JP2023056096A - Mast stay device of climbing crane - Google Patents

Mast stay device of climbing crane Download PDF

Info

Publication number
JP2023056096A
JP2023056096A JP2021165202A JP2021165202A JP2023056096A JP 2023056096 A JP2023056096 A JP 2023056096A JP 2021165202 A JP2021165202 A JP 2021165202A JP 2021165202 A JP2021165202 A JP 2021165202A JP 2023056096 A JP2023056096 A JP 2023056096A
Authority
JP
Japan
Prior art keywords
stay
mast
frame
climbing crane
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021165202A
Other languages
Japanese (ja)
Inventor
馨 高松
Kaoru Takamatsu
宏明 田畑
Hiroaki Tabata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Transport Machinery Co Ltd
Original Assignee
IHI Transport Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Transport Machinery Co Ltd filed Critical IHI Transport Machinery Co Ltd
Priority to JP2021165202A priority Critical patent/JP2023056096A/en
Publication of JP2023056096A publication Critical patent/JP2023056096A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

To provide a mast stay device of a climbing crane capable of avoiding high place work during assembly or disassembly and improving the degree of freedom in height adjustment of a stay.SOLUTION: A mast stay device includes a stay frame 800 detachably provided on an elevation unit 400 freely raised and lowered along a mast 300 and fixed to the mast 300. A stay 700 for reinforcing the mast 300 is bridged between the stay frame 800 and a foundation frame 200.SELECTED DRAWING: Figure 1

Description

本発明は、クライミングクレーンのマストステー装置に関するものである。 The present invention relates to a climbing crane mast stay device.

一般に、高層ビル等の構造物の建造には、図5に示されるようなクライミングクレーン100が用いられている。 Generally, a climbing crane 100 as shown in FIG. 5 is used for construction of structures such as high-rise buildings.

前記クライミングクレーン100は、基礎架台200と、マスト300と、昇降ユニット400と、旋回体500とを備えている。 The climbing crane 100 includes a base frame 200 , a mast 300 , an elevating unit 400 and a revolving body 500 .

前記基礎架台200は、ベース面Bに載置固定される平面形状が十字型の架台である。 The base pedestal 200 is a pedestal mounted and fixed on the base surface B and having a cross-shaped planar shape.

前記マスト300は、前記基礎架台200の上にマストブロック310を順次積み上げて立設されるようになっている。 The mast 300 is erected by sequentially stacking mast blocks 310 on the base frame 200 .

前記昇降ユニット400は、ガイドマスト410と昇降フレーム420とを備え、前記マスト300に沿って昇降自在となっている。 The elevating unit 400 includes a guide mast 410 and an elevating frame 420 and can be vertically moved along the mast 300 .

前記旋回体500は、前記昇降ユニット400の上端に旋回自在に配設され且つジブ600が起伏自在に設けられている。 The revolving body 500 is rotatably disposed on the upper end of the lifting unit 400 and has a jib 600 that can be raised and lowered.

前記クライミングクレーン100において、前記マストブロック310が多数積み上げられてマスト300の高さが高くなる場合、前記基礎架台200とマスト300との間にステー700が取り付けられてマスト300が補強され、その撓みを抑えることが行われる。 In the climbing crane 100, when a large number of the mast blocks 310 are piled up to increase the height of the mast 300, a stay 700 is attached between the foundation frame 200 and the mast 300 to reinforce the mast 300, thereby is suppressed.

前記ステー700の上端は、前記マストブロック310の側面に突設されたステーブラケット320に連結ピン710により連結され、前記ステー700の下端は、前記基礎架台200の上面に突設された基礎ブラケット210に連結ピン710により連結される。 An upper end of the stay 700 is connected to a stay bracket 320 protruding from the side surface of the mast block 310 by a connecting pin 710 , and a lower end of the stay 700 is a base bracket 210 protruding from the upper surface of the base frame 200 . is connected by a connecting pin 710 to .

尚、前記クライミングクレーン100と関連する一般的技術水準を示すものとしては、例えば、特許文献1がある。 For example, Japanese Patent Application Laid-Open No. 2002-200000 discloses a general technical level related to the climbing crane 100 .

特開2008-30905号公報Japanese Patent Application Laid-Open No. 2008-30905

しかしながら、前述のように、マストブロック310の側面からステーブラケット320が突設されていると、クライミングクレーン100の組立時、図6に示される如く、昇降ユニット400及び旋回体500を最下部のマストブロック310に組付けた場合、昇降ユニット400がステーブラケット320と干渉して上昇していくことができなくなる。 However, if the stay bracket 320 protrudes from the side surface of the mast block 310 as described above, when the climbing crane 100 is assembled, the elevating unit 400 and the revolving body 500 are positioned on the lowermost mast as shown in FIG. When assembled to the block 310, the lift unit 400 interferes with the stay bracket 320 and cannot be lifted.

このため、前記昇降ユニット400及び旋回体500は、前記ステーブラケット320が突設されたマストブロック310より上方位置に組付けざるを得なくなり、高所作業を行わなければならず、同様に、クライミングクレーン100の解体時も高所作業が必須となることから、改善が望まれていた。 Therefore, the lifting unit 400 and the revolving body 500 must be assembled at a position above the mast block 310 from which the stay bracket 320 protrudes. Improvements have been desired since work at height is essential even when the crane 100 is dismantled.

しかも、前記ステー700の上端をマストブロック310の側面に突設されたステーブラケット320に連結する作業も高所で行わざるを得なかった。 Moreover, the work of connecting the upper end of the stay 700 to the stay bracket 320 projecting from the side surface of the mast block 310 has to be done at a high place.

又、前記ステーブラケット320がマストブロック310の側面から突設される位置は固定されており、ステー700の高さ調節ができないことも改善すべき点の一つとして挙げられていた。 In addition, the position where the stay bracket 320 protrudes from the side surface of the mast block 310 is fixed, and the height of the stay 700 cannot be adjusted.

本発明は、上記従来の問題点に鑑みてなしたもので、組立・解体時における高所作業を回避し得且つステーの高さ調節の自由度を高め得るクライミングクレーンのマストステー装置を提供しようとするものである。 SUMMARY OF THE INVENTION It is an object of the present invention to provide a mast stay device for a climbing crane that can avoid high-place work during assembly and dismantling and can increase the degree of freedom in adjusting the height of the stay. and

本発明は、ベース面に設置される基礎架台と、該基礎架台の上にマストブロックを順次積み上げて立設されるマストと、該マストに沿って昇降自在な昇降ユニットと、該昇降ユニットの上端に旋回自在に配設され且つジブが起伏自在に設けられる旋回体と、前記マストを補強するステーとを備えたクライミングクレーンのマストステー装置において、
前記昇降ユニットに着脱自在に設けられ且つ前記マストに固定されるステー枠を備え、
前記ステーは、前記ステー枠と基礎架台との間に掛け渡されるクライミングクレーンのマストステー装置に係るものである。
The present invention comprises a foundation frame installed on a base surface, a mast erected by sequentially stacking mast blocks on the foundation frame, a lifting unit capable of moving up and down along the mast, and an upper end of the lifting unit. A mast stay device for a climbing crane, comprising: a revolving body arranged so as to be able to turn freely and a jib provided so as to be able to rise and fall; and a stay that reinforces the mast,
A stay frame that is detachably provided on the lifting unit and fixed to the mast,
The stay relates to a mast stay device of a climbing crane that spans between the stay frame and the foundation frame.

前記クライミングクレーンのマストステー装置において、前記ステー枠は、該ステー枠に取り付けられた吊下ブラケットと前記昇降ユニットに取り付けられた昇降ブラケットとの間に吊下ピンを打ち込んで吊り下げられるようにすることができる。 In the climbing crane mast stay device, the stay frame is suspended by driving a suspension pin between a suspension bracket attached to the stay frame and a lifting bracket attached to the lifting unit. be able to.

又、前記ステー枠は、前記マストブロックに穿設されたカンヌキ孔にロックピンを打ち込んでマストに固定されるようにすることができる。 Also, the stay frame can be fixed to the mast by driving a lock pin into a bolt hole drilled in the mast block.

更に又、前記ステーは、マストの高さに応じて連結本数が選定されるようにすることができる。 Furthermore, the number of stays to be connected can be selected according to the height of the mast.

本発明のクライミングクレーンのマストステー装置によれば、組立・解体時における高所作業を回避し得且つステーの高さ調節の自由度を高め得るという優れた効果を奏し得る。 According to the climbing crane mast stay device of the present invention, it is possible to avoid high-place work during assembly and dismantling, and to increase the degree of freedom in adjusting the height of the stay.

本発明のクライミングクレーンのマストステー装置の実施例を示す分解斜視図である。1 is an exploded perspective view showing an embodiment of a mast stay device for a climbing crane according to the present invention; FIG. 本発明のクライミングクレーンのマストステー装置の実施例を示す平面図である。1 is a plan view showing an embodiment of a mast stay device for a climbing crane according to the present invention; FIG. 本発明のクライミングクレーンのマストステー装置の実施例におけるステーを示す斜視図である。1 is a perspective view showing a stay in an embodiment of a mast stay device for a climbing crane of the present invention; FIG. 本発明のクライミングクレーンのマストステー装置の実施例における組立時と解体時の手順を示す側面図である。FIG. 4 is a side view showing the procedure at the time of assembling and dismantling in the embodiment of the mast stay device of the climbing crane of the present invention; 従来のステーが取り付けられたクライミングクレーンの一例を示す全体斜視図である。1 is an overall perspective view showing an example of a climbing crane to which a conventional stay is attached; FIG. 従来のクライミングクレーンの組立時における不具合を示す側面図である。FIG. 11 is a side view showing a problem during assembly of a conventional climbing crane;

以下、本発明の実施の形態を添付図面を参照して説明する。 BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

図1~図4は本発明のクライミングクレーンのマストステー装置の実施例であって、図中、図5及び図6と同一の符号を付した部分は同一物を表わしている。 1 to 4 show an embodiment of a mast stay device for a climbing crane according to the present invention, and in the figures, the same reference numerals as in FIGS. 5 and 6 represent the same parts.

本実施例の場合、ステー枠800を備え、該ステー枠800と基礎架台200との間にステー700を掛け渡すようにした点を特徴としている。 This embodiment is characterized in that a stay frame 800 is provided, and the stay 700 is hung between the stay frame 800 and the base frame 200 .

前記ステー枠800は、昇降ユニット400に対し着脱自在に設けられるようになっている。前記ステー枠800の昇降ユニット400に対する連結の仕方の一例としては、該ステー枠800に取り付けられた吊下ブラケット810と前記昇降ユニット400に取り付けられた昇降ブラケット430との間に吊下ピン820を打ち込んで、前記ステー枠800が昇降ユニット400から吊り下げられるようにすることができる。 The stay frame 800 is detachably attached to the lifting unit 400 . As an example of a method of connecting the stay frame 800 to the elevation unit 400, a suspension pin 820 is inserted between a suspension bracket 810 attached to the stay frame 800 and an elevation bracket 430 attached to the elevation unit 400. The stay frame 800 can be hung from the lifting unit 400 by hammering.

又、前記ステー枠800は、図2に示す如く、前記マストブロック310に穿設されたカンヌキ孔330にロックピン830を打ち込むことにより、マスト300に固定されるようになっている。前記ロックピン830は、ステー枠800の格納孔840にマスト300の半径方向へスライド自在に挿入され、ロックピン830の基端突片831に揺動リンク850を介してシリンダ860が連結されている。前記揺動リンク850とシリンダ860はそれぞれ、ステー枠800から外方へ張り出すフレーム870に枢支されている。 2, the stay frame 800 is fixed to the mast 300 by driving a lock pin 830 into a bolt hole 330 drilled in the mast block 310. As shown in FIG. The lock pin 830 is inserted into the storage hole 840 of the stay frame 800 so as to be slidable in the radial direction of the mast 300 , and the cylinder 860 is connected to the base end projecting piece 831 of the lock pin 830 via a swing link 850 . . The rocking link 850 and the cylinder 860 are each pivotally supported by a frame 870 projecting outward from the stay frame 800 .

尚、前記ステー枠800を固定すべきマスト300の高さ位置におけるマストブロック310には、図2に示す如く、円周方向四箇所にガイド340(例えば、アングル)が固着され、該ガイド340に対しステー枠800の貫通孔880から固定金具890をねじ込んでステー枠800のマスト300からの脱落を防ぐようになっている。 As shown in FIG. 2, four guides 340 (for example, angles) are fixed to the mast block 310 at the height of the mast 300 to which the stay frame 800 is to be fixed. A fixing metal fitting 890 is screwed into the through hole 880 of the stay frame 800 to prevent the stay frame 800 from falling off from the mast 300 .

更に又、前記ステー枠800の外周部には、ステーブラケット320が取り付けられ、該ステーブラケット320に対して後述するステー700の上端ブラケット720が連結ピン710により連結されるようになっている。 Furthermore, a stay bracket 320 is attached to the outer peripheral portion of the stay frame 800 , and an upper end bracket 720 of a stay 700 to be described later is connected to the stay bracket 320 by a connecting pin 710 .

一方、前記ステー700の上下端部には、連結用の上端ブラケット720と下端ブラケット730とが設けられ、ステー700の軸線と直交する面における上端ブラケット720の取付角度と下端ブラケット730の取付角度は、図3に示す如く、90°位相をずらし、上に位置するステー700の下端ブラケット730に対して下に位置するステー700の上端ブラケット720が連結ピン710により連結され、ステー700の取り付け時における揺れを発生しにくくすることも可能となっている。 On the other hand, an upper end bracket 720 and a lower end bracket 730 for connection are provided at the upper and lower ends of the stay 700, and the mounting angle of the upper end bracket 720 and the mounting angle of the lower end bracket 730 in a plane perpendicular to the axis of the stay 700 are , the upper end bracket 720 of the lower stay 700 is connected by a connecting pin 710 to the lower end bracket 730 of the upper stay 700 with a 90° phase shift, as shown in FIG. It is also possible to make vibration less likely to occur.

又、前記ステー700は、マスト300の高さに応じて連結本数が選定されるようになっている。因みに、本実施例の場合、前記マスト300の連結本数は、図4に示す如く、四本となっているが、四本に限らず、一本でも四本以外の複数本であっても良いことは言うまでもない。尚、複数本連結された最下端に位置するステー700の下端ブラケット730は、図4(f)に示す如く、基礎架台200の上面に突設された基礎ブラケット210に連結ピン710により連結される。 The number of stays 700 connected is selected according to the height of the mast 300 . Incidentally, in the case of the present embodiment, the number of connecting masts 300 is four as shown in FIG. Needless to say. A lower end bracket 730 of the stay 700 located at the lowermost end of the plurality of connected stays 700 is connected to a base bracket 210 protruding from the upper surface of the base frame 200 by a connecting pin 710, as shown in FIG. 4(f). .

次に、上記実施例の作用を説明する。 Next, the operation of the above embodiment will be described.

クライミングクレーン100の組立時には、先ず、図4(a)に示す如く、ベース面Bに基礎架台200が設置され、該基礎架台200にマストブロック310が立設される。 When assembling the climbing crane 100, first, as shown in FIG.

続いて、前記マストブロック310に、図4(b)に示す如く、昇降ユニット400及びステー枠800がセットされる。前記ステー枠800は、前記昇降ユニット400に取り付けられた昇降ブラケット430に吊下ピン820を打ち込んで吊り下げられている。 Subsequently, the elevating unit 400 and the stay frame 800 are set on the mast block 310 as shown in FIG. 4(b). The stay frame 800 is suspended by driving a suspending pin 820 into an elevating bracket 430 attached to the elevating unit 400 .

この後、前記昇降ユニット400に、図4(c)に示す如く、旋回体500が取り付けられ、該旋回体500に、図4(d)に示す如く、ジブ600が取り付けられる。 After that, a revolving body 500 is attached to the lifting unit 400 as shown in FIG. 4(c), and a jib 600 is attached to the revolving body 500 as shown in FIG. 4(d).

前記ジブ600の取り付け後、図4(e)に示す如く、マストブロック310が複数本積み上げられる。 After the jib 600 is attached, a plurality of mast blocks 310 are stacked as shown in FIG. 4(e).

前記マストブロック310が複数本積み上げられると、前記昇降ユニット400はステー枠800と共にマストブロック310に沿って上昇を開始する。 When the mast blocks 310 are piled up, the elevating unit 400 starts to rise along the mast blocks 310 together with the stay frame 800 .

前記昇降ユニット400及びステー枠800が一段階目の所要高さまで上昇すると、ステー枠800のステーブラケット320に一段階目のステー700の上端ブラケット720が連結ピン710により連結され、一段階目のステー700がステー枠800から吊り下げられる。 When the elevating unit 400 and the stay frame 800 are raised to the required height of the first stage, the upper end bracket 720 of the first stage stay 700 is connected to the stay bracket 320 of the stay frame 800 by the connecting pin 710, and the first stage stay 700 are suspended from the stay frame 800 .

一段階目のステー700がステー枠800から吊り下げられた後、前記昇降ユニット400及びステー枠800は、マストブロック310に沿って上昇し、マストブロック310が上方へ継ぎ足され、継ぎ足されたマストブロック310に沿って昇降ユニット400及びステー枠800が更に上昇する。 After the stay 700 of the first stage is suspended from the stay frame 800, the elevating unit 400 and the stay frame 800 are lifted along the mast block 310, and the mast block 310 is spliced upward. The lifting unit 400 and the stay frame 800 are further lifted along 310 .

前記昇降ユニット400及びステー枠800が二段階目の所要高さまで上昇すると、一段階目のステー700の下端ブラケット730に二段階目のステー700の上端ブラケット720が連結ピン710により連結され、一段階目と二段階目のステー700がステー枠800から吊り下げられる。 When the elevating unit 400 and the stay frame 800 rise to the required height of the second stage, the upper end bracket 720 of the stay 700 of the second stage is connected to the lower end bracket 730 of the stay 700 of the first stage by the connecting pin 710, and the first stage The eye and the second stage stay 700 are suspended from the stay frame 800 .

以下、前述と同様の操作が繰り返され、図4の例では、前記昇降ユニット400及びステー枠800が四段階目の所要高さまで上昇し、この位置がステー700の上端を固定すべき高さである場合、図2に示す如く、シリンダ860が伸長し揺動リンク850を介してロックピン830がカンヌキ孔330に打ち込まれ、更に、前記ステー枠800を固定すべきマスト300の高さ位置におけるマストブロック310に固着されたガイド340に対しステー枠800の貫通孔880から固定金具890をねじ込み、ステー枠800がマストブロック310に固定される。 Thereafter, the same operation as described above is repeated, and in the example of FIG. 4, the elevating unit 400 and the stay frame 800 rise to the required height of the fourth step, and this position is the height at which the upper end of the stay 700 should be fixed. In some cases, as shown in FIG. 2, the cylinder 860 is extended, the lock pin 830 is driven into the bolt hole 330 via the swing link 850, and the stay frame 800 is fixed at the height position of the mast 300. The stay frame 800 is fixed to the mast block 310 by screwing the fixture 890 through the through hole 880 of the stay frame 800 into the guide 340 fixed to the block 310 .

同時に、三段階目のステー700の下端ブラケット730に四段階目のステー700の上端ブラケット720が連結ピン710により連結され、四段階目のステー700の下端ブラケット730が、図4(f)に示す如く、基礎ブラケット210に連結ピン710により連結される。これにより、ステー700の設置が完了する。 At the same time, the upper end bracket 720 of the fourth stage stay 700 is connected to the lower end bracket 730 of the third stage stay 700 by a connecting pin 710, and the lower end bracket 730 of the fourth stage stay 700 is shown in FIG. As shown, it is connected to the base bracket 210 by the connecting pin 710 . This completes the installation of the stay 700 .

前記ステー700の設置が完了すると、昇降ユニット400からステー枠800が切り離され、マストブロック310が上方へ継ぎ足され、継ぎ足されたマストブロック310に沿って昇降ユニット400だけが更に上昇し、図4(g)に示す如く、マスト300がステー700に補強されてその撓みが抑えられ、この状態でクライミングクレーン100による作業が行われる。 When the installation of the stay 700 is completed, the stay frame 800 is separated from the lifting unit 400, the mast block 310 is spliced upward, and only the lifting unit 400 is further lifted along the spliced mast block 310, as shown in FIG. As shown in g), the mast 300 is reinforced by the stay 700 to suppress its deflection, and the climbing crane 100 performs work in this state.

前記クライミングクレーン100による作業が完了すると、前述と逆の手順でクライミングクレーン100の解体作業が行われる。 When the work by the climbing crane 100 is completed, the dismantling work of the climbing crane 100 is performed in the reverse order of the above.

本実施例においては、従来のように、マストブロック310の側面からステーブラケット320が突設されていないので、クライミングクレーン100の組立時、昇降ユニット400及び旋回体500を最下部のマストブロック310に組付けても、昇降ユニット400がステーブラケット320と干渉せずに上昇していくことが可能となる。 In this embodiment, the stay bracket 320 does not protrude from the side surface of the mast block 310 as in the conventional art. Even when assembled, the lift unit 400 can be lifted without interfering with the stay bracket 320 .

このため、クライミングクレーン100の組立時は勿論のこと、解体時も高所作業を行わなくて済む。 Therefore, it is not necessary to perform high-place work not only when assembling the climbing crane 100 but also when dismantling it.

しかも、前記ステー700の上端は、低所でステー枠800に予め連結した状態で引き上げられ、ステー700の下端に順次ステー700を低所で継ぎ足していくことが可能となる。 Moreover, the upper end of the stay 700 can be pulled up while being pre-connected to the stay frame 800 at a lower position, and the stay 700 can be successively added to the lower end of the stay 700 at a lower position.

又、前記カンヌキ孔330はマストブロック310の長手方向に所要ピッチで穿設されており、前記ステー枠800の固定位置は可変となるため、ステー700の高さ調節を行うことも可能となる。 Also, the bolt holes 330 are bored in the longitudinal direction of the mast block 310 at a required pitch, and the fixing position of the stay frame 800 is variable, so that the height of the stay 700 can be adjusted.

こうして、組立・解体時における高所作業を回避し得且つステー700の高さ調節の自由度を高め得る。 In this way, it is possible to avoid high-place work during assembly and disassembly, and increase the degree of freedom in adjusting the height of the stay 700 .

そして、本実施例の場合、前記ステー枠800は、該ステー枠800に取り付けられた吊下ブラケット810と前記昇降ユニット400に取り付けられた昇降ブラケット430との間に吊下ピン820を打ち込んで吊り下げられるようになっている。このように構成すると、昇降ユニット400の昇降と連動してステー枠800をマスト300の所要高さ位置に設置したり、取り外したりすることを容易に行うことができる。 In the case of this embodiment, the stay frame 800 is suspended by driving a suspension pin 820 between a suspension bracket 810 attached to the stay frame 800 and an elevation bracket 430 attached to the elevation unit 400. It is designed to be lowered. With this configuration, the stay frame 800 can be easily installed at the required height position of the mast 300 and removed in conjunction with the elevation of the elevation unit 400 .

又、前記ステー枠800は、前記マストブロック310に穿設されたカンヌキ孔330にロックピン830を打ち込んでマスト300に固定されるようになっている。このように構成すると、ステー枠800を固定するための受具等をマストブロック310に新たに設ける必要がなく、昇降ユニット400を昇降させるためにマストブロック310に穿設されたカンヌキ孔330を有効活用することができる。 The stay frame 800 is fixed to the mast 300 by driving a lock pin 830 into a bolt hole 330 drilled in the mast block 310 . With this configuration, there is no need to newly provide a receiving tool or the like for fixing the stay frame 800 to the mast block 310, and the bolt holes 330 drilled in the mast block 310 for lifting the lifting unit 400 can be effectively used. can be utilized.

更に又、前記ステー700は、マスト300の高さに応じて連結本数が選定されるようになっている。このように構成すると、クライミングクレーン100によって建造される構造物の規模に合わせてマスト300の補強を過不足なく行うことができる。 Furthermore, the number of stays 700 connected is selected according to the height of the mast 300 . With this configuration, the mast 300 can be properly reinforced according to the scale of the structure constructed by the climbing crane 100 .

尚、本発明のクライミングクレーンのマストステー装置は、上述の実施例にのみ限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。 It should be noted that the climbing crane mast stay device of the present invention is not limited to the above-described embodiment, and of course various modifications can be made without departing from the gist of the present invention.

100 クライミングクレーン
200 基礎架台
210 基礎ブラケット
300 マスト
310 マストブロック
320 ステーブラケット
330 カンヌキ孔
340 ガイド
400 昇降ユニット
410 ガイドマスト
420 昇降フレーム
430 昇降ブラケット
500 旋回体
600 ジブ
700 ステー
710 連結ピン
720 上端ブラケット
730 下端ブラケット
800 ステー枠
810 吊下ブラケット
820 吊下ピン
830 ロックピン
831 基端突片
840 格納孔
850 揺動リンク
860 シリンダ
870 フレーム
880 貫通孔
890 固定金具
B ベース面
100 climbing crane 200 foundation frame 210 foundation bracket 300 mast 310 mast block 320 stay bracket 330 bolt hole 340 guide 400 lifting unit 410 guide mast 420 lifting frame 430 lifting bracket 500 rotating body 600 jib 700 stay 710 connecting pin 720 upper end bracket 730 lower end bracket 800 Stay frame 810 Hanging bracket 820 Hanging pin 830 Lock pin 831 Base end projecting piece 840 Storage hole 850 Swing link 860 Cylinder 870 Frame 880 Through hole 890 Fixing bracket B Base surface

Claims (4)

ベース面に設置される基礎架台と、該基礎架台の上にマストブロックを順次積み上げて立設されるマストと、該マストに沿って昇降自在な昇降ユニットと、該昇降ユニットの上端に旋回自在に配設され且つジブが起伏自在に設けられる旋回体と、前記マストを補強するステーとを備えたクライミングクレーンのマストステー装置において、
前記昇降ユニットに着脱自在に設けられ且つ前記マストに固定されるステー枠を備え、
前記ステーは、前記ステー枠と基礎架台との間に掛け渡されるクライミングクレーンのマストステー装置。
A foundation frame installed on the base surface, a mast erected by sequentially stacking mast blocks on the foundation frame, an elevating unit that can ascend and descend along the mast, and a rotatable upper end of the elevating unit. A mast stay device for a climbing crane, comprising: a revolving body provided with a jib that can be raised and lowered; and a stay that reinforces the mast,
A stay frame that is detachably provided on the lifting unit and fixed to the mast,
The stay is a mast stay device of a climbing crane that is stretched between the stay frame and the foundation frame.
前記ステー枠は、該ステー枠に取り付けられた吊下ブラケットと前記昇降ユニットに取り付けられた昇降ブラケットとの間に吊下ピンを打ち込んで吊り下げられる請求項1記載のクライミングクレーンのマストステー装置。 2. A mast stay device for a climbing crane according to claim 1, wherein said stay frame is suspended by driving a suspension pin between a suspension bracket attached to said stay frame and a lifting bracket attached to said lifting unit. 前記ステー枠は、前記マストブロックに穿設されたカンヌキ孔にロックピンを打ち込んでマストに固定される請求項1又は2記載のクライミングクレーンのマストステー装置。 The mast stay device for a climbing crane according to claim 1 or 2, wherein the stay frame is fixed to the mast by driving a lock pin into a bolt hole drilled in the mast block. 前記ステーは、マストの高さに応じて連結本数が選定される請求項1~3の何れか一項に記載のクライミングクレーンのマストステー装置。 The mast stay device for a climbing crane according to any one of claims 1 to 3, wherein the number of stays connected is selected according to the height of the mast.
JP2021165202A 2021-10-07 2021-10-07 Mast stay device of climbing crane Pending JP2023056096A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021165202A JP2023056096A (en) 2021-10-07 2021-10-07 Mast stay device of climbing crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021165202A JP2023056096A (en) 2021-10-07 2021-10-07 Mast stay device of climbing crane

Publications (1)

Publication Number Publication Date
JP2023056096A true JP2023056096A (en) 2023-04-19

Family

ID=86004528

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021165202A Pending JP2023056096A (en) 2021-10-07 2021-10-07 Mast stay device of climbing crane

Country Status (1)

Country Link
JP (1) JP2023056096A (en)

Similar Documents

Publication Publication Date Title
KR101110837B1 (en) Turnover method of use turn over jig
EP2189575B1 (en) Jack-up offshore platform and a method thereof
JP2023056096A (en) Mast stay device of climbing crane
JP4982066B2 (en) Method of adjusting tilt of hanging jig and suspended body
JP2012254836A (en) Mast support structure of tower crane and support method of tower crane
EP2857615A1 (en) Mounting method and mounting device of a concrete tower formed with precast pieces
JP2018150089A (en) Operation method of tower crane
JP7266460B2 (en) Temporary gantry for foundation frame of climbing crane
CN111088799A (en) Foundation pit steel support and mounting method thereof
JP3905103B2 (en) Tower-like building erection method and erection device
JPH10205429A (en) Construction method for wind power generator
JPH10205430A (en) Construction method for wind power generator
CN209493242U (en) A kind of parallel crane of both arms
JP4914130B2 (en) Climbing crane
CN103539023B (en) The mounting structure of equilibrium arm and pull bar and tower head, installation method and tower crane
JP2000247568A (en) Suspending jig, standing jig and angle regulating jig
CN110552542A (en) Construction method of conical building structure
KR100427751B1 (en) An installation beam of tower-crane for an outer wall
JP4669692B2 (en) Climbing type jib crane
JP2009286531A (en) Dismantling method of tower crane
CN110117956A (en) A kind of rotary digging pile driving construction device and rotary digging pile construction method
JP2007182270A (en) Sling for elevator hoist unit
JP6545965B2 (en) Climbing crane
CN220376146U (en) Simple lifting device
JP2000145126A (en) Demolishing unit for tower body and its demolishing method