JP2005524913A5 - - Google Patents

Download PDF

Info

Publication number
JP2005524913A5
JP2005524913A5 JP2004504167A JP2004504167A JP2005524913A5 JP 2005524913 A5 JP2005524913 A5 JP 2005524913A5 JP 2004504167 A JP2004504167 A JP 2004504167A JP 2004504167 A JP2004504167 A JP 2004504167A JP 2005524913 A5 JP2005524913 A5 JP 2005524913A5
Authority
JP
Japan
Prior art keywords
factor
time interval
return
asset
rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004504167A
Other languages
English (en)
Japanese (ja)
Other versions
JP2005524913A (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/US2003/015325 external-priority patent/WO2003096254A1/en
Publication of JP2005524913A publication Critical patent/JP2005524913A/ja
Publication of JP2005524913A5 publication Critical patent/JP2005524913A5/ja
Pending legal-status Critical Current

Links

JP2004504167A 2002-05-07 2003-05-07 財務における動的多因子モデルを解くための方法およびシステム Pending JP2005524913A (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US37856202P 2002-05-07 2002-05-07
PCT/US2003/015325 WO2003096254A1 (en) 2002-05-07 2003-05-07 A method and system to solve dynamic multi-factor models in finance

Publications (2)

Publication Number Publication Date
JP2005524913A JP2005524913A (ja) 2005-08-18
JP2005524913A5 true JP2005524913A5 (enExample) 2006-06-15

Family

ID=29420416

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004504167A Pending JP2005524913A (ja) 2002-05-07 2003-05-07 財務における動的多因子モデルを解くための方法およびシステム

Country Status (6)

Country Link
US (5) US7617142B2 (enExample)
EP (1) EP1508109A4 (enExample)
JP (1) JP2005524913A (enExample)
AU (1) AU2003230405A1 (enExample)
CA (1) CA2484649A1 (enExample)
WO (1) WO2003096254A1 (enExample)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7580876B1 (en) * 2000-07-13 2009-08-25 C4Cast.Com, Inc. Sensitivity/elasticity-based asset evaluation and screening
US20040236673A1 (en) 2000-10-17 2004-11-25 Eder Jeff Scott Collaborative risk transfer system
US20080027769A1 (en) 2002-09-09 2008-01-31 Jeff Scott Eder Knowledge based performance management system
US8812388B2 (en) * 2003-02-25 2014-08-19 Fiserv Investment Solutions, Inc. Systems and methods for multi-style portfolio (MSP) cash flow enhancement
US7809624B1 (en) * 2003-02-25 2010-10-05 Checkfree Corporation Drift determination in multi-style managed client investment account
US7822660B1 (en) * 2003-03-07 2010-10-26 Mantas, Inc. Method and system for the protection of broker and investor relationships, accounts and transactions
US7580852B2 (en) * 2004-04-15 2009-08-25 Sap Ag System and method for modeling non-stationary time series using a non-parametric demand profile
US20090043637A1 (en) * 2004-06-01 2009-02-12 Eder Jeffrey Scott Extended value and risk management system
WO2005119475A2 (en) * 2004-06-04 2005-12-15 Khimetrics, Inc. Attribute modeler
US8713025B2 (en) 2005-03-31 2014-04-29 Square Halt Solutions, Limited Liability Company Complete context search system
CA2618577A1 (en) * 2005-08-10 2007-02-15 Axcessnet Innovations Llc Networked loan market and lending management system
US20070050288A1 (en) * 2005-08-31 2007-03-01 General Electric Company System and method for integrating risk and marketing objectives for making credit offers
US7827046B2 (en) * 2005-11-22 2010-11-02 Plymouth Rock Assurance Corporation Premium transition factor
US8498915B2 (en) 2006-04-02 2013-07-30 Asset Reliance, Inc. Data processing framework for financial services
US20090063363A1 (en) * 2006-09-21 2009-03-05 F-Squared Investments, Llc Systems and methods for constructing exchange traded funds and other investment vehicles
US8255316B2 (en) * 2007-12-21 2012-08-28 General Electric Company Integrated business decision-making system and method
US20090281958A1 (en) * 2008-05-07 2009-11-12 Business Logic Corporation Benchmark and evaluation of reference-date dependent investments
US9147206B2 (en) * 2009-08-31 2015-09-29 Accenture Global Services Limited Model optimization system using variable scoring
US20110087616A1 (en) * 2009-10-09 2011-04-14 International Business Machines Corporation System and method for creating a graphical representation of portfolio risk
GB201000091D0 (en) * 2010-01-05 2010-02-17 Mura Michael E Numerical Modelling Apparatus for Pricing,Trading and Risk Assessment
US20110167034A1 (en) * 2010-01-05 2011-07-07 Hewlett-Packard Development Company, L.P. System and method for metric based allocation of costs
GB201000089D0 (en) * 2010-01-05 2010-02-17 Mura Michael E Numerical modelling apparatus
US8712738B2 (en) * 2010-04-30 2014-04-29 International Business Machines Corporation Determining ill conditioning in square linear system of equations
US8606681B2 (en) * 2011-03-04 2013-12-10 Ultratick, Inc. Predicting the performance of a financial instrument
US10157419B1 (en) * 2012-02-10 2018-12-18 Fmr Llc Multi-factor risk modeling platform
US20140108295A1 (en) * 2012-10-11 2014-04-17 Axioma, Inc. Methods and Apparatus for Generating Purified Minimum Risk Portfolios
DE202013004851U1 (de) 2013-05-27 2013-09-03 Labetherm Ltd. Tiegeldeckel mit Sensoren und Tiegelverschluss
CN109284320B (zh) * 2018-08-15 2021-10-26 上海派拉软件股份有限公司 大数据平台上的自动回归诊断方法
CN109635330B (zh) * 2018-11-08 2024-01-19 杭州电子科技大学 一种基于直接法的复杂优化控制问题准确和快速求解方法
US11403541B2 (en) * 2019-02-14 2022-08-02 Rockwell Automation Technologies, Inc. AI extensions and intelligent model validation for an industrial digital twin
KR102862042B1 (ko) 2019-12-02 2025-09-19 삼성전자주식회사 배터리 상태 추정 방법 및 장치
US20210304310A1 (en) * 2020-03-27 2021-09-30 Markov Processes International Inc. System and method for estimating multifactor models of illiquid, stale and noisy financial and economic data
CN111681113B (zh) * 2020-05-29 2023-07-18 泰康保险集团股份有限公司 一种基金产品对象配置的系统和服务器
US20210390618A1 (en) * 2020-06-16 2021-12-16 The Financial Risk Group Inc. Financial Risk Assessment
CN113190682B (zh) * 2021-06-30 2021-09-28 平安科技(深圳)有限公司 基于树模型的事件影响度获取方法、装置及计算机设备

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5148365A (en) 1989-08-15 1992-09-15 Dembo Ron S Scenario optimization
US6321205B1 (en) 1995-10-03 2001-11-20 Value Miner, Inc. Method of and system for modeling and analyzing business improvement programs
US6061662A (en) 1997-08-15 2000-05-09 Options Technology Company, Inc. Simulation method and system for the valuation of derivative financial instruments
US6278981B1 (en) * 1997-05-29 2001-08-21 Algorithmics International Corporation Computer-implemented method and apparatus for portfolio compression
US6536935B2 (en) 1997-07-23 2003-03-25 Atarum Institute Computerized system for market-based constraint optimization
US5918217A (en) 1997-12-10 1999-06-29 Financial Engines, Inc. User interface for a financial advisory system
US6292787B1 (en) * 1998-09-11 2001-09-18 Financial Engines, Inc. Enhancing utility and diversifying model risk in a portfolio optimization framework
US6546375B1 (en) 1999-09-21 2003-04-08 Johns Hopkins University Apparatus and method of pricing financial derivatives
US6349291B1 (en) 2000-01-21 2002-02-19 Attractor Holdings Llc Method and system for analysis, display and dissemination of financial information using resampled statistical methods
US6456375B1 (en) * 2001-02-20 2002-09-24 Honeywell International Inc. Focused laser light turbidity sensor apparatus and method for measuring very low concentrations of particles in fluids

Similar Documents

Publication Publication Date Title
JP2005524913A5 (enExample)
JP6992526B2 (ja) 需要予測プログラム、需要予測方法および需要予測装置
JP4678943B2 (ja) 新製品の初期投入量予測方法、新製品の初期投入量予測装置及び記録媒体
Sun et al. A spatio-temporal autoregressive model for multi-unit residential market analysis
JP4405520B2 (ja) プロジェクトの進行スケジュールを調整するためのコンピュータプログラム、コンピュータ装置及び方法
US9286573B2 (en) Cost-aware non-stationary online learning
JP6919705B2 (ja) 劣化予測装置、劣化予測方法、及びプログラム
CN110942086A (zh) 数据预测优化方法、装置、设备及可读存储介质
US20170061484A1 (en) Method for determining next purchase interval for customer and system thereof
JP2008226179A (ja) 業務プロセス推定プログラム、業務プロセス推定方法および業務プロセス推定装置
JPWO2008111349A1 (ja) 生存分析システム、生存分析方法および生存分析用プログラム
WO2021140698A1 (ja) 情報処理装置、方法及びプログラム
JP2010061456A (ja) 購入予測方法、購入予測装置、購入予測プログラム、および、記録媒体
JP7696287B2 (ja) 販売数量予測システム、販売数量予測方法
CN110956675A (zh) 技术成熟度曲线自动生成方法及装置
Kosmidis et al. Linking the performance of endurance runners to training and physiological effects via multi-resolution elastic net
Jank et al. Dynamic, real-time forecasting of online auctions via functional models
JPWO2020075255A1 (ja) 学習装置、学習方法、及びプログラム
JP2004110300A (ja) データ予測方法、データ予測装置、コンピュータプログラム、及び記録媒体
Baughman et al. Measuring, quantifying, and predicting the cost-accuracy tradeoff
JP2008186285A (ja) 地震被害予測装置、地震被害予測方法及び地震被害予測プログラム
JP2004354119A (ja) 構造物の損傷確率評価装置及び評価方法
Zhang et al. Forecast of International Tourist Arrivals Based on ARIMA Model
CN112242959A (zh) 微服务限流控制方法、装置、设备及计算机存储介质
JP2005242580A (ja) パラメータ推定方法、データ予測方法、パラメータ推定装置、データ予測装置、及びコンピュータプログラム