JP2006307505A - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
JP2006307505A
JP2006307505A JP2005130386A JP2005130386A JP2006307505A JP 2006307505 A JP2006307505 A JP 2006307505A JP 2005130386 A JP2005130386 A JP 2005130386A JP 2005130386 A JP2005130386 A JP 2005130386A JP 2006307505 A JP2006307505 A JP 2006307505A
Authority
JP
Japan
Prior art keywords
scaffold
vertical hole
unit
units
floor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005130386A
Other languages
Japanese (ja)
Inventor
Koji Iwata
光司 岩田
Kazuhisa Kurimoto
一寿 栗本
Hideaki Nishiuchi
英顕 西内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gifu Industry Co Ltd
Original Assignee
Gifu Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gifu Industry Co Ltd filed Critical Gifu Industry Co Ltd
Priority to JP2005130386A priority Critical patent/JP2006307505A/en
Publication of JP2006307505A publication Critical patent/JP2006307505A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Movable Scaffolding (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a scaffold capable of eliminating the need of stackingly assembling scaffold units in a vertical hole and enabling the easy assembling operation in a short time. <P>SOLUTION: The plurality of scaffold units with floor plates 20 are continuously connected to each other a through connection cable 13 so as to be suspended in the vertical direction. The scaffold unit 12 at the upper end is supported on a supporting tower 15 installed on the vertical hole 14 at a construction site, and the other scaffold units 12 are lowered into the vertical hole 14 so that the plurality of scaffold units 12 can be disposed in the vertical hole 14 so as to be suspended up to near its bottom part. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

この発明は、例えば道路橋、鉄道橋、建築構造物の基礎等の深礎杭を施工する場合、施工現場の地面に掘削した縦穴内へコンクリートを打設するのに先立って、鉄筋を組み込む際に使用する足場に関するものである。   For example, when constructing deep foundation piles such as road bridges, railway bridges, foundations of building structures, etc., when installing concrete before placing concrete into vertical holes excavated in the ground of the construction site, It is related to the scaffold used.

従来、この種の足場としては、例えば次のような構成のものが知られている。すなわち、この従来構成においては、床板と、その床板の外周部に立設された複数の支柱と、その支柱の上端間に支持された天枠とよりなる複数の足場ユニットが用意されている。そして、この足場ユニットをクレーン等で吊下支持した状態で、施工現場の縦穴内に搬入して上下に積層組立てすることにより、縦穴の深さに相当する所定高さの足場を建造していた。   Conventionally, as this type of scaffold, for example, one having the following configuration is known. That is, in this conventional configuration, a plurality of scaffold units each including a floor plate, a plurality of support columns erected on the outer periphery of the floor plate, and a top frame supported between the upper ends of the support columns are prepared. And, with this scaffold unit suspended and supported by a crane or the like, it was built into a vertical hole at the construction site and assembled vertically to build a scaffold with a predetermined height corresponding to the depth of the vertical hole .

ところが、この従来の足場においては、多数の足場ユニットを1つずつ縦穴内に搬入して、所定の連結位置に位置決めしながら積層組立てする必要があるため、その組立作業が非常に面倒で時間がかかるという問題があった。   However, in this conventional scaffold, it is necessary to carry a large number of scaffold units one by one into the vertical hole and stack and assemble them while positioning them at a predetermined connecting position. There was a problem that it took.

この発明は、このような従来の技術に存在する問題点に着目してなされたものである。その目的は、足場ユニットを1つずつ縦穴内に搬入しながら積層組立てする必要がなく、その組立作業を容易かつ短時間に行うことができる足場を提供することにある。   The present invention has been made paying attention to such problems existing in the prior art. An object of the present invention is to provide a scaffold that does not need to be stacked and assembled while carrying the scaffold units one by one into the vertical hole, and that can be assembled easily and in a short time.

上記の目的を達成するために、請求項1に記載の発明は、床板が設けられた複数の足場ユニットを、連結索を介して縦方向へ吊下可能に連接したことを特徴とするものである。
請求項2に記載の発明は、請求項1に記載の発明において、下端の足場ユニットには、その足場ユニットを昇降させるための昇降索を連結可能な連結部を設けたことを特徴とするものである。
In order to achieve the above object, the invention according to claim 1 is characterized in that a plurality of scaffold units provided with floor boards are connected via a connecting rope so as to be able to be suspended in the vertical direction. is there.
The invention according to claim 2 is characterized in that, in the invention according to claim 1, the scaffold unit at the lower end is provided with a connecting portion capable of connecting an elevator cable for raising and lowering the scaffold unit. It is.

請求項3に記載の発明は、請求項1または請求項2に記載の発明において、連結索の外周に手摺りを設けたことを特徴とするものである。
請求項4に記載の発明は、請求項1〜請求項3のうちのいずれか一項に記載の発明において、各足場ユニット間には、吊下状態においてそれらの間の間隔を保持するための間隔保持手段を設けたことを特徴とするものである。
The invention described in claim 3 is characterized in that in the invention described in claim 1 or claim 2, a handrail is provided on the outer periphery of the connecting rope.
According to a fourth aspect of the present invention, in the invention according to any one of the first to third aspects, the scaffold units are held between the scaffold units in a suspended state. It is characterized in that an interval holding means is provided.

請求項5に記載の発明は、請求項1〜請求項4のうちのいずれか一項に記載の発明において、足場ユニットの床板の外周に増設床板を着脱可能に設けたことを特徴とするものである。   The invention according to claim 5 is characterized in that, in the invention according to any one of claims 1 to 4, an additional floor board is detachably provided on the outer periphery of the floor board of the scaffold unit. It is.

(作用)
請求項1に記載の発明においては、施工現場の縦穴上に支持用やぐら等を設置し、その支持用やぐらに上端の足場ユニットを支持して、他の足場ユニットを縦穴内に下降させれば、複数の足場ユニットが連結索を介して縦穴の底部付近まで吊り下げられる。よって、多数の足場ユニットを1つずつ縦穴内に搬入しながら積層組立てする必要がなく、その組立作業を容易かつ短時間に行うことができる。
(Function)
In the invention according to claim 1, if a support tower or the like is installed on the vertical hole in the construction site, the upper end scaffold unit is supported on the support tower, and the other scaffold unit is lowered into the vertical hole. The plurality of scaffold units are suspended to the vicinity of the bottom of the vertical hole through the connecting rope. Therefore, it is not necessary to stack and assemble a large number of scaffold units one by one in a vertical hole, and the assembly work can be performed easily and in a short time.

請求項2に記載の発明においては、下端の足場ユニットに設けられた連結部に昇降索を連結した状態で、その昇降索を介して複数の足場ユニットを縦穴内で容易に昇降させることができる。   In the invention according to claim 2, a plurality of scaffold units can be easily lifted and lowered within the vertical hole via the lifting / lowering cable in a state where the lifting / lowering cable is connected to the connecting portion provided in the lower-end scaffolding unit. .

請求項3に記載の発明においては、各足場ユニットの床板の周側上部を手摺りにより囲むことができて、各足場ユニットの床板上で縦穴の内周面に対する鉄筋の組み込み作業を安全に行うことができる。   In the invention according to claim 3, the peripheral side upper part of the floor plate of each scaffold unit can be surrounded by a handrail, and the rebar assembling work to the inner peripheral surface of the vertical hole is safely performed on the floor plate of each scaffold unit. be able to.

請求項4に記載の発明においては、各足場ユニットを縦穴内で所定の間隔を保持した状態に吊り下げることができ、作業空間を確保できる。
請求項5に記載の発明においては、足場ユニットの床板の外周に増設床板を設けることにより、床板の径を実質的に大きくすることができ、従って、径の大きな深礎杭用の縦穴内の作業に都合がよい。
In the invention according to claim 4, each scaffold unit can be suspended in a state where a predetermined interval is maintained in the vertical hole, and a work space can be secured.
In the invention according to claim 5, by providing an additional floor plate on the outer periphery of the floor plate of the scaffold unit, the diameter of the floor plate can be substantially increased. Therefore, in the vertical hole for a deep foundation pile having a large diameter, Convenient for work.

以上のように、この発明によれば、足場ユニットを1つずつ縦穴内に搬入しながら積層組立てする必要がなく、その組立作業を容易かつ短時間に行うことができる。   As described above, according to the present invention, it is not necessary to stack and assemble the scaffold units one by one in the vertical holes, and the assembly work can be performed easily and in a short time.

以下に、この発明の一実施形態を、図面に基づいて説明する。
図1〜図3に示すように、この実施形態においては、深礎杭用足場11を組立てるための複数の足場ユニット12が、各4本のチェーンよりなる連結索13を介して縦方向へ吊下可能に連接して構成されている。そして、道路橋、鉄道橋、建築構造物の基礎等の深礎杭を施工する場合には、図4に示すように、施工現場の地面に掘削した縦穴14上に、支持用やぐら15及び吊下用やぐら16を設置する。この状態で、支持用やぐら15に上端の足場ユニット12を支持するとともに、吊下用やぐら16に上端の連結索13を連結して、他の足場ユニット12を縦穴14内に下降させる。これにより、複数の足場ユニット12が連結索13を介して縦穴14の底部付近まで吊り下げられて、所定高さの深礎杭用足場11が組み立てられるようになっている。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
As shown in FIGS. 1 to 3, in this embodiment, a plurality of scaffold units 12 for assembling the foundation pile scaffold 11 are suspended in the vertical direction via connecting ropes 13 each consisting of four chains. Concatenated so that it can be moved down. Then, when constructing deep foundation piles such as road bridges, railway bridges, foundations of building structures, etc., as shown in FIG. Install the lower tower 16. In this state, the upper end scaffold unit 12 is supported by the support tower 15, and the upper connection cord 13 is connected to the suspension tower 16, and the other scaffold unit 12 is lowered into the vertical hole 14. As a result, the plurality of scaffold units 12 are suspended to the vicinity of the bottom of the vertical hole 14 via the connecting rope 13, and the foundation pile scaffold 11 having a predetermined height is assembled.

さらに、この深礎杭用足場11の組立て状態で、作業者が支持用やぐら15上から所定高さ位置の足場ユニット12まで降りて、縦穴14の内周面に対する鉄筋17の組み込み作業を行うようになっている。   Further, in the assembled state of the foundation pile scaffold 11, the operator descends from the support tower 15 to the scaffold unit 12 at a predetermined height, and performs the assembling work of the reinforcing bars 17 on the inner peripheral surface of the vertical hole 14. It has become.

図1〜図5に示すように、前記足場ユニット12は、平面ほぼ円形枠状の床板20と、その床板20の上部に所定間隔おきで立設された4本の支柱21と、その支柱21の上端間に固定支持された平面四角枠状の天枠22とから構成されている。この構成において、図1から理解されるように、下端側の足場ユニット12ほど、天枠22及び支柱21間の横幅が次第に小さくなるように形成されている。   As shown in FIGS. 1 to 5, the scaffold unit 12 includes a floor plate 20 having a substantially circular frame shape, four pillars 21 erected on the floor plate 20 at predetermined intervals, and the pillars 21. It is comprised from the top frame 22 of the plane square frame shape fixedly supported between the upper ends of these. In this configuration, as can be understood from FIG. 1, the scaffold unit 12 on the lower end side is formed so that the lateral width between the top frame 22 and the support column 21 becomes gradually smaller.

また、各足場ユニット12において、4本の支柱21により間隔保持手段が構成され、それらの支柱21の下端には連接する下部の足場ユニット12の天枠22に係合可能な係合部23が設けられている。そして、各足場ユニット12が縦穴14内に吊り下げられた状態で、係合部23と天枠22との係合により、上下に隣接する足場ユニット12の床板20間に所定の上下間隔が保持されるようになっている。   Further, in each scaffold unit 12, an interval holding means is configured by four struts 21, and an engaging portion 23 that can be engaged with the top frame 22 of the lower scaffold unit 12 connected to the lower end of the struts 21. Is provided. Then, in a state where each scaffold unit 12 is suspended in the vertical hole 14, a predetermined vertical distance is maintained between the floor plates 20 of the scaffold units 12 adjacent to each other by the engagement between the engagement portion 23 and the top frame 22. It has come to be.

図2及び図3に示すように、前記各足場ユニット12における床板20の上面には金網24が張設され、その金網24の一部には昇降用の開口25が、上下に隣接する足場ユニット12において互い違いに位置をずらした状態で形成されている。各足場ユニット12の開口25には、蓋板26がヒンジ27を介して開閉可能に取り付けられている。開口25に対応するように、各足場ユニット12の床板20と天枠22との間には昇降用の梯子28が着脱可能に取り付けられようになっている。   As shown in FIGS. 2 and 3, a metal mesh 24 is stretched on the upper surface of the floor plate 20 in each of the scaffold units 12, and an opening 25 for raising and lowering is formed in a part of the metal mesh 24 so that the scaffold unit is vertically adjacent. In FIG. 12, the positions are alternately shifted. A lid plate 26 is attached to the opening 25 of each scaffold unit 12 via a hinge 27 so as to be opened and closed. Corresponding to the opening 25, an elevating ladder 28 is detachably attached between the floor plate 20 and the top frame 22 of each scaffold unit 12.

図2、図3及び図5に示すように、前記各足場ユニット12の床板20の外周には、必要に応じて複数の扇形の増設床板29が取り付けられるようになっている。すなわち、施工現場の縦穴14の内径が大きい場合には、図6の左半部に示すように、各足場ユニット12の床板20の外周に増設床板29を取り付けて、床板20上の作業面積を拡張するようになっている。これに対して、縦穴14の内径が小さい場合には、図6の右半部に示すように、各足場ユニット12の床板20の外周に増設床板29を取り付けることなく、鉄筋17の組み込み作業を行うようになっている。   As shown in FIGS. 2, 3, and 5, a plurality of fan-shaped additional floor boards 29 are attached to the outer periphery of the floor board 20 of each scaffold unit 12 as necessary. In other words, when the inner diameter of the vertical hole 14 at the construction site is large, as shown in the left half of FIG. 6, an additional floor plate 29 is attached to the outer periphery of the floor plate 20 of each scaffold unit 12 to reduce the work area on the floor plate 20. It is designed to be expanded. On the other hand, when the inner diameter of the vertical hole 14 is small, as shown in the right half of FIG. 6, the rebar 17 is assembled without attaching the additional floor plate 29 to the outer periphery of the floor plate 20 of each scaffold unit 12. To do.

図1及び図3に示すように、下端の足場ユニット12の床板20の中心には連結部30が設けられている。そして、図4に示すように、この連結部30に昇降索31を着脱可能に連結して、吊下用やぐら16に支持したチェーンブロック32により、昇降索31を巻き戻しまたは巻き上げることにより、足場ユニット12が縦穴14に対して下降または上昇されるようになっている。   As shown in FIG.1 and FIG.3, the connection part 30 is provided in the center of the floor board 20 of the scaffold unit 12 of a lower end. Then, as shown in FIG. 4, the lifting / lowering rope 31 is detachably connected to the connecting portion 30, and the lifting / lowering rope 31 is rewound or rolled up by the chain block 32 supported by the hanging tower 16. The unit 12 is lowered or raised with respect to the vertical hole 14.

図1及び図5に示すように、足場ユニット12の吊下状態において、各連結索13間には索よりなる手摺り33が着脱可能に取り付けられようになっている。そして、この手摺り33により、各足場ユニット12の床板20の周側上部が取り囲まれて、床板20上で縦穴14の内周面に対する鉄筋17の組み込み作業を安全に行うことができるようになっている。なお、前記増設床板29を用いる場合は、手摺り33として長いものを用いて、作業者が増設床板29上で作業するのを許容するようになっている。従って、この場合は、手摺り33は、自然状態では、やや垂れ下がる。   As shown in FIGS. 1 and 5, in the suspended state of the scaffold unit 12, a handrail 33 made of a rope is detachably attached between the connecting ropes 13. And by this handrail 33, the circumference side upper part of the floor board 20 of each scaffold unit 12 is surrounded, and the installation operation | work of the reinforcement 17 with respect to the internal peripheral surface of the vertical hole 14 can be performed safely on the floor board 20. FIG. ing. When the extension floor plate 29 is used, a long handrail 33 is used to allow an operator to work on the extension floor plate 29. Therefore, in this case, the handrail 33 hangs slightly in the natural state.

次に、前記のように構成された深礎杭用足場11の組立て方法について説明する。
さて、道路橋、鉄道橋、建築構造物の基礎等の深礎杭を施工する際には、図4に示すように、施工現場の地面に縦穴14を掘削し、その縦穴14上に支持用やぐら15及び吊下用やぐら16を設置する。そして、支持用やぐら15に上端の足場ユニット12を支持するとともに、吊下用やぐら16に上端の連結索13を連結する。また、吊下用やぐら16にチェーンブロック32を支持するとともに、そのチェーンブロック32から延びる昇降索31を下端の足場ユニット12の連結部30に連結する。
Next, the assembly method of the scaffold 11 for deep foundation piles comprised as mentioned above is demonstrated.
Now, when constructing deep foundation piles such as road bridges, railway bridges, foundations of building structures, etc., as shown in FIG. A tower 15 and a hanging tower 16 are installed. Then, the upper end scaffolding unit 12 is supported by the support tower 15, and the upper end connection cord 13 is connected to the suspension tower 16. Further, the chain block 32 is supported by the hanging tower 16, and the lifting rope 31 extending from the chain block 32 is connected to the connecting portion 30 of the scaffold unit 12 at the lower end.

この状態で、チェーンブロック32により昇降索31を巻き戻すと、複数の足場ユニット12が縦穴14内に下降されて、連結索13を介して縦穴14の底部付近まで吊り下げられ、所定高さの深礎杭用足場11が組み立てられる。その後、昇降索31を連結部30から外して、上方の退避位置に巻き上げる。   In this state, when the hoisting rope 31 is rewound by the chain block 32, the plurality of scaffold units 12 are lowered into the vertical hole 14 and suspended to the vicinity of the bottom of the vertical hole 14 via the connecting rope 13, and have a predetermined height. The foundation pile scaffold 11 is assembled. Then, the lifting / lowering line 31 is removed from the connecting part 30 and wound up to the upper retracted position.

この深礎杭用足場11の組立て状態で、作業者が支持用やぐら15から梯子28を利用して所要定高さ位置の足場ユニット12の床板20上まで降りて、縦穴14の内周面に対する鉄筋17の組み込み作業を行うことができ。   In the assembled state of the foundation 11 for deep pile, the operator descends from the supporting tower 15 to the floor plate 20 of the scaffold unit 12 at the required fixed height by using the ladder 28, and against the inner peripheral surface of the vertical hole 14. The rebar 17 can be assembled.

このように、この実施形態の足場においては、複数の足場ユニット12が連結索13を介して吊下可能に連接されているため、多数の足場ユニット12を1つずつ縦穴14内に搬入しながら積層組立てする必要がなく、足場ユニット12を縦穴14の底部付近まで吊り下げればよい。従って、足場の組立作業を容易かつ短時間に行うことができる。   Thus, in the scaffolding of this embodiment, since the plurality of scaffolding units 12 are connected so as to be suspendable via the connecting ropes 13, a large number of scaffolding units 12 are carried into the vertical holes 14 one by one. There is no need to assemble and assemble the scaffold unit 12 to the vicinity of the bottom of the vertical hole 14. Therefore, the assembly work of the scaffold can be performed easily and in a short time.

また、縦穴14内から足場を撤去する場合には、昇降索31を降ろして、連結部30に連結する。そして、昇降索31を巻き上げれば、多数の足場ユニット12を吊下状態で連続的に引き上げることができて、その撤去作業を容易かつ短時間に行うことができる。   Moreover, when removing a scaffold from the inside of the vertical hole 14, the lifting / lowering line 31 is lowered | hung and it connects with the connection part 30. FIG. And if the hoisting rope 31 is wound up, many scaffold units 12 can be continuously pulled up in the suspended state, and the removal work can be performed easily and in a short time.

以上に述べた実施形態の効果を列挙すれば、以下の通りである。
・ 多数の足場ユニットを1つずつ縦穴14内に搬入しながら積層組立てする必要がなく、その組立作業を容易かつ短時間に行うことができる。
The effects of the embodiments described above are listed as follows.
-It is not necessary to assemble and assemble a large number of scaffold units one by one into the vertical hole 14, and the assembly work can be performed easily and in a short time.

・ 下端の足場ユニット12に設けられた連結部30に昇降索31を連結した状態で、その昇降索31を介して複数の足場ユニット12を縦穴14内で容易に昇降させることができる。   A plurality of scaffold units 12 can be easily raised and lowered within the vertical hole 14 via the lifting / lowering line 31 in a state where the lifting / lowering line 31 is connected to the connecting portion 30 provided on the lower-end scaffolding unit 12.

・ 各足場ユニット12の床板20の周側上部を手摺り33により囲むことができて、各足場ユニット12の床板20上で縦穴14の内周面に対する鉄筋17の組み込み作業を安全に行うことができる。   The upper part of the peripheral side of the floor plate 20 of each scaffold unit 12 can be surrounded by a handrail 33, and the assembling work of the reinforcing bars 17 to the inner peripheral surface of the vertical hole 14 can be performed safely on the floor plate 20 of each scaffold unit 12. it can.

・ 各足場ユニット12を縦穴14内で所定の間隔を保持した状態に吊り下げることができ、作業空間を確保できる。
・ 足場ユニット12の床板20の外周に増設床板29を設けることにより、床板20の径を実質的に大きくすることができ、従って、径の大きな縦穴14内の作業に都合がよい。
(変更例)
なお、この実施形態は、次のように変更して具体化することも可能である。
-Each scaffold unit 12 can be suspended in a state where a predetermined interval is maintained in the vertical hole 14, and a work space can be secured.
-By providing the additional floor plate 29 on the outer periphery of the floor plate 20 of the scaffold unit 12, the diameter of the floor plate 20 can be substantially increased. Therefore, it is convenient for work in the vertical hole 14 having a large diameter.
(Example of change)
In addition, this embodiment can also be changed and embodied as follows.

・ 前記実施形態において、昇降索31を使用することなく、連結索13を介して足場ユニット12を昇降させるようにすること。
・ 前記実施形態において、連結索13として、チェーンの他、ザイル等の他の手段を用いること。
In the embodiment, the scaffold unit 12 is lifted and lowered via the connecting rope 13 without using the lifting rope 31.
In the above-described embodiment, as the connecting rope 13, other means such as a zile are used in addition to the chain.

一実施形態の足場を収納状態で示す縦断面図。The longitudinal cross-sectional view which shows the scaffold of one Embodiment in the accommodation state. 図1の2−2線における断面図。Sectional drawing in the 2-2 line of FIG. 図1の3−3線における断面図。Sectional drawing in the 3-3 line of FIG. 図1の足場を吊下状態で示す部分断面図。The fragmentary sectional view which shows the scaffold of FIG. 1 in a suspended state. 図4の一部を拡大して示す部分断面図。The fragmentary sectional view which expands and shows a part of FIG. 図4の6−6線における拡大断面図。The expanded sectional view in the 6-6 line of FIG.

符号の説明Explanation of symbols

11…深礎杭用足場、12…足場ユニット、13…連結索、14…縦穴、15支持用やぐら…、20…床板、21…支柱、22…天枠、23…係合部、29…増設床板、30…連結部、31…昇降索、33…手摺り。   DESCRIPTION OF SYMBOLS 11 ... Scaffolding for deep foundation piles, 12 ... Scaffolding unit, 13 ... Connecting cable, 14 ... Vertical hole, 15 Supporting tower ..., 20 ... Floor board, 21 ... Column, 22 ... Top frame, 23 ... Engagement part, 29 ... Expansion Floor plate, 30 ... connecting portion, 31 ... lifting rope, 33 ... handrail.

Claims (5)

床板が設けられた複数の足場ユニットを、連結索を介して縦方向へ吊下可能に連接したことを特徴とする足場。 A scaffold characterized in that a plurality of scaffold units provided with floor boards are connected via a connecting rope so as to be suspended in the vertical direction. 下端の足場ユニットには、その足場ユニットを昇降させるための昇降索を着脱可能に連結可能な連結部を設けたことを特徴とする請求項1に記載の足場。 The scaffold according to claim 1, wherein the lower end scaffold unit is provided with a connecting portion that can removably connect an elevator cable for raising and lowering the scaffold unit. 連結索の外周に手摺りを設けたことを特徴とする請求項1または請求項2に記載の足場。 The scaffold according to claim 1 or 2, wherein a handrail is provided on an outer periphery of the connecting rope. 各足場ユニット間には、吊下状態においてそれらの間の間隔を保持するための間隔保持手段を設けたことを特徴とする請求項1〜請求項3のうちのいずれか一項に記載の足場。 The scaffold according to any one of claims 1 to 3, further comprising a gap holding means for holding a gap between the scaffold units in a suspended state. . 足場ユニットの床板の外周に増設床板を着脱可能に設けたことを特徴とする請求項1〜請求項4のうちのいずれか一項に記載の足場。 The scaffold according to any one of claims 1 to 4, wherein an additional floor plate is detachably provided on the outer periphery of the floor plate of the scaffold unit.
JP2005130386A 2005-04-27 2005-04-27 Scaffold Pending JP2006307505A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005130386A JP2006307505A (en) 2005-04-27 2005-04-27 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005130386A JP2006307505A (en) 2005-04-27 2005-04-27 Scaffold

Publications (1)

Publication Number Publication Date
JP2006307505A true JP2006307505A (en) 2006-11-09

Family

ID=37474698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005130386A Pending JP2006307505A (en) 2005-04-27 2005-04-27 Scaffold

Country Status (1)

Country Link
JP (1) JP2006307505A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05319362A (en) * 1992-05-19 1993-12-03 Ishikawajima Harima Heavy Ind Co Ltd Expansion working device for ship tank work
JPH09242329A (en) * 1996-03-13 1997-09-16 Kobe Steel Ltd Folding continuous suspended scaffolding
JP2002129741A (en) * 2000-10-19 2002-05-09 Sumitomo Metal Steel Products Inc Hanging scaffold for repairing inner surface of cylindrical structure and installation method therefor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05319362A (en) * 1992-05-19 1993-12-03 Ishikawajima Harima Heavy Ind Co Ltd Expansion working device for ship tank work
JPH09242329A (en) * 1996-03-13 1997-09-16 Kobe Steel Ltd Folding continuous suspended scaffolding
JP2002129741A (en) * 2000-10-19 2002-05-09 Sumitomo Metal Steel Products Inc Hanging scaffold for repairing inner surface of cylindrical structure and installation method therefor

Similar Documents

Publication Publication Date Title
CA3090621A1 (en) Apparatus and method for slipforming a shaft
JP6132143B2 (en) Building demolition system
JP2010265727A (en) Method for demolishing building using floor climbing type tower crane
JP2009091123A (en) Crane for steel tower
JP2010242429A (en) Demolition method for steel tower
JP5421143B2 (en) Overhead crane installation equipment
JP4789876B2 (en) Method and apparatus for disassembling double structure chimney
JP4122501B2 (en) Caisson&#39;s mobile scaffold construction method
JPH08311818A (en) Climbing type lift-up construction method of building and device thereof
JP6920118B2 (en) Demolition system for existing structures
JP6059176B2 (en) Mobile lifting scaffold for assembling temporary elevated jetty
JP2010064867A (en) Method for demolishing tower crane
JP2005226295A (en) Dismantling method and dismantling device for cylindrical structure
JP2006307505A (en) Scaffold
JP6391134B2 (en) Dismantling method and dismantling system
JP7044393B2 (en) Tower-shaped structure dismantling method and tower-shaped structure dismantling device
JP2780571B2 (en) Reinforcing cage construction equipment
JP6967383B2 (en) How to dismantle an existing structure
JP2018091098A (en) Temporary strut and construction method of roof frame structure
JP6886356B2 (en) Suspension device and packing method
KR101044443B1 (en) Slab hanging up and down apparatus for top-down method of underground construction
JP2009286531A (en) Dismantling method of tower crane
JPH11287040A (en) Hanging stairs
JP2006307506A (en) Scaffolding
JP7339477B2 (en) Concrete column formwork construction device and concrete column formwork construction method using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100311

A131 Notification of reasons for refusal

Effective date: 20100323

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100803