JP2005042382A - Reinforced structure of grave - Google Patents

Reinforced structure of grave Download PDF

Info

Publication number
JP2005042382A
JP2005042382A JP2003277283A JP2003277283A JP2005042382A JP 2005042382 A JP2005042382 A JP 2005042382A JP 2003277283 A JP2003277283 A JP 2003277283A JP 2003277283 A JP2003277283 A JP 2003277283A JP 2005042382 A JP2005042382 A JP 2005042382A
Authority
JP
Japan
Prior art keywords
grave
stone
reinforcing
fence
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003277283A
Other languages
Japanese (ja)
Other versions
JP3886477B2 (en
Inventor
Hirokazu Kobayashi
広和 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUPENDY CO Ltd
Original Assignee
YUPENDY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUPENDY CO Ltd filed Critical YUPENDY CO Ltd
Priority to JP2003277283A priority Critical patent/JP3886477B2/en
Publication of JP2005042382A publication Critical patent/JP2005042382A/en
Application granted granted Critical
Publication of JP3886477B2 publication Critical patent/JP3886477B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a reinforced structure of a grave capable of the facilitating the realization of construction work and, at the same time, increasing earthquake resistance of the whole grave by ensuring sufficient strength. <P>SOLUTION: The grave is so constituted that a basic section 4 and a fence stone section 5 mounted on the basic section 4 such as a plurality of sites in grave materials 4, 5 and 6 located at least on up and down are connected with reinforced poles 2 and 3 having the end face sections 2a, 3a and 3b on one end or both ends folded in an L-shape and in the direction of folded line and, at the same time, the basic section 4 and a large pedestal 6 placed upward of the basic section 4 are connected with the reinforced pole 3 and that a reinforced bar 8 penetrated across up and down is kept inside between the large pedestal 6 and a grave stone section 7 mounted on the large pedestal 6. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

本発明は、墓全体の耐震性を高めた墓の補強構造に関する。   The present invention relates to a tomb reinforcing structure that improves the earthquake resistance of the entire tomb.

一般に、墓は複数の墓材(石材)を積上げた構造を有するため、地震等により倒壊しやすい問題がある。   In general, since the grave has a structure in which a plurality of grave materials (stone materials) are stacked, there is a problem that the grave is easily collapsed by an earthquake or the like.

このため、従来より耐震構造を付加した墓も、例えば、特開平9−60347号公報,特開平9−137638号公報及び特開平11−350795号公報等で提案されている。これらの墓は、いずれも積上げた複数の石材、具体的には、下台,上台及び石碑の内部に、上下方向に沿って相互に貫通する貫通孔又は挿入孔を形成し、この貫通孔又は挿入孔に、相互の石材に跨がる棒部材を収容することにより耐震性を高めたものである。
特開平9−60347号公報 特開平9−137638号公報 特開平11−350795号公報
For this reason, graves to which an earthquake resistant structure has been added have been proposed in, for example, Japanese Patent Application Laid-Open Nos. 9-60347, 9-137638, and 11-350795. Each of these graves forms a through-hole or insertion hole penetrating each other along the vertical direction in a plurality of stone materials stacked, specifically, the lower base, the upper base, and the stone monument. By accommodating the rod members straddling the mutual stones in the holes, the earthquake resistance is enhanced.
Japanese Patent Laid-Open No. 9-60347 JP-A-9-137638 JP-A-11-350795

しかし、墓に対する従来の耐震構造は、次のような解決すべき課題が存在した。   However, conventional seismic structures for graves have the following problems to be solved.

第一に、耐震構造のほとんどが、積上げられた下台,上台及び石碑を対象としていたため、地震等に対するこれらの倒壊は回避できるものの、墓全体の耐震性を確保する観点からは不十分である。   First, since most of the earthquake-resistant structures were intended for the stacked bases, upper bases, and stone monuments, these collapses against earthquakes can be avoided, but this is insufficient from the viewpoint of ensuring the earthquake resistance of the entire tomb. .

第二に、石材の内部に、貫通孔及び所定深さを有する挿入孔を形成する必要があるなど、石材に対する加工作業が大変となる。   Secondly, it is necessary to form a through hole and an insertion hole having a predetermined depth inside the stone material.

本発明は、このような背景技術に存在する課題を解決したものであり、特に、施工の容易化を実現するとともに、十分な強度を確保することにより、墓全体の耐震性を高めることができる墓の補強構造の提供を目的とする。   The present invention solves the problems that exist in such background art, and in particular, it is possible to improve the seismic resistance of the entire tomb by realizing ease of construction and ensuring sufficient strength. The purpose is to provide a tomb reinforcement structure.

本発明に係る墓Sの補強構造1は、L形に折曲し、かつ折線方向の一端又は両端に端面部2a,3a,3bを設けた補強柱2…,3…により、少なくとも上下に位置する墓材4,5,6…同士における複数の部位を結合してなることを特徴とする。   The reinforcing structure 1 of the tomb S according to the present invention is positioned at least vertically by reinforcing columns 2... 3 which are bent in an L shape and provided with end face portions 2a, 3a and 3b at one or both ends in the fold line direction. It is characterized by combining a plurality of parts in the grave materials 4, 5, 6.

これにより、本発明に係る補強構造1によれば、次のような顕著な効果を奏する。   Thereby, according to the reinforcement structure 1 which concerns on this invention, there exist the following remarkable effects.

(1) 別途の補強柱2…,3…を用いるため、墓材(石材)4,5,6…に対する大掛かりな加工作業が不要となり、施工の容易化を実現することができる。   (1) Since separate reinforcing pillars 2... 3 are used, a large-scale processing work on grave materials (stones) 4, 5, 6.

(2) 別途の補強柱2…,3…により、上下に位置する墓材4,5,6…同士における複数の部位を結合するため、十分な強度を確保できるとともに、墓全体の耐震性を高めることができる。   (2) Since the separate reinforcement pillars 2 ..., 3 ... combine multiple parts in the grave materials 4, 5, 6 ... positioned above and below, sufficient strength can be secured and the earthquake resistance of the entire grave Can be increased.

本発明に係る補強構造1によれば、最良の形態により、基礎部4とこの基礎部4に載置した柵石部5を、補強柱2…により結合する。これにより、特に、柵石部5の位置ズレや倒壊を有効に防止することができる。また、基礎部4とこの基礎部4の上方に配した大台6は、補強柱3…により結合する。これにより、特に、大台6の位置ズレや倒壊を有効に防止することができる。さらに、大台6とこの大台6の上に載置した墓石部7間の内部には、上下に貫通して跨がる補強棒8を収容する。これにより、特に、大台6から上に配した墓石部7の位置ズレや倒壊を有効に防止することができる。   According to the reinforcing structure 1 according to the present invention, the base portion 4 and the fence stone portion 5 placed on the base portion 4 are coupled by the reinforcing pillars 2. Thereby, especially the positional shift and collapse of the fence stone part 5 can be effectively prevented. Further, the base portion 4 and the base 6 disposed above the base portion 4 are coupled by the reinforcing columns 3. Thereby, especially the position shift and collapse of the platform 6 can be effectively prevented. Further, a reinforcing bar 8 penetrating vertically and straddling is accommodated in the interior between the platform 6 and the tombstone portion 7 placed on the platform 6. Thereby, especially the positional shift and collapse of the tombstone portion 7 arranged above the platform 6 can be effectively prevented.

次に、本発明に係る好適な実施例を挙げ、図面に基づき詳細に説明する。   Next, preferred embodiments according to the present invention will be given and described in detail with reference to the drawings.

まず、本実施例に係る補強構造1に用いる補強柱2,3について、図4を参照して説明する。   First, the reinforcing columns 2 and 3 used in the reinforcing structure 1 according to the present embodiment will be described with reference to FIG.

本実施例に係る補強構造1では、二種類の補強柱2と3を使用する。補強柱2は、スチール或いはステンレス等の金属プレートPを、L形に折曲し、かつ折線方向の一端(下端)に下端面部2aを設けて構成する。これにより、補強柱2は、長方形の第一鉛直面部2p,長方形の第二鉛直面部2q及び三角形の下端面部2aを組合わせた一体の部材となる。なお、各面部2p,2q,2aの相隣る突合わせ部分は、溶接等により接合する。そして、第一鉛直面部2pには二つのボルト挿通孔21,21を設けるとともに、第二鉛直面部2qには、二つのボルト挿通孔22,22を設け、さらに、下端面部2aには、ボルト挿通孔23を設ける。   In the reinforcing structure 1 according to the present embodiment, two types of reinforcing columns 2 and 3 are used. The reinforcing column 2 is formed by bending a metal plate P such as steel or stainless steel into an L shape and providing a lower end surface portion 2a at one end (lower end) in the fold line direction. Thereby, the reinforcement pillar 2 becomes an integral member which combined the rectangular 1st vertical surface part 2p, the rectangular 2nd vertical surface part 2q, and the triangular lower end surface part 2a. The adjacent butted portions of the surface portions 2p, 2q, 2a are joined by welding or the like. The first vertical surface portion 2p is provided with two bolt insertion holes 21 and 21, the second vertical surface portion 2q is provided with two bolt insertion holes 22 and 22, and the lower end surface portion 2a is inserted with a bolt. Holes 23 are provided.

また、補強柱3は、スチール或いはステンレス等の金属プレートPを、L形に折曲し、かつ折線方向の両端(上下端)に端面部3a,3bを設けて構成する。これにより、補強柱3は、長方形の第一鉛直面部3p,長方形の第二鉛直面部3q,三角形の下端面部3a及び三角形の上端面部3bを組合わせた一体の部材となる。なお、各面部3p,3q,3a,3bの相隣る突合わせ部分は、溶接等により接合する。そして、下端面部3aには、ボルト挿通孔24を設けるとともに、上端面部3bには、ボルト挿通孔25を設ける。   The reinforcing column 3 is formed by bending a metal plate P such as steel or stainless steel into an L shape and providing end face portions 3a and 3b at both ends (upper and lower ends) in the fold line direction. Thereby, the reinforcement pillar 3 becomes an integral member combining the rectangular first vertical surface portion 3p, the rectangular second vertical surface portion 3q, the triangular lower end surface portion 3a, and the triangular upper end surface portion 3b. The adjacent butted portions of the surface portions 3p, 3q, 3a, 3b are joined by welding or the like. The lower end surface portion 3a is provided with a bolt insertion hole 24, and the upper end surface portion 3b is provided with a bolt insertion hole 25.

次に、本実施例に係る補強構造1を含む墓Sの建墓方法について、図1〜図4を参照して説明する。   Next, a method for building a tomb S including the reinforcing structure 1 according to the present embodiment will be described with reference to FIGS.

まず、地面Eに、基礎部4を施行する。基礎部4は、型枠を使用し、鉄筋とモルタルにより造型する。この際、基礎部4のほぼ中央には、納骨室31を設ける。   First, the base part 4 is enforced on the ground E. The base part 4 uses a formwork and is formed by reinforcing bars and mortar. At this time, the ossuary chamber 31 is provided substantially at the center of the base portion 4.

そして、基礎部(墓材)4の上面に、柵石部(墓材)5を設置するとともに、基礎部4の上方に、大台(墓材)6を配するため、柵石部5と大台6をそれぞれ基礎部4に対して固定する補強構造1を付加する。   And while installing the fence stone part (grave material) 5 on the upper surface of the foundation part (grave material) 4, and arranging the table (grave material) 6 above the foundation part 4, the fence stone part 5 and the table Reinforcing structures 1 for fixing 6 to the base part 4 are added.

この場合、前述した補強柱2と3を、それぞれ四つずつ使用し、図1及び図2に示すように、各補強柱2…は、平面視が矩形となる柵石部5の内側面における四隅にそれぞれ重なるように基礎部4の上面に起立させるとともに、各補強柱3…は、平面視が矩形となる大台6の底面における四隅付近を支持するように基礎部4の上面に起立させるため、基礎部4における各補強柱2…に対応する位置には、基礎施行時に、それぞれアンカボルト32…を埋設し、また、基礎部4における各補強柱3…に対応する位置には、基礎施行時に、それぞれアンカナット33…を埋設する。なお、アンカナット33…は、基礎部4の施行後に穴空けし、打ち込んでもよい。   In this case, four each of the reinforcing columns 2 and 3 described above are used, and as shown in FIGS. 1 and 2, each reinforcing column 2 has four corners on the inner surface of the fence stone portion 5 that is rectangular in plan view. So that each of the reinforcing pillars 3 stands on the upper surface of the base portion 4 so as to support the vicinity of the four corners of the bottom surface of the base 6 that is rectangular in plan view. The anchor bolts 32 are embedded in the positions corresponding to the reinforcing pillars 2 in the base portion 4 at the time of the foundation operation, and the foundations are applied in positions corresponding to the reinforcing pillars 3 in the base portion 4. Sometimes, the anchor nuts 33 are buried. The anchor nuts 33 may be pierced and driven in after the foundation portion 4 is executed.

そして、基礎部4を施行し、モルタルが固化したなら、図3に示すように、各アンカボルト32…に各補強柱2…のボルト挿通孔23…をセットし、上から各アンカボルト32…にそれぞれナット34…を螺着することにより、各補強柱2…を基礎部4の上面に固定する。また、同様に、各アンカナット33…の位置に各補強柱3…のボルト挿通孔24…をセットし、上から各アンカナット33…にそれぞれボルト35…を螺着することにより、各補強柱3…を基礎部4の上面に固定する。   And if the foundation part 4 is enforced and mortar solidifies, as shown in FIG. 3, the bolt insertion hole 23 ... of each reinforcement pillar 2 ... is set to each anchor bolt 32 ..., and each anchor bolt 32 ... from the top. Each of the reinforcing columns 2 is fixed to the upper surface of the base portion 4 by screwing the nuts 34. Similarly, the bolt insertion holes 24 of the reinforcing pillars 3 are set at the positions of the anchor nuts 33, and the bolts 35 are screwed into the anchor nuts 33 from above, whereby the reinforcing pillars 3 are ... Is fixed to the upper surface of the base portion 4.

次いで、図2に示すように、柵石部5における後部の柵石5aを基礎部4の上面に設置する。柵石5aには、予め、後側に配した左右一対の各補強柱2…のボルト挿通孔22…に対応する位置に穴空けを行い、図3に示すアンカナット36…を打ち込む。そして、ボルト37…を、ボルト挿通孔22…に通した後、アンカナット36…に螺着することにより、各補強柱2…と柵石5aを固定する。   Next, as shown in FIG. 2, the rear fence stone 5 a in the fence stone section 5 is installed on the upper surface of the foundation section 4. In the fence stone 5a, holes are made in advance at positions corresponding to the bolt insertion holes 22 of the pair of left and right reinforcing columns 2 arranged on the rear side, and anchor nuts 36 shown in FIG. The bolts 37 are passed through the bolt insertion holes 22 and then screwed into the anchor nuts 36 to fix the reinforcing columns 2 and the fence stone 5a.

この後、基礎部4の上面に、納骨室31に連通する筒形の囲石38を設置し、この囲石38の上端と柵石5aの上面に、囲石38と柵石5aに跨がる大台6を載置する。なお、囲石38の上端と柵石5aの上面は、同じ高さに設定する。図2に大台6の位置を仮想線で示す。また、大台6の底面には、予め、各補強柱3…のボルト挿通孔25…に対応する位置に穴空けを行い、アンカナット40…を打ち込む。これにより、図3に示すように、ボルト41…を、ボルト挿通孔25…に通した後、アンカナット40…に螺着することにより、各補強柱3…と大台6を固定する。各補強柱3…は、このように基礎部4と大台6間に介在させるため、各補強柱3…の長さ(高さ)は、囲石38(柵石5a)と同じ高さを選定する。   Thereafter, a cylindrical wall stone 38 communicating with the ossuary chamber 31 is installed on the upper surface of the foundation portion 4, and the upper edge of the stone wall 38 and the upper surface of the fence stone 5 a are straddled between the stone stone 38 and the fence stone 5 a. The platform 6 is placed. In addition, the upper end of the stone 38 and the upper surface of the fence stone 5a are set to the same height. FIG. 2 shows the position of the platform 6 with phantom lines. Further, in the bottom surface of the base 6, holes are made in advance at positions corresponding to the bolt insertion holes 25 of the reinforcing columns 3, and anchor nuts 40 are driven. 3, the bolts 41 are passed through the bolt insertion holes 25 and then screwed into the anchor nuts 40 to fix the reinforcing columns 3 and the base 6. Since each reinforcing column 3 is interposed between the base portion 4 and the base 6 in this way, the length (height) of each reinforcing column 3 has the same height as the stone 38 (the fence stone 5a). Select.

よって、大台6は、基礎部4の上面に起立した四本の補強柱3…により支持固定される。この場合、地震等により横揺れが発生しても、大台6は、各補強柱3…自身により位置ズレや倒壊が防止されるとともに、補強柱3…により大台6と基礎部4の間隔が規制され、かつ大台6と基礎部4間に囲石38が存在するため、この囲石38と各補強柱3…によっても大台6の位置ズレや倒壊が防止される。このように、大台6は、各補強柱3…及び囲石38の双方によって横揺れに対する補強がなされる。   Therefore, the platform 6 is supported and fixed by the four reinforcing pillars 3 erected on the upper surface of the base portion 4. In this case, even if rolling occurs due to an earthquake or the like, the gantry 6 is prevented from being displaced or collapsed by each reinforcing column 3 itself, and the spacing between the gantry 6 and the base portion 4 by the reinforcing column 3. In addition, since a go stone 38 exists between the pedestal 6 and the base 4, displacement of the pedestal 6 and collapse of the pedestal 6 can be prevented by the go stone 38 and the reinforcing columns 3. In this way, the platform 6 is reinforced against rolling by both the reinforcing columns 3.

次いで、柵石部5における左側部の柵石5bと右側部の柵石5cを、上述した後部の柵石5aと同様に、対応する各補強柱2…に固定する。この場合、各柵石5bと5cの後部は、後側に配した左右一対の各補強柱2…における他方のボルト挿通孔21,21…を用いて固定するとともに、各柵石5bと5cの前部は、前側に配した左右一対の各補強柱2…における一方のボルト挿通孔21,21…を用いて固定する。この後、柵石部5における前部の柵石5dを上述した後部の柵石5aと同様に、対応する各補強柱2…、即ち、前部に配した左右一対の各補強柱2…の他方のボルト挿通孔22,22…を用いて固定する。なお、各柵石5b,5c,5dには、各ボルト挿通孔21,22…に対応する位置に穴空けを行い、アンカナット36…を打ち込む。各補強柱2…は、このように基礎部4と柵石部5を固定するため、各補強柱2…の長さ(高さ)は、柵石部5の高さよりも短く(低く)なるように選定する。   Next, the left side fence stone 5b and the right side fence stone 5c in the fence stone portion 5 are fixed to the corresponding reinforcing pillars 2... In the same manner as the rear fence stone 5a described above. In this case, the rear portion of each of the fence stones 5b and 5c is fixed by using the other bolt insertion holes 21, 21... In the pair of left and right reinforcing columns 2. The front part is fixed by using one bolt insertion hole 21, 21... In each of the pair of left and right reinforcing columns 2. Thereafter, the front fence stone 5d in the fence stone section 5 is the same as the rear fence stone 5a described above, the corresponding reinforcement pillars 2 ..., that is, the other of the pair of left and right reinforcement pillars 2 ... arranged in the front part. Are fixed using the bolt insertion holes 22, 22. In each of the fence stones 5b, 5c, 5d, holes are drilled at positions corresponding to the bolt insertion holes 21, 22,. Since each reinforcement pillar 2 ... fixes the base part 4 and the fence stone part 5 in this way, the length (height) of each reinforcement pillar 2 ... is shorter (lower) than the height of the fence stone part 5. Select.

よって、柵石部5は、基礎部4の上面に起立した四本の補強柱2…により固定される。この場合、柵石部5の全体が補強柱2…により基礎部4の上面に固定されるとともに、四つの各柵石5a〜5dも各補強柱2…により連結され、地震等の横揺れに対する柵石部5の位置ズレや倒壊が防止される。このように、各補強柱2…は、基礎部4に対する柵石部5の固定(補強)と各柵石5a〜5d同士の連結(補強)の双方の機能を兼ねることになる。   Therefore, the fence stone part 5 is fixed by the four reinforcing pillars 2 erected on the upper surface of the foundation part 4. In this case, the entire fence stone part 5 is fixed to the upper surface of the base part 4 by the reinforcing pillars 2... And the four fence stones 5 a to 5 d are also connected by the reinforcement pillars 2. Misalignment and collapse of the stone part 5 are prevented. Thus, each reinforcement pillar 2 ... serves as both functions of fixation (reinforcement) of the fence stone part 5 with respect to the base part 4, and connection (reinforcement) of each fence stone 5a-5d.

以上により、本実施例に係る補強構造1の主要部が構成される。この後、通常の建墓方法に従って施工を行う。   The main part of the reinforcement structure 1 which concerns on a present Example is comprised by the above. After this, construction will be performed according to the usual grave method.

まず、柵石部5と囲石38間の空間には、盛土を行い、この盛土の上に玉舎利を敷く。なお、玉舎利の上面は、柵石部5の上端付近に一致させる。また、囲石38の上端前部は、上方に開放されるため、蓋石42(図2参照)を載せて閉塞する。他方、大台6の上には墓石部7を載置する。実施例の墓石部7は、下から上に、下台43,上台44,石碑45を備えている。この場合、大台6の内部から石碑45の内部に至る貫通孔46を形成し、この貫通孔46に、大台6から石碑45に跨がる補強棒8を収容することにより、大台6から墓石部7までの補強を行う。よって、大台6から上に配した墓石部7の倒壊を有効に防止することができる。なお、補強棒8による補強は、公知の従来手法を用いることができる。   First, embankment is performed in the space between the fence stone portion 5 and the go stone 38, and a tamari is laid on the embankment. In addition, the upper surface of Tamari is matched with the vicinity of the upper end of the fence stone portion 5. Moreover, since the upper end front part of the go stone 38 is open | released upwards, the cover stone 42 (refer FIG. 2) is mounted and obstruct | occluded. On the other hand, a tombstone portion 7 is placed on the table 6. The tombstone portion 7 of the embodiment includes a lower base 43, an upper base 44, and a monument 45 from the bottom to the top. In this case, a through hole 46 extending from the inside of the base 6 to the inside of the monument 45 is formed. To the tombstone part 7. Therefore, it is possible to effectively prevent the tombstone portion 7 disposed above the platform 6 from collapsing. A known conventional method can be used for reinforcement by the reinforcing rod 8.

これにより、図1に示す墓Sが得られる。このような本発明に係る墓Sの補強構造1によれば、別途用意した補強柱2…,3…を用いるため、基礎部4,柵石部5,大台6に対する大掛かりな加工作業が不要となり、施工の容易化を実現することができる。また、別途用意した補強柱2…,3…により、上下に位置する基礎部4と柵石部5同士、さらには基礎部4と大台6同士における複数の部位を結合したため、十分な強度を確保できるとともに、墓Sの全体の耐震性を高めることができる。   Thereby, the grave S shown in FIG. 1 is obtained. According to the reinforcing structure 1 of the tomb S according to the present invention, since the separately prepared reinforcing pillars 2, 3, etc. are used, a large-scale processing operation for the base portion 4, the fence stone portion 5, and the pedestal 6 becomes unnecessary. The construction can be facilitated. In addition, the reinforcement pillars 2, 3, etc. prepared separately combine the base portion 4 and the fence stone portion 5 positioned above and below, as well as a plurality of portions in the base portion 4 and the base 6, thereby ensuring sufficient strength. In addition, the overall earthquake resistance of the grave S can be increased.

以上、実施例について詳細に説明したが、本発明は、このような実施例に限定されるものではなく、細部の構成,形状,素材,数量,数値等において、本発明の要旨を逸脱しない範囲で、任意に変更,追加,削除することができる。   Although the embodiments have been described in detail above, the present invention is not limited to such embodiments, and the details, configurations, shapes, materials, quantities, numerical values and the like do not depart from the spirit of the present invention. It can be changed, added, or deleted arbitrarily.

例えば、基礎部4とこの基礎部4に載置した柵石部5を補強柱2…により結合し、また、基礎部4とこの基礎部4の上方に配した大台6を補強柱3…により結合することにより、柵石部5と大台6の倒壊を有効に防止できるようにしたが、他の任意の墓材同士を同様に結合する場合を排除するものではない。   For example, the base part 4 and the fence stone part 5 placed on the base part 4 are connected by the reinforcing pillars 2..., And the base part 4 and the base 6 disposed above the base part 4 are connected by the reinforcing pillars 3. Although it was possible to effectively prevent the collapse of the fence stone portion 5 and the platform 6 by combining, it does not exclude the case where other arbitrary grave materials are combined in the same manner.

本発明の好適な実施例に係る補強構造を付加した墓の断面正面図、A cross-sectional front view of a grave with a reinforcement structure according to a preferred embodiment of the present invention, 同補強構造を付加した墓の断面平面図、Cross-sectional plan view of the grave with the same reinforcement structure, 同補強構造の一部を拡大して示す断面図、Sectional drawing which expands and shows a part of the reinforcing structure, 同補強構造に用いる補強柱の斜視図、A perspective view of a reinforcing column used in the reinforcing structure,

符号の説明Explanation of symbols

1 補強構造
2… 補強柱
2a 端面部
3… 補強柱
3a 端面部
3b 端面部
4 墓材(基礎部)
5 墓材(柵石部)
6 墓材(大台)
7 墓石部
8 補強棒
S 墓
DESCRIPTION OF SYMBOLS 1 Reinforcement structure 2 ... Reinforcement pillar 2a End surface part 3 ... Reinforcement pillar 3a End surface part 3b End surface part 4 Grave material (base part)
5 Grave material (fence stone part)
6 Grave material (Odai)
7 Tombstone 8 Reinforcing Bar S Tomb

Claims (4)

L形に折曲し、かつ折線方向の一端又は両端に端面部を設けた補強柱により、少なくとも上下に位置する墓材同士における複数の部位を結合してなることを特徴とする墓の補強構造。 A reinforced structure for a grave characterized by being joined to at least a plurality of parts in the grave materials positioned at the top and bottom by a reinforcing column which is bent in an L shape and provided with end face portions at one or both ends in the fold line direction. . 前記補強柱により、基礎部とこの基礎部に載置した柵石部を結合したことを特徴とする請求孔1記載の墓の補強構造。 The reinforced structure for a grave according to claim 1, wherein a base portion and a fence stone portion placed on the base portion are joined by the reinforcing pillar. 前記補強柱により、基礎部とこの基礎部の上方に配した大台を結合したことを特徴とする請求孔1記載の墓の補強構造。 The reinforced structure for a grave according to claim 1, wherein a base portion and a pedestal disposed above the base portion are joined by the reinforcing pillar. 前記大台とこの大台の上に載置した墓石部間の内部に、上下に貫通して跨がる補強棒を収容してなることを特徴とする請求孔3記載の墓の補強構造。 The reinforced structure for a grave according to claim 3, wherein a reinforcing bar penetrating vertically and straddling is accommodated in the interior between said platform and the tombstone portion placed on the platform.
JP2003277283A 2003-07-22 2003-07-22 Grave reinforcement structure Expired - Lifetime JP3886477B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003277283A JP3886477B2 (en) 2003-07-22 2003-07-22 Grave reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003277283A JP3886477B2 (en) 2003-07-22 2003-07-22 Grave reinforcement structure

Publications (2)

Publication Number Publication Date
JP2005042382A true JP2005042382A (en) 2005-02-17
JP3886477B2 JP3886477B2 (en) 2007-02-28

Family

ID=34264052

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003277283A Expired - Lifetime JP3886477B2 (en) 2003-07-22 2003-07-22 Grave reinforcement structure

Country Status (1)

Country Link
JP (1) JP3886477B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006233595A (en) * 2005-02-25 2006-09-07 Masaoki Takahashi External fence for tomb

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006233595A (en) * 2005-02-25 2006-09-07 Masaoki Takahashi External fence for tomb

Also Published As

Publication number Publication date
JP3886477B2 (en) 2007-02-28

Similar Documents

Publication Publication Date Title
JP2012102460A (en) Form support system and construction method for underground structure using the same
JP3603130B2 (en) Root-wound reinforcement structure for column bases such as steel columns
KR100582866B1 (en) A structure for supporting post of fence
JP4550534B2 (en) Building basic structure
JP3886477B2 (en) Grave reinforcement structure
JP5527644B2 (en) Forming method of outer underground beam, inner underground beam and post in pressure-resistant plate post foundation
JP3680150B1 (en) Building foundation and its construction method
JP4130393B2 (en) Pile-column connection structure
JP3109038B2 (en) Underground skeleton structure and construction method
JP3134306U (en) Grave
JP2010043439A (en) Method of reinforcing foundation of existing wooden house
JPH05156654A (en) Top-down construction method
KR101707376B1 (en) Structure for constructing underground structure using composite beams and the construction method thereof
JP2015161059A (en) building construction method
JP2005139746A (en) Grave
JP3767347B2 (en) Reverse strike method
JP2842149B2 (en) Underground structure
JP6877612B2 (en) Rebuilding building with existing underground outer wall
KR20090098126A (en) Reinforcement
JP3161886B2 (en) Foundation for small buildings
JP2007177531A (en) Aseismatic reinforcing structure of existing building
JP2006057282A (en) Detached house
JPH10266227A (en) Method of connecting ready made pile and foundation slab
JP4077378B2 (en) Block fence construction method and reinforcing bracket for block fence
JP2006028998A (en) Fence and its construction method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060309

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060809

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061006

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061121

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3886477

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091201

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121201

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121201

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151201

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term