JP2004516396A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2004516396A5 JP2004516396A5 JP2002509627A JP2002509627A JP2004516396A5 JP 2004516396 A5 JP2004516396 A5 JP 2004516396A5 JP 2002509627 A JP2002509627 A JP 2002509627A JP 2002509627 A JP2002509627 A JP 2002509627A JP 2004516396 A5 JP2004516396 A5 JP 2004516396A5
- Authority
- JP
- Japan
- Prior art keywords
- riser
- buoy
- well
- shows
- view
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002131 composite material Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 7
- 239000004020 conductor Substances 0.000 description 5
- 150000002430 hydrocarbons Chemical class 0.000 description 4
- 239000004215 Carbon black (E152) Substances 0.000 description 3
- 125000004122 cyclic group Chemical group 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000789 fastener Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 210000000088 Lip Anatomy 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Description
【0003】
一般に、従来の海洋掘削及び生産システムは海洋表面12における作業施設10と、海底の泥線(mudline)16に配置された生産設備14とを有している。深海フィールド、すなわち、プラットホームのための基礎を海洋底の上に設置するには海が深すぎるフィールドにおいては、浮遊リグや半分水中に沈んだ船などの浮遊施設10を用いて掘削やインターベンション(intervention)作業が行われる。泥線16における装置は、井戸穴26の中へ延びるケーシング20及びチュービングを有する海中井戸ヘッド24内において、ケーシングやチュービング22などの同心状のパイプストリングを支持するための海中井戸ヘッドシステム18を有し得る。スチールの海洋ライザ28が海中井戸ヘッド24から浮遊プラットホーム10まで延びている。
一般に、従来の海洋掘削及び生産システムは海洋表面12における作業施設10と、海底の泥線(mudline)16に配置された生産設備14とを有している。深海フィールド、すなわち、プラットホームのための基礎を海洋底の上に設置するには海が深すぎるフィールドにおいては、浮遊リグや半分水中に沈んだ船などの浮遊施設10を用いて掘削やインターベンション(intervention)作業が行われる。泥線16における装置は、井戸穴26の中へ延びるケーシング20及びチュービングを有する海中井戸ヘッド24内において、ケーシングやチュービング22などの同心状のパイプストリングを支持するための海中井戸ヘッドシステム18を有し得る。スチールの海洋ライザ28が海中井戸ヘッド24から浮遊プラットホーム10まで延びている。
【0013】
好ましい実施の形態の詳細な説明
この発明のシステム及び方法は地下に存在する炭化水素の埋蔵域34が枯渇するまで深海油田を効率的かつ経済的に管理することを可能にする。ここで図2を参照すると、泥線16において井戸36を通じて埋蔵域34から炭化水素を生産するために深海フィールド32に配備されたフィールドの管理及び完成システム(以下、「管理システム」)30が示されている。井戸36は井戸ヘッド38を有することができる。この井戸ヘッド38は参照番号40で集合的に表されているケーシング及びチュービングを井戸穴42の中で支持するために使用される。簡素化のために、生産ツリー(production tree)、地下パイプ、海中貯蔵タンクなどの構造物は示されていない。その理由は、それらの使用及び設置は当該分野の技術者には明瞭なものだからである。ここで例示された環境において実現された好ましい管理システムはライザ50と、海面上に浮いているブイ80と、サービス船100とを含んでいる。
好ましい実施の形態の詳細な説明
この発明のシステム及び方法は地下に存在する炭化水素の埋蔵域34が枯渇するまで深海油田を効率的かつ経済的に管理することを可能にする。ここで図2を参照すると、泥線16において井戸36を通じて埋蔵域34から炭化水素を生産するために深海フィールド32に配備されたフィールドの管理及び完成システム(以下、「管理システム」)30が示されている。井戸36は井戸ヘッド38を有することができる。この井戸ヘッド38は参照番号40で集合的に表されているケーシング及びチュービングを井戸穴42の中で支持するために使用される。簡素化のために、生産ツリー(production tree)、地下パイプ、海中貯蔵タンクなどの構造物は示されていない。その理由は、それらの使用及び設置は当該分野の技術者には明瞭なものだからである。ここで例示された環境において実現された好ましい管理システムはライザ50と、海面上に浮いているブイ80と、サービス船100とを含んでいる。
【0016】
また、ライザ50は大部分が複合材料で形成されていることが好ましい。容易に認識できるように、ブイ80は海洋の波(荒れた海)のために周期的に上下する。ライザ50はブイ80に連結されているために、ライザ50はブイ80が海とともに上下するときに周期的なテンションを受ける。周期的なテンションは急速に金属疲労をもたらすけれども、複合材料は周期テンションによって加わるストレスに対して高い耐性を有する。炭化水素の回収用途に利用される管に対して複合材料を使用することは、1998年5月20日に出願された「ウェル・システム(Well System)」という名称の同時係属中の米国出願第09/081,961号に開示されている。その出願はすべての目的に対して本願において文献援用される。しかしながら、疲労損傷に対して同様の耐久性を有する他の材料も使用できることは理解できよう。複合材などの耐疲労性の材料を使用すると、金属製のライザに比べてライザの寿命が延びる。このことは井戸のインターベンション、完成及び建造の活動に対して長期の計画を立てることを可能にする。
また、ライザ50は大部分が複合材料で形成されていることが好ましい。容易に認識できるように、ブイ80は海洋の波(荒れた海)のために周期的に上下する。ライザ50はブイ80に連結されているために、ライザ50はブイ80が海とともに上下するときに周期的なテンションを受ける。周期的なテンションは急速に金属疲労をもたらすけれども、複合材料は周期テンションによって加わるストレスに対して高い耐性を有する。炭化水素の回収用途に利用される管に対して複合材料を使用することは、1998年5月20日に出願された「ウェル・システム(Well System)」という名称の同時係属中の米国出願第09/081,961号に開示されている。その出願はすべての目的に対して本願において文献援用される。しかしながら、疲労損傷に対して同様の耐久性を有する他の材料も使用できることは理解できよう。複合材などの耐疲労性の材料を使用すると、金属製のライザに比べてライザの寿命が延びる。このことは井戸のインターベンション、完成及び建造の活動に対して長期の計画を立てることを可能にする。
【0018】
ここで図3Aを参照すると、隣接する複合管状セグメント60,62を形成するためのコネクタ58が例示されている。一般に、電気導体及び端子を有するコネクタ本体がセグメント60,62の間に挿入されている。コイル状の複合チュービングセグメントとの使用に適合されたコネクタの詳細が2000年3月24日に出願された米国出願第09/534,685号に開示されている。その出願はここにおいて文献援用されている。別の連結が図3Bに示されている。そこでは、隣接する管状セグメント70,72が周知のスリップジョイント73を用いて連結されている。
ここで図3Aを参照すると、隣接する複合管状セグメント60,62を形成するためのコネクタ58が例示されている。一般に、電気導体及び端子を有するコネクタ本体がセグメント60,62の間に挿入されている。コイル状の複合チュービングセグメントとの使用に適合されたコネクタの詳細が2000年3月24日に出願された米国出願第09/534,685号に開示されている。その出願はここにおいて文献援用されている。別の連結が図3Bに示されている。そこでは、隣接する管状セグメント70,72が周知のスリップジョイント73を用いて連結されている。
【0019】
ここで図3C及び図3Dを参照する。ライザ50には選択的に埋め込み式の電気導体74を設けることができる。同様に、ライザ50内に配置された生産チュービング又は他のチュービングにも埋め込み式の電気導体76を設けることができる。埋め込まれた導体を有する複合チューブが米国特許第6,004,639号、第5,921,285号及び同時係属中の出願の米国出願第09/081,961号に開示されている。これらはすべてその全体がここにおいて文献援用されている。以下で詳細に説明されるように、これらの電気導体は井戸作業者が炭化水素生産活動をモニタ及び管理する能力を著しく向上させることができる。
ここで図3C及び図3Dを参照する。ライザ50には選択的に埋め込み式の電気導体74を設けることができる。同様に、ライザ50内に配置された生産チュービング又は他のチュービングにも埋め込み式の電気導体76を設けることができる。埋め込まれた導体を有する複合チューブが米国特許第6,004,639号、第5,921,285号及び同時係属中の出願の米国出願第09/081,961号に開示されている。これらはすべてその全体がここにおいて文献援用されている。以下で詳細に説明されるように、これらの電気導体は井戸作業者が炭化水素生産活動をモニタ及び管理する能力を著しく向上させることができる。
【0023】
ブイ80はそのブイ80の有用性を増すために様々な設計変更が可能であることは認識できるであろう。例えば、ハッチ90はサービス船100上の設備と迅速に係合できる包括的な係合面を有するように形成することができる。以下で述べるように、ブイ80は井戸サービス作業を開始する前にサービス船100へ入渠される。ある作業に対しては、サービス船の作業員はハッチの蓋91を単に持ち上げて、設備をムーンプール86及びライザ50の中へ挿入することができる。別の作業では、スナバ、ブローアウトプリベンタ、インジェクタ、バルブアセンブリ及び他のそうした設備を含むスタック(stack)を通じてムーンプール86へ入れる必要がある。従って、ハッチ90にはスタックなどの井戸設備と解除可能に係合するための手段が設けられていることが好ましい。例えば、ハッチ90はねじ部又は受容されるファスナのための穴を有する環状リップを有することができる。また、環状カラー又は摺動スリーブ(図示されていない)を用いてハッチ90を井戸設備にロックすることも可能である。さらに、ねじ端部又はファスナの代わりに、油圧駆動式のロックを使用することもできる。しかしながら、要素にさらされる部材の数を最小にするために、従って、腐食や故障を生じる部材の数を最小にするために、ハッチ90の設計は、比較的簡単なことが好ましい。
ブイ80はそのブイ80の有用性を増すために様々な設計変更が可能であることは認識できるであろう。例えば、ハッチ90はサービス船100上の設備と迅速に係合できる包括的な係合面を有するように形成することができる。以下で述べるように、ブイ80は井戸サービス作業を開始する前にサービス船100へ入渠される。ある作業に対しては、サービス船の作業員はハッチの蓋91を単に持ち上げて、設備をムーンプール86及びライザ50の中へ挿入することができる。別の作業では、スナバ、ブローアウトプリベンタ、インジェクタ、バルブアセンブリ及び他のそうした設備を含むスタック(stack)を通じてムーンプール86へ入れる必要がある。従って、ハッチ90にはスタックなどの井戸設備と解除可能に係合するための手段が設けられていることが好ましい。例えば、ハッチ90はねじ部又は受容されるファスナのための穴を有する環状リップを有することができる。また、環状カラー又は摺動スリーブ(図示されていない)を用いてハッチ90を井戸設備にロックすることも可能である。さらに、ねじ端部又はファスナの代わりに、油圧駆動式のロックを使用することもできる。しかしながら、要素にさらされる部材の数を最小にするために、従って、腐食や故障を生じる部材の数を最小にするために、ハッチ90の設計は、比較的簡単なことが好ましい。
【図面の簡単な説明】
【図1】
深海環境における従来の海洋プラットホームの側面図を示している。
【図2】
井戸管理及び完成システムの好ましい実施の形態の側面図を示している。
【図3A】
ライザ連結の好ましい実施の形態の側面図を示している。
【図3B】
ライザ連結用のスリップジョイントの一例の側面図を示している。
【図3C】
ライザ及び生産チュービングの好ましい実施の形態の断面図を示している。
【図3D】
ライザ及び生産チュービング及びそれぞれの埋め込みワイヤの断面図を示している。
【図4A】
ブイの好ましい実施の形態の平面図を示している。
【図4B】
ブイの好ましい実施の形態の側面図を示している。
【図5A】
サービス船内の好ましいベイへ繋ぎ止められた仮想的なブイの平面図を示している。
【図5B】
ブイに係合する油圧アームを有するサービス船へ繋ぎ止められたブイの側面図を示している。
【図1】
深海環境における従来の海洋プラットホームの側面図を示している。
【図2】
井戸管理及び完成システムの好ましい実施の形態の側面図を示している。
【図3A】
ライザ連結の好ましい実施の形態の側面図を示している。
【図3B】
ライザ連結用のスリップジョイントの一例の側面図を示している。
【図3C】
ライザ及び生産チュービングの好ましい実施の形態の断面図を示している。
【図3D】
ライザ及び生産チュービング及びそれぞれの埋め込みワイヤの断面図を示している。
【図4A】
ブイの好ましい実施の形態の平面図を示している。
【図4B】
ブイの好ましい実施の形態の側面図を示している。
【図5A】
サービス船内の好ましいベイへ繋ぎ止められた仮想的なブイの平面図を示している。
【図5B】
ブイに係合する油圧アームを有するサービス船へ繋ぎ止められたブイの側面図を示している。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/613,375 US6364021B1 (en) | 2000-07-11 | 2000-07-11 | Well management system and method of operation |
PCT/US2001/021760 WO2002004785A1 (en) | 2000-07-11 | 2001-07-11 | Well management system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004516396A JP2004516396A (ja) | 2004-06-03 |
JP2004516396A5 true JP2004516396A5 (ja) | 2005-02-03 |
Family
ID=24457072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002509627A Pending JP2004516396A (ja) | 2000-07-11 | 2001-07-11 | 井戸管理システム |
Country Status (10)
Country | Link |
---|---|
US (1) | US6364021B1 (ja) |
EP (1) | EP1303681A4 (ja) |
JP (1) | JP2004516396A (ja) |
CN (1) | CN1252373C (ja) |
AU (2) | AU7589001A (ja) |
BR (1) | BR0112345A (ja) |
CA (1) | CA2415637C (ja) |
MX (1) | MXPA03000398A (ja) |
NO (1) | NO20030144D0 (ja) |
WO (1) | WO2002004785A1 (ja) |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO322809B1 (no) * | 2001-06-15 | 2006-12-11 | Schlumberger Technology Bv | Anordning og fremgangsmate for a overvake og styre utplassering av utstyr pa havbunnen |
GB2414258B (en) * | 2001-07-12 | 2006-02-08 | Sensor Highway Ltd | Method and apparatus to monitor, control and log subsea wells |
FR2840951B1 (fr) * | 2002-06-13 | 2004-12-24 | Inst Francais Du Petrole | Ensemble d'instrumentation d'une colonne montante de forage offshore |
US20040052586A1 (en) * | 2002-08-07 | 2004-03-18 | Deepwater Technology, Inc. | Offshore platform with vertically-restrained buoy and well deck |
US6854933B2 (en) * | 2002-08-07 | 2005-02-15 | Deepwater Technologies, Inc. | Vertically restrained centerwell SPAR |
MXPA05004043A (es) * | 2002-10-16 | 2005-08-18 | Single Buoy Moorings | Buque para instalar tubos ascendentes y metodo de uso del mismo. |
US20060197678A1 (en) * | 2003-05-20 | 2006-09-07 | David Silvers | Wireless well communication system and method |
AU2004242120B2 (en) * | 2003-05-20 | 2010-05-13 | Silversmith, Inc. | Wireless well communication system and method for using the same |
RU2330154C1 (ru) | 2004-05-03 | 2008-07-27 | Эксонмобил Апстрим Рисерч Компани , | Система и судно для технического обслуживания шельфовых месторождений |
US8074720B2 (en) * | 2004-09-28 | 2011-12-13 | Vetco Gray Inc. | Riser lifecycle management system, program product, and related methods |
WO2006102259A2 (en) * | 2005-03-23 | 2006-09-28 | Shell Internationale Research Maatschappij B.V. | Underwater structure monitoring systems and methods |
NO326575B1 (no) * | 2006-07-19 | 2009-01-12 | Framo Eng As | System og fartoy for hydrokarbonproduksjon og fremgangsmate for intervensjon pa undervannsutstyr |
CA2867384C (en) * | 2006-11-07 | 2016-06-07 | Charles R. Orbell | Method of drilling by installing multiple annular seals between a riser and a string |
NO2150742T3 (ja) * | 2007-04-27 | 2018-04-14 | ||
GB2451258A (en) * | 2007-07-25 | 2009-01-28 | Vetco Gray Controls Ltd | A wireless subsea electronic control module for a well installation |
US9051785B2 (en) | 2008-02-11 | 2015-06-09 | Vetco Gray Inc. | Oil and gas riser spider with low frequency antenna apparatus and method |
US8875798B2 (en) * | 2009-04-27 | 2014-11-04 | National Oilwell Varco, L.P. | Wellsite replacement system and method for using same |
WO2011002602A2 (en) | 2009-07-01 | 2011-01-06 | National Oilwell Varco, L.P. | Wellsite equipment replacement system and method for using same |
US9074428B2 (en) * | 2010-03-19 | 2015-07-07 | Seahorse Equipment Corp | Connector for steel catenary riser to flexible line without stress-joint or flex-joint |
CN102913177A (zh) * | 2012-11-12 | 2013-02-06 | 中国海洋石油总公司 | 基盘式水中干式井口结构 |
CN103112553B (zh) * | 2013-02-04 | 2015-11-25 | 大连海事大学 | 自航式半潜维修船及使用方法 |
CN105358794A (zh) * | 2013-06-06 | 2016-02-24 | 国际壳牌研究有限公司 | 深水低速率评价生产系统 |
US9441444B2 (en) | 2013-09-13 | 2016-09-13 | National Oilwell Varco, L.P. | Modular subsea stripper packer and method of using same |
CN104563996A (zh) * | 2013-10-29 | 2015-04-29 | 中国石油天然气股份有限公司 | 带压拖动压裂管柱及其压裂方法 |
US9822761B2 (en) * | 2014-08-13 | 2017-11-21 | General Electric Company | Structural components and methods of manufacturing |
CN108338110A (zh) * | 2018-03-07 | 2018-07-31 | 中国海洋大学 | 一种浮标式投饵机 |
BR102018069281B1 (pt) * | 2018-09-21 | 2022-02-22 | Petróleo Brasileiro S.A. - Petrobras | Sistema e método de monitoramento de poços desconectados |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4205379A (en) | 1977-05-16 | 1980-05-27 | TRW Inc., Systems & Energy | Position determining and dynamic positioning method and system for floating marine well drill platforms and the like |
US4650431A (en) | 1979-03-28 | 1987-03-17 | Amtel, Inc | Quick disconnect storage production terminal |
EP0470883B1 (fr) * | 1990-08-10 | 1995-10-18 | Institut Français du Pétrole | Installation et méthode pour l'exploitation en mer de petits gisements |
NO311075B1 (no) * | 1994-02-02 | 2001-10-08 | Norske Stats Oljeselskap | Fartöy som kan veksle mellom å operere som produksjonsskip for hydrokarbonproduksjon/lagerskip på felter til havs og somskytteltanker |
US5426332A (en) | 1994-03-11 | 1995-06-20 | Tidal Electric, Inc. | Tidal generator |
NO303144B1 (no) * | 1995-03-20 | 1998-06-02 | Norske Stats Oljeselskap | System for produksjon av hydrokarboner fra reservoarer til havs |
US5921285A (en) | 1995-09-28 | 1999-07-13 | Fiberspar Spoolable Products, Inc. | Composite spoolable tube |
US5979881A (en) * | 1996-07-31 | 1999-11-09 | Kendall, Jr.; Clarence E. | Apparatus for manufacturing an insulated conductor in metal tubing |
US5855062A (en) * | 1996-07-31 | 1999-01-05 | Kendall, Jr.; Clarence E. | Method and apparatus for manufacturing an insulated conductor in metal tubing |
US6004639A (en) | 1997-10-10 | 1999-12-21 | Fiberspar Spoolable Products, Inc. | Composite spoolable tube with sensor |
US5978739A (en) | 1997-10-14 | 1999-11-02 | Stockton; Thomas R. | Disconnect information and monitoring system for dynamically positioned offshore drilling rigs |
AU3217899A (en) * | 1998-03-30 | 1999-10-18 | Kellogg Brown & Root, Inc. | Extended reach tie-back system |
-
2000
- 2000-07-11 US US09/613,375 patent/US6364021B1/en not_active Expired - Fee Related
-
2001
- 2001-07-11 AU AU7589001A patent/AU7589001A/xx active Pending
- 2001-07-11 BR BR0112345-9A patent/BR0112345A/pt not_active Application Discontinuation
- 2001-07-11 CN CNB018120784A patent/CN1252373C/zh not_active Expired - Fee Related
- 2001-07-11 JP JP2002509627A patent/JP2004516396A/ja active Pending
- 2001-07-11 CA CA002415637A patent/CA2415637C/en not_active Expired - Fee Related
- 2001-07-11 MX MXPA03000398A patent/MXPA03000398A/es active IP Right Grant
- 2001-07-11 EP EP01953442A patent/EP1303681A4/en not_active Withdrawn
- 2001-07-11 AU AU2001275890A patent/AU2001275890B2/en not_active Ceased
- 2001-07-11 WO PCT/US2001/021760 patent/WO2002004785A1/en not_active Application Discontinuation
-
2003
- 2003-01-10 NO NO20030144A patent/NO20030144D0/no not_active Application Discontinuation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2004516396A5 (ja) | ||
AU2006202208B2 (en) | Subsea well communications apparatus and method using variable tension large offset risers | |
US6364021B1 (en) | Well management system and method of operation | |
US7938190B2 (en) | Anchored riserless mud return systems | |
AU2005202612B2 (en) | Dry tree subsea well communications apparatus and method using variable tension large offset risers | |
AU2001275890A1 (en) | Well management system | |
US6196322B1 (en) | Underwater installation and method for building of an underwater installation | |
US20100326667A1 (en) | Production of hydrocarbons | |
US8657012B2 (en) | Efficient open water riser deployment | |
King | Drilling engineering for subsea development wells | |
Moreira et al. | Guideline/ess Completions Offshore Brazil | |
KR101640791B1 (ko) | 웰헤드 보강 유닛, 이를 포함하는 웰헤드 및 분출 방지용 스택 설치 방법 | |
Okamoto et al. | Competitive CVAR-FPSO concepts with Dry trees in ultra-deepwater; Weathervaning CVAR-FPSO for Brazil and Indonesia vs. Non-weathervaning for West Africa | |
KR101640786B1 (ko) | 웰헤드 보강 유닛 및 이를 포함하는 웰헤드 | |
Filho et al. | Critical Points For The Project Of Very Deep Subsea Completions | |
Juiniti | Roncador Field Development with Subsea Completions | |
CA2248683C (en) | Underwater installation and method for building of an underwater installation | |
Harris | Floating Drilling Experience in Santa Barbara Channel, California | |
Humphrey et al. | North Sea Marginal Fields: The Subsea Completions Option | |
White et al. | Foinaven subsea system connection | |
WO1996021792A3 (en) | Riser assembly | |
Moreira | The Use of Dynamically Positioned Units in Subsea Completions Offshore Brazil | |
Graser | Development of a Subsea Wireline Winch System | |
Henderson | A GUIDELINELESS TREE AND A FLOWLINE CONNECTION SYSTEM FOR DEEPWATER PRODUCTION | |
Sanders | Installation of Concentric Subsea Completions from a Jack-Up in the Welland Field: A Case History |