JP2006027750A - Jacket lifting tool device - Google Patents
Jacket lifting tool device Download PDFInfo
- Publication number
- JP2006027750A JP2006027750A JP2004204550A JP2004204550A JP2006027750A JP 2006027750 A JP2006027750 A JP 2006027750A JP 2004204550 A JP2004204550 A JP 2004204550A JP 2004204550 A JP2004204550 A JP 2004204550A JP 2006027750 A JP2006027750 A JP 2006027750A
- Authority
- JP
- Japan
- Prior art keywords
- jacket
- twist lock
- lock pin
- tool device
- lifting tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
本発明は、ジャケットを据え付ける際のジャケットの吊上げ装置に関するものである。
The present invention relates to a lifting device for a jacket when the jacket is installed.
従来のジャケット据付時の吊上げ方法を説明する。吊上げの対象となるジャケットとは、陸上で主に下部構造をあらかじめ製作し、それを設置現場(例えば海底)まで起重機船で搬送して据え付け、上部構造を取り付けるような柱と梁で組み立てられた枠体の事である。
ジャケット(a)は例えば左側が右側に比べ重かったりする等、重量バランスが均等で無い場合が多々ある。そこで、バランスをとるために吊天秤(i)を使用する。(図7参照)
まず、この吊天秤(i)と起重機船(n)のアーム部との結合を説明する。起重機船のアーム部には、フック(f)の付いたフックブロック(b)を取り付ける。そして、アイプレート(c)と呼ばれるフックブロック側と吊天秤側を接続するプレート上に開いている穴をピン(h)で通す。そのピンをフックに引っ掛けてやることでフックブロック(b)とアイプレート(c)を結合する。アイプレート(c)には吊天秤側にも穴が開いており、吊天秤上部から延びた吊金具(g)と、こちらもピン(j)で接続する。(図8、9参照)
また、吊天秤(i)の下部にも吊金具(k)が取り付けられており、ジャケット上面に取り付けられている吊金具(d)と、それぞれ金具に空いた穴を重なるようにし、そこに取り外し可能な重い固定ピン(e)を挿入して結合する。(図8、9参照)
これら一連の作業の中でジャケット側、起重機側の吊治具をピン(e、h、j等)によって結合する際には、主に作業員が手作業でピンを水平に結合する作業を行うことになる。
A conventional lifting method when installing the jacket will be described. The jacket to be lifted was assembled with pillars and beams that prefabricated the lower structure mainly on land, transported it to the installation site (for example, the seabed) with a hoist ship, and installed the upper structure. It is a frame.
The jacket (a) often has a non-uniform weight balance, for example, the left side is heavier than the right side. Therefore, the suspension balance (i) is used for balancing. (See Figure 7)
First, the connection between the suspension balance (i) and the arm portion of the hoist ship (n) will be described. A hook block (b) with a hook (f) is attached to the arm portion of the hoist ship. And the hole opened on the plate which connects the hook block side called the eye plate (c) and the suspension balance side is passed with a pin (h). The hook block (b) and the eye plate (c) are coupled by hooking the pin on the hook. The eye plate (c) also has a hole on the side of the suspension balance, and the eye plate (c) is also connected to the suspension fitting (g) extending from the upper portion of the suspension balance with a pin (j). (See Figs. 8 and 9)
A hanging bracket (k) is also attached to the lower part of the hanging balance (i), and the hanging bracket (d) attached to the upper surface of the jacket is overlapped with a hole formed in each bracket, and is removed there. Insert possible heavy fixing pins (e) and join. (See Figs. 8 and 9)
In the series of operations, when the suspension jigs on the jacket side and the hoist side are coupled by the pins (e, h, j, etc.), the worker mainly performs the task of horizontally coupling the pins manually. It will be.
前記した従来のジャケット吊上げ装置および方法にあっては、次のような問題点がある。
<1> ジャケット上部に吊治具を取り付けた場合、ジャケット等の重量物では吊天秤を使用する事などで吊治具が大きくなり、より高い場所から吊下げる必要が生じる。このため作業する際に上空制限(13、m)がある場合は、ジャケットを十分に持ち上げられる程の高さが確保できず、作業が不可能になる事が懸念される。(図1、7参照)
<2> ジャケット側、フック側の吊治具をピンによって結合する場合、主に作業員の手作業で重量の重いピンの挿入作業を行うため作業性が非常に悪くなる。また作業時の危険性として作業員の手足が挟まれたりする事などが懸念される。
<3> 取付金具やピンが数多くあり、またピンの取付け外しが作業員の手によるものである等、作業の効率性が悪いため施工サイクルに及ぼす影響が大きくなる。作業時間に制約がある場合は、限られた時間内での施工が困難になる事が懸念される。
The above-described conventional jacket lifting device and method have the following problems.
<1> When a hanging jig is attached to the upper part of the jacket, the heavy jig such as a jacket becomes large due to the use of a hanging balance, and the hanging jig needs to be hung from a higher place. For this reason, when there is an upper limit (13, m) when working, there is a concern that the height is not high enough to lift the jacket sufficiently and the work becomes impossible. (See Figures 1 and 7)
<2> When the jacket-side and hook-side suspension jigs are coupled with pins, the workability is very poor because the heavy pins are inserted manually by the workers. In addition, there is a concern that workers' hands and feet may be caught as a danger during work.
<3> There are a large number of mounting brackets and pins, and the mounting and dismounting of the pins is performed by the operator's hands. For example, the work efficiency is poor, so the influence on the construction cycle is increased. When working time is limited, there is a concern that construction within a limited time becomes difficult.
上記のような課題を解決するために、本発明のジャケット吊上げ治具装置は、起重機船の吊フックに取り付けたブロック部と回転自在の回転軸からなるツイストロックピンと、縦横の柱、梁からなる枠体で構成したジャケットよりなり、ジャケットの柱の最上端に設けた受台と、ツイストロックピンのブロック部の平面投影形状の結合穴とより構成した事を特徴とするものである。
In order to solve the above-described problems, a jacket lifting jig apparatus according to the present invention includes a block portion attached to a lifting hook of a hoist ship, a twist lock pin including a rotatable rotating shaft, vertical and horizontal columns, and a beam. It consists of a jacket made of a frame, and is characterized by comprising a cradle provided at the uppermost end of a column of the jacket and a coupling hole in a planar projection shape of the block portion of the twist lock pin.
本発明のジャケット吊上げ治具装置及びジャケット吊上げ方法は以上説明したようになるから次のような効果を得ることができる。
<1> ジャケット側吊治具をジャケットの縦柱(レグ)内に取付け、その中にツイストロックピンを挿入する構成である。そのためジャケット上部に吊治具が出ないため、吊治具の存在したスペース分だけの高さを縮めることができる。
<2> 請求項2記載の発明によれば油圧機構でツイストロックピンを回転させジャケット側と連結するため、連結ピン挿入作業などの人力による作業が必要なくなる。この為、作業員は確認作業を行うだけとなり、作業性が向上するとともに危険性も無くなる。
<3> 作業性の向上により作業時間の短縮を図ることができ、また人力作業を排除する事で施工サイクル上の不確定要素を排除することが出来る。
Since the jacket lifting jig apparatus and the jacket lifting method of the present invention are as described above, the following effects can be obtained.
<1> A jacket-side hanging jig is mounted in a vertical column (leg) of the jacket, and a twist lock pin is inserted therein. Therefore, since the hanging jig does not appear on the upper part of the jacket, the height corresponding to the space where the hanging jig exists can be reduced.
<2> According to the second aspect of the present invention, since the twist lock pin is rotated by the hydraulic mechanism and connected to the jacket side, no manual work such as a connection pin insertion work is required. For this reason, the worker only performs the confirmation work, and the workability is improved and the danger is eliminated.
<3> The work time can be shortened by improving workability, and uncertain elements in the construction cycle can be eliminated by eliminating manual work.
以下図面を参照にしながら本発明の好適な実施の形態を詳細に説明する。 DESCRIPTION OF EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.
<1> ツイストロック式吊上げ装置の取付け
最初に、起重機船(12)のアーム部に物を吊下げる吊フックであるフックブロック(1)を取り付ける。そして、そのフックブロック(1)に「ツイストロック式吊上げ装置」(2)を取付ける。(図1、2参照)
<1> Installation of twist lock type lifting device First, a hook block (1), which is a suspension hook for suspending an object, is attached to an arm portion of a hoist ship (12). Then, a "twist lock type lifting device" (2) is attached to the hook block (1). (See Figures 1 and 2)
<2> ツイストロック式吊上げ装置の説明
ツイストロック式吊上げ装置(2)は、ツイストロック装置(4)と、ツイストロックピン(6)から成り立っており、ツイストロック装置(4)の中には油圧機構(5)が内蔵されている。(図4参照)
<2> Description of Twist Lock Type Lifting Device The twist lock type lifting device (2) is composed of a twist lock device (4) and a twist lock pin (6). A mechanism (5) is incorporated. (See Figure 4)
<3>ツイストロックピンの説明
ツイストロックピン(6)はハンマー(金槌)のように、先端が長方形のブロック部分(7)と、ハンマーの柄にあたる回転軸(8)から構成されている。(図4参照)長方形のブロックは長辺(b1)と短辺(b2)を備えている。(図3参照)なお先端部は長方形以外にも、楕円形の他、回転中心を中心として非対称の形状であれば同様の効果が期待できる。
<3> Description of Twist Lock Pin The twist lock pin (6), like a hammer (metal hammer), is composed of a block portion (7) having a rectangular tip and a rotating shaft (8) corresponding to the handle of the hammer. (See FIG. 4) The rectangular block has a long side (b1) and a short side (b2). (Refer to FIG. 3) In addition to the rectangular shape, the tip can be expected to have the same effect as long as it has an asymmetric shape with the center of rotation in addition to an elliptical shape.
<4> 油圧機構の説明
この油圧機構(5)はシリンダー(51)の中に満たされた油の圧力を変化させることにより、油圧機構から伸びるロッド(52)を伸縮する。そして回転軸の中心から偏心した位置に向け往復動を与える事でツイストロックピン(6)を一定の角度(90度)の範囲で回動させる役目を果たす。(図4参照)
<4> Description of Hydraulic Mechanism This hydraulic mechanism (5) expands and contracts the rod (52) extending from the hydraulic mechanism by changing the pressure of the oil filled in the cylinder (51). The twist lock pin (6) is rotated in a range of a constant angle (90 degrees) by reciprocating toward a position eccentric from the center of the rotation shaft. (See Figure 4)
<5> ツイストロック受台の説明(図3、5、6参照)
一方、吊上げたい、ジャケット(3)のジャケットレグ(9)内に予め、ツイストロック受台(10)を取付けておく。
ツイストロック受台(10)はジャケット(3)の重みに耐えられる様にジャケットレグ(9)にしっかりと固定する。
ツイストロック受台(10)はいわばジャケットレグ(9)内に固定されたある程度厚みを持った蓋のような状態で、その厚みを持った蓋(ツイストロック受台)の中心部には蓋部を貫通する長方形の穴であるツイストロックピン穴(11)を持っている。
この長方形の穴は、ツイストロックピン(6)が挿入できるサイズの大きさで。長方形の短い方の辺の長さ(a2)はb1より短いものとなっている。
また、ツイストロックピンのブロック部をツイストロック受台の底に引っ掛ける必要があるため、ツイストロックピン穴の長方形の辺の長い方の長さ(a1)はブロック部の長辺(b1)より長く、ブロック部の短辺(b2)はツイストロックピン穴の短辺(a2)よりも短くなる。(図3参照)なおツイストロックピンの先端部とツイストロックピン穴の平面投影図が同一であれば、穴、及びツイストロックピン先端部の形状は長方形に限る必要は無い。
<5> Explanation of twist lock cradle (see Figs. 3, 5, and 6)
On the other hand, the twist lock cradle (10) is attached in advance in the jacket leg (9) of the jacket (3) to be lifted.
The twist lock cradle (10) is firmly fixed to the jacket leg (9) so as to withstand the weight of the jacket (3).
The twist lock pedestal (10) is like a lid with a certain thickness fixed in the jacket leg (9), and there is a lid at the center of the thick lid (twist lock cradle). Twist lock pin hole (11), which is a rectangular hole penetrating through.
This rectangular hole is sized to allow the twist lock pin (6) to be inserted. The length (a2) of the shorter side of the rectangle is shorter than b1.
Further, since it is necessary to hook the block portion of the twist lock pin to the bottom of the twist lock receiving base, the longer length (a1) of the rectangular side of the twist lock pin hole is longer than the long side (b1) of the block portion. The short side (b2) of the block part is shorter than the short side (a2) of the twist lock pin hole. (Refer to FIG. 3) If the plan view of the tip of the twist lock pin and the twist lock pin hole are the same, the shape of the hole and the tip of the twist lock pin need not be rectangular.
<6> ジャケットと吊フックの結合
次に、吊上装置とジャケットの結合方法について説明する。
起重機船の吊フックを予めジャケットレグ側吊点の平面位置に合わせておく。つまり、ツイストロックピン先端部の長辺とツイストロックピン穴の長辺を合わせる。
吊フックを降下させてツイストロックピン(6)をツイストロックピン穴(11)に挿入する。(図6参照)
ツイストロックピン(6)のハンマー状の先頭部(7)がツイストロックピン穴(11)を通過しツイストロック受台(10)を通り越したところで、油圧機構によりツイストロックピン(6)を90度回転させて、ツイストロックピンの先端部(7)がツイストロック受台(10)の底に引っ掛かるようにし、ジャケット(3)と吊フックを一体化させる。(図2、6参照)
このツイストロックピン(6)のツイストロック受台(10)への引っ掛かりを利用しジャケット全体(3)を巻き上げて持ち上げる。
<6> Coupling of jacket and suspension hook Next, a method of coupling the lifting device and the jacket will be described.
The hoisting ship's suspension hook is set in advance to the plane position of the jacket leg side suspension point. That is, the long side of the twist lock pin tip is aligned with the long side of the twist lock pin hole.
The suspension hook is lowered and the twist lock pin (6) is inserted into the twist lock pin hole (11). (See Figure 6)
When the hammer-shaped leading portion (7) of the twist lock pin (6) passes through the twist lock pin hole (11) and passes through the twist lock cradle (10), the twist lock pin (6) is moved 90 degrees by a hydraulic mechanism. By rotating, the tip (7) of the twist lock pin is hooked on the bottom of the twist lock cradle (10), and the jacket (3) and the suspension hook are integrated. (See Figures 2 and 6)
Using the hook of the twist lock pin (6) to the twist lock cradle (10), the entire jacket (3) is wound up and lifted.
<7> ジャケットの据付
起重機船(12)でジャケット(3)を据え付けたい場所まで移動し、据え付けたい場所に到着したらジャケット(3)を巻き下ろして海底などに据え付ける。ジャケット(3)裾付完了後、ツイストロックピン(6)を油圧機構(5)により再び90度回転し、フックを巻き上げる事でツイストロックピン(6)をジャケットレグ(9)から抜き出して起重機船の吊フックを開放する。
<7> Installing the jacket Move the jacket (3) to the place where you want to install it on the hoist ship (12). When you arrive at the place where you want to install the jacket, unwind the jacket (3) and install it on the seabed. After the skirting of the jacket (3) is completed, the twist lock pin (6) is rotated 90 degrees again by the hydraulic mechanism (5), and the twist lock pin (6) is pulled out from the jacket leg (9) by winding up the hook, and the hoist ship Open the hanging hook.
1・・・フックブロック
2・・・ツイストロック式吊上げ装置
3・・・ジャケット(本発明の図)
4・・・ツイストロック装置
5・・・油圧機構
51・・・シリンダー
52・・・ロッド
6・・・ツイストロックピン
7・・・ツイストロックピン先端部
8・・・回転軸
9・・・ジャケットレグ
10・・・ツイストロック受台
11・・・ツイストロックピン穴
12・・・起重機船(本発明の図)
13・・・上空制限高さ(本発明の図)
a1・・・ツイストロックピン穴の長い方の辺の長さ
a2・・・ツイストロックピン穴の短い方の辺の長さ
b1・・・ツイストロックピンの先端部の長い方の辺の長さ
b2・・・ツイストロックピンの先端部の短い方の辺の長さ
a・・・ジャケット(従来図)
b・・・フックブロック
c・・・アイプレート
d・・・ジャケット上側にある吊金具
e・・・固定ピン
f・・・フック
g・・・吊天秤上側にある吊金具
h・・・ピン(アイプレートとフック結合用)
i・・・吊天秤
j・・・ピン(アイプレートと吊天秤結合用)
k・・・吊天秤下側にある吊金具
m・・・上空制限高さ(従来図)
n・・・起重機船(従来図)
DESCRIPTION OF SYMBOLS 1 ... Hook block 2 ... Twist lock type lifting device 3 ... Jacket (figure of this invention)
DESCRIPTION OF
13... Upper limit height (figure of the present invention)
a1 ... the length of the longer side of the twist lock pin hole a2 ... the length of the shorter side of the twist lock pin hole b1 ... the length of the longer side of the tip of the twist lock pin b2: Length of the shorter side of the tip of the twist lock pin a ... Jacket (conventional view)
b ... Hook block c ... Eye plate d ... Suspension bracket e above the jacket e ... Fixed pin f ... Hook g ... Suspension bracket h ... pin above the suspension balance (For eye plate and hook connection)
i ... Suspension balance j ... Pin (for connecting eye plate and suspension balance)
k: Suspension bracket m on the lower side of the suspension balance m: Upper limit height (conventional diagram)
n ... Hoist ship (conventional diagram)
Claims (1)
ブロック部と回転自在の回転軸からなるツイストロックピンと、
縦横の柱、梁からなる枠体で構成したジャケットよりなり、
ジャケットの柱の最上端に設けた受台と、
受台に開口したツイストロックピンのブロック部の平面投影形状の結合穴、
とより構成した
ジャケット吊上げ治具装置。 Attached to the hanging hook of the hoist ship,
A twist lock pin comprising a block and a rotatable rotating shaft;
It consists of a jacket composed of vertical and horizontal columns and a frame made of beams.
A cradle provided at the uppermost end of the jacket column;
Planar projection-shaped coupling hole in the block portion of the twist lock pin opened in the cradle,
A jacket lifting jig device composed of
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004204550A JP2006027750A (en) | 2004-07-12 | 2004-07-12 | Jacket lifting tool device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004204550A JP2006027750A (en) | 2004-07-12 | 2004-07-12 | Jacket lifting tool device |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2006027750A true JP2006027750A (en) | 2006-02-02 |
Family
ID=35894560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004204550A Pending JP2006027750A (en) | 2004-07-12 | 2004-07-12 | Jacket lifting tool device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2006027750A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105236256A (en) * | 2015-11-13 | 2016-01-13 | 中国船舶重工集团公司第七二六研究所 | Underwater hoisting device and fast connecting device thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04350217A (en) * | 1991-01-17 | 1992-12-04 | Taisei Corp | Installation method for steel jacket |
JPH07215655A (en) * | 1994-02-07 | 1995-08-15 | Mitsubishi Heavy Ind Ltd | Pallet device |
-
2004
- 2004-07-12 JP JP2004204550A patent/JP2006027750A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04350217A (en) * | 1991-01-17 | 1992-12-04 | Taisei Corp | Installation method for steel jacket |
JPH07215655A (en) * | 1994-02-07 | 1995-08-15 | Mitsubishi Heavy Ind Ltd | Pallet device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105236256A (en) * | 2015-11-13 | 2016-01-13 | 中国船舶重工集团公司第七二六研究所 | Underwater hoisting device and fast connecting device thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109231023B (en) | Method for installing jib system of portal crane | |
JP5731311B2 (en) | Concrete block lifting jig | |
JP5010354B2 (en) | Structure assembly method and lifting scaffold device | |
JP6098453B2 (en) | Jib hanger | |
JP2006027750A (en) | Jacket lifting tool device | |
JP2006096476A (en) | Hoisting accessory | |
JP2005248585A (en) | Temporary arm and assembling method of crossarm in power transmission line steel tower using the temporary arm | |
JP5988288B2 (en) | Jig for hanging long materials | |
JP2009286531A (en) | Dismantling method of tower crane | |
JP4222990B2 (en) | Floor opening device, floor opening method | |
JP4584862B2 (en) | Installation method of automatic tension adjusting device for train line | |
JP2016023021A (en) | Column lifting tool and method of using the same | |
CN111993569B (en) | Method for automatically erecting lifting hook and forming equipment | |
CN220467288U (en) | Adjustable prefabricated component hoisting structure | |
JP2001316074A (en) | Lifting jig for lifted cargo and its use | |
JP2010013799A (en) | Method for mounting precast member and precast member | |
JP7374865B2 (en) | hanging jig | |
JP5519374B2 (en) | Container crane | |
KR102334835B1 (en) | An apparatus for supporting bulb plate and a method of construcring bulb plate using the same | |
JP2013011119A (en) | Construction method of multi-layer building and lifting device for continuous layer foothold used therefor | |
JP2008007252A (en) | Climbing crane | |
JP2023056096A (en) | Mast stay device of climbing crane | |
CN110255352A (en) | The vertical hoisting method of long rib-shaped curved surface group | |
JP2023165881A (en) | Pipe lifting-down-device and connection method for pipe | |
JP2003314053A (en) | Working table for large precast retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070411 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100319 |
|
A131 | Notification of reasons for refusal |
Effective date: 20100420 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100611 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20110125 |