JP2006277696A - Job execution monitoring system, job control device and program, and job execution method - Google Patents

Job execution monitoring system, job control device and program, and job execution method Download PDF

Info

Publication number
JP2006277696A
JP2006277696A JP2005100197A JP2005100197A JP2006277696A JP 2006277696 A JP2006277696 A JP 2006277696A JP 2005100197 A JP2005100197 A JP 2005100197A JP 2005100197 A JP2005100197 A JP 2005100197A JP 2006277696 A JP2006277696 A JP 2006277696A
Authority
JP
Japan
Prior art keywords
job
execution
event
network
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005100197A
Other languages
Japanese (ja)
Other versions
JP4538736B2 (en
Inventor
Shinji Takai
真志 高井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2005100197A priority Critical patent/JP4538736B2/en
Publication of JP2006277696A publication Critical patent/JP2006277696A/en
Application granted granted Critical
Publication of JP4538736B2 publication Critical patent/JP4538736B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To monitor execution, an execution status, and an execution history of a job at low cost by central control of execution of a large amount of jobs in a distributed network environment. <P>SOLUTION: The job execution monitoring system comprises a job control device 1, at least one or more job execution devices connected to the job control device 1, and a job monitoring terminal 3. The job control device 1 selects a predetermined job network 51 held by itself, extracts the job 52 from the job network 51, and transmits the job 52 to the job execution device 2. The job execution device 2 executes the job 52 received from the job control device 1, and transmits an event 53 presenting a state of the execution status of the job 52 to the job control device 1. The job monitoring terminal 3 issues an event request signal and acquires the event 53 from the job control device 1, and outputs the execution status of the job network 51 on the basis of the event 53 to a display screen 34 or the like. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、ジョブ実行監視システム、ジョブ制御装置、ジョブ実行方法及びジョブ制御プログラムに関し、特に、大量のジョブの実行を分散ネットワーク環境で実行・制御・監視するジョブ実行監視システム、ジョブ制御装置、ジョブ実行方法及びジョブ制御プログラムに関する。   The present invention relates to a job execution monitoring system, a job control apparatus, a job execution method, and a job control program, and in particular, a job execution monitoring system, a job control apparatus, and a job for executing, controlling, and monitoring a large number of jobs in a distributed network environment The present invention relates to an execution method and a job control program.

これまで、大規模ジョブ実行システムでは、長い間メインフレーム等の大型計算機が使用されてきた。しかし、近年、メインフレームの老朽化及び保守経費削減のため、UNIX(登録商標)サーバ等のオープンシステムへの置換が活発に行われている。この際、通常のUNIX(登録商標)サーバ1台でメインフレーム型の単一のマシンによる集中処理は不可能であり、ネットワーク接続された多数台のマシンへの負荷分散システムが構築される。   Until now, large computers such as mainframes have been used in large-scale job execution systems for a long time. However, in recent years, replacement with an open system such as a UNIX (registered trademark) server has been actively performed in order to age the mainframe and reduce maintenance costs. At this time, centralized processing by a single mainframe type machine with one ordinary UNIX (registered trademark) server is impossible, and a load distribution system to a large number of machines connected to the network is constructed.

このようなシステムを構築する場合、負荷分散に用いる制御サーバは、大量のジョブの転送・実行・結果取得の制御を実行するため、制御サーバにこれらの処理に伴う信号やデータが集約する。このため、1台の制御サーバでは、負荷分散のための制御処理が困難となってきている。又、たとえ処理が行なえても、大量のジョブの実行状況・実行結果・実行履歴の監視のコストが膨大となっている。   When constructing such a system, a control server used for load distribution executes control of transfer / execution / result acquisition of a large number of jobs, so that signals and data associated with these processes are collected on the control server. For this reason, it is difficult for one control server to perform control processing for load distribution. Even if processing can be performed, the cost of monitoring the execution status, execution results, and execution history of a large number of jobs is enormous.

以下に、ジョブ実行システムに関わる負荷分散に関する開示例が示される。   A disclosure example regarding load distribution related to a job execution system is shown below.

特開2000−148517号公報にネットワーク環境におけるジョブ実行システムが開示されている(特許文献1参照)。特許文献1には、ジョブの定義情報と実行順序を定義したジョブネットをコンピュータシステム毎に分割して、実行スケジュールとジョブ定義情報を配布するジョブ実行方式が開示されている。   JP-A-2000-148517 discloses a job execution system in a network environment (see Patent Document 1). Patent Document 1 discloses a job execution method in which a job net that defines job definition information and execution order is divided for each computer system, and an execution schedule and job definition information are distributed.

特開2000−347884号公報に複数ジョブの処理順序の制御や効率的なシステム運用を行なうジョブネットワーク制御システムが開示されている(特許文献2参照)。特許文献2のジョブネットワーク制御システムは、ジョブを実行する複数システムを集中管理するジョブネットワーク制御装置によって、先行ジョブの待ち合わせのないジョブを担当するシステムが選択され、各システムに対しジョブ起動をかけ、各システムはジョブ起動に対するジョブの処理結果をジョブネットワーク制御装置に通知する。しかしながら、各システムは、ジョブネットワーク及びジョブネットワークに含まれる全てのジョブを保持していなければならない。又、ジョブネットワーク制御装置が新規のジョブネットワークを作成した場合、そのジョブネットワークを各システムに送信する必要がある。   Japanese Laid-Open Patent Publication No. 2000-347884 discloses a job network control system that controls the processing order of a plurality of jobs and performs efficient system operation (see Patent Document 2). In the job network control system of Patent Document 2, a system that handles a job that does not wait for a preceding job is selected by a job network control apparatus that centrally manages a plurality of systems that execute jobs, and starts a job for each system. Each system notifies the job network control apparatus of the job processing result for job activation. However, each system must hold a job network and all jobs included in the job network. Further, when the job network control apparatus creates a new job network, it is necessary to transmit the job network to each system.

又、特開平08−095916号公報に業務ジョブのスケジュール及び実行手段を有する計算機で業務ジョブを実行し、その実行状況を監視する業務ジョブ監視方法が開示されている(特許文献3参照)。特許文献3の業務ジョブ監視方法は、業務ジョブを監視者の指示により業務グループ毎にまとめ、業務グループ毎に許容遅延時間を設定し、業務グループの実行終了がこの許容時間を越えて遅延する時、あるいは異常終了した時に警告を発する。
特開2000−347884号公報 特開2002−157134号公報 特開平08−095916号公報
Japanese Patent Application Laid-Open No. 08-095916 discloses a business job monitoring method for executing a business job on a computer having a business job schedule and execution means and monitoring the execution status (see Patent Document 3). The business job monitoring method disclosed in Patent Document 3 summarizes business jobs for each business group according to instructions from the supervisor, sets an allowable delay time for each business group, and delays the end of execution of the business group beyond this allowable time. Or issue a warning when it ends abnormally.
JP 2000-347884 A JP 2002-157134 A Japanese Patent Laid-Open No. 08-095916

本発明の目的は、大量のジョブの実行を分散ネットワーク環境で集中制御することができるジョブ実行監視システム、ジョブ制御装置、ジョブ実行方法及びジョブ制御プログラムを提供することにある。   An object of the present invention is to provide a job execution monitoring system, a job control apparatus, a job execution method, and a job control program capable of centrally controlling the execution of a large number of jobs in a distributed network environment.

本発明の他の目的は、大量のジョブの実行状況を容易に監視することができるジョブ実行監視システム、ジョブ制御装置、ジョブ実行方法及びジョブ制御プログラムを提供することにある。   Another object of the present invention is to provide a job execution monitoring system, a job control device, a job execution method, and a job control program that can easily monitor the execution status of a large number of jobs.

本発明の更に他の目的は、大量のジョブの実行状況・実行結果・実行履歴の監視にかかるコストを低減するジョブ実行監視システム、ジョブ制御装置、ジョブ実行方法及びジョブ制御プログラムを提供することにある。   Still another object of the present invention is to provide a job execution monitoring system, a job control apparatus, a job execution method, and a job control program that reduce the cost of monitoring the execution status / execution result / execution history of a large number of jobs. is there.

以下に、[発明を実施するための最良の形態]で使用される番号・符号を括弧付きで用いて、[課題を解決するための手段]を説明する。この番号・符号は、[特許請求の範囲]の記載と[発明を実施するための最良の形態]の記載との対応関係を明らかにするために付加されたものであるが、[特許請求の範囲]に記載されている発明の技術的範囲の解釈に用いてはならない。   [Means for Solving the Problems] will be described below using the numbers and symbols used in [Best Mode for Carrying Out the Invention] in parentheses. This number / symbol is added to clarify the correspondence between the description of [Claims] and the description of the best mode for carrying out the invention. It should not be used for interpreting the technical scope of the invention described in [Scope].

本発明によるジョブ実行監視システムは、少なくとも1つ以上のジョブネットワーク(51)を保持するジョブ制御装置(1)と、ジョブ制御装置(1)に接続される少なくとも1つ以上のジョブ実行装置(2)と、ジョブ制御装置(1)に接続されるジョブ監視端末(3)とを備える。ジョブ制御装置(1)は、自身の保持する所定のジョブネットワーク(51)を選定し、ジョブネットワーク(51)からジョブ(52)を抽出し、ジョブネットワーク(51)によって、ジョブ(52)に割り当てられたジョブ実行装置(2)に対し、ジョブ(52)を送信する。ジョブ実行装置(2)は、ジョブ制御装置(1)から受信されるジョブ(52)を実行し、ジョブ(52)の実行状況の状態を示すイベント(53)をジョブ制御装置(1)に送信する。ジョブ監視端末(3)は、イベント要求信号を発行してイベント(53)をジョブ制御装置(1)から取得し、このイベント(53)に基づきジョブネットワーク(51)の実行状況を表示画面(34)等に出力する。   A job execution monitoring system according to the present invention includes a job control device (1) holding at least one job network (51) and at least one job execution device (2) connected to the job control device (1). ) And a job monitoring terminal (3) connected to the job control device (1). The job control device (1) selects a predetermined job network (51) held by itself, extracts the job (52) from the job network (51), and assigns it to the job (52) by the job network (51). The job (52) is transmitted to the job execution apparatus (2). The job execution device (2) executes the job (52) received from the job control device (1), and transmits an event (53) indicating the execution status of the job (52) to the job control device (1). To do. The job monitoring terminal (3) issues an event request signal, acquires the event (53) from the job control device (1), and displays the execution status of the job network (51) on the display screen (34) based on the event (53). ) Etc.

このように、1台のジョブ制御装置(1)にジョブ及びジョブネットワークを集約し、それをネットワーク接続された多数台のジョブ実行装置(2)に分散し、実行させることができる。又、ジョブ実行状況をイベントという形式でジョブ制御装置(1)に通知し、ジョブ監視端末(3)を操作する監視者が、即時にジョブ実行装置(2)上のジョブの実行状況を把握することができる。更に、ジョブ実行状況をイベントという形式でジョブ制御装置(1)に通知され、ジョブ制御装置(1)は、即時にジョブ実行マシン上のジョブの実行状況を把握できる。   In this way, jobs and job networks can be aggregated in one job control device (1), and distributed and executed by a number of job execution devices (2) connected to the network. Also, the job execution status is notified to the job control device (1) in the form of an event, and the monitor operating the job monitoring terminal (3) immediately grasps the job execution status on the job execution device (2). be able to. Further, the job execution status is notified to the job control device (1) in the form of an event, and the job control device (1) can immediately grasp the job execution status on the job execution machine.

ジョブ制御装置(1)は、ジョブ監視端末(3)に対して未送信のイベントを差分イベント(56)とし、ジョブ監視端末(3)からの要求信号に応じて、差分イベント(56)をジョブ監視端末(3)に送信する。このため、ジョブ監視端末(3)に送信される情報は差分情報のみであるため、ジョブ監視端末(3)とジョブ実行制御マシンの間のネットワーク負荷は必要最小限となる。   The job control device (1) sets the event that has not been transmitted to the job monitoring terminal (3) as the difference event (56), and sets the difference event (56) as the job in response to the request signal from the job monitoring terminal (3). Transmit to the monitoring terminal (3). For this reason, since only the difference information is transmitted to the job monitoring terminal (3), the network load between the job monitoring terminal (3) and the job execution control machine is minimized.

ジョブ実行装置(1)は、ジョブ(52)の実行を終了すると、ジョブ(51)の実行結果である実行結果情報(57)をジョブ制御装置(1)に送信する。ジョブ制御装置(1)は、実行結果情報(57)を実行したジョブ(52)と関連付けて記録する。このため、ジョブ実行結果のステータスはイベントという形式でジョブ制御装置(1)に通知され、実行結果(57)は別途取得することができる。従って、ジョブ(51)の実行結果(57)が大量に出力された場合でもジョブ制御装置(1)のステータスの更新は遅れない。   When the job execution device (1) finishes executing the job (52), it transmits execution result information (57), which is the execution result of the job (51), to the job control device (1). The job control device (1) records the execution result information (57) in association with the executed job (52). For this reason, the status of the job execution result is notified to the job control device (1) in the form of an event, and the execution result (57) can be acquired separately. Therefore, even when a large amount of execution results (57) of the job (51) are output, the status update of the job control device (1) is not delayed.

ジョブ実行装置(1)は、ジョブ(57)の実行を終了すると、イベント(53)として実行終了を示す終了イベント(55)をジョブ制御装置(1)に送信する。ジョブ制御装置(1)は、終了イベント(55)を受信すると、ジョブネットワーク(51)に基づき、終了したジョブ(52)の次に実行するジョブ(52)を、次のジョブ(52)に割り当てられたジョブ実行端末装置(2)に送信する。   When the job execution device (1) finishes executing the job (57), it transmits an end event (55) indicating the end of execution to the job control device (1) as an event (53). Upon receiving the end event (55), the job control device (1) assigns the job (52) to be executed next to the ended job (52) to the next job (52) based on the job network (51). To the received job execution terminal device (2).

又、本発明によるジョブ実行監視システムは、ジョブ制御装置に接続される統合監視端末(4)を更に具備する。ジョブ制御装置(1)は、ジョブ(52)の実行処理に異常が生じた際にジョブ実行装置(2)から受信される異常イベント(54)や、ジョブ(52)の実行終了時に受信される終了イベント(55)を直ちに統合監視端末装置に送信する。統合監視端末(4)は、異常イベント(54)や終了イベント(55)に応じて、警報を発生し、あるいは表示を出力する。ジョブ(52)の実行状況のイベント(53)のうち、重要なものは統合監視端末(4)に転送するため、監視者は統合監視端末(4)のみを監視すれば良い。   The job execution monitoring system according to the present invention further includes an integrated monitoring terminal (4) connected to the job control device. The job control device (1) receives an abnormal event (54) received from the job execution device (2) when an abnormality occurs in the execution processing of the job (52) or at the end of execution of the job (52). The end event (55) is immediately transmitted to the integrated monitoring terminal device. The integrated monitoring terminal (4) generates an alarm or outputs a display according to the abnormal event (54) or the end event (55). Of the events (53) of the execution status of the job (52), important ones are transferred to the integrated monitoring terminal (4), and therefore the monitor only needs to monitor the integrated monitoring terminal (4).

本発明に係るジョブ制御装置(1)は、少なくとも1つ以上のジョブネットワーク(51)を保持するジョブネットワーク定義データベース(100)と、所定の時刻に前記ジョブネットワーク定義データベース(100)から所定のジョブネットワーク(51)を抽出するスケジュール制御部(14)と、ジョブネットワーク(51)から、ジョブ(51)を抽出するジョブネットワーク制御部(15)と、少なくとも1つ以上のジョブ実行装置(2−1〜n)に接続されるジョブ制御部(16)とを具備する。ジョブネットワーク制御部(15)は、ジョブネットワーク(51)に規定された順序で、ジョブ(52)をジョブ制御部(16)に送信し、ジョブ制御部(16)は、ジョブネットワーク(51)によってジョブ(52)に割り当てられたジョブ実行端末(2)に対しジョブ(52)を送信する。又、ジョブネットワーク制御部(15)は、ジョブ実行装置(2)から受信されるイベント等を制御して、履歴の作成やジョブ監視装置(3)や統合監視装置(4)に通知を行ない、ジョブ制御装置(16)は、ジョブ実行装置(2)との間でジョブ(52)、イベント(53)、ジョブ実行結果(57)等の制御を行なう。このように、ジョブ制御装置(1)の制御をジョブネットワーク制御部(15)とジョブ制御部(16)とに分割し、2つの制御の連携でジョブネットワークを処理することができる。   A job control apparatus (1) according to the present invention includes a job network definition database (100) holding at least one job network (51), and a predetermined job from the job network definition database (100) at a predetermined time. A schedule control unit (14) for extracting the network (51), a job network control unit (15) for extracting the job (51) from the job network (51), and at least one job execution device (2-1) -N), and a job control unit (16) connected to. The job network control unit (15) transmits the job (52) to the job control unit (16) in the order defined in the job network (51), and the job control unit (16) uses the job network (51). The job (52) is transmitted to the job execution terminal (2) assigned to the job (52). The job network control unit (15) controls events received from the job execution device (2) to create a history and notify the job monitoring device (3) and the integrated monitoring device (4). The job control device (16) controls the job (52), the event (53), the job execution result (57) and the like with the job execution device (2). In this way, the control of the job control device (1) can be divided into the job network control unit (15) and the job control unit (16), and the job network can be processed by cooperation of the two controls.

以上のように、全てのジョブの実行状況・実行結果を1台のジョブ制御装置(1)上に集約し、制御することができる。   As described above, the execution status and execution results of all jobs can be collected and controlled on one job control apparatus (1).

従って、本発明によるジョブ実行監視システムは、1台のジョブ制御装置(1)によって、大規模ジョブを実行するジョブ実行システムを、実行及び監視の集中制御を可能とする。   Therefore, the job execution monitoring system according to the present invention enables centralized control of execution and monitoring of a job execution system that executes a large-scale job by a single job control device (1).

本発明によるジョブ実行監視システム、バッチジョブ実行方法及びバッチジョブ管理プログラムによれば、大量のジョブの実行を分散ネットワーク環境で集中制御することができる。   According to the job execution monitoring system, the batch job execution method, and the batch job management program according to the present invention, execution of a large number of jobs can be centrally controlled in a distributed network environment.

又、大量のジョブの実行状況を容易に監視することができる。   In addition, the execution status of a large number of jobs can be easily monitored.

更に、大量のジョブの実行状況・実行結果・実行履歴の監視にかかるコストを低減することができる。   Furthermore, it is possible to reduce the cost for monitoring the execution status / execution result / execution history of a large number of jobs.

以下、添付図面を参照して、本発明によるジョブ実行監視システムの第1の実施の形態が説明される。   Hereinafter, a first embodiment of a job execution monitoring system according to the present invention will be described with reference to the accompanying drawings.

(構成)
図1を参照して、本発明によるジョブ実行監視システムの構成が示される。本発明によるジョブ実行監視システムは、好適には、UNIX(登録商標)等の汎用なOSを利用したオープンシステムである。ジョブ実行監視システムの構成は、ジョブネットワークを管理して、ジョブの集中制御、実行監視を行なうジョブ制御装置1と、ジョブ制御装置1にLANやWANのようなネットワーク又は光ケーブル等の通信回線を介して接続される複数のジョブ実行装置2−1〜nと、ジョブ監視端末3と、統合監視端末4とを具備する。
(Constitution)
Referring to FIG. 1, the configuration of a job execution monitoring system according to the present invention is shown. The job execution monitoring system according to the present invention is preferably an open system using a general-purpose OS such as UNIX (registered trademark). The configuration of the job execution monitoring system includes a job control device 1 that manages a job network to perform centralized control and execution monitoring of a job, and a network such as a LAN or WAN, or a communication line such as an optical cable. A plurality of job execution devices 2-1 to n, a job monitoring terminal 3, and an integrated monitoring terminal 4.

ジョブ制御装置1は、保有するジョブネットワーク51に基づいて、ジョブ52を実行するジョブ実行装置2に送信する。ジョブ実行装置2は、受信されるジョブ52を実行し、実行状況を示すイベント53をジョブ制御装置1に送信する。ジョブ制御装置は、ジョブ実行装置2から受信されるイベント53から当該ジョブネットワーク51の実行履歴であるイベント履歴58を作成する。又、ジョブ監視端末3からの要求に応じ、イベント53や、ジョブネットワークの実行履歴であるイベント履歴58を送信する。この際、ジョブ実行装置1はジョブ監視端末3に未送信のイベントのみを差分イベント56としてジョブ監視端末に送信する。ユーザである監視者は、ジョブ監視端末3において表示される差分イベント56やイベント履歴を監視することができる。更に、ジョブ実行装置2から受信されるイベント53に重要なイベントが含まれる場合、すなわち、実行中のジョブの異常を示す異常イベント54やジョブの実行終了を示す終了イベント55等が含まれる場合、これらのイベントは統合監視端末4に通知される。統合監視端末4は、受信されるイベントに応じて警報を発し、監視者に異常を告げる。   The job control apparatus 1 transmits to the job execution apparatus 2 that executes the job 52 based on the job network 51 that the job control apparatus 1 has. The job execution device 2 executes the received job 52 and transmits an event 53 indicating the execution status to the job control device 1. The job control apparatus creates an event history 58 that is an execution history of the job network 51 from the event 53 received from the job execution apparatus 2. Further, in response to a request from the job monitoring terminal 3, an event 53 and an event history 58 that is an execution history of the job network are transmitted. At this time, the job execution apparatus 1 transmits only events that have not been transmitted to the job monitoring terminal 3 as difference events 56 to the job monitoring terminal. A monitor who is a user can monitor the differential event 56 and the event history displayed on the job monitoring terminal 3. Furthermore, when an important event is included in the event 53 received from the job execution apparatus 2, that is, when an abnormal event 54 indicating an abnormality of the job being executed, an end event 55 indicating the end of execution of the job, or the like is included, These events are notified to the integrated monitoring terminal 4. The integrated monitoring terminal 4 issues an alarm according to the received event and notifies the monitor of the abnormality.

図2を参照して、本発明によるジョブ実行監視システムのブロック図が示される。   Referring to FIG. 2, a block diagram of a job execution monitoring system according to the present invention is shown.

ジョブ制御装置1は、図示しないCPUを備え、CPUによって実行されるプログラム又はプログラムと装置の組み合わせであるイベント送信部11、差分イベント管理部12、ジョブネットワーク履歴検索部13、スケジュール部14、ジョブネットワーク制御部15、ジョブ制御部16及びタイマ17を具備する。又、メモリやハードディスク等の記憶装置や、CDROMやDVDROM等の記録媒体に格納されるジョブネットワーク定義データベース(ジョブネットワークD/B)100、ジョブデータベース(ジョブD/B)101、ジョブネットワークデータベース(ジョブネットワークD/B)102、差分イベントデータベース(差分イベントD/B)103とを備える。   The job control apparatus 1 includes a CPU (not shown), and includes an event transmission unit 11, a differential event management unit 12, a job network history search unit 13, a schedule unit 14, and a job network that are programs executed by the CPU or a combination of the program and the device. A control unit 15, a job control unit 16, and a timer 17 are provided. In addition, a job network definition database (job network D / B) 100, a job database (job D / B) 101, a job network database (job) stored in a storage device such as a memory or a hard disk, or a recording medium such as a CDROM or a DVDROM. Network D / B) 102 and a differential event database (differential event D / B) 103.

スケジュール部14は、ジョブスケジューラを備え、ジョブネットワーク定義D/B100に格納されるジョブネットワーク51を管理する。   The schedule unit 14 includes a job scheduler and manages the job network 51 stored in the job network definition D / B 100.

図3を参照して、ジョブネットワーク51の構成が示される。ジョブネットワーク51は、ジョブの実行順序や連携関係を規定したジョブの集まりである。ジョブネットワーク51には、ジョブネットワーク51を起動するための条件となる時間やイベントを示す起動条件511を含み、ジョブの識別子であるジョブID512と、ジョブ制御言語で記述されたジョブ513とジョブを実行するジョブ実行装置を示す実行端末装置514とが関連付けられている。更に各ジョブ実行順序や連携関係515が示されている。尚、ジョブ実行装置514には、ジョブの実行にエラーが生じた場合に使用する予備のジョブ実行装置を含んでも良い。   Referring to FIG. 3, the configuration of job network 51 is shown. The job network 51 is a collection of jobs that define the job execution order and linkage relationships. The job network 51 includes a start condition 511 indicating a time and an event as a condition for starting the job network 51, and executes a job ID 512 as a job identifier, a job 513 described in a job control language, and the job And an execution terminal device 514 indicating a job execution device to be executed. Further, each job execution order and linkage relationship 515 are shown. The job execution device 514 may include a spare job execution device used when an error occurs in job execution.

ジョブネットワーク制御部15は、ジョブネットワーク51からジョブ52を抽出し、ジョブネットワーク51に従いジョブ制御部16及びジョブD/B101にジョブ52を送信する。又、ジョブ制御部16から受信されるイベント53やジョブD/B101から抽出するジョブ実行結果57を管理する。   The job network control unit 15 extracts the job 52 from the job network 51 and transmits the job 52 to the job control unit 16 and the job D / B 101 according to the job network 51. It also manages the event 53 received from the job control unit 16 and the job execution result 57 extracted from the job D / B 101.

図7を参照して、ジョブD/B101の構成が示される。ジョブD/B101は、ジョブ52の識別子であるジョブID521と、ジョブ実行装置2に転送済みのジョブ522と、イベント523と、イベントがステータスイベント、終了イベント、異常イベント等を示すイベント種別524と、ジョブの実行結果525と、イベントの発生時刻であるイベント発生時刻526とが関連付けられて格納されている。   Referring to FIG. 7, the configuration of job D / B 101 is shown. The job D / B 101 includes a job ID 521 that is an identifier of the job 52, a job 522 that has been transferred to the job execution apparatus 2, an event 523, an event type 524 that indicates a status event, an end event, an abnormal event, and the like. A job execution result 525 and an event occurrence time 526 that is an event occurrence time are stored in association with each other.

ジョブ制御部16は、ジョブ実行装置2−1〜nに接続され、ジョブネットワーク制御部15から受信されるジョブ52を、ジョブ実行装置2に転送する。又、ジョブ実行装置2から受信されるイベント53や実行結果57をジョブD/B101に格納し、イベント53をジョブネットワーク制御部15に送信する。   The job control unit 16 is connected to the job execution devices 2-1 to 2-n and transfers the job 52 received from the job network control unit 15 to the job execution device 2. Further, the event 53 and the execution result 57 received from the job execution apparatus 2 are stored in the job D / B 101, and the event 53 is transmitted to the job network control unit 15.

イベント送信部11は、ジョブネットワークから受信されるイベント53を差分イベント管理部12に転送する。又、受信されるイベント53のイベント種別を参照し、異常イベント54や終了イベント55のような重要イベントである場合、統合監視端末4に転送する。   The event transmission unit 11 transfers the event 53 received from the job network to the differential event management unit 12. The event type of the received event 53 is referred to, and if it is an important event such as an abnormal event 54 or an end event 55, it is transferred to the integrated monitoring terminal 4.

差分イベント管理部12は、イベント送信部11から受信されるイベント53をジョブ監視端末3に転送する。又、未送信のイベントを差分イベント56として、差分イベントD/B103に格納する。更に、ジョブ監視端末3からの要求に応じて、差分イベントD/B103から差分イベント56を抽出してジョブ監視端末3に送信する。図8を参照して、差分イベントD/B103の構成が示される。差分イベントD/B103はジョブネットワーク51を識別するジョブネットワークID551と差分イベント552と、送信済みイベント553が関連付けられて格納される。   The differential event management unit 12 transfers the event 53 received from the event transmission unit 11 to the job monitoring terminal 3. Further, the unsent event is stored in the differential event D / B 103 as the differential event 56. Further, in response to a request from the job monitoring terminal 3, the differential event 56 is extracted from the differential event D / B 103 and transmitted to the job monitoring terminal 3. Referring to FIG. 8, the configuration of differential event D / B 103 is shown. In the differential event D / B 103, a job network ID 551 for identifying the job network 51, a differential event 552, and a transmitted event 553 are stored in association with each other.

ジョブネットワーク履歴検索部13は、ジョブ監視端末3からの要求に応じて、ジョブネットワークD/B102からイベント履歴58を抽出し、ジョブ監視端末3に送信する。図11を参照して、ジョブネットワークD/B102の構成が示される。ジョブネットワークD/B102は、ジョブネットワークの識別子であるジョブネットワークID571毎に、関連するジョブの識別子であるジョブID572と、イベント573と、イベント種別574と、イベント発生時刻575と、ジョブ実行結果576とが関連付けて格納される。   In response to a request from the job monitoring terminal 3, the job network history search unit 13 extracts the event history 58 from the job network D / B 102 and transmits it to the job monitoring terminal 3. Referring to FIG. 11, the configuration of job network D / B 102 is shown. For each job network ID 571 that is a job network identifier, the job network D / B 102 includes a job ID 572 that is a related job identifier, an event 573, an event type 574, an event occurrence time 575, and a job execution result 576. Are stored in association with each other.

図2を参照して、ジョブ実行装置2は、図示しないCPUを備え、CPUによって実行されるプログラムと装置とから構成され、ジョブ制御装置1からジョブ52を受信し、実行するジョブ実行部21と、受信されるジョブ52を一時記憶するメモリやハードディスク等のジョブデーダベース(D/B)22とを具備する。ジョブ実行部21は、ジョブを実行するとともに、ジョブ52の実行状況や実行終了状況をイベントとしてジョブ制御装置1に送信する。又、ジョブ52の実行結果であるジョブ実行結果57もジョブ制御装置1に送信する。   Referring to FIG. 2, job execution apparatus 2 includes a CPU (not shown), and includes a program and an apparatus executed by CPU. Job execution apparatus 21 receives job 52 from job control apparatus 1 and executes it. And a job data base (D / B) 22 such as a memory or a hard disk for temporarily storing the received job 52. The job execution unit 21 executes the job and transmits the execution status and execution end status of the job 52 to the job control apparatus 1 as events. In addition, a job execution result 57 that is an execution result of the job 52 is also transmitted to the job control apparatus 1.

ジョブ監視端末3は、監視者によって使用され、ジョブネットワークの各処理の実行状況や履歴を表示する。図2を参照して、ジョブ監視端末3の構成が示される。ジョブ監視端末3は、図示しないCPUを備え、CPUによって実行されるプログラム又はプログラムと装置との組み合わせであるジョブ監視部31と、履歴管理部32とを備える。又、モニタ等の表示装置であるジョブ監視情報出力装置34を更に備える。   The job monitoring terminal 3 is used by a monitor and displays the execution status and history of each process of the job network. Referring to FIG. 2, the configuration of job monitoring terminal 3 is shown. The job monitoring terminal 3 includes a CPU (not shown), and includes a job monitoring unit 31 that is a program executed by the CPU or a combination of a program and an apparatus, and a history management unit 32. Further, the apparatus further includes a job monitoring information output device 34 which is a display device such as a monitor.

ジョブ監視部31は、ジョブ制御装置1に対しイベント要求を発行し、ジョブ制御装置1から差分イベント56を受信し、ジョブ監視情報出力装置34に転送する。履歴管理部32は、ジョブ制御装置1に対して履歴情報要求を発行し、ジョブ制御装置1からイベント履歴58を受信しジョブ監視情報出力装置34に転送する。ジョブ監視情報出力装置34は、差分イベント56やイベント履歴58を画像、音声、文字情報として出力する。この際、ジョブ監視部31や履歴管理部は、ユーザの操作によって図示されない入力装置から入力されたイベント要求や履歴要求に従い、それぞれイベント要求や履歴要求を発行し、差分イベント56やイベント履歴58を取得し、ジョブ監視情報出力装置34にて表示されることが好適である。   The job monitoring unit 31 issues an event request to the job control apparatus 1, receives the differential event 56 from the job control apparatus 1, and transfers it to the job monitoring information output apparatus 34. The history management unit 32 issues a history information request to the job control apparatus 1, receives the event history 58 from the job control apparatus 1, and transfers it to the job monitoring information output apparatus 34. The job monitoring information output device 34 outputs the difference event 56 and the event history 58 as image, sound, and character information. At this time, the job monitoring unit 31 and the history management unit issue an event request and a history request according to an event request and a history request input from an input device (not shown) by a user operation, respectively, and a difference event 56 and an event history 58 are displayed. It is preferable that the information is acquired and displayed on the job monitoring information output device 34.

図2を参照して、統合監視端末4の構成が示される。統合監視端末4は、図示しないCPUを備え、CPUが実行するプログラム及び装置から構成される異常情報制御部41と、モニタ等である統合監視情報出力装置42と、サイレンや赤色灯等である警告装置43とを具備する。又、メモリやハードディスク等の記憶装置又はCDROM、DVD等の記録媒体に格納される統合監視データベース(D/B)44を具備する。   Referring to FIG. 2, the configuration of the integrated monitoring terminal 4 is shown. The integrated monitoring terminal 4 includes a CPU (not shown), an abnormality information control unit 41 including programs and devices executed by the CPU, an integrated monitoring information output device 42 such as a monitor, and a warning such as a siren or a red light. Device 43. In addition, an integrated monitoring database (D / B) 44 stored in a storage device such as a memory or a hard disk or a recording medium such as a CDROM or DVD is provided.

異常情報制御部41は、ジョブ制御装置1から受信される異常イベント54や終了イベント55を統合監視D/B44に格納するとともに統合監視情報出力装置42に画像、音声、文字情報等として出力させ、警告装置43に警告音を発生、あるいは警告灯を点灯させる。図14に統合監視D/B44の構成が示される。統合監視D/Bは、ジョブネットワークID441に関連付けられたジョブID442、イベント443、イベント種別444、イベント発生時刻445とを具備している。   The abnormality information control unit 41 stores the abnormality event 54 and the end event 55 received from the job control device 1 in the integrated monitoring D / B 44 and causes the integrated monitoring information output device 42 to output as image, sound, character information, etc. A warning sound is generated in the warning device 43 or a warning lamp is turned on. FIG. 14 shows the configuration of the integrated monitoring D / B 44. The integrated monitoring D / B includes a job ID 442 associated with the job network ID 441, an event 443, an event type 444, and an event occurrence time 445.

(動作)
図2から17を参照して、本発明によるジョブ実行監視システムの実施の形態における動作が説明される。
(Operation)
The operation in the embodiment of the job execution monitoring system according to the present invention will be described with reference to FIGS.

図4を参照して、ジョブ制御装置1のジョブネットワークの実行制御処理の動作が、詳細に説明される。   With reference to FIG. 4, the operation of the job network execution control process of the job control apparatus 1 will be described in detail.

ジョブネットワーク51を実行する際、ジョブ制御装置1のスケジュール制御部14は、タイマ17から出力される時刻を参照し、ジョブネットワーク定義D/B100からこの時刻と一致する起動条件511に対応するジョブネットワーク51を抽出する(ステップS102)。次にジョブネットワーク51の実行準備が完了したことをジョブネットワーク制御部15に通知し、抽出したジョブネットワーク51をジョブネットワーク制御部15に転送する。   When executing the job network 51, the schedule control unit 14 of the job control apparatus 1 refers to the time output from the timer 17, and the job network corresponding to the start condition 511 that matches this time from the job network definition D / B 100. 51 is extracted (step S102). Next, the job network control unit 15 is notified that the job network 51 has been prepared for execution, and the extracted job network 51 is transferred to the job network control unit 15.

ジョブネットワーク制御部15は、転送されたジョブネットワーク51をジョブ52毎に分解する(ステップS104)。図6を参照して、ジョブネットワーク51及びジョブ52の概念図が示される。図6(a)に示されるジョブネットワーク51は、ジョブA52−1、ジョブB52−2、ジョブC52−3、ジョブD52−4を備え、ジョブネットワーク制御部15は、このジョブネットワーク51を図6(b)に示されるようにジョブ52に分解する。図6(c)は、図3に示されるジョブネットワーク51の各要素をジョブ毎に関連付けたジョブの実行条件であるジョブパラメータ59の一例である。ジョブパラメータ59は、ジョブネットワーク51を構成するジョブ513であるジョブA52−1、ジョブB52−2、ジョブC52−3、ジョブD52−4にそれぞれ対応して、ジョブID512としてジョブA〜D、実行端末装置514であるジョブ実行装置及び予備のジョブ実行装置、実行順序及び連携関係515を具備している。本実施の形態の場合、当初ジョブAをジョブ実行装置2−1に実行させ、次にジョブBとジョブCをそれぞれジョブ実行装置2−2及びジョブ実行装置2−3に並行的に実行させる。その両方のジョブ52が終了するとジョブDをジョブ実行装置2−5に実行させる。尚、ジョブAを実行する際、エラーが発生し、終了できない場合、予備ジョブ実行装置としてジョブ実行装置2−2にジョブAを実行させる。   The job network control unit 15 disassembles the transferred job network 51 for each job 52 (step S104). Referring to FIG. 6, a conceptual diagram of job network 51 and job 52 is shown. The job network 51 shown in FIG. 6A includes a job A 52-1, a job B 52-2, a job C 52-3, and a job D 52-4. The job network control unit 15 includes the job network 51 shown in FIG. Disassembled into job 52 as shown in b). FIG. 6C is an example of a job parameter 59 that is a job execution condition that associates each element of the job network 51 shown in FIG. 3 for each job. Job parameters 59 correspond to job A52-1, job B52-2, job C52-3, and job D52-4, which are jobs 513 constituting the job network 51, respectively, and jobs A to D as job IDs 512, execution terminals The job execution apparatus, which is the apparatus 514, a spare job execution apparatus, an execution order, and a linkage relationship 515 are provided. In the case of the present embodiment, the job execution apparatus 2-1 initially executes job A, and then causes job execution apparatus 2-2 and job execution apparatus 2-3 to execute job B and job C in parallel. When both the jobs 52 are completed, the job execution apparatus 2-5 is caused to execute the job D. If an error occurs when job A is executed and cannot be terminated, the job execution device 2-2 is caused to execute job A as a spare job execution device.

ジョブの分解の後、ジョブネットワーク制御部15は、実行順に基づいてジョブ52(ここでは、ジョブA52−1)を選択し、ジョブD/B101に格納するとともに、ジョブ制御部16に転送する(ステップS106)。この際、ジョブA52−1はジョブID521としてジョブAが対応付けられて格納される。ジョブA52−1の実行が終了し、その実行結果の取得が完了するまで、ジョブB52−2、ジョブC52−3、ジョブD52−4のジョブ実行部21への転送は待ち合わせられる。   After disassembling the job, the job network control unit 15 selects the job 52 (here, job A 52-1) based on the execution order, stores it in the job D / B 101, and transfers it to the job control unit 16 (step S1). S106). At this time, job A 52-1 is stored as job ID 521 in association with job A. Until the execution of the job A 52-1 is completed and acquisition of the execution result is completed, the transfer of the job B 52-2, the job C 52-3, and the job D 52-4 to the job execution unit 21 is awaited.

ジョブ制御部16は、ジョブネットワーク制御部15より受け取ったジョブA52−1を、ジョブパラメータ59に従い、所定のジョブ実行装置(この場合、ジョブ実行装置2−1)に転送する。ジョブA52−1は、その転送先のジョブ実行装置2−1のジョブD/B22に一時保管され、ジョブ実行部21にて実行される。ジョブ実行部21は、ジョブA52−1の実行を開始すると同時に、ジョブ制御部16に対しジョブA52−1が「実行中」のステータスになったことを示すイベント53を送信する。   The job control unit 16 transfers the job A 52-1 received from the job network control unit 15 to a predetermined job execution device (in this case, the job execution device 2-1) according to the job parameter 59. The job A 52-1 is temporarily stored in the job D / B 22 of the transfer destination job execution apparatus 2-1 and executed by the job execution unit 21. The job execution unit 21 starts execution of the job A 52-1, and transmits an event 53 indicating that the job A 52-1 has a status of “executing” to the job control unit 16.

ジョブ制御部16は、ジョブ実行装置2から受信されるイベント53に基づきジョブD/B101のジョブA52−1に対応するイベント522のステータスを「実行中」に更新し、ジョブネットワーク制御部15にイベント53を転送する。ジョブネットワーク制御部15は、イベント送信部11を介して差分イベント管理部12にイベント53を転送する。差分イベント管理部12は、転送されるイベント53のジョブネットワークIDに一致する送信済みイベント553を差分イベントD/B103から抽出して、イベント53と比較し、ジョブ監視端末3に対する未送信のイベントを差分イベント56として作成する。差分イベント管理部12は、作成した差分イベント56を差分イベントD/B103に格納し、差分イベント552を更新する(ステップS110)。   The job control unit 16 updates the status of the event 522 corresponding to the job A 52-1 of the job D / B 101 to “in execution” based on the event 53 received from the job execution apparatus 2, and notifies the job network control unit 15 of the event. 53 is transferred. The job network control unit 15 transfers the event 53 to the differential event management unit 12 via the event transmission unit 11. The differential event management unit 12 extracts the transmitted event 553 that matches the job network ID of the transferred event 53 from the differential event D / B 103, compares it with the event 53, and determines an event that has not been transmitted to the job monitoring terminal 3. Created as a differential event 56. The difference event management unit 12 stores the created difference event 56 in the difference event D / B 103, and updates the difference event 552 (step S110).

ジョブネットワーク制御部15は、ジョブ実行装置2から受信されるイベント53のイベント種別を参照し、実行エラーを示す異常イベント54であるどうかを判定し(ステップS116)、正常動作を示すイベントである場合、終了イベント55であるかどうかを判定する(ステップS112)。イベント53が終了イベント55ではなく、ジョブの実行状況のステータスを示すイベントである場合、ジョブ実行装置2からのイベント53を待ちうける。受信されるイベント53が終了イベント55である場合、ジョブネットワーク制御部15は、その終了イベント55を、イベント送信部を介して統合監視端末4に転送する(ステップ113)。又、ジョブD/B101から当該終了ジョブ55のジョブIDに対応するジョブ実行結果(終了コード、標準出力、標準エラー出力)を抽出し、ジョブネットワークD/B102にその情報を書き込み、ジョブ履歴58を作成、更新する(ステップS114)。   The job network control unit 15 refers to the event type of the event 53 received from the job execution device 2 to determine whether the event is an abnormal event 54 indicating an execution error (step S116). Then, it is determined whether or not it is the end event 55 (step S112). When the event 53 is not an end event 55 but an event indicating the status of the job execution status, the event 53 from the job execution apparatus 2 is awaited. If the received event 53 is the end event 55, the job network control unit 15 transfers the end event 55 to the integrated monitoring terminal 4 via the event transmission unit (step 113). Also, a job execution result (end code, standard output, standard error output) corresponding to the job ID of the end job 55 is extracted from the job D / B 101, the information is written in the job network D / B 102, and the job history 58 is stored. Create and update (step S114).

ジョブネットワーク制御部15に受信される終了イベント55が当該ジョブネットワーク51の最終ジョブの終了ジョブでない場合は、ジョブパラメータ59を参照し、ジョブの起動条件である実行順や連携関係に基づき、次に実行するジョブ52を選択し(ステップS106)、所定のジョブ実行装置2にそのジョブ52を転送して実行させる(ステップS108)。受信される終了イベント55が当該ジョブネットワーク51の最終ジョブの終了を示すイベントである場合、ジョブ実行装置1は、バッチネットワーク51の実行処理を終了する。   If the end event 55 received by the job network control unit 15 is not the end job of the final job of the job network 51, the job parameter 59 is referred to, and the next is determined based on the execution order or linkage relationship that is the job start condition. The job 52 to be executed is selected (step S106), and the job 52 is transferred to the predetermined job execution apparatus 2 and executed (step S108). When the received end event 55 is an event indicating the end of the final job of the job network 51, the job execution apparatus 1 ends the execution process of the batch network 51.

ステップS110において、ジョブネットワーク制御部15に受信されるイベント53が、異常イベント54である場合、すなわち、ジョブ52の実行結果の異常終了を示す場合や、ジョブネットワーク51に設定されている所定の時間(図示なし)を超過している場合等、ジョブネットワーク制御部15は、イベント送信部11を介して統合監視端末4に異常イベント54を送信する(ステップ118)。異常イベント54は、関連するジョブネットワークID441及びジョブID442と、異常ステータスの内容を含むイベント443と、警報情報を示すイベント種別444と、イベント発生時刻445とが含まれている。   In step S110, if the event 53 received by the job network control unit 15 is an abnormal event 54, that is, indicates an abnormal end of the execution result of the job 52, or a predetermined time set in the job network 51. When exceeding (not shown), the job network control unit 15 transmits the abnormal event 54 to the integrated monitoring terminal 4 via the event transmission unit 11 (step 118). The abnormal event 54 includes a related job network ID 441 and job ID 442, an event 443 including the content of the abnormal status, an event type 444 indicating alarm information, and an event occurrence time 445.

ジョブネットワーク制御部15は、ジョブパラメータ59を参照し、ジョブを実行する予備のジョブ実行装置2が指定されている場合、ジョブ実行装置2を変更して、当該ジョブ52をそのジョブ実行装置2に転送し、実行させる(ステップS122)。予備のジョブ実行装置2が指定されていない場合、あるいは予備のジョブ実行装置2からも異常イベント54を受信した場合、異常終了イベントとしてステップS114に移行する。   The job network control unit 15 refers to the job parameter 59, and when the spare job execution device 2 for executing the job is designated, the job network control unit 15 changes the job execution device 2 and changes the job 52 to the job execution device 2. Transfer and execute (step S122). When the spare job execution device 2 is not designated or when the abnormal event 54 is received from the spare job execution device 2, the process proceeds to step S114 as an abnormal end event.

以上のように、本発明によるジョブ実行監視システムは、ジョブネットワーク制御部15と、ジョブ実行制御部16に分離して、2つの制御の連携でジョブネットワークを処理し、単一のジョブ制御装置1によるネットワーク分散型のジョブ実行システムの集中制御を可能とした。   As described above, the job execution monitoring system according to the present invention is divided into the job network control unit 15 and the job execution control unit 16, and processes the job network in cooperation with the two controls. Enables centralized control of network distributed job execution systems.

又、ジョブ52の実行状況をイベント53という形式でジョブ制御装置1に通知し、ジョブ制御装置1が、即時にジョブ実行装置2上のジョブ52の実行状況を把握することができる。この際、ジョブ実行状況又は実行結果のステータスをイベント53という形式でジョブ制御装置1に通知し、ジョブ実行結果57を別途取得する形式で、ジョブ52の実行結果が大量に出力された場合でもジョブ制御装置1のステータスの更新は遅れない。   Further, the job control apparatus 1 is notified of the execution status of the job 52 in the form of an event 53, and the job control apparatus 1 can immediately grasp the execution status of the job 52 on the job execution apparatus 2. At this time, the job execution status or the status of the execution result is notified to the job control apparatus 1 in the format of event 53, and the job execution result 57 is separately acquired, and even if a large number of execution results of the job 52 are output, the job The update of the status of the control device 1 is not delayed.

図2及び図5を参照して、本発明によるジョブ実行監視システムにおけるジョブの実行処理の動作が説明される。   With reference to FIGS. 2 and 5, the operation of job execution processing in the job execution monitoring system according to the present invention will be described.

ジョブ制御装置1は、ジョブネットワーク定義D/B100から起動条件511に一致するジョブネットワーク51を抽出する(ステップS2)。次に、ジョブネットワーク51をジョブ52毎に分解し(ステップS4)、ジョブネットワーク51に含まれる実行順序515に基づきジョブ513を選択する(ステップS6)。選択したジョブ513(例えばジョブA52−1)を、所定の実行端末装置514(例えばジョブ実行装置2−1)に対し転送するとともに実行命令を発行する(ステップS8)。   The job control apparatus 1 extracts the job network 51 that matches the activation condition 511 from the job network definition D / B 100 (step S2). Next, the job network 51 is disassembled for each job 52 (step S4), and the job 513 is selected based on the execution order 515 included in the job network 51 (step S6). The selected job 513 (for example, job A 52-1) is transferred to a predetermined execution terminal device 514 (for example, job execution device 2-1) and an execution command is issued (step S8).

ジョブ実行装置2−1は、ジョブA52−1を受信し、実行命令を受け付けると、ジョブ実行部21においてジョブA52−2を実行する(ステップS10)。ジョブ実行装置2−1は、ジョブA52−2を開始すると、ジョブA52−2を実行中であることを示すイベント53をジョブ制御装置1に送信する(ステップS12)。   When job execution apparatus 2-1 receives job A 52-1 and receives an execution instruction, job execution unit 21 executes job A 52-2 (step S 10). When the job execution apparatus 2-1 starts the job A 52-2, the job execution apparatus 2-1 transmits an event 53 indicating that the job A 52-2 is being executed to the job control apparatus 1 (step S12).

ジョブ制御装置1はジョブ実行装置2−1から受信されるイベント53を保存し、イベント履歴58を作成、保存する(ステップS14)。ジョブ実行装置2−1は、ジョブA52−1を終了すると、終了イベント55とジョブ実行結果57をジョブ制御装置1に送信する(ステップS16)。ジョブ実行装置1は受信される終了イベント55を保存し、イベント履歴58を更新する(ステップS18)。又、受信されるジョブ実行結果57を保存する(ステップS20)。   The job control device 1 stores the event 53 received from the job execution device 2-1, and creates and stores the event history 58 (step S14). When the job execution apparatus 2-1 ends the job A 52-1, the job execution apparatus 2-1 transmits an end event 55 and a job execution result 57 to the job control apparatus 1 (step S16). The job execution apparatus 1 stores the received end event 55 and updates the event history 58 (step S18). The received job execution result 57 is stored (step S20).

終了イベント55を受信したジョブ制御装置1は、ジョブネットワーク51のジョブの起動条件(順序や連携関係)に基づき、次のジョブ52、例えばジョブB52−2をジョブ実行装置2−2に転送するとともに実行命令を発行する(ステップS24)。この際、ジョブB52−2とジョブC52−3を並列処理する場合、ジョブB52−2の転送と同時にジョブC52−3をジョブ実行装置2−3に転送及び実行命令を発行する(ステップS28)。ジョブ実行装置2−2及びジョブ実行装置2−3はそれぞれ受信されるジョブ52を実行する(ステップS26、S30)。以上のようにジョブ実行監視システムは、ジョブ52の転送、実行、イベント53の転送、ジョブの切り替えを実行する。ジョブ制御装置1は、当該ジョブネットワーク51の最終ジョブ52の終了イベント55及び実行結果を受信すると(ステップS32)、終了イベント55を保存し、イベント履歴58を更新し、実行結果を保存してジョブネットワーク51の実行処理を終了する。   Upon receiving the end event 55, the job control apparatus 1 transfers the next job 52, for example, job B 52-2, to the job execution apparatus 2-2 based on the job start conditions (order and linkage relationship) of the job network 51. An execution instruction is issued (step S24). At this time, when the job B 52-2 and the job C 52-3 are processed in parallel, the job C 52-3 is transferred to the job execution apparatus 2-3 and an execution command is issued simultaneously with the transfer of the job B 52-2 (step S28). The job execution device 2-2 and the job execution device 2-3 execute the received job 52 (steps S26 and S30). As described above, the job execution monitoring system executes the transfer and execution of the job 52, the transfer of the event 53, and the job switching. Upon receiving the end event 55 and the execution result of the final job 52 of the job network 51 (step S32), the job control apparatus 1 stores the end event 55, updates the event history 58, stores the execution result, and saves the job. The execution process of the network 51 is terminated.

以上のように、本発明によるジョブ実行監視システムは、ジョブ制御装置1によって大規模ジョブを含むジョブネットワークをジョブ毎に分解し、担当するジョブのみをジョブ実行装置2−1〜nに転送、実行させるため、ジョブネットワークの実行制御時の通信負荷を抑えることができる。又、各ジョブ実行装置2は与えられたジョブを実行するだけで良いので、他のジョブ実行装置2との実行状況や実行結果を知る必要がない。このため、ジョブの実行状況や実行結果等の情報を転送するための同期信号のやり取りの必要がなくなり、この同期のための遅延やネットワークヘの負荷をなくすことができる。更に、ジョブ実行装置2はジョブの実行状況を情報量の少ないイベント53としてジョブ制御装置1に対し発行するため、ジョブ制御装置1に対する通信負荷を軽減しつつ、ジョブの集中制御及び管理を実行できる。   As described above, in the job execution monitoring system according to the present invention, the job control apparatus 1 disassembles a job network including a large-scale job for each job, and transfers and executes only the jobs in charge to the job execution apparatuses 2-1 to n. Therefore, the communication load at the time of job network execution control can be suppressed. Further, each job execution device 2 only needs to execute a given job, so there is no need to know the execution status and execution results with other job execution devices 2. For this reason, there is no need to exchange a synchronization signal for transferring information such as the job execution status and execution result, and it is possible to eliminate a delay for the synchronization and a load on the network. Furthermore, since the job execution apparatus 2 issues the job execution status to the job control apparatus 1 as an event 53 with a small amount of information, centralized control and management of the job can be executed while reducing the communication load on the job control apparatus 1. .

図2及び図9を参照して、本発明によるジョブ実行監視システムのジョブ実行状況監視処理の動作が示される。ジョブ監視端末3のジョブ監視部31は、ジョブ制御装置1の差分イベント管理部12に対し、イベント要求を発行する(ステップS42)。この際、ジョブ監視部31は、定期的にイベント要求を発行しても、監視者によって操作される図示しない入力装置からの指令により、任意にイベント要求を発行しても良い。イベント要求を受け付けた差分イベント管理部12は、イベント要求に基づき差分イベントD/B103から、差分イベント56(例えば、イベント要求に含まれるジョブネットワークIDに対応する差分イベント56)を抽出し、ジョブ監視端末3のジョブ監視部31に送信する(ステップS44)。ジョブ監視部31は、ジョブ監視情報出力装置31に受信される差分イベント56をジョブ監視情報出力装置34に転送し、ジョブ監視情報出力装置34に表示されるジョブネットワーク51の実行状況のステータス表示を更新する。   2 and 9, the operation of the job execution status monitoring process of the job execution monitoring system according to the present invention will be described. The job monitoring unit 31 of the job monitoring terminal 3 issues an event request to the differential event management unit 12 of the job control device 1 (step S42). At this time, the job monitoring unit 31 may issue an event request periodically or arbitrarily issue an event request according to a command from an input device (not shown) operated by a monitor. Upon receiving the event request, the differential event management unit 12 extracts the differential event 56 (for example, the differential event 56 corresponding to the job network ID included in the event request) from the differential event D / B 103 based on the event request, and monitors the job. It transmits to the job monitoring part 31 of the terminal 3 (step S44). The job monitoring unit 31 transfers the difference event 56 received by the job monitoring information output device 31 to the job monitoring information output device 34 and displays the status display of the execution status of the job network 51 displayed on the job monitoring information output device 34. Update.

図2及び図10を参照して、本発明によるジョブ実行監視システムのジョブ実行履歴の取得及び表示処理の動作が示される。ジョブ監視端末3の履歴管理部32は、ジョブ制御装置1のジョブネットワーク履歴検索部13に対し、履歴情報要求を発行する(ステップS52)。この際、履歴管理部32は、定期的に履歴情報要求を発行しても、監視者によって操作される図示しない入力装置からの指令により、任意に履歴情報要求を発行しても良い。履歴情報要求を受け付けたジョブネットワーク履歴検索部12は、ジョブネットワークD/B102からジョブ履歴58(例えば、ジョブのステータスイベント以外の詳細な情報である終了コード、標準出力、標準エラー出力、ジョブ実行開始時刻、実行終了時刻、ジョブ実行装置名等)を抽出し、履歴管理部32に送信する(ステップS56)。履歴管理部32は受信されるジョブ履歴58をジョブ監視情報出力装置34に転送し、ジョブ監視情報出力装置34に表示されるジョブネットワーク51の履歴表示を更新する(ステップS58)。   With reference to FIGS. 2 and 10, the operation of the job execution history acquisition and display processing of the job execution monitoring system according to the present invention will be described. The history management unit 32 of the job monitoring terminal 3 issues a history information request to the job network history search unit 13 of the job control device 1 (step S52). At this time, the history management unit 32 may issue a history information request periodically, or may arbitrarily issue a history information request according to a command from an input device (not shown) operated by a supervisor. Upon receiving the history information request, the job network history search unit 12 receives a job history 58 from the job network D / B 102 (for example, an end code that is detailed information other than the job status event, standard output, standard error output, job execution start) Time, execution end time, job execution device name, etc.) are extracted and transmitted to the history management unit 32 (step S56). The history management unit 32 transfers the received job history 58 to the job monitoring information output device 34, and updates the history display of the job network 51 displayed on the job monitoring information output device 34 (step S58).

図12を参照して、本発明に係るジョブ監視情報出力装置34の表示画面の概念図が示される。ジョブ情報出力装置34の表示画面は、好適には、実行予定、実行済み、実行中のジョブネットワーク51の実行状況のステータス及びジョブの実行開始時刻及び終了時刻等が表示される監視ウインドウ341と、ジョブネットワーク51の実行状況をフロー等の図式的に表示される監視ウインドウ342とを有する。監視ウインドウ341は、ジョブネットワーク51を識別するジョブネットワークIDと、ジョブの実行状況のステータスと、ジョブの実行開始及び終了時刻が関連付けられて表示される。ステータスは、好適には、正常終了が緑色、異常終了が赤色、実行中が黄色と色分けされて表示される。監視ウインドウ342は、現在実行中のジョブネットワーク341がフロー表示され、各ジョブを示す四角枠には、ジョブを識別するジョブIDが付され、四角枠内には正常終了、異常終了、実行中と、実行状況が表示される。この表示も監視ウインドウ341と同様に色分けされても構わない。又、監視者によって操作される図示しない入力装置からの信号により、監視ウインドウ342は、実行中のジョブネットワーク以外にも実施済みのジョブネットワークや実施予定のジョブネットワークが表示されても構わない。   Referring to FIG. 12, a conceptual diagram of a display screen of the job monitoring information output device 34 according to the present invention is shown. The display screen of the job information output device 34 is preferably a monitoring window 341 that displays the execution status, execution status of the job network 51 being executed, execution start time and end time of the job, and the like. And a monitoring window 342 that graphically displays the execution status of the job network 51 such as a flow. The monitoring window 341 displays a job network ID for identifying the job network 51, a job execution status, and job execution start and end times in association with each other. The status is preferably displayed in different colors, such as normal end green, abnormal end red, and running yellow. In the monitoring window 342, the currently executing job network 341 is displayed as a flow, a square frame indicating each job is assigned a job ID for identifying the job, and the square frame indicates normal end, abnormal end, and executing. The execution status is displayed. This display may also be color-coded in the same manner as the monitoring window 341. The monitoring window 342 may display a job network that has already been executed or a job network that is scheduled to be executed, in addition to the job network that is being executed, by a signal from an input device (not shown) that is operated by the monitor.

このように、ジョブ監視端末3は、定期的にあるいは監視者の必要な時に差分イベント56やイベント履歴58を取得するため、ジョブ制御装置1へのアクセス回数及び転送情報量を制限できる。従って、ジョブ制御装置1や各装置間を結ぶネットワークに対する負荷を軽減することができる。   As described above, since the job monitoring terminal 3 acquires the differential event 56 and the event history 58 periodically or when necessary by the monitor, the number of accesses to the job control apparatus 1 and the amount of transfer information can be limited. Therefore, it is possible to reduce the load on the job control device 1 and the network connecting the devices.

図13を参照して、本発明によるジョブ実行監視システムにおける、ジョブの実行エラー時の動作が説明される。ジョブ実行装置2において、ジョブ52の実行できない場合や、ジョブネットワーク51に設定されている所定の時間(図示なし)を超過している場合等、ジョブ実行装置2は、ジョブ制御装置1に対し、異常イベント54を送信する(ステップS62)。ジョブネットワーク制御部15は、ジョブ統合監視端末4に対して異常イベントを転送する(ステップS64)。異常イベント54を受信した統合監視端末4の異常情報制御部41は、統合監視情報出力装置42及び警告装置43に異常イベントを送信する。図15を参照して、統合監視情報出力装置42は、受信される異常イベントに基づき統合監視情報を表示する。統合監視情報は、受信される異常イベント54のイベント種別、ジョブID、イベント内容が含まれる。又、警告装置43は、サイレンを鳴らし、赤色灯を点灯することによって警報を発生する。例えば、ジョブCが異常終了した場合、警告装置43のサイレンが鳴り、統合監視情報出力装置42にイベント「警報」、ジョブID「ジョブC」、イベント「異常終了」が表示される。尚、統合監視端末4の異常情報制御部41は、ジョブ制御装置1から受信される終了イベント55を統合監視情報出力装置42に送信し、終了情報を表示する。この際、正常終了の場合、イベント種別は「情報」、ジョブIDは、例えば「ジョブA」、イベントは「正常終了」と表示される。   With reference to FIG. 13, the operation at the time of job execution error in the job execution monitoring system according to the present invention will be described. In the job execution device 2, when the job 52 cannot be executed, or when a predetermined time (not shown) set in the job network 51 is exceeded, the job execution device 2 An abnormal event 54 is transmitted (step S62). The job network control unit 15 transfers an abnormal event to the job integrated monitoring terminal 4 (step S64). The abnormality information control unit 41 of the integrated monitoring terminal 4 that has received the abnormal event 54 transmits the abnormal event to the integrated monitoring information output device 42 and the warning device 43. Referring to FIG. 15, the integrated monitoring information output device 42 displays the integrated monitoring information based on the received abnormal event. The integrated monitoring information includes the event type, job ID, and event content of the received abnormal event 54. The warning device 43 generates an alarm by sounding a siren and turning on a red light. For example, when job C ends abnormally, the siren of the warning device 43 sounds, and the event “alarm”, job ID “job C”, and event “abnormal end” are displayed on the integrated monitoring information output device 42. The abnormality information control unit 41 of the integrated monitoring terminal 4 transmits an end event 55 received from the job control apparatus 1 to the integrated monitoring information output apparatus 42 and displays the end information. At this time, in the case of normal end, the event type is displayed as “information”, the job ID is displayed as “job A”, for example, and the event is displayed as “normal end”.

このようにして、実行中にエラーが発生したジョブとその内容を容易に、且つ、適時に把握することができる。又、監視者は、常に統合監視情報出力装置42を目視・確認する必要がなく異常のある時のみ異常の確認ができるため、監視者の負担やコストを軽減することができる。   In this way, it is possible to easily and timely grasp a job in which an error has occurred during execution and its contents. Further, since the monitor does not always need to visually check and confirm the integrated monitoring information output device 42 and can check the abnormality only when there is an abnormality, the burden and cost of the monitoring person can be reduced.

又、ジョブ52の実行状況のイベント53のうち、重要なイベントのみが統合監視端末4に転送されるため、監視者は統合監視端末4のみを監視すれば良い。   Further, since only important events among the events 53 of the execution status of the job 52 are transferred to the integrated monitoring terminal 4, the monitor need only monitor the integrated monitoring terminal 4.

図16を参照して、本発明によるジョブ実行監視システムにおいて、ジョブの実行エラーの際のジョブ実行装置2の変更の動作が示される。   Referring to FIG. 16, in the job execution monitoring system according to the present invention, an operation of changing the job execution apparatus 2 when a job execution error occurs is shown.

図6(c)に示されるように、ジョブA53−1を実行する場合、ジョブ実行装置として「ジョブ実行装置2−1」、予備のジョブ実行装置として「ジョブ実行装置2−2」が割り当てられている。ジョブA53−1を実行していたジョブ実行装置2−1にエラーが発生すると、ジョブ実行装置2−1は、異常イベント54をジョブ制御装置1に送信する(ステップS72)。ジョブ制御装置1はジョブA53−1の実行先を予備のジョブ実行装置であるジョブ実行装置2−2にジョブA53−1を転送する(ステップS76)。ジョブ実行装置2−2は、受信されるジョブA53−1を実行する(ステップS78)。ジョブ実行装置2−2においてジョブA53−1の実行中にエラーが発生すると、異常イベント54をジョブ制御装置1に送信する(ステップS80)。ジョブ制御装置1は、異常イベント54を受信すると、予備のジョブ実行装置を検索し、予備のジョブ実行装置の割り当てがない場合、異常終了として次のジョブ、例えばジョブB52−2及びジョブC52−3を抽出し、それぞれに割り当てらたジョブ実行装置2−2及びジョブ実行装置2−3に送信する(ステップS82、S84)。ジョブB52−2を受信したジョブ実行装置2−2は、受信されたジョブB52−2を実行し、ジョブC52−3を受信した実行装置2−3は受信されたジョブC52−3を実行する(ステップS86)。   As shown in FIG. 6C, when job A53-1 is executed, "job execution device 2-1" is assigned as the job execution device, and "job execution device 2-2" is assigned as the spare job execution device. ing. When an error occurs in the job execution device 2-1 that has been executing the job A53-1, the job execution device 2-1 transmits an abnormal event 54 to the job control device 1 (step S72). The job control apparatus 1 transfers the job A53-1 to the job execution apparatus 2-2, which is a backup job execution apparatus, as the execution destination of the job A53-1 (step S76). The job execution device 2-2 executes the received job A53-1 (step S78). If an error occurs during execution of job A53-1 in the job execution device 2-2, an abnormal event 54 is transmitted to the job control device 1 (step S80). Upon receiving the abnormal event 54, the job control apparatus 1 searches for a spare job execution apparatus. If there is no spare job execution apparatus assigned, the job control apparatus 1 abnormally terminates the next job, for example, job B52-2 and job C52-3. Are transmitted to the job execution device 2-2 and the job execution device 2-3 assigned to each of them (steps S82 and S84). The job execution apparatus 2-2 that has received the job B 52-2 executes the received job B 52-2, and the execution apparatus 2-3 that has received the job C 52-3 executes the received job C 52-3 ( Step S86).

このように、予備のジョブ実行装置をジョブネットワークに定義し、異常イベント54をトリガーにジョブ52の実行先を切り替えることで、ジョブの実行エラーを即時に、一元的に救済することができる。   In this way, by defining a spare job execution device in the job network and switching the execution destination of the job 52 using the abnormal event 54 as a trigger, job execution errors can be immediately and centrally remedied.

以上のように、本発明によるジョブ実行監視システムは、メインフレーム等の大型計算機ではなく、UNIX(登録商標)サーバ等のオープンシステムでシステムが構築できるため、システム導入の経費削減ができる。又、統合監視端末4には、重要な警告のみが通知され、それが警告音や警告ランプの回転で知らされるため、この統合監視端末4の傍にいるだけでよく、大量のジョブの実行結果を全て目で監視する必要がなくなる。このため、監視者のコスト削減ができることである。更に、1台のジョブ制御装置1にジョブ52及びジョブネットワーク51を集約し、それをネットワーク接続された多数台のジョブ実行装置2−1〜nに分散し、実行させる。このため、全てのジョブ実行状況・実行結果を1台のジョブ制御装置1に集約、制御、管理することができ、システムの管理が容易になる。   As described above, the job execution monitoring system according to the present invention can be constructed with an open system such as a UNIX (registered trademark) server instead of a large-sized computer such as a mainframe. Further, since only the important warning is notified to the integrated monitoring terminal 4 and is notified by the warning sound or the rotation of the warning lamp, it is only necessary to be near the integrated monitoring terminal 4 and execute a large number of jobs. Eliminates the need to monitor all results visually. For this reason, the cost of the supervisor can be reduced. Further, the job 52 and the job network 51 are aggregated in one job control apparatus 1 and distributed to a plurality of job execution apparatuses 2-1 to n connected to the network and executed. For this reason, all job execution statuses and execution results can be consolidated, controlled, and managed in one job control apparatus 1, and system management becomes easy.

以上、本発明の実施の形態を詳述してきたが、具体的な構成は上記実施の形態に限られるものではなく、本発明の要旨を逸脱しない範囲の変更があっても本発明に含まれる。本実施の形態では、ジョブ52の実行エラーの際、ジョブネットワーク制御部15は、異常イベント54を、イベント送信部11を介して統合監視端末4に転送したが、警報イベントとして統合監視端末4に送信しても構わない。この際、警報イベントを受信した異常情報制御部41は、警報イベントに基づき、警告装置43に警報を発生させる。これにより、ジョブ制御装置1と統合監視端末4との間の情報量は更に軽減できる。   The embodiment of the present invention has been described in detail above, but the specific configuration is not limited to the above-described embodiment, and changes within a scope not departing from the gist of the present invention are included in the present invention. . In the present embodiment, the job network control unit 15 transfers the abnormal event 54 to the integrated monitoring terminal 4 via the event transmission unit 11 when the job 52 execution error occurs. You can send it. At this time, the abnormality information control unit 41 that has received the alarm event causes the alarm device 43 to generate an alarm based on the alarm event. Thereby, the amount of information between the job control device 1 and the integrated monitoring terminal 4 can be further reduced.

図1は、本発明によるバッチジョブシステムの実施の形態におけるブロック図である。FIG. 1 is a block diagram of an embodiment of a batch job system according to the present invention. 図2は、本発明によるバッチジョブシステムの実施の形態におけるブロック図である。FIG. 2 is a block diagram of an embodiment of a batch job system according to the present invention. 図3は、本発明によるジョブネットワークの実施の形態における構成図である。FIG. 3 is a configuration diagram in the embodiment of the job network according to the present invention. 図4は、本発明によるジョブ制御装置のジョブネットワークの制御処理の流れ図である。FIG. 4 is a flowchart of job network control processing of the job control apparatus according to the present invention. 図5は、本発明によるジョブ実行監視システムの実施の形態におけるジョブネットワークの実行処理のシーケンス図である。FIG. 5 is a sequence diagram of job network execution processing in the embodiment of the job execution monitoring system according to the present invention. 図6は、本発明によるジョブネットワークをジョブに分解する処理の概念図である。FIG. 6 is a conceptual diagram of processing for decomposing a job network according to the present invention into jobs. 図7は、本発明によるジョブD/Bの実施の形態における構成図である。FIG. 7 is a configuration diagram of the embodiment of the job D / B according to the present invention. 図8は、本発明による差分イベントD/Bの実施の形態における構成図である。FIG. 8 is a configuration diagram in the embodiment of the differential event D / B according to the present invention. 図9は、本発明によるジョブ実行監視システムの実施の形態における監視処理のシーケンス図である。FIG. 9 is a sequence diagram of the monitoring process in the embodiment of the job execution monitoring system according to the present invention. 図10は、本発明によるジョブ実行監視システムの実施の形態における履歴作成処理のシーケンス図である。FIG. 10 is a sequence diagram of history creation processing in the embodiment of the job execution monitoring system according to the present invention. 図11は、本発明によるジョブネットワークD/Bの実施の形態における構成図である。FIG. 11 is a configuration diagram of the embodiment of the job network D / B according to the present invention. 図12は、本発明によるジョブ監視出力装置の実施の形態における表示画面の一例である。FIG. 12 is an example of a display screen in the embodiment of the job monitoring output apparatus according to the present invention. 図13は、本発明によるジョブ実行監視システムの実施の形態における警報通知処理のシーケンス図である。FIG. 13 is a sequence diagram of alarm notification processing in the embodiment of the job execution monitoring system according to the present invention. 図14は、本発明による統合監視処理D/Bの実施の形態における構成図である。FIG. 14 is a configuration diagram in the embodiment of the integrated monitoring process D / B according to the present invention. 図15は、本発明による統合監視出力装置の実施の形態における表示画面の一例である。FIG. 15 is an example of a display screen in the embodiment of the integrated monitoring output device according to the present invention. 図16は、本発明によるジョブ実行監視システムのジョブの実施の形態における実行エラー発生時のジョブ実行装置切り替え処理のシーケンス図である。FIG. 16 is a sequence diagram of job execution device switching processing when an execution error occurs in the job execution monitoring system according to the present invention.

符号の説明Explanation of symbols

1:ジョブ制御装置
2、2−1〜n:ジョブ実行装置
3:ジョブ監視端末
4:統合監視端末
11:イベント送信部
12:差分イベント管理部
13:ジョブネットワーク履歴検索部
14:スケジュール制御部
15:ジョブネットワーク制御部
16:ジョブ制御部
21:ジョブ実行部
22:ジョブD/B
31:ジョブ監視部
32:履歴管理部
34:ジョブ監視情報出力装置
35:ジョブ監視部
41:異常情報制御部
42:統合監視情報出力装置
43:警告装置
44:統合監視D/B
51:ジョブネットワーク
52:ジョブ
53:イベント
54:異常イベント
55:終了イベント
56:差分イベント
57:ジョブ実行結果
58:イベント履歴
59:ジョブパラメータ
1: Job control device 2, 2-1 to n: Job execution device 3: Job monitoring terminal 4: Integrated monitoring terminal 11: Event transmission unit 12: Difference event management unit 13: Job network history search unit 14: Schedule control unit 15 : Job network control unit 16: Job control unit 21: Job execution unit 22: Job D / B
31: Job monitoring unit 32: History management unit 34: Job monitoring information output device 35: Job monitoring unit 41: Abnormal information control unit 42: Integrated monitoring information output device 43: Warning device 44: Integrated monitoring D / B
51: Job network 52: Job 53: Event 54: Abnormal event 55: End event 56: Difference event 57: Job execution result 58: Event history 59: Job parameter

Claims (17)

少なくとも1つ以上のジョブネットワークを保持するジョブ制御装置と、
前記ジョブ制御装置に接続される少なくとも1つ以上のジョブ実行装置と、
前記ジョブ制御装置に接続されるジョブ監視端末とを備え、
前記ジョブ制御装置は、自身の保持する所定のジョブネットワークを選定し、前記ジョブネットワークからジョブを抽出し、前記ジョブネットワークによって前記ジョブに割り当てられたジョブ実行装置に対し、前記ジョブを送信し、
前記ジョブ実行装置は、前記ジョブ制御装置から受信される前記ジョブを実行し、前記実行状況の状態を示すイベントを前記ジョブ制御装置に送信し、
前記ジョブ監視端末は、前記イベントを前記ジョブ制御装置から取得し、前記イベントに基づき前記ジョブネットワークの実行状況を出力する
ジョブ実行監視システム。
A job control device holding at least one job network;
At least one job execution device connected to the job control device;
A job monitoring terminal connected to the job control device,
The job control device selects a predetermined job network held by the job control device, extracts a job from the job network, transmits the job to a job execution device assigned to the job by the job network,
The job execution device executes the job received from the job control device, transmits an event indicating the state of the execution status to the job control device,
The job monitoring terminal, wherein the job monitoring terminal acquires the event from the job control device and outputs an execution status of the job network based on the event.
請求項1に記載のジョブ実行監視システムにおいて、
前記ジョブ制御装置は、前記ジョブ監視端末からの要求信号に応じて、未送信のイベントを差分イベントとして前記ジョブ監視端末に送信する
ジョブ実行監視システム。
The job execution monitoring system according to claim 1,
The job control apparatus, wherein the job control device transmits an unsent event as a difference event to the job monitoring terminal in response to a request signal from the job monitoring terminal.
請求項1又は2に記載のジョブ実行監視システムにおいて、
前記ジョブ実行装置は、前記ジョブの実行を終了すると、前記ジョブの実行結果である実行結果情報を前記ジョブ制御装置に送信し、
前記ジョブ制御装置は、前記実行結果情報を前記ジョブと関連付けて記録する
ジョブ実行監視システム。
In the job execution monitoring system according to claim 1 or 2,
When the job execution device finishes executing the job, the job execution device transmits execution result information, which is an execution result of the job, to the job control device,
The job control device is a job execution monitoring system in which the execution result information is recorded in association with the job.
請求項1から3いずれか1項に記載のジョブ実行監視システムにおいて、
前記ジョブ実行装置は、前記ジョブの実行を終了すると、前記イベントとして実行終了を示す終了イベントを前記ジョブ制御装置に送信し、
前記ジョブ制御装置は、前記終了イベントを受信すると、前記ジョブネットワークに基づき、終了した前記ジョブの次に実行するジョブを、前記次のジョブに割り当てられたジョブ実行端末装置に送信する
ジョブ実行監視システム。
In the job execution monitoring system according to any one of claims 1 to 3,
When the job execution device ends execution of the job, the job execution device transmits an end event indicating the end of execution as the event to the job control device,
Upon receiving the end event, the job control device transmits a job to be executed next to the completed job to the job execution terminal device assigned to the next job based on the job network. .
請求項1から4に記載のジョブ実行監視システムにおいて、
前記ジョブ制御装置に接続される統合監視端末を更に具備し、
前記ジョブ実行装置は、ジョブの実行処理に異常が生じると、イベントとしてジョブの実行状況の異常状態を示す異常イベントを前記ジョブ制御装置に送信し、
前記ジョブ制御装置は、前記異常イベントを、統合監視端末に送信し、
前記統合監視端末は、前記異常イベントに応じて、警報を発生する
ジョブ実行監視システム。
In the job execution monitoring system according to claim 1,
Further comprising an integrated monitoring terminal connected to the job control device;
When an abnormality occurs in the job execution process, the job execution device transmits an abnormal event indicating an abnormal state of the job execution status to the job control device as an event,
The job control device transmits the abnormal event to an integrated monitoring terminal,
The integrated monitoring terminal is a job execution monitoring system that generates an alarm in response to the abnormal event.
請求項4に記載のジョブ実行監視システムにおいて、
前記ジョブ制御装置に接続される統合監視端末を更に具備し、
前記ジョブ制御装置は、前記終了イベントを、統合監視端末に送信し、
前記統合監視端末は、前記終了イベントに応じて、前記ジョブの実行終了を告げる表示を出力する
ジョブ実行監視システム。
The job execution monitoring system according to claim 4,
Further comprising an integrated monitoring terminal connected to the job control device;
The job control device transmits the end event to an integrated monitoring terminal,
The integrated monitoring terminal outputs a display informing the end of execution of the job in response to the end event.
少なくとも1つ以上のジョブネットワークを保持するジョブネットワーク定義データベースと、
所定の時刻に前記ジョブネットワーク定義データベースから所定のジョブネットワークを抽出するスケジュール制御部と、
前記ジョブネットワークから、ジョブを抽出するジョブネットワーク制御部と、
少なくとも1つ以上のジョブ実行装置に接続されるジョブ制御部とを具備し、
前記ジョブネットワーク制御部は、前記ジョブネットワークに規定された順序で、前記ジョブをジョブ制御部に送信し、
前記ジョブ制御部は、前記ジョブネットワークによって前記ジョブに割り当てられたジョブ実行端末に対し前記ジョブを送信する
ジョブ制御装置。
A job network definition database holding at least one job network;
A schedule control unit for extracting a predetermined job network from the job network definition database at a predetermined time;
A job network control unit for extracting a job from the job network;
A job control unit connected to at least one job execution device,
The job network control unit transmits the job to the job control unit in an order defined in the job network;
The job control unit transmits the job to a job execution terminal assigned to the job by the job network.
請求項7に記載のジョブ制御装置において、
前記抽出されたジョブが格納されるジョブデータベースを更に具備し、
前記ジョブ制御部は前記ジョブ実行端末から前記ジョブの実行状況の状態を示すイベントを受信すると、前記イベントと前記ジョブを関連付けて前記ジョブデーダベースに格納する
ジョブ制御装置。
The job control apparatus according to claim 7.
A job database in which the extracted jobs are stored;
When the job control unit receives an event indicating the status of execution of the job from the job execution terminal, the job control unit associates the event with the job and stores the event in the job database.
請求項8に記載のジョブ制御装置において、
ジョブの実行状況を出力するジョブ監視端末に対し、前記イベントを送信する差分イベント管理部を更に具備し、
前記ジョブネットワーク制御部は、前記イベントを受信すると、前記イベントを差分イベント管理部に送信し、
前記差分イベント管理部は、受信される前記イベントから前記ジョブ監視端末に未送信の情報である差分イベントを作成し、前記ジョブ監視端末に前記差分イベントを送信する
ジョブ制御装置。
The job control apparatus according to claim 8.
The job monitoring terminal that outputs the job execution status further includes a differential event management unit that transmits the event,
When the job network control unit receives the event, the job network control unit transmits the event to the differential event management unit,
The job control device, wherein the difference event management unit creates a difference event that is information that has not been transmitted to the job monitoring terminal from the received event, and transmits the difference event to the job monitoring terminal.
請求項8又は9に記載のジョブ制御装置において、
前記ジョブネットワーク制御部は、前記イベントとして前記ジョブの実行処理の異常を示す異常イベントを受信すると、前記異常イベントに応じて警報を発生する統合監視端末に前記異常イベントを送信する
ジョブ制御装置。
In the job control device according to claim 8 or 9,
When the job network control unit receives an abnormal event indicating an abnormality in the execution process of the job as the event, the job network control unit transmits the abnormal event to an integrated monitoring terminal that generates an alarm in response to the abnormal event.
請求項8から10いずれか1項に記載のジョブ制御装置において、
前記ジョブネットワークの実行状況の履歴を保持するジョブネットワークデータベースと、
前記ジョブネットワークデータベースから前記履歴を抽出し、前記ジョブ監視端末に転送するジョブネットワーク履歴検索部とを更に備え、
前記ジョブ制御部は、前記ジョブ実行装置から受信されるジョブの実行結果である実行結果情報を前記ジョブに関連付けて前記ジョブデーダベースに格納し、
前記ジョブネットワーク制御部は、前記イベントとして前記ジョブの実行終了を示す終了イベントを受信すると、前記ジョブデーダベースから前記実行結果を抽出し、前記ジョブと関連付けて前記履歴として前記ジョブネットワークデータベースに格納する
ジョブ制御装置。
The job control apparatus according to any one of claims 8 to 10,
A job network database for holding a history of the execution status of the job network;
A job network history search unit that extracts the history from the job network database and transfers the history to the job monitoring terminal;
The job control unit stores execution result information, which is an execution result of a job received from the job execution device, in the job database in association with the job;
When the job network control unit receives an end event indicating the end of execution of the job as the event, the job network control unit extracts the execution result from the job database and stores it in the job network database as the history in association with the job. Job control unit.
ジョブネットワークをジョブに分解するステップと、
ジョブ制御装置が、前記ジョブを前記ジョブネットワークの規定に従って、前記ジョブを実行するジョブ実行装置に送信するステップと、
前記ジョブ実行装置が受信される前記ジョブを実行するステップと、
前記ジョブ実行装置が前記ジョブの実行状況を示すイベントを、前記ジョブ制御装置に送信するステップと、
前記ジョブ制御装置がジョブ監視端末に前記イベントを送信するステップと、
前記ジョブ監視端末が前記イベントに基づき前記ジョブネットワークの実行状況を表示するステップとを具備する
ジョブ実行監視方法。
Disassembling the job network into jobs;
A job control device sending the job to a job execution device that executes the job in accordance with the rules of the job network;
Executing the job received by the job execution device;
The job execution device sending an event indicating the execution status of the job to the job control device;
The job control device transmitting the event to a job monitoring terminal;
A job execution monitoring method, comprising: displaying the execution status of the job network based on the event.
請求項12に記載のジョブ実行監視方法において、
前記ジョブ実行装置が、前記イベントとして前記ジョブの実行処理の異常を示す異常イベントを前記ジョブ制御装置に送信するステップと、
前記ジョブ制御装置が、前記異常イベントを統合監視端末に送信するステップと、
前記統合監視端末が、受信される前記異常イベントに基づき、前記ジョブネットワークの実行異常を示す警報を出力するステップとを更に具備する
ジョブ実行監視方法。
The job execution monitoring method according to claim 12, wherein
The job execution device sending an abnormal event indicating an abnormality of the job execution process to the job control device as the event;
The job control device transmitting the abnormal event to an integrated monitoring terminal;
The integrated monitoring terminal further includes a step of outputting an alarm indicating an abnormal execution of the job network based on the received abnormal event.
請求項12又は13に記載のジョブ実行監視方法において、
前記ジョブ制御装置が、前記ジョブ実行装置から受信される前記イベントから、前記ジョブ監視端末に未送信のイベントのみを抽出して差分イベントを作成するステップと
前記差分イベントを前記ジョブ監視端末に送信するステップと、
前記ジョブ監視端末が前記差分イベントに基づき、前記ジョブネットワークの実行状況を表示するステップとを更に具備する
ジョブ実行監視方法。
The job execution monitoring method according to claim 12 or 13,
The job control device extracts only events that have not been sent to the job monitoring terminal from the events received from the job execution device, and creates a differential event, and sends the differential event to the job monitoring terminal. Steps,
A job execution monitoring method, further comprising: displaying the execution status of the job network based on the difference event.
ジョブネットワークをジョブに分解するステップと、
前記ジョブを前記ジョブネットワークの規定に従って、前記ジョブを実行するジョブ実行装置を選択するステップと、
前記ジョブを前記選択されたジョブ実行装置に送信するステップと、
前記ジョブの実行状況を示すイベントを、前記ジョブ実行装置から受信するステップと
前記ジョブネットワークの実行状況を出力するジョブ監視端末からの要求信号に応じて前記イベントを前記ジョブ監視端末に送信するステップとをコンピュータに実行させる
ジョブ制御プログラム。
Disassembling the job network into jobs;
Selecting a job execution device that executes the job according to the rules of the job network;
Transmitting the job to the selected job execution device;
Receiving an event indicating the execution status of the job from the job execution device; transmitting the event to the job monitoring terminal in response to a request signal from a job monitoring terminal that outputs the execution status of the job network; A job control program that causes a computer to execute.
請求項15に記載のジョブ制御プログラムにおいて、
前記イベントから、前記ジョブ監視端末に未送信のイベントのみを抽出して差分イベントを作成するステップと
前記差分イベントを前記ジョブ監視端末に送信するステップとをコンピュータに実行させるジョブ制御プログラム。
The job control program according to claim 15, wherein
A job control program that causes a computer to execute a step of generating a differential event by extracting only events that have not been transmitted to the job monitoring terminal from the event, and a step of transmitting the differential event to the job monitoring terminal.
請求項15又は16に記載のジョブ制御プログラムにおいて、
前記イベントが前記ジョブの実行処理の異常を示す異常イベントである場合、前記異常イベントを統合監視端末に送信するステップをコンピュータに実行させる
ジョブ制御プログラム。
The job control program according to claim 15 or 16,
A job control program that causes a computer to execute a step of transmitting the abnormal event to an integrated monitoring terminal when the event is an abnormal event indicating an abnormality in execution processing of the job.
JP2005100197A 2005-03-30 2005-03-30 Job execution monitoring system, job control apparatus, job execution method, and job control program Expired - Fee Related JP4538736B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005100197A JP4538736B2 (en) 2005-03-30 2005-03-30 Job execution monitoring system, job control apparatus, job execution method, and job control program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005100197A JP4538736B2 (en) 2005-03-30 2005-03-30 Job execution monitoring system, job control apparatus, job execution method, and job control program

Publications (2)

Publication Number Publication Date
JP2006277696A true JP2006277696A (en) 2006-10-12
JP4538736B2 JP4538736B2 (en) 2010-09-08

Family

ID=37212345

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005100197A Expired - Fee Related JP4538736B2 (en) 2005-03-30 2005-03-30 Job execution monitoring system, job control apparatus, job execution method, and job control program

Country Status (1)

Country Link
JP (1) JP4538736B2 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010074681A (en) * 2008-09-19 2010-04-02 Konica Minolta Business Technologies Inc Image processor, method and program for executing cooperative job
JP2010079436A (en) * 2008-09-24 2010-04-08 Fuji Xerox Co Ltd Information processor, information processing system, and program
JP2010541055A (en) * 2007-09-28 2010-12-24 インターナショナル・ビジネス・マシーンズ・コーポレーション Method, system, and computer program for scheduling execution of jobs driven by events
WO2011027484A1 (en) * 2009-09-03 2011-03-10 株式会社日立製作所 Data processing control method and calculator system
JP2011096110A (en) * 2009-10-30 2011-05-12 Toshiba Corp Job net control program and job net control device
JP2013515304A (en) * 2009-12-22 2013-05-02 テレフオンアクチーボラゲット エル エム エリクソン(パブル) How to coordinate the provision of composite services
JP2014027454A (en) * 2012-07-26 2014-02-06 Konica Minolta Inc Image processor, display device and program
US8661296B2 (en) 2011-01-31 2014-02-25 International Business Machines Corporation Dynamic data store for failed jobs in a systems complex
CN103765384A (en) * 2011-09-02 2014-04-30 飞思卡尔半导体公司 Data processing system and method for task scheduling in a data processing system
US9183038B2 (en) 2010-11-10 2015-11-10 Hitachi, Ltd. Job management system that determines if master data has been updated, then re-executes a sub-job based on available executing computers and data sharing status
JP2016115340A (en) * 2014-12-16 2016-06-23 インテル コーポレイション Leveraging offload programming model for local checkpoints
JP2016200981A (en) * 2015-04-10 2016-12-01 富士通株式会社 Operation management program, operation management method and operation management device
JP2017123048A (en) * 2016-01-07 2017-07-13 富士通株式会社 Parallel processor, job monitoring method, and job monitoring program
JP2019068443A (en) * 2018-11-28 2019-04-25 富士ゼロックス株式会社 Information processing device and program
JP2019149079A (en) * 2018-02-28 2019-09-05 株式会社日立製作所 Failure influence investigation apparatus and failure influence investigation method
CN112350955A (en) * 2019-08-06 2021-02-09 横河电机株式会社 Alarm management system and alarm management method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1078894A (en) * 1996-09-03 1998-03-24 Hitachi Ltd Method for supporting failure restoration for computer system
JPH10326201A (en) * 1997-05-26 1998-12-08 Nec Corp Distributed batch job processing system and method for automatically re-activating job at the time of failure of the system
JPH113230A (en) * 1997-06-13 1999-01-06 Hitachi Ltd Job information inquiry/display system
JP2000347884A (en) * 1999-06-08 2000-12-15 Nec Corp Job network control system
JP2001147910A (en) * 1999-11-19 2001-05-29 Nec Soft Ltd Distributed batch job processing continuing system and recording medium therefor
JP2001282551A (en) * 2000-03-29 2001-10-12 Hitachi Ltd Job processor and job processing method
JP2003101586A (en) * 2001-09-25 2003-04-04 Hitachi Ltd Network management support method
JP2003323359A (en) * 2002-04-30 2003-11-14 Canon Inc Network device management system and control method of the same
JP2004220221A (en) * 2003-01-14 2004-08-05 Toshiba Corp Information processor, monitoring control method for information processor, and information processing system
JP2005031771A (en) * 2003-07-08 2005-02-03 Hitachi Ltd Job scheduling management method, system, and program

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1078894A (en) * 1996-09-03 1998-03-24 Hitachi Ltd Method for supporting failure restoration for computer system
JPH10326201A (en) * 1997-05-26 1998-12-08 Nec Corp Distributed batch job processing system and method for automatically re-activating job at the time of failure of the system
JPH113230A (en) * 1997-06-13 1999-01-06 Hitachi Ltd Job information inquiry/display system
JP2000347884A (en) * 1999-06-08 2000-12-15 Nec Corp Job network control system
JP2001147910A (en) * 1999-11-19 2001-05-29 Nec Soft Ltd Distributed batch job processing continuing system and recording medium therefor
JP2001282551A (en) * 2000-03-29 2001-10-12 Hitachi Ltd Job processor and job processing method
JP2003101586A (en) * 2001-09-25 2003-04-04 Hitachi Ltd Network management support method
JP2003323359A (en) * 2002-04-30 2003-11-14 Canon Inc Network device management system and control method of the same
JP2004220221A (en) * 2003-01-14 2004-08-05 Toshiba Corp Information processor, monitoring control method for information processor, and information processing system
JP2005031771A (en) * 2003-07-08 2005-02-03 Hitachi Ltd Job scheduling management method, system, and program

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010541055A (en) * 2007-09-28 2010-12-24 インターナショナル・ビジネス・マシーンズ・コーポレーション Method, system, and computer program for scheduling execution of jobs driven by events
JP2010074681A (en) * 2008-09-19 2010-04-02 Konica Minolta Business Technologies Inc Image processor, method and program for executing cooperative job
JP4710942B2 (en) * 2008-09-19 2011-06-29 コニカミノルタビジネステクノロジーズ株式会社 Image processing apparatus, cooperative job execution method, and execution program
JP2010079436A (en) * 2008-09-24 2010-04-08 Fuji Xerox Co Ltd Information processor, information processing system, and program
US8625128B2 (en) 2008-09-24 2014-01-07 Fuji Xerox Co., Ltd. Information-processing device, an information-processing system, and a storing medium
WO2011027484A1 (en) * 2009-09-03 2011-03-10 株式会社日立製作所 Data processing control method and calculator system
JP2011096110A (en) * 2009-10-30 2011-05-12 Toshiba Corp Job net control program and job net control device
JP2013515304A (en) * 2009-12-22 2013-05-02 テレフオンアクチーボラゲット エル エム エリクソン(パブル) How to coordinate the provision of composite services
US9183038B2 (en) 2010-11-10 2015-11-10 Hitachi, Ltd. Job management system that determines if master data has been updated, then re-executes a sub-job based on available executing computers and data sharing status
US8661296B2 (en) 2011-01-31 2014-02-25 International Business Machines Corporation Dynamic data store for failed jobs in a systems complex
CN103765384A (en) * 2011-09-02 2014-04-30 飞思卡尔半导体公司 Data processing system and method for task scheduling in a data processing system
JP2014525619A (en) * 2011-09-02 2014-09-29 フリースケール セミコンダクター インコーポレイテッド Data processing system
JP2014027454A (en) * 2012-07-26 2014-02-06 Konica Minolta Inc Image processor, display device and program
JP2016115340A (en) * 2014-12-16 2016-06-23 インテル コーポレイション Leveraging offload programming model for local checkpoints
US10089197B2 (en) 2014-12-16 2018-10-02 Intel Corporation Leverage offload programming model for local checkpoints
JP2016200981A (en) * 2015-04-10 2016-12-01 富士通株式会社 Operation management program, operation management method and operation management device
US10235210B2 (en) 2015-04-10 2019-03-19 Fujitsu Limited Operation management method and operation management apparatus
JP2017123048A (en) * 2016-01-07 2017-07-13 富士通株式会社 Parallel processor, job monitoring method, and job monitoring program
JP2019149079A (en) * 2018-02-28 2019-09-05 株式会社日立製作所 Failure influence investigation apparatus and failure influence investigation method
JP2019068443A (en) * 2018-11-28 2019-04-25 富士ゼロックス株式会社 Information processing device and program
CN112350955A (en) * 2019-08-06 2021-02-09 横河电机株式会社 Alarm management system and alarm management method
JP2021026559A (en) * 2019-08-06 2021-02-22 横河電機株式会社 Alarm management system and alarm management method
JP7379006B2 (en) 2019-08-06 2023-11-14 横河電機株式会社 Alarm management system and alarm management method

Also Published As

Publication number Publication date
JP4538736B2 (en) 2010-09-08

Similar Documents

Publication Publication Date Title
JP4538736B2 (en) Job execution monitoring system, job control apparatus, job execution method, and job control program
JP4701148B2 (en) Failure recovery system and server
US6219701B1 (en) Method for controlling managing computer, medium for storing control program, and managing computer
JP2016173782A (en) Failure prediction system, failure prediction method, failure prediction apparatus, learning apparatus, failure prediction program, and learning program
EP2112783A2 (en) Knowledge-based failure recovery support system
JPWO2015037603A1 (en) Remote monitoring system, remote monitoring method, and program
JP5514040B2 (en) Operation management system, operation management method, and operation management apparatus
JP4527572B2 (en) Monitoring device and monitoring method
JP2010231293A (en) Monitoring device
US20110296330A1 (en) Method and apparatus for providing industrial plant information
JP3748232B2 (en) Data transmission device, display device, and control system
WO2012004891A1 (en) Monitoring program, monitoring method and monitoring device of computer
JP2003256624A (en) Work support device
JP4492530B2 (en) Computer control method, management computer and processing program therefor
JP2005141466A (en) Computer monitoring device and message processing method for processing message about computer to be monitored
JP2005346257A (en) Information processing apparatus and device
JP2007026122A (en) Plant monitoring control system
JP3737503B2 (en) Monitoring system, monitoring method and program thereof
JP2015087875A (en) Medical equipment operation management device
JPH1040124A (en) Execution control method for diagnostic program
JPH06149623A (en) Operation management system for information processor
JP2010231292A (en) Monitoring device
JP2017138850A (en) Device monitoring control system and device monitor control method
JPH07306820A (en) Event management system in network system
JP6044434B2 (en) Information processing system, control method, and control program

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090527

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090727

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091201

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100527

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100609

R150 Certificate of patent or registration of utility model

Ref document number: 4538736

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130702

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees