JP2007040028A - Reinforcing structure and reinforcing method for ground - Google Patents

Reinforcing structure and reinforcing method for ground Download PDF

Info

Publication number
JP2007040028A
JP2007040028A JP2005227176A JP2005227176A JP2007040028A JP 2007040028 A JP2007040028 A JP 2007040028A JP 2005227176 A JP2005227176 A JP 2005227176A JP 2005227176 A JP2005227176 A JP 2005227176A JP 2007040028 A JP2007040028 A JP 2007040028A
Authority
JP
Japan
Prior art keywords
ground
tunnel
tunnel excavation
tensile
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005227176A
Other languages
Japanese (ja)
Other versions
JP4706382B2 (en
Inventor
Akira Yamamoto
山本  彰
Kunihiko Hamai
邦彦 浜井
Koji Morita
晃司 森田
Takenobu Inagawa
雄宣 稲川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2005227176A priority Critical patent/JP4706382B2/en
Publication of JP2007040028A publication Critical patent/JP2007040028A/en
Application granted granted Critical
Publication of JP4706382B2 publication Critical patent/JP4706382B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a reinforcing structure and a reinforcing method for the ground for preventing abnormality such as loosening, deformation, and collapse of the ground due to excavation of a tunnel. <P>SOLUTION: Tension members 5 buried into tunnel excavation planned sections 2 obliquely or vertically from the surface of the ground, respectively, fixing bodies 7 provided so as to surround the outer peripheries of the tension members 5 in lower parts of the tension members 5, extension members 9 connected with lower ends of the tension members 5, compression members 11 buried into sides of the tunnel excavation planned sections 2 obliquely from the surface of the ground, respectively, and pressure receiving plates 13 connecting the tension members 5 with the compression members 11 and provided so as to come into contact with the surface of the ground are provided in the ground 3 around the tunnel excavation planned sections 2. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、トンネルを掘削する際に地盤の崩壊を防止するための補強構造及び補強方法に関する。   The present invention relates to a reinforcing structure and a reinforcing method for preventing ground collapse when excavating a tunnel.

崖錐や地滑り地帯のトンネル坑口施工、土砂地山、土被りの小さなトンネル施工などの場合に、トンネル掘削にともない地盤が緩み、地盤変形が生じて地滑りや斜面崩壊が発生する可能性がある。そこで、トンネル掘削にともなう地盤の緩み、地盤の変形及び斜面の崩壊の防止などを目的として種々の対策工が施工される。   In the case of tunnel pit construction in cliffs and landslide areas, tunnels with earth and sand, and small earth covers, the ground may loosen due to tunnel excavation, causing ground deformation and landslides and slope failures. Therefore, various countermeasures are implemented for the purpose of preventing ground loosening, ground deformation and slope collapse associated with tunnel excavation.

例えば、非特許文献1においては、図20に示すように、トンネル坑口の斜面よりトンネル掘削予定箇所60に向けて、ボーリングにて孔を穿孔し、この孔内に鉄筋等の補強材を挿入してセメントミルク又はモルタル等のグラウト材を充填し、垂直縫地ボルト61を地中に埋設する垂直縫地ボルト工法が示されている。かかる工法によれば、トンネル掘削にともなう地山変形を防止するための力を、硬化したグラウト材を介して鉄筋に負担させることにより地山固有のせん断強度を向上させることができ、また、地滑り面等に生じる滑動力に対しては、鉄筋のせん断剛性及び曲げ剛性にて抵抗することにより地滑りを防止することができる。   For example, in Non-Patent Document 1, as shown in FIG. 20, a hole is drilled by boring from the slope of the tunnel well to the planned tunnel excavation point 60, and a reinforcing material such as a reinforcing bar is inserted into the hole. A vertical sewing bolt method in which a grout material such as cement milk or mortar is filled and a vertical sewing bolt 61 is buried in the ground is shown. According to such a construction method, the shear strength inherent to the natural ground can be improved by applying the force to prevent the natural ground deformation due to tunnel excavation to the rebar through the hardened grout material, and the landslide The landslide can be prevented by resisting the sliding force generated on the surface by the shear rigidity and bending rigidity of the reinforcing bar.

また、特許文献2においては、トンネル外周面を先受けするコンクリート製の覆工体を切羽の前方に所定長さ形成し、この覆工体により覆われた部分を掘削するプレライニング工法が示されている。この覆工体は、例えば、チェーンカッター等の細溝掘削機械を用いてトンネル外周に沿って所定幅の掘削溝を順次形成するとともに、その掘削溝にコンクリート圧送管を通じてコンクリートを充填する工程を周方向に繰り返すことによって一体形成される。かかる工法によれば、覆工体が地山の掘削すべきトンネル部分を覆うように形成されているために、覆工体内を掘削していくことにより、トンネル掘削にともなう地山変形を防止することができ、また、掘削時にトンネルの天端部が崩落することなく安全にトンネルを掘削することができる。
トンネル・ライブラリー第5号 山岳トンネルの補助工法、平成6年3月20日発行、社団法人土木学会 特開平6−212877号公報
Patent Document 2 discloses a pre-lining method in which a concrete lining body that receives the outer peripheral surface of a tunnel is formed in a predetermined length in front of a face, and a portion covered with the lining body is excavated. ing. For example, this lining body is formed by sequentially forming a predetermined width of the excavation groove along the outer periphery of the tunnel using a narrow groove excavation machine such as a chain cutter and filling the excavation groove with concrete through a concrete feed pipe. It is integrally formed by repeating in the direction. According to such a construction method, since the lining body is formed so as to cover the tunnel portion of the natural ground to be excavated, the natural ground deformation accompanying the tunnel excavation is prevented by excavating the lining body. In addition, the tunnel can be safely excavated without collapsing the top end of the tunnel during excavation.
Tunnel Library No. 5 Auxiliary Construction Method for Mountain Tunnels, published on March 20, 1994, Japan Society of Civil Engineers JP-A-6-212877

しかしながら、従来の縫地工法は、トンネル掘削にともなうトンネル坑口付近における不安定化のメカニズムを考慮しておらず、設計方法も確立されていないために、鉄筋等の補強材の設置間隔や埋設長は経験的に決められていた。したがって、過小設計又は過大設計の可能性があり、合理的な施工方法ではないという問題点があった。   However, the conventional sewing method does not consider the mechanism of destabilization in the vicinity of the tunnel pit due to tunnel excavation, and the design method has not been established. Was determined empirically. Therefore, there is a possibility of under-design or over-design, and there is a problem that it is not a rational construction method.

また、鉄筋等の補強材はトンネル掘削断面内まで打設されているために、トンネル掘削と同時に補強材を切断しなければならず、この切断作業に手間と時間がかかり日進距離が短くなるという問題点があった。一方、補強材をトンネル断面内までに挿入せずにトンネル上方まで挿入した場合においては、トンネル切羽前面の緩みを防止する効果が少なくなるために、鏡ボルト打設等の切羽の緩み防止対策が必要となり、この切羽の緩み防止対策に手間と時間がかかるという問題点があった。   In addition, since reinforcing materials such as reinforcing bars are driven into the tunnel excavation cross section, it is necessary to cut the reinforcing material simultaneously with tunnel excavation. There was a problem. On the other hand, when the reinforcing material is not inserted into the tunnel cross section but inserted above the tunnel, the effect of preventing loosening of the front face of the tunnel face is reduced. There is a problem that it takes time and effort to prevent the face from loosening.

そして、プレライニング工法を用いた場合は、トンネル外周面に覆工体を形成することにより、切羽に作用する鉛直荷重は低減するが、切羽前面の緩みに対する効果は少ないために、鏡ボルト打設等の切羽の緩み防止対策が必要となり、この切羽の緩み防止対策にさらに手間と時間がかかるという問題点があった。また、トンネル外周面に覆工体を形成する作業はトンネル内の切羽近傍で行うために、掘削作業を中断しなければならず、トンネル掘削作業に工期がかかるという問題点があった。   When the pre-lining method is used, the vertical load acting on the face is reduced by forming a lining body on the outer peripheral surface of the tunnel, but the effect of loosening the front face of the face is small. Therefore, it is necessary to take measures to prevent the face from loosening, and this face has a problem that it takes more time and effort. In addition, since the work for forming the lining body on the outer peripheral surface of the tunnel is performed in the vicinity of the face in the tunnel, the excavation work must be interrupted, and the tunnel excavation work takes a work period.

そこで、本発明は、上記の問題点を鑑みてなされたものであり、トンネルの掘削にともなう地盤の緩み、変形、崩壊等の異常を防止する地盤の補強構造及び補強方法を提供することにある。   Therefore, the present invention has been made in view of the above-described problems, and provides a ground reinforcement structure and a reinforcement method for preventing abnormalities such as loosening, deformation, and collapse of the ground due to tunnel excavation. .

上記問題を解決する本発明の地盤の補強構造は、トンネル掘削予定箇所周辺に予め施工される地盤の補強構造であって、地表からトンネル掘削予定箇所へ斜め又は鉛直に埋設され、緊張力を与えられる引張材と、該引張材の外周に設けられ、前記引張材を地盤に固定する定着体と、地表からトンネル掘削予定箇所の側方へ斜め又は鉛直に埋設され、地盤に固定される圧縮材と、地表面に設置され、前記引張材と前記圧縮材とを地表面上にて連結する受圧板とからなることを特徴とする(第1の発明)。   The ground reinforcing structure of the present invention that solves the above problem is a ground reinforcing structure that is preliminarily constructed around the tunnel excavation site, and is embedded obliquely or vertically from the ground surface to the tunnel excavation site and gives tension. A tension member provided on the outer periphery of the tension member, and a fixing member for fixing the tension member to the ground, and a compression member that is buried obliquely or vertically from the surface to the side of the tunnel excavation site and fixed to the ground. And a pressure receiving plate that is installed on the ground surface and connects the tensile material and the compression material on the ground surface (first invention).

本発明によれば、定着体を地盤に固定するとともに、引張材を受圧板に接続し、この引張材を緊張させて受圧板を反力材とすることにより、トンネル掘削にともない切羽前方で生じる地盤の鉛直方向圧縮ひずみ及び切羽直上での地盤の引張りひずみを抑制することが可能になる。さらに、トンネルとトンネル坑口周辺の斜面との間に存在する地盤や地滑り面の拘束力が増加することにより、滑り抵抗力を大きくすることができ、斜面の安定性が向上する。つまり、崖錐や地滑り地帯のトンネル坑口施工、土砂地山、土被りの小さなトンネル施工などの場合に、切羽の安定性及びトンネル坑口の斜面の安定性が向上するとともに、切羽の掘削作業中に今後掘削する予定箇所の地盤の補強作業を予め行うことができるために、トンネルの掘削作業を妨げない。したがって、トンネル掘削を安全に、かつ短期間で施工することが可能となる。   According to the present invention, the fixing body is fixed to the ground, the tension member is connected to the pressure receiving plate, and the tension member is tensioned to use the pressure receiving plate as the reaction force material. It becomes possible to suppress the vertical compressive strain of the ground and the tensile strain of the ground just above the face. Furthermore, by increasing the binding force of the ground or landslide surface existing between the tunnel and the slope around the tunnel wellhead, the slip resistance can be increased, and the stability of the slope is improved. In other words, the stability of the working face and the stability of the slope of the tunnel well is improved in the case of tunnel tunnel construction in cliffs and landslide areas, tunnels with small earth and sand covers, and during tunnel excavation work. Since it is possible to pre-reinforce the ground where the site is to be excavated in the future, the tunnel excavation work is not hindered. Therefore, tunnel excavation can be performed safely and in a short period of time.

第2の発明は、第1の発明において、前記引張材の下端に延長材が接続され、該延長材は地盤に固定されていることを特徴とする。   A second invention is characterized in that, in the first invention, an extension member is connected to a lower end of the tension member, and the extension member is fixed to the ground.

第3の発明は、第1又は第2の発明において、前記延長材は、トンネル掘削時に破砕されることを特徴とする。   According to a third invention, in the first or second invention, the extension member is crushed during tunnel excavation.

第4の発明の地盤の補強方法は、トンネル掘削予定箇所周辺に予め施工する地盤の補強方法において、地表からトンネル掘削予定箇所へ斜め又は鉛直に、下端に切断可能な延長材が接続された引張材を埋設する工程と、該引張材を定着体にて地盤に固定する工程と、地表からトンネル掘削予定箇所の側方へ斜め又は鉛直に圧縮材を埋設して地盤に固定する工程と、前記引張材と前記圧縮材とを地表面上にて連結する受圧板を地表面に設置する工程と、前記引張材を緊張する工程と、前記延長材を地盤に固定する工程とを備えることを特徴とする。   The ground reinforcement method according to the fourth aspect of the present invention is a ground reinforcement method preliminarily constructed around a planned site for tunnel excavation, wherein a tensile material having a cutable extension material connected to the lower end obliquely or vertically from the ground surface to the planned site for tunnel excavation. A step of embedding a material, a step of fixing the tensile material to the ground with a fixing body, a step of embedding a compression material obliquely or vertically from the ground surface to the side of the planned tunnel excavation and fixing to the ground, and A step of installing a pressure receiving plate for connecting the tension material and the compression material on the ground surface, a step of tensioning the tension material, and a step of fixing the extension material to the ground. And

本発明の地盤の補強構造によれば、トンネルの掘削にともなう地盤の緩み、変形、崩壊等の異常を防止することが可能となる。また、トンネル掘削予定箇所の補強作業を予め行うことができるために、トンネルの掘削作業を妨げない。したがって、トンネル掘削を安全に、かつ短期間で施工することが可能となる。   According to the ground reinforcing structure of the present invention, it is possible to prevent abnormalities such as loosening, deformation and collapse of the ground due to tunnel excavation. Moreover, since the reinforcement work of the tunnel excavation planned part can be performed in advance, the tunnel excavation work is not hindered. Therefore, tunnel excavation can be performed safely and in a short period of time.

以下、本発明に係る地盤の補強構造の好ましい実施形態について図面を用いて詳細に説明する。図1は、本発明の第一実施形態に係る地盤の補強構造1によりトンネル坑口予定箇所周辺を補強した状態を示す正断面図であり、図2は、本発明の第一実施形態に係る地盤の補強構造1によりトンネル坑口予定箇所周辺を補強した状態を示す側断面図である。図1及び図2に示すように、トンネル掘削予定箇所2の周辺の地盤3内に、地表からトンネル掘削予定箇所2へ斜め又は鉛直にそれぞれ埋設される引張材5と、引張材5の下部に、引張材5の外周を囲うように設けられる定着体7と、引張材5の下端に接続される延長材9と、地表からトンネル掘削予定箇所2の側方へ斜めにそれぞれ埋設される圧縮材11と、引張材5と圧縮材11とを連結し、地表面に接するように設置される受圧板13とが設けられる。   Hereinafter, a preferred embodiment of a ground reinforcing structure according to the present invention will be described in detail with reference to the drawings. FIG. 1 is a front sectional view showing a state in which the vicinity of a tunnel wellhead planned location is reinforced by a ground reinforcing structure 1 according to the first embodiment of the present invention, and FIG. 2 is a ground according to the first embodiment of the present invention. It is a sectional side view which shows the state which reinforce | strengthened the tunnel wellhead planned location periphery with the reinforcing structure 1 of this. As shown in FIG. 1 and FIG. 2, a tensile material 5 embedded in the ground 3 around the planned tunnel excavation site 2 obliquely or vertically from the ground surface to the planned tunnel excavation site 2, and below the tensile material 5 The fixing member 7 provided so as to surround the outer periphery of the tensile member 5, the extension member 9 connected to the lower end of the tensile member 5, and the compression member buried obliquely from the ground surface to the side of the tunnel excavation site 2 11 and a pressure receiving plate 13 that connects the tension member 5 and the compression member 11 and is installed so as to be in contact with the ground surface.

図3は、本発明の第一実施形態に係る引張材5、定着体7及び延長材9の設置状態を示す図である。図3に示すように、引張材5の下端に延長材9が接続され、この接続部分Cがトンネル天端位置TTの上側近傍となるように、地盤3に削孔されたボーリング孔15内に挿入されている。引張材5は、下部は定着体7内に埋設され、上端はナット等のねじ部材27と螺合し、受圧板13に接続されて緊張力を与えられる鋼材であり、本実施形態においては、曲げ剛性の大きい、例えば、鉄筋を用いる。ここで、引張材5は定着体7を介して地盤3に固定されている。   FIG. 3 is a diagram showing an installation state of the tension member 5, the fixing body 7, and the extension member 9 according to the first embodiment of the present invention. As shown in FIG. 3, the extension member 9 is connected to the lower end of the tensile member 5, and the connection portion C is in the vicinity of the upper side of the tunnel top end position TT in the borehole 15 drilled in the ground 3. Has been inserted. The tensile member 5 is a steel member whose lower part is embedded in the fixing body 7 and whose upper end is screwed with a screw member 27 such as a nut and is connected to the pressure receiving plate 13 to give a tension force. In this embodiment, For example, a reinforcing bar having high bending rigidity is used. Here, the tension member 5 is fixed to the ground 3 via the fixing body 7.

定着体7は、ボーリング孔15内の引張材5の外周を囲うように、引張材5の下端から所定の深度までの区間にセメントミルクやモルタル等のグラウト材を充填することにより形成され、地盤3に固定されている。   The fixing body 7 is formed by filling a section from the lower end of the tensile material 5 to a predetermined depth with a grout material such as cement milk or mortar so as to surround the outer periphery of the tensile material 5 in the boring hole 15. 3 is fixed.

引張材5の下端に接続されている棒状の延長材9は、延長材9の外周を囲うように、延長材9の下端から接続部分Cの深度までの区間にセメントミルクやモルタル等のグラウト材を充填することにより形成される固結体19を介して地盤3に固定されている。延長材9は、本実施形態においては、軽量で圧縮剛性及び曲げ剛性が大きく、かつ破砕の容易な材料である、例えば、FRPを用いる。   The rod-shaped extension member 9 connected to the lower end of the tension member 5 is a grout material such as cement milk or mortar in the section from the lower end of the extension member 9 to the depth of the connection portion C so as to surround the outer periphery of the extension member 9. It is fixed to the ground 3 through a solidified body 19 formed by filling. In the present embodiment, for example, FRP is used as the extension member 9, which is a material that is lightweight, has high compression rigidity and bending rigidity, and is easily crushed.

図4は、本発明の第一実施形態に係る圧縮材11の設置状態を示す図である。図4に示すように、圧縮材11は、ボーリング孔16内の圧縮材11の外周を囲うように、孔底から圧縮材11の上端部までの区間にセメントミルクやモルタル等のグラウト材を充填することにより形成される固結体23を介して地盤3に固定されている。圧縮材11は、本実施形態においては、圧縮剛性及び曲げ剛性の大きな、例えば、鋼管を用いる。   FIG. 4 is a diagram showing an installation state of the compression material 11 according to the first embodiment of the present invention. As shown in FIG. 4, the compressed material 11 is filled with a grout material such as cement milk or mortar in the section from the bottom of the hole to the upper end of the compressed material 11 so as to surround the outer periphery of the compressed material 11 in the boring hole 16. It is fixed to the ground 3 via a solidified body 23 formed by doing so. In the present embodiment, for example, a steel pipe having high compression rigidity and bending rigidity is used as the compression material 11.

図5は、本発明の第一実施形態に係る受圧板13の平面図である。図5に示すように、受圧板13には複数の貫通孔25、29が設けられており、受圧板13の両側に、長手方向に設けられている貫通孔29には圧縮材11の上端が挿入され、固結体23にて受圧板13に接続されている。また、貫通孔29同士の間に設けられている貫通孔25には引張材5が挿通され、引張材5の上端はナット等のねじ部材27と螺合して受圧板13に接続されている。受圧板13は、補強箇所上方の地表面全体を覆うように配置される。受圧板13は、本実施形態においては、例えば、プレキャストコンクリートフレームを用いる。   FIG. 5 is a plan view of the pressure receiving plate 13 according to the first embodiment of the present invention. As shown in FIG. 5, the pressure receiving plate 13 is provided with a plurality of through holes 25 and 29, and the upper end of the compression material 11 is formed in the through holes 29 provided on both sides of the pressure receiving plate 13 in the longitudinal direction. Inserted and connected to the pressure receiving plate 13 by a solidified body 23. The tension member 5 is inserted into the through holes 25 provided between the through holes 29, and the upper end of the tension member 5 is screwed with a screw member 27 such as a nut and connected to the pressure receiving plate 13. . The pressure receiving plate 13 is arrange | positioned so that the whole ground surface above a reinforcement location may be covered. In the present embodiment, for example, a precast concrete frame is used as the pressure receiving plate 13.

次に、本実施形態の地盤3の補強構造1の施工方法を施工手順に従って説明する。
図6〜図12は、本発明の第一実施形態に係る地盤3の補強構造1の施工手順を示す図である。
Next, the construction method of the reinforcement structure 1 of the ground 3 of this embodiment will be described according to the construction procedure.
6-12 is a figure which shows the construction procedure of the reinforcement structure 1 of the ground 3 which concerns on 1st embodiment of this invention.

まず、図6に示すように、削孔機にて地表からトンネル掘削予定箇所2へ斜め又は鉛直にボーリング孔15を削孔する。削孔方法は、ロータリーパーカッション式、ダウンザホールハンマー式等の種々の方法を用いることが可能である。そして、下端に切断可能な延長材9が接続され、下部にグラウト充填が可能なパッカー31を有する引張材5をボーリング孔15に挿入する。なお、地盤3に埋設する引張材5の本数は地盤強度等の現場状況により適宜変更する。   First, as shown in FIG. 6, a borehole 15 is drilled obliquely or vertically from the ground surface to the planned tunnel excavation site 2 with a drilling machine. As the hole drilling method, various methods such as a rotary percussion method and a down-the-hole hammer method can be used. Then, a cleavable extension member 9 is connected to the lower end, and a tensile member 5 having a packer 31 capable of grout filling at the lower portion is inserted into the boring hole 15. In addition, the number of the tension | tensile_strength materials 5 embed | buried in the ground 3 changes suitably according to field conditions, such as ground strength.

また、図7に示すように、地上に設置されたグラウト注入用ポンプ33にてホース等の注入管35を介してパッカー31内にグラウト材を圧入してパッカー31を膨張させ、パッカー31の外周を孔壁15aに密着させる。パッカー31は硬化するとともに、地盤3に固定される。   Further, as shown in FIG. 7, the grout material is press-fitted into the packer 31 through the injection pipe 35 such as a hose by the grout injection pump 33 installed on the ground to expand the packer 31, and the outer periphery of the packer 31. Is closely attached to the hole wall 15a. The packer 31 is hardened and fixed to the ground 3.

そして、図8に示すように、グラウト注入用ポンプ33にてホース等の注入管38を介して、パッカー31の上面から所定の深度までグラウト材を充填し、硬化させて定着体7を形成する。パッカー31の上面からグラウト材を充填することにより、パッカー31と定着体7とは一体化するために、本実施形態においては、パッカー31の下面からグラウト材の上面までを定着体7とする。定着体7は硬化するとともに、地盤3に固定される。そして、引張材5は定着体7を介して地盤3に固定される。   Then, as shown in FIG. 8, a grout material is filled from the upper surface of the packer 31 to a predetermined depth via an injection tube 38 such as a hose by a grout injection pump 33 and cured to form a fixing body 7. . In order to integrate the packer 31 and the fixing body 7 by filling the grout material from the upper surface of the packer 31, in this embodiment, the fixing body 7 is formed from the lower surface of the packer 31 to the upper surface of the grout material. The fixing body 7 is hardened and fixed to the ground 3. The tension material 5 is fixed to the ground 3 via the fixing body 7.

次に、図9に示すように、削孔機にて地表からトンネル掘削予定箇所2の側方へ斜めにボーリング孔16を削孔する。そして、ボーリング孔16に圧縮材11を挿入する。   Next, as shown in FIG. 9, a borehole 16 is drilled obliquely from the ground surface to the side of the tunnel excavation site 2 with a drilling machine. Then, the compression material 11 is inserted into the boring hole 16.

また、図10に示すように、受圧板13の貫通孔25に引張材5の上端を挿通させると同時に、貫通孔29に圧縮材11の上端を挿入し、受圧板13を地表面に設置する。そして、グラウト注入用ポンプ33にてホース等の注入管39を介して、孔底から受圧板13の貫通孔29の表面まで完全に圧縮材11を覆うようにグラウト材を充填し、硬化させて固結体23を形成する。固結体23は硬化するとともに、地盤3に固定される。そして、圧縮材11は固結体23を介して地盤3に固定される。なお、地盤3に埋設する圧縮材11の本数は地盤強度等の現場状況により適宜変更する。   Further, as shown in FIG. 10, the upper end of the tension member 5 is inserted into the through hole 25 of the pressure receiving plate 13, and at the same time, the upper end of the compression material 11 is inserted into the through hole 29 to install the pressure receiving plate 13 on the ground surface. . The grout injection pump 33 is filled with a grout material through the injection pipe 39 such as a hose to completely cover the compression material 11 from the hole bottom to the surface of the through hole 29 of the pressure receiving plate 13 and cured. A consolidated body 23 is formed. The consolidated body 23 is cured and fixed to the ground 3. Then, the compressed material 11 is fixed to the ground 3 through the consolidated body 23. In addition, the number of the compression materials 11 embed | buried in the ground 3 changes suitably according to field conditions, such as ground strength.

そして、図11に示すように、受圧板13の上面より露出している引張材5の上端をねじ部材27と螺合し、引張材5を受圧板13に接続する。ここで、ねじ部材27を締め付けることにより引張材5にプレストレスを与えて緊張した状態となるように調整する。   Then, as shown in FIG. 11, the upper end of the tension member 5 exposed from the upper surface of the pressure receiving plate 13 is screwed with the screw member 27, and the tension member 5 is connected to the pressure receiving plate 13. Here, by adjusting the screw member 27, the tension member 5 is adjusted to be in a tensioned state by applying prestress.

最後に、図12に示すように、グラウト注入用ポンプ33にてホース等の注入管43を介して孔底から接続部分C近傍までグラウト材を圧入し、硬化させて固結体19を形成する。固結体19は硬化するとともに、地盤3に固定される。そして、延長材9は固結体19を介して地盤3に固定され、補強構造1が形成される。   Finally, as shown in FIG. 12, a grout material is press-fitted from the bottom of the hole to the vicinity of the connection portion C through an injection pipe 43 such as a hose by a grout injection pump 33 and cured to form a solidified body 19. . The consolidated body 19 is cured and fixed to the ground 3. And the extension material 9 is fixed to the ground 3 through the solidified body 19, and the reinforcement structure 1 is formed.

上述した手順にてトンネル坑口周辺に、切羽が到達するよりも前に予め補強構造1を形成し、地盤3を強固に補強する。   The reinforcing structure 1 is formed in advance before the face reaches the tunnel well opening in the above-described procedure, and the ground 3 is strongly reinforced.

図13は、本発明の第一実施形態に係る地盤3の補強構造1を施工された地山にトンネルを掘削した状態を示す図である。図13に示すように、トンネル掘削時は、作業員が延長材9を切断することなく、切羽を掘削すると同時に延長材9が破砕されて除去される。
トンネル内に二次吹付を行い、インバートコンクリートを打設した後に、切羽が通過した地盤3内に埋設されている引張材5、圧縮材11及び受圧板13を撤去する。
なお、本実施形態において、引張材5、圧縮材11及び受圧板13を撤去する方法について説明したが、これに限定されるものではなく、このまま埋め殺ししてもよい。
FIG. 13 is a view showing a state where a tunnel is excavated in a natural ground where the reinforcing structure 1 for the ground 3 according to the first embodiment of the present invention is constructed. As shown in FIG. 13, during tunnel excavation, the extension member 9 is crushed and removed simultaneously with excavating the face without an operator cutting the extension member 9.
After secondary spraying in the tunnel and placing invert concrete, the tension material 5, the compression material 11 and the pressure receiving plate 13 embedded in the ground 3 through which the face has passed are removed.
In addition, in this embodiment, although the method to remove the tension | tensile_strength material 5, the compression material 11, and the pressure receiving plate 13 was demonstrated, it is not limited to this, You may bury as it is.

以上のようにして構築された地盤3の補強構造1によれば、切羽の安定性及びトンネル坑口の斜面の安定性が向上するとともに、トンネルの掘削作業中に今後掘削する予定箇所の地盤3の補強作業を予め行うことができるために、トンネルの掘削作業を妨げない。したがって、トンネル掘削作業を安全に、かつ短期間で施工することが可能となる。   According to the reinforcing structure 1 of the ground 3 constructed as described above, the stability of the face and the stability of the slope of the tunnel pit are improved, and the ground 3 of the planned site to be excavated in the future during the excavation work of the tunnel is improved. Since the reinforcement work can be performed in advance, the tunnel excavation work is not hindered. Therefore, tunnel excavation work can be performed safely and in a short period of time.

また、定着体7及び延長材9を地盤3に固定するとともに、引張材5を受圧板13に接続し、この引張材5を緊張させて受圧板13を反力材とすることにより、トンネル掘削にともない切羽前方で生じる地盤3の鉛直方向圧縮ひずみ及び切羽直上での地盤3の引張りひずみを抑制することが可能になる。また、トンネルとトンネル坑口周辺の斜面との間に存在する地盤3や地滑り面の拘束力が増加するために、滑り抵抗力を大きくすることができ、斜面の安定性が向上する。さらに、曲げ剛性の大きい引張材5を用いることにより、地滑り面の滑り抵抗力を大きくすることができ、斜面の安定性が向上する。   Further, the fixing body 7 and the extension member 9 are fixed to the ground 3, and the tensile material 5 is connected to the pressure receiving plate 13, and the tensile material 5 is tensioned so that the pressure receiving plate 13 is used as a reaction force material. Accordingly, it is possible to suppress the vertical compressive strain of the ground 3 generated in front of the face and the tensile strain of the ground 3 immediately above the face. In addition, since the restraining force of the ground 3 and the landslide surface existing between the tunnel and the slope around the tunnel pit increases, the slip resistance can be increased and the stability of the slope is improved. Furthermore, by using the tensile material 5 having a large bending rigidity, the slip resistance force of the landslide surface can be increased, and the stability of the slope is improved.

また、圧縮材11を地盤3に固定して、トンネル掘削にともなうトンネル側部の鉛直方向の圧縮ひずみ及びトンネル方向への水平変位に対して圧縮材11の圧縮剛性、曲げ剛性にて抵抗するために、トンネル側方への緩みの進展を抑制することが可能になる。そして、曲げ剛性の大きい圧縮材11を用いることにより、地滑り面の滑り抵抗力を大きくすることができ、斜面の安定性が向上する。   In addition, the compression material 11 is fixed to the ground 3 to resist the compressive rigidity and bending rigidity of the compression material 11 against the vertical compressive strain and the horizontal displacement in the tunnel direction at the side of the tunnel due to tunnel excavation. Furthermore, it becomes possible to suppress the progress of loosening toward the side of the tunnel. And by using the compression material 11 with large bending rigidity, the slip resistance of a landslide surface can be enlarged and the stability of a slope improves.

そして、地表面に引張材5と圧縮材11とを連結する受圧板13を設けることにより、引張材5の反力を支持するとともに、引張材5の荷重を圧縮材11に伝達することが可能となる。   And by providing the pressure receiving plate 13 which connects the tension material 5 and the compression material 11 to the ground surface, it is possible to support the reaction force of the tension material 5 and to transmit the load of the tension material 5 to the compression material 11. It becomes.

さらに、トンネル掘削予定箇所2に延長材9を埋設することにより、トンネル掘削にともなう切羽前面の鉛直方向荷重及び切羽方向への水平変位に対して圧縮部材、曲げ部材として抵抗するために、切羽の緩みの進展を抑制することが可能になる。したがって、鏡ボルト等の切羽に対する補強作業が不要となる。   Furthermore, by embedding the extension material 9 in the planned tunnel excavation point 2, in order to resist the vertical load on the front face of the face and the horizontal displacement in the face direction due to tunnel excavation as a compression member and a bending member, It becomes possible to suppress the progress of loosening. Accordingly, it is not necessary to reinforce the face such as a mirror bolt.

そして、延長材9は、トンネル掘削時に破砕されることにより、掘削作業を中断することなく延長材9を除去することが可能となる。したがって、切断作業の手間が省けることにより、日進距離を長くすることが可能となる。   The extension material 9 is crushed during tunnel excavation, so that the extension material 9 can be removed without interrupting excavation work. Therefore, it is possible to increase the daily travel distance by saving the labor of cutting work.

また、引張材5の下部に設けられたパッカー31にてボーリング孔15内を、上下方向のグラウト材の移動を禁止するように分断し、パッカー31の上に定着体7を、下方に固結体19を設けることにより、引張力を定着体7にのみ作用させ、固結体19には作用させないことが可能となる。   Further, the inside of the boring hole 15 is divided by a packer 31 provided at the lower part of the tensile material 5 so as to prohibit the movement of the grout material in the vertical direction, and the fixing body 7 is consolidated downward on the packer 31. By providing the body 19, it becomes possible to apply a tensile force only to the fixing body 7 and not to act on the solidified body 19.

次に、本発明における第一実施形態と異なる他の実施形態を示す。下記に示す説明において、第一実施形態と同様の技術を用いたものと対応する部分には同一の符号を付して、説明を省略する。   Next, other embodiment different from 1st embodiment in this invention is shown. In the following description, the same reference numerals are given to portions corresponding to those using the same technique as in the first embodiment, and description thereof is omitted.

図14は、本発明の第二実施形態に係る地盤3の補強構造51によりトンネル坑口予定箇所の周辺を補強した状態を示す側断面図である。図14に示すように、トンネル掘削予定箇所2の周辺の地盤3内に、引張材5と、定着体7と、延長材9と、地表に露出する引張材5の上端部の近傍からトンネル掘削予定箇所2の側方へ斜め又は鉛直に埋設される圧縮材11と、受圧板13とが設けられる。地表において隣接する引張材5同士の間隔、圧縮材11と引張材5との間隔を共に狭くし、第一実施形態と比較して受圧板13を小さくしたものである。   FIG. 14 is a side cross-sectional view showing a state in which the vicinity of a tunnel wellhead planned location is reinforced by the reinforcing structure 51 of the ground 3 according to the second embodiment of the present invention. As shown in FIG. 14, tunnel excavation is performed in the ground 3 around the planned tunnel excavation site 2 from the vicinity of the tensile material 5, the fixing body 7, the extension material 9, and the upper end portion of the tensile material 5 exposed to the ground surface. A compression material 11 and a pressure receiving plate 13 are provided obliquely or vertically to the side of the planned location 2. In the ground surface, the distance between adjacent tension members 5 and the distance between the compression member 11 and the tension member 5 are both narrowed, and the pressure receiving plate 13 is made smaller than in the first embodiment.

以上のようにして構築された地盤3の補強構造51によれば、切羽の安定性及びトンネル坑口の斜面の安定性が向上するとともに、トンネルの掘削作業中に今後掘削する予定箇所の地盤3の補強作業を予め行うことができるために、トンネルの掘削作業を妨げない。したがって、トンネル掘削作業を安全に、かつ短期間で施工することが可能となる。   According to the reinforcing structure 51 of the ground 3 constructed as described above, the stability of the face and the stability of the slope of the tunnel pit are improved, and the ground 3 of the planned site to be excavated in the future during the excavation work of the tunnel is improved. Since the reinforcement work can be performed in advance, the tunnel excavation work is not hindered. Therefore, tunnel excavation work can be performed safely and in a short period of time.

また、地表において隣接する引張材5同士の間隔、圧縮材11と引張材5との間隔を狭くし、受圧板13を小さくしたことにより、受圧板13を設置するための地表面の清掃及び整形の範囲を狭くすることが可能となる。したがって、清掃及び整形作業にかかる時間を短縮することが可能となる。さらに、受圧板13を小さくしたことにより重量が軽くなるために、現場での設置作業が容易になる。   In addition, the ground surface for installing the pressure receiving plate 13 is cleaned and shaped by reducing the interval between the adjacent tensile members 5 on the ground surface, the interval between the compression member 11 and the tensile member 5, and reducing the pressure receiving plate 13. It is possible to narrow the range. Accordingly, it is possible to shorten the time required for the cleaning and shaping work. Furthermore, since the weight is reduced by reducing the pressure receiving plate 13, installation work at the site is facilitated.

図15は、本発明の第三実施形態に係る引張材5、延長材9及び定着体17の設置状態を示す図である。図15に示すように、引張材5の下端に延長材9が接続され、この接続部分Cがトンネル天端位置TTの上側近傍となるように、地盤3に削孔されたボーリング孔15内に挿入されている。   FIG. 15 is a diagram showing an installation state of the tension member 5, the extension member 9, and the fixing body 17 according to the third embodiment of the present invention. As shown in FIG. 15, the extension member 9 is connected to the lower end of the tensile member 5, and the connection portion C is in the vicinity of the upper side of the tunnel top end position TT in the borehole 15 drilled in the ground 3. Has been inserted.

引張材5の下部及び延長材9は定着体17内に埋設され、引張材5及び延長材9は定着体17を介して地盤3に固定されている。また、引張材5の上端はナット等のねじ部材27と螺合し、引張材5は受圧板13に接続されて緊張力を与えられる。   The lower part of the tension member 5 and the extension member 9 are embedded in the fixing member 17, and the tension member 5 and the extension member 9 are fixed to the ground 3 through the fixing member 17. Further, the upper end of the tension member 5 is screwed with a screw member 27 such as a nut, and the tension member 5 is connected to the pressure receiving plate 13 to give a tension force.

定着体17は、ボーリング孔15内の延長材9の外周及び引張材5の下部外周を囲うように、ボーリング孔15の孔底から引張材5下部近傍の所定の深度までの区間にグラウト材を一回で充填することにより形成される。   The fixing member 17 applies a grout material in a section from the bottom of the boring hole 15 to a predetermined depth in the vicinity of the lower portion of the tensile material 5 so as to surround the outer periphery of the extension material 9 in the boring hole 15 and the lower outer periphery of the tensile material 5. Formed by filling once.

引張材5を緊張することにより生じる定着体17への引張力は、定着体17の上端面が最も大きく、深度方向へ上端面からの距離が長くなるとともに定着体17と孔壁15aとの間で生じる付着力により低減されて、上端面から、ある長さL以上になると定着体17への引張力の影響が無くなる。この長さLの位置がトンネル天端位置TTの上側近傍になるように、定着体17の上端面の深度を調整する。   The tensile force to the fixing member 17 generated by tensioning the tensile member 5 is the largest at the upper end surface of the fixing member 17 and the distance from the upper end surface in the depth direction becomes longer, and between the fixing member 17 and the hole wall 15a. When the length is longer than a certain length L from the upper end surface, the influence of the tensile force on the fixing member 17 is eliminated. The depth of the upper end surface of the fixing body 17 is adjusted so that the position of the length L is near the upper side of the tunnel top end position TT.

なお、長さLは、地質等の地盤条件により異なるために、現場毎に設計する。
また、トンネル掘削時は、定着体17の上端面より長さL以深の定着体17の部分、つまり延長材9の外周部分を破砕して除去するために、延長材9を除去することにより定着体17に作用する引張力を低減することはない。
In addition, since length L changes with ground conditions, such as geology, it designs for every site.
During tunnel excavation, the fixing member 17 is removed by removing the extension member 9 in order to crush and remove the portion of the fixing member 17 that is deeper than the upper end surface of the fixing member 17, that is, the outer peripheral portion of the extension member 9. The tensile force acting on the body 17 is not reduced.

図16は、本発明の第三実施形態に係る地盤3の補強構造59によりトンネル坑口予定箇所の周辺を補強した状態を示す正断面図である。図16に示すように、トンネル掘削予定箇所2の周辺の地盤3内に、引張材5と、定着体17と、延長材9と、地表に露出する引張材5の上端部の近傍からトンネル掘削予定箇所2の側方へ斜め又は鉛直に埋設される圧縮材11と、受圧板13とが設けられる。   FIG. 16 is a front sectional view showing a state in which the vicinity of a tunnel wellhead planned location is reinforced by the reinforcing structure 59 of the ground 3 according to the third embodiment of the present invention. As shown in FIG. 16, tunnel excavation is performed from the vicinity of the upper end portion of the tensile material 5, the fixing member 17, the extension material 9, and the tensile material 5 exposed to the ground surface in the ground 3 around the planned tunnel excavation site 2. A compression material 11 and a pressure receiving plate 13 are provided obliquely or vertically to the side of the planned location 2.

以上のようにして構築された地盤3の補強構造59によれば、切羽の安定性及びトンネル坑口の斜面の安定性が向上するとともに、トンネルの掘削作業中に今後掘削する予定箇所の地盤3の補強作業を予め行うことができるために、トンネルの掘削作業を妨げない。したがって、トンネル掘削作業を安全に、かつ短期間で施工することが可能となる。   According to the reinforcing structure 59 of the ground 3 constructed as described above, the stability of the face and the stability of the slope of the tunnel pit are improved, and the ground 3 of the future planned excavation site during the tunnel excavation work is improved. Since the reinforcement work can be performed in advance, the tunnel excavation work is not hindered. Therefore, tunnel excavation work can be performed safely and in a short period of time.

また、延長材9の外周及び引張材5の下部外周を囲うように、ボーリング孔15の孔底から引張材5下部近傍の所定の深度までの区間にグラウト材を一回で充填することにより、パッカー31をグラウトにて膨張させ、このパッカー31の上・下側に定着体7、固結体19を構築する方法よりも、定着体17を短時間で施工することが可能となる。また、グラウト材の圧入回数を1回にしたことにより、グラウト注入用ポンプ33の清掃等の圧入毎に行う作業回数が減少し、現場での地盤補強作業を容易にする。   Also, by filling the grout material at a time from the hole bottom of the boring hole 15 to a predetermined depth near the lower part of the tensile material 5 so as to surround the outer periphery of the extension material 9 and the lower outer periphery of the tensile material 5, The fixing body 17 can be applied in a shorter time than the method in which the packer 31 is expanded by a grout and the fixing body 7 and the consolidated body 19 are constructed above and below the packer 31. Further, since the number of times of pressing the grout material is set to one, the number of operations to be performed for each pressing such as cleaning of the grout injection pump 33 is reduced, and the ground reinforcement work at the site is facilitated.

なお、上述したすべての実施形態において、引張材5を緊張させ、受圧板13に固定するための定着具としてねじ部材27を使用する方法について説明したが、これに限定されるものではなく、例えば、くさび形の定着具を使用して引張材5を緊張させ、受圧板13に固定する方法を用いてもよい。   In all of the embodiments described above, the method of using the screw member 27 as a fixing tool for tensioning the tension member 5 and fixing the tension member 5 to the pressure receiving plate 13 has been described. Alternatively, a method of tensioning the tension member 5 using a wedge-shaped fixing tool and fixing it to the pressure receiving plate 13 may be used.

また、上述したすべての実施形態において、補強箇所の地表面全体を覆う板状の受圧板13について説明したが、これに限定されるものではなく、例えば、図17又は図18に示すような地表面を格子状に覆う板状の受圧板52、53を用いてもよい。ここで、地面を覆わない部分の枠内54には景観保護のために植生を行うことが望ましい。   Further, in all the embodiments described above, the plate-like pressure receiving plate 13 covering the entire ground surface of the reinforcing portion has been described. However, the present invention is not limited to this, and for example, the ground as shown in FIG. 17 or FIG. Plate-shaped pressure receiving plates 52 and 53 that cover the surface in a lattice pattern may be used. Here, it is desirable to perform vegetation in the frame 54 of the portion that does not cover the ground to protect the landscape.

そして、上述したすべての実施形態において、受圧板13にてすべての引張材5とすべての圧縮材11とを連結する方法について説明したが、この方法に限定されるものではなく、例えば、図19に示すように、ベルト状の受圧板55にて、切羽と並行する引張材5と圧縮材11とのみを連結する方法を用いてもよい。   In all the embodiments described above, the method of connecting all the tension members 5 and all the compression members 11 with the pressure receiving plate 13 has been described. However, the method is not limited to this method. For example, FIG. As shown in FIG. 4, a method of connecting only the tension member 5 and the compression member 11 parallel to the face may be used by the belt-shaped pressure receiving plate 55.

さらに、上述したすべての実施形態において、プレキャストコンクリートからなる受圧板13を用いたが、この材質に限定されるものではなく、例えば、鋼板、現場打ちの鉄筋コンクリート、アルミ合金等の受圧板を用いてもよい。   Furthermore, in all the embodiments described above, the pressure receiving plate 13 made of precast concrete is used. However, the pressure receiving plate 13 is not limited to this material. For example, a pressure receiving plate such as a steel plate, on-site reinforced concrete, or an aluminum alloy is used. Also good.

そして、上述したすべての実施形態において、補強構造1、51、59を構築する際に、引張材5を埋設し、この引張材5を定着体7又は定着体17にて地盤3に固定した後に、圧縮材11を埋設し、この圧縮材11を固結体23にて地盤3に固定する順序で説明したが、この順序に限定されるものではなく、圧縮材11を埋設して固結体23にて地盤3に固定した後に、引張材5を埋設して定着体7又は定着体17にて地盤3に固定する順序でもよく、さらに、引張材5を埋設して定着体7又は定着体17にて地盤3に固定する作業と、圧縮材11を埋設して固結体23にて地盤3に固定する作業とを同時に行ってもよい。   In all the embodiments described above, when the reinforcing structures 1, 51, 59 are constructed, the tensile material 5 is embedded and the tensile material 5 is fixed to the ground 3 with the fixing body 7 or the fixing body 17. The compression material 11 is buried and the compression material 11 is fixed to the ground 3 with the solidified body 23. However, the compression material 11 is not limited to this order, and the compression material 11 is buried and the solidified body. After fixing to the ground 3 at 23, the tensile material 5 may be buried and fixed to the ground 3 by the fixing body 7 or the fixing body 17. Further, the tensile material 5 may be buried and the fixing body 7 or the fixing body. The work of fixing to the ground 3 at 17 and the work of embedding the compression material 11 and fixing to the ground 3 by the consolidated body 23 may be performed simultaneously.

なお、上述したすべての実施形態において、孔底から孔口まで同一径のボーリング孔15を用いる方法について説明したが、これに限定されるものではなく、例えば、定着体7又は定着体17を設置する区間が拡幅されたボーリング孔を削孔し、この区間に定着体7又は定着体17を嵌合させて、引張材5の緊張力を地盤3に伝達する方法を用いてもよい。   In all the embodiments described above, the method of using the boring hole 15 having the same diameter from the hole bottom to the hole opening has been described. However, the present invention is not limited to this. For example, the fixing body 7 or the fixing body 17 is installed. A method may be used in which a boring hole in which a section to be widened is drilled and the fixing body 7 or the fixing body 17 is fitted in this section to transmit the tension force of the tensile material 5 to the ground 3.

なお、上述したすべての実施形態は、地表面近傍地盤の強度を改良した後にも適用することが可能である。   All the embodiments described above can also be applied after improving the strength of the ground near the ground surface.

本発明の第一実施形態に係る地盤の補強構造によりトンネル坑口予定箇所周辺を補強した状態を示す正断面図である。It is a front sectional view showing a state in which the vicinity of a tunnel wellhead planned location is reinforced by the ground reinforcing structure according to the first embodiment of the present invention. 本発明の第一実施形態に係る地盤の補強構造によりトンネル坑口予定箇所周辺を補強した状態を示す側断面図である。It is a sectional side view which shows the state which reinforced the tunnel wellhead planned location periphery by the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る引張材、定着体及び延長材の設置状態を示す図である。It is a figure which shows the installation state of the tension | tensile_strength material, fixing body, and extension material which concern on 1st embodiment of this invention. 本発明の第一実施形態に係る圧縮材の設置状態を示す図である。It is a figure which shows the installation state of the compression material which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る受圧板の平面図である。It is a top view of the pressure receiving plate which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のためのボーリング孔に引張材、延長材を挿入した状態を示す図である。It is a figure which shows the state which inserted the tension | tensile_strength material and the extension material in the boring hole for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のためのパッカー内にセメントミルクを圧入した状態を示す図である。It is a figure which shows the state which press-fit cement milk in the packer for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のために引張材の外周下部にセメントミルクを充填した状態を示す図である。It is a figure which shows the state which filled the cement milk in the outer periphery lower part of the tension | tensile_strength material for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のためのボーリング孔に圧縮材を挿入した状態を示す図である。It is a figure which shows the state which inserted the compression material in the boring hole for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のために圧縮材の外周にセメントミルクを圧入した状態を示す図である。It is a figure which shows the state which press-fit cement milk to the outer periphery of the compression material for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のための引張材を緊張させた状態を示す図である。It is a figure which shows the state which tensioned the tension | tensile_strength material for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造のために延長材の外周にセメントミルクを圧入した状態を示す図である。It is a figure which shows the state which press-fit cement milk to the outer periphery of the extension material for the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る地盤の補強構造を施工した地山にトンネルを掘削した状態を示す図である。It is a figure which shows the state which excavated the tunnel in the natural ground which constructed the ground reinforcement structure which concerns on 1st embodiment of this invention. 本発明の第二実施形態に係る地盤の補強構造によりトンネル坑口予定箇所周辺を補強した状態を示す側断面図である。It is a sectional side view which shows the state which reinforced the tunnel wellhead planned location periphery by the ground reinforcement structure which concerns on 2nd embodiment of this invention. 本発明の第三実施形態に係る引張材、延長材及び定着体の設置状態を示す図である。It is a figure which shows the installation state of the tension | tensile_strength material, extension material, and fixing body which concern on 3rd embodiment of this invention. 本発明の第三実施形態に係る地盤の補強構造によりトンネル坑口予定箇所周辺を補強した状態を示す側断面図である。It is a sectional side view which shows the state which reinforced the tunnel wellhead planned location periphery by the ground reinforcement structure which concerns on 3rd embodiment of this invention. 本発明に係る受圧板の他の形状を示す平面図である。It is a top view which shows the other shape of the pressure receiving plate which concerns on this invention. 本発明に係る受圧板の他の形状を示す平面図である。It is a top view which shows the other shape of the pressure receiving plate which concerns on this invention. 本発明に係る受圧板の他の形状を示す平面図である。It is a top view which shows the other shape of the pressure receiving plate which concerns on this invention. 従来の縫地工法を示す図である。It is a figure which shows the conventional sewing method.

符号の説明Explanation of symbols

1、51、59 補強構造
2 トンネル掘削予定箇所
3 地盤
5 引張材
7、17 定着体
9 延長材
11 圧縮材
13、52、53、55 受圧板
15、16 ボーリング孔
15a 孔壁
19、23 固結体
25、29 貫通孔
27 ねじ部材
31 パッカー
33 グラウト注入用ポンプ
35、38、39、43 注入管
54 枠内
C 接続部分
TT トンネル天端位置
L 長さ
1, 51, 59 Reinforcement structure 2 Tunnel excavation planned site 3 Ground 5 Tensile material 7, 17 Fixing body 9 Extension material 11 Compressed material 13, 52, 53, 55 Pressure receiving plate 15, 16 Boring hole 15a Hole wall 19, 23 Solidified Body 25, 29 Through hole 27 Screw member 31 Packer 33 Grout injection pump 35, 38, 39, 43 Injection pipe 54 In-frame C Connection portion TT Tunnel top position L Length

Claims (4)

トンネル掘削予定箇所周辺に予め施工される地盤の補強構造であって、
地表からトンネル掘削予定箇所へ斜め又は鉛直に埋設され、緊張力を与えられる引張材と、
該引張材の外周に設けられ、前記引張材を地盤に固定する定着体と、
地表からトンネル掘削予定箇所の側方へ斜め又は鉛直に埋設され、地盤に固定される圧縮材と、
地表面に設置され、前記引張材と前記圧縮材とを地表面上にて連結する受圧板とからなることを特徴とする地盤の補強構造。
It is a ground reinforcement structure pre-constructed around the tunnel excavation site,
A tensile material that is buried obliquely or vertically from the ground surface to the tunnel excavation site, and that gives tension.
A fixing body provided on an outer periphery of the tensile material and fixing the tensile material to the ground;
A compression material buried obliquely or vertically from the ground surface to the side of the tunnel excavation site and fixed to the ground;
A ground reinforcing structure comprising a pressure receiving plate which is installed on the ground surface and connects the tensile material and the compression material on the ground surface.
前記引張材の下端に延長材が接続され、該延長材は地盤に固定されていることを特徴とする請求項1に記載の地盤の補強構造。   2. The ground reinforcing structure according to claim 1, wherein an extension member is connected to a lower end of the tensile member, and the extension member is fixed to the ground. 前記延長材は、トンネル掘削時に破砕されることを特徴とする請求項2に記載の地盤の補強構造。   The ground reinforcement structure according to claim 2, wherein the extension member is crushed during tunnel excavation. トンネル掘削予定箇所周辺に予め施工する地盤の補強方法において、
地表からトンネル掘削予定箇所へ斜め又は鉛直に、下端に切断可能な延長材が接続された引張材を埋設する工程と、
該引張材を定着体にて地盤に固定する工程と、
地表からトンネル掘削予定箇所の側方へ斜め又は鉛直に圧縮材を埋設して地盤に固定する工程と、
前記引張材と前記圧縮材とを地表面上にて連結する受圧板を地表面に設置する工程と、
前記引張材を緊張する工程と、
前記延長材を地盤に固定する工程とを備えることを特徴とする地盤の補強方法。
In the ground reinforcement method to be constructed in advance around the tunnel excavation site,
A step of burying a tensile material to which an extendable material that can be cut at the lower end is connected obliquely or vertically from a ground surface to a tunnel excavation site;
Fixing the tensile material to the ground with a fixing body;
A process of burying a compression material obliquely or vertically from the surface to the side of the tunnel excavation site and fixing it to the ground;
Installing a pressure receiving plate on the ground surface for connecting the tensile material and the compression material on the ground surface;
Tensioning the tension material;
And a step of fixing the extension material to the ground.
JP2005227176A 2005-08-04 2005-08-04 Ground reinforcement structure and reinforcement method Expired - Fee Related JP4706382B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005227176A JP4706382B2 (en) 2005-08-04 2005-08-04 Ground reinforcement structure and reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005227176A JP4706382B2 (en) 2005-08-04 2005-08-04 Ground reinforcement structure and reinforcement method

Publications (2)

Publication Number Publication Date
JP2007040028A true JP2007040028A (en) 2007-02-15
JP4706382B2 JP4706382B2 (en) 2011-06-22

Family

ID=37798270

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005227176A Expired - Fee Related JP4706382B2 (en) 2005-08-04 2005-08-04 Ground reinforcement structure and reinforcement method

Country Status (1)

Country Link
JP (1) JP4706382B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010112128A (en) * 2008-11-10 2010-05-20 Ohbayashi Corp Reinforcement method of ground, reinforced ground
KR101531754B1 (en) * 2013-07-22 2015-06-25 서동현 Method of construction a shallow tunnel using pre-support beam
CN109653190A (en) * 2018-12-11 2019-04-19 宝钢集团新疆八钢铁有限公司 A kind of large-scale heavy duty Equipment Foundations grouting and consolidation on foundation technique
CN116220700A (en) * 2023-05-06 2023-06-06 山东建筑大学 Prestressed active support control process for underground excavation underground engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07305589A (en) * 1994-05-12 1995-11-21 Ohbayashi Corp Reinforcement structure for widened tunnel
JPH08134923A (en) * 1994-11-08 1996-05-28 Fujita Corp Cut surface stabilizing construction method
JP2002194986A (en) * 2000-12-25 2002-07-10 Ohbayashi Corp Tie rod construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07305589A (en) * 1994-05-12 1995-11-21 Ohbayashi Corp Reinforcement structure for widened tunnel
JPH08134923A (en) * 1994-11-08 1996-05-28 Fujita Corp Cut surface stabilizing construction method
JP2002194986A (en) * 2000-12-25 2002-07-10 Ohbayashi Corp Tie rod construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010112128A (en) * 2008-11-10 2010-05-20 Ohbayashi Corp Reinforcement method of ground, reinforced ground
KR101531754B1 (en) * 2013-07-22 2015-06-25 서동현 Method of construction a shallow tunnel using pre-support beam
CN109653190A (en) * 2018-12-11 2019-04-19 宝钢集团新疆八钢铁有限公司 A kind of large-scale heavy duty Equipment Foundations grouting and consolidation on foundation technique
CN116220700A (en) * 2023-05-06 2023-06-06 山东建筑大学 Prestressed active support control process for underground excavation underground engineering

Also Published As

Publication number Publication date
JP4706382B2 (en) 2011-06-22

Similar Documents

Publication Publication Date Title
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
KR100847352B1 (en) Supporting tube assembly for tunnel supporting method with grouted steel pipe in the borehole and supporting method of using thereof
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
KR101152265B1 (en) Prestressed bored pile construction method and structures
KR100713787B1 (en) The underground structure assembly and the underground structure building method which it uses
KR101179778B1 (en) Method for constructing underground structure
KR101838663B1 (en) strengthening method of rock tunnel fault fractured zone
JP6936613B2 (en) Masonry reinforcement structure and reinforcement method
CN105378222A (en) Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method
KR101536209B1 (en) Steel Pipe Multi Step Grouting device Open and cut and NATM complex excavation tunnel construction method
KR101283672B1 (en) Non open cut method using the lifting device
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
KR100949606B1 (en) Hole-boring and hammering-vibration working method and device for integrated construction with sheet-pile fixed to outside of hole-boring auger casing
JP4706382B2 (en) Ground reinforcement structure and reinforcement method
JP3927842B2 (en) Construction method of double pipe digging small diameter pile
KR100805189B1 (en) Construction method of underground structure characterized by going side by side wall construction and excavation
JP4735114B2 (en) Ground reinforcement structure and reinforcement method
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
KR101061516B1 (en) Temporary wall structure using arched steel pile
KR100898969B1 (en) Tunnel Boring Method Using Sheet Pile and Tunnel Structure therof
KR100546998B1 (en) Construction method of temporary apparatus of thnnel for direct digging
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
JP2008248488A (en) Slope stabilizing method and slope construction equipment
KR101283663B1 (en) Method for digging two arch type tunnel
KR100984040B1 (en) Method of reinforced earth retaining wall for cutting face through double reinforcing execution

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080718

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100802

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100817

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101015

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110228

LAPS Cancellation because of no payment of annual fees