埋戻し材7の剛性が高まり、埋戻し材7が地中構造物としてのパイプライン2A、2Bに対してアンカー機能を果たすので、ジオテキスタイル10上側に投入される土被りとしての埋め戻し材層の厚みを薄くすることができ、浅い素堀溝でも確実に地中構造物の浮上を抑制することができることに加え、介在物を用いることなく、埋め戻し材7が所定の高さL1に達すると、ジオテキスタイル10を接続しさえすれば埋め戻すことができるので施工効率が向上する。このため、浅い素堀溝に複数の地中構造物を埋設する場合に有効である。なお、第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、パイプライン2A、2Bの配置前に、第2の工程で、素堀溝3の底面5に支持地盤Cを形成するようにしているがこれに限られるものではなく、素堀溝3の底面5に直接パイプライン2A、2Bを配置するようにしてもよい。また、第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、パイプライン2A、2Bの配置後、第3の工程で埋め戻し材7Aを所定の高さL3まで投入して、パイプライン2A、2Bの上部を埋め戻し材7A上に露出させるようにしているが、これに限られるものではなく、パイプライン2A、2Bの配置後、埋め戻し材7Aを投入することなく、ジオテキスタイル10を被せるようにしてもよい。   Thus, in the shallow embedding method of the underground structure by the geotextile according to the third embodiment, the backfill material 7 is increased in rigidity by wrapping the backfill material 7 with the geotextile 10, and the backfill material 7 is underground. Since the anchor function is achieved for the pipelines 2A and 2B as structures, the thickness of the backfill material layer as the earth covering thrown into the upper side of the geotextile 10 can be reduced, and the ground is surely buried even in the shallow trench In addition to suppressing the floating of the structure, when the backfilling material 7 reaches a predetermined height L1 without using inclusions, it can be backfilled only by connecting the geotextile 10, so that the construction efficiency Will improve. For this reason, it is effective when a plurality of underground structures are buried in a shallow trench. In the shallow embedding method of the underground structure by the geotextile according to the third embodiment, the supporting ground C is formed on the bottom surface 5 of the moat groove 3 in the second step before the pipelines 2A and 2B are arranged. However, the present invention is not limited to this, and the pipelines 2 </ b> A and 2 </ b> B may be arranged directly on the bottom surface 5 of the moat groove 3. Moreover, in the shallow burying method of the underground structure by the geotextile according to the third embodiment, after placing the pipelines 2A and 2B, the backfill material 7A is thrown up to a predetermined height L3 in the third step, The upper portions of the pipelines 2A and 2B are exposed on the backfill material 7A. However, the present invention is not limited to this, and the geotextile can be used without introducing the backfill material 7A after the pipelines 2A and 2B are arranged. 10 may be covered.

次に、本発明の第4の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法について説明する。図11の(A)、(B)はそれぞれ、第4の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図および要部を拡大して示す断面図である。この第4の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法は、上記第1ないし第3の各実施例が、掘削溝を、掘削しただけで土留めを行っていない素堀溝3としているのに対し、軟弱地盤対策として、掘削溝53の両側壁53A、53Bに土留め用の矢板20、20を設けた点と、ジオテキスタイル11を、溝幅方向が短寸の長片から構成するとともに、このジオテキスタイル11の両端余り部11B、11Cを接続することなく、埋め戻し材7に埋め込んでいる点との2点が異なる他は、ほぼ同じ構成を有している。ジオテキスタイル11は、パイプライン2の両側で埋め戻し材7を囲むことにより埋戻し材の剛性が高まり、埋戻し材7がパイプライン2に対してアンカー機能を果たすようになっている。しかも、ジオテキスタイル11の、土嚢6のパイプライン2側の面に沿って上方に立ち上がる立ち上がり部11D、11Eは複数の土嚢6を積み上げて形成された支持壁に接しているので、埋戻し材7の剛性がより高まる。   Next, a method for embedding underground structures using geotextiles according to a fourth embodiment of the present invention will be described. 11A and 11B are respectively a cross-sectional view and a main part showing a state in which the underground structure is embedded in the ground by the shallow embedding method of the underground structure by the geotextile according to the fourth embodiment. It is sectional drawing expanded and shown. According to the geotextile shallow burying method according to the fourth embodiment, each of the first to third embodiments is configured as a bare trench 3 in which the excavation groove is just excavated and not earthed. On the other hand, as measures against soft ground, the earth textile sheet piles 20 and 20 are provided on both side walls 53A and 53B of the excavation groove 53, and the geotextile 11 is composed of long pieces whose groove width direction is short. In addition, the geotextile 11 has substantially the same configuration except that it is not connected to both end portions 11B and 11C of the geotextile 11 and is different from that embedded in the backfill material 7. The geotextile 11 surrounds the backfill material 7 on both sides of the pipeline 2 to increase the rigidity of the backfill material 7 so that the backfill material 7 performs an anchor function with respect to the pipeline 2. Moreover, since the rising portions 11D and 11E of the geotextile 11 that rise upward along the surface of the sandbag 6 on the pipeline 2 side are in contact with the support wall formed by stacking the plurality of sandbags 6, the backfill material 7 Increased rigidity.

このように、第4の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル11の両端11B、11Cを例え接続しなくとも、ジオテキスタイル11で埋戻し材7を囲むことにより、埋戻し材7の剛性が高まり、埋戻し材7がパイプライン2に対してアンカー機能を果たすので、ジオテキスタイル11上側に投入される土被りとしての埋め戻し材層の厚みを薄くすることができ、浅い素堀溝でも確実に地中構造物の浮上を抑制することができる。   As described above, in the shallow embedding method of the underground structure by the geotextile according to the fourth embodiment, the backfill material 7 is surrounded by the geotextile 11 without connecting the both ends 11B and 11C of the geotextile 11 to each other. Since the rigidity of the return material 7 is increased and the backfill material 7 functions as an anchor for the pipeline 2, the thickness of the backfill material layer as the earth covering placed on the upper side of the geotextile 11 can be reduced and shallow. Even underground trenches can reliably suppress the floating of underground structures.

図12の(A)、(B)はそれぞれ、第4の実施例の第1の変形例を示すもので、上記第4の実施例では、ジオテキスタイル11の立ち上がり部11D、11Eが、土嚢6の支持壁内面に沿ってほぼ垂直に立ち上がるよう構成されているのに対し、この第4の実施例の第1の変形例に係るジオテキスタイル12は、土嚢6を積み上げて形成された支持壁に沿って立ち上がり部12D、12Eが立ち上がるとともに、両端12B、12Cがパイプライン2側に折れて、埋め戻し材7の上面に載せられる点が異なる他は、第4の実施例とほぼ同様の構成を備えている。このように、第4の実施例の第1の変形例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル12の両端12B、12Cを例え接続しなくとも、ジオテキスタイル12で埋戻し材7を囲むことにより、埋戻し材7の剛性が高まり、埋戻し材7がパイプライン2に対してアンカー機能を果たすようになっている。   FIGS. 12A and 12B show a first modification of the fourth embodiment. In the fourth embodiment, the rising portions 11D and 11E of the geotextile 11 are Whereas the geotextile 12 according to the first modification of the fourth embodiment is configured to rise substantially vertically along the inner surface of the support wall, the geotextile 12 according to the first modification of the fourth embodiment extends along the support wall formed by stacking the sandbags 6. The rising portions 12D and 12E rise, and both ends 12B and 12C are folded to the pipeline 2 side, and are different in that they are placed on the upper surface of the backfill material 7, and have substantially the same configuration as that of the fourth embodiment. Yes. Thus, in the shallow embedding method of the underground structure by the geotextile according to the first modification of the fourth embodiment, the backfilling material 7 can be formed by the geotextile 12 even if the both ends 12B and 12C of the geotextile 12 are not connected. , The rigidity of the backfilling material 7 is increased, and the backfilling material 7 fulfills an anchor function with respect to the pipeline 2.

図13は、第4の実施例の第2の変形例を示すもので、上記第4の実施例では、ジオテキスタイル11の立ち上がり部11D、11Eが、土嚢6の支持壁内面に沿ってほぼ垂直に立ち上がるよう構成されているのに対し、この第4の実施例の第2の変形例に係るジオテキスタイル13は、土嚢6を積み上げて形成された支持壁に沿って立ち上がり部13D、13Eが立ち上がるとともに、両端13B、13Cが積み上げられた土嚢6のうち上側の土嚢6U、6Uに下面に挟み込まれるようにしている点が異なる他は、第4の実施例とほぼ同様の構成を備えている。このように、第4の実施例の第2の変形例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル13の両端13B、13Cを例え接続しなくとも、ジオテキスタイル13で埋戻し材7を囲むことにより、埋戻し材7の剛性が高まり、埋戻し材7がパイプライン2に対してアンカー機能を果たすようになっている。   FIG. 13 shows a second modification of the fourth embodiment. In the fourth embodiment, the rising portions 11D and 11E of the geotextile 11 are substantially vertical along the inner surface of the support wall of the sandbag 6. Whereas the geotextile 13 according to the second modification of the fourth embodiment is configured to rise, the rising portions 13D and 13E rise along the support wall formed by stacking the sandbags 6; The structure is substantially the same as that of the fourth embodiment, except that the sandbags 6 on which both ends 13B and 13C are stacked are sandwiched between the upper sandbags 6U and 6U on the lower surface. Thus, in the shallow embedding method of the underground structure by the geotextile according to the second modification of the fourth embodiment, the backfilling material 7 can be formed by the geotextile 13 even if the both ends 13B and 13C of the geotextile 13 are not connected. , The rigidity of the backfilling material 7 is increased, and the backfilling material 7 fulfills an anchor function with respect to the pipeline 2.

次に、本発明の第5の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法について説明する。図14は、この第5の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図である。この第5の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法は、上記第1、第2および第4の各実施例および第4の実施例の各変形例が、土嚢6または抜き板9を、パイプライン2との間に、所定の空隙S1(図1参照)を設けて配設するとともに、壁面3A、3Bまたは矢板20との間にも、空隙S2を隔てて配設するようにしているのに対し、軟弱地盤対策として、掘削溝53の両側壁53A、53Bに土留め用の矢板20、20を設け、この矢板20に沿って土嚢16を積み上げるようにした点が異なっている他は、第4の実施例の第2の変形例とほぼ同じ構成を有している。   Next, a method for embedding underground structures using geotextiles according to a fifth embodiment of the present invention will be described. FIG. 14 is a cross-sectional view showing a state in which the underground structure is embedded in the ground by the shallow embedding method of the underground structure using the geotextile according to the fifth embodiment. The shallow embedding method of the underground structure by geotextile according to the fifth embodiment is the same as that of the first, second and fourth embodiments and each modification of the fourth embodiment. 9 is provided with a predetermined gap S1 (see FIG. 1) between the pipeline 2 and the wall surface 3A, 3B or the sheet pile 20 with a gap S2 therebetween. In contrast to this, as a countermeasure against the soft ground, there is a difference in that the sheet piles 20 and 20 are provided on both side walls 53A and 53B of the excavation groove 53, and the sandbags 16 are stacked along the sheet pile 20. Other than that, it has substantially the same configuration as the second modification of the fourth embodiment.

すなわち、矢板20、20により土留めがなされた掘削溝53にパイプライン2を配置し、地盤材料を投入してパイプライン2と矢板20、20との間に支持地盤Cを形成し、その後、土嚢16を矢板20、20に沿って積み上げ、溝幅方向が短寸の長片からなるジオテキスタイル14を、パイプライン2、支持地盤Cおよび積み上げられた土嚢16の内側面に沿って被せ、所定の高さまで埋め戻し材7を投入するようにしている。埋め戻し材7がアンカー機能を発揮する所定の高さに達すると、ジオテキスタイル14の両端余り部14B、14Cを接続することなく、パイプライン2側に折り、埋め戻し材7の上面に載せるようにしている。この状態で、掘削溝53には、埋め戻し材7が再び投入され埋め戻されるようになっている。このように、第5の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法では、ジオテキスタイル14の両端14B、14Cを例え接続しなくとも、ジオテキスタイル14で埋戻し材7を囲むことにより、埋戻し材7の剛性が高まり、埋戻し材7がパイプライン2に対してアンカー機能を果たすようになっている。   That is, the pipeline 2 is arranged in the excavation groove 53 that is earthed by the sheet piles 20 and 20, and the ground material is introduced to form the support ground C between the pipeline 2 and the sheet piles 20 and 20. The sandbag 16 is piled up along the sheet piles 20 and 20, and the geotextile 14 composed of a long piece having a short groove width direction is placed along the pipeline 2, the supporting ground C, and the inner side of the piled sandbag 16, The backfill material 7 is thrown up to the height. When the backfill material 7 reaches a predetermined height at which the anchor function is exerted, it is folded to the pipeline 2 side without connecting both end portions 14B and 14C of the geotextile 14, and placed on the top surface of the backfill material 7. ing. In this state, the backfill material 7 is again put into the excavation groove 53 and backfilled. As described above, in the shallow embedding method of the underground structure by the geotextile according to the fifth embodiment, the backfill material 7 is surrounded by the geotextile 14 without connecting the both ends 14B and 14C of the geotextile 14 to each other. The rigidity of the return material 7 is increased, and the backfill material 7 performs an anchor function with respect to the pipeline 2.

なお、上記各実施例では、素堀溝3の底面5上に砂や砕石などの支持力の高い地盤材料を投入して支持地盤Cを形成するようにしているがこれに限られるものではなく、底面5上に直接、地中構造物を配置するようにしてもよい。こうすることにより、例えば、素堀溝3の底面5が強固な地盤の場合、支持地盤を形成しなくても地中構造物が確実に支持され変形等の虞がないので、コストダウンを図ることができる。さらに、地盤材料に代えて埋め戻し材または掘削により発生した掘削土を投入し、この埋め戻し材または掘削土の上に地中構造物を配置するようにしてもよい。また、上記第1および第2の実施例では、支持地盤上にパイプラインを配置しているが、これに限られるものではなく、支持地盤上に埋め戻し材または掘削土を投入し、埋め戻し材または掘削土上にパイプラインを配置するようにしてもよいし、支持地盤上にパイプラインを配置した後、埋め戻し材または掘削土を投入し、パイプラインの上部または一部を露出させてジオテキスタイルを被せるようにしてもよい。さらに、上記第1および第2の実施例では、埋め戻し材が包み込まれるジオテキスタイルの外側にも埋め戻し材を投入するようにしているがこれに限られるものではなく、包み込んだジオテキスタイルの外側には、すなわち、土嚢や抜き板と素堀溝側壁との間に、掘削により発生した掘削土を投入するようにしてもよい。掘削土を投入することにより、掘削残土の量を減らすことができる。また、上記第1の実施例および第2の実施例では、地中構造物の溝幅方向両側に、地中構造物の長手方向に沿って土嚢や抜き板を配置しているがこれに限られるものではなく、片側のみに配置するようにしてもよい。その場合、他方は第3の実施例に示すように、ジオテキスタイルを素堀溝の側壁に沿って敷設すればよい。さらに、上記各実施例では、地中構造物の例としてパイプライン2について述べているが、これに限られものではなく、水路、マンホールなどの地中に埋設される構造物であればよいことはいうまでもない。また、上記第1の実施例では、土嚢6の積み上げと埋め戻し材7の投入を繰り返し、複数の土嚢6を積み上げて支持壁を形成し、埋め戻し材がアンカー機能を発揮する所定の高さに達するまで投入されるようになっているがこれに限られるものではなく、浅い素堀溝であって、地中構造物の高さ寸法が短く、単数の土嚢(支持壁材)の高さまで埋め戻し材を投入してアンカー機能を発揮するのであれば、複数の土嚢6を積み上げる必要がないことはいうまでもない。さらに、上記第1の実施例では、支持壁材として土嚢6を用いているがこれに限られるものではなく、積み上げて支持壁を形成するものであれば良く、ブロックや板材であってもよいことはいうまでもない。また、埋め戻し材は、掘削により発生した掘削土や改良土に限られるものではなく、セメント等による流動化処理土、高分子材料などによる人工材料を用いてもよいし、これらを組み合わせて埋め戻し材としてもよい。さらに、土嚢6の内部またはジオテキスタイル10〜14で囲まれる空間には、掘削により発生する発生土を入れてよいし、改良土や砂利などを入れるようにしてもよいことはいうまでもない。   In each of the above embodiments, a ground material having a high supporting force such as sand or crushed stone is formed on the bottom surface 5 of the moat groove 3 to form the supporting ground C, but the present invention is not limited to this. An underground structure may be arranged directly on the bottom surface 5. By doing so, for example, in the case where the bottom surface 5 of the moat groove 3 is a solid ground, the underground structure is reliably supported without forming a support ground, and there is no risk of deformation or the like, so the cost can be reduced. Can do. Furthermore, instead of the ground material, a backfill material or excavated soil generated by excavation may be input, and an underground structure may be disposed on the backfill material or excavated soil. In the first and second embodiments, the pipeline is arranged on the supporting ground. However, the present invention is not limited to this, and a backfilling material or excavated soil is put on the supporting ground and backfilled. The pipeline may be arranged on the material or excavated soil, or after placing the pipeline on the supporting ground, the backfill material or excavated soil is introduced to expose the upper part or part of the pipeline. Geotextiles may be covered. Further, in the first and second embodiments, the backfill material is also introduced outside the geotextile in which the backfill material is wrapped. However, the present invention is not limited to this. That is, the excavated soil generated by excavation may be put between the sandbag or the punching plate and the side wall of the moat groove. By adding excavated soil, the amount of excavated soil can be reduced. In the first and second embodiments, sandbags and punched plates are arranged along the longitudinal direction of the underground structure on both sides in the groove width direction of the underground structure. However, it may be arranged only on one side. In that case, the other should just lay a geotextile along the side wall of a moat groove, as shown in a 3rd Example. Further, in each of the above-described embodiments, the pipeline 2 is described as an example of the underground structure. However, the structure is not limited to this, and any structure that is buried in the ground such as a waterway or a manhole may be used. Needless to say. In the first embodiment, the sandbags 6 are stacked and the backfill material 7 is repeatedly stacked, and a plurality of sandbags 6 are stacked to form a support wall. The backfill material has a predetermined height at which an anchor function is exhibited. However, it is not limited to this, it is a shallow trench, the height of the underground structure is short, and it fills up to the height of a single sandbag (support wall material) It goes without saying that it is not necessary to stack a plurality of sandbags 6 if the return material is introduced to exert the anchor function. Furthermore, in the said 1st Example, the sandbag 6 is used as a support wall material, However, it is not restricted to this, What is piled up and forms a support wall may be sufficient as a block and a board | plate material. Needless to say. In addition, the backfill material is not limited to excavated soil or improved soil generated by excavation, and fluidized soil such as cement or artificial material such as a polymer material may be used, or a combination of these may be used for filling. It is good also as a return material. Furthermore, it goes without saying that generated soil generated by excavation may be put in the interior of the sandbag 6 or the space surrounded by the geotextiles 10 to 14, and improved soil or gravel may be put.

本発明の第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設するした状態を示す断面である。(実施例1)It is a cross section which shows the state which buried the underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on 1st Example of this invention. Example 1 (A)ないし(E)はそれぞれ、第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(A) thru | or (E) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 1st Example, respectively. (F)ないし(I)はそれぞれ、第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(F) thru | or (I) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 1st Example, respectively. (J)ないし(M)はそれぞれ、第1の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(J) thru | or (M) is explanatory drawing which shows in order the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 1st Example, respectively. 本発明の第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設するした状態を示す断面である。(実施例2)It is a cross section which shows the state which buried the underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on 2nd Example of this invention. (Example 2) (A)ないし(E)はそれぞれ、第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(A) thru | or (E) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 2nd Example, respectively. (F)ないし(I)はそれぞれ、第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(F) thru | or (I) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 2nd Example, respectively. (J)ないし(M)はそれぞれ、第2の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(J) thru | or (M) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 2nd Example, respectively. (A)ないし(F)は、第2の実施例の変形例を示すジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(A) thru | or (F) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which shows the modification of a 2nd Example. . (A)ないし(D)はそれぞれ、第3の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設する工程を順を追って示す説明図である。(実施例3)(A) thru | or (D) is explanatory drawing which shows sequentially the process of embed | buying an underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on a 3rd Example, respectively. (Example 3) (A)、(B)はそれぞれ、第4の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図および要部を拡大して示す断面図である。(実施例4)(A) and (B) are respectively enlarged cross-sectional views and main parts showing a state in which the underground structure is embedded in the ground by the shallow embedding method of the underground structure by the geotextile according to the fourth embodiment. It is sectional drawing shown. (Example 4) (A)、(B)はそれぞれ、第4の実施例の第1の変形例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図および要部を拡大して示す断面図である。(実施例5)(A), (B) is a cross-sectional view showing a state in which the underground structure is embedded in the ground by the shallow embedding method of the underground structure by the geotextile according to the first modification of the fourth embodiment, respectively It is sectional drawing which expands and shows a principal part. (Example 5) 第4の実施例の第2の変形例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す要部を拡大して示す断面図である。(実施例6)It is sectional drawing which expands and shows the principal part which shows the state which buried the underground structure in the ground by the shallow embedding method of the underground structure by the geotextile which concerns on the 2nd modification of a 4th Example. (Example 6) 第5の実施例に係るジオテキスタイルによる地中構造物の浅埋設工法により地中構造物を地中に埋設した状態を示す断面図である。(実施例7)It is sectional drawing which shows the state which buried the underground structure in the ground by the shallow embedding construction method of the underground structure by the geotextile which concerns on a 5th Example. (Example 7)

符号の説明Explanation of symbols

3 素堀溝
3A、3B 素堀溝壁面
4 地盤
5 素堀溝底面
6 土嚢(支持壁材)
7 埋め戻し材
10 ジオテキスタイル
10B、10C 余り部
L1 所定の高さ
3 Moat Groove 3A, 3B Moat Groove Wall 4 Ground 5 Moat Groove Bottom 6 Sandbag (Support Wall Material)
7 Backfill material 10 Geotextile 10B, 10C Surplus part L1 Predetermined height

Claims (18)

地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第2の工程と、地中構造物と溝底面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えたことを特徴とするジオテキスタイルによる地中構造物の浅埋設工法。   The first step of excavating the ground to form the excavation groove, and placing the underground structure on the bottom surface of the excavation groove, and supporting wall material between at least one of the underground structure and the excavation groove wall surface A third step of placing the geotextile along the underground structure, the bottom surface of the groove, and the inner surface of the support wall, and leaving the both ends of the geotextile in the width direction of the geotextile, and the remainder of both ends of the geotextile A geotextile characterized in that it comprises a fourth step of extending the part in response to the input of backfill material and a fifth step of introducing backfill material and filling both ends of the geotextile to backfill the excavation groove Underground construction method for underground structures. 地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に支持壁材を配置する第4の工程と、地中構造物と埋め戻し材上面と支持壁材の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばす第6の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第7の工程とを備えたことを特徴とするジオテキスタイルによる地中構造物の浅埋設工法。   The first step of excavating the ground to form the excavation groove, the second step of disposing the underground structure on the bottom surface of the excavation groove, and the backfill material to the excavation groove where the underground structure is disposed And a third step of exposing a part of the underground structure on the backfilling material, and a fourth step of disposing the support wall material between at least one of the underground structure and the wall surface of the excavation groove. A fifth step of covering the geotextile along the process, the underground structure, the upper surface of the backfilling material, and the inner surface of the support wall material, and leaving the both ends of the geotextile in the groove width direction, and backfilling the remaining portions of both ends of the geotextile Geotextile underground structure characterized by comprising a sixth step of extending in response to the input of material and a seventh step of introducing backfill material and filling both ends of the geotextile to backfill the excavation trench Shallow burial method. 埋め戻し材を、配置された支持壁材まで投入しては、支持壁材上に他の支持壁材を積み上げてジオテキスタイルの余り部を引き上げ、積み上げと埋め戻しと余り部の引き上げを繰り返し、投入された埋め戻し材内に積み上げた支持壁材により支持壁を形成するとともに、所定の高さまで埋め戻し材を投入することを特徴とする請求項1または2に記載のジオテキスタイルによる地中構造物の浅埋設工法。   Put backfill material up to the placed support wall material, stack other support wall materials on the support wall material, pull up the surplus part of the geotextile, and repeat the stacking, backfilling and lifting of the surplus part 3. The geotextile underground structure according to claim 1, wherein the support wall is formed by the support wall material stacked in the backfill material, and the backfill material is introduced to a predetermined height. Shallow burial method. 地中構造物と支持壁材との間に、埋め戻し材が所定の嵩を確保するように空隙を設けたことを特徴とする請求項1ないし3のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The ground by the geotextile according to any one of claims 1 to 3, wherein a gap is provided between the underground structure and the support wall material so that the backfill material has a predetermined volume. A shallow burial method for medium structures. 支持壁材は、地中構造物の溝幅方向両側に設けられることを特徴とする請求項1ないし4のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   5. The shallow embedding method for an underground structure by geotextile according to claim 1, wherein the supporting wall material is provided on both sides of the underground structure in the groove width direction. 地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置するとともに、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第2の工程と、地中構造物と溝底面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第4の工程と、抜き板を引き抜く第5の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えたことを特徴とするジオテキスタイルによる地中構造物の浅埋設工法。   A first step of excavating the ground to form an excavation groove, and an underground structure is disposed on the bottom surface of the excavation groove, and a blanking plate is provided between at least one of the underground structure and the excavation groove wall surface. The second step of standing, the third step of covering the geotextile along the underground structure, the bottom surface of the groove and the inner surface of the punched plate, leaving the both ends of the groove width direction of this geotextile, and the remaining portions of both ends of the geotextile The fourth step of pulling up the blanking plate, the fifth step of pulling out the blanking plate, the backfilling material into the groove from which the blanking plate has been pulled, A shallow embedding method for underground structure by geotextile, characterized by comprising a sixth step of embedding both ends and refilling the excavation groove. 地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物が配置された掘削溝に埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と掘削溝壁面との間のうち少なくともいずれか一方に抜き板を立設する第4の工程と、地中構造物と埋め戻し材上面と抜き板の内側面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第5の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて伸ばし、抜き板を上方に引き上げる第6の工程と、抜き板を引き抜く第7の工程と、抜き板が引き抜かれた溝に埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第8の工程とを備えたことを特徴とするジオテキスタイルによる地中構造物の浅埋設工法。   The first step of excavating the ground to form the excavation groove, the second step of disposing the underground structure on the bottom surface of the excavation groove, and the backfill material to the excavation groove where the underground structure is disposed And a third step of exposing a part of the underground structure on the backfill material, and a fourth step of erecting a punching plate at least one of the underground structure and the wall surface of the excavation groove 5th step of covering the geotextile along the process, the underground structure, the upper surface of the backfill material, and the inner surface of the punched plate, and leaving the both ends of the geotextile in the groove width direction, and the backfilling material of both ends of the geotextile The sixth step of pulling up the punching plate, the seventh step of pulling out the punching plate, the backfilling material into the groove from which the punching plate was pulled out, and embedding both ends of the geotextile An eighth step of refilling the excavation groove Shallow buried method of underground structures according geotextile characterized. 地中構造物の配置後、埋め戻し材を投入しては、抜き板を徐々に引き上げ、埋め戻しと抜き板の引き上げとを繰り返すことを特徴とする請求項6または7に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The geotextile-based ground according to claim 6 or 7, characterized in that after placing the underground structure, a backfill material is introduced, the punched plate is gradually lifted, and backfilling and lifting of the punched plate are repeated. A shallow burial method for medium structures. 地中構造物と抜き板との間に、埋め戻し材が所定の嵩を確保するように空隙を設けたことを特徴とする請求項6ないし8のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   9. The underground by geotextile according to any one of claims 6 to 8, wherein a gap is provided between the underground structure and the blank plate so that the backfilling material has a predetermined volume. A method for shallowly embedding structures. 抜き板は、地中構造物の溝幅方向両側に設けられることを特徴とする請求項6ないし9のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The method for shallowly embedding underground structures by geotextile according to any one of claims 6 to 9, wherein the punching plates are provided on both sides of the underground structure in the groove width direction. 地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、地中構造物と溝底面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第3の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第4の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第5の工程とを備えたことを特徴とするジオテキスタイルによる地中構造物の浅埋設工法。   The first step of excavating the ground to form the excavation groove, the second step of disposing the underground structure on the bottom surface of the excavation groove, and the geotextile along the underground structure, the bottom surface of the groove and the wall surface of the excavation groove Covering, the third step of leaving the both ends of the geotextile in the groove width direction, the fourth step of extending the geotextile both ends of the geotextile along the groove wall surface according to the input of the backfill material, and the backfill material A shallow embedding method for underground structure by geotextile, comprising a fifth step of embedding both ends of geotextile and refilling the excavation trench. 地盤を掘削して掘削溝を形成する第1の工程と、掘削溝底面に地中構造物を配置する第2の工程と、埋め戻し材を投入して、地中構造物の一部を埋め戻し材上に露出させる第3の工程と、地中構造物と埋め戻し材上面と掘削溝壁面とに沿ってジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせる第4の工程と、ジオテキスタイル両端余り部を埋め戻し材の投入に応じて溝壁面に沿って敷き伸ばす第5の工程と、埋め戻し材を投入し、ジオテキスタイルの両端を埋め込んで掘削溝を埋め戻す第6の工程とを備えたことを特徴とするジオテキスタイルによる地中構造物の浅埋設工法。   The first step of excavating the ground to form the excavation groove, the second step of disposing the underground structure on the bottom of the excavation groove, and filling the backfill material to bury part of the underground structure A third step of exposing on the return material, a fourth step of covering the geotextile along the underground structure, the back surface of the backfill material and the wall surface of the excavation groove, and leaving the both ends of the geotextile in the width direction of the geotextile, and the geotextile A fifth step of spreading the surplus portions at both ends along the groove wall surface according to the input of the backfill material, and a sixth step of introducing the backfill material and filling both ends of the geotextile to backfill the excavation groove A shallow embedding method for underground structures using geotextiles. ジオテキスタイルを被せ、このジオテキスタイルの溝幅方向両端を余らせて埋め戻し材を投入した後、埋め戻し材が所定の高さに達すると、上記ジオテキスタイルの余り部を投入された埋め戻し材上に被せて接続し埋め戻し材を包むことを特徴とする請求項1ないし12のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   After covering the geotextile and putting backfill material with both ends in the groove width direction of this geotextile remaining, when the backfill material reaches a predetermined height, cover the backfill material with the surplus portion of the geotextile. The method for shallowly embedding underground structures by geotextile according to any one of claims 1 to 12, wherein the backfill material is wrapped and connected. 掘削溝の壁面に土留め用矢板を設け、掘削溝を埋め戻す際、矢板を引き抜くことを特徴とする請求項1ないし13のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The shallow embedding method for underground structure by geotextile according to any one of claims 1 to 13, wherein a sheet pile for earth retaining is provided on a wall surface of the excavation groove, and the sheet pile is pulled out when the excavation groove is backfilled. . 埋め戻し材を囲んだジオテキスタイルの外側には、溝掘削により生じた掘削土を用いることを特徴とする請求項1ないし14のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The method for shallowly embedding underground structures by geotextile according to any one of claims 1 to 14, wherein excavated soil generated by trench excavation is used outside the geotextile surrounding the backfill material. 掘削溝底面に地盤材料を投入して支持地盤を形成し、この支持地盤上に地中構造物を配置することを特徴とする請求項1ないし15のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The geotextile by geotextile according to any one of claims 1 to 15, wherein a ground material is thrown into the bottom of the excavation groove to form a support ground, and an underground structure is disposed on the support ground. A method for shallowly embedding structures. 地盤材料に埋め戻し材を用いたことを特徴とする請求項16に記載のジオテキスタイルによる地中構造物の浅埋設工法。   The method for shallow embedding of underground structures by geotextile according to claim 16, wherein a backfill material is used for the ground material. 掘削溝の壁面に土留め用矢板を設け、上記支持壁材を土留め用矢板に沿って配置するとともに、掘削溝を埋め戻す際、矢板を引き抜くことを特徴とする請求項1ないし5のうちいずれか1に記載のジオテキスタイルによる地中構造物の浅埋設工法。   A sheet pile for earth retaining is provided on a wall surface of the excavation groove, the support wall material is disposed along the sheet pile for earth retaining, and the sheet pile is pulled out when the excavation groove is backfilled. A shallow embedding method for underground structures using any one of the geotextiles.
JP2005317188A 2005-10-31 2005-10-31 Shallow burial method of underground structure by geotextile Active JP3995166B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005317188A JP3995166B2 (en) 2005-10-31 2005-10-31 Shallow burial method of underground structure by geotextile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005317188A JP3995166B2 (en) 2005-10-31 2005-10-31 Shallow burial method of underground structure by geotextile

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2007065629A Division JP4803497B2 (en) 2007-03-14 2007-03-14 Shallow burial method of underground structure by geotextile

Publications (2)

Publication Number Publication Date
JP2007120721A true JP2007120721A (en) 2007-05-17
JP3995166B2 JP3995166B2 (en) 2007-10-24

Family

ID=38144779

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005317188A Active JP3995166B2 (en) 2005-10-31 2005-10-31 Shallow burial method of underground structure by geotextile

Country Status (1)

Country Link
JP (1) JP3995166B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008267567A (en) * 2007-04-24 2008-11-06 National Agriculture & Food Research Organization Shallow burying construction method of underground structure by geotextile
WO2016061650A1 (en) * 2014-10-22 2016-04-28 Petroleo Brasileiro S.A. - Petrobras System and method for installing buried pipes
CN106836034A (en) * 2017-03-09 2017-06-13 山西省交通科学研究院 A kind of high roadbed slab culvert flexibility off-load system and construction method
CN112814045A (en) * 2021-02-08 2021-05-18 江苏科技大学 Reusable fluidized soil pipeline anti-floating device and construction method thereof
CN113566019A (en) * 2021-06-29 2021-10-29 中国二十冶集团有限公司 Construction method for laying drainage pipe network without excavating upper part of ground reservoir

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112901854B (en) * 2021-01-19 2021-11-19 江苏科技大学 Flexible anti-floating device for pipeline and pipeline installation method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008267567A (en) * 2007-04-24 2008-11-06 National Agriculture & Food Research Organization Shallow burying construction method of underground structure by geotextile
WO2016061650A1 (en) * 2014-10-22 2016-04-28 Petroleo Brasileiro S.A. - Petrobras System and method for installing buried pipes
CN106836034A (en) * 2017-03-09 2017-06-13 山西省交通科学研究院 A kind of high roadbed slab culvert flexibility off-load system and construction method
CN106836034B (en) * 2017-03-09 2023-04-28 山西省交通科学研究院 High-fill cover plate culvert flexible load shedding system and construction method
CN112814045A (en) * 2021-02-08 2021-05-18 江苏科技大学 Reusable fluidized soil pipeline anti-floating device and construction method thereof
CN113566019A (en) * 2021-06-29 2021-10-29 中国二十冶集团有限公司 Construction method for laying drainage pipe network without excavating upper part of ground reservoir

Also Published As

Publication number Publication date
JP3995166B2 (en) 2007-10-24

Similar Documents

Publication Publication Date Title
JP4803497B2 (en) Shallow burial method of underground structure by geotextile
KR100971004B1 (en) Retaining Wall with Panels
JP3995166B2 (en) Shallow burial method of underground structure by geotextile
KR20120001856A (en) Method for reinforcing soft ground using geosynthetics and open channel
JP5418369B2 (en) Filling reinforcement structure
JP4262292B1 (en) Deformation control method for embankment
TW201114981A (en) Underground structure having an overlaid structure of resin-made layers
WO2010131330A1 (en) Method of suppressing deformation of embankment
JP5121293B2 (en) Shallow burial method of underground structure by geotextile
JP3773495B2 (en) Reinforced earthwork method
JP3314191B2 (en) Underground construction method of underground structure by geotextile
JP2007051514A (en) Long-sandbag drain reinforcing method
JP5065346B2 (en) Structure and construction method of reinforced earth embankment
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
JP3756077B2 (en) Burial method and structure of underground objects
JP4463568B2 (en) Reinforcement method for soft ground
JP2014237980A (en) Method for laying road on slope face
JP6814581B2 (en) Pipe burying method
JP2009013608A (en) Wall structure and construction method for it
JP2000160559A (en) Landslide protection wall and construction method therefor
JP2012046908A (en) Bank protection retaining wall structure
JP4446524B2 (en) Earth retaining wall structure and earth retaining method
JPH0634076A (en) Subsidence preventive method for buried pipe conduit by civil engineering work sheet
JP4627464B2 (en) Inclined pile construction method
JP5266099B2 (en) Design method of pullout resistor for earth retaining

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070314

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070424

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070621

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070724

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070726

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100810

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3995166

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100810

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110810

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110810

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120810

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120810

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130810

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250