JP2005127036A - Standard frame for scaffolding - Google Patents

Standard frame for scaffolding Download PDF

Info

Publication number
JP2005127036A
JP2005127036A JP2003364414A JP2003364414A JP2005127036A JP 2005127036 A JP2005127036 A JP 2005127036A JP 2003364414 A JP2003364414 A JP 2003364414A JP 2003364414 A JP2003364414 A JP 2003364414A JP 2005127036 A JP2005127036 A JP 2005127036A
Authority
JP
Japan
Prior art keywords
frame
lock
fitting
building
handrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003364414A
Other languages
Japanese (ja)
Other versions
JP4098213B2 (en
Inventor
Junji Inamori
純二 稲森
Shinji Yoshida
信二 吉田
Hiroyuki Yokoyama
博之 横山
Junichi Ujiie
純一 氏家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Metal Steel Products Inc
Original Assignee
Sumitomo Metal Steel Products Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Steel Products Inc filed Critical Sumitomo Metal Steel Products Inc
Priority to JP2003364414A priority Critical patent/JP4098213B2/en
Publication of JP2005127036A publication Critical patent/JP2005127036A/en
Application granted granted Critical
Publication of JP4098213B2 publication Critical patent/JP4098213B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a standard frame reducing labor of release of lock metal fittings by half when a handrail frame is removed from the standard frame for a scaffolding used at a construction site or the like. <P>SOLUTION: The standard frame for the scaffolding constituted by providing a plurality of lock metal fittings for mounting the handrail or bracings is so formed that one of the lock metal fittings making a pair to vertical columns 51 and 52 forming the standard frame is used for a movable lock metal fitting 24 and that the other is used for a fixed lock metal fitting 23. For the standard frames, a shrine-entrance type standard frame and an H-frame are typical ones. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、建築現場等に使用する足場用建枠に関する。   The present invention relates to a scaffolding frame used in a construction site or the like.

建築現場等で用いられる枠組足場は、通常、横桟と縦柱から構成される鳥居形状やH形状の建枠を複数個組み立てることによって形成される。   A framework scaffold used at a construction site or the like is usually formed by assembling a plurality of torii-shaped or H-shaped building frames composed of horizontal rails and vertical columns.

建枠の複数個を所定の間隔で建物とは直角に立設し、建枠に筋違(すじかい)を取り付け固定して複数個の建枠を自立させた後、手摺枠を取り付け固定し、さらに建枠の横桟の上に足場板(布板)を架け渡すことで、1単位の足場を形成する。次に、既に立設した建枠の上に、別途用意された建枠を載置し、この建枠にも別途用意された筋違と手摺枠を取り付け固定した後、新たに形成された自立した建枠の横桟の上に別途用意した足場板を架け渡すことによって一つ上の段の足場を形成する。建枠の上に別の建枠を載置するには、通常、建枠を構成する縦柱の上に、別の建枠の縦柱を継ぎ足すようにして載置する。これを順次繰り返すことによって、全体の枠組み足場を形成する。   After standing a plurality of building frames at right angles to the building at a predetermined interval, attaching and fixing a streak to the building frame to make the building frames self-supporting, then attaching and fixing the handrail frame In addition, a scaffolding board (cloth board) is laid on the horizontal rail of the building frame to form one unit of scaffolding. Next, after placing a separately prepared building frame on the already erected building frame and attaching and fixing the separately prepared strut and handrail frame to this building frame, the newly formed self-standing The scaffolding of the upper level is formed by suspending a separately prepared scaffolding plate on the horizontal frame of the building frame. In order to place another building frame on the building frame, the building column is usually placed by adding the vertical column of another building frame on the vertical column constituting the building frame. By repeating this sequentially, the entire framework scaffolding is formed.

建枠には筋違及び手摺枠を取り付けるためのロック金具の複数がその縦柱に設けられている。枠組足場を下から組み上げる場合、順次、建枠の縦柱に設けられたロック金具に筋違及び手摺枠を取り付けられて、1単位の足場ごとに、建枠に筋違及び手摺枠が固定される。   The building frame is provided with a plurality of lock metal fittings for attaching the struts and the handrail frame on the vertical column. When assembling the frame scaffolding from below, the struts and handrail frames are attached to the lock brackets provided on the vertical pillars of the building frame, and the struts and handrail frames are fixed to the building frame for each unit of scaffold. The

逆の作業で、枠組足場を順次上から解体する際にも、最上段の足場の建枠の縦柱にロック金具によって固定された筋違及び手摺枠のロックを外して、筋違及び手摺枠を最上段の建枠から取り外してから、最上段の建枠を取り外すことになる。そして、同様に、一つ下の足場についても、順次、1単位の足場ごとに、建枠に固定された筋違及び手摺枠のロックを外して、取り付けられた筋違及び手摺枠を建枠から取り外していくことになる。   Even when the frame scaffolding is disassembled sequentially from the top in the reverse operation, the struts and handrail frames are unlocked by unlocking the struts and handrail frames that are fixed to the vertical pillars of the building frame of the uppermost scaffold by lock metal fittings. Is removed from the uppermost building frame, and then the uppermost building frame is removed. Similarly, also for the lower scaffold, for each unit of the scaffold, the misalignment fixed on the building frame and the handrail frame are unlocked, and the attached misalignment and handrail frame are installed in the building frame. It will be removed from.

建枠の例としては、鳥居型建枠とH枠が代表的である。以下に、それぞれ、建枠を1段当たり3個用いたときを想定して、足場を組み立てる手順を説明する。   Representative examples of the building frame are the torii type building frame and the H frame. The procedure for assembling the scaffolding will be described below assuming that three building frames are used per stage.

鳥居型建枠は上部に横桟を有する鳥居形状の建枠であり、この鳥居型建枠を用いて、枠組足場を形成する一例を図12に示す。(a)が正面図、(b)が右側面図である。地面の上に敷板90を敷いて、1段目の鳥居型建枠31の3個を建物とは直角に等間隔に立設し、建物側に筋違8を建枠の建物側の縦柱51に設置された2つのロック金具11に取り付けて固定することによって、1段目の鳥居型建枠31が自立する。そして道路側に手摺枠(図示せず)を建枠の道路側の縦柱52に設置された2つのロック金具12に取り付けて固定した後、1段目の鳥居型建枠31の上部横桟6の上に1段目の足場板91を架け渡して1段目の足場を形成する。次に、別途に3個の鳥居型建枠を用意し、既に立設した1段目の鳥居型建枠の縦柱51,52の上に、新たに2段目の鳥居型建枠32の縦柱51,52を載置したのち固定し、建物側に筋違8を建枠の建物側の縦柱51に設置された2つのロック金具11に取り付けて固定することによって、2段目の鳥居型建枠32が自立する。そして道路側に手摺枠(図示せず)を建枠の道路側の縦柱52に設置された2つのロック金具12に取り付けて固定した後、この2段目の鳥居型建枠32の上部横桟6の上に2段目の足場板92を架け渡して2段目の足場を形成する。   The torii type building frame is a torii-shaped building frame having a horizontal rail at the top, and an example of forming a frame scaffold using this torii type building frame is shown in FIG. (a) is a front view, (b) is a right side view. Laying the floor plate 90 on the ground, standing up the three torii-type building frames 31 of the first step at right angles to the building at equal intervals, and creating a streak 8 on the building side of the building side vertical column By attaching and fixing to the two lock fittings 11 installed in 51, the first-stage torii type building frame 31 is self-supporting. And after attaching a handrail frame (not shown) on the road side to the two lock fittings 12 installed on the vertical pillar 52 on the road side of the building frame, the upper side rail of the first stage torii type building frame 31 A first-stage scaffolding plate 91 is bridged over 6 to form a first-stage scaffolding. Next, three torii type building frames are prepared separately, and the second torii type building frame 32 is newly placed on the vertical columns 51 and 52 of the first torii type building frame already erected. After the vertical columns 51 and 52 are placed and fixed, the streak 8 on the building side is attached and fixed to the two lock fittings 11 installed on the vertical column 51 on the building side of the building frame. The torii type building frame 32 is self-supporting. Then, after attaching a handrail frame (not shown) to the two lock fittings 12 installed on the vertical column 52 on the road side of the building frame on the road side, the upper side of the second stage torii type building frame 32 is fixed. A second-stage scaffolding plate 92 is formed on the crosspiece 6 to form a second-stage scaffolding.

H枠は中間部に横桟を有するH型形状の建枠であり、このH枠を用いて、枠組足場を形成する一例を図13に示す。(a)が正面図、(b)が背面図、そして(c)が右側面図である。地面の上に敷板90を敷いて、3個の最下段の建枠40を建物とは直角に等間隔に立設するが、この場合の最下段の建枠40は、H枠ではなく、H枠の半分の高さの建枠を用いる。建物側にH枠の半分の高さの筋違兼手摺枠81を建枠の建物側の縦柱51に設置された2つのロック金具11に取り付けて固定することによって、最下段の建枠40を自立させる。そして道路側にH枠の半分の高さの手摺枠82を建枠の道路側の縦柱52に設置された2つのロック金具12に取り付けて固定して後、最下段の建枠40の下部横桟10の上に1段目の足場板91を架け渡して最下段の足場を形成する。   The H frame is an H-shaped building frame having a horizontal rail in the middle part, and an example of forming a frame scaffold using this H frame is shown in FIG. (a) is a front view, (b) is a rear view, and (c) is a right side view. A floor plate 90 is laid on the ground, and the three bottom building frames 40 are erected at equal intervals at right angles to the building. In this case, the bottom building frame 40 is not an H frame but an H frame. Use a building frame that is half the height of the frame. The lowermost building frame 40 is attached and fixed to the two lock fittings 11 installed on the vertical column 51 on the building side of the building frame on the building side by attaching a half-height and handrail frame 81 that is half the height of the H frame. Make them independent. A handrail frame 82, which is half the height of the H frame, is attached to and secured to the two lock fittings 12 installed on the vertical column 52 on the road side of the building frame, and then the lower part of the lowermost building frame 40 A first-stage scaffolding plate 91 is bridged on the horizontal rail 10 to form the lowest-stage scaffolding.

次に、3個のH枠41を用意し、既に立設した最下段の建枠(H枠の半分の高さの建枠)40の縦柱51,52の上に、H枠41の縦柱51,52を載置したのち固定して、1段目のH枠41を立設する。建物側にH枠の半分の高さの筋違兼手摺枠81をH枠の建物側の縦柱51の上半分に設置された2つのロック金具11に取り付けて固定することによって、1段目のH枠41を自立させる。そして道路側にはH枠の半分の高さの手摺枠82をH枠41の道路側の縦柱52の下半分に設置された2つのロック金具12に取り付け、さらに、道路側にはH枠の半分の高さの手摺枠82をH枠41の道路側の縦柱52の上半分に設置された2つのロック金具12に取り付ける。そして、1段目のH枠41の中間部横桟7の上に2段目の足場板92を架け渡して2段目の足場を形成する。   Next, three H frames 41 are prepared, and the vertical position of the H frame 41 is placed on the vertical columns 51 and 52 of the lowermost building frame (a building frame having a half height of the H frame) 40 that has already been erected. After the columns 51 and 52 are placed and fixed, the first-stage H frame 41 is erected. By attaching and fixing a half-height staggered handrail frame 81 on the building side to the two lock fittings 11 installed in the upper half of the vertical column 51 on the building side of the H frame, the first step The H frame 41 is made independent. On the road side, a handrail frame 82 that is half the height of the H frame is attached to the two lock fittings 12 installed in the lower half of the vertical column 52 on the road side of the H frame 41. Is attached to two lock fittings 12 installed in the upper half of the vertical column 52 on the road side of the H frame 41. Then, a second-stage scaffolding plate 92 is formed on the intermediate crosspiece 7 of the first-stage H frame 41 to form a second-stage scaffolding.

次に、別途に3個のH枠42を用意し、既に立設した1段目のH枠41の縦柱の上に、新たなH枠42の縦柱51,52を載置したのち固定して、2段目のH枠42を立設する。建物側にH枠の半分の高さの筋違兼手摺枠81をH枠の建物側の縦柱51の上半分に設置された2つのロック金具11に取り付けて固定することによって、2段目のH枠42を自立させる。そして道路側にはH枠の半分の高さの手摺枠82をH枠42の道路側の縦柱52の下半分に設置された2つのロック金具12に取り付け、さらに、道路側にはH枠の半分の高さの手摺枠82をH枠42の道路側の縦柱52の上半分に設置された2つのロック金具12に取り付ける。そして、2段目のH枠42の中間部横桟7の上に3段目の足場板93を架け渡して3段目の足場を形成する。   Next, three H frames 42 are separately prepared, and the vertical pillars 51 and 52 of the new H frame 42 are placed on the vertical pillars of the first-stage H frame 41 and fixed. Then, the second stage H frame 42 is erected. By attaching and fixing the half-height staggered and handrail frame 81 on the building side to the two lock fittings 11 installed in the upper half of the vertical column 51 on the building side of the H frame, the second stage The H frame 42 is made independent. On the road side, a handrail frame 82, which is half the height of the H frame, is attached to two lock fittings 12 installed in the lower half of the vertical column 52 on the road side of the H frame 42. Is attached to two lock fittings 12 installed in the upper half of the vertical column 52 on the road side of the H frame 42. Then, a third-stage scaffolding plate 93 is bridged on the intermediate crosspiece 7 of the second-stage H frame 42 to form a third-stage scaffolding.

このように、建枠には建物側に筋違又は手摺枠が、道路側に手摺枠が、それぞれ取り付けられ、固定される。   In this way, the building frame is attached and fixed to the building side with a striation or a handrail frame and to the road side.

筋違の先端は孔(取付孔)が開いており、その取付孔が建枠のロック金具に嵌め込まれてから、ロック金具の爪金具を作動させて固定される。また、手摺枠には、その枠の上段と下段に、先端に孔(取付孔)の開いた固定用金具が複数取り付けられ、その取付孔が建枠のロック金具に嵌め込まれてから、ロック金具の爪金具を作動させて固定される。なお、ロック金具には、先端に取付孔が開いた筋違又は手摺枠の固定用金具を少なくとも2枚嵌め込むことができるだけの長さを有する。   A hole (attachment hole) is opened at the tip of the streak, and after the attachment hole is fitted into the lock fitting of the building frame, the lock fitting of the lock fitting is operated and fixed. In addition, a plurality of fixing brackets with holes (mounting holes) at the tip are attached to the upper and lower stages of the handrail frame, and the mounting holes are fitted into the lock brackets of the building frame. It is fixed by operating the nail bracket. Note that the lock metal fitting has a length that allows fitting of at least two fixing brackets having a mounting hole at the tip or a handrail frame.

ロック金具の爪金具の作動は、手動で行われるものもあれば、自動的に行われるものもある。自動的に行われるものとしては、バネ式や重力落下式のものがある。図14に、ロック金具1に組み込まれた爪金具13の例を示す。(a)がバネ式、(b)が重力落下式である。バネ式の爪金具13には、バネ17が内蔵されている。いずれも、取付孔を差し込むと爪金具13が作動する。すなわち、爪金具13が矢印方向に移動してロックされる。   The operation of the locking metal claws may be performed manually or may be performed automatically. There are a spring type and a gravity drop type that are automatically performed. FIG. 14 shows an example of the claw metal fitting 13 incorporated in the lock metal fitting 1. (a) is a spring type, and (b) is a gravity drop type. A spring 17 is incorporated in the spring-type claw fitting 13. In either case, when the attachment hole is inserted, the claw fitting 13 operates. That is, the claw fitting 13 moves in the direction of the arrow and is locked.

図15にロック金具1に組み込まれたバネ式の爪金具13が作動する状態を示す。(a)がロック金具1の側面図、(b)が正面図である。ロック金具1に筋違又は手摺枠の取付孔14を差し込むと、外側に出ている爪金具13がロック金具1の内部に収納された後、内蔵されたバネの力で外側に出てくる。これが、爪金具13が作動した状態であり、外力によって爪金具13をロック金具1の内部に収納しないかぎり、取付孔14に矢印方向に力がかかっても取付孔14はロック金具1から外れないので、筋違又は手摺枠は建枠に固定されたままとなる。   FIG. 15 shows a state in which the spring-type claw fitting 13 incorporated in the lock fitting 1 operates. (a) is a side view of the lock fitting 1, and (b) is a front view. When the strut or the attachment hole 14 of the handrail frame is inserted into the lock fitting 1, the claw fitting 13 protruding outside is housed inside the lock fitting 1 and then comes out to the outside by the force of the built-in spring. This is a state in which the claw fitting 13 is activated, and the attachment hole 14 does not come off the lock fitting 1 even if a force is applied to the attachment hole 14 in the direction of the arrow unless the claw fitting 13 is housed inside the lock fitting 1 by an external force. Therefore, the striation or the handrail frame remains fixed to the building frame.

このロック金具は、1つの建枠に複数個設けられている。1つの建枠に必要なロック金具の個数は、隣り合う2つの建枠の間に設ける筋違や手摺枠の形状と個数によって異なる。   A plurality of the lock fittings are provided on one building frame. The number of lock fittings required for one building frame differs depending on the striation provided between two adjacent building frames and the shape and number of handrail frames.

図16に、種々の筋違や手摺枠の例を挙げる。(a)は隣り合う建枠の間にX状の筋違をに取り付けた例である。(b)は隣り合う建枠の間に三角形状の筋違兼手摺枠を1個取り付けた例である。(c)は隣り合う建枠の間に1本の斜材からなる筋違を取り付けた例である。そして、(d)は隣り合う建枠の間に手摺枠を1個取り付けた例である。いずれも、筋違又は手摺枠を建枠の縦柱に設けられたロック金具に嵌め込むための取付孔14を複数個有している。   FIG. 16 shows examples of various lines and handrail frames. (a) is an example in which an X-shaped strut is attached between adjacent building frames. (b) is an example in which one triangular stagger and handrail frame is attached between adjacent building frames. (c) is an example in which a strut made of one diagonal is attached between adjacent building frames. And (d) is the example which attached one handrail frame between adjacent building frames. Each has a plurality of mounting holes 14 for fitting the struts or the handrail frame to the lock fitting provided on the vertical column of the building frame.

建枠の建物側の縦柱のロック金具は、上述の鳥居型建枠(図12)の例では、筋違は隣り合う建枠の間に2本交叉状に取り付けられる(図16(a)参照)ので、1つの建枠の建物側にロック金具は2個必要である。そして、上述のH枠(図13)の例では、三角形状の筋違兼手摺枠(図16(b)参照)が隣り合う建枠の間に1個設けられるので、1つの建枠の建物側に2個又は1個が必要である。なお、筋違を隣り合う建枠の間に1本だけ設ける(図16(c)参照)こともあり、この場合は、1つの建枠の建物側に1個あればよい。   In the example of the above-mentioned torii type building frame (FIG. 12), the vertical bracket lock fitting on the building side of the building frame is attached in a cross shape between two adjacent building frames (FIG. 16 (a)). Therefore, two lock fittings are required on the building side of one building frame. And in the example of the above-mentioned H frame (FIG. 13), one triangular frame and handrail frame (see FIG. 16 (b)) is provided between adjacent building frames. Two or one is required on the side. Note that there may be only one streak between adjacent building frames (see FIG. 16 (c)). In this case, only one building frame may be provided on the building side.

また、建枠の道路側の縦柱のロック金具は、上述のH枠(図13)の例では、外周が矩形状の手摺枠(図16(d)参照)が隣り合う建枠の間に上下2個が設けられるので、1つの建枠の道路側に4個必要である。   In addition, in the example of the above-described H frame (FIG. 13), the vertical bracket lock fitting on the road side of the building frame is between the building frames where the handrail frame (see FIG. 16 (d)) whose outer periphery is rectangular is adjacent. Since two pieces are provided at the top and bottom, four pieces are required on the road side of one building frame.

しかしながら、一般に、建枠は建物側と道路側とは区別せずに用いられるので、ロック金具の個数は、建物側と道路側では同数としている。図12に例示した鳥居型建枠の場合は縦柱のそれぞれに2個設けており、図13で例示したH枠の場合は縦柱のそれぞれに4個設けている。   However, since the building frames are generally used without distinguishing between the building side and the road side, the number of lock fittings is the same on the building side and the road side. In the case of the torii type building frame illustrated in FIG. 12, two are provided for each of the vertical columns, and in the case of the H frame illustrated in FIG. 13, four are provided for each of the vertical columns.

このような足場用建枠に筋違や手摺枠を取り付けるための、筋違や手摺枠の取付孔に嵌め込ませる建枠のロック金具については、技術の改良がなされていない。このため、このような建枠のロック金具についての文献は見あたらない。特許文献1には、建枠に手摺枠を嵌め込ませた後に、手摺枠を遊びがないように固定するためのクランプ金具などのロック機構についての改良技術が記載されているが、建枠に手摺枠を取り付ける際のロック金具は記載されていない。   No technical improvements have been made to the building frame lock fittings that are fitted into the mounting holes of the struts or the handrail frame for attaching the struts or the handrail frame to the scaffold building frame. For this reason, there is no literature on such a lock fitting for a building frame. Patent Document 1 describes an improved technique for a lock mechanism such as a clamp fitting for fixing a handrail frame so that there is no play after the handrail frame is fitted into the building frame. Lock fittings for attaching the frame are not described.

特開平6−307072号公報JP-A-6-307072

このように、足場用建枠に筋違や手摺枠を取り付けるための、筋違や手摺枠の取付孔に嵌め込ませる建枠のロック金具については、ロック金具の爪金具が作動すれば、外力によって爪金具を内側に動かさないかぎり、筋違又は手摺枠が建枠から外れることはない。しかも、ロック金具の爪具を作動するために、爪具に作業員の手が直接触れる必要はなく、筋違又は手摺枠を建枠に取り付ける際に筋違又は手摺枠の取付孔が爪具に触れるだけで爪具が作動する。したがって、足場を組み立てるときは、建枠の縦柱に設置したロック金具の爪金具に筋違又は手摺枠の取付孔を嵌め込ませることによって、ロック金具の爪金具が作動するように、筋違又は手摺枠を取り付けていけばよい。   In this way, with regard to building bracket lock fittings that are fitted into the attachment holes of the misalignment or handrail frame to attach the misalignment or handrail frame to the scaffolding frame, if the nail bracket of the lock bracket is activated, the external force As long as the claws are not moved inward, the striations or handrail frame will not come off the building frame. In addition, it is not necessary for the operator's hand to touch the nail tool directly to operate the lock fitting nail tool, and when attaching the misalignment or handrail frame to the building frame, the misalignment or the mounting hole of the handrail frame has a nail tool. The nail tool is activated simply by touching. Therefore, when assembling the scaffold, make sure that the lock bracket's claw fittings are operated by fitting the struts or the mounting holes of the handrail frame into the claw fittings of the lock fittings installed on the vertical columns of the building frame. A handrail frame should be attached.

しかしながら、逆の作業で、足場を順次上から解体するときは、建枠の縦柱からロック金具の爪金具を順次解除する必要があるが、建枠の縦柱からロック金具の爪金具を解除するためには、外力によって爪金具を内側に動かした状態で、筋違又は手摺枠の取付孔をロック金具から取り外すという手間を必要とする。しかも、固定される取付孔の数だけの作業を行う必要があるので、1個の建枠に対して、前述の鳥居型建枠を用いた例(図12参照)で4回、H枠を用いた例(図13)の場合で6回の、取り外す作業が必要となる。   However, when the scaffolds are disassembled from the top in the reverse order, it is necessary to release the lock fittings from the vertical column of the building frame in sequence, but the lock fittings from the vertical column of the building frame must be released. In order to do this, it is necessary to take the trouble of removing the attachment hole of the handrail frame from the lock fitting in a state where the claw fitting is moved inward by an external force. In addition, since it is necessary to perform the work as many as the number of mounting holes to be fixed, the H frame is mounted four times in the example using the torii type building frame (see FIG. 12) for one building frame. In the case of the example used (FIG. 13), it is necessary to perform the removing operation six times.

また、建枠としてH枠を用いて足場を組み立てる場合の利点は、自動的に作動するロック金具を設置しておけば、下の段のH枠の足場板の上にいても、上の段のH枠の縦柱のロック金具に筋違又は手摺枠を取り付けることができることにある。   Also, the advantage of assembling the scaffold using the H frame as the building frame is that if the lock bracket that automatically operates is installed, even if it is on the scaffold plate of the lower H frame, the upper It is possible to attach a streak or a handrail frame to the lock fitting of the vertical column of the H frame.

図17は、高さ1.8mのH枠を用いて足場を組み立てる場合の作業図を示す。(a)は全体図、(b)は作業者の頭上近傍の拡大図である。作業者15は建物側の筋違兼手摺枠81を既に取り付け終えて、今は道路側の手摺枠82を取り付けようとしている。H枠の縦柱に自動的に作動するロック金具21が設置されているので、作業者15は下の段のH枠の足場板の上にいたままで、高さ2.0mに設置されたロック金具21だけでなく、高さ2.6mに設置されたロック金具22にも、建物側の筋違兼手摺枠81と道路側の手摺枠82を取り付けることができる。このように、下の段のH枠の足場板の上にいたままで、上の段のH枠の縦柱のロック金具に筋違又は手摺枠を取り付けることができるので、上の段に上った際に既に建物側と道路側の両側に筋違と手摺枠の両方が取り付けられた状態となっており、上の段での作業を安全に行うことができるという特徴を有する。   FIG. 17 shows a work diagram for assembling a scaffold using an H frame with a height of 1.8 m. (a) is an overall view, and (b) is an enlarged view of the vicinity of the worker's head. The worker 15 has already attached the building side railing and handrail frame 81 and is now trying to attach the roadside handrail frame 82. Since the lock bracket 21 that automatically operates is installed on the vertical column of the H frame, the worker 15 is installed at a height of 2.0 m while remaining on the scaffolding plate of the lower H frame. Not only the lock fitting 21 but also the lock fitting 22 installed at a height of 2.6 m can be provided with a building-side streak / handrail frame 81 and a road-side handrail frame 82. In this way, a streak or handrail frame can be attached to the vertical column lock fitting of the upper H frame while staying on the scaffolding plate of the lower H frame. In this case, both the struts and the handrail frame are already attached to both the building side and the road side, and the work at the upper stage can be performed safely.

しかしながら、逆の作業で、足場を解体する場合は、作業者が上の段にある道路側の手摺枠82と建物側の筋違兼手摺枠81を下段から取り外すとき、高さ2.0mに設置されたロック金具21の爪金具13は手で解除できる高さにあるが、高さ2.6mに設置されたロック金具22には手が届かない。したがって、高さ2.6mに設置されたロック金具22の爪金具13を解除するためには、専用解体治具が必要となる。   However, when the scaffold is disassembled in the reverse operation, when the operator removes the road-side handrail frame 82 and the building-side handrail frame 81 on the upper stage from the lower stage, the height becomes 2.0 m. The claw fitting 13 of the installed lock fitting 21 is at a height that can be released by hand, but the hand cannot reach the lock fitting 22 installed at a height of 2.6 m. Therefore, in order to release the claw fitting 13 of the lock fitting 22 installed at a height of 2.6 m, a dedicated disassembly jig is required.

図18は、高さ1.8mのH枠を用いて組み立てられた足場を解体する場合の作業図を示す。(a)は作業者の頭上近傍の拡大図である。作業者15は、道路側の手摺枠82を取り外そうとしている。高さ2.0mに設置されたロック金具21の爪金具13は手で解除できたが、高さ2.6mに設置されたロック金具22には手が届かないので、専用解体治具16を用いて、高さ2.6mに設置されたロック金具22の爪金具13を解除作業をしている。作業者15が、(b)に示すようにロック金具22に専用解体金具16を差し込み、そして、(c)に示すように専用解体金具16を回転させることによって、爪金具13が解除される。   FIG. 18 shows a work diagram in the case of dismantling a scaffold assembled using an H frame having a height of 1.8 m. (a) is an enlarged view of the vicinity of the operator's head. The worker 15 is about to remove the handrail frame 82 on the road side. The claw fitting 13 of the lock fitting 21 installed at a height of 2.0 m could be released by hand, but the hand cannot reach the lock fitting 22 installed at a height of 2.6 m. Using this, the claw fitting 13 of the lock fitting 22 installed at a height of 2.6 m is being released. The operator 15 inserts the special disassembly metal fitting 16 into the lock metal fitting 22 as shown in (b), and rotates the special disassembly metal fitting 16 as shown in (c), thereby releasing the claw metal fitting 13.

このように、組み立てられた足場を解体する場合には、専用の解体治具が必要となるだけでなく、片手で専用解体治具を操作しながら、残る片手で手摺枠を支えるという作業が必要となり、作業者がバランスを崩して、作業者が足場から転落する恐れがあった。   In this way, when disassembling the assembled scaffold, not only a dedicated disassembly jig is required, but also the operation of supporting the handrail frame with the remaining one hand while operating the dedicated disassembly jig with one hand is necessary. As a result, the worker lost his balance and the worker could fall from the scaffold.

したがって、足場を順次上から解体する場合、筋違又は手摺枠を取り外す際の、建枠の縦柱に設けられたロック金具の爪金具を順次解除する手間を減らす必要がある。また、専用の解体治具を不要とすることによって作業者の安全を守ることが求められる。   Therefore, when the scaffold is disassembled sequentially from above, it is necessary to reduce the trouble of sequentially releasing the claw brackets of the lock brackets provided on the vertical columns of the building frame when removing the struts or the handrail frame. In addition, it is required to protect the worker's safety by eliminating the need for a dedicated dismantling jig.

本発明者らは、筋違又は手摺枠を取り外す際の、建枠の縦柱に設けられたロック金具の形状を種々に検討した結果、次の(1)〜(7)の知見を得た。   As a result of various studies on the shape of the lock fitting provided on the vertical column of the building frame when removing the striation or the handrail frame, the present inventors obtained the following knowledge (1) to (7) .

(1)建枠に取り付ける1つの筋違は、例えば、図16(a)〜(c)にみるごとく、隣り合う建枠の縦柱の建物側の2個又は3個のロック金具によって固定されている。また、建枠の道路側に取り付ける1つの手摺枠(筋違としての機能も有することから建物側に取り付けることもできる。このときは、筋違兼手摺枠となる。)は、例えば、図16(d)にみるごとく、隣り合う建枠の縦柱の建物側又は道路側の4個のロック金具によって固定されている。このように、1個の筋違又は手摺枠は、筋違又は手摺枠の形状はどうであれ、必ず建枠の縦柱に設けられた複数のロック金具によって固定されている。   (1) One difference attached to the building frame is fixed by two or three lock fittings on the building side of the vertical column of the adjacent building frame as seen in FIGS. 16 (a) to (c), for example. ing. In addition, one handrail frame attached to the road side of the building frame (because it also has a function as a streak, it can also be attached to the building side. In this case, it becomes a streak and handrail frame), for example, FIG. As shown in (d), it is fixed by four lock fittings on the building side or road side of the vertical column of the adjacent building frame. In this way, a single misalignment or handrail frame is always fixed by a plurality of lock fittings provided on the vertical column of the building frame, regardless of the misalignment or the shape of the handrail frame.

(2)したがって、ロック金具による筋違又は手摺枠の固定機能を1個のロック金具だけで発揮させる必要はなく、2個あるいは3個以上のロック金具の組合せによって、筋違又は手摺枠の固定機能を発揮させることができる。   (2) Therefore, it is not necessary to exert the function of fixing the lock bracket or the handrail frame with only one lock bracket, and it is possible to fix the bracket or the handrail frame by combining two or more lock brackets. The function can be demonstrated.

(3)すなわち、1つの筋違又は手摺枠に設けられた複数の取付孔のうち少なくとも1つに嵌め込むロック金具は、その爪金具を作動させることによって固定する方式の可動型ロック金具である必要はなく、固定型ロック金具の形状を工夫すれば、爪金具を有しない固定型ロック金具であっても構わない。固定型ロック金具は、それ自体が爪金具のようなロック作動機能を有しなくても、可動型ロック金具と組み合わせて使うことによって、可動型ロック金具の爪金具の作動によって連動して固定型ロック金具が固定される形状であればよい。   (3) That is, a lock fitting that fits into at least one of a plurality of mounting holes provided in one rail or a handrail frame is a movable lock fitting that is fixed by operating the claw fitting. There is no need, and if the shape of the fixed lock metal fitting is devised, a fixed lock metal fitting having no claw metal fitting may be used. Even if the fixed lock bracket itself does not have a lock operation function like a claw bracket, it can be used in combination with a movable lock bracket to interlock with the movement of the claw bracket of the movable lock bracket. Any shape may be used as long as the lock metal fitting is fixed.

(4)1つの手摺枠を2つのH枠の間に取り付ける場合を考えてみると、1つの手摺枠には取付孔が4個設けられているので、H枠の縦柱にはそれぞれ、上下2個のロック金具が必要である。このとき、作業員の手が届かない上部ロック金具を固定型ロック金具とし、作業員の手が届く下部ロック金具を可動型ロック金具とすることによって、手摺枠の取付孔は4個ともH枠の縦柱に固定することができる。   (4) Considering the case where one handrail frame is attached between two H frames, one handrail frame is provided with four attachment holes. Two lock fittings are required. At this time, the upper lock fitting that the worker cannot reach is a fixed lock fitting, and the lower lock fitting that the worker can reach is a movable lock fitting. Can be fixed to the vertical column.

(5)したがって、足場を組み立てる際には、まず上部の固定型ロック金具に手摺枠の上部2個の取付孔を嵌めあわせた後、下部の可動型ロック金具に手摺枠の下部2個の取付孔を嵌めあわせて、爪金具を作動させることによって、手摺枠を固定する。下部の可動型ロック金具の爪金具を解除しない限り、固定型ロック金具もふくめて、4個の取付孔はロック金具から外れることなく、手摺枠はH枠に固定されたままとなる。   (5) Therefore, when assembling the scaffolding, first fit the two upper mounting holes of the handrail frame to the upper fixed lock fitting, and then attach the lower two handrail frames to the lower movable lock fitting. The handrail frame is fixed by fitting the holes and operating the claws. Unless the nail bracket of the lower movable lock bracket is released, the fixed lock bracket is also included, and the four attachment holes are not detached from the lock bracket, and the handrail frame remains fixed to the H frame.

(6)逆に、足場を順次上から解体する場合、まず作業員の手の届く下部の可動型ロック金具の爪金具を解除した後、1つの手摺枠全体を一定方向にスライドし、所定の角度に傾ければ、手摺枠の上部の取付孔が建枠の上部の固定型ロック金具から外れるので、1つの手摺枠全体を建枠から外すことができる。   (6) Conversely, when disassembling the scaffold sequentially from above, first release the nail bracket of the lower movable lock bracket that can be reached by the worker's hand, then slide the entire handrail frame in a certain direction, If tilted to an angle, the mounting hole at the top of the handrail frame is detached from the fixed lock fitting at the top of the building frame, so that one handrail frame can be removed from the building frame.

(7)以上は、手摺枠をH枠に取り付ける場合であるが、H枠の代わりに鳥居型建枠に取り付ける場合も同様である。また、手摺枠の代わりに筋違又は筋違兼手摺枠を使用する場合も同様である。1つの建枠の縦柱に設けられる固定型ロック金具と可動型ロック金具の配置は、隣り合う上下で対をなせばよい。   (7) The above is the case where the handrail frame is attached to the H frame, but the same applies to the case where it is attached to the torii type building frame instead of the H frame. The same applies to the case of using a streak or a streak and handrail frame instead of the handrail frame. The arrangement of the fixed lock metal fitting and the movable lock metal fitting provided on the vertical column of one building frame may be paired on the upper and lower sides adjacent to each other.

本発明にかかる建枠は、これらの知見に基づいて完成したものであり、次に記載する通りである。   The building frame according to the present invention has been completed based on these findings and is as described below.

「手摺枠又は筋違を取り付けるための複数個のロック金具を設けてなる足場用建枠であって、建枠を構成する縦柱に対をなして設置されるロック金具の一方が可動型であり、他方が固定型であることを特徴とする建枠。」
ここで、固定型ロック金具は、金具の途中で角度変位点を有していてもよいし、また、金具の途中で段差を有していてもよい。
“A scaffold building frame that is provided with a plurality of lock brackets for attaching handrail frames or struts, and one of the lock brackets installed in pairs with the vertical columns constituting the building frame is movable. A building frame characterized in that the other is a fixed type. "
Here, the fixed lock metal fitting may have an angular displacement point in the middle of the metal fitting, or may have a step in the middle of the metal fitting.

そして、建枠としては、上部横桟と2本の縦柱を有する鳥居型建枠と、中間部横桟と2本の縦柱を有するH枠が代表的であるが、特に建枠の形状にはこだわらないので、他の形状の建枠であっても何ら差し支えない。   Typical examples of the building frame include a torii type building frame having an upper horizontal beam and two vertical columns, and an H frame having an intermediate horizontal beam and two vertical columns. There is no problem even if it is a building frame of other shapes.

また、ロック金具の縦柱一本当たりの個数としては、2個以上設置されていればよく、奇数であっても構わない。1つの建枠の縦柱に必要なロック金具の個数は、隣り合う2つの建枠の間に設ける筋違や手摺枠の形状と個数によって異なるし、建物側と道路側でも異なるので、一概には決められない。そして、一般に、建枠は建物側と道路側とは区別せずに用いられるので、通常は、ロック金具の縦柱一本当たりの個数は偶数個設置するのが好ましい。特に好ましくは、鳥居型建枠の場合は4個、H枠の場合は8個である。   Further, the number of the lock metal fittings per one vertical column may be two or more, and may be an odd number. The number of lock brackets required for the vertical column of one building frame differs depending on the struts provided between two adjacent building frames and the shape and number of handrail frames. Cannot be decided. In general, since the building frame is used without distinguishing between the building side and the road side, it is usually preferable to install an even number of lock metal fittings per one vertical column. Particularly preferably, the number is 4 for the torii type building frame and 8 for the H frame.

本発明によれば、固定型ロック金具と可動型ロック金具を建枠の縦柱に対をなして配置することによって、手摺枠を取り外す際のロック金具の解除の手間は半減する。また、専用の解体治具の操作も不要となるので、作業者の安全を守ることが可能となる。   According to the present invention, by disposing the fixed lock metal fitting and the movable lock metal fitting in pairs with the vertical column of the building frame, the time and effort for releasing the lock metal fitting when removing the handrail frame is halved. In addition, since the operation of a dedicated disassembly jig is not required, it is possible to protect the safety of the operator.

本発明に係る建枠の一例を図面を用いて説明する。   An example of a building frame according to the present invention will be described with reference to the drawings.

図1は、建枠としてH枠を用いる場合の建物側の縦柱51と道路側の縦柱52に設けられた、固定ロック金具23と可動ロック金具24の配置を示す。(a)はH枠の上半分を示す図であり、(b)は上部ロック金具23の拡大図、(c)は下部の可動ロック金具24の拡大図である。ロック金具は、上部の固定ロック金具23と下部の可動ロック金具24が、対になって設置されている。ここで、上部の固定ロック金具23は段差25を有し、下部の可動ロック金具24には爪金具13が組み込まれている。このH枠と隣のH枠との間には、建物側の縦柱51に筋違8が既に取り付けられて、この段のH枠は自立している。   FIG. 1 shows the arrangement of fixed lock fittings 23 and movable lock fittings 24 provided on a building-side vertical column 51 and a road-side vertical column 52 when an H frame is used as a building frame. (a) is a figure which shows the upper half of H frame, (b) is an enlarged view of the upper lock metal fitting 23, (c) is an enlarged view of the lower movable lock metal fitting 24. As for the lock fitting, an upper fixed lock fitting 23 and a lower movable lock fitting 24 are installed in pairs. Here, the upper fixed lock fitting 23 has a step 25 and the lower movable lock fitting 24 incorporates the claw fitting 13. Between this H frame and the adjacent H frame, a streak 8 is already attached to the vertical column 51 on the building side, and the H frame at this stage is self-supporting.

図2において、このH枠と隣のH枠との間の道路側に、取付孔14が開けられた固定用金具20が4個設けられている手摺枠9を1つ取り付ける場合、手摺枠の上部の2個の取付孔14がH枠の縦柱に設けられた上部の固定ロック金具23に嵌められた後、手摺枠の下部の2個の取付孔がH枠の縦柱に設けられた下部の可動ロック金具24に嵌められて、下部の可動ロック金具の爪金具13を作動することによって、手摺枠全体が2つの隣り合ったH枠に固定される。   In FIG. 2, when attaching one handrail frame 9 provided with four fixing brackets 20 with mounting holes 14 on the road side between this H frame and the adjacent H frame, After the two upper mounting holes 14 were fitted into the upper fixed lock fitting 23 provided in the vertical column of the H frame, the two lower mounting holes of the handrail frame were provided in the vertical column of the H frame. The entire handrail frame is fixed to two adjacent H frames by being fitted to the lower movable lock fitting 24 and operating the claw fitting 13 of the lower movable lock fitting.

図3は、上部の固定ロック金具23と下部の可動ロック金具24が、それぞれ、手摺枠の固定金具20に開けられた取付孔14に嵌めあわせた状態のロック金具近傍の模式図である。(a)が上部の固定ロック金具23、(b)が下部の可動ロック金具24である。上部の固定ロック金具23に嵌めあわされた取付孔14は、固定ロック金具の段差25に当たるので、矢印の方向に力がかかっても外れない。そして、下部の可動ロック金具に嵌めあわされた取付孔14は作動した爪金具13に当たるので、矢印の方向に力がかかっても外れない。このように、固定ロック金具と可動ロック金具を対として設置すれば、両方を可動ロックにしなくても、手摺枠を建枠に固定することができる。   FIG. 3 is a schematic view of the vicinity of the lock fitting in a state where the upper fixed lock fitting 23 and the lower movable lock fitting 24 are fitted in the mounting holes 14 formed in the fixed fitting 20 of the handrail frame. (a) is the upper fixed lock fitting 23, and (b) is the lower movable lock fitting 24. Since the mounting hole 14 fitted to the upper fixed lock fitting 23 hits the step 25 of the fixed lock fitting, it cannot be removed even if a force is applied in the direction of the arrow. Since the mounting hole 14 fitted to the lower movable lock fitting hits the activated claw fitting 13, it does not come off even if a force is applied in the direction of the arrow. In this way, if the fixed lock metal fitting and the movable lock metal fitting are installed as a pair, the handrail frame can be fixed to the building frame without using both as a movable lock.

逆に、足場を解体する場合、まず下部の可動型ロック金具24の爪金具13を解除した後、手摺枠全体を作業者側に引き出せば、手摺枠の上部の固定金具20に開けられた取付孔14が建枠の縦柱に設けられた上部の固定型ロック金具23から外れるので、1つの手摺枠全体を建枠から外すことができる。なお、固定型ロック金具の形状によっては、下部の可動型ロック金具24の爪金具13を解除した後、手摺枠の下部を作業者側に引き出した後、手摺枠全体を特定の角度で上方向に持ち上げるか、又は一旦スライドした後手摺枠全体を特定の角度で上方向に持ち上げれることが必要となる場合もある。このように、上部の固定型ロック金具23から手摺枠を外す方法は、固定型ロック金具の形状に依存する。   On the contrary, when dismantling the scaffold, first, after releasing the claw fitting 13 of the lower movable lock fitting 24, if the entire handrail frame is pulled out to the operator side, the attachment opened on the fixing bracket 20 at the upper part of the handrail frame Since the hole 14 is disengaged from the upper fixed lock fitting 23 provided in the vertical column of the building frame, the entire handrail frame can be removed from the building frame. Depending on the shape of the fixed lock fitting, after the claw fitting 13 of the lower movable lock fitting 24 is released, the lower part of the handrail frame is pulled out to the operator side, and then the entire handrail frame is moved upward at a specific angle. In some cases, it may be necessary to lift the entire handrail frame upward at a specific angle after it has been lifted. Thus, the method of removing the handrail frame from the upper fixed lock metal fitting 23 depends on the shape of the fixed lock metal fitting.

次に、上部の固定型ロック金具から手摺枠を外す方法の一例を示す。図4は、下部の可動ロック金具24の爪金具13が解除されて、下部の可動ロック金具24から手摺枠の下部の固定金具20に開けられた取付孔14が外れた状態で、上部の固定ロック金具23から手摺枠の上部の固定金具20に開けられた取付孔14を外す際のロック金具近傍の模式図である。(a)が上部の固定ロック金具23、(b)が下部の可動ロック金具24である。ここでは、上部の固定ロック金具23は、その途中で角度変位点を有しかつ角度変位点の付近に段差25を有している。また、先端部26は角度θだけ上方に曲げられるとともに先端部26の外径は根本部27の外径よりも小さくしている。このような段差25と先端部26を有する固定ロック金具23の場合は、まず下部の可動型ロック金具24の爪金具13を解除した後、手摺枠の下方を作業者側に引き出した後、手摺枠全体を一旦上方にスライドし、その後、手摺枠の上部の固定金具20に開けられた取付孔14が上部のロック金具の先端をすり抜けるように手摺枠上部を角度θで上方向に持ち上ることによって、手摺枠全体を建枠から外すことができる。   Next, an example of a method for removing the handrail frame from the upper fixed lock metal fitting will be described. FIG. 4 shows the state in which the claw fitting 13 of the lower movable lock fitting 24 is released and the mounting hole 14 opened from the lower movable lock fitting 24 to the lower fitting 20 of the handrail frame is removed. It is a schematic diagram of the vicinity of the lock fitting when the mounting hole 14 opened in the fixing fitting 20 at the upper part of the handrail frame is removed from the lock fitting. (a) is the upper fixed lock fitting 23, and (b) is the lower movable lock fitting 24. Here, the upper fixed lock fitting 23 has an angular displacement point in the middle thereof and a step 25 in the vicinity of the angular displacement point. The distal end portion 26 is bent upward by an angle θ and the outer diameter of the distal end portion 26 is smaller than the outer diameter of the root portion 27. In the case of the fixed lock fitting 23 having such a step 25 and the tip end portion 26, first, after releasing the claw fitting 13 of the lower movable lock fitting 24, the lower side of the handrail frame is pulled out to the operator side, and then the handrail. Slide the entire frame once upward, and then lift the upper part of the handrail frame upward at an angle θ so that the mounting hole 14 opened in the fixing bracket 20 on the upper part of the handrail frame passes through the tip of the upper lock metal fitting. Thus, the entire handrail frame can be removed from the building frame.

固定ロック金具23の形状は、図4に示すものが好ましいが、特に限定されるものではなく、図4に示されたもの以外の形状であっても構わない。図5(a)にストレートタイプの固定型ロック金具23を、図6(a)に金具の途中に角度変位点28を有する固定型ロック金具23を、図7に段差25を途中に有する固定型ロック金具23を、そして、図8に先端部26の外径を根本部27よりも大きくした固定型ロック金具23を、それぞれ示す。これらの形状は、足場に使用される建枠の種類、筋違又は手摺枠の形状と個数、筋違又は手摺枠に要求される安全性の大小などによって、異なってくる。   The shape of the fixed lock fitting 23 is preferably as shown in FIG. 4, but is not particularly limited, and may be a shape other than that shown in FIG. 4. FIG. 5 (a) shows a straight type fixed lock metal fitting 23, FIG. 6 (a) shows a fixed type lock metal fitting 23 having an angular displacement point 28 in the middle of the metal fitting, and FIG. The metal fitting 23 and the fixed lock metal fitting 23 in which the outer diameter of the distal end portion 26 is larger than the root portion 27 are shown in FIG. These shapes vary depending on the type of building frame used for the scaffold, the shape or number of lines or handrail frames, the level of safety required for the lines or handrail frames, and the like.

好ましいのは、(1)固定ロック金具の途中に角度変位点を有するもの(図6(a)参照)、又は、(2)固定ロック金具の途中に段差を有するもの(図7参照)である。そして、特に好ましいのは、(3)固定ロック金具の途中に角度変位点を有しかつ角度変位点の付近に段差を有するもの(図4(a)参照)である。   Preference is given to (1) having an angular displacement point in the middle of the fixed lock fitting (see FIG. 6 (a)) or (2) having a step in the middle of the fixed lock fitting (see FIG. 7). . Particularly preferred is (3) one having an angular displacement point in the middle of the fixed lock fitting and a step near the angular displacement point (see FIG. 4A).

以下、固定ロック金具のそれぞれの形状について、詳述する。   Hereinafter, each shape of the fixed lock fitting will be described in detail.

(1)固定ロック金具の途中に角度変位点があることについて
図5の(a)にストレートタイプの固定型ロック金具を、(b)に可動型ロック金具を、それぞれ示す。上部の固定型ロック金具23と下部の可動型ロック金具24の距離は一定であって、可動型ロック金具24の爪金具13が作動しているため、可動型ロック金具24に嵌め込まれた取付孔14は固定されている。したがって、固定型ロック金具23がこのようなストレートタイプの場合であっても、固定型ロック金具23に嵌め込まれた取付孔14は、固定型ロック金具23の上を一定距離を水平移動するものの固定型ロック金具から外れることはない。しかしながら、固定型ロック金具23の上を筋違又は手摺枠の上部の取付孔14が水平移動する分だけ、手摺枠の上部は揺れやすい。したがって、筋違又は手摺枠の上部の揺れを少なくするためには、固定ロック金具の途中に角度θの変位点があることが好ましい。図6の(a)に角度変位点28を有する固定型ロック金具23を、(b)に可動型ロック金具を、それぞれ示す。
(1) About the angle displacement point in the middle of the fixed lock bracket Fig. 5 (a) shows the straight type fixed lock bracket, and Fig. 5 (b) shows the movable lock bracket. Since the distance between the upper fixed lock fitting 23 and the lower movable lock fitting 24 is constant and the claw fitting 13 of the movable lock fitting 24 is in operation, the mounting hole fitted in the movable lock fitting 24 14 is fixed. Therefore, even if the fixed lock metal fitting 23 is such a straight type, the mounting hole 14 fitted into the fixed lock metal fitting 23 moves horizontally over the fixed lock metal fitting 23 for a fixed distance. It will not come off the lock fitting. However, the upper portion of the handrail frame is easily shaken by the amount of the struts or the mounting hole 14 at the upper portion of the handrail frame horizontally moving on the fixed lock fitting 23. Therefore, in order to reduce the striation or the shaking of the upper part of the handrail frame, it is preferable that there is a displacement point of the angle θ in the middle of the fixed lock fitting. FIG. 6A shows a fixed lock fitting 23 having an angular displacement point 28, and FIG. 6B shows a movable lock fitting.

このときの角度θは、20゜〜30゜が望ましい。角度が小さすぎるとストレートタイプの固定型ロック金具と同様の現象が起きるし、大きすぎると筋違又は手摺枠を取り付けるときと取り外すときに、その移動距離が多くなり手間がかかる。   The angle θ at this time is preferably 20 ° to 30 °. If the angle is too small, the same phenomenon as that of the straight type fixed lock metal fitting occurs. If it is too large, the movement distance increases when attaching or removing the streak or the handrail frame.

なお、固定ロック金具の先端は上側を向いているのが、好ましい。固定ロック金具の先端が上側を向いていれば、筋違又は手摺枠に衝撃が加わっても、筋違又は手摺枠が抜け落ちないからである。   In addition, it is preferable that the front-end | tip of a fixed lock metal fitting has faced the upper side. This is because if the front end of the fixed lock metal fitting is facing upward, the striation or the handrail frame will not fall out even if an impact is applied to the streak or the handrail frame.

(2)固定ロック金具の途中に段差を有するものであることについて
図7は、(a)が段差25を途中に有する固定型ロック金具23の側面図であり、(b)がそのA断面図、(c)がそのB断面図である。この上部の固定型ロック金具23と下部の可動型ロック金具(図示せず)の距離は一定である。したがって、固定型ロック金具23がこのような段差25を途中に有していて、下部の可動型ロック金具が作動していれば、固定型ロック金具23に嵌め込まれた取付孔(図示せず)は、この段差25より左方向には移動しないので、固定型ロック金具から外れることはない。
(2) About having a step in the middle of the fixed lock metal fitting FIG. 7A is a side view of a fixed lock metal fitting 23 having a step 25 in the middle, and FIG. (C) is a B sectional view thereof. The distance between the upper fixed lock fitting 23 and the lower movable lock fitting (not shown) is constant. Therefore, if the fixed lock fitting 23 has such a step 25 in the middle and the lower movable lock fitting is activated, a mounting hole (not shown) fitted into the fixed lock fitting 23 is provided. Since it does not move to the left of the step 25, it does not come off the fixed lock fitting.

なお、この段差が小さすぎれば、嵌め込まれた取付孔(図示せず)がその段差を乗り越えてしまう可能性があるし、逆に段差が大きすぎればその段差付近の断面形状が図7の(b)及び(c)に示すように、固定型ロック金具23の段差25の部分は根元部27と比べ断面が小さくなり、その分、固定型ロック金具としての強度が落ちる可能性がある。したがって、この段差の大きさは、これらの可能性を勘案して適正値にするのがよい。     If this step is too small, the fitted mounting hole (not shown) may get over the step, and conversely if the step is too large, the cross-sectional shape in the vicinity of the step is shown in FIG. As shown in b) and (c), the stepped portion 25 of the fixed lock fitting 23 has a smaller cross section than the root portion 27, and the strength of the fixed lock fitting may be reduced accordingly. Therefore, the size of the step is preferably set to an appropriate value in consideration of these possibilities.

(3)固定ロック金具の途中に角度変位点を有しかつ角度変位点の付近に段差を有するものあることについて
固定ロック金具の途中に角度θの変位点があれば、筋違又は手摺枠の上部の揺れを少なくすることができる。しかしながら、固定ロック金具の途中に角度変位点があるだけでは、筋違又は手摺枠の上部を建枠の内側方向に強い力で引っ張った場合に固定型ロック金具の変形が起こる可能性がある。図9の(a)は途中に角度変位点28がある固定ロック金具23である。(b)は(a)の固定ロック金具23に取付孔14を嵌め込んだ状態である。このとき、矢印方向に強い力がかかると、固定ロック金具の斜辺部分が押されるので、固定ロック金具23の根本部27に又は固定ロック金具の途中に弾性又は塑性変形がおこって、筋違又は手摺枠が外れる可能性がある。(c)は、途中に角度変位点を有した上でさらに段差25を有する固定型ロック金具23である。この場合は、矢印方向に強い力がかかっても、取付孔14は段差25に引っ掛かり、曲げ荷重ではなく引張荷重が固定型ロック金具にかかるので、固定ロック金具23に変形が生じにくくなるので、筋違又は手摺枠が外れる可能性は小さくなる。
(3) There is an angle displacement point in the middle of the fixed lock bracket and a step near the angle displacement point. If there is a displacement point of angle θ in the middle of the fixed lock bracket, The shaking of the upper part can be reduced. However, if there is only an angular displacement point in the middle of the fixed lock fitting, there is a possibility that the fixed lock fitting may be deformed when the struts or the upper part of the handrail frame is pulled with a strong force in the inner direction of the building frame. FIG. 9A shows a fixed lock fitting 23 having an angular displacement point 28 in the middle. (b) is a state in which the mounting hole 14 is fitted into the fixed lock fitting 23 of (a). At this time, if a strong force is applied in the direction of the arrow, the oblique side portion of the fixed lock fitting is pushed, so that elastic or plastic deformation occurs in the root portion 27 of the fixed lock fitting 23 or in the middle of the fixed lock fitting, The handrail frame may come off. (c) is a fixed lock fitting 23 having an angular displacement point on the way and further having a step 25. In this case, even if a strong force is applied in the direction of the arrow, the mounting hole 14 is caught by the step 25, and a tensile load is applied to the fixed lock metal fitting instead of a bending load. The possibility of a streak or handrail frame coming off is reduced.

また、固定型ロック金具が段差を途中に有しているだけでは、前述の通り、その段差の大きさによっては嵌め込まれた取付孔がその段差を乗り越えてしまう可能性があるし、固定型ロック金具としての強度が落ちる可能性がある。しかしながら、このような途中に角度変位点を有した上でさらに段差25を有する固定型ロック金具23では、段差をそれ程大きくしなくても嵌め込まれた取付孔がその段差を乗り越えてしまう可能性は小さく、その分固定型ロック金具の強度を落とさずにすますことができる。   In addition, if the fixed lock bracket has a step in the middle, as described above, depending on the size of the step, the fitted mounting hole may get over the step. There is a possibility that strength as a metal fitting may be lowered. However, in such a fixed lock metal fitting 23 having an angular displacement point in the middle and further having a step 25, there is a possibility that the fitted mounting hole can get over the step without enlarging the step so much. It is small and can be saved without reducing the strength of the fixed lock fitting.

このように、ロック金具を可動型ロック金具と固定型ロック金具の対にすることにより、ロック金具を解除する動作が減る。また、専用解体治具を使用しなくても、筋違又は手摺枠取り外せる事が可能となる。   Thus, by making the lock fitting a pair of a movable lock fitting and a fixed lock fitting, the operation of releasing the lock fitting is reduced. Further, it is possible to remove the streak or remove the handrail frame without using a dedicated dismantling jig.

図10は、可動型ロック金具23と固定型ロック金具24が設けられている、高さ1.8mのH枠を用いて組み立てられた足場を解体する場合の作業図を示す。作業者15は、道路側に取り付けられていた手摺枠9を取り外そうとしている。高さ2.0mに設置されたロック金具24の爪金具を手で解除した後、手摺枠9を矢印方向に移動させるだけで、手摺枠9を高さ2.6mに設置されたロック金具23からも簡単に取り外すことができる。このように、専用解体治具が不要となるため、作業者は片手だけでも又は両手を使っても自在に組み立てられた足場を解体できる。したがって、筋違又は手摺枠を取り外す際に作業者がバランスを崩して足場から転落するおそれが少なくなる。   FIG. 10 shows a work diagram in the case of disassembling a scaffold assembled with an H frame having a height of 1.8 m provided with a movable lock fitting 23 and a fixed lock fitting 24. The worker 15 tries to remove the handrail frame 9 attached to the road side. After manually releasing the claw fitting of the lock fitting 24 installed at a height of 2.0 m, the handrail frame 9 is simply moved in the direction of the arrow, and the handrail frame 9 is installed at a height of 2.6 m. Can be removed easily. In this way, since a dedicated dismantling jig is not required, the operator can dismantle the scaffold assembled freely with only one hand or using both hands. Therefore, the possibility that the operator loses balance and falls from the scaffolding when removing the struts or the handrail frame is reduced.

最後に、筋違の取付孔又は手摺枠の固定用金具に設けられた取付孔の形状を図11に例示する。(a)は円形、(b)は楕円形、(c)はだるま形である。固定型ロック金具と可動型ロック金具の両方に嵌め込むことのできる形状であれば、取付孔14の形状は特に制約はないが、(a)〜(c)のようにRのついた形状が好ましい。   Finally, FIG. 11 illustrates the shape of the mounting holes provided in the fixing holes of the streaks or the fixing brackets of the handrail frame. (a) is circular, (b) is oval, and (c) is daruma. The shape of the mounting hole 14 is not particularly limited as long as it can be fitted into both the fixed lock metal fitting and the movable lock metal fitting, but the shape with R as shown in (a) to (c). preferable.

なお、図8のように、先端部26の外径を根本部27よりも大きくした固定型ロック金具23の場合は、取付孔の形状として(c)のだるま形を採用すればよい。ただし、対として用いる可動型ロック金具の外径によっては、足場の組立時に筋違又は手摺枠の上下を確認する手間が増える可能性がある。したがって、取付孔の形状としては、上下方向性をもたない、(a)の円形、(b)の楕円形が、特に好ましい。   As shown in FIG. 8, in the case of the fixed lock metal fitting 23 in which the outer diameter of the distal end portion 26 is larger than that of the root portion 27, the daruma shape of (c) may be adopted as the shape of the mounting hole. However, depending on the outer diameter of the movable lock fittings used as a pair, there is a possibility that the labor for checking the striation or the upper and lower sides of the handrail frame during assembly of the scaffold may increase. Therefore, as the shape of the mounting hole, the circular shape of (a) and the elliptical shape of (b) that have no vertical direction are particularly preferable.

本発明によれば、固定型ロック金具と可動型ロック金具を建枠の縦柱に対をなして配置することによって、建築現場等に使用する足場用建枠から手摺枠を取り外す際のロック金具の解除の手間は半減する。また、専用の解体治具の操作も不要となるので、作業者の転落等の危険がなくなり、作業者の安全を守ることが可能となる。   According to the present invention, the lock bracket when the handrail frame is removed from the scaffolding frame used in the construction site or the like by arranging the fixed lock bracket and the movable lock bracket in pairs with the vertical column of the building frame. The effort of releasing is reduced by half. In addition, since the operation of the dedicated dismantling jig is not required, there is no danger of the operator falling and the safety of the operator can be protected.

建枠としてH枠を用いる場合の縦柱に設けられたロック金具の配置を示す。(a)は全体図、(b)は固定型ロック金具、(c)は可動型ロック金具である。The arrangement | positioning of the lock metal fitting provided in the vertical column in the case of using H frame as a building frame is shown. (a) is an overall view, (b) is a fixed lock fitting, and (c) is a movable lock fitting. 1つの手摺枠が2つの隣り合ったH枠に固定された状態を示す。A state in which one handrail frame is fixed to two adjacent H frames is shown. 上部の固定ロック金具と下部の可動ロック金具を、それぞれ、手摺枠の取付孔に嵌めあわせた状態のロック金具近傍の模式図である。(a)は固定型ロック金具、(b)は可動型ロック金具である。It is a schematic diagram of the vicinity of the lock fitting in a state in which the upper fixed lock fitting and the lower movable lock fitting are fitted in the attachment holes of the handrail frame. (a) is a fixed lock metal fitting, and (b) is a movable lock metal fitting. 下部の可動ロック金具から手摺枠の下部の取付孔14が外れた状態で上部の固定ロック金具から手摺枠の上部の取付孔14を外す際のロック金具近傍の模式図である。(a)は固定型ロック金具、(b)は可動型ロック金具である。It is a schematic diagram of the vicinity of the lock fitting when the upper attachment hole 14 of the handrail frame is removed from the upper fixed lock fitting with the lower attachment hole 14 of the handrail frame removed from the lower movable lock fitting. (a) is a fixed lock metal fitting, and (b) is a movable lock metal fitting. (a)にストレートタイプの固定型ロック金具を、(b)に可動型ロック金具を、それぞれ示す。(a) shows a straight type fixed lock fitting, and (b) shows a movable lock fitting. (a)に角度変位点を有する固定型ロック金具を、(b)に可動型ロック金具を、それぞれ示す。(a) shows a fixed lock metal fitting having an angular displacement point, and (b) shows a movable lock metal fitting. (a)が段差を途中に有する固定型ロック金具の側面図であり、(b)がそのA断面図、(c)がそのB断面図である。(a) is a side view of the fixed lock metal fitting which has a level | step difference in the middle, (b) is the A sectional drawing, (c) is the B sectional drawing. 先端部の外径を根本部よりも大きくした固定型ロック金具を示す。(a)は固定ロック金具の正面図であり、(b)は側面図である。The fixed type | mold metal fitting which made the outer diameter of the front-end | tip part larger than the root part is shown. (a) is a front view of a fixed lock metal fitting, and (b) is a side view. (a)は途中に角度変位点がある固定ロック金具である。(b)は(a)の固定ロック金具に取付孔を嵌め込んだ状態である。(c)は途中に角度変位点を有した上でさらに段差を有する固定型ロック金具である。(a) is a fixed lock metal fitting with an angular displacement point in the middle. (b) is a state in which a mounting hole is fitted into the fixed lock fitting of (a). (c) is a fixed type lock fitting having an angular displacement point on the way and further having a step. 可動型ロック金具と固定型ロック金具が設けられているH枠を用いて組み立てられた足場を解体する場合の作業図を示す。The work figure in the case of disassembling the scaffold assembled using the H frame in which the movable lock metal fitting and the fixed lock metal fitting are provided is shown. 筋違の取付孔又は手摺枠の固定用金具に設けられた取付孔の形状の例示である。(a)は円形、(b)は楕円形、(c)はだるま形である。It is an illustration of the shape of the attachment hole provided in the fixing hole of a staggered attachment hole or a handrail frame. (a) is circular, (b) is oval, and (c) is daruma. 鳥居型建枠を用いて枠組足場を形成する一例を示す。(a)が正面図、(b)が右側面図である。An example of forming a frame scaffold using a torii type building frame is shown. (a) is a front view, (b) is a right side view. H枠を用いて枠組足場を形成する一例を示す。(a)が正面図、(b)が背面図、そして(c)が右側面図である。An example of forming a frame scaffold using the H frame will be shown. (a) is a front view, (b) is a rear view, and (c) is a right side view. ロック金具に組み込まれた爪金具の例を示す。(a)がバネ式、(b)が重力落下式である。The example of the nail | claw metal fitting integrated in the lock metal fitting is shown. (a) is a spring type, and (b) is a gravity drop type. ロック金具に組み込まれたバネ式の爪金具が作動する状態を示す。(a)が側面図、(b)が正面図である。The state where the spring-type claw metal fittings incorporated in the lock metal fittings operate is shown. (a) is a side view, (b) is a front view. 種々の筋違や手摺枠を隣り合う建枠の間に取り付けた例を示す。(a)は筋違を2本交叉状に取り付けた例である。(b)は三角形状の筋違兼手摺枠を1個取り付けた例である。(c)は筋違を1本だけ取り付けた例である。(d)は手摺枠を1個取り付けた例である。An example in which various struts and handrail frames are attached between adjacent building frames is shown. (a) is an example in which two struts are attached in a cross shape. (b) is an example in which one triangular strut and handrail frame is attached. (c) is an example in which only one strut is attached. (d) is an example in which one handrail frame is attached. H枠を用いて足場を組み立てる場合の作業図を示す。(a)は全体図、(b)は作業者の頭上近傍の拡大図である。The work figure in the case of assembling a scaffold using H frame is shown. (a) is an overall view, and (b) is an enlarged view of the vicinity of the worker's head. H枠を用いて組み立てられた足場を解体する場合の作業図を示す。(a)は作業者の頭上近傍の拡大図である。(b)はロック金具に専用解体金具を差し込む作業を、そして、(c)専用解体金具を回転させることによって爪金具を解除する作業を示す。The work figure in the case of dismantling the scaffold assembled using the H frame is shown. (a) is an enlarged view of the vicinity of the operator's head. (b) shows the work of inserting the dedicated dismantling metal fitting into the lock metal fitting, and (c) the work of releasing the claw metal fitting by rotating the special dismantling metal fitting.

符号の説明Explanation of symbols

6 上部横桟
7 中間部横桟
8 筋違
9 手摺枠
10 下部横桟
11 建物側縦柱のロック金具
12 道路側縦柱のロック金具
13 爪金具
14 取付孔
15 作業者
16 専用解体金具
17 バネ
20 固定用金具
21 高さ2.0mに設置されたロック金具
22 高さ2.6mに設置されたロック金具
23 固定ロック金具
24 可動ロック金具
25 段差
26 先端部
27 根本部
28 角度変位点
31 1段目の鳥居型建枠
32 2段目の鳥居型建枠
40 最下段の建枠
41 1段目のH枠
42 2段目のH枠
51 建物側の縦柱
52 道路側の縦柱
81 建物側の筋違兼手摺枠
82 道路側の手摺枠
90 敷板
91 1段目の足場板
92 2段目の足場板
93 3段目の足場板
6 Upper horizontal beam 7 Middle horizontal beam 8 Stitch 9 Handrail frame 10 Lower horizontal beam 11 Locking bracket for building-side vertical column 12 Locking bracket for road-side vertical column 13 Claw bracket 14 Mounting hole 15 Worker 16 Dedicated disassembly bracket 17 Spring DESCRIPTION OF SYMBOLS 20 Fixing metal fixture 21 Lock metal fitting installed in height 2.0m 22 Lock metal fitting installed in height 2.6m 23 Fixed lock metal fitting 24 Movable lock metal fitting 25 Step 26 Tip part 27 Base part 28 Angular displacement point 31 1 Torii type building frame in the second stage 32 Torii type building frame in the second stage 40 Lowermost building frame 41 H frame in the first stage 42 H frame in the second stage 51 Vertical column on the building side 52 Vertical column on the road side 81 Building Side railing and handrail frame 82 Handrail frame on road side 90 Base plate 91 First stage scaffolding plate 92 Second stage scaffolding plate 93 Third stage scaffolding plate

Claims (7)

手摺枠又は筋違を取り付けるための複数個のロック金具を設けてなる足場用建枠であって、建枠を構成する縦柱に対をなして設置されるロック金具の一方が可動型であり、他方が固定型であることを特徴とする建枠。   A scaffolding frame that is provided with a plurality of lock brackets for attaching handrail frames or struts, and one of the lock brackets installed in pairs with the vertical columns constituting the building frame is movable A building frame characterized in that the other is a fixed type. 固定型ロック金具が金具の途中で角度変位点を有することを特徴とする請求項1記載の建枠。   The building frame according to claim 1, wherein the fixed lock metal fitting has an angular displacement point in the middle of the metal fitting. 固定型ロック金具が金具の途中で段差を有することを特徴とする請求項1又は2記載の建枠。   The building frame according to claim 1 or 2, wherein the fixed lock metal fitting has a step in the middle of the metal fitting. 建枠が上部横桟と2本の縦柱を有する鳥居型形状であることを特徴とする請求項1から3までのいずれかに記載の建枠。   The building frame according to any one of claims 1 to 3, wherein the building frame has a torii-shaped shape having an upper horizontal rail and two vertical columns. ロック金具が縦柱一本当たり偶数個設置されていることを特徴とする請求項4に記載の建枠。   The building frame according to claim 4, wherein an even number of lock fittings are installed per vertical column. 建枠が中間部横桟と2本の縦柱を有するH型形状であることを特徴とする請求項1から3までのいずれかに記載の建枠。   The building frame according to any one of claims 1 to 3, wherein the building frame has an H-shape having an intermediate horizontal rail and two vertical columns. ロック金具が縦柱一本当たり偶数個設置されていることを特徴とする請求項6に記載の建枠。
The building frame according to claim 6, wherein an even number of lock fittings are installed per vertical column.
JP2003364414A 2003-10-24 2003-10-24 Scaffolding frame Expired - Fee Related JP4098213B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003364414A JP4098213B2 (en) 2003-10-24 2003-10-24 Scaffolding frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003364414A JP4098213B2 (en) 2003-10-24 2003-10-24 Scaffolding frame

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2008016338A Division JP4909291B2 (en) 2008-01-28 2008-01-28 Scaffolding frame

Publications (2)

Publication Number Publication Date
JP2005127036A true JP2005127036A (en) 2005-05-19
JP4098213B2 JP4098213B2 (en) 2008-06-11

Family

ID=34643397

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003364414A Expired - Fee Related JP4098213B2 (en) 2003-10-24 2003-10-24 Scaffolding frame

Country Status (1)

Country Link
JP (1) JP4098213B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITRM20080631A1 (en) * 2008-11-27 2010-05-28 Condor Group S P A PARAPET FOR MODULAR SCAFFOLDING.
IT201600104385A1 (en) * 2016-10-18 2018-04-18 Amadio & C S P A ASSEMBLY OF CURRENT CONNECTIONS TO VERTICAL UPRIGHTS OF A CRAFTING AND OF THE ASSEMBLY METHOD OF A CRAFT INCLUDING SUCH
WO2019179913A1 (en) * 2018-03-22 2019-09-26 Peri Gmbh Supporting framework

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITRM20080631A1 (en) * 2008-11-27 2010-05-28 Condor Group S P A PARAPET FOR MODULAR SCAFFOLDING.
EP2192250A1 (en) * 2008-11-27 2010-06-02 Condor Group S.p.A. Parapet for modular scaffold
IT201600104385A1 (en) * 2016-10-18 2018-04-18 Amadio & C S P A ASSEMBLY OF CURRENT CONNECTIONS TO VERTICAL UPRIGHTS OF A CRAFTING AND OF THE ASSEMBLY METHOD OF A CRAFT INCLUDING SUCH
WO2019179913A1 (en) * 2018-03-22 2019-09-26 Peri Gmbh Supporting framework
CN111989446A (en) * 2018-03-22 2020-11-24 Peri有限公司 Support structure
US20210054638A1 (en) * 2018-03-22 2021-02-25 Peri Gmbh Supporting framework

Also Published As

Publication number Publication date
JP4098213B2 (en) 2008-06-11

Similar Documents

Publication Publication Date Title
RU2400609C2 (en) Complex system of accident prevention support in construction
EP3012385B1 (en) Scaffolding security railing
WO2014080998A1 (en) Suppot steel pipe for scaffolding or timbering
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
JP4900673B2 (en) Fence and its construction method
JP4704766B2 (en) Method for forming leading handrail frame and frame scaffold
JP3692293B2 (en) Safety handrail for assembly and disassembly of frame scaffold
JP4909291B2 (en) Scaffolding frame
JP4098213B2 (en) Scaffolding frame
JP4204605B2 (en) Assembly scaffold
JP5875000B2 (en) Temporary handrail
JP4183654B2 (en) Handrail support bracket, preceding handrail assembly set, frame scaffold
JP5914175B2 (en) Demolition protection member and dismantling protection method
JP5485579B2 (en) Temporary scaffold for exit corner and its construction method
JP2013129961A (en) Temporary fixation method for steel staircase and pipe support for supporting steel staircase
JP5502396B2 (en) Handrail support and leading handrail
JP4639115B2 (en) Handrail for frame scaffolding of H-shaped building frame
JP3929279B2 (en) Mobile handrail frame of framework scaffold
JP7224591B1 (en) Preceding handrail and preemptive net type scaffolding curing system, and scaffolding curing method using the same
JPH047317Y2 (en)
JP4162549B2 (en) Handrail for frame scaffolding of H-shaped building frame
KR20070102503A (en) Integral safety system which can be used for construction
JP5745898B2 (en) A cane-type connecting material with a handrail frame and a temporary scaffold
JP4588064B2 (en) Mobile handrail frame of framework scaffold
JP5393510B2 (en) Fall prevention equipment from the roof in temporary scaffolding

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050927

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20070130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070813

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070821

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070925

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071211

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080128

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20080215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080311

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080312

R150 Certificate of patent or registration of utility model

Ref document number: 4098213

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120321

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120321

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130321

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130321

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees