JP2006348601A - Climbing scaffolding - Google Patents

Climbing scaffolding Download PDF

Info

Publication number
JP2006348601A
JP2006348601A JP2005176557A JP2005176557A JP2006348601A JP 2006348601 A JP2006348601 A JP 2006348601A JP 2005176557 A JP2005176557 A JP 2005176557A JP 2005176557 A JP2005176557 A JP 2005176557A JP 2006348601 A JP2006348601 A JP 2006348601A
Authority
JP
Japan
Prior art keywords
scaffold
attached
guide
frame
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005176557A
Other languages
Japanese (ja)
Other versions
JP4704123B2 (en
Inventor
Tomio Kurabayashi
富美夫 倉林
Kazuhiko Masuda
和彦 増田
Shinichiro Fujiwara
進一郎 藤原
Hiroshi Tokuda
浩 徳田
Masaki Fuchimoto
正樹 淵本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Milx Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Milx Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp, Milx Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2005176557A priority Critical patent/JP4704123B2/en
Publication of JP2006348601A publication Critical patent/JP2006348601A/en
Application granted granted Critical
Publication of JP4704123B2 publication Critical patent/JP4704123B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a climbing scaffolding that allows external work such as painting, repairing and joint sealing of an external wall surface of a building even before constructing a roof skeleton and installing a scaffolding lifting means on the roof skeleton. <P>SOLUTION: A guided member 4 liftably supported from an upper floor 104 to a lower floor 105 by a pair of guide members 3 mounted to a skeleton beam 102A of the upper floor 104 and to a skeleton beam 102B of the lower floor 105 and extended outside the building is used as a base part to attach a work scaffolding 5. External work such as painting, repairing and joint sealing of the external wall surface of the building can thereby be performed even before constructing the roof skeleton and installing the scaffolding lifting means on the roof skeleton. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、クライミング足場に関し、特にカーテンウォールを施工する建物の外部に付設するクライミング足場に関するものである。   The present invention relates to a climbing scaffold, and more particularly to a climbing scaffold attached to the outside of a building for constructing a curtain wall.

プレキャストコンクリート等の壁材で外壁にカーテンウォールを構築した建物が広く知られている。このような建物の壁材は、予め工場で製作され、施工現場の進捗状況に応じて施工現場に搬入される。そして、壁材はクレーン等の揚重手段により、地上、あるいはトラックからつり上げられて、建物躯体の建ち上がりに合わせて下方から順次躯体に取り付けられる。その後、外壁面の塗装、補修、目地シールなどの外部作業を経て、建物の外壁面が完成することになる。   Buildings in which curtain walls are constructed on the outer wall with wall materials such as precast concrete are widely known. The wall material of such a building is manufactured in advance in a factory, and is carried into the construction site according to the progress of the construction site. Then, the wall material is lifted from the ground or a truck by a lifting means such as a crane, and is attached to the frame sequentially from below according to the building frame. Thereafter, the external wall surface of the building is completed through external work such as painting, repairing, and sealing of the external wall surface.

このように外壁にカーテンウォールを構築した建物の施工性を改善するものとして、カーテンウォール組立装置が提案されている。このカーテンウォール組立装置は、建物外壁面の地上部に、外壁面に取り付ける外装カーテンウォールの組立作業施設を設置する一方、組立作業施設と外壁面との間に亘って、外壁面に敷設された垂直のガイドレールに案内されて昇降する組立足場を装架してある。そして、外装カーテンウォール組立装置に壁材を搬入して、組立足場上に一層分の大きさのカーテンウォールを組み立てた後、屋上躯体に設置した電動巻上機等の足場揚重手段によって所定の位置まで上昇せしめて、カーテンウォールを建物外壁面に固定していた(たとえば、特許文献1参照)。   As described above, a curtain wall assembling apparatus has been proposed to improve the workability of a building in which a curtain wall is constructed on the outer wall. This curtain wall assembling apparatus is installed on the outer wall surface between the assembly work facility and the outer wall surface, while installing an exterior curtain wall assembly work facility to be attached to the outer wall surface on the ground part of the outer wall surface of the building. An assembly scaffold that is guided up and down by a vertical guide rail is mounted. And after carrying a wall material into an exterior curtain wall assembly apparatus and assembling a curtain wall of a size of one layer on the assembly scaffold, a predetermined lifting means such as an electric hoist installed on the roof frame is used to The curtain wall was fixed to the outer wall surface of the building by raising it to the position (see, for example, Patent Document 1).

特開平7−54491号公報Japanese Patent Application Laid-Open No. 7-54491

しかしながら、このようなカーテンウォール組立装置は、屋上躯体を構築し、屋上躯体に足場揚重手段を設置するまでは、外壁面にカーテンウォールを設置できないばかりか、外部作業に着手できず、工程上や止水の上で問題となっていた。   However, such a curtain wall assembling apparatus cannot construct a curtain wall on the outer wall surface until it constructs the roof frame and installs the scaffold lifting means on the roof frame. It was a problem on the water stop.

本発明は、上記に鑑みてなされたものであって、屋上躯体を構築し、屋上躯体に足場揚重手段を設置する前であっても、施工階の養生、建物の外壁面の塗装、補修、目地シールなどの外部作業を可能とするクライミング足場を提供することを目的とする。   The present invention has been made in view of the above, and even before building a roof frame and installing scaffold lifting means on the roof frame, curing the construction floor, painting the exterior wall of the building, repairing An object of the present invention is to provide a climbing scaffold that enables external work such as joint sealing.

上述した課題を解決し、目的を達成するために、本発明は、カーテンウォールを施工した建物の外部に付設するクライミング足場において、上フロアの躯体梁と下フロアの躯体梁とに取り付けられ、建物の外部に延在する一対のガイド部材により、上フロアと下フロアとに亘り、上昇可能に支承された被ガイド部材を基部として作業足場を組み付けたことを特徴とする。   In order to solve the above-described problems and achieve the object, the present invention is a climbing scaffold attached to the outside of a building where a curtain wall is constructed, and is attached to a frame beam on an upper floor and a frame beam on a lower floor. A working scaffold is assembled with a pair of guide members extending to the outside as a base portion of a guided member supported so as to be able to rise over an upper floor and a lower floor.

また、本発明は、上記請求項1において、前記ガイド部材が、前記躯体梁に取り付けた支持ベースと、支持ベースに取り付けたガイドとからなり、前記被ガイド部材が、ガイドに収容されたガイドレールと、ガイドレールに取り付けたフレームとからなることを特徴とする。   The present invention provides the guide rail according to claim 1, wherein the guide member includes a support base attached to the frame beam and a guide attached to the support base, and the guided member is accommodated in the guide. And a frame attached to the guide rail.

また、本発明は、上記請求項2において、前記支持ベースは、カーテンウォールの縦目地から外部に延在する支持部と、躯体梁に取り付ける取付部とを有し、前記取付部を躯体柱に沿って取り付けたことを特徴とする。   Further, the present invention according to claim 2, wherein the support base includes a support portion that extends outward from the vertical joint of the curtain wall, and a mounting portion that is attached to the frame beam, and the mounting portion is a column. It is attached along.

本発明にかかるクライミング足場は、上フロアの躯体梁と下フロアの躯体梁とに取り付けられ、建物の外部に延在する一対のガイド部材により、上フロアと下フロアとに亘り、上昇可能に支承された被ガイド部材を基部として作業足場を組み付けたので、屋上躯体を構築し、屋上躯体に足場揚重手段が設置される前で合っても、クレーン等の足場揚重手段によって足場を上昇させることにより、下フロアから上フロアに順番に外部作業が可能となる。   The climbing scaffold according to the present invention is supported on the upper floor and the lower floor by a pair of guide members that are attached to the upper floor and the lower floor and are extended to the outside of the building. Since the work scaffold is assembled with the guided member as the base, the roof frame is constructed and the scaffold is lifted by the platform lifting means such as a crane even if the platform lifting means is installed on the roof frame. Thus, external work can be performed in order from the lower floor to the upper floor.

以下に、本発明にかかるクライミング足場の実施例を図面に基づいて詳細に説明する。なお、この実施例によりこの発明が限定されるものではない。   Hereinafter, embodiments of a climbing scaffold according to the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

図1は本発明の実施例1にかかるクライミング足場を付設した高層建物を示す正面図、図2は図1に示したクライミング足場を付設した高層建物を示す平面図、図3は図1に示したクライミング足場を付設した高層建物を示す側面図である。   1 is a front view showing a high-rise building with a climbing scaffold according to Example 1 of the present invention, FIG. 2 is a plan view showing the high-rise building with a climbing scaffold shown in FIG. 1, and FIG. 3 is shown in FIG. It is a side view which shows the high-rise building which attached the climbing scaffold.

本発明の実施例1にかかるクライミング足場は、カーテンウォールを施工した高層建物100の外部に付設するクライミング足場1であって、作業足場となる部分に、単管足場を採用したものである。   The climbing scaffold according to Example 1 of the present invention is a climbing scaffold 1 attached to the outside of a high-rise building 100 in which a curtain wall is constructed, and a single pipe scaffold is adopted as a work scaffold.

図1〜図3に示すように、本発明の実施例1にかかるクライミング足場1を付設する高層建物100は、躯体柱101と、躯体梁102とを有するものであって、躯体柱101と躯体梁102の外部の外壁となる部分にカーテンウォール103が配設してある。カーテンウォール103は、たとえば、プレキャストコンクリートにより構築されたものであり、縦目地となる部分に間隙を有している。   As shown in FIGS. 1-3, the high-rise building 100 which attaches the climbing scaffold 1 concerning Example 1 of this invention has the frame column 101 and the frame beam 102, Comprising: The frame column 101 and the frame A curtain wall 103 is disposed on the outer wall of the beam 102. The curtain wall 103 is constructed of, for example, precast concrete, and has a gap in a portion that becomes a vertical joint.

本発明の実施例1にかかるクライミング足場1は、ガイド部材3と、被ガイド部材4と、足場5とを有している。ガイド部材3は、目地シール作業階となる上フロア104の躯体梁102Aと、下フロア105の躯体梁102Bとに取り付けてある。   The climbing scaffold 1 according to the first embodiment of the present invention includes a guide member 3, a guided member 4, and a scaffold 5. The guide member 3 is attached to the frame beam 102A of the upper floor 104 and the frame beam 102B of the lower floor 105, which serve as joint sealing work floors.

図4および図5に示すように、ガイド部材3は、躯体梁102に取り付けた支持ベース31と、支持ベース31に取り付けたガイド32とからなる。支持ベース31は、支持部31aと取付部31bとを溶接して構築してある。支持部31aは、カーテンウォール103の縦目地となる間隙から外部に延在する部分である。支持部31aは、カーテンウォール103の縦目地となる間隙よりも薄く形成してあり、先端部にガイド取付穴(図示せず)が形成してある。取付部31bは、支持ベース31を躯体梁102に取り付ける部分であり、躯体柱101を避けるように、躯体柱101から離反する方向に延在している。たとえば、カーテンウォール103の縦目地の右側に躯体柱101が位置する場合には、取付部31bが左側に延在するように形成してあり(図5参照)、カーテンウォール103の縦目地の左側に躯体柱101が位置する場合には、取付部31bが右側に延在するように形成してある(図示せず)。したがって、図5に示すような左勝手の支持ベース31と、右勝手の支持ベース(図示せず)を任意に使い分けることにより、躯体柱101を避けて、支持ベース31を躯体梁102に取り付け可能である。なお、支持部31aと取付部31bとの間は、補強のためのリブ31cが溶接してある。   As shown in FIGS. 4 and 5, the guide member 3 includes a support base 31 attached to the frame beam 102 and a guide 32 attached to the support base 31. The support base 31 is constructed by welding a support portion 31a and a mounting portion 31b. The support portion 31 a is a portion that extends to the outside from a gap that becomes a vertical joint of the curtain wall 103. The support portion 31a is formed thinner than the gap serving as the vertical joint of the curtain wall 103, and a guide mounting hole (not shown) is formed at the tip. The attachment part 31 b is a part for attaching the support base 31 to the frame beam 102, and extends in a direction away from the frame column 101 so as to avoid the frame column 101. For example, when the frame column 101 is located on the right side of the vertical joint of the curtain wall 103, the mounting portion 31b is formed to extend to the left side (see FIG. 5), and the left side of the vertical joint of the curtain wall 103. When the frame column 101 is positioned at the center, the attachment portion 31b is formed to extend to the right side (not shown). Therefore, by arbitrarily using a left-handed support base 31 and a right-handed support base (not shown) as shown in FIG. It is. In addition, the rib 31c for reinforcement is welded between the support part 31a and the attaching part 31b.

支持ベース31のガイド取付穴には、ガイド32が取り付けてある。ガイド32は、取付部32aと支承部32bとを有している。取付部32aは、ガイド32を支持ベース31に取り付ける部分であり、支持ベース31の支持部31aの両側に延在するように形成してある。そして、取付部32aの一方から挿入したボルト33が支持ベース31のガイド取付穴を貫通し、取付部32aの他方に螺合することにより、ガイド32は支持ベース31に取り付けられる。支承部32bは、被ガイド部材4を上昇可能に支承する部分であり、溝形鋼に山形鋼を溶接することにより、足場側の中央部が開口した断面がCの字状となるリップ溝形状を有している。   A guide 32 is attached to the guide attachment hole of the support base 31. The guide 32 has an attachment portion 32a and a support portion 32b. The attachment portion 32 a is a portion for attaching the guide 32 to the support base 31, and is formed so as to extend on both sides of the support portion 31 a of the support base 31. The guide 32 is attached to the support base 31 by the bolt 33 inserted from one of the attachment portions 32a passing through the guide attachment hole of the support base 31 and screwing into the other of the attachment portions 32a. The support portion 32b is a portion that supports the guided member 4 so as to be lifted, and a lip groove shape in which a cross-section in which the center portion on the scaffold side is opened becomes a C-shape by welding the angle steel to the groove steel. have.

被ガイド部材4は、ガイド部材3に支承される部材であり、上フロア104と下フロア105とに亘るように形成してある。被ガイド部材4は、ガイドレール41とフレーム42とからなり、ガイドレール41がガイド32に支承され、このガイドレール41にフレーム42が取り付けてある。   The guided member 4 is a member that is supported by the guide member 3 and is formed so as to extend over the upper floor 104 and the lower floor 105. The guided member 4 includes a guide rail 41 and a frame 42. The guide rail 41 is supported by a guide 32, and the frame 42 is attached to the guide rail 41.

ガイドレール41は、レール部41aと、連結部41bとパイプ部41cとを有し、レール部41aに任意の間隔で連結部41bが溶接してある。レール部41aは角パイプにより構成してあり、ガイド32の支承部32bに収容してある。このため、ガイドレール41はガイド32に確実に支承されることになる。連結部41bは、レール部41aとパイプ部41cとを連結する部分であり、一端側がレール部41aに溶接してあり、ガイド32の開口から足場側に延在し、他端側が交差するパイプ部41cに溶接してある。なお、連結部41bとパイプ部41cとの間は、補強のためのリブ41dが溶接してある。   The guide rail 41 has a rail portion 41a, a connecting portion 41b, and a pipe portion 41c, and the connecting portion 41b is welded to the rail portion 41a at an arbitrary interval. The rail portion 41a is formed of a square pipe and is accommodated in the support portion 32b of the guide 32. For this reason, the guide rail 41 is securely supported by the guide 32. The connecting part 41b is a part that connects the rail part 41a and the pipe part 41c, one end side is welded to the rail part 41a, the pipe part that extends from the opening of the guide 32 to the scaffold side, and the other end side intersects. It is welded to 41c. In addition, the rib 41d for reinforcement is welded between the connection part 41b and the pipe part 41c.

フレーム42は、平行に配設したパイプ42aに矩形の板材42bを溶接することによりフィーレンディール構造としたものを、パイプ42aが角部に位置するように、連結部材43により、連結したものである(図7参照)。このように構成したフレーム42がクライミング足場1の主架構となる。   The frame 42 is obtained by connecting a rectangular plate material 42b to a pipe 42a arranged in parallel to form a feeler deal structure by a connecting member 43 so that the pipe 42a is positioned at a corner. Yes (see FIG. 7). The frame 42 configured in this way becomes the main frame of the climbing scaffold 1.

そして、ガイドレール41のパイプ部41cとフレーム42のパイプ42aとは、市販のブラケット44により連結してある。この結果、ガイドレール41とフレーム42とは一体となって、ガイド部材3に支承されることになる。   The pipe portion 41 c of the guide rail 41 and the pipe 42 a of the frame 42 are connected by a commercially available bracket 44. As a result, the guide rail 41 and the frame 42 are integrally supported by the guide member 3.

図6〜図8に示すように、フレーム42には、支持部45が設けてある。支持部45は下フロア105の躯体梁102Bに取り付けた支持ベース31と係合し、フレーム42を支持するものであり、連結部材43に組み付けてある。支持部45は、山形鋼に平板を溶接することにより形成した下側が開口となるコの字状の支持部材45aと、支持部材45aに回動可能に取り付けた板状体45bとを有している。この板状体45bの端部には、ウェイト45cが設けてあり、ウェイト45cの反力により支持部材45aの開口に進入し、支持部材45aと係合し、支持ベース31に支持されている。   As shown in FIGS. 6 to 8, the frame 42 is provided with a support portion 45. The support portion 45 engages with the support base 31 attached to the frame beam 102 </ b> B of the lower floor 105, supports the frame 42, and is assembled to the connecting member 43. The support part 45 has a U-shaped support member 45a formed by welding a flat plate to an angle steel and having an opening on the lower side, and a plate-like body 45b rotatably attached to the support member 45a. Yes. A weight 45c is provided at the end of the plate-like body 45b. The weight 45c enters the opening of the support member 45a by the reaction force of the weight 45c, engages with the support member 45a, and is supported by the support base 31.

フレーム42には、市販のブラケットにより、足場5が組み付けてある。本実施例にかかる足場5は、単管足場であり、二つの目地シール作業階(上フロア104、下フロア105)のほか、階上フロア106に亘るように組み付けてある。そして、この足場5の外側全域を覆うように、養生シート6が張ってある(図3参照)。このため、階上フロア106を養生することも可能である。   A scaffold 5 is assembled to the frame 42 by a commercially available bracket. The scaffold 5 according to the present embodiment is a single pipe scaffold and is assembled so as to extend over the upper floor 106 in addition to the two joint sealing work floors (upper floor 104 and lower floor 105). A curing sheet 6 is stretched so as to cover the entire outside of the scaffold 5 (see FIG. 3). Therefore, the upper floor 106 can be cured.

上述した本発明の実施例1にかかるクライミング足場1によれば、目地シール作業階(上フロア104、下フロア105)において目地シール作業が可能となる。そして、さらに、目地シール作業階(上フロア104)の階上フロア106を養生させることが可能となる。   According to the climbing scaffold 1 according to the first embodiment of the present invention described above, the joint sealing work can be performed on the joint sealing work floor (upper floor 104, lower floor 105). Further, the upper floor 106 of the joint seal work floor (upper floor 104) can be cured.

目地シール作業階(下フロア105、上フロア104)における目地シール作業が終了した場合には、階上フロア106の躯体梁102に高層建物100の内部から支持ベース31を取り付けた後、カーテンウォール103の外部からガイド32を取り付ける。   When the joint sealing work on the joint sealing work floor (the lower floor 105 and the upper floor 104) is completed, the support base 31 is attached to the frame beam 102 of the upper floor 106 from the inside of the high-rise building 100, and then the curtain wall 103 A guide 32 is attached from the outside.

その後、タワークレーン(図示せず)等の揚重手段により、足場5を揚重すると、足場5及び被ガイド部材4は、ガイド部材3に案内されて、上昇することになる。具体的には、足場5を組み付けたフレーム42とガイドレール41とが、支持ベース31に取り付けたガイド32に案内されて上昇(クライミング)することになる。   Thereafter, when the scaffold 5 is lifted by a lifting means such as a tower crane (not shown), the scaffold 5 and the guided member 4 are guided and guided by the guide member 3. Specifically, the frame 42 and the guide rail 41 assembled with the scaffold 5 are guided by the guide 32 attached to the support base 31 and climb (climb).

そして、支持部45の板状体45bが支持ベース31に当接すると、図8−1に示すように、ウェイト45cの反力に抗して板状体45bが反時計回りに回動する。そして、板状体45bが支持ベース31を乗り越えると、再び板状体45bがウェイト45cの反力により時計回りに回動し、図8−2に示すように、板状体45bが支持ベース31に係止されることになる。   When the plate-like body 45b of the support portion 45 comes into contact with the support base 31, as shown in FIG. 8A, the plate-like body 45b rotates counterclockwise against the reaction force of the weight 45c. Then, when the plate-like body 45b gets over the support base 31, the plate-like body 45b again rotates clockwise by the reaction force of the weight 45c, and as shown in FIG. It will be locked to.

このように、足場5を揚重すると、上フロア104と階上フロア106とが目地シール作業階となる。そして、下フロア105の躯体梁102Bの支持ベース31に取り付けてあるガイド32をカーテンウォール103の外側から取り外した後に、下フロア105の躯体梁102Bに取り付けてある支持ベース31をカーテンウォール103の内側から取り外せば、上フロア104の目地全域に亘って目地シール作業が可能となる。   In this way, when the scaffold 5 is lifted, the upper floor 104 and the upper floor 106 become the joint sealing work floor. Then, after the guide 32 attached to the support base 31 of the frame beam 102B of the lower floor 105 is removed from the outside of the curtain wall 103, the support base 31 attached to the frame beam 102B of the lower floor 105 is set inside the curtain wall 103. If it is removed, joint sealing work is possible over the entire joint of the upper floor 104.

上述したように、クライミング足場1を順次上階に移動させれば、屋外躯体を構築し、屋上躯体に足場揚重手段を設置する前であっても、建物の外壁面の塗装、補修、目地シールなどの外部作業が可能となる。   As mentioned above, if the climbing scaffolding 1 is sequentially moved to the upper floor, even before building the outdoor frame and installing the platform lifting means on the roof frame, painting, repairing, and jointing the outer wall of the building External work such as sealing is possible.

図9は本発明の実施例2にかかるクライミング足場を付設した高層建物を示す正面図、図10は図9に示したクライミング足場を付設した高層建物を示す平面図、図11は図9に示したクライミング足場を付設した高層建物を示す側面図である。   9 is a front view showing a high-rise building with a climbing scaffold according to Example 2 of the present invention, FIG. 10 is a plan view showing the high-rise building with a climbing scaffold shown in FIG. 9, and FIG. 11 is shown in FIG. It is a side view which shows the high-rise building which attached the climbing scaffold.

本発明の実施例2にかかるクライミング足場10は、実施例1にかかるクライミング足場1と同様に、カーテンウォール103を施工した高層建物100の外部に付設するクライミング足場10であって、作業足場となる部分に、枠組み足場を採用したものである。   The climbing scaffold 10 according to the second embodiment of the present invention is a climbing scaffold 10 provided outside the high-rise building 100 in which the curtain wall 103 is constructed, as in the climbing scaffold 1 according to the first embodiment, and serves as a work scaffold. The framework scaffolding is adopted for the part.

本発明の実施例2にかかるクライミング足場10は、図9〜図11に示すように、作業足場となる部分に枠組み足場を適用したことを除いて、実施例1にかかるクライミング足場と異なるところはないので、説明を省略する。   The climbing scaffold 10 according to the second embodiment of the present invention is different from the climbing scaffold according to the first embodiment except that a framework scaffold is applied to a portion serving as a work scaffold as shown in FIGS. 9 to 11. Since there is no description, the description is omitted.

上述した実施例1にかかるクライミング足場1は、作業足場として単管足場を採用し、実施例2にかかるクライミング足場10は、作業足場として枠組み足場を採用したが、作業足場はこれらに限られるものではなく、任意の構造の作業足場を採用可能である。   The climbing scaffold 1 according to the first embodiment employs a single pipe scaffold as a work scaffold, and the climbing scaffold 10 according to the second embodiment employs a framework scaffold as a work scaffold. However, the work scaffold is limited to these. Instead, a work scaffold with an arbitrary structure can be employed.

以上のように、本発明のクライミング足場は、施工階の養生およびプレキャストカーテンウォールの塗装、補修、目地シール等の外部作業に有用であり、特に、高層建物のクライミング足場に適している。   As described above, the climbing scaffold of the present invention is useful for external work such as curing of construction floors, precast curtain wall painting, repair, and joint sealing, and is particularly suitable for climbing scaffolds of high-rise buildings.

本発明の実施例1にかかるクライミング足場を付設した高層建物を示す正面図である。It is a front view which shows the high-rise building which attached the climbing scaffold concerning Example 1 of this invention. 図1に示したクライミング足場を付設した高層建物を示す平面図である。It is a top view which shows the high-rise building which attached the climbing scaffold shown in FIG. 図1に示したクライミング足場を付設した高層建物を示す側面図である。It is a side view which shows the high-rise building which attached the climbing scaffold shown in FIG. 図1に示したクライミング足場の壁つなぎ部を示す側面図である。It is a side view which shows the wall connection part of the climbing scaffold shown in FIG. 図4に示したクライミング足場の壁つなぎ部を示す平面図である。It is a top view which shows the wall connection part of the climbing scaffold shown in FIG. 図1に示したクライミング足場の支持部を示す側面図である。It is a side view which shows the support part of the climbing scaffold shown in FIG. 図6に示したクライミング足場の支持部を示す平面図である。It is a top view which shows the support part of the climbing scaffold shown in FIG. セット時のクライミング足場の支持部を示す概念図である。It is a conceptual diagram which shows the support part of the climbing scaffold at the time of a set. クライミング時のクライミング足場の支持部を示す概念図である。It is a conceptual diagram which shows the support part of the climbing scaffold at the time of climbing. 本発明の実施例2にかかるクライミング足場を付設した建物を示す正面図である。It is a front view which shows the building which attached the climbing scaffold concerning Example 2 of this invention. 図9に示したクライミング足場を付設した高層建物を示す平面図である。It is a top view which shows the high-rise building which attached the climbing scaffold shown in FIG. 図9に示したクライミング足場を付設した高層建物を示す側面図である。It is a side view which shows the high-rise building which attached the climbing scaffold shown in FIG.

符号の説明Explanation of symbols

1,10 クライミング足場
3 ガイド部材
4 被ガイド部材
5 足場
6 養生シート
31 支持ベース
31a 支持部
31b 取付部
31c リブ
32 ガイド
32a 取付部
32b 支承部
33 ボルト
41 ガイドレール
41a レール部
41b 連結部
41c パイプ部
41d リブ
42 フレーム
42a パイプ
42b 板材
43 連結部材
44 ブラケット
45 支持部
45a 支持部材
45b 板状体
45c ウェイト
100 高層建物
101 躯体柱
102 躯体梁
102A 躯体梁
102B 躯体梁
103 カーテンウォール
104 上フロア
105 下フロア
106 階上フロア
DESCRIPTION OF SYMBOLS 1,10 Climbing scaffold 3 Guide member 4 Guided member 5 Scaffold 6 Curing sheet 31 Support base 31a Support part 31b Attachment part 31c Rib 32 Guide 32a Attachment part 32b Bearing part 33 Bolt 41 Guide rail 41a Rail part 41b Connection part 41c Pipe part 41d rib 42 frame 42a pipe 42b plate member 43 connecting member 44 bracket 45 support portion 45a support member 45b plate-like body 45c weight 100 high-rise building 101 frame pillar 102 frame beam 102A frame beam 102B frame beam 103 curtain wall 104 upper floor 105 lower floor 106 Upstairs floor

Claims (3)

カーテンウォールを施工した建物の外部に付設するクライミング足場において、
上フロアの躯体梁と下フロアの躯体梁とに取り付けられ、建物の外部に延在する一対のガイド部材により、上フロアと下フロアとに亘り、上昇可能に支承された被ガイド部材を基部として作業足場を組み付けたことを特徴とするクライミング足場。
In the climbing scaffolding attached outside the building where the curtain wall was constructed,
A pair of guide members that are attached to the upper and lower floor beams and extend to the outside of the building, with the guided member supported ascending across the upper and lower floors. Climbing scaffold characterized by assembly of work scaffold.
前記ガイド部材が、前記躯体梁に取り付けた支持ベースと、支持ベースに取り付けたガイドとからなり、
前記被ガイド部材が、ガイドに収容されたガイドレールと、ガイドレールに取り付けたフレームとからなることを特徴とする請求項1に記載のクライミング足場。
The guide member comprises a support base attached to the frame beam, and a guide attached to the support base,
The climbing scaffold according to claim 1, wherein the guided member includes a guide rail accommodated in the guide and a frame attached to the guide rail.
前記支持ベースは、カーテンウォールの縦目地から外部に延在する支持部と、躯体梁に取り付ける取付部とを有し、前記取付部を躯体柱に沿って取り付けたことを特徴とする請求項2に記載のクライミング足場。   The said support base has the support part extended outside from the vertical joint of a curtain wall, and the attachment part attached to a frame beam, The said attachment part was attached along the frame pillar, The feature is characterized by the above-mentioned. Climbing scaffold as described in.
JP2005176557A 2005-06-16 2005-06-16 Climbing scaffold Active JP4704123B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005176557A JP4704123B2 (en) 2005-06-16 2005-06-16 Climbing scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005176557A JP4704123B2 (en) 2005-06-16 2005-06-16 Climbing scaffold

Publications (2)

Publication Number Publication Date
JP2006348601A true JP2006348601A (en) 2006-12-28
JP4704123B2 JP4704123B2 (en) 2011-06-15

Family

ID=37644728

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005176557A Active JP4704123B2 (en) 2005-06-16 2005-06-16 Climbing scaffold

Country Status (1)

Country Link
JP (1) JP4704123B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009167617A (en) * 2008-01-11 2009-07-30 Shimizu Corp Slide scaffold facility
KR100967177B1 (en) 2008-03-17 2010-07-27 (주)재경건설 The safety fence for construction work
JP2013011119A (en) * 2011-06-30 2013-01-17 Sumitomo Mitsui Construction Co Ltd Construction method of multi-layer building and lifting device for continuous layer foothold used therefor
KR101251847B1 (en) * 2011-12-29 2013-04-09 고려대학교 산학협력단 Outer wall climbing apparatus
CN103711301A (en) * 2013-12-30 2014-04-09 江河创建集团股份有限公司 Construction method and device for two-track movable electric basket and lifting hoist
CN108643551A (en) * 2018-07-23 2018-10-12 广州达蒙安防科技有限公司 Inner guide type elevating scaffold wall-attaching equipment
CN109629813A (en) * 2019-01-03 2019-04-16 中国建筑第五工程局有限公司 A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN113073835A (en) * 2021-04-25 2021-07-06 中国十九冶集团有限公司 Outer protection frame installation auxiliary device and assembly arrangement structure thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401714B (en) * 2015-10-27 2017-07-07 重庆东辰建筑机械安装工程有限公司 Attached lifting scaffold and lifting method
CN110173106B (en) * 2019-05-30 2021-03-09 广西建工大都租赁有限公司 Upper and lower guide seat is full-automatic to climb a shore device in coordination with atress

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003147956A (en) * 2001-11-12 2003-05-21 Samu:Kk Self-climbing mobile scaffold

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003147956A (en) * 2001-11-12 2003-05-21 Samu:Kk Self-climbing mobile scaffold

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009167617A (en) * 2008-01-11 2009-07-30 Shimizu Corp Slide scaffold facility
KR100967177B1 (en) 2008-03-17 2010-07-27 (주)재경건설 The safety fence for construction work
JP2013011119A (en) * 2011-06-30 2013-01-17 Sumitomo Mitsui Construction Co Ltd Construction method of multi-layer building and lifting device for continuous layer foothold used therefor
KR101251847B1 (en) * 2011-12-29 2013-04-09 고려대학교 산학협력단 Outer wall climbing apparatus
CN103711301A (en) * 2013-12-30 2014-04-09 江河创建集团股份有限公司 Construction method and device for two-track movable electric basket and lifting hoist
CN108643551A (en) * 2018-07-23 2018-10-12 广州达蒙安防科技有限公司 Inner guide type elevating scaffold wall-attaching equipment
CN109629813A (en) * 2019-01-03 2019-04-16 中国建筑第五工程局有限公司 A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN113073835A (en) * 2021-04-25 2021-07-06 中国十九冶集团有限公司 Outer protection frame installation auxiliary device and assembly arrangement structure thereof

Also Published As

Publication number Publication date
JP4704123B2 (en) 2011-06-15

Similar Documents

Publication Publication Date Title
JP4704123B2 (en) Climbing scaffold
JP4847153B2 (en) Roof repair structure and construction method of flat roof building
JP6667940B2 (en) Exterior wall panel and column layout structure of exterior wall and layout construction method
JP6271399B2 (en) Exterior wall panel mounting structure
JP7250712B2 (en) balcony device
JP6186155B2 (en) Exterior wall panel mounting device and exterior wall panel mounting method
JP7369090B2 (en) shaft wall unit
JP5377986B2 (en) Construction method of unit type building
JP4092299B2 (en) Scaffold for external corner
JP3920888B2 (en) Dry fireproof coating unit construction method
JP4445366B2 (en) Reinforcement method for tower crane mount
JP4541837B2 (en) Curtain wall structure by ALC plate with steel frame and its construction method
JP5689273B2 (en) Temporary scaffolding and building construction method
JP7505336B2 (en) Sash installation method
JP7335769B2 (en) Corner cover mounting hardware and corner cover mounting method
JP4691202B1 (en) Building reinforcement structure
JP3145989U (en) Lightweight construction
JP2005068772A (en) Towery building and its construction method
JP2980199B2 (en) Building structure
JP2557161B2 (en) Roof unit with parapet
JP2006307506A (en) Scaffolding
JP2007107352A (en) House construction method, house and lift device
JP2010285744A (en) Narrow site building method
JP4018000B2 (en) Construction method of unit type building
JP4453490B2 (en) Method for forming outer wall of steel structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100831

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101109

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110308

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110309

R150 Certificate of patent or registration of utility model

Ref document number: 4704123

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140318

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140318

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250