JP2005018580A - Information control system - Google Patents

Information control system Download PDF

Info

Publication number
JP2005018580A
JP2005018580A JP2003184811A JP2003184811A JP2005018580A JP 2005018580 A JP2005018580 A JP 2005018580A JP 2003184811 A JP2003184811 A JP 2003184811A JP 2003184811 A JP2003184811 A JP 2003184811A JP 2005018580 A JP2005018580 A JP 2005018580A
Authority
JP
Japan
Prior art keywords
work
worker
display data
server
operation terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003184811A
Other languages
Japanese (ja)
Inventor
Motoi Otsuka
基 大塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casio Computer Co Ltd
Original Assignee
Casio Computer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casio Computer Co Ltd filed Critical Casio Computer Co Ltd
Priority to JP2003184811A priority Critical patent/JP2005018580A/en
Publication of JP2005018580A publication Critical patent/JP2005018580A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To display a working load concerned in each worker, in an information control system for controlling information related to various kinds of works. <P>SOLUTION: Data of work indication contents and predicted times for the works are input the worker by the worker in an operation terminal 2 for a work indicating person, and the input data are transmitted to a server 1. The data transmitted from the operation terminal 2 are received in the server 1, and the received data are stored in a memory 15. When a working condition is required to be displayed from the operation terminal 2, a display data is prepared to display the predicted time of the work, the worker by the worker, based on the storage content in the memory 15, and the prepared data is transmitted to the operation terminal 2. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、情報管理システムに関する。
【0002】
【従来の技術】
スーパーマーケット、家電量販店、ホームセンター等の店舗では、店長から売場にいる各担当者(各作業者)に各種の作業指示が出される。大規模な店舗では、店長だけでなく、各売場のチーフから各担当者に作業指示が出される。各作業者に作業指示を確実に伝えるために、従来から様々な方法が提案されている。例えば、特許文献1には、災害時における救急活動等の作業を迅速かつ的確に行うために、各作業者が所持する携帯端末に、作業指示情報を送信するシステムが提案されている。
【0003】
【特許文献1】
特開2002−15099号
【0004】
【発明が解決しようとする課題】
しかしながら、上述の従来の作業指示システムでは、各作業者への負荷を把握する手段がなかったため、作業指示者は、各作業者の負荷を考えずに作業指示を出すことが多く、各作業者の負荷に偏りが生じる可能性があった。特に、大規模店舗において、店長から店員、チーフから店員など、複数の指示系統が存在する場合、一人の店員に、複数の作業指示者からの指示が出されることがあるため、一人の店員に多大な負荷が係ることがあった。
【0005】
本発明の課題は、各種作業に関する情報を管理する情報管理システムにおいて、各作業者に係る作業負荷を表示可能にすることである。
【0006】
【課題を解決するための手段】
上記課題を解決するため、請求項1記載の発明は、作業指示者用の操作端末と、前記操作端末に通信ネットワークを介して接続され、各作業者が実施する各種作業に関する情報を管理するサーバと、を備えた情報管理システムであって、前記サーバは、作業者別に、作業指示者から指示された作業指示内容及び当該作業の予想時間のデータを記憶する記憶手段と、前記記憶手段の記憶内容に基づいて、作業者別に、担当する作業の予想時間を表示するための表示データを作成する表示データ作成手段と、を備えることを特徴としている。
【0007】
本発明によれば、作業者別に、作業の予想時間を表示することが可能になることにより、作業指示者は、各作業者の作業負荷状況を容易に把握することができる。
【0008】
【発明の実施の形態】
以下、図を参照して本発明の実施の形態を詳細に説明する。
まず、構成を説明する。
【0009】
図1は、本発明を適用した実施の形態の情報管理システム100の全体構成を示す図である。情報管理システム100は、店舗内の情報伝達、情報管理を行うためのシステムであり、図1に示すように、サーバ1、操作端末2、アクセスポイント3、情報端末4により構成される。
【0010】
サーバ1は、店舗内の情報管理を行うための装置であり、通信ネットワークNを介して操作端末2及び情報端末4に接続される。操作端末2は、店長、各売場のチーフ等の作業指示者が使用するPC(Personal Computer)等の通信端末であり、店舗の事務所に設置されている。情報端末4は、売場にいる各担当者(各作業者)が所持する携帯情報端末であり、通信ネットワークN上に複数設置されたアクセスポイント3に無線接続される。なお、1台のサーバに通信ネットワークNを介して接続される操作端末2、アクセスポイント3、情報端末4の台数は特に限定されない。
【0011】
ここで、通信ネットワークNとは、例えば、LAN(Local Area Network)等により構成される通信回線網であり、独立して構築された専用線、或いは一般の電話回線やデジタルデータを伝送可能なISDN(Integrated Services Digital Network)回線等の公衆回線を複数有する。
【0012】
次に、図2を参照して、サーバ1の主要部構成について説明する。サーバ1は、図2に示すように、CPU(Central Processing Unit)10、表示装置11、入力装置12、通信制御部13、RAM(Random Access Memory)14、記憶装置15により構成され、各部は、バス16により接続される。
【0013】
CPU10は、記憶装置15に格納されている各種制御プログラムを読み出してRAM14内に展開し、それらの制御プログラムに従ってサーバ1の各部を集中制御する。以下、CPU10による制御動作について説明する。
【0014】
CPU10は、操作端末2から受信された、各担当者が実施する作業に関する情報を、作業情報テーブル151及び作業項目テーブル153に登録する作業情報登録処理(図8参照)を実行する。この作業情報登録処理において、CPU10は、担当者別に、作業の予想時間(作業に要する時間の見積もり)を登録する。
【0015】
また、CPU10は、各担当者に割り当てられた作業の予想時間の合計をグラフ(例えば、円グラフ)表示するための表示データを作成する作業負荷表示データ作成処理(図9参照)を実行する。この作業負荷表示データ作成処理において、CPU10は、各担当者別に、担当する作業の予想時間の合計を算出し、各担当者の予想時間の合計を日付別に表示するための表示データを作成する。
【0016】
表示装置11は、LCD(Liquid Crystal Display)やCRT(Cathode Ray Tube)等の表示画面を備え、CPU10から入力される表示信号に従って所要の表示処理を行う。
【0017】
入力装置12は、文字入力キー、テンキー、カーソルキー及び各種機能キーを備えたキー入力装置や、マウス等のポインティングデバイス等を備え、キー入力装置やポインティングデバイスの操作による操作信号をCPU10に出力する。
【0018】
通信制御部13は、モデム(MODEM:MOdulator/DEModulator)、ルータ、TA(Terminal Adapter)等によって構成され、電話回線、専用線、ISDN回線等の通信回線を介して外部機器と通信を行うための制御を行う。
【0019】
RAM14は、CPU10により実行される各種制御プログラムや各種アプリケーションプログラムをプログラム格納エリアに展開する。また、RAM14は、入力データ及び上記の制御処理プログラムの実行時に生じる処理結果等のデータを、ワークエリアに一時的に格納する。
【0020】
記憶装置15は、プログラムやデータ等が予め記憶されている記録媒体を有している。この記録媒体は、磁気的、光学的記録媒体又は半導体等の不揮発性メモリで構成されており、記憶装置15に固定的に設けたもの又は着脱自在に装着するものである。この記録媒体は、作業情報登録処理プログラム、作業負荷表示データ作成処理プログラム及びこれらのプログラムで処理されたデータ等を記憶する。
【0021】
なお、記憶装置15が記憶するプログラム又はデータ等は、その一部又は全部を他の機器から通信ネットワークを介して受信して記憶する構成にしてもよい。また、記録媒体は通信ネットワーク上に構築された別のホストコンピュータの記録媒体であってもよい。また、記憶装置15が記憶するプログラムを、通信ネットワークを介して他の機器へ伝送して、これらの機器にインストールするような構成にしてもよい。
【0022】
記憶装置15は、図3に示すような作業情報テーブル151を格納する。作業情報テーブル151は、作業情報登録処理(図8参照)による登録内容を格納したもので、図3に示すように、作業指示者毎に、「店舗コード」、「作業ID」、「発信者ユーザID」、「発信日時」、「重要度」、「期限」、「作業内容」等の各項目を対応付けて格納する。作業情報テーブル151において、「店舗コード」項目は、各作業指示者が所属する店舗の識別情報のデータを格納する。「作業ID」項目は、後述の発信者ユーザIDに該当する作業指示者が担当者に指示した作業の識別情報のデータを格納する。「発信者ユーザID」項目は、作業指示者の識別情報のデータを格納する。「発信日時」項目は、対応する作業指示者が担当者に作業を指示した日時のデータを格納する。「重要度」項目は、対応する作業の重要度(普通、重要、緊急)を示すデータを格納する。「期限」項目は、対応する作業を実施する日付のデータを格納する。「作業内容」項目は、対応する作業の作業指示内容を表すデータを格納する。
【0023】
また、記憶装置15は、図4に示すようなユーザ管理テーブル152を格納する。ユーザ管理テーブル152は、図4に示すように、作業が指示される担当者毎に、「店舗コード」、「ユーザID」、「氏名」等の各項目を対応付けて格納する。ユーザ管理テーブル152において、「店舗コード」項目は、該当する担当者が所属する店舗の識別情報のデータを格納する。「ユーザID」項目は、対応する担当者の識別情報のデータを格納する。「氏名」項目は、対応する担当者の氏名のデータを格納する。
【0024】
更に、記憶装置15は、図5に示すような作業項目テーブル153を格納する。作業項目テーブル153は、作業毎に、「作業ID」、「ユーザID」、「予想時間」、「実績時間」等の各項目を対応付けて格納する。作業項目テーブル153において、「作業ID」項目は、後述のユーザIDに該当する担当者に割り当てられた作業の識別情報のデータを格納する。「ユーザID」項目は、該当担当者の識別情報のデータを格納する。「予想時間」項目は、該当作業の予想時間のデータを格納する。この予想時間のデータは、作業情報登録処理(図8参照)により登録される。「実績時間」項目は、該当作業に実際に要した時間、即ち、実績時間のデータを格納する。この「実績時間」項目は、各担当者が所持する情報端末4から送信された実績時間データを格納したものである。
【0025】
次に、図6を参照して、操作端末2の主要部構成について説明する。操作端末2は、図6に示すように、CPU20、表示装置21、入力装置22、通信制御部23、RAM24、記憶装置25により構成され、各部は、バス26により接続される。
【0026】
CPU20は、記憶装置25に格納されている各種制御プログラムを読み出してRAM24内に展開し、それらの制御プログラムに従って操作端末2の各部を集中制御する。以下、CPU20による制御動作について説明する。
【0027】
CPU20は、図7に示す作業登録画面211において入力された、作業の期限、重要度、予想時間、作業指示内容のデータをサーバ1に送信する処理を実行する。また、CPU20は、サーバ1に対し、特定の期間における作業負荷の表示を要求する信号を送信する処理を実行する。また、CPU20は、サーバ1から受信された表示データに従って、表示装置21に、各担当者の作業負荷状況を表示させる(図10参照)。
【0028】
表示装置21は、LCDやCRT等の表示画面を備え、CPU20から入力される表示信号に従って所要の表示処理を行う。
【0029】
入力装置22は、文字入力キー、テンキー、カーソルキー及び各種機能キーを備えたキー入力装置や、マウス等のポインティングデバイス等を備え、キー入力装置やポインティングデバイスの操作による操作信号をCPU20に出力する。
【0030】
通信制御部23は、モデム(MODEM:MOdulator/DEModulator)、ルータ、TA(Terminal Adapter)等によって構成され、電話回線、専用線、ISDN回線等の通信回線を介して外部機器と通信を行うための制御を行う。
【0031】
RAM24は、CPU20により実行される各種制御プログラムや各種アプリケーションプログラムをプログラム格納エリアに展開する。また、RAM24は、入力データ及び上記の制御処理プログラムの実行時に生じる処理結果等のデータを、ワークエリアに一時的に格納する。
【0032】
記憶装置25は、プログラムやデータ等が予め記憶されている記録媒体を有している。この記録媒体は、磁気的、光学的記録媒体又は半導体等の不揮発性メモリで構成されており、記憶装置25に固定的に設けたもの又は着脱自在に装着するものである。
【0033】
なお、記憶装置25が記憶するプログラム又はデータ等は、その一部又は全部を他の機器から通信ネットワークを介して受信して記憶する構成にしてもよい。また、記録媒体は通信ネットワーク上に構築された別のホストコンピュータの記録媒体であってもよい。また、記憶装置25が記憶するプログラムを、通信ネットワークを介して他の機器へ伝送して、これらの機器にインストールするような構成にしてもよい。
【0034】
図1に戻って、情報端末4は、売場にいる各担当者(作業者)が所持する携帯情報端末であり、担当者により入力された作業の実績時間のデータ(実際に作業に要した時間のデータ)をアクセスポイント3を経由してサーバ1に送信する。
【0035】
次に、本実施の形態における動作を説明する。
【0036】
操作端末2の表示装置21に、図7に示すような作業登録画面211が表示されているものとする。作業登録画面211には、担当者の氏名を入力するための宛先欄、その担当者が担当する作業の期限(作業が実施される日付)を入力するための期限欄、その作業の重要度を入力するための重要度欄、作業指示内容を入力するための作業内容入力欄、入力データのサーバ1への登録を指示するための「登録」ボタン、入力内容の削除を指示するための「クリア」ボタン、作業登録画面211の消去を指示するための「閉じる」ボタンが設けられている。
【0037】
作業登録画面211において、作業指示者により、担当者の氏名、その担当者に割り当てる作業の期限、重要度、予想時間、作業指示内容が入力され、「登録」ボタンが指定されると、サーバ1に、作業指示者のユーザID(発信者ユーザID)とともに、作業登録画面211において入力されたデータが送信される。操作端末2から送信されたデータを受信したサーバ1では、図8に示す作業情報登録処理が実行される。
【0038】
図8及び図9は、サーバ1の動作を説明するためのフロ−チャートである。これらのフローチャートは、サーバ1を構成するコンピュータに各機能を実現させるためのプログラムを説明するためのものである。これらのプログラムはCPU10が読み取り可能なプログラムコードの形態で記録媒体に格納されている例で説明するが、全ての機能を記録媒体に格納する必要はなく、必要に応じて、その一部又は全部を、通信ネットワークを介して伝送制御部13から受信して実現するようにしてもよい。
【0039】
図8のフローチャートを参照して、サーバ1において実行される作業情報登録処理について説明する。
【0040】
操作端末2から、発信者ユーザID、担当者氏名、作業ID、予想時間、重要度、期限、作業指示内容のデータが受信されると(ステップS1)、作業情報テーブル151に、ステップS1において受信された発信者ユーザID、作業ID、重要度、期限、作業指示内容のデータが対応付けて登録される(ステップS2)。
【0041】
次いで、ユーザ管理テーブル152から、ステップS1において受信された担当者氏名に該当するユーザIDが取得される(ステップS3)。次いで、作業項目テーブル153の「予想時間」フィールドのうち、ステップS1において受信された作業IDと、ステップS3において取得されたユーザIDに対応する「予想時間」フィールドに、受信された予想時間のデータが書き込まれ(ステップS4)、本作業情報登録処理が終了する。
【0042】
作業情報テーブル151及び作業項目テーブル153に、作業指示内容、予想時間等の作業情報が登録されると、その作業を担当する担当者が所持する情報端末4がアクセスポイント3を経由してサーバ1にアクセスすることによって、情報端末4が作業情報テーブル151に記憶された作業指示内容のデータを参照できるようになる。なお、上述では、店舗内に設置された操作端末2により入力された作業指示内容のデータが、各担当者が所持する情報端末4からアクセス可能になる場合を示したが、作業指示内容を入力する端末は、店舗内の端末に限定されず、通信ネットワークNに接続された他の端末(例えば、本部に設置された端末)でもよい。
【0043】
次に、図9のフローチャートを参照して、サーバ1において実行される作業負荷表示データ作成処理について説明する。
【0044】
操作端末2から、特定の期間における作業負荷の表示を指定する信号が受信されると、作業情報テーブル151の各レコードが、「期限」フィールドに設定された日付に従ってソートされ(ステップS10)、操作端末2から指定された期間に日付が設定されたレコードが抽出される(ステップS11)。
【0045】
次いで、作業項目テーブル153から、ステップS11において抽出されたレコードの作業IDと同一の作業IDを有するレコードが抽出される(ステップS12)。次いで、ステップS12において抽出されたレコードが、日付別に、「予想時間」フィールドに設定された予想時間が多い順にソートされ、予想時間の多い上位10レコードが抽出される(ステップS13)。
【0046】
次いで、ユーザ管理テーブル152から、ステップS13において抽出された10レコードのユーザIDと同一のユーザIDを有するレコードが抽出され、その抽出されたレコードから、ユーザの氏名が抽出される(ステップS14)。
【0047】
次いで、ステップS14において氏名が抽出された担当者が行う作業の予想時間の合計が算出され(ステップS15)、予想時間の合計が多い順に、担当者の氏名及び予想時間をグラフ表示するための表示データが作成される(ステップS16)。ステップS15において作成された表示データは操作端末2に送信され(ステップS17)、本作業負荷表示データ作成処理が終了する。
【0048】
操作端末2の表示画面21には、サーバ1によって作成された表示データに従って、図10に示すような作業状況表示画面212が表示される。この作業状況表示画面212には、表示内容を指定するための表示内容指定欄30、表示範囲(期間)を指定するための期間指定欄40、作業状況を表示するための作業状況表示欄50が設けられている。表示内容指定欄30において、「作業負荷」が指定され、期間指定欄40において、期間が指定されたことによって、サーバ1において図9に示す作業負荷表示データ作成処理が実行される。この作業負荷表示データ作成処理の結果として、作業状況表示欄50には、図10に示すように、指定された期間における作業負荷状況が日付別に表示される。
【0049】
図10の作業状況表示欄50には、予想時間が多い順で上位10人の担当者の作業負荷が日付別に円グラフで表示されている。円グラフで占める面積の大きさにより、作業負荷の大きさが示されている。図10の作業状況表示欄50において、円グラフ中の領域をマウスでポイントすると、その領域に対応する担当者の予想時間がポップアップ表示される。作業指示者は、図10に示すような作業負荷状況を参照することによって、負荷の多い担当者を容易に特定することができる。
【0050】
なお、図9では、作業の予想時間が多い順番で作業負荷を表示させるための処理を示したが、逆に、予想時間の少ない順番で作業負荷を表示させることも可能である。このようにすると、作業担当者は、負荷の少ない担当者を容易に特定することができる。
【0051】
また、図10には、作業負荷状況を円グラフで表示する場合を示しているが、作業負荷状態の表示形態はこれに限定されるものではない。例えば、担当者別の予想時間を数値表示するようにしてもよい。
【0052】
以上のように、本実施の形態の情報管理システム100によれば、操作端末2に、各担当者の作業負荷状況を表示可能にしたことにより、作業指示者は、操作端末2に表示された作業負荷状況を参照することによって、担当者の変更、作業の延期、作業の中止など、各担当者の負荷分散を図ることができる。これにより、店舗内における作業効率を向上させることができる。
【0053】
また、作業指示前に、各担当者の作業負荷状況を見ることにより、作業負荷が大きい担当者への作業指示は避けるなど、無駄な作業指示を減らすことができる。更に、作業登録画面211において、作業の予想時間を入力するという行為自体が、作業担当者に、その作業指示が適切であるか否かという意識をもたせることができる。
【0054】
なお、本実施の形態における記述内容は、本発明の趣旨を逸脱しない範囲で適宜変更可能である。
【0055】
【発明の効果】
本発明によれば、作業者別に、作業の予想時間を表示することが可能になることにより、作業指示者は、各作業者の作業負荷状況を容易に把握することができる。
【図面の簡単な説明】
【図1】本発明を適用した実施の形態の情報管理システム100の全体構成を示す図。
【図2】図1のサーバ1の主要部構成を示すブロック図。
【図3】サーバ1の記憶装置15に格納される作業情報テーブル151のデータ構成例を示す図。
【図4】サーバ1の記憶装置15に格納されるユーザ管理テーブル152のデータ構成例を示す図。
【図5】サーバ1の記憶装置15に格納される作業項目テーブル153のデータ構成例を示す図。
【図6】図1の操作端末2の主要部構成を示すブロック図。
【図7】操作端末2の表示装置21に表示される作業登録画面211を示す図。
【図8】サーバ1において実行される作業情報登録処理を示すフローチャート。
【図9】サーバ1において実行される作業負荷表示データ作成処理を示すフローチャート。
【図10】操作端末2の表示装置21に表示される作業状況表示画面212を示す図。
【符号の説明】
1 サーバ
10 CPU
11 表示装置
12 入力装置
13 通信制御部
14 RAM
15 記憶装置
151 作業情報テーブル
152 ユーザ管理テーブル
153 作業項目テーブル
2 操作端末
20 CPU
21 表示装置
211 作業登録画面
212 作業状況表示画面
22 入力装置
23 通信制御部
24 RAM
25 記憶装置
3 アクセスポイント
4 情報端末
30 表示内容指定欄
40 期間指定欄
50 作業状況表示欄
100 情報管理システム
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an information management system.
[0002]
[Prior art]
In stores such as supermarkets, home appliance mass retailers, and home centers, the store manager issues various work instructions to each person in charge (each worker) at the sales floor. In a large-scale store, not only the store manager but also the chief of each sales floor gives work instructions to each person in charge. Conventionally, various methods have been proposed in order to reliably convey work instructions to each worker. For example, Patent Document 1 proposes a system that transmits work instruction information to a portable terminal possessed by each worker in order to quickly and accurately perform work such as emergency activities during a disaster.
[0003]
[Patent Document 1]
JP 2002-15099 A
[Problems to be solved by the invention]
However, in the above-described conventional work instruction system, since there is no means for grasping the load on each worker, the work instruction person often issues a work instruction without considering the load on each worker. There was a possibility that the load would be biased. In particular, in a large-scale store, if there are multiple instruction systems such as store manager to store clerk, chief to store clerk, one store clerk may receive instructions from multiple work instructors, so one store clerk There was a case where a great load was applied.
[0005]
An object of the present invention is to make it possible to display a work load related to each worker in an information management system for managing information related to various operations.
[0006]
[Means for Solving the Problems]
In order to solve the above-mentioned problem, an invention according to claim 1 is an operation terminal for a work instructor and a server that is connected to the operation terminal via a communication network and manages information related to various works performed by each worker. And a storage means for storing the work instruction content instructed by the work instructor and the expected time of the work for each worker, and the storage of the storage means. It is characterized by comprising display data creating means for creating display data for displaying the expected time of work in charge for each worker based on the contents.
[0007]
According to the present invention, it is possible to display the estimated work time for each worker, so that the work instructor can easily grasp the workload status of each worker.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
First, the configuration will be described.
[0009]
FIG. 1 is a diagram showing an overall configuration of an information management system 100 according to an embodiment to which the present invention is applied. The information management system 100 is a system for performing information transmission and information management in a store, and includes a server 1, an operation terminal 2, an access point 3, and an information terminal 4 as shown in FIG.
[0010]
The server 1 is a device for managing information in the store, and is connected to the operation terminal 2 and the information terminal 4 via the communication network N. The operation terminal 2 is a communication terminal such as a PC (Personal Computer) used by a store manager and a work instructor such as a chief of each sales floor, and is installed in a store office. The information terminal 4 is a portable information terminal possessed by each person in charge (each worker) in the sales floor, and is wirelessly connected to a plurality of access points 3 installed on the communication network N. The number of operation terminals 2, access points 3, and information terminals 4 connected to one server via the communication network N is not particularly limited.
[0011]
Here, the communication network N is a communication line network configured by, for example, a LAN (Local Area Network) or the like, and is an ISDN that can transmit an independent dedicated line, a general telephone line, or digital data. (Integrated Services Digital Network) It has a plurality of public lines such as lines.
[0012]
Next, with reference to FIG. 2, the main part structure of the server 1 is demonstrated. As shown in FIG. 2, the server 1 includes a CPU (Central Processing Unit) 10, a display device 11, an input device 12, a communication control unit 13, a RAM (Random Access Memory) 14, and a storage device 15. Connected by a bus 16.
[0013]
The CPU 10 reads out various control programs stored in the storage device 15 and develops them in the RAM 14, and centrally controls each part of the server 1 according to these control programs. Hereinafter, the control operation by the CPU 10 will be described.
[0014]
The CPU 10 executes a work information registration process (see FIG. 8) for registering information regarding work performed by each person in charge received from the operation terminal 2 in the work information table 151 and the work item table 153. In this work information registration process, the CPU 10 registers the estimated work time (estimated time required for work) for each person in charge.
[0015]
Further, the CPU 10 executes a work load display data creation process (see FIG. 9) for creating display data for displaying a graph (for example, a pie chart) of the total estimated time of work assigned to each person in charge. In this work load display data creation processing, the CPU 10 calculates the total estimated time of work for each person in charge, and creates display data for displaying the total estimated time of each person in charge by date.
[0016]
The display device 11 includes a display screen such as an LCD (Liquid Crystal Display) or a CRT (Cathode Ray Tube), and performs a required display process according to a display signal input from the CPU 10.
[0017]
The input device 12 includes a key input device including a character input key, a numeric keypad, a cursor key, and various function keys, a pointing device such as a mouse, and the like, and outputs an operation signal generated by operating the key input device and the pointing device to the CPU 10. .
[0018]
The communication control unit 13 includes a modem (MODEM: Modulator / DEModulator), a router, a TA (Terminal Adapter), and the like, and performs communication with an external device via a communication line such as a telephone line, a dedicated line, and an ISDN line. Take control.
[0019]
The RAM 14 develops various control programs and various application programs executed by the CPU 10 in a program storage area. The RAM 14 temporarily stores input data and data such as processing results generated when the control processing program is executed in the work area.
[0020]
The storage device 15 has a recording medium in which programs, data, and the like are stored in advance. This recording medium is composed of a magnetic or optical recording medium or a non-volatile memory such as a semiconductor, and is fixedly attached to the storage device 15 or detachably mounted. This recording medium stores a work information registration processing program, a work load display data creation processing program, data processed by these programs, and the like.
[0021]
Note that the program or data stored in the storage device 15 may be received and stored in part or in whole from another device via a communication network. Further, the recording medium may be a recording medium of another host computer constructed on a communication network. In addition, the program stored in the storage device 15 may be transmitted to other devices via a communication network and installed in these devices.
[0022]
The storage device 15 stores a work information table 151 as shown in FIG. The work information table 151 stores registration contents by the work information registration process (see FIG. 8). As shown in FIG. 3, for each work instructor, “store code”, “work ID”, “sender” Items such as “user ID”, “sending date / time”, “importance”, “time limit”, “work content”, and the like are stored in association with each other. In the work information table 151, the “store code” item stores identification information data of a store to which each work instructor belongs. The “work ID” item stores data of work identification information instructed to a person in charge by a work instructor corresponding to a sender user ID described later. The “sender user ID” item stores identification information data of the work instructor. The “sending date and time” item stores data on the date and time when the corresponding work instructor instructs the person in charge to perform the work. The “importance” item stores data indicating the importance (normal, important, urgent) of the corresponding work. The “expiration date” item stores data of the date on which the corresponding work is performed. The “work content” item stores data representing the work instruction content of the corresponding work.
[0023]
The storage device 15 stores a user management table 152 as shown in FIG. As shown in FIG. 4, the user management table 152 stores items such as “store code”, “user ID”, and “name” in association with each person in charge of instructing work. In the user management table 152, the “store code” item stores identification information data of a store to which the person in charge belongs. The “user ID” item stores identification information data of a corresponding person in charge. The “name” item stores the data of the name of the corresponding person in charge.
[0024]
Furthermore, the storage device 15 stores a work item table 153 as shown in FIG. The work item table 153 stores items such as “work ID”, “user ID”, “expected time”, and “actual time” in association with each work. In the work item table 153, the “work ID” item stores data of work identification information assigned to a person in charge corresponding to a user ID described later. The “user ID” item stores the identification information data of the person in charge. The “expected time” item stores data on the expected time of the corresponding work. The estimated time data is registered by the work information registration process (see FIG. 8). The “actual time” item stores time actually required for the corresponding work, that is, data of the actual time. This “actual time” item stores the actual time data transmitted from the information terminal 4 possessed by each person in charge.
[0025]
Next, with reference to FIG. 6, the main part structure of the operating terminal 2 is demonstrated. As shown in FIG. 6, the operation terminal 2 includes a CPU 20, a display device 21, an input device 22, a communication control unit 23, a RAM 24, and a storage device 25, and each unit is connected by a bus 26.
[0026]
The CPU 20 reads out various control programs stored in the storage device 25 and develops them in the RAM 24, and centrally controls each part of the operation terminal 2 according to these control programs. Hereinafter, the control operation by the CPU 20 will be described.
[0027]
The CPU 20 executes processing for transmitting data on the work deadline, importance, expected time, and work instruction content input on the work registration screen 211 shown in FIG. 7 to the server 1. In addition, the CPU 20 executes a process of transmitting a signal for requesting display of a workload during a specific period to the server 1. Further, the CPU 20 displays the workload status of each person in charge on the display device 21 according to the display data received from the server 1 (see FIG. 10).
[0028]
The display device 21 includes a display screen such as an LCD or CRT, and performs a required display process according to a display signal input from the CPU 20.
[0029]
The input device 22 includes a key input device including a character input key, a numeric keypad, a cursor key, and various function keys, a pointing device such as a mouse, and the like, and outputs an operation signal generated by operating the key input device and the pointing device to the CPU 20. .
[0030]
The communication control unit 23 includes a modem (MODEM: Modulator / DEModulator), a router, a TA (Terminal Adapter), and the like, and performs communication with an external device via a communication line such as a telephone line, a dedicated line, and an ISDN line. Take control.
[0031]
The RAM 24 develops various control programs and various application programs executed by the CPU 20 in a program storage area. The RAM 24 temporarily stores input data and data such as processing results generated when the control processing program is executed in the work area.
[0032]
The storage device 25 has a recording medium in which programs, data, and the like are stored in advance. This recording medium is composed of a magnetic or optical recording medium or a non-volatile memory such as a semiconductor, and is provided in the storage device 25 fixedly or detachably mounted.
[0033]
Note that a part or all of the programs or data stored in the storage device 25 may be received from other devices via a communication network and stored. Further, the recording medium may be a recording medium of another host computer constructed on a communication network. Further, the program stored in the storage device 25 may be transmitted to other devices via a communication network and installed in these devices.
[0034]
Returning to FIG. 1, the information terminal 4 is a portable information terminal possessed by each person in charge (worker) in the sales floor, and data on the actual time of work input by the person in charge (time actually taken for work) Are transmitted to the server 1 via the access point 3.
[0035]
Next, the operation in the present embodiment will be described.
[0036]
It is assumed that a work registration screen 211 as shown in FIG. 7 is displayed on the display device 21 of the operation terminal 2. In the work registration screen 211, a destination field for inputting the name of the person in charge, a time limit field for entering the work deadline (date on which the work is performed) for the person in charge, and the importance of the work are displayed. Importance field for input, work content input field for inputting work instruction content, “registration” button for instructing registration of input data to the server 1, and “clear” for instructing deletion of input content ”Button and a“ Close ”button for instructing deletion of the work registration screen 211 are provided.
[0037]
In the work registration screen 211, when the work instructor inputs the name of the person in charge, the deadline of the work assigned to the person in charge, the importance, the expected time, and the contents of the work instruction, and the “Register” button is designated, the server 1 In addition, the data input on the work registration screen 211 is transmitted together with the user ID (sender user ID) of the work instructor. The server 1 that has received the data transmitted from the operation terminal 2 executes the work information registration process shown in FIG.
[0038]
8 and 9 are flowcharts for explaining the operation of the server 1. These flowcharts are for explaining a program for causing a computer constituting the server 1 to realize each function. These programs will be described in an example where they are stored in a recording medium in the form of a program code that can be read by the CPU 10, but it is not necessary to store all the functions in the recording medium, and part or all of the functions are necessary. May be received from the transmission control unit 13 via a communication network.
[0039]
The work information registration process executed in the server 1 will be described with reference to the flowchart of FIG.
[0040]
When data of the caller user ID, the name of the person in charge, the work ID, the expected time, the importance, the time limit, and the work instruction content is received from the operation terminal 2 (step S1), the data is received in the work information table 151 in step S1. The transmitted caller user ID, work ID, importance, time limit, and work instruction content data are registered in association with each other (step S2).
[0041]
Next, the user ID corresponding to the person-in-charge name received in step S1 is acquired from the user management table 152 (step S3). Next, in the “expected time” field of the work item table 153, data of the expected time received in the “expected time” field corresponding to the work ID received in step S1 and the user ID acquired in step S3. Is written (step S4), and the work information registration process is completed.
[0042]
When work information such as work instruction contents and expected time is registered in the work information table 151 and the work item table 153, the information terminal 4 possessed by the person in charge of the work is connected to the server 1 via the access point 3. By accessing, the information terminal 4 can refer to the data of the work instruction content stored in the work information table 151. In the above description, the case where the data of the work instruction content input by the operation terminal 2 installed in the store is accessible from the information terminal 4 possessed by each person in charge is shown. The terminal to perform is not limited to a terminal in the store, but may be another terminal connected to the communication network N (for example, a terminal installed at the headquarters).
[0043]
Next, a workload display data creation process executed in the server 1 will be described with reference to the flowchart of FIG.
[0044]
When a signal designating the display of the workload during a specific period is received from the operation terminal 2, the records in the work information table 151 are sorted according to the date set in the “time limit” field (step S10). A record in which a date is set in the period specified by the terminal 2 is extracted (step S11).
[0045]
Next, a record having the same work ID as the work ID of the record extracted in step S11 is extracted from the work item table 153 (step S12). Next, the records extracted in step S12 are sorted by date in descending order of the expected time set in the “expected time” field, and the top 10 records having the highest expected time are extracted (step S13).
[0046]
Next, a record having the same user ID as the user ID of 10 records extracted in step S13 is extracted from the user management table 152, and the name of the user is extracted from the extracted record (step S14).
[0047]
Next, in step S14, the total expected time of work performed by the person in charge whose name is extracted is calculated (step S15), and the name and expected time of the person in charge are displayed in graph order in descending order of the total expected time. Data is created (step S16). The display data created in step S15 is transmitted to the operation terminal 2 (step S17), and this work load display data creation process ends.
[0048]
On the display screen 21 of the operation terminal 2, a work status display screen 212 as shown in FIG. 10 is displayed according to the display data created by the server 1. The work status display screen 212 includes a display content designation column 30 for designating display content, a period designation column 40 for designating a display range (period), and a work status display column 50 for displaying the work status. Is provided. When “work load” is designated in the display content designation column 30 and the period is designated in the period designation column 40, the workload display data creation processing shown in FIG. As a result of the workload display data creation processing, the workload status column 50 displays the workload status for the specified period by date as shown in FIG.
[0049]
In the work status display column 50 of FIG. 10, the work loads of the top 10 persons in charge are displayed by date in a pie chart in descending order of expected time. The size of the work load is indicated by the size of the area occupied by the pie chart. In the work status display field 50 of FIG. 10, when an area in the pie chart is pointed with the mouse, the estimated time of the person in charge corresponding to that area is displayed in a pop-up. The work instructor can easily identify a person in charge with a heavy load by referring to the work load situation as shown in FIG.
[0050]
Although FIG. 9 shows the process for displaying the workloads in the order of the estimated work time, conversely, the workloads can be displayed in the order of the expected time. If it does in this way, the person in charge of work can specify easily the person in charge with little load.
[0051]
FIG. 10 shows a case where the workload status is displayed in a pie chart, but the display mode of the workload status is not limited to this. For example, the expected time for each person in charge may be numerically displayed.
[0052]
As described above, according to the information management system 100 of the present embodiment, the work instructor is displayed on the operation terminal 2 by enabling the operation terminal 2 to display the workload status of each person in charge. By referring to the work load status, it is possible to distribute the load of each person in charge, such as changing the person in charge, postponing work, or canceling work. Thereby, the work efficiency in a store can be improved.
[0053]
Further, by looking at the workload status of each person in charge before the work instruction, it is possible to reduce useless work instructions such as avoiding work instructions to persons in charge with a large work load. Furthermore, the act of inputting the expected work time on the work registration screen 211 can make the work person aware of whether or not the work instruction is appropriate.
[0054]
Note that the description in this embodiment can be changed as appropriate without departing from the spirit of the present invention.
[0055]
【The invention's effect】
According to the present invention, it is possible to display the estimated work time for each worker, so that the work instructor can easily grasp the workload status of each worker.
[Brief description of the drawings]
FIG. 1 is a diagram showing an overall configuration of an information management system 100 according to an embodiment to which the present invention is applied.
FIG. 2 is a block diagram showing a main part configuration of the server 1 of FIG. 1;
FIG. 3 is a diagram showing a data configuration example of a work information table 151 stored in the storage device 15 of the server 1;
4 is a view showing an example of the data configuration of a user management table 152 stored in the storage device 15 of the server 1. FIG.
FIG. 5 is a diagram showing a data configuration example of a work item table 153 stored in the storage device 15 of the server 1;
6 is a block diagram showing a configuration of main parts of the operation terminal 2 of FIG.
7 is a diagram showing a work registration screen 211 displayed on the display device 21 of the operation terminal 2. FIG.
FIG. 8 is a flowchart showing work information registration processing executed in the server 1;
FIG. 9 is a flowchart showing workload display data creation processing executed in the server 1;
10 is a diagram showing a work status display screen 212 displayed on the display device 21 of the operation terminal 2. FIG.
[Explanation of symbols]
1 Server 10 CPU
11 Display device 12 Input device 13 Communication control unit 14 RAM
15 Storage Device 151 Work Information Table 152 User Management Table 153 Work Item Table 2 Operation Terminal 20 CPU
21 Display device 211 Work registration screen 212 Work status display screen 22 Input device 23 Communication control unit 24 RAM
25 storage device 3 access point 4 information terminal 30 display content designation column 40 period designation column 50 work status display column 100 information management system

Claims (7)

作業指示者用の操作端末と、前記操作端末に通信ネットワークを介して接続され、各作業者が実施する各種作業に関する情報を管理するサーバと、を備えた情報管理システムであって、
前記サーバは、
作業者別に、作業指示者から指示された作業指示内容及び当該作業の予想時間のデータを記憶する記憶手段と、
前記記憶手段の記憶内容に基づいて、作業者別に、担当する作業の予想時間を表示するための表示データを作成する表示データ作成手段と、
を備えることを特徴とする情報管理システム。
An information management system comprising: an operation terminal for a work instructor; and a server that is connected to the operation terminal via a communication network and manages information related to various operations performed by each worker,
The server
Storage means for storing data of work instruction contents instructed by the work instructor and expected time of the work for each worker,
Display data creation means for creating display data for displaying the expected time of work in charge for each worker based on the storage contents of the storage means;
An information management system comprising:
前記操作端末は、
作業者別に、作業指示者から指示された作業指示内容及び当該作業の予想時間のデータを入力する入力手段と、
前記入力手段により入力された作業指示内容及び当該作業の予想時間のデータを前記サーバに送信する送信手段と、を備え、
前記サーバは、
前記操作端末から送信されたデータを受信する受信手段を備え、
前記記憶手段は、前記受信手段による受信データを記憶することを特徴とする請求項1に記載の情報管理システム。
The operation terminal is
For each worker, an input means for inputting the work instruction content instructed by the work instructor and the expected time of the work;
Transmission means for transmitting the work instruction content input by the input means and data of the expected time of the work to the server,
The server
Receiving means for receiving data transmitted from the operation terminal;
The information management system according to claim 1, wherein the storage unit stores data received by the reception unit.
前記サーバは、前記表示データ作成手段により作成された表示データを前記操作端末に送信する表示データ送信手段を備え、
前記操作端末は、前記サーバから送信された表示データに従って、作業者別に、作業の予想時間を表示する表示手段を備えることを特徴とする請求項1又は2に記載の情報管理システム。
The server comprises display data transmission means for transmitting display data created by the display data creation means to the operation terminal,
The information management system according to claim 1, wherein the operation terminal includes a display unit that displays an estimated work time for each worker according to display data transmitted from the server.
前記表示データ作成手段は、作業者別の前記予想時間をグラフ表示するための表示データを作成することを特徴とする請求項1〜3の何れか一項に記載の情報管理システム。The information management system according to any one of claims 1 to 3, wherein the display data creation means creates display data for displaying the expected time for each worker in a graph. 前記表示データ作成手段は、作業者別の前記予想時間を数値表示するための表示データを作成することを特徴とする請求項1〜3の何れか一項に記載の情報管理システム。The information management system according to any one of claims 1 to 3, wherein the display data creation unit creates display data for numerically displaying the estimated time for each worker. 前記サーバは、前記記憶手段の記憶内容に基づいて、作業者別に、担当する作業の予想時間の合計を算出する算出手段を備え、
前記表示データ作成手段は、作業者別に、前記予想時間の合計を表示するための表示データを作成することを特徴とする請求項1〜5の何れか一項に記載の情報管理システム。
The server includes calculation means for calculating the total estimated time of work for each worker based on the storage contents of the storage means,
The information management system according to any one of claims 1 to 5, wherein the display data creation means creates display data for displaying the total of the estimated times for each worker.
前記操作端末の入力手段により、作業者別に、作業を実施する日付が更に入力され、
前記サーバの表示データ作成手段は、作業者別の前記予想時間を日付別に表示するための表示データを作成することを特徴とする請求項1〜6の何れか一項に記載の情報管理システム。
By the input means of the operation terminal, a date for carrying out the work is further inputted for each worker,
The information management system according to any one of claims 1 to 6, wherein the display data creation means of the server creates display data for displaying the estimated time for each worker by date.
JP2003184811A 2003-06-27 2003-06-27 Information control system Pending JP2005018580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003184811A JP2005018580A (en) 2003-06-27 2003-06-27 Information control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003184811A JP2005018580A (en) 2003-06-27 2003-06-27 Information control system

Publications (1)

Publication Number Publication Date
JP2005018580A true JP2005018580A (en) 2005-01-20

Family

ID=34184462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003184811A Pending JP2005018580A (en) 2003-06-27 2003-06-27 Information control system

Country Status (1)

Country Link
JP (1) JP2005018580A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006227669A (en) * 2005-02-15 2006-08-31 Casio Comput Co Ltd System and program for managing operation instructions
JP2006238902A (en) * 2005-02-28 2006-09-14 Aiphone Co Ltd Nurse call system
JP2016077156A (en) * 2016-02-09 2016-05-12 京セラ株式会社 Power control device, display device, display method, and image generation program

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006227669A (en) * 2005-02-15 2006-08-31 Casio Comput Co Ltd System and program for managing operation instructions
JP4577035B2 (en) * 2005-02-15 2010-11-10 カシオ計算機株式会社 Business instruction management system and program
JP2006238902A (en) * 2005-02-28 2006-09-14 Aiphone Co Ltd Nurse call system
JP4629457B2 (en) * 2005-02-28 2011-02-09 アイホン株式会社 Nurse call system
JP2016077156A (en) * 2016-02-09 2016-05-12 京セラ株式会社 Power control device, display device, display method, and image generation program

Similar Documents

Publication Publication Date Title
JP6085963B2 (en) Human resource information display device and program
JP4577035B2 (en) Business instruction management system and program
JP2008234185A (en) Nurse assignment apparatus and computer program
JP2019117439A (en) Information management device, information management method and program
JP4639793B2 (en) Information processing apparatus and program
JP6280894B2 (en) Business management support apparatus and method and program thereof
JP2005018580A (en) Information control system
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP6101372B1 (en) Order management system, order management terminal, and order management program
JP2005018586A (en) Information control system
JP4327686B2 (en) Method and system for supporting construction of individual system based on EA
JP2008123191A (en) Operation management server, operation management method and computer program
WO2017065332A1 (en) Server for providing customer management service, and customer management method using server
JP2004062710A (en) System for managing information in store
JP2017168131A (en) Human resource information provision apparatus and program
JP2023167488A (en) Information service system, information service method and program
JP2006048376A (en) System and method for managing resource, and computer program
JP2006048471A (en) Work schedule table creation management apparatus, work schedule transmitting and receiving system, and program
JP2007133708A (en) Business channel management system
JP2002032542A (en) Work managing system, work managing method, work managing device and recording medium
JPH0879298A (en) Electronic mail system
JP2003281037A (en) Device, system and method for managing electronic bulletin board
JP2005018704A (en) Information control system and information control program
JP2006040153A (en) Progress management device and method and computer program
JP4245260B2 (en) E-mail receiving apparatus, recording medium, and e-mail receiving method