JP2006209672A - Development machine assignment program and development machine management program - Google Patents

Development machine assignment program and development machine management program Download PDF

Info

Publication number
JP2006209672A
JP2006209672A JP2005023984A JP2005023984A JP2006209672A JP 2006209672 A JP2006209672 A JP 2006209672A JP 2005023984 A JP2005023984 A JP 2005023984A JP 2005023984 A JP2005023984 A JP 2005023984A JP 2006209672 A JP2006209672 A JP 2006209672A
Authority
JP
Japan
Prior art keywords
development machine
project
development
software
management information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005023984A
Other languages
Japanese (ja)
Inventor
Eiji Takahashi
英治 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2005023984A priority Critical patent/JP2006209672A/en
Publication of JP2006209672A publication Critical patent/JP2006209672A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a development machine assignment program performing optimum development machine assignment optimum for actuality in development machine common use, and to provide a development machine management program performing license management or use cost management of a development machine. <P>SOLUTION: When a retrieval condition is set and when use application of the development machine of a prescribed project is made, a development machine retrieval means 11a searches project management information 12a, development machine management information 12b, hardware management information 12c and software management information 12d using the retrieval condition as a key to extract the development machine and software suitable for the retrieval condition. A use cost estimation means 11b calculates a use cost estimate for using the extracted development machine and software. When they are presented to a project manager and when approval can be obtained, a development machine assignment means 11c decides certainty of the project. When the certainty is high, the development machine assignment means 11c assigns the development machine to the project, and updates the project management information 12a and the development machine management information 12b. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は開発機割当てプログラム及び開発機管理プログラムに関し、特に共同利用される複数の開発機をプロジェクトごとに割当てる開発機割当てプログラム及び割当てられた開発機を管理する開発機管理プログラムに関する。   The present invention relates to a development machine assignment program and a development machine management program, and more particularly to a development machine assignment program that assigns a plurality of development machines to be shared for each project and a development machine management program that manages the assigned development machines.

従来、メインフレームでアプリケーション開発を行う場合には、センターに開発機を設置し、クローズ運用によって複数の開発プロジェクトでひとつの開発機を利用する形態で開発が行われてきた。しかし、ダウンサイジングが進み、メインフレームからハードウェアやソフトウェアを組み合わせて構築されたシステムをターゲットとするようになってきた。このため、アプリケーション開発は、プロジェクトごとに仕様に合った開発機を必要とするようになった。   Conventionally, when developing an application on a mainframe, development has been performed in a form in which a development machine is installed in a center and one development machine is used in a plurality of development projects by closed operation. However, downsizing has progressed, and the system constructed by combining hardware and software from the mainframe has been targeted. For this reason, application development has required a development machine that meets the specifications for each project.

近年では、プロジェクトごとに開発機を購入すると開発コストが高くなり、さらに、開発終了後はこの開発機がほとんど利用されていないという観点から、開発機を組織全体で購入し、購入するより廉価な月額費用で開発期間だけプロジェクトで利用し、開発終了後には開発機を別のプロジェクトで再利用するケースが見受けられるようになった。   In recent years, purchasing a development machine for each project increases the development cost, and since the development machine is rarely used after completion of development, it is cheaper than purchasing the development machine for the entire organization and purchasing it. There are cases where the monthly fee is used for the project only during the development period, and the development machine is reused for another project after the end of development.

そこで、実施が確定したアプリケーション開発について、各ユーザに、ソフトウェアやハードウェアを含む開発用機器の割当てを行い、ライセンスに応じた課金を行う電子機器開発システムが提案されている(たとえば、特許文献1参照)。
特開2001−306775号公報(段落番号〔0025〕〜〔0073〕、図1)
In view of this, an electronic device development system has been proposed in which development devices including software and hardware are assigned to each user for application development that has been confirmed to be implemented, and charging is performed according to the license (for example, Patent Document 1). reference).
JP 2001-306775 A (paragraph numbers [0025] to [0073], FIG. 1)

しかし、従来の開発機の割当てでは最適な開発機選択が難しく、開発機の割当てが行われてからの管理が十分でないという問題点があった。
第1に、開発機の割当てや、新規購入などの際の基準がないため、オーバスペックの機器選定や不必要に長い開発期間の申請を抑止できないという問題がある。たとえば、プロジェクト計画段階では、開発工程計画が確定しておらず、プロジェクト管理者は開発機の確保のため、リスクを考慮してオーバスペックの開発機や、冗長度の高い開発期間を申請してしまいがちである。この申請に従って開発機の割当てを行うと、実際の開発工程とにずれが生じてしまい、開発機が有効活用されないことになる。また、開発機の中には、利用費用が若干割高になるが既に必要なソフトウェアのライセンスが購入されているものや、利用費用は安いがソフトウェアライセンスの購入が必要なものがある。このような場合、どちらを選択すべきかの基準はなく、最適な開発機選択がなされない場合があった。
However, it has been difficult to select an optimum development machine with the conventional assignment of development machines, and there is a problem that management after the assignment of development machines is not sufficient.
First, since there is no standard for assignment of development machines or new purchases, there is a problem that it is not possible to deter application of overspec equipment selection and an unnecessarily long development period. For example, at the project planning stage, the development process plan has not been finalized, and the project manager applies for an over-spec development machine or a highly redundant development period in consideration of risks in order to secure development machines. It tends to end up. If the development machines are assigned in accordance with this application, a deviation occurs from the actual development process, and the development machines are not effectively used. Some development machines have slightly higher usage costs but have already purchased necessary software licenses, while others have lower usage costs but require purchase of software licenses. In such a case, there is no standard for selecting which one, and there is a case where the optimum development machine is not selected.

第2に、期間変動する利用費用の実績をプロジェクト計画に反映できないという問題点がある。プロジェクトは長期に渡って進行するため、最初に算出した予算と実績にずれが生じる場合がある。特に、ハードウェア及びソフトウェアの利用費用は組織全体で購入したハードウェア及びソフトウェアの原価償却から算出しているため、利用状況に応じて期間変動してしまう。このため予算からずれてしまうが、差額の算出やプロジェクトの予算見直しなどは、プロジェクト管理者が行わなければならなかった。   Secondly, there is a problem that the actual cost of use that varies over time cannot be reflected in the project plan. Since the project proceeds over a long period of time, there may be a gap between the initially calculated budget and actual results. In particular, the usage cost of hardware and software is calculated from the cost amortization of hardware and software purchased by the entire organization, and therefore varies depending on the usage status. For this reason, it would deviate from the budget, but the project manager had to perform the difference calculation and project budget review.

第3に、開発機の利用時に、ソフトウェアの不正利用を防止することが難しいという問題がある。不正利用には、たとえば、正式提供版と同等の機能を有するが正式提供版前で無償のソフトウェアを利用している期間中に正式提供版が出荷された場合、正式提供版を購入しなければならないが、正式提供版前の無償のソフトウェアを継続して利用する場合がある。また、期間限定で利用可能なトライアルバージョンを利用し、期間が満了しても開発機の日付を有効期間内に戻すなどして、利用を継続するような場合もある。しかしながら、開発機割当て後のライセンス管理は行われていないため、このような不正利用を防止することができない。   Third, there is a problem that it is difficult to prevent unauthorized use of software when using the development machine. For unauthorized use, for example, if the officially provided version is shipped during the period of using free software before the officially provided version, the same function as the officially provided version must be purchased. However, free software before the official release version may continue to be used. In some cases, a trial version that can be used for a limited period of time is used, and even if the period expires, the date of the development machine is returned to the valid period, and the use is continued. However, since license management after development machine assignment is not performed, such unauthorized use cannot be prevented.

本発明はこのような点に鑑みてなされたものであり、開発機共同利用における実際に則した最適な開発機割当てを行う開発機割当てプログラム及び開発機のライセンス管理や利用費用管理などを行う開発機管理プログラムを提供することを目的とする。   The present invention has been made in view of the above points, and a development machine allocation program for performing optimal allocation of development machines in accordance with actual use in development machine shared use, and development for performing development machine license management, usage cost management, and the like. The purpose is to provide a machine management program.

本発明では上記課題を解決するために、図1に示すような処理をコンピュータに実行させるための開発機割当てプログラムが提供される。本発明にかかる開発機割当てプログラムは、開発機管理サーバ10に適用され、コンピュータを開発機検索手段11a、利用費用見積り手段11b及び開発機割当て手段11cとして機能させる。開発機に関する管理情報を格納する開発機管理情報部12は、プロジェクト及び開発機に関する管理情報を記憶する記憶装置で、既に開発機が割当てられたプロジェクトに関するプロジェクト管理情報12a、開発機が具備するソフトウェアに関する開発機管理情報12b、開発機のハードウェア仕様に関するハードウェア管理情報12c、及び利用可能なソフトウェアに関するソフトウェア管理情報12dが格納される。   In order to solve the above-described problems, the present invention provides a development machine assignment program for causing a computer to execute the process shown in FIG. The development machine allocation program according to the present invention is applied to the development machine management server 10, and causes the computer to function as the development machine search means 11a, the usage cost estimation means 11b, and the development machine allocation means 11c. The development machine management information unit 12 that stores management information related to the development machine is a storage device that stores management information related to the project and the development machine. The project management information 12a related to the project to which the development machine has already been assigned, and the software included in the development machine. Development machine management information 12b, hardware management information 12c related to the hardware specifications of the development machine, and software management information 12d related to available software.

開発機検索手段11aは、プロジェクトで利用する開発機の利用期間、ハードウェア仕様、必要なソフトウェアを含む検索条件が設定されると、検索条件をキーとして、プロジェクト管理情報12a、開発機管理情報12b、ハードウェア管理情報12c及びソフトウェア管理情報12dを検索し、検索条件に適合する開発機を抽出する。利用費用見積り手段11bは、開発機検索手段によって抽出された開発機について、ハードウェア管理情報12cの利用料及びソフトウェア管理情報12dの利用料に基づき、利用費用の見積りを算出する。開発機割当て手段11cは、抽出された開発機の利用が承認されると、プロジェクトの確実度が判定され、確実度が高い場合には、プロジェクトに開発機を割当て、プロジェクト管理情報12aに登録する。   When a search condition including a usage period of a development machine used in a project, hardware specifications, and necessary software is set, the development machine search means 11a uses the search condition as a key to project management information 12a and development machine management information 12b. Then, the hardware management information 12c and the software management information 12d are searched, and a development machine that matches the search condition is extracted. The usage cost estimation unit 11b calculates an estimation of the usage cost for the development machine extracted by the development machine search unit based on the usage fee of the hardware management information 12c and the usage fee of the software management information 12d. When the use of the extracted development machine is approved, the development machine assignment unit 11c determines the certainty of the project, and when the certainty is high, assigns the development machine to the project and registers it in the project management information 12a. .

このような開発機割当てプログラムによりコンピュータは、以下の処理手順を実行する。管理者によりプロジェクトで利用する開発機の利用期間、ハードウェア仕様及び必要なソフトウェアが設定されると、開発機検索手段11aは、プロジェクト管理情報12a、開発機管理情報12b、ハードウェア管理情報12c及びソフトウェア管理情報12dを検索し、検索条件に適合する開発機を抽出する。続いて、利用費用見積り手段11bは、ハードウェア管理情報12cの開発機の利用料及びソフトウェア管理情報12dのソフトウェア利用料に基づき、抽出された開発機の利用費用の見積りを算出する。開発機割当て手段11cは、抽出された開発機が承認されると、プロジェクトの確実度が高い場合のみ、このプロジェクトに抽出された開発機を割当て、プロジェクト管理情報12aに登録する。   The computer executes the following processing procedure by such a development machine assignment program. When the administrator sets the usage period of the development machine used in the project, hardware specifications, and necessary software, the development machine search means 11a includes the project management information 12a, the development machine management information 12b, the hardware management information 12c, The software management information 12d is searched, and a development machine that matches the search condition is extracted. Subsequently, the usage cost estimation unit 11b calculates the estimated usage cost of the extracted development machine based on the usage fee of the development machine of the hardware management information 12c and the software usage charge of the software management information 12d. When the extracted development machine is approved, the development machine assignment unit 11c assigns the development machine extracted to this project and registers it in the project management information 12a only when the certainty of the project is high.

また、上記課題を解決するために、プロジェクトごとに割当てられ、共同利用される開発機を管理する開発機管理プログラムにおいて、コンピュータを、所定のタイミングで、既に前記開発機が割当てられたプロジェクトとのその利用期間に関するプロジェクト管理情報から利用期間の終了年月日が過ぎた前記プロジェクトを検索し、前記開発機が具備するソフトウェアの利用期間とライセンスキーを含む開発機管理情報を検索して前記プロジェクトに割当てられた前記ソフトウェアのライセンスキーを抽出し、該当の前記開発機のライセンス登録削除手段に対し、抽出された前記ソフトウェアのライセンスキーを削除するように要請するとともに、前記プロジェクト管理情報から利用期間の開始年月日に到達した前記プロジェクトを検索し、前記開発管理情報を検索して前記ソフトウェアのライセンスキーを抽出し、該当の前記開発機の前記登録削除手段に対し、抽出された前記ソフトウェアのライセンスキーを登録するように要請するライセンス管理手段、として機能させることを特徴とする開発機管理プログラム、が提供される。   Further, in order to solve the above problems, in a development machine management program for managing a development machine that is allocated for each project and used jointly, the computer is connected to the project that has already been assigned the development machine at a predetermined timing. The project whose usage period has ended is searched from the project management information related to the usage period, and the development machine management information including the usage period of the software included in the development machine and the license key is searched for the project. The license key of the assigned software is extracted, and the license registration deletion unit of the corresponding development machine is requested to delete the extracted license key of the software, and the usage period is determined from the project management information. Search for the project that reached the start date A license management unit that searches the development management information to extract a license key of the software and requests the registration deletion unit of the development machine to register the extracted license key of the software; A development machine management program characterized by functioning is provided.

このような開発機管理プログラムによりコンピュータは、以下の処理手順を実行する。所定のタイミングで、プロジェクト管理情報から利用期間の終了年月日が過ぎたプロジェクトと、利用期間の開始年月日に到達したプロジェクトを検索する。そして、終了年月日が過ぎたプロジェクトに対応する開発機に与えられたソフトウェアのライセンスキーを削除するように開発機に要請する。また、開始年月日に到達したプロジェクトに対応する開発機に利用可能となったソフトウェアのライセンスキーを登録する。   With such a development machine management program, the computer executes the following processing procedure. At a predetermined timing, a project whose usage period end date has passed and a project that has reached the usage date start date are searched from the project management information. Then, the development machine is requested to delete the software license key given to the development machine corresponding to the project whose end date has passed. Also, register the license key of the software that can be used for the development machine corresponding to the project that has reached the start date.

本発明では、開発機利用の申請があった場合、検索条件を用いて複数の管理情報を検索し、適合する開発機を抽出し、利用費用の見積りを算出するが、実際の割当ては、プロジェクトの確実度を判定し、確実度が高い場合のみ行う。これにより、プロジェクトがほぼ確定した適切なタイミングで、適切な開発機の選定及び利用期間の設定を行うことができる。なぜなら、プロジェクトの確実度が高い場合には、開発機に必要な仕様や利用期間が明確になっているからである。この結果、オーバスペックや不必要な開発機利用期間の設定を防止しすることが可能となり、開発機の有効利用が行え、かつその開発機の利用費用の見積り精度が向上する。また、利用期間の開始と終了をチェックし、利用期間内でのみ利用可能なソフトウェアのライセンスキーの登録と削除を開発機に指示する。これにより、ライセンスキーの登録と削除が自動的に管理され、ソフトウェアの不正利用を防止することができる。   In the present invention, when there is an application for the use of a development machine, a plurality of management information is searched using a search condition, a suitable development machine is extracted, and an estimate of the usage cost is calculated. This is done only when the certainty is high and the certainty is high. This makes it possible to select an appropriate development machine and set the usage period at an appropriate timing when the project is almost finalized. This is because when the project is highly reliable, the specifications and usage period required for the development machine are clear. As a result, it is possible to prevent the setting of an overspec and an unnecessary development machine usage period, the development machine can be used effectively, and the estimation accuracy of the usage cost of the development machine is improved. It also checks the start and end of the usage period, and instructs the development machine to register and delete license keys for software that can only be used within the usage period. Thereby, registration and deletion of the license key are automatically managed, and unauthorized use of the software can be prevented.

以下、本発明の実施の形態を図面を参照して説明する。まず、実施の形態に適用される発明の概念について説明し、その後、実施の形態の具体的な内容を説明する。
図1は、本発明の原理図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. First, the concept of the invention applied to the embodiment will be described, and then the specific contents of the embodiment will be described.
FIG. 1 is a principle diagram of the present invention.

本発明にかかる開発機管理システムでは、開発機の割当てと管理を行う開発機管理サーバ10が、ネットワークを介して、開発機1(20a)から開発機N(20b;Nは任意の整数)、プロジェクト予算管理サーバ30、プロジェクト管理者端末40及びサーバ管理者端末50と接続する。   In the development machine management system according to the present invention, the development machine management server 10 for assigning and managing development machines, via the network, the development machine 1 (20a) to the development machine N (20b; N is an arbitrary integer), The project budget management server 30, the project manager terminal 40, and the server manager terminal 50 are connected.

開発機管理サーバ10は、開発機の割当てを行う開発機割当て処理部11、開発機に関する情報を保持する開発機管理情報部12、開発機のライセンス監視を行うライセンス監視処理部13を有する。開発機管理サーバ10では、開発機割当て処理部11が、プロジェクト管理者から検索条件を設定されると、開発機管理情報部12の有する情報に基づいて検索条件の妥当性をチェックし、開発機の割当てを行う。そして、ライセンス監視処理部13は、開発機のライセンスの管理と監視を行う。   The development machine management server 10 includes a development machine assignment processing unit 11 that assigns development machines, a development machine management information part 12 that holds information related to development machines, and a license monitoring processing unit 13 that monitors licenses for development machines. In the development machine management server 10, when the search condition is set by the development manager, the development machine allocation processing unit 11 checks the validity of the search condition based on information held by the development machine management information part 12, and develops the development machine. Assigns. The license monitoring processing unit 13 manages and monitors the license of the development machine.

開発機管理情報部12は、開発機及びプロジェクトに関する管理情報を記憶する記憶装置で、管理情報として、開発機が割当てられたプロジェクトに関するプロジェクト管理情報を設定したプロジェクト管理情報12a、開発機が具備するソフトウェアに関する開発機管理情報を設定した開発機管理情報12b、開発機のハードウェア仕様に関するハードウェア管理情報を設定したハードウェア管理情報12c及び利用可能なソフトウェアに関するソフトウェア管理情報を設定したソフトウェア管理情報12dがある。   The development machine management information unit 12 is a storage device that stores management information related to the development machine and the project. The development machine management information unit 12 includes project management information 12a in which project management information related to the project to which the development machine is assigned is set as management information. Development machine management information 12b in which development machine management information related to software is set, hardware management information 12c in which hardware management information related to hardware specifications of the development machine is set, and software management information 12d in which software management information related to available software is set There is.

プロジェクト管理情報12aには、プロジェクトを識別するプロジェクトオーダ番号ごとに、プロジェクトで開発機を利用する利用期間(開始年月日と終了年月日)、利用する開発機名、利用するソフトウェア名と利用開始日が設定される。これらの情報は、開発機がプロジェクトに割当てられるごとに、開発機割当て手段11cによって設定される。開発機管理情報12bには、開発機名ごとに、インストールされたソフトウェアの製品番号やライセンスキーなどのソフトウェア情報、割当てられたプロジェクトオーダ番号などが設定される。ライセンスキーは、正当な利用者に与えられるキーで、ライセンスキーを持たないとそのソフトウェアを利用することができない。ハードウェア管理情報12cには、開発機名ごとに、CPU、OS、メモリ及びディスクなど、開発機に装備されたハードウェア情報、その月額使用料、変更した場合の費用を算出する係数などが設定される。なお、OSはソフトウェアであるが、ハードウェアに依存するBIOSを含め、ハードウェア仕様に含める。ソフトウェア管理情報12dには、ソフトウェアの製品番号ごとに、バージョン、出荷状況、その月額使用料、利用期間ごとのライセンス購入に要する費用算出の係数及び変更した場合の費用を算出する係数などが設定される。各管理情報の詳細は後述する。   In the project management information 12a, for each project order number that identifies the project, the usage period (start date and end date) of using the development machine in the project, the name of the development machine to be used, the name of the software to be used and the usage The start date is set. These pieces of information are set by the development machine assignment means 11c every time a development machine is assigned to a project. In the development machine management information 12b, software information such as the product number and license key of the installed software, the assigned project order number, and the like are set for each development machine name. The license key is a key given to a legitimate user, and the software cannot be used without the license key. In the hardware management information 12c, the hardware information installed in the development machine, such as CPU, OS, memory, and disk, the monthly usage fee, the coefficient for calculating the cost when changed, etc. are set for each development machine name Is done. Note that although the OS is software, it is included in the hardware specifications, including the BIOS that depends on the hardware. In the software management information 12d, for each product number of software, the version, the shipping status, the monthly usage fee, the coefficient for calculating the cost for purchasing the license for each usage period, the coefficient for calculating the cost when changing, etc. are set. The Details of each management information will be described later.

開発機割当て処理部11は、開発機検索手段11a、利用費用見積り手段11b及び開発機割当て手段11cを具備する。
開発機検索手段11aは、プロジェクト管理者端末40から設定された開発機の検索条件(プロジェクトごとに割当てられるプロジェクトオーダ番号、開発機を利用する利用期間、プロジェクト計画の確実性、開発機の最低CPU能力、最低メモリ、最低ディスク、OS、必要なソフトウェア名とバージョン(V/L)など)に基づき、最初に検索条件が妥当であるかどうかを開発機利用期間とプロジェクトオーダ管理ファイル31と照合する。そして、妥当である場合には、開発機管理情報12b、ハードウェア管理情報12c及びソフトウェア管理情報12dを検索して検索条件に合致する開発機を検索する。なお、複数の開発機が検索された場合は、たとえば、それぞれの開発機の利用費用を月額単位で算出し、利用費用が最小の開発機を選択する。または、検索された開発機と利用費用をプロジェクト管理者に提示し、選択させるようにしてもよい。
The development machine allocation processing unit 11 includes development machine search means 11a, utilization cost estimation means 11b, and development machine allocation means 11c.
The development machine search means 11a is provided with the development machine search conditions set from the project manager terminal 40 (project order number assigned to each project, usage period for using the development machine, project plan certainty, minimum CPU of the development machine) Based on the capacity, minimum memory, minimum disk, OS, required software name and version (V / L), etc., first, check whether the search condition is valid against the development machine usage period and the project order management file 31. . If it is valid, the development machine management information 12b, the hardware management information 12c, and the software management information 12d are searched to search for a development machine that matches the search condition. When a plurality of development machines are searched, for example, the usage cost of each development machine is calculated on a monthly basis, and the development machine with the lowest usage cost is selected. Alternatively, the searched development machine and usage cost may be presented to the project manager for selection.

利用費用見積り手段11bは、開発機検索手段11aにより検索された開発機を利用するのに要する費用の見積りを行う。なお、ハードウェアやソフトウェアの利用費用など期間変動するものは、その時点の費用で算出する。また、既にプロジェクト管理情報12aに割当てが登録されているプロジェクトについて利用申請がされていた場合、変更に要する手数料を算出し、利用費用の見積りに加える。   The usage cost estimation unit 11b estimates the cost required to use the development machine searched by the development machine search unit 11a. Note that items that vary over time, such as hardware and software usage costs, are calculated using the costs at that time. Further, when a use application has been made for a project whose assignment is already registered in the project management information 12a, a fee required for the change is calculated and added to the estimate of the use cost.

開発機割当て手段11cは、プロジェクト管理者の承認が得られれば、プロジェクトが実行される確実度をチェックする。そして、実施が確定したプロジェクトであると判定されれば、検索された開発機を割当て、プロジェクト管理情報を含む関連ファイルを更新する。また、利用費用見積り手段11bの算出した利用費用が、プロジェクトオーダ管理ファイル31の計画予算を超えた場合、これをプロジェクト管理者に通知する。   The developer allocation unit 11c checks the certainty that the project will be executed if the approval of the project manager is obtained. If it is determined that the project has been confirmed to be implemented, the searched development machine is assigned and the related file including the project management information is updated. Further, when the usage cost calculated by the usage cost estimation means 11b exceeds the planned budget of the project order management file 31, this is notified to the project manager.

ライセンス監視処理部13は、ライセンスの管理を行うライセンス管理手段13aと、開発機の持つライセンスの監視を行う開発機監視手段13bを具備する。ライセンス管理手段13aは、利用期間終了の開発機とライセンスキーを検索し、該当するサーバのライセンス登録削除手段21a、21bに指示を出し、ライセンス情報23a、23bより該当のキーを削除させる。また、当日より利用開始となる開発機とライセンスキーを検索し、該当するソフトウェアを有する開発機のライセンス登録削除手段21a、21bを起動させ、ライセンス情報23a、23bにライセンスを登録させる。また、月初めなど、決められた期日であれば、開発機の当月度の利用費用を算出し、累計の実績開発機費用を算出する。さらに、最新見積りを更新し、プロジェクトオーダ管理ファイル31に設定される計画予算を超えた場合、これをプロジェクト管理者に通知する。開発機監視手段13bは、開発機1(20a)から開発機N(20b)のライセンス情報23a、23bに登録されたライセンスキーと、開発機管理情報12bのライセンスキーを照合することによって、未許可のライセンスキーが開発機側に登録されていないかを調べ、ソフトウェアの不正利用がないかどうかを監視する。ソフトウェアの不正利用を検出したら管理者に通知する。   The license monitoring processing unit 13 includes a license management unit 13a that manages licenses and a development machine monitoring unit 13b that monitors licenses of the development machine. The license management unit 13a searches for a development machine and a license key whose usage period has ended, issues an instruction to the license registration deletion unit 21a, 21b of the corresponding server, and deletes the corresponding key from the license information 23a, 23b. Further, the development machine and the license key that are to be used from the day are searched, and the license registration deletion means 21a, 21b of the development machine having the corresponding software is activated to register the license in the license information 23a, 23b. Also, if it is a fixed date such as the beginning of the month, the usage cost of the development machine for the current month is calculated, and the total actual development machine cost is calculated. Further, when the latest estimate is updated and the planned budget set in the project order management file 31 is exceeded, this is notified to the project manager. The development machine monitoring means 13b is not authorized by comparing the license key registered in the license information 23a, 23b of the development machine 1 (20a) to the development machine N (20b) with the license key of the development machine management information 12b. Check whether the license key is registered on the development machine side and monitor for unauthorized use of the software. If an unauthorized use of software is detected, notify the administrator.

開発機1(20a)から開発機N(20b)は、複数のプロジェクトが共同利用する開発機で、開発機管理サーバ10によって割当てと管理が行われる。開発機1(20a)、開発機N(20b)は、ライセンス登録削除手段21a、21b及びライセンス監視手段22a、22bと、ライセンス情報23a、23b及びソフトウェア24a、24bを記憶する記憶装置を具備する。   Development machines 1 (20 a) to N (20 b) are development machines shared by a plurality of projects, and are assigned and managed by the development machine management server 10. The development machine 1 (20a) and the development machine N (20b) include license storage / deletion units 21a and 21b and license monitoring units 22a and 22b, and storage devices that store license information 23a and 23b and software 24a and 24b.

ライセンス登録削除手段21a、21bは、開発機管理サーバ10のライセンス管理手段13aからの指示に従って、指示されたソフトウェアのライセンス登録を削除する。ライセンス監視手段22a、22bは、開発機監視手段13bからの指示に従って、ライセンス情報23a、23bに登録されるライセンス情報を読み出し、開発機監視手段13bに送信する。ライセンス情報23a、23bは、自装置が保持するソフトウェア24a、24bに関するライセンスキーが登録される。ソフトウェア24a、24bは、自装置にインストールされたソフトウェア群で、所定の記憶装置に保持される。   The license registration deletion means 21a, 21b deletes the license registration of the instructed software in accordance with the instruction from the license management means 13a of the development machine management server 10. The license monitoring means 22a and 22b read the license information registered in the license information 23a and 23b in accordance with the instruction from the development machine monitoring means 13b, and transmit the license information to the development machine monitoring means 13b. In the license information 23a and 23b, a license key related to the software 24a and 24b held by the own apparatus is registered. The software 24a, 24b is a software group installed in its own device, and is held in a predetermined storage device.

プロジェクト予算管理サーバ30は、プロジェクトごとの予算管理情報であるプロジェクトオーダ管理ファイル31を記憶装置に保持し、その管理を行う。プロジェクトオーダ管理ファイル31は、プロジェクト計画に関するプロジェクト計画情報であり、プロジェクトオーダ番号に関連付けて、プロジェクト名、開発計画期間、計画予算、これまでの実績の費用、実績をふまえた予算の最新見積りなどが設定される。   The project budget management server 30 holds a project order management file 31 that is budget management information for each project in a storage device, and manages it. The project order management file 31 is project plan information relating to a project plan, and is associated with a project order number, such as a project name, a development plan period, a plan budget, an actual cost, a latest estimate of a budget based on the actual result, and the like. Is set.

プロジェクト管理者端末40は、プロジェクト管理者が入力した指示をネットワーク経由で開発機割当て処理部11へ送信し、受信した処理結果をディスプレイに表示するなどしてプロジェクト管理者に通知する。   The project manager terminal 40 transmits an instruction input by the project manager to the development machine assignment processing unit 11 via the network, and notifies the project manager by displaying the received processing result on a display.

サーバ管理者端末50は、サーバ管理者に従って、開発機管理情報部12を構成するプロジェクト管理情報12a、開発機管理情報12b、ハードウェア管理情報12c及びソフトウェア管理情報12dを更新する。また、開発機監視手段13bの生成する開発機監視情報を取得し、サーバ管理者に提示する。   The server administrator terminal 50 updates the project management information 12a, the development device management information 12b, the hardware management information 12c, and the software management information 12d constituting the development device management information unit 12 according to the server administrator. Further, the development machine monitoring information generated by the development machine monitoring means 13b is acquired and presented to the server administrator.

このような構成の開発機管理システムの動作について説明する。まず、開発機割当て処理について説明する。
プロジェクト管理者端末40から開発機の検索条件が設定され、開発機の利用申請が行われると、開発機管理サーバ10は、開発機割当て処理部11を起動する。検索条件には、プロジェクトオーダ番号、利用期間、プロジェクト計画の確実性、ハードウェア仕様、必要なソフトウェア名とバージョンなどが設定されている。開発機検索手段11aは、プロジェクトオーダ番号に基づき、プロジェクトオーダ管理ファイル31から該プロジェクトの情報を抽出し、検索条件と照合する。たとえば、検索条件に設定された利用期間が、プロジェクトオーダ管理ファイル31に登録された開発期間内であるかなど、検索条件の妥当性をチェックする。妥当であれば、検索条件に従って、プロジェクト管理情報12a、開発機管理情報12b、ハードウェア管理情報12c及びソフトウェア管理情報12dを検索し、適合する開発機と必要なソフトウェアを抽出する。続いて、利用費用見積り手段11bは、抽出された開発機及び必要なソフトウェアを利用した場合の利用費用の見積りを算出する。見積りは、ハードウェア管理情報12cに開発機ごとに設定される月額利用料と、ソフトウェア管理情報12dにソフトウェアごとに設定される月額利用料を累計した値になる。
The operation of the development machine management system having such a configuration will be described. First, the development machine assignment process will be described.
When a search condition for a development machine is set from the project manager terminal 40 and a use application for the development machine is made, the development machine management server 10 activates the development machine allocation processing unit 11. The search condition includes a project order number, usage period, project plan certainty, hardware specifications, and required software name and version. Based on the project order number, the development machine search means 11a extracts the project information from the project order management file 31 and collates it with the search conditions. For example, the validity of the search condition is checked, for example, whether the usage period set in the search condition is within the development period registered in the project order management file 31. If appropriate, the project management information 12a, the development machine management information 12b, the hardware management information 12c, and the software management information 12d are searched according to the search conditions, and a suitable development machine and necessary software are extracted. Subsequently, the usage cost estimation unit 11b calculates an estimation of the usage cost when the extracted development machine and necessary software are used. The estimate is a cumulative value of the monthly usage fee set for each development machine in the hardware management information 12c and the monthly usage fee set for each software in the software management information 12d.

こうして検索条件に適合する開発機が検索され、その利用にともなう利用費用の見積りが算出される。開発機名と利用費用の見積りなどの情報は、プロジェクト管理者端末40に送られ、ここでディスプレイなどに表示され、プロジェクト管理者に通知される。プロジェクト管理者がこれを承認すると、プロジェクト管理者端末40から承認されたことが通知され、開発機割当て手段11cが起動する。   In this way, development machines that match the search conditions are searched, and an estimate of the usage costs associated with the use is calculated. Information such as the name of the development machine and the estimated usage cost is sent to the project manager terminal 40, where it is displayed on a display or the like and notified to the project manager. When the project manager approves this, it is notified from the project manager terminal 40 that the developer allocation unit 11c is activated.

開発機割当て手段11cは、検索条件に設定されたプロジェクトの確実度が高ければ、この開発機をプロジェクトに割当て、プロジェクト管理情報12a及び開発機管理情報12bの該当箇所を更新する。   If the certainty of the project set in the search condition is high, the development machine assigning means 11c assigns this development machine to the project and updates the corresponding part of the project management information 12a and the development machine management information 12b.

また、開発機の利用申請が、既に開発機割当て処理部11により処理され、プロジェクト管理情報12aに登録されたプロジェクトについて行われた場合、上記の手順と同様の処理が行われるが、利用費用の見積りにおいて、変更に要する手数料を算出し、利用費用に加算する。これは、開発機利用の申請を行うごとに手数料を取ることにより、開発工程が不確定のプロジェクトの開発機利用申請を抑止するためのものである。   In addition, when the application for use of the development machine is already processed by the development machine assignment processing unit 11 and performed for the project registered in the project management information 12a, the same processing as the above procedure is performed, In the estimation, the fee required for the change is calculated and added to the usage cost. This is to deter development machine use applications for projects whose development process is uncertain by taking a fee each time an application for use of development machines is made.

次に、開発機の管理と監視処理について説明する。
ライセンス監視処理部13では、たとえば、日付が変わったときなどのタイミングで、ライセンス管理手段13aが処理を開始する。ライセンス管理手段13aでは、プロジェクト管理情報12aの利用期間(開始年月日と終了年月日)を検索し、前日が終了年月日の開発機を抽出する。そして、その開発機のライセンス登録削除手段21a、21bに対し、ライセンス情報23a、23bに登録されるライセンスキーを削除するように要請する。また、本日が開始年月日の開発機のライセンス登録削除手段21a、21bに対し、ライセンス情報23a、23bに利用可能となるライセンスキーを登録するように要請する。要請が受け入れられれば、この開発機を再起動させ、ライセンスキーの登録を有効(削除の場合は無効)にする。また、ライセンスキーを登録した登録時、及び月初めなどの所定の期日に開発機のハードウェアとソフトウェアの利用費用の見積りを算出する。このとき、使用されるハードウェア管理情報12c及びソフトウェア管理情報12dの利用料に関する情報は、最新の値に更新されているとする。こうして算出された利用費用の見積りは、プロジェクトオーダ管理ファイル31の最新見積りに設定される。また、最新見積りをプロジェクトオーダ管理ファイル31に設定される計画予算と比較し、最新見積りが計画予算を超える場合は、管理者に通知する。
Next, development machine management and monitoring processing will be described.
In the license monitoring processing unit 13, for example, the license management unit 13a starts processing at a timing such as when the date changes. The license management means 13a searches the usage period (start date and end date) of the project management information 12a, and extracts the development machine whose end date is the previous day. Then, it requests the license registration deletion means 21a, 21b of the development machine to delete the license key registered in the license information 23a, 23b. Further, the license registration deletion unit 21a, 21b of the development machine whose start date is today is requested to register the license key that can be used in the license information 23a, 23b. If the request is accepted, this development machine is restarted and the license key registration is enabled (in case of deletion). In addition, an estimate of the usage cost of the hardware and software of the development machine is calculated at the registration date when the license key is registered and at a predetermined date such as the beginning of the month. At this time, it is assumed that the information regarding the usage fee of the hardware management information 12c and the software management information 12d used is updated to the latest value. The usage cost estimate thus calculated is set to the latest estimate in the project order management file 31. Further, the latest estimate is compared with the planned budget set in the project order management file 31, and if the latest estimate exceeds the planned budget, the administrator is notified.

開発機監視手段13bは、所定のタイミングで開発機1(20a)から開発機N(20b)のライセンス監視手段22a、22bに対し、ライセンス情報23a、23bに設定されるライセンスキーの読み出しを要求する。そして、読み出されたライセンスキーが、該当するプロジェクトの開発機管理情報12bに登録されているかどうかを判定する。登録されていない場合は、未許可のライセンスキーである可能性が高いので、サーバ管理者に通知する。また、このとき、開発機の時刻情報を取得し、時刻が所定の時間以上ずれていれば、これもサーバ管理者に通知する。なお、これは、開発機の時刻を前に戻し、ライセンスキーの期限に到達していないように開発機に判断させるために行われる不正操作を知らせるものである。   The development machine monitoring means 13b requests the license monitoring means 22a and 22b of the development machine N (20b) from the development machine 1 (20a) to read out the license key set in the license information 23a and 23b at a predetermined timing. . Then, it is determined whether or not the read license key is registered in the development machine management information 12b of the corresponding project. If it is not registered, there is a high possibility that it is an unauthorized license key, so the server administrator is notified. At this time, the time information of the development machine is acquired, and if the time is shifted by a predetermined time or more, this is also notified to the server administrator. This informs of an unauthorized operation performed to return the time of the development machine to the previous time and cause the development machine to determine that the expiration date of the license key has not been reached.

このように、開発プロジェクトの計画が進行していない状態(確実度が低い状態)では、開発機とソフトウェアの選択と、その利用費用の見積りを実行し、割当ては行わない。開発機の割当ては、確実度の高いプロジェクトに対してのみ行うことにより、プロジェクトが実行されるかどうかに関わらず、開発機を仮押さえすることを防止する。また、確実度の高いプロジェクトのみ割当てを行うことにより、実行が確実かつ計画が明確なプロジェクトのみに割当てが行われ、開発機の有効利用ができ、かつ利用費用の見積りの精度を向上させることができる。   As described above, when the development project plan is not progressing (low certainty), the development machine and software are selected and the usage cost is estimated, and the allocation is not performed. By assigning development machines only to projects with a high degree of certainty, it is possible to prevent the development machines from being temporarily held regardless of whether the projects are executed or not. In addition, by assigning only projects with a high degree of certainty, assignment can be made only to projects that are surely executed and the plan is clear, so that the development machine can be used effectively and the accuracy of estimation of usage costs can be improved. it can.

一方、ライセンスキー登録時や、所定の期日ごとに利用費用の見積りを算出することにより、開発機利用実績と連動してプロジェクト予算への実績反映が可能となり、開発機に関するプロジェクト予算の管理が適切に行える。また、算出された最新見積りが計画予算を超える場合には、これをサーバ管理者に通知することによって、プロジェクトの計画予算の見直しを適宜行うことが可能となる。   On the other hand, when the license key is registered or an estimated usage cost is calculated for each specified date, the project budget can be reflected in the project budget in conjunction with the development machine usage record, and the project budget related to the development machine can be managed appropriately. Can be done. In addition, when the calculated latest estimate exceeds the planned budget, it is possible to appropriately review the planned budget of the project by notifying the server administrator of this.

また、開発機へのライセンスキーの登録と削除を自動的に行うため、従来行ってきた作業を軽減することができる。さらに、不定期に各開発機のライセンス情報23a、23bをチェックし、許可されていないライセンスキーがある時は、サーバ管理者に通知することにより、ソフトウェアの不正利用を防止することができる。   In addition, since the license key is automatically registered and deleted from the development machine, the conventional work can be reduced. Further, it is possible to prevent unauthorized use of software by checking the license information 23a and 23b of each development machine irregularly and notifying the server administrator when there is an unauthorized license key.

以下、実施の形態を図面を参照して詳細に説明する。図2は、実施の形態の開発機管理システムの構成図である。
本発明の実施の形態の開発機管理システムは、ネットワーク600を介して、開発機管理サーバ100、SUN1(201)、SUN2(202)、SUN3(203)、・・・、SUN9(209)により構成される開発機サーバ群200、プロジェクト予算管理サーバ300、プロジェクト管理者端末400及びサーバ管理者端末500が接続する。
Hereinafter, embodiments will be described in detail with reference to the drawings. FIG. 2 is a configuration diagram of the development machine management system according to the embodiment.
The development machine management system according to the embodiment of the present invention includes a development machine management server 100, SUN1 (201), SUN2 (202), SUN3 (203),..., SUN9 (209) via a network 600. The development machine server group 200, the project budget management server 300, the project manager terminal 400, and the server manager terminal 500 are connected.

開発機管理サーバ100は、開発機の割当て処理を行う開発機割当て処理部110と開発機の管理処理を行うライセンス管理処理部130、プロジェクト管理ファイル121、開発機管理ファイル122、ハードウェア管理ファイル123及びソフトウェア管理ファイル124を具備する開発機管理情報部120を有する。開発機管理サーバ100は、プロジェクト管理者端末400から入力する開発機の利用申請に応じて開発機を検索し、これをプロジェクトに割当てる処理を行う。また、開発機のライセンス管理、所定のタイミングにおける利用費用の見積りなどを行い、必要があればプロジェクト管理者端末400またはサーバ管理者端末500に通知を行う。   The development machine management server 100 includes a development machine allocation processing unit 110 that performs development machine allocation processing, a license management processing unit 130 that performs development machine management processing, a project management file 121, a development machine management file 122, and a hardware management file 123. And a development machine management information unit 120 having a software management file 124. The development machine management server 100 searches for a development machine according to the application for use of the development machine input from the project manager terminal 400 and performs a process of assigning it to the project. In addition, the license management of the development machine, the estimation of the usage cost at a predetermined timing, and the like are performed, and if necessary, the project manager terminal 400 or the server manager terminal 500 is notified.

開発機サーバ群200は、ハードウェア構成やインストール済みのソフトウェアの構成がそれぞれ異なる複数のサーバで構成される。各開発機サーバは、開発機管理サーバ100の割当てに基づいて、各プロジェクトの開発に利用される。開発機管理サーバ100によって、利用期間の開始日には、必要なソフトウェアがインストールされ、ライセンスキーが登録されて使用可能にされ、利用期間の終了日には、ライセンスキーが削除されて使用不可能になる。また、開発機管理サーバ100からの指令に応じて、自装置が保持するライセンスキーの読み出しや、ライセンスキーの登録と削除処理を行う。   The development machine server group 200 includes a plurality of servers having different hardware configurations and installed software configurations. Each development machine server is used for development of each project based on the assignment of the development machine management server 100. The development machine management server 100 installs necessary software on the start date of the usage period, registers the license key to be usable, and deletes the license key on the end date of the usage period and cannot be used. become. Further, in response to a command from the development machine management server 100, the license key held by the own apparatus is read, and the license key is registered and deleted.

プロジェクト予算管理サーバ300は、プロジェクトの予算を管理するサーバで、プロジェクト計画情報として、プロジェクトごとに計画予算や実績などが設定されるプロジェクトオーダ管理ファイル310を保持する。   The project budget management server 300 is a server that manages a project budget, and holds a project order management file 310 in which a plan budget, actual results, etc. are set for each project as project plan information.

プロジェクト管理者端末400及びサーバ管理者端末500は、それぞれの管理者からの指令を開発機管理サーバ100に通知するとともに、開発機管理サーバ100から受信した情報をそれぞれの管理者に通知する。   The project manager terminal 400 and the server manager terminal 500 notify the development machine management server 100 of commands from the respective managers, and notify the respective managers of information received from the development machine management server 100.

ところで、開発機管理サーバ100は、開発機の割当てとその管理を行うためのデータ処理機能を有している。図3は、本実施の形態の開発機管理サーバのハードウェア構成例を示すブロック図である。   Incidentally, the development machine management server 100 has a data processing function for assigning and managing development machines. FIG. 3 is a block diagram illustrating a hardware configuration example of the development machine management server according to the present embodiment.

開発機管理サーバ100は、CPU(Central Processing Unit)101によって装置全体が制御されている。CPU101には、バス107を介してRAM(Random Access Memory)102、ハードディスクドライブ(HDD:Hard Disk Drive)103、グラフィック処理装置104、入力インタフェース105、通信インタフェース106が接続されている。   The entire development machine management server 100 is controlled by a CPU (Central Processing Unit) 101. A random access memory (RAM) 102, a hard disk drive (HDD) 103, a graphic processing device 104, an input interface 105, and a communication interface 106 are connected to the CPU 101 via a bus 107.

RAM102には、CPU101に実行させるOS(Operating System)のプログラムやアプリケーションプログラムの少なくとも一部が一時的に格納される。また、RAM102には、CPU101による処理に必要な各種データが格納される。HDD103には、OSやアプリケーションのプログラムが格納される。グラフィック処理装置104には、モニタ108が接続されており、CPU101からの命令に従って画像をモニタ108の画面に表示させる。入力インタフェース105には、キーボード109aやマウス109bが接続されており、キーボード109aやマウス109bから送られてくる信号を、バス107を介してCPU101に送信する。なお、モニタ108、キーボード109a、マウス109bなどのユーザインタフェースは、ネットワーク600を介して接続する端末装置側で具備し、ネットワーク600を介してデータの入出力を行うとし、開発機管理サーバ100で具備しない構成としてもよい。通信インタフェース106は、ネットワーク600に接続されており、ネットワーク600を介して開発機及び管理者端末装置との間でデータの送受信を行う。   The RAM 102 temporarily stores at least part of an OS (Operating System) program and application programs to be executed by the CPU 101. The RAM 102 stores various data necessary for processing by the CPU 101. The HDD 103 stores the OS and application programs. A monitor 108 is connected to the graphic processing device 104, and an image is displayed on the screen of the monitor 108 in accordance with a command from the CPU 101. A keyboard 109 a and a mouse 109 b are connected to the input interface 105, and signals transmitted from the keyboard 109 a and the mouse 109 b are transmitted to the CPU 101 via the bus 107. The user interface such as the monitor 108, the keyboard 109a, and the mouse 109b is provided on the terminal device side connected via the network 600, and the development machine management server 100 includes data input / output via the network 600. It is good also as a structure which does not. The communication interface 106 is connected to the network 600 and transmits / receives data to / from the development machine and the administrator terminal device via the network 600.

このようなハードウェア構成によって、本実施の形態の処理機能を実現することができる。なお、図2には、開発機管理サーバ100のハードウェア構成を示したが、開発機及び管理者端末装置のハードウェア構成も同様である。   With such a hardware configuration, the processing functions of the present embodiment can be realized. 2 shows the hardware configuration of the development machine management server 100, the hardware configurations of the development machine and the administrator terminal device are the same.

次に、各管理ファイルの構成について順次説明する。
図4は、本発明の実施の形態のプロジェクト管理ファイルの構成例を示した図である。
プロジェクト管理ファイル121は、開発機が割当てられたプロジェクトに関する情報が設定されており、図の例では、案件番号ごとに、プロジェクトオーダ番号、利用期間(開始年月日と終了年月日)、開発機サーバ名、利用ソフトウェア数N、利用するソフトウェアのソフトウェア製品番号とその利用開始日が順に利用ソフトウェア数N分設定されている。たとえば、案件番号「1」として、プロジェクトオーダ番号「SD11111」のプロジェクトに、利用期間「03/12/15」から「04/09/30」までの期間、開発機サーバ「SUN1」が割当てられている。また、利用ソフトウェアとして、「5」つのソフトウェアが製品番号と利用開始日とともに登録されている。
Next, the configuration of each management file will be described sequentially.
FIG. 4 is a diagram showing a configuration example of the project management file according to the embodiment of the present invention.
In the project management file 121, information related to the project to which the development machine is assigned is set. In the example shown in the figure, for each project number, the project order number, the usage period (start date and end date), development The server name, the number of used software N, the software product number of the software to be used, and the use start date are set in order for the number of used software N. For example, as the project number “1”, the development server “SUN1” is assigned to the project with the project order number “SD11111” for the period from the usage period “03/12/15” to “04/09/30”. Yes. In addition, as software to be used, “5” softwares are registered together with product numbers and use start dates.

図5は、本発明の実施の形態の開発機管理ファイルの構成例を示した図である。
開発機管理ファイル122は、プロジェクトに割当てられて、共同利用される開発機に関する情報が設定される。図の例では、開発機サーバ名ごとに、開発機サーバに予め搭載されているソフトウェアの製品番号とライセンスキーが設定されるソフトウェア情報と、ソフトウェアのステータス及び利用しているプロジェクトがある場合には、そのプロジェクトオーダ番号が設定される。ステータスはソフトウェアごとに設けられ、開発機サーバに該当するソフトウェアライセンスが登録されているかどうかを表し、「使用中」は、開発機サーバに該当ソフトウェアライセンスが登録されている状態で、「未使用」は、開発機サーバに該当ソフトウェアライセンスが登録されていない状態であることを示す。図では、開発機サーバSUN1からSUN9までの情報が順次設定されており、たとえば、SUN1のソフトウェアは、「SD11111」のプロジェクトによって全て使用されている。また、SUN3のソフトウェアは、未使用である。
FIG. 5 is a diagram showing a configuration example of the development machine management file according to the embodiment of the present invention.
In the development machine management file 122, information related to development machines that are allocated to projects and used jointly is set. In the example in the figure, for each development machine server name, if there is software information in which the product number and license key of the software installed in advance on the development machine server are set, the software status, and the project being used , The project order number is set. The status is provided for each software and indicates whether the corresponding software license is registered on the development machine server. “In use” indicates that the corresponding software license is registered on the development machine server and “Unused” Indicates that the corresponding software license is not registered in the development machine server. In the figure, information from development machine servers SUN1 to SUN9 is sequentially set. For example, all software of SUN1 is used by the project “SD11111”. The software of SUN3 is not used.

図6は、本発明の実施の形態のハードウェア管理ファイルの構成例を示した図である。
ハードウェア管理ファイル123は、開発機サーバのハードウェア(OSを含む)使用に関する情報と、その利用料金が設定される。図の例では、開発機サーバ名ごとに、ハードウェアに関するハードウェア情報と、月単位の開発機サーバの月額利用料(円)、開発管理者メールアドレス、利用期間別ハードウェア変更係数が設定される。ハードウェア情報として、CPUの動作速度(GHz)、OSの名称、メモリのサイズ(GB)及びディスクのサイズ(GB)が登録される。利用期間別ハードウェア変更係数は、開発機が一旦割当てられた後、再び開発機の利用申請を行って変更した場合にかかる手数料を算出する係数である。開始3月前、開始直前、それ以降で係数が変わっている。手数料は、変更時期に応じて選択されるハードウェア変更係数に月額利用料を乗算して算出する。
FIG. 6 is a diagram illustrating a configuration example of the hardware management file according to the embodiment of this invention.
In the hardware management file 123, information related to the hardware (including OS) use of the development server and the usage fee are set. In the example in the figure, hardware information related to the hardware, monthly usage fee (yen) for the monthly development machine server, development administrator email address, and hardware change factor for each usage period are set for each development machine server name. The As hardware information, CPU operating speed (GHz), OS name, memory size (GB), and disk size (GB) are registered. The hardware change coefficient for each usage period is a coefficient for calculating a fee when a development machine is once assigned and then changed by making an application for use of the development machine again. The coefficient has changed three months before the start, just before the start, and thereafter. The fee is calculated by multiplying the hardware change coefficient selected according to the change time by the monthly usage fee.

図7は、本発明の実施の形態のソフトウェア管理ファイルの構成例を示した図である。
ソフトウェア管理ファイル124は、開発機サーバにインストールして利用するソフトウェアに関する情報と、その利用料金が設定される。図の例では、ソフトウェアの製品番号ごとに、ソフトウェアの名称、バージョン(V/L)、出荷状況、月額利用料、利用期間ごとのライセンス購入係数、利用期間ごとのソフトウェア変更係数が設定される。出荷状況は、そのソフトウェアが出荷されたかどうかに関する情報で、フラグは、出荷が行われたことを示す「済」、または、まだ出荷されていないことを示す「未」が設定される。予定日は、フラグが「未」の場合に出荷予定日が設定される。プロジェクト開発では、複数のソフトウェアが並行して開発されており、開発機を用いた試験などでは、他のソフトウェアが完成していなければ開発機の利用ができないことがある。これをチェックするため、この項目が設けられた。利用期間ごとのライセンス購入係数は、ライセンスを購入した場合に必要となる月額利用料を算出するための係数である。利用期間に応じて選択されるライセンス購入係数に月額利用料を乗算した値がライセンス購入時の月額利用料になる。なお、ライセンスが既に購入されている場合、ライセンス購入係数は、1.0になる。利用期間ごとのソフトウェア変更係数は、ハードウェア変更係数と同様に、ソフトウェアが一旦割当てられた後、変更された場合にかかる手数料を算出する係数である。手数料は、変更時期に応じて選択されるソフトウェア変更係数に月額利用料を乗算して算出する。
FIG. 7 is a diagram showing a configuration example of the software management file according to the embodiment of the present invention.
In the software management file 124, information related to software to be installed and used on the development machine server and the usage fee are set. In the example of the figure, the software name, version (V / L), shipping status, monthly usage fee, license purchase coefficient for each usage period, and software change coefficient for each usage period are set for each product number of the software. The shipment status is information regarding whether or not the software has been shipped, and the flag is set to “done” indicating that the software has been shipped or “not yet” indicating that the software has not been shipped yet. As the scheduled date, the shipping date is set when the flag is “not yet”. In project development, a plurality of software is developed in parallel, and in a test using a development machine, the development machine may not be used unless other software is completed. This item was provided to check this. The license purchase coefficient for each usage period is a coefficient for calculating a monthly usage fee required when a license is purchased. The value obtained by multiplying the license purchase coefficient selected according to the usage period by the monthly usage fee is the monthly usage fee at the time of license purchase. If a license has already been purchased, the license purchase coefficient is 1.0. Similarly to the hardware change coefficient, the software change coefficient for each usage period is a coefficient for calculating a fee when the software is changed after being assigned once. The fee is calculated by multiplying the software change coefficient selected according to the change timing by the monthly usage fee.

図8は、本発明の実施の形態のプロジェクトオーダ管理ファイルの構成例を示した図である。
プロジェクトオーダ管理ファイル131は、プロジェクト計画に関する情報が設定される。図の例では、プロジェクトオーダ番号ごとに、プロジェクト名、プロジェクトの管理者名と管理者のメールアドレス、プロジェクト期間、計画予算、最新見積り及び実績が設定される。プロジェクト期間には、プロジェクトを開始する開始年月日と、終了する終了年月日が設定される。計画予算は、プロジェクトごとに予め設定された予算値である。予算には、人件費と開発機、その他とあるが、実施の形態の開発機監視システムで参照するのは、「開発機」に関する予算情報である。最新見積りには、最新の見積りが設定される。このうち、「開発機」に関する最新見積りは、実施の形態の開発機監視サーバが算出して設定する。実績は、実際にかかった費用が設定される。このうち、「開発機」に関する実績は、実施の形態の開発機監視サーバが、月初めなどの所定のタイミングで算出して設定する。
FIG. 8 is a diagram showing a configuration example of the project order management file according to the embodiment of the present invention.
In the project order management file 131, information related to the project plan is set. In the example of the figure, for each project order number, a project name, a project manager name and a manager e-mail address, a project period, a planned budget, a latest estimate, and an actual result are set. In the project period, a start date for starting the project and an end date for ending the project are set. The planned budget is a budget value set in advance for each project. The budget includes labor costs, development machines, and others, but the development machine monitoring system of the embodiment refers to budget information related to “development machines”. The latest estimate is set in the latest estimate. Among these, the latest estimate for the “development machine” is calculated and set by the development machine monitoring server of the embodiment. The actual cost is set as the actual cost. Among these, the performance related to the “development machine” is calculated and set by the development machine monitoring server according to the embodiment at a predetermined timing such as the beginning of the month.

このような構成の開発機管理サーバ100の開発機割当て処理について、具体例を挙げて説明する。
開発機割当て処理は、プロジェクト管理者が、プロジェクト管理者端末400より開発機の利用申請を行うと開始される。図9は、本発明の実施の形態の開発機の利用申請における検索条件設定画面の一例である。
A development machine assignment process of the development machine management server 100 having such a configuration will be described with a specific example.
The development machine assignment process is started when the project manager makes an application for use of a development machine from the project manager terminal 400. FIG. 9 is an example of a search condition setting screen in the application for use of the development machine according to the embodiment of the present invention.

検索条件設定画面401には、新規/更新選択欄402、(プロジェクトオーダ)番号欄403、開発要件確定欄404、開始年月日と終了年月日を設定する開発機利用期間欄405、必要なOS、CPU、メモリ(GB)、ディスク(GB)を設定するハードウェア仕様欄406及び必要なソフトウェアを設定する利用ソフトウェア欄407があり、それぞれの入力欄を登録することにより、検索条件が設定される。   The search condition setting screen 401 includes a new / update selection field 402, a (project order) number field 403, a development requirement confirmation field 404, a development machine usage period field 405 for setting a start date and an end date, and necessary. There are a hardware specification column 406 for setting an OS, a CPU, a memory (GB), and a disk (GB), and a use software column 407 for setting necessary software, and search conditions are set by registering each input column. The

新規/更新選択欄402は、今回の検索条件の登録が「新規」であるか「変更」であるかを指定する。番号403は、対象のプロジェクトオーダ番号を設定する。開発要件確定欄404は、プロジェクトが計画段階にあるか確定したかを設定する。白丸であれば未確定、黒丸であれば確定を示す。開発機利用期間欄405は、開発機を利用したい期間の開始日と終了日を、年/月/日で設定する。ハードウェア仕様欄406は、必要なハードウェアの仕様を数値で設定する。利用ソフトウェア欄407は、必要なソフトウェアとそのバージョン(V/L)を設定する。   The new / update selection field 402 specifies whether the current search condition registration is “new” or “change”. A number 403 sets a target project order number. The development requirement confirmation column 404 sets whether or not the project is in the planning stage. A white circle indicates unconfirmed, and a black circle indicates confirmation. In the development machine usage period column 405, the start date and end date of the period in which the development machine is desired to be used are set in year / month / day. In the hardware specification column 406, necessary hardware specifications are set numerically. The use software column 407 sets necessary software and its version (V / L).

上記の画面にデータを入力することにより、検索条件が設定される。以下、3つのケースについて説明する。
<第1のケース>
第1のケースとして、ハードウェア仕様は、「CPU:1.2GHz以上、OS:Solaris8、メモリ:1.0GB以上、ディスク40GB以上」、利用ソフトウェアは、「InterstageV06/L10」と「DBEOracleV09L03」、利用期間は、「04/11/01−05/03/31」、(プロジェクトオーダ)番号は、「SD77777」、開発要件確定は、「未確定」が設定された場合について説明する。また、検索処理を行った日時は、「2004/09/20」であるとする。
Search conditions are set by inputting data in the above screen. Hereinafter, three cases will be described.
<First case>
As a first case, the hardware specifications are “CPU: 1.2 GHz or higher, OS: Solaris 8, memory: 1.0 GB or higher, disk 40 GB or higher”, and the software used is “Interstage V06 / L10” and “DBE Oracle V09L03”, usage A case will be described in which the period is set to “04/11 / 01-05 / 03/31”, the (project order) number is set to “SD77777”, and the development requirement confirmation is set to “unconfirmed”. Further, it is assumed that the date and time when the search process is performed is “2004/09/20”.

開発機管理サーバ100では、開発機割当て処理部110が検索条件に合致し、利用期間に他のプロジェクトによって利用されていない開発機を検索する。
まず、設定された利用期間「04/11/01−05/03/31」をチェックする。プロジェクトオーダ番号「SD77777」を用いて、プロジェクトオーダ管理ファイル310を検索し、プロジェクト期間「04/09/20−05/05/20」を得る。利用期間は、プロジェクト期間内にあることから、プロジェクト計画に適合した利用期間設定であると判断する。なお、利用期間の終了の日時がプロジェクト期間の終了日時よりも後に設定されているのは、プロジェクトの工程が遅れることを考慮しての妥当な設定と考える。たとえば、1ヶ月以内のずれであれば、妥当と判定する。
In the development machine management server 100, the development machine assignment processing unit 110 searches for a development machine that matches the search condition and is not used by another project during the usage period.
First, the set usage period “04/11 / 01-05 / 03/31” is checked. The project order management file 310 is searched using the project order number “SD77777”, and the project period “04/09 / 20-05 / 05/20” is obtained. Since the usage period is within the project period, it is determined that the usage period is set according to the project plan. It should be noted that setting the end date / time of the usage period after the end date / time of the project period is considered to be a reasonable setting considering that the project process is delayed. For example, if the deviation is within one month, it is determined to be appropriate.

次に、ハードウェア仕様に合致する開発機を検索する。ハードウェア管理ファイル123を参照し、検索条件「CPU:1.2GHz以上、OS:Solaris8、メモリ:1.0GB以上、ディスク40GB以上」を満たすものを検索すると、開発機サーバ名SUN3、SUN4、SUN5、SUN6、SUN8及びSUN9が抽出される。   Next, search for development machines that match the hardware specifications. When the hardware management file 123 is referred to and a search is performed that satisfies the search conditions “CPU: 1.2 GHz or higher, OS: Solaris 8, memory: 1.0 GB or higher, disk 40 GB or higher”, the development machine server names SUN3, SUN4, SUN5 , SUN6, SUN8 and SUN9 are extracted.

次に、プロジェクト管理ファイル121に基づき、抽出された開発機サーバのうち、利用期間「04/11/01−05/03/31」に空いているものを探す。このとき、前の利用プロジェクトの工程遅延と、自プロジェクトの工程遅延を考慮し、設定された利用期間より前後1ヶ月のリスク付きで検索対象を絞り込む。すなわち、利用期間「04/10/01−05/04/30」に空いている開発機サーバを探すと、SUN3、SUN6、SUN8、SUN9となる。   Next, based on the project management file 121, the extracted development machine servers are searched for those that are available in the usage period “04/11 / 01-05 / 03/31”. At this time, considering the process delay of the previous use project and the process delay of the own project, the search target is narrowed down with a risk of one month before and after the set use period. That is, when a search is made for a development machine server that is available in the usage period “04/10 / 01-05 / 04/30”, SUN3, SUN6, SUN8, and SUN9 are obtained.

次に、それぞれの仮想月額費用を算出し、最も費用の少ないものを選択する。ハードウェア管理ファイル123及びソフトウェア管理ファイル124を参照し、それぞれの開発機サーバの利用費用を算出する。   Next, each virtual monthly fee is calculated, and the one with the lowest cost is selected. By referring to the hardware management file 123 and the software management file 124, the usage cost of each development machine server is calculated.

たとえば、SUN3の場合、ハードウェアの月額利用料(160,000)に、「InterstageV06/L10」の利用料(5,000)と、「DBEOracleV09L03」の利用料(15,000)を加算し、180,000となる。なお、ライセンス購入係数は1.0なので、ライセンスを購入しても同額となる。   For example, in the case of SUN3, the usage fee (5,000) of “Interstage V06 / L10” and the usage fee (15,000) of “DBEOracleV09L03” are added to the monthly usage fee (160,000) of hardware, and 180 , 000. Since the license purchase coefficient is 1.0, the same amount will be obtained even if a license is purchased.

同様にして、SUN6の場合は、180,000+5,000+15,000=200,000となる。SUN8の場合は、250,000+5,000+15,000=270,000となる。SUN9の場合は、270,000+5,000+15,000=29,000となる。この結果、SUN3が選択される。   Similarly, in the case of SUN6, 180,000 + 5,000 + 15,000 = 200,000. In the case of SUN8, 250,000 + 5,000 + 15,000 = 270,000. In the case of SUN9, 270,000 + 5,000 + 15,000 = 29,000. As a result, SUN3 is selected.

<第2のケース>
第2のケースとして、ハードウェア仕様は、「CPU:1.5GHz以上、OS:Solaris8、メモリ:2.0GB以上、ディスク70GB以上」、利用ソフトウェアは、「InterstageV06/L10」と「DBEOracleV09L03」、利用期間は、「04/10/20−05/06/30」、(プロジェクトオーダ)番号は、「SD88888」、開発要件確定は、「確定」が設定された場合について説明する。また、検索処理を行った日時は、「2004/09/20」であるとする。
<Second case>
As the second case, the hardware specifications are “CPU: 1.5 GHz or more, OS: Solaris 8, memory: 2.0 GB or more, disk 70 GB or more”, and the software used is “Interstage V06 / L10” and “DBE Oracle V09L03”, use The case where “04/10 / 20-05 / 06/30” is set as the period, “SD88888” as the (project order) number, and “confirmed” as the development requirement confirmation will be described. Further, it is assumed that the date and time when the search process is performed is “2004/09/20”.

まず、設定された利用期間「04/10/20−05/06/30」は、プロジェクトオーダ管理ファイル131のプロジェクトオーダ番号「SD88888」のプロジェクト期間「04/09/20−05/05/20」内であることから、検索が行われる。   First, the set usage period “04/10 / 20-05 / 06/30” is the project period “04/09 / 20-05 / 05/20” of the project order number “SD88888” of the project order management file 131. Because it is within, a search is performed.

検索では、ハードウェア仕様の検索条件に基づき、SUN4、SUN5、SUN8、SUN)が抽出される。さらに、プロジェクト管理ファイル121から、利用期間に使用できる開発機サーバは、SUN4、SUN8、SUN9になる。   In the search, SUN4, SUN5, SUN8, SUN) are extracted based on the search conditions of the hardware specification. Furthermore, the development machine servers that can be used during the usage period from the project management file 121 are SUN4, SUN8, and SUN9.

第1のケースの場合と同様に仮想月額費用を算出すると、SUN4=180,000+5,000+15,000=200,000、SUN8=250,000+5,000+15,000=270,000、SUN9=270,000+5,000+15,000=29,000、となる。この結果、SUN4が選択される。   When the virtual monthly fee is calculated as in the first case, SUN4 = 180,000 + 5,000 + 15,000 = 200,000, SUN8 = 250,000 + 5,000 + 15,000 = 270,000, SUN9 = 270,000 + 5 000 + 15,000 = 29,000. As a result, SUN4 is selected.

以上、新規登録の場合について説明したが、更新登録の場合には、手数料が加算される。次に、第3のケースとして、更新登録の場合の検索処理について説明する。
<第3のケース>
第3のケースとして、更新登録が選択され、ハードウェア仕様は、「CPU:1.5GHz以上、OS:Solaris8、メモリ:2.0GB以上、ディスク120GB以上」、利用ソフトウェアは、「InterstageV06/L10」と「DBEOracleV09L03」、利用期間は、「04/10/20−05/06/30」、(プロジェクトオーダ)番号は、「SD33333」、開発要件確定は、「未確定」が設定された場合について説明する。また、検索処理を行った日時は、「2004/07/20」であるとする。利用期間のチェックについては省略する。
Although the case of new registration has been described above, a fee is added for update registration. Next, search processing in the case of update registration will be described as a third case.
<Third case>
As a third case, update registration is selected, the hardware specifications are “CPU: 1.5 GHz or more, OS: Solaris 8, memory: 2.0 GB or more, disk 120 GB or more”, and the software used is “Interstage V06 / L10”. And “DBE Oracle V09L03”, the usage period is “04/10 / 20-05 / 06/30”, the (project order) number is “SD33333”, and the development requirement confirmation is “unconfirmed”. To do. Further, it is assumed that the date and time when the search process is performed is “2004/07/20”. The usage period check is omitted.

検索では、ハードウェア仕様の検索条件に基づき、SUN8、SUN9が選択される。さらに、プロジェクト管理ファイル121から、SUN8、SUN9ともに利用期間に使用できる。そこで、仮想月額費用を算出すると、SUN8=250,000+5,000+15,000=270,000、SUN9=270,000+5,000+15,000=29,000、となる。この結果、SUN8が選択される。   In the search, SUN8 and SUN9 are selected based on the search conditions of the hardware specification. Further, both SUN8 and SUN9 can be used from the project management file 121 during the usage period. Therefore, when the virtual monthly fee is calculated, SUN8 = 250,000 + 5,000 + 15,000 = 270,000 and SUN9 = 270,000 + 5,000 + 15,000 = 29,000. As a result, SUN8 is selected.

また、更新登録であるので、変更手数料を算出する。利用期間は、「04/10/20」から始まり、現在「04/07/20」であるので、ハードウェア変更係数は、ハードウェア管理ファイル123を参照し、「開始直前まで」の係数が選択される。同様に、ソフトウェア変更係数は、ソフトウェア管理ファイル124を参照し、「開始直前まで」の係数が選択される。具体的には、「InterstageV06/L10」については、0.2、「DBEOracleV09L03」についても0.2が選択される。これにより、手数料は、
0.2×160,000+0.2×150,000+0.2×150,000=36,000が算出される。
Further, since it is renewal registration, a change fee is calculated. Since the usage period starts from “04/10/20” and is currently “04/07/20”, the hardware change coefficient is referred to the hardware management file 123 and the coefficient “until just before start” is selected. Is done. Similarly, the software change coefficient refers to the software management file 124, and the coefficient “until just before starting” is selected. Specifically, 0.2 is selected for “Interstage V06 / L10”, and 0.2 is also selected for “DBEOracleV09L03”. As a result, the commission is
0.2 × 160,000 + 0.2 × 150,000 + 0.2 × 150,000 = 36,000 is calculated.

以上のようにして、検索された開発機サーバは、プロジェクト管理者端末400に表示され、プロジェクト管理者に通知される。図10は、本発明の実施の形態の開発機の利用申請における検索結果画面の一例である。   The developer server searched as described above is displayed on the project manager terminal 400 and notified to the project manager. FIG. 10 is an example of a search result screen in the application for use of the development machine according to the embodiment of the present invention.

検索結果画面410では、指定されたプロジェクトオーダ番号411、開発機利用期間412とともに、検索された検索開発機サーバ名413が表示される。さらに、検索された開発機サーバのハードウェア仕様(検索開発機サーバスペック)414と、ソフトウェア415が表示される。   In the search result screen 410, the searched search development machine server name 413 is displayed together with the designated project order number 411 and development machine usage period 412. Further, the hardware specifications (search development machine server specifications) 414 and software 415 of the searched development machine server are displayed.

さらに、この検索結果を承認するOKボタン417と、承認しないNGボタン416が用意される。
OKボタン417を操作すると、承認されたと見なし、開発要件確定が確定であれば、検索開発機サーバ名413の開発機サーバがプロジェクトに割当てられる。上記の例では、第2のケース及び第3のケースが「確定」であるので、割当てが行われる。
Further, an OK button 417 for approving the search result and an NG button 416 for not approving are provided.
When the OK button 417 is operated, it is considered that the approval has been made, and if the development requirement confirmation is confirmed, the development machine server of the search development machine server name 413 is assigned to the project. In the above example, since the second case and the third case are “confirmed”, the assignment is performed.

NGボタン416を操作すると、もう一度、検索条件設定画面401に戻って、検索条件の設定からの処理が行われる。
次に、本実施の形態の開発機割当て処理及び開発機管理処理の手順についてフローチャートを用いて説明する。
When the NG button 416 is operated, the process returns to the search condition setting screen 401 once again, and processing from the search condition setting is performed.
Next, the procedure of the development machine assignment process and the development machine management process of the present embodiment will be described using a flowchart.

図11は、本発明の実施の形態の開発機割当て処理の手順を示したフローチャートである。図9に示した開発機検索画面が表示されて、処理が開始される。
[ステップS01] 開発機検索画面に従って、プロジェクト管理者によって、検索条件が設定されるのを待つ。検索条件として、新規の場合は、プロジェクトオーダ番号、利用期間、プロジェクト計画の確実性、最低CPU能力、最低メモリ、最低ディスク、OS、必要なソフトウェア名とV/Lなどの情報が入力される。変更時は、登録済みの案件番号(プロジェクトオーダ番号)が入力される。
FIG. 11 is a flowchart showing a procedure of development device assignment processing according to the embodiment of this invention. The development machine search screen shown in FIG. 9 is displayed and the process is started.
[Step S01] Wait until the search condition is set by the project manager according to the development machine search screen. In the case of a new search condition, information such as the project order number, usage period, project plan certainty, minimum CPU capacity, minimum memory, minimum disk, OS, necessary software name and V / L are input. When changing, the registered project number (project order number) is entered.

[ステップS02] 取得したプロジェクトオーダ番号に基づき、プロジェクト管理ファイルを検索し、プロジェクトに指定されている開発工程計画期間と、ステップS01で入力された利用期間を照合する。   [Step S02] Based on the acquired project order number, the project management file is searched, and the development process plan period specified in the project is collated with the utilization period input in step S01.

[ステップS03] 設定された利用期間がプロジェクト計画の期間外であるかどうかを判定する。期間外であれば、ステップS16へ処理を進め、検索条件の再設定からやり直す。   [Step S03] It is determined whether the set usage period is outside the project plan period. If it is outside the period, the process proceeds to step S16, and the search condition is reset and restarted.

[ステップS04] 期間内であれば、開発機の検索処理を行う。開発機の検索処理の詳細は後述する。
[ステップS05] 検索された開発機が0であるかどうかを判定する。0であれば、ステップS16へ処理を進め、検索条件の再設定からやり直す。
[Step S04] If it is within the period, search processing of the development machine is performed. Details of the search processing of the development machine will be described later.
[Step S05] It is determined whether or not the searched development machine is zero. If 0, the process proceeds to step S16, and the search condition is reset and restarted.

[ステップS06] 検索された開発機が複数であるかどうかを判定する。1台であれば、処理をステップS08へ進める。
[ステップS07] 検索された開発機が複数である場合、開発機の選択を行う。開発機の選択は、ステップS04により検索された開発機について、以下の計算式(1)で仮想月額費用を計算し、その値が最小の開発機を選択する。
[Step S06] It is determined whether there are a plurality of searched development machines. If there is one, the process proceeds to step S08.
[Step S07] When there are a plurality of searched development machines, the development machine is selected. For the selection of the development machine, the virtual monthly cost is calculated by the following calculation formula (1) for the development machine searched in step S04, and the development machine having the smallest value is selected.

開発機の仮想月額費用=
ハードウェア月額利用料+Σライセンス購入係数×ソフトウェア月額利用料
・・・(1)
なお、ハードウェア月額利用料は、開発機サーバ名に基づき、ハードウェア管理ファイル123を検索し、該当開発機サーバの月額利用料を取り出す。ソフトウェア月額利用料は、検索条件のソフトウェアの製品番号(ステップS04で得られる)に基づきソフトウェア管理ファイル124を検索して抽出する。また、開発機サーバ名とソフトウェアの製品番号に基づき、開発機管理ファイル122を検索し、この製品番号のライセンスを取得済みであるかどうかを調べる。ライセンス購入係数は、開発機のライセンスがすでに購入済みの場合には1.0になる。一方、未購入の場合は、検索条件の利用期間とソフトウェアの製品番号に基づきソフトウェア管理ファイル124を調べ、ライセンス購入係数を取り出す。ライセンス購入係数は、新規購入となる場合にはソフトウェアの種類と利用期間に応じた1.0以上の値となる。
Virtual monthly fee for development machine =
Hardware monthly usage fee + Σ license purchase coefficient × monthly software usage fee
... (1)
The hardware monthly usage fee is retrieved from the hardware management file 123 based on the development machine server name, and the monthly usage fee of the corresponding development machine server is extracted. The software monthly usage fee is extracted by searching the software management file 124 based on the software product number of the search condition (obtained in step S04). Further, based on the development machine server name and the software product number, the development machine management file 122 is searched to check whether the license for this product number has been acquired. The license purchase coefficient is 1.0 if the development machine license has already been purchased. On the other hand, if not purchased, the software management file 124 is examined based on the use period of the search condition and the software product number, and the license purchase coefficient is extracted. The license purchase coefficient is a value of 1.0 or more in accordance with the type of software and usage period when a new purchase is made.

ここまでの処理で、検索条件に適した1の開発機が検索される。
[ステップS08] 検索された開発機の利用費用を以下の計算式(2)で算出する。そして、算出された費用と選択した開発機情報をプロジェクト管理者に通知し、プロジェクト管理者の承認を待つ。たとえば、図11に示した検索結果画面410が表示される。
With the processing so far, one development machine suitable for the search condition is searched.
[Step S08] Use cost of the searched development machine is calculated by the following calculation formula (2). The calculated cost and the selected development machine information are notified to the project manager, and the approval of the project manager is awaited. For example, the search result screen 410 shown in FIG. 11 is displayed.

開発機費用=利用期間月数×仮想月額利用料 ・・・(2)
なお、仮想月額利用料は、式(1)より得られる。
[ステップS09] 承認されたかどうかを判定する。承認されない場合、ステップS16へ処理を進め、検索条件の再設定からやり直す。
Development machine cost = number of months of use x virtual monthly usage fee (2)
The virtual monthly usage fee is obtained from equation (1).
[Step S09] It is determined whether or not it has been approved. If not approved, the process proceeds to step S16, and the search condition is reset and restarted.

[ステップS10] 承認された場合は、検索条件の開発要件確定が、確定であるかどうかを判定する。確定でない場合は、処理をステップS15へ進め、開発機の割当て処理(登録)は行わない。   [Step S10] If approved, it is determined whether or not the development requirement confirmation of the search condition is confirmed. If it is not confirmed, the process proceeds to step S15, and the development machine assignment process (registration) is not performed.

[ステップS11] 承認かつ確定であるので、開発機の割当て(登録)を行う。ここで、検索が新規か更新であるかを判定する。新規である場合、処理をステップS13へ進める。   [Step S11] Since it is approved and confirmed, the development machine is assigned (registered). Here, it is determined whether the search is new or updated. If it is new, the process proceeds to step S13.

[ステップS12] 今回の検索により抽出された開発機サーバへの変更に要する変更費用を算出する。変更費用を変更前のハードウェアとソフトウェアについて、以下の計算式(3)で求める。   [Step S12] The change cost required for the change to the development machine server extracted by the current search is calculated. The change cost is calculated by the following calculation formula (3) for the hardware and software before the change.

変更費用=ハードウェア変更係数×ハードウェアの月額利用料+Σ(ソフトウェア変
更係数×ソフトウェア月額利用料) ・・・(3)
計算後、プロジェクトオーダ管理ファイル310の開発機の実績値に、この変更費用を累積する。ハードウェアの月額利用料は、ステップS4で得られた開発機サーバ名に基づき、ハードウェア管理ファイル123の月額利用料を取り出し、プロジェクト管理ファイル121から案件番号により得られる変更前の利用開始日と現在の年月日から得られる利用期間と、開発機サーバ名に基づきハードウェア管理ファイル123のハードウェア変更係数を取り出す。また、ソフトウェアの月額利用料は、ステップS04で得られるソフトウェアの製品番号に基づき、ソフトウェア管理ファイル124の月額利用料を取り出す。さらに、変更前の利用開始日と現在の年月日から得られる利用期間とソフトウェアの製品番号に基づいてソフトウェア管理ファイル124を調べ、利用期間に応じたソフトウェア変更係数を取り出す。
Change cost = Hardware change coefficient x Monthly usage fee for hardware + Σ (Software change coefficient x Monthly software usage fee) (3)
After the calculation, this change cost is accumulated in the actual value of the development machine in the project order management file 310. Based on the development machine server name obtained in step S4, the monthly usage fee for hardware is extracted from the monthly usage fee of the hardware management file 123, and the usage start date before change obtained from the project management file 121 by the project number The hardware change coefficient of the hardware management file 123 is extracted based on the usage period obtained from the current date and the development machine server name. As for the monthly usage fee of the software, the monthly usage fee of the software management file 124 is taken out based on the product number of the software obtained in step S04. Further, the software management file 124 is examined based on the use start date before the change, the use period obtained from the current date, and the product number of the software, and the software change coefficient corresponding to the use period is extracted.

[ステップS13] 新規割当ての場合は、新たな案件番号を割当て、プロジェクト管理ファイル121に、案件番号、プロジェクトオーダ番号(ステップS02で取得)、開発期間、開発機サーバ名とソフトウェア製品番号とソフトウェア個数(ステップS04で取得)を書き込む。さらに、開発機サーバ名とソフトウェア製品番号に対応する開発機管理ファイルのプロジェクトオーダ番号を書き込む。   [Step S13] In the case of a new assignment, a new case number is assigned, and the case number, project order number (obtained in step S02), development period, development server name, software product number, and number of software are assigned to the project management file 121. (Obtained in step S04) is written. Furthermore, the project order number of the development machine management file corresponding to the development machine server name and the software product number is written.

変更割当ての場合は、案件番号に基づきプロジェクト管理ファイル121の開発機サーバ名を取り出し、開発機管理ファイル122で該当する開発機サーバ名に対応するプロジェクトオーダ番号をすべて削除する。その後、案件番号に対応するプロジェクト管理ファイル121のデータを、プロジェクトオーダ番号(ステップS02で取得)、開発期間、開発機サーバ名とソフトウェア製品番号とソフトウェア個数(ステップS04で取得)で更新する。さらに、開発機サーバ名とソフトウェア製品番号に対応する開発機管理ファイルのプロジェクトオーダ番号を書き込む。   In the case of change assignment, the development machine server name of the project management file 121 is extracted based on the case number, and all the project order numbers corresponding to the corresponding development machine server name are deleted from the development machine management file 122. Thereafter, the data of the project management file 121 corresponding to the case number is updated with the project order number (obtained in step S02), the development period, the development machine server name, the software product number, and the number of software (obtained in step S04). Furthermore, the project order number of the development machine management file corresponding to the development machine server name and the software product number is written.

[ステップS14] ここでまた、検索が新規か更新であるかを判定する。変更である場合、処理を終了する。
[ステップS15] 新規である場合、プロジェクトオーダ管理ファイル131の最新見積りに、ステップS08で求めた費用を書き込む。さらに、ステップS08で求めた最新見積りの費用がプロジェクトオーダ管理ファイル131の計画予算を超えているかどうかを調べ、オーバしていれば、プロジェクト管理者に開発機に関する計画予算見直し依頼を通知する。そして、検索処理を終了する。
[Step S14] Here, it is also determined whether the search is new or updated. If it is a change, the process ends.
[Step S15] If it is new, the cost obtained in Step S08 is written in the latest estimate of the project order management file 131. Further, it is checked whether or not the cost of the latest estimate obtained in step S08 exceeds the plan budget of the project order management file 131. If it exceeds, the project manager is notified of a plan budget review request for the development machine. Then, the search process ends.

通知は、たとえば、プロジェクトオーダ番号に基づきプロジェクトオーダ管理ファイル131からプロジェクト管理者のメールアドレスを取得し、プロジェクトオーダ番号、計画予算、今回の見積りを内容として、Eメールを送信して行う。   The notification is performed, for example, by acquiring the project manager's mail address from the project order management file 131 based on the project order number, and sending an e-mail with the project order number, the planned budget, and the current estimate as contents.

[ステップS16] 検索できない場合、再度検索条件を設定するようにプロジェクト管理者に促し、変更された後、ステップS02に戻って、検索処理を再開する。
以上の処理手順が実行されることにより、開発機の最適な割当てが行える。
[Step S16] If the search cannot be performed, the project manager is prompted to set the search condition again. After the change, the process returns to step S02 to restart the search process.
By executing the above processing procedure, the optimal allocation of the development machine can be performed.

ここで、検索処理の詳細について説明する。図12は、本実施の形態の開発機検索処理の手順を示したフローチャートである。
検索条件として、利用期間、CPU能力、メモリ容量、ディスク容量、OS種類、必要なソフトウェアとバージョン(V/L)が入力され、処理が開始される。
Here, details of the search processing will be described. FIG. 12 is a flowchart showing the procedure of the development machine search process according to the present embodiment.
As a search condition, a use period, CPU capacity, memory capacity, disk capacity, OS type, necessary software and version (V / L) are input, and processing is started.

[ステップS41] ハードウェア管理ファイル123を検索し、検索条件のCPU能力、メモリ容量、ディスク容量、OS種類を条件に該当する開発機サーバ名を抽出する。
[ステップS42] ステップS41による検索処理で、開発機が検索されなかった(検索数=0であるかどうか)かを判定する。検索数=0の場合、処理を終了する。
[Step S41] The hardware management file 123 is searched, and the development server name corresponding to the CPU conditions, memory capacity, disk capacity, and OS type of the search conditions is extracted.
[Step S42] In the search process in step S41, it is determined whether the development machine has not been searched (whether the number of searches = 0). If the number of searches = 0, the process ends.

[ステップS43] 続けて、ソフトウェア管理ファイル124を検索し、検索条件のソフトウェア名とV/Lを条件に該当するソフトウェアの製品番号と出荷情報を得る。ソフトウェアが検索された場合、集荷情報を調べ、ソフトウェア利用開始年月日がソフトウェア製品出荷の90日以上前であるかどうかを調べる。90日以内であれば、β版として利用することができるので、これを利用する。ソフトウェアが検索されなかった場合、及び検索されたソフトウェアの製品出荷が利用開始年月日の90日以上後である場合には、検索数=0とする。   [Step S43] Subsequently, the software management file 124 is searched, and the product number and shipping information of the software corresponding to the search software name and V / L are obtained. When the software is searched, the collection information is checked to check whether the software use start date is 90 days or more before the shipment of the software product. If it is within 90 days, it can be used as a beta version. If the software is not searched, and if the product shipment of the searched software is 90 days or more after the use start date, the number of searches is set to zero.

[ステップS44] ステップS43による検索処理で、開発機が検索されなかった(検索数=0であるかどうか)かを判定する。検索数=0の場合、処理を終了する。
[ステップS45] 検索条件の開発期間の開始年月日の1ヶ月前の年月日と、終了年月日の1ヵ月後の年月日を拡張利用期間とし、ステップS41で得られた開発機から拡張利用期間内に利用可能な開発機を選択する。ステップS41で得られた開発機サーバ名と拡張利用期間で、プロジェクト管理ファイル121を検索し、開発機サーバ名がプロジェクト管理ファイル121の開発機サーバ名と一致し、拡張利用期間が開発機利用期間と重複する開発機サーバ名があれば、この開発機サーバを除外する。ただし、案件番号が指定された変更の検索の場合には、以前に利用申請した利用期間が開発期間と重複しても除外しない。ステップS41で得られた開発機サーバがすべて除外されたら、検索数=0とする。
[Step S44] It is determined whether or not the development machine was not searched in the search process in step S43 (whether or not the number of searches = 0). If the number of searches = 0, the process ends.
[Step S45] The development date obtained in Step S41, with the date of use one month before the start date of the search condition development date and the date one month after the end date as the extended use period Select a development machine that can be used within the extended usage period. The project management file 121 is searched with the development machine server name and the extended use period obtained in step S41, the development machine server name matches the development machine server name of the project management file 121, and the extended use period is the development machine use period. If there is a duplicate development machine server name, this development machine server is excluded. However, in the case of a search for a change with a specified project number, it is not excluded even if the usage period previously applied for usage overlaps with the development period. If all the development machine servers obtained in step S41 are excluded, the number of searches is set to zero.

[ステップS46] ステップS45による検索処理で、開発機が検索されなかった(検索数=0であるかどうか)かを判定する。検索数=0の場合、処理を終了する。
[ステップS47] 検索された開発機サーバ名、ソフトウェアの製品番号をパラメータとして設定し、処理を終了する。
[Step S46] It is determined whether the development machine has not been searched in the search process in step S45 (whether the number of searches = 0). If the number of searches = 0, the process ends.
[Step S47] The searched development machine server name and software product number are set as parameters, and the process ends.

以上の処理手順により検索された場合は、その開発機サーバ名と、ソフトウェアの製品番号が得られる。
次に、ライセンス管理処理について説明する。ライセンス管理処理では、ライセンス管理とともに、実績収集処理も行う。図13は、本発明の実施の形態のライセンス管理処理の処理手順を示したフローチャートである。
When a search is made by the above processing procedure, the name of the development server and the product number of the software are obtained.
Next, the license management process will be described. In the license management process, a performance collecting process is performed together with the license management. FIG. 13 is a flowchart showing a processing procedure of license management processing according to the embodiment of the present invention.

時刻をチェックし、日付が翌日になるまで待機し、日付が翌日になった時点(0時)で処理を開始する。
[ステップS101] プロジェクト管理ファイル121の利用期間の終了年月日を調べ、前日が利用終了日の案件番号と開発機サーバ名及びソフトウェア製品番号を検索する。次に、ソフトウェア製品番号を用いてソフトウェア管理ファイル124を検索し、このソフトウェアが未出荷ソフトであるものを除外する。そして、開発機管理ファイル122を検索し、利用終了日の開発機サーバ名と、ソフトウェア製品番号から、対応するライセンスキーをすべて抽出する。
Check the time, wait until the date becomes the next day, and start the process when the date becomes the next day (0 o'clock).
[Step S101] The end date of the usage period of the project management file 121 is checked, and the project number, the development machine server name, and the software product number of the usage end date on the previous day are searched. Next, the software management file 124 is searched using the software product number, and the software that has not been shipped is excluded. Then, the development machine management file 122 is searched, and all the corresponding license keys are extracted from the development machine server name on the use end date and the software product number.

[ステップS102] 該当するものがあるかどうかが判定される。ない場合は、処理をステップS105へ進める。
[ステップS103] 利用終了のものがあった場合、該当開発機サーバのライセンス削除を行う。ステップS101で得られた開発機サーバ名と削除対象ソフトウェアライセンスキーに基づき、該当する開発機サーバのライセンス登録削除プログラムを呼び出し、該当するライセンスキーの削除依頼を行う。開発機サーバより削除が正常終了と返信されれば、開発機管理ファイル122の該当する開発機サーバ名とソフトウェア製品番号に対応するステータスを未使用とする。
[Step S102] It is determined whether there is a corresponding item. If not, the process proceeds to step S105.
[Step S103] If there is an end of use, the license of the corresponding development machine server is deleted. Based on the development server name obtained in step S101 and the deletion target software license key, the license registration deletion program of the corresponding development server is called to request the deletion of the corresponding license key. If the deletion is returned from the development machine server as a normal end, the status corresponding to the corresponding development machine server name and software product number in the development machine management file 122 is made unused.

[ステップS104] 検索されたライセンスキーすべての削除が終了したかどうかを判定する。終了していなければ、ステップS103に戻って、次のライセンスキーの削除を行う。   [Step S104] It is determined whether or not deletion of all the searched license keys has been completed. If not completed, the process returns to step S103 to delete the next license key.

[ステップS105] ステップS101と同様にして、今度は、当日が利用開始日の案件番号と開発機サーバ名及びソフトウェア製品番号を検索する。すなわち、プロジェクト管理ファイル121のソフトウェアの利用期間の開始年月日を調べ、当日が利用開始日の案件番号と開発機サーバ名、ソフトウェア製品番号をすべて検索する。次に、ソフトウェア製品番号を用いてソフトウェア管理ファイル124を検索し、このソフトウェアが未出荷ソフトであるものを除外する。そして、開発機管理ファイル122を検索し、利用開始日の開発機サーバ名と、ソフトウェア製品番号から、対応するライセンスキーをすべて抽出する。   [Step S105] In the same manner as in step S101, this time, the project number, the development machine server name, and the software product number on the start date of use are searched. That is, the start date of the software use period in the project management file 121 is checked, and all the case numbers, development machine server names, and software product numbers on the use start date are searched for that day. Next, the software management file 124 is searched using the software product number, and the software that has not been shipped is excluded. Then, the development machine management file 122 is searched, and all corresponding license keys are extracted from the development machine server name and the software product number on the use start date.

[ステップS106] 該当するものがあるかどうかが判定される。ない場合は、処理をステップS109へ進める。
[ステップS107] 利用開始のものがあった場合、該当開発機サーバのライセンス登録を行う。ステップS105で得られた開発機サーバ名と登録対象ソフトウェアライセンスキーに基づき、該当する開発機サーバのライセンス登録削除プログラムを呼び出し、ライセンスキーを渡して登録依頼を行う。開発機サーバより登録が正常終了と返信されれば、開発機管理ファイル122の該当する開発機サーバ名とソフトウェア製品番号に対応するステータスを使用中とする。
[Step S106] It is determined whether there is a corresponding item. If not, the process proceeds to step S109.
[Step S107] If there is one that has started to be used, the license of the corresponding development machine server is registered. Based on the development server name and registration target software license key obtained in step S105, the license registration deletion program of the corresponding development server is called, and the license key is passed to make a registration request. If registration is returned as normal completion from the development machine server, the status corresponding to the corresponding development machine server name and software product number in the development machine management file 122 is used.

[ステップS108] 検索されたライセンスキーすべての登録が終了したかどうかを判定する。終了していなければ、ステップS107に戻って、次のライセンスキーの削除を行う。   [Step S108] It is determined whether registration of all the searched license keys has been completed. If not finished, the process returns to step S107 to delete the next license key.

[ステップS109] 当日が月初めであるかどうかを判定する。月初めの場合は、処理をステップS112へ進める。
[ステップS110] 当日が月初めでない場合、プロジェクト管理ファイル121のソフトウェアの利用期間開始年月日を調べ、当日(月初め)が利用開始日の案件番号と開発機サーバ名、ソフトウェア製品番号をすべて検索する。ただし、ソフトウェア製品番号の中で、対応するソフトウェア管理ファイル124の出荷情報が未出荷になっているものを除外する。
[Step S109] It is determined whether the current day is the beginning of the month. If it is the beginning of the month, the process proceeds to step S112.
[Step S110] If the current day is not the beginning of the month, the start date of the usage period of the software in the project management file 121 is checked, and the project number, the development machine server name, and the software product number are all displayed on the current day (the beginning of the month). Search for. However, software product numbers whose shipping information in the corresponding software management file 124 has not been shipped are excluded.

[ステップS111] ステップS110により、該当する開発機サーバ名とソフトウェア製品番号が検索されたかどうかを判定する。検索されなかった場合は、処理をステップS113へ進める。   [Step S111] In step S110, it is determined whether or not the corresponding development machine server name and software product number have been searched. If not, the process proceeds to step S113.

[ステップS112] 開発費用の実績を算出する。ステップS105またはステップS110によって得られた開発機サーバ名に基づきハードウェア管理ファイル123の月額利用料を取り出す。さらに、開発機サーバ名とソフトウェア製品番号に基づき、開発機管理ファイルより、利用中のプロジェクトオーダ番号を取り出す。ステップS105またはステップS110によって得られたソフトウェア製品番号に基づき、ソフトウェア管理ファイル124の月額利用料を取り出す。さらに、開発機サーバ名とソフトウェアの製品番号に基づいて開発機管理ファイル122を調べ、すでにライセンス購入しているか判断する。すでに購入済であれば、ライセンス購入係数を1.0とする。一方、未購入の場合には、プロジェクト管理ファイルのソフトウェアの利用開始年月日と利用終了年月日から得られる開発期間とソフトウェアの製品番号に基づき、ソフトウェア管理ファイルを調べ、利用期間に応じたライセンス購入係数を取り出す。開発機の月額費用は、以下の計算式(4)で算出される。   [Step S112] The actual development cost is calculated. The monthly usage fee of the hardware management file 123 is taken out based on the development machine server name obtained in step S105 or step S110. Further, based on the development machine server name and software product number, the project order number in use is extracted from the development machine management file. Based on the software product number obtained in step S105 or step S110, the monthly usage fee of the software management file 124 is taken out. Further, based on the development machine server name and the software product number, the development machine management file 122 is checked to determine whether a license has already been purchased. If it has already been purchased, the license purchase coefficient is set to 1.0. On the other hand, if it has not been purchased, the software management file is examined based on the development period and software product number obtained from the start date and end date of use of the software in the project management file. Get license purchase factor. The monthly cost of the development machine is calculated by the following formula (4).

開発機の月額費用=ハードウェア月額利用料+Σライセンス購入係数×ソフトウェア
月額利用料 ・・・(4)
プロジェクトオーダ番号に基づき、プロジェクトオーダ管理ファイル310に、算出した今月度の月額費用の実績値を累計して更新する。
Monthly cost for development machine = Monthly usage fee for hardware + Σ license purchase coefficient × Monthly usage fee for software (4)
Based on the project order number, the actual value of the calculated monthly cost for the current month is accumulated and updated in the project order management file 310.

さらに、ステップS105またはステップS110によって検索された開発機サーバ名とソフトウェア製品番号より、当月度の開発機サーバ利用料とソフトウェア利用料より、来月以降の残り月分の利用料を見込みとして計算し、今までの開発実績に加算し、プロジェクトオーダ管理ファイルの最新見積り開発機費に書き込む。このとき、開発機サーバの仮想月額費用を式(1)により算出し、最新見積り開発機利用費用を計算式(5)で算出する。   Further, from the development machine server name and software product number retrieved in step S105 or step S110, the usage fee for the remaining months from next month is calculated based on the development machine server usage fee and software usage fee for the current month. , Add to the development results so far and write the latest estimated development machine cost in the project order management file. At this time, the virtual monthly fee of the development machine server is calculated by the formula (1), and the latest estimated development machine usage cost is calculated by the calculation formula (5).

最新見積り開発機利用費用=当月までの開発機利用費用実績+残期間月数×(ハードウェア月額利用料+Σライセンス購入係数×ソフトウェア月額利用料) ・・・(5)
ただし、当月までの開発機利用費用実績は、前述のように、式(4)で得られた実績値の累計である。
Latest estimated development machine usage cost = development machine usage cost up to the current month + number of remaining months * (monthly hardware usage fee + Σ license purchase coefficient × monthly software usage fee) (5)
However, the actual cost of using the development machine up to the current month is the cumulative total of the actual values obtained from Equation (4) as described above.

さらに、最新見積り開発機費用と計画予算の開発機費用とを比較し、見積り費用が計画予算を超える場合は、プロジェクト管理者に計画の見直しを通知する。
[ステップS113] ステップS103またはステップS105で検出され、ライセンスの登録または削除が行われた、初期化を必要とする開発機サーバがあるかどうかを判定する。ない場合は、処理を終了する。
Furthermore, the latest estimated development machine cost is compared with the development machine cost of the planned budget. If the estimated cost exceeds the planned budget, the project manager is notified of the plan revision.
[Step S113] It is determined whether or not there is a development machine server that is detected in step S103 or step S105 and that has been registered or deleted and requires initialization. If not, the process ends.

[ステップS114] ライセンス削除対象となった開発機サーバ及びライセンス登録対象となった開発機サーバのライセンス登録削除プログラムを呼び出し、システムの再起動を依頼する。再起動させることにより、登録または削除が有効になる。   [Step S114] The license registration deletion program of the development machine server targeted for license deletion and the development machine server targeted for license registration is called to request a system restart. By restarting, registration or deletion becomes valid.

[ステップS115] すべての初期化が終了したかどうかを判定する。終了していなければ、ステップS114に戻って、次のライセンスキーの削除を行う。
次に、開発機監視処理について説明する。図14は、本発明の実施の形態の開発機監視処理の手順を示したフローチャートである。
[Step S115] It is determined whether all initializations have been completed. If not completed, the process returns to step S114 to delete the next license key.
Next, the development machine monitoring process will be described. FIG. 14 is a flowchart showing the procedure of the development machine monitoring process according to the embodiment of the present invention.

サーバ管理者がサーバ管理者端末500経由で確認処理実行依頼を行うと、処理が起動される。
[ステップS201] 開発機管理ファイル122のステータスが「未使用」のものを調べ、その開発機で未使用のソフトウェアライセンスを検索する。なお、未出荷ソフトウェアは除外する。未出荷ソフトウェアであるかどうかは、前述のように、ソフトウェア製品番号に基づき、ソフトウェア管理ファイル124の出荷情報を確認して判定する。
When the server administrator makes a confirmation process execution request via the server administrator terminal 500, the process is started.
[Step S201] The development machine management file 122 is checked for a status of “unused”, and an unused software license is searched for the development machine. Unshipped software is excluded. As described above, whether the software is unshipped software is determined by confirming the shipping information in the software management file 124 based on the software product number.

[ステップS202] 開発機に対する未使用ライセンスの確認が終了したかどうかを判定する。確認が終了している場合は、処理を終了する。
[ステップS203] 開発機サーバの状態監視プログラムを起動し、時刻確認依頼を行う。また、ステップS201でこの開発サーバ機に未使用のソフトウェアライセンスがあれば、ライセンス確認依頼も行う。なお、開発機サーバでは、時刻情報を送信するとともに、ライセンス確認要求のあったライセンスキーの登録を調べ、登録されているかどうかを通知する。
[Step S202] It is determined whether or not the confirmation of the unused license for the development machine is completed. If the confirmation has been completed, the process ends.
[Step S203] The state monitoring program of the development machine server is started and a time confirmation request is made. If there is an unused software license in this development server machine in step S201, a license confirmation request is also made. The development machine server transmits time information, checks the registration of the license key for which a license confirmation request has been made, and notifies whether it has been registered.

[ステップS204] 開発機サーバからの応答に基づき、未使用ライセンスがあるかどうかを判定する。すなわち、開発機管理ファイル122のステータスで未使用が設定されているライセンスキーが開発機サーバに登録されていれば、未使用ライセンス有りという応答が得られる。未使用ライセンスがない場合は、処理をステップS206へ進める。   [Step S204] Based on the response from the development machine server, it is determined whether there is an unused license. That is, if a license key that is set to unused in the status of the development machine management file 122 is registered in the development machine server, a response that there is an unused license is obtained. If there is no unused license, the process proceeds to step S206.

[ステップS205] 未使用ライセンスのライセンスキーが登録されている開発機サーバ名と、発見された未使用ライセンスキーをサーバ管理者に通知する。
[ステップS206] 開発機サーバの時刻情報を調べ、開発機サーバの時刻が24時間以上前であるかを判定する。24時間以上前でなければ、ステップS202へ戻って、次の開発機サーバへの処理を行う。
[Step S205] The server manager is notified of the name of the development machine server in which the license key of the unused license is registered, and the discovered unused license key.
[Step S206] The time information of the development machine server is checked to determine whether the time of the development machine server is more than 24 hours ago. If it is not more than 24 hours ago, the process returns to step S202 to perform processing for the next development machine server.

[ステップS207] 開発機サーバの時刻が24時間以上前であれば、この開発機サーバ名とその時刻をサーバ管理者に通知する。
以上の処理手順が実行されることにより、使用が許可されないライセンスキーを用いてソフトウェアを不正利用していた場合、これを検出することができる。なお、上記の説明では、サーバ管理者からの要求で処理を実行するとしたが、所定の周期で実行させるようにすることもできる。
[Step S207] If the time of the development machine server is more than 24 hours ago, the server administrator is notified of the development server name and the time.
By executing the above processing procedure, it is possible to detect when the software is illegally used using a license key that is not permitted to be used. In the above description, the process is executed in response to a request from the server administrator. However, the process may be executed at a predetermined cycle.

なお、上記の処理機能は、クライアントサーバシステムのサーバコンピュータによって実現することができる。その場合、開発機管理サーバが有すべき機能の処理内容を記述したサーバプログラムが提供される。サーバコンピュータは、クライアントコンピュータからの要求に応答して、サーバプログラムを実行する。これにより、上記処理機能がサーバコンピュータ上で実現され、処理結果がクライアントコンピュータに提供される。   The above processing functions can be realized by a server computer of a client server system. In that case, a server program describing the processing contents of the functions that the development machine management server should have is provided. The server computer executes the server program in response to a request from the client computer. As a result, the processing function is realized on the server computer, and the processing result is provided to the client computer.

処理内容を記述したサーバプログラムは、サーバコンピュータで読み取り可能な記録媒体に記録しておくことができる。サーバコンピュータで読み取り可能な記録媒体としては、磁気記録装置、光ディスク、光磁気記録媒体、半導体メモリなどがある。磁気記録装置には、ハードディスク装置(HDD)、フレキシブルディスク(FD)、磁気テープなどがある。光ディスクには、DVD(Digital Versatile Disc)、DVD−RAM(Random Access Memory)、CD−ROM(Compact Disc Read Only Memory)、CD−R(Recordable)/RW(ReWritable)などがある。光磁気記録媒体には、MO(Magneto-Optical disk)などがある。   The server program describing the processing contents can be recorded on a recording medium readable by the server computer. Examples of the recording medium readable by the server computer include a magnetic recording device, an optical disk, a magneto-optical recording medium, and a semiconductor memory. Examples of the magnetic recording device include a hard disk device (HDD), a flexible disk (FD), and a magnetic tape. Examples of the optical disc include a DVD (Digital Versatile Disc), a DVD-RAM (Random Access Memory), a CD-ROM (Compact Disc Read Only Memory), and a CD-R (Recordable) / RW (ReWritable). Magneto-optical recording media include MO (Magneto-Optical disk).

サーバプログラムを流通させる場合には、たとえば、そのサーバプログラムが記録されたDVD、CD−ROMなどの可搬型記録媒体が販売される。
サーバプログラムを実行するサーバコンピュータは、たとえば、可搬型記録媒体に記録されたサーバプログラムを、自己の記憶装置に格納する。そして、サーバコンピュータは、自己の記憶装置からサーバプログラムを読み取り、サーバプログラムに従った処理を実行する。なお、サーバコンピュータは、可搬型記録媒体から直接サーバプログラムを読み取り、そのサーバプログラムに従った処理を実行することもできる。
When distributing a server program, for example, portable recording media such as a DVD and a CD-ROM on which the server program is recorded are sold.
The server computer that executes the server program stores, for example, the server program recorded on the portable recording medium in its own storage device. Then, the server computer reads the server program from its own storage device and executes processing according to the server program. The server computer can also read the server program directly from the portable recording medium and execute processing according to the server program.

(付記1) 共同利用される複数の開発機をプロジェクトごとに割当てる開発機割当てプログラムにおいて、
コンピュータを、
前記開発機の利用申請時、前記プロジェクトで利用する前記開発機の利用期間、ハードウェア仕様、必要なソフトウェアを含む検索条件が設定されると、既に前記開発機が割当てられたプロジェクトとその利用期間に関するプロジェクト管理情報、前記開発機が具備するソフトウェアに関する開発機管理情報、前記開発機のハードウェア仕様と利用料に関するハードウェア管理情報及び利用可能なソフトウェアと利用料に関するソフトウェア管理情報を検索し、前記検索条件に適合する開発機を抽出する開発機検索手段、
前記ハードウェア管理情報の前記利用料及び前記ソフトウェア管理情報の前記利用料に関する情報に基づき、抽出された前記開発機を利用する場合の利用費用を見積る利用費用見積り手段、
抽出された前記開発機の利用が承認されれば、前記プロジェクトの確実度を判定し、前記確実度が高い場合には前記プロジェクトに前記開発機を割当て、前記プロジェクト管理情報に登録する開発機割当て手段、
として機能させることを特徴とする開発機割当てプログラム。
(Supplementary note 1) In the development machine assignment program that assigns multiple development machines to be shared for each project,
Computer
When a search condition including the usage period of the development machine used in the project, hardware specifications, and necessary software is set at the time of application for use of the development machine, the project to which the development machine has already been assigned and its usage period Search for project management information related to, development machine management information related to software included in the development machine, hardware management information related to hardware specifications and usage fees of the development machine, and software management information related to usable software and usage charges, and Development machine search means to extract development machines that meet the search conditions,
Usage cost estimation means for estimating a usage cost when using the extracted development machine based on the information on the usage fee of the hardware management information and the usage fee of the software management information;
If the use of the extracted development machine is approved, the certainty level of the project is determined. If the certainty level is high, the development machine is assigned to the project and registered in the project management information. means,
Development machine assignment program characterized by functioning as

(付記2) 前記開発機検索手段では、前記プロジェクトに関するプロジェクト計画情報を読み出し、前記検索条件と前記プロジェクト計画情報の内容を照合して前記検索条件が前記プロジェクト計画に適合するかどうかを判定し、適合する場合には前記検索条件に基づく前記開発機の検索を行わせる、
ことを特徴とする付記1記載の開発機割当てプログラム。
(Additional remark 2) In the said development machine search means, the project plan information regarding the said project is read, the said search conditions and the content of the said project plan information are collated, and it is determined whether the said search conditions are suitable for the said project plan, If it matches, the search for the development machine based on the search condition is performed.
The development machine assignment program according to appendix 1, characterized in that:

(付記3) 前記開発機検索手段では、前記検索条件の前記利用期間に使用可能な前記開発機を検索する際に、前記利用期間の前後に所定の余裕期間を付加し、前記余裕期間を含む前記利用期間に使用可能な前記開発機を検索させる、
ことを特徴とする付記1記載の開発機割当てプログラム。
(Additional remark 3) When the said development machine search means searches the said development machine which can be used in the said utilization period of the said search conditions, a predetermined margin period is added before and after the said utilization period, and the said margin period is included. Search for the development machine that can be used during the usage period,
The development machine assignment program according to appendix 1, characterized in that:

(付記4) 前記開発機割当て手段では、前記開発機検索手段により複数の前記開発機が抽出された場合には、前記利用費用見積り手段によって算出された前記利用費用の見積りが最も低い前記開発機を選択させる、
ことを特徴とする付記1記載の開発機割当てプログラム。
(Additional remark 4) In the said development machine allocation means, when the said several development machine is extracted by the said development machine search means, the said development machine with the lowest estimate of the said usage cost calculated by the said usage cost estimation means To select,
The development machine assignment program according to appendix 1, characterized in that:

(付記5) 前記開発機割当て手段では、前記検索条件に設定された前記必要なソフトウェアを前記ソフトウェア管理情報から抽出する際に、前記ソフトウェア管理情報に前記ソフトウェアごとに設定される前記ソフトウェアが利用可能となる予定日と、前記検索条件に設定される前記開発機の利用期間の利用開始日を照合し、前記利用開始日に前記ソフトウェアが利用可能でない場合は検索を中断させる、
ことを特徴とする付記1記載の開発機割当てプログラム。
(Additional remark 5) In the said development machine allocation means, when extracting the said required software set to the said search conditions from the said software management information, the said software set for every said software to the said software management information can be utilized The scheduled start date and the use start date of the use period of the development machine set in the search condition are collated, and the search is interrupted when the software is not available on the use start date,
The development machine assignment program according to appendix 1, characterized in that:

(付記6) 前記利用費用見積り手段では、前記開発機の利用申請が、既に割当てが行われた前記プロジェクトに対して行われたときは、予め前記ハードウェア管理情報及び前記ソフトウェア管理情報に規定された所定の変更手数料を前記利用費用の見積りに加算させる、
ことを特徴とする付記1記載の開発機割当てプログラム。
(Additional remark 6) In the said utilization cost estimation means, when the application for use of the said development machine is performed with respect to the said project which has already been allocated, it prescribes | regulates in the said hardware management information and the said software management information beforehand. A predetermined change fee is added to the estimated cost of use,
The development machine assignment program according to appendix 1, characterized in that:

(付記7) 共同利用される複数の開発機をプロジェクトごとに割当てる開発機割当て方法において、
開発機検索手段が、前記開発機の利用申請時、前記プロジェクトで利用する前記開発機の利用期間、ハードウェア仕様、必要なソフトウェアを含む検索条件が設定されると、既に前記開発機が割当てられたプロジェクトとその利用期間に関するプロジェクト管理情報、前記開発機が具備するソフトウェアに関する開発機管理情報、前記開発機のハードウェア仕様と利用料に関するハードウェア管理情報及び利用可能なソフトウェアと利用料に関するソフトウェア管理情報を検索し、前記検索条件に適合する開発機を抽出し、
利用費用見積り手段が、前記ハードウェア管理情報の前記利用料及び前記ソフトウェア管理情報の前記利用料に関する情報に基づき、抽出された前記開発機を利用する場合の利用費用の見積りを算出し、
開発機割当て手段が、抽出された前記開発機の利用が承認されれば、前記プロジェクトの確実度を判定し、前記確実度が高い場合には前記プロジェクトに前記開発機を割当て、前記プロジェクト管理情報に登録する、
ことを特徴とする開発機割当て方法。
(Supplementary note 7) In the development machine allocation method for allocating a plurality of jointly used development machines for each project,
When the development machine search means sets the search conditions including the usage period of the development machine used in the project, hardware specifications, and necessary software when applying for the use of the development machine, the development machine is already assigned. Project management information related to the developed project and its usage period, development machine management information related to the software included in the development machine, hardware management information related to the hardware specifications and usage fee of the development machine, and software management related to available software and usage charges Search for information, extract development machines that meet the search conditions,
Based on the information about the usage fee of the hardware management information and the usage fee of the software management information, the usage cost estimation means calculates an estimate of the usage cost when using the extracted development machine,
If the development machine assigning means approves the use of the extracted development machine, it determines the certainty of the project, and if the certainty is high, assigns the development machine to the project, and the project management information Register with,
A development machine assignment method characterized by the above.

(付記8) プロジェクトごとに割当てられ、共同利用される開発機を管理する開発機管理プログラムにおいて、
コンピュータを、
所定のタイミングで、既に前記開発機が割当てられたプロジェクトとその利用期間に関するプロジェクト管理情報から前記利用期間の終了年月日が過ぎた前記プロジェクトを検索し、前記開発機が具備するソフトウェアの利用期間とライセンスキーを含む開発機管理情報を検索して前記プロジェクトに割当てられた前記ライセンスキーを抽出し、該当の前記開発機のライセンス登録削除手段に対し、抽出された前記ライセンスキーを削除するように要請するとともに、前記プロジェクト管理情報から利用期間の開始年月日に到達した前記プロジェクトを検索し、前記開発管理情報を検索して前記ライセンスキーを抽出し、該当の前記開発機の前記登録削除手段に対し、抽出された前記ライセンスキーを登録するように要請するライセンス管理手段、
として機能させることを特徴とする開発機管理プログラム。
(Appendix 8) In the development machine management program that manages the development machines that are allocated for each project and used jointly,
Computer
At a predetermined timing, the project that has already been assigned to the development machine and the project management information related to the usage period are searched for the project that has passed the end date of the usage period, and the usage period of the software included in the development machine And the development machine management information including the license key is extracted, the license key assigned to the project is extracted, and the extracted license key is deleted with respect to the license registration deletion unit of the corresponding development machine. And requesting the project that has reached the start date of the use period from the project management information, searching for the development management information, extracting the license key, and deleting the registration of the corresponding development machine License management requesting to register the extracted license key Stage,
Development machine management program characterized by functioning as

(付記9) 前記ライセンス管理手段では、日付が更新されるときに起動され、前記ライセンスキーの削除は、前記利用期間の終了年月日が前日の前記プロジェクトを検索し、前記ライセンスキーの登録は、前記利用期間の開始年月日が当日の前記プロジェクトを検索させる、
ことを特徴とする付記8記載の開発機管理プログラム。
(Supplementary note 9) The license management means is activated when a date is updated, and the deletion of the license key is performed by searching for the project whose end date of the usage period is the previous day, and registering the license key , Search for the project whose start date of the usage period is the current day,
The development machine management program according to appendix 8, characterized in that

(付記10) 前記ライセンス管理手段では、前記開発機の前記利用期間の開始年月日及び所定の期日に、前記ハードウェア管理情報の前記利用料及び前記ソフトウェア管理情報の前記利用料に関する情報に基づき、前記開発機及び前記ソフトウェアの利用見積りを算出し、前記プロジェクト計画情報に設定される最新見積りに登録させる、
ことを特徴とする付記8記載の開発機管理プログラム。
(Additional remark 10) In the said license management means, based on the information regarding the said usage fee of the said hardware management information, and the said usage fee of the said software management information on the start date and the predetermined date of the said usage period of the said development machine Calculating a usage estimate for the development machine and the software and registering it in the latest estimate set in the project plan information;
The development machine management program according to appendix 8, characterized in that

(付記11) 前記ライセンス管理手段では、算出された前記最新見積りと、前記プロジェクト計画情報に設定される計画予算を比較し、前記最新見積りが前記計画予算を超える場合は、管理者に通知させる、
ことを特徴とする付記10記載の開発機管理プログラム。
(Additional remark 11) In the said license management means, the said latest estimate calculated and the plan budget set to the said project plan information are compared, and when the said latest estimate exceeds the said plan budget, it is made to notify an administrator,
The development machine management program according to supplementary note 10, characterized in that

(付記12) さらに、コンピュータを、
所定のタイミングで、前記開発機から前記開発機の保持する前記ライセンスキーの登録情報を取得し、前記開発機の前記開発機管理情報に設定された前記ライセンスキーと照合し、前記開発機管理情報に登録されていない前記ライセンスキーを検出したら、この未許可ライセンスキーを管理者に通知する開発機監視手段、
として機能させることを特徴とする付記8記載の開発機管理プログラム。
(Appendix 12) Further, the computer
The registration information of the license key held by the development machine is acquired from the development machine at a predetermined timing, checked with the license key set in the development machine management information of the development machine, and the development machine management information Development machine monitoring means for notifying the administrator of the unauthorized license key when the license key that is not registered with the license key is detected;
The development machine management program according to appendix 8, which is caused to function as

(付記13) 前記開発機監視手段では、
前記未許可ライセンスキーが登録された前記開発機の時刻情報を取得し、前記時刻情報により前記開発機の時刻が所定の期間より前に設定されていることが検出された場合、前記開発機の時刻を前記管理者に通知させる、
ことを特徴とする付記12記載の開発機管理プログラム。
(Supplementary note 13) In the development machine monitoring means,
If the time information of the development machine in which the unauthorized license key is registered is acquired and the time information of the development machine detects that the time of the development machine is set before a predetermined period, Let the administrator know the time,
The development machine management program according to appendix 12, characterized by:

(付記14) プロジェクトごとに割当てられ、共同利用される開発機を管理する開発機管理方法において、
ライセンス管理手段が、
所定のタイミングで、既に前記開発機が割当てられたプロジェクトとのその利用期間に関するプロジェクト管理情報から利用期間の終了年月日が過ぎた前記プロジェクトを検索し、
前記開発機が具備するソフトウェアの利用期間とライセンスキーを含む開発機管理情報を検索して前記プロジェクトに割当てられた前記ソフトウェアのライセンスキーを抽出し、該当の前記開発機のライセンス登録削除手段に対し、抽出された前記ソフトウェアのライセンスキーを削除するように要請し、
前記プロジェクト管理情報から利用期間の開始年月日に到達した前記プロジェクトを検索し、前記開発管理情報を検索して前記ソフトウェアのライセンスキーを抽出し、該当の前記開発機の前記登録削除手段に対し、抽出された前記ソフトウェアのライセンスキーを登録する、
ことを特徴とする開発機管理方法。
(Supplementary note 14) In the development machine management method for managing the development machines that are allocated for each project and used jointly,
License management means
At a predetermined timing, search for the project for which the end date of the use period has passed from the project management information regarding the use period with the project to which the development machine has already been assigned,
The development machine management information including the usage period and license key of the software included in the development machine is searched to extract the license key of the software assigned to the project, and the license registration deletion unit of the corresponding development machine is extracted. Request to delete the extracted license key of the software,
The project that has reached the start date of the usage period is searched from the project management information, the development management information is searched to extract the software license key, and the registration deletion unit of the corresponding development machine is extracted. Register the license key of the extracted software,
Development machine management method characterized by this.

(付記15) 共同利用される複数の開発機をプロジェクトごとに割当て、割当てられた前記開発機を管理する開発機管理装置において、
前記開発機の利用申請時、前記プロジェクトで利用する前記開発機の利用期間、ハードウェア仕様、必要なソフトウェアを含む検索条件が設定されると、既に前記開発機が割当てられたプロジェクトとその利用期間に関するプロジェクト管理情報、前記開発機が具備するソフトウェアに関する開発機管理情報、前記開発機のハードウェア仕様と利用料に関するハードウェア管理情報及び利用可能なソフトウェアと利用料に関するソフトウェア管理情報を検索し、前記検索条件に適合する開発機を抽出する開発機検索手段と、
前記ハードウェア管理情報の前記利用料及び前記ソフトウェア管理情報の前記利用料に関する情報に基づき、抽出された前記開発機を利用する場合の利用費用を見積る利用費用見積り手段と、
抽出された前記開発機の利用が承認されれば、前記プロジェクトの確実度を判定し、前記確実度が高い場合には前記プロジェクトに前記開発機を割当て、前記プロジェクト管理情報に登録する開発機割当て手段と、
所定のタイミングで、前記プロジェクト管理情報から利用期間の終了年月日が過ぎた前記プロジェクトを検索し、前記開発機が具備するソフトウェアの利用期間とライセンスキーを含む開発機管理情報を検索して前記プロジェクトに割当てられた前記ソフトウェアのライセンスキーを抽出し、該当の前記開発機のライセンス登録削除手段に対し、抽出された前記ソフトウェアのライセンスキーを削除するように要請するとともに、前記プロジェクト管理情報から利用期間の開始年月日に到達した前記プロジェクトを検索し、前記開発管理情報を検索して前記ソフトウェアのライセンスキーを抽出し、該当の前記開発機の前記登録削除手段に対し、抽出された前記ソフトウェアのライセンスキーを登録するように要請するライセンス管理手段、
を具備することを特徴とする開発機管理装置。
(Supplementary Note 15) In a development machine management apparatus that allocates a plurality of development machines to be shared for each project and manages the assigned development machines,
When a search condition including the usage period of the development machine used in the project, hardware specifications, and necessary software is set at the time of application for use of the development machine, the project to which the development machine has already been assigned and its usage period Search for project management information related to, development machine management information related to software included in the development machine, hardware management information related to hardware specifications and usage fees of the development machine, and software management information related to usable software and usage charges, and Development machine search means for extracting development machines that meet the search conditions;
Usage cost estimation means for estimating a usage cost when using the extracted development machine based on the information on the usage fee of the hardware management information and the usage fee of the software management information;
If the use of the extracted development machine is approved, the certainty level of the project is determined. If the certainty level is high, the development machine is assigned to the project and registered in the project management information. Means,
At a predetermined timing, the project that has passed the end date of the usage period is searched from the project management information, and the development machine management information including the usage period and license key of the software included in the development machine is searched for and The license key of the software assigned to the project is extracted, and the license registration deletion means of the corresponding development machine is requested to delete the extracted license key of the software and used from the project management information The project that has reached the start date of the period is searched, the development management information is searched to extract the license key of the software, and the extracted software is extracted to the registration deletion unit of the corresponding development machine License management means requesting to register the license key of
A development machine management device characterized by comprising:

本発明の原理図である。It is a principle diagram of the present invention. 実施の形態の開発機管理システムの構成図である。It is a block diagram of the development machine management system of an embodiment. 本実施の形態の開発機管理サーバのハードウェア構成例を示すブロック図である。It is a block diagram which shows the hardware structural example of the development machine management server of this Embodiment. 本発明の実施の形態のプロジェクト管理ファイルの構成例を示した図である。It is the figure which showed the example of a structure of the project management file of embodiment of this invention. 本発明の実施の形態の開発機管理ファイルの構成例を示した図である。It is the figure which showed the example of a structure of the development machine management file of embodiment of this invention. 本発明の実施の形態のハードウェア管理ファイルの構成例を示した図である。It is the figure which showed the structural example of the hardware management file of embodiment of this invention. 本発明の実施の形態のソフトウェア管理ファイルの構成例を示した図である。It is the figure which showed the example of a structure of the software management file of embodiment of this invention. 本発明の実施の形態のプロジェクトオーダ管理ファイルの構成例を示した図である。It is the figure which showed the example of a structure of the project order management file of embodiment of this invention. 本発明の実施の形態の開発機の利用申請における検索条件設定画面の一例である。It is an example of the search condition setting screen in the use application of the development machine of the embodiment of the present invention. 本発明の実施の形態の開発機の利用申請における検索結果画面の一例である。It is an example of the search result screen in the use application of the development machine of embodiment of this invention. 本発明の実施の形態の開発機割当て処理の手順を示したフローチャートである。It is the flowchart which showed the procedure of the development machine allocation process of embodiment of this invention. 本実施の形態の開発機検索処理の手順を示したフローチャートである。It is the flowchart which showed the procedure of the development machine search process of this Embodiment. 本発明の実施の形態のライセンス管理処理の処理手順を示したフローチャートである。It is the flowchart which showed the process sequence of the license management process of embodiment of this invention. 本発明の実施の形態の開発機監視処理の手順を示したフローチャートである。It is the flowchart which showed the procedure of the development machine monitoring process of embodiment of this invention.

符号の説明Explanation of symbols

10 開発機管理サーバ
11 開発機割当て処理部
11a 開発機検索手段
11b 利用費用見積り手段
11c 開発機割当て手段
12 開発機管理情報
12a プロジェクト管理情報
12b 開発機管理情報
12c ハードウェア管理情報
12d ソフトウェア管理情報
13 ライセンス監視処理部
13a ライセンス管理手段
13b 開発機監視手段
20a 開発機1
20b 開発機N
21a、21b ライセンス登録削除手段
22a、22b ライセンス監視手段
23a、23b ライセンス情報
24a、24b ソフトウェア
30 プロジェクト予算管理サーバ
31 プロジェルトオーダ管理ファイル
40 プロジェクト管理者端末
50 サーバ管理者端末
DESCRIPTION OF SYMBOLS 10 Development machine management server 11 Development machine allocation process part 11a Development machine search means 11b Usage cost estimation means 11c Development machine allocation means 12 Development machine management information 12a Project management information 12b Development machine management information 12c Hardware management information 12d Software management information 13 License monitoring processing unit 13a License management means 13b Development machine monitoring means 20a Development machine 1
20b Development machine N
21a, 21b License registration deletion means 22a, 22b License monitoring means 23a, 23b License information 24a, 24b Software 30 Project budget management server 31 Project order management file 40 Project manager terminal 50 Server manager terminal

Claims (5)

共同利用される複数の開発機をプロジェクトごとに割当てる開発機割当てプログラムにおいて、
コンピュータを、
前記開発機の利用申請時、前記プロジェクトで利用する前記開発機の利用期間、ハードウェア仕様、必要なソフトウェアを含む検索条件が設定されると、既に前記開発機が割当てられたプロジェクトとその利用期間に関するプロジェクト管理情報、前記開発機が具備するソフトウェアに関する開発機管理情報、前記開発機のハードウェア仕様と利用料に関するハードウェア管理情報及び利用可能なソフトウェアと利用料に関するソフトウェア管理情報を検索し、前記検索条件に適合する開発機を抽出する開発機検索手段、
前記ハードウェア管理情報の前記利用料及び前記ソフトウェア管理情報の前記利用料に関する情報に基づき、抽出された前記開発機を利用する場合の利用費用を見積る利用費用見積り手段、
抽出された前記開発機の利用が承認されれば、前記プロジェクトの確実度を判定し、前記確実度が高い場合には前記プロジェクトに前記開発機を割当て、前記プロジェクト管理情報に登録する開発機割当て手段、
として機能させることを特徴とする開発機割当てプログラム。
In the development machine assignment program that assigns multiple development machines to be shared for each project,
Computer
When a search condition including the usage period of the development machine used in the project, hardware specifications, and necessary software is set at the time of application for use of the development machine, the project to which the development machine has already been assigned and its usage period Search for project management information related to, development machine management information related to software included in the development machine, hardware management information related to hardware specifications and usage fees of the development machine, and software management information related to usable software and usage charges, and Development machine search means to extract development machines that meet the search conditions,
Usage cost estimation means for estimating a usage cost when using the extracted development machine based on the information on the usage fee of the hardware management information and the usage fee of the software management information;
If the use of the extracted development machine is approved, the certainty level of the project is determined. If the certainty level is high, the development machine is assigned to the project and registered in the project management information. means,
Development machine assignment program characterized by functioning as
前記開発機検索手段では、前記検索条件の前記利用期間に使用可能な前記開発機を検索する際に、前記利用期間の前後に所定の余裕期間を付加し、前記余裕期間を含む前記利用期間に使用可能な前記開発機を検索させる、
ことを特徴とする請求項1記載の開発機割当てプログラム。
In the development machine search means, when searching for the development machine that can be used in the usage period of the search condition, a predetermined margin period is added before and after the usage period, and the usage period including the margin period is included in the usage period. Search for the development machine that can be used.
2. The development machine assignment program according to claim 1, wherein:
前記利用費用見積り手段では、前記開発機の利用申請が、既に割当てが行われた前記プロジェクトに対して行われたときは、予め前記ハードウェア管理情報及び前記ソフトウェア管理情報に規定された所定の変更手数料を前記利用費用の見積りに加算させる、
ことを特徴とする請求項1記載の開発機割当てプログラム。
In the usage cost estimation means, when the application for use of the development machine is made for the already allocated project, a predetermined change defined in advance in the hardware management information and the software management information Add a fee to the estimate of usage costs;
2. The development machine assignment program according to claim 1, wherein:
プロジェクトごとに割当てられ、共同利用される開発機を管理する開発機管理プログラムにおいて、
コンピュータを、
所定のタイミングで、既に前記開発機が割当てられたプロジェクトとその利用期間に関するプロジェクト管理情報から前記利用期間の終了年月日が過ぎた前記プロジェクトを検索し、前記開発機が具備するソフトウェアの利用期間とライセンスキーを含む開発機管理情報を検索して前記プロジェクトに割当てられた前記ライセンスキーを抽出し、該当の前記開発機のライセンス登録削除手段に対し、抽出された前記ライセンスキーを削除するように要請するとともに、前記プロジェクト管理情報から利用期間の開始年月日に到達した前記プロジェクトを検索し、前記開発管理情報を検索して前記ライセンスキーを抽出し、該当の前記開発機の前記登録削除手段に対し、抽出された前記ライセンスキーを登録するように要請するライセンス管理手段、
として機能させることを特徴とする開発機管理プログラム。
In the development machine management program that manages the development machines that are allocated for each project and used jointly,
Computer
At a predetermined timing, the project that has already been assigned to the development machine and the project management information related to the usage period are searched for the project that has passed the end date of the usage period, and the usage period of the software included in the development machine And the development machine management information including the license key is extracted, the license key assigned to the project is extracted, and the extracted license key is deleted with respect to the license registration deletion unit of the corresponding development machine. And requesting the project that has reached the start date of the use period from the project management information, searching for the development management information, extracting the license key, and deleting the registration of the corresponding development machine License management requesting to register the extracted license key Stage,
Development machine management program characterized by functioning as
さらに、コンピュータを、
所定のタイミングで、前記開発機から前記開発機の保持する前記ライセンスキーの登録情報を取得し、前記開発機の前記開発機管理情報に設定された前記ライセンスキーと照合し、前記開発機管理情報に登録されていない前記ライセンスキーを検出したら、この未許可ライセンスキーを管理者に通知する開発機監視手段、
として機能させることを特徴とする請求項4記載の開発機管理プログラム。
In addition, the computer
The registration information of the license key held by the development machine is acquired from the development machine at a predetermined timing, checked with the license key set in the development machine management information of the development machine, and the development machine management information Development machine monitoring means for notifying the administrator of the unauthorized license key when the license key that is not registered with the license key is detected;
5. The development machine management program according to claim 4, wherein the development machine management program is functioned as:
JP2005023984A 2005-01-31 2005-01-31 Development machine assignment program and development machine management program Pending JP2006209672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005023984A JP2006209672A (en) 2005-01-31 2005-01-31 Development machine assignment program and development machine management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005023984A JP2006209672A (en) 2005-01-31 2005-01-31 Development machine assignment program and development machine management program

Publications (1)

Publication Number Publication Date
JP2006209672A true JP2006209672A (en) 2006-08-10

Family

ID=36966422

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005023984A Pending JP2006209672A (en) 2005-01-31 2005-01-31 Development machine assignment program and development machine management program

Country Status (1)

Country Link
JP (1) JP2006209672A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013225206A (en) * 2012-04-20 2013-10-31 Docomo Technology Inc Retrieval expression validity determination device, retrieval expression validity determination method, and program
JP6126193B1 (en) * 2015-12-15 2017-05-10 株式会社オプティム Application management system, application management method and program thereof
CN115187318A (en) * 2022-06-29 2022-10-14 广州市华达石化有限公司 Billing method, billing device, electronic device and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10105406A (en) * 1996-09-25 1998-04-24 Hitachi Inf Syst Ltd System for installing and updating software
JP2001243353A (en) * 2000-02-29 2001-09-07 Orix Corp Personal computer rental system utilizing communication line
JP2001306775A (en) * 2000-04-18 2001-11-02 Toppan Printing Co Ltd System and method for developing electronic equipment
JP2002207942A (en) * 2001-01-05 2002-07-26 Nec Fielding Ltd System and device for system environment generation
JP2002258968A (en) * 2001-03-02 2002-09-13 Toshiba Corp Software management system, software management method and its program
JP2002288416A (en) * 2001-03-27 2002-10-04 Hitachi Ltd Assets management method
JP2002366736A (en) * 2001-06-08 2002-12-20 Argo 21 Corp Property management system and property management method using this
JP2003099662A (en) * 2001-09-21 2003-04-04 Denso Corp Equipment management device, equipment management system and program

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10105406A (en) * 1996-09-25 1998-04-24 Hitachi Inf Syst Ltd System for installing and updating software
JP2001243353A (en) * 2000-02-29 2001-09-07 Orix Corp Personal computer rental system utilizing communication line
JP2001306775A (en) * 2000-04-18 2001-11-02 Toppan Printing Co Ltd System and method for developing electronic equipment
JP2002207942A (en) * 2001-01-05 2002-07-26 Nec Fielding Ltd System and device for system environment generation
JP2002258968A (en) * 2001-03-02 2002-09-13 Toshiba Corp Software management system, software management method and its program
JP2002288416A (en) * 2001-03-27 2002-10-04 Hitachi Ltd Assets management method
JP2002366736A (en) * 2001-06-08 2002-12-20 Argo 21 Corp Property management system and property management method using this
JP2003099662A (en) * 2001-09-21 2003-04-04 Denso Corp Equipment management device, equipment management system and program

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013225206A (en) * 2012-04-20 2013-10-31 Docomo Technology Inc Retrieval expression validity determination device, retrieval expression validity determination method, and program
JP6126193B1 (en) * 2015-12-15 2017-05-10 株式会社オプティム Application management system, application management method and program thereof
JP2017111577A (en) * 2015-12-15 2017-06-22 株式会社オプティム Application management system, application management method, and program therefor
CN115187318A (en) * 2022-06-29 2022-10-14 广州市华达石化有限公司 Billing method, billing device, electronic device and storage medium

Similar Documents

Publication Publication Date Title
US10437795B2 (en) Upgrading systems with changing constraints
JP6499085B2 (en) Resource annotations
US7519561B2 (en) System, method and program to manage software licenses
US11263048B1 (en) Resource tolerations and taints
US8781970B2 (en) System, method and program product to determine resolution when software installed on a computer is not properly licensed
EP2435908B1 (en) Java store
US20060294019A1 (en) On demand business model to reuse software license
US10394488B2 (en) Managing a collection of data
TW200813834A (en) Apparatus and methods for updating firmware
JP5643307B2 (en) Method and system for optimizing license usage
CN101485129A (en) Enforced seat-based licensing
JP2017134773A (en) License management server, license management system, and program
JP2012033096A (en) License check system and resource pool management system
US20180144108A1 (en) License management system and license management method
EP3115917B1 (en) Information processing apparatus, method, and program
US8327457B1 (en) Managing asset access
JP2009069959A (en) Software management system, method, and program
JP2006209672A (en) Development machine assignment program and development machine management program
US20060248513A1 (en) z/OS rapid automated deployment method
CN111522626A (en) Virtual machine list generation method and device and electronic equipment
JP6191162B2 (en) Server device, service free use management method and service free use management program
KR101116565B1 (en) Filtering method and system to advertisement a cutoff
CN107667343B (en) System and method for loading on-demand resources
JP4894592B2 (en) Information notification apparatus, information notification method, and program
JP2005301465A (en) Software investment management method and system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100525

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100721

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101116

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110308