JP2006099235A - Maintenance work instruction output system and method, and computer program - Google Patents

Maintenance work instruction output system and method, and computer program Download PDF

Info

Publication number
JP2006099235A
JP2006099235A JP2004282034A JP2004282034A JP2006099235A JP 2006099235 A JP2006099235 A JP 2006099235A JP 2004282034 A JP2004282034 A JP 2004282034A JP 2004282034 A JP2004282034 A JP 2004282034A JP 2006099235 A JP2006099235 A JP 2006099235A
Authority
JP
Japan
Prior art keywords
work
maintenance work
scheduled
execution condition
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2004282034A
Other languages
Japanese (ja)
Inventor
Toshiro Kamioka
利朗 上岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2004282034A priority Critical patent/JP2006099235A/en
Publication of JP2006099235A publication Critical patent/JP2006099235A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To change the requirements for performing maintenance work, upon the occurrence of an event not presupposed during the planning of the maintenance work without placing burden on a person in charge. <P>SOLUTION: In this maintenance work instruction output system, a maintenance work management device 1 for use in providing instructions to a worker performing maintenance work for facilities is provided with a storage means for storing the requirements for performing every planned maintenance work that is to be performed during a predetermined period; a site situation report receiving part 103 for receiving situation difference information 72 as information about the situations of the present work site from the worker at the facilities, i.e., the work site; a requirement changing part 105 for making changes to the requirements for performing every maintenance work at the input of the situation difference information 72, so that the execution of every maintenance work can be completed within a predetermined period under situations indicated in the situation difference information 72; and a work instruction sending part 102 for sending work instruction information 71 that shows the results of the changes to a worker terminal 2 that the worker at the work site has. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、ビルなどの施設のメンテナンス作業に関する情報を管理するシステムおよび方法に関する。   The present invention relates to a system and method for managing information related to maintenance work of a facility such as a building.

ビル、体育館、ショッピングセンタ、ターミナル、またはイベントホールなどの施設のオーナは、これらの施設のメンテナンス作業を、メンテナンスサービス会社に委託(アウトソーシング)する場合が多い。委託を受けたメンテナンスサービス会社は、自社に所属する作業員を施設に派遣し、メンテナンス作業を実施する。   Owners of facilities such as buildings, gymnasiums, shopping centers, terminals, or event halls often outsource maintenance work of these facilities to a maintenance service company. The consigned maintenance service company dispatches workers belonging to the company to the facility to carry out maintenance work.

毎日のメンテナンス作業の計画(予定)は、各作業員の出勤予定およびオーナとの契約の内容に従って立てられる。契約の内容が単純であれば、メンテナンス作業の計画を立てる作業自体は、それほど複雑ではない。しかし、近年、オーナの要求が多様になり、メンテナンス作業の計画を立てる作業が複雑になっている。   The daily maintenance work plan (plan) is made according to the schedule of each worker's work and the contents of the contract with the owner. If the contents of the contract are simple, the work itself for planning the maintenance work is not so complicated. However, in recent years, the owner's requirements have been diversified, and the work of planning a maintenance work has become complicated.

そこで、特許文献1に記載されるような、コンピュータを用いて自動的にメンテナンス作業の計画を立てる方法が提案されている。特許文献1に記載される方法によると、翌日のメンテナンス作業の計画が既に出来上がっていても、作業員の勤務時間の変更があった場合に、その計画を修正することができる。
特許第2821227号公報
Therefore, a method for automatically planning a maintenance work using a computer as described in Patent Document 1 has been proposed. According to the method described in Patent Literature 1, even if the maintenance work plan for the next day has already been completed, the plan can be corrected when the working hours of the worker are changed.
Japanese Patent No. 28212227

しかし、特許文献1に記載される方法では、メンテナンス作業を実施する当日に何らかの変更が生じても、メンテナンス作業の計画を変更することはできない。したがって、このような状況が生じた場合は、メンテナンス作業の計画の担当者が手作業で計画の変更を行わなければならない。   However, in the method described in Patent Document 1, even if some change occurs on the day when the maintenance work is performed, the maintenance work plan cannot be changed. Therefore, when such a situation occurs, the person in charge of the maintenance work plan must manually change the plan.

本発明は、このような問題点に鑑み、メンテナンス作業の計画を立てる際には前提としていなかった出来事が起こった場合に、担当者に負担を掛けることなくメンテナンス作業の実施条件の変更を行うことができるようにすることを目的とする。   In view of such a problem, the present invention changes the execution conditions of maintenance work without imposing a burden on the person in charge when an event that has not been assumed when the maintenance work is planned occurs. The purpose is to be able to.

本発明に係るメンテナンス作業指示出力システムは、施設のメンテナンス作業を行う作業員に対して与えるべき、当該メンテナンス作業に関する指示を出力する、メンテナンス作業指示出力システムであって、所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとに、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を記憶する、予定作業実施条件記憶手段と、作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報を入力する作業現場状況情報入力手段と、前記各実施予定メンテナンス作業の実施が入力された前記作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する、実施条件変更手段と、前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する、変更結果出力手段と、を有することを特徴とする。   A maintenance work instruction output system according to the present invention is a maintenance work instruction output system that outputs an instruction related to the maintenance work to be given to a worker who performs maintenance work on a facility, and is performed during a predetermined period. For each scheduled maintenance work that is the scheduled maintenance work, scheduled work execution condition storage means for storing scheduled work execution condition information indicating an execution condition for the scheduled maintenance work, and the facility in the facility that is the work site Work site status information input means for inputting work site status information, which is information related to the current status of the work site reported from the worker, and the work site status information to which the execution of each scheduled maintenance work is input. Each implementation schedule will be completed so that it can be completed in the given period under the circumstances indicated The execution condition changing means for changing the execution condition indicated in the scheduled work execution condition information of the maintenance work, and the result changed by the execution condition changing means for the worker at the facility that is the work site. Change result output means for outputting in order to give the instruction.

好ましくは、前記作業現場状況情報が入力されるたびに、当該作業現場状況情報に基づいて、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する必要があるか否かを判別する、変更要否判別手段、を有し、前記実施条件変更手段は、実施条件を変更する必要があると前記変更要否判別手段によって判別された場合に、当該実施条件を変更する。   Preferably, each time the work site status information is input, whether or not it is necessary to change the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance operation based on the work site status information The execution condition change means changes the execution condition when it is determined by the change necessity determination means that the execution condition needs to be changed.

前記作業員は、作業現場の状況として、どのような天候であるか、または急な欠勤者がいるか、などを前記メンテナンス作業指示出力システムに報告するのが好ましい。この場合は、前記メンテナンス作業指示出力システムを、次のように構成すればよい。前記メンテナンス作業の種目ごとに、天候ごとの、当該メンテナンス作業を実施するのに必要な第一の工数を示す、天候別実施条件情報を記憶する、天候別実施条件記憶手段、を設けておき、前記作業現場状況情報には、前記施設の天候および前記作業員の勤怠の状況が示されており、前記実施予定メンテナンス作業の前記予定作業実施条件情報には、実施条件として、当該実施予定メンテナンス作業の開始時刻、完了時刻、および実施を行うべき前記作業員の人数が示されており、前記変更要否判別手段は、前記作業現場状況情報に少なくとも1人の前記作業員が欠勤する旨が示されている場合、または、いずれかの前記実施予定メンテナンス作業の、前記予定作業実施条件情報に基づいて求められる第二の工数が、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候のときの前記第一の工数よりも小さい場合に、実施条件を変更する必要があると判別する。   It is preferable that the worker reports to the maintenance work instruction output system, such as the weather at the work site or whether there is a sudden absence from work. In this case, the maintenance work instruction output system may be configured as follows. For each event of the maintenance work, there is provided a weather-specific execution condition storage means for storing weather-specific execution condition information indicating the first man-hour required for performing the maintenance work for each weather, The work site status information indicates the weather of the facility and the attendance status of the worker, and the scheduled work execution condition information of the scheduled maintenance work includes the scheduled maintenance work as an execution condition. The start time, completion time, and the number of workers to be executed are indicated, and the change necessity determination means indicates that at least one worker is absent from the work site status information. Or the second man-hour calculated based on the scheduled work execution condition information of any of the scheduled maintenance operations is the scheduled maintenance The execution condition is changed when it is smaller than the first man-hour at the time of the weather of the facility indicated in the input work site status information, which is indicated in the execution condition information classified by the weather related to the event. Determine that you need to

本発明によると、メンテナンス作業の計画を立てる際には前提としていなかった出来事が起こった場合に、計画の担当者に負担を掛けることなくメンテナンス作業の実施条件の変更を行うことができる。   According to the present invention, when an event that has not been assumed when a maintenance work plan is made, the execution condition of the maintenance work can be changed without placing a burden on the person in charge of the plan.

図1は本発明に係るメンテナンス作業管理装置1が設けられたネットワークシステム全体の例を示す図、図2はメンテナンス作業管理装置1のハードウェア構成の例を示す図、図3はメンテナンス作業管理装置1の機能的構成の例を示す図である。   1 is a diagram showing an example of an entire network system provided with a maintenance work management apparatus 1 according to the present invention, FIG. 2 is a diagram showing an example of a hardware configuration of the maintenance work management apparatus 1, and FIG. 3 is a maintenance work management apparatus It is a figure which shows the example of 1 functional structure.

本発明に係るメンテナンス作業管理装置1は、ビル、体育館、ショッピングセンタ、ターミナル、またはイベントホールなどの施設の清掃、保守、または点検などのメンテナンス作業を請け負うメンテナンスサービス会社によって管理されている。または、情報サービス会社がこのメンテナンスサービス会社から委託を受けてメンテナンス作業管理装置1を管理してもよい。   The maintenance work management device 1 according to the present invention is managed by a maintenance service company that undertakes maintenance work such as cleaning, maintenance, or inspection of facilities such as buildings, gymnasiums, shopping centers, terminals, or event halls. Alternatively, the information service company may receive the commission from the maintenance service company and manage the maintenance work management apparatus 1.

このメンテナンス作業管理装置1は、メンテナンスサービス会社が上記のような施設のオーナから委託を受けて実施するメンテナンス作業に関する情報などを管理している。また、メンテナンス作業を行うために施設に出掛けている作業員に対して、どのような作業を行うべきかについての指示を与える。   The maintenance work management apparatus 1 manages information related to maintenance work performed by a maintenance service company commissioned from the owner of the facility as described above. In addition, an instruction as to what kind of work should be performed is given to a worker who has gone to the facility to perform the maintenance work.

作業員には、作業員端末2が貸与されている。必ずしも作業員全員に1台ずつ作業員端末2を貸与する必要はなく、複数の作業員が同じ時間帯に同じ施設でメンテナンス作業を行う場合は、いずれか1人の作業員(例えば、現場監督者)に貸与しておけばよい。作業員端末2として、携帯電話端末、PDA(Personal Digital Assistant)、またはノート型パソコンなどが用いられる。   A worker terminal 2 is lent to the worker. It is not always necessary to lend one worker terminal 2 to all workers. When multiple workers perform maintenance work at the same facility during the same time period, one of the workers (for example, a field supervisor) Lending to a person). As the worker terminal 2, a mobile phone terminal, a PDA (Personal Digital Assistant), a notebook personal computer, or the like is used.

メンテナンス作業管理装置1と作業員端末2とは、図1に示すように、通信回線3を介して互いに情報の送受信を行うことができる。通信回線3として、インターネット、公衆回線、または専用線などが用いられる。   As shown in FIG. 1, the maintenance work management device 1 and the worker terminal 2 can exchange information with each other via the communication line 3. As the communication line 3, the Internet, a public line, a dedicated line, or the like is used.

メンテナンス作業管理装置1は、図2に示すように、CPU1a、RAM1b、ROM1c、ハードディスク1d、および各種インタフェースなどによって構成されている。ハードディスク1dには、図3に示すような日別作業テーブル生成部101、作業指示送信部102、現場状況報告受信部103、変更要否判別部104、実施条件変更部105、作業実績報告受信部106、作業工数分析部107、および作業関連情報管理部108などの機能を実現するためのプログラムおよびデータがインストールされている。これらのプログラムおよびデータは、必要に応じてRAM1bにロードされ、CPU1aによって実行される。メンテナンス作業管理装置1として、ワークステーションまたはパーソナルコンピュータなどが用いられる。   As shown in FIG. 2, the maintenance work management apparatus 1 includes a CPU 1a, a RAM 1b, a ROM 1c, a hard disk 1d, and various interfaces. The hard disk 1d includes a daily work table generation unit 101, a work instruction transmission unit 102, an on-site status report reception unit 103, a change necessity determination unit 104, an execution condition change unit 105, and a work result report reception unit as illustrated in FIG. A program and data for realizing functions such as 106, a work man-hour analysis unit 107, and a work related information management unit 108 are installed. These programs and data are loaded into the RAM 1b as necessary and executed by the CPU 1a. As the maintenance work management apparatus 1, a workstation or a personal computer is used.

以下、あるビルBLのメンテナンス作業の委託を受けたメンテナンスサービス会社CPがメンテナンス作業管理装置1を使用する場合を例に説明する。   Hereinafter, a case where the maintenance service company CP entrusted with maintenance work for a certain building BL uses the maintenance work management apparatus 1 will be described as an example.

メンテナンス作業の現場であるビルBLにいる作業員は、自分の作業員端末2を使用することによって、これからビルBLでどのような内容のメンテナンス作業をどのような順番で実施すべきかを示す作業指示情報をメンテナンス作業管理装置1から取得して閲覧することができる。また、当日の天候が予想の天候とは異なったり同じビルBLを担当するいずれかの作業員が欠勤したりした場合、つまり、作業環境に予定外の状況が生じた場合に、その旨をメンテナンス作業管理装置1に報告し、その状況に対応した新たな作業指示情報を取得することができる。   The worker in the building BL that is the maintenance work site uses the worker terminal 2 to indicate what kind of maintenance work should be performed in the building BL in what order. Information can be acquired from the maintenance work management apparatus 1 and browsed. Also, if the day's weather is different from the expected weather or if any worker in charge of the same building BL is absent from work, that is, if an unplanned situation occurs in the work environment, this will be maintained. It is possible to report to the work management apparatus 1 and acquire new work instruction information corresponding to the situation.

メンテナンス作業の完了後は、作業員端末2を操作してメンテナンス作業の完了報告および実績報告をメンテナンス作業管理装置1に送信する。これらの報告は、メンテナンス作業管理装置1において、メンテナンス作業の工数に関する設定の修正などのために用いられる。   After completion of the maintenance work, the operator terminal 2 is operated to transmit a maintenance work completion report and a performance report to the maintenance work management apparatus 1. These reports are used in the maintenance work management apparatus 1 to correct settings related to the number of maintenance work steps.

図4は作業別実施条件マスタTL1の例を示す図、図5は出勤予定テーブルTL2の例を示す図、図6は日別作業テーブルTL30の例を示す図、図7は日別作業テーブル生成処理の流れの例を説明するフローチャート、図8は作業指示情報71の例を示す図、図9は状況変化対応処理の流れの例を説明するフローチャート、図10は日別作業テーブルTL31の例を示す図、図11はある作業員についての作業実績の分析結果の例を示す図である。   4 is a diagram showing an example of the work-specific execution condition master TL1, FIG. 5 is a diagram showing an example of the attendance schedule table TL2, FIG. 6 is a diagram showing an example of the daily work table TL30, and FIG. FIG. 8 is a diagram illustrating an example of work instruction information 71, FIG. 9 is a flowchart illustrating an example of a flow of situation change handling processing, and FIG. 10 is an example of a daily work table TL31. FIG. 11 is a diagram illustrating an example of an analysis result of work results for a certain worker.

次に、図3に示すメンテナンス作業管理装置1の各部の処理内容などについて、詳細に説明する。   Next, the processing contents of each part of the maintenance work management apparatus 1 shown in FIG. 3 will be described in detail.

作業関連情報管理部108は、作業別実施条件マスタTL1、出勤予定テーブルTL2、および日別作業テーブルTL3などを記憶し管理している。   The work related information management unit 108 stores and manages a work-specific execution condition master TL1, a work schedule table TL2, a daily work table TL3, and the like.

作業別実施条件マスタTL1には、図4に示すように、「ロビー床掃除」または「中庭水やり」などといった様々な種目のメンテナンス作業ごとの実施条件情報DT1が格納されている。実施条件情報DT1の「作業番号」は、そのメンテナンス作業の種目を識別するための識別情報を示している。「作業分類」は、そのメンテナンス作業が屋外および屋内のいずれで行われるものであるかを示している。「作業内容」は、そのメンテナンス作業の内容(仕事内容)を示しており、メンテナンス作業名としても用いられる。   The work-specific execution condition master TL1 stores execution condition information DT1 for each type of maintenance work such as “lobby floor cleaning” or “courtyard watering” as shown in FIG. The “work number” of the execution condition information DT1 indicates identification information for identifying the type of maintenance work. “Work classification” indicates whether the maintenance work is performed outdoors or indoors. “Work content” indicates the content of the maintenance work (work content), and is also used as a maintenance work name.

「実施回数」ないし「雨天作業工数」は、メンテナンス作業ごとの実施条件について示している。すなわち、「実施回数」は、そのメンテナンス作業を実施すべき頻度または時期を示している。例えば、実施回数が「午前1回、午後1回」である場合は、毎日午前および午後にそれぞれ1回ずつそのメンテナンス作業を実施しなければならないことを意味する。「中止条件」は、どのような天候のときにそのメンテナンス作業を中止するのかを示している。中止条件は、実施回数よりも優先して適用される。つまり、例えば、実施回数および中止条件にそれぞれ「午前1回」および「雨天中止」と設定されており、かつ、作業当日の午前中の天候が雨天であった場合は、そのメンテナンス作業は中止されることになる。「晴天時作業工数」および「雨天時作業工数」は、それぞれ、天候が晴天であるときおよび雨天であるときにそのメンテナンス作業を実施するのに要する工数を示している。   “Implementation count” or “rainy work man-hour” indicates the implementation conditions for each maintenance operation. That is, “the number of times of execution” indicates the frequency or timing at which the maintenance work should be performed. For example, when the number of executions is “once in the morning and once in the afternoon”, it means that the maintenance work must be performed once in the morning and in the afternoon each day. “Cancellation condition” indicates in what kind of weather the maintenance work is to be suspended. The cancellation condition is applied in preference to the number of implementations. That is, for example, if the number of executions and cancellation conditions are set to “once in the morning” and “cancellation in the rain”, respectively, and the weather on the morning of the work day is raining, the maintenance work is canceled. Will be. “Sunny-day work man-hours” and “rainy-day work man-hours” respectively indicate the man-hours required to perform the maintenance work when the weather is fine and when it is rainy.

どのような作業内容のメンテナンス作業をどれくらいの頻度でまたはどの時期に実施するのかは、委託契約などの際に、メンテナンスサービス会社CPがビルBLのオーナと話し合って決めておく。晴天時および雨天時の作業工数、中止条件、および作業分類については、メンテナンスサービス会社CPがビルBLの現場の様子を確認するなどして決めておく。そして、これらの決定した事項を作業別実施条件マスタTL1に登録する。つまり、作業別実施条件マスタTL1は、メンテナンス作業に関する契約内容および作業条件の基準を示していると言える。また、天候の判断基準についても、メンテナンスサービス会社がビルBLのオーナと話し合って決めておくことができる。例えば、気象学上の天候が「曇り」である場合は「晴天」と判断するようにしてもよいし、「雪」である場合は「雨天」と判断するようにしてもよい。   The maintenance service company CP discusses with the owner of the building BL at the time of consignment contract, etc. at what frequency or when the maintenance work of what kind of work is to be carried out. The maintenance service company CP confirms the state of the site of the building BL with respect to the work man-hours, cancellation conditions, and work classifications during fine weather and rainy weather. These determined items are registered in the work-specific execution condition master TL1. That is, it can be said that the work-specific execution condition master TL1 indicates the contract contents and the standard of the work conditions regarding the maintenance work. Also, the maintenance service company can decide the weather judgment criteria by talking with the owner of the building BL. For example, when the meteorological weather is “cloudy”, it may be determined as “sunny”, and when it is “snow”, it may be determined as “rainy”.

出勤予定テーブルTL2には、図5に示すように、メンテナンスサービス会社に所属する各作業員の作業時間帯(各日の午前および午後)ごとの出勤予定および担当施設に関する情報が格納されている。1つのレコードが1人の作業員についての情報である。「出勤予定」が「○」である場合は、その作業員がその作業時間帯に出勤する予定であることを意味し、「×」である場合は、欠勤する予定であることを意味する。「担当施設」は、その作業員が主に担当している施設を示している。   As shown in FIG. 5, the attendance schedule table TL2 stores information on attendance schedules and facilities in charge for each work time zone (morning and afternoon) of each worker belonging to the maintenance service company. One record is information about one worker. When “schedule to work” is “◯”, it means that the worker is going to work in the work time zone, and when it is “x”, it means that he is going to work. “Responsible facility” indicates a facility mainly handled by the worker.

出勤予定テーブルTL2を、作業関連情報管理部108で管理する代わりに、メンテナンスサービス会社の他のシステム(例えば、人事管理システム)で管理し、必要に応じて係るシステムから呼び出すようにしてもよい。   Instead of managing the attendance schedule table TL2 by the work-related information management unit 108, the attendance schedule table TL2 may be managed by another system (for example, a personnel management system) of the maintenance service company, and may be called from the system as necessary.

日別作業テーブルTL3には、図6に示すように、ビルBLで実施されるメンテナンス作業の実施条件(開始時刻、終了時刻、掛けることができる工数、および担当すべき作業員など)に関する情報が格納されている。1つのレコードが1回のメンテナンス作業に対応している。   In the daily work table TL3, as shown in FIG. 6, information on the execution conditions (start time, end time, man-hours that can be multiplied, workers to be in charge, etc.) of the maintenance work performed in the building BL is provided. Stored. One record corresponds to one maintenance work.

「作業時間帯」は、そのメンテナンス作業を実施しなければならない期間を示している。係る期間は、メンテナンスサービス会社CPがビルBLのオーナと話し合って決めておくことができる。本実施形態では、1日の中に「午前9時〜正午」および「午後1時〜午後5時半」の2つの期間が設けられており、それぞれ、「午前」および「午後」という期間名が付けられているものとする。作業時間帯の名称は、日付と期間名とを組み合わせて設定される。   The “working time zone” indicates a period during which the maintenance work must be performed. Such a period can be determined by the maintenance service company CP in discussion with the owner of the building BL. In the present embodiment, two periods of “9:00 am to noon” and “1 pm to 5:30 pm” are provided in one day, and period names “am” and “afternoon” are respectively provided. It is assumed that is attached. The name of the work time zone is set by combining a date and a period name.

「作業担当者」は、そのメンテナンス作業を担当する作業員の識別情報を示している。本実施形態では、係る識別情報として作業員の苗字を用いているが、作業員コードなどを用いてもよい。複数の作業員が担当する場合は、各人の識別情報が作業担当者として設定される。   “Worker” indicates identification information of a worker who is in charge of the maintenance work. In this embodiment, the worker's last name is used as the identification information, but a worker code or the like may be used. When a plurality of workers are in charge, the identification information of each person is set as the worker.

「作業予定時刻」は、そのメンテナンス作業を開始する予定の時刻および終了する予定の時刻を示している。作業員は、両時刻の間にそのメンテナンス作業を完了させなければならない。「作業番号」は、そのメンテナンス作業の種目を識別するための識別情報を示している。この作業番号は、図4の作業別実施条件マスタTL1の作業番号に対応している。したがって、作業番号を検索キーにして、そのメンテナンス作業に関する実施条件情報DT1を作業別実施条件マスタTL1から抽出することができる。「作業天候条件」は、そのメンテナンス作業が実施される作業時間帯における天候の予想が格納される。   “Scheduled work time” indicates the time at which the maintenance work is scheduled to start and the time at which the maintenance work is scheduled to end. The worker must complete the maintenance work between both times. The “work number” indicates identification information for identifying the type of maintenance work. This work number corresponds to the work number of the work condition execution condition master TL1 of FIG. Therefore, using the work number as a search key, the execution condition information DT1 related to the maintenance work can be extracted from the work-specific execution condition master TL1. The “working weather condition” stores the forecast of the weather in the working time period in which the maintenance work is performed.

「作業予定工数」は、そのメンテナンス作業に要する工数が格納される。作業員は、その工数の範囲内でそのメンテナンス作業を完了させなければならない。なお、「工数」とは、メンテナンス作業を1時間で終わらせるのに必要な人数のことである。また、メンテナンス作業を1人で行う場合に必要な時間でもある。つまり、例えば、作業予定工数が「1.5人・時間」であるメンテナンス作業は、作業員が1人で行う場合は1.5時間の作業時間を必要とし、2人で行う場合は0.75時間の作業時間を必要とする。   The “work schedule man-hour” stores the man-hour required for the maintenance work. The worker must complete the maintenance work within the man-hours. “Man-hour” is the number of persons required to complete the maintenance work in one hour. It is also the time required for maintenance work by one person. In other words, for example, a maintenance work with a scheduled work man-hour of “1.5 man · hour” requires 1.5 hours of work time when one worker performs, and 0. 75 hours of work time is required.

「作業実績時刻」は、そのメンテナンス作業を実際に開始した時刻および終了した時刻を示している。「作業実績工数」は、実際にそのメンテナンス作業を実施するのに掛かった工数を示している。   The “actual work time” indicates the time when the maintenance work is actually started and the time when the work is finished. “Actual work man-hour” indicates the man-hour required to actually perform the maintenance work.

この日別作業テーブルTL3は、図3の日別作業テーブル生成部101によって、図7に示すような手順で生成される。なお、ここでは、9月1日水曜日分のメンテナンス作業のための日別作業テーブルTL3を生成する場合を例に説明する。   The daily work table TL3 is generated by the daily work table generation unit 101 in FIG. 3 according to the procedure shown in FIG. Here, a case where the daily work table TL3 for the maintenance work for Wednesday, September 1 is generated will be described as an example.

ビルBLの建っている地域における9月1日午前の天気予報の情報を天気予報会社のサーバなどから取得し、9月1日午前の天候を予測する(#101)。例えば、天気予報の降水確率が80%以上であれば雨天であると予測し、それ未満であれば晴天と予測する。予測方法は、メンテナンスサービス会社CPが自由に決めればよい。なお、天気予報の情報の情報を取得せずに、9月1日午前の天候が常に所定の天候(例えば、晴天)であることを前提にステップ#102以降の処理を実行してもよい。   Information on the weather forecast for the morning of September 1 in the area where the building BL is built is obtained from a server of a weather forecast company, etc., and the weather for the morning of September 1 is predicted (# 101). For example, if the precipitation probability of the weather forecast is 80% or more, it is predicted to be rainy, and if it is less than that, it is predicted to be clear. The prediction method may be freely determined by the maintenance service company CP. It should be noted that the processing after step # 102 may be executed on the assumption that the weather on September 1st is always a predetermined weather (for example, fine weather) without acquiring the weather forecast information.

9月1日午前に実施しなければならないメンテナンス作業の種目を、ステップ#101で予測された天候および図4の作業別実施条件マスタTL1に基づいて判別する(#102)。例えば、ステップ#101で「晴天」という予測結果が得られた場合は、作業番号が「001」〜「006」である6つの種目のメンテナンス作業を実施しなければならないと判別する。「雨天」という予測結果が得られた場合は、中止条件が「雨天時」であるものが除外されるので、作業番号が「001」〜「003」である3つの種目のメンテナンス作業を実施しなければならないと判別する。   The type of maintenance work that must be performed on the morning of September 1 is determined based on the weather predicted in step # 101 and the work-specific execution condition master TL1 in FIG. 4 (# 102). For example, if a prediction result of “fine weather” is obtained in step # 101, it is determined that six types of maintenance work with work numbers “001” to “006” must be performed. If a prediction result of “rainy” is obtained, those with a stop condition of “rainy” are excluded, so three maintenance tasks with work numbers “001” to “003” are performed. It is determined that it is necessary.

ステップ#101、#102の処理と並行して、ビルBLを担当する作業員の中から9月1日午前に勤務する予定の作業員を、図5の出勤予定テーブルTL2に基づいて判別する(#103)。出勤予定テーブルTL2には、ビルBLを担当する作業員として4人が登録されているが、そのうちの1人は欠勤の予定なので、「佐藤」、「鈴木」、および「田中」という識別情報(苗字)の作業員が判別結果に示される。   In parallel with the processing of steps # 101 and # 102, the worker who is scheduled to work on the morning of September 1 among the workers in charge of the building BL is determined based on the attendance schedule table TL2 in FIG. # 103). In the attendance schedule table TL2, four workers are registered as workers in charge of the building BL, but one of them is scheduled to be absent, so identification information “Sato”, “Suzuki”, and “Tanaka” ( The worker of the last name is shown in the discrimination result.

実施しなければならないとステップ#102で判別されたメンテナンス作業を、出勤する予定であるとステップ#103で判別された作業員に割り振る(#104)。係る処理は、公知の方法を用いればよい。ただし、ステップ#101での天候の予測結果が「晴天」である場合は晴天時作業工数に示される工数に基づいて割振りを行い、「雨天」である場合は雨天時作業工数に示される工数に基づいて割振りを行う。また、すべてのメンテナンス作業を作業員に割り振ることができない場合つまり人手が足りない場合は、他の施設を担当する作業員を参加させるようにする。   The maintenance work determined in step # 102 that must be carried out is allocated to the worker determined in step # 103 as scheduled to go to work (# 104). A known method may be used for such processing. However, if the weather prediction result at step # 101 is “sunny”, the allocation is made based on the man-hours indicated in the work hours in fine weather, and if it is “rainy”, the man-hours indicated in the man-hours in the rainy day are set. Based on the allocation. In addition, when all the maintenance work cannot be allocated to the workers, that is, when there is not enough manpower, the workers in charge of other facilities are allowed to participate.

例えば、ステップ#101の予測結果が「晴天」であり、ステップ#102の判別結果が、作業番号が「001」〜「006」である6つの種目のメンテナンス作業であり、ステップ#103の判別結果が「佐藤」、「鈴木」、および「田中」という苗字の作業員であったとする。これらのメンテナンス作業を実施するのに要する工数は、「1.5人・時間×6=9人・時間」である。一方、これらの作業員が実施可能な仕事量は、前に述べたように午前の作業時間は3時間なので、「3人×3時間=9人・時間」である。したがって、これらの作業員によってすべてのメンテナンス作業を実施することができるので、例えば図6のように9月1日午前のメンテナンス作業を割り振ることができる。   For example, the prediction result of Step # 101 is “Sunny”, the determination result of Step # 102 is the maintenance work of six items with work numbers “001” to “006”, and the determination result of Step # 103 Suppose that they are workers with surnames "Sato", "Suzuki", and "Tanaka". The number of man-hours required to carry out these maintenance operations is “1.5 man · hour × 6 = 9 man · hour”. On the other hand, the amount of work that can be performed by these workers is “3 persons × 3 hours = 9 persons / hour” because the morning work time is 3 hours as described above. Therefore, since all maintenance work can be performed by these workers, for example, the maintenance work for the morning of September 1 can be allocated as shown in FIG.

なお、この時点では、日別作業テーブルTL3の「作業実績時刻」および「作業実績呼応数」には、データは格納されていない。これらの項目には、後に説明するように、メンテナンス作業の完了後にデータが格納される。   At this time, no data is stored in the “work record time” and “work record response number” of the daily work table TL3. In these items, data is stored after the maintenance work is completed, as will be described later.

9月1日午後に実施しなければならないメンテナンス作業の実施条件についても同様に、図7で説明した通りの手順で求められる。なお、勤務する予定の作業員が実施可能な仕事量が、実施しなければならないメンテナンス作業の全工数を上回る場合がある。つまり、作業員に空き時間が生じる場合がある。このような場合は、図6の下から3レコード分に示すように、メンテナンス作業を割り当てない予備の時間を設けておく。   Similarly, the execution conditions of the maintenance work that must be performed on the afternoon of September 1 can be obtained by the procedure described with reference to FIG. Note that the amount of work that can be performed by a worker scheduled to work may exceed the total number of maintenance work that must be performed. In other words, there is a case where an idle time is generated in the worker. In such a case, as shown in the three records from the bottom of FIG. 6, a spare time during which no maintenance work is assigned is provided.

このようにして、9月1日全体のメンテナンス作業のための日別作業テーブルTL3が完成する。以下、生成された時点の日別作業テーブルTL3を特に「日別作業テーブルTL30」と記載することがある。日別作業テーブルTL30は、後に説明する処理によって、日別作業テーブルTL31、TL32、…と遷移していく(図10、図13、図14参照)。なお、複数の日(例えば、翌月1か月の各日)の日別作業テーブルTL3を一度に纏めて生成してもよい。   In this way, the daily work table TL3 for the maintenance work for the entire September 1st is completed. Hereinafter, the daily work table TL3 at the time of generation may be particularly referred to as “daily work table TL30”. The daily work table TL30 transitions to the daily work tables TL31, TL32,... By processing described later (see FIGS. 10, 13, and 14). The daily work table TL3 for a plurality of days (for example, each day of the next month) may be generated at once.

図3に戻って、作業指示送信部102は、作業員の作業員端末2に対して、その作業員が行うべきメンテナンス作業を示す作業指示情報71を送信する。送信は、作業員から送信要求があった場合および作業現場の状況に関する変更の報告があった場合に行われる。後者の場合については、後に説明する。なお、1ヶ所の作業現場(施設)で同じ作業時間帯に複数の作業員が作業を行う場合は、これらの作業員のうちの代表者(例えば、現場監督者)が送信要求および変更の報告を行う。   Returning to FIG. 3, the work instruction transmission unit 102 transmits work instruction information 71 indicating the maintenance work to be performed by the worker to the worker terminal 2 of the worker. Transmission is performed when there is a transmission request from the worker and when there is a report of a change in the situation of the work site. The latter case will be described later. When multiple workers are working at the same work site (facility) at the same work time, a representative of these workers (for example, a field supervisor) reports a transmission request and changes. I do.

例えば、メンテナンス作業を実施する当日の朝(例えば午前8時ごろ)以前に、ビルBLの作業員の代表者は、自分の作業員端末2を操作して、作業指示情報71を送信すべき旨の要求および自分の識別情報を記載した電子メールを作成する。そして、この電子メールをメンテナンス作業管理装置1に送信する。   For example, the representative of the worker of the building BL should operate his own worker terminal 2 and transmit the work instruction information 71 before the morning of the day of the maintenance work (for example, around 8:00 am). Create an email with your request and your identity. Then, the electronic mail is transmitted to the maintenance work management apparatus 1.

すると、作業指示送信部102は、ビルBLについての最新の状態の当日の日別作業テーブルTL3(日別作業テーブルTL3の生成後、一度も更新されたことがない場合は、図6の日別作業テーブルTL30)から、ビルBLを担当する作業員が行うべきメンテナンス作業の情報(レコード)を抽出する。抽出した情報に示される作業番号を検索キーにして、実施条件情報DT1を作業別実施条件マスタTL1から抽出する。そして、これらの情報に基づいて、図8に示すような、ビルBLの作業員のための作業指示情報71を生成し、これを電子メールとして作業員端末2に返信(送信)する。代表者は、送信されてきた作業指示情報71の内容を見て、自分が実施すべきメンテナンス作業の実施条件を把握するとともに、他の作業員にも各人のメンテナンス作業の実施条件を伝える。   Then, the work instruction transmitting unit 102 updates the daily work table TL3 on the current day of the building BL (if the daily work table TL3 has never been updated after the generation of the daily work table TL3, the daily work table shown in FIG. From the work table TL30), information (record) of maintenance work to be performed by the worker in charge of the building BL is extracted. Using the work number indicated in the extracted information as a search key, the execution condition information DT1 is extracted from the work-specific execution condition master TL1. Based on these pieces of information, work instruction information 71 for the worker of the building BL as shown in FIG. 8 is generated, and this is returned (transmitted) to the worker terminal 2 as an e-mail. The representative sees the contents of the transmitted work instruction information 71, grasps the maintenance work execution conditions to be performed by himself, and informs other workers of the maintenance work execution conditions of each person.

しかし、作業当日、作業指示情報71の通りにメンテナンス作業を実施できないというトラブルが発生する場合がある。例えば、当日の天候が予測されていた天候(作業指示情報71の「作業天候条件」に示される天候)と異なる場合や、急に欠勤者が発生した場合などである。このような場合は、代表者は、作業指示情報71と当日の状況とを比較し、作業員端末2に両者の差異を入力する。これとともに、自分の識別情報も入力しておく。作業員端末2は、入力されたこれらの情報を状況差異情報72として電子メールでメンテナンス作業管理装置1に送信する。   However, there may be a trouble that the maintenance work cannot be performed according to the work instruction information 71 on the work day. For example, there is a case where the weather of the day is different from the predicted weather (the weather indicated in the “working weather condition” of the work instruction information 71), or when an absentee is suddenly generated. In such a case, the representative compares the work instruction information 71 with the situation on the current day, and inputs the difference between the two to the worker terminal 2. At the same time, input his / her identification information. The worker terminal 2 transmits the input information as status difference information 72 to the maintenance work management apparatus 1 by e-mail.

なお、識別情報の入力は、作業者本人に与えられている社員カードの記録部(RFIDまたは磁気ストライプなど)に記録されているデータを読み取らせることによって行ってもよい。後に説明する作業実績情報73の入力の場合も同様である。   The identification information may be input by reading data recorded in a recording unit (RFID or magnetic stripe) of an employee card given to the worker himself / herself. The same applies to input of work performance information 73 described later.

メンテナンス作業管理装置1において、現場状況報告受信部103が状況差異情報72を受信すると、変更要否判別部104は、当日のメンテナンス作業の実施条件(開始時刻、終了時刻、掛けることができる工数、または分担など)を変更しなければならないか否かを判別する処理を行う。本実施形態では、次の(a)〜(c)の要件のうちの少なくともいずれか1つに該当する場合に、変更しなければならないと判別する。(a)欠勤者が発生した場合。(b)作業当日に実施すべきいずれかのメンテナンス作業の実施条件情報DT1(図4参照)の中止条件に設定値が格納されている場合。(c)作業当日に実施すべきメンテナンス作業の中に、晴天時作業工数の値と雨天時作業工数の値とが異なる実施条件情報DT1を有するメンテナンス作業が少なくとも1つ含まれている場合。   In the maintenance work management apparatus 1, when the site situation report receiving unit 103 receives the situation difference information 72, the change necessity determination unit 104 performs the maintenance work implementation conditions (start time, end time, man-hours that can be multiplied, Alternatively, a process for determining whether or not to change the sharing) is performed. In this embodiment, when it corresponds to at least any one of the following requirements (a) to (c), it is determined that it should be changed. (A) When absentees occur. (B) A set value is stored in the cancellation condition of the execution condition information DT1 (see FIG. 4) of any maintenance work to be performed on the day of the work. (C) The maintenance work to be performed on the day of the work includes at least one maintenance work having the execution condition information DT1 in which the value of the work hours in fine weather and the value of the work hours in rainy weather are different.

変更する必要があると変更要否判別部104によって判別された場合は、実施条件変更部105は、実施すべきメンテナンス作業が実施できるように、現在の(つまり、最新の状態である)当日分の日別作業テーブルTL3の内容を変更する処理を行う。係る変更処理は、例えば図9に示すような手順で行われる。以下、現在の日別作業テーブルTL3が図6の日別作業テーブルTL30のように設定されている場合を例に、変更処理について説明する。   When it is determined by the change necessity determination unit 104 that it is necessary to change, the execution condition change unit 105 is for the current day (that is, the latest state) so that the maintenance work to be performed can be performed. The process of changing the contents of the daily work table TL3 is performed. Such change processing is performed, for example, according to the procedure shown in FIG. Hereinafter, the change process will be described by taking as an example a case where the current daily work table TL3 is set like the daily work table TL30 of FIG.

受信した状況差異情報72に、作業当日の天候が雨天に変わった旨が示される場合は(#111でYes)、図4の作業別実施条件マスタTL1を参照し、中止条件が「雨天時」と設定されているメンテナンス作業を現在の日別作業テーブルTL3(TL30)から除外(削除)する(#112)。なお、作業別実施条件マスタTL1には示されていないが、もしも、「晴天中止」と設定されているメンテナンス作業があれば、これを日別作業テーブルTL3に追加する。   When the received situation difference information 72 indicates that the weather on the work day has changed to rainy (Yes in # 111), the work-specific execution condition master TL1 in FIG. Are removed (deleted) from the current daily work table TL3 (TL30) (# 112). Although not shown in the work-specific execution condition master TL1, if there is a maintenance work that is set to “sunny weather cancellation”, this is added to the daily work table TL3.

日別作業テーブルTL3に晴天時作業工数の値と雨天時作業工数の値とが異なるメンテナンス作業が含まれている場合は、そのメンテナンス作業の作業予定工数を後者の値に変更する(#113)。ただし、そのメンテナンス作業の作業予定時刻は、後で調整する。   If the daily work table TL3 includes maintenance work in which the value of the work hours in fine weather and the value of the work hours in rainy weather are different, the scheduled work time of the maintenance work is changed to the latter value (# 113). . However, the scheduled work time of the maintenance work will be adjusted later.

受信した状況差異情報72に、作業当日の天候が晴天に変わった旨が示される場合は(#114でYes)、作業別実施条件マスタTL1から、当日に実施すべきでありかつ中止条件が「雨天時」であるメンテナンス作業を抽出し、これを日別作業テーブルTL3に追加する(#115)。このとき、作業予定工数には晴天時作業工数の値を設定する。作業担当者および作業予定時刻は後で調整する。なお、「晴天中止」と設定されているメンテナンス作業があれば、これを削除する。   When the received situation difference information 72 indicates that the weather on the day of the work has changed to a clear sky (Yes in # 114), the work-specific execution condition master TL1 should perform the day and the stop condition is “ The maintenance work that is “rainy” is extracted and added to the daily work table TL3 (# 115). At this time, the value of the work man-hour in fine weather is set as the planned work man-hour. The person in charge and the scheduled work time will be adjusted later. If there is a maintenance work set to “cancel fine weather”, it is deleted.

ステップ#113の場合と同様に、晴天時作業工数の値と雨天時作業工数の値とが異なるメンテナンス作業が含まれている場合は、そのメンテナンス作業の作業予定工数を変更する(#116)。ただし、ここでは、前者の値に変更する。作業予定時刻は、後で調整する。   As in the case of step # 113, if a maintenance work is included in which the value of the work man-hour in fine weather and the value of the work man-hour in rainy weather are included, the work scheduled man-hour of the maintenance work is changed (# 116). However, here, the former value is changed. The scheduled work time will be adjusted later.

受信した状況差異情報72に欠勤者が示される場合は(#117でYes)、日別作業テーブルTL3の中からその欠勤者が担当するメンテナンス作業の作業担当者の設定を削除して空欄にする(#118)。   When the absentee is indicated in the received status difference information 72 (Yes in # 117), the setting of the worker in charge of the maintenance work that the absentee is in charge of is deleted from the daily work table TL3 and left blank. (# 118).

上記のように実施条件が変更されたメンテナンス作業、新たに追加されたメンテナンス作業、および元のままのメンテナンス作業のそれぞれの実施条件を、1人の作業員に対して同じ時刻に複数のメンテナンス作業が割り当てられないように調整する(#119)。なお、人手が足りなくなった場合は、他の施設を担当する作業員の中から当日ビルBLに来ることができる作業員を検索し、その作業員にもメンテナンス作業を割り当てるようにする。そして、調整された内容に基づいて日別作業テーブルTL30を更新する(#120)。   As described above, multiple maintenance operations can be performed for one worker at the same time, with the maintenance conditions for which the execution conditions have been changed, the newly added maintenance work, and the original maintenance work being performed. Is adjusted so as not to be assigned (# 119). When there is not enough manpower, a worker who can come to the building BL on the day is searched from workers in charge of other facilities, and maintenance work is also assigned to that worker. Then, the daily work table TL30 is updated based on the adjusted contents (# 120).

例えば、9月1日の作業開始前に、当日の天候が雨天に変わり田中さんが欠勤することになった旨を示す状況差異情報72が受信された場合は、図6の日別作業テーブルTL30は、図10に示す日別作業テーブルTL31のように更新される。   For example, before the start of work on September 1, when the situation difference information 72 indicating that the weather on the day changed to rain and Tanaka was absent from work is received, the daily work table TL30 in FIG. Is updated like the daily work table TL31 shown in FIG.

作業指示送信部102は、更新された日別作業テーブルTL3(TL31)に基づいて、当日の作業指示情報71を生成し直して、状況差異情報72の送信元である作業員端末2に送信する。   Based on the updated daily work table TL3 (TL31), the work instruction transmission unit 102 generates the work instruction information 71 for the current day and transmits it to the worker terminal 2 that is the transmission source of the situation difference information 72. .

また、当日のメンテナンス作業を実施している間にも、天候が変化したり、午後の勤務を行うことが急に無理になった作業員が発生したりするなど、作業現場の状況に変化が生じる場合がある。このような場合にも、作業員は、作業員端末2を操作して、その旨を知らせる状況差異情報72をメンテナンス作業管理装置1に送信する。そして、メンテナンス作業の実施条件を変更する必要があると変更要否判別部104によって判別されたら、実施条件変更部105は、図9に示す手順の処理を再び実行し、現在の日別作業テーブルTL3を更新する。   In addition, during the maintenance work on the day, the situation at the work site has changed, such as the weather changing or workers suddenly unable to work in the afternoon. May occur. Even in such a case, the worker operates the worker terminal 2 and transmits the status difference information 72 to that effect to the maintenance work management apparatus 1. When it is determined by the change necessity determination unit 104 that the maintenance work execution condition needs to be changed, the execution condition change unit 105 executes the process of the procedure shown in FIG. Update TL3.

一方、当日のメンテナンス作業の実施条件を変更する必要はないと、変更要否判別部104によって判別された場合は、実施条件変更部105による上記の図9の処理は実行されない。この場合は、日別作業テーブル生成部101は、前に送信した作業指示情報71の通りにメンテナンス作業を実施すべき旨のメッセージを、状況差異情報72の送信元である作業員端末2に送信する。または、前に送信した作業指示情報71を再送信してもよい。   On the other hand, when it is determined by the change necessity determination unit 104 that it is not necessary to change the execution condition of the maintenance work for the day, the above-described processing of FIG. 9 by the execution condition change unit 105 is not executed. In this case, the daily work table generation unit 101 transmits a message indicating that the maintenance work should be performed according to the work instruction information 71 transmitted previously to the worker terminal 2 that is the transmission source of the situation difference information 72. To do. Alternatively, the work instruction information 71 transmitted before may be retransmitted.

作業員は、自分に割り当てられたメンテナンス作業が完了したら、作業員端末2を操作して、自分の識別情報、そのメンテナンス作業の作業番号、およびそのメンテナンス作業の開始時刻および終了時刻の実績などを示す作業実績情報73を電子メールによってメンテナンス作業管理装置1に送信する。または、代表者が送信のための操作を行ってもよい。   When the maintenance work assigned to him / her is completed, the worker operates the worker terminal 2 to obtain his / her identification information, the work number of the maintenance work, and the results of the start time and end time of the maintenance work. The work performance information 73 shown is transmitted to the maintenance work management apparatus 1 by electronic mail. Alternatively, the representative may perform an operation for transmission.

すると、メンテナンス作業管理装置1において、作業実績報告受信部106は、その作業実績情報73を受信し、メンテナンス作業の開始時刻および終了時刻の実績に基づいて係るメンテナンス作業に要した工数を算出する。そして、開始時刻および終了時刻の実績および算出した工数を、現在の日別作業テーブルTL3の中の対応するレコードに書き込む。   Then, in the maintenance work management apparatus 1, the work result report receiving unit 106 receives the work result information 73 and calculates the man-hours required for the maintenance work based on the results of the start time and the end time of the maintenance work. Then, the results of the start time and end time and the calculated man-hours are written in the corresponding records in the current daily work table TL3.

例えば、現在の日別作業テーブルTL3が図10の日別作業テーブルTL31のような内容であり、かつ、「佐藤」という識別情報の作業員、「001」という作業番号、および「9:00−11:48」という作業時刻を示す作業実績情報73が受信された場合は、メンテナンス作業に要した工数として「2.8人・時間」を算出し、1レコード目の「作業実績時刻」および「作業実績工数」にそれぞれ「9:00−11:48」および「2.8人・時間」を書き込む。または、工数の算出は、作業員端末2で行ってもよい。   For example, the current daily work table TL3 has the same contents as the daily work table TL31 in FIG. 10, and the worker with the identification information “Sato”, the work number “001”, and “9: 00− When the work record information 73 indicating the work time of “11:48” is received, “2.8 person / hour” is calculated as the man-hour required for the maintenance work, and “work record time” and “ Write "9: 00-11: 48" and "2.8 man / hour" in "Work actual man-hours", respectively. Alternatively, the calculation of the man-hour may be performed at the worker terminal 2.

作業工数分析部107は、定期的に(例えば、1ヶ月ごとに)またはメンテナンス作業管理装置1の管理者からの指令があったときに、今までのメンテナンス作業の実績の分析を行う。例えば、晴天時の場合および雨天時の場合のそれぞれについて、佐藤さんが9月1日から9月6日までの期間に実施したロビー床掃除のメンテナンス作業に掛かった時間(工数)の平均値を算出し、図11のような資料を生成してもよい。または、作業員全体の工数の平均値を示す資料を生成してもよい。メンテナンス作業の種目ごとまたは天候ごとに、工数の少ない作業員または多い作業員の一覧表を生成してもよい。   The work man-hour analyzing unit 107 analyzes the results of the maintenance work so far, periodically (for example, every month) or when a command from the administrator of the maintenance work management apparatus 1 is given. For example, the average value of the time (man-hours) required for the maintenance work for lobby floor cleaning performed during the period from September 1st to September 6th in the case of sunny weather and rainy weather. It is also possible to calculate and generate a material as shown in FIG. Or you may produce | generate the material which shows the average value of the man-hour of the whole worker. A list of workers with a small number of workers or a large number of workers may be generated for each type of maintenance work or for each weather.

作業工数分析部107による分析結果は、図4の作業別実施条件マスタTL1の改正のために用いることができる。例えば、メンテナンス作業の種目ごとに、晴天時および雨天時のそれぞれの全作業員の作業実績工数の平均値を算出し、これを、作業別実施条件マスタTL1の晴天時作業工数および雨天時作業工数に適用してもよい。または、日別作業テーブルTL3(図6など参照)を生成しまたは更新する際に、各作業員に、自分の得意なメンテナンス作業(例えば、少ない工数で作業できるメンテナンス作業)が割り当てられるようにしてもよい。   The analysis result by the work man-hour analysis unit 107 can be used for revision of the work-specific execution condition master TL1 of FIG. For example, for each type of maintenance work, the average value of the work performance man-hours of all workers in fine weather and rainy weather is calculated, and this is calculated as the work hours in fine weather and the work hours in rainy weather of the work-specific execution condition master TL1. You may apply to. Alternatively, when generating or updating the daily work table TL3 (see FIG. 6 and the like), each worker is assigned a maintenance work that he / she is good at (for example, a maintenance work that can be performed with a small number of man-hours). Also good.

図12はメンテナンス作業管理装置1および作業員端末2の全体的な処理の流れの例を説明するフローチャート、図13は日別作業テーブルTL32の例を示す図、図14は日別作業テーブルTL33の例を示す図である。   12 is a flowchart for explaining an example of the overall processing flow of the maintenance work management apparatus 1 and the worker terminal 2, FIG. 13 is a diagram showing an example of the daily work table TL32, and FIG. 14 is a diagram of the daily work table TL33. It is a figure which shows an example.

次に、メンテナンス作業のスケジュールを立ててからそのメンテナンス作業の完了報告がなされるまでのメンテナンス作業管理装置1および作業員端末2の処理の流れを、図12のフローチャートなどを参照して説明する。   Next, the flow of processing of the maintenance work management apparatus 1 and the worker terminal 2 from the time when the maintenance work schedule is established until the completion of the maintenance work is reported will be described with reference to the flowchart of FIG.

メンテナンス作業管理装置1は、定期的に、図4の作業別実施条件マスタTL1および図5の出勤予定テーブルTL2に基づいて、これから実施しなければならないメンテナンス作業およびその実施条件についての予定を生成し、図6のような日別作業テーブルTL3を生成する(図12の#11)。日別作業テーブルTL30の生成処理の手順は、前に図7で説明した通りである。   The maintenance work management device 1 periodically generates a schedule for the maintenance work to be performed and its execution conditions based on the work-specific execution condition master TL1 in FIG. 4 and the attendance schedule table TL2 in FIG. Then, the daily work table TL3 as shown in FIG. 6 is generated (# 11 in FIG. 12). The procedure for generating the daily work table TL30 is as described above with reference to FIG.

ビルBLでの作業当日の朝、ビルBLを担当する作業員の作業員端末2から作業指示の要求があったら、その作業員が当日に実施すべきメンテナンス作業に関する情報を日別作業テーブルTL3から抽出し、図8に示すような作業指示情報71として作業員端末2に返信する(#12)。または、作業員からの要求の有無に関わらず、定時になったら、当日の作業指示情報71を送信するようにしてもよい。   In the morning of the day of work at the building BL, if there is a request for work instructions from the worker terminal 2 of the worker in charge of the building BL, information on the maintenance work that the worker should perform on the day is obtained from the daily work table TL3. Extracted and returned to the worker terminal 2 as work instruction information 71 as shown in FIG. 8 (# 12). Alternatively, regardless of whether there is a request from the worker, the work instruction information 71 of the day may be transmitted at a fixed time.

作業員端末2は、作業指示情報71を受信すると、その内容をディスプレイに表示する(#21)。作業員は、作業指示情報71の内容を閲覧し、その内容と当日の現場(ビルBL)の状況とに相違点(差異)がないかどうかチェックする。具体的には、当日の現場の実際の天候が作業指示情報71の中の作業天候条件と同じであるか違うかをチェックする。また、作業指示情報71に示される作業担当者が全員、現場に集合しているか否かをチェックする。チェックの結果、差異がある場合は(#22でYes)、作業員端末2によって、それを示す情報を状況差異情報72としてメンテナンス作業管理装置1に送信する(#23)。差異がない場合は、作業員は、ステップ#21で受信した作業指示情報71に従ってメンテナンス作業を実施する。   Upon receiving the work instruction information 71, the worker terminal 2 displays the contents on the display (# 21). The worker browses the contents of the work instruction information 71 and checks whether there is any difference (difference) between the contents and the situation of the spot (building BL) on the day. Specifically, it is checked whether the actual weather at the site on the day is the same as or different from the working weather conditions in the work instruction information 71. Further, it is checked whether all the persons in charge indicated in the work instruction information 71 are gathered at the work site. If there is a difference as a result of the check (Yes in # 22), the worker terminal 2 transmits information indicating it to the maintenance work management apparatus 1 as the situation difference information 72 (# 23). If there is no difference, the worker performs the maintenance work according to the work instruction information 71 received in step # 21.

メンテナンス作業管理装置1は、状況差異情報72を受信すると(#13)、ビルBLで実施する予定であるメンテナンス作業の実施条件を変更する必要があるか否かを判別する(#14)。変更が必要である場合は(#14でYes)、状況差異情報72に示される当日の現場の状況の変化に対応できるように、メンテナンス作業の実施条件の変更処理を行う(#15)。係る処理の手順は、前に図9で説明した通りである。これにより、例えば、図6のような内容であった日別作業テーブルTL30が図10の日別作業テーブルTL31のように更新される。   When receiving the situation difference information 72 (# 13), the maintenance work management apparatus 1 determines whether or not it is necessary to change the maintenance work execution condition scheduled to be performed in the building BL (# 14). If a change is necessary (Yes in # 14), a maintenance work execution condition change process is performed so as to cope with a change in the situation on the day indicated by the situation difference information 72 (# 15). The processing procedure is as described above with reference to FIG. Thereby, for example, the daily work table TL30 having the contents as shown in FIG. 6 is updated like the daily work table TL31 of FIG.

ステップ#14、#15の処理結果を、状況差異情報72の送信元の作業員端末2に送信する(#16)。すなわち、日別作業テーブルTL3の内容を更新した場合は、新たな作業指示情報71を生成して送信する。更新しなかった場合は、実施条件を変更する必要がない旨のメッセージを送信する。   The processing results of steps # 14 and # 15 are transmitted to the worker terminal 2 that is the transmission source of the situation difference information 72 (# 16). That is, when the contents of the daily work table TL3 are updated, new work instruction information 71 is generated and transmitted. If it has not been updated, a message indicating that there is no need to change the implementation condition is transmitted.

作業員端末2は、処理結果を受信すると、これをディスプレイに表示する(#24)。新たな作業指示情報71が表示されたら、作業員は、これに従ってメンテナンス作業を実施する。一方、実施条件を変更する必要がない旨のメッセージが表示されたら、前にステップ#21で受信された作業指示情報71に従ってメンテナンス作業を実施する。   Upon receiving the processing result, the worker terminal 2 displays this on the display (# 24). When new work instruction information 71 is displayed, the worker performs a maintenance work according to the new work instruction information 71. On the other hand, when a message indicating that it is not necessary to change the execution condition is displayed, the maintenance work is performed according to the work instruction information 71 received in the previous step # 21.

作業員は、メンテナンス作業を完了させたら、その開始時刻および終了時刻の実績などを作業員端末2に入力する。すると、作業員端末2は、入力された実績の情報を作業実績情報73としてメンテナンス作業管理装置1に送信する(#25)。   When the worker completes the maintenance work, the worker inputs the results of the start time and end time to the worker terminal 2. Then, the worker terminal 2 transmits the input result information as work result information 73 to the maintenance work management apparatus 1 (# 25).

メンテナンス作業管理装置1は、作業実績情報73を受信すると(#17)、日別作業テーブルTL3の中の、完了したそのメンテナンス作業の作業実績時刻および作業実績工数を更新する(#18)。例えば、図10の日別作業テーブルTL31に従って9月1日午前の作業時間帯の3つのメンテナンス作業が実施された場合は、上から3つ分のレコードの作業実績時刻および作業実績工数に、それぞれの作業実績を示す値が登録される。   When the maintenance work management apparatus 1 receives the work record information 73 (# 17), the maintenance work management apparatus 1 updates the work record time and work record man-hour of the completed maintenance work in the daily work table TL3 (# 18). For example, when three maintenance operations are performed in the morning work hours of September 1st according to the daily work table TL31 in FIG. 10, the actual operation time and the actual operation man-hour of the three records from the top are respectively set. A value indicating the actual work result is registered.

一日の途中で現場の状況が変化する場合がある。この場合にも、作業員は、その旨を示す状況差異情報72をメンテナンス作業管理装置1に送信する(#22)。例えば、9月1日午前のメンテナンス作業終了後すぐに、それまで降っていた雨が止んだとする。作業員は、直ちに天候が晴天になった旨を示す状況差異情報72をメンテナンス作業管理装置1に送信する。   The situation at the site may change during the day. Also in this case, the worker transmits status difference information 72 indicating that to the maintenance work management apparatus 1 (# 22). For example, immediately after the maintenance work on the morning of September 1, it is assumed that the rain that had fallen until then stopped. The worker immediately transmits the situation difference information 72 indicating that the weather has become clear to the maintenance work management apparatus 1.

すると、メンテナンス作業管理装置1は、新たに受信した状況差異情報72に基づいて、必要に応じて9月1日午後のメンテナンス作業の実施条件を変更する(#14でYes、#15)。これにより、例えば、日別作業テーブルTL3の内容が図13の日別作業テーブルTL32のように更新される。そして、メンテナンス作業管理装置1は、更新された日別作業テーブルTL3(TL32)から新たな作業指示情報71を生成し作業員端末2に送信する(#16)。作業員は、この作業指示情報71に従って午後のメンテナンス作業を実施する。   Then, based on the newly received status difference information 72, the maintenance work management device 1 changes the execution conditions for the maintenance work on the afternoon of September 1 as necessary (Yes in # 14, # 15). Thereby, for example, the contents of the daily work table TL3 are updated as in the daily work table TL32 of FIG. Then, the maintenance work management device 1 generates new work instruction information 71 from the updated daily work table TL3 (TL32) and transmits it to the worker terminal 2 (# 16). The worker performs the afternoon maintenance work according to the work instruction information 71.

そして、一日のメンテナンス作業がすべて終了し、これらのメンテナンス作業に関する作業実績情報73がメンテナンス作業管理装置1に送信されると、図14に示すように、日別作業テーブルTL3の中のすべての作業実績時刻および作業実績工数に、それぞれの作業実績を示す値が登録される。これらの値は、後に分析処理などのために用いられる。   When all the daily maintenance work is completed and the work performance information 73 regarding these maintenance work is transmitted to the maintenance work management apparatus 1, as shown in FIG. A value indicating each work record is registered in the work record time and work record man-hours. These values are used later for analysis processing and the like.

本実施形態によると、メンテナンス作業のスケジュールを立てる際には前提としていなかった出来事が当日に起こっても、メンテナンス作業の実施条件を簡単にかつ即座に変更することができる。例えば、天候が晴天でありかつ作業を行う作業員が3人であることを前提にスケジュールを立てたが、作業日当日の天候が雨天でありかつ作業員が1人急に欠勤したという事態が発生しても、簡単にその事態に対処できる作業指示を現場の作業員に与えることができる。   According to the present embodiment, even if an event that was not premised when the maintenance work schedule is made occurs on the same day, the execution condition of the maintenance work can be changed easily and immediately. For example, the schedule is based on the assumption that the weather is clear and there are three workers working, but the weather on the work day is rainy and one worker suddenly missed work. Even if it occurs, it is possible to give a work instruction that can easily cope with the situation to an on-site worker.

また、メンテナンス作業に取り掛かった時刻およびそれを完了させた時刻に関する報告を作業員から受け、その報告の内容を解析することによって、本システムの様々な問題点を見つけることができる。そして、この問題点をフィードバックすることによって、メンテナンス作業の効率化およびサービスの向上などを図ることができる。   In addition, various problems of the present system can be found by receiving reports on the time when the maintenance work is started and the time when the maintenance work is completed from the worker and analyzing the contents of the report. By feeding back this problem, it is possible to improve the efficiency of maintenance work and improve services.

本実施形態では、メンテナンス作業管理装置1と作業員端末2との間の情報の送受信は電子メールによって行ったが、それ以外の手段を用いることもできる。例えば、メンテナンス作業管理装置1に、作業員端末2がWebブラウザによって作業指示情報71の送信要求を行ったり状況差異情報72および作業実績情報73の内容を入力したりするためのWebサイトを開設しておいてもよい。Webサイトは、メンテナンス作業管理装置1以外のWebサーバに開設してもよい。この場合は、そのWebサーバは、作業員端末2から受け付けた送信要求、状況差異情報72、および作業実績情報73などをメンテナンス作業管理装置1に転送し、その送信要求または状況差異情報72に対する回答である作業指示情報71をメンテナンス作業管理装置1から作業員端末2に中継する。   In the present embodiment, transmission / reception of information between the maintenance work management apparatus 1 and the worker terminal 2 is performed by e-mail, but other means may be used. For example, a web site is opened in the maintenance work management apparatus 1 for the worker terminal 2 to request transmission of the work instruction information 71 by the web browser and to input the contents of the situation difference information 72 and the work performance information 73. You may keep it. The Web site may be opened on a Web server other than the maintenance work management apparatus 1. In this case, the Web server transfers the transmission request received from the worker terminal 2, the situation difference information 72, the work result information 73, and the like to the maintenance work management apparatus 1, and a response to the transmission request or the situation difference information 72. The work instruction information 71 is relayed from the maintenance work management apparatus 1 to the worker terminal 2.

または、メンテナンス作業管理装置1に、電話による音声案内用のハードウェアおよびソフトウェアを設けておき、作業員端末2からの情報はプッシュ信号で受信し、作業員端末2への情報は音声で送信するようにしてもよい。   Alternatively, the maintenance work management device 1 is provided with hardware and software for voice guidance by telephone, information from the worker terminal 2 is received by a push signal, and information to the worker terminal 2 is transmitted by voice. You may do it.

または、メンテナンスサービス会社CPの電話オペレータが、作業員から掛かってきた電話に応対し、作業員が口頭で言った情報をキーボードでメンテナンス作業管理装置1に入力してもよい。そして、メンテナンス作業管理装置1に表示された作業指示情報71をオペレータが作業員に口頭で伝えてもよい。   Alternatively, the telephone operator of the maintenance service company CP may answer the telephone call from the worker and input the information spoken by the worker to the maintenance work management apparatus 1 using a keyboard. Then, the operator may verbally convey the work instruction information 71 displayed on the maintenance work management apparatus 1 to the worker.

本実施形態では、ある1個所のビルBLのメンテナンス作業を行う場合を例に説明したが、メンテナンス作業管理装置1を、複数の施設のメンテナンス作業のために用いることも可能である。この場合は、施設ごとに作業別実施条件マスタTL1および日別作業テーブルTL3を設けておき、それぞれにその施設の識別情報を対応付けて管理すればよい。そして、作業員は、メンテナンス作業管理装置1に対して作業指示情報71を要求しまたは状況差異情報72を送信する際に、自分の担当する施設の識別情報も送信するようにすればよい。   In this embodiment, the case where the maintenance work of a certain building BL is performed has been described as an example, but the maintenance work management apparatus 1 can also be used for the maintenance work of a plurality of facilities. In this case, an operation-specific execution condition master TL1 and a daily operation table TL3 may be provided for each facility, and the identification information of the facility may be associated with each other and managed. Then, when the worker requests the work instruction information 71 from the maintenance work management apparatus 1 or transmits the situation difference information 72, the worker may also transmit the identification information of the facility in charge of the worker.

本実施形態では、1日の中の作業時間帯として、「午前9時〜正午(午前)」および「午後1時〜午後5時半(午後)」の2つの期間を設けた場合を例に説明したが、これ以外の期間であってもよい。例えば、「午前5時〜午前8時(早朝)」、「午前9時〜正午(午前)」、「午後1時〜午後5時半(午後)」、および「午後9時〜午後12時(夜間)」のような期間を設けてもよい。また、天候の種類も、2種類でなくてもよい。例えば、「晴天」、「小雨」、「大雨」、「強風」などの天候を用いてもよい。   In the present embodiment, as an example, a case where two periods of “9:00 am to noon (morning)” and “1 pm to 5:30 pm (afternoon)” are provided as working hours in one day. Although described, a period other than this may be used. For example, “5:00 am to 8:00 am (early morning)”, “9 am to noon (morning)”, “1 pm to 5:30 pm (pm)”, and “9 pm to 12:00 pm ( A period such as “nighttime” may be provided. Also, the types of weather need not be two. For example, weather such as “fine weather”, “light rain”, “heavy rain”, “strong wind”, etc. may be used.

その他、メンテナンス作業管理装置1の全体または各部の構成、処理内容、処理順序、テーブルの構成などは、本発明の趣旨に沿って適宜変更することができる。   In addition, the configuration of the entire maintenance work management apparatus 1 or each unit, processing contents, processing order, table configuration, and the like can be appropriately changed in accordance with the spirit of the present invention.

以上説明した実施形態に関し、さらに以下の付記を開示する。
(付記1)
施設のメンテナンス作業を行う作業員に対して与えるべき、当該メンテナンス作業に関する指示を出力する、メンテナンス作業指示出力システムであって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとに、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を記憶する、予定作業実施条件記憶手段と、
作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報を入力する作業現場状況情報入力手段と、
前記各実施予定メンテナンス作業の実施が入力された前記作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する、実施条件変更手段と、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する、変更結果出力手段と、
を有することを特徴とするメンテナンス作業指示出力システム。
(付記2)
前記メンテナンス作業の種目ごとに、天候ごとの実施条件を示す天候別実施条件情報を記憶する、天候別実施条件記憶手段、を有し、
前記作業現場状況情報入力手段は、前記作業現場状況情報として、前記施設の天候を示す作業現場状況情報を入力し、
前記実施条件変更手段は、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候の実施条件に基づいて変更する、
付記1記載のメンテナンス作業指示出力システム。
(付記3)
前記作業現場状況情報が入力されるたびに、当該作業現場状況情報に基づいて、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する必要があるか否かを判別する、変更要否判別手段、を有し、
前記実施条件変更手段は、実施条件を変更する必要があると前記変更要否判別手段によって判別された場合に、当該実施条件を変更する、
付記1または付記2記載のメンテナンス作業指示出力システム。
(付記4)
前記実施予定メンテナンス作業のそれぞれについて、当該実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件と、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候の実施条件と、を比較することによって、実施条件を変更する必要があるか否かを判別する、変更要否判別手段、を有し、
前記実施条件変更手段は、実施条件を変更する必要があると前記変更要否判別手段によって判別された場合に、当該実施条件を変更する、
付記2記載のメンテナンス作業指示出力システム。
(付記5)
前記実施予定メンテナンス作業の前記作業予定情報に示される実施条件は、当該実施予定メンテナンス作業を完了させるまでに掛けてもよい第二の工数に関し、
前記種目の前記天候別実施条件情報に示される実施条件は、当該種目の前記メンテナンス作業を実施するのに必要な第一の工数に関し、
前記変更要否判別手段は、いずれかの前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される前記第二の工数が、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候のときの前記第一の工数よりも小さい場合に、実施条件を変更する必要があると判別する、
付記4記載のメンテナンス作業指示出力システム。
(付記6)
前記メンテナンス作業の種目ごとに、天候ごとの、当該メンテナンス作業を実施するのに必要な第一の工数を示す、天候別実施条件情報を記憶する、天候別実施条件記憶手段と、
前記作業現場状況情報が入力されるたびに、当該作業現場状況情報に基づいて、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する必要があるか否かを判別する、変更要否判別手段と、を有し、
前記作業現場状況情報には、前記施設の天候および前記作業員の勤怠の状況が示されており、
前記実施予定メンテナンス作業の前記予定作業実施条件情報には、実施条件として、当該実施予定メンテナンス作業の開始時刻、完了時刻、および実施を行うべき前記作業員の人数が示されており、
前記変更要否判別手段は、前記作業現場状況情報に少なくとも1人の前記作業員が欠勤する旨が示されている場合、または、いずれかの前記実施予定メンテナンス作業の、前記予定作業実施条件情報に基づいて求められる第二の工数が、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候のときの前記第一の工数よりも小さい場合に、実施条件を変更する必要があると判別し、
前記実施条件変更手段は、実施条件を変更する必要があると前記変更要否判別手段によって判別された場合に、当該実施条件を変更する、
付記1記載のメンテナンス作業指示出力システム。
(付記7)
前記実施予定メンテナンス作業が完了した旨の報告を、当該実施予定メンテナンス作業を実施するのに実際に掛かった第三の工数とともに入力する、報告入力手段と、
入力された前記第三の工数の平均値である実績工数平均値を、前記種目ごとおよび天候ごとに算出する、実績工数平均値算出手段と、を有し、
算出された前記種目および天候ごとの前記実績工数平均値に基づいて、当該種目の前記天候別実施条件情報の、当該天候のときの前記第一の工数を更新する、
付記5または付記6記載のメンテナンス作業指示出力システム。
(付記8)
施設のメンテナンス作業を行う作業員に対して与えるべき、当該メンテナンス作業に関する指示を出力する、メンテナンス作業指示出力システムであって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとに、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を記憶する、予定作業実施条件記憶手段と、
作業現場である前記施設にいる前記作業員の端末装置から、現在の当該作業現場の状況に関する情報である作業現場状況情報を受信する、作業現場状況情報受信手段と、
前記作業現場状況情報が受信されるたびに、当該作業現場状況情報に基づいて、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する必要があるか否かを判別する、変更要否判別手段と、
変更する必要があると前記変更要否判別手段によって判別された場合に、前記各実施予定メンテナンス作業の実施が前記作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する、実施条件変更手段と、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員の端末装置に送信する、変更結果送信手段と、
を有することを特徴とするメンテナンス作業指示出力システム。
(付記9)
施設のメンテナンス作業を行う作業員に対して与えるべき、当該メンテナンス作業に関する指示を出力する、メンテナンス作業指示出力方法であって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとの、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を、予定作業実施条件記憶手段に記憶させておき、
作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報が入力されるのを待ち、
前記作業現場状況情報が入力されるたびに、前記各実施予定メンテナンス作業の実施が当該作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更し、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する、
ことを特徴とするメンテナンス作業指示出力方法。
(付記10)
施設のメンテナンス作業を行う作業員に対して当該メンテナンス作業に関する指示を出力するためのコンピュータに用いられるコンピュータプログラムであって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとに、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を記憶する、予定作業実施条件記憶手段にアクセスする処理と、
作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報の入力する処理と、
前記作業現場状況情報が入力された場合に、前記各実施予定メンテナンス作業の実施が当該作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する処理と、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する処理と、
をコンピュータに実行させるためのコンピュータプログラム。
The following additional notes are disclosed with respect to the embodiment described above.
(Appendix 1)
A maintenance work instruction output system for outputting instructions related to the maintenance work to be given to workers who perform maintenance work on the facility,
A scheduled work execution condition storage unit that stores scheduled work execution condition information indicating an execution condition of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period;
Work site status information input means for inputting work site status information that is information on the current status of the work site reported from the worker at the facility that is the work site;
The scheduled work execution condition information of each scheduled maintenance work is indicated so that the execution of each scheduled maintenance work can be completed in the predetermined period under the status indicated in the work site status information that has been input. An implementation condition changing means for changing the implementation condition
A change result output means for outputting the result changed by the execution condition changing means to give the instruction to the worker at the facility which is a work site;
A maintenance work instruction output system characterized by comprising:
(Appendix 2)
For each event of the maintenance work, there is a weather-specific execution condition storage means for storing weather-specific execution condition information indicating an execution condition for each weather,
The work site status information input means inputs the work site status information indicating the weather of the facility as the work site status information,
The execution condition changing means is configured to input the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance work indicated in the weather-specific execution condition information relating to the scheduled maintenance work. Change based on the weather conditions of the facility indicated in the work site status information,
The maintenance work instruction output system according to appendix 1.
(Appendix 3)
Each time the work site status information is input, it is determined whether or not it is necessary to change the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance operation based on the work site status information. , A change necessity determination means,
The execution condition changing means changes the execution condition when it is determined by the change necessity determining means that the execution condition needs to be changed.
The maintenance work instruction output system according to appendix 1 or appendix 2.
(Appendix 4)
For each of the scheduled maintenance work, the execution conditions indicated in the scheduled work execution condition information of the scheduled maintenance work and the weather-specific execution condition information related to the scheduled maintenance work are input. A change necessity determination means for determining whether or not the execution condition needs to be changed by comparing the execution condition of the weather of the facility indicated in the work site status information;
The execution condition changing means changes the execution condition when it is determined by the change necessity determining means that the execution condition needs to be changed.
The maintenance work instruction output system according to appendix 2.
(Appendix 5)
The execution condition indicated in the work schedule information of the execution schedule maintenance work is related to a second man-hour that may be applied until the execution schedule maintenance work is completed.
The implementation condition shown in the weather-specific implementation condition information for the event relates to the first man-hour required to perform the maintenance work for the event,
The change necessity determination means indicates that the second man-hour indicated in the scheduled work execution condition information of any of the scheduled maintenance work is the weather-specific execution condition information related to the scheduled maintenance work. When it is smaller than the first man-hour at the time of the weather of the facility indicated in the input work site status information shown, it is determined that it is necessary to change the implementation condition,
The maintenance work instruction output system according to appendix 4.
(Appendix 6)
For each event of the maintenance work, for each weather, the weather-specific execution condition storage means for storing the weather-specific execution condition information indicating the first man-hour required to perform the maintenance work;
Each time the work site status information is input, it is determined whether or not it is necessary to change the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance operation based on the work site status information. A change necessity determination means,
The work site status information indicates the weather of the facility and the attendance status of the worker,
In the scheduled work execution condition information of the scheduled execution maintenance work, as the execution conditions, the start time, completion time of the scheduled execution maintenance work, and the number of workers to be executed are shown,
The change necessity determination means includes the scheduled work execution condition information of at least one of the scheduled maintenance work when the work site status information indicates that at least one of the workers is absent. The second man-hour calculated on the basis of the above-mentioned when the weather of the facility indicated in the input work site status information is indicated in the weather-specific execution condition information related to the scheduled maintenance work When it is smaller than the first man-hour, it is determined that it is necessary to change the execution conditions,
The execution condition changing means changes the execution condition when it is determined by the change necessity determining means that the execution condition needs to be changed.
The maintenance work instruction output system according to appendix 1.
(Appendix 7)
A report input means for inputting a report to the effect that the scheduled maintenance work has been completed, together with a third man-hour actually taken to perform the scheduled maintenance work;
An actual man-hour average value calculating means for calculating an actual man-hour average value that is an average value of the input third man-hours for each event and each weather, and
Based on the calculated actual man-hour average value for each event and weather, update the first man-hour at the time of the weather in the weather-specific implementation condition information for the event,
The maintenance work instruction output system according to appendix 5 or appendix 6.
(Appendix 8)
A maintenance work instruction output system for outputting instructions related to the maintenance work to be given to workers who perform maintenance work on the facility,
A scheduled work execution condition storage unit that stores scheduled work execution condition information indicating an execution condition of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period;
Work site status information receiving means for receiving work site status information, which is information related to the current status of the work site, from the terminal device of the worker at the facility that is the work site;
Each time the work site status information is received, it is determined based on the work site status information whether or not it is necessary to change the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance operation. Change necessity determination means,
When it is determined by the change necessity determination means that it is necessary to change, the execution of each scheduled maintenance work can be completed in the predetermined period under the situation indicated in the work site situation information. An execution condition changing means for changing the execution condition indicated in the scheduled work execution condition information of each of the planned execution maintenance work,
A change result transmitting means for transmitting the result changed by the execution condition changing means to the terminal device of the worker in the facility which is a work site;
A maintenance work instruction output system characterized by comprising:
(Appendix 9)
A maintenance work instruction output method for outputting an instruction regarding the maintenance work to be given to a worker who performs maintenance work of the facility,
Scheduled work execution condition information indicating the execution conditions of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period is stored in the scheduled work execution condition storage unit,
Waiting for input of work site status information that is information on the current status of the work site reported from the worker at the facility that is the work site,
Each time the work site status information is input, each scheduled maintenance task can be completed in the predetermined period under the status indicated in the work site status information. Change the execution conditions indicated in the scheduled work execution condition information
The result changed by the execution condition changing means is output to give the instruction to the worker in the facility that is a work site.
A maintenance work instruction output method characterized by that.
(Appendix 10)
A computer program used in a computer for outputting instructions related to maintenance work to a worker who performs maintenance work of a facility,
Processing for accessing scheduled work execution condition storage means for storing scheduled work execution condition information indicating an execution condition of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period When,
Processing to input work site status information, which is information on the current status of the work site reported from the worker at the facility that is the work site;
When the work site status information is input, each scheduled maintenance task is performed so that the execution of each scheduled maintenance task can be completed in the predetermined period under the status indicated in the work site status information. A process of changing the execution condition indicated in the scheduled work execution condition information of
Processing for outputting the result changed by the execution condition changing means to give the instruction to the worker at the facility which is a work site;
A computer program for causing a computer to execute.

本発明は、特に、契約先の施設に作業員を派遣してメンテナンス作業のサービスを提供する企業などが、より効率的にかつ確実にメンテナンス作業が実施されるようにするために用いられる。また、効率性を向上させることによって、労働力などの無駄を削減し、コストダウンを図ることもできる。   In particular, the present invention is used by a company or the like that dispatches workers to a contract facility and provides maintenance work services so that the maintenance work can be performed more efficiently and reliably. In addition, by improving efficiency, it is possible to reduce waste such as labor and reduce costs.

本発明に係るメンテナンス作業管理装置が設けられたネットワークシステム全体の例を示す図である。It is a figure which shows the example of the whole network system provided with the maintenance work management apparatus which concerns on this invention. メンテナンス作業管理装置のハードウェア構成の例を示す図である。It is a figure which shows the example of the hardware constitutions of a maintenance work management apparatus. メンテナンス作業管理装置の機能的構成の例を示す図である。It is a figure which shows the example of a functional structure of a maintenance work management apparatus. 作業別実施条件マスタの例を示す図である。It is a figure which shows the example of the implementation condition master classified by work. 出勤予定テーブルの例を示す図である。It is a figure which shows the example of an attendance schedule table. 日別作業テーブルの例を示す図である。It is a figure which shows the example of a daily work table. 日別作業テーブル生成処理の流れの例を説明するフローチャートである。It is a flowchart explaining the example of the flow of a daily work table production | generation process. 作業指示情報の例を示す図である。It is a figure which shows the example of work instruction information. 状況変化対応処理の流れの例を説明するフローチャートである。It is a flowchart explaining the example of the flow of a situation change response process. 日別作業テーブルの例を示す図である。It is a figure which shows the example of a daily work table. ある作業員についての作業実績の分析結果の例を示す図である。It is a figure which shows the example of the analysis result of the work performance about a certain worker. メンテナンス作業管理装置および作業員端末の全体的な処理の流れの例を説明するフローチャートである。It is a flowchart explaining the example of the flow of the whole process of a maintenance work management apparatus and a worker terminal. 日別作業テーブルの例を示す図である。It is a figure which shows the example of a daily work table. 日別作業テーブルの例を示す図である。It is a figure which shows the example of a daily work table.

符号の説明Explanation of symbols

1 メンテナンス作業管理装置(メンテナンス作業指示出力システム)
72 状況差異情報(作業現場状況情報)
102 作業指示送信部(変更結果出力手段)
103 現場状況報告受信部(作業現場状況情報入力手段)
104 変更要否判別部(変更要否判別手段)
105 実施条件変更部(実施条件変更手段)
TL1 作業別実施条件マスタ(天候別実施条件記憶手段)
TL3 日別作業条件テーブル(予定作業実施条件記憶手段)
1 Maintenance work management device (Maintenance work instruction output system)
72 Status difference information (work site status information)
102 Work instruction transmission unit (change result output means)
103 Site status report receiving part (work site status information input means)
104 Change necessity determination unit (change necessity determination means)
105 Implementation condition changing unit (implementing condition changing means)
TL1 Work-specific execution condition master (weather-specific execution condition storage means)
TL3 daily work condition table (scheduled work execution condition storage means)

Claims (5)

施設のメンテナンス作業を行う作業員に対して与えるべき、当該メンテナンス作業に関する指示を出力する、メンテナンス作業指示出力システムであって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとに、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を記憶する、予定作業実施条件記憶手段と、
作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報を入力する作業現場状況情報入力手段と、
前記各実施予定メンテナンス作業の実施が入力された前記作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する、実施条件変更手段と、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する、変更結果出力手段と、
を有することを特徴とするメンテナンス作業指示出力システム。
A maintenance work instruction output system for outputting instructions related to the maintenance work to be given to workers who perform maintenance work on the facility,
A scheduled work execution condition storage unit that stores scheduled work execution condition information indicating an execution condition of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period;
Work site status information input means for inputting work site status information that is information on the current status of the work site reported from the worker at the facility that is the work site;
The scheduled work execution condition information of each scheduled maintenance work is indicated so that the execution of each scheduled maintenance work can be completed in the predetermined period under the status indicated in the work site status information that has been input. An implementation condition changing means for changing the implementation condition
A change result output means for outputting the result changed by the execution condition changing means to give the instruction to the worker at the facility which is a work site;
A maintenance work instruction output system characterized by comprising:
前記メンテナンス作業の種目ごとに、天候ごとの実施条件を示す天候別実施条件情報を記憶する、天候別実施条件記憶手段、を有し、
前記作業現場状況情報入力手段は、前記作業現場状況情報として、前記施設の天候を示す作業現場状況情報を入力し、
前記実施条件変更手段は、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候の実施条件に基づいて変更する、
請求項1記載のメンテナンス作業指示出力システム。
For each event of the maintenance work, there is a weather-specific execution condition storage means for storing weather-specific execution condition information indicating an execution condition for each weather,
The work site status information input means inputs the work site status information indicating the weather of the facility as the work site status information,
The execution condition changing means is configured to input the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance work indicated in the weather-specific execution condition information relating to the scheduled maintenance work. Change based on the weather conditions of the facility indicated in the work site status information,
The maintenance work instruction output system according to claim 1.
前記メンテナンス作業の種目ごとに、天候ごとの、当該メンテナンス作業を実施するのに必要な第一の工数を示す、天候別実施条件情報を記憶する、天候別実施条件記憶手段と、
前記作業現場状況情報が入力されるたびに、当該作業現場状況情報に基づいて、前記実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する必要があるか否かを判別する、変更要否判別手段と、を有し、
前記作業現場状況情報には、前記施設の天候および前記作業員の勤怠の状況が示されており、
前記実施予定メンテナンス作業の前記予定作業実施条件情報には、実施条件として、当該実施予定メンテナンス作業の開始時刻、完了時刻、および実施を行うべき前記作業員の人数が示されており、
前記変更要否判別手段は、前記作業現場状況情報に少なくとも1人の前記作業員が欠勤する旨が示されている場合、または、いずれかの前記実施予定メンテナンス作業の、前記予定作業実施条件情報に基づいて求められる第二の工数が、当該実施予定メンテナンス作業に係る前記種目の前記天候別実施条件情報に示される、入力された前記作業現場状況情報に示される前記施設の天候のときの前記第一の工数よりも小さい場合に、実施条件を変更する必要があると判別し、
前記実施条件変更手段は、実施条件を変更する必要があると前記変更要否判別手段によって判別された場合に、当該実施条件を変更する、
請求項1記載のメンテナンス作業指示出力システム。
For each event of the maintenance work, for each weather, the weather-specific execution condition storage means for storing the weather-specific execution condition information indicating the first man-hour required to perform the maintenance work;
Each time the work site status information is input, it is determined whether or not it is necessary to change the execution condition indicated in the scheduled work execution condition information of the scheduled maintenance operation based on the work site status information. A change necessity determination means,
The work site status information indicates the weather of the facility and the attendance status of the worker,
In the scheduled work execution condition information of the scheduled execution maintenance work, as the execution conditions, the start time, completion time of the scheduled execution maintenance work, and the number of workers to be executed are shown,
The change necessity determination means includes the scheduled work execution condition information of at least one of the scheduled maintenance work when the work site status information indicates that at least one of the workers is absent. The second man-hour calculated on the basis of the above-mentioned when the weather of the facility indicated in the input work site status information is indicated in the weather-specific execution condition information related to the scheduled maintenance work When it is smaller than the first man-hour, it is determined that it is necessary to change the execution conditions,
The execution condition changing means changes the execution condition when it is determined by the change necessity determining means that the execution condition needs to be changed.
The maintenance work instruction output system according to claim 1.
施設のメンテナンス作業を行う作業員に対して与えるべき、当該メンテナンス作業に関する指示を出力する、メンテナンス作業指示出力方法であって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとの、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を、予定作業実施条件記憶手段に記憶させておき、
作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報が入力されるのを待ち、
前記作業現場状況情報が入力されるたびに、前記各実施予定メンテナンス作業の実施が当該作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更し、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する、
ことを特徴とするメンテナンス作業指示出力方法。
A maintenance work instruction output method for outputting an instruction regarding the maintenance work to be given to a worker who performs maintenance work of the facility,
Scheduled work execution condition information indicating the execution conditions of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period is stored in the scheduled work execution condition storage unit,
Waiting for input of work site status information that is information on the current status of the work site reported from the worker at the facility that is the work site,
Each time the work site status information is input, each scheduled maintenance task can be completed in the predetermined period under the status indicated in the work site status information. Change the execution conditions indicated in the scheduled work execution condition information
The result changed by the execution condition changing means is output to give the instruction to the worker in the facility that is a work site.
A maintenance work instruction output method characterized by that.
施設のメンテナンス作業を行う作業員に対して当該メンテナンス作業に関する指示を出力するためのコンピュータに用いられるコンピュータプログラムであって、
所定の期間に実施される予定の前記メンテナンス作業である実施予定メンテナンス作業ごとに、当該実施予定メンテナンス作業の実施条件を示す予定作業実施条件情報を記憶する、予定作業実施条件記憶手段にアクセスする処理と、
作業現場である前記施設にいる前記作業員から報告される現在の当該作業現場の状況に関する情報である作業現場状況情報の入力する処理と、
前記作業現場状況情報が入力された場合に、前記各実施予定メンテナンス作業の実施が当該作業現場状況情報に示される前記状況の下で前記所定の期間に完了できるように、当該各実施予定メンテナンス作業の前記予定作業実施条件情報に示される実施条件を変更する処理と、
前記実施条件変更手段によって変更された結果を、作業現場である前記施設にいる前記作業員に対して前記指示を与えるために出力する処理と、
をコンピュータに実行させるためのコンピュータプログラム。

A computer program used in a computer for outputting instructions related to maintenance work to a worker who performs maintenance work of a facility,
Processing for accessing scheduled work execution condition storage means for storing scheduled work execution condition information indicating an execution condition of the scheduled maintenance work for each scheduled maintenance work that is the maintenance work scheduled to be performed in a predetermined period When,
Processing to input work site status information, which is information on the current status of the work site reported from the worker at the facility that is the work site;
When the work site status information is input, each scheduled maintenance task is performed so that the execution of each scheduled maintenance task can be completed in the predetermined period under the status indicated in the work site status information. A process of changing the execution condition indicated in the scheduled work execution condition information of
Processing for outputting the result changed by the execution condition changing means to give the instruction to the worker at the facility which is a work site;
A computer program for causing a computer to execute.

JP2004282034A 2004-09-28 2004-09-28 Maintenance work instruction output system and method, and computer program Withdrawn JP2006099235A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004282034A JP2006099235A (en) 2004-09-28 2004-09-28 Maintenance work instruction output system and method, and computer program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004282034A JP2006099235A (en) 2004-09-28 2004-09-28 Maintenance work instruction output system and method, and computer program

Publications (1)

Publication Number Publication Date
JP2006099235A true JP2006099235A (en) 2006-04-13

Family

ID=36239010

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004282034A Withdrawn JP2006099235A (en) 2004-09-28 2004-09-28 Maintenance work instruction output system and method, and computer program

Country Status (1)

Country Link
JP (1) JP2006099235A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008186382A (en) * 2007-01-31 2008-08-14 Chugoku Electric Power Co Inc:The System and program for determining work propriety
JP2013025771A (en) * 2011-07-26 2013-02-04 Hitachi Systems Ltd Operator-for-maintenance/repair arrangement system
JP2013242774A (en) * 2012-05-22 2013-12-05 Mitsubishi Electric Building Techno Service Co Ltd Maintenance work schedule preparation device and program
JP2015148961A (en) * 2014-02-06 2015-08-20 三菱電機ビルテクノサービス株式会社 Standard working time estimation device and program
EP3340137A1 (en) * 2016-12-20 2018-06-27 Yokogawa Electric Corporation Operation support apparatus
JP2020194420A (en) * 2019-05-29 2020-12-03 東京瓦斯株式会社 Operation implementation progress management control device, and operation implementation progress management control program
JP2022076718A (en) * 2020-11-10 2022-05-20 ソフトバンク株式会社 Management device, management system, management method, and management program

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008186382A (en) * 2007-01-31 2008-08-14 Chugoku Electric Power Co Inc:The System and program for determining work propriety
JP4633069B2 (en) * 2007-01-31 2011-02-16 中国電力株式会社 Work availability determination system and work availability determination program
JP2013025771A (en) * 2011-07-26 2013-02-04 Hitachi Systems Ltd Operator-for-maintenance/repair arrangement system
JP2013242774A (en) * 2012-05-22 2013-12-05 Mitsubishi Electric Building Techno Service Co Ltd Maintenance work schedule preparation device and program
JP2015148961A (en) * 2014-02-06 2015-08-20 三菱電機ビルテクノサービス株式会社 Standard working time estimation device and program
EP3340137A1 (en) * 2016-12-20 2018-06-27 Yokogawa Electric Corporation Operation support apparatus
US10509379B2 (en) 2016-12-20 2019-12-17 Yokogawa Electric Corporation Operation support apparatus, system, and method for reduction in number of operation mistakes of an operator actually performing operations in a facility of a plant
JP2020194420A (en) * 2019-05-29 2020-12-03 東京瓦斯株式会社 Operation implementation progress management control device, and operation implementation progress management control program
JP7332344B2 (en) 2019-05-29 2023-08-23 東京瓦斯株式会社 Business execution progress management control device, business execution progress management control program
JP2022076718A (en) * 2020-11-10 2022-05-20 ソフトバンク株式会社 Management device, management system, management method, and management program
JP7186758B2 (en) 2020-11-10 2022-12-09 ソフトバンク株式会社 Management device, management system, management method, and management program

Similar Documents

Publication Publication Date Title
US8612276B1 (en) Methods, apparatus, and systems for dispatching service technicians
US6574605B1 (en) Method and system for strategic services enterprise workload management
US6415259B1 (en) Automatic work progress tracking and optimizing engine for a telecommunications customer care and billing system
US8660877B2 (en) Technician control system
US20040010437A1 (en) Method and system for scheduling and sharing a pool of resources across multiple distributed forecasted workloads
US20210295984A1 (en) Optimized patient schedules based on patient workflow and resource availability
US20050021384A1 (en) Capacity planning method and system with approved accuracy and confidence indication
Vile et al. Time-dependent stochastic methods for managing and scheduling Emergency Medical Services
CA2483598A1 (en) System for managing real estate properties
CN101552842A (en) Call center application data and interoperation architecture for a telecommunication service center
US11227241B2 (en) System and method for assigning employees to cash registers
CN116151547A (en) Cleaning task execution method and device
JP2006099235A (en) Maintenance work instruction output system and method, and computer program
JP2020038718A (en) Information processor and program
JP2001250003A (en) System for operating at-home care service and evaluating quality of care service while using communication means such as internet
JP2001216428A (en) Centralized management system for labor safety information
JP4489340B2 (en) Information management support device, information management support system, information management support method, storage medium, and program
Entner The increasingly important impact of wireless broadband technology and services on the US economy
JP2010218324A (en) Task allocation device, task allocation method and task allocation program
JP2002342541A (en) Employee and worker management system
JP2019067386A (en) Management system
JP2003030770A (en) Communication instruction system
JP2002342539A (en) Method and system for member arrangement service
JP2002041854A (en) Device and method for processing talent dispatch information
JP7147922B1 (en) Secondment arrangement system, control method and program

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20071204