JP2006226106A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2006226106A5 JP2006226106A5 JP2006111729A JP2006111729A JP2006226106A5 JP 2006226106 A5 JP2006226106 A5 JP 2006226106A5 JP 2006111729 A JP2006111729 A JP 2006111729A JP 2006111729 A JP2006111729 A JP 2006111729A JP 2006226106 A5 JP2006226106 A5 JP 2006226106A5
- Authority
- JP
- Japan
- Prior art keywords
- support
- formwork
- floor
- work
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 claims description 145
- 238000009415 formwork Methods 0.000 claims description 120
- 238000010276 construction Methods 0.000 claims description 47
- 239000000463 material Substances 0.000 claims description 32
- 230000000149 penetrating Effects 0.000 claims description 2
- 238000007730 finishing process Methods 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 8
- 238000009434 installation Methods 0.000 description 8
- 239000011150 reinforced concrete Substances 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 230000003014 reinforcing Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 238000004904 shortening Methods 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 3
- 239000011800 void material Substances 0.000 description 3
- 239000006260 foam Substances 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 238000004381 surface treatment Methods 0.000 description 2
- 210000000282 Nails Anatomy 0.000 description 1
- 210000002356 Skeleton Anatomy 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000003111 delayed Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009429 electrical wiring Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
Description
本発明は、マンションなどのコンクリート系構造体を施工する方法に関するものである。 The present invention relates to a method for constructing a concrete structure such as an apartment.
マンションやビルなどの建造物には、建造物の構造上の基礎となるコンクリートの構造体100が用いられている。コンクリートの構造体100は図1、図9、図10に示されており、柱11、壁部12、梁部13及びスラブ10等が設けられている。そして、梁部13とスラブ10により床部9が形成される。 In a building such as a condominium or a building, a concrete structure 100 serving as a structural basis of the building is used. A concrete structure 100 is shown in FIGS. 1, 9, and 10, and is provided with a column 11, a wall portion 12, a beam portion 13, a slab 10, and the like. The floor portion 9 is formed by the beam portion 13 and the slab 10.
そして、コンクリートの構造体100の従来工法として、各階ごとを1つの単位として、下側から順番に、現場でコンクリートを固めながら形成する工法がある。
具体的には、空間が所定のコンクリートの形状となるように型枠を設置し、その後、型枠にコンクリートを流し込み、さらにコンクリートを養生させて型枠を取り外していく。
As a conventional construction method for the concrete structure 100, there is a construction method in which each floor is formed as one unit, and the concrete is formed in order from the lower side while solidifying the concrete.
Specifically, the formwork is installed so that the space has a predetermined concrete shape, and then the concrete is poured into the formwork, and the concrete is cured to remove the formwork.
コンクリートは、流し込んでから徐々に強度が上昇する。したがって、所定の時間が経過するまでは養生させ、設計強度が出るまでの間は、仮設構造物である支保工によって型枠ごと荷重を支えて、自重などによってひび割れや破壊を防止している。特に、スラブ10や梁部13は、水平面に位置しているので強度が必要であり、充分な養生期間が必要であった。そして、養生後、設計強度となる時間が経過した後に、型枠と支保工を取り外している。 The concrete gradually increases in strength after pouring. Therefore, it is cured until a predetermined time elapses, and until the design strength is obtained, the load of the mold is supported by the support structure which is a temporary structure, and cracks and breakage are prevented by its own weight. In particular, since the slab 10 and the beam portion 13 are located on a horizontal plane, the slab 10 and the beam portion 13 are required strength, and a sufficient curing period is required. And after the time which becomes design strength passes after curing, the formwork and the support work are removed.
また、柱11、壁部12、梁部13及びスラブ10には、必要に応じて鉄筋や鉄骨が用いられ、コンクリートが形成されると鉄筋コンクリート(RC)や鉄骨鉄筋コンクリート(SRC)となる。具体的には、型枠を設置する前に鉄筋や鉄骨を設置して、コンクリートを流し込んで固めていく。このようなコンクリート構造体の施工方法の従来技術として、特許文献1に記載されるようなものがある。
上記の、コンクリートを流し込んで打設した後、型枠と支保工を取り外すまでの養生期間は長く、通常の場合、4週間程度必要である。そして、その間は、型枠と支保工が残っている。型枠や支保工を残したままでは、設備配管工事及び仕上げ工事などができず、例えばコンクリート壁の表面処理、サッシの取り付け、ダクトの取り付け、電気配線、ユニットバスなどの搬入や設置、間仕切り壁の造作ができなかった。
したがって、上記仕上げ工事の開始が遅れるため、コンクリートの構造体100の施工期間が長期となってしまう。
The above-described curing period from pouring and pouring the concrete to removing the formwork and the supporting work is long, and usually about 4 weeks are required. In the meantime, the formwork and support work remain. Without leaving the formwork and support work, equipment piping work and finishing work cannot be done, for example, concrete wall surface treatment, sash installation, duct installation, electric wiring, installation and installation of unit buses, partition walls, etc. I couldn't make any work.
Therefore, since the start of the finishing work is delayed, the construction period of the concrete structure 100 becomes long.
最上階のコンクリートを打設してから、仕上げ工程の開始までを短縮することができれば、短縮した期間がほぼそのまま工期の短縮が可能となる。 If the time from placing the top floor concrete to the start of the finishing process can be shortened, the shortened period can be shortened as it is.
また、特に高層マンションなどの場合には、工期の短縮のため、下の階のコンクリートの養生期間中に、上の階のコンクリートの打設を行っている。したがって、下の階の型枠や支保工を転用することができず、型枠や支保工が複数階分のセットが必要であり、多量の資材を必要としていた。 In particular, in the case of high-rise apartments, in order to shorten the construction period, the concrete on the upper floor is placed during the concrete curing period on the lower floor. Therefore, the formwork and supporting work on the lower floor cannot be diverted, and the formwork and supporting work need to be set for a plurality of floors, and a large amount of materials are required.
そこで、最小限の型枠や支保工を用い、施工期間の短縮が可能なコンクリート構造体の施工方法の提供を課題とする。 Therefore, an object of the present invention is to provide a concrete structure construction method capable of shortening the construction period by using a minimum formwork and support work.
そして、上記した目的を達成するための請求項1に記載の発明は、略水平な床部を上下に複数有するコンクリート構造体を、型枠を設置して支保工を型枠の下側に配置して型枠を支えて型枠内にコンクリートを流し込んで行うコンクリート構造体の施工方法において、前記支保工は一般支保工と特定支保工が用いられ、型枠内にコンクリートを流し込む前に一般支保工を設置し、コンクリートが設計強度に達する前の不完全養生状態で一般支保工を取り外して特定支保工により床部を支え、コンクリートが設計強度に達した後に特定支保工を取り外すものであり、下階で使用した一般支保工は直上階で使用するものであり、特定支保工で床部を支えている状態で一般支保工を取り外し、取り外した一般支保工を用いて直上階の型枠を支えてコンクリートを流し込み、別の特定支保工で当該直上階の床部を支えて一般支保工を取り外して施工することを特徴とするコンクリート構造体の施工方法である。 And the invention according to claim 1 for achieving the above-mentioned object is that the concrete structure having a plurality of substantially horizontal floor portions above and below is placed on the lower side of the formwork by installing the formwork. In the method of constructing a concrete structure in which concrete is supported by pouring concrete into the formwork, the support work is a general support work and a specific support work, and before the concrete is poured into the formwork, The work is installed, the general support work is removed in the incomplete curing state before the concrete reaches the design strength, the floor is supported by the specific support work, and the specific support work is removed after the concrete reaches the design strength. The general support work used on the lower floor is used on the upper floor. Remove the general support work while supporting the floor with the specific support work, and use the removed general support work to form the form on the upper floor. Support Pouring the cleat is a construction method of the concrete structure, characterized in that the construction by removing the general支保Engineering supporting the just above floor floor in other specific shoring.
請求項1に記載の発明によれば、一般支保工と特定支保工を用いて型枠を支え、コンクリートが設計強度に達する前の不完全養生状態で一般支保工を取り外すことができ、短期間で一般支保工を取り外すことができるので、早期に次工程の作業が可能であり、また、上側のコンクリート構造体を形成する場合に一般支保工の転用が可能である。さらに、不完全養生状態で一般支保工を取り外しても、特定支保工により床部を支えているので、コンクリートの破損を防止することができる。 According to the first aspect of the present invention, the general support work and the specific support work are used to support the formwork, and the general support work can be removed in an incomplete curing state before the concrete reaches the design strength. Since the general support work can be removed, the next process can be performed at an early stage, and the general support work can be diverted when the upper concrete structure is formed. Furthermore, even if the general support is removed in the incomplete curing state, the floor is supported by the specific support, so that the concrete can be prevented from being damaged.
請求項2に記載の発明は、前記床部の下側に用いられる型枠の下側に複数の型枠保持材を全面に配置し、前記型枠支持材は一般支保工により支えられ、一般支保工は型枠保持材を介して型枠を支えており、型枠保持材は、直上階で使用するものであることを特徴とする請求項1に記載のコンクリート構造体の施工方法である。 In the invention according to claim 2, a plurality of formwork holding materials are arranged on the entire lower surface of the formwork used on the lower side of the floor portion, and the formwork support material is supported by a general support work, 2. The method for constructing a concrete structure according to claim 1, wherein the supporter supports the formwork via a formwork holding material, and the formwork holding material is used on the upper floor. .
請求項3に記載の発明は、コンクリート構造体のスラブには、上階と下階を貫通する貫通孔であるだめ穴が設けられ、一般支保工はだめ穴を用いて直上階に運搬するものであることを特徴とする請求項1又は2に記載のコンクリート構造体の施工方法である。 According to a third aspect of the present invention, a slab of a concrete structure is provided with a drain hole which is a through-hole penetrating the upper floor and the lower floor, and the general support is transported to the upper floor using the drain hole. It is the construction method of the concrete structure of Claim 1 or 2 characterized by the above-mentioned.
請求項4に記載の発明は、一般支保工を取り外す前に、特定支保工の支持力を大きくする支持力調整作業を行うことを特徴とする請求項1〜3のいずれかに記載のコンクリート構造体の施工方法である。 The invention according to claim 4 is a concrete structure according to any one of claims 1 to 3, wherein a supporting force adjusting operation for increasing a supporting force of the specific supporting work is performed before removing the general supporting work. It is a body construction method.
請求項4に記載の発明によれば、特定支保工の支持力を大きくする支持力調整作業が行われるので、特定支保工による支持が確実な状態で一般支保工を取り外すこととなり、一般支保工を取り外す際にコンクリート構造体の破損を防止できる。
なお、支持力調整作業は、特定支保工の設置後であって、一般支保工を取り外す前であればよい。また、支持力調整作業する際には、コンクリートに一定の強度が必要であるので、コンクリート打設後から、中1日程度の期間が経過後が望ましい。さらに、一般支保工の取り外しの作業の段取りの関係上、一般支保工の取り外しの作業の前日が望ましい。
また、特定支保工の設置はコンクリート打設前でも打設後でもよく、さらに、特定支保工の設置をコンクリート打設前に一般支保工と同時に行っても良い。
According to the invention described in claim 4, since the support force adjustment work for increasing the support force of the specific support work is performed, the general support work is removed in a state in which the support by the specific support work is reliable, and the general support work is removed. It is possible to prevent the concrete structure from being damaged when removing.
The support force adjustment work may be performed after the specific support work is installed and before the general support work is removed. Moreover, when carrying out the supporting force adjustment work, the concrete needs to have a certain strength. Therefore, it is desirable that a period of about one day is passed after the concrete is placed. Furthermore, the day before the removal work of the general support work is desirable because of the setup of the work of removing the general support work.
In addition, the specific support work may be installed before or after the concrete placement, and the specific support work may be installed at the same time as the general support work before the concrete placement.
支持力調整作業後の特定支保工の支持力は1.96kN以上とすることができる。 The support force of the specific support work after the support force adjustment work can be 1.96 kN or more .
この構成によれば、支持力調整作業後の特定支保工の支持力は1.96kN以上であるので、一般支保工を取り外して特定支保工だけで支える際に、確実に支えることができる。さらに、支持力調整作業後の特定支保工の支持力を5.88kN以上とすることが望ましい。 According to this configuration, since the support force of the specific support after the support force adjustment work is 1.96 kN or more, the support can be reliably supported when the general support is removed and supported only by the specific support. Furthermore, it is desirable that the support force of the specific support work after the support force adjustment work is 5.88 kN or more.
前記床部の下側に用いられる型枠の下側に複数の型枠保持材を全面に配置し、前記型枠支持材は一般支保工により支えられ、一般支保工は型枠保持材を介して型枠を支えるようにすることができる。 A plurality of formwork holding materials are arranged on the entire lower surface of the formwork used on the lower side of the floor, the formwork support material is supported by a general support work, and the general support work is performed via the formwork support material. Can support the formwork .
この構成によれば、前記床部の下側に用いられる型枠の下側に複数の型枠保持材を全面に配置し、前記型枠支持材は一般支保工により支えられて、一般支保工は型枠保持材を介して型枠を支えているので、広範囲の型枠の設置が容易となり、また、一般支保工を取り外すことにより、一般支保工に保持された根太・大引等の型枠保持材を取り外すことができる。 According to this configuration, a plurality of formwork holding materials are arranged on the entire lower surface of the formwork used on the lower side of the floor portion, and the formwork support material is supported by the general support work. Supports the formwork via the formwork retainer, making it easy to install a wide range of formwork. Also, by removing the general support work, the molds such as joists and large draws held by the general support work The frame holding material can be removed.
特定支保工は型枠に直接接触するようにすることができる。 The specific support can be in direct contact with the formwork .
この構成によれば、特定支保工は型枠に直接接触しているので、一般支保工を取り外すことにより全ての型枠保持材を取り外すことができる。 According to this configuration, since the specific support is in direct contact with the formwork, all the formwork holding materials can be removed by removing the general support work.
前記床部の下側に用いられる型枠は、所定の形状をした定形型枠と、前記定形型枠と形状が異なる異形型枠が用いられ、特定支保工は異形型枠を支えるようにすることができる。 Formwork used in the lower side of the floor portion includes a shaped mold having a predetermined shape, the shaped mold and shape are different irregular mold is used, specific shoring is to support the profiled formwork be able to.
この構成によれば、特定支保工により直接に支えている型枠は異形型枠であるので、利用価値の高い定形型枠を多く使用することができる。すなわち、不完全養生状態で一般支保工を取り外した状態では、特定支保工により支えられている型枠は取り外すことができない。しかしながら、かかる型枠は異形型枠であり、型枠を転用する場合に定形型枠を多く使用することができる。 According to this structure, since the formwork directly supported by the specific support work is a deformed formwork, many fixed formwork with high utility value can be used. That is, in a state where the general support is removed in an incomplete curing state, the formwork supported by the specific support cannot be removed. However, such a formwork is a deformed formwork, and when a formwork is diverted, many fixed formwork can be used.
前記特定支保工は複数の場所に配置されており、前記特定支保工の配置は、直線状の配列である、又は、直線状の配列を複数有して前記直線状の配列の全てが略平行であるようにすることができる。 The specific support works are arranged at a plurality of locations, and the arrangement of the specific support works is a linear arrangement, or a plurality of linear arrangements are provided, and all of the linear arrangements are substantially parallel. Can be.
この構成によれば、前記特定支保工は複数の場所に配置されており、前記特定支保工の配置は、直線状の配列である、又は、直線状の配列を複数有して前記直線状の配列の全てが略平行であるので、特定支保工を設置する場所の数を少なくしながらバランス良く支えることが可能である。 According to this configuration, the specific support works are arranged at a plurality of locations, and the arrangement of the specific support works is a linear array, or has a plurality of linear arrays and the linear support works. Since all the arrangements are substantially parallel, it is possible to support in a well-balanced manner while reducing the number of places where specific support works are installed.
前記床部の形状は略長方形であり、特定支保工の直線状の配列は前記長方形の長辺に対して略平行であるようにすることができる。 The shape of the floor portion is substantially rectangular, and the linear arrangement of the specific support works can be made substantially parallel to the long side of the rectangle .
この構成によれば、特定支保工の直線状の配列を前記長方形の長辺に対して略平行となるように配置されているので、コンクリート構造体の床部の形状として多く採用されている略長方形状の場合に、バランス良く支えることが可能である。 According to this configuration, since the linear arrangement of the specific support works is arranged so as to be substantially parallel to the long side of the rectangle, it is often used as the shape of the floor portion of the concrete structure. In the case of a rectangular shape, it is possible to support in a well-balanced manner.
前記特定支保工は複数の場所に配置されており、隣接する他の特定支保工との間隔は2m以上であって5m以下とすることができる。 The said specific support work is arrange | positioned in several places, and the space | interval with the adjacent other specific support work is 2 m or more, and can be 5 m or less .
この構成によれば、隣接する他の特定支保工との間隔は2m以上であって5m以下であるので、特定支保工を設置する場所の数を少なくしながら効率よく支えることができる。 According to this structure, since the space | interval with other adjacent specific support works is 2 m or more and 5 m or less, it can support efficiently, reducing the number of places which install a specific support work.
コンクリート構造体には梁が設けられており、前記梁は前記特定支保工によって支えられているようにすることができる。 The concrete structure is provided with a beam, and the beam can be supported by the specific support work .
この構成によれば、コンクリート構造体には梁が設けられており、前記梁は前記特定支保工によって支えられているので、特定支保工によって支えられる梁により、効率よく支えることができる。 According to this configuration, the concrete structure is provided with the beam, and the beam is supported by the specific support work. Therefore, the concrete structure can be efficiently supported by the beam supported by the specific support work.
前記特定支保工は、前記一般支保工よりも支持可能な荷重が大きいすることができる。 The specific support work can have a larger load that can be supported than the general support work.
この構成によれば、前記特定支保工は、前記一般支保工よりも支持可能な荷重が大きいので、少ない特定支保工により、支持が可能となる。 According to this structure, since the specific support work has a larger load that can be supported than the general support work, the specific support work can be supported with less specific support work.
一般支保工を取り外す際のコンクリートの圧縮強度は、単位平方mm当たり13N以上であることが望ましい。 The concrete compressive strength when removing the general support is desirably 13 N or more per unit square mm.
型枠をコンクリート構造体の一部として使用してもよい。 The formwork may be used as part of a concrete structure.
本発明のコンクリート構造体の施工方法によれば、最小限の型枠や支保工を用い、施工期間の短縮が可能である。 According to the method for constructing a concrete structure of the present invention, the construction period can be shortened by using a minimum formwork and support work.
以下さらに本発明の具体的実施例について説明する。図1は、本発明の施工方法により施工されるコンクリート構造体を内部から見たA−A面における側面図である。図2は、本発明の施工方法で、型枠を設置した状態の内部から見たB−B面における側面図である。図3は、本発明の施工方法で、型枠を設置した状態の斜視図である。図4は、本発明の施工方法で、施工されるコンクリート構造体のスラブの下側を示した斜視図である。図5は、本発明の施工方法に用いられる支保工の斜視図である。図6は、本発明の施工方法で、型枠を設置した状態の上側から見た正面図である。図7は、本発明の施工方法で、型枠を設置した状態の下側から見た正面図である。本発明の施工方法で、型枠を設置した状態の上面図である。図8は、本発明の施工方法で、支保工の使用状況を示した模式図である。 Hereinafter, specific examples of the present invention will be described. Drawing 1 is a side view in the AA side which looked at the concrete structure constructed by the construction method of the present invention from the inside. FIG. 2: is the side view in the BB surface seen from the inside of the state which installed the formwork with the construction method of this invention. FIG. 3 is a perspective view showing a state in which a formwork is installed in the construction method of the present invention. FIG. 4 is a perspective view showing a lower side of a slab of a concrete structure to be constructed by the construction method of the present invention. FIG. 5 is a perspective view of a support used in the construction method of the present invention. FIG. 6: is the front view seen from the upper side of the state which installed the formwork with the construction method of this invention. FIG. 7: is the front view seen from the lower side in the state which installed the formwork with the construction method of this invention. It is a top view of the state which installed the formwork with the construction method of this invention. FIG. 8 is a schematic view showing a usage situation of a support work in the construction method of the present invention.
本発明の第1の実施形態のコンクリート構造体の施工方法により施工されるコンクリート構造体は、従来技術により施工された図9,図10に示されているコンクリート構造体100と同様である。また、コンクリート構造体1はマンションなどの建築物を建設する際に最初に造られるものであり、骨格となる構造体である。 The concrete structure constructed by the concrete structure construction method of the first embodiment of the present invention is the same as the concrete structure 100 shown in FIGS. 9 and 10 constructed by the conventional technique. The concrete structure 1 is a structure that is first formed when a building such as an apartment is constructed, and serves as a skeleton.
コンクリート構造体1には、スラブ10、柱11、壁部12及び梁部13が設けられ、スラブ10と梁部13により床部9となっている。また、スラブ10、柱11、壁部12及び梁部13は、鉄筋が内部に設けられて、鉄筋コンクリート造となっている。
尚、コンクリート構造体1は、通常、窓や扉となる開口が設けられるが、本明細書においては図示及び説明を省略する。
The concrete structure 1 is provided with a slab 10, a column 11, a wall portion 12, and a beam portion 13, and a floor portion 9 is formed by the slab 10 and the beam portion 13. Moreover, the slab 10, the column 11, the wall part 12, and the beam part 13 are provided with a reinforcing bar inside, and become a reinforced concrete structure.
In addition, although the concrete structure 1 is normally provided with the opening used as a window and a door, illustration and description are abbreviate | omitted in this specification.
図1に示されるように、スラブ10は水平方向に配置される板状の部分である。そして、スラブ10(床部9)はコンクリート構造体1に上下に複数設けられている。上側のスラブ10は、下側のスラブ10の上側に設けられている柱11や壁部12及び梁13により支えられている。
また、図4は、コンクリート構造体1をスラブ10部分を取り除いた状態で上から見た図である。
As shown in FIG. 1, the slab 10 is a plate-like portion arranged in the horizontal direction. And the slab 10 (floor part 9) is provided with two or more by the concrete structure 1 up and down. The upper slab 10 is supported by a column 11, a wall portion 12, and a beam 13 provided on the upper side of the lower slab 10.
Moreover, FIG. 4 is the figure which looked at the concrete structure 1 from the state in the state which removed the slab 10 part.
梁部13はスラブ10の下側に設けられている。そして、スラブ10の自重及びスラブ10の上側部分から受ける力によって、スラブ10がたわむことを防止する。梁部13は必要に応じてコンクリート構造体1に設けられるものであり、スラブ10のみからなる床部9であっても良い。
柱11は上下に延びる長尺状であり、隣接する上下のスラブ10同士の間に位置している。壁部12は板状であり、上下方向に配置している。本実施形態の施工方法により施工されるコンクリート構造体1には、柱11及び壁部12が設けられて、その上側の部分の重力を支えているが、柱11のみでもよく、また、壁部12のみでもよい。
The beam portion 13 is provided on the lower side of the slab 10. Then, the slab 10 is prevented from being bent by its own weight and the force received from the upper portion of the slab 10. The beam portion 13 is provided in the concrete structure 1 as necessary, and may be a floor portion 9 made of only the slab 10.
The column 11 has a long shape extending vertically and is positioned between adjacent upper and lower slabs 10. The wall portion 12 has a plate shape and is arranged in the vertical direction. The concrete structure 1 constructed by the construction method of the present embodiment is provided with a column 11 and a wall portion 12 to support the gravity of the upper portion thereof, but only the column 11 may be used. Only 12 may be used.
スラブ10同士の間には、内部空間16が設けられており、内部空間16内に住居等のための施設等が設置される。そして、コンクリート構造体1には、上下に複数の内部空間16が設けられている。 An internal space 16 is provided between the slabs 10, and a facility for a residence or the like is installed in the internal space 16. The concrete structure 1 is provided with a plurality of internal spaces 16 in the vertical direction.
次に、コンクリート構造体1の施工方法について説明する。
本実施形態のコンクリート構造体1の施工方法を概略すると、下側の床部9を形成した後に上側の床部9を形成していくものである。また、その形成は、型枠27を設置して、支保工45を型枠27の下側に配置して型枠27を支え、型枠27内にコンクリートを流し込み、支保工45を取り外して行われる。さらに、支保工45は一般支保工46と特定支保工47が用いられ、型枠27内にコンクリートを流し込む前に一般支保工46を設置し、コンクリートが設計強度に達する前の不完全養生状態で一般支保工46を取り外して特定支保工47により床部9を支え、コンクリートが設計強度に達した後に特定支保工47を取り外すものである。
Next, the construction method of the concrete structure 1 is demonstrated.
When the construction method of the concrete structure 1 of this embodiment is outlined, the upper floor portion 9 is formed after the lower floor portion 9 is formed. In addition, the mold 27 is installed, the support 45 is placed below the mold 27 to support the mold 27, concrete is poured into the mold 27, and the support 45 is removed. Is called. Furthermore, the general support work 46 and the specific support work 47 are used as the support work 45, and the general support work 46 is installed before pouring concrete into the mold 27, and in an incomplete curing state before the concrete reaches the design strength. The general support 46 is removed and the floor 9 is supported by the specific support 47, and the specific support 47 is removed after the concrete reaches the design strength.
まず、図示しない基礎部を形成する。基礎部は、地面より下の部分に設けられ、コンクリート構造体1自体が傾いたり、倒れたりしないように支えるものである。具体的には、地盤にコンクリート杭などを埋設し、さらに前記杭をコンクリートで固めるなどして、形成されている。そして、基礎部の上面に1階床部21を形成する。基礎部及び1階床部21は、従来技術と同様に形成される。 First, a base portion (not shown) is formed. The foundation is provided in a portion below the ground, and supports the concrete structure 1 itself so that it does not tilt or fall. Specifically, a concrete pile or the like is buried in the ground, and the pile is further solidified with concrete. And the 1st floor part 21 is formed in the upper surface of a foundation part. The base part and the first floor part 21 are formed in the same manner as in the prior art.
そして、図2、図3に示されるように、1階床部21の上側に、1階部分の柱11及び壁部12と、1階部分の柱11及び壁部12の上側に位置する2階の床のスラブ10の型枠27を設置する。
型枠27は、従来技術と同様なものが用いられ、型枠27の内側の空間39を、コンクリート構造体1の形状に合わせて設置する。また、空間39の上側は開口状である。
2 and 3, the first floor portion column 11 and the wall portion 12 are located above the first floor portion 21 and the first floor portion pillar 11 and the wall portion 12 are located above the first floor portion 21 and the wall portion 12. The formwork 27 of the floor slab 10 is installed.
The mold 27 is the same as that of the prior art, and the space 39 inside the mold 27 is installed according to the shape of the concrete structure 1. The upper side of the space 39 is open.
型枠27は、スラブ用型枠30、柱用型枠31、壁用型枠32及び梁用型枠33を有している。そして、型枠27は木製の板状であり、コンクリート構造体1の形状や大きさに合わせて、適当な大きさのものが使用される。具体的には型枠27は長方形のベニヤ板に必要に応じて補強したものが用いられている。なお、かかる補強材の図示は省略している。 The formwork 27 includes a slab formwork 30, a pillar formwork 31, a wall formwork 32, and a beam formwork 33. And the formwork 27 is a wooden plate shape, and the thing of a suitable magnitude | size is used according to the shape and magnitude | size of the concrete structure 1. FIG. Specifically, the formwork 27 is a rectangular veneer that is reinforced as necessary. Note that illustration of such a reinforcing material is omitted.
型枠27の設置の前にあらかじめ、空間39に、鉄筋を配して、スラブ10、柱11、壁部12及び梁部13を鉄筋コンクリート造としている。なお、必要に応じて、鉄骨を空間39に配置して鉄骨鉄筋コンクリート造としても良い。 Prior to installation of the formwork 27, reinforcing bars are arranged in the space 39 in advance, and the slab 10, the pillar 11, the wall part 12, and the beam part 13 are made of reinforced concrete. If necessary, a steel frame may be arranged in the space 39 to form a steel frame reinforced concrete structure.
型枠27は適宜、従来技術と同様に釘などの固定方法により固定される。また、スラブ用型枠30及び梁用型枠33は、後述するように、型枠保持材44を設置した後で設置される。 The mold 27 is appropriately fixed by a fixing method such as a nail as in the prior art. Further, the slab mold 30 and the beam mold 33 are installed after the mold holding member 44 is installed, as will be described later.
スラブ用型枠30は、図2に示されるように、支保工45によって支えられている。支保工45は、従来より使用されているものと同様であり、図5に示されるように、上下にフランジ部45bを有して長さが可変できる円筒状の部材である。支保工45は、コンクリート構造体1の構造などに応じて、適当な長さや太さのものを選定して用いる。
そして、中間部に設けられたねじ部45aを回転させることにより、支保工45は型枠27などを支持している状態で、さらに長さを長くすることができ、支保工45により支えている状態で、軸力を加えて、軸力調節することが出来る。この軸力は支持力となり、後述するように支持力を調整することができる。
The slab mold 30 is supported by a support 45 as shown in FIG. The support work 45 is the same as that conventionally used, and as shown in FIG. 5, the support work 45 is a cylindrical member having a flange portion 45b at the top and bottom and having a variable length. The support 45 is selected and used with an appropriate length and thickness according to the structure of the concrete structure 1 and the like.
Then, by rotating the screw part 45 a provided in the intermediate part, the support work 45 can be further lengthened while being supported by the support work 45 while supporting the mold 27 and the like. In the state, the axial force can be adjusted by applying the axial force. This axial force becomes a support force, and the support force can be adjusted as will be described later.
スラブ用型枠30及び梁用型枠33は、型枠保持材44の上に設置される。型枠保持材44は、木製や金属製の角柱状のものが用いられる。型枠保持材44は、上下2段に配置されており、上側の型枠保持材である根太44aと、根太44aの下側に位置する大引44bが設けられている。 The slab formwork 30 and the beam formwork 33 are installed on a formwork holding member 44. As the formwork holding material 44, a wooden or metal prismatic material is used. The formwork holding member 44 is arranged in two upper and lower stages, and is provided with a joist 44a that is an upper formwork holding member and a large pull 44b that is located below the joist 44a.
本実施形態においては、スラブ用型枠30と、支保工45と、型枠保持材44である根太44a及び大引44bの配置に特徴を有しており、図6,図7を用いて説明する。
図7に示されるように、根太44a及び大引44bが配置される。上下の位置関係は、支保工45の上側に大引44bが配置しており、大引44bの上側に根太44aが配置しており、さらに根太44aの上側にスラブ用型枠30が設けられている。
The present embodiment is characterized by the arrangement of the slab mold 30, the support 45, and the joists 44a and the large forks 44b that are the mold retainers 44, and will be described with reference to FIGS. To do.
As shown in FIG. 7, a joist 44a and a large pull 44b are arranged. The upper and lower positional relationships are such that the large pull 44b is disposed above the support 45, the joist 44a is disposed above the large pull 44b, and the slab mold 30 is provided above the joist 44a. Yes.
スラブ用型枠30はスラブ10の下側の位置で水平方向に敷き詰められている。スラブ用型枠30には、定形の板である複数の定形型枠35と、定形型枠35とは形が異なる異形型枠36を有している。
図6に示されるように、スラブ用型枠30の定形型枠35は、スラブ10の両端側から敷き詰めて設置される。そして、スラブ10の中程にできる、定形型枠35よりも幅が小さい隙間に異形型枠36が敷き詰められる。したがって、異形型枠36はスラブ10の中程に位置しており、定形型枠35に比べて小さい。なお、この異形型枠36の配置は、後述するように、特定支保工47の位置に合わせられている。
The slab formwork 30 is laid horizontally in the lower position of the slab 10. The slab mold 30 has a plurality of regular molds 35 which are regular plates, and a deformed mold 36 having a different shape from the regular mold 35.
As shown in FIG. 6, the fixed form 35 of the slab form 30 is laid and installed from both ends of the slab 10. Then, the deformed mold 36 is laid in a gap formed in the middle of the slab 10 and having a width smaller than that of the fixed mold 35. Therefore, the deformed form 36 is located in the middle of the slab 10 and is smaller than the fixed form 35. The layout of the deformed form 36 is matched to the position of the specific support 47 as will be described later.
根太44aは複数設けられ、スラブ用型枠30の幅よりも短い間隔で略平行にスラブ10の全面に配置している。根太44aによって、スラブ10の全面に設けられているスラブ用型枠30を支える。そして、図7に示されるように、根太44aの下側で、根太44aの長手方向と垂直となるように大引44bが配置されている。大引44bは、根太44aと同様に複数設けられ、スラブ10の全面に配置して根太44aを支えている。 A plurality of joists 44 a are provided, and are arranged on the entire surface of the slab 10 at a substantially shorter interval than the width of the slab mold 30. The joist 44a supports the slab mold 30 provided on the entire surface of the slab 10. As shown in FIG. 7, the large pull 44 b is arranged below the joist 44 a so as to be perpendicular to the longitudinal direction of the joist 44 a. A plurality of large pulls 44b are provided in the same manner as the joists 44a, and are arranged on the entire surface of the slab 10 to support the joists 44a.
支保工45には、一般支保工46と特定支保工47とを有している。特定支保工47は一般支保工46よりも太く、より大きな荷重を支えることができる。
また、図2に示されるように、一般支保工46は、型枠保持材44の下側と1階床部21の間に設けられ、型枠保持材44を支えて、間接的にスラブ用型枠30を支えている。また、特定支保工47はスラブ用型枠30の異形型枠36と1階床部21の間に設けられ、異形型枠36aを直接支えている。
特定支保工47による支持の際、フランジ部45bの先に、ばた角などと呼ばれる木製の角材や木製の平板等を中継材として、型枠27等との間に挟んでも良く、また、1つの中継材を複数の特定支保工47によって挟んでもよい。
The support work 45 includes a general support work 46 and a specific support work 47. The specific support 47 is thicker than the general support 46 and can support a larger load.
Further, as shown in FIG. 2, the general support 46 is provided between the lower side of the formwork holding material 44 and the first floor 21, and supports the formwork holding material 44 and indirectly for the slab. The mold 30 is supported. The specific support 47 is provided between the deformed mold 36 of the slab mold 30 and the first floor 21 and directly supports the deformed mold 36a.
At the time of support by the specific support 47, a wooden square or a wooden flat plate called a flute corner may be sandwiched between the formwork 27 and the like at the end of the flange 45b. One relay material may be sandwiched between a plurality of specific support works 47.
一般支保工46の配置は、従来技術と同様に、大引44bを支えるように多数配置され、コンクリート打設後にスラブ10の部分のコンクリートの重さを支えることができる。
また、特定支保工47の配置は、検討結果により決められる。すなわち、設計段階でコンクリート構造体1の構造の力学計算や、養生時間とコンクリート強度との関係等により、不完全養生状態で一般支保工46を取り外すまでの期間を算出し、また、特定支保工47により床の部分を支える配置を検討する。
一般支保工46を取り外すまでの養生時間は、スラブ10等の床部9について構造計算を行い、養生によって得られるコンクリート強度が、特定支保工47により床部9を支えた状態におけるコンクリートの所定強度を超えるように設定する。
As with the prior art, the general supporters 46 are arranged so as to support the large pull 44b, and can support the weight of the concrete in the slab 10 after placing the concrete.
In addition, the arrangement of the specific support work 47 is determined by the examination result. That is, the period until the general support 46 is removed in the incomplete curing state is calculated by the mechanical calculation of the structure of the concrete structure 1 at the design stage, the relationship between the curing time and the concrete strength, and the specific support 47 Consider the arrangement to support the floor part.
The curing time until the general support 46 is removed is the structural calculation of the floor 9 such as the slab 10 and the concrete strength obtained by the curing is the predetermined strength of the concrete in a state where the floor 9 is supported by the specific support 47 Set to exceed.
また、特定支保工47は、仕上げ工程などの邪魔にならないような配置とするのが望ましく、特定支保工47により床部9を支えた状態におけるコンクリートの応力状態が、床部9の場所による差が小さくなるように、特定支保工47を配置するのが望ましい。また、梁部13が設けられている場合には、梁部13を支えるように特定支保工47を配置するのが望ましい。 In addition, the specific support 47 is desirably arranged so as not to interfere with the finishing process, and the stress state of the concrete in a state where the floor 9 is supported by the specific support 47 differs depending on the location of the floor 9. It is desirable to arrange the specific support 47 so as to reduce the size. Moreover, when the beam part 13 is provided, it is desirable to arrange | position the specific support work 47 so that the beam part 13 may be supported.
本実施形態の特定支保工47の配置は、図7に示されている。
特定支保工47によって床部9を支える場合、一カ所に一本の特定支保工47により行っても良く、一カ所に複数の特定支保工47を用いても良い。本実施形態では、一カ所で2本の特定支保工47が用いられている。
The arrangement of the specific support work 47 of this embodiment is shown in FIG.
When the floor 9 is supported by the specific support 47, it may be performed by one specific support 47 at one place, or a plurality of specific support 47 may be used at one place. In this embodiment, two specific support works 47 are used at one place.
特定支保工47は複数の場所に配置されており、本実施形態では3カ所に各2本ずつ設けられている。そして、特定支保工47の配置は、直線状の配列となっている。なお、特定支保工47の配置を説明の際に、一つの場所に複数の特定支保工47を用いた場合には一カ所として説明する。 The specific support works 47 are arranged at a plurality of places, and in this embodiment, two of each are provided at three places. And the arrangement | positioning of the specific support 47 is a linear arrangement | sequence. In the description of the arrangement of the specific support works 47, when a plurality of specific support works 47 are used in one place, the description will be made as one place.
本実施形態の床部9の形状は略長方形であり、前記した特定支保工47の配列の方向が、床部9の長辺に平行となっており、また、その位置は床部9の中央に位置している。 The shape of the floor portion 9 of the present embodiment is substantially rectangular, the direction of the arrangement of the specific support 47 described above is parallel to the long side of the floor portion 9, and the position thereof is the center of the floor portion 9. Is located.
なお、特定支保工47は、隣接する他の特定支保工47との間隔は2m以上であって5m以下であるのが望ましい。かかる間隔にすることにより、少ない特定支保工47で効率よく支えることができる。さらに、床部9の任意の場所において、特定支保工47、柱11及び壁部12のいずれかまでの最短距離が1m以上であって2.5m以下となるように特定支保工47の配置を行うことが望ましい。
また、床部9の短辺の幅が10m以上の幅広の場合には、特定支保工47の配置を、直線状の配列を複数として、これらの配列の全てを略平行となるような配置とすることができる。
In addition, as for the specific support 47, it is desirable that the space | interval with the other adjacent specific support 47 is 2 m or more and 5 m or less. By setting such an interval, it can be efficiently supported by a small number of specific support works 47. Furthermore, in any place on the floor 9, the specific support 47 is arranged so that the shortest distance to any of the specific support 47, the pillar 11 and the wall 12 is 1 m or more and 2.5 m or less. It is desirable to do.
Further, when the width of the short side of the floor portion 9 is 10 m or more, the specific support 47 is arranged in a plurality of linear arrangements, and all of these arrangements are substantially parallel. can do.
そして、この検討結果に従って特定支保工47を配置する。一般支保工46及び特定支保工47の配置は、図7に示されている。 And the specific support 47 is arrange | positioned according to this examination result. The arrangement of the general support works 46 and the specific support works 47 is shown in FIG.
また、図7に示されるように、特定支保工47は、根太44aや大引44bを介さずに、直接的に異形型枠36aを支えている。特定支保工47に支えられている異形型枠36aは、他の異形型枠36よりも小さい。そして、異形型枠36aの幅は、根太44aの設置間隔の幅に合わせて、異形型枠36aが根太44aの上に配置し、異形型枠36aが2本の根太44aの間に位置するようにしてもよい。かかる場合には、異形型枠36aをより小さくすることが可能である。 Further, as shown in FIG. 7, the specific support 47 supports the deformed form 36a directly without using the joists 44a and the large pull 44b. The deformed mold 36 a supported by the specific support 47 is smaller than other deformed molds 36. The width of the deformed mold 36a is set so that the deformed mold 36a is disposed on the joist 44a and the deformed mold 36a is positioned between the two joists 44a in accordance with the width of the installation interval of the joists 44a. It may be. In such a case, the deformed form 36a can be made smaller.
なお、本実施形態に用いられる特定支保工47は一般支保工46よりも太く、大きな荷重を支えることができるので、より少ない本数の特定支保工47で支持することができる。 In addition, since the specific support 47 used in this embodiment is thicker than the general support 46 and can support a large load, it can be supported by a smaller number of specific supports 47.
また、梁用型枠33についても、スラブ用型枠30と同様に設置する。すなわち、梁用型枠33は、根太44a・大引44bを介して一般支保工46により支えられている。また、特定支保工47を用い、根太44aや大引44bを介さずに、直接的に梁用型枠33を支え、特定支保工47により支えられる梁用型枠33を異形型枠36aとしている。 The beam form 33 is also installed in the same manner as the slab form 30. In other words, the beam formwork 33 is supported by the general support 46 through the joists 44a and the large pulls 44b. Further, the specific support 47 is used, and the beam formwork 33 is directly supported without using the joist 44a and the large pull 44b, and the beam formwork 33 supported by the specific support 47 is used as the deformed formwork 36a. .
上記したように、型枠27、型枠保持材44及び支保工45を設置した後、空間39の上側からコンクリートを流し込む。空間39の下側から徐々にコンクリートが充填し、2階の床のスラブ10の上側まで充填する。コンクリートの材質は、公知のものが用いられる。 As described above, after the mold 27, the mold retainer 44 and the support 45 are installed, concrete is poured from the upper side of the space 39. The concrete gradually fills from the lower side of the space 39 and fills up to the upper side of the slab 10 on the second floor. Known materials are used for the concrete.
このスラブ10を形成する際に、だめ穴と呼ばれる資材運搬用の貫通孔を設けるようにしてもよい。このだめ穴は、上階と下階を貫通するように設けられており、下階で使用した型枠27、型枠保持材44及び支保工45などを手渡しなどで上階に運び上げることができる。そして、上階の施工の際などにコンクリートにより、だめ穴が塞がれる。 When forming this slab 10, you may make it provide the through-hole for material conveyance called a dead hole. This drain hole is provided so as to penetrate the upper floor and the lower floor, and the formwork 27, the formwork holding material 44, the support work 45, etc. used on the lower floor can be carried up to the upper floor by handing or the like. it can. And, when the upper floor is constructed, the dead hole is closed with concrete.
さらに、そのままの状態で、養生させる。養生させていくと、徐々にコンクリートの強度が増す。 Furthermore, it is cured as it is. As it is cured, the concrete strength gradually increases.
そして、支持力調整作業を行う。この支持力調整作業は、ある程度のコンクリート強度が必要であり、コンクリート打設後から中1日以上経過した後、すなわち、コンクリート打設した日の翌々日より後に行われる。
また、支持力調整作業は一般支保工46を取り外す前までに行われる。そして、支持力調整作業の時期は一般支保工46を取り外す直前がコンクリート強度が高いので望ましく、具体的には支持力調整作業から一般支保工46を取り外すまでの時間が24時間以内であることが望ましい。支持力調整作業は、特定支保工47のねじ部45a調整して、特定支保工47の長さを長くして支持力を大きくすることにより行われる。
Then, the supporting force adjustment work is performed. This supporting force adjustment work requires a certain level of concrete strength, and is performed after one or more days have passed since the concrete placement, that is, after the next day after the concrete placement.
Further, the supporting force adjustment work is performed before the general support 46 is removed. The timing of the supporting force adjustment work is desirable because the concrete strength is high immediately before the general support 46 is removed. Specifically, the time from the support force adjustment work to the removal of the general support 46 is within 24 hours. desirable. The support force adjustment work is performed by adjusting the screw portion 45a of the specific support 47 and increasing the support force by increasing the length of the specific support 47.
この支持力調整作業はねじ部45aを調整して、特定支保工47の軸力(支持力)が所定の軸力となるように行われるが、具体的には、手動によりねじ部45aを回転させ、さらに、工具を用いて所定の回転角度だけねじ部45aを回転させて行われる。このように行うことにより、誰にでもわかりやすく操作を間違えることが無く、工事現場でほぼ均一な軸力を簡単に得ることができる。
また、支持力調整作業による調整後の特定支保工47の軸力(支持力)は、1.96kN(200kgf)以上となるように調整することが望ましい。さらには、5.88kN(600kgf)以上となるように調整することが望ましい。このような軸力となるように調整することにより、一般支保工46を取り外して特定支保工47に大きな軸力がかかる際に、より小さな変形で軸力を大きくなり、コンクリートの変形を小さくすることができる。
This support force adjustment operation is performed by adjusting the screw portion 45a so that the axial force (support force) of the specific support 47 becomes a predetermined axial force. Specifically, the screw portion 45a is manually rotated. Furthermore, the screw portion 45a is rotated by a predetermined rotation angle using a tool. By carrying out in this way, it is easy for anyone to understand and the operation is not mistaken, and a substantially uniform axial force can be easily obtained at the construction site.
Moreover, it is desirable to adjust the axial force (supporting force) of the specific support 47 after the adjustment by the supporting force adjusting operation to be 1.96 kN (200 kgf) or more. Furthermore, it is desirable to adjust so that it may become 5.88kN (600kgf) or more. By adjusting to such an axial force, when the general support 46 is removed and a large axial force is applied to the specific support 47, the axial force is increased with a smaller deformation and the deformation of the concrete is reduced. be able to.
コンクリート打設後、所定の期間経過後に、不完全養生状態で、特定支保工47を残して、一般支保工46を全て取り外す。この期間は、上記した検討結果により予め計算によって得られた期間で、コンクリート強度は所定強度以上である。また、テストピースによるコンクリート圧縮試験により強度を確認した後に、一般支保工46を取り外す。この期間は通常、コンクリート打設後中3日程度である。 After the concrete placement, after a predetermined period of time, the general support work 46 is removed while leaving the specific support work 47 in an incompletely cured state. This period is a period previously obtained by calculation based on the above examination results, and the concrete strength is equal to or higher than a predetermined strength. Further, after confirming the strength by a concrete compression test using a test piece, the general support 46 is removed. This period is usually about 3 days after placing concrete.
一般支保工46の取り外しの際のコンクリートの所定強度、すなわち、不完全養生状態でのコンクリート強度は、圧縮強度が単位平方mm当たり13N以上が望ましい。このような状態で行うことにより、コンクリートの破損を防ぐことができる。 As for the predetermined strength of the concrete when the general support 46 is removed, that is, the concrete strength in the incomplete curing state, the compressive strength is desirably 13 N or more per unit square mm. By carrying out in such a state, breakage of concrete can be prevented.
このとき、根太44a及び大引44bは、一般支保工46によって支えられているので、一般支保工46を取り外すことにより取り外しが可能である。
さらに、型枠27も取り外す。スラブ用型枠30については、異形型枠36aが特定支保工47により支持されており、特定支保工47を取り外さないと異形型枠36aを取りはずことが出来ないが、異形型枠36a以外のスラブ用型枠27については、根太44aを取り外すことにより取り外しが可能である。そして、異形型枠36a以外のスラブ用型枠27を取り外す。
At this time, since the joists 44a and the large pull 44b are supported by the general support 46, the general support 46 can be removed.
Furthermore, the formwork 27 is also removed. As for the slab mold 30, the deformed form 36a is supported by the specific support 47, and the deformed form 36a cannot be removed unless the specific support 47 is removed. The slab mold 27 can be removed by removing the joists 44a. Then, the slab mold 27 other than the deformed mold 36a is removed.
このようにして、根太44a、大引44b、一般支保工46及び異形型枠36a以外の型枠27を取り外すと、コンクリート構造体1の床部9は、特定支保工47により支えられる。また、型枠27は、異形型枠36aのみとなる。 In this way, when the formwork 27 other than the joists 44a, the large pull 44b, the general support work 46, and the deformed formwork 36a is removed, the floor portion 9 of the concrete structure 1 is supported by the specific support work 47. Further, the mold 27 is only the deformed mold 36a.
従来技術では、設計強度に達するまで約4週間程度養生させて型枠27及び支保工45を取り外していたが、本実施形態では、コンクリート打設後、短期間でほとんどの型枠27及び一般支保工46を取り外すことができる。
また、特定支保工47により支持しているスラブ用型枠30は、特定支保工47を取り外すまで、取り外すことができないが、このスラブ用型枠30は異形型枠36aであり、後述するように、上階でスラブ用型枠30を再度使用する際に、定形型枠35をそのまま使用することができる。特定支保工47の取り外しは、床部9が設計強度に達した後に行われる。さらに、異形型枠36aは、定形型枠35に比べて小さく、他の異形型枠36に比べて小さいので、後述するように、仕上げ工程などの次工程の作業の際に邪魔になりにくい。
In the prior art, the mold 27 and the support 45 are removed after curing for about 4 weeks until the design strength is reached. However, in this embodiment, most of the mold 27 and general support in a short period of time after placing the concrete. The work 46 can be removed.
Further, the slab mold 30 supported by the specific support 47 cannot be removed until the specific support 47 is removed. However, the slab mold 30 is a deformed mold 36a, which will be described later. When the slab formwork 30 is used again on the upper floor, the fixed formwork 35 can be used as it is. The removal of the specific support 47 is performed after the floor portion 9 reaches the design strength. Furthermore, the deformed mold 36a is smaller than the fixed mold 35 and smaller than the other deformed molds 36. Therefore, as described later, the deformed mold 36a is not easily disturbed during the next process such as a finishing process.
そして、2階の床スラブ10の上側に、2階部分の柱11及び壁部12と、2階部分の柱11及び壁部12の上側に位置する3階の床のスラブ10を、1階部分と同様に、型枠27を用いコンクリートを打設して形成する。
一般支保工46、型枠27及び型枠保持材44(根太44a、大引44b)は、1階部分で使用して取り外したものをそのまま直上階で用いることができるので、1セットあればよく、仮置きの場所も不要である。
Then, on the upper side of the second-story floor slab 10, the second-story column 11 and wall 12, and the third-story floor slab 10 located above the second-story column 11 and wall 12 are placed on the first floor. Similarly to the portion, concrete is cast using the formwork 27.
The general support 46, the formwork 27, and the formwork holding material 44 (the joists 44a and the large draw 44b) can be used on the first floor as they are and removed from the first floor. No temporary place is required.
このとき、スラブ10に上記しただめ穴が設けられている場合には、下階で使用した一般支保工46、型枠27及び型枠保持材44を上階に持ち上げて、上階での作業にすぐに用いることができる。
したがって、一般支保工46などについては、クレーンなどにより荷揚げを行う必要が無く、従来技術で必要であった、各階に設けられる一般支保工46用の荷揚げ用のステージは不要となる。
At this time, when the slab 10 is provided with the above-mentioned dead hole, the general support 46, the formwork 27, and the formwork holding material 44 used on the lower floor are lifted to the upper floor, and the work on the upper floor is performed. Can be used immediately.
Accordingly, it is not necessary to unload the general support 46 using a crane or the like, and the unloading stage for the general support 46 provided on each floor, which is necessary in the prior art, is unnecessary.
3階より上側も同様に、コンクリートを打設して形成し、最上階まで行う。そして、コンクリート構造体1が完成する。 In the same way above the 3rd floor, concrete is cast and formed up to the top floor. And the concrete structure 1 is completed.
図8は、コンクリート構造体1を施工する際の支保工45の使用状況を示した図である。1階部分のコンクリートを流し込んで、一般支保工46を取り外すまでは、図8(a)の状態であり、一般支保工46及び特定支保工47によりコンクリート構造体1が支えられている。そして、所定の期間の後、一般支保工46及び型枠27を外して2階部分で組み立てる。このとき、1階部分の特定支保工47をそのままとして、2階部分の特定支保工47は別のものを用いる。そして、2階部分のコンクリートを流し込む。この状態が図8(b)の状態である。 FIG. 8 is a view showing a usage situation of the support work 45 when the concrete structure 1 is constructed. Until the concrete on the first floor is poured and the general support 46 is removed, the state shown in FIG. 8A is maintained, and the concrete structure 1 is supported by the general support 46 and the specific support 47. And after a predetermined period, the general support 46 and the formwork 27 are removed, and it assembles in the 2nd floor part. At this time, the specific support 47 on the first floor is used as it is, and another specific support 47 on the second floor is used. Then pour the concrete on the second floor. This state is the state of FIG.
さらに、3階部分及び4階部分のコンクリート構造体1も同様にして形成し、図8(c)の状態から図8(d)の状態となる。そして、4階部分に用いる特定支保工47は、1階部分で用いた特定支保工47を用いることができる。
したがって、コンクリート構造体1の施工段階では、特定支保工47は三階分(3セット)が用いられて行われる。
Further, the concrete structures 1 of the third floor portion and the fourth floor portion are formed in the same manner, and the state shown in FIG. 8 (c) is changed to the state shown in FIG. 8 (d). The specific support 47 used for the fourth floor can be the specific support 47 used for the first floor.
Therefore, at the construction stage of the concrete structure 1, the specific support 47 is performed using three floors (three sets).
なお、特定支保工47の取り外しの際には、従来技術の方法における全ての支保工45を取り外す際と同様に、コンクリート強度が設計上の強度となっているか確認した後に取り外すものである。したがって、本実施形態のコンクリート打設から特定支保工47の取り外しが可能となる期間と、従来技術の方法のコンクリート打設から支保工45の取り外しが可能となる期間はほぼ同じである。 When the specific support 47 is removed, it is removed after confirming that the concrete strength is the design strength as in the case of removing all the supports 45 in the conventional method. Therefore, the period during which the specific support 47 can be removed from the concrete placement according to the present embodiment is substantially the same as the period during which the support 45 can be removed from the concrete placement according to the conventional technique.
本発明の実施形態によれば、一般支保工46及び型枠27をコンクリートを打設から短期間で取り外しができ、サイクル期間の短縮が可能であるので、仕上げ工程などの次工程の作業が可能となり、例えば、コンクリート壁の表面処理、サッシの取り付け、ダクトの取り付け、電気配線、ユニットバスなどの搬入、間仕切り壁の造作などが早期に開始でき、躯体工事と仕上げ工事の時間差の短縮により、施工期間の短縮が図ることができ、また仕上げ工程の期間を確保することができる。 According to the embodiment of the present invention, the general support 46 and the formwork 27 can be removed from the concrete placement in a short period of time, and the cycle period can be shortened, so that the next process such as the finishing process can be performed. For example, surface treatment of concrete walls, installation of sashes, installation of ducts, electrical wiring, delivery of unit baths, construction of partition walls, etc. can be started at an early stage, and construction can be carried out by shortening the time difference between frame construction and finishing work. The period can be shortened and the period of the finishing process can be secured.
1階部分で用いた特定支保工47を、4階部分で用いる際に、クレーンなどにより荷揚げを行う必要があり、各階に荷揚げ用のステージが必要となる。仕上げ工程で用いる材料の搬入に用いるステージを、仕上げ工程で用いる材料の搬入後に、用いることができるので、特定支保工47用のステージを作らなくても作業することができる。 When the specific support 47 used in the first floor portion is used in the fourth floor portion, it is necessary to unload with a crane or the like, and a stage for unloading is required on each floor. Since the stage used for carrying in the material used in the finishing process can be used after carrying in the material used in the finishing process, the work can be performed without making a stage for the specific support 47.
上記したコンクリート構造体1の施工方法は、以下のような利点がある。
まず、一般支保工46、特定支保工47で支えられていない型枠27及び型枠保持材44は、コンクリートの打ち込みから短期間で取り外すことができるので、直上階の作業に使用でき、これら資材は一セットあればよい。したがって、だめ穴を用いることにより、クレーンなどによる荷揚げが不要であり、それに伴う荷揚げ用ステージが不要となり、少ない資材で作業を行うことができる。
次に、特定支保工47と、特定支保工47で支えられている型枠27以外は、早い段階で取り外すことができるので、次工程の仕上げ工程を早く着手することができる。したがって、従来技術の工法に比べて、最上階や最上階付近の階の仕上げ工程の着手及び完了を早くすることができ、全体の工期を短縮することができる。また、型枠27の早期取り外しため使用していた早強コンクリートを使用しなくとも、型枠27の早期取り外しが可能となり、コスト低減を図ることができる。
また、型枠27の取り外し後のコンクリート部分の補修や修正を行うことが必要となる問題が発生した場合、型枠を早期に取り外すことができるので早期に問題を発見することができ、工期の遅れを最小限とすることができる。
The construction method of the concrete structure 1 described above has the following advantages.
First, the formwork 27 and the formwork holding material 44 that are not supported by the general support work 46 and the specific support work 47 can be removed in a short period of time from placing concrete. There is only one set. Therefore, by using the drain hole, it is not necessary to unload with a crane or the like, and the associated unloading stage is not necessary, so that work can be performed with less material.
Next, since the parts other than the specific support 47 and the formwork 27 supported by the specific support 47 can be removed at an early stage, the finishing process of the next process can be started quickly. Therefore, compared with the prior art method, it is possible to start and complete the finishing process on the top floor and the floors near the top floor, thereby shortening the entire construction period. Further, the early removal of the mold 27 is possible without using the early strong concrete that has been used for the early removal of the mold 27, and the cost can be reduced.
In addition, if a problem that requires repair or correction of the concrete part after removal of the formwork 27 occurs, the formwork can be removed early, so the problem can be discovered early, Delay can be minimized.
また、特定支保工47の設置は、一般支保工46と同時に設置しなくてもよく、一般支保工46の取り外しまでに行えばよい。 The specific support 47 may not be installed at the same time as the general support 46, and may be installed before the general support 46 is removed.
さらに、上記した実施形態では、スラブ用型枠30等の型枠27は、最後には取り外されるものであったが、型枠27をいわゆる「捨て型枠」としてコンクリート構造体1に取り付いた状態のままとして型枠27をコンクリート構造体1の一部とし、型枠27を取り外す工程の無いものでも適用することが出来る。
具体的には、鉄筋コンクリート板(RC板)をスラブ用型枠30として用いてコンクリートを打設し、前記スラブ用型枠30を取り外さないでそのまま残す工法や、スラブ用型枠30となる鉄板の上側にコンクリート構造体1の鉄筋を設けたものを用い、スラブ用型枠30を取り外さないでそのまま残す工法に用いることが出来る。なお、これらの工法は、「スラブ工業化工法」と呼ばれるものである。
Furthermore, in the above-described embodiment, the formwork 27 such as the slab formwork 30 is finally removed, but the state where the formwork 27 is attached to the concrete structure 1 as a so-called “disposal formwork”. The mold 27 can be used as a part of the concrete structure 1 without any process of removing the mold 27.
Specifically, concrete is cast using a reinforced concrete plate (RC plate) as a slab formwork 30 and the slab formwork 30 is left without being removed. The concrete structure 1 having reinforcing bars provided on the upper side can be used for a method of leaving the slab formwork 30 without removing it. These construction methods are called “slab industrialization methods”.
また、コンクリート構造体1のスラブ10の構造については、従来より用いられている他の構造を採用することができ、具体的には、中空ボイド、エスレンボイド、スパンクリート、アンボンドなどがある。 Moreover, about the structure of the slab 10 of the concrete structure 1, the other structure conventionally used can be employ | adopted, and there exist a hollow void, an slenoid void, a spun cleat, an unbond etc. specifically ,.
中空ボイドは、スラブ10の内部にパイプを配置して、コンクリートを打設し、スラブ10の内部に空間を有する構造である。エスレンボイドは、PCa(プレキャストコンクリート)板の上に樹脂発泡体を所定の間隔に配置して、コンクリートを打設して形成するものである。なお、この樹脂発泡体をあらかじめPC板に取り付けたものを用いても良い。
スパンクリートは、中空孔をもったPC板である。PC板とは鋼線を引っ張った状態でコンクリートを硬化させてコンクリートに圧縮応力を付与させた板のことであり、コンクリートに引張応力が加わった時の強度を大きくすることができる。
アンボンドは、放物線状に配置した鋼線を鉄筋の配筋と同時に配置してコンクリートを打設して硬化させ、専用ジャッキを使って鋼線を緊張させるものである。そうすることにより、放物線状に配置された鋼線によって、コンクリート構造体にプレストレスを与え、上向きの吊り上げ力を発揮することができる。
The hollow void is a structure in which a pipe is arranged inside the slab 10 and concrete is placed, and a space is provided inside the slab 10. An eslenoid is formed by placing a resin foam at a predetermined interval on a PCa (precast concrete) plate and casting concrete. In addition, you may use what attached this resin foam to the PC board previously.
The spun cleat is a PC plate having a hollow hole. The PC board is a board in which concrete is hardened with a steel wire pulled to impart compressive stress to the concrete, and the strength when tensile stress is applied to the concrete can be increased.
Unbonding is a method of placing a steel wire arranged in a parabolic shape at the same time as reinforcing bar placement, placing and hardening the concrete, and tensioning the steel wire using a special jack. By doing so, prestress can be given to a concrete structure by the steel wire arranged in the shape of a parabola, and upward lifting force can be exhibited.
本発明は、最小限の型枠や支保工を用い、施工期間の短縮が可能なコンクリート構造体の施工方法に用いることができる。 INDUSTRIAL APPLICABILITY The present invention can be used for a concrete structure construction method capable of shortening a construction period by using a minimum formwork and support work.
1 コンクリート構造体
9 床部
10 スラブ
27 型枠
30 スラブ用型枠
35 定形型枠
36、36a 異形型枠
44 型枠保持材
45 支保工
46 一般支保工
47 特定支保工
DESCRIPTION OF SYMBOLS 1 Concrete structure 9 Floor part 10 Slab 27 Formwork 30 Slab formwork 35 Fixed formwork 36, 36a Deformed formwork 44 Formwork holding material 45 Support work 46 General support work 47 Special support work
Claims (4)
下階で使用した一般支保工は直上階で使用するものであり、特定支保工で床部を支えている状態で一般支保工を取り外し、取り外した一般支保工を用いて直上階の型枠を支えてコンクリートを流し込み、別の特定支保工で当該直上階の床部を支えて一般支保工を取り外して施工することを特徴とするコンクリート構造体の施工方法。 A concrete structure that has a plurality of substantially horizontal floors above and below a concrete structure that is installed by placing a formwork and placing a support under the formwork to support the formwork and pour concrete into the formwork In the construction method described above, the support work is a general support work and a specific support work. The support is removed and the floor is supported by the specific support. After the concrete reaches the design strength, the specific support is removed.
The general support work used on the lower floor is used on the upper floor. Remove the general support work while supporting the floor with the specific support work, and use the removed general support work to form the form on the upper floor. A method for constructing a concrete structure, characterized in that concrete is supported and poured, and a general support work is removed and constructed by supporting the floor on the floor directly above by another specific support work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006111729A JP4204603B2 (en) | 2002-09-02 | 2006-04-14 | Construction method of concrete structure |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002256891 | 2002-09-02 | ||
JP2006111729A JP4204603B2 (en) | 2002-09-02 | 2006-04-14 | Construction method of concrete structure |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003308382A Division JP2004116281A (en) | 2002-09-02 | 2003-09-01 | Construction method for concrete structure |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2006226106A JP2006226106A (en) | 2006-08-31 |
JP2006226106A5 true JP2006226106A5 (en) | 2006-10-12 |
JP4204603B2 JP4204603B2 (en) | 2009-01-07 |
Family
ID=36987702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2006111729A Expired - Lifetime JP4204603B2 (en) | 2002-09-02 | 2006-04-14 | Construction method of concrete structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4204603B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130634A (en) * | 2019-05-20 | 2019-08-16 | 中国机械工业机械工程有限公司 | Umbrella shape high-supported formwork supporting arrangement and its assembly and disassembly methods |
CN111734031B (en) * | 2020-07-20 | 2020-11-27 | 烟台众诚新型建材科技有限公司 | Fast-assembling and fast-disassembling formwork system of building multi-ribbed structure and construction process thereof |
CN113530243B (en) * | 2021-08-10 | 2022-11-11 | 山西广业建设工程有限公司 | High-earthquake-resistance quick-installation steel structure floor bearing plate concrete multilayer synchronous pouring construction method |
-
2006
- 2006-04-14 JP JP2006111729A patent/JP4204603B2/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4204603B2 (en) | Construction method of concrete structure | |
WO2016020932A2 (en) | Deployable pre-fabricated reinforcement cage system | |
RU2558868C2 (en) | Prefabricated bearing structure of slab with beams | |
KR20120013739A (en) | Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab | |
JP2006226106A5 (en) | ||
KR102059435B1 (en) | Precast slab beam and rahmen structure construction method therewith | |
KR20200107332A (en) | The Simultaneous Construction Method for Wall and Slab of Building | |
KR101880813B1 (en) | A sandwitch pc pannel structure and construction method of structure using thereof | |
KR20100057293A (en) | Method for the continuous construction concrete wall using slide form | |
JP2019002140A (en) | Steel form for constructing base mortar and construction method of base mortar using the same | |
JPH1129910A (en) | Method for constructing concrete pier | |
KR102120426B1 (en) | The prefabricated double wall precast concrete | |
JP2004116281A (en) | Construction method for concrete structure | |
JP7455931B1 (en) | Precast board manufacturing method and precast board | |
JP7479228B2 (en) | Precast concrete slabs and method for constructing concrete structures | |
JPH07286393A (en) | Slab construction method using arched slab board | |
JP7572413B2 (en) | How to build a structure | |
CN219887348U (en) | Integrated steel bar mould-free cast-in-place concrete mould shell parapet | |
KR102310249B1 (en) | Slab structre to prevent noise between floors in apartments | |
KR20100033695A (en) | Multi tee slab for structure construction | |
KR102242175B1 (en) | Mold for prefabricated double wall precast concrete | |
KR20090022451A (en) | The underground wall body gang form and will reach and construction method of the underground wall body which it uses | |
CN110067305B (en) | Beam column joint structure and construction method thereof | |
KR100654822B1 (en) | A system and method of constructing the concret structure which is harded the buttom and wall | |
KR20090120289A (en) | Slab form for multi-layer structure and supporting method thereof |