JP2006300320A - Module for manufacturing storage tank for liquefied natural gas and tank utilizing the same - Google Patents

Module for manufacturing storage tank for liquefied natural gas and tank utilizing the same Download PDF

Info

Publication number
JP2006300320A
JP2006300320A JP2006074957A JP2006074957A JP2006300320A JP 2006300320 A JP2006300320 A JP 2006300320A JP 2006074957 A JP2006074957 A JP 2006074957A JP 2006074957 A JP2006074957 A JP 2006074957A JP 2006300320 A JP2006300320 A JP 2006300320A
Authority
JP
Japan
Prior art keywords
wall
heat insulating
natural gas
storage tank
liquefied natural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006074957A
Other languages
Japanese (ja)
Other versions
JP4813934B2 (en
Inventor
Young Myung Yang
ヨン ミュン ヤン
Seong Ho Hong
ソン ホ ホン
Ihn Soo Yoon
イン スー ユーン
Young Chul Yang
ヨン チュル ヤン
Heung Seok Seo
フン ソク ソ
Ji Hun Kim
ジ フン キム
Byoung Taek Oh
ビョン テク オウ
Young Kyun Kim
ヨン キュン キム
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Korea Gas Corp
Original Assignee
Korea Gas Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Korea Gas Corp filed Critical Korea Gas Corp
Publication of JP2006300320A publication Critical patent/JP2006300320A/en
Application granted granted Critical
Publication of JP4813934B2 publication Critical patent/JP4813934B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61HPHYSICAL THERAPY APPARATUS, e.g. DEVICES FOR LOCATING OR STIMULATING REFLEX POINTS IN THE BODY; ARTIFICIAL RESPIRATION; MASSAGE; BATHING DEVICES FOR SPECIAL THERAPEUTIC OR HYGIENIC PURPOSES OR SPECIFIC PARTS OF THE BODY
    • A61H33/00Bathing devices for special therapeutic or hygienic purposes
    • A61H33/06Artificial hot-air or cold-air baths; Steam or gas baths or douches, e.g. sauna or Finnish baths
    • A61H33/066Cabins therefor
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61HPHYSICAL THERAPY APPARATUS, e.g. DEVICES FOR LOCATING OR STIMULATING REFLEX POINTS IN THE BODY; ARTIFICIAL RESPIRATION; MASSAGE; BATHING DEVICES FOR SPECIAL THERAPEUTIC OR HYGIENIC PURPOSES OR SPECIFIC PARTS OF THE BODY
    • A61H33/00Bathing devices for special therapeutic or hygienic purposes
    • A61H33/06Artificial hot-air or cold-air baths; Steam or gas baths or douches, e.g. sauna or Finnish baths
    • A61H33/063Heaters specifically designed therefor
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61HPHYSICAL THERAPY APPARATUS, e.g. DEVICES FOR LOCATING OR STIMULATING REFLEX POINTS IN THE BODY; ARTIFICIAL RESPIRATION; MASSAGE; BATHING DEVICES FOR SPECIAL THERAPEUTIC OR HYGIENIC PURPOSES OR SPECIFIC PARTS OF THE BODY
    • A61H33/00Bathing devices for special therapeutic or hygienic purposes
    • A61H2033/0008Arrangement for cleaning the installation before or after use
    • A61H2033/0012Arrangement for cleaning the installation before or after use by rinsing
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61HPHYSICAL THERAPY APPARATUS, e.g. DEVICES FOR LOCATING OR STIMULATING REFLEX POINTS IN THE BODY; ARTIFICIAL RESPIRATION; MASSAGE; BATHING DEVICES FOR SPECIAL THERAPEUTIC OR HYGIENIC PURPOSES OR SPECIFIC PARTS OF THE BODY
    • A61H33/00Bathing devices for special therapeutic or hygienic purposes
    • A61H33/06Artificial hot-air or cold-air baths; Steam or gas baths or douches, e.g. sauna or Finnish baths
    • A61H2033/061Artificial hot-air baths
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61HPHYSICAL THERAPY APPARATUS, e.g. DEVICES FOR LOCATING OR STIMULATING REFLEX POINTS IN THE BODY; ARTIFICIAL RESPIRATION; MASSAGE; BATHING DEVICES FOR SPECIAL THERAPEUTIC OR HYGIENIC PURPOSES OR SPECIFIC PARTS OF THE BODY
    • A61H33/00Bathing devices for special therapeutic or hygienic purposes
    • A61H33/06Artificial hot-air or cold-air baths; Steam or gas baths or douches, e.g. sauna or Finnish baths
    • A61H2033/068Steam baths
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61HPHYSICAL THERAPY APPARATUS, e.g. DEVICES FOR LOCATING OR STIMULATING REFLEX POINTS IN THE BODY; ARTIFICIAL RESPIRATION; MASSAGE; BATHING DEVICES FOR SPECIAL THERAPEUTIC OR HYGIENIC PURPOSES OR SPECIFIC PARTS OF THE BODY
    • A61H2201/00Characteristics of apparatus not provided for in the preceding codes
    • A61H2201/02Characteristics of apparatus not provided for in the preceding codes heated or cooled
    • A61H2201/0207Characteristics of apparatus not provided for in the preceding codes heated or cooled heated

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Epidemiology (AREA)
  • Pain & Pain Management (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Rehabilitation Therapy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Animal Behavior & Ethology (AREA)
  • General Health & Medical Sciences (AREA)
  • Veterinary Medicine (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a liquefied gas storage tank capable of minimizing the loss of a liquefied natural gas due to vaporization by simplifying the tank for storing the liquefied natural gas in the form of a liquid in an ultra low temperature state, shortening an assembling step, maintaining advanced liquid tightness, and easily eliminating stress due to mechanical deformation in a module for manufacturing the liquefied natural gas storage tank and the tank utilizing the module. <P>SOLUTION: In this heat insulating module used for the liquefied natural gas storage tank, its lower end part is projected to easily assemble parts between the modules adjacent to each other. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、船舶及び陸上用のタンク、車両などの構造物の内部に設置される液化天然ガスの保存タンク及びその製造方法に関するもので、詳細には超低温状態の液体の液化天然ガスを保存するタンクの構造を単純化することによって従来の組立工程を縮小すると共に高度の液密性を維持する一方、機械的変形による応力をより容易に解消できる液化天然ガスの保存タンクに用いられるモジュール及びそれを利用したの液化天然ガスの保存タンクに関するものである。   TECHNICAL FIELD The present invention relates to a storage tank for liquefied natural gas installed in structures such as ships and land tanks and vehicles, and a method for manufacturing the same, and more particularly, to store liquid liquefied natural gas in an ultra-low temperature state. A module used in a storage tank for liquefied natural gas, which can reduce the stress caused by mechanical deformation more easily while reducing the conventional assembly process and maintaining high liquid-tightness by simplifying the tank structure This relates to a storage tank for liquefied natural gas using

一般的に、液化天然ガス(Liquefied Natural Gas、LNG)は化石燃料の一種の天然ガスが液化したもので、液化天然ガスの保存タンクは設置される位置によって地上に設置されるものと地中に埋め立てられる陸上型保存タンクまたは自動車、船舶などの運送手段に設置される移動型保存タンクなどに仕分けられる。   Generally, liquefied natural gas (Liquefied Natural Gas, LNG) is a liquefied form of natural gas, a fossil fuel, and storage tanks for liquefied natural gas are installed on the ground depending on where they are installed. They are sorted into land-based storage tanks that are landfilled or mobile storage tanks that are installed in transportation means such as automobiles and ships.

前述の液化天然ガスは衝撃による爆発の危険性を有しているため、超低温状態に保存されるので、これを保管する保存タンクは高度の耐衝撃性及び液密性で保たれる構造を成している。このような保存タンクにおいて、流動のほとんどない陸上型保存タンクに比べて流動のある自動車、船舶に設置される液化天然ガスの保存タンクの構造は流動による機械的応力に備えて対備策を工夫しなければならないという点では多少違いがある。しかし、機械的応力に備えて対備策が工夫された船舶に設置された液化天然ガスの保存タンクは陸上型保存タンクとしても当然使用することができるので、本発明の明細書には船舶に設置される液化天然ガスの保存タンクの構造を一例として説明する。   Since the above-mentioned liquefied natural gas has a risk of explosion due to impact, it is stored in an ultra-low temperature state. Therefore, the storage tank for storing the liquefied natural gas has a structure that maintains a high degree of impact resistance and liquid tightness. is doing. In such storage tanks, the structure of liquefied natural gas storage tanks installed in automobiles and ships that are more fluid than terrestrial storage tanks with little flow is devised in preparation for mechanical stress due to flow. There is a slight difference in that you have to do. However, since the storage tank of liquefied natural gas installed in a ship whose countermeasures have been devised in preparation for mechanical stress can naturally be used as a land-type storage tank, the specification of the present invention includes The structure of the liquefied natural gas storage tank installed will be described as an example.

まずLNG輸送船の内部に設置される液化天然ガス(Liquefied Natural Gas、LNG)の保存タンクは独立タンク型(Independent Tank Type)とメンブレン型(Membrane Type)に分けることができる。これは断熱材に貨物の荷重が直接作用するかどうかによる分類であり、その具体的な内容は下記のとおりである。   First, liquefied natural gas (LNG) storage tanks installed inside LNG carriers can be divided into independent tank types and membrane types. This is a classification based on whether the load of cargo acts directly on the insulation, and the specific contents are as follows.

下記の(表1)において、所謂GTT NO 96-2型とGTT Mark III 型は1995年ガズトランスポート(Gaz Transport、GT)社とテクニガズ(Technigaz、TGZ)社がGTT(Gaztransport & Technigaz)社に名称が変更されたので、GT型はGTT NO 96-2型に、TGZ型はGTT Mark III 型にそれぞれ改称された。   In the following (Table 1), the so-called GTT NO 96-2 type and GTT Mark III type are 1995 Gaz Transport (GT) and Technigaz (TGZ) to GTT (Gaztransport & Technigaz) Since the names were changed, the GT type was renamed GTT NO 96-2 and the TGZ type was renamed GTT Mark III.

前述のGT型及びTGZ型のタンクの構造は、アメリカ合衆国特許US6,035,795(特許文献1)、US6,378,722(特許文献2)、US5,586,513(特許文献3)、アメリカ合衆国特許公開US2003-0000949(特許文献4)と、大韓民国特許公開KR2000-0011347号(特許文献5)、KR2000-0011346号(特許文献6)などに記載されている。   The structure of the GT and TGZ tanks described above is as follows: US Pat. No. 6,035,795 (Patent Document 1), US 6,378,722 (Patent Document 2), US 5,586,513 (Patent Document 3), US Patent It is described in the publication US2003-0000949 (patent document 4), Korean patent publications KR2000-0011347 (patent document 5), KR2000-0011346 (patent document 6) and the like.

LNG保存タンクの分類

Figure 2006300320
Classification of LNG storage tanks
Figure 2006300320

GTT社のメンブレン型のLNG線は、断熱材及び船体が直接荷重を受けて、貨物タンクと貨物タンクとの間における機械的/熱的特性に伴う危険性を避けるために、コファダム(Cofferdam)が設置されており、これらのコファダム(Cofferdam)の内部の空気温度はコファダム側の船体内板の低温脆性を防ぐために+5℃以上を維持しなければならない。そのために、ヒーティングコイル(Heating Coil)のような加熱手段が設置されて、一般的に蒸気または高温水のような熱源を利用するようにしている。断熱材の施工はまず船体に足場を設置して完成した後、アクセスハウス(Access House)で足場資材と陸上で完成された断熱材ボックスとメンブレン(Membrane)及びその他の資材を搬入して設置する。球形タンクの場合、進水の事前作業期間が長いのに対してメンブレン方式は進水後の期間が長い。   GTT's membrane-type LNG wire is manufactured by Cofferdam to avoid the dangers associated with mechanical / thermal properties between cargo tanks and cargo tanks when the insulation and hull are directly loaded. The air temperature inside these Cofferdams must be maintained at + 5 ° C or higher to prevent the low temperature brittleness of the hull plate on the Cofferdam side. For this purpose, a heating means such as a heating coil is installed to generally use a heat source such as steam or hot water. Installation of insulation material is completed by first installing the scaffolding on the hull, and then installing and installing the scaffolding material and the insulation box and membrane (Membrane) completed on the land in the Access House. . In the case of a spherical tank, the pre-launch work period is long, whereas the membrane system has a long period after launch.

GTT社のメンブレン型の中でNO 96-2型は、図1及び図2に図示したとおりに0.5〜0.7mmの厚さのインバー(Invar)鋼(36% Ni)を使用するので、一次密封壁(10)及び二次密封壁(15)がほとんど同一の液密性及び強度を維持しており、一次密封壁(10)の漏洩時に長い期間を二次密封壁(15)だけで貨物を安全に守ることができる。また、GTT NO 96-2型の密封壁(10、15)はメンブレン(Membrane)が直線型なので、Mark III 型の波形メンブレンより熔接が簡単で自動化率は高いが、全体的な熔接の長さはGTT NO 96-2型の方が長い。   The NO 96-2 type of GTT membrane type uses Invar steel (36% Ni) with a thickness of 0.5 to 0.7 mm as shown in FIGS. The primary sealing wall (10) and the secondary sealing wall (15) maintain almost the same liquid tightness and strength, and when the primary sealing wall (10) leaks, the secondary sealing wall (15) only has a long period of time. Can keep the cargo safe. The GTT NO 96-2 type sealing wall (10, 15) has a straight membrane, so it is easier to weld and has a higher automation rate than the Mark III type corrugated membrane. GTT NO 96-2 is longer.

更に、既存のGT型と現在使われているGTT NO 96-2型との最大の違いは断熱材ボックス(断熱壁、11、16)を支持するU型バー(Bar)の代わりにDouble Couple(17)を利用する点である。GTT NO 96-2型のLNG線の保存タンクの防熱断面に対する主要部分の機能は、(表2)のとおりである。   Furthermore, the biggest difference between the existing GT type and the currently used GTT NO 96-2 type is Double Couple (instead of the U type bar (Bar) that supports the insulation box (insulation walls, 11 and 16). 17). The functions of the main parts of the GTT NO 96-2 LNG wire storage tank for the heat insulation cross section are as shown in (Table 2).

GTT NO 96-2型保存タンクの防熱断面の主要部分

Figure 2006300320
The main part of the heat-insulation section of GTT NO 96-2 storage tank
Figure 2006300320

一方、GTT社のMark III 型は、図3及び図4に図示したとおりに、一次密封壁(20)で1.2mmの厚さの波形が付いたステンレス鋼メンブレンであり、低温による収縮は波形部のしわで吸収するので、メンブレン内には大きい応力がほとんど発生しない。また、断熱壁(21、26)の材料としてGlass Wool、Triplexなどが使用される。Mark III 型は一次及び二次断熱壁(Insulation、21、26)を陸上で加工して一体型に搭載するので、ボックス型の一次及び二次断熱壁(21、26)をそれぞれ設置しなければならないGTT NO 96-2型に比べて施工が相対的に容易である。   On the other hand, GTT's Mark III type is a stainless steel membrane with a corrugated thickness of 1.2mm at the primary sealing wall (20) as shown in Figs. Since it is absorbed by the wrinkles of the part, a large stress is hardly generated in the membrane. Moreover, Glass Wool, Triplex, etc. are used as a material of a heat insulation wall (21, 26). The Mark III type has primary and secondary insulation walls (Insulation, 21 and 26) processed on land and mounted in one piece, so the box type primary and secondary insulation walls (21 and 26) must be installed respectively. The construction is relatively easy compared to GTT NO 96-2 type.

GTT Mark III 型のLNG線の保存タンクの防熱断面に関する主要部分の機能は下記の(表3)のとおりである。   The functions of the main parts related to the heat insulation cross section of the storage tank of GTT Mark III type LNG wire are as follows (Table 3).

Mark III 型保存タンクの防熱断面の主要部分

Figure 2006300320
The main part of the heat insulation section of the Mark III storage tank
Figure 2006300320

上述のような構造のGTT NO 96-2型の保存タンクとGTT Mark III 型の保存タンクとで重要な部分がコーナー部(Corner Part)の構造である。   An important part of the GTT NO 96-2 type storage tank and the GTT Mark III type storage tank having the above-described structure is the corner part structure.

ここで、液化天然ガスの保存タンクにおけるコーナー部(Corner Part)は保存タンクを構成する各密封壁(メンブレン)の熱変形による荷重が非対称的に作用する区域であり、このような非対称荷重を分散させることで保存タンクから発生する応力を解消することができるように構造的に成らなければならない。   Here, the corner part (Corner Part) in the storage tank of liquefied natural gas is an area where the load due to thermal deformation of each sealing wall (membrane) constituting the storage tank acts asymmetrically, and such asymmetric load is distributed. It must be structured structurally so that the stress generated from the storage tank can be eliminated.

このようなLNG保存タンクにおけるコーナー部に関する最近の技術としては、大韓民国公開特許公報KR2000-0011347号に開始された“船舶の支持構造物内に設置されるタンクとして改良されたコーナー構造を有する液密及び断熱タンク”がある。   As a recent technology related to the corner portion in such an LNG storage tank, “Liquid-tightness having a corner structure improved as a tank installed in a ship support structure” started in Korean Patent Publication KR2000-0011347. And an insulation tank ”.

図5に示したとおりに、上述のKR2000-0011347号に開始されたコーナー部の構造は、船体内部面(1)と横隔壁(2)とが成す90°角度の部位に予備組立式の複合ガーダー(Girder、30)を固定するようになり、その複合ガーダー(30)は硬質のW型の金属形象体(31)に一定間隔に形成された強化ウェイブ(39、点線部分)を内蔵した熱絶縁材(40)からなっている。   As shown in FIG. 5, the structure of the corner portion started in the above-mentioned KR2000-0011347 is a pre-assembled composite at the 90 ° angle part formed by the hull inner surface (1) and the transverse bulkhead (2). The girder (30) is fixed, and the composite girder (30) has a built-in reinforcing wave (39, dotted line portion) formed in a hard W-shaped metal figure (31) at regular intervals. It consists of an insulating material (40).

これらの形式の予備組立式の複合ガーダー(30)は船体内部面(1)及び横隔壁(2)に面する部分はそれぞれ重合樹脂(34)を媒介に固定されており、両分岐面は上述の横隔壁(2)及び二重船体内部面(1)によってそれぞれ支持される固定手段(32、33)によって船体のベアリング(Bearing)構造物に機械的に取り付けられるようにする。   In these types of pre-assembled composite girder (30), the inner surface (1) of the hull and the part facing the transverse bulkhead (2) are respectively fixed by means of a polymer resin (34), and both branch surfaces are as described above. It is mechanically attached to the bearing structure of the hull by fixing means (32, 33) respectively supported by the transverse bulkhead (2) and the double hull inner surface (1).

また、上述の予備組立式の複合ガーダー(30)の底部は、船体内部面(1)と横隔壁(2)が接する90°角度の部位に排水空間(41)が設けられるように勾配(42)になっている。   In addition, the bottom of the pre-assembled composite girder (30) has a gradient (42) so that a drainage space (41) is provided at a 90 ° angle where the hull inner surface (1) and the transverse bulkhead (2) are in contact. )It has become.

上述の予備組立式の複合ガーダー(30)を利用してLNG保存タンクのコーナー部を組み立てる技術は、比較的に簡単な構造であり、安い取付費で二重隔壁の塗装体を損傷せずに機械的衝撃による密封壁の抵抗性を改善するという效果は有しているが、保存タンクのコーナー部を構成する基本単位である予備組立式の複合ガーダー(30)が硬質の金属形象体(31)で構成されているので、上述の金属形象体(31)が船体内部面(1)及び横隔壁(2)に固定するために機械的固定手段(32、33、ボルト-ナット)による手作業で行われる)ので、組立作業が用意ではない。   The technology for assembling the corner of the LNG storage tank using the pre-assembled composite girder (30) described above is a relatively simple structure without damaging the double bulkhead paint body at a low installation cost. Although it has the effect of improving the resistance of the sealing wall due to mechanical shock, the pre-assembled composite girder (30), which is the basic unit constituting the corner of the storage tank, is made of a hard metal figure (31 ), So that the above-mentioned metal figure (31) is fixed to the hull inner surface (1) and the horizontal bulkhead (2) by manual fixing means (32, 33, bolt-nut). Assembling work is not ready.

上述のメンブレン型のLNG保存タンクのコーナー部の構造は、上述の保存タンクのコーナー部を構成する基本単位である予備組立式の複合ガーダー(30)が船体内部面(1)と横隔壁(2)に堅固に固定される構造であり、船体の運行時あるいは波によって船体に部分的な応力が発生し得るので、コーナー部に応力集中現象が発生する。そのため、数十年にも及んで応力集中を改善しようとする努力が行われており、更なる持続的な改善が必要である。そして、応力集中に限らず超低温の液体LNGの気化による損失であるBOG(Boil-Off Gas)の低減、構造の単純化、製造工程の単純化に関する持続的な改善も行われている。   The structure of the corner portion of the membrane-type LNG storage tank described above is that the pre-assembled composite girder (30), which is a basic unit constituting the corner portion of the storage tank, has a hull inner surface (1) and a transverse bulkhead (2 ), And a stress concentration phenomenon occurs in the corner portion because a partial stress can be generated in the hull during the operation of the hull or due to waves. For this reason, efforts have been made to improve stress concentration for several decades, and further sustained improvement is necessary. In addition to the concentration of stress, continuous improvements have been made to reduce BOG (Boil-Off Gas), which is a loss due to vaporization of ultra-low temperature liquid LNG, simplification of the structure, and simplification of the manufacturing process.

アメリカ合衆国特許US6,035,795号United States Patent US 6,035,795 US6,378,722号US6,378,722 US5,586,513号US 5,586,513 アメリカ合衆国特許公開US2003-0000949号United States Patent Publication US2003-000049 大韓民国特許公開KR2000-0011347号Republic of Korea Patent Publication KR2000-0011347 大韓民国特許公開KR2000-0011346号Republic of Korea Patent Publication KR2000-0011346

上述のメンブレン(Membrane)型の液化天然ガスの保存タンクは、超低温液状の液化天然ガスの気化による損失であるBOGの低減、複雑な断熱壁及び密封壁の構造単純化、製造工程の単純化によるタンクの乾燥期間の減少、タンクのコーナー部及び密封壁での応力解消などの点において数十年に渡って改善の努力が行われているが、更なる改善の必要性が求められる。   The above-mentioned Membrane type liquefied natural gas storage tank is based on the reduction of BOG, which is the loss due to vaporization of ultra-low temperature liquid liquefied natural gas, simplification of the structure of complicated heat insulating and sealing walls, and simplification of the manufacturing process Improvement efforts have been made over several decades in terms of reducing the drying period of the tank and relieving stress at the corners and sealing walls of the tank, but there is a need for further improvement.

よって、本発明は、従来のメンブレン型の液化天然ガスの保存タンクと相異な新しい構造のメンブレン型の液化天然ガスの保存タンクを発明して上述の問題点を改善しようとする。   Accordingly, the present invention seeks to improve the above-mentioned problems by inventing a membrane-type liquefied natural gas storage tank having a new structure different from the conventional membrane-type liquefied natural gas storage tank.

また、従来のLNG保存タンクの底面に設置される断熱壁は複数で成り立つ構造であり、各平面構造体はアンカー構造体によって固定される。ところで、船舶の移動時に波や荷物のスロッシング(Sloshing)などによって船体に変形が生じて、それに伴って上述の断熱壁には機械的応力が発生するので、その問題点を解消するための持続的な技術開発が行われている。   In addition, a plurality of heat insulating walls are provided on the bottom surface of the conventional LNG storage tank, and each planar structure is fixed by an anchor structure. By the way, when the ship moves, the hull is deformed by waves and sloshing of the load, and mechanical stress is generated on the above-mentioned heat insulation wall. Technology development is underway.

よって、本発明は、従来のメンブレン型のLNG保存タンクと相異な新しい構造のメンブレン型のLNG保存タンクを提案しており、組立構造及び製造工程が単純化されて、タンクの乾燥期間が短縮されるだけではなく、保存タンクに保存される液化天然ガスの貯蔵及び排出から発生する熱的/機械的応力をより效率的に解消するための新しい構造の液化天然ガスの保存タンク及びその製造方法を提供することにその目的がある。   Therefore, the present invention proposes a membrane-type LNG storage tank with a new structure different from the conventional membrane-type LNG storage tank, which simplifies the assembly structure and manufacturing process and shortens the drying period of the tank. A new structure of liquefied natural gas storage tank and its manufacturing method for more efficiently relieving thermal / mechanical stress generated from storage and discharge of liquefied natural gas stored in storage tank The purpose is to provide.

本発明は、例えば、以下の態様を含む。   The present invention includes, for example, the following aspects.

[1] 液化天然ガスの保存タンクに使用される断熱モジュールとして、隣接するモジュール間の組立を容易にするためにその下端部が突出していることを特徴とする、液化天然ガスの保存タンク製造用のモジュール。   [1] As a heat insulation module used in a liquefied natural gas storage tank, the lower end protrudes to facilitate assembly between adjacent modules, for producing a liquefied natural gas storage tank Modules.

[2] 前記モジュールは一次断熱壁と、
前記一次断熱壁の下部に接着剤で接着される二次密封壁と、
前記二次密封壁の下部に接着剤で接着される二次断熱壁とで構成されることを特徴とする、請求項1に記載の液化天然ガスの保存タンク製造用のモジュール。
[2] The module includes a primary heat insulating wall;
A secondary sealing wall adhered to the lower portion of the primary heat insulating wall with an adhesive;
The module for manufacturing a storage tank for liquefied natural gas according to claim 1, wherein the module is composed of a secondary heat insulating wall bonded to the lower part of the secondary sealing wall with an adhesive.

[3] 前記モジュールはタンクの平面部に位する多数の平面構造体とコーナー部に位する多数のコーナー構造体とで構成されることを特徴とする[1]に記載の液化天然ガスの保存タンク製造用のモジュール。   [3] The storage of liquefied natural gas according to [1], wherein the module is configured by a large number of planar structures positioned at a planar portion of the tank and a large number of corner structures positioned at a corner portion. Module for tank production.

[4] 前記平面構造体は四角柱を形成して、一つ以上のコーナー部位は一部が切断されていることを特徴とする、[3]に記載の液化天然ガスの保存タンク製造用のモジュール。   [4] The liquefied natural gas storage tank manufacturing method according to [3], wherein the planar structure forms a quadrangular prism, and one or more corner portions are partially cut. module.

[5] 前記モジュールは一次断熱壁と、
前記一次断熱壁の上部に附着する上部板材と、
前記一次断熱壁の下部に附着する二次密封壁と、
前記二次密封壁の下部に附着する二次断熱壁と、
前記二次断熱壁の下部に附着する下部板材とで構成されて、
前記下部板材は前記二次断熱壁の一つ以上の側面で延長されてフランジを形成することを特徴とする、[1]に記載の液化天然ガスの保存タンク製造用のモジュール。
[5] The module includes a primary heat insulating wall;
An upper plate attached to the upper part of the primary heat insulating wall;
A secondary sealing wall attached to a lower portion of the primary heat insulating wall;
A secondary heat insulating wall attached to a lower portion of the secondary sealing wall;
It consists of a lower plate attached to the lower part of the secondary heat insulating wall,
The module for manufacturing a liquefied natural gas storage tank according to [1], wherein the lower plate member is extended at one or more side surfaces of the secondary heat insulating wall to form a flange.

[6] 前記一次または二次断熱壁及び密封壁及び上下部板材が接している部分は接着剤で接着することを特徴とする、[5]に記載の液化天然ガスの保存タンク製造用のモジュール。   [6] The module for producing a storage tank for a liquefied natural gas according to [5], wherein the primary or secondary heat insulating wall, the sealing wall, and a portion where the upper and lower plate members are in contact are bonded with an adhesive. .

[7] 前記二次密封壁は前記一次及び二次断熱壁の一つ以上の側面から突出していることを特徴とする、[6]に記載の液化天然ガスの保存タンク製造用のモジュール。   [7] The module for producing a liquefied natural gas storage tank according to [6], wherein the secondary sealing wall protrudes from one or more side surfaces of the primary and secondary heat insulation walls.

[8] 前記二次密封壁はモジュール同士に液密的に繋がることを特徴とする[7]に記載の液化天然ガスの保存タンク製造用のモジュール。   [8] The module for manufacturing a storage tank for liquefied natural gas according to [7], wherein the secondary sealing wall is liquid-tightly connected to each other.

[9] 前記断熱壁はポリウレタンフォームであることを特徴とする、[8]に記載の液化天然ガスの保存タンク製造用のモジュール。   [9] The module for producing a liquefied natural gas storage tank according to [8], wherein the heat insulating wall is polyurethane foam.

[10] 2個の連続する密封壁及び2個の断熱壁を含んで、前記密封壁の中で一次密封壁は保存タンクに保存される液化天然ガスと直接接して、その下部に一次断熱壁、二次密封壁及び二次断熱壁の手順に配置される液化天然ガスの保存タンクにおいて、
前記一次密封壁は前記タンクの底面と機械的に締結したアンカー部によって支持されて、
上述[1]〜[9]の一項に記載の多数のモジュールで成り立って、前記各モジュールはそれぞれ前記一次密封壁及びタンク底面の間で少なくとも上記一次密封壁及びタンク底面の一つに対してスライディング(Sliding)できるように設置されることを特徴とする、液化天然ガスの保存タンク。
[10] Including two continuous sealing walls and two heat insulating walls, the primary sealing wall is in direct contact with the liquefied natural gas stored in the storage tank, and the primary heat insulating wall is provided below the primary sealing wall. In a liquefied natural gas storage tank arranged in the procedure of the secondary sealing wall and the secondary insulation wall,
The primary sealing wall is supported by an anchor portion mechanically fastened to the bottom surface of the tank,
It consists of many modules as described in one item of the above [1] to [9], and each of the modules is at least one of the primary sealing wall and the tank bottom surface between the primary sealing wall and the tank bottom surface. A storage tank for liquefied natural gas, which is installed so that it can be slid.

[11] 前記モジュールは予備組立体に製作されて、前記アンカー部を基準に組み立られて、断熱システムを構成することを特徴とする、[10]に記載の液化天然ガスの保存タンク。   [11] The storage tank for liquefied natural gas according to [10], wherein the module is manufactured in a preliminary assembly and is assembled based on the anchor portion to constitute a heat insulation system.

[12] 前記一次密封壁は前記アンカー部の上端部と熔接で締結することを特徴とする、[11]に記載の液化天然ガスの保存タンク。   [12] The storage tank for liquefied natural gas according to [11], wherein the primary sealing wall is fastened to an upper end portion of the anchor portion by welding.

[13] 前記アンカー部の上端部は前記アンカー部内に設置されるアンカー支持ロードの末端またはこれに締結するアンカー上部キャップであることを特徴とする、[12]に記載の液化天然ガスの保存タンク。   [13] The liquefied natural gas storage tank according to [12], wherein an upper end portion of the anchor portion is an end of an anchor support load installed in the anchor portion or an anchor upper cap fastened to the anchor support load. .

[14] 前記二次密封壁は前記断熱壁が形成する側面の空間部に延長されて、
前記延長された二次密封壁の端部は上部固定板及び下部固定板によって締結されて、
前記上部固定板及び下部固定板の締結面は前記二次密封壁の端部が挿入できるように形成された溝を含むことを特徴とする、[13]に記載の液化天然ガスの保存タンク。
[14] The secondary sealing wall is extended to a side space formed by the heat insulating wall,
The end of the extended secondary sealing wall is fastened by an upper fixing plate and a lower fixing plate,
The liquefied natural gas storage tank according to [13], wherein the fastening surfaces of the upper fixing plate and the lower fixing plate include a groove formed so that an end of the secondary sealing wall can be inserted.

[15] 前記タンク内部のコーナー部に位置するコーナー構造体と、
前記タンク内部の平面上にスライディング移動ができるように位したモジュールと、
前記タンクの底面に締結して前記モジュールを前記タンク内部に付着させるアンカー構造体とを含むことを特徴とする、[10]に記載の液化天然ガスの保存タンク。
[15] A corner structure located at a corner inside the tank;
A module positioned for sliding movement on a plane inside the tank;
The liquefied natural gas storage tank according to [10], further comprising an anchor structure that is fastened to a bottom surface of the tank and attaches the module to the inside of the tank.

[16] 前記モジュールは平面部の二次断熱壁と、その上部面に形成される平面の二次密封壁及びその上部面に形成される平面部の一次断熱壁とが設置される予備組立体に製作されることを特徴とする、[15]に記載の液化天然ガスの保存タンク。   [16] The module is a pre-assembly in which a flat secondary heat insulating wall, a flat secondary sealing wall formed on an upper surface thereof, and a flat primary heat insulating wall formed on an upper surface thereof are installed. The liquefied natural gas storage tank according to [15], wherein the storage tank is liquefied natural gas.

[17] 前記コーナー構造体は前記タンクにおける二つの面が合うコーナー地点にそれぞれ接するようにL形態に形成されたコーナー部の二次断熱壁と、その上部面に形成されたコーナー部の二次密封壁と、その上部面に形成されたコーナー部の一次断熱壁と、前記コーナー部の一次断熱壁の上部面に保存タンクの荷重を受けることができるように更にL形態のコーナー支持板が設置された予備組立体として製作されて、前記タンク内部面にそれぞれ形成されたコーナー部の突出部材によって固定されることを特徴とする、[15]に記載の液化天然ガスの保存タンク。   [17] The corner structure has a secondary heat insulating wall of a corner portion formed in an L shape so as to be in contact with a corner point where two surfaces of the tank meet, and a secondary of the corner portion formed on the upper surface thereof. An L-shaped corner support plate is installed to receive the load of the storage tank on the sealing wall, the primary heat insulating wall of the corner portion formed on the upper surface, and the upper surface of the primary heat insulating wall of the corner portion. The liquefied natural gas storage tank according to [15], wherein the liquefied natural gas storage tank according to [15], wherein the liquefied natural gas storage tank is manufactured as a preliminary assembly and fixed by a protruding member at a corner portion formed on each inner surface of the tank.

[18] 前記コーナー支持板は熱による収縮及び伸長ができるように前記コーナー部の一次断熱壁にスライディング移動ができるように設置されることを特徴とする、[16]に記載の液化天然ガスの保存タンク。   [18] The liquefied natural gas according to [16], wherein the corner support plate is installed so as to be slidable on the primary heat insulating wall of the corner portion so that the corner support plate can be contracted and extended by heat. Storage tank.

[19] 前記コーナー構造体で前記二次断熱壁及び一次断熱壁は前記二次断熱壁を貫通して突出する下部支持ロードの上端部と、前記一次断熱壁を貫通する上部支持ロードの下端部を連結固定する連結補強台によって機械的に締結されることを特徴とする、[18]の一項に記載の液化天然ガスの保存タンク。   [19] In the corner structure, the secondary heat insulation wall and the primary heat insulation wall are protruded through the secondary heat insulation wall and an upper end portion of the lower support load, and a lower end portion of the upper support load penetrates the primary heat insulation wall. The storage tank for liquefied natural gas according to one of [18], wherein the storage tank is mechanically fastened by a connection reinforcing base for connecting and fixing the two.

[20] 前記上部支持ロードは前記一次断熱壁を貫通して、前記コーナー支持板と締結して、前記コーナー支持板を支持することを特徴とする、[19]に記載の液化天然ガスの保存タンク。   [20] The storage of liquefied natural gas according to [19], wherein the upper support load penetrates the primary heat insulating wall and is fastened to the corner support plate to support the corner support plate. tank.

[21] 前記上部支持ロードは前記コーナー支持板と熔接で締結することを特徴とする、[20]に記載の液化天然ガスの保存タンク。   [21] The storage tank for liquefied natural gas according to [20], wherein the upper support load is fastened to the corner support plate by welding.

[22] 前記一次密封壁は前記アンカー部の上端部と熔接で締結することを特徴とする、[21]に記載の液化天然ガスの保存タンク。   [22] The liquefied natural gas storage tank according to [21], wherein the primary sealing wall is fastened to an upper end portion of the anchor portion by welding.

[23] 前記モジュールの中で、タンクの平面部に位する平面構造体の下端で突出しているフランジは、前記アンカー部の下部とタンク底面の間に形成されている隙間に挿入されて上方向の移動は制限されるが水平方向はスライディングは可能であることを特徴とする、[10]〜[22]の一項に記載の液化天然ガスの保存タンク。   [23] In the module, the flange projecting at the lower end of the planar structure located in the planar portion of the tank is inserted into a gap formed between the lower portion of the anchor portion and the bottom surface of the tank, and upward The storage tank for liquefied natural gas according to any one of [10] to [22], wherein movement of the liquefied natural gas is limited but sliding is possible in the horizontal direction.

上述のとおりに、本発明による液化天然ガスの保存タンクは、超低温状態の液体である液化天然ガスを輸送する船舶内部に設置される保存タンクの設置構造をより単純化して組立工程を短縮させると共に、保存タンクの液密性を堅固に維持しながら液化天然ガスの積載または荷役による機械的変形に対する応力をより容易に解消して、信頼性の高い船舶用、車両用、陸上用タンクを提供することができる長所を有している。   As described above, the storage tank for liquefied natural gas according to the present invention simplifies the installation structure of the storage tank installed inside the ship that transports liquefied natural gas, which is a liquid at an ultra-low temperature, and shortens the assembly process. , Providing more reliable marine, vehicle, and onshore tanks, while maintaining the liquid-tightness of storage tanks and eliminating the stress of mechanical deformation caused by loading or loading of liquefied natural gas more easily Has the advantage of being able to.

特に、隣接するモジュール間の組立を容易にするためにその下端部が突出しており、タンクの平面部に位する平面構造体(モジュール)の下端で突出しているフランジは、アンカー部の下部とタンク底面の間に形成されている隙間に挿入されて、一次密封壁及びタンク底面の間でスライディング(Sliding)可能である。このスライディングにより、船舶に波などによって船体に捩れが発生し、その捩れによって船体に屈曲が生じる場合にも、タンク内部の断熱システムを破壊されない効果がある。なお、組み立ても簡単である。   In particular, in order to facilitate the assembly between adjacent modules, the lower end portion protrudes, and the flange protruding at the lower end of the planar structure (module) located on the plane portion of the tank is formed between the lower portion of the anchor portion and the tank. It is inserted into a gap formed between the bottom surfaces and can be slid between the primary sealing wall and the tank bottom surface. This sliding has an effect that the heat insulation system inside the tank is not destroyed even when the ship is twisted by waves or the like and the ship is bent by the twist. It is easy to assemble.

本発明において液化天然ガスの保存タンクに用いられるモジュールはモジュール間の組立を容易にするためにその下端部が突出している。なお、タンクの平面部に位する平面構造体(モジュール)の下端で突出しているフランジは、アンカー部の下部とタンク底面の間に形成されている隙間に挿入されて、一次密封壁及びタンク底面の間でスライディング(Sliding)可能である。この構造により、船舶に波などによって船体に捩れが発生し、その捩れによって船体に屈曲が生じる場合にも、タンク内部の断熱システムを破壊されない効果がある。なお、組み立ても簡単である。   In the present invention, the lower end of the module used in the storage tank for liquefied natural gas protrudes in order to facilitate assembly between the modules. The flange projecting at the lower end of the planar structure (module) located on the planar portion of the tank is inserted into a gap formed between the lower portion of the anchor portion and the bottom surface of the tank, and the primary sealing wall and the bottom surface of the tank Sliding is possible. This structure has an effect that the heat insulation system inside the tank is not destroyed even when the ship is twisted by waves or the like and the ship is bent by the twist. It is easy to assemble.

本発明の一実施例によれば、
液化天然ガスを積載するタンクと;
上述のタンク内に積載する液化天然ガスと直接接する一次密封壁と;
上述のタンクと上述の一次密封壁とを機械的に連結する多数の連結手段(即ち、アンカー構造体)と;
上述のタンクと上述の一次密封壁との間に位する中間壁構造体で構成され、
上述の中間壁構造体は、上述のタンク及び上述の一次密封壁の中で少なくとも一つ以上に対して移動できることを特徴とする液化天然ガスの保存タンクが提供される。
According to one embodiment of the present invention,
A tank for loading liquefied natural gas;
A primary sealing wall in direct contact with the liquefied natural gas loaded in the tank described above;
A number of connecting means (ie anchor structures) that mechanically connect the tank described above and the primary sealing wall described above;
Consists of an intermediate wall structure located between the tank described above and the primary sealing wall described above,
A storage tank for liquefied natural gas is provided in which the intermediate wall structure is movable relative to at least one of the tank and the primary sealing wall.

上述の中間壁構造体は、上述のタンク及び上述の一次密封壁の中で少なくとも一つ以上に対して水平方向に移動できることが望ましい。ここで、タンクというのは、断熱壁及び密封壁が設置される前の構造物を示す。また、上述の中間壁構造体は多数の孔を有しており、その孔に上述の連結手段が通るのを特徴とする。   It is desirable that the intermediate wall structure described above can move in the horizontal direction with respect to at least one of the tank and the primary sealing wall described above. Here, the tank indicates a structure before the heat insulating wall and the sealing wall are installed. The intermediate wall structure described above has a large number of holes, and the connecting means passes through the holes.

本発明の他の実施例によれば、上述の中間壁構造体は、
上述の一次密封壁と直接接する一次断熱壁と;
上述のタンクと直接接する二次断熱壁と;
上述の一次断熱壁と二次断熱壁との間に位する二次密封壁とで構成されるのを特徴とする液化天然ガスの保存タンクが提供される。上述の二次密封壁は上述の中間壁構造体と上述の連結手段との間を液密的に繋げていることを特徴とする。
According to another embodiment of the present invention, the intermediate wall structure described above is
A primary insulation wall directly in contact with the primary sealing wall as described above;
A secondary insulation wall in direct contact with the tank described above;
There is provided a storage tank for liquefied natural gas, characterized in that it is composed of a secondary sealing wall positioned between the primary heat insulating wall and the secondary heat insulating wall. The secondary sealing wall is characterized in that the intermediate wall structure and the connecting means are connected in a liquid-tight manner.

また、上述の中間壁構造体は、多数のモジュール(Modules)で構成されることができ、上述のモジュールは上述のタンクの平面部に位する多数の平面構造体とコーナー部に位する多数のコーナー構造体とで構成される。上述のモジュールは予備組立体として製作されるのが望ましい。上述のコーナー構造体は上述のタンクに接着剤(P)で接着されており、上述の一次密封壁に対してのみ移動が可能であり、上述の平面構造体は上述の一次密封壁及びタンクという両方に対して移動できるのが望ましい。上述の液化天然ガスの保存タンクは船舶に設置することが望ましい。上述の連結手段の上端部は上述の一次密封壁と熔接で繋げることが望ましい。   In addition, the intermediate wall structure described above can be composed of a large number of modules (Modules), and the above-mentioned module is composed of a large number of planar structures positioned at the planar portion of the tank and a large number of corners positioned at the corner portion. Consists of a corner structure. The module described above is preferably manufactured as a pre-assembly. The corner structure is bonded to the tank with an adhesive (P) and can move only with respect to the primary sealing wall. The planar structure is called the primary sealing wall and tank. It is desirable to be able to move with respect to both. It is desirable to install the above-mentioned storage tank for liquefied natural gas on a ship. It is desirable that the upper end portion of the connecting means is connected to the primary sealing wall by welding.

本発明の他の実施例によれば、液化天然ガスの保存タンクに用いられる断熱モジュールとして、隣接するモジュール同士の組立が容易にできるようにするために、その下端部が突出しているのを特徴とする液化天然ガスの保存タンクの製造用のモジュールが提供される。上述のモジュールは、一次断熱壁と;上述の一次断熱壁の下部に接着剤(P)で接着される二次密封壁と;上述の二次密封壁の下部に接着剤(P)で接着される二次断熱壁とで構成されるのが望ましい。また、上述のモジュールは四角柱を成しており、一つ以上のコーナー部位は一部が切断された形象に形成される。上述の断熱壁はポリウレタンフォーム(Polyurethane Foam)で構成されるのが望ましい。   According to another embodiment of the present invention, the heat insulation module used in the storage tank for liquefied natural gas is characterized in that the lower end portion protrudes so that adjacent modules can be easily assembled. A module for manufacturing a liquefied natural gas storage tank is provided. The module described above includes a primary insulating wall; a secondary sealing wall bonded to the lower portion of the primary insulating wall with an adhesive (P); and an adhesive (P) bonded to the lower portion of the secondary sealing wall. It is desirable to be comprised with the secondary heat insulation wall. Further, the module described above has a quadrangular prism, and one or more corner portions are formed in a partially cut shape. It is desirable that the above-mentioned heat insulating wall is made of polyurethane foam (Polyurethane Foam).

また、上述のモジュールは一次断熱壁と;
上述の一次断熱壁の上部に附着される上部板材と;
上述の一次断熱壁の下部に附着される二次密封壁と;
上述の二次密封壁の下部に附着される二次断熱壁と;
上述の二次断熱壁の下部に附着される下部板材とで構成され、
上述の下部板材は上述の二次断熱壁の一つ以上の側面から延長してフランジ(突出部、Flange)を形成することを特徴とする液化天然ガスの保存タンク製造用のモジュールが提供される。
Also, the module mentioned above is the primary insulation wall;
An upper plate attached to the upper part of the primary insulation wall as described above;
A secondary sealing wall attached to the lower part of the primary insulation wall as described above;
A secondary insulation wall attached to the lower part of the secondary sealing wall as described above;
It consists of the lower plate material attached to the lower part of the above-mentioned secondary heat insulation wall,
A module for manufacturing a storage tank for liquefied natural gas is provided in which the lower plate is extended from one or more side surfaces of the secondary heat insulating wall to form a flange. .

上述の一次または二次断熱壁及び密封壁同士は接着剤(P)で接着されるのが望ましい。また、上述の二次密封壁は上述の一次及び二次断熱壁の一つ以上の側面から突出しているのが望ましい。また、上述の二次密封壁はモジュール同士に液密的に繋がっている。   It is desirable that the primary or secondary heat insulating wall and the sealing wall are bonded with an adhesive (P). The secondary sealing wall preferably projects from one or more side surfaces of the primary and secondary heat insulation walls. Moreover, the above-mentioned secondary sealing wall is connected to the modules in a liquid-tight manner.

上述のモジュールの中で、タンクの平面部に位する平面構造体の下端で突出しているフランジは、上述のアンカー部の下部とタンク底面との間に形成されている隙間に挿入されて上方向の移動は制限されるが水平方向はスライディングは可能である。上述のアンカー部の下部とタンク底面との間に形成されている隙間は、下の実施例で説明するアンカー下部板とタンク底面との間に形成されている隙間を意味する。   In the above-mentioned module, the flange protruding at the lower end of the planar structure located in the plane part of the tank is inserted into the gap formed between the lower part of the above-mentioned anchor part and the tank bottom surface, and upward Is limited, but sliding is possible in the horizontal direction. The gap formed between the lower portion of the anchor portion and the tank bottom surface means a gap formed between the anchor lower plate and the tank bottom surface described in the embodiment below.

本発明の他の実施例によれば、2個の連続する密封壁及び2個の断熱壁を含んでおり、上述の密封壁の中で一次密封壁は保存タンクに保存される液化天然ガスと直接接しており、その下部に一次断熱壁、二次密封壁及び二次断熱壁の手順に配置される液化天然ガスの保存タンクにおいて、
上述の一次密封壁は上述のタンクの底面と機械的に締結したアンカー部によって支持され、
上述の一次断熱壁、二次密封壁及び二次断熱壁は、タンクの平面部においてその上下面が締結した複数の平面構造体(即ち、モジュール)で構成されて、上述の各平面構造体は上述の一次密封壁とタンクの底面との間に多少のスライディング(Sliding、即ち、水平移動)ができるように設置される。ただし、タンク内の貨物の荷重に関してはアンカー部と断熱壁とが均等に受けるが、一次密封壁はアンカー部にのみ熔接されて支持されるので、断熱壁が一次密封壁に対して若干のスライディング(Sliding)ができる。
According to another embodiment of the present invention, two continuous sealing walls and two heat insulating walls are included, and the primary sealing wall among the above-described sealing walls is a liquid natural gas stored in a storage tank. In a liquefied natural gas storage tank that is in direct contact with the primary insulation wall, the secondary sealing wall and the secondary insulation wall in the lower part,
The primary sealing wall is supported by an anchor portion mechanically fastened to the bottom surface of the tank,
The primary heat insulation wall, the secondary sealing wall, and the secondary heat insulation wall described above are composed of a plurality of planar structures (that is, modules) whose upper and lower surfaces are fastened in the planar portion of the tank. It is installed so as to allow some sliding (ie, horizontal movement) between the primary sealing wall and the bottom surface of the tank. However, the load on the cargo in the tank is equally received by the anchor part and the heat insulating wall, but the primary sealing wall is supported by welding only to the anchor part, so the heat insulating wall is slightly sliding with respect to the primary sealing wall. (Sliding) is possible.

上述の各モジュールはそれぞれ上述の一次密封壁及びタンク底面の間で少なくとも上記一次密封壁及びタンク底面の一つに対してスライディング(Sliding)できるが、平面構造体だけが上記一次密封壁及びタンク底面の両方に対してスライディング(Sliding)できる。   Each of the modules described above can be slid between at least one of the primary sealing wall and the tank bottom surface between the primary sealing wall and the tank bottom surface, but only the planar structure is the primary sealing wall and the tank bottom surface. Can slide on both.

タンクの設置される構造物が二重殻船舶の場合、上述の“タンクの底面(または内部面)”は、当然船体の側面及び下面の内部壁(内殻)とタンクの上部壁及び横隔壁を意味する。   When the structure where the tank is installed is a double-shell ship, the above-mentioned “bottom surface (or inner surface) of the tank” naturally means the inner wall (inner shell) of the side and lower surface of the hull, the upper wall of the tank, and the horizontal bulkhead Means.

ここで、スライディング(Sliding)というは、船舶の場合に波などによって船体に捩れが発生して、その捩れによって船体に屈曲が生じる場合、一次及び二次断熱壁で成り立つタンクの断熱システムは船体内壁に接しているため、上述の断熱システムにも屈曲応力が生じるが、その屈曲応力に対して断熱システムを破壊せずに下記の平面構造体のような断熱壁の各単位体が多少横方向に動くことができることを意味する。上述の断熱壁単位体というのは、本発明において主に予備組立体として形成された一次断熱壁、それに接着された二次密封壁及びそれに接着された二次断熱壁の単位体を意味する。   Here, the term “sliding” refers to a tank insulation system consisting of primary and secondary insulation walls when the ship is twisted due to waves or the like and bent due to the twist in the case of a ship. However, each unit body of the heat insulating wall such as the following planar structure does not break the heat insulating system against the bending stress. It means you can move. The above-mentioned heat insulating wall unit means a primary heat insulating wall mainly formed as a pre-assembly in the present invention, a secondary sealing wall bonded thereto, and a unit of a secondary heat insulating wall bonded thereto.

上述の一次断熱壁と二次断熱壁は、上述の二次密封壁の各上下部面に接着剤(P)で接着されて、予備組立体に形成されて、タンクの製造時に組立の単位になることが望ましい。本発明で予備組立体に製作されるのは、タンクのコーナー部に設置されるコーナー構造体と、タンクの平面部に設置される平面構造体とがある。上述の二次断熱壁というのは、ポリウレタンフォーム(Polyurethane Foam)材質の断熱材と、その下部面に接着されるプライウッド(Plywood)材質の板材とを含む。更に、上述の一次断熱壁というのは、ポリウレタンフォーム(Polyurethane Foam)材質の断熱材と、その上下部面に接着されるプライウッド(Plywood)材質の板材とを含む。また、上述の二次密封壁の材質はアルミニウムシーツまたは可撓性シーツ(Triplex、望ましくはRigid Triplex)にすることもできる。   The primary heat insulating wall and the secondary heat insulating wall are bonded to the upper and lower surfaces of the secondary sealing wall with an adhesive (P) and formed into a pre-assembly. It is desirable to become. The prefabricated assembly according to the present invention includes a corner structure installed at the corner of the tank and a planar structure installed at the plane of the tank. The secondary heat insulating wall includes a heat insulating material made of polyurethane foam (Polyurethane Foam) and a plate material made of plywood (Plywood) bonded to the lower surface thereof. Furthermore, the above-mentioned primary heat insulating wall includes a heat insulating material made of polyurethane foam (Polyurethane Foam) and a plate material made of plywood (Plywood) bonded to the upper and lower surfaces thereof. The material of the secondary sealing wall may be an aluminum sheet or a flexible sheet (Triplex, preferably Rigid Triplex).

一方、上述の二次密封壁は上述の一次断熱壁及び二次断熱壁の側面から突出しており、予備組立体(平面構造体)の各単位体を組み立てる際に隣接した予備組立体の二次密封壁またはアンカー部の二次密封壁と相互連結される。ここで、上述の一次密封壁の形象や材質は特に制限がなく、下記に記載した本出願人によって公開された特許及びTGZ社によって公開された特許に記載されたとおりにステンレス材質にすることもできて、しわ部(Corrugation)が形成されることもできる。また、上述の二次断熱壁の間に形成される側面空間部はポリウレタンフォーム(Polyurethane Foam)材質の断熱材で充填される。一方、上述の一次断熱壁の間に形成される側面空間部はグラスウール(Glass Wool)材質の断熱材で充填される。   On the other hand, the above-mentioned secondary sealing wall protrudes from the side surfaces of the above-mentioned primary heat insulating wall and secondary heat insulating wall, and the secondary of the adjacent pre-assembly is adjacent when assembling each unit body of the pre-assembly (planar structure). It is interconnected with the sealing wall or the secondary sealing wall of the anchor part. Here, the shape and material of the primary sealing wall described above are not particularly limited, and may be made of stainless steel as described in the patent published by the applicant and the patent published by TGZ described below. And wrinkle (Corrugation) can be formed. The side space formed between the secondary heat insulating walls is filled with a heat insulating material made of polyurethane foam (Polyurethane Foam). On the other hand, the side space formed between the primary heat insulating walls is filled with a heat insulating material made of glass wool.

また、上述の二次密封壁は上述の断熱壁が形成する空間部(即ち、断熱壁側面の間)へ延長して、上述の空間部において上述の二次密封壁の端部は上部固定板及び下部固定板によって繋がって、上述の上部固定板及び下部固定板の締結面は上述の二次密封壁の端部が挿入できるように形成された溝を含むことができる。ここで、上述の溝は屈曲に形成することができて、上述の下部固定板及び上部固定板の締結体はその縦方向に多少の屈曲が存在して、多少長めにして冷却による密封壁の収縮時にその応力を吸収することができる。   In addition, the secondary sealing wall extends to the space formed by the heat insulating wall (that is, between the side surfaces of the heat insulating wall), and the end of the secondary sealing wall is the upper fixing plate in the space. The fastening surfaces of the upper fixing plate and the lower fixing plate may include a groove formed so that the end of the secondary sealing wall can be inserted. Here, the above-mentioned groove can be formed to be bent, and the fastening body of the above-mentioned lower fixing plate and upper fixing plate has some bending in the longitudinal direction, and is slightly longer, so that the sealing wall by cooling is formed. The stress can be absorbed during contraction.

もう一つの実施例によれば、上述の二次密封壁は上部面と下部面に樹脂材が塗布されて、隣接する断熱壁が形成する側面空間部へ延長されて、上述の空間部には上述の二次密封壁の端部と接するように締結される上部連結部材及び下部連結部材を含めて、上述の上部耐熱部材及び下部連結部材の締結面にはそれぞれ形成される凹凸部が形成されて、上述の二次密封壁の上部面と下部面に塗布された樹脂材を圧搾しながら締結されるのが望ましい。このような締結方式は二次密封壁の密封特性をより向上させる。   According to another embodiment, the secondary sealing wall is coated with a resin material on the upper surface and the lower surface, and is extended to a side space formed by an adjacent heat insulating wall. Including the upper connecting member and the lower connecting member that are fastened so as to be in contact with the end of the secondary sealing wall, the upper and lower heat-resistant members and the lower connecting member are formed with uneven portions formed on the fastening surfaces. Thus, it is desirable that the resin material applied to the upper and lower surfaces of the secondary sealing wall is fastened while being squeezed. Such a fastening method further improves the sealing characteristics of the secondary sealing wall.

二次密封壁の連結に関する本発明の他の実施例によれば、上述のタンク内部のコーナー部(Corner Part)に締結されるコーナー構造体と、上述のタンク内部の平面上においてスライディング(Sliding)移動ができるように位している平面構造体と、上述のタンクに締結されて上述の平面構造体を上述のタンク内部に付着させるアンカー構造体を含むことができる。   According to another embodiment of the present invention relating to the connection of the secondary sealing wall, the corner structure fastened to the corner part inside the tank described above, and sliding on the plane inside the tank described above. It may include a planar structure that is positioned for movement and an anchor structure that is fastened to the tank and attaches the planar structure to the interior of the tank.

ここで、上述の平面構造体は、上述のコーナー構造体が固定されたコーナー部の突出部材によって一方が固定されて、上述のコーナー部の二次断熱壁と同一の高さで設置される平面部の二次断熱壁と、その上部面に形成される平面部の二次密封壁及びその上部面に形成される平面部の一次断熱壁で成り立つ予備組立体に製作するのが望ましい。   Here, the above-described planar structure is a plane that is fixed at the same height as the secondary heat insulating wall of the above-mentioned corner portion, one of which is fixed by the protruding member of the corner portion to which the above-described corner structure is fixed. It is desirable to manufacture a pre-assembly comprising a secondary heat insulating wall of a part, a secondary sealing wall of a flat part formed on the upper surface thereof, and a primary heat insulating wall of a flat part formed on the upper surface thereof.

また、上述のアンカー構造体は、上述の平面構造体が合うコーナー部位に機械的に固定されるアンカー下部板に固定されるアンカー支持ロードと、上述のアンカー支持ロードに中心部が挿入固定されて、上述の平面部の二次断熱壁と同一の高さで設置されるアンカー部の二次断熱壁と、上述のアンカー支持ロードに中心部が挿入されてアンカー部の二次断熱壁の上部面に固定されながら、隣接した平面部の二次密封壁と機械的に取り付けられるアンカー部の二次密封壁と、上述のアンカー支持ロードに中心部が挿入されてアンカー部の二次密封壁の上部面に固定されるアンカー部の一次断熱壁と、上述のアンカー部の一次断熱壁の上部中心部である上述のアンカー支持ロードの上端部に固定される上部キャップを含むことができる。   In addition, the above-mentioned anchor structure has an anchor support load fixed to an anchor lower plate that is mechanically fixed to a corner portion where the above-described planar structure is fitted, and a center portion is inserted and fixed to the above-described anchor support load. The secondary heat insulating wall of the anchor portion installed at the same height as the secondary heat insulating wall of the flat surface portion, and the upper surface of the secondary heat insulating wall of the anchor portion with the center portion inserted into the anchor support load described above The secondary sealing wall of the anchor part that is mechanically attached to the secondary sealing wall of the adjacent flat part while being fixed to the upper part, and the upper part of the secondary sealing wall of the anchor part by inserting the center part into the anchor support load described above A primary insulating wall of the anchor portion fixed to the surface and an upper cap fixed to the upper end portion of the anchor supporting load, which is the upper central portion of the primary insulating wall of the anchor portion, may be included.

上述の構造において、上述のアンカー下部板はこれに接する予備組立体の単位構造体の二次断熱壁の下部板材を上述のタンクの内部面に固定するように構成される。また、上述のアンカー部の二次密封壁は外周面部に形成されたしわ部を含むことができる。ここで、上述のアンカー部の二次密封壁は上述のアンカー部の一次断熱壁の断面より突出して面する予備組立体の二次密封壁と繋がる。また、上述のアンカー部の一次断熱壁とアンカー部の二次断熱壁は上述のアンカー部の二次密封壁の上下部面にそれぞれ接着剤(P)で接着される。   In the above-described structure, the above-described anchor lower plate is configured to fix the lower plate material of the secondary heat insulating wall of the unit structure of the pre-assembly that contacts the anchor lower plate to the inner surface of the above-described tank. Further, the secondary sealing wall of the anchor portion described above can include a wrinkle portion formed on the outer peripheral surface portion. Here, the secondary sealing wall of the anchor part is connected to the secondary sealing wall of the pre-assembly that faces and protrudes from the section of the primary heat insulating wall of the anchor part. The primary heat insulating wall of the anchor part and the secondary heat insulating wall of the anchor part are respectively bonded to the upper and lower surfaces of the secondary sealing wall of the anchor part with an adhesive (P).

一方、上述のアンカー部の二次断熱壁は、ポリウレタンフォーム(Polyurethane Foam)の断熱材と、その上部面に接着されたプライウッド(Plywood)とを含むことができる。また、上述のアンカー部の一次断熱壁は、ポリウレタンフォーム(Polyurethane Foam)材質の断熱材と、その上下部面に接着されたプライウッド(Plywood)材質の板材とを含むことができる。予備組立体の二次断熱壁の下端に接着されたプライウッド(Plywood)板材はその側面部が突出してアンカー部を構成するアンカー下部板によってタンクの下部面に固定される。このような固定によって各断熱壁の縦方向の移動を防止する。横方向は固定しているが、若干の移動は可能である。   Meanwhile, the secondary heat insulating wall of the anchor part may include a polyurethane foam (Polyurethane Foam) heat insulating material and a plywood bonded to an upper surface thereof. The primary heat insulating wall of the anchor part may include a polyurethane foam (Polyurethane Foam) heat insulating material and a plywood (Plywood) material bonded to the upper and lower surfaces thereof. The plywood plate material bonded to the lower end of the secondary heat insulating wall of the pre-assembly is fixed to the lower surface of the tank by an anchor lower plate that protrudes from the side surface and constitutes the anchor portion. Such fixing prevents the vertical movement of each heat insulating wall. Although the lateral direction is fixed, slight movement is possible.

一方、上述のコーナー構造体は、上述のタンクの内部に形成される二つの面が合うコーナー地点にそれぞれ接するようにL形態に形成されるコーナー部の二次断熱壁と、その上部面に形成されるコーナー部の二次密封壁及びその上部面に形成されるコーナー部の一次断熱壁と、上述のコーナー部の一次断熱壁の上部面に保存タンクの荷重を支持するように、L形態のコーナー支持板が多く設置された予備組立体に製作されて、上述のタンクの内部面にそれぞれ形成されるコーナー部の突出部材で固定することができる。   On the other hand, the above-mentioned corner structure is formed on the secondary heat insulating wall of the corner portion formed in an L shape so as to be in contact with the corner point where the two surfaces formed inside the above-mentioned tank meet, and the upper surface thereof In order to support the load of the storage tank on the secondary sealing wall of the corner portion and the primary heat insulating wall of the corner portion formed on the upper surface thereof, and the upper surface of the primary heat insulating wall of the corner portion described above, It can be manufactured in a pre-assembly having a large number of corner support plates, and can be fixed by the protruding members at the corners respectively formed on the inner surface of the tank.

上述のコーナー支持板は、熱による収縮及び伸長ができるようにするために、多少のスライディング(Sliding)移動ができるように設置することができる。また、上述のコーナー部の一次断熱壁及び二次断熱壁は上述の二次密封壁の上下部面にそれぞれ接着剤(P)で接着することができる。それと共に、上述の一次断熱壁、二次断熱壁及びコーナー支持板は予備組立体に製作することができる。   The corner support plate described above can be installed to allow some sliding movement in order to be able to contract and extend by heat. In addition, the primary heat insulating wall and the secondary heat insulating wall of the corner portion can be bonded to the upper and lower surfaces of the secondary sealing wall with an adhesive (P), respectively. At the same time, the primary heat insulation wall, the secondary heat insulation wall and the corner support plate described above can be manufactured in a pre-assembly.

一方、上述のコーナー部の予備組立体(コーナー構造体)はタンクの内部面にそれぞれ形成されるコーナー部の突出部材で固定することができる。また、上述の二次密封壁は上述の一次断熱壁及び二次断熱壁の側面から突出したように形成されることができる。また、上述の一次断熱壁及び二次断熱壁の下部面には板材が形成されており、上述の板材はその端部が上述の断熱材から突出したように形成された上述の突出部材で固定台によってタンク下部面に固定される。また、二次断熱壁の下部面はタンク壁面に接着剤(P)で接着するのが望ましい。   On the other hand, the above-mentioned corner portion preliminary assembly (corner structure) can be fixed by the protruding members of the corner portions formed on the inner surface of the tank. In addition, the secondary sealing wall may be formed to protrude from the side surfaces of the primary heat insulating wall and the secondary heat insulating wall. Further, a plate material is formed on the lower surface of the primary heat insulation wall and the secondary heat insulation wall described above, and the above plate material is fixed by the above protruding member formed so that the end portion protrudes from the above heat insulating material. It is fixed to the tank lower surface by a stand. The lower surface of the secondary heat insulating wall is preferably bonded to the tank wall surface with an adhesive (P).

また、上述のコーナー部の二次断熱壁及び一次断熱壁は、上述の二次断熱壁を貫通して突出する下部支持ロードの上端部と、上述の一次断熱壁を貫通する上部支持ロードの下端部を連結固定する連結補強台によって機械的に締結することができる。   In addition, the secondary heat insulating wall and the primary heat insulating wall at the corner portion described above are the upper end portion of the lower support load protruding through the secondary heat insulating wall and the lower end of the upper support load penetrating the primary heat insulating wall. It can be mechanically fastened by a connection reinforcing stand for connecting and fixing the parts.

それだけではなく、上述の下部支持ロードは、上述の二次断熱壁の下部面に固定されたロード支持キャップに挿入固定されて、二次断熱壁を貫通した後、その上端部が上述の連結補強台に固定されることができる。また、上述の上部支持ロードは、上述の一次断熱壁の下部に固定されながら上述の連結補強台に固定されたロード支持キャップに挿入固定されて、上述の一次断熱壁を貫通して上述のコーナー支持板を支持することができる。その支持方法は熔接で締結して支持するのが望ましい。上述のコーナー支持板の上部には、一次密封壁が位するようになり、一次密封壁及びコーナー支持板は熔接で締結される。このような構造によってコーナー部の一次密封壁は、タンクの底面に締結された下部支持ロード、下部支持ロードに締結された上部支持ロード、上部支持ロードと締結されたコーナー支持板によって安定的に支持される。また、上述のコーナー支持板は、多少厚目の厚板で構成されるので、非対称応力が発生するコーナー部の一次密封壁を安定的に支持することができる。また、上述のコーナー支持板は、コーナー部の一次断熱壁とは直接的な締結が弱くて、一次断熱壁に対して多少のスライディング(Sliding)ができるので、それによる一次断熱壁とコーナー支持板及び一次密封壁との温度変化による伸縮率の差による機械的応力の克服が可能である。   In addition, the lower support load described above is inserted and fixed in a load support cap fixed to the lower surface of the secondary heat insulation wall, and after passing through the secondary heat insulation wall, the upper end portion thereof is connected and strengthened as described above. Can be fixed to the pedestal. In addition, the upper support load is inserted and fixed to the load support cap fixed to the connection reinforcing base while being fixed to the lower portion of the primary heat insulation wall, and passes through the primary heat insulation wall to pass the corner. The support plate can be supported. It is desirable that the supporting method is fastened by welding. The primary sealing wall is positioned on the corner support plate, and the primary sealing wall and the corner support plate are fastened by welding. With this structure, the primary sealing wall of the corner is stably supported by the lower support load fastened to the bottom of the tank, the upper support load fastened to the lower support load, and the corner support plate fastened to the upper support load. Is done. Moreover, since the above-mentioned corner support plate is comprised of a somewhat thicker plate, the primary sealing wall of the corner portion where asymmetric stress occurs can be stably supported. In addition, the above corner support plate is weak in direct fastening with the primary heat insulating wall of the corner portion, and can be somewhat slid (Sliding) with respect to the primary heat insulating wall. In addition, it is possible to overcome the mechanical stress due to the difference in expansion / contraction rate due to temperature change with the primary sealing wall.

本発明における更に他の実施例によれば、上述のアンカー構造体は、上述の平面構造体が合うコーナー部位に機械的に固定されたアンカー下部板に固定されるアンカー支持ロードと、上述のアンカー支持ロードに中心部が挿入固定されて上述の平面部の二次断熱壁と同一の高さで設置されるアンカー部の二次断熱壁と、上述のアンカー支持ロードに中心部が挿入されてアンカー部の二次断熱壁の上部面に固定され隣接する平面部の二次密封壁に機械的に取り付けられるアンカー部の二次密封壁と、上述のアンカー支持ロードに中心部が挿入されてアンカー部の二次密封壁の上部面に固定されるアンカー部の一次断熱壁と、上述のアンカー部の一次断熱壁の上部中心部である上述のアンカー支持ロードの上端部に固定される上部キャップを含むことを特徴とする。   According to still another embodiment of the present invention, the above-described anchor structure includes an anchor support load fixed to an anchor lower plate mechanically fixed to a corner portion where the above-described planar structure meets, and the above-described anchor. A secondary heat insulating wall of the anchor portion, which is installed and fixed at the same height as the secondary heat insulating wall of the above-described flat portion, with the center portion inserted and fixed to the support load, and the anchor having the central portion inserted into the above-mentioned anchor support load. A secondary sealing wall of the anchor portion fixed to the upper surface of the secondary heat insulating wall of the portion and mechanically attached to the secondary sealing wall of the adjacent flat portion, and the anchor portion having the center portion inserted into the anchor support load described above A primary insulating wall of the anchor portion fixed to the upper surface of the secondary sealing wall of the main body, and an upper cap fixed to the upper end portion of the anchor supporting load that is the upper central portion of the primary insulating wall of the anchor portion. And wherein the door.

上述のアンカー下部板はそれに接する単位構造体の二次断熱壁の下部板材をタンクの内部面に固定する役目をする。上述のアンカー部の二次密封壁は外周面部にしわ部を含むのが望ましい。また、上述のアンカー部の一次断熱壁及びアンカー部の二次断熱壁は、上述のアンカー部の二次密封壁の上下部面にそれぞれ接着剤(P)で接着するのが望ましい。   The anchor lower plate described above serves to fix the lower plate material of the secondary heat insulating wall of the unit structure in contact with the inner surface of the tank. The secondary sealing wall of the anchor portion described above preferably includes a wrinkle portion on the outer peripheral surface portion. The primary heat insulating wall of the anchor part and the secondary heat insulating wall of the anchor part are preferably bonded to the upper and lower surfaces of the secondary sealing wall of the anchor part with an adhesive (P).

アンカー部における更に他の実施例として、上述のアンカー構造体は、上述のタンクの内部に形成された空間の底面及び左右隔壁に一定間隔で設置されて締結孔が形成されたロード支持キャップが内蔵されたアンカーベース板を固定するアンカー下部板と、上述のロード支持キャップに垂直するように固定されるアンカー支持ロードと、上述のアンカー支持ロードに中心部が挿入固定されるアンカー部の二次断熱壁と、上述のアンカー部の二次断熱壁の上部面に固定されて上述のアンカー支持ロードに中心部が挿入固定されるアンカー部の二次密封壁と、上述のアンカー部の二次密封壁の上部面に固定されて上述のアンカー支持ロードに中心部が挿入固定されるアンカー部の一次断熱壁と、上述のアンカー支持ロードの上端部に固定されて上述のアンカー部の一次断熱壁を固定する上部キャップと、隣接配置される一次断熱壁の側部及び二次密封壁の上部面に固定されて、上述のアンカー部の一次断熱壁と所定距離を置いて締結して、隣接する上述の二次密封壁及び上述のアンカー部の二次密封壁の端部の上部に固定される平面部の連結断熱壁とを含むことを特徴とする。上述の平面部の連結断熱壁は隣接配置された各一次断熱壁の側面と隣接した二次断熱壁の上部に固定される二次密封壁の上部面に固定して、上述の平面部の連結断熱壁はその下部の上述の平面部の二次密封壁及びアンカー部の二次密封壁と接着剤(P)で固定することが望ましい。上述の平面部の連結断熱壁と上述のアンカー部の一次断熱壁との間の空間部には断熱材が充填される。上述の平面部の連結断熱壁はその下部に端が位する二次断熱壁を固定する役目も有する。   As still another embodiment of the anchor portion, the above-described anchor structure has a built-in load support cap that is installed at fixed intervals on the bottom surface and the left and right partition walls of the space formed inside the above-described tank. Anchor lower plate for fixing the anchor base plate, an anchor support load fixed so as to be perpendicular to the load support cap, and a secondary insulation of the anchor portion whose center is inserted and fixed to the anchor support load. A wall, a secondary sealing wall of the anchor part fixed to the upper surface of the secondary heat insulating wall of the anchor part, the center part being inserted and fixed to the anchor supporting load, and a secondary sealing wall of the anchor part A primary heat insulating wall of the anchor portion that is fixed to the upper surface of the anchor portion and the center portion is inserted and fixed to the anchor support load described above, and fixed to the upper end portion of the anchor support load described above. The upper cap for fixing the primary heat insulating wall of the anchor portion of the anchor portion, and the side portion of the primary heat insulating wall and the upper surface of the secondary sealing wall that are arranged adjacent to each other, are spaced a predetermined distance from the primary heat insulating wall of the anchor portion described above. And the above-mentioned secondary sealing wall and the planar connecting heat insulating wall fixed to the upper part of the end of the secondary sealing wall of the anchor part. The above-mentioned flat portion of the heat insulating wall is fixed to the side surface of each adjacent primary heat insulating wall and the upper surface of the secondary sealing wall fixed to the upper portion of the adjacent secondary heat insulating wall. It is desirable that the heat insulating wall be fixed with an adhesive (P) to the secondary sealing wall of the above-described flat portion and the secondary sealing wall of the anchor portion. A space between the above-described planar heat insulating wall of the flat portion and the primary heat insulating wall of the anchor portion is filled with a heat insulating material. The above-mentioned connecting heat insulating wall of the flat part also has a role of fixing the secondary heat insulating wall whose end is located at the lower part thereof.

本発明による液化天然ガスの保存タンクの製造方法は、2個の連続する密封壁及び2個の断熱壁を含んでおり、上述の密封壁の中で一次密封壁は保存タンクに保存される液化天然ガスに面しており、その下部に一次断熱壁、二次密封壁及び二次断熱壁の手順に配置された保存タンクを製造する方法において、上述のタンクの内部に形成されたコーナー部にそれぞれ突出部材を形成して、タンクの内部面に一定間隔ごとにアンカーベース板を付着固定する段階と、上述の形成されたコーナー部の突出部材を境にして二次断熱壁、二次密封壁、一次断熱壁及びコーナー部の支持板で予め組み立られたコーナー構造体を付着固定する段階と、上述の固定されたコーナー構造体を上述のコーナー部の突出部材に固定台として固定すると共に、上述のアンカーベース板の上部にアンカー下部板を固定して中央部にアンカー支持ロードを垂直に固定する段階と、上述のコーナー構造体を固定した固定台の片方に二次断熱壁、二次密封壁、一次断熱壁の順に予め組み立られた平面構造体の一側部を挿入固定して、上述の平面構造体の他側のコーナー部を上述のアンカーベース板及び上述のアンカー下部板が成す空間部に挿入固定する段階と、上述のコーナー構造体と平面構造体の二次断熱壁が形成する空間部を断熱材で充填すると共に、上述のアンカー支持ロードにアンカー部の二次断熱壁及びアンカー部の二次密封壁を挿入する段階と、上述のコーナー構造体の二次密封壁とそれに接する平面構造体の二次密封壁を固定して、上述の平面構造体の二次密封壁を相互固定すると共に、上述の平面構造体の二次密封壁と接する上述のアンカー部の二次密封壁を相互固定する段階と、上述のアンカー支持ロードにアンカー部の一次断熱壁を挿入した後、アンカー上部板及びアンカー断熱板材を付着固定して、上述のアンカー支持ロードの端部にアンカー上部キャップを付着固定して、アンカー構造体の組立を完了する段階と、上述のコーナー構造体、平面構造体とアンカー構造体が形成する一次断熱壁との間の空間部に断熱材で充填する段階と、上述のコーナー構造体、平面構造体及びアンカー構造体の上部面にしわ部を有する一次密封壁を付着固定する段階を含む。   The method for manufacturing a storage tank for liquefied natural gas according to the present invention includes two continuous sealing walls and two heat insulating walls, and the primary sealing wall among the above-described sealing walls is stored in the storage tank. In a method of manufacturing a storage tank facing natural gas and arranged in a procedure of a primary heat insulating wall, a secondary sealing wall, and a secondary heat insulating wall at a lower portion thereof, a corner portion formed inside the tank described above Each of the protruding members is formed, and the anchor base plate is attached and fixed to the inner surface of the tank at regular intervals, and the secondary heat insulating wall and the secondary sealing wall with the protruding member of the formed corner as a boundary. A step of adhering and fixing a corner structure pre-assembled with a primary heat insulating wall and a corner support plate, and fixing the fixed corner structure to the protruding member of the corner as a fixing base, and No Fixing the anchor lower plate to the upper part of the car base plate and fixing the anchor support load vertically to the central part, and the secondary heat insulating wall, the secondary sealing wall on one side of the fixing base to which the corner structure is fixed, One side part of the planar structure assembled in advance in the order of the primary heat insulating wall is inserted and fixed, and the corner part on the other side of the planar structure is formed into a space formed by the anchor base plate and the anchor lower plate. The step of inserting and fixing, and filling the space formed by the secondary heat insulating wall of the corner structure and the planar structure with a heat insulating material, and the secondary heat insulating wall and the anchor portion of the anchor portion on the anchor supporting load described above. Inserting the secondary sealing wall, fixing the secondary sealing wall of the corner structure and the secondary sealing wall of the planar structure adjacent thereto, and fixing the secondary sealing wall of the planar structure to each other In addition, the plane structure described above Fixing the secondary sealing wall of the above-mentioned anchor part in contact with the secondary sealing wall of the body, and inserting the primary thermal insulation wall of the anchor part into the above-mentioned anchor support load, and then attaching the anchor upper plate and the anchor thermal insulation plate material And fixing the anchor upper cap to the end of the anchor support load to complete the assembly of the anchor structure, and the primary structure formed by the corner structure, the planar structure, and the anchor structure. Filling the space between the insulating wall with a heat insulating material and attaching and fixing a primary sealing wall having wrinkles on the upper surface of the corner structure, the planar structure and the anchor structure.

上述のアンカーベース板の上部にアンカー下部板を固定して、中央部にアンカー支持ロードを垂直固定する段階は、上述のアンカーベース板にボルティング(Bolting)固定されたアンカー下部板の中央部に固定されたロード支持キャップに上述のアンカー支持ロードがボルティング締結して固定することができる。   The step of fixing the anchor lower plate to the upper portion of the anchor base plate and vertically fixing the anchor support load to the center portion is performed at the center portion of the anchor lower plate which is bolted to the anchor base plate. The anchor support load described above can be fixed by bolting to the fixed load support cap.

上述のコーナー構造体と平面構造体の二次断熱壁が形成する空間部を断熱材で充填する段階は断熱材としてポリウレタンフォームを充填することができる。   The step of filling the space formed by the secondary heat insulating walls of the corner structure and the planar structure with the heat insulating material can be filled with polyurethane foam as the heat insulating material.

また、上述のコーナー構造体の二次密封壁及びそれに接する平面構造体の二次密封壁を固定して、上述の平面構造体の二次密封壁を相互固定すると共に、上述の平面構造体の二次密封壁と接する上述のアンカー部の二次密封壁を相互固定する段階は上述の二次密封壁の下部に位する下部固定板と、その上部面と対面するように位する上部固定板とをボルティング締結することで固定することができる。ここで、上述のコーナー構造体の二次密封壁とそれに接する平面構造体の二次密封壁を固定して、上述の平面構造体の二次密封壁を相互固定すると共に、上述の平面構造体の二次密封壁に接する上述のアンカー部の二次密封壁を相互固定する段階は上述の二次密封壁をボルティング締結する下部固定板と、その上部面と対面するように位する上部固定板に形成された曲面部位によって曲面形象に固定することができる。   Further, the secondary sealing wall of the corner structure and the secondary sealing wall of the planar structure in contact with the corner structure are fixed, and the secondary sealing wall of the planar structure is fixed to each other. The step of mutually fixing the secondary sealing wall of the anchor part in contact with the secondary sealing wall includes a lower fixing plate positioned at the lower part of the secondary sealing wall and an upper fixing plate positioned so as to face the upper surface. And can be fixed by bolting. Here, the secondary sealing wall of the above-mentioned corner structure and the secondary sealing wall of the planar structure in contact therewith are fixed, and the secondary sealing wall of the above-mentioned planar structure is mutually fixed, and the above-described planar structure The step of mutually fixing the secondary sealing wall of the anchor part in contact with the secondary sealing wall is a lower fixing plate for bolting the secondary sealing wall and an upper fixing positioned so as to face the upper surface. It can be fixed to a curved surface shape by a curved surface portion formed on the plate.

上記に記載した本発明のLNG用タンクは、貨物の流動がある自動車、船舶に設置される液化天然ガスの保存タンク、流動がほとんどない陸上型タンクなどを含めており、本発明に基づくタンクは上述の船舶、陸上用のタンク、車両などに設置することができる。   The LNG tanks of the present invention described above include automobiles with cargo flow, liquefied natural gas storage tanks installed on ships, land-type tanks with little flow, etc. It can be installed in the above-mentioned ship, land tank, vehicle and the like.

また、本発明は超低温状態の液体である液化天然ガスを輸送する船舶の内部に設置される保存タンクの平面構造体を連結するアンカー部の構造を単純化して組立工程を縮めると共に、隣接する平面構造体の連結をより結束させることによってアンカー部の液密性を堅固に維持する。それと共に、船舶の航海時に波などによって船舶船体に捩れが発生した場合、本発明による断熱システムでは一次密封壁がアンカー部に直接繋がっているが、各断熱壁とは直接的な連結が弱くて、各断熱壁が一次密封壁に対して多少のスライディングができて、上述の船体が捩れに順応できるので、断熱システムの破壊が発生しない。   In addition, the present invention simplifies the structure of the anchor portion that connects the planar structure of the storage tank installed inside the ship that transports liquefied natural gas, which is a liquid at an ultra-low temperature state, and shortens the assembly process, and the adjacent plane. The liquid tightness of the anchor portion is firmly maintained by binding the connection of the structures. At the same time, when the ship hull is twisted due to waves during the voyage of the ship, in the heat insulation system according to the present invention, the primary sealing wall is directly connected to the anchor part, but the direct connection with each heat insulation wall is weak. Each insulation wall can be slightly slid with respect to the primary sealing wall, and the above-mentioned hull can adapt to torsion, so that the insulation system does not break.

また、本発明は超低温状態の液体である液化天然ガスを保存するタンク内部に設置されるタンクのコーナー構造を単純化して組立工程を縮めると共に、コーナー部の液密性を高度に維持する一方、コーナー部を支持することができる厚板材を設置することで保存タンクの機械的/熱的収縮及び膨脹による応力をより容易に解消して信頼性の高い船舶が提供できる長所がある。   In addition, the present invention simplifies the corner structure of the tank installed inside the tank for storing liquefied natural gas, which is a liquid in an ultra-low temperature state, shortens the assembly process, and highly maintains the liquid tightness of the corner portion, There is an advantage that a highly reliable ship can be provided by installing a thick plate material that can support the corner portion, thereby easily eliminating the stress caused by mechanical / thermal contraction and expansion of the storage tank.

また、本発明は上述の平面部の連結断熱壁とその下の二次密封壁との接着剤(P)による締結と、各上下連結部材の締結構造によってアンカー部の周辺における二次密封壁の締結構造がより改善されて、液密性及び安全性がより増加する效果を有している。   In addition, the present invention provides the fastening of the secondary sealing wall in the vicinity of the anchor portion by fastening with the adhesive (P) between the connecting heat insulating wall of the plane portion and the secondary sealing wall below it and the fastening structure of the upper and lower connecting members. The fastening structure is further improved, and the liquid-tightness and safety are further increased.

以下、添付された図面を参照して本発明の構成を詳細に説明する。   Hereinafter, the configuration of the present invention will be described in detail with reference to the accompanying drawings.

本発明は液化天然ガスの保存タンクとして、高圧、超低温状態の液化天然ガスを保存する。そのために、液化天然ガスの保存タンクは耐衝撃性及び液密性が堅固に維持される構造を成している。   The present invention stores liquefied natural gas in a high-pressure, ultra-low temperature state as a storage tank for liquefied natural gas. Therefore, the storage tank for liquefied natural gas has a structure in which impact resistance and liquid tightness are firmly maintained.

貨物の流動のある自動車、船舶に設置される液化天然ガスの保存タンクは、流動のほとんどない陸上型タンクに比べて貨物の流動による機械的応力に対する対備策を工夫しなければならないという点においては違いがある。しかし、機械的応力に対する対備策が用意された船舶に設置される液化天然ガスの保存タンクは当然陸上型タンクにも使われることができるので、本発明の明細書には船舶に設置された液化天然ガスの保存タンクの構造を一例として説明する。   The storage tank for liquefied natural gas installed in automobiles and ships with cargo flow must be devised for countermeasures against mechanical stress due to cargo flow compared to land-type tanks with little flow. There is a difference. However, since the storage tank of liquefied natural gas installed in a ship provided with countermeasures against mechanical stress can naturally be used in a land-type tank, the specification of the present invention is installed in the ship. The structure of a storage tank for liquefied natural gas will be described as an example.

図39は本発明の一実施例に基づいてLNGタンクが設置された例示的な船舶3900の断面図である。船舶3900は船舶の外形を形成する船体外部壁(外殻)3901と船体内部壁(内殻)3903の二重殻船体で成り立っている。船体内部壁と船体外部壁は3905によって繋がっており、一体に形成される。場合に応じては船体内部壁3903が存在しないこともある。   FIG. 39 is a cross-sectional view of an exemplary vessel 3900 with an LNG tank installed in accordance with one embodiment of the present invention. The ship 3900 is composed of a double-shell hull of a hull outer wall (outer shell) 3901 and a hull inner wall (inner shell) 3903 that form the outer shape of the ship. The hull inner wall and the hull outer wall are connected by 3905 and are integrally formed. Depending on the case, the hull inner wall 3903 may not exist.

また、船舶3900の上部は図39に図示したものとは異なって単一層の甲板に形成されることもある。船体内部壁3903の内部は一つ以上の隔壁3907によって分割されることもできる。隔壁3907は従来のLNGに公知されているようにコファダム(Cofferdam)を形成することもできる。   Also, the upper part of the ship 3900 may be formed on a single layer deck different from that shown in FIG. The interior of the hull inner wall 3903 may be divided by one or more partition walls 3907. Septum 3907 can also form a cofferdam as is known in conventional LNG.

各内部空間3911は液化天然ガスのような超低温液体を積載するタンクを構成することができる。例として、船舶3900の左側から2番目の空間にタンクを設置した概念図で説明する。一次密封壁250はLNGを一次的に液密する密封壁としてLNG3913と接しており、従来公知されたとおりに超低温状態のLNGの船荷積による温度変化に対応するためにしわ部(Corrugation)が形成される場合がある。一次密封壁250は多数のアンカー構造体あるいは連結手段3915によって船舶内部壁3903あるいは隔壁3907に繋がっている。一次密封壁250とタンクを構成する船体内部壁3903との間には中間壁構造体3917が位している。中間壁構造体3917(200a、200b)は船体内部隔壁あるいは船体内部壁と一次密封壁250との間に位しており、これらはモジュール(Modules)に構成されており、コーナー部に位するコーナー構造体3917(100)と、平面部に位する平面構造体3917(200)とで構成される。   Each internal space 3911 can constitute a tank for loading a cryogenic liquid such as liquefied natural gas. As an example, a conceptual diagram in which a tank is installed in the second space from the left side of the ship 3900 will be described. The primary sealing wall 250 is in contact with the LNG 3913 as a sealing wall for primarily liquid-tightening LNG, and a wrinkle portion (Corrugation) is formed to cope with a temperature change caused by loading of LNG in an ultra-low temperature state as conventionally known. May be. The primary sealing wall 250 is connected to the ship inner wall 3903 or the bulkhead 3907 by a number of anchor structures or connecting means 3915. An intermediate wall structure 3917 is positioned between the primary sealing wall 250 and the hull inner wall 3903 constituting the tank. The intermediate wall structure 3917 (200a, 200b) is located between the hull inner bulkhead or the hull inner wall and the primary sealing wall 250. These are configured as modules, and are located at the corners. The structure 3917 (100) and the planar structure 3917 (200) located in the plane portion are configured.

図39は理解を助けるために、実際のLNGタンクにおけるものよりモジュールを拡大図示した。各中間壁構造体3917は実際は個数が結構多くて、相互繋がっている。   FIG. 39 enlarges the module from that in an actual LNG tank to aid understanding. The intermediate wall structures 3917 are actually quite many in number and are interconnected.

図40は図39で図示した円3923の拡大図である。図示した例で中間壁構造体3917(平面構造体200a、200b、及びコーナー構造体100)は一次断熱壁204、51、二次断熱壁202、53及び二次密封壁203、52を含んでいる。各中間壁構造体は一つ以上の更に別の機能層を有することができる。本発明の一実施例によれば、上述の中間壁構造体3917の各単位モジュール(200、100)の各密封壁及び各断熱壁の接触面は接着剤(P)で接着して一体型に形成する。また、中間壁構造体3917の下部の二次断熱壁202、52の下端部にはフランジ(Flange)が形成されている。通常、二次断熱壁は絶縁性物質であるPUF(ポリウレタンフォーム)とその下部に附着した板材で構成されて、この板材がPUF(ポリウレタンフォーム)より増大してフランジ(Flange)を形成する。一次断熱壁はPUFとその上部に接着剤(P)で附着された板材で成り立つ。   FIG. 40 is an enlarged view of the circle 3923 shown in FIG. In the illustrated example, the intermediate wall structure 3917 (planar structures 200a, 200b and corner structure 100) includes primary heat insulating walls 204, 51, secondary heat insulating walls 202, 53, and secondary sealing walls 203, 52. . Each intermediate wall structure can have one or more additional functional layers. According to an embodiment of the present invention, the contact surfaces of the sealing walls and the heat insulating walls of the unit modules (200, 100) of the intermediate wall structure 3917 described above are bonded together with an adhesive (P) to be integrated. Form. In addition, a flange is formed at the lower end of the secondary heat insulating walls 202 and 52 below the intermediate wall structure 3917. Usually, the secondary heat insulating wall is made up of PUF (polyurethane foam) which is an insulating material and a plate attached to the lower part thereof, and this plate increases from the PUF (polyurethane foam) to form a flange. The primary insulation wall consists of a PUF and a plate attached with adhesive (P) on top of it.

図示した例で各アンカー構造体3915はアンカー支持ロード112a、112b、下部に位している固定部材113a、113b、上部空間3929、3931に入れられる一次断熱壁(図示せず)を有する。アンカー支持ロード112a、112bの一末端は一次密封壁250に繋がっており、他の末端は船体内部壁(3903)に繋がっている。このようなアンカー構造体の連結関係は下記の他の実施例で詳細に説明する。アンカー構造体3915はタンクを成す船体内部壁または隔壁と一次密封壁250とを繋げる。   In the illustrated example, each anchor structure 3915 has anchor support loads 112a and 112b, lower fixing members 113a and 113b, and primary heat insulating walls (not shown) that are placed in the upper spaces 3929 and 3931. One end of the anchor support load 112a, 112b is connected to the primary sealing wall 250, and the other end is connected to the hull inner wall (3903). The connection relationship of the anchor structure will be described in detail in another embodiment below. The anchor structure 3915 connects the hull inner wall or bulkhead constituting the tank and the primary sealing wall 250.

また、アンカー構造体3915は、隣接した各中間壁構造体のモジュールの100、200a、200bの連結地点に位しており、これらを繋げて、中間壁構造体をタンクを成す船体内部壁または隔壁に固定する。他の実施例において中間壁構造体の中でコーナー構造体及び平面構造体はアンカー構造体以外の手段によって船体内部壁または隔壁に固定されることができる。それについては後で詳細に説明する。更に他の実施例として、アンカー構造体3915は単一体の中間壁構造体の壁に形成された孔に位することもできる。   The anchor structure 3915 is located at a connection point between the modules 100, 200a, and 200b of the adjacent intermediate wall structures. The anchor structure 3915 is connected to connect the intermediate wall structures to the inner wall or bulkhead of the hull that forms a tank. To fix. In another embodiment, the corner structure and the planar structure in the intermediate wall structure can be fixed to the inner wall or bulkhead by means other than the anchor structure. This will be described in detail later. As yet another example, the anchor structure 3915 may be located in a hole formed in the wall of a single intermediate wall structure.

アンカー構造体3915の固定部材113a、113bはアンカー支持ロード112の周りに設置される。空間部3929及び3931はPUF(ポリウレタンフォーム)のような絶縁性物質が入れられる。固定部材113a、113bの下部には凹が形成されて、二次断熱壁202及び53の下部に突出したフランジ(Flange)3925をタンクに密着させる。このような構造によって中間壁構造体3917の中で平面構造体200は一次密封壁250の下部において一次密封壁に対して水平には多少の移動ができるが、垂直方向への移動が制限される。固定部材113aの下部凹3927と二次断熱壁202のフランジ3925との間には多少の空間が存在することができ、また固定部材113aと二次断熱壁202との間にも多少の空間が存在できて、図40で平面構造体200aは左右に水平移動ができる。もちろん図40で平面構造体200aは前後方向(上述の左右に垂直方向)にも水平移動が可能である。一方、中間壁構造体3917の中でコーナー構造体100はタンクと接する面が接着剤(P)で接着固定されるので、船体内部壁及び隔壁に固定されて移動が自由ではなく、ただ該上部の一次密封壁250は上述のコーナー構造体100に対して多少の移動ができるようになる。もちろん一次密封壁250がアンカー構造体によって船体に繋がっているが、一次密封壁はアンカー構造体の上部に熔接締結してもアンカー構造体の下部と船体との連結を多少の動きができるように熔接ではない方法で繋げれば、一次密封壁がコーナー構造体(または船体)に対して多少の移動ができると考えられる。これに対する具体的な実施例については下記の他の実施例で説明する。   The fixing members 113 a and 113 b of the anchor structure 3915 are installed around the anchor support load 112. The spaces 3929 and 3931 are filled with an insulating material such as PUF (polyurethane foam). A recess is formed in the lower part of the fixing members 113a and 113b, and a flange 3925 protruding from the lower part of the secondary heat insulating walls 202 and 53 is brought into close contact with the tank. With this structure, the planar structure 200 in the intermediate wall structure 3917 can move slightly with respect to the primary sealing wall at the lower part of the primary sealing wall 250, but the movement in the vertical direction is limited. . There may be some space between the lower recess 3927 of the fixing member 113a and the flange 3925 of the secondary heat insulating wall 202, and there is also some space between the fixing member 113a and the secondary heat insulating wall 202. In FIG. 40, the planar structure 200a can move horizontally from side to side. Of course, in FIG. 40, the planar structure 200a can also be moved horizontally in the front-rear direction (the above-described left-right direction). On the other hand, in the intermediate wall structure 3917, the surface of the corner structure 100 that is in contact with the tank is bonded and fixed with an adhesive (P). The primary sealing wall 250 can move somewhat with respect to the corner structure 100 described above. Of course, the primary sealing wall 250 is connected to the hull by the anchor structure. However, the primary sealing wall can be connected to the lower part of the anchor structure and the hull even if welded to the upper part of the anchor structure. If connected by a method other than welding, it is considered that the primary sealing wall can move somewhat with respect to the corner structure (or hull). Specific examples of this will be described in other examples below.

図40において二次密封壁52、203及び3933は図41に図示したとおりに液密的に繋がっている。また、多数のモジュール100、200相互間においても二次密封壁は液密的に繋がっている。   In FIG. 40, the secondary sealing walls 52, 203 and 3933 are connected in a liquid-tight manner as shown in FIG. Also, the secondary sealing wall is connected in a liquid-tight manner between the multiple modules 100 and 200.

アンカー構造体3915のアンカー支持ロード112aには適当な締結部材、図41の実施例においては二つのナット3936、3937によってアンカー構造体の二次密封壁3933が固定されている。隣接する中間壁構造体の二次密封壁52、203とは適当な連結部材212とスクリュー(Screw)214によって液密的に繋がるようになる。連結部材212と二次密封壁の接する面は接着剤(P)を塗布して液密性を増大させることができる。また、液密性を増大させるために、連結部材212の上下接合面には屈曲部3935が形成されることができる。アンカー構造体3915の二次密封壁3933のまわりにはしわ部115が形成されて、隣接する平面構造体の水平移動時に発生する二次密封壁の伸縮または凝縮応力を吸収することができる。   A secondary sealing wall 3933 of the anchor structure is fixed to the anchor support load 112a of the anchor structure 3915 by a suitable fastening member, in the embodiment of FIG. 41, by two nuts 3936, 3937. The secondary sealing walls 52 and 203 of the adjacent intermediate wall structure are liquid-tightly connected by a suitable connecting member 212 and a screw 214. The surface where the connecting member 212 and the secondary sealing wall are in contact can be coated with an adhesive (P) to increase the liquid tightness. In order to increase liquid tightness, a bent portion 3935 can be formed on the upper and lower joint surfaces of the connecting member 212. A wrinkle 115 is formed around the secondary sealing wall 3933 of the anchor structure 3915 to absorb the expansion or contraction stress of the secondary sealing wall generated when the adjacent planar structure moves horizontally.

また、上述の連結部材212による二次密封壁間の連結は、隣接する平面構造体の密封壁間の連結、平面構造体とコーナー構造体の密封壁間の連結にも同じく適用される。   In addition, the connection between the secondary sealing walls by the connecting member 212 is also applied to the connection between the sealing walls of the adjacent planar structures and the connection between the sealing walls of the planar structure and the corner structure.

本発明における更に他の実施例によれば、液化天然ガスの保存タンクは船舶の船体内部に形成された面に隣接するように設置される二次断熱壁と、その上部面に形成される二次密封壁及びその上部面に形成される一次断熱壁を含んでおり、本発明においてはそのようなタンクを船舶の外部で予備組立体としてそれぞれコーナー構造体、平面構造体を予め製作してタンクの内部空間に組み入れるのが望ましい。   According to still another embodiment of the present invention, the liquefied natural gas storage tank has a secondary heat insulating wall installed adjacent to a surface formed inside the hull of the ship, and a second insulating wall formed on the upper surface thereof. And a primary heat insulating wall formed on the upper surface of the secondary sealing wall. In the present invention, such a tank is preliminarily manufactured as a pre-assembly outside the ship, and a corner structure and a planar structure are manufactured in advance, respectively. It is desirable to incorporate it into the interior space.

即ち、予め製作されたコーナー構造体を船体内部に先に固定した後、これを基準に平面構造体を組み立てて、これらの平面構造体の固定はタンクの組立現場にてアンカー構造体を組み立てることで成り立つ。   In other words, after pre-fabricated corner structures are first fixed inside the hull, plane structures are assembled on the basis of these, and the anchor structures are assembled at the tank assembly site. It consists of.

図6は本発明の一実施例による液化天然ガスの保存タンクを構成するコーナー構造体の内部構造を図示した断面図で、図7は本発明の一実施例による船舶の内部に設置される液化天然ガスの保存タンクのコーナー構造の連結関係を図示した全体斜視図である。また、図8は本発明の一実施例による船舶の内部に設置される液化天然ガスの保存タンクのコーナー構造を図示した部分拡大断面斜視図である。   FIG. 6 is a cross-sectional view illustrating an internal structure of a corner structure constituting a storage tank for liquefied natural gas according to an embodiment of the present invention, and FIG. 7 illustrates liquefaction installed in a ship according to an embodiment of the present invention. It is the whole perspective view which illustrated the connection relation of the corner structure of the storage tank of natural gas. FIG. 8 is a partial enlarged cross-sectional perspective view illustrating a corner structure of a storage tank for liquefied natural gas installed in a ship according to an embodiment of the present invention.

本発明の一実施例によるコーナー構造体(100)は、図6ないし図8に図示したとおりに、船舶の船体面が合うコーナー地点にそれぞれ接するようにコーナー部の二次断熱壁(53)がL形態に形成されて、その上部(内側)面にコーナー部の二次密封壁(52)が同一の形態に付着固定されて、またその上部面にコーナー部の一次断熱壁(51)が形成される構造として予め組み立てられたものである。ここで、上述のコーナー部の一次断熱壁(51)とコーナー部の二次断熱壁(53)は上述のコーナー部の二次密封壁(52)の上下部面にそれぞれ接着剤(P)で接着して堅固に密着固定するのが望ましい。   As shown in FIGS. 6 to 8, the corner structure (100) according to an embodiment of the present invention has the secondary heat insulating wall (53) at the corner so as to contact each corner point where the ship's hull surface matches. It is formed in L shape, and the secondary sealing wall (52) of the corner part is adhered and fixed to the same form on the upper (inside) surface, and the primary heat insulating wall (51) of the corner part is formed on the upper surface. As a structure to be assembled, it is pre-assembled. Here, the primary heat insulating wall (51) of the corner portion and the secondary heat insulating wall (53) of the corner portion are respectively bonded to the upper and lower surfaces of the secondary sealing wall (52) of the corner portion with an adhesive (P). It is desirable to adhere and fix firmly.

上述で説明したコーナー支持板(50)、一次及び二次断熱壁(51、53)、二次密封壁(52)と上述の上部及び下部(外側)支持ロード(70、60)の連結関係をより詳細に説明すると、次のとおりである。   The connection relationship between the corner support plate (50), the primary and secondary heat insulating walls (51, 53), the secondary sealing wall (52), and the upper and lower (outer) support loads (70, 60) described above. This will be described in more detail as follows.

液化天然ガス(LNG)を保存するための船舶の内部は、本発明のコーナー構造が設置できる空間を形成するように、下部底面(1、二重殻船体の内殻)及びそれと一体型に横隔壁(2)が形成されており、本発明は上述の下部底面(1)と左右あるいは横隔壁(2)が所定の角度で合う地点に設置されるコーナー構造に関するものである。従って、二次断熱壁の形象はタンクの模様及びコーナーの位置によってタンク面の接続角度が異なるので、その模様はL字より更に広がることもある。   The interior of the vessel for storing liquefied natural gas (LNG) is horizontally integrated with the bottom bottom (1, the inner shell of the double-shell hull) and the bottom so as to form a space where the corner structure of the present invention can be installed. A partition wall (2) is formed, and the present invention relates to a corner structure installed at a point where the lower bottom surface (1) and the left or right or horizontal partition wall (2) meet at a predetermined angle. Therefore, the shape of the secondary heat insulating wall has a tank surface connection angle that differs depending on the tank pattern and the corner position, and therefore the pattern may be wider than the L-shape.

上述のとおりに、上述の下部底面(1)と隔壁(2)が所定の角度で合う地点には上述の下部底面(1)及び隔壁(2)と面接するL型の二次断熱壁(53)が形成される。本発明で‘一次’及び‘二次’という用語の使用は、保存タンクに保存される液化天然ガスを基準にして液化天然ガスを一次的に密封または断熱する機能を有しているか、二次的に密封または断熱する機能を有しているかに対する区分の基準として駆使されたものである。   As described above, an L-shaped secondary heat insulating wall (53) that is in contact with the lower bottom surface (1) and the partition wall (2) at a point where the lower bottom surface (1) and the partition wall (2) meet at a predetermined angle. ) Is formed. The use of the terms 'primary' and 'secondary' in the present invention has the function of primarily sealing or insulating the liquefied natural gas based on the liquefied natural gas stored in the storage tank, or the secondary This is used as a standard for classification of whether it has a function of sealing or insulating.

上述の二次断熱壁(53)は、ポリウレタンフォーム(Polyurethane Form)材質の二次断熱材(58)と、その下部面に接着されたプライウッド(Plywood)材質の二次断熱壁の板材(56)に形成されるので、上述の二次断熱壁の板材(56)は船体内部に形成された下部底面(1)及び隔壁(2)に接するようになる。断熱壁の構成方法や形象、材質などに関してはUS4,747,513、WO8909909、US5,501,359、US5,586,513、JP2000-038190(公開)、US6,035,795、JP2001-122386(公開)、などに公知されており、上述の特許に記載されている内容を本発明の明細書の一部とし、これらの技術を本発明でも使うことができる。   The secondary heat insulation wall (53) is composed of a secondary heat insulation material (58) made of polyurethane foam and a plate material (56) of the secondary heat insulation wall made of plywood bonded to the lower surface thereof. Therefore, the plate material (56) of the secondary heat insulating wall comes into contact with the lower bottom surface (1) and the partition wall (2) formed inside the hull. US 4,747,513, WO 909909, US 5,501,359, US 5,586,513, JP2000-038190 (open), US6,035,795, JP2001-122386 (open) ), Etc., and the contents described in the above-mentioned patents are part of the specification of the present invention, and these techniques can also be used in the present invention.

上述の二次断熱壁(53)が形成されると、その上部面に二次密封壁(52)が位するようになる。その二次密封壁(52)は保存タンクに保存された液化天然ガスの漏出ガスを二次的に遮断する機能を有する。そのような上述の二次密封壁(52)の下部面に上述の二次断熱壁(53)の二次断熱材(58)の上部面が接着剤(P)で接着するようにする。このような二次密封壁(52)の材質はアルミニウムシーツまたは可撓性シーツ(所謂‘Triplex’)が望ましい。   When the secondary heat insulating wall (53) is formed, the secondary sealing wall (52) is positioned on the upper surface thereof. The secondary sealing wall (52) has a function of secondarily blocking the leakage gas of the liquefied natural gas stored in the storage tank. The upper surface of the secondary heat insulating material (58) of the secondary heat insulating wall (53) is adhered to the lower surface of the above-described secondary sealing wall (52) with an adhesive (P). The material of the secondary sealing wall 52 is preferably an aluminum sheet or a flexible sheet (so-called 'Triplex').

上述の参照特許US6,035,795ではFlexible Triplexについて記載されているが、本発明ではより硬いRigid Triplexを使うのが望ましい。   Although the above-mentioned reference patent US 6,035,795 describes Flexible Triplex, it is desirable to use a rigid Rigid Triplex in the present invention.

上述のように、二次断熱壁(53)と二次密封壁(52)の締結が行われると、その上部面に形成される一次断熱壁(51)との固定のための下部支持ロード(60)が上述の二次断熱壁(53)と二次密封壁(52)を貫通するようになる。   As described above, when the secondary heat insulating wall (53) and the secondary sealing wall (52) are fastened, the lower support load (for fixing to the primary heat insulating wall (51) formed on the upper surface thereof ( 60) penetrates the secondary heat insulation wall (53) and the secondary sealing wall (52) described above.

即ち、上述の二次断熱壁(53)には、上述の下部支持ロード(60)が貫通できる貫通ホール(hole)が一定間隔に形成され、二次断熱壁板材(56)に形成された貫通ホールの下部には上述の下部支持ロード(60)の下部が堅固に固定できるロード支持キャップ(CAP)(61)が挿入されて上述の二次断熱壁板材(56)に支持される。   That is, in the secondary heat insulating wall (53), through holes (holes) through which the lower support load (60) can pass are formed at regular intervals, and the through holes formed in the secondary heat insulating wall plate material (56). A load support cap (CAP) (61) capable of firmly fixing the lower portion of the lower support load (60) is inserted in the lower portion of the hole and supported by the secondary heat insulating wall plate material (56).

上述のロード支持キャップ(61)に下部支持ロード(60)が挿入されて、二次断熱壁(53)を貫通した後、上述の下部支持ロード(60)の下部はロード支持キャップ(61)の内部にて固定ナット(62)で堅固に固定される。   After the lower support load (60) is inserted into the load support cap (61) and passes through the secondary heat insulating wall (53), the lower portion of the lower support load (60) is formed on the load support cap (61). It is firmly fixed inside with a fixing nut (62).

また、上述の二次断熱壁(53)を貫通した上述の下部支持ロード(60)の上部は、二次断熱壁(53)の上部面に固定された二次密封壁(52)を貫通するようになって、その二次密封壁(52)は下部支持ロード(60)の上部に取り付けられる支持ナット(63)と密封壁固定ナット(64)によって下部支持ロード(60)の上に固定される。   Further, the upper part of the lower support load (60) penetrating the secondary heat insulating wall (53) penetrates the secondary sealing wall (52) fixed to the upper surface of the secondary heat insulating wall (53). Thus, the secondary sealing wall (52) is fixed on the lower support load (60) by a support nut (63) and a sealing wall fixing nut (64) attached to the upper part of the lower support load (60). The

上述のとおりに、二次断熱壁(53)及び二次密封壁(52)を貫通して固定される下部支持ロード(60)の上端部は一次断熱壁(51)の下部を貫通して固定される。   As described above, the upper end of the lower support load (60) fixed through the secondary heat insulation wall (53) and the secondary sealing wall (52) is fixed through the lower part of the primary heat insulation wall (51). Is done.

即ち、上述の一次断熱壁(51)は、二次断熱壁(53)の上部面に固定された二次密封壁(52)に接して付着固定されたものであり、その構成は上述の二次密封壁(52)に接して接着剤(P)などによって付着固定される一次断熱壁(51)の下部板材(55)とその上部面に形成される一次断熱材(57)及びその上部面に付着固定される一次断熱壁(51)の上部板材(54)で構成される。上述の一次断熱壁の上部及び下部板材(54、55)はプライウッド材質であり、一次断熱材(57)はポリウレタンフォーム材質である。   That is, the primary heat insulating wall (51) is attached and fixed in contact with the secondary sealing wall (52) fixed to the upper surface of the secondary heat insulating wall (53). A lower plate member (55) of the primary heat insulating wall (51) that is in contact with and fixed to the secondary sealing wall (52) by an adhesive (P), a primary heat insulating material (57) formed on the upper surface thereof, and an upper surface thereof It is comprised by the upper board | plate material (54) of the primary heat insulation wall (51) attached and fixed to. The upper and lower plate members (54, 55) of the primary heat insulating wall described above are made of plywood, and the primary heat insulating material (57) is made of polyurethane foam.

この際に上述の下部支持ロード(60)が貫通する一次断熱壁(51)の下部板材(55)の上には後述する上部支持ロード(70)との固定のために連結補強台(90)が位するようになる。即ち、上述の二次断熱壁(53)及び二次密封壁(52)を貫通して固定された下部支持ロード(60)の上端部が上述の一次断熱壁(51)の下部板材(55)の上に位する連結補強台(90)を貫通してボルト-ナット締結方式に固定される。   At this time, on the lower plate member (55) of the primary heat insulating wall (51) through which the lower support load (60) passes, the connection reinforcing base (90) is fixed for fixing to the upper support load (70) described later. Will be ranked. That is, the upper end of the lower support load (60) fixed through the secondary heat insulation wall (53) and the secondary sealing wall (52) is the lower plate (55) of the primary heat insulation wall (51). It is fixed to the bolt-nut fastening system through the connection reinforcement stand (90) located on the top.

上述の連結補強台(90)には多数の(本発明の図面では一番の)上部支持ロード(70)の下部が固定されて、固定方式は連結補強台(90)の下部面に熔接のような方式で固定されたロード支持キャップ(71)に上部支持ロード(70)が挿入された後で固定ナット(72)で固定する方式である。   The lower part of a number of upper support loads (70) (first in the drawing of the present invention) is fixed to the connection reinforcing table (90), and the fixing system is welded to the lower surface of the connection reinforcing table (90). In this method, the upper support load (70) is inserted into the load support cap (71) fixed in such a manner, and then fixed with the fixing nut (72).

従って、二次断熱壁(53)及び二次密封壁(52)を貫通する下部支持ロード(60)の上端部と一次断熱壁(51)を貫通する上部支持ロード(70)の下端部が堅固に固定される。   Accordingly, the upper end portion of the lower support load (60) penetrating the secondary heat insulating wall (53) and the secondary sealing wall (52) and the lower end portion of the upper support load (70) penetrating the primary heat insulating wall (51) are solid. Fixed to.

また、図6の(a)においては、上述の上部支持ロード(70)は一次断熱壁(51)とその上部板材(54)が固定されて支持され、この一次断熱壁(51)の上部板材(54)の上部面に上述の保存タンクの非対称荷重が受けられるようにL型のコーナー支持板(50)が位して支持される。ここで、上述のコーナー支持板(50)は、熱による収縮及び伸長ができるように、上述の一次断熱壁(51)の接着剤(P)で締結せずにスライディング移動ができるように機械的に締結する。このようなコーナー支持板(50)の上に後述する一次密封壁(250)が熔接などの方法で締結されて位するようになる。   In FIG. 6 (a), the upper support load (70) is supported by the primary heat insulating wall (51) and its upper plate (54) fixed, and the upper plate of the primary heat insulating wall (51). The L-shaped corner support plate (50) is positioned and supported on the upper surface of (54) so that the asymmetric load of the storage tank described above can be received. Here, the above-mentioned corner support plate (50) is mechanically slidable without being fastened by the adhesive (P) of the above-mentioned primary heat insulating wall (51) so that it can be contracted and extended by heat. To conclude. A primary sealing wall (250), which will be described later, is fastened and positioned on the corner support plate (50) by a method such as welding.

上部支持ロード(70)とコーナー支持板(50)の締結方法に関する更に他の実施例として図6の(b)を挙げる。即ち、上部支持ロード(70)は一次断熱壁(51)とその上部の上部板材(54)を貫通してコーナー支持板(50)に直接締結して、コーナー支持板(50)を支持する。この際に上部支持ロード(70)はコーナー部の一次断熱壁(51)との間に少し空間が存在して、上述のコーナー支持板(50)と一次断熱壁(51)との間には接着剤(P)などによる直接的な締結がないので、上述のコーナー支持板(50)は一次断熱壁(51)に対して多少のスライディング(Sliding)が可能である。このようなスライディングは一次断熱壁(51)とコーナー支持板(50)との間に材質の相違による温度変化に伴う伸縮率の差を解消してくれる。   FIG. 6B shows another embodiment relating to the fastening method of the upper support load 70 and the corner support plate 50. That is, the upper support load (70) passes through the primary heat insulating wall (51) and the upper plate member (54) thereabove and is directly fastened to the corner support plate (50) to support the corner support plate (50). At this time, there is a little space between the upper support load (70) and the primary heat insulating wall (51) of the corner portion, and between the corner support plate (50) and the primary heat insulating wall (51). Since there is no direct fastening by an adhesive (P) or the like, the corner support plate (50) can be slightly slid with respect to the primary heat insulating wall (51). Such sliding eliminates a difference in expansion / contraction rate due to a temperature change due to a difference in material between the primary heat insulating wall (51) and the corner support plate (50).

また、このような構造によって、コーナー部の一次密封壁は、タンクの底に締結された下部支持ロード(60)、上述の下部支持ロード(60)に締結された上部支持ロード(70)、上述の上部支持ロード(70)と締結したコーナー支持板(50)によって安定的に支持される。また、上述のコーナー支持板(50)は少し厚目の厚板で構成されるので、非対称応力が発生するコーナー部の一次密封壁を安定的に支持することができる。   In addition, due to such a structure, the primary sealing wall of the corner portion has a lower support load (60) fastened to the bottom of the tank, an upper support load (70) fastened to the lower support load (60), It is stably supported by the corner support plate (50) fastened to the upper support load (70) of the main body. Moreover, since the above-mentioned corner support plate (50) is comprised of a slightly thicker plate, the primary sealing wall of the corner portion where asymmetric stress occurs can be stably supported.

また、本発明のコーナー構造体(100)を形成する上述の二次密封壁(52)の材質はアルミニウムシーツまたは可撓性シーツ(Triplex)の材質であり、上述のコーナー部の二次密封壁(52)は上述のコーナー部の一次断熱壁(51)及びコーナー部の二次断熱壁(53)の側面でより突出するように形成されて、後工程で隣接する平面部の予備組立体の二次密封壁(203)に取り付けられるようにする。   The material of the secondary sealing wall (52) forming the corner structure (100) of the present invention is an aluminum sheet or a flexible sheet (Triplex), and the secondary sealing wall of the corner portion described above. (52) is formed so as to protrude more from the side surfaces of the primary heat insulating wall (51) and the secondary heat insulating wall (53) of the corner portion described above, and is a pre-assembly of the adjacent flat portion in a later step. It is attached to the secondary sealing wall (203).

本発明による液化天然ガスの保存タンクを構成する平面構造体を図示した斜視図の図9を参照すると、本発明を構成する上述の平面構造体(200)は船体の外部で予め組み立られた状態で船体の内部へ導入されて、このような平面構造体(200)の構造は上述のコーナー構造体(100)と類似の構成で構成されており、平面部の一次断熱壁(204)の上部にはプライウッド材質の上部板材(205)が設置される。   Referring to FIG. 9 of the perspective view illustrating the planar structure constituting the storage tank for liquefied natural gas according to the present invention, the planar structure (200) constituting the present invention is pre-assembled outside the hull. The planar structure (200) has a structure similar to that of the corner structure (100) described above, and is an upper part of the primary heat insulating wall (204) of the planar portion. Is provided with an upper plate material (205) made of plywood.

即ち、船体内部面(1)に接する平面部の二次断熱壁(202)には、下部板材(201)が用意されて、その上部面にポリウレタンフォーム材質の平面部の二次断熱壁(202)が附着されて、その上部面にまたアルミニウムシーツあるいは可撓性シーツ(Triplex、望ましくはRigid Triplex)材質の平面部の二次密封壁(203)が附着されて、また、その上部面にポリウレタンフォーム材質の平面部の一次断熱壁(204)及びプライウッド材質の上部板材(205)が附着される仕組みになっている。   That is, a lower plate member (201) is prepared on the secondary heat insulating wall (202) of the flat surface in contact with the inner surface (1) of the hull, and the secondary heat insulating wall (202 of the flat surface portion made of polyurethane foam material on the upper surface thereof. ) And a secondary sealing wall (203) of a flat portion made of an aluminum sheet or a flexible sheet (Triplex, preferably Rigid Triplex) is attached to the upper surface, and polyurethane is attached to the upper surface. A primary heat insulating wall (204) of a flat portion made of foam material and an upper plate material (205) made of plywood are attached.

また、上述の平面部の二次断熱壁の下部板材(201)と二次密封壁(203)は、一次及び二次断熱壁(202、204)の側面から少し突出しており、後工程で隣接する平面構造体(200)またはコーナー構造体(100)と互いに締結して固定されるようになって、コーナー構造体(100)と隣接する反対面のコーナー部位は本発明のアンカー構造体(150)によって組み立てられて、固定されるように一部が切断された形象に形成される。このような構造で構成される本発明の平面構造体(200)の高さは隣接するコーナー構造体(100)の高さと同一になるように製作される。   Further, the lower plate material (201) and the secondary sealing wall (203) of the secondary heat insulating wall of the above-described flat portion slightly protrude from the side surfaces of the primary and secondary heat insulating walls (202, 204), and are adjacent in the subsequent process. The planar structure (200) or the corner structure (100) to be fixed is fastened to each other, and the corner portion on the opposite surface adjacent to the corner structure (100) is the anchor structure (150) of the present invention. ) And is formed into a shape that is partially cut so as to be fixed. The planar structure (200) of the present invention having such a structure is manufactured to have the same height as that of the adjacent corner structure (100).

図10は船体内壁に突出部材及びスタッドピン(Stud Pin)(109)を設置した斜視図で、図11は図10の突出部材にコーナー構造体を挿入した斜視図で、図12は図11のコーナー構造体を固定した斜視図で、図13は図12のコーナー構造体と接する平面構造体を配置した斜視図で、図14は図13の平面構造体が固定された後でアンカー支持ロードを締結した斜視図で、図15は図14のアンカー支持ロードにアンカー部の二次断熱壁及びアンカー部の二次密封壁を設置した斜視図で、図16は船体内壁に複数の平面構造体を固定した斜視図で、図17は図16の平面構造体に図示されたアンカー部の二次密封壁を固定した斜視図で、図18は図17のアンカー部の二次密封壁の上部にアンカー部の一次断熱壁を挿入した斜視図で、図19は図18のアンカー部の一次断熱壁(116)上部の溝にアンカー上部版(117)を入れた斜視図で、図20は図19のアンカー部の一次断熱壁の上面にアンカー断熱板材を設置した斜視図で、図21は図20のアンカー断熱板材をアンカー上部キャップで固定した斜視図で、図22は一次断熱材が入れられた斜視図で、そして、図23は図22に一次密封壁が設置された斜視図である。   10 is a perspective view in which a projecting member and a stud pin (109) are installed on the wall of the hull, FIG. 11 is a perspective view in which a corner structure is inserted into the projecting member in FIG. 10, and FIG. 13 is a perspective view in which a corner structure is fixed, FIG. 13 is a perspective view in which a planar structure in contact with the corner structure in FIG. 12 is arranged, and FIG. 14 is an anchor support load after the planar structure in FIG. 13 is fixed. FIG. 15 is a perspective view in which a secondary heat insulating wall of the anchor portion and a secondary sealing wall of the anchor portion are installed on the anchor support load of FIG. 14, and FIG. 16 shows a plurality of planar structures on the wall of the ship body. FIG. 17 is a perspective view in which the secondary sealing wall of the anchor portion illustrated in the planar structure of FIG. 16 is fixed. FIG. 18 is an anchor on the upper portion of the secondary sealing wall of the anchor portion in FIG. Is a perspective view in which a primary heat insulating wall is inserted, 19 is a perspective view in which an anchor upper plate (117) is placed in a groove on the primary heat insulating wall (116) of the anchor portion of FIG. 18, and FIG. 20 shows an anchor heat insulating plate on the upper surface of the primary heat insulating wall of the anchor portion of FIG. FIG. 21 is a perspective view in which the anchor heat insulating plate material of FIG. 20 is fixed with an anchor upper cap, FIG. 22 is a perspective view in which a primary heat insulating material is inserted, and FIG. 23 is a primary seal in FIG. It is the perspective view in which the wall was installed.

下記には、本発明の一実施例による液化天然ガスの保存タンク及びそのようなタンクが設置される過程を図10ないし図23を参照して詳細に説明する。   Hereinafter, a storage tank for liquefied natural gas according to an embodiment of the present invention and a process of installing such a tank will be described in detail with reference to FIGS.

本発明による液化天然ガスの保存タンクは、船体の下部底面(1、二重船体の内殻)及びそれと左右あるいは横方向に垂直あるいは一定角度に延長して形成された左右側壁あるいは横隔壁(2)に設置される。   The storage tank for liquefied natural gas according to the present invention includes a lower bottom surface (1, inner hull of a double hull) and left and right side walls or horizontal bulkheads (2 ).

まず、コーナー構造体(100)が固定できるコーナー部の突出部材(80、81)を下部底部(1)及び横隔壁(2)に固定する。この際に上述のコーナー部の突出部材(80、81)を固定する方法としては熔接による方法が適当であり、コーナー部からの間隔は組立が完了したコーナー構造体(100)が挿入できる程にする。このように、コーナー部の突出部材(80、81)の間に挿入されるコーナー構造体(100)は上述の突出部材(80、81)との間に所定の隙間が形成される。   First, the protruding members (80, 81) at the corners to which the corner structure (100) can be fixed are fixed to the lower bottom part (1) and the horizontal partition wall (2). At this time, as a method of fixing the protruding members (80, 81) at the corner portion, a method by welding is appropriate, and the interval from the corner portion is such that the corner structure (100) after assembly can be inserted. To do. Thus, a predetermined gap is formed between the corner structure (100) inserted between the protruding members (80, 81) in the corner portion and the above-described protruding members (80, 81).

上述の突出部材(80、81)の間に図10ないし図12に図示したとおりに上述のコーナー構造体(100)が装着されると、上述の突出部材(80、81)に固定台(101)を固定するようになる。   When the corner structure (100) is mounted between the protruding members (80, 81) as shown in FIGS. 10 to 12, the fixed base (101) is mounted on the protruding members (80, 81). ) Will be fixed.

この際に固定する方式は上述の固定台(101)を上述の突出部材(80、81)にボルティング固定する方式を採用する。上述の固定台(101)は上述の突出部材(80、81)とコーナー構造体(100)との間の隙間に当たる突起が形成されて、上述の固定台(101)の固定時に上述のコーナー構造体(100)と突出部材(80、81)との間の隙間が埋められて、流動が防止できるようにするのが望ましい。上述の船体内部の下部底部(1)または隔壁(2)とコーナー構造体(100)の下面はボンディング(Bonding)によって締結されて、二次的には上述の内部の突出部材(80、81)には本発明のコーナー構造体(100)が付着して、固定される。   As a method of fixing at this time, a method of bolting and fixing the above-mentioned fixing base (101) to the above-mentioned protruding members (80, 81) is adopted. The above-mentioned fixing base (101) is formed with protrusions that correspond to the gaps between the above-mentioned protruding members (80, 81) and the corner structure (100), and the above-mentioned corner structure is fixed when the above-mentioned fixing base (101) is fixed. It is desirable to fill the gap between the body (100) and the projecting members (80, 81) to prevent flow. The lower bottom portion (1) or partition wall (2) inside the hull described above and the lower surface of the corner structure (100) are fastened by bonding, and secondarily the protruding members (80, 81) described above inside. The corner structure (100) of the present invention is attached to and fixed to.

また、それと共に図13に図示したとおりに、上述のコーナー構造体(100)から連続的に設置される平面構造体(200)を相互固定するためのアンカー構造体(150)のアンカーベース板(110)を下部底部(1)及び隔壁(2)面に一定間隔に固定する。   In addition, as shown in FIG. 13, the anchor base plate (150) of the anchor structure (150) for mutually fixing the planar structure (200) continuously installed from the corner structure (100) described above. 110) is fixed to the lower bottom (1) and the partition (2) surface at regular intervals.

このために、船体内部面に一定間隔に一群のスタッドピン(109)を設置する。この際に上述のスタッドピン(109)は上述の下部底面(1)または隔壁(2)に接触される部分を尖らせる加工をした後、加圧状態で熔接して、上述のスタッドピン(109)が船体内壁面に熔接される。   For this purpose, a group of stud pins (109) are installed at regular intervals on the inner surface of the hull. At this time, the above-described stud pin (109) is sharpened at the portion that comes into contact with the lower bottom surface (1) or the partition wall (2), and then welded in a pressurized state, so that the above-described stud pin (109) ) Is welded to the hull wall.

次に、上述のスタッドピン(109)には、上述のスタッドピン(109)と対応する貫通孔が形成されて、上述のスタッドピン(109)に挿入されるアンカーベース板(110)を挿入する。この際に上述のアンカーベース板(110)は船体内壁面に熔接またはボンディング(Bonding)によって締結するようにする。また、上述のアンカーベース板(110)の厚さは上述の平面部の二次断熱壁の下部板材(201)の厚さと同一である。   Next, a through hole corresponding to the stud pin (109) is formed in the stud pin (109), and the anchor base plate (110) to be inserted into the stud pin (109) is inserted. . At this time, the above-described anchor base plate (110) is fastened to the wall surface of the ship body by welding or bonding. The thickness of the anchor base plate (110) described above is the same as the thickness of the lower plate member (201) of the secondary heat insulating wall of the planar portion described above.

引き継いで、図14に図示したとおりに、上述の平面部の二次断熱壁の下部板材(201)の突出部を覆うことができるように上述のアンカーベース板(110)の上部にアンカー下部板(111)を締結する。そのために、上述のアンカー下部板(111)には、上述のスタッドピン(109)と対応する位置に貫通孔が形成されて、上述のアンカー下部板(111)を貫通したスタッドピン(109)にはナットが締結されることによって上述のアンカーベース板(110)の固定が行われる。   In succession, as shown in FIG. 14, the anchor lower plate is placed on the upper portion of the anchor base plate (110) so as to cover the protruding portion of the lower plate member (201) of the secondary heat insulating wall of the flat portion. (111) is fastened. Therefore, a through hole is formed in the anchor lower plate (111) at a position corresponding to the stud pin (109), and the stud pin (109) penetrating the anchor lower plate (111) is formed. The anchor base plate (110) is fixed by fastening the nut.

このように、上述の平面構造体(200)はその下部板材(201)が上述の固定台(101)または上述のアンカー下部板(111)によって固定されて、上方向の移動が制限されるが、水平方向は多少のスライディング(Sliding)が可能である。即ち、アンカー下部板(111)は予備組立体として形成された平面構造体(200)が上向に移動するのを防止する。   Thus, although the lower plate member (201) of the planar structure (200) is fixed by the fixed base (101) or the anchor lower plate (111), the upward movement is restricted. Some horizontal sliding is possible in the horizontal direction. That is, the anchor lower plate (111) prevents the planar structure (200) formed as a preliminary assembly from moving upward.

次に、図14と図15に図示したとおりに、上述のアンカー下部板(111)の中央部にアンカー支持ロード(112)を垂直に固定する。   Next, as shown in FIGS. 14 and 15, the anchor support load (112) is vertically fixed to the center portion of the anchor lower plate (111).

そのために、上述のアンカー下部板(111)の中央部には所定の溝が形成される。また、上述のアンカー下部板(111)の下部にアンカーベース板(110)が位する。   For this purpose, a predetermined groove is formed at the center of the anchor lower plate (111). Further, the anchor base plate (110) is positioned below the anchor lower plate (111).

この際に上述のアンカーベース板(110)には上述のスタッドピン(109)に対応する複数の貫通孔が形成されて、上述のスタッドピン(109)に貫通孔を通らせて上述のアンカーベース板(110)を設置する。次に、上述のアンカーベース板(110)を貫通したスタッドピン(109)をナットで取り付けて、上述のアンカーベース板(110)を固定するようになる。   At this time, a plurality of through holes corresponding to the stud pins (109) are formed in the anchor base plate (110), and the stud bases (109) are passed through the through holes. Install the plate (110). Next, the stud pin (109) penetrating the anchor base plate (110) is attached with a nut to fix the anchor base plate (110).

一方、上述のアンカー下部板(111)の溝には上述のアンカーベース板(110)の中央に形成されたホールを通ってロード支持キャップ(120)が設置される。上述のロード支持キャップ(120)は、内部にナットが含まれていたり、あるいはナットの構造が一体に形成されたものであり、本発明においては上述のロード支持キャップ(120)の中央部がナット加工されており、上述のロード支持キャップ(120)に上述のアンカー支持ロード(112)が垂直に締結する方式を取るようになる。   Meanwhile, the load support cap (120) is installed in the groove of the anchor lower plate (111) through a hole formed in the center of the anchor base plate (110). The above-mentioned load support cap (120) includes a nut inside, or the structure of the nut is integrally formed. In the present invention, the central portion of the load support cap (120) is a nut. The anchor support load (112) is vertically fastened to the load support cap (120).

ここで、上述のロード支持キャップ(120)及びナットは図8に図示したロード支持キャップ(61)及び固定ナット(62)と類似している方式である。   Here, the load support cap (120) and the nut are similar to the load support cap (61) and the fixing nut (62) shown in FIG.

ここで、上述のアンカー支持ロード(112)は上部または下部で熱伝逹が発生し得るが、設計時に上述のアンカー支持ロード(112)の直径及び他の部品としての熱伝逹率を考慮して、タンク内の液化天然ガスから船体への熱伝逹を最小化することが望ましい。   Here, although the above-described anchor support load (112) may generate heat transfer at the top or the bottom, the diameter of the above-mentioned anchor support load (112) and the heat transfer rate as another component are considered at the time of design. Therefore, it is desirable to minimize heat transfer from the liquefied natural gas in the tank to the hull.

このようなアンカー支持ロード(112)は後工程で附着する一次密封壁から発生する荷重を一次的に支持する役目をするようになり、断熱壁の予備組立体(平面構造体)は一次密封壁及び接着剤(P)などによって直接的な結合がほとんどないので、従来の断熱壁とは異なって一次密封壁に対して多少のスライディングが許容されるので、船体の変形などに対するタンク構造の安全性が増大する。   Such an anchor support load (112) serves to primarily support a load generated from a primary sealing wall to be attached in a later process, and a pre-assembly (planar structure) of a heat insulating wall serves as a primary sealing wall. And because there is almost no direct connection with adhesive (P) etc., unlike the conventional heat insulation wall, some sliding is allowed for the primary sealing wall, so the tank structure safety against deformation of the hull etc. Will increase.

上述のような固定方式で本発明のアンカー下部板(111)及びアンカー支持ロード(112)を中心にして各平面構造体(200)を固定するようになる。この際に上述の平面構造体(200)の下部板材(201)は上述の船体内部面(1)と上述のアンカー下部板(111)とが形成する隙間に入れられて固定される。   Each planar structure (200) is fixed around the anchor lower plate (111) and the anchor support load (112) of the present invention by the fixing method as described above. At this time, the lower plate member (201) of the planar structure (200) is fixed in a gap formed by the inner surface (1) of the hull and the anchor lower plate (111).

上述の平面構造体(200)は、船体外部にて予め組み立てられた状態で船体内部へ導入されるものであり、このような平面構造体(200)の平面部の一次断熱壁(204)の上部には上部板材(205)が接着される。   The above-described planar structure (200) is introduced into the hull in a state assembled in advance outside the hull, and the primary heat insulating wall (204) of the planar portion of such a planar structure (200) is provided. An upper plate (205) is bonded to the upper part.

即ち、船体内部面(1)に面する平面部の二次断熱壁の下部板材(201)が用意されており、その上部面にポリウレタンフォーム材質の平面部の二次断熱壁(202)が附着されて、その上部面に再びアルミニウムシーツまたは可撓性シーツ(Triplex)材質の平面部の二次密封壁(203)が附着されて、またその上部面にポリウレタンフォーム材質の平面部の一次断熱壁(204)及びその上部面にプライウッド材質の上部板材(205)が附着される構造で成り立つ。   That is, a lower plate member (201) of a flat secondary heat insulating wall facing the inner surface (1) of the hull is prepared, and a secondary heat insulating wall (202) of a flat surface made of polyurethane foam is attached to the upper surface. Then, the secondary sealing wall (203) of the flat part made of aluminum sheet or flexible sheet (Triplex) material is attached to the upper face again, and the primary heat insulating wall of the flat part made of polyurethane foam material is attached to the upper face. (204) and an upper plate (205) made of a plywood material is attached to the upper surface thereof.

また、上述の平面部の二次断熱壁の下部板材(201)及び二次密封壁(203)は、一次及び二次断熱壁(202、204)の側面から多少突出しており、後工程で隣接する平面構造体(200)またはコーナー構造体(100)の二次密封壁と相互締結して固定されるようになり、コーナー構造体(100)と接する反対面のコーナー部位は本発明のアンカー構造体(150)によって組立及び固定されるようになり、一部が切断された形象に形成されている。このような構造で成り立つ本発明における平面構造体(200)の高さは隣接するコーナー構造体(100)の高さと同一になるように製作される。   In addition, the lower plate material (201) and the secondary sealing wall (203) of the secondary heat insulating wall of the above-described flat portion slightly protrude from the side surfaces of the primary and secondary heat insulating walls (202, 204), and are adjacent in the subsequent process. The planar structure (200) or the corner structure (100) is fixed to the secondary sealing wall by mutual fastening, and the corner portion on the opposite surface in contact with the corner structure (100) is the anchor structure of the present invention. It is assembled and fixed by the body (150) and is formed in a partially cut shape. The planar structure (200) according to the present invention having such a structure is manufactured to have the same height as the adjacent corner structure (100).

本発明において予め組み立てられた平面構造体(200)が船体内部面に固定される方式は、コーナー構造体(図示せず)を突出部材に固定する固定台の他側に平面部の二次断熱壁(202)の側面から突出した平面部の二次断熱壁の下部板材(201)が挿入されると共に、上述のコーナー構造体(100)と接する反対面のコーナー部位から突出した平面部の二次断熱壁の下部板材(201)が船体内部面(1)に固定された金属材質のアンカーベース板(110)及びこの上部面に固定されたプライウッド材質のアンカー下部板(111)が形成する隙間に挿入される方式で固定する。   In the present invention, the planar structure (200) pre-assembled in the present invention is fixed to the inner surface of the hull. Secondary insulation of the planar portion is provided on the other side of the fixing base for fixing the corner structure (not shown) to the protruding member. The lower plate member (201) of the secondary heat insulating wall of the flat portion protruding from the side surface of the wall (202) is inserted, and the two of the flat portion protruding from the opposite corner portion in contact with the corner structure (100) are inserted. A gap formed by a metal anchor base plate (110) fixed to the hull inner surface (1) and a plywood anchor lower plate (111) fixed to the upper surface of the lower heat insulating wall lower plate material (201). It is fixed by the method inserted in.

上述のとおりに、本発明のアンカー構造体を形成するアンカー下部板(111)及びアンカー支持ロード(112)を中心に上述の平面構造体(200)が挿入固定されると、図15及び図29に図示したとおりに、アンカー部の二次断熱壁(113)が挿入される。そのアンカー部の二次断熱壁(113)の上部面には周りに円形のしわ部(115)が形成されたアンカー部の二次密封壁(114)が位するようになり、これらの二次密封壁(114)はアンカー支持ロード(112)に形成された板材(121)によって支持されて、挿入後は支持ロード(112)にボルティング締結される固定ナット(123)によって堅固に固定される。   As described above, when the above-described planar structure (200) is inserted and fixed around the anchor lower plate (111) and the anchor support load (112) forming the anchor structure of the present invention, FIGS. As shown in Fig. 8, the secondary heat insulating wall (113) of the anchor portion is inserted. The secondary sealing wall (114) of the anchor part in which a circular wrinkle part (115) is formed is positioned on the upper surface of the secondary heat insulating wall (113) of the anchor part. The sealing wall (114) is supported by a plate member (121) formed on the anchor support load (112), and is firmly fixed by a fixing nut (123) bolted to the support load (112) after insertion. .

このような平面構造体(200)の位置が固定されると、図15ないし図22に図示したとおりに、コーナー構造体(100)及び平面構造体(200)の二次断熱壁(53、202)が形成する空間部をポリウレタンフォーム材質の断熱材で充填すると共に、上述のアンカー支持ロード(112)にアンカー部の二次断熱壁(113)及びアンカー部の二次密封壁(114)を挿入するようになる。   When the position of the planar structure (200) is fixed, as shown in FIGS. 15 to 22, the secondary heat insulating walls (53, 202) of the corner structure (100) and the planar structure (200) are obtained. ) Is filled with a heat insulating material made of polyurethane foam material, and the secondary heat insulating wall (113) of the anchor portion and the secondary sealing wall (114) of the anchor portion are inserted into the anchor support load (112). To come.

上述のアンカー部の二次断熱壁(113)は、ポリウレタンフォーム材質の断熱材及びプライウッド材質の板材になっていて、断面が四角で、その上部面に付着固定されるアンカー部の二次密封壁(114)はアルミニウムシーツまたは可撓性シーツ(Triplex)材質になっている。   The secondary heat insulating wall (113) of the anchor part is a heat insulating material made of polyurethane foam and a plate material made of plywood, and has a square cross section and is attached and fixed to the upper surface of the secondary sealing wall of the anchor part. (114) is made of aluminum sheets or flexible sheets (Triplex).

前述のとおりに構成されたLNG保存タンクは、船舶の移動時に波等で船体が曲がる現象による部分的な応力が発生して、それによって船体に変形が生じると、断熱材及び二次密封壁に課される応力が増加する。このように、上述の密封壁に発生する応力を減少させるために、上述のアンカー部の二次密封壁(114)には図23に示したとおりに円形のしわ部(115)が形成される方がいい。即ち、上述のしわ部(115)は上述の平面構造体(200)のスライディング移動時に上述の平面構造体(200)がスライディング移動する方向へ伸長または収縮して断熱材または密封壁に与えられる機械的または熱的変形を防止する。   When the LNG storage tank configured as described above is subjected to partial stress due to the phenomenon that the hull bends due to waves, etc. during the movement of the ship, the deformation of the hull will cause the insulation and the secondary sealing wall to The stress imposed is increased. Thus, in order to reduce the stress generated in the sealing wall, a circular wrinkle portion (115) is formed on the secondary sealing wall (114) of the anchor portion as shown in FIG. Better. That is, the wrinkle portion (115) extends or contracts in the sliding movement direction of the planar structure (200) when the planar structure (200) slides, and is applied to the heat insulating material or the sealing wall. Prevent mechanical or thermal deformation.

また、断熱壁層に生じる応力によって上述の平面構造体(200)間の連結が行われる傾向がある。この際に本発明に基づく保存タンクの平面構造体(200)は、上述のアンカー構造体(150)のアンカー下部支持板(111)にかかっているので、離脱が防止される状態で多少のスライディング移動が可能である。   Moreover, there exists a tendency for the connection between the above-mentioned planar structures (200) to be performed by the stress which arises in a heat insulation wall layer. At this time, since the planar structure (200) of the storage tank according to the present invention rests on the anchor lower support plate (111) of the anchor structure (150), the sliding tank is slightly slid in a state in which separation is prevented. It is possible to move.

上述の理由によって、船体に応力が発生する場合、上述のコーナー構造体(100)は固定されたままの状態だが、各平面構造体(200)は船体変形時に部分的な横方向のスライディングが可能であり、船体の変形を上述の断熱壁層自体が吸収することができる。   For the reasons described above, when stress is generated in the hull, the corner structure (100) remains fixed, but each planar structure (200) can partially slide in the horizontal direction when the hull is deformed. And the above-mentioned heat insulation wall layer itself can absorb the deformation of the hull.

上述のとおりに、本発明のコーナー構造体(100)及び各平面構造体(200)が船体内部面に設置された後、各二次断熱壁が成している空間部にポリウレタンフォーム材質の断熱材(211)が入れられた後は隣接する各二次密封壁が固定手段によって連結固定される。   As described above, after the corner structure (100) and each planar structure (200) of the present invention are installed on the inner surface of the hull, heat insulation of polyurethane foam material is formed in the space formed by each secondary heat insulation wall. After the material (211) is inserted, the adjacent secondary sealing walls are connected and fixed by fixing means.

即ち、コーナー構造体(100)の二次密封壁(52)とそれに隣接する平面構造体(200)の二次密封壁(203)を固定して、上述の平面構造体(200)の隣接する二次密封壁(203)を相互固定させると共に、上述の平面構造体(200)の二次密封壁(203)と隣接する上述のアンカー部の二次密封壁(114)を相互固定させるようになる。   That is, the secondary sealing wall (52) of the corner structure (100) and the secondary sealing wall (203) of the planar structure (200) adjacent to the corner structure (100) are fixed and the planar structure (200) is adjacent. The secondary sealing wall (203) is fixed to each other, and the secondary sealing wall (203) of the planar structure (200) and the secondary sealing wall (114) of the anchor part adjacent to each other are fixed to each other. Become.

また、各一次断熱壁が成す空間部にポリウレタンフォーム材質の断熱材(210)が充填される。   Further, the space formed by each primary heat insulating wall is filled with a heat insulating material (210) made of polyurethane foam.

その上部には一次密封壁(250)が締結される。一次密封壁はアンカー部に熔接(望ましくはFillet熔接)される、望ましくはアンカー上部キャップ(119)に熔接される。一次密封壁については下記に詳細に記載する。   A primary sealing wall (250) is fastened to the top. The primary sealing wall is welded to the anchor portion (preferably Fillet weld), preferably to the anchor upper cap (119). The primary sealing wall is described in detail below.

図24は本発明による液化天然ガスの保存タンクにおける二次密封壁を取り付ける手段を図示した拡大断面図で、図25は本発明による液化天然ガスの保存タンクにおける二次密封壁を取り付ける手段を図示した拡大斜視図である。また、図26は本発明による液化天然ガスの保存タンクにおけるアンカー構造体の締結関係を拡大図示した部分断面斜視図である。   FIG. 24 is an enlarged cross-sectional view illustrating a means for attaching a secondary sealing wall in a liquefied natural gas storage tank according to the present invention, and FIG. 25 illustrates a means for attaching a secondary sealing wall in a liquefied natural gas storage tank according to the present invention. FIG. FIG. 26 is an enlarged partial sectional perspective view showing the fastening relationship of the anchor structure in the liquefied natural gas storage tank according to the present invention.

ここで固定方法は、図24及び図25に図示したとおりに固定手段で固定するが、このような固定方式は本発明における全ての二次密封壁を取り付けるのにもれなく適用される。   Here, the fixing method is fixed by fixing means as shown in FIGS. 24 and 25, but such a fixing method is applied to all the secondary sealing walls in the present invention.

即ち、一例として図24に図示したとおりに、本発明のコーナー部の一次及び二次断熱材(57、58)と平面部の一次及び二次断熱壁(204、202)とが形成する空間部(即ち、断熱壁の隙間)に突出した各二次密封壁(52、203)が近接する部位に下部固定板(213)及び上部固定板(212)が上述の二次密封壁(52、203)を間に挟んで対面するような形で位して、特にこの際に限らないが、固定ボルト(214)で上述の下部固定板(213)及び上部固定板(212)を固定すると、二次密封壁(52、203)が堅固に固定される。   That is, as shown in FIG. 24 as an example, the space portion formed by the primary and secondary heat insulating materials (57, 58) of the corner portion of the present invention and the primary and secondary heat insulating walls (204, 202) of the flat portion. In other words, the lower fixing plate (213) and the upper fixing plate (212) are arranged in the vicinity of the secondary sealing walls (52, 203) protruding in the gaps (that is, the gaps between the heat insulating walls). ) In the form of facing each other, and not limited to this, but if the lower fixing plate (213) and the upper fixing plate (212) are fixed by the fixing bolt (214), The next sealing wall (52, 203) is firmly fixed.

ここで、下部固定板(213)及び上部固定板(212)は金属材質を利用する。   Here, the lower fixing plate (213) and the upper fixing plate (212) use a metal material.

また、上述の下部固定板(213)及び上部固定板(212)は上述の各二次密封壁(52、203)を曲線形態に連結固定するが、これは上述の各下部固定板(213)及び上部固定板(212)の対面部が互いに対応している曲面凹凸部に形成されることで可能になる。このように、二次密封壁の末端が曲線で繋がっていることで万一発生するかもしれない一次密封壁のLNGの漏出に対する二次密封壁の密封特性が向上する。   Further, the lower fixing plate (213) and the upper fixing plate (212) described above connect and fix the secondary sealing walls (52, 203) in a curved shape, which is the above-described lower fixing plate (213). Further, the facing portions of the upper fixing plate (212) are formed on the curved uneven portions corresponding to each other. Thus, the sealing characteristic of the secondary sealing wall with respect to the leakage of LNG of the primary sealing wall which may occur by the end of the secondary sealing wall being connected by the curve is improved.

また、下部固定板(213)及び上部固定板(212)の締結体はその縦方向に多少の屈曲が存在するので、多少余分の長さを有することが望ましくて、保存タンクに液化天然ガスが入れられてから温度が下がって熱的に収縮してもその応力を吸収する余裕を提供するなど、機械的/熱的収縮及び膨脹作用に伴う負荷を容易に解消できる。   Further, since the fastening body of the lower fixing plate (213) and the upper fixing plate (212) has some bending in the vertical direction, it is desirable that the fastening body has a slightly extra length, and the liquefied natural gas is stored in the storage tank. Even if the temperature is reduced after being put in, it is possible to easily eliminate the load associated with the mechanical / thermal contraction and expansion action, such as providing a margin for absorbing the stress even if the thermal contraction occurs.

また、このような二次密封壁の締結構造は、二次密封壁の締結を各断熱壁及び船体とは関係無く独立的に締結することによって断熱壁に自由度をある程度提供できて、特に船体内部面の変形に伴う断熱壁の損傷を防止することができる。   Also, such a fastening structure of the secondary sealing wall can provide a certain degree of freedom to the heat insulating wall by fastening the secondary sealing wall independently of each heat insulating wall and the hull. Damage to the heat insulating wall due to deformation of the inner surface can be prevented.

以上のように、各コーナー構造体(100)及び平面構造体(200)が成す下部空間部に断熱材を充填して、各二次密封壁を固定手段で固定する。その次に、アンカー部の一次断熱壁(116)上部の溝にアンカー上部版(117)を入れ、再びアンカー断熱板材(118)を付着固定して、この中央部にまた円形のアンカー上部キャップ(119)を挿入固定する。このために、上述のアンカー断熱板材(118)の上部中央には所定の溝が形成されて、その空間に前述のアンカー上部キャップ(119)が位置する。上述のアンカー上部キャップ(119)にはナットが含まれており、ナットの構造が一体に形成されて上述のアンカー支持ロード(112)の上端に取り付けることでアンカー構造体(150)の組立を完了するようになる。   As described above, the lower space formed by each corner structure (100) and planar structure (200) is filled with the heat insulating material, and each secondary sealing wall is fixed by the fixing means. Next, the anchor upper plate (117) is inserted into the groove on the upper part of the primary heat insulating wall (116) of the anchor portion, and the anchor heat insulating plate (118) is adhered and fixed again, and a circular anchor upper cap ( 119) is inserted and fixed. For this purpose, a predetermined groove is formed at the upper center of the above-mentioned anchor heat insulating plate (118), and the above-mentioned anchor upper cap (119) is located in the space. The anchor upper cap (119) includes a nut, and the structure of the nut is integrally formed and attached to the upper end of the anchor support load (112) to complete the assembly of the anchor structure (150). To come.

図26は本発明による液化天然ガスの保存タンクにおけるアンカー構造体の締結関係を拡大図示した部分断面斜視図で、一連の過程を経て組み立られた本発明によるアンカー構造体(150)は図26に図示したとおりの締結構造を持つようになる。   FIG. 26 is an enlarged partial sectional perspective view illustrating the fastening relationship of the anchor structure in the storage tank for liquefied natural gas according to the present invention. The anchor structure (150) according to the present invention assembled through a series of processes is shown in FIG. It comes to have a fastening structure as shown.

上述の組立過程を経て本発明によるコーナー構造体(100)及び平面構造体(200)が船体内部面に設置されて、アンカー構造体(150)の組立が完了すると、図20に図示したとおりに、上述のコーナー構造体(100)、各平面構造体(200)及びアンカー構造体(150)が形成する一次断熱壁(204)が成す空間部(二次断熱壁が形成する空間部の上部)に断熱材で充填される。この際に充填される断熱材としてはグラスウール(Glass Wool)が適用されるが、これは一次断熱壁の熱的収縮に従来より柔軟性で対応することによって熱的応力をより容易に解消するためである。また、船体における捩れ現象の発生時に予備組立体の単位体が船体における捩れに順応して多少動くことができるようにする效果も有している。   When the corner structure (100) and the planar structure (200) according to the present invention are installed on the inner surface of the hull through the assembly process described above and the assembly of the anchor structure (150) is completed, as shown in FIG. The space part formed by the primary heat insulating wall (204) formed by the corner structure (100), each planar structure (200) and the anchor structure (150) (upper part of the space part formed by the secondary heat insulating wall) Filled with insulation. Glass wool (Glass Wool) is used as the heat insulating material to be filled at this time, but this is because the thermal stress is more easily eliminated by responding more flexibly to the thermal contraction of the primary heat insulating wall. It is. In addition, there is an effect that the unit of the preliminary assembly can be moved to some extent in accordance with the torsion in the hull when the torsion phenomenon occurs in the hull.

上述のとおりに、各組立構造体が形成する一次断熱壁の空間部にグラスウール(Glass Wool)のような断熱材を充填した後はその上部面にしわ部(251、Corrugation)を有するメンブレン型の一次密封壁(250)を付着固定するようになる。その一次密封壁(250)の材質は主に耐食性及び熱的安全性に優れたステンレス材質を利用するようになる。   As described above, after filling the space portion of the primary heat insulating wall formed by each assembly structure with a heat insulating material such as glass wool, the membrane type having a wrinkle portion (251, Corrugation) on its upper surface. The primary sealing wall (250) is attached and fixed. As the material of the primary sealing wall (250), a stainless steel material having excellent corrosion resistance and thermal safety is mainly used.

一方、上述の一次密封壁(250)の材質は、従来のMark III 型タンクで知られたり、本出願人によって公知された特許(国内特許出願第2001-0010438または2001-0010152号)に提示されたりした材質や形象にすることも可能で、彼らの変形も可能である。また、US3,299,598;US3,302,359;US3,510,278などに記載された一次密封壁を用いることもできる。   On the other hand, the material of the above-mentioned primary sealing wall (250) is known in the conventional Mark III type tank or presented in a patent known by the present applicant (Japanese Patent Application No. 2001-0010438 or 2001-0010152). It is possible to change the shape and shape of the material, and to modify them. Moreover, the primary sealing wall described in US3,299,598; US3,302,359; US3,510,278 etc. can also be used.

また、上述のしわ部(251)は、各組立構造体(100、150、200)によって形成された空間部に沿って縦方向に形成されて、しわ部(251)を中心にして周辺部に多数のしわ部(251)が形成される。上述のしわ部(251)は、保存された液化天然ガスと直接接する一次密封壁(250)の熱的収縮及び膨脹作用が最も激しいので、柔軟性を持ってこれに対応して熱的変形を容易に解消するために工夫されたものである。また、上述のしわ部(251)が各一次断熱壁が形成した空間部の上部と同じく縦方向に形成される理由は、一次断熱壁に附着された二次密封壁の熱的収縮及び膨脹にも相互依存的に対応して保存タンクが受ける熱的応力を容易に解消することができるからである。   In addition, the wrinkle portion (251) described above is formed in a vertical direction along the space portion formed by each assembly structure (100, 150, 200), and is formed around the wrinkle portion (251) as a peripheral portion. A large number of wrinkle portions (251) are formed. The wrinkle portion (251) described above has the most severe thermal contraction and expansion action of the primary sealing wall (250) in direct contact with the stored liquefied natural gas. It has been devised to eliminate it easily. In addition, the reason why the wrinkle part (251) is formed in the vertical direction is the same as the upper part of the space part formed by each primary heat insulating wall. This is because of the thermal contraction and expansion of the secondary sealing wall attached to the primary heat insulating wall. This is because the thermal stress applied to the storage tank can be easily eliminated in a mutually dependent manner.

図27は本発明における他の実施例による液化天然ガスの保存タンクの一部切截斜視図である。   FIG. 27 is a partially cut perspective view of a storage tank for liquefied natural gas according to another embodiment of the present invention.

本発明の他の実施例によれば、上述の液化天然ガスの保存タンクは、図27に図示したとおりに、液化天然ガスを保存する船舶のような構造物の内部に形成された空間に二次断熱壁(292)が設置されて、その上部面に形成される二次密封壁(293)及び一次断熱壁(294)が設置される。   According to another embodiment of the present invention, the liquefied natural gas storage tank described above is installed in a space formed inside a structure such as a ship for storing liquefied natural gas, as shown in FIG. The secondary heat insulation wall (292) is installed, and the secondary sealing wall (293) and the primary heat insulation wall (294) formed on the upper surface thereof are installed.

ここで、上述の一次断熱壁(294)というのは、上述の二次断熱壁(292)の端部の間の上部に形成される所定の空間部を含めており、上述の空間部には上述の一次断熱壁(294)側面及び二次密封壁(293)の上面と結合する平面部の連結断熱壁(297)が設置される。   Here, the above-mentioned primary heat insulating wall (294) includes a predetermined space portion formed at an upper portion between the end portions of the above-described secondary heat insulating wall (292). The connecting heat insulating wall (297) of the flat portion that is connected to the side surface of the primary heat insulating wall (294) and the upper surface of the secondary sealing wall (293) is installed.

上述の平面部の連結断熱壁(297)の中心部には、アンカー部の一次断熱壁(276)が設置されて、上述の平面部の連結断熱壁(297)とアンカー部の一次断熱壁(276)との間の空間にはグラスウールを含める断熱材が充填される。   The primary heat insulating wall (276) of the anchor portion is installed at the center of the connecting heat insulating wall (297) of the flat surface portion, and the primary heat insulating wall (297) of the flat surface portion and the primary heat insulating wall of the anchor portion ( 276) is filled with a heat insulating material including glass wool.

前述のとおりに他の実施例による液化天然ガスの保存タンクの製造工程を見てみると、次のとおりである。   As described above, a manufacturing process of a liquefied natural gas storage tank according to another embodiment is as follows.

図28ないし図36は本発明の他の実施例による液化天然ガスの保存タンクが船体内部空間に組み立られる過程を順次に図示した斜視図である。   FIGS. 28 to 36 are perspective views sequentially illustrating a process of assembling a storage tank for liquefied natural gas according to another embodiment of the present invention in the interior space of the hull.

本明細書の説明のために、各図面の各構成要素に参照符号を与えることにおいて、同一の構成要素に対しては例え異なる図面上に示されても同一の符号が使われていることに留意する。   For the purpose of description of the present specification, the same reference numerals are used for the same constituent elements even if they are shown on different drawings. pay attention to.

序でに本発明の他の実施例において、平面構造体またはコーナー構造体を固定する過程は前述の実施例のとおりであり、本発明における他の実施例では同一の過程について省略する。   In the beginning, in another embodiment of the present invention, the process of fixing the planar structure or the corner structure is as described in the previous embodiment, and the same process is omitted in the other embodiments of the present invention.

前述の過程を経て、図28及び図29に図示したとおりに、本発明のアンカー構造体(150)を形成するアンカー下部板(111)及びアンカー支持ロード(112)を中心に上述の平面構造体(200)が挿入固定されると、アンカー部の二次断熱壁(113)が挿入される。   Through the above-described process, as shown in FIGS. 28 and 29, the above-described planar structure centering on the anchor lower plate (111) and the anchor support load (112) forming the anchor structure (150) of the present invention. When (200) is inserted and fixed, the secondary heat insulating wall (113) of the anchor portion is inserted.

上述のアンカー部の二次断熱壁(113)の上部面には円形のしわ部(115)が形成されたアンカー部の二次密封壁(114)が位するようになり、これらの二次密封壁(114)はアンカー支持ロード(112)に形成された板材(121)によって支持されて、挿入された後はアンカー支持ロード(112)にボルティング締結する固定ナット(123)によって堅固に固定される。   The secondary sealing wall (114) of the anchor part in which the circular wrinkle part (115) is formed is positioned on the upper surface of the secondary heat insulating wall (113) of the anchor part. The wall (114) is supported by a plate (121) formed on the anchor support load (112), and after being inserted, the wall (114) is firmly fixed by a fixing nut (123) that is bolted to the anchor support load (112). The

また、図30を参照すると、隣接して配置された各平面部の一次断熱壁(294)の側面と、その下部に隣接して位置した平面部の二次断熱壁(292)の上部に固定された二次密封壁(293)の上部面には平面部の連結断熱壁(297)が設置されて、本発明の実施例において上述の平面部の連結断熱壁(297)は上述の平面部の二次密封壁(293)または上述のアンカー部の二次密封壁(114)の上面に接着剤(P)で固定される。従って、予備組立体に形成される平面構造体(200)はアンカー部の下端のアンカー下部板(111)によって上部への移動が制限される。一方、アンカー部の二次密封壁(114)の周辺にはしわ部が形成されているので、平面構造体(200)はアンカー下部板(111)によって上部への移動が制限された状態で横方向へ多少移動しても二次密封壁はその移動を吸収することができる。   In addition, referring to FIG. 30, it is fixed to the side surface of the primary heat insulating wall (294) of each planar portion arranged adjacent to the upper portion of the secondary heat insulating wall (292) of the planar portion located adjacent to the lower portion thereof. The upper surface of the formed secondary sealing wall (293) is provided with a flat connecting heat insulating wall (297). In the embodiment of the present invention, the flat connecting heat insulating wall (297) is the flat surface portion. Are fixed to the upper surface of the secondary sealing wall (293) or the secondary sealing wall (114) of the anchor portion with an adhesive (P). Accordingly, the planar structure (200) formed in the preliminary assembly is restricted from moving upward by the anchor lower plate (111) at the lower end of the anchor portion. On the other hand, since the wrinkle portion is formed around the secondary sealing wall (114) of the anchor portion, the planar structure (200) is laterally moved in a state where the upward movement is restricted by the anchor lower plate (111). Even if it moves slightly in the direction, the secondary sealing wall can absorb the movement.

このように、上述の平面部の連結断熱壁(297)と二次密封壁(114、293)が接着剤(P)によってより強く締結するようになる。   In this way, the connection heat insulating wall (297) and the secondary sealing walls (114, 293) of the above-described flat portion are more strongly fastened by the adhesive (P).

この際に上述の平面部の連結断熱壁(297)は隣接した上述の平面部の一次断熱壁(294)の側面と一定の距離を離隔した隙間(1〜4mm)が形成できて、このように形成された隙間は上述の船体の変形時に上述の平面構造体(200)が流動できる空間を提供して変形量を吸収することができるようにする。   At this time, the connecting heat insulating wall (297) of the flat part can form a gap (1 to 4 mm) spaced apart from the side surface of the primary heat insulating wall (294) of the adjacent flat part by a certain distance. The gaps formed in (1) provide a space in which the above-described planar structure (200) can flow when the above-mentioned hull is deformed to absorb the deformation.

また、上述の平面部の連結断熱壁(297)は、隣接する平面部の二次密封壁(293)の上部に位して上述のアンカー部の二次密封壁(114)と平面部の二次密封壁(293)の端部を固定する。これによって、上述の平面部の連結断熱壁(297)が下記の平面部の二次密封壁(293)または上述のアンカー部の二次密封壁(114)と接着剤(P)で強く接着される。従って、万一の場合、一次密封壁が破損しても液化天然ガスが上述の平面部の二次密封壁(293)の連結部分またはアンカー部の二次密封壁(114)まで到逹することができないので、液化天然ガスの漏出を確実に遮断することができる。   In addition, the connecting heat insulating wall (297) of the above-described flat part is positioned above the secondary sealing wall (293) of the adjacent flat part, and is connected to the secondary sealing wall (114) of the above-described anchor part and the two of the flat part. The end of the next sealing wall (293) is fixed. As a result, the connecting heat insulating wall (297) of the above-described flat portion is strongly bonded to the secondary sealing wall (293) of the following flat portion or the secondary sealing wall (114) of the above-described anchor portion with the adhesive (P). The Therefore, in the unlikely event that the primary sealing wall breaks, the liquefied natural gas reaches the connecting portion of the above-mentioned planar secondary sealing wall (293) or the secondary sealing wall (114) of the anchor portion. Therefore, leakage of liquefied natural gas can be reliably blocked.

上述のとおりに、各二次密封壁(114、293)を固定手段によって固定した後は、図31ないし図36に図示した手順に、アンカー支持ロード(112)にアンカー部の一次断熱壁(116)を挿入して、そのアンカー部の一次断熱壁(116)の上部面に形成された円形のへこんでいるところにアンカー上部板(337)を挿入してアンカー支持ロード(112)の上端部に固定する。   As described above, after each secondary sealing wall (114, 293) is fixed by the fixing means, the primary heat insulating wall (116) of the anchor portion is attached to the anchor support load (112) according to the procedure shown in FIGS. ) And an anchor upper plate (337) is inserted into the circular depression formed on the upper surface of the primary heat insulating wall (116) of the anchor portion to the upper end of the anchor support load (112). Fix it.

次に、その上部面に更にアンカー断熱板材(338)を付着固定させて、その中央部に更に円形のアンカー上部キャップ(339)を挿入固定する。このために、上述のアンカー断熱板材(338)の上部中央には所定の溝が形成されて、その空間に上述のアンカー上部キャップ(339)が位するようになる。上述のアンカー上部キャップ(339)にはナットが含まれていたり、ナットの構造が一体に形成されて、上述のアンカー支持ロード(112)の上端に取り付けられることによってアンカー構造体(150)の組立作業が完了するようになる。   Next, an anchor heat insulating plate (338) is further adhered and fixed to the upper surface, and a further circular anchor upper cap (339) is inserted and fixed to the center. For this reason, a predetermined groove is formed in the upper center of the anchor heat insulating plate (338), and the anchor upper cap (339) is positioned in the space. The above-mentioned anchor upper cap (339) includes a nut, or the structure of the nut is integrally formed and attached to the upper end of the above-mentioned anchor support load (112), thereby assembling the anchor structure (150). Work will be completed.

上述の組立過程を経て、本発明によるアンカー構造体と平面構造体(200)が形成する一次断熱壁(276、297)の空間部(二次断熱壁が形成する空間部の上部)に断熱材で充填することができる。この際に充填される断熱材としてはグラスウール(Glass Wool、325)を適用することができて、これは一次断熱壁(276、297)の熱的収縮によって柔軟性を持って対応して熱的応力をより容易に解消するためである。   Through the above-described assembly process, a heat insulating material is formed in the space portion (the upper portion of the space portion formed by the secondary heat insulating wall) of the primary heat insulating walls (276, 297) formed by the anchor structure and the planar structure (200) according to the present invention. Can be filled with. Glass wool (Glass Wool, 325) can be used as a heat insulating material to be filled at this time, and this is flexible and thermally corresponding to the thermal contraction of the primary heat insulating wall (276, 297). This is because the stress is more easily eliminated.

上述の一次断熱壁(276、297)が形成する空間部にグラスウール(325)のような断熱材を充填した後、図36に図示したとおりに、その上部面にしわ部(251)を有するメンブレン型の一次密封壁(250)を付着固定するようになる。その一次密封壁(250)の材質は主に耐食性及び熱的安全性が優れているステンレス材質を利用することができる。   After filling the space formed by the primary heat insulating walls (276, 297) with a heat insulating material such as glass wool (325), as shown in FIG. 36, the membrane having a wrinkle (251) on the upper surface thereof The primary sealing wall (250) of the mold is attached and fixed. As the material of the primary sealing wall (250), a stainless steel material having excellent corrosion resistance and thermal safety can be mainly used.

また、上述の一次密封壁(250)の材質は、従来のMark III 型タンクで知られており、本出願人によって公知された特許(国内特許出願第2001-0010438または2001-0010152号)に提示された材質で構成することができて、その形象においても変形が可能である。   Further, the material of the primary sealing wall (250) described above is known in the conventional Mark III type tank, and is presented in a patent known by the present applicant (Japanese Patent Application No. 2001-0010438 or 2001-0010152). The material can be made of any of the above materials, and the shape can be modified.

図37及び図38は本発明による液化天然ガスの保存タンクにおいて二次密封壁を取り付ける状態図を拡大図示した断面図である。   37 and 38 are cross-sectional views showing enlarged views of a state in which a secondary sealing wall is attached in the liquefied natural gas storage tank according to the present invention.

ここで上述の平面部の二次密封壁(293)が固定される方式は、図37及び図38に図示したものと同一の固定手段によって固定されて、これらの固定方式は本発明の全ての平面部の二次密封壁(293)を相互固定するのに全て適用される。   Here, the above-described method of fixing the secondary sealing wall (293) of the flat portion is fixed by the same fixing means as shown in FIGS. 37 and 38, and these fixing methods are all of the present invention. All are applied to fix the secondary sealing wall (293) of the flat part.

即ち、一例として図37に図示したとおりに、本発明において隣接する平面部の一次及び二次断熱壁(292、294)が形成する空間部に突出した各平面部の二次密封壁(293)が近接する部位に上述の平面部の二次密封壁(293)の端部が隙間無く接するように締結する上部連結部材(312)及び下部連結部材(313)が設置される。   That is, as illustrated in FIG. 37 as an example, in the present invention, the secondary sealing wall (293) of each planar portion protruding into the space formed by the primary and secondary heat insulating walls (292, 294) of the adjacent planar portion in the present invention. The upper connecting member (312) and the lower connecting member (313) that are fastened so that the end portion of the secondary sealing wall (293) of the above-described flat surface is in contact with a portion close to each other without a gap are installed.

また、上述の平面部の二次密封壁(293)は上部面と下部面にそれぞれ樹脂材(293a)が塗布されて、隣接した断熱壁が形成する空間部に延長される。   Further, the secondary sealing wall (293) of the above-described flat portion is applied with a resin material (293a) on the upper surface and the lower surface, respectively, and is extended to the space portion formed by the adjacent heat insulating wall.

この際に特に限らないが、直結ボルト(314)で上述の下部連結部材(313)及び上部連結部材(312)を固定すると、上述の平面部の二次密封壁(293)が堅固に固定される。更に、このために、上述の平面部の連結断熱壁(297)には上述の直結ボルト(314)を挿入するための貫通部(297a)が形成される。   At this time, although not particularly limited, when the lower connecting member (313) and the upper connecting member (312) are fixed by the direct connection bolt (314), the secondary sealing wall (293) of the flat portion is firmly fixed. The Further, for this purpose, a through-hole (297a) for inserting the above-mentioned direct connection bolt (314) is formed in the above-mentioned connecting heat insulating wall (297) of the flat portion.

ここで、上述の固定ボルトまたは固定ボルト(314)は、上述の上部連結部材(312)または下部連結部材(313)を直接貫通させて締結する構造を有して、別途のボルト締結孔を形成しない状態の作業が可能である。例えば、直結ボルト(Self Drilling Screw)が使用可能である。   Here, the fixing bolt or the fixing bolt (314) described above has a structure in which the upper connecting member (312) or the lower connecting member (313) is directly penetrated and fastened to form a separate bolt fastening hole. It is possible to work in a state where no For example, a direct drilling screw can be used.

また、上述の固定ボルト(314)には平ワッシャー(Washer Plain、314a)またはスプリングワッシャー(Spring Washer、314b)が含まれており、上述の断熱材の上部を所定の圧力で圧搾した状態で維持するようになる。ここで、上述の固定ボルト(314)はLNGの膨脹圧による断熱材の体積、即ち厚さの減少量を考慮して取り付けるのが望ましい。   The fixing bolt (314) includes a flat washer (314a) or a spring washer (314b), and the upper portion of the heat insulating material is maintained in a compressed state. To come. Here, it is preferable that the fixing bolt (314) is attached in consideration of the volume of the heat insulating material due to the expansion pressure of LNG, that is, the thickness reduction amount.

一方、上述の上部連結部材(312)及び下部連結部材(313)の締結面には上述の平面部の二次密封壁(293)を収容する溝が形成される。また、上述の溝の両端部には相互対向または非対向するように形成された凹凸部(312a、313a)が形成される。前述の上部連結部材(312)及び下部連結部材(313)は上述の固定ボルト(314)によって固定時に上述の凹凸部(312a、313a)が上述の平面部の二次密封壁(293)に塗布された樹脂材(293a)を圧搾するようになる。   On the other hand, a groove for accommodating the secondary sealing wall (293) of the flat portion is formed on the fastening surface of the upper connecting member (312) and the lower connecting member (313). Moreover, the uneven | corrugated | grooved part (312a, 313a) formed so that it may mutually oppose or non-opposite is formed in the both ends of the above-mentioned groove | channel. When the upper connecting member (312) and the lower connecting member (313) are fixed by the fixing bolt (314), the uneven portions (312a, 313a) are applied to the secondary sealing wall (293) of the flat portion. The pressed resin material (293a) is squeezed.

この際に上述の樹脂材(293a)は上述の凹凸部(312a、313b)の間の凹部に収容されて、上述の平面部の二次密封壁(293)と上述の上部連結部材(312)または下部連結部材(313)の間の隙間を密閉する。ここで、上述の樹脂材(293a)は硬化性樹脂で作られたものであり、圧搾成形された後で硬化する。   At this time, the above-described resin material (293a) is accommodated in the recesses between the above-described concavo-convex portions (312a, 313b), and the above-described planar sealing wall (293) and the above-described upper connecting member (312). Or the clearance gap between lower connection members (313) is sealed. Here, the above-mentioned resin material (293a) is made of a curable resin, and is cured after being squeezed.

従って、万一発生するかもしれない一次密封壁(250)の破損に伴うガス漏出に対する二次密封壁(203)の密封特性が向上する。   Therefore, the sealing characteristic of the secondary sealing wall (203) with respect to gas leakage due to the breakage of the primary sealing wall (250) that may occur may be improved.

本発明は、上述の各図面に図示したような具体的な実施例に施されて、本発明がこれらの具体的な実施例に限らずに本発明における技術思想を脱しない範囲内で多様に変形して実施することも可能である。   The present invention is applied to specific embodiments as illustrated in the above-described drawings, and the present invention is not limited to these specific embodiments, and variously within a range not departing from the technical idea of the present invention. It is also possible to carry out with modification.

更に、本発明は船体内部に設置される液化天然ガスの保存タンクだけではなく、陸上に設置される液化天然ガスの保存タンクにも同じく適用することができるのは勿論のことである。   Further, the present invention can be applied not only to a liquefied natural gas storage tank installed in the hull, but also to a liquefied natural gas storage tank installed on land.

図1は、従来のメンブレン型の液化天然ガスの保存タンクであるGTT NO 96-2型を図示した断面図である。FIG. 1 is a cross-sectional view illustrating a conventional membrane-type liquefied natural gas storage tank GTT NO 96-2. 図2は、従来のメンブレン型の液化天然ガスの保存タンクであるGTT NO 96-2型を図示した斜視図である。FIG. 2 is a perspective view illustrating a GTT NO 96-2 type, which is a conventional membrane type liquefied natural gas storage tank. 図3は、従来のメンブレン型の液化天然ガスの保存タンクであるGTT Mark III 型を図示した断面図である。FIG. 3 is a sectional view illustrating a GTT Mark III type, which is a conventional membrane type liquefied natural gas storage tank. 図4は、従来のメンブレン型の液化天然ガスの保存タンクであるGTT Mark III 型を図示した斜視図である。FIG. 4 is a perspective view illustrating a GTT Mark III type, which is a conventional membrane type liquefied natural gas storage tank. 図5は、従来のLNG保存タンクのコーナー部の構造を図示した断面図である。FIG. 5 is a cross-sectional view illustrating the structure of a corner portion of a conventional LNG storage tank. 図6の(a)及び(b)は、本発明の一実施例による液化天然ガスの保存タンクを構成するコーナー構造体の内部構造を図示した断面図である。6A and 6B are cross-sectional views illustrating the internal structure of a corner structure constituting a storage tank for liquefied natural gas according to an embodiment of the present invention. 図7は、本発明による船舶の内部に設置される液化天然ガスの保存タンクのコーナー構造の連結関係を図示した全体斜視図である。FIG. 7 is an overall perspective view illustrating the connection relationship of the corner structure of the storage tank for liquefied natural gas installed inside the ship according to the present invention. 図8は、本発明の一実施例による船舶の内部に設置される液化天然ガスの保存タンクのコーナー構造を図示した部分拡大断面斜視図である。FIG. 8 is a partially enlarged cross-sectional perspective view illustrating a corner structure of a liquefied natural gas storage tank installed in a ship according to an embodiment of the present invention. 図9は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 9 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図10は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 10 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図11は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 11 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図12は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 12 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into the interior space of a hull. 図13は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 13 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図14は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 14 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図15は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 15 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図16は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 16 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図17は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 17 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図18は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 18 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into the interior space of a hull. 図19は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 19 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図20は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 20 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図21は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 21 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図22は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 22 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into the interior space of a hull. 図23は、本発明の一実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 23 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to an embodiment of the present invention is incorporated into an interior space of a hull. 図24は、本発明の一実施例による液化天然ガスの保存タンクの二次密封壁を取り付ける手段を図示した拡大断面図である。FIG. 24 is an enlarged cross-sectional view illustrating a means for attaching a secondary sealing wall of a storage tank for liquefied natural gas according to an embodiment of the present invention. 図25は、本発明の一実施例による液化天然ガスの保存タンクの二次密封壁を取り付ける手段を図示した拡大斜視図である。FIG. 25 is an enlarged perspective view illustrating a means for attaching the secondary sealing wall of the storage tank for liquefied natural gas according to an embodiment of the present invention. 図26の(a)、(b)は、本発明の一実施例による液化天然ガスの保存タンクのアンカー構造体の締結関係を拡大図示した部分断面斜視図である。26 (a) and 26 (b) are partial cross-sectional perspective views illustrating enlarged fastening relationships of anchor structures of a liquefied natural gas storage tank according to an embodiment of the present invention. 図27は、本発明の他の実施例による液化天然ガスの保存タンクの一部切截斜視図である。FIG. 27 is a partially cut perspective view of a storage tank for liquefied natural gas according to another embodiment of the present invention. 図28は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 28 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated in the interior space of the hull. 図29は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 29 is a perspective view sequentially illustrating a process of incorporating a storage tank for liquefied natural gas according to another embodiment of the present invention into the interior space of the hull. 図30は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 30 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated into the interior space of the hull. 図31は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 31 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated into the interior space of the hull. 図32は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 32 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated into the interior space of the hull. 図33は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 33 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated in the interior space of the hull. 図34は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 34 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated into the interior space of the hull. 図35は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 35 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated in the interior space of the hull. 図36は、本発明の他の実施例による液化天然ガスの保存タンクが船体の内部空間に組み込まれる過程を順次に図示した斜視図である。FIG. 36 is a perspective view sequentially illustrating a process in which a storage tank for liquefied natural gas according to another embodiment of the present invention is incorporated in the interior space of the hull. 図37は、本発明による液化天然ガスの保存タンクの二次密封壁を取り付ける状態図を図示した拡大断面図である。FIG. 37 is an enlarged cross-sectional view illustrating a state diagram for attaching the secondary sealing wall of the storage tank for liquefied natural gas according to the present invention. 図38は、本発明による液化天然ガスの保存タンクの二次密封壁を取り付ける状態図を図示した拡大断面図である。FIG. 38 is an enlarged cross-sectional view illustrating a state diagram for attaching the secondary sealing wall of the storage tank for liquefied natural gas according to the present invention. 図39は、本発明による液化天然ガスの保存タンクが設置された船舶の断面図である。FIG. 39 is a cross-sectional view of a ship provided with a liquefied natural gas storage tank according to the present invention. 図40は、図39の断熱システムの部分拡大図である。40 is a partially enlarged view of the heat insulation system of FIG. 図41は、アンカー部から二次密封壁の連結状態を図示した図である。FIG. 41 is a diagram illustrating a connection state of the secondary sealing wall from the anchor portion.

符号の説明Explanation of symbols

50 コーナー支持板
51 コーナー部の一次断熱壁
52 コーナー部の二次密封壁
53 コーナー部の二次断熱壁
54、56 板材
57、58 断熱材
60 下部支持ロード
61 ロード支持キャップ(Cap)
70 上部支持ロード
80、81 コーナー部の突出部材
90 連結補強台
100 コーナー構造体
101 固定台
109 スタッドピン(Stud Pin)
110 アンカーベース板
111 アンカー下部板
113 アンカー部の二次断熱壁
114 アンカー部の二次密封壁
115 しわ部
119 アンカー上部キャップ
150 アンカー構造体
200 平面構造体
201 下部板材
202 平面部の二次断熱壁
203 平面部の二次密封壁
204 平面部の一次断熱壁
205 上部板材
211 断熱材
212 上部固定板
213 下部固定板
214 固定ボルト
250 一次密封壁
251 しわ部
3900 船舶
3901 船体外部壁(外殻)
3903 船体内部壁(内殻)
3907 隔壁
3915 アンカー構造体
3917 中間壁構造体
3917(100) コーナー構造体
3917(200) 平面構造体
50 corner support plate 51 primary heat insulating wall of corner 52 secondary sealing wall of corner 53 secondary heat insulating wall of corner 54, 56 plate material 57, 58 heat insulating material 60 lower support load 61 load support cap (Cap)
70 Upper support load 80, 81 Projection member at corner 90 Connection reinforcement base 100 Corner structure 101 Fixing base 109 Stud Pin
DESCRIPTION OF SYMBOLS 110 Anchor base board 111 Anchor lower board 113 Secondary insulation wall of anchor part 114 Secondary sealing wall of anchor part 115 Wrinkle part 119 Anchor upper cap 150 Anchor structure 200 Planar structure 201 Lower board material 202 Secondary insulation wall of plane part 203 Secondary sealing wall of flat part 204 Primary heat insulating wall of flat part 205 Upper plate material 211 Heat insulating material 212 Upper fixing plate 213 Lower fixing plate 214 Fixing bolt 250 Primary sealing wall 251 Wrinkle part 3900 Ship 3901 Ship outer wall (outer shell)
3903 Hull inner wall (inner shell)
3907 Bulkhead 3915 Anchor structure 3917 Intermediate wall structure 3917 (100) Corner structure 3917 (200) Planar structure

Claims (23)

液化天然ガスの保存タンクに使用される断熱モジュールとして、隣接するモジュール間の組立を容易にするためにその下端部が突出していることを特徴とする、液化天然ガスの保存タンク製造用のモジュール。   A module for manufacturing a storage tank for liquefied natural gas, characterized in that, as a heat insulation module used in a storage tank for liquefied natural gas, a lower end portion thereof protrudes to facilitate assembly between adjacent modules. 前記モジュールは一次断熱壁と、
前記一次断熱壁の下部に接着剤で接着される二次密封壁と、
前記二次密封壁の下部に接着剤で接着される二次断熱壁とで構成されることを特徴とする、請求項1に記載の液化天然ガスの保存タンク製造用のモジュール。
The module includes a primary insulation wall;
A secondary sealing wall adhered to the lower portion of the primary heat insulating wall with an adhesive;
The module for manufacturing a storage tank for liquefied natural gas according to claim 1, wherein the module is composed of a secondary heat insulating wall bonded to the lower part of the secondary sealing wall with an adhesive.
前記モジュールはタンクの平面部に位する多数の平面構造体とコーナー部に位する多数のコーナー構造体とで構成されることを特徴とする請求項1に記載の液化天然ガスの保存タンク製造用のモジュール。   2. The liquefied natural gas storage tank manufacturing method according to claim 1, wherein the module includes a plurality of planar structures positioned at a plane portion of the tank and a plurality of corner structures positioned at a corner portion. Modules. 前記平面構造体は四角柱を形成して、一つ以上のコーナー部位は一部が切断されていることを特徴とする、請求項3に記載の液化天然ガスの保存タンク製造用のモジュール。   The module for manufacturing a storage tank for liquefied natural gas according to claim 3, wherein the planar structure forms a quadrangular prism, and one or more corner portions are partially cut. 前記モジュールは一次断熱壁と、
前記一次断熱壁の上部に附着する上部板材と、
前記一次断熱壁の下部に附着する二次密封壁と、
前記二次密封壁の下部に附着する二次断熱壁と、
前記二次断熱壁の下部に附着する下部板材とで構成されて、
前記下部板材は前記二次断熱壁の一つ以上の側面で延長されてフランジを形成することを特徴とする、請求項1に記載の液化天然ガスの保存タンク製造用のモジュール。
The module includes a primary insulation wall;
An upper plate attached to the upper part of the primary heat insulating wall;
A secondary sealing wall attached to a lower portion of the primary heat insulating wall;
A secondary heat insulating wall attached to a lower portion of the secondary sealing wall;
It consists of a lower plate attached to the lower part of the secondary heat insulating wall,
The module for manufacturing a storage tank for liquefied natural gas according to claim 1, wherein the lower plate member is extended at one or more side surfaces of the secondary heat insulating wall to form a flange.
前記一次または二次断熱壁及び密封壁及び上下部板材が接している部分は接着剤で接着することを特徴とする、請求項5に記載の液化天然ガスの保存タンク製造用のモジュール。   6. The module for manufacturing a liquefied natural gas storage tank according to claim 5, wherein the primary or secondary heat insulating wall, the sealing wall, and a portion where the upper and lower plate members are in contact are bonded with an adhesive. 前記二次密封壁は前記一次及び二次断熱壁の一つ以上の側面から突出していることを特徴とする、請求項6に記載の液化天然ガスの保存タンク製造用のモジュール。   The module for manufacturing a liquefied natural gas storage tank according to claim 6, wherein the secondary sealing wall protrudes from one or more side surfaces of the primary and secondary heat insulation walls. 前記二次密封壁はモジュール同士に液密的に繋がることを特徴とする請求項7に記載の液化天然ガスの保存タンク製造用のモジュール。   The module for manufacturing a storage tank for liquefied natural gas according to claim 7, wherein the secondary sealing wall is liquid-tightly connected to each other. 前記断熱壁はポリウレタンフォームであることを特徴とする、請求項8に記載の液化天然ガスの保存タンク製造用のモジュール。   The module for manufacturing a storage tank for liquefied natural gas according to claim 8, wherein the heat insulating wall is polyurethane foam. 2個の連続する密封壁及び2個の断熱壁を含んで、前記密封壁の中で一次密封壁は保存タンクに保存される液化天然ガスと直接接して、その下部に一次断熱壁、二次密封壁及び二次断熱壁の手順に配置される液化天然ガスの保存タンクにおいて、
前記一次密封壁は前記タンクの底面と機械的に締結したアンカー部によって支持されて、
上述請求項1〜9の一項に記載の多数のモジュールで成り立って、前記各モジュールはそれぞれ前記一次密封壁及びタンク底面の間で少なくとも上記一次密封壁及びタンク底面の一つに対してスライディング(Sliding)できるように設置されることを特徴とする、液化天然ガスの保存タンク。
The primary sealing wall is in direct contact with the liquefied natural gas stored in the storage tank, and includes a primary insulating wall and a secondary wall in the lower part. In liquefied natural gas storage tanks placed in the procedure of sealed walls and secondary insulation walls,
The primary sealing wall is supported by an anchor portion mechanically fastened to the bottom surface of the tank,
A plurality of modules according to claim 1, wherein each module slides between at least one of the primary sealing wall and the tank bottom surface between the primary sealing wall and the tank bottom surface. A storage tank for liquefied natural gas, characterized in that it is installed so that it can be sliding.
前記モジュールは予備組立体に製作されて、前記アンカー部を基準に組み立られて、断熱システムを構成することを特徴とする、請求項10に記載の液化天然ガスの保存タンク。   The liquefied natural gas storage tank according to claim 10, wherein the module is manufactured as a pre-assembly and is assembled based on the anchor portion to constitute a heat insulation system. 前記一次密封壁は前記アンカー部の上端部と熔接で締結することを特徴とする、請求項11に記載の液化天然ガスの保存タンク。   The liquefied natural gas storage tank according to claim 11, wherein the primary sealing wall is fastened to an upper end of the anchor portion by welding. 前記アンカー部の上端部は前記アンカー部内に設置されるアンカー支持ロードの末端またはこれに締結するアンカー上部キャップであることを特徴とする、請求項12に記載の液化天然ガスの保存タンク。   The liquefied natural gas storage tank according to claim 12, wherein the upper end of the anchor part is an end of an anchor support load installed in the anchor part or an anchor upper cap fastened to the anchor support load. 前記二次密封壁は前記断熱壁が形成する側面の空間部に延長されて、
前記延長された二次密封壁の端部は上部固定板及び下部固定板によって締結されて、
前記上部固定板及び下部固定板の締結面は前記二次密封壁の端部が挿入できるように形成された溝を含むことを特徴とする、請求項13に記載の液化天然ガスの保存タンク。
The secondary sealing wall is extended to a side space formed by the heat insulating wall,
The end of the extended secondary sealing wall is fastened by an upper fixing plate and a lower fixing plate,
The liquefied natural gas storage tank according to claim 13, wherein the fastening surfaces of the upper fixing plate and the lower fixing plate include a groove formed so that an end of the secondary sealing wall can be inserted.
前記タンク内部のコーナー部に位置するコーナー構造体と、
前記タンク内部の平面上にスライディング移動ができるように位したモジュールと、
前記タンクの底面に締結して前記モジュールを前記タンク内部に付着させるアンカー構造体とを含むことを特徴とする、請求項10に記載の液化天然ガスの保存タンク。
A corner structure located at a corner inside the tank;
A module positioned for sliding movement on a plane inside the tank;
The liquefied natural gas storage tank according to claim 10, further comprising an anchor structure that fastens to a bottom surface of the tank and attaches the module to the inside of the tank.
前記モジュールは平面部の二次断熱壁と、その上部面に形成される平面の二次密封壁及びその上部面に形成される平面部の一次断熱壁とが設置される予備組立体に製作されることを特徴とする、請求項15に記載の液化天然ガスの保存タンク。   The module is manufactured in a pre-assembly in which a flat secondary heat insulating wall, a flat secondary sealing wall formed on an upper surface thereof, and a flat primary heat insulating wall formed on an upper surface thereof are installed. The liquefied natural gas storage tank according to claim 15, wherein: 前記コーナー構造体は前記タンクにおける二つの面が合うコーナー地点にそれぞれ接するようにL形態に形成されたコーナー部の二次断熱壁と、その上部面に形成されたコーナー部の二次密封壁と、その上部面に形成されたコーナー部の一次断熱壁と、前記コーナー部の一次断熱壁の上部面に保存タンクの荷重を受けることができるように更にL形態のコーナー支持板が設置された予備組立体として製作されて、前記タンク内部面にそれぞれ形成されたコーナー部の突出部材によって固定されることを特徴とする、請求項15に記載の液化天然ガスの保存タンク。   The corner structure has a secondary heat insulating wall of a corner portion formed in an L shape so as to be in contact with a corner point where the two surfaces of the tank meet, and a secondary sealing wall of a corner portion formed on an upper surface thereof. And a primary heat insulating wall of the corner portion formed on the upper surface thereof, and a spare L-shaped corner support plate installed on the upper surface of the primary heat insulating wall of the corner portion so as to receive the load of the storage tank. The liquefied natural gas storage tank according to claim 15, wherein the liquefied natural gas storage tank is manufactured as an assembly and fixed by protruding members at corner portions respectively formed on the inner surface of the tank. 前記コーナー支持板は熱による収縮及び伸長ができるように前記コーナー部の一次断熱壁にスライディング移動ができるように設置されることを特徴とする、請求項16に記載の液化天然ガスの保存タンク。   The liquefied natural gas storage tank according to claim 16, wherein the corner support plate is installed to be slidable on the primary heat insulating wall of the corner so as to be contracted and extended by heat. 前記コーナー構造体で前記二次断熱壁及び一次断熱壁は前記二次断熱壁を貫通して突出する下部支持ロードの上端部と、前記一次断熱壁を貫通する上部支持ロードの下端部を連結固定する連結補強台によって機械的に締結されることを特徴とする、請求項18の一項に記載の液化天然ガスの保存タンク。   In the corner structure, the secondary heat insulating wall and the primary heat insulating wall are connected and fixed to the upper end portion of the lower support load protruding through the secondary heat insulating wall and the lower end portion of the upper support load passing through the primary heat insulating wall. 19. The storage tank for liquefied natural gas according to claim 18, wherein the storage tank is mechanically fastened by a connecting reinforcing base. 前記上部支持ロードは前記一次断熱壁を貫通して、前記コーナー支持板と締結して、前記コーナー支持板を支持することを特徴とする、請求項19に記載の液化天然ガスの保存タンク。   The liquefied natural gas storage tank according to claim 19, wherein the upper support load passes through the primary heat insulating wall and is fastened to the corner support plate to support the corner support plate. 前記上部支持ロードは前記コーナー支持板と熔接で締結することを特徴とする、請求項20に記載の液化天然ガスの保存タンク。   21. The liquefied natural gas storage tank according to claim 20, wherein the upper support load is fastened to the corner support plate by welding. 前記一次密封壁は前記アンカー部の上端部と熔接で締結することを特徴とする、請求項21に記載の液化天然ガスの保存タンク。   The liquefied natural gas storage tank according to claim 21, wherein the primary sealing wall is fastened to the upper end of the anchor portion by welding. 前記モジュールの中で、タンクの平面部に位する平面構造体の下端で突出しているフランジは、前記アンカー部の下部とタンク底面の間に形成されている隙間に挿入されて上方向の移動は制限されるが水平方向はスライディングは可能であることを特徴とする、請求項10〜22の一項に記載の液化天然ガスの保存タンク。   In the module, the flange projecting at the lower end of the planar structure located in the planar portion of the tank is inserted into the gap formed between the lower portion of the anchor portion and the bottom surface of the tank, and the upward movement is 23. The storage tank for liquefied natural gas according to one of claims 10 to 22, wherein the storage tank is slidable in a horizontal direction although it is limited.
JP2006074957A 2005-04-15 2006-03-17 LNG storage tank Expired - Fee Related JP4813934B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020050031400A KR100667500B1 (en) 2005-04-15 2005-04-15 Lng storage tank and modules for constructing it
KR10-2005-0031400 2005-04-15

Publications (2)

Publication Number Publication Date
JP2006300320A true JP2006300320A (en) 2006-11-02
JP4813934B2 JP4813934B2 (en) 2011-11-09

Family

ID=37468839

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2006069199A Pending JP2006300319A (en) 2005-04-15 2006-03-14 Liquefied natural gas storage tank utilizing anchor
JP2006074957A Expired - Fee Related JP4813934B2 (en) 2005-04-15 2006-03-17 LNG storage tank

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2006069199A Pending JP2006300319A (en) 2005-04-15 2006-03-14 Liquefied natural gas storage tank utilizing anchor

Country Status (2)

Country Link
JP (2) JP2006300319A (en)
KR (1) KR100667500B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8834219B2 (en) 2009-10-16 2014-09-16 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Floating structure with fuel tank for gas fuel
US8834218B2 (en) 2009-10-16 2014-09-16 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Floating structure with fuel tank for gas fuel
JP2017530064A (en) * 2014-09-26 2017-10-12 ギャズトランスポルト エ テクニギャズ Sealed insulated container with bridging elements between the panels of the secondary insulation barrier
JP6228709B1 (en) * 2017-06-01 2017-11-08 ギャズトランスポルト エ テクニギャズ Sealed insulation tank
CN113226912A (en) * 2018-12-27 2021-08-06 大宇造船海洋株式会社 Heat insulation wall fixing device of liquefied natural gas storage tank
CN113494677A (en) * 2020-03-18 2021-10-12 大宇造船海洋株式会社 Heat insulation structure of liquefied natural gas storage tank
CN114761318A (en) * 2019-12-10 2022-07-15 韩国Gas公社 Corner structure of liquefied gas storage tank
CN117818844A (en) * 2024-03-06 2024-04-05 沪东中华造船(集团)有限公司 Method for installing thin film type enclosure system for low-temperature liquid cargo storage and transportation

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100872864B1 (en) * 2007-06-29 2008-12-10 중앙대학교 산학협력단 Heat insulator for lng storage tank and manufacturing method thereof
KR100983436B1 (en) 2008-06-12 2010-09-20 현대중공업 주식회사 Insulation System of Insulation Tank for Gas Carrier
ATE546349T1 (en) * 2008-08-21 2012-03-15 Daewoo Shipbuilding & Marine LIQUID GAS STORAGE TANK AND VESSEL CONTAINING SUCH TANK
FR3004510B1 (en) * 2013-04-12 2016-12-09 Gaztransport Et Technigaz SEALED AND THERMALLY INSULATING TANK FOR STORAGE OF A FLUID
US20160159438A1 (en) * 2013-07-22 2016-06-09 Daewoo Shipbuilding & Marine Engineering Co.,Ltd. Insulation system for floating marine structure
KR101487108B1 (en) * 2013-12-27 2015-01-27 현대중공업 주식회사 Cargo tank for extremely low temperature substance carrier
KR101432949B1 (en) * 2013-12-30 2014-08-21 현대중공업 주식회사 Cargo tank for extremely low temperature substance carrier
KR101432960B1 (en) * 2014-01-07 2014-08-21 현대중공업 주식회사 Cargo tank for extremely low temperature substance carrier
US10557592B2 (en) 2014-08-06 2020-02-11 Kc Lng Tech Co., Ltd. Corner structure of LNG storage tank
KR101739982B1 (en) * 2015-02-06 2017-05-25 대우조선해양 주식회사 Lng storage tank and insulation box thereof
KR101751839B1 (en) * 2015-08-21 2017-06-28 대우조선해양 주식회사 Insulation system of membraine type storage tank and membrain type storage tank
KR101707661B1 (en) 2015-10-21 2017-02-17 경성산업(주) A stud auto welding system for jig unit
KR101667495B1 (en) 2015-10-21 2016-10-21 경성산업(주) A stud auto welding system
KR102211324B1 (en) * 2019-04-16 2021-02-04 한국가스공사 Liquefied gas tank capable of lifting inner shell and lifting method for lifting inner shell of lng tank

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS538816A (en) * 1976-07-13 1978-01-26 Conch Int Methane Ltd Liquefied gas containers
JPS53133213U (en) * 1977-03-30 1978-10-21
JPS56150699A (en) * 1980-04-25 1981-11-21 Kahe Shimomura Construction method for low temperature liquid gas tank
JPS5798400U (en) * 1976-03-09 1982-06-17
JPS594898U (en) * 1982-07-01 1984-01-12 三菱重工業株式会社 cryogenic tank membrane
JPH07500406A (en) * 1992-05-20 1995-01-12 ソシエテ・ヌーヴェル・テクニガーズ Preformed structures forming watertight insulating walls of cryogenic fluid-tight containers
JPH0761493A (en) * 1993-08-20 1995-03-07 Dow Kakoh Kk Panel for heat insulation of extremely low temperature tank
JPH07217796A (en) * 1994-01-28 1995-08-15 Mitsubishi Heavy Ind Ltd Structure for fixing main membrane in low temperature tank
JP2001122386A (en) * 1999-09-29 2001-05-08 Gaz Transport & Technigaz Method for incorporating waterproof and heat insulated tank into supporting structure of ship and fabrication method of heat insulated caisson for use in waterproof and heat insulated tank

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5662500U (en) * 1979-10-22 1981-05-26
JPH0527499U (en) * 1991-09-19 1993-04-09 三菱重工業株式会社 Membrane fixing device for low temperature tank
FR2781557B1 (en) * 1998-07-24 2000-09-15 Gaz Transport & Technigaz IMPROVEMENT FOR A WATERPROOF AND THERMALLY INSULATING TANK WITH PREFABRICATED PANELS

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5798400U (en) * 1976-03-09 1982-06-17
JPS538816A (en) * 1976-07-13 1978-01-26 Conch Int Methane Ltd Liquefied gas containers
JPS53133213U (en) * 1977-03-30 1978-10-21
JPS56150699A (en) * 1980-04-25 1981-11-21 Kahe Shimomura Construction method for low temperature liquid gas tank
JPS594898U (en) * 1982-07-01 1984-01-12 三菱重工業株式会社 cryogenic tank membrane
JPH07500406A (en) * 1992-05-20 1995-01-12 ソシエテ・ヌーヴェル・テクニガーズ Preformed structures forming watertight insulating walls of cryogenic fluid-tight containers
JPH0761493A (en) * 1993-08-20 1995-03-07 Dow Kakoh Kk Panel for heat insulation of extremely low temperature tank
JPH07217796A (en) * 1994-01-28 1995-08-15 Mitsubishi Heavy Ind Ltd Structure for fixing main membrane in low temperature tank
JP2001122386A (en) * 1999-09-29 2001-05-08 Gaz Transport & Technigaz Method for incorporating waterproof and heat insulated tank into supporting structure of ship and fabrication method of heat insulated caisson for use in waterproof and heat insulated tank

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8834218B2 (en) 2009-10-16 2014-09-16 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Floating structure with fuel tank for gas fuel
US8834219B2 (en) 2009-10-16 2014-09-16 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Floating structure with fuel tank for gas fuel
JP2017530064A (en) * 2014-09-26 2017-10-12 ギャズトランスポルト エ テクニギャズ Sealed insulated container with bridging elements between the panels of the secondary insulation barrier
US10072798B2 (en) 2014-09-26 2018-09-11 Gaztransport Et Technigaz Sealed and insulating vessel comprising a bridging element between the panels of the secondary insulation barrier
JP6228709B1 (en) * 2017-06-01 2017-11-08 ギャズトランスポルト エ テクニギャズ Sealed insulation tank
US11971140B2 (en) 2018-12-27 2024-04-30 Hanwha Ocean Co., Ltd. Insulating wall fixing device of liquefied natural gas storage tank
CN113226912A (en) * 2018-12-27 2021-08-06 大宇造船海洋株式会社 Heat insulation wall fixing device of liquefied natural gas storage tank
CN113226912B (en) * 2018-12-27 2023-10-13 大宇造船海洋株式会社 Heat insulation wall fixing device of liquefied natural gas storage tank
CN114761318A (en) * 2019-12-10 2022-07-15 韩国Gas公社 Corner structure of liquefied gas storage tank
US12111016B2 (en) 2019-12-10 2024-10-08 Korea Gas Corporation Corner structure of liquefied gas storage tank
CN113494677A (en) * 2020-03-18 2021-10-12 大宇造船海洋株式会社 Heat insulation structure of liquefied natural gas storage tank
CN117818844B (en) * 2024-03-06 2024-06-11 沪东中华造船(集团)有限公司 Method for installing thin film type enclosure system for low-temperature liquid cargo storage and transportation
CN117818844A (en) * 2024-03-06 2024-04-05 沪东中华造船(集团)有限公司 Method for installing thin film type enclosure system for low-temperature liquid cargo storage and transportation

Also Published As

Publication number Publication date
JP4813934B2 (en) 2011-11-09
JP2006300319A (en) 2006-11-02
KR100667500B1 (en) 2007-01-10
KR20060109110A (en) 2006-10-19

Similar Documents

Publication Publication Date Title
JP4813934B2 (en) LNG storage tank
JP4616279B2 (en) Storage tank for liquefied natural gas and method for producing the same
US7204195B2 (en) Ship with liquid tank
EP1717509A2 (en) Liquefied gas tank
US7938287B2 (en) Structure for liquefied natural gas storage tank
EP1847758B1 (en) Liquefied natural gas storage tank having improved insulation structure and method of manufacturing the same
KR100649316B1 (en) Anchor structure of lng storage tank
KR100649317B1 (en) Corner structure of lng storage tank
US10557592B2 (en) Corner structure of LNG storage tank
KR100499713B1 (en) Anchor of a lng storage tank
US20220390069A1 (en) Corner structure of liquefied gas storage tank
US11821587B2 (en) Sealed and thermally insulating tank
KR102685798B1 (en) Reinforcement structure of liquefied gas cargo tank
KR20160048236A (en) Cargo for liquefied natural gas
KR102350341B1 (en) liquefied gas tank and ship having the same
KR20110011385A (en) Membrane of a cargo
KR20120035671A (en) Anti-sloshing apparatus

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090331

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20090629

A602 Written permission of extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A602

Effective date: 20090702

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100302

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20100601

A602 Written permission of extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A602

Effective date: 20100604

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100902

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110412

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110524

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110726

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110825

R150 Certificate of patent or registration of utility model

Ref document number: 4813934

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140902

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

Free format text: JAPANESE INTERMEDIATE CODE: R313114

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees