JP4704766B2 - Method for forming leading handrail frame and frame scaffold - Google Patents

Method for forming leading handrail frame and frame scaffold Download PDF

Info

Publication number
JP4704766B2
JP4704766B2 JP2005041676A JP2005041676A JP4704766B2 JP 4704766 B2 JP4704766 B2 JP 4704766B2 JP 2005041676 A JP2005041676 A JP 2005041676A JP 2005041676 A JP2005041676 A JP 2005041676A JP 4704766 B2 JP4704766 B2 JP 4704766B2
Authority
JP
Japan
Prior art keywords
handrail
frame
scaffold
column
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005041676A
Other languages
Japanese (ja)
Other versions
JP2006226001A (en
JP2006226001A5 (en
Inventor
純二 稲森
信二 吉田
純一 氏家
博之 横山
陽一朗 南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Metal Products Co Ltd filed Critical Nippon Steel Metal Products Co Ltd
Priority to JP2005041676A priority Critical patent/JP4704766B2/en
Publication of JP2006226001A publication Critical patent/JP2006226001A/en
Publication of JP2006226001A5 publication Critical patent/JP2006226001A5/ja
Application granted granted Critical
Publication of JP4704766B2 publication Critical patent/JP4704766B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Description

本発明は、建築現場等に使用する先行手摺枠及びその先行手摺枠を用いて枠組足場を形成する方法に関する。   The present invention relates to a preceding handrail frame used in a construction site and the like and a method for forming a frame scaffold using the preceding handrail frame.

建築現場等で用いられる枠組足場は、大別すると、(1)建枠を含む部材を組み立ててなる建枠式足場と、(2)支柱部材や手摺部材等の足場構成部材を緊結して組み立ててなる緊結式足場がある。   Frame scaffolds used at construction sites can be broadly classified as follows: (1) Building frame type scaffolds assembled with members including building frames, and (2) Scaffolding components such as support members and handrail members. There is a tight type scaffolding.

(1)の「建枠式足場」は、通常、横桟と縦柱から構成される鳥居形状やH形状の建枠を複数個組み立てることによって形成される。   The “building frame type scaffolding” of (1) is usually formed by assembling a plurality of torii-shaped and H-shaped building frames composed of horizontal bars and vertical columns.

そして、その組立及び解体の際に作業員が転落することを防止すべく、先行手摺工法が用いられている。この工法によれば、作業員が下段の足場から、上段の足場の道路側の手摺を先行して取り付けることができるので、作業員は安全に枠組足場の組立をすることができる。また、作業員が下段の足場から、上段の足場の道路側の手摺を取り外すことができるので、作業員は安全に枠組足場の解体をすることができる。   In order to prevent the worker from falling down during the assembly and disassembly, the handrail method is used. According to this construction method, since the worker can attach the handrail on the road side of the upper scaffold in advance from the lower scaffold, the worker can assemble the frame scaffold safely. In addition, since the worker can remove the handrail on the road side of the upper scaffold from the lower scaffold, the worker can safely dismantle the frame scaffold.

この複数個の建枠を組み立てて足場を形成する際の先行手摺工法としては、「先行手摺枠据え置き方式」と「先行手摺枠先送り方式」の2種類がある。   There are two types of preceding handrail methods for assembling a plurality of building frames to form a scaffold: “preceding handrail frame installation method” and “advanced handrail frame advance method”.

まず、「先行手摺枠据え置き方式」では、次のようにして、建枠を用いて枠組み足場が組み立てられる。   First, in the “preceding handrail frame installation method”, a framework scaffold is assembled using a building frame as follows.

すなわち、複数個の建枠を所定の間隔で建物とは直角に立設し、隣接する建枠の間の建物側に筋違(すじかい)を取り付け固定して建枠を自立させた後、隣接する建枠の間の建物側とは反対側に手摺枠を取り付け固定し、さらに隣接する建枠の間の建枠の横桟の上に足場板(布板)を架け渡すことで、1単位の足場を形成する。次に、既に立設した建枠の上に、別途用意した建枠を載置し、この建枠にも別途用意した筋違と手摺枠を取り付け固定した後、新たに形成された自立した建枠の横桟の上に別途用意した足場板を架け渡すことによって一つ上の段の足場を形成する。建枠の上に別の建枠を載置するには、通常、建枠を構成する縦柱の上に、別の建枠の縦柱を継ぎ足すようにして載置する。これを順次繰り返すことによって、全体の枠組み足場を形成する。   In other words, after standing a plurality of building frames at right angles to the building at a predetermined interval, attaching and fixing streaks on the building side between adjacent building frames, By attaching and fixing a handrail frame on the side opposite to the building side between the adjacent building frames, and further spanning a scaffolding board (cloth board) on the side rail of the building frame between the adjacent building frames, 1 Form a unit scaffold. Next, after placing a separately prepared building frame on the already erected building frame and attaching and fixing the separately prepared strut and handrail frame to this building frame, a newly formed independent building The scaffolding on the upper level is formed by bridging a separately prepared scaffolding plate on the side rail of the frame. In order to place another building frame on the building frame, the building column is usually placed by adding the vertical column of another building frame on the vertical column constituting the building frame. By repeating this sequentially, the entire framework scaffolding is formed.

ここで、用意した手摺枠は、ある段の足場を形成する際に取り付けるのではなく、その1つ下の段の足場から、先行して取り付けられるため、「先行手摺枠」と呼ばれる。また、先行手摺枠は、いずれも枠組足場にそのまま据え置かれ、枠組み足場を構成する部材の一つとして組み込まれることになるため、「先行手摺枠据え置き方式」と呼ばれる。作業員が、新たに一つ上の段の足場を形成するために1つ上の段の足場板の上に立ったときには、既にその段の手摺は取り付け済みであるから、作業員は安全に作業をすることができる。   Here, the prepared handrail frame is not attached when forming a scaffold in a certain step, but is attached in advance from the scaffold in the next lower step, so it is referred to as a “preceding handrail frame”. In addition, since the preceding handrail frame is all placed on the frame scaffold as it is and is incorporated as one of the members constituting the framework scaffold, it is referred to as a “preceding handrail frame stationary method”. When an operator stands on the upper scaffolding plate to form a new stepped scaffold, the worker is safe because the handrail has already been installed. Can work.

図14は、上部に横桟を有する鳥居形状の建枠と据え置き方式の先行手摺枠を用いて、枠組み足場を順次下から組み上げる作業を示す模式図である。(a)は枠組み足場の正面図、(b)は枠組み足場の右側面図を示す。   FIG. 14 is a schematic diagram showing the work of sequentially assembling the framework scaffold from below using a torii-shaped building frame having a horizontal rail at the top and a stationary handrail frame. (a) is a front view of the framework scaffold and (b) is a right side view of the framework scaffold.

作業員20の立っている現足場の一段下の足場は、次のようにして形成される。一段下の足場の隣り合う建枠43の間に、建物40の側に筋違41が斜めに取り付けられて、複数の建枠43が自立した構造を形成し、そして、建物の反対側には、一段下の足場用の先行手摺枠42の上部固定金具7と現足場用の先行手摺枠52の下部固定金具9とが固定されていて、一段下の足場用の先行手摺枠42だけでなく現足場用の先行手摺枠52も既に設置されている。   The scaffold one step below the current scaffold on which the worker 20 stands is formed as follows. Between the adjacent building frames 43 of the lower level scaffolding, the struts 41 are obliquely attached to the side of the building 40 to form a structure in which the plurality of building frames 43 are self-supporting, and on the opposite side of the building The upper fixing bracket 7 of the preceding handrail frame 42 for the lower stage scaffolding and the lower fixing bracket 9 of the preceding handrail frame 52 for the current scaffolding are fixed, and not only the preceding handrail frame 42 for the lower stage scaffolding. A preceding handrail frame 52 for the current scaffold is already installed.

そして、現足場用の先行手摺枠52は、作業員20が一段下の足場板(図示せず)に立って隣り合う建枠43の間に取り付けられたものである。また、作業員20の立っている現足場の足場板51は、一段下の足場板に立って作業員20が一段下の足場の隣接する建枠43の横桟44の上に架け渡されたものである。   The preceding handrail frame 52 for the current scaffold is attached between the adjacent building frames 43 while the operator 20 stands on a scaffold plate (not shown) one step below. In addition, the scaffolding plate 51 of the current scaffold on which the worker 20 stands is standing on the scaffolding plate one step below, and the worker 20 is bridged on the horizontal beam 44 of the building frame 43 adjacent to the scaffolding one step below. Is.

作業員20は、現在、この足場板51の上に乗って、一段下の足場用の建枠43の2本の縦柱45の上に現足場用の建枠53の2本の縦柱55を縦方向に嵌合連結して、現足場用の建枠53を複数設置しているところである。作業員20は、既に先行して設置されている現足場用の先行手摺枠52に安全帯70の一端を取り付け、他端を自分の腰に取り付けることで、転落防止を図ることができる。なお、現足場用の先行手摺枠52の上部固定金具7は、現足場用の建枠53を設置したのちに、その建枠53の縦柱55に固定する。   The worker 20 currently rides on the scaffolding plate 51, and on the two vertical columns 45 of the building frame 43 for the scaffold one step below, the two vertical columns 55 of the building frame 53 for the current scaffold. Are installed in a vertical direction, and a plurality of building frames 53 for the current scaffold are installed. The worker 20 can prevent falling by attaching one end of the safety belt 70 to the preceding handrail frame 52 for the current scaffold that has already been installed and attaching the other end to his / her waist. The upper fixing bracket 7 of the current handrail frame 52 for the current scaffold is fixed to the vertical column 55 of the building frame 53 after the building frame 53 for the current scaffold is installed.

図15に、据え置き方式の先行手摺枠を建枠に取り付ける際の作業手順を示す。(a)は取り付け作業の正面図、(b)は取り付け作業の右側面図である。   FIG. 15 shows a work procedure for attaching the stationary type handrail frame to the building frame. (a) is a front view of the installation work, (b) is a right side view of the installation work.

この図中の作業員20は、現足場用の足場板51の上に立って、一段上の足場用の先行手摺枠62を持ち上げ、2個の位置決め金具8を、隣り合う建枠53の横桟54の所定位置に載置したのち、2個の位置決め金具8を支点として先行手摺枠62を回転させ、その先行手摺枠62に設けられた2個の下部固定金具9を、隣り合う建枠53の縦柱55に押し当て、固定する。こうして、一段上の足場用の先行手摺枠62は、現足場用の隣り合う建枠53に固定されることになる。   The worker 20 in this figure stands on the scaffolding plate 51 for the current scaffold, lifts the preceding handrail frame 62 for the upper scaffold, and places the two positioning brackets 8 on the side of the adjacent building frame 53. After being placed at a predetermined position on the crosspiece 54, the leading handrail frame 62 is rotated with the two positioning brackets 8 as fulcrums, and the two lower fixing brackets 9 provided on the leading handrail frame 62 are connected to adjacent building frames. It is pressed against 53 vertical columns 55 and fixed. In this way, the preceding handrail frame 62 for the upper scaffold is fixed to the adjacent building frame 53 for the current scaffold.

また、逆に、枠組足場を順次上から取り外す際には、一段下の足場に立つ作業者が下部固定金具を建枠から取り外した後に、位置決め金具を支点として手摺り枠を逆回転させるだけで、簡単に取り外しができる。   On the other hand, when removing the frame scaffold from the top, the worker standing on the lower platform simply removes the lower bracket from the building frame and then reverses the handrail frame with the positioning bracket as a fulcrum. Easy to remove.

以上は、鳥居形状の建枠からなる「先行手摺据え置き方式」による枠組み足場を説明してきたが、鳥居形状の建枠に代えて、H形状の建枠からなる「先行手摺据え置き方式」による枠組み足場を形成することもできる。   The above has described the framework scaffolding based on the “previous handrail deferment method” consisting of a torii-shaped building frame, but instead of the torii-shaped building frame, the framework scaffolding based on the “preceding handrail deferment method” consisting of an H-shaped building frame. Can also be formed.

図16は、中間部に横桟を有するH型形状のH枠と据え置き方式の先行手摺枠を用いて、枠組み足場を順次下から組み上げる作業を示す模式図である。(a)は枠組み足場の正面図、(b)は枠組み足場の右側面図を示す。ここでは、手摺枠は、1段の枠組毎に上部手摺枠63と下部手摺枠64の2つからなる。   FIG. 16 is a schematic diagram showing an operation of sequentially assembling a frame scaffold from below using an H-shaped H frame having a horizontal rail in the middle part and a stationary type handrail frame. (a) is a front view of the framework scaffold and (b) is a right side view of the framework scaffold. Here, the handrail frame is composed of an upper handrail frame 63 and a lower handrail frame 64 for each frame.

H枠33は中央部に横桟34を有することから、H枠の中央部に足場板(布板)51が架け渡される。この点が、上部に横桟を有する鳥居形状の建枠とは異なるところである。H枠を用いて枠組足場を形成する手順は、鳥居枠を用いて枠組足場を形成する手順と基本的には同じである。   Since the H frame 33 has the horizontal rail 34 at the center, a scaffolding board (cloth board) 51 is bridged around the center of the H frame. This point is different from a torii-shaped building frame having a horizontal rail at the top. The procedure for forming the frame scaffold using the H frame is basically the same as the procedure for forming the frame scaffold using the torii frame.

すなわち、複数個のH枠33を所定の間隔で建物40とは直角に立設し、隣接するH枠の間の建物側に筋違(図示せず)を取り付け固定してH枠を自立させ、隣接するH枠の間の建物側とは反対側に現足場用の上部手摺枠63と一段上の足場用の下部手摺枠64を取り付け固定した後、さらに隣接するH枠の間の横桟34の上に足場板(布板)51を架け渡すことで、1単位の足場を形成する。次に、既に立設したH枠の上に、別途用意したH枠を載置し、このH枠にも別途用意した筋違と手摺枠を取り付け固定した後、新たに形成された自立したH枠の横桟の上に別途用意した足場板を架け渡すことによって一段上の段の足場を形成する。H枠の上に別のH枠を載置するには、通常、H枠を構成する縦柱35の上に、別のH枠の縦柱を継ぎ足して載置する。これを順次繰り返すことによって、全体の枠組み足場を形成する。ここで、下部手摺枠64が先行手摺枠であり、一段下の足場の上に立った作業員によって取り付けられたものである。上部手摺枠63は、作業員がその足場に立った後に取り付けられるから、先行手摺枠ではない。しかし、作業員が新たに一段上の足場を形成するために一段上の足場板の上に立ったときに既に下部手摺枠64が先行して取り付けられているため、作業員はその下部手摺枠64に安全帯70の一端を取り付け、他端を自分の腰に取り付けることで、転落防止を図ることができる。このように、鳥居形状の建枠に代えて特殊な形状の建枠を使用する先行手摺方式を、一般に「手摺先行専用足場方式」という。   That is, a plurality of H frames 33 are erected at right angles to the building 40 at predetermined intervals, and a streak (not shown) is attached and fixed to the building side between adjacent H frames to make the H frame stand alone. After fixing the upper handrail frame 63 for the current scaffold and the lower handrail frame 64 for the upper scaffold on the opposite side of the building between the adjacent H frames, the horizontal rail between the adjacent H frames is further fixed. A scaffolding board (cloth board) 51 is bridged on 34 to form one unit of scaffolding. Next, a separately prepared H frame is placed on the already established H frame, and a separately prepared streak and handrail frame is attached and fixed to the H frame. The scaffolding of the upper stage is formed by bridging a separately prepared scaffolding plate on the horizontal rail of the frame. In order to mount another H frame on the H frame, the vertical column of another H frame is usually mounted on the vertical column 35 constituting the H frame. By repeating this sequentially, the entire framework scaffolding is formed. Here, the lower handrail frame 64 is a preceding handrail frame, which is attached by an operator standing on the scaffold one step below. The upper handrail frame 63 is not a preceding handrail frame because it is attached after the worker stands on the scaffold. However, since the lower handrail frame 64 is already attached in advance when the worker stands on the upper scaffolding plate in order to form a new upper scaffolding, By attaching one end of the safety belt 70 to 64 and attaching the other end to one's waist, it is possible to prevent falling. In this way, the preceding handrail method that uses a specially-shaped building frame instead of the torii-shaped building frame is generally referred to as a “handrail leading dedicated scaffolding method”.

次に、「先行手摺枠先送り方式」について、説明する。これは、複数個の建枠からなり、先行手摺枠を用いて枠組足場を形成する点では「先行手摺枠据え置き方式」と同じであるが、用いた先行手摺枠は枠組み足場に組み込まれない。   Next, the “advance handrail frame advance method” will be described. This is the same as the “preceding handrail frame deferment method” in that it is composed of a plurality of building frames and forms a frame scaffold using the preceding handrail frame, but the used handrail frame is not incorporated into the framework scaffold.

特許文献1には、「先行手摺枠先送り方式」で建枠を用いて枠組み足場を形成する方法が開示されている。ここで用いる先送り方式の先行手摺枠は、2本の手摺り柱とこれらの間を連結する2本の手摺材からなる。そして、手摺材は、アウターチューブにインナーチューブが挿入された2重管からなる伸縮自在の管材から構成されていて、手摺材の両端において手摺柱に対して垂直方向に回転自在に連結されている。   Patent Document 1 discloses a method of forming a framework scaffold using a building frame by the “preceding handrail frame advance method”. The advance handrail frame used here is composed of two handrail pillars and two handrail members connecting them. And the handrail material is comprised from the elastic tube material which consists of a double tube by which the inner tube was inserted in the outer tube, and is connected with the both ends of the handrail material so that it can rotate freely with respect to the handrail pillar. .

この「先行手摺枠先送り方式」では、足場を組み立てる際に、2本の手摺り柱とこれらの手摺柱を連結する可変長さの手摺材からなる手摺枠を用いる。この手摺枠は、作業員が一段下の足場板の上に立って形成されるので、先行手摺枠の1種である。ただし、この先行手摺枠はさらに上の段へと先送りされて、その段の足場の部材として組み込まれない。この先送り方式の先行手摺枠を用いる場合であっても、作業員が、新たに一段上の足場を形成するために一段上の足場板の上に立ったときには、既にその段の足場用の手摺枠は一段下の足場から先送りされて形成されているから、作業員は安全に作業をすることができる。なお、この段の足場の上にさらにもう一つの足場を形成したいときは、その段の足場用の手摺枠をさらに一段上の足場用の先行手摺枠に用いるべく先送りされ、先行手摺枠が先送りされた後には、別途用意した作業用手摺を取り付けることで、作業員の安全を確保することができる。   In this “preceding handrail frame forward feed method”, when assembling a scaffold, a handrail frame made of two handrail pillars and a variable-length handrail material that connects these handrail pillars is used. This handrail frame is a kind of preceding handrail frame because the worker is formed standing on the scaffolding plate one step below. However, the preceding handrail frame is further advanced to the upper stage and is not incorporated as a member of the scaffolding of that stage. Even when this advance-feed type handrail frame is used, when an operator stands on the upper scaffolding plate in order to form a new one-step scaffolding, the handrail for the scaffolding at that stage is already used. Since the frame is formed by being advanced from the scaffold one step below, the worker can work safely. If you want to form another scaffold on this stage scaffolding, the scaffolding frame for the scaffolding will be postponed to be used as the preceding railing frame for the scaffolding of the next stage, and the leading railing frame will be postponed. After being done, it is possible to secure the safety of the worker by attaching a separately prepared work handrail.

このように、この先行手摺枠は、常に一段上の足場に先送りされることになるため「先行手摺枠先送り方式」と呼ばれる。したがって、この先行手摺枠は、最終的には、全体の枠組足場の最上段の足場にだけ組み込まれることになる。   In this way, the preceding handrail frame is always forwarded to the scaffold one step above, and is therefore referred to as a “preceding handrail frame advance method”. Therefore, this leading handrail frame is finally incorporated only in the uppermost scaffold of the entire frame scaffold.

図17は、上部に横桟を有する鳥居形状の建枠とこの先送り方式の先行手摺枠を用いて、枠組み足場を順次下から組み上げる作業を示す模式図である。(a)は枠組み足場の正面図、(b)は枠組み足場の右側面図を示す。   FIG. 17 is a schematic diagram showing an operation of sequentially assembling a frame scaffold from below using a torii-shaped building frame having a horizontal rail at the top and a preceding handrail frame of this forward feed method. (a) is a front view of the framework scaffold and (b) is a right side view of the framework scaffold.

作業員20の立っている現足場の一段下の足場は、次のようにして形成される。すなわち、一段下の足場の隣り合う建枠43の間に、建物40の側に筋違41が斜めに取り付けられて、複数の建枠43が自立した構造を形成する。建物の反対側には、一段下の足場用の先行手摺枠(図示せず)が2段下の足場から作業員によって先送りされて、手摺枠として既に設置されているが、作業員20は一段下の足場に立ったとき、この先行手摺枠を現足場用の先行手摺枠71に用いるべく現足場に先送りし、その後、別途用意した作業用手摺15及び筋違41を取り付ける。   The scaffold one step below the current scaffold on which the worker 20 stands is formed as follows. That is, between the building frames 43 adjacent to the next lower scaffold, the struts 41 are obliquely attached to the building 40 side to form a structure in which the plurality of building frames 43 are self-supporting. On the opposite side of the building, a preceding handrail frame (not shown) for the scaffold one step below is sent by the worker from the scaffold two steps below and has already been installed as a handrail frame. When standing on the lower scaffold, the preceding handrail frame is forwarded to the current scaffold to be used as the preceding handrail frame 71 for the current scaffold, and then the separately prepared work handrail 15 and streak 41 are attached.

したがって、作業員20の立っている現足場用の先行手摺枠71は、作業員が1段下の足場板(図示せず)に立って、1段下の足場用の先行手摺枠を現足場用の先行手摺枠に用いるべく先送りされて形成されたものである。また、作業員20の立っている現足場の足場板51は、一段下の足場板(図示せず)に立って作業員20が一段下の足場の隣接する建枠43の横桟44の上に架け渡されたものである。   Therefore, the current handrail frame 71 for the current scaffold on which the worker 20 stands is the current foothold frame for the scaffold one step below the worker standing on the scaffold plate (not shown) one step lower. It is formed by being advanced to be used for a preceding handrail frame. In addition, the scaffolding plate 51 of the current scaffold on which the worker 20 stands is standing on a horizontal plate 44 of the building frame 43 adjacent to the scaffolding of the lower step by standing on the scaffolding plate (not shown) of the lower step. It is the one that was passed over.

作業員20は、現足場用の建枠53を2個設置した後に、1段下の足場から先送りされた先行手摺枠71を構成する2本の手摺り柱72のうちの左側の1本のみを持ち上げ終わり、そして、3個目の現足場用の建枠53を設置しようとしているところである。先行手摺枠71の2本の手摺り柱72を連結する手摺材73は伸縮自在の可変長さとなっているから、一番左の先行手摺枠71の手摺材73は斜めに伸びた状態になっている。ここで、作業員20は、1段下の足場から先送りされた現足場用の先行手摺枠の手摺材73に安全帯70の一端を取り付け、他端を自分の腰に取り付けることで、転落防止を図ることができる。   The worker 20 installs two building frames 53 for the current scaffolding, and then only one of the two handrail pillars 72 that constitute the preceding handrail frame 71 that is advanced from the scaffold one step below. Is about to be installed, and a third frame 53 for the current scaffolding is about to be installed. Since the handrail material 73 connecting the two handrail pillars 72 of the preceding handrail frame 71 has a variable length that can be expanded and contracted, the handrail material 73 of the leftmost preceding handrail frame 71 is in an obliquely extended state. ing. Here, the worker 20 attaches one end of the safety belt 70 to the handrail material 73 of the preceding handrail frame for the current scaffold that has been advanced from the scaffold one step below, and attaches the other end to his / her waist to prevent falling. Can be achieved.

手摺枠の先送り作業は、次のとおりである。すなわち、先送り方式の先行手摺枠71は、その2本の手摺柱72をそれぞれ隣接する建枠53の縦柱55に固定することによって、隣接して立設された建枠53の縦柱55の間に取り付けられる。そして、手摺枠72を構成する2本の手摺り柱72のうちの1本のみを縦柱55から外してから、その縦柱55に沿って持ち上げ固定する。2本の手摺り柱72を連結する手摺材73は、伸縮自在の管材から構成されていて、手摺材は可変長さとなっているとともに、手摺材先端において手摺柱に対して回転可能に連結されているから、手摺材73は斜めに伸びた状態になる。その後、先行手摺枠71を構成する他方の手摺り柱72を建枠の縦柱55から外してから、その縦柱に沿って持ち上げ固定する。これで、先送り方式の手摺枠が、一段上の足場に持ち送られることになる。先送り方式の手摺枠が一段上の足場に持ち送られた後には、隣接する建枠の間に作業用手摺15及び筋違41を取り付けることによって、作業者の安全を図ることができる。   The handrail frame post-feeding operation is as follows. That is, the advance handrail frame 71 is fixed to the vertical column 55 of the adjacent building frame 53 by fixing the two handrail columns 72 to the adjacent vertical column 55 of the building frame 53. Installed between. Then, only one of the two handrail pillars 72 constituting the handrail frame 72 is removed from the vertical pillar 55 and then lifted and fixed along the vertical pillar 55. The handrail material 73 that connects the two handrail pillars 72 is made of an extendable tube material. The handrail material has a variable length and is rotatably connected to the handrail pillar at the front end of the handrail material. Therefore, the handrail material 73 is in an obliquely extended state. Then, after removing the other handrail pillar 72 which comprises the preceding handrail frame 71 from the vertical pillar 55 of a building frame, it lifts and fixes along the vertical pillar. Thus, the advance-type handrail frame is carried to the scaffold one level above. After the advance-type handrail frame is carried to the scaffold one step above, the operator's safety can be achieved by attaching the work handrail 15 and the strut 41 between the adjacent building frames.

「先行手摺枠先送り方式」で建枠を用いて枠組み足場を形成する他の方法としては、別付けのレールを介して先行手摺枠を持ち上げるタイプのものや、建枠をレール代わりに先行手摺枠を持ち上げるタイプのものがある。   Other methods of forming a framework scaffold using a building frame with the "advanced handrail frame advance method" include a type in which the preceding handrail frame is lifted via a separate rail, or a preceding handrail frame instead of the rail. There is a type of lifting.

以上は、(1)の建枠を含む部材を組み立ててなる「建枠式足場」について述べたが、枠組足場としては、前記(2)の支柱部材や手摺部材等の足場構成部材を緊結して組み立ててなる「緊結式足場」がある。   The above describes the `` building frame type scaffolding '' formed by assembling the members including the building frame of (1), but as the frame scaffolding, the scaffolding structural members such as the column members and handrail members of (2) are tightly coupled. There is a “tight-type scaffold” that is assembled.

(2)の「緊結式足場」は、「コマ」と呼ばれる取付部材が設けられた支柱部材に、手摺部材、斜材(ブレース材)、腕木部材等の足場構成部材をコマを介して取り付け、そして、コマにおいて楔等によってこれらの足場構成部材を緊結した後、足場板(布板)を架け渡すことによって、組み立てられる。   (2) "tightening type scaffolding" is a scaffolding member provided with a mounting member called "coma" to which a scaffolding member such as a handrail member, a diagonal material (brace material), a brace member is attached via a frame, Then, after these scaffold constituent members are fastened together with wedges or the like in the top, they are assembled by bridging a scaffold board (cloth board).

図18に、緊結式足場の構造の一例を示す。(a)は緊結式足場の正面図、(b)は取り付け部材(コマ)の周辺の拡大図、そして、(c)は緊結式足場の右側面図である。   FIG. 18 shows an example of the structure of a tight-binding scaffold. (a) is a front view of a binding type scaffold, (b) is an enlarged view of the periphery of a mounting member (frame), and (c) is a right side view of the binding type scaffold.

緊結式足場は、次のようにして、形成される。建物40の側の隣接する支柱17の間に支柱17のコマ22を結ぶ形で斜材19が取り付けられ、また、建物とは反対側の隣接する支柱18の間に支柱18のコマ22を結ぶ形で作業用手摺15が取り付けられ、それぞれ、コマ22において楔等で斜材19及び作業用手摺15が緊結される。さらに、建物側の支柱17と建物とは反対側の支柱18の間に支柱17と支柱18のコマ22を結ぶ形で腕木材21を取り付け、コマ22において楔等で腕木材21が緊結されることで、支柱が自立する。その後、隣接する腕木材21の上に足場板(布板)51を架け渡すことで、1段の緊結式足場が形成される。なお、斜材19は支柱18の間に取り付ける場合もある。   The tight scaffolding is formed as follows. The diagonal member 19 is attached between the adjacent columns 17 on the side of the building 40 so as to connect the frames 22 of the columns 17, and the frame 22 of the columns 18 is connected between the adjacent columns 18 on the opposite side of the building. The work handrail 15 is attached in a form, and the diagonal member 19 and the work handrail 15 are fastened with a wedge or the like at the top 22 respectively. Further, the arm wood 21 is attached in such a manner that the column 17 of the column 17 and the column 18 is connected between the column 17 on the building side and the column 18 on the opposite side of the building, and the arm wood 21 is fastened with a wedge or the like at the frame 22. By doing so, the column becomes independent. Thereafter, a scaffold plate (fabric plate) 51 is bridged on the adjacent arm lumber 21 to form a one-stage tight scaffold. Note that the diagonal member 19 may be attached between the columns 18.

次に、この足場の最上部に位置する支柱部材16の上に別の支柱部材16が縦方向に継ぎ足され、同様にして、一段上の足場が形成される。これを順次繰り返すことによって、全体の緊結式足場が形成される。   Next, another strut member 16 is vertically joined on the strut member 16 located at the top of the scaffold, and similarly, a one-step scaffold is formed. By repeating this in sequence, the entire tight-binding scaffold is formed.

なお、ここでは、作業用手摺を用いて「緊結式足場」を組み立てる方法を説明したが、作業員の転落防止のためには、作業用手摺をある段の足場を形成する際に取り付けるのではなく、「建枠式足場」で用いるのと同様に、その1つ下の段の足場から先行して取り付けることが求められる。したがって、先送り方式の先行手摺枠を、「緊結式足場」にも適用する必要がある In this example, the method of assembling the “tightened scaffold” using the work handrail has been described. However, in order to prevent the worker from falling, the work handrail is not attached when the scaffold is formed at a certain stage. In the same manner as in the “building frame type scaffolding”, it is required to attach it in advance from the scaffolding of the next lower stage. Therefore, it is necessary to apply the advance handrail frame to the “tightening type scaffold” .

特許文献2には、このような「緊結式足場」が開示されているが、「緊結式足場」に適した先送り方式の先行手摺枠についての記載はない。   Patent Document 2 discloses such a “tightening type scaffold”, but there is no description about a forward-feed type handrail frame suitable for the “tightening type scaffold”.

特開2003−193676号公報JP 2003-193676 A 特開2000−248737号公報JP 2000-248737 A

種々の先行手摺工法が提案されているが、「先行手摺枠据え置き方式」は、先行手摺枠自体が大型であり、その搬送や取り付けに手間がかかる上に、完成した枠組み足場に組み込まれるため、手摺枠を多数用意しなければならないため、リース代や運搬費用が嵩んで、建築工事のコストアップ要因となる。   Various leading handrail construction methods have been proposed, but the `` preceding handrail frame deferment method '' is large in size, and takes time and effort to transport and attach it, and is incorporated into the completed framework scaffold, Since a large number of handrail frames must be prepared, leasing costs and transportation costs increase, resulting in an increase in construction work costs.

これに対して、「先行手摺枠先送り方式」は、先行手摺枠は最上段の足場のみに組み込まれるため、用意する手摺枠の数は少ないため、その分、リース代や運搬費用も少なくて済む。しかしながら、従来の先送り方式の先行手摺枠は、手摺柱を伸縮させるために2重管構造になっており、そのため、衝撃に弱く、また、異物が付着したり錆び等が発生して伸縮ができなくなるなどの問題があった。   On the other hand, in the “advance handrail frame advance method”, since the prior handrail frame is incorporated only in the uppermost stage scaffolding, the number of handrail frames to be prepared is small, so the leasing fee and the transportation cost can be reduced accordingly. . However, the conventional advance handrail frame has a double-pipe structure for expanding and contracting the handrail column. Therefore, it is vulnerable to impacts, and it can expand and contract due to foreign matter adhering or rusting. There were problems such as disappearing.

また、「先行手摺枠先送り方式」は、「建枠式足場」だけでなく、「緊結式足場」でも使用することができる。しかしながら、「緊結式足場」は、支柱部材に、手摺部材、斜材(ブレース材)、腕木部材、足場板(布板)等の足場構成部材を取り付けるために、「コマ」と呼ばれる取り付け部材が用いられることが多いが、このコマが突出した形状を有するために、従来の先送り方式の先行手摺枠を「緊結式足場」にそのまま持ち込むことには困難が伴うことが多い。   Further, the “advance handrail frame advance method” can be used not only for “building frame type scaffolding” but also for “tightening type scaffolding”. However, in the “tightening type scaffold”, there is an attachment member called “frame” for attaching a scaffold component member such as a handrail member, a diagonal member (brace material), a brace member, a scaffold board (cloth board) to the support member. Although often used, since the top has a protruding shape, it is often difficult to bring the conventional handrail frame of the conventional forward-feed type into the “tightening type scaffold” as it is.

本発明は、このような問題を解決するためになされたものであって、「建枠式足場」だけでなく「緊結式足場」でも使用することができる、衝撃に強くかつ錆びにくい先送り式の先行手摺枠を提供することを目的とする。また、この先行手摺枠を用いて、枠組み足場を形成する方法を提供することを目的とする。   The present invention has been made to solve such a problem, and can be used not only for “building frame type scaffolding” but also for “tightening type scaffolding”. The object is to provide a leading handrail frame. It is another object of the present invention to provide a method for forming a framework scaffold using the preceding handrail frame.

本発明は、次の(1)〜(6)の先行手摺枠並びに(7)〜(8)の建枠式足場を形成する方法及び(9)〜(10)の緊結式足場を形成する方法に関する。以下、(1)〜(10)を総称して、本発明ということもある。
The present invention provides the following (1) to ( 6 ) leading handrail frame and ( 7 ) to (8) building frame type scaffolding and (9) to ( 10 ) binding type scaffolding About. Hereinafter, (1) to ( 10 ) may be collectively referred to as the present invention.

(1) 複数本の手摺柱とそれらの手摺柱を連結する少なくとも1本の手摺材からなる先送り方式の先行手摺枠であって、手摺り柱が作業用手摺又は筋違又は斜材からなる棒状部材の上にあずけるあずけ金具を有し、かつ手摺材が手摺柱に対して回転可能に連結されていることを特徴とする先行手摺枠。
(1) A pre-handed handrail frame composed of a plurality of handrail pillars and at least one handrail material connecting the handrail pillars, wherein the handrail pillar is a bar-shaped work rail or a strut or diagonal material It has Azukeru entrusts fitting over the member, and the preceding handrail frame handrail material is characterized in that it is rotatably coupled to the handrail column.

(2)手摺材が手摺柱から着脱可能であることを特徴とする上記(1)の先行手摺枠。   (2) The preceding handrail frame according to (1) above, wherein the handrail material is detachable from the handrail pillar.

(3)手摺柱が縦柱又は支柱に手摺柱を固定するための固定金具を有していることを特徴とする上記(1)又は(2)の先行手摺枠。   (3) The preceding handrail frame according to (1) or (2) above, wherein the handrail column has a fixing bracket for fixing the handrail column to the vertical column or the column.

(4)手摺柱が縦柱又は支柱に手摺柱を固定する際の位置決め金具を有していることを特徴とする上記(1)〜(3)のいずれかの先行手摺枠。   (4) The preceding handrail frame according to any one of the above (1) to (3), wherein the handrail column has a positioning bracket for fixing the handrail column to the vertical column or the column.

(5) 手摺柱に設けられたあずけ金具が作業用手摺又は筋違又は斜材からなる棒状部材にあずけられたときにその棒状部材から外れないようにするための外れ止め手段を備えていることを特徴とする上記(1)〜(4)のいずれかの先行手摺枠。
(5) Provided with a means for preventing the razor bracket provided on the handrail pillar from being removed from the bar-shaped member when it is applied to the bar-shaped member made of a handrail or a strut or diagonal material for work . The preceding handrail frame according to any one of (1) to (4) above.

(6) 手摺柱に設けられたあずけ金具が作業用手摺又は筋違又は斜材からなる棒状部材にあずけられた後に、手摺柱が転倒しないようにするための転倒防止手段を備えていることを特徴とする上記(1)〜(5)のいずれかの先行手摺枠。
(6) It is provided with a fall prevention means for preventing the handrail pillar from falling after the handrail provided on the handrail pillar is assigned to the work handrail or the bar-like member made of striation or diagonal material. The preceding handrail frame according to any one of (1) to (5) above.

(7) 上記(1)〜(6)のいずれかの先行手摺枠を先送り方式で用いて建枠式枠組足場を形成する方法であって、先行手摺枠の手摺柱を建枠の縦柱に固定することによって隣接して立設された建枠の縦柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を縦柱から外して水平又は斜めに設置された作業用手摺又は筋違からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を縦柱から外してから一段上の足場を構成する建枠の縦柱に持ち送って固定し、その後、その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の建枠の縦柱に持ち送って固定することを特徴とする、建枠式枠組足場を形成する方法。
(7) A method of forming a building-frame-type frame scaffold using the preceding handrail frame according to any one of (1) to (6) above, wherein the handrail column of the preceding handrail frame is used as a vertical column of the building frame. After attaching the preceding handrail frame between the vertical pillars of the building frame that are erected adjacently by fixing, the work is installed horizontally or diagonally with one handrail pillar of the preceding handrail frame removed from the vertical pillar After temporarily placing it on a bar-shaped member made of a handrail or a streak, remove the other handrail column of the preceding handrail frame from the vertical column, and then carry it to the vertical column of the building frame that constitutes the upper scaffold. Then, a handrail column temporarily placed on the rod-shaped member is carried and fixed to the vertical column of the other building frame that constitutes the upper scaffold, and a building frame type frame scaffold is formed. how to.

(8) 上記(1)〜(6)のいずれかの先行手摺枠を先送り方式で用いて建枠式枠組足場を形成する方法であって、先行手摺枠の手摺柱を建枠の縦柱に固定することによって隣接して立設された建枠の縦柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を縦柱から外して水平又は斜めに設置された作業用手摺又は筋違からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を縦柱から外してから一段上の足場を構成する建枠の縦柱に持ち送って固定し、その後、その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の建枠の縦柱に持ち送って固定し、さらに、隣接する建枠の間に作業用手摺を取り付けることを特徴とする、建枠式枠組足場を形成する方法。
(8) A method of forming a building-frame-type frame scaffold using the preceding handrail frame of any one of (1) to (6) above by a forward feed method, wherein the handrail column of the preceding handrail frame is used as a vertical column of the building frame. After attaching the preceding handrail frame between the vertical pillars of the building frame that are erected adjacently by fixing, the work is installed horizontally or diagonally with one handrail pillar of the preceding handrail frame removed from the vertical pillar After temporarily placing it on a bar-shaped member made of a handrail or a streak, remove the other handrail column of the preceding handrail frame from the vertical column, and then carry it to the vertical column of the building frame that constitutes the upper scaffold. After that, the handrail column temporarily placed on the rod-shaped member is transported and fixed to the vertical column of the other building frame that constitutes the upper scaffold, and the work handrail is further interposed between the adjacent building frames. A method of forming a building-framework scaffold, characterized by attaching a frame.

(9) 上記(1)〜(6)のいずれかの先行手摺枠を先送り方式で用いて緊結式枠組足場を形成する方法であって、先行手摺枠の手摺柱を支柱に固定することによって隣接して立設された支柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を支柱から外して水平又は斜めに設置された作業用手摺又は斜材からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を支柱から外してから一段上の足場を構成する支柱に持ち送って固定し、その後その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の支柱に持ち送って固定することを特徴とする、緊結式枠組足場を形成する方法。
( 9 ) A method for forming a tight-framed scaffold using the preceding handrail frame of any one of (1) to (6) above by a forward feed method, wherein the handrail column of the preceding handrail frame is adjacent to the column by fixing it. After attaching the leading handrail frame between the standing pillars, the bar-shaped member made of the handrail or the diagonal member is installed horizontally or obliquely by removing one of the handrail pillars of the preceding handrail frame from the pillar. after temporarily entrusts above, send fixed has a post that constitutes the anchorage on one stage and the other handrail pillars of the preceding handrail frame and disconnect from the strut, then handrail column that was tentatively entrusts on the rod-like member A method for forming a tight-framework scaffold, characterized in that the frame is carried and fixed to the other strut that constitutes the scaffold one step above.

(10) 上記(1)〜(6)のいずれかの先行手摺枠を先送り方式で用いて緊結式枠組足場を形成する方法であって、先行手摺枠の手摺柱を支柱に固定することによって隣接して立設された支柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を支柱から外して水平又は斜めに設置された作業用手摺又は斜材からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を支柱から外してから一段上の足場を構成する支柱に持ち送って固定し、その後その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の支柱に持ち送って固定し、さらに、隣接する支柱の間に作業用手摺を取り付けることを特徴とする、緊結式枠組足場を形成する方法。
( 10 ) A method of forming a tight-framed scaffold using the preceding handrail frame of any one of the above (1) to (6) by a forward feed method, wherein the handrail pillar of the preceding handrail frame is adjacent to the column by fixing it. After attaching the leading handrail frame between the standing pillars, the bar-shaped member made of the handrail or the diagonal member is installed horizontally or obliquely by removing one of the handrail pillars of the preceding handrail frame from the pillar. after temporarily entrusts above, send fixed has a post that constitutes the anchorage on one stage and the other handrail pillars of the preceding handrail frame and disconnect from the strut, then handrail column that was tentatively entrusts on the rod-like member A method of forming a tight-framework scaffold, characterized in that the work frame is carried and fixed to the other strut constituting the one-stage scaffold, and a work handrail is attached between the adjacent struts.

本発明によれば、衝撃に強くかつ錆びや異物の付着に左右されない先送り式の先行手摺枠を提供することができる。また、この先行手摺枠を用いて、「建枠式足場」だけでなく「緊結式足場」による枠組足場についても、手間をかけずに組み立てることができる。   According to the present invention, it is possible to provide a forward-feed type handrail frame that is resistant to impact and is not affected by rust or foreign matter adhesion. Further, using this leading handrail frame, not only “building frame type scaffolding” but also frame scaffolding by “tightening type scaffolding” can be assembled without taking time and effort.

本発明に係る、先送り式の先行手摺枠と、この先行手摺枠を用いて枠組み足場を形成する方法を、図面を用いて説明する。   The advance type handrail frame according to the present invention and a method of forming a frame scaffold using the preceding handrail frame will be described with reference to the drawings.

図1は、本発明に係る先送り式の先行手摺枠の一例である。(a)が正面図、(b)が右側面図である。   FIG. 1 is an example of a advance-type preceding handrail frame according to the present invention. (a) is a front view, (b) is a right side view.

先行手摺枠1は、2本の手摺柱2と、これらの2本の手摺柱2を連結する2本の手摺材3からなる。それぞれの手摺材3の両端には取付孔(図示せず)が穿たれており、この取付孔を手摺柱2に設けられた手摺材回転金具6に掛けることによって、手摺材回転金具を支点として、それぞれの手摺材3は手摺柱2に対して垂直方向に回転可能となっている。手摺材回転金具の詳細については、後述する。

The preceding handrail frame 1 includes two handrail pillars 2 and two handrail members 3 that connect the two handrail pillars 2. The both ends of the handrail member 3 are bored mounting holes (not shown), by multiplying the handrail member rotating bracket 6 provided with the mounting hole in the handrail column 2, fulcrum handrail member rotating fitting 6 As a result, each handrail material 3 is rotatable in a direction perpendicular to the handrail column 2. The details of the handrail rotating metal fitting will be described later.

手摺柱2には、棒状部材(図示せず)の上に手摺柱2をあずけることができる形状を有する2個のあずけ金具5が設けられている。先行手摺枠1を一段上の足場へと先送りする際に、まず片方の手摺柱2が持ち上げられ、その手摺柱2に設けられたあずけ金具5が建枠間又は支柱間に設けられた作業用手摺や斜材等の棒状部材の上にあずけられる。したがって、あずけ金具5には、手摺柱2があずけ金具5により棒状部材の上にあずけられた後に、棒状部材から外れないように外れ止め手段を備えることが好ましい。また、あずけ金具には、手摺柱2があずけ金具5により棒状部材の上にあずけられた後に、その手摺柱が転倒しないように転倒防止手段を備えていることが好ましい。あずけ金具の詳細については、後述する。   The handrail column 2 is provided with two hand brackets 5 having a shape that allows the handrail column 2 to be disposed on a bar-like member (not shown). When the preceding handrail frame 1 is moved forward to the scaffold one step higher, first, one handrail pillar 2 is first lifted, and a working bracket 5 provided on the handrail pillar 2 is provided between the building frames or between the columns. It is placed on a bar-shaped member such as a handrail or diagonal material. Accordingly, it is preferable that the rake metal 5 is provided with a detachment prevention means so that the handrail column 2 is not detached from the bar-shaped member after the handrail column 2 is placed on the bar-shaped member by the rake metal 5. Moreover, it is preferable that the handrail column is provided with a fall prevention means so that the handrail column does not fall after the handrail column 2 is placed on the rod-like member by the hand bracket 5. Details of the Azuki metal fitting will be described later.

さらに、ここでは、手摺柱2は、固定金具10と位置決め金具8を備えている。固定金具10は、予め手摺柱2に設けておいてもよいが、別途分離した金具を用いてもよく、建枠足場の縦柱又は緊結式足場の支柱に手摺柱2を固定する際に用いることができる。そして、位置決め金具8は、建枠足場の縦柱又は緊結式足場の支柱に手摺柱2を固定する際のガイドとしての機能と固定金具を補完する機能を有しており、固定金具10とともに用いるのが好ましい。固定金具と位置決め金具の詳細については、後述する。   Further, here, the handrail pillar 2 includes a fixing bracket 10 and a positioning bracket 8. The fixing bracket 10 may be provided on the handrail column 2 in advance, but a separate bracket may be used, and is used when the handrail column 2 is fixed to the vertical column of the building scaffold or the column of the binding type scaffold. be able to. The positioning bracket 8 has a function as a guide for fixing the handrail column 2 to the vertical column of the building scaffold or the column of the binding type scaffolding and the function of complementing the fixing bracket, and is used together with the fixing bracket 10. Is preferred. Details of the fixing bracket and the positioning bracket will be described later.

なお、この例では、2本の手摺材3が用いられているが、これは1本であってもよいし、3本以上でも構わない。その手摺材の長さは、建枠足場で用いる場合は隣接する建枠の間の距離によって決まり、そして、緊結足場で用いる場合は隣接する支柱の間の距離によって決まる。手摺柱は管材を用いるのが好ましく、34.0mm以上の外径の鋼管を用いるのが望ましい。また、手摺材の長さは、予め固定したものでもよい。   In this example, two handrail members 3 are used, but this may be one or three or more. The length of the handrail material is determined by the distance between adjacent building frames when used in a building frame scaffold, and is determined by the distance between adjacent columns when used in a binding scaffold. It is preferable to use a pipe material for the handrail column, and it is desirable to use a steel pipe having an outer diameter of 34.0 mm or more. The length of the handrail material may be fixed in advance.

図2に、手摺材の先端を手摺柱に掛けて垂直方向に回転可能にするための手摺材回転金具を例示する。   FIG. 2 shows an example of a handrail material rotating metal fitting for allowing the front end of the handrail material to be hung on a handrail column and rotating in the vertical direction.

(a)は、いわゆる「バネ式グラビティロック」であり、爪部12がバネによって外側に付勢されているので、手摺材回転金具に手摺材先端に穿たれた取付孔が掛けられた後は、爪部12を内側に押し込まない限り、手摺材が外れることはない。   (a) is a so-called “spring-type gravity lock”, and the claw portion 12 is urged outward by a spring. Therefore, after the mounting hole drilled at the tip of the handrail material is hung on the handrail material rotating bracket, Unless the nail | claw part 12 is pushed inward, a handrail material does not remove | deviate.

(b)は、いわゆる「自由落下式グラビティロック」であり、(a)と同様に爪部12を有するが、バネによる付勢はない。しかし、重力によって爪部12は下方に垂れ下がるから、手摺材回転金具に手摺材先端に穿たれた取付孔が掛けられた後は、爪部12を内側に押し込まない限り、手摺材が外れることはない。   (b) is a so-called “free fall type gravity lock” and has a claw portion 12 as in (a), but is not biased by a spring. However, since the claw portion 12 hangs downward due to gravity, the handrail material will not come off unless the claw portion 12 is pushed inward after the mounting hole drilled at the handrail material tip is hung on the handrail material rotating bracket. Absent.

(c)は、先端に平面部13を有するピン(ネーブル)14であり、平面部13は長方形、多角形、楕円形、円形等の形状を採用することができる。手摺材回転金具に手摺材先端に穿たれた取付孔が掛けられた後は、この平面部が邪魔をするので、手摺材は金具から外れにくい。   (c) is a pin (navel) 14 having a flat surface portion 13 at the tip, and the flat surface portion 13 can adopt a shape such as a rectangle, a polygon, an ellipse, or a circle. After the mounting hole pierced at the tip of the handrail material is hung on the handrail material rotating metal fitting, this plane portion interferes, and the handrail material is difficult to come off the metal fitting.

このように、手摺材回転金具は、手摺材の先端を手摺柱に掛けて垂直方向に回転可能にするためのものであり、図2に例示した金具に限定されない。爪等の開閉により手摺材が外れない構造のものだけでなく、一定角度に手摺材を回転しないと外れないようにした特殊ピン構造のものでもよい。   As described above, the handrail material rotating metal fitting is for hanging the front end of the handrail material on the handrail pillar so as to be rotatable in the vertical direction, and is not limited to the metal fitting illustrated in FIG. Not only a structure in which the handrail material is not removed by opening and closing of the nail or the like, but also a special pin structure in which the handrail material is not removed unless the handrail material is rotated at a certain angle.

なお、手摺柱と手摺材は分離できる構造とするのが好ましいが、分離できない構造であっても構わない。手摺柱と手摺材を分離できる構造にすると、図3に示すように、手摺柱と手摺材を別々にして運搬できるという利点がある。ここで、(a)が手摺柱2であり、(b)が手摺材3である。   In addition, although it is preferable to set it as the structure which can isolate | separate a handrail pillar and a handrail material, the structure which cannot be separated may be sufficient. The structure in which the handrail pillar and the handrail material can be separated has an advantage that the handrail pillar and the handrail material can be transported separately as shown in FIG. Here, (a) is the handrail pillar 2, and (b) is the handrail material 3.

手摺柱と手摺材を分離できる構造とするには、手摺材3の両端に穿たれた取付孔11において、手摺柱2から着脱可能とするのがよい。   In order to achieve a structure in which the handrail pillar and the handrail material can be separated, it is preferable that the attachment holes 11 formed at both ends of the handrail material 3 be detachable from the handrail pillar 2.

手摺材の材料としては管材を用いるのが好ましく、27.2mm以上の外径の鋼管を用いるのが望ましい。その管材の両端をつぶして平板化し、その平板に取付孔を穿つことができる。取付孔の形状は円形でよいが、手摺材回転金具の形状によっては、長円形又は多角形にしてもよい。長円形又は多角形の孔を採用すると、ある一定の角度に手摺材を回転させたときに手摺材が外れるようにすることができる。あるいは、鍵穴形状のように、特定の動作をすると手摺材が外れるような形状を採用することもできる。   As the material of the handrail material, it is preferable to use a pipe material, and it is desirable to use a steel pipe having an outer diameter of 27.2 mm or more. Both ends of the tube material can be crushed and flattened, and mounting holes can be made in the flat plate. The shape of the mounting hole may be circular, but may be oval or polygonal depending on the shape of the handrail material rotating metal fitting. When an oval or polygonal hole is employed, the handrail can be removed when the handrail is rotated at a certain angle. Alternatively, a shape that allows the handrail material to be removed when a specific operation is performed, such as a keyhole shape, may be employed.

図4に、手摺材の先端に設ける取付孔に採用される種々の形状を例示する。
(a)が円形、(b)が長円形、(c)が菱形、(d)が長方形、(e)が三角形、(f)と(g)が鍵穴形状である。
FIG. 4 illustrates various shapes employed in the mounting hole provided at the tip of the handrail material.
(a) is a circle, (b) is an oval, (c) is a rhombus, (d) is a rectangle, (e) is a triangle, and (f) and (g) are keyhole shapes.

次に、あずけ金具について、説明する。上述したとおり、手摺柱には、作業用手摺や斜材等の棒状部材の上に手摺柱をあずけることができる形状を有するあずけ金具が設けられている。あずけ金具は、棒状部材の上に手摺柱を立てた状態で仮にあずけることができればよいものであって、手摺柱に少なくとも1個は必要である。手摺柱の転倒防止の点からは2個設けるのが好ましい。また、手摺部材が棒状部材の上にあずけられた後に棒状部材から外れないようにするのが好ましい。   Next, the Azuki metal fitting will be described. As described above, the handrail column is provided with a metal fitting having a shape that allows the handrail column to be placed on a bar-shaped member such as a work handrail or a diagonal member. It is only necessary that the metal fittings can be temporarily arranged in a state where the handrail pillar is set up on the bar-like member, and at least one handrail pillar is necessary. From the viewpoint of preventing the handrail pillar from falling, it is preferable to provide two. Further, it is preferable that the handrail member is not detached from the bar-shaped member after being placed on the bar-shaped member.

図5に、上下2個のあずけ金具を手摺柱に設ける場合に用いられるあずけ金具を例示する。これらは、足場板(布板)に使用される掴み金具を転用したものである。   FIG. 5 shows an example of a side bracket used when two top and bottom side brackets are provided on a handrail post. These are diverted grips used for scaffold boards (cloth boards).

(a)は上下2個とも落下錠つきのあずけ金具を用いた例、(b)は上側のあずけ金具のみに落下錠を組み込んだもの、(c)は下側のあずけ金具のみに落下錠を組み込んだもの、そして、(d)は上下2個とも落下錠なしのあずけ金具を用いた例である。   (a) is an example of using a razor bracket with a drop lock on both the top and bottom, (b) is a combination of a drop lock only on the upper rake bracket, and (c) is a drop lock only on the lower rake bracket. (D) and (d) are examples in which the upper and lower two parts are used with razor brackets without a drop lock.

この場合、落下錠79をあずけ金具の一方又は両方に組み込むと、手摺部材が棒状部材の上にあずけられた後に棒状部材から外れないようにすることができる。このような外れ防止機能は、落下錠を用いる代わりに、バネ等の特殊な機構を用いたり、あるいは、あずけ金具の形状に細工を施すことによっても、付与することができる。   In this case, when the falling lock 79 is incorporated in one or both of the rivet fittings, it is possible to prevent the handrail member from being detached from the rod-shaped member after being placed on the rod-shaped member. Such a detachment prevention function can be imparted by using a special mechanism such as a spring instead of using a falling lock, or by crafting the shape of a lacquer fitting.

図6は、あずけ金具の形状に細工を施すことによって、外れ防止機能を付与した例である。あずけ金具5は、棒状部材(図示せず)を抱き込む形の開口部80を有するが、この開口部80の幅を、入口は広く、そして、奥は狭くすることによって、抱き込まれた棒状部材を抜けにくくすることが可能となる。なお、ここでは、上下2個のあずけ金具を手摺柱2に設け、かつ両方のあずけ金具とも、開口部の幅を入口は広くそして奥は狭くしているが、片方のあずけ金具のみこのような形状としてもよく、また、あずけ金具は1個であっても構わない。   FIG. 6 is an example in which a detachment prevention function is provided by crafting the shape of the lacquer fitting. The azuke metal fitting 5 has an opening 80 in the shape of embracing a rod-shaped member (not shown). The width of the opening 80 is widened so that the entrance is wide and the back is narrowed. It becomes possible to make it difficult to remove the member. Here, the upper and lower two side fittings are provided on the handrail post 2 and both the side fittings have a wide opening at the entrance and a depth at the bottom, but only one side fitting is like this. The shape may be good, and there may be only one izuke metal fitting.

また、図7は、あずけ金具5を手摺柱2に対して回転可能に設けたあずけ金具の例である。(a)が足場組立時の手摺柱のあずけ金具の状態であり、そして、(b)が手摺柱の運搬時のあずけ金具の状態である。   FIG. 7 is an example of a razor fitting provided with the azuma fitting 5 rotatably with respect to the handrail column 2. (a) is the state of the handrail pillar mounting bracket when assembling the scaffolding, and (b) is the state of the handrail mounting bracket when transporting the handrail pillar.

(a)の足場組立時には、あずけ金具5に棒状部材(図示せず)を抱き込ませた後にあずけ金具5が自重で棒状部材を締め付けることによって、抱き込まれた棒状部材を抜けにくくすることが可能となる。なお、ここでは、上下2個のあずけ金具を手摺柱2に設け、かつ両方のあずけ金具とも、手摺柱2に対して回転可能に設けられているが、片方のあずけ金具のみ回転可能としてもよく、また、あずけ金具は1個であっても構わない。また、あずけ金具5を手摺柱2に対して回転可能に設けた場合には、(b)に示すように、運搬の際にあずけ金具5が収納されてコンパクトになるため、場所をとらないため、運搬効率を上げることができる。   At the time of assembling the scaffold of (a), the rod-shaped member 5 is clamped by its own weight after the rod-shaped member (not shown) is embraced in the metal frame 5, so that the rod-shaped member that is embraced cannot be easily removed. It becomes possible. Here, the upper and lower two side fittings are provided on the handrail column 2 and both of the side fittings are provided so as to be rotatable with respect to the handrail column 2. However, only one side fitting may be rotatable. In addition, there may be one ledge metal fitting. In addition, when the azuma bracket 5 is provided so as to be rotatable with respect to the handrail pillar 2, the razor bracket 5 is housed and compact when transported, as shown in FIG. , Can improve the transport efficiency.

さらに、図8は、図7に示したあずけ金具の変形例であり、あずけ金具5の先端形状が延びていて鉤形状を構成しているため、足場組立時に手摺柱のあずけ金具に抱き込まれた棒状部材はさらに抜けにくくなっている。   Further, FIG. 8 is a modification of the rake metal fitting shown in FIG. 7, and since the tip shape of the rake metal fitting 5 extends to form a hook shape, it is held in the rake metal fitting of the handrail pillar when assembling the scaffolding. The rod-shaped member is more difficult to come off.

以上は、外れ防止機能をあずけ金具自体に設けた例を説明してきたが、外れ防止機能は手摺柱の本体に設けてもよい。   The example in which the detachment prevention function is provided on the metal fitting itself has been described above, but the detachment prevention function may be provided on the main body of the handrail pillar.

図9は、手摺柱2の本体にバネ式ピン81を設けることによって、外れ防止機能を付与した例である。   FIG. 9 is an example in which a spring-type pin 81 is provided on the main body of the handrail pillar 2 to provide a detachment preventing function.

手摺柱の本体にバネで右方に付勢したバネ式ピン81が設けられている。足場組立時には、この手摺柱に設けられたバネ式ピン81を左方に動かしておいて、あずけ金具5に棒状部材(図示せず)を抱き込ませた後に、バネ式ピン81を離すとバネ式ピンが右方に移動するから、抱き込まれた棒状部材は抜けなくなる。なお、ここでは、上下2個のあずけ金具を手摺柱2に設け、かつ両方のあずけ金具の下にバネ式ピンを設置したが、片方のあずけ金具の下のみに設置してもよく、また、あずけ金具は1個であっても構わない。   A spring-type pin 81 urged rightward by a spring is provided on the main body of the handrail pillar. When assembling the scaffold, the spring-type pin 81 provided on the handrail post is moved to the left, and a bar-shaped member (not shown) is held in the ledge 5 and then the spring-type pin 81 is released to release the spring. Since the expression pin moves to the right, the embraced rod-shaped member cannot be removed. In this example, the upper and lower two side fittings are provided on the handrail post 2 and the spring-type pins are installed below both of the side fittings. However, they may be installed only under one side fitting, There may be one Azuki metal fitting.

このように、あずけ金具には外れ防止機能を設けることが好ましいが、1本の手摺柱に外れ防止機能を有するあずけ金具を2個以上設けた場合には、手摺柱があずけ金具により棒状部材の上にあずけられた後に、手摺柱が転倒しにくくなるという機能も付与される。   As described above, it is preferable to provide a detachment prevention function for the razor bracket. However, when two or more arbor fittings having a detachment prevention function are provided on one handrail column, the handrail column is attached to the bar-shaped member by the bracket. The function that the handrail column is difficult to fall after being placed on top is also provided.

あずけ金具には、このような手摺柱の転倒防止機能を付与することが好ましい。その他の転倒防止機能を付与する方法としては、あずけ金具の棒状部材(図示せず)を抱き込ませる形状の部分に幅を持たせて樋状にすることによっても可能である。   It is preferable to provide such a function to prevent the handrail pillar from falling over to the azuke metal fittings. As another method for providing a fall prevention function, it is also possible to give a portion having a shape for embedding a rod-shaped member (not shown) of the lacquer metal fitting to form a bowl shape.

次に、固定金具と位置決め金具について、説明する。   Next, the fixing bracket and the positioning bracket will be described.

固定金具は、建枠足場の縦柱又は緊結式足場の支柱に手摺柱を固定する際に用いるものであって、予め手摺柱に組み込んでおいてもよいし、別途用意しておいて、手摺柱に取り付けることもできる。固定金具は、建枠足場の縦柱又は緊結式足場の支柱に手摺柱を直接固定できるものであればよく、クランプ等の一般に用いられる固定金具を挙げることができる。また、緊結式足場の支柱に手摺柱を固定する場合には、支柱材の取付部材(コマ)を利用して固定することもできる。固定金具の種類は、特に限定するものではないが、先行手摺枠の手摺柱を建枠足場の縦柱又は緊結式足場の支柱に強固に固定でき、かつ、枠組足場を解体する際に外しやすい構造を有するとともに、その取付位置も枠組足場の組立と解体の邪魔にならないものが好ましい。   The fixing bracket is used when the handrail column is fixed to the vertical column of the building frame scaffolding or the column of the binding type scaffolding, and may be incorporated in the handrail column in advance or separately prepared. It can also be attached to a pillar. The fixing bracket is not particularly limited as long as it can directly fix the handrail column to the vertical column of the building scaffold or the support column of the binding type scaffold, and examples thereof include a commonly used fixing bracket such as a clamp. Moreover, when fixing a handrail pillar to the support | pillar of a binding type scaffold, it can also fix using the attachment member (top) of a support | pillar material. The type of the fixing bracket is not particularly limited, but the handrail column of the preceding handrail frame can be firmly fixed to the vertical column of the building frame scaffolding or the column of the binding type scaffolding, and can be easily removed when dismantling the frame scaffolding It preferably has a structure and its mounting position does not interfere with the assembly and disassembly of the frame scaffold.

図10に、建枠足場の縦柱又は緊結式足場の支柱に手摺柱を固定する際に用いることができる、種々の固定金具を例示する。(a)はクランプを用いる固定金具、そして、(b)と(c)はコマ利用の固定金具である。   FIG. 10 illustrates various fixing brackets that can be used when a handrail column is fixed to a vertical column of a building frame scaffolding or a column of a binding type scaffolding. (a) is a fixing bracket using a clamp, and (b) and (c) are frame-based fixing brackets.

(a)のクランプ85を用いるときは、建枠足場の縦柱35又は緊結式足場の支柱4と手摺柱2をクランプ85で留めることによって固定する。(b)と(c)は、緊結式足場の支柱4のコマ22を利用して固定するものである。(b)は、コマに横方向から、手摺柱2に設けられたコの字型の金具86を差し込んだ後に、コマ22とコの字形の金具86を貫くように楔87を上方から打ち込み固定するものであり、(c)は手摺柱2に設けられた下向きの突起をもった金具88をコマの上に載置した後に、コマ22の下部に抜け止めピン89を留めることで固定するものである。   When the clamp 85 of (a) is used, the vertical column 35 of the building scaffold or the column 4 of the binding type scaffold and the handrail column 2 are fixed with the clamp 85. (b) and (c) are fixed using the frame 22 of the support column 4 of the tight-binding scaffold. (b) After inserting the U-shaped fitting 86 provided on the handrail post 2 from the side into the frame, the wedge 87 is driven and fixed so as to penetrate the frame 22 and the U-shaped fitting 86 from above. (C) is to fix the metal fitting 88 having a downward projection provided on the handrail pillar 2 by placing it on the top and then fastening a retaining pin 89 to the bottom of the top 22 It is.

位置決め金具は必ずしも必要ではないが、位置決め金具を手摺柱に設けた場合には、建枠足場の縦柱又は緊結式足場の支柱に手摺柱を固定する際のガイドとしての役割を果たすことができる。また、固定金具だけの場合には曲げ応力が発生する場合があるが、その際に、手摺柱が回転しないようにする役割を果たすことができる。固定金具が堅固のときは、殊更に位置決め金具を設置しなくてもよい。   The positioning bracket is not necessarily required, but when the positioning bracket is provided on the handrail column, it can serve as a guide when fixing the handrail column to the vertical column of the building frame scaffolding or the column of the binding type scaffolding. . Further, in the case of only the fixing metal fitting, bending stress may be generated, but at that time, it can play a role of preventing the handrail pillar from rotating. When the fixing bracket is solid, it is not necessary to install a positioning bracket.

位置決め金具は、予め手摺柱に組み込んでおいてもよいし、別途、手摺柱に取り付けることもできる。位置決め金具としては、建枠足場の縦柱又は緊結式足場の支柱に直接当てるものであってもよいし、緊結式足場においては支柱材の取付部材(コマ)に当てる又は差し込むものでもよい。   The positioning metal fitting may be incorporated in the handrail pillar in advance, or may be separately attached to the handrail pillar. As a positioning metal fitting, it may be applied directly to the vertical column of the building frame scaffolding or the column of the binding type scaffolding, or may be applied to or inserted into the support member (top) of the column material in the binding type scaffolding.

図11に、建枠足場の縦柱又は緊結式足場の支柱に手摺柱を固定する際のガイドとして用いることができる、種々の位置決め金具を例示する。(a)は当て材を用いる位置決め金具、そして、(b)と(c)はコマ利用の位置決め金具である。   FIG. 11 illustrates various positioning brackets that can be used as a guide when a handrail column is fixed to a vertical column of a building frame scaffolding or a column of a binding type scaffolding. (a) is a positioning bracket using a contact material, and (b) and (c) are positioning brackets using frames.

(a)の当て材を用いる位置決め金具は、湾曲形の当て材90を直接に建枠足場の縦柱又は緊結式足場の支柱に当てることで位置決めする。(b)と(c)は、緊結式足場の支柱4のコマ22を利用して位置決めするものである。(b)は、手摺柱2に設けられた逆U字形状の位置決め金具91の先端をコマの上部に横方向から被せることによって位置決めするものであり、(c)は手摺柱2に設けられた下向きの突起をもった位置決め金具92をコマの上に載置することによって位置決めするものである。   The positioning metal fitting using the contact material of (a) is positioned by directly applying the curved contact material 90 to the vertical column of the building frame scaffolding or the column of the binding type scaffolding. (b) and (c) are for positioning using the top 22 of the support 4 of the tight-binding scaffold. (b) is for positioning the tip of the inverted U-shaped positioning fitting 91 provided on the handrail column 2 by covering the top of the frame from the lateral direction, and (c) is provided on the handrail column 2. The positioning fitting 92 having a downward projection is positioned by placing it on the frame.

次に、本発明に係る、先送り式の先行手摺枠を用いて枠組み足場を形成する方法を説明する。   Next, a method for forming a frame scaffold using the advance-type advance handrail frame according to the present invention will be described.

図12及び図13は、先送り方式の先行手摺枠を用いて、緊結式の枠組み足場を順次下から組み上げる作業を示す模式図である。   FIGS. 12 and 13 are schematic diagrams showing an operation of sequentially assembling a tightly-fitting frame scaffold from below using a forward-feed type handrail frame.

図12の(a)〜(c)に、最下段の緊結式足場を形成する手順を示す。   12 (a) to 12 (c) show a procedure for forming the lowermost type scaffolding.

(a)は、最下段の緊結式足場が形成された状態である。この最下段の足場の組立手順は、図18で示した手順と同じであるので、説明は省略する。コマ22が設けられた支柱部材16を縦方向に継ぎ足して1本の支柱4が形成され、建物側の支柱(図示せず)と建物とは反対側の支柱4の間に腕木材(図示せず)を取り付け、支柱4が自立する。その後、隣接する腕木材の上に足場板(布板)51を架け渡し、その足場板51の上で作業員20が隣接する支柱4の間に作業用手摺15を2本ずつ取り付けることで、1段の緊結式足場が形成される。   (a) is a state in which the lowermost type scaffold is formed. The assembly procedure of the lowermost scaffold is the same as the procedure shown in FIG. One strut 4 is formed by vertically connecting the strut members 16 provided with the tops 22, and arm arms (not shown) are provided between the struts (not shown) on the building side and the struts 4 on the opposite side of the building. Z)) and the column 4 is self-supporting. Thereafter, the scaffold board (cloth board) 51 is bridged on the adjacent arm wood, and the work rails 15 are attached to the work pillars 15 adjacent to each other on the scaffold board 51 by two each, A one-stage tight scaffolding is formed.

この場合、作業用手摺15が取り付けられていない状態での作業を余儀なくされるが、最下段であり、足場板の高さが2m以下と低いため、安全上の問題はない。   In this case, the work without the work handrail 15 attached is unavoidable, but there is no safety problem because it is the lowest stage and the height of the scaffolding plate is as low as 2 m or less.

(b)に、本発明に係る先送り方式の先行手摺枠を取り付ける作業を示す。作業員20は、先行手摺枠1を構成する2本の手摺り柱2のうち、左側の1本を左側の支柱4に固定した後、右側の手摺り柱2を持ち上げようとしているところである。なお、手摺り柱2の左側の1本を左側の支柱4に固定する際には、右側の手摺り柱2を作業用手摺15にあずけておくと、手摺り柱2の左側の1本を左側の支柱4に固定する作業を楽に行うことができる。   (b) shows an operation of attaching the advance handrail frame of the forward feeding method according to the present invention. The worker 20 is about to lift the right handrail column 2 after fixing the left one of the two handrail columns 2 constituting the preceding handrail frame 1 to the left column 4. In addition, when fixing the left one of the handrail pillar 2 to the left support column 4, if the right handrail pillar 2 is placed on the work handrail 15, the left one of the handrail pillar 2 is fixed. The work of fixing to the left column 4 can be performed easily.

(c)は、作業員20が、先行手摺枠1を構成する2本の手摺り柱2のうち右側の手摺り柱2を持ち上げて、右側の支柱4に固定したところである。これで、最下段の足場から、作業員20は一段上の足場に先行手摺枠を先送りしたことになる。   (c) is where the operator 20 lifts the right handrail column 2 out of the two handrail columns 2 constituting the preceding handrail frame 1 and fixes it to the right column 4. Thus, the worker 20 has advanced the preceding handrail frame from the lowermost scaffold to the upper scaffold.

次に、作業員は、一段上の足場を形成することになるが、最下段の足場を形成するのと同様に、コマが設けられた支柱部材を縦方向に継ぎ足して支柱を伸ばし、腕木材を支柱4に取り付けて、隣接する腕木材の上に一段上の足場板(布板)を架け渡すことで、一段上の足場を形成した後、一段上の足場板の上に立つことになる。このとき、一段上の足場には、下の足場から先送りされた先行手摺枠が設置されているので、作業員は、その手摺枠の手摺材に安全帯(図示せず)の一端を取り付け、他端を自分の腰に取り付けることで、転落防止を図ることができる。   Next, the worker will form the upper scaffold, but in the same way as the bottom scaffold, the strut member with the top is added vertically to extend the strut, Is attached to the support column 4 and the scaffolding board (fabric board) on the upper level is bridged on the adjacent arm wood to form the scaffolding on the upper level, and then stands on the scaffolding board on the upper level. . At this time, since the preceding handrail frame that is postponed from the lower footing is installed in the upper scaffold, the worker attaches one end of a safety belt (not shown) to the handrail material of the handrail frame, By attaching the other end to your waist, you can prevent falling.

図13の(d)〜(f)は、この先行手摺枠をさらにもう1段上の足場に先送りする手順を示すものである。   (D) to (f) of FIG. 13 show a procedure for further feeding the preceding handrail frame to the scaffold one level higher.

(d)は、1段上の足場に立った作業員20は、先行手摺枠1を構成する手摺材3とほぼ同じ位置に、別途用意した作業用手摺15を隣接する支柱4の間に2本ずつ取り付けた後に、先行手摺枠1を構成する2本の手摺り柱2のうち、右側の1本を右側の支柱4から外して持ち上げ、作業用手摺15にあずけたところである。   (d) shows that the worker 20 standing on the scaffold one level above has a separately prepared work handrail 15 between adjacent struts 4 at substantially the same position as the handrail material 3 constituting the preceding handrail frame 1. After attaching the books one by one, of the two handrail pillars 2 constituting the preceding handrail frame 1, one on the right side is removed from the right pillar 4 and lifted to be put on the work handrail 15.

(e)において、作業員20は、右側の手摺り柱2が作業用手摺15に確実にあずけられていることを確認した後、左側の手摺り柱2を左側の支柱4から外して、持ち上げ、左側の支柱4に固定しようとしているところである。   In (e), after confirming that the right handrail column 2 is securely attached to the work handrail 15, the worker 20 removes the left handrail column 2 from the left column 4 and lifts it up. This is where the left column 4 is being fixed.

(f)において、作業員20は、作業用手摺15にあずけていた右側の手摺り柱2を持ち上げて、右側の支柱4に固定したところである。後は、同じ手順で繰り返していくことになる。   In (f), the worker 20 has just lifted the right handrail column 2 that was assigned to the work handrail 15 and fixed it to the right support column 4. After that, the same procedure will be repeated.

以上は、本発明に係る、先送り式の先行手摺枠を用いて緊結式の枠組み足場を順次下から組み上げる方法を説明したが、先送り式の先行手摺枠を用いて建枠式の枠組み足場を順次下から組み上げる場合も同じである。建枠式の枠組み足場を順次下から組み上げる場合は、支柱部材を縦方向に継ぎ足して1本の支柱を形成する代わりに鳥居枠やH枠等の建枠の縦柱を縦方向に継ぎ足していくことと、腕木材の上に足場板(布板)を架け渡す代わりに建枠の横桟の上に足場板を架け渡すことことと、先送りした先行手摺枠の手摺柱は支柱の代わりに建枠の縦柱に固定されることが異なる。   The above describes the method of sequentially assembling the tight-working frame scaffold from the bottom using the advance-type preceding handrail frame according to the present invention, but the building-frame-type framework scaffold is sequentially used using the advance-type preceding handrail frame. The same applies to the assembly from the bottom. When building frame-type frame scaffolds sequentially from the bottom, the vertical columns of the building frame such as the torii frame and H frame are added vertically instead of adding the column members vertically to form one column. In addition to suspending the scaffolding board (cloth board) on the arm timber, the scaffolding board is built on the side rail of the building frame, and the handrail pillar of the preceding handrail frame that has been advanced is built instead of the column. It is different that it is fixed to the vertical column of the frame.

本発明によれば、衝撃に強くかつ錆びや付着物に左右されない先送り式の先行手摺枠を提供することができる。また、この先行手摺枠を用いて、「建枠式足場」だけでなく「緊結式足場」による枠組足場についても、手間をかけずに組み立てることができる。   According to the present invention, it is possible to provide a forward-feed type advance handrail frame that is resistant to impact and is not affected by rust or deposits. Also, using this leading handrail frame, not only “building frame type scaffolding” but also framed scaffolding by “tightening type scaffolding” can be assembled without much effort.

本発明に係る先送り式の先行手摺枠の一例である。(a)が正面図、(b)が右側面図である。It is an example of the advance-type advance handrail frame which concerns on this invention. (a) is a front view, (b) is a right side view. 手摺材の先端を手摺柱に掛けて垂直方向に回転可能にするための手摺材回転金具を例示する。The handrail material rotation metal fitting for making the front-end | tip of a handrail material hung on a handrail pillar, and enabling it to rotate to a perpendicular direction is illustrated. 手摺柱と手摺材を別々にした状態を示す。The state which separated the handrail pillar and the handrail material is shown. 手摺材の先端に設ける取付孔に採用される種々の形状を例示する。The various shapes employ | adopted as the attachment hole provided in the front-end | tip of a handrail material are illustrated. 上下2個のあずけ金具を手摺柱に設ける場合に用いられるあずけ金具を例示する。An example of a side bracket used when two upper and lower side brackets are provided on a handrail post will be described. あずけ金具の形状に細工を施すことによって、外れ防止機能を付与した例である。This is an example in which a detachment prevention function is provided by crafting the shape of the azusa metal fittings. あずけ金具5を手摺柱2に対して回転可能に設けたあずけ金具の例である。This is an example of a razor bracket provided with a razor bracket 5 rotatably with respect to the handrail column 2. 図7に示したあずけ金具の変形例である。It is a modification of the marquetry metal fitting shown in FIG. 手摺柱2の本体にバネ式ピン14を設けることによって、外れ防止機能を付与した例である。This is an example in which a spring-type pin 14 is provided on the main body of the handrail column 2 to provide a detachment prevention function. 種々の固定金具を例示する。Various fixing brackets are illustrated. 種々の位置決め金具を例示する。Various positioning brackets are illustrated. 本発明に係る先送り方式の先行手摺枠を用いて、緊結式の枠組み足場を順次下から組み上げる作業のうち、最下段の緊結式足場を形成する手順を示す。The procedure for forming the bottom-stage binding scaffold among the operations of sequentially assembling the binding-type frame scaffold from below using the advance-type advance handrail frame according to the present invention will be described. 本発明に係る先送り式の先行手摺枠を1段上の足場に先送りする手順を示す。The procedure for pre-feeding the advance-type advance handrail frame according to the present invention to the scaffold one step above is shown. 上部に横桟を有する鳥居形状の建枠と据え置き方式の先行手摺枠を用いて、枠組み足場を順次下から組み上げる作業を示す模式図である。(a)は枠組み足場の正面図、(b)は枠組み足場の右側面図を示す。It is a schematic diagram which shows the operation | work which assembles a frame scaffold one by one from the bottom using the torii-shaped building frame which has a horizontal rail in the upper part, and the stationary handrail frame of a stationary system. (a) is a front view of the framework scaffold and (b) is a right side view of the framework scaffold. 据え置き方式の先行手摺枠を建枠に取り付ける際の作業手順を示す。(a)は取り付け作業の正面図、(b)は取り付け作業の右側面図である。The work procedure at the time of attaching the stationary type handrail frame to the building frame is shown. (a) is a front view of the installation work, (b) is a right side view of the installation work. 中間部に横桟を有するH型形状のH枠と据え置き方式の先行手摺枠を用いて、枠組み足場を順次下から組み上げる作業を示す模式図である。(a)は枠組み足場の正面図、(b)は枠組み足場の右側面図を示す。It is a schematic diagram which shows the operation | work which assembles a frame scaffold one by one from the bottom using the H-shaped H frame which has a horizontal cross in an intermediate part, and the stationary handrail frame of a stationary system. (a) is a front view of the framework scaffold and (b) is a right side view of the framework scaffold. 上部に横桟を有する鳥居形状の建枠と特許文献1に記載先送り方式の先行手摺枠を用いて、枠組み足場を順次下から組み上げる作業を示す模式図である。(a)は枠組み足場の正面図、(b)は枠組み足場の右側面図を示す。FIG. 5 is a schematic diagram showing an operation of sequentially assembling a frame scaffold from below using a torii-shaped building frame having a horizontal rail at the upper part and a forward-handed advance handrail frame described in Patent Document 1; (a) is a front view of the framework scaffold and (b) is a right side view of the framework scaffold. 緊結式足場の構造の一例を示す。(a)は緊結式足場の正面図、(b)は取り付け部材(コマ)の周辺の拡大図、そして、(c)は緊結式足場の右側面図である。An example of the structure of a tight-binding scaffold is shown. (a) is a front view of a binding type scaffold, (b) is an enlarged view of the periphery of a mounting member (frame), and (c) is a right side view of the binding type scaffold.

符号の説明Explanation of symbols

1 先行手摺枠
2 手摺柱
3 手摺材
4 支柱
5 あずけ金具
6 手摺材回転金具
7 上部固定金具
8 位置決め金具
9 下部固定金具
10 固定金具
11 取付孔
12 爪部
13 平面部
14 ピン
15 作業用手摺
16 支柱部材
17 建物側の支柱
18 建物と反対側の支柱
19 斜材
20 作業員
21 腕木材
22 コマ
33 H枠
34 横桟
35 縦柱
40 建物
41 筋違
42 下方の足場用の先行手摺枠
43 下方の足場用の建枠
44 下方の足場用の横桟
45 下方の足場用の縦柱
51 足場板
52 現足場用の先行手摺枠
53 現足場用の建枠
54 現足場用の横桟
55 現足場用の縦柱
62 上方の足場用の先行手摺枠
63 上部手摺枠
64 下部手摺枠
70 安全帯
71 特許文献1に記載の先送り式の先行手摺枠
72 特許文献1に記載の先送り式の先行手摺枠の手摺柱
73 特許文献1に記載の先送り式の先行手摺枠の手摺材
79 落下錠
80 開口部
81 バネ式ピン
85 クランプ
86 コの字形の金具
87 楔
88 下向きの突起をもった固定金具
89 抜け止めピン
90 湾曲形の当て材
91 逆U字形の位置決め金具
92 下向きの突起をもった位置決め金具
DESCRIPTION OF SYMBOLS 1 Leading handrail frame 2 Handrail pillar 3 Handrail material 4 Prop 5 Azuki metal fitting 6 Handrail material rotating metal fitting 7 Upper fixing metal fitting 8 Positioning metal fitting 9 Lower fixing metal fitting 10 Fixing metal fitting 11 Mounting hole 12 Claw part 13 Plane part 14 Pin 15 Work handrail 16 Column member 17 Column on the building side 18 Column on the opposite side of the building 19 Diagonal material 20 Worker 21 Arm lumber 22 Frame 33 H frame 34 Horizontal beam 35 Vertical column 40 Building 41 Stiff 42 Lower handrail frame for lower scaffolding 43 Below Building scaffolding for lower scaffolding 44 Horizontal scaffolding for lower scaffolding 45 Vertical column for lower scaffolding 51 Scaffolding plate 52 Leading handrail frame for current scaffolding 53 Building frame for current scaffolding 54 Horizontal scaffolding for current scaffolding 55 Current scaffolding Vertical column 62 Upper handrail frame for upper scaffold 63 Upper handrail frame 64 Lower handrail frame 70 Safety belt 71 Advance-type advance handrail frame described in Patent Literature 1 72 Advance delivery described in Patent Literature 1 Handrail pillar of the advance handrail frame of No. 73 Handrail material of the advance-type advance handrail frame described in Patent Document 1 79 Drop lock 80 Opening portion 81 Spring type pin 85 Clamp 86 U-shaped metal fitting 87 Wedge 88 Downward projection Fixing bracket 89 Retaining pin 90 Curved patch 91 Reverse U-shaped positioning bracket 92 Positioning bracket with downward projection

Claims (10)

複数本の手摺柱とそれらの手摺柱を連結する少なくとも1本の手摺材からなる先送り方式の先行手摺枠であって、手摺り柱が作業用手摺又は筋違又は斜材からなる棒状部材の上にあずけるあずけ金具を有し、かつ手摺材が手摺柱に対して回転可能に連結されていることを特徴とする先行手摺枠。 A forward-feed type advance handrail frame composed of a plurality of handrail pillars and at least one handrail material connecting the handrail pillars, and the handrail pillar is on a bar-shaped member made of a work handrail, a streak, or a diagonal material. A preceding handrail frame characterized by having a hand- jointed metal fitting and a handrail material rotatably connected to a handrail column. 手摺材が手摺柱から着脱可能であることを特徴とする請求項1に記載の先行手摺枠。   The handrail frame according to claim 1, wherein the handrail material is detachable from the handrail pillar. 手摺柱が縦柱又は支柱に手摺柱を固定するための固定金具を有していることを特徴とする請求項1又は2に記載の先行手摺枠。   The preceding handrail frame according to claim 1 or 2, wherein the handrail column has a fixing bracket for fixing the handrail column to the vertical column or the column. 手摺柱が縦柱又は支柱に手摺柱を固定する際の位置決め金具を有していることを特徴とする請求項1から3までのいずれかに記載の先行手摺枠。   The preceding handrail frame according to any one of claims 1 to 3, wherein the handrail column has a positioning fitting for fixing the handrail column to the vertical column or the column. 手摺柱に設けられたあずけ金具が作業用手摺又は筋違又は斜材からなる棒状部材にあずけられたときにその棒状部材から外れないようにするための外れ止め手段を備えていることを特徴とする請求項1から4までのいずれかに記載の先行手摺枠。 It is characterized in that it is provided with anti-detachment means for preventing the razor fitting provided on the handrail pillar from being removed from the bar-shaped member when it is applied to the bar-shaped member made of a handrail for work or striation or diagonal material. The preceding handrail frame according to any one of claims 1 to 4. 手摺柱に設けられたあずけ金具が作業用手摺又は筋違又は斜材からなる棒状部材にあずけられたときに手摺柱が転倒しないようにするための転倒防止手段を備えていることを特徴とする請求項1から5までのいずれかに記載の先行手摺枠。 It is provided with a fall prevention means for preventing the handrail column from overturning when the handrail provided on the handrail column is applied to a work handrail or a bar-like member made of a skewed or diagonal material. The preceding handrail frame in any one of Claim 1-5. 請求項1から6までのいずれかに記載の先行手摺枠を先送り方式で用いて建枠式枠組足場を形成する方法であって、先行手摺枠の手摺柱を建枠の縦柱に固定することによって隣接して立設された建枠の縦柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を縦柱から外して水平又は斜めに設置された作業用手摺又は筋違からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を縦柱から外してから一段上の足場を構成する建枠の縦柱に持ち送って固定し、その後、その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の建枠の縦柱に持ち送って固定することを特徴とする、建枠式枠組足場を形成する方法。 It is a method of forming a building-frame-type frame scaffold using the preceding handrail frame according to any one of claims 1 to 6, and fixing a handrail column of the preceding handrail frame to a vertical column of the building frame. After attaching the preceding handrail frame between the vertical pillars of the building frame that are erected adjacent to each other, one of the handrail pillars of the preceding handrail frame is removed from the vertical pillar and the work handrail installed horizontally or diagonally or After temporarily placing it on a bar-shaped member consisting of a streak, remove the other handrail column of the preceding handrail frame from the vertical column, and then carry it to the vertical column of the building frame that forms the upper scaffold, and then fix it A method of forming a building-frame-type frame scaffold, characterized in that a handrail column temporarily placed on the rod-shaped member is carried and fixed to a vertical column of the other building frame that constitutes the scaffold one step above. 請求項1から6までのいずれかに記載の先行手摺枠を先送り方式で用いて建枠式枠組足場を形成する方法であって、先行手摺枠の手摺柱を建枠の縦柱に固定することによって隣接して立設された建枠の縦柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を縦柱から外して水平又は斜めに設置された作業用手摺又は筋違からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を縦柱から外してから一段上の足場を構成する建枠の縦柱に持ち送って固定し、その後、その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の建枠の縦柱に持ち送って固定し、さらに、隣接する建枠の間に作業用手摺を取り付けることを特徴とする、建枠式枠組足場を形成する方法。 It is a method of forming a building-frame-type frame scaffold using the preceding handrail frame according to any one of claims 1 to 6, and fixing a handrail column of the preceding handrail frame to a vertical column of the building frame. After attaching the preceding handrail frame between the vertical pillars of the building frame that are erected adjacent to each other, one of the handrail pillars of the preceding handrail frame is removed from the vertical pillar and the work handrail installed horizontally or diagonally or After temporarily placing it on a bar-shaped member consisting of a streak, remove the other handrail column of the preceding handrail frame from the vertical column, and then carry it to the vertical column of the building frame that forms the upper scaffold, and then fix it The handrail pillar that had been temporarily placed on the rod-shaped member is transported and fixed to the vertical pillar of the other building frame that constitutes the scaffold one step above, and the work handrail is attached between the adjacent building frames. A method of forming a building-framework scaffold characterized by: 請求項1から6までのいずれかに記載の先行手摺枠を先送り方式で用いて緊結式枠組足場を形成する方法であって、先行手摺枠の手摺柱を支柱に固定することによって隣接して立設された支柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を支柱から外して水平又は斜めに設置された作業用手摺又は斜材からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を支柱から外してから一段上の足場を構成する支柱に持ち送って固定し、その後その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の支柱に持ち送って固定することを特徴とする、緊結式枠組足場を形成する方法。 A method for forming a tight-framed scaffold using the preceding handrail frame according to any one of claims 1 to 6 in a forward-feed manner, wherein the handrail pillar of the preceding handrail frame is fixed to a support column in an adjacent manner. After attaching the preceding handrail frame between the installed pillars, remove one of the handrail pillars of the preceding handrail frame from the pillar and temporarily place it on a bar-shaped member made of work handrails or diagonal members installed horizontally or diagonally After allocating, remove the other handrail pillar of the preceding handrail frame from the pillar, and then carry it to the pillar constituting the upper scaffold, and then fix the handrail pillar that was temporarily placed on the rod-shaped member A method for forming a tight-framework scaffold, characterized in that the scaffold is carried and fixed to the other strut constituting the scaffold. 請求項1から6までのいずれかに記載の先行手摺枠を先送り方式で用いて緊結式枠組足場を形成する方法であって、先行手摺枠の手摺柱を支柱に固定することによって隣接して立設された支柱の間に先行手摺枠を取り付けた後、当該先行手摺枠の手摺柱の片方を支柱から外して水平又は斜めに設置された作業用手摺又は斜材からなる棒状部材の上に仮にあずけた後、当該先行手摺枠の他方の手摺柱を支柱から外してから一段上の足場を構成する支柱に持ち送って固定し、その後その棒状部材の上に仮にあずけていた手摺柱を一段上の足場を構成する他方の支柱に持ち送って固定し、さらに、隣接する支柱の間に作業用手摺を取り付けることを特徴とする、緊結式枠組足場を形成する方法。 A method for forming a tight-framed scaffold using the preceding handrail frame according to any one of claims 1 to 6 in a forward-feed manner, wherein the handrail pillar of the preceding handrail frame is fixed to a support column in an adjacent manner. After attaching the preceding handrail frame between the installed pillars, remove one of the handrail pillars of the preceding handrail frame from the pillar and temporarily place it on a bar-shaped member made of work handrails or diagonal members installed horizontally or diagonally After allocating, remove the other handrail pillar of the preceding handrail frame from the pillar, and then carry it to the pillar constituting the upper scaffold, and then fix the handrail pillar that was temporarily placed on the rod-shaped member A method of forming a tight-framework scaffold, characterized in that it is carried and fixed to the other strut constituting the scaffold, and a work handrail is attached between adjacent struts.
JP2005041676A 2005-02-18 2005-02-18 Method for forming leading handrail frame and frame scaffold Expired - Fee Related JP4704766B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005041676A JP4704766B2 (en) 2005-02-18 2005-02-18 Method for forming leading handrail frame and frame scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005041676A JP4704766B2 (en) 2005-02-18 2005-02-18 Method for forming leading handrail frame and frame scaffold

Publications (3)

Publication Number Publication Date
JP2006226001A JP2006226001A (en) 2006-08-31
JP2006226001A5 JP2006226001A5 (en) 2008-02-28
JP4704766B2 true JP4704766B2 (en) 2011-06-22

Family

ID=36987600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005041676A Expired - Fee Related JP4704766B2 (en) 2005-02-18 2005-02-18 Method for forming leading handrail frame and frame scaffold

Country Status (1)

Country Link
JP (1) JP4704766B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797350B (en) * 2012-09-11 2015-12-16 李大泽 Quick detach scaffold
DE102014224002A1 (en) 2014-11-25 2016-05-25 Peri Gmbh Railing rail and scaffolding with a railing rail
DE102016205906A1 (en) * 2016-04-08 2017-10-12 Peri Gmbh mounting aid
DE102016213773A1 (en) 2016-07-27 2018-02-01 Peri Gmbh fastener
DE102017216889A1 (en) 2017-09-25 2019-03-28 Peri Gmbh Bar-shaped scaffolding element, scaffolding part with such a scaffolding element and method for mounting such a scaffolding element
CN112810830B (en) * 2020-12-31 2022-12-02 四川省场道工程有限公司 Construction method of reinforced concrete folded plate type flow guide screen for airport
DE102021109947A1 (en) * 2021-04-20 2022-10-20 Peri Se Railing, scaffolding, methods of erecting a scaffolding, and using a railing in a scaffolding

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002356989A (en) * 2001-05-31 2002-12-13 Tatsuo Ono Device for attaching handrail to prefabricated scaffold
JP2003097055A (en) * 2001-09-20 2003-04-03 Rarikku:Kk Preceding handrail frame
JP2003193676A (en) * 2001-12-28 2003-07-09 Tatsuo Ono Mounting method of handrail in prefabricated scaffolding
JP2004324210A (en) * 2003-04-24 2004-11-18 Alinco Inc Safety handrail
JP2005068651A (en) * 2003-08-25 2005-03-17 Alinco Inc Safety handrail

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4181939B2 (en) * 2003-07-28 2008-11-19 光洋機械産業株式会社 Handrail mounting bracket for frame assembly scaffolding

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002356989A (en) * 2001-05-31 2002-12-13 Tatsuo Ono Device for attaching handrail to prefabricated scaffold
JP2003097055A (en) * 2001-09-20 2003-04-03 Rarikku:Kk Preceding handrail frame
JP2003193676A (en) * 2001-12-28 2003-07-09 Tatsuo Ono Mounting method of handrail in prefabricated scaffolding
JP2004324210A (en) * 2003-04-24 2004-11-18 Alinco Inc Safety handrail
JP2005068651A (en) * 2003-08-25 2005-03-17 Alinco Inc Safety handrail

Also Published As

Publication number Publication date
JP2006226001A (en) 2006-08-31

Similar Documents

Publication Publication Date Title
JP4704766B2 (en) Method for forming leading handrail frame and frame scaffold
JP5384092B2 (en) Temporary structure erection member
JP2013064321A (en) Erection member for temporary structure
AU2006201721B1 (en) Hook-On-Scaffold
KR100862737B1 (en) Cage apparatus of gang form system for a building
JP4942074B2 (en) Handrail mounting device
EP1691007B1 (en) Detachable cross-piece for supporting platforms in scaffolds
JP2006291473A (en) Preceding handrail frame and bound-type prefabricated scaffolding
JP2007177502A (en) Metal mesh panel and metal mesh panel mounting method
JP2005068652A (en) Safety handrail
JP2005068650A (en) Safety handrail
JPH1150653A (en) Supporting frame of scaffold plate and fitting and removing method therefor and construction for reinforced concrete wall by use thereof
JP4002869B2 (en) Safety handrail
JP3899330B2 (en) Safety handrail
JP4909291B2 (en) Scaffolding frame
JP4986419B2 (en) Temporary staircase
JP4098213B2 (en) Scaffolding frame
JP2001288883A (en) Precedent handrail for prefabricated scaffolding
JP3199629U (en) Handrail mounting bracket for scaffolding
JP2000054617A (en) Working scaffold for cylindrical structure, assembly method for cylindrical structure using it and its removing method
JP4183654B2 (en) Handrail support bracket, preceding handrail assembly set, frame scaffold
JP5502396B2 (en) Handrail support and leading handrail
JP2006299697A (en) Handrail frame for prefabricated scaffolding
JP4989100B2 (en) Handrail fixing bracket
JP5745898B2 (en) A cane-type connecting material with a handrail frame and a temporary scaffold

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20070130

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080116

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100831

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100921

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101025

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110308

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110310

LAPS Cancellation because of no payment of annual fees