JP2006233498A - Bridge-fall prevention equipment - Google Patents

Bridge-fall prevention equipment Download PDF

Info

Publication number
JP2006233498A
JP2006233498A JP2005047216A JP2005047216A JP2006233498A JP 2006233498 A JP2006233498 A JP 2006233498A JP 2005047216 A JP2005047216 A JP 2005047216A JP 2005047216 A JP2005047216 A JP 2005047216A JP 2006233498 A JP2006233498 A JP 2006233498A
Authority
JP
Japan
Prior art keywords
steel
concrete
block
steel material
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005047216A
Other languages
Japanese (ja)
Inventor
Yukimasa Naramura
幸正 楢村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oriental Construction Co
Original Assignee
Oriental Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oriental Construction Co filed Critical Oriental Construction Co
Priority to JP2005047216A priority Critical patent/JP2006233498A/en
Publication of JP2006233498A publication Critical patent/JP2006233498A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide bridge-fall prevention equipment which can be surely attached to a lower structure section, without the need for drilling a deep anchor hole by means of core boring, or the risk of cutting a reinforcing bar in the lower structure section. <P>SOLUTION: Prestressing-steel supporting blocks 1 with upper locking parts 4 each also serving as a cross-girder supporting stopper are arranged on both side surfaces of a lower structure 3 made of concrete, in such a manner as to face each other in front and rear positions, and connected together across the front and rear upper locking parts by means of prestressing steel 25 for connection, so as to be fixed to the lower structure 3 made of concrete. Prestressing-steel anchoring blocks 16 with upper locking parts 4 each also serving as a main-girder supporting stopper are arranged on both the side surfaces of the horizontal upper section of the lower structure in an opposed manner so as to be locked to the top surface of the lower structure 3. Traverse prestressing steel 14, which is arranged on the outside of the blocks 1 on both the longitudinal sides in such a manner as to be supported on the blocks 1, is tensioned and anchored to the blocks 16 which are arranged on both horizontal sides. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、橋桁等の上部構造物が橋脚または橋台等の下部構造物から落橋するのを防止するための落橋防止装置に関する。   The present invention relates to a fall prevention apparatus for preventing an upper structure such as a bridge girder from falling from a lower structure such as a pier or an abutment.

従来、橋梁の落橋防止装置としては、既設橋台または橋脚上の巾方向中央部等に、所定深さの複数のアンカー孔を穿設し、そのアンカー孔にアンカーボルトの下部を埋め込み固定し、場所打ちコンクリートまたはプレキャストコンクリートブロック等の支承壁に前記アンカーボルトを挿通すると共に、前記アンカーボルトの上部にねじ込み固定した定着金具により前記支承壁を固定した、主桁等の橋桁の落橋を防止するようにした落橋防止装置が知られている(例えば、特許文献1参照)。   Conventionally, as a bridge drop prevention device, a plurality of anchor holes with a predetermined depth are drilled in the center of the width direction on an existing abutment or pier, and the anchor bolts are embedded and fixed under the anchor holes. The anchor bolt is inserted into a support wall such as cast concrete or precast concrete block, and the support wall is fixed by a fixing bracket screwed and fixed to the top of the anchor bolt so as to prevent a bridge girder such as a main girder from being dropped. A fallen bridge prevention apparatus is known (for example, see Patent Document 1).

特開2004−124617JP 2004-124617 A

前記従来の場合は、既設橋台または既設橋脚に、かなり深いアンカー孔を穿設する必要があり、コアボーリングによる深いアンカー孔の削孔に伴い、既設橋台または橋脚内に埋め込み固定されている鉄筋を切断する恐れがある。また、既設橋台または既設橋脚内の鉄筋を切断しないように施工する場合にアンカーボルトの埋め込み長不足が起こる場合もあり、強度上の問題から別個にこれを補う必要があり、施工が煩雑になる共に施工の変更を余儀なくされる場合もある。   In the conventional case, it is necessary to drill a considerably deep anchor hole in an existing abutment or existing pier. There is a risk of cutting. Also, when installing so as not to cut the reinforcing bars in existing abutments or existing piers, there is a case where the anchor bolt embedding length is insufficient, and it is necessary to compensate for this separately due to strength problems, which makes the construction complicated In some cases, construction changes may be required.

本発明は、コアボーリングによる深いアンカー孔を穿設する必要もなく、そのためアンカーボルトの埋め込み長不足が生じることもなく、既設橋台または橋脚等の下部構造物部内の鉄筋を切断する恐れもなく確実に下部構造物部に取付けることができる落橋防止装置を提供することを目的とする。   The present invention eliminates the need for drilling deep anchor holes by core boring, so that there is no shortage of anchor bolt embedding length, and there is no risk of cutting reinforcing bars in the substructure such as existing abutments or piers. An object of the present invention is to provide a falling bridge prevention device that can be attached to a lower structure part.

前記の課題を有利に解決するために、第1発明の落橋防止装置では、コンクリート製下部構造物(3)における前後方向の両側面に、それぞれ横桁支承ストッパを兼ねた上部係止部(4)を有するPC鋼材支承ブロック1をコンクリート製下部構造物(3)の上面に係止させるように対抗配置すると共に、前後のPC鋼材支承ブロック(1)における上部係止部に渡って上下構造物間の間隙Gに配置した連結用PC鋼材(25)により連結してコンクリート製下部構造物に固定し、前記コンクリート製下部構造物(3)における左右方向の両側面に、それぞれ主桁支承ストッパを兼ねた上部係止部(4)を有するPC鋼材定着ブロック(16)をコンクリート製下部構造物(3)の上面に係止させるように対抗配置し、前後方向両側のPC鋼材支承ブロック1の外側にこれに支承させるように配置した横締めPC鋼材(14)を左右方向の両側に配置したPC鋼材定着ブロック(16)に緊張定着させたことを特徴とする。   In order to solve the above-mentioned problem advantageously, in the falling bridge prevention device according to the first aspect of the present invention, the upper locking portions (4) which also serve as horizontal girder support stoppers on both sides in the front-rear direction of the concrete lower structure (3). The PC steel bearing block 1 having the upper and lower structures is arranged so as to be locked to the upper surface of the concrete lower structure (3), and the upper and lower structures extend over the upper locking portions of the front and rear PC steel bearing blocks (1). Are connected to the concrete substructure by connecting PC steel members (25) arranged in the gap G between them, and the main girder support stoppers are respectively provided on both lateral sides of the concrete substructure (3). The PC steel fixing block (16) having the upper locking part (4) which also serves as a counter is disposed so as to be locked to the upper surface of the concrete lower structure (3). Characterized in that by stressing anchorage to the arranged to support to the outside of the bearing bracket 1 horizontal clamping PC steel member (14) the PC steel fixing blocks arranged on both sides in the lateral direction (16).

また、第2発明では、第1発明の落橋防止装置において、前後方向に対抗するPC鋼材支承ブロック(1)は、左右方向に間隔をおいて複数組配置され、コンクリート製下部構造物(3)の左右方向の中心に近づくにしたがって前後方向の突出長さが長くされ、前後方向の両側面に配置の各PC鋼材支承ブロック(1)の外側に配置した横締めPC鋼材(14)がほぼ平面円弧状に配置されていることを特徴とする。   In the second invention, in the fallen bridge prevention device of the first invention, a plurality of PC steel support blocks (1) that oppose the front-rear direction are arranged at intervals in the left-right direction, and the concrete substructure (3) The protrusion length in the front-rear direction is increased as it approaches the center in the left-right direction, and the laterally tightened PC steel material (14) disposed on the outer side of each PC steel support block (1) disposed on both side surfaces in the front-rear direction is substantially flat. It is arranged in an arc shape.

また、第3発明では、第1発明または第2発明の落橋防止装置において、PC鋼材支承ブロック(1)は、コンクリート製下部構造物(3)に固定されるプレキャストコンクリート製ブロック(2)と、そのコンクリート製ブロック(2)にアンカーボルト(31)により固定される鋼製の横締めPC鋼材支承用ブラケット(11)とにより構成され、各横締めPC鋼材14はPC鋼材支承ブラケット(11)に支承されていることを特徴とする。   Further, in the third invention, in the falling bridge prevention device of the first invention or the second invention, the PC steel support block (1) is a precast concrete block (2) fixed to the concrete substructure (3), The steel block is composed of a steel laterally-clamped PC steel support bracket (11) fixed to the concrete block (2) by anchor bolts (31), and each laterally-clamped PC steel material 14 is attached to the PC steel material support bracket (11). It is characterized by being supported.

また、第4発明では、第1発明または第2発明の落橋防止装置において、PC鋼材定着ブロック16は、コンクリート製下部構造物3に固定されるプレキャストコンクリート製ブロック(17)と、そのコンクリート製ブロック(17)にアンカーボルト(34)により固定される鋼製のPC鋼材定着ブラケット(19)とにより構成され、各横締めPC鋼材14はPC鋼材定着ブラケット(19)に定着されていることを特徴とする。   In the fourth invention, the PC steel material fixing block 16 is a precast concrete block (17) fixed to the concrete substructure 3 and the concrete block in the fallen bridge prevention device of the first invention or the second invention. (17) is composed of a steel PC steel material fixing bracket (19) fixed by an anchor bolt (34), and each laterally tightened PC steel material 14 is fixed to the PC steel material fixing bracket (19). And

本発明によると、コンクリート製下部構造物の上部の前後両側に配置したPC鋼材支承用ブロックを連結用PC鋼材により連結して、下部構造物に取付けことができると共にその外側に配置した横締めPC鋼材によりPC鋼材支承ブロックをコンクリート製下部構造物に押圧するように固定することができるため、コンクリート製下部構造物にコアボーリングによる深いアンカー孔を穿設する必要もなく、そのためアンカーボルトの埋め込み長不足が生じることもなく、既設橋台または橋脚等のコンクリート製下部構造物内の鉄筋を切断する恐れがない。また、各コンクリート製ブロックの下部をインサート等の簡単な仮止め手段でコンクリート製下部構造物に仮止めするだけでよいので、施工が容易である。
また、コンクリート製下部構造物の左右の両側に配置したPC鋼材定着用ブロックにより、横締めPC鋼材を緊張定着させることができると共に、PC鋼材定着用ブロック自身を横締めPC鋼材によりコンクリート製下部構造物に固定することができる。
According to the present invention, PC steel support blocks arranged on the front and rear sides of the upper part of the concrete substructure can be connected by the connecting PC steel, and can be attached to the lower structure and laterally tightened PC arranged on the outside thereof. Since the steel material can be fixed to the concrete substructure by pressing it against the concrete substructure, it is not necessary to drill a deep anchor hole by core boring in the concrete substructure. There is no shortage, and there is no risk of cutting reinforcing bars in concrete substructures such as existing abutments or piers. Further, since the lower part of each concrete block only needs to be temporarily fixed to the concrete substructure by a simple temporary fixing means such as an insert, construction is easy.
In addition, the PC steel fixing blocks placed on the left and right sides of the concrete substructure can be used to fix the tension of the horizontal PC steel, and the PC steel fixing block itself can be fixed to the concrete by the PC steel. Can be fixed to objects.

第2発明によると、前後方向に対抗するPC鋼材支承ブロックをコンクリート製下部構造物の左右方向の中心に近づくにしたがって前後方向の突出長さを長くするだけで、その外側に配置される横締めPC鋼材を横方向に凸に配置させて、これによりPC鋼材支承ブロックをコンクリート製下部構造物に向かって押圧させることができ、また、左右方向に間隔をおいて複数のPC鋼材支承ブロックを配置しても、すべてのPC鋼材支承ブロックをコンクリート製下部構造物に向かって押圧させることができるため、横桁等の上部構造物が地震時にPC鋼材支承ブロックに衝突してもPC鋼材支承ブロックの抵抗力を高めることができる。   According to the second invention, the PC steel support block that opposes the front-rear direction is laterally fastened by simply extending the length of the front-rear direction as it approaches the center in the left-right direction of the concrete substructure. PC steel can be arranged in a convex manner in the horizontal direction, so that the PC steel support block can be pressed against the concrete substructure, and multiple PC steel support blocks can be arranged at intervals in the left-right direction. However, since all PC steel support blocks can be pressed against the concrete substructure, even if the upper structure such as a cross beam collides with the PC steel support block during an earthquake, the PC steel support block Resistance can be increased.

また、第3発明によると、プレキャストコンクリート製ブロックに鋼製のPC鋼材支承ブラケットを、アンカーボルトにより容易に固定することができ、また、鋼製のPC鋼材支承ブラケットにより横締めPC鋼材を支承させることができ、さらにPC鋼材支承ブラケットをプレキャストコンクリート製ブロックの外側に配置したので、プレキャストコンクリート製ブロックに大きな引張り力を作用させることがなく、合理的なPC鋼材支承ブロックとすることができる。   According to the third invention, the steel PC steel support bracket can be easily fixed to the precast concrete block by the anchor bolt, and the laterally tightened PC steel material is supported by the steel PC steel support bracket. Further, since the PC steel material support bracket is arranged outside the precast concrete block, a large PC steel support block can be obtained without applying a large tensile force to the precast concrete block.

また、第4発明によると、プレキャストコンクリート製ブロックと鋼製の横締めPC鋼材定着用ブラケットとを、プレキャストコンクリート製ブロックに固定したアンカーボルトにより容易に固定することができ、また、鋼製のPC鋼材定着用ブラケットをプレキャストコンクリート製ブロックの外側に配置したので、プレキャストコンクリート製ブロックに大きな引張り力を作用させることがなく、合理的なPC鋼材定着ブロックとすることができる。   Further, according to the fourth invention, the precast concrete block and the steel horizontal fastening PC steel material fixing bracket can be easily fixed by the anchor bolts fixed to the precast concrete block, and the steel PC Since the steel material fixing bracket is arranged outside the precast concrete block, a large PC steel material fixing block can be obtained without applying a large tensile force to the precast concrete block.

次に、本発明を図示の実施形態に基づいて詳細に説明する。     Next, the present invention will be described in detail based on the illustrated embodiment.

先ず、図6を参照して、橋脚または橋台等のコンクリート製下部構造物の橋軸方向の両側に配置されるPC鋼材支承ブロック1の内側部分を構成するコンクリート製ブロック2について説明すると、前記のコンクリート製ブロック2は、下部構造物3の上面に係止され、かつ橋軸方向に対向するように配置されるコンクリート製ブロック2であり、橋軸方向の上部には、内向きに突出する横桁支承ストッパを兼ねた上部係止部4を備えていると共に、前記上部係止部4に一体に上下方向に延長する縦部分5とを備えた全体として逆L字状のプレキャストコンクリート製ブロックであり、上部係止部4は、縦部分5に対して直角であり、また橋軸直角方向に間隔をおいて複数のPC鋼材挿通用透孔6とその端部に定着用凹部7を備えている。   First, referring to FIG. 6, a concrete block 2 constituting an inner portion of a PC steel material support block 1 disposed on both sides in a bridge axis direction of a concrete substructure such as an abutment or an abutment will be described. The concrete block 2 is a concrete block 2 that is locked to the upper surface of the lower structure 3 and is disposed so as to face the bridge axis direction. A precast concrete block having an inverted L-shape as a whole and having an upper locking portion 4 that also serves as a girder support stopper and a vertical portion 5 that extends integrally with the upper locking portion 4 in the vertical direction. The upper locking portion 4 is perpendicular to the vertical portion 5 and includes a plurality of PC steel material insertion holes 6 at intervals in the direction perpendicular to the bridge axis and a fixing recess 7 at the end thereof. Yes.

また、前記コンクリート製ブロック2における縦部分5の上下方向の中間部には、上下方向に間隔をおくと共に左右方向に間隔をおいて複数のインサート等の雌ねじ金具8が埋め込み固定されている。   A plurality of female screw fittings 8 such as a plurality of inserts are embedded and fixed at an intermediate portion in the vertical direction of the vertical portion 5 in the concrete block 2 and spaced in the vertical direction.

また、前記の縦部分5における下部には、左右方向に間隔をおいて複数のアンカーボルト挿通用孔9とその端部に定着用凹部10を備えている。   A plurality of anchor bolt insertion holes 9 are provided at the lower portion of the vertical portion 5 and spaced in the left-right direction, and fixing concave portions 10 are provided at the ends thereof.

次に、前記のPC鋼材支承ブロック1における外側部分を構成し、前記内側のコンクリート製ブロック2に固定される鋼製の横締めPC鋼材支承用ブラケット11の構成について、図8(a)(b)(c)を参照して説明すると、横締めPC鋼材支承用ブラケット11の外側中間部には横方向に延長するPC鋼材支承用横溝(凹部)12が設けられ、前記PC鋼材支承用横溝(凹部)12の横断面形状は、橋軸直角方向に横断面円弧状の横溝12とされ、また、前記の横締めPC鋼材支承用ブラケット11には、上下方向に間隔を置くと共に左右方向に間隔をおいて複数のボルト挿通用透孔13が設けられている。   Next, about the structure of the steel laterally-tightening PC steel material support bracket 11 which comprises the outer part in the said PC steel material support block 1 and is fixed to the said inner concrete block 2, FIG. 8 (a) (b) ) (C), a laterally extending PC steel material support lateral groove (concave portion) 12 is provided in the outer intermediate portion of the laterally tightened PC steel material support bracket 11, and the PC steel material support lateral groove ( The cross-sectional shape of the concave portion 12 is a transverse groove 12 having an arc-shaped cross section in the direction perpendicular to the bridge axis, and the horizontal fastening PC steel material support bracket 11 is spaced in the vertical direction and spaced in the left-right direction. A plurality of bolt insertion through holes 13 are provided.

前記の横締めPC鋼材支承用ブラケット11の橋軸方向の厚さTは、橋軸直角方向の中央側に配置される横締めPC鋼材支承用ブラケット11については、橋軸直角方向の端部に配置される横締めPC鋼材支承用ブラケット11の厚さに比べて厚くなるように、すなわち橋軸方向の突出長さが長くなるように構成されている。   The thickness T in the bridge axis direction of the laterally tightened PC steel material support bracket 11 is set at the end portion in the direction perpendicular to the bridge axis for the laterally tightened PC steel material support bracket 11 arranged at the center side in the perpendicular direction of the bridge axis. It is comprised so that it may become thick compared with the thickness of the horizontal fastening PC steel material support bracket 11 arrange | positioned, ie, the protrusion length of a bridge axis direction may become long.

前記の横締めPC鋼材支承用ブラケット11が複数配置された状態では、橋軸方向の中心軸線に対して、左右対称に配置され、橋軸直角方向で外側に凸に配置される横締めPC鋼材14を各支承用横溝12内で面タッチさせて支承するように配置して各支承用横溝12により支承させ、下部構造物3に向かって横締めPC鋼材14により押圧させるように取付けられる。   In the state where a plurality of the above-mentioned laterally tightened PC steel material support brackets 11 are disposed, the laterally tightened PC steel material which is disposed symmetrically with respect to the central axis in the bridge axis direction and is convex outward in the direction perpendicular to the bridge axis. 14 are arranged so as to be supported by touching in the horizontal grooves 12 for support, are supported by the horizontal grooves 12 for support, and are mounted so as to be pressed against the lower structure 3 by the PC steel material 14 laterally tightened.

前記の橋軸方向のコンクリート製ブロック2に埋め込み固定の雌ねじ金具8に、横締めPC鋼材支承用ブラケット11がボルト等により固定されて、コンクリート製ブロック2と横締め支承用ブラケット11とからなるPC鋼材支承用ブロック1が構成される。前記のPC鋼材支承用ブロック1の施工にあたっては、最初に内側のコンクリート製ブロック2をコンクリート製下部構造物3の上部に固定した後、前記コンクリート製ブロック2にPC鋼材支承用ブラケット11が固定される。   A PC made of a concrete block 2 and a side fastening support bracket 11 is fixed to a female screw fitting 8 embedded and fixed in the concrete block 2 in the bridge axis direction by a bolt 11 or the like. A steel support block 1 is configured. In the construction of the PC steel support block 1, the inner concrete block 2 is first fixed to the upper part of the concrete substructure 3, and then the PC steel support bracket 11 is fixed to the concrete block 2. The

次に、図7を参照して、橋脚または橋台等のコンクリート製下部構造物3の橋軸直角方向(左右方向)の両側上面に係止され、かつ橋軸直角方向に対向するように配置されるPC鋼材定着ブロック16の内側を構成するコンクリート製ブロック17の構成について説明すると、コンクリート製ブロック17は、内側すなわち橋軸直角方向の中央側に向かって突出する上部係止部4にゴム製等の弾性支承からなる主桁支承ストッパ18を備えていると共に、上部係止部4に一体に上下方向に延長する縦部分5とにより構成された全体としてほぼ逆L字状のプレキャストコンクリート製ブロックであり、上部係止部4は、縦部分5に対して直角であり、また上部係止部4の内側の主桁支承ストッパ18はボルトあるいはアンカーボルト等により固定されている。   Next, referring to FIG. 7, the concrete substructure 3 such as an abutment or an abutment is locked to both upper surfaces on both sides in the direction perpendicular to the bridge axis (left and right direction) and is disposed so as to face the direction perpendicular to the bridge axis. The concrete block 17 constituting the inner side of the PC steel material fixing block 16 will be described. The concrete block 17 is made of rubber or the like on the upper locking portion 4 protruding toward the inner side, that is, the center side in the direction perpendicular to the bridge axis. The main girder support stopper 18 is made of an elastic support, and is a precast concrete block having a substantially inverted L shape as a whole, which is composed of a vertical portion 5 extending integrally with the upper locking portion 4 in the vertical direction. The upper locking portion 4 is perpendicular to the vertical portion 5, and the main girder support stopper 18 inside the upper locking portion 4 is fixed by a bolt or an anchor bolt. It is.

また、前記コンクリート製ブロック17における縦部分5の上下方向の中間部には、上下方向に間隔をおくと共に左右方向に間隔をおいて複数のインサート等の雌ねじ金具8が埋め込み固定されている。   A plurality of female screw fittings 8 such as inserts are embedded and fixed at an intermediate portion in the vertical direction of the vertical portion 5 in the concrete block 17 with a space in the vertical direction and a space in the left and right direction.

また、前記の縦部分5における下部には、前後方向に間隔をおいて複数のアンカーボルト挿通用孔9およびその端部に定着用凹部10を備えている。   A plurality of anchor bolt insertion holes 9 are provided at the lower portion of the vertical portion 5 and spaced in the front-rear direction, and fixing concave portions 10 are provided at the ends thereof.

次に、前記の橋軸直角方向のPC鋼材定着ブロック16の外側を構成し、前記内側のコンクリート製ブロック17に固定される鋼製のPC鋼材定着用ブラケット19の構成について、図9(a)(b)(c)を参照して説明すると、PC鋼材定着用ブラケット19の前後方向の両面には、その上下方向の中間部(図示の場合は中央部)からほぼ側面21の中央に近接して貫通する横向きのPC鋼材挿通用孔20が設けられ、前記各側面21には、傾斜した支承面を有する平面ほぼV字状の凹部22が設けられ、また、前記PC鋼材定着用ブラケット19には、前後方向に間隔を置くと共に左右方向に間隔をおいて複数のアンカー部材挿通用の透孔23が設けられている。   Next, regarding the configuration of the steel PC steel material fixing bracket 19 that forms the outside of the PC steel material fixing block 16 in the direction perpendicular to the bridge axis and is fixed to the inner concrete block 17, FIG. (B) Describing with reference to (c), both sides of the PC steel material fixing bracket 19 in the front-rear direction are close to the center of the side surface 21 from the middle part in the vertical direction (the center part in the figure). A horizontal PC steel material insertion hole 20 penetrating therethrough is provided, and each side surface 21 is provided with a substantially V-shaped concave portion 22 having an inclined support surface, and the PC steel material fixing bracket 19 is provided in the bracket 19 for fixing the PC steel material. Are provided with a plurality of through holes 23 for inserting anchor members at intervals in the front-rear direction and at intervals in the left-right direction.

前記の橋軸直角方向のコンクリート製ブロック17における雌ねじ金具8にPC鋼材定着用ブラケット19がボルト等により固定されて、コンクリート製ブロック17とPC鋼材定着用ブラケット19によりPC鋼材定着用ブロック16が構成される。   A PC steel material fixing bracket 19 is fixed to the female screw fitting 8 in the concrete block 17 perpendicular to the bridge axis by bolts or the like, and the concrete block 17 and the PC steel material fixing bracket 19 constitute a PC steel material fixing block 16. Is done.

次に、前記の各コンクリート製ブロック2,17およびPC鋼材支承用ブラケット11あるいはPC鋼材定着用ブラケット19を取付けて、図1および図2に示す状態に至るまでの施工手順について、図3から図5を参照しながら説明する。   Next, FIG. 3 to FIG. 3 show the construction procedure from the concrete blocks 2 and 17 and the PC steel material support bracket 11 or PC steel material fixing bracket 19 to the state shown in FIGS. This will be described with reference to FIG.

まず、図3(a)〜(c)に示すように、主桁24間に位置するように、またコンクリート製下部構造物3の上端部においてこれを挟むように橋軸方向に対向するように、図6に示すコンクリート製ブロック2の一対を、端部横桁28に間隔をおくことで主桁24の伸縮を許容するように橋軸直角方向に間隔をおいて、下部構造物3の左右の張り出しフランジに渡って複数組配置し、かつ、コンクリート製ブロック2の上部係止部4下面および縦部分5の内側をコンクリート製下部構造物3の上面および橋軸方向の前面(または後面)に配置し、適宜支保工(図示を省略)により保持する。   First, as shown in FIGS. 3 (a) to 3 (c), so as to be positioned between the main girders 24 and to face the bridge axis direction so as to sandwich the upper end of the concrete substructure 3. 6, the pair of concrete blocks 2 shown in FIG. 6 are spaced apart in the direction perpendicular to the bridge axis so as to allow expansion and contraction of the main girder 24 by spacing the end cross beams 28. A plurality of sets are arranged over the overhanging flange, and the lower surface of the upper locking portion 4 and the inner side of the vertical portion 5 of the concrete block 2 are on the upper surface of the concrete lower structure 3 and the front surface (or rear surface) in the bridge axis direction. Arrange and hold by appropriate support (not shown).

対向する前記コンクリート製ブロック2における上部係止部4のPC鋼材挿通用透孔6に渡って、連結用PC鋼材25を配置し、下部構造物3の上端部上面および上部側面に無収縮モルタル26を介在させ、前記無収縮モルタル26の硬化後に、各コンクリート製ブロック2の外側の定着用凹部7内において連結用PC鋼材25の端部に設けたナット等の定着金具によりこれらを緊張定着させる。   A connecting PC steel material 25 is arranged across the PC steel material insertion through hole 6 of the upper locking portion 4 in the opposing concrete block 2, and a non-shrink mortar 26 is provided on the upper surface and upper side surface of the lower structure 3. After the non-shrinking mortar 26 is cured, these are tension-fixed by a fixing metal fitting such as a nut provided at the end of the connecting PC steel material 25 in the fixing recess 7 on the outside of each concrete block 2.

前記の連結用PC鋼材25は、支承装置27によって主桁24を支持することにより形成されている端部横桁28と下部構造物3上面との間の間隙Gを有効に利用して、支承装置27から横方向にずらして下部構造物3の上面から僅かに浮かせるように配置される。   The connecting PC steel material 25 is supported by effectively utilizing the gap G between the end cross beam 28 formed by supporting the main beam 24 by the support device 27 and the upper surface of the lower structure 3. It is arranged so as to be slightly lifted from the upper surface of the lower structure 3 while being shifted laterally from the device 27.

また、コンクリート製下部構造物3における橋軸方向の前後両面で、上端部から下方に離れた位置に浅く穿設されたアンカー孔に埋め込み固定の雌ねじ金具29にアンカーボルト30の一端部を固定すると共に、前記アンカーボルト30を前記コンクリート製ブロック2の下部のアンカーボルト挿通用孔9に挿通して、前記コンクリート製ブロック2の下部定着凹部10内においてナット等により定着する。   Further, one end of the anchor bolt 30 is fixed to the female screw fitting 29 that is embedded and fixed in the anchor hole that is shallowly drilled at a position away from the upper end on both the front and rear sides in the bridge axis direction of the concrete substructure 3. At the same time, the anchor bolt 30 is inserted into the anchor bolt insertion hole 9 in the lower part of the concrete block 2 and fixed in the lower fixing recess 10 of the concrete block 2 with a nut or the like.

なお、図5に示すように、前記コンクリート製ブロック2の外面に、鋼製のPC鋼材支承用ブラケット11を配置すると共に、前記コンクリート製ブロック2に一端を雌ねじ金具8に連結されたアンカーボルト31をPC鋼材支承用ブラケット11のボルト挿通用透孔13に挿通すると共にナット等の定着金具32により固定して、PC鋼材支承用ブロック1を構成する。   As shown in FIG. 5, a steel PC steel support bracket 11 is arranged on the outer surface of the concrete block 2, and an anchor bolt 31 having one end connected to the female screw fitting 8 at the concrete block 2. Is inserted into the bolt insertion through hole 13 of the PC steel material support bracket 11 and fixed by a fixing metal fitting 32 such as a nut to constitute the PC steel material support block 1.

前記のようにして橋軸直角方向に間隔を置くと共に主桁間にPC鋼材支承ブロック1を設置する。   As described above, the PC steel support block 1 is installed between the main girders while being spaced in the direction perpendicular to the bridge axis.

次いで、図4に示すように、コンクリート製下部構造物3の橋軸直角方向(左右方向)の上部両側面に、図7に示すコンクリート製ブロック17の一対を、橋軸直角方向に対向するように配置し、かつ、コンクリート製ブロック17の上部係止部4下面および縦部分5の内側をコンクリート製下部構造物3の上面および橋軸方向の前面または後面に対向するように配置し、適宜支保工(図示を省略)により保持する。   Next, as shown in FIG. 4, a pair of concrete blocks 17 shown in FIG. 7 are opposed to each other in the direction perpendicular to the bridge axis on both upper side surfaces in the direction perpendicular to the bridge axis (left and right direction) of the concrete substructure 3. And arranged so that the lower surface of the upper locking portion 4 and the inner side of the vertical portion 5 of the concrete block 17 are opposed to the upper surface of the concrete lower structure 3 and the front or rear surface in the bridge axis direction. Hold by work (not shown).

また、下部構造物3の上端部上面および上部側面に無収縮モルタル26を介在させ、前記無収縮モルタル26の硬化させる。   Further, the non-shrink mortar 26 is interposed between the upper surface and the upper side surface of the upper structure 3 to cure the non-shrink mortar 26.

また、コンクリート製下部構造物3に埋め込み固定の雌ねじ金具29にアンカーボルト33の一端部を固定すると共に、前記アンカーボルト33を前記コンクリート製ブロック17の下部のアンカーボルト挿通用孔9に挿通して、前記コンクリート製ブロック17の下部凹部10内においてナット等の定着金具36により定着する。   In addition, one end portion of the anchor bolt 33 is fixed to the female screw fitting 29 embedded and fixed in the concrete lower structure 3, and the anchor bolt 33 is inserted into the anchor bolt insertion hole 9 in the lower portion of the concrete block 17. In the lower concave portion 10 of the concrete block 17, fixing is performed by a fixing metal fitting 36 such as a nut.

前記のようにして橋軸直角方向に対向するコンクリート製ブロック17を配置し、また、図5(a)(b)に示すように、前記コンクリート製ブロック17の外面に、鋼製のPC鋼材定着用ブラケット19を配置すると共に、前記コンクリート製ブロック17の雌ねじ金具8に連結固定されたアンカーボルト34をPC鋼材定着用ブラケット19の挿通孔23に挿通すると共に定着金具37により固定して、PC鋼材定着用ブロック16を構成する。   As described above, the concrete block 17 facing the direction perpendicular to the bridge axis is disposed, and as shown in FIGS. 5A and 5B, the steel PC steel material is fixed on the outer surface of the concrete block 17. The bracket 19 is arranged, and the anchor bolt 34 connected and fixed to the female screw fitting 8 of the concrete block 17 is inserted into the insertion hole 23 of the PC steel fixing bracket 19 and fixed by the fixing fitting 37, and the PC steel A fixing block 16 is configured.

次いで、図5に示すように、橋軸方向の前後両側にそれぞれ外ケーブルなどのPC鋼材14を配置すると共に、各横締めPC鋼材14の中間部をPC鋼材支承用ブラケット11の支承用横溝12内に位置させると共に、前記横締めPC鋼材14の端部を、橋軸直角方向の両側のPC鋼材定着用ブラケット19の挿通孔20に挿通させると共に、定着金具38により、緊張定着させる。   Next, as shown in FIG. 5, PC steel materials 14 such as outer cables are arranged on both the front and rear sides in the bridge axis direction, and the intermediate portion of each laterally tightened PC steel material 14 is a lateral groove 12 for supporting the PC steel material supporting bracket 11. The end portions of the laterally tightened PC steel material 14 are inserted into the insertion holes 20 of the PC steel material fixing brackets 19 on both sides in the direction perpendicular to the bridge axis, and the fixing metal fittings 38 are used to fix the tension.

図1および図2は、前記のようにして、既設の橋梁に本発明の落橋防止装置を実施した一実施形態を示すものである。   FIG. 1 and FIG. 2 show an embodiment in which the falling bridge prevention device of the present invention is implemented on an existing bridge as described above.

図1および図2に示すように、既設の橋脚または橋台等のコンクリート製下部構造物3に支承装置27を介して上部構造物35が支持されている既設の状態から、橋梁橋台または橋脚等のコンクリート製下部構造物3における前後方向(橋軸方向)の上部の両側面および左右方向(橋軸直角方向)の上部の両側面にそれぞれPC鋼材支承ブロック1およびPC鋼材定着用ブロック16を設置し、橋軸方向の両側面に対向するPC鋼材支承ブロック1は、橋軸方向の連結用PC鋼材25により固定され、左右方向(橋軸直角方向)の両側に対向するPC鋼材定着ブロック16は、これらに渡って配置されると共に橋軸方向の両側面に対向するPC鋼材支承ブロック1の外側に配置された横締めPC鋼材14の端部を定着することにより、コンクリート製下部構造物3に押圧するように固定されている。   As shown in FIGS. 1 and 2, from an existing state in which an upper structure 35 is supported by a concrete lower structure 3 such as an existing pier or an abutment via a support device 27, a bridge abutment or an pier PC steel support block 1 and PC steel fixing block 16 are installed on both sides of the upper part in the front-rear direction (bridge axis direction) and both sides of the upper part in the left-right direction (bridge axis perpendicular direction) in the concrete substructure 3, respectively. The PC steel support block 1 facing both side surfaces in the bridge axis direction is fixed by the connecting PC steel material 25 in the bridge axis direction, and the PC steel material fixing block 16 facing both sides in the left-right direction (the direction perpendicular to the bridge axis) is By fixing the end portion of the laterally tightened PC steel material 14 arranged on the outside of the PC steel material support block 1 which is arranged over these and faces both side surfaces in the bridge axis direction, It is fixed so as to press the chromatography preparative made lower structure 3.

前記の実施形態では、PC鋼材支承用ブロック1におけるPC鋼材支承用横溝12とPC鋼材定着用ブラケット19のPC鋼材挿通用孔とが同レベルに設けられているので、PC鋼材支承用ブロック1を下部構造物3に対して水平方向に押圧させるように作用させて外側から支承させることができ、またPC鋼材支承用ブロック1により横締めPC鋼材14を安定した状態で支承することができる。   In the above embodiment, the PC steel material support block 1 in the PC steel material support block 1 and the PC steel material insertion hole of the PC steel material fixing bracket 19 are provided at the same level. The lower structure 3 can be made to press in the horizontal direction to be supported from the outside, and the PC steel material 14 can be supported in a stable state by the PC steel material support block 1.

また、PC鋼材支承用ブロック1は、橋軸直角方向の中央側の中心に近づくにしたがって、PC鋼材支承用横溝12までの橋軸方向の突出長さの長いPC鋼材支承用ブロック1で、かつ各PC鋼材支承用横溝12の溝底部は同じ曲率の円弧状の軌跡上にあるので、横締めPC鋼材14により、各PC鋼材支承用ブロック1に均等に押圧力を作用させることができる。   The PC steel support block 1 is a PC steel support block 1 having a long projecting length in the bridge axis direction up to the PC steel support lateral groove 12 as it approaches the center of the bridge axis perpendicular direction. Since the groove bottom portion of each PC steel material supporting horizontal groove 12 is on an arcuate locus having the same curvature, the pressing force can be applied to each PC steel material supporting block 1 evenly by the laterally tightening PC steel material 14.

なお、前記実施形態では、プレキャストコンクリート製ブロック2の縦部分5の橋軸方向の厚さ(突出寸法)を一定にして、PC鋼材支承用ブラケット11の橋軸方向の長さを変化させているが、前記縦部分5の厚さを変化させ、かつPC鋼材支承用ブラケット11の長さを一定にしてもよい。   In addition, in the said embodiment, the thickness (protrusion dimension) of the longitudinal direction 5 of the vertical part 5 of the block 2 made from precast concrete is made constant, and the length of the bridge direction of the PC steel material support bracket 11 is changed. However, the thickness of the vertical portion 5 may be changed, and the length of the PC steel material support bracket 11 may be made constant.

本発明を実施する場合、横締めPC鋼材14としては、PC鋼線またはPC鋼撚り線あるいはPC鋼棒等を使用することができる。   When carrying out the present invention, a PC steel wire, a PC steel stranded wire, a PC steel rod, or the like can be used as the laterally tightened PC steel material 14.

本発明の一実施形態の落橋防止装置を示す一部縦断正面図である。It is a partially longitudinal front view showing a fallen bridge prevention device of one embodiment of the present invention. 図1の一部横断平面図である。FIG. 2 is a partial cross-sectional plan view of FIG. 1. 本発明の落橋防止装置の施工工程を示す説明図であり、(a)は概略縦断正面図、(b)は概略縦断側面図、(c)は概略横断平面図である。It is explanatory drawing which shows the construction process of the fallen bridge prevention apparatus of this invention, (a) is a schematic longitudinal front view, (b) is a schematic longitudinal side view, (c) is a schematic cross-sectional top view. 本発明の落橋防止装置の施工工程を示す説明図であり、(a)は概略縦断正面図、(b)は概略縦断側面図、(c)は概略横断平面図である。It is explanatory drawing which shows the construction process of the fallen bridge prevention apparatus of this invention, (a) is a schematic longitudinal front view, (b) is a schematic longitudinal side view, (c) is a schematic cross-sectional top view. 本発明の落橋防止装置の施工工程を示す説明図であり、(a)は概略縦断正面図、(b)は概略縦断側面図、(c)は概略横断平面図である。It is explanatory drawing which shows the construction process of the fallen bridge prevention apparatus of this invention, (a) is a schematic longitudinal front view, (b) is a schematic longitudinal side view, (c) is a schematic cross-sectional top view. 下部構造物部の橋軸方向の両側に配置されるプレキャストコンクリート製ブロックの代表形態を示すものであって、(a)は正面図、(b)は縦断側面図である。The typical form of the block made from a precast concrete arrange | positioned at the both sides of the bridge axis direction of a lower structure part is shown, Comprising: (a) is a front view, (b) is a vertical side view. 下部構造物部の橋軸直角方向の両側に配置されるプレキャストコンクリート製ブロックを示すものであって、(a)は正面図、(b)は一部縦断側面図である。The block made from a precast concrete arrange | positioned at the both sides of the bridge axis orthogonal direction of a lower structure part is shown, Comprising: (a) is a front view, (b) is a partially longitudinal side view. PC鋼材支承用ブロックにおける外側に配置されるPC鋼材支承用ブラケットを示すものであって、(a)は正面図、(b)は側面図、(c)は平面図である。The PC steel material support bracket arrange | positioned on the outer side in the block for PC steel material support is shown, Comprising: (a) is a front view, (b) is a side view, (c) is a top view. PC鋼材定着用ブロックにおける外側に配置されるPC鋼材定着用ブラケットを示すものであって、(a)は正面図、(b)は側面図、(c)は底面図である。1 shows a PC steel material fixing bracket disposed outside a PC steel material fixing block, in which (a) is a front view, (b) is a side view, and (c) is a bottom view.

符号の説明Explanation of symbols

1 PC鋼材支承ブロック
2 コンクリート製ブロック
3 下部構造物
4 上部係止部
5 縦部分
6 PC鋼材挿通用孔
7 定着用凹部
8 雌ねじ金具
9 アンカーボルト挿通用孔
10 定着用凹部
11 PC鋼材支承用ブラケット
12 PC鋼材支承用横溝
13 ボルト挿通用透孔
14 横締めPC鋼材
15 PC鋼材支承用ブロック
16 PC鋼材定着用ブロック
17 コンクリート製ブロック
18 主桁支承ストッパ
19 PC鋼材定着用ブラケット
20 PC鋼材挿通用孔
21 側面
22 凹部
23 透孔
24 主桁
25 連結用PC鋼材
26 無収縮モルタル
27 支承装置
28 端部横桁
29 雌ねじ金具
30 アンカーボルト
31 アンカーボルト
32 定着金具
33 アンカーボルト
34 アンカーボルト
35 上部構造物
36 定着金具
37 定着金具
38 定着金具
DESCRIPTION OF SYMBOLS 1 PC steel material support block 2 Concrete block 3 Lower structure 4 Upper latching part 5 Vertical part 6 PC steel material insertion hole 7 Fixing recessed part 8 Female screw metal fitting 9 Anchor bolt insertion hole 10 Fixing recessed part 11 PC steel material support bracket 12 PC steel material transverse groove 13 Bolt insertion hole 14 Horizontally tightened PC steel material 15 PC steel material support block 16 PC steel material fixing block 17 Concrete block 18 Main girder support stopper 19 PC steel material fixing bracket 20 PC steel material insertion hole 21 Side 22 Recess 23 Through hole 24 Main girder 25 PC steel 26 for connection 26 Non-shrink mortar 27 Bearing device 28 End cross girder 29 Female screw fitting 30 Anchor bolt 31 Anchor bolt 32 Fixing fitting 33 Anchor bolt 34 Anchor bolt 35 Superstructure 36 Fixing bracket 37 Fixing bracket 38 Fixing bracket

Claims (4)

コンクリート製下部構造物における前後方向の両側面に、それぞれ横桁支承ストッパを兼ねた上部係止部を有するPC鋼材支承ブロックをコンクリート製下部構造物の上面に係止させるように対抗配置すると共に、前後のPC鋼材支承ブロックにおける上部係止部に渡って上下構造物間の間隙に配置した連結用PC鋼材により連結してコンクリート製下部構造物に固定し、前記コンクリート製下部構造物における左右方向の両側面に、それぞれ主桁支承ストッパを兼ねた上部係止部を有するPC鋼材定着ブロックをコンクリート製下部構造物の上面に係止させるように対抗配置し、前後方向両側のPC鋼材支承ブロックの外側にこれに支承させるように配置した横締めPC鋼材を左右方向の両側に配置したPC鋼材定着ブロックに緊張定着させたことを特徴とする落橋防止装置。   On both sides of the concrete substructure in the front-rear direction, each PC steel support block having an upper locking portion that also serves as a cross-girder support stopper is arranged so as to be locked to the upper surface of the concrete substructure, The upper and lower PC steel support blocks are connected to each other by a connecting PC steel member disposed in the gap between the upper and lower structures across the upper locking portion and fixed to the concrete lower structure. PC steel material fixing blocks having upper locking parts that also serve as main girder support stoppers on both sides are arranged so as to be locked to the upper surface of the concrete substructure, and the outside of the PC steel material support blocks on both sides in the front-rear direction Tighten the laterally tightened PC steel placed so that it is supported by the PC steel fixed block placed on both sides in the left-right direction. Girder prevention device, characterized in that the. 前後方向に対抗するPC鋼材支承ブロックは、左右方向に間隔をおいて複数組配置され、コンクリート製下部構造物の左右方向の中心に近づくにしたがって前後方向の突出長さが長くされ、前後方向の両側面に配置の各PC鋼材支承ブロックの外側に配置した横締めPC鋼材がほぼ平面円弧状に配置されていることを特徴とする請求項1に記載の落橋防止装置。   A plurality of PC steel support blocks that oppose the front-rear direction are arranged at intervals in the left-right direction, and the protrusion length in the front-rear direction increases as the distance from the center of the concrete substructure increases toward the left-right direction. 2. The falling bridge prevention device according to claim 1, wherein the laterally tightened PC steel materials arranged on the outer sides of the PC steel material support blocks arranged on both side surfaces are arranged in a substantially circular arc shape. PC鋼材支承ブロックは、コンクリート製下部構造物に固定されるプレキャストコンクリート製ブロックと、そのコンクリート製ブロックにアンカーボルトにより固定される鋼製のPC鋼材支承ブラケットとにより構成され、各横締めPC鋼材はPC鋼材支承ブラケットに支承されていることを特徴とする請求項1または2に記載の落橋防止装置。   The PC steel support block is composed of a precast concrete block fixed to a concrete substructure and a steel PC steel support bracket fixed to the concrete block with anchor bolts. The fallen bridge prevention device according to claim 1, wherein the fallen bridge prevention device is supported by a PC steel material support bracket. PC鋼材定着ブロックは、コンクリート製下部構造物に固定されるプレキャストコンクリート製ブロックと、そのコンクリート製ブロックにアンカーボルトにより固定される鋼製のPC鋼材定着ブラケットとにより構成され、各横締めPC鋼材はPC鋼材定着ブラケットに定着されていることを特徴とする請求項1または2に記載の落橋防止装置。   The PC steel fixing block is composed of a precast concrete block fixed to the concrete substructure and a steel PC steel fixing bracket fixed to the concrete block with anchor bolts. The fallen bridge prevention device according to claim 1 or 2, wherein the fallen bridge prevention device is fixed to a PC steel material fixing bracket.
JP2005047216A 2005-02-23 2005-02-23 Bridge-fall prevention equipment Pending JP2006233498A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005047216A JP2006233498A (en) 2005-02-23 2005-02-23 Bridge-fall prevention equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005047216A JP2006233498A (en) 2005-02-23 2005-02-23 Bridge-fall prevention equipment

Publications (1)

Publication Number Publication Date
JP2006233498A true JP2006233498A (en) 2006-09-07

Family

ID=37041462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005047216A Pending JP2006233498A (en) 2005-02-23 2005-02-23 Bridge-fall prevention equipment

Country Status (1)

Country Link
JP (1) JP2006233498A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014091979A (en) * 2012-11-05 2014-05-19 Sho-Bond Corp Upper edge widening structure of bridge footing, and method for widening upper edge
JP2014190092A (en) * 2013-03-27 2014-10-06 Okumura Corp Bridge fall prevention device and its installation method
CN104894974A (en) * 2015-04-16 2015-09-09 福州大学 Prestressed tendon tensioning device and use method of prestressed tendon tensioning device
JP2015218454A (en) * 2014-05-15 2015-12-07 靖弘 井上 Bridge seat member fitting structure for bridge lower structure
JP2017166268A (en) * 2016-03-17 2017-09-21 公益財団法人鉄道総合技術研究所 Bridge falling prevention structure
CN110777682A (en) * 2019-12-06 2020-02-11 湘潭大学 Anti-seismic reinforcing method for bridge transverse stop block
CN113235463A (en) * 2021-05-12 2021-08-10 山西省交通科技研发有限公司 Self-locking creeping limiting method for curved bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014091979A (en) * 2012-11-05 2014-05-19 Sho-Bond Corp Upper edge widening structure of bridge footing, and method for widening upper edge
JP2014190092A (en) * 2013-03-27 2014-10-06 Okumura Corp Bridge fall prevention device and its installation method
JP2015218454A (en) * 2014-05-15 2015-12-07 靖弘 井上 Bridge seat member fitting structure for bridge lower structure
CN104894974A (en) * 2015-04-16 2015-09-09 福州大学 Prestressed tendon tensioning device and use method of prestressed tendon tensioning device
CN104894974B (en) * 2015-04-16 2016-09-07 福州大学 A kind of tension of prestressed tendon device and using method thereof
JP2017166268A (en) * 2016-03-17 2017-09-21 公益財団法人鉄道総合技術研究所 Bridge falling prevention structure
CN110777682A (en) * 2019-12-06 2020-02-11 湘潭大学 Anti-seismic reinforcing method for bridge transverse stop block
CN113235463A (en) * 2021-05-12 2021-08-10 山西省交通科技研发有限公司 Self-locking creeping limiting method for curved bridge

Similar Documents

Publication Publication Date Title
JP5679975B2 (en) Architectural frame shear rug
US6904636B2 (en) Deck-to-girder connections for precast or prefabricated bridge decks
JP2006233498A (en) Bridge-fall prevention equipment
JP6609815B2 (en) Precast slab, composite structure of steel girder and precast slab, and method of synthesizing steel girder and precast slab
JP4823937B2 (en) Fall bridge prevention structure
JP2009256873A (en) Bridge equipped with precast cross girder and precast stringer, and its construction method
JP4491820B2 (en) Precast bridge
JP2759755B2 (en) Prestressed bridge reinforcement method using lower cable
JP2007262746A (en) Bridge fall preventing structure
JP5384310B2 (en) Fall bridge prevention device
KR101013009B1 (en) Apparatus having a girder connection anchor plate and the continuous construction method for a psc girder bridge by using the same apparatus
KR20100123405A (en) Structure for filling-up a steel reinforced concrete on h shaped section steel in slab bridge
KR101699022B1 (en) Embedded girder bridge construction method for continuous point part of pier
KR20150010421A (en) Cap beam assembly
KR102486675B1 (en) Precast concrete slab construction method and bridge fabricated by usinr the same
JP6080462B2 (en) Outer cable fixing device for prestress introduction in bridge girder
KR101911731B1 (en) Tendon fixing system of long span fire resistance deck strained at deck end and construction method of the same
JP2007009517A (en) Continuous girder structure of multispan girder bridge
KR101389821B1 (en) Prestressed concrete girder with means to add additional stress and method of production and maintenance thereof
KR100516769B1 (en) A reinforcement method by anchoring &amp; tensioning steel strand.
KR101357637B1 (en) Horizontal shear connector for precast concrete bridge pier
KR20090001754U (en) Shear connector with recess
JP3847758B2 (en) Repair structure of PC floor slab bridge
JP4388881B2 (en) Wide structure of the upper edge of the pier
JP2003064621A (en) Hanging floor slab bridge and reinforcing method of hanging floor slab