JP2006199244A - Control method for information processor, information processor, and program - Google Patents

Control method for information processor, information processor, and program Download PDF

Info

Publication number
JP2006199244A
JP2006199244A JP2005015849A JP2005015849A JP2006199244A JP 2006199244 A JP2006199244 A JP 2006199244A JP 2005015849 A JP2005015849 A JP 2005015849A JP 2005015849 A JP2005015849 A JP 2005015849A JP 2006199244 A JP2006199244 A JP 2006199244A
Authority
JP
Japan
Prior art keywords
train
station
information
stop
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005015849A
Other languages
Japanese (ja)
Inventor
Hiroshi Imai
博 今井
Kazunori Matsuda
和則 松田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2005015849A priority Critical patent/JP2006199244A/en
Publication of JP2006199244A publication Critical patent/JP2006199244A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To prepare a station yard switching plan accurately and efficiently for a station where trains are switched in the station yard. <P>SOLUTION: An information processor receives main line data (train schedule, train service) stored in a central transportation plan management system, the data including a basic plan for a train schedule change and daily changing plans. The processor manages base data including facility conditions for individual stations, and displays the main line data in the form of schedule lines on a graphic display. Based on the displayed information, station yard train data and station yard train schedule data are put into the processor through mouse manipulation or the like, and the processor generates station yard switching plan data, using input data, and stores the generated switching plan data. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、情報処理装置の制御方法、情報処理装置、及びプログラムに関する。   The present invention relates to a method for controlling an information processing apparatus, an information processing apparatus, and a program.

列車は始発駅を発車した後、途中駅を経由して終着駅に到着することにより運行されている。この列車の運行は予め定められた運行計画に従って行われる。列車の運行計画は、始発駅から終着駅までの運行計画を定めた本線運行計画と、駅の構内における運行計画を定めた構内運行計画とにより構成される。   The trains are operated by arriving at the final station after departing from the first station. This train is operated according to a predetermined operation plan. The train operation plan is composed of a main line operation plan that defines an operation plan from the first station to the end station, and an on-site operation plan that defines an operation plan for the station.

本線運行計画は、縦軸に各駅、横軸に時刻が記載された用紙に各列車の各時刻における位置を描画したダイヤスジにより表すことができる。また構内運行計画も同様にダイヤスジにより表すことができる。ただし構内運行計画の場合は、縦軸には駅構内に設けられる車庫や引き上げ線等の列車の各停留箇所が記載される。   The main line operation plan can be represented by a diagram in which the position of each train at each time is drawn on a sheet of paper on which the vertical axis represents each station and the horizontal axis represents time. A campus operation plan can also be represented by a diagram. However, in the case of a campus operation plan, the vertical axis indicates each stop point of a train such as a garage or a pull-up line provided in the station.

列車の運行計画の作成は、安全性の確保や輸送効率の維持向上など、様々な点を考慮しながら行われるため、作業量が膨大であり、大きな負担となっている。かかる負担を軽減するために様々な技術が開発されている(例えば特許文献1参照)。
特開2000−52992号公報
The preparation of train operation plans is carried out in consideration of various points such as ensuring safety and maintaining and improving transportation efficiency. Therefore, the amount of work is enormous and a heavy burden. Various techniques have been developed to reduce this burden (see, for example, Patent Document 1).
JP 2000-52992 A

ところで、構内運行計画は本線運行計画に抵触しないように作成される必要がある。そのため構内運行計画は本線運行計画の策定後に作成される必要があり、短期間で作成されなければならない。一方で、従来の構内運行計画の作成は各駅にて手作業で行われているため、本線運行計画の抜粋ミスや転記ミスが発生する可能性がある上、多大な作業時間と労力を要している。   By the way, the campus operation plan needs to be created so as not to conflict with the main line operation plan. Therefore, the premises operation plan needs to be prepared after the main line operation plan is formulated, and it must be prepared in a short period of time. On the other hand, since the preparation of a conventional on-site operation plan is performed manually at each station, there is a possibility that an error in exchanging the main line operation plan or a transcription error may occur, and a large amount of work time and labor are required. ing.

本発明は上記課題を鑑みてなされたものであり、構内運行計画の作成を正確かつ効率良く行うことができる情報処理装置の制御方法、情報処理装置、及びプログラムを提供することを主たる目的とする。   The present invention has been made in view of the above problems, and has as its main object to provide a control method for an information processing apparatus, an information processing apparatus, and a program capable of accurately and efficiently creating a campus operation plan. .

上記課題を解決するために、本発明は、駅の構内に設けられる列車の各停留箇所を示す情報と各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す情報とを記憶し、駅の構内における列車の運行計画の作成を支援する情報処理装置の制御方法であって、前記運行計画の作成者により操作される情報処理端末から、前記運行計画の作成を開始する旨の情報を受信し、前記駅を着発又は通過する各列車について、前記着発又は通過する停留箇所を示す情報と、前記着発又は通過する時刻を示す情報と、前記駅に隣接する隣接駅を着発又は通過する時刻を示す情報と、を少なくとも対応付けた本線運行計画データを記憶する本線運行計画管理サーバから、前記本線運行計画データを受信し、各列車が前記駅を着発又は通過する時刻を示す前記情報、前記隣接駅を着発又は通過する時刻を示す前記情報、及び前記駅の構内に設けられる列車の各停留箇所を示す前記情報に基づいて、前記駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を示すダイヤスジを前記情報処理端末のユーザインタフェースに表示し、前記運行計画の作成者により前記情報処理端末に入力された、前記駅を終着駅として到着する列車を指定する情報、及び前記指定された列車を引き上げる停留箇所を指定する情報を、前記情報処理端末から受信し、前記本線運行計画データ、及び前記各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す前記情報に基づいて、前記指定された列車が到着する停留箇所から前記指定された停留箇所へ前記列車を引き上げることを示すダイヤスジを、前記情報処理端末のユーザインタフェースに表示し、前記指定された列車を示す情報と、前記指定された列車が到着した停留箇所を発車する時刻を示す情報と、前記指定された列車が前記指定された停留箇所へ到着する時刻を示す情報と、前記指定された停留箇所を示す情報と、を少なくとも対応付けた構内運行計画データを記憶することを特徴とする情報処理装置の制御方法に関する。   In order to solve the above problems, the present invention shows information indicating each stop location of a train provided on the station premises and each time required to move the train from each stop location to each other stop location. Information processing apparatus, and a method for controlling an information processing apparatus that supports creation of a train operation plan on a station premises, wherein the operation plan is created from an information processing terminal operated by a creator of the operation plan. For each train that arrives at or passes through the station, information indicating the start point, information indicating the stop point at which the train arrives or passes, information indicating the time at which the train arrives or passes, and adjacent to the station The main line operation plan data is received from a main line operation plan management server that stores main line operation plan data that associates at least information indicating the time of arrival or departure of the adjacent station, and each train arrives at the station. Or Based on the information indicating the time to pass, the information indicating the time to arrive at or pass through the adjacent station, and the information indicating each stop point of the train provided in the station premises, A schedule indicating each position of each passing train at each time is displayed on the user interface of the information processing terminal, and the station input by the creator of the operation plan to the information processing terminal arrives as the terminal station Information specifying a train and information specifying a stop where the specified train is to be pulled up are received from the information processing terminal, and trains are sent from the main line operation plan data and from each stop to each other stop. Based on the information indicating the time required to move the train from the stop where the designated train arrives to the designated stop A schedule indicating that the designated train is displayed is displayed on the user interface of the information processing terminal, information indicating the designated train, information indicating a time at which the designated train arrives, and the designation An information processing apparatus for storing on-site operation plan data that associates at least information indicating a time at which a train arrives at the specified stop with information indicating the specified stop Relates to the control method.

その他、本願が開示する課題、及びその解決方法は、発明を実施するための最良の形態の欄、及び図面により明らかにされる。   In addition, the problems disclosed by the present application and the solutions thereof will be clarified by the column of the best mode for carrying out the invention and the drawings.

構内運行計画の作成を正確かつ効率良く行うことができる情報処理装置の制御方法、情報処理装置、及びプログラムを提供することができる。   It is possible to provide an information processing device control method, an information processing device, and a program capable of accurately and efficiently creating a campus operation plan.

===全体構成例===
本実施の形態に係る構内入換計画作成システム10の全体構成を図1に示す。構内入換計画作成システム10は、駅の構内における列車の運行計画すなわち構内運行計画の作成を支援する情報処理システムである。構内入換計画作成システム10は、構内入換計画作成サーバ(特許請求の範囲に記載の情報処理装置に相当する)60と構内入換計画作成端末(特許請求の範囲に記載の情報処理端末に相当する)50とを含んで構成される。
=== Example of Overall Configuration ===
FIG. 1 shows an overall configuration of a premises replacement plan creation system 10 according to the present embodiment. The premises exchange plan creation system 10 is an information processing system that supports creation of a train operation plan in a station premises, that is, a premises operation plan. The premises replacement plan creation system 10 includes a premises replacement plan creation server (corresponding to the information processing device described in the claims) 60 and a premises replacement plan creation terminal (in the information processing terminal described in the claims). 50).

構内入換計画作成サーバ60は、構内運行計画の作成を支援するコンピュータである。構内入換計画作成端末50は、構内運行計画の作成者により操作されるコンピュータである。構内入換計画作成サーバ60と構内入換計画作成端末50とは通信可能に接続される。   The campus replacement plan creation server 60 is a computer that supports creation of a campus operation plan. The campus replacement plan creation terminal 50 is a computer operated by the creator of the campus operation plan. The premises exchange plan creation server 60 and the premises exchange plan creation terminal 50 are connected to be communicable.

また構内入換計画作成サーバ60は、ネットワーク40を介して計画情報伝達サーバ30と通信可能に接続される。この計画情報伝達サーバ30は輸送計画管理サーバ(特許請求の範囲に記載の本線運行計画管理サーバに相当する)20と通信可能に接続される。輸送計画管理サーバ20は、本線運行計画データすなわち本線運行計画の内容を定めるデータを記憶しており、本線運行計画を管理するコンピュータである。計画情報伝達サーバ30は、輸送計画管理サーバ20に記憶される上記本線運行計画データの送信要求を構内入換計画作成サーバ60から受信すると、上記輸送計画管理サーバ20から送信された上記本線運行計画データを構内入換計画作成サーバ60に送信するコンピュータである。   The private branch exchange plan creation server 60 is connected to the plan information transmission server 30 via the network 40 so as to be communicable. This plan information transmission server 30 is communicably connected to a transport plan management server (corresponding to a main line operation plan management server described in claims) 20. The transportation plan management server 20 stores main line operation plan data, that is, data defining the contents of the main line operation plan, and is a computer that manages the main line operation plan. When the plan information transmission server 30 receives the transmission request for the main line operation plan data stored in the transportation plan management server 20 from the local exchange plan creation server 60, the main line operation plan transmitted from the transportation plan management server 20. It is a computer that transmits data to the premises exchange plan creation server 60.

ネットワーク40は、鉄道会社により独自に構築される専用の情報通信網とすることもできるし、インターネットのような一般の情報通信網とすることもできる。   The network 40 can be a dedicated information communication network that is uniquely constructed by a railway company, or can be a general information communication network such as the Internet.

一方、構内入換計画作成サーバ60は、駅内ネットワーク80を介してプリンタ(特許請求の範囲に記載の印刷装置に相当する)90やPRC(Programmed Route Control)装置70と通信可能に接続される。駅内ネットワーク80は、駅の構内に構築されたLAN(Local Area network)とすることができる。PRC装置70は、駅の構内を走行する各列車の進路を定める信号機や転轍機等の制御を行うコンピュータである。   On the other hand, the premises replacement plan creation server 60 is connected to a printer (corresponding to a printing device described in claims) 90 and a PRC (Programmed Route Control) device 70 via a station network 80 so as to be communicable. . The in-station network 80 can be a LAN (Local Area Network) built on the station premises. The PRC device 70 is a computer that controls a traffic light, a switch, and the like that determine the course of each train traveling on the premises of a station.

上述したように構内入換計画作成サーバ60はコンピュータであるので、CPU(Central Processing Unit)やメモリ、ハードディスク装置、通信ポート、入力装置、出力装置、記録媒体読み取り装置を備える。   As described above, the private branch exchange plan creation server 60 is a computer, and thus includes a CPU (Central Processing Unit), a memory, a hard disk device, a communication port, an input device, an output device, and a recording medium reading device.

ハードディスク装置には構内入換計画作成サーバ60の制御を行う構内入換計画作成サーバ制御プログラム(特許請求の範囲に記載のプログラムに相当する)800が記憶されており、CPUにより構内入換計画作成サーバ制御プログラム800が実行されることにより、本実施の形態に係る構内入換計画作成サーバ60の各種機能が実現される。例えば、CPUにより構内入換計画作成サーバ制御プログラム800が実行され、メモリや通信ポート、入力装置、出力装置、ハードディスク装置等のハードウェア機器と協働することにより、通信処理部102や制御処理部104、中央の輸送計画管理データ取込処理部112、構内基礎データメンテナンス処理部114、作図パラメータメンテナンス処理部116、構内改正面管理処理部118、基本構内入換計画作成処理部120、構内変更計画管理処理部122、変更構内入換計画作成処理部124、実施構内入換計画作成処理部126、実施計画データ配信処理部128、基本/実施構内入換ダイヤ図作成処理部130、データベース202〜234が実現される。なお特許請求の範囲に記載の運行計画作成開始情報受信部や本線運行計画データ受信部、第1のダイヤグラム表示部、入力情報受信部、第2のダイヤグラム表示部、構内運行計画データ記憶部、停留箇所データベース、移動時間データベースは、上記通信処理部102や制御処理部104、中央の輸送計画管理データ取込処理部112、構内基礎データメンテナンス処理部114、作図パラメータメンテナンス処理部116、構内改正面管理処理部118、基本構内入換計画作成処理部120、構内変更計画管理処理部122、変更構内入換計画作成処理部124、実施構内入換計画作成処理部126、実施計画データ配信処理部128、基本/実施構内入換ダイヤ図作成処理部130、データベース202〜234により実現される。詳細は後述する。   The hard disk device stores a private branch exchange plan creation server control program (corresponding to the program described in the claims) 800 for controlling the private branch exchange plan creation server 60, and creates a private branch exchange plan by the CPU. By executing the server control program 800, various functions of the private branch exchange plan creation server 60 according to the present embodiment are realized. For example, the private branch exchange plan creation server control program 800 is executed by the CPU and cooperates with hardware devices such as a memory, a communication port, an input device, an output device, and a hard disk device, so that the communication processing unit 102 and the control processing unit 104, central transportation plan management data import processing unit 112, campus basic data maintenance processing unit 114, drawing parameter maintenance processing unit 116, site revision surface management processing unit 118, basic site replacement plan creation processing unit 120, site change plan Management processing unit 122, changed premises exchange plan creation processing unit 124, implementation premises exchange plan creation processing unit 126, implementation plan data distribution processing unit 128, basic / implementation premises exchange diagram creation processing unit 130, databases 202 to 234 Is realized. The operation plan creation start information receiving unit, main line operation plan data receiving unit, first diagram display unit, input information receiving unit, second diagram display unit, campus operation plan data storage unit, stop The location database and the travel time database include the communication processing unit 102, the control processing unit 104, the central transportation plan management data fetch processing unit 112, the campus basic data maintenance processing unit 114, the drawing parameter maintenance processing unit 116, and the site revision surface management. Processing unit 118, basic premises replacement plan creation processing unit 120, premises change plan management processing unit 122, changed premises replacement plan creation processing unit 124, implementation premises replacement plan creation processing unit 126, implementation plan data distribution processing unit 128, This is realized by the basic / implementation campus exchange diagram creation processing unit 130 and the databases 202 to 234. Details will be described later.

記録媒体読取装置は、フレキシブルディスクや磁気テープ、コンパクトディスク等の記録媒体に記録されているプログラムやデータを読み取るための装置である。読み取られたプログラムやデータはメモリやハードディスク装置に格納される。従って、例えば記録媒体に記録された構内入換計画作成サーバ制御プログラム800を、記録媒体読取装置を用いて上記記録媒体から読み取って、メモリやハードディスク装置に記憶するようにすることができる。記録媒体読取装置は構内入換計画作成サーバ60に内蔵されている形態とすることもできるし、外付されている形態とすることもできる。   The recording medium reader is an apparatus for reading a program and data recorded on a recording medium such as a flexible disk, a magnetic tape, and a compact disk. The read program and data are stored in a memory or a hard disk device. Therefore, for example, the private branch exchange plan creation server control program 800 recorded on a recording medium can be read from the recording medium using a recording medium reader and stored in a memory or a hard disk device. The recording medium reading device may be built in the private branch exchange plan creation server 60 or may be externally attached.

入力装置は構内入換計画作成サーバ60へのデータ入力等のために用いられる装置でありユーザインタフェースとして機能する。入力装置としては例えばキーボードやマウス等を用いることができる。
出力装置は情報を外部に出力するための装置でありユーザインタフェースとして機能する。出力装置としては例えばディスプレイやプリンタ90等を用いることができる。
The input device is a device used for data input to the private branch exchange plan creation server 60 and functions as a user interface. For example, a keyboard or a mouse can be used as the input device.
The output device is a device for outputting information to the outside and functions as a user interface. For example, a display or a printer 90 can be used as the output device.

通信ポートは通信を行うための装置である。例えばネットワーク40を介して行われる計画情報伝達サーバ30との通信や、駅内ネットワーク80を介して行われるプリンタ90やPRC装置70との通信等の他のコンピュータとの通信は、通信ポートを介して行われるようにすることができる。また例えば、構内入換計画作成サーバ制御プログラム800を通信ポートを通じて他のコンピュータからネットワーク40や駅内ネットワーク80を介して受信して、メモリやハードディスク装置に記憶するようにすることもできる。   The communication port is a device for performing communication. For example, communication with other computers such as communication with the plan information transmission server 30 performed via the network 40 and communication with the printer 90 and the PRC apparatus 70 performed via the station network 80 is performed via the communication port. Can be done. Further, for example, the private branch exchange plan creation server control program 800 may be received from another computer via the communication port via the network 40 or the station network 80 and stored in a memory or a hard disk device.

また、構内入換計画作成端末50やPRC装置70、計画情報伝達サーバ30、輸送計画管理サーバ20は、上述したようにいずれもコンピュータであり、構内入換計画作成サーバ60と同様に、CPUやメモリ、ハードディスク装置、通信ポート、入力装置、出力装置、記録媒体読み取り装置をそれぞれ備える。そして構内入換計画作成端末制御プログラム、PRC装置制御プログラム、計画情報伝達サーバ制御プログラム、輸送計画管理サーバ制御プログラムが、それぞれ構内入換計画作成端末50、PRC装置70、計画情報伝達サーバ30、輸送計画管理サーバ20において実行されることにより、それぞれ構内入換計画作成端末50、PRC装置70、計画情報伝達サーバ30、輸送計画管理サーバ20としての機能が実現される。   Further, as described above, the premises exchange plan creation terminal 50, the PRC device 70, the plan information transmission server 30, and the transportation plan management server 20 are all computers, and like the premises exchange plan creation server 60, the CPU, A memory, a hard disk device, a communication port, an input device, an output device, and a recording medium reading device are provided. Then, the private branch exchange plan creation terminal control program, the PRC device control program, the plan information transmission server control program, and the transportation plan management server control program are the private branch exchange plan creation terminal 50, the PRC device 70, the plan information transmission server 30, and the transportation, respectively. By being executed in the plan management server 20, functions as the premises replacement plan creation terminal 50, the PRC device 70, the plan information transmission server 30, and the transport plan management server 20 are realized.

<通信処理部>
構内入換計画作成サーバ60が備える通信処理部(特許請求の範囲に記載の本線運行計画データ受信部に相当する)102は、計画情報伝達サーバ30との送受信の制御を行う。なお上述したように、構内入換計画作成サーバ60は、輸送計画管理サーバ20に記憶される本線運行計画を計画情報伝達サーバ30を介して受信する。
<Communication processing unit>
A communication processing unit (corresponding to a main line operation plan data receiving unit described in claims) 102 included in the premises exchange plan creation server 60 controls transmission and reception with the plan information transmission server 30. As described above, the premises replacement plan creation server 60 receives the main line operation plan stored in the transportation plan management server 20 via the plan information transmission server 30.

<制御処理部>
また制御処理部104は、構内入換計画作成サーバ60の全体の制御を司る。
<Control processing unit>
In addition, the control processing unit 104 controls the entire premises replacement plan creation server 60.

<中央の輸送計画管理データ取込処理部>
中央の輸送計画管理データ取込処理部112は、通信処理部102を通じて計画情報伝達サーバ30に対して本線運行計画データ等の各種データの取込要求を送信し、計画情報伝達サーバ30から送信された上記本線運行計画データ等の各種データを通信処理部102を通じて受信し、データベース202〜234に記憶する。なお本線運行計画データは、駅を着発又は通過する各列車について、着発又は通過する停留箇所を示す情報と、着発又は通過する時刻を示す情報と、駅に隣接する隣接駅を着発又は通過する時刻を示す情報と、が少なくとも対応付けられてなる。また計画情報伝達サーバ30から受信した本線運行計画データは、構内入換計画作成サーバ60において基本列車情報データベース206、変更列車情報データベース208、基本本線列車運用情報データベース210、変更本線列車運用情報データベース212、基本車両運用情報データベース214、変更車両運用情報データベース216に記憶される。
<Central transportation plan management data import processing section>
The central transportation plan management data capture processing unit 112 transmits a request for capturing various data such as main line operation plan data to the plan information transmission server 30 through the communication processing unit 102, and is transmitted from the plan information transmission server 30. Further, various data such as the main line operation plan data is received through the communication processing unit 102 and stored in the databases 202 to 234. The main line operation plan data for each train that arrives at or passes through the station, information indicating the stop point where the train arrives or passes, information that indicates the time when the train arrives or passes, and information on the adjacent station adjacent to the station. Or the information which shows the time to pass is matched at least. The main line operation plan data received from the plan information transmission server 30 is converted into the basic train information database 206, the changed train information database 208, the basic main line train operation information database 210, and the changed main line train operation information database 212 in the premises exchange plan creation server 60. The basic vehicle operation information database 214 and the changed vehicle operation information database 216 are stored.

基本列車情報データベース206には、列車の運転区間や時刻等を列車番号単位に登録した基本列車データが記憶される。変更列車情報データベース208には、基本列車データに対する変更情報を登録した変更列車データが記憶される。基本本線列車運用情報データベース210には、本線列車に対して、駅における折返、継送、分割、併合運用を登録した基本本線列車運用データが記憶される。変更本線列車運用情報データベース212には、本線列車運用データに対する変更情報を登録した変更本線列車運用データが記憶される。基本車両運用情報データベース214には、編成(仕業)単位の車両運用を列車番号を指定し登録した基本車両運用データが記憶される。変更車両運用情報データベース21には、基本車両運用データに対する変更情報を登録した変更車両運用データが記憶される。   The basic train information database 206 stores basic train data in which train operation sections and times are registered in units of train numbers. The changed train information database 208 stores changed train data in which change information for basic train data is registered. The basic main line train operation information database 210 stores basic main line train operation data in which return, transmission, division, and merge operations are registered for a main line train. The changed main train operation information database 212 stores changed main train operation data in which change information for main train operation data is registered. The basic vehicle operation information database 214 stores basic vehicle operation data in which train operations (work) units are registered by specifying train numbers. The changed vehicle operation information database 21 stores changed vehicle operation data in which change information for basic vehicle operation data is registered.

その他、中央の輸送計画管理データ取込処理部112は計画情報伝達サーバ30から、駅コードや頭冠記号コード、末尾記号コード等を含む基礎データや、ダイヤ改正日の情報を登録した改正面データなども受信する。基礎データや改正面データは、構内入換計画作成サーバ60においてはそれぞれ基礎情報データベース202、改正面情報データベース204に記憶される。各データベースについては図2に詳細を示す。   In addition, the central transportation plan management data capture processing unit 112 receives the basic data including the station code, the crown symbol code, the tail symbol code, etc. from the plan information transmission server 30, and the revised plane data in which information on the schedule revision date is registered. Etc. are also received. The basic data and the revised plane data are stored in the basic information database 202 and the revised plane information database 204 in the premises exchange plan creation server 60, respectively. Details of each database are shown in FIG.

中央の輸送計画管理データ取込処理部112の詳細な処理の流れを図3を用いて説明する。
まず中央の輸送計画管理データ取込処理部112はデータ取込要求処理を行う(S201)。つまり、中央の輸送計画管理データ取込処理部112は、構内基礎情報データベース218内に格納された計画情報伝達サーバ30でのデータ抜粋条件を有する配信パラメータをもとに計画情報伝達サーバ30に取込要求を送信する。なお構内基礎情報データベース218は、構内入換システム特有の構内基礎データを記憶するデータベースである。
A detailed processing flow of the central transportation plan management data fetch processing unit 112 will be described with reference to FIG.
First, the central transportation plan management data fetch processing unit 112 performs a data fetch request process (S201). That is, the central transportation plan management data capture processing unit 112 receives the plan information transmission server 30 based on the distribution parameters having the data extraction conditions in the plan information transmission server 30 stored in the campus basic information database 218. Send request. The in-house basic information database 218 is a database that stores in-house basic data unique to the in-house replacement system.

このデータ取込要求処理は、構内入換計画作成端末50で構内入換計画作成システム10が起動されたタイミングで実行される。構内入換計画作成端末50で構内入換計画作成システム10が起動されたタイミングは、構内運行計画の作成者により操作される構内入換計画作成端末50から、構内運行計画の作成を開始する旨の情報を受信したタイミングとすることができる。   This data fetch request process is executed at the timing when the private branch exchange plan creation system 10 is activated by the private branch exchange plan creation terminal 50. The timing at which the premises exchange plan creation system 10 is activated at the premises exchange plan creation terminal 50 is that the creation of the premises operation plan is started from the premises exchange plan creation terminal 50 operated by the creator of the premises operation plan. The timing when the information is received can be set.

取込要求を受信した計画情報伝達サーバ30は、要求された内容を上記配信パラメータにより判定しデータを抜粋する(S204)。そして計画情報伝達サーバ30は抜粋した上記データを構内入換計画作成サーバ60へ送信する(S205)。なお抜粋した上記データには本線運行計画データが含まれる。   The plan information transmission server 30 that has received the capture request determines the requested content based on the distribution parameter and extracts the data (S204). Then, the plan information transmission server 30 transmits the extracted data to the premises replacement plan creation server 60 (S205). The excerpted data includes main line operation plan data.

そして構内入換計画作成サーバ60は、上記データを受信し(S202)、受信完了後各データベースに格納する(S203)。なお上述したように、計画情報伝達サーバ30から受信したデータを格納するデータベースは、基礎情報データベース202、改正面情報データベース204、基本列車情報データベース206、変更列車情報データベース208、基本本線列車運用情報データベース210、変更本線列車運用情報データベース212、基本車両運用情報データベース214、変更車両運用情報データベース216である。   The private branch exchange plan creation server 60 receives the data (S202), and stores it in each database after the reception is completed (S203). As described above, the database that stores the data received from the plan information transmission server 30 is the basic information database 202, the revised plane information database 204, the basic train information database 206, the changed train information database 208, and the basic main train operation information database. 210, a changed main line train operation information database 212, a basic vehicle operation information database 214, and a changed vehicle operation information database 216.

<構内基礎データメンテナンス処理部>
構内基礎データメンテナンス処理部114は、構内入換計画作成システム10に必要な駅管理の構内基礎データの登録や修正、削除等の制御を行う。構内基礎データは、上述した構内基礎情報データベース(特許請求の範囲に記載の停留箇所データベース、移動時間データベースに相当する)218に記憶され、駅の構内に設けられる列車の各停留箇所を示す情報や各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す情報等が含まれる。
<In-house basic data maintenance processing department>
The premises basic data maintenance processing unit 114 performs control such as registration, correction, and deletion of premises basic data for station management necessary for the premises replacement plan creation system 10. The campus basic data is stored in the above-mentioned campus basic information database (corresponding to the stop location database and travel time database described in the claims) 218, and information indicating each stop location of the train provided in the station premises, Information indicating each time required for moving the train from each stop to each other stop is included.

図4を用いて、構内基礎データメンテナンス処理部114について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から、構内基礎データメンテナンス処理がマウス操作等により起動されると、構内入換計画作成サーバ60は構内基礎情報データベース218から最新の構内基礎データを読み出す(S301)。読み出された最新の構内基礎データは構内入換計画作成端末50に送信されるようにしても良い。
The campus basic data maintenance processing unit 114 will be described with reference to FIG.
First, when the campus basic data maintenance process is started by a mouse operation or the like from the display screen of the campus exchange plan creation terminal 50, the campus exchange plan creation server 60 obtains the latest campus basic data from the campus basic information database 218. Read (S301). The latest read basic data on the premises may be transmitted to the premises exchange plan creation terminal 50.

続いて構内入換計画作成サーバ60は、構内入換計画作成端末50が備えるディスプレイの画面から構内運行計画の作成者により入力された、構内基礎データを選択する情報及び選択された構内基礎データを追加、修正、あるいは削除するための情報に基づいて、構内基礎データの追加、修正、削除を行う(S302)。
そして構内入換計画作成サーバ60は、追加、修正あるいは削除された構内基礎データを構内基礎情報データベース218に記憶する(S303)。
Subsequently, the premises exchange plan creation server 60 receives the information for selecting the premises basic data and the selected premises basic data, which are input by the creator of the premises operation plan from the display screen of the premises exchange plan creation terminal 50. Based on the information for addition, correction, or deletion, the campus basic data is added, corrected, or deleted (S302).
Then, the campus replacement plan creation server 60 stores the added, corrected, or deleted campus basic data in the campus basic information database 218 (S303).

<作図パラメータメンテナンス処理部>
作図パラメータメンテナンス処理部116は、構内入換ダイヤ図のレイアウト定義や出力項目の登録、修正、削除等の制御を行う。構内入換ダイヤ図とは、駅構内における各列車の運行計画を示す各列車のダイヤスジを表した図である。例えば、列車が到着したホーム等の駅構内の停留箇所から、車庫等の駅構内の他の停留箇所へ列車を引き上げることを示すダイヤスジや、車庫に停留している列車が始発列車としてホームに移動することを示すダイヤスジなど、駅構内における列車の運行計画を示す各ダイヤスジが記載される。
<Drawing parameter maintenance processing part>
The drawing parameter maintenance processing unit 116 performs control such as layout definition of the premises replacement diagram and registration, correction, and deletion of output items. The premises exchange diagram is a diagram showing a diagram of each train indicating an operation plan of each train in the station premises. For example, a diagram indicating that a train is to be pulled up from a stop in a station such as a platform where the train arrives to another stop in the station such as a garage, or a train stopped in the garage moves to the home as a first train Each diagram showing the train operation plan in the station premises, such as a diagram showing what to do, is described.

なお、駅構内における列車の運行計画すなわち構内運行計画は構内入換計画とも呼ばれ、基本構内入換計画、変更構内入換計画、実施構内入換計画の各種類がある。基本構内入換計画は臨時列車等の特別列車の取り扱いを含まない構内運行計画のことである。変更構内入換計画は臨時列車等の特別列車に対する構内運行計画のことである。実施構内入換計画とは基本構内入換計画と変更構内入換計画とを合わせた構内運行計画のことであり、各駅において行われる実際の列車の運行管理は実施構内入換計画に従って行われる。   In addition, the train operation plan in the station premises, that is, the premises operation plan is also called a premises exchange plan, and there are various types of basic premises exchange plans, changed premises exchange plans, and implemented premises exchange plans. The basic campus replacement plan is a campus operation plan that does not include the handling of special trains such as temporary trains. The changed premises replacement plan is a premises operation plan for special trains such as temporary trains. The on-site replacement plan is an on-site operation plan that is a combination of the basic on-site replacement plan and the changed on-site replacement plan. The actual train operation management performed at each station is performed according to the on-site replacement plan.

基本構内入換計画の作成は、ダイヤ改正時に行われる。基本構内入換計画は、平日用や休日用等指定日単位に作成される。そして本線上の列車運用(例えば折返、継送、分割、併合等)が上記基本構内入換計画に折り込まれる。さらに、自駅で終着又は始発となる列車のうち本線運用が定められていない列車については、着発時刻や本線の番線使用状況等を考慮し基本構内入換計画に折り込まれる。そしてこのようにして作成された基本構内入換計画の通りに列車が運行されるように、駅の電子連動装置に所定のデータが入力される。   The basic campus replacement plan will be created when the schedule is revised. The basic campus replacement plan is created on a specified day basis, such as for weekdays or holidays. The train operation on the main line (for example, turnaround, transmission, splitting, merging, etc.) is incorporated into the basic campus replacement plan. Furthermore, of the trains that are terminated or started at their own station, the trains for which main line operation is not defined are taken into the basic premises replacement plan in consideration of the arrival and departure times and the main line use situation. Then, predetermined data is input to the electronic interlocking device of the station so that the train operates in accordance with the basic campus replacement plan created in this way.

また変更構内入換計画の作成は、運転報に記載された列車の増発や臨時列車の運行、あるいは列車の運休等の情報のうち、自駅にかかわる分の情報に基づいて行われる。そして駅の電子連動装置に変更後の構内入換ダイヤの入力を行う。また変更構内入換計画の内容を帳票として作成する。
なお、構内入換計画と同様に、本線運行計画についても基本本線運行計画、変更本線運行計画、実施本線運行計画の各種類がある。
In addition, the creation of the changed premises replacement plan is performed based on information relating to the own station among the information such as the increase in the number of trains, the operation of the temporary trains, or the suspension of the trains described in the operation report. Then, the changed premises exchange diagram is input to the electronic interlocking device at the station. The contents of the changed premises replacement plan are created as a form.
Similar to the campus replacement plan, the main line operation plan includes the basic main line operation plan, the modified main line operation plan, and the implementation main line operation plan.

図5を用いて、作図パラメータメンテナンス処理部116について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から、作図パラメータメンテナンス処理がマウス操作等により起動されると、構内入換計画作成サーバ60は作図パラメータ情報データベース220から最新の作図パラメータデータを読み出す(S401)。読み出された最新の作図パラメータデータは構内入換計画作成端末50に送信されるようにしても良い。
The drawing parameter maintenance processing unit 116 will be described with reference to FIG.
First, when the plotting parameter maintenance process is started by a mouse operation or the like from the display screen of the campus exchange plan creation terminal 50, the campus exchange plan creation server 60 reads the latest plotting parameter data from the plotting parameter information database 220. (S401). The read latest plotting parameter data may be transmitted to the premises exchange plan creation terminal 50.

作図パラメータデータは、構内入換ダイヤ図を作成するための構内の条件を登録したデータである。例えば各列車のダイヤスジを表現する線の色や太さ、実線や破線等の線の種類、文字のフォント、時間軸の幅などのデータである。これにより例えば特定の列車のダイヤスジを他の列車のダイヤスジとは異なる態様で表示するなど、様々な態様でダイヤスジを表示することが可能となる。   The drawing parameter data is data in which the premise conditions for creating the pre-replacement diagram are registered. For example, data such as the color and thickness of a line representing the schedule of each train, the type of line such as a solid line and a broken line, character font, and time axis width. This makes it possible to display a diagram in various modes, such as displaying a diagram of a specific train in a mode different from that of other trains.

続いて構内入換計画作成サーバ60は、構内入換計画作成端末50が備えるディスプレイの画面から送信される、構内運行計画の作成者により入力された作図パラメータデータを選択する情報及び選択された作図パラメータデータを追加、修正、あるいは削除するための情報に基づいて、作図パラメータデータの追加、修正、削除を行う(S402)。
そして構内入換計画作成サーバ60は、追加、修正あるいは削除された作図パラメータデータを作図パラメータ情報データベース220に記憶する(S403)。
Subsequently, the premises exchange plan creation server 60 transmits information selected from the drawing parameter data input by the creator of the premises operation plan, which is transmitted from the display screen of the premises exchange plan creation terminal 50, and the selected drawing. Based on the information for adding, modifying, or deleting the parameter data, the drawing parameter data is added, modified, or deleted (S402).
Then, the campus replacement plan creation server 60 stores the added, modified or deleted drawing parameter data in the drawing parameter information database 220 (S403).

<構内改正面管理処理部>
構内改正面管理処理部118は、基本構内入換計画を登録するための構内改正面データの管理を行う。
構内改正面データは、構内改正面情報データベース222に記憶されるデータであり、後述する基本構内列車情報データベース224に記憶される基本構内列車データを登録する面情報を登録したデータである。例えば駅設備を改修する日付を示すデータ等である。
<On-site revision surface management processing department>
The premises revision surface management processing unit 118 manages premises revision surface data for registering a basic premises exchange plan.
The premises amendment surface data is data stored in the premises amendment surface information database 222, and is data in which surface information for registering basic premises train data stored in a basic premises train information database 224 described later is registered. For example, data indicating the date of repairing the station equipment.

図6を用いて、構内改正面管理処理部118について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から、構内改正面管理処理がマウス操作等により起動されると、構内入換計画作成サーバ60は改正面情報データベース204から最新の改正面データを読み出す(S501)。また同様に構内入換計画作成サーバ60は構内改正面情報データベース222から最新の構内改正面データを読み出す(S502)。読み出された最新の改正面データや構内改正面データは構内入換計画作成端末50に送信されるようにしても良い。
The campus revision surface management processing unit 118 will be described with reference to FIG.
First, when the on-site revision plane management process is activated by a mouse operation or the like from the display screen of the on-premises exchange plan creation terminal 50, the on-premises exchange plan creation server 60 obtains the latest revision plane data from the revision plane information database 204. Read (S501). Similarly, the premises replacement plan creation server 60 reads the latest premises revision surface data from the premises revision surface information database 222 (S502). The latest revision plane data and premises revision plane data read out may be transmitted to the premises exchange plan creation terminal 50.

そして構内入換計画作成サーバ60は、ダイヤ改正や駅の設備変更(番線の追加、線路追加、進入進出条件変更等)等の実施日や事由等の構内改正面データを構内改正面情報データベース222に登録する(S503)。構内改正面データを登録する際には、改正面データとの日付等の矛盾チェックを行うこともできる。矛盾がある場合は、構内入換計画作成端末50の画面上にエラーメッセージの表示等を行うこともできる。   Then, the campus replacement plan creation server 60 stores the site revision surface data such as the date of implementation and reasons such as schedule revisions and station equipment changes (addition of line, addition of tracks, change of entry / exit conditions, etc.). (S503). When registering the revised data on the premises, it is possible to check for inconsistencies such as dates with the revised data. When there is a contradiction, an error message can be displayed on the screen of the private branch exchange plan creation terminal 50.

また、上記登録された構内改正面内において、後述する基本構内列車データ及び基本構内列車運用データの内容にあまり変更が無い場合は、すでに登録されている基本構内列車データ及び基本構内列車運用データの複製を、基本構内列車情報データベース224及び基本構内列車運用情報データベース228へ書き込み、修正するようにすることも可能である(S504、S505)。   In addition, if there is not much change in the contents of the basic campus train data and basic campus train operation data, which will be described later, within the above-mentioned registered site revisions, the basic campus train data and basic campus train operation data that have already been registered It is also possible to write the copy in the basic premises train information database 224 and the basic premises train operation information database 228 for correction (S504, S505).

<基本構内入換計画作成処理部>
基本構内入換計画作成処理部120は、基本構内入換計画及び基本構内入換運用の作成を行うための制御を行う。例えば、構内入換計画作成端末50が備えるディスプレイ等のユーザインタフェースにダイヤスジを表示し、構内入換計画作成端末50から送信された基本構内入換計画や基本構内入換運用を作成するための各種情報に基づいてダイヤスジを変更したりするための制御を行う。
<Basic campus replacement plan creation processing section>
The basic premises replacement plan creation processing unit 120 performs control for creating a basic premises replacement plan and a basic premises replacement operation. For example, various types for displaying a diagram on a user interface such as a display provided in the private branch exchange plan creation terminal 50 and creating a basic private branch exchange plan and a basic private branch exchange operation transmitted from the private branch exchange plan creation terminal 50. Control to change the diagram based on the information is performed.

図7を用いて、基本構内入換計画作成処理部120について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から基本構内入換計画作成処理がマウス操作等により起動されると、構内入換計画作成サーバ60は、構内基礎情報データベース218、改正面情報データベース204、基本列車情報データベース206、基本本線列車運用情報データベース210、及び基本車両運用情報データベース214から、それぞれ最新の構内基礎データ、改正面データ、基本列車データ、基本本線列車運用データ、及び基本車両運用データを読み出す(S601)。読み出されたこれらのデータは構内入換計画作成端末50に送信されるようにしても良い。
The basic premises replacement plan creation processing unit 120 will be described with reference to FIG.
First, when a basic premises exchange plan creation process is started by a mouse operation or the like from a display screen of the premises exchange plan creation terminal 50, the premises exchange plan creation server 60 includes a premises basic information database 218, a revised surface information database. 204, latest train basic data, revised plane data, basic train data, basic main train operation data, and basic vehicle operation from the basic train information database 206, basic main train operation information database 210, and basic vehicle operation information database 214, respectively. Data is read (S601). These read data may be transmitted to the private branch exchange plan creation terminal 50.

そして構内入換計画作成サーバ60は、構内改正面データ及び構内運行計画データを構内改正面情報データベース222、基本構内列車情報データベース224、及び基本構内列車運用情報データベース228から読み出す(S602)。読み出された構内改正面データ及び構内運行計画データは構内入換計画作成端末50に送信されるようにしても良い。   Then, the campus replacement plan creation server 60 reads the campus revision surface data and the campus operation plan data from the campus revision surface information database 222, the basic campus train information database 224, and the basic campus train operation information database 228 (S602). The read site revision plane data and site operation plan data may be transmitted to the site replacement plan creation terminal 50.

構内運行計画データは、駅構内における列車を示す情報と、上記列車が到着した駅のホームなどの停留箇所を発車する時刻を示す情報と、上記列車が駅構内の車庫などの停留箇所へ到着する時刻を示す情報と、上記停留箇所を示す情報と、が少なくとも対応付けられてなる。なお構内運行計画データには、上記各情報に加え、上記列車が上記停留箇所を発車する時刻を示す情報と、駅を発車する列車を示す情報と、上記駅を発車する列車が発車する停留箇所へ到着する時刻を示す情報とが対応付けられるようにすることもできる。   On-site operation plan data includes information indicating the trains in the station, information indicating the time of departure from the station where the train arrives, and the train arrives at a stop such as a garage in the station. Information indicating the time and information indicating the stop location are associated with each other at least. In addition to the above information, the on-site operation plan data includes information indicating the time when the train departs from the stop, information indicating the train departing from the station, and a stop where the train departing from the station departs. It is also possible to associate information indicating the time of arrival at the destination.

構内運行計画データは、基本構内列車データや変更構内列車データ、基本構内列車運用データ、変更構内列車運用データを含む。基本構内列車データは駅の構内を走行する列車の番線(停留箇所を示す情報)移動や時刻等を駅における構内列車番号単位に登録したデータであり、基本構内列車情報データベース224に記憶される。変更構内列車データは構内列車に対する変更情報を登録したデータであり、変更構内列車情報データベース226に記憶される。基本構内列車運用データは本線列車に対して駅における折り返し、継送、分割、併合運用を登録したデータであり、基本構内列車運用情報データベース228に記憶される。変更構内列車運用データは構内列車運用に対する変更情報を登録した変更構内列車運用データであり、変更構内列車運用情報データベース230に記憶される。
構内運行計画データにより、例えば1番線を10時10分30秒に発車した列車は、引き上げ線に10時12分30秒に到着する、といったことがわかる。
The premises operation plan data includes basic premises train data, changed premises train data, basic premises train operation data, and changed premises train operation data. The basic premises train data is data obtained by registering movements and times of trains running on the premises of the station (information indicating stop points) and the time in units of premises train numbers at the station, and is stored in the basic premises train information database 224. The changed premises train data is data in which change information for the premises train is registered, and is stored in the changed premises train information database 226. The basic premises train operation data is data in which the turn-back, transfer, division, and merge operations at the station are registered for the main train, and is stored in the basic premises train operation information database 228. The changed premises train operation data is changed premises train operation data in which change information for the premises train operation is registered, and is stored in the changed premises train operation information database 230.
From the on-site operation plan data, it can be seen that, for example, a train that departs Line 1 at 10:10:30 arrives on the pull-up line at 10:12:30.

続いて構内入換計画作成サーバ60は、構内入換計画作成端末50が備えるディスプレイの画面からマウス操作等により入力された、構内入換計画の作成を行いたい改正面を選択するための情報を受信すると、構内入換計画作成端末50が備えるディスプレイに図14に示すような画面を表示する(S603)。   Subsequently, the private branch exchange plan creation server 60 receives information for selecting a revision plane for which a private branch exchange plan is to be created, which is input from the display screen of the private branch exchange plan creation terminal 50 by a mouse operation or the like. When received, a screen as shown in FIG. 14 is displayed on the display of the private branch exchange plan creation terminal 50 (S603).

構内入換計画作成サーバ60は、基本列車データと基本本線列車運用データと構内基礎データとに基づいて、駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を駅並びと時刻とでスジ編集し、図14に示す本線表示エリア300に、駅並びを縦軸に時刻を横軸にして各列車のダイヤスジを表示する。なお上記スジ編集は、画面に表示される各駅の位置及び時刻の位置を、画面上の位置を表す例えばピクセル座標と対応付け、各列車のダイヤスジの始点と終点の上記ピクセル座標値を、基本列車データと基本本線列車運用データとに記載された各列車が各駅に到着する時刻及び発車する時刻を示す情報から求めることにより行うことができる。なお、当該駅に関する基本本線列車運用データが記憶されている場合には、該当するダイヤスジをまわし線でつないで表示することもできる。まわし線とは、駅に到着した列車のダイヤスジと駅を出発する列車のダイヤスジとをつなぐダイヤスジのことである。また、基本車両運用データを参照し、当該駅において入区又は、出区が設定されている場合は、それぞれの記号をダイヤスジの当該駅上に表示する。   Based on the basic train data, basic main line train operation data, and premises basic data, the premises exchange plan creation server 60 determines the position of each train that arrives or departs the station at each time as a station arrangement and a time. Line editing is performed, and a train line of each train is displayed in the main line display area 300 shown in FIG. In addition, the above-mentioned line edit associates the position of each station displayed on the screen and the position of time with, for example, pixel coordinates representing the position on the screen, and the above-mentioned pixel coordinate values of the start point and end point of each train It can be performed by obtaining from the information indicating the time when each train described in the data and the basic main line train operation data arrives at each station and the time when the train departs. In addition, when the basic main line train operation data regarding the said station are memorize | stored, it can also be displayed by connecting a corresponding diagram with a turn line. The wrapping line is a diagram that connects a diagram of a train that arrives at a station and a diagram of a train that leaves the station. In addition, referring to the basic vehicle operation data, if entry or departure is set at the station, each symbol is displayed on the station of the diagram.

続いて構内入換計画作成サーバ60は、構内運行計画の作成者により構内入換計画作成端末50に入力される構内の列車運行を示す情報を、構内入換計画作成端末50から受信する。構内の列車運行を示す情報の構内入換計画作成端末50への入力は、図15に示すように到着側本線列車、出発側本線列車、及び構内番線を、それぞれマウスを用いてクリックすることにより行う。なお、上記マウスを用いて選択される到着側本線列車、出発側本線列車、及び構内番線は、それぞれ特許請求の範囲に記載の、駅を終着駅として到着する列車を指定する情報、駅を始発駅として発車する列車を指定する情報、指定された列車を引き上げる停留箇所を指定する情報に相当する。   Subsequently, the premises exchange plan creation server 60 receives information indicating the train operation on the premises that is input to the premises exchange plan creation terminal 50 by the creator of the premises operation plan from the premises exchange plan creation terminal 50. As shown in FIG. 15, the information indicating the train operation on the premises is input to the premises exchange plan creation terminal 50 by clicking on the arrival main train, the departure main train, and the premises number using the mouse. Do. Note that the arrival main train, departure main train, and branch number selected with the mouse are information specifying the train arriving with the station as the terminal station, as described in the claims. This corresponds to information for specifying a train that departs as a station, and information for specifying a stop where the designated train is to be lifted.

番線間の移動にかかる時間は、構内基礎データ内の構内列車基準運転時分にて自動計算される。時刻の修正が必要な場合は、構内列車スジをマウスを用いてドラッグするか、図17に示すように、時刻詳細画面305を表示させ、直接時刻を指定する。   The time required for the movement between the lines is automatically calculated based on the on-site train reference operation time in the basic data of the premises. When it is necessary to correct the time, drag the local train streak with the mouse or display the time details screen 305 as shown in FIG. 17 and directly specify the time.

このようにして構内入換計画作成サーバ60は、指定された列車が到着する停留箇所から指定された停留箇所へ上記列車を引き上げた後、上記列車を、上記列車が発車する停留箇所に移動させることを示すダイヤスジを、構内入換表示エリア302に表示する(S604)。   In this way, the premises replacement plan creation server 60 lifts the train from the stop where the designated train arrives to the designated stop, and then moves the train to the stop where the train departs. A diagram indicating this is displayed in the premises replacement display area 302 (S604).

なお、構内入換計画作成端末50に入力された構内の列車運行を示す情報が到着側本線列車及び構内番線のみであった場合には、構内入換計画作成サーバ60は指定された列車が到着する停留箇所から指定された停留箇所へ上記列車を引き上げることを示すダイヤスジを、構内入換表示エリア302に表示する。   In addition, when the information indicating the train operation on the premises input to the premises exchange plan creation terminal 50 is only the arrival main line train and the premises number line, the premises exchange plan creation server 60 receives the designated train. A diagram indicating that the train is to be pulled up from the stop location to the designated stop location is displayed in the premises exchange display area 302.

なお、構内入換計画が新規作成の場合は、基本構内列車データと基本構内列車運用データが記憶されていないため、図13に示すように、構内入換表示エリア302には構内入換ダイヤスジは表示されない。   In addition, when the premises replacement plan is newly created, the basic premises train data and the basic premises train operation data are not stored, and therefore, as shown in FIG. Do not show.

また、当該駅を始発駅又は終着駅とする本線列車に対して本線列車運用または構内列車運用が指定されていない場合、すなわち、当該駅を終着駅として到着する各列車のうち、列車を示す情報が列車を引き上げる停留箇所を示す情報と対応付けて記憶されていない場合には、その列車については、他の列車とは異なる態様でダイヤスジを表示することができる。例えば、本線表示エリア300のダイヤスジを色変え表示する。これにより運行計画の未設定の列車が一見して判別できると共に、構内列車運用の指定を促すことができる。   In addition, when main train operation or on-premise train operation is not specified for a main train that uses the station as the first station or end station, that is, information indicating a train among trains arriving with the station as the end station. If the train is not stored in association with the information indicating the stop where the train is pulled up, the train can be displayed in a manner different from other trains. For example, the diagram of the main line display area 300 is displayed in a different color. This makes it possible to identify at a glance trains that have not been set for an operation plan, and can prompt the designation of on-site train operation.

また構内入換計画作成サーバ60は、作成した構内列車に対して折返、継送、分割、併合等の運用の指定を受け付ける(S605)。構内列車運用の指定は、図16に示す構内入換表示エリア302の番線上に表示された箱が選択された場合に表示する、図18に示す構内列車運用設定画面306において入力された、構内列車運用の指定及び作業の指定を受け付けることにより行う。   Further, the campus replacement plan creation server 60 accepts designation of operation such as return, transmission, division, and merger for the created campus train (S605). The designation of on-premise train operation is indicated on the premise train operation setting screen 306 shown in FIG. 18 that is displayed when a box displayed on the number line in the on-premise replacement display area 302 shown in FIG. 16 is selected. This is done by accepting designation of train operation and work.

続いて構内入換計画作成サーバ60は、妥当性/合理性のチェック処理を行う(S606)。妥当性/合理性のチェック処理は、構内列車及び構内列車運用作成後にチェック実行ボタンが押下されることにより実行される。妥当性/合理性のチェックにおいては、基本列車データ、基本本線列車運用データ、基本構内列車データ、基本構内列車運用データ間の妥当性と合理性をチェックする。   Subsequently, the private branch exchange plan creation server 60 performs validity / reasonability check processing (S606). The validity / rationality check process is executed by pressing the check execution button after creating the local train and the local train operation. In the validity / reasonability check, the validity and rationality among basic train data, basic main line train operation data, basic campus train data, and basic campus train operation data is checked.

チェックの内容は、時刻逆転チェック、番線一致チェック、進入進出チェック、作業時間チェック、運用未充当チェックの少なくともいずれかとすることができる。
時刻逆転チェックは、構内列車運用(列車の折返、継送、分割、併合運用を列車を指定しつないだ計画)でつながれた本線列車と構内列車間及び、構内列車間が時刻逆転(前運用列車の着時刻と後運用列車の発時刻の関係が、前列車の着時刻<後列車の発時刻)でないか、つまり各列車について、停留箇所に到着する時刻が停留箇所を発車する時刻よりも前であるか否かを判定するものである。
番線一致チェックは、構内列車運用でつながれた本線列車と構内列車間の番線が前運用列車の着番線と後運用列車の発番線が一致しているか、つまり各列車について、到着した停留箇所と同一の停留箇所から発車しているか否かを判定するものである。
進入進出チェックは、駅設備と番線設備の条件により構内列車が番線から番線への移動が可能かどうか、つまり各列車について、移動可能な停留箇所間で移動が行われているか否かを判定するものである。
作業時間チェックは、構内列車の停車時間が構内入換計画で設定した車内清掃や座席の方向換え等の作業時間よりも短くないかどうか、つまり各列車について、停留箇所に到着してから発車するまでの時間が所定時間以上あるか否かを判定するものである。
運用未充当チェックは、当該駅が始発駅又は終着駅である全ての列車に対して本線列車運用又は構内列車運用が設定されているか、当該駅を終着駅として到着した各列車について、各列車を引き上げる停留箇所が指定されているか否かを判定するものである。
判定結果はプリンタ90に出力されるようにすることができる。例えばエラーが存在する場合は、エラー内容をプリンタ90に出力する。
The content of the check can be at least one of a time reversal check, a line coincidence check, an approach advance check, a work time check, and an operation unallocated check.
The time reversal check is performed between the main train and the on-site train, and between the on-site trains connected by the on-site train operation (plans that specify train return, transfer, division, and merge operation). The relationship between the arrival time of the train and the departure time of the post-operation train is not the arrival time of the previous train <the departure time of the subsequent train), that is, for each train, the time of arrival at the stop point is earlier than the time of departure of the stop point It is determined whether or not.
The line matching check is the same as the arrival point of arrival for each train, in which the number between the main train connected to the train on the campus train and the train on the campus match the number of the previous train and the number of the train on the rear train. It is determined whether or not the vehicle departs from the stop.
The entry / exit check determines whether the on-site train can move from the number line to the number line according to the conditions of the station facility and the number line facility, that is, whether each train is moving between the movable stop points. Is.
The work time check determines whether the stop time of the on-site train is shorter than the work time for in-vehicle cleaning and seat redirection set in the on-site replacement plan, that is, for each train, it will depart after arrival at the stop It is determined whether or not the time up to is a predetermined time or more.
Operation unappropriation check is performed for each train that arrives with the main station train operation or on-premise train operation set for all trains whose station is the first station or the last station, or the station is the last station. It is determined whether or not a stop location to be lifted is designated.
The determination result can be output to the printer 90. For example, if there is an error, the error content is output to the printer 90.

このように構内入換計画作成サーバ60により妥当性/合理性のチェックが行われることによって構内運用計画作成時のミスを防止することが可能となる。またチェック作業を短期間で行うことが可能となるので、構内運用計画の作成にかかる期間を短縮することも可能となる。   As described above, the validity / rationality check is performed by the premises exchange plan creation server 60, thereby making it possible to prevent mistakes when creating the premises operation plan. In addition, since the check work can be performed in a short period of time, it is possible to shorten the period required for creating the campus operation plan.

次に上記妥当性/合理性チェック処理においてエラーが検出されなかった場合には、構内入換計画作成サーバ60は、基本構内列車情報データベース224及び基本構内列車運用情報データベース228に、それぞれ基本構内列車データ及び基本構内列車運用データの登録を行う(S607)。   Next, when no error is detected in the validity / rationality check process, the campus replacement plan creation server 60 stores the basic campus train in the basic campus train information database 224 and the basic campus train operation information database 228, respectively. Data and basic premises train operation data are registered (S607).

<構内変更計画管理処理部>
構内変更計画管理処理部122は、変更構内入換計画を登録するための管理番号を管理する。
<Private change plan management processing department>
The premises change plan management processing unit 122 manages a management number for registering the changed premises replacement plan.

図8を用いて、構内変更計画管理処理部122について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から、構内変更計画管理処理がマウス操作等により起動されると、構内入換計画作成サーバ60は構内変更管理情報データベース223から最新の構内変更管理データを読み出す(S701)。読み出された最新の構内変更管理データは構内入換計画作成端末50に送信されるようにしても良い。
The campus change plan management processing unit 122 will be described with reference to FIG.
First, when a local area change plan management process is started by a mouse operation or the like from the display screen of the local area replacement plan creation terminal 50, the local area replacement plan creation server 60 updates the latest local area change management information from the local area change management information database 223. Data is read (S701). The read latest premises change management data may be transmitted to the premises exchange plan creation terminal 50.

構内変更管理データは、臨時列車の運転や列車の運休などの発効日や変更事由等が記載される変更計画データを登録するための管理情報を登録したデータである。
続いて構内入換計画作成サーバ60は、構内入換計画作成端末50が備えるディスプレイの画面から構内運行計画の作成者により入力された変更計画データを、構内変更管理情報データベース223に記憶する(S702)。
The premises change management data is data in which management information for registering change plan data in which an effective date such as operation of a temporary train or train suspension, a reason for change, and the like is described is registered.
Subsequently, the premises exchange plan creation server 60 stores in the premises change management information database 223 the change plan data input by the creator of the premises operation plan from the display screen provided in the premises exchange plan creation terminal 50 (S702). ).

<変更構内入換計画作成処理部>
変更構内入換計画作成処理部124は、変更構内入換計画及び変更構内入換運用の作成を行うための制御を行う。
<Change premises replacement plan creation processing section>
The changed premises replacement plan creation processing unit 124 performs control for creating a changed premises replacement plan and a changed premises replacement operation.

図9を用いて、変更構内入換計画作成処理部124について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から変更構内入換計画作成処理がマウス操作等により起動されると、構内入換計画作成サーバ60は、構内基礎情報データベース218、改正面情報データベース204、基本列車情報データベース206、変更列車情報データベース208、基本本線列車運用情報データベース210、変更本線列車運用情報データベース212、基本車両運用情報データベース214、及び変更車両運用情報データベース216から、それぞれ最新の構内基礎データ、改正面データ、基本列車データ、変更列車データ、基本本線列車運用データ、変更本線列車運用データ、基本車両運用データ、及び変更車両運用データを読み出す(S801)。読み出されたこれらのデータは構内入換計画作成端末50に送信されるようにしても良い。
The changed premises replacement plan creation processing unit 124 will be described with reference to FIG.
First, when the modified local exchange plan creation process is started by a mouse operation or the like from the display screen of the local exchange plan creation terminal 50, the local exchange plan creation server 60 includes the campus basic information database 218, the revised plane information database. 204, the basic train information database 206, the changed train information database 208, the basic main train operation information database 210, the changed main train operation information database 212, the basic vehicle operation information database 214, and the changed vehicle operation information database 216, respectively. Basic data, revised surface data, basic train data, changed train data, basic main train operation data, changed main train operation data, basic vehicle operation data, and changed vehicle operation data are read (S801). These read data may be transmitted to the private branch exchange plan creation terminal 50.

そして構内入換計画作成サーバ60は、構内改正面データ、構内変更管理データ及び構内運行計画データを構内改正面情報データベース222、構内変更管理情報データベース223、基本構内列車情報データベース224、変更構内列車情報データベース226、基本構内列車運用情報データベース228、及び変更構内列車運用情報データベース230から読み出す(S802)。読み出された構内改正面データ、構内変更管理データ及び構内運行計画データは構内入換計画作成端末50に送信されるようにしても良い。   The premises replacement plan creation server 60 uses the premises revision surface data, the premises change management data, and the premises operation plan data as the premises revision surface information database 222, the premises change management information database 223, the basic premises train information database 224, and the changed premises train information. Data is read from the database 226, the basic premises train operation information database 228, and the changed premises train operation information database 230 (S802). The read site revision plane data, site change management data, and site operation plan data may be transmitted to the site replacement plan creation terminal 50.

続いて構内入換計画作成サーバ60は、構内入換計画作成端末50が備えるディスプレイの画面からマウス操作等により入力された、変更構内入換計画の作成を行いたい構内変更管理と変更開始日を選択するための情報を受信すると、構内入換計画作成端末50が備えるディスプレイに図14に示すような画面を表示する(S803)。   Subsequently, the premises exchange plan creation server 60 selects the premises change management and the change start date for which the changed premises exchange plan that is input from the display screen of the premises exchange plan creation terminal 50 by a mouse operation or the like is to be created. When the information for selection is received, a screen as shown in FIG. 14 is displayed on the display of the private branch exchange plan creation terminal 50 (S803).

構内入換計画作成サーバ60は、基本列車データと基本本線列車運用データと変更列車データと変更本線列車運用データと構内基礎データとに基づいて、駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を駅並びと時刻とでスジ編集し、図14に示す本線表示エリア300に、駅並びを縦軸に時刻を横軸にして各列車のダイヤスジを表示する。なお上記スジ編集は、画面に表示される各駅の位置及び時刻の位置を、画面上の位置を表す例えばピクセル座標と対応付け、各列車のダイヤスジの始点と終点の上記ピクセル座標値を、基本列車データと基本本線列車運用データとに記載された各列車が各駅に到着する時刻及び発車する時刻を示す情報から求めることにより行うことができる。なお、当該駅に関する基本本線列車運用データと変更本線列車運用データとが記憶されている場合には、該当するダイヤスジをまわし線でつないで表示することもできる。また、基本車両運用データと変更車両運用データとを参照し、当該駅において入区又は、出区が設定されている場合は、それぞれの記号をダイヤスジの当該駅上に表示する。   Based on the basic train data, the basic main line train operation data, the changed train data, the changed main line train operation data, and the basic campus data, the on-premises replacement plan creation server 60 Each position is line-edited with the station arrangement and time, and the train line of each train is displayed in the main line display area 300 shown in FIG. 14 with the station arrangement as the vertical axis and the time as the horizontal axis. In addition, the above-mentioned line edit associates the position of each station displayed on the screen and the position of time with, for example, pixel coordinates representing the position on the screen, and the above-mentioned pixel coordinate values of the start point and end point of each train It can be performed by obtaining from the information indicating the time when each train described in the data and the basic main line train operation data arrives at each station and the time when the train departs. In addition, when the basic main line train operation data and change main line train operation data regarding the said station are memorize | stored, it can also be displayed by connecting a corresponding diagram with a turn line. In addition, referring to the basic vehicle operation data and the changed vehicle operation data, when entering or leaving is set at the station, each symbol is displayed on the station of the diagram.

続いて構内入換計画作成サーバ60は、構内運行計画の作成者により構内入換計画作成端末50に入力される構内の列車運行を示す情報を、構内入換計画作成端末50から受信する。構内の列車運行を示す情報の構内入換計画作成端末50への入力は、図15に示すように到着側本線列車、出発側本線列車、及び構内番線を、それぞれマウスを用いてクリックすることにより行う。   Subsequently, the premises exchange plan creation server 60 receives information indicating the train operation on the premises that is input to the premises exchange plan creation terminal 50 by the creator of the premises operation plan from the premises exchange plan creation terminal 50. As shown in FIG. 15, the information indicating the train operation on the premises is input to the premises exchange plan creation terminal 50 by clicking on the arrival main train, the departure main train, and the premises number using the mouse. Do.

番線間の移動にかかる時間は、構内基礎データ内の構内列車基準運転時分にて自動計算される。時刻の修正が必要な場合は、構内列車スジをマウスを用いてドラッグするか、図17に示すように、時刻詳細画面305を表示させ、直接時刻を指定する。   The time required for the movement between the lines is automatically calculated based on the on-site train reference operation time in the basic data of the premises. When it is necessary to correct the time, drag the local train streak with the mouse or display the time details screen 305 as shown in FIG. 17 and directly specify the time.

このようにして構内入換計画作成サーバ60は、指定された列車が到着する停留箇所から指定された停留箇所へ上記列車を引き上げた後、上記列車を、上記列車が発車する停留箇所に移動させることを示すダイヤスジを、構内入換表示エリア302に表示する(S804)。   In this way, the premises replacement plan creation server 60 lifts the train from the stop where the designated train arrives to the designated stop, and then moves the train to the stop where the train departs. A diagram indicating this is displayed in the premises replacement display area 302 (S804).

なお、構内入換計画作成端末50に入力された構内の列車運行を示す情報が到着側本線列車及び構内番線のみであった場合には、構内入換計画作成サーバ60は指定された列車が到着する停留箇所から指定された停留箇所へ上記列車を引き上げることを示すダイヤスジを、構内入換表示エリア302に表示する。   In addition, when the information indicating the train operation on the premises input to the premises exchange plan creation terminal 50 is only the arrival main line train and the premises number line, the premises exchange plan creation server 60 receives the designated train. A diagram indicating that the train is to be pulled up from the stop location to the designated stop location is displayed in the premises exchange display area 302.

また、当該駅を始発駅又は終着駅とする本線列車に対して本線列車運用または構内列車運用が指定されていない場合、すなわち、当該駅を終着駅として到着する各列車のうち、列車を示す情報が列車を引き上げる停留箇所を示す情報と対応付けて記憶されていない場合には、その列車については、他の列車とは異なる態様でダイヤスジを表示することができる。例えば、本線表示エリア300のダイヤスジを色変え表示する。これにより運行計画の未設定の列車が一見して判別できると共に、構内列車運用の指定を促すことができる。   In addition, when main train operation or on-premise train operation is not specified for a main train that uses the station as the first station or end station, that is, information indicating a train among trains arriving with the station as the end station. If the train is not stored in association with the information indicating the stop where the train is pulled up, the train can be displayed in a manner different from other trains. For example, the diagram of the main line display area 300 is displayed in a different color. This makes it possible to identify at a glance trains that have not been set for an operation plan, and can prompt the designation of on-site train operation.

また構内入換計画作成サーバ60は、作成した構内列車に対して折返、継送、分割、併合等の運用の指定を受け付ける(S805)。構内列車運用の指定は、図16に示す構内入換表示エリア302の番線上に表示された箱が選択された場合に表示する、図18に示す構内列車運用設定画面306において入力された、構内列車運用の指定及び作業の指定を受け付けることにより行う。   Further, the campus replacement plan creation server 60 accepts designation of operations such as return, transmission, division, and merger for the created campus train (S805). The designation of on-premise train operation is indicated on the premise train operation setting screen 306 shown in FIG. 18 that is displayed when a box displayed on the number line in the on-premise replacement display area 302 shown in FIG. 16 is selected. This is done by accepting designation of train operation and work.

続いて構内入換計画作成サーバ60は、妥当性/合理性のチェック処理を行う(S806)。妥当性/合理性のチェック処理は、構内列車及び構内列車運用作成後にチェック実行ボタンが押下されることにより実行される。妥当性/合理性のチェックにおいては、基本列車データ、基本本線列車運用データ、基本構内列車データ、基本構内列車運用データ、変更列車データ、変更本線列車運用データ、変更構内列車データ、変更構内列車運用データ間の妥当性と合理性をチェックする。   Subsequently, the private branch exchange plan creation server 60 performs validity / reasonability check processing (S806). The validity / rationality check process is executed by pressing the check execution button after creating the local train and the local train operation. In checking validity / reasonability, basic train data, basic main line train operation data, basic premise train data, basic premise train operation data, change train data, change main train operation data, change premise train data, change premise train operation Check the validity and rationality between data.

チェックの内容は、時刻逆転チェック、番線一致チェック、進入進出チェック、作業時間チェック、運用未充当チェックの少なくともいずれかとすることができる。
チェックの結果はプリンタ90に出力されるようにすることができる。例えばエラーが存在する場合は、エラー内容をプリンタ90に出力する。
The content of the check can be at least one of a time reversal check, a line coincidence check, an approach advance check, a work time check, and an operation unallocated check.
The result of the check can be output to the printer 90. For example, if there is an error, the error content is output to the printer 90.

このように構内入換計画作成サーバ60により妥当性/合理性のチェックが行われることによって構内運用計画作成時のミスを防止することが可能となる。またチェック作業を短期間で行うことが可能となるので、構内運用計画の作成にかかる期間を短縮することも可能となる。   As described above, the validity / rationality check is performed by the premises exchange plan creation server 60, thereby making it possible to prevent mistakes when creating the premises operation plan. In addition, since the check work can be performed in a short period of time, it is possible to shorten the period required for creating the campus operation plan.

次に上記妥当性/合理性チェック処理においてエラーが検出されなかった場合には、構内入換計画作成サーバ60は、基本構内列車情報データベース224及び基本構内列車運用情報データベース228に、それぞれ変更構内列車データ及び変更構内列車運用データの登録を行う(S807)。   Next, when no error is detected in the validity / rationality check process, the campus replacement plan creation server 60 stores the changed campus trains in the basic campus train information database 224 and the basic campus train operation information database 228, respectively. The data and the changed premises train operation data are registered (S807).

<実施構内入換計画作成処理部>
実施構内入換計画作成処理部126は、基本構内入換計画と変更構内入換計画とにより、日々の実施構内入換計画を生成する。
基本構内入換計画は、基本構内列車データ及び基本構内列車運用データにより定められる。また変更構内入換計画は、変更構内列車データ及び変更構内列車運用データにより定められる。実施構内入換計画は、実施構内列車データ及び実施構内列車運用データにより定められる。
<On-site replacement plan creation processing section>
The implementation premises replacement plan creation processing unit 126 generates a daily implementation premises replacement plan based on the basic premises replacement plan and the changed premises replacement plan.
The basic premises replacement plan is determined by basic premises train data and basic premises train operation data. The changed premises replacement plan is determined by the changed premises train data and the changed premises train operation data. The implementation campus replacement plan is determined by the implementation campus train data and the implementation campus train operation data.

実施構内入換計画作成処理部126は、以下に記すように、基本構内列車データと変更構内列車データとにより実施構内列車データを生成すると共に、基本構内列車運用データと変更構内列車運用データとにより実施構内列車運用データを生成する。
上述したように、基本構内列車データ、基本構内列車運用データ、変更構内列車データ及び変更構内列車運用データは、構内運行計画データを構成する。従って、これらのデータから生成される実施構内列車データ及び実施構内列車運用データも、構内運行計画データを構成する。
As shown below, the implementation campus replacement plan creation processing unit 126 generates the implementation campus train data from the basic campus train data and the changed campus train data, and uses the basic campus train operation data and the changed campus train operation data. Generate on-site train operation data.
As described above, the basic premises train data, the basic premises train operation data, the changed premises train data, and the changed premises train operation data constitute the premises operation plan data. Therefore, the on-site train data and the on-site train operation data generated from these data also constitute on-site operation plan data.

図10を用いて、実施構内入換計画作成処理部126について説明する。
構内入換計画作成サーバ60は、タイマー起動によりバッチ的に実施構内入換計画作成処理を開始する。
まず構内入換計画作成サーバ60は、基本構内列車情報データベース224及び変更構内列車情報データベース226からそれぞれ、基本構内列車データ及び変更構内列車データを読み出す。そして構内入換計画作成サーバ60は、起動された日付を判定し、実施構内入換計画の作成を行う(S901)。実施構内入換計画の作成は、新規の日付での実施構内入換計画の作成と、差分での実施構内入換計画の作成とがある。新規の日付での実施構内入換計画の作成は、基本構内列車データと変更構内列車データとをマージして実施構内列車データを生成し、実施構内列車情報データベース232に登録することにより行う(S902)。また差分での実施構内入換計画の作成は、上記実施構内入換計画の作成後、変更構内列車情報データベース226に登録された構内列車に対する変更情報を差分情報として読み出し、実施構内列車情報データベース232に記憶されている実施構内列車データと上記差分情報とをマージして、最新の実施構内列車データを生成後、変更構内列車情報データベース226に登録することにより行う(S902)。
With reference to FIG. 10, the on-site replacement plan creation processing unit 126 will be described.
The premises exchange plan creation server 60 starts the implementation premises exchange plan creation processing in batches by starting the timer.
First, the campus replacement plan creation server 60 reads the basic campus train data and the changed campus train data from the basic campus train information database 224 and the changed campus train information database 226, respectively. Then, the campus replacement plan creation server 60 determines the date of activation and creates an implemented campus replacement plan (S901). There are two types of creation of an implementation campus replacement plan: creation of an implementation campus exchange plan with a new date, and creation of an implementation campus exchange plan with a difference. The on-site replacement plan for the new date is created by merging the basic on-site train data and the changed on-site train data to generate the on-site train data and registering it in the on-site train information database 232 (S902). ). In addition, the creation of the on-site replacement plan for the difference is performed by reading out the change information for the on-site train registered in the changed on-site train information database 226 as the difference information after the creation of the above-described on-site replacement plan. This is performed by merging the on-site train data stored in the above and the above difference information to generate the latest on-site train data and registering it in the changed on-site train information database 226 (S902).

続いて構内入換計画作成サーバ60は、基本構内列車運用情報データベース228及び変更構内列車運用情報データベース230からそれぞれ、基本構内列車運用データ及び変更構内列車運用データを読み出す。そして構内入換計画作成サーバ60は、起動された日付を判定し、実施構内入換運用計画の作成を行う(S903)。実施構内入換運用計画の作成は、新規の日付での実施構内入換運用計画の作成と、差分での実施構内入換運用計画の作成とがある。新規の日付での実施構内入換運用計画の作成は、基本構内列車運用データと変更構内列車運用データとをマージして実施構内列車運用データを生成し、実施構内列車運用情報データベース234に登録することにより行う(S904)。また差分での実施構内入換運用計画の作成は、上記実施構内入換運用計画の作成後、変更構内列車運用情報データベース234に登録された構内列車の運用に対する変更情報を差分情報として読み出し、実施構内列車運用情報データベース234に記憶されている実施構内列車運用データと上記差分情報とをマージして、最新の実施構内列車運用データを生成後、変更構内列車運用情報データベース234に登録することにより行う(S904)。   Subsequently, the premises replacement plan creation server 60 reads the basic premises train operation data and the changed premises train operation data from the basic premises train operation information database 228 and the changed premises train operation information database 230, respectively. Then, the campus replacement plan creation server 60 determines the date of activation and creates an implementation campus replacement operation plan (S903). There are two types of creation of the implementation campus replacement operation plan: creation of an implementation campus replacement operation plan with a new date, and creation of an implementation campus replacement operation plan with a difference. To create an on-site replacement operation plan with a new date, the basic on-site train operation data and the changed on-site train operation data are merged to generate the on-site train operation data, which is registered in the on-site train operation information database 234. (S904). In addition, the creation of the on-site replacement operation plan with the difference is performed after the creation of the above-described on-site replacement operation plan, by reading out the change information for the operation of the on-site train registered in the changed on-site train operation information database 234 as difference information. This is performed by merging the in-service train operation data stored in the on-site train operation information database 234 and the above difference information to generate the latest on-site train operation data and registering it in the changed on-site train operation information database 234. (S904).

<実施計画データ配信処理部>
実施計画データ配信処理部128は、実施構内入換計画データ(実施構内列車データ及び実施構内列車運用データ、すなわち構内運行計画データ)のPRC装置70への送信を制御する。実施構内入換計画データのPRC装置70への送信は、PRC装置70から実施構内入換計画データをPRC装置70に送信する旨の要求を受信することにより行われる。
<Execution plan data distribution processor>
The execution plan data distribution processing unit 128 controls transmission of the implementation premises replacement plan data (implementation premises train data and implementation premises train operation data, that is, premises operation plan data) to the PRC device 70. The transmission of the implementation campus replacement plan data to the PRC device 70 is performed by receiving a request from the PRC device 70 to transmit the implementation campus replacement plan data to the PRC device 70.

図11を用いて、実施計画データ配信処理部128について説明する。
構内入換計画作成サーバ60は、PRC装置70から日付を指定したデータ取込要求を受けると、指定された日付に対する実施構内列車データと実施構内列車運用データとをそれぞれ実施構内列車情報データベース232と実施構内列車運用情報データベース234とから読み出す(S1003、S1001)。そして構内入換計画作成サーバ60は、上記読み出した実施構内列車データと実施構内列車運用データとを、PRC装置70に送信する(S1002、S1004)。
このようにすることにより、登録された、構内列車データ、構内列車運用データを施行日単位に、PRC装置70へ配信することが出来る。これによりPRC装置70への実施構内入換計画データの入力の際のミスを防止することが可能となると共に、短時間で入力することが可能となる。
The implementation plan data distribution processing unit 128 will be described with reference to FIG.
Upon receipt of the data fetch request specifying the date from the PRC device 70, the campus replacement plan creation server 60 stores the train data on the train on the campus and the train operation data on the train on the designated date respectively. Read from the on-site train operation information database 234 (S1003, S1001). Then, the campus replacement plan creation server 60 transmits the read on-site train data and the on-site train operation data read to the PRC device 70 (S1002, S1004).
By doing in this way, the registered local train data and local train operation data can be distributed to the PRC device 70 in units of enforcement dates. As a result, it is possible to prevent mistakes when inputting the on-site replacement plan data to the PRC device 70 and to input it in a short time.

<基本/実施構内入換ダイヤ図作成処理部>
基本/実施構内入換ダイヤ図作成処理部130は、基本構内入換ダイヤ図、及び実施構内入換ダイヤ図の生成を行う。また生成した基本構内入換ダイヤ図、及び実施構内入換ダイヤ図をプリンタ90に印刷させるための情報をプリンタ90に送信する。
<Basic / Implementation exchange diagram diagram creation processing section>
The basic / implemented campus exchange diagram creation processing unit 130 generates a basic campus exchange diagram and an implemented campus exchange diagram. Information for causing the printer 90 to print the generated basic premises exchange diagram and the implemented premises exchange diagram is transmitted to the printer 90.

図12を用いて、基本/実施構内入換ダイヤ図作成処理部130について説明する。
まず構内入換計画作成端末50が備えるディスプレイの画面から、基本/実施構内入換ダイヤ図作成処理がマウス等により起動され、基本構内入換ダイヤ図または実施構内入換ダイヤ図を指定する情報が入力されると、構内入換計画作成サーバ60は、構内入換計画作成端末50から基本構内入換ダイヤ図または実施構内入換ダイヤ図を指定する情報を受信する(S1101)。
The basic / implemented in-place exchange diagram creation processing unit 130 will be described with reference to FIG.
First, a basic / implemented in-house exchange diagram creation process is activated by a mouse or the like on the display screen of the in-house exchange plan creation terminal 50, and information specifying a basic in-house exchange diagram or an in-house exchange diagram is shown. When input, the private branch exchange plan creation server 60 receives information specifying a basic private branch exchange diagram or an implemented private branch exchange diagram from the private branch exchange plan creation terminal 50 (S1101).

基本構内入換ダイヤ図が指定された場合には、構内入換計画作成サーバ60は、構内運行計画の作成者により入力された改正面を指定する情報を構内入換計画作成端末50から受信した後、基礎データ、改正面データ、基本列車データ、基本本線列車運用データ、基本車両運用データ、構内基礎データ、作図パラメータデータ、構内改正面データ、基本構内列車データ、及び基本構内列車運用データをそれぞれ、基礎データ202、改正面データ204、基本列車データ206、基本本線列車運用データ210、基本車両運用データ214、構内基礎データ218、作図パラメータデータ220、構内改正面データ222、基本構内列車データ224、及び基本構内列車運用データ228から読み出す。そしてこれらのデータを編集して基本構内入換ダイヤ図のイメージデータを作成する(S1102)。   When the basic premises replacement diagram is designated, the premises replacement plan creation server 60 has received from the premises replacement plan creation terminal 50 information specifying the revised surface input by the creator of the campus operation plan. Later, basic data, revised surface data, basic train data, basic main line train operation data, basic vehicle operation data, campus basic data, construction parameter data, campus revised surface data, basic campus train data, and basic campus train operation data, respectively. , Basic data 202, revised plane data 204, basic train data 206, basic main train operation data 210, basic vehicle operational data 214, premises basic data 218, construction parameter data 220, premises revised plane data 222, basic premises train data 224, And basic premises train operation data 228. These data are edited to create image data of a basic premises replacement diagram (S1102).

そして構内入換計画作成端末50から基本構内入換ダイヤ図のイメージデータを印刷する旨の情報を受信すると、構内入換計画作成サーバ60は、基本構内入換ダイヤ図のイメージデータをプリンタ90に送信する(S1103)。   When receiving the information indicating that the image data of the basic premises exchange diagram is to be printed from the premises exchange plan creation terminal 50, the premises exchange plan creation server 60 sends the image data of the basic premises exchange diagram to the printer 90. Transmit (S1103).

また実施構内入換ダイヤ図が指定された場合には、構内入換計画作成サーバ60は、構内運行計画の作成者により入力された実施日を指定する情報を構内入換計画作成端末50から受信した後、基礎データ、改正面データ、基本列車データ、変更列車データ、基本本線列車運用データ、変更本線列車運用データ、基本車両運用データ、変更車両運用データ、構内基礎データ、作図パラメータデータ、実施構内列車データ、及び実施構内列車運用データをそれぞれ、基礎データ202、改正面データ204、基本列車データ206、変更列車データ208、基本本線列車運用データ210、変更本線列車運用データ212、基本車両運用データ214、変更車両運用データ216、構内基礎データ218、作図パラメータデータ220、実施構内列車データ232、及び実施構内列車運用データ234から読み出す。そしてこれらのデータを編集して実施構内入換ダイヤ図のイメージデータを作成する(S1104)。   In addition, when an implementation premises replacement diagram is designated, the premises exchange plan creation server 60 receives information designating the implementation date input by the creator of the campus operation plan from the premises exchange plan creation terminal 50. After that, basic data, revised surface data, basic train data, changed train data, basic main line train operation data, changed main line train operation data, basic vehicle operation data, changed vehicle operation data, campus basic data, drawing parameter data, implementation campus The train data and the on-site train operation data are respectively the basic data 202, the revised plane data 204, the basic train data 206, the changed train data 208, the basic main train operation data 210, the changed main train operation data 212, and the basic vehicle operation data 214. , Changed vehicle operation data 216, premises basic data 218, construction parameter data 220, implementation premises Train data 232, and read out from practice premises train operational data 234. Then, these data are edited to create image data of the implementation premises replacement diagram (S1104).

そして構内入換計画作成端末50から実施構内入換ダイヤ図のイメージデータを印刷する旨の情報を受信すると、構内入換計画作成サーバ60は、実施構内入換ダイヤ図のイメージデータをプリンタ90に送信する(S1105)。
このように、基本構内入換ダイヤ図または実施構内入換ダイヤ図をプリンタ90から印刷することができることにより、ダイヤ図作成にかかる時間を短縮することが可能となる。
Upon receiving information indicating that the image data of the implemented on-site replacement diagram is to be printed from the on-premises replacement plan creation terminal 50, the on-premises replacement plan creation server 60 sends the image data of the on-site replacement plan diagram to the printer 90. Transmit (S1105).
As described above, since the basic premises exchange diagram or the effective premises exchange diagram can be printed from the printer 90, the time required for creating the diagram can be shortened.

以上詳細に説明したように、本実施の形態に係る構内入換計画作成システム10は、基礎データや本線列車情報及び、本線列車運用情報を中央の計画情報伝達サーバ30を介して輸送計画管理サーバ20から取込む機能を有する。これにより、これらのデータを各駅での構内入換計画を立案する上での元データとして使用することができる。   As described above in detail, the premises replacement plan creation system 10 according to the present embodiment is configured to transfer basic data, main train information, and main train operation information to the transport plan management server via the central plan information transmission server 30. It has the function to take in from 20. As a result, these data can be used as original data for creating a premises replacement plan at each station.

また、各駅の設備改良に伴い変更となる、構内入換信号情報(番線情報、進路情報)等各駅固有の情報は、基礎データ化しユーザでの登録変更が可能である。これにより駅の設備改良による変更があってもモジュール(プログラム)の修正や追加を行うことがないようにすることができる。構内入換計画作成においては、まず、本線データをグラフィックディスプレー上にダイヤスジで表示し、構内入換が必要な列車に対し構内列車計画及び、構内列車運用を作成する。   In addition, information unique to each station such as on-premise replacement signal information (number line information, route information), which is changed in accordance with the improvement of facilities at each station, can be converted into basic data and can be changed by the user. As a result, it is possible to prevent modification or addition of a module (program) even if there is a change due to improvement of the station equipment. In creating a campus replacement plan, first, the main line data is displayed in a diagram on a graphic display, and a local train plan and a local train operation are created for a train that requires a campus replacement.

また、基本構内入換計画の作成は、ダイヤ面(改正)単位に行う。ダイヤ面内は、平日、休日などの指定日を画面上で指定することにより指定日単位の構内入換計画を作成する。入力完了後は、ダイヤ面単位に確定操作を行うことにより、基本構内入換計画データの修正が行えない状態とする。   In addition, the basic premises replacement plan will be created on a diamond (revision) basis. In the diagram plane, a designated in-place replacement plan is created by designating designated days such as weekdays and holidays on the screen. After the input is completed, the basic premises replacement plan data cannot be corrected by performing a confirmation operation for each diagram surface.

また変更構内入換計画の作成は、施行日を指定することにより該当日の本線列車スジ及び構内列車スジを画面に表示する。本線の変更計画(臨時列車運転、時刻変更、番線変更等)により変更となっている列車データはダイヤスジの色を変えて表示する。また、本線の臨時列車運転により構内入換必要となった場合や、本線の時刻変更及び、番線変更により本線列車と構内列車との間に矛盾が発生した場合はその内容を表示する。その内容をもとに変更構内入換計画の作成を行う。変更構内計画は、変更計画を纏める一つのグループ(通達番号)単位に登録を行う。入力完了後は、グループ単位に確定操作を行うことにより、変更構内入換計画データの修正が行えない状態とする。確定後に訂正が必要な場合は、新たにグループを作成し変更構内入換計画を作成し登録を行う。   Moreover, the creation of the changed premises replacement plan displays the main line train lines and the premises train lines on the screen by designating the effective date. The train data changed by the main line change plan (temporary train operation, time change, number change etc.) is displayed by changing the color of the diagram. In addition, when it is necessary to replace the premises due to temporary train operation on the main line, or when a contradiction occurs between the main line train and the premises train due to a change in the time of the main line or a change in the number line, the contents are displayed. Based on the contents, a modified premises replacement plan is created. The changed premises plan is registered in units of one group (notification number) that summarizes the changed plan. After the input is completed, the changed premises replacement plan data cannot be corrected by performing a confirmation operation for each group. If correction is necessary after confirmation, a new group is created and a changed premises replacement plan is created and registered.

また、構内列車ダイヤの作成操作は、基本計画、変更計画共にマウス操作により行う。画面上に表示されている出発番線と到着番線の時間軸をクリック指定することにより発時刻及び、着時刻の設定を行う。また、設定したダイヤスジの移動や複写を可能とする。設定したダイヤスジの時刻(秒単位)微調整は、キャラクターによる文字入力を可能にする。構内列車ダイヤ設定時に、出発番線から到着番線への進出進入チェック及び、出発時刻と到着時刻により番線占有時間の設定を自動的に行う。設定した構内列車ダイヤには、1本毎にユニークな構内列車番号を付与する。登録時には、構内列車番号の重複チェックも行う。   In addition, the creation of the on-site train diagram is performed by operating the mouse for both the basic plan and the change plan. The departure time and arrival time are set by clicking and specifying the time axis of the departure number and arrival number displayed on the screen. In addition, the set diagram can be moved and copied. Fine adjustment of the set dial time (in seconds) enables character input by characters. When setting up a local train schedule, the advance check from the departure number line to the arrival number line and the setting of the line occupation time are automatically performed according to the departure time and arrival time. A unique private train number is assigned to each set of private train schedules. When registering, we also check for duplicate train numbers.

また構内列車運用の作成操作は、基本計画、変更計画伴にマウス操作により行う。画面上に表示されている本線列車スジと構内列車スジまたは、構内列車スジ同士を指定することにより、列車運用として2本の列車スジをつなぐ。構内列車運用設定時に、本線列車と構内列車をつなぐ場合の番線チェック及び、同一番線上での運用重複チェックを行う。構内列車運用に対して作業の設定を行う。構内列車運用を画面上から選択し、そこに対して作業の設定を行う。作業情報は、基礎データとしてあらかじめデータ登録されているものを使用する。作業情報には、作業の名称、標準時間等の情報がある。作業設定時に、構内列車運用の時間幅と設定した作業時間合計のチェックを行い、作業時間合計が大きい場合は警告メッセージを画面上に表示する。   In addition, the creation operation of the on-site train operation is performed by operating the mouse with the basic plan and the change plan. By specifying the main line train line and the on-site train line displayed on the screen, or the on-site train lines, two train lines are connected as train operation. When setting up on-premise train operation, check the number line when connecting the main line train and the on-site train, and check the operation overlap on the same number line. Set up work for local train operation. Select the local train operation from the screen, and set the work for it. For the work information, data that is registered in advance as basic data is used. The work information includes information such as work name and standard time. At the time of work setting, check the time width of on-site train operation and the set work time total. If the work time total is large, a warning message is displayed on the screen.

また夜間の定時起動処理により、基本構内入換データと変更構内入換データから、実施構内列車データと実施構内列車運用データの実施構内入換計画を作成する。実施構内入換計画は、PRC装置からの要求によりPRC装置へ配信する。配信された実施計画は、PRC装置の列車制御情報として使用される。   In addition, an on-site replacement plan of the on-site train data and the on-site train operation data is created from the basic on-site replacement data and the changed on-site replacement data by the nightly scheduled start-up process. The on-site replacement plan is distributed to the PRC device in response to a request from the PRC device. The distributed execution plan is used as train control information of the PRC device.

また登録された、基本構内入換計画と変更構内入換計画を編集し、構内入換ダイヤ図の作成を行う。作図処理は、線色、線種、線幅 等の情報を持った作図パラメータを参照し行う。作図パラメータは、ユーザによりメンテナンスを可能とし、線色、線種、線幅 等はユーザのより設定される。なお構内入換ダイヤ図には、改正面と指定日(平日、休日 等)を指定して作成する、基本構内入換ダイヤ図と、施行日を指定して作成する、実施構内入換ダイヤ図とがある。   Also, the registered basic premises exchange plan and the changed premises exchange plan are edited, and a premises exchange diagram is created. The plotting process is performed by referring to plotting parameters that have information such as line color, line type, and line width. The drawing parameters can be maintained by the user, and the line color, line type, line width, etc. are set by the user. In addition, in the premises exchange diagram, the revised premises and the designated date (weekdays, holidays, etc.) are specified and created, and the basic premises exchange diagram and the designated premises exchange diagram are created. There is.

本実施の形態に係る構内入換計画作成システム10によれば、中央管理の本線データ(列車ダイヤ、列車運用等)を取込むことにより、本線情報の手入力を無くすことができる。これによって転記ミスの防止や入力チェック作業の軽減を図ることができる。
また入力作業及び入力チェックの作業が軽減されることにより、従来、本線計画案状態から構内入換計画作成を開始していたが、本線計画確定状態での構内入換計画の作成を可能とし、本線情報の追加修正による、構内入換計画の見直しに伴う修正作業を無くすことが可能となる。
さらに構内入換計画作成時の合理性チェックを行うことにより、構内入換計画のチェック負担を軽減することができる。
According to the premises exchange plan creation system 10 according to the present embodiment, manual input of main line information can be eliminated by incorporating central management main line data (train schedule, train operation, etc.). As a result, it is possible to prevent transcription errors and reduce input check work.
In addition, by reducing input work and input check work, the construction of a local exchange plan has been started from the mainline plan state in the past. It becomes possible to eliminate the correction work accompanying the review of the premises replacement plan by adding and correcting the main line information.
Furthermore, by performing a rationality check at the time of creating a campus replacement plan, the burden of checking the campus replacement plan can be reduced.

また構内入換ダイヤ図をシステムより出力することができるため、手書きの構内入換ダイヤ図を作成する必要を無くすことができる。
さらに、従来作成を行っていなかった実施の構内入換ダイヤ図の作成も可能となる。
またPRC装置経由で電子連動装置へ構内入換計画データを配信することにより、電子連動装置への構内ダイヤ入力作業及びチェック作業を無くすことができる。
Moreover, since a private branch diagram can be output from the system, it is possible to eliminate the need to create a hand-drawn private diagram.
Furthermore, it is also possible to create a premises exchange diagram that has not been previously created.
In addition, by distributing the in-house replacement plan data to the electronic interlocking device via the PRC device, it is possible to eliminate on-site diagram input work and check work to the electronic interlocking device.

以上発明を実施するための最良の形態について説明したが、上記実施の形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明はその趣旨を逸脱することなく変更、改良され得ると共に、本発明にはその等価物も含まれる。   Although the best mode for carrying out the invention has been described above, the above embodiment is intended to facilitate understanding of the present invention and is not intended to limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.

本実施の形態に係る構内入換計画作成システムの全体構成を示す図である。It is a figure which shows the whole structure of the premises exchange plan preparation system which concerns on this Embodiment. 本実施の形態に係るデータベースを示す図である。It is a figure which shows the database which concerns on this Embodiment. 本実施の形態に係る中央の輸送計画管理データ取り込み処理を示すフローチャートである。It is a flowchart which shows the central transportation plan management data taking-in process which concerns on this Embodiment. 本実施の形態に係る構内基礎データメンテナンス処理を示すフローチャートである。It is a flowchart which shows the campus basic data maintenance process which concerns on this Embodiment. 本実施の形態に係る作図パラメータメンテナンス処理を示すフローチャートである。It is a flowchart which shows the drawing parameter maintenance process which concerns on this Embodiment. 本実施の形態に係る構内改正面管理処理を示すフローチャートである。It is a flowchart which shows the premises revision surface management process which concerns on this Embodiment. 本実施の形態に係る基本構内列車計画作成処理を示すフローチャートである。It is a flowchart which shows the basic premise train plan creation process which concerns on this Embodiment. 本実施の形態に係る構内変更計画管理処理を示すフローチャートである。It is a flowchart which shows the premise change plan management process which concerns on this Embodiment. 本実施の形態に係る変更構内列車計画作成処理を示すフローチャートである。It is a flowchart which shows the change premise train plan creation process which concerns on this Embodiment. 本実施の形態に係る実施構内列車計画作成処理を示すフローチャートである。It is a flowchart which shows the implementation local train plan creation process which concerns on this Embodiment. 本実施の形態に係る実施計画データ配信処理を示すフローチャートである。It is a flowchart which shows the implementation plan data delivery process which concerns on this Embodiment. 本実施の形態に係る基本/実施構内入換ダイヤ図作成処理を示すフローチャートである。It is a flowchart which shows the basic / implementation in-place exchange diagram creation processing according to the present embodiment. 本実施の形態に係る本線列車及び本線列車運用を表示した画面イメージを示す図である。It is a figure which shows the screen image which displayed the main line train and main line train operation which concern on this Embodiment. 本実施の形態に係る本線列車、本線列車運用、構内列車及び構内列車運用を表示した画面イメージを示す図である。It is a figure which shows the screen image which displayed the main line train which concerns on this Embodiment, main line train operation, a private train, and a private train operation. 本実施の形態に係る構内列車計画作成の操作画面イメージを示す図である。It is a figure which shows the operation screen image of premise train plan preparation which concerns on this Embodiment. 本実施の形態に係る構内列車運用計画作成の操作手順を示す画面イメージを示す図である。It is a figure which shows the screen image which shows the operation procedure of premise train operation plan preparation which concerns on this Embodiment. 本実施の形態に係る時刻詳細設定画面イメージを示す図である。It is a figure which shows the time detailed setting screen image which concerns on this Embodiment. 本実施の形態に係る構内列車運用設定画面イメージを示す図である。It is a figure which shows the local train operation setting screen image which concerns on this Embodiment.

符号の説明Explanation of symbols

10 構内入換計画作成システム
20 輸送計画管理サーバ
30 計画情報伝達サーバ
40 ネットワーク
50 構内入換計画作成端末
60 構内入換計画作成サーバ
70 PRC装置
80 駅内ネットワーク
90 プリンタ
102 通信処理部
104 制御処理部
112 中央の輸送計画データ取込処理部
114 構内基礎データメンテナンス処理部
116 作図パラメータメンテナンス処理部
118 構内改正面管理処理部
120 基本構内入換計画作成処理部
122 構内変更計画管理処理部
124 変更構内入換計画作成処理部
126 実施構内入換計画作成処理部
128 実施計画データ配信処理部
130 基本/実施構内入換ダイヤ図作成処理部
202 基礎情報データベース
204 改正面情報データベース
206 基本列車情報データベース
208 変更列車情報データベース
210 基本本線列車運用情報データベース
212 変更本線列車運用情報データベース
214 基本車両運用情報データベース
216 変更車両運用情報データベース
218 構内基礎情報データベース
220 作図パラメータ情報データベース
222 構内改正面情報データベース
223 構内変更管理情報データベース
224 基本構内列車情報データベース
226 変更構内列車情報データベース
228 基本構内列車運用情報データベース
230 変更構内列車運用情報データベース
232 実施構内列車情報データベース
234 実施構内列車運用情報データベース
300 本線表示エリア
302 構内入換表示エリア
800 構内入換計画作成サーバ制御プログラム
DESCRIPTION OF SYMBOLS 10 Local exchange plan creation system 20 Transportation plan management server 30 Plan information transmission server 40 Network 50 Local exchange plan creation terminal 60 Local exchange plan creation server 70 PRC device 80 In-station network 90 Printer 102 Communication processing part 104 Control processing part 112 Central transportation plan data capture processing unit 114 On-site basic data maintenance processing unit 116 Plotting parameter maintenance processing unit 118 On-site revision surface management processing unit 120 Basic on-site replacement plan creation processing unit 122 On-site change plan management processing unit 124 Change on-site entry Replacement plan creation processing unit 126 Implementation premises exchange plan creation processing unit 128 Implementation plan data distribution processing unit 130 Basic / implementation premises exchange diagram creation processing unit 202 Basic information database 204 Revised surface information database 206 Basic train information database 08 Change train information database 210 Basic main train operation information database 212 Change main train operation information database 214 Basic vehicle operation information database 216 Change vehicle operation information database 218 Premise basic information database 220 Plotting parameter information database 222 Premise revision surface information database 223 Premise change Management information database 224 Basic premises train information database 226 Changed premises train information database
228 Basic campus train operation information database 230 Changed campus train operation information database 232 Implementation campus train information database 234 Implementation campus train operation information database 300 Main line display area 302 Campus exchange display area 800 Campus exchange plan creation server control program

Claims (8)

駅の構内に設けられる列車の各停留箇所を示す情報と各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す情報とを記憶し、駅の構内における列車の運行計画の作成を支援する情報処理装置の制御方法であって、
前記運行計画の作成者により操作される情報処理端末から、前記運行計画の作成を開始する旨の情報を受信し、
前記駅を着発又は通過する各列車について、前記着発又は通過する停留箇所を示す情報と、前記着発又は通過する時刻を示す情報と、前記駅に隣接する隣接駅を着発又は通過する時刻を示す情報と、を少なくとも対応付けた本線運行計画データを記憶する本線運行計画管理サーバから、前記本線運行計画データを受信し、
各列車が前記駅を着発又は通過する時刻を示す前記情報、前記隣接駅を着発又は通過する時刻を示す前記情報、及び前記駅の構内に設けられる列車の各停留箇所を示す前記情報に基づいて、前記駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を示すダイヤスジを前記情報処理端末のユーザインタフェースに表示し、
前記運行計画の作成者により前記情報処理端末に入力された、前記駅を終着駅として到着する列車を指定する情報、及び前記指定された列車を引き上げる停留箇所を指定する情報を、前記情報処理端末から受信し、
前記本線運行計画データ、及び前記各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す前記情報に基づいて、前記指定された列車が到着する停留箇所から前記指定された停留箇所へ前記列車を引き上げることを示すダイヤスジを、前記情報処理端末のユーザインタフェースに表示し、
前記指定された列車を示す情報と、前記指定された列車が到着した停留箇所を発車する時刻を示す情報と、前記指定された列車が前記指定された停留箇所へ到着する時刻を示す情報と、前記指定された停留箇所を示す情報と、を少なくとも対応付けた構内運行計画データを記憶する
ことを特徴とする情報処理装置の制御方法。
Stores information indicating each stop location of the train provided on the station premises and information indicating each time required to move the train from each stop location to each other stop location. A method of controlling an information processing device that supports creation of an operation plan,
From the information processing terminal operated by the creator of the operation plan, information indicating that the creation of the operation plan is started,
For each train that arrives at or passes through the station, information that indicates the stop location that arrives or passes, information that indicates the time when the train arrives or passes, and an adjacent station that is adjacent to the station. The main line operation plan data is received from the main line operation plan management server that stores the main line operation plan data associated with at least information indicating the time,
In the information indicating the time when each train arrives or departs the station, the information indicating the time when the train arrives or passes through the adjacent station, and the information indicating each stop point of the train provided in the station premises On the basis of displaying a diagram showing each position at each time of each train that arrives at or leaves the station on the user interface of the information processing terminal,
Information that designates a train that arrives at the station as an end station, and information that designates a stop point where the designated train is pulled up, is input to the information processing terminal by the creator of the operation plan. Received from
Based on the main line operation plan data and the information indicating each time required to move the train from each stop to each other stop, the designation from the stop where the designated train arrives Display a diagram indicating that the train is to be pulled up to the stop where the information processing terminal has been displayed on the user interface of the information processing terminal;
Information indicating the designated train, information indicating the time of departure from the stop where the specified train arrived, information indicating the time of arrival of the specified train at the specified stop, A method of controlling an information processing apparatus, comprising storing on-site operation plan data in which at least the information indicating the designated stop location is associated.
前記運行計画の作成者により前記情報処理端末に入力された、前記駅を終着駅として到着する列車を指定する情報、前記指定された列車を引き上げる停留箇所を指定する情報、及び前記駅を始発駅として発車する列車を指定する情報を前記情報処理端末から受信した場合には、
前記本線運行計画データ、及び前記各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す前記情報に基づいて、前記指定された列車が到着する停留箇所から前記指定された停留箇所へ前記列車を引き上げた後、前記列車を前記指定された列車が発車する停留箇所に移動させることを示すダイヤスジを、前記情報処理端末のユーザインタフェースに表示し、
前記駅に到着する前記指定された列車を示す情報と、前記駅に到着する前記指定された列車が到着した停留箇所を発車する時刻を示す情報と、前記駅に到着する前記指定された列車が前記指定された停留箇所へ到着する時刻を示す情報と、前記指定された停留箇所を示す情報と、前記駅に到着する前記指定された列車が前記指定された停留箇所を発車する時刻を示す情報と、前記駅を発車する前記指定された列車を示す情報と、前記駅を発車する前記指定された列車が発車する停留箇所へ到着する時刻を示す情報と、を少なくとも対応付けた構内運行計画データを記憶する
ことを特徴とする請求項1に記載の情報処理装置の制御方法。
Information that designates a train that arrives at the station as an end station, information that designates a stop point where the designated train is lifted, and the station that is the starting station, which is input to the information processing terminal by the creator of the operation plan When the information specifying the train that departs from the information processing terminal is received,
Based on the main line operation plan data and the information indicating each time required to move the train from each stop to each other stop, the designation from the stop where the designated train arrives After the train is lifted to the stop point, a diagram indicating that the train is moved to the stop point where the designated train departs is displayed on the user interface of the information processing terminal,
Information indicating the designated train arriving at the station, information indicating a departure time at which the designated train arriving at the station arrived, and the designated train arriving at the station Information indicating the time of arrival at the specified stop, information indicating the specified stop, and information indicating the time at which the specified train arriving at the station departs the specified stop And on-site operation plan data that associates at least information indicating the designated train that departs from the station and information indicative of a time at which the designated train that departs from the station arrives at a stop where it departs The information processing apparatus control method according to claim 1, wherein:
前記駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を示すダイヤスジを前記情報処理端末のユーザインタフェースに表示する際に、
前記駅を終着駅として到着する各列車のうち、前記列車を示す情報が前記列車を引き上げる停留箇所を示す情報と対応付けて記憶されていない列車については、他の列車とは異なる態様でダイヤスジを表示する
ことを特徴とする請求項1に記載の情報処理装置の制御方法。
When displaying on the user interface of the information processing terminal a diagram showing each position at each time of each train that arrives at or passes through the station,
Among trains arriving with the station as a terminal station, for trains in which the information indicating the train is not stored in association with the information indicating the stop where the train is pulled up, the schedule is different in a manner different from other trains. The information processing apparatus control method according to claim 1, wherein the information processing apparatus is displayed.
各列車について、停留箇所に到着する時刻が前記停留箇所を発車する時刻よりも前であるか否か、
各列車について、到着した停留箇所と同一の停留箇所から発車しているか否か、
各列車について、移動可能な停留箇所間で移動が行われているか否か、
各列車について、停留箇所に到着してから発車するまでの時間が所定時間以上あるか否か、
前記駅を終着駅として到着した各列車について、前記各列車を引き上げる停留箇所が指定されているか否か、
の少なくともいずれかを判定する
ことを特徴とする請求項1に記載の情報処理装置の制御方法。
For each train, whether the time of arrival at the stop is before the time of leaving the stop,
Whether each train departs from the same stop where it arrived,
Whether each train is moving between movable stops,
For each train, whether or not there is a predetermined time or more after arrival at the stop,
For each train arriving as the terminal station, whether or not a stop point is specified for lifting each train,
The method of controlling an information processing apparatus according to claim 1, wherein at least one of the following is determined.
前記情報処理装置は印刷装置と通信可能に接続され、
前記情報処理端末から、前記情報処理端末のユーザインタフェースに表示されるダイヤスジを印刷する旨の情報を受信し、
前記ダイヤスジを印刷するための情報を前記印刷装置に送信する
ことを特徴とする請求項1に記載の情報処理装置の制御方法。
The information processing apparatus is communicably connected to a printing apparatus,
Received from the information processing terminal information to print a diagram displayed on the user interface of the information processing terminal;
The information processing apparatus control method according to claim 1, wherein information for printing the diagram is transmitted to the printing apparatus.
前記情報処理装置は、前記駅の構内を走行する各列車の進路を定める信号機や転轍機の制御を行うPRC装置と通信可能に接続され、
前記PRC装置から、前記構内運行計画データを前記PRC装置に送信する旨の情報を受信し、
前記構内運行計画データを前記PRC装置に送信する
ことを特徴とする請求項1に記載の情報処理装置の制御方法。
The information processing device is communicably connected to a PRC device that controls a traffic light or a switch that determines the course of each train that runs on the premises of the station,
From the PRC device, receiving information indicating that the campus operation plan data is transmitted to the PRC device,
The information processing apparatus control method according to claim 1, wherein the on-site operation plan data is transmitted to the PRC apparatus.
駅の構内における列車の運行計画の作成を支援する情報処理装置であって、
駅の構内に設けられる列車の各停留箇所を示す情報を記憶する停留箇所データベースと、
各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す情報を記憶する移動時間データベースと、
前記運行計画の作成者により操作される情報処理端末から、前記運行計画の作成を開始する旨の情報を受信する運行計画作成開始情報受信部と、
前記駅を着発又は通過する各列車について、前記着発又は通過する停留箇所を示す情報と、前記着発又は通過する時刻を示す情報と、前記駅に隣接する隣接駅を着発又は通過する時刻を示す情報と、を少なくとも対応付けた本線運行計画データを記憶する本線運行計画管理サーバから、前記本線運行計画データを受信する本線運行計画データ受信部と、
各列車が前記駅を着発又は通過する時刻を示す前記情報、前記隣接駅を着発又は通過する時刻を示す前記情報、及び前記駅の構内に設けられる列車の各停留箇所を示す前記情報に基づいて、前記駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を示すダイヤスジを前記情報処理端末のユーザインタフェースに表示する第1のダイヤグラム表示部と、
前記運行計画の作成者により前記情報処理端末に入力された、前記駅を終着駅として到着する列車を指定する情報、及び前記指定された列車を引き上げる停留箇所を指定する情報を、前記情報処理端末から受信する入力情報受信部と、
前記本線運行計画データ、及び前記各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す前記情報に基づいて、前記指定された列車が到着する停留箇所から前記指定された停留箇所へ前記列車を引き上げることを示すダイヤスジを、前記情報処理端末のユーザインタフェースに表示する第2のダイヤグラム表示部と、
前記指定された列車を示す情報と、前記指定された列車が到着した停留箇所を発車する時刻を示す情報と、前記指定された列車が前記指定された停留箇所へ到着する時刻を示す情報と、前記指定された停留箇所を示す情報と、を少なくとも対応付けた構内運行計画データを記憶する構内運行計画データ記憶部と、
を備えることを特徴とする情報処理装置。
An information processing device that supports creation of a train operation plan in a station premises,
A stop location database that stores information indicating each stop location of a train provided on the station premises,
A travel time database that stores information indicating each time required to move the train from each stop to each other stop,
From the information processing terminal operated by the creator of the operation plan, an operation plan creation start information receiving unit that receives information indicating that the preparation of the operation plan is started,
For each train that arrives at or passes through the station, information that indicates the stop location that arrives or passes, information that indicates the time when the train arrives or passes, and an adjacent station that is adjacent to the station. A main line operation plan data receiving unit that receives the main line operation plan data from a main line operation plan management server that stores main line operation plan data associated with at least time information,
In the information indicating the time when each train arrives or departs the station, the information indicating the time when the train arrives or passes through the adjacent station, and the information indicating each stop point of the train provided in the station premises A first diagram display unit for displaying a diagram indicating a position at each time of each train arriving at or passing through the station on a user interface of the information processing terminal;
Information that designates a train that arrives at the station as an end station, and information that designates a stop point where the designated train is pulled up, is input to the information processing terminal by the creator of the operation plan. An input information receiving unit to receive from,
Based on the main line operation plan data and the information indicating each time required to move the train from each stop to each other stop, the designation from the stop where the designated train arrives A second diagram display unit for displaying a diagram indicating that the train is to be pulled up to the stopped location on the user interface of the information processing terminal;
Information indicating the designated train, information indicating the time of departure from the stop where the specified train arrived, information indicating the time of arrival of the specified train at the specified stop, On-site operation plan data storage unit for storing on-site operation plan data associated with at least the information indicating the designated stop point;
An information processing apparatus comprising:
駅の構内に設けられる列車の各停留箇所を示す情報と各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す情報とを記憶し、駅の構内における列車の運行計画の作成を支援する情報処理装置に、
前記運行計画の作成者により操作される情報処理端末から、前記運行計画の作成を開始する旨の情報を受信する手順と、
前記駅を着発又は通過する各列車について、前記着発又は通過する停留箇所を示す情報と、前記着発又は通過する時刻を示す情報と、前記駅に隣接する隣接駅を着発又は通過する時刻を示す情報と、を少なくとも対応付けた本線運行計画データを記憶する本線運行計画管理サーバから、前記本線運行計画データを受信する手順と、
各列車が前記駅を着発又は通過する時刻を示す前記情報、前記隣接駅を着発又は通過する時刻を示す前記情報、及び前記駅の構内に設けられる列車の各停留箇所を示す前記情報に基づいて、前記駅を着発又は通過する各列車の各時刻におけるそれぞれの位置を示すダイヤスジを前記情報処理端末のユーザインタフェースに表示する手順と、
前記運行計画の作成者により前記情報処理端末に入力された、前記駅を終着駅として到着する列車を指定する情報、及び前記指定された列車を引き上げる停留箇所を指定する情報を、前記情報処理端末から受信する手順と、
前記本線運行計画データ、及び前記各停留箇所から他の各停留箇所へそれぞれ列車を移動させるのに必要な各時間を示す前記情報に基づいて、前記指定された列車が到着する停留箇所から前記指定された停留箇所へ前記列車を引き上げることを示すダイヤスジを、前記情報処理端末のユーザインタフェースに表示する手順と、
前記指定された列車を示す情報と、前記指定された列車が到着した停留箇所を発車する時刻を示す情報と、前記指定された列車が前記指定された停留箇所へ到着する時刻を示す情報と、前記指定された停留箇所を示す情報と、を少なくとも対応付けた構内運行計画データを記憶する手順と、
を実行させるためのプログラム。

Stores information indicating each stop location of the train provided on the station premises and information indicating each time required to move the train from each stop location to each other stop location. In the information processing device that supports the creation of the operation plan,
From the information processing terminal operated by the creator of the operation plan, a procedure for receiving information indicating that the preparation of the operation plan is started,
For each train that arrives at or passes through the station, information that indicates the stop location that arrives or passes, information that indicates the time when the train arrives or passes, and an adjacent station that is adjacent to the station. A procedure for receiving the main line operation plan data from the main line operation plan management server storing main line operation plan data associated with at least information indicating time;
In the information indicating the time when each train arrives or departs the station, the information indicating the time when the train arrives or passes through the adjacent station, and the information indicating each stop point of the train provided in the station premises On the basis of a procedure for displaying on the user interface of the information processing terminal a diagram indicating the position of each train at each time of arrival or departure from the station,
Information that designates a train that arrives at the station as an end station, and information that designates a stop point where the designated train is pulled up, is input to the information processing terminal by the creator of the operation plan. The procedure to receive from
Based on the main line operation plan data and the information indicating each time required to move the train from each stop to each other stop, the designation from the stop where the designated train arrives A procedure for displaying on the user interface of the information processing terminal a diagram indicating that the train is to be pulled up to the stopped location;
Information indicating the designated train, information indicating the time of departure from the stop where the specified train arrived, information indicating the time of arrival of the specified train at the specified stop, A procedure for storing on-site operation plan data associated with at least the information indicating the designated stop point;
A program for running

JP2005015849A 2005-01-24 2005-01-24 Control method for information processor, information processor, and program Pending JP2006199244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005015849A JP2006199244A (en) 2005-01-24 2005-01-24 Control method for information processor, information processor, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005015849A JP2006199244A (en) 2005-01-24 2005-01-24 Control method for information processor, information processor, and program

Publications (1)

Publication Number Publication Date
JP2006199244A true JP2006199244A (en) 2006-08-03

Family

ID=36957605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005015849A Pending JP2006199244A (en) 2005-01-24 2005-01-24 Control method for information processor, information processor, and program

Country Status (1)

Country Link
JP (1) JP2006199244A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009051444A (en) * 2007-08-29 2009-03-12 Mitsubishi Electric Corp In-yard schedule preparation device
JP2009119929A (en) * 2007-11-12 2009-06-04 Ns Solutions Corp Information processing device, method and program for processing information
JP2010064548A (en) * 2008-09-09 2010-03-25 Toshiba Corp Vehicular information management device
JP2016155397A (en) * 2015-02-23 2016-09-01 株式会社日立製作所 Operation arrangement support system
JP2021000861A (en) * 2019-06-19 2021-01-07 三菱電機株式会社 Train operation management device and method for the same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009051444A (en) * 2007-08-29 2009-03-12 Mitsubishi Electric Corp In-yard schedule preparation device
JP2009119929A (en) * 2007-11-12 2009-06-04 Ns Solutions Corp Information processing device, method and program for processing information
JP2010064548A (en) * 2008-09-09 2010-03-25 Toshiba Corp Vehicular information management device
JP2016155397A (en) * 2015-02-23 2016-09-01 株式会社日立製作所 Operation arrangement support system
JP2021000861A (en) * 2019-06-19 2021-01-07 三菱電機株式会社 Train operation management device and method for the same
JP7178965B2 (en) 2019-06-19 2022-11-28 三菱電機株式会社 TRAIN OPERATION MANAGEMENT DEVICE AND TRAIN OPERATION MANAGEMENT METHOD

Similar Documents

Publication Publication Date Title
JP5425454B2 (en) Trip planning support device
US20100185472A1 (en) Locomotive Assistant
JP2006199244A (en) Control method for information processor, information processor, and program
JP4719534B2 (en) Operation schedule cooperation plan creation system and method
JPWO2005007483A1 (en) Vehicle replacement plan creation support device
JP5425455B2 (en) Travel plan creation support device and travel plan creation support system using the same
JP2024020268A (en) System and method for railroad tie management
JPH09156506A (en) Operation schedule correcting system using plural terminals
CN110413678A (en) Construction survey system
JP2018090137A (en) Vehicle application business support system
JP2013154787A (en) Vehicle operation plan making device
JP5600389B2 (en) Travel plan creation support device, travel plan creation support system, and travel plan creation support program
US8019573B2 (en) Drawing conversion assignment and management system
US7937414B2 (en) Fiber splice assignment and management system
JP2004291817A (en) Information and apparatus for supporting preparation of train schedule
JP2018062249A (en) Vehicle operation business assistance system
JP4221254B2 (en) Vehicle base diamond creation device
JP4727097B2 (en) Update operation information provision system
JPH04238775A (en) Diagram operation and preparation device
JPH11144069A (en) Facility arrangement drawing generating device and recording medium where facility arrangement drawing generating process program is recorded
JP5051605B2 (en) Operation schedule management device and program
JP7324042B2 (en) TRANSPORT PLANNING SUPPORT SYSTEM AND METHOD
US20050125303A1 (en) Split plat assignment and management system
JP2006123747A (en) Supporting and output system for actual scheduling of train operation diagram, output method, and output program
JP2003191846A (en) Operation arrangement device