JP2004326716A - System for managing ready mixed concrete schedule - Google Patents

System for managing ready mixed concrete schedule Download PDF

Info

Publication number
JP2004326716A
JP2004326716A JP2003153527A JP2003153527A JP2004326716A JP 2004326716 A JP2004326716 A JP 2004326716A JP 2003153527 A JP2003153527 A JP 2003153527A JP 2003153527 A JP2003153527 A JP 2003153527A JP 2004326716 A JP2004326716 A JP 2004326716A
Authority
JP
Japan
Prior art keywords
manufacturer
site
order
scheduled
schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003153527A
Other languages
Japanese (ja)
Inventor
Minoru Domichi
実 堂道
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NET COM KK
Original Assignee
NET COM KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NET COM KK filed Critical NET COM KK
Priority to JP2003153527A priority Critical patent/JP2004326716A/en
Priority to KR1020040025468A priority patent/KR20040093398A/en
Publication of JP2004326716A publication Critical patent/JP2004326716A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0621Item configuration or customization
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a system enabling order reservation of business forms via the Internet by solving the problem that, in a ready mixed concrete industry, number of points to be confirmed occur and business itself used to be complicated and inefficient from when order reservation is made to execution. <P>SOLUTION: Data are shared among a manufacturer, a seller and a consumer via the Internet and the manufacturer releases its own schedule conditions. Thus, they become helpful when the seller and the consumer try to decide a scheduled date and can actually make scheduled order on the Internet. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、製造者の生コンクリート予定状況(受注状況)を公開し、販売者及び消費者がインターネットを介して、生コンクリートの予定注文及び予定照会ができるものである。また、生コンクリートの管理業務においては、製造者は販売者及び消費者からの生コンクリートの注文実績や受注状況、納入時に必要な車の台数、納入するのに必要な代車の台数、販売者は消費者単位での生コンクリートの注文実績、注文可否、予定状況、消費者は生コンクリートの注文実績、注文可否、予定状況が確認可能である生コンクリート予定管理システムに関するものである。
【0002】
【従来の技術】
従来より、生コンクリートの注文業務(予定注文業務)は電話もしくはFAX連絡によるものであった。販売形態が、製造者から販売者そして消費者へと流れる場合、注文業務(予定注文業務)の流れは、消費者が販売者に○月○日の○時○分に生コンクリートを○m3欲しいと注文の電話をする。殆どの場合、販売者は受注後一度消費者からの電話を切り、その予定注文内容を製造者へ電話連絡等の方法で伝え、消費者の該予定注文に対応できるか否かを確認する。そして製造者の予定状況と注文可否を聞いた後注文ができる場合は、注文ができた旨消費者へ折り返し電話連絡をする。注文ができない場合は、消費者へ注文ができない旨電話連絡をし、別の日にしてもらうか、時間の変更等の調整をしてもらうか再度製造者へ連絡をして調整をし直す。そしてその結果を両者へ電話連絡する。
そして、注文日(予定日)間近になると販売者が消費者へ実際に該当日に納入をしてもいいのかを確認し、その結果を製造者に電話連絡をする。
【0003】
販売形態が、製造者から直接消費者への場合、注文業務(予定注文業務)の流れは消費者が製造者に○月○日の○時○分に生コンクリートを○m3欲しいと注文の電話をし製造者はその注文ができるか、できないかを回答する。そして、注文日(予定日)間近になると製造者が消費者へ実際に該当日に納入をしてもいいのかを確認する。また、製造者は該注文に対応できるか否かを、熟練した受注担当者が、その時点での受注数量を把握した上で、経験と知識を元に納入状況を推測して判断するという方法が常であり、それと同時に納入に必要とされる車の台数なども推測し、足りない車に関しては代車を他業者へ依頼する。
【0004】
【発明が解決しようとする課題】
このように従来の電話による販売者の注文業務(予定注文業務)では、注文可否を伝達するのにタイムラグや重複作業が多かった。これは、一度、消費者から注文を聞き、製造者へ電話連絡をして注文の可否を確認してから再度、消費者へ注文可否の電話連絡をするため、消費者が不在の場合や不意の事柄等の場合、消費者への伝達が遅れることがある。ここで時間的誤差が生じる上に、製造者及び消費者の2者への連絡をしなくてはならない作業が必要となる。
【0005】
それと同様に、納入確認業務でも注文該当日(予定該当日)に消費者へ納入可否の確認を取り、その結果を製造者へ伝える際にも時間的誤差が生じる上に、2者への連絡をしなくてはならない作業が必要となる。また、製造者では熟練された受注担当者が不在時の注文可否の判断や納入に使用する車の台数が何台になるかの判断を下すのが難しいものであった。更に、これら一連の連絡確認作業には製造・販売・消費者3者の営業時間内でしか行えないものであった。本発明はこれらの課題を解決するためになされたものである。
【0006】
【課題を解決するための手段】
本発明においては、製造者、販売者、消費者の3者間でインターネットを介しデータを共有し、製造者が自己の予定状況を公開することで、販売者及び消費者が予定日を決定するのに参考となり実際にインターネット上で予定注文をすることが出来る。ここで注文可否が即座に表示されるため製造者、販売者、消費者3者間の注文可否の伝達におけるタイムラグと作業が無くなる。
また、販売者の納入確認業務では、消費者に連絡を取りその結果をインターネットを介して製造者に伝えることが出来るので伝達に要する作業が軽減される。
また、製造者では予定注文の可否や納入に必要な車の台数、必要な代車の台数、消費者が希望した注文日(予定日)に予定注文ができなかった場合の代替日の表示等を本システムを使って導き出せるため、熟練された受注担当者は必要ではなくなる。また、3者の営業時間内に業務を行わなければならないという時間的制約がインターネットを使用することにより排除できる。
【0007】
すなわち本発明はインターネットを介して製造者、販売者、消費者をつなぐ生コンクリート予定管理システムであって、本発明によるホームページ上に製造者及び販売者が自己の受発注情報を公開し、インターネット閲覧入力可能な該製造者、販売者及び消費者による予定注文及び予定照会を可能にするシステムであって、前記製造者、販売者及び消費者を管理認証するシステムと、前期認証された製造者、販売者及び消費者による情報書き込み及びデータ収集システムと、収集したデータを公開するシステムとを備え、製造者においては予定状況管理、配車手配管理、出荷当日予定管理、販売者においては予定状況管理、出荷当日予定管理、消費者においては当該製造者予定状況閲覧、当該製造者予定注文、当該製造者出荷当日予定確認が可能であり、更に、製造者に対して行われる予定注文において可否判定をする手段と、製造者が納入時に必要となる車輌の台数表示手段を備えている事を特徴とする生コンクリート予定管理システムである。
【0008】
【発明の実施の形態】
以下、本発明の実施の形態について説明するが、以下、当該システムの説明の都合上、販売者を「販売店(1)」消費者を「現場(2)」製造者を「工場(3)」と呼称する。
【図1】は本発明の構成例を示すものである。先ず、本発明を司る管理センター(4)により、当管理システム(5)のデータベースに任意の販売店情報と工場情報が登録される。ここで言う管理センター(4)とはより合理的にシステムを運用するという意味から、いわゆるASP(アプリケーションサービスプロバイダ)を想定しているが以下管理センター(4)と呼称する。登録された前販売店(1)と工場(3)がインターネット(6)を介し当管理システム(5)のホームページにIDとパスワードでログインし任意の現場(2)の情報を登録する。登録された現場(2)はインターネット(6)を介し当管理システム(5)のホームページにIDとパスワードでログインすることができる。
【0009】
次に現場(2)データ登録作業について説明する。
現場(2)データ登録を行う者は販売形態によって異なり、販売経路が工場(3)から販売店(1)そして現場(2)への場合、販売店(1)が現場(2)データを登録する。また、販売経路が工場(3)から直接現場(2)への場合、工場(3)が登録する。販売店(1)、工場(3)とも本管理システム(5)によるホームページ上でIDとパスワードでログインし、ホームページ上に表示された画面から「新規現場登録」を選択することで登録作業を行う。現場登録は現場(2)名称単位で行い、仮に施工者が同じでも現場(2)名称が異なるデータとして蓄積される。
【0010】
販売店(1)が現場(2)を登録する場合について説明する。
販売店(1)は、本管理システム(5)によるホームページ上でIDとパスワードでログインし、ホームページ上に表示された画面から「新規現場登録」を選択する。図2、及び図3は新規現場登録を行う画面の実施例である。基本登録を入力すると該データは販売店(1)の1現場(2)データとしてホームページ上に反映される。販売店(1)は画面上に表示された「現場/予定/管理」を選択し、更に詳細データを設定しなくてはならない。詳細データの設定とは「配合登録」と「納入工場登録」とがある。「配合登録」とは▲1▼現場(2)が使用する生コンクリートの種類(生コンクリートとモルタルの2種類がある)、▲2▼打設箇所(構造物の納入する部分)、▲3▼配合(仕様)、▲4▼連続打設(日毎打設)、▲5▼配合備考(仕様の補足)、▲6▼予定納期(納入する期間)の各登録である。また「納入工場登録」は該当現場(2)に納入する工場(3)の登録をいう。図4は販売店(1)が現場(2)の詳細データの設定を行う画面の実施例である。
【0011】
「納入工場登録」には「納入担当区分」の欄が設けられており、これは1現場(2)に複数の工場(3)が納入する場合に、各工場(3)の納入する部分(区分)を決めるものである。元来、販売店(1)は現場(2)との打ち合わせ通りの区分にそって工場(3)に予定を入れたいものだが、現場(2)は予定さえ入れば担当する以外の工場(3)でも構わないといったことになる可能性がある為、この「納入担当区分」作業が必要となる。販売店(1)の現場(2)登録が完了すると、当管理システム(5)から該現場(2)へ自動的に割り当てられるIDと設定されたパスワードが送信される。現場(2)は送信されたIDとパスワードにより当管理システム(5)のホームページよりログインし、本システムの利用が可能となる。
【0012】
次に工場(3)が現場(2)を登録する場合について説明する。
工場(3)は、本管理システム(5)によるホームページ上でIDとパスワードでログインし、ホームページ上に表示された画面から「新規現場登録」を選択する。新規現場登録を行う画面は上記した販売店(1)のものと同一フォーマットである。基本登録を入力すると該データは工場(3)の1現場(2)データとしてホームページ上に反映される。工場(3)は画面上に表示された「現場/予定/管理」を選択し、更に詳細データを設定しなくてはならない。詳細データの設定とは「配合登録」と「時間データ」とがある。「配合登録」は上記した販売店(1)と同種、同行程である。図5は工場(3)が現場(2)の詳細データの設定を行う画面の実施例である。
【0013】
「時間データ」とは▲1▼工場(3)から現場(2)までの通常時とラッシュ時の所要時間、▲2▼各種取り(荷降ろし)方法でかかる時間の設定のことである。工場(3)の現場(2)登録が完了すると、当管理システム(5)から該現場(2)へ自動的に割り当てられるIDと設定されたパスワードが送信される。現場(2)は送信されたIDとパスワードにより当管理システム(5)のホームページよりログインし、本システムの利用が可能となる。
【0014】
次に、販売店(1)の本管理システム(5)によるホームページ上での現場(2)の管理作業について説明する。
販売店(1)により登録された現場(2)情報は本管理システム(5)のデーターベースに蓄積されホームページ上に反映される。販売店(1)は画面上の「現場/予定/管理」を選択し、現場(2)名記載のページを表示させ、該任意の現場(2)名をクリックすることで各現場(2)専用のページを表示させることができる。該ページで予定注文業務、予定状況確認、注文実績確認、詳細データ設定、基本データ(現場データ)の変更及び削除等を行う。予定注文業務とは予定注文を入れる、予定注文を変更する、予定注文をキャンセルする作業をいう。
【0015】
次に、工場(3)の本システムによるホームページ上での現場(2)の管理作業について説明する。
工場(3)により登録された現場(2)情報は本管理システム(5)のデーターベースに蓄積されホームページ上に反映される。工場(3)は画面上の「現場/予定/管理」を選択し、現場(2)名記載のページを表示させ、該任意の現場(2)名をクリックすることで各現場(2)専用のページを表示させることができる。このページで予定注文業務、予定状況確認、注文実績確認、配合データ設定、時間データ設定、基本データ(現場データ)等の変更及び削除等を行う。予定注文業務とは予定注文を入れる、予定注文を変更する、予定注文をキャンセルする作業をいう。
【0016】
次に、販売店(1)の予定注文業務について説明する。
注文(予定)をするには、まず管理センター(4)から割り当てられているIDとパスワードで当管理システム(5)にホームページ上からログインし、画面上にて「現場/予定/管理」を選択する。表示された「現場/予定/管理」ページにある任意の現場(2)名をクリックすることで該現場(2)専用ページを表示させる。次に該現場(2)専用ページ内に表示されている「納入工場」の項目の中から任意の工場(3)決定し、その工場(3)名の横にある「予定を入れる」ボタンをクリックする。次に表示された予定注文画面に予定条件を入力する。条件を入力したら「次へ」ボタンをクリックする。この時、本管理システム(4)が当該予定注文の可否を判定する。予定が可能であれば販売店(1)は画面上で注文内容をを確認し「注文」ボタンをクリックする。これで予定注文が完了する。予定注文が不可能であれば、当システムにより表示された別の予定注文可能日ににチェックをいれて「再予定」ボタンをクリックするか、「戻る」ボタンをクリックし予定条件を変えて再度行う。
【0017】
予定可否の決定に必要な条件項目は、予定注文内容の▲1▼開始時間、▲2▼取り(荷降ろし)の方法、▲3▼希望ピッチ、▲4▼予定数量、▲5▼積載量、▲6▼納入工場の時間帯生産能力残量等である。ここで言う▲1▼開始時間とは、現場(2)で荷降ろしを開始する時間のことであり、▲2▼取り(荷降ろし)の方法では生コンクリートをどのように降ろすかを選択する。荷降ろし方法は主に、流し込み、ポンプ1台1台付け、ポンプ1台2台付け、ポンプ2台各1台付け、ポンプ2台各2台付け、ホッパー取り、ネコ等があり、各方法によって荷降ろし時間が異なる。▲3▼希望ピッチとは希望する時間当たりの荷降ろし台数のことである。▲4▼予定数量とは納入する予定注文数量のことである。▲5▼積載量とは運搬車輌(生コン車)の積載数量(m3/台)のことである。▲6▼納入工場(3)の時間帯生産能力残量とは、現時点での時間当りの出荷できる数量のことである。
【0018】
工場(3)の時間帯生産能力のマックス値が100m3の場合、営業時間が7時から17時であれば一日の生産能力は1100m3となる。つまり、予定注文が1件も無い場合は時間帯生産能力残量は各時間帯とも100m3となる。しかし予定注文がある場合例えば7時台、8時台、9時台、10時台、11時台に30m3づつ出荷するとしたら、7時台、8時台、9時台、10時台、11時台の時間帯生産能力残量は70m3、12時台、13時台、14時台、15時台、16時台、17時台の時間帯生産能力残量は100m3となる。この7時台から11時台は時間帯生産能力残量は70m3なので、これを超える予定は受付られないということになる。図6は、販売店(1)による予定条件を入力する予定注文画面の実施例である。図7は前記予定注文が可能であることを示す画面の実施例であり、図8は前記予定注文が不可能であることを示す画面の実施例である。また、当管理システム(5)は、工場(3)から現場(2)までの所要時間をラッシュ時と通常時の2通り設定してあり、自動的にラッシュ時にかかる車輌台数と通常時にかかる車輌台数を算定する。これは、予定注文可否の判断基準ともなる。
【0019】
次に、販売店(1)の次打設予定現場確認作業について説明する。
次打設予定現場確認とは受け付けた注文日(予定日)の前日に、該当する現場(2)の納入予定について変更が無いかを確認することをいう。
例えば販売店(1)の営業体系が月曜日から金曜日、現場(2)の営業体系が月曜日から土曜日、工場(3)の営業体系が月曜日から土曜日で、日曜日以外全ての曜日に予定注文が入っているとする。販売店(1)が月曜日に行う次打設予定現場確認は火曜日分、同じく火曜日に行う次打設予定現場確認は水曜日分、そして金曜日に行う次打設予定現場確認は土曜日と月曜日分となる。
【0020】
本発明による管理システム(5)では、画面上で「次打設予定現場確認」ボタンをクリックすると、現在日を基準に直近の日の打設予定現場一覧が表示される。販売店(1)は各現場(2)へ連絡を取り、予定注文の可否を確認し、確認の取れた現場(2)について画面上の確認欄にチェックをいれ「確認」ボタンをクリックし、次ページにて「登録」ボタンをクリックすると打設予定現場確認は完了したことになりこの情報が該当工場(3)に反映される。次打設予定現場一覧では、次打設予定現場確認が済んだ現場(2)の確認欄には「済」と表示される。また、金曜日は土曜日分と月曜日分を行うのでページ上の「他の日の予定を表示する」のオプションメニューで月曜日の日付を指定して行う。図9は販売店(1)が行う打設予定現場確認の流れを示す画面の実施例である。工場(3)の次打設予定現場確認作業についても以上の行程を辿るものである。
【0021】
次に、販売店(1)の各現場(2)の納入実績確認作業について説明する。
納入実績確認とは日付単位でどの現場(2)に何時にどんな商品がどこの工場(3)からどれだけ納められたかを見ることをいう。日付の選択は年、月、日と絞込み、実績がある日付のみ表示される。つまり2002年に実績は一つもなく2001年と2003年にある場合は、年を選択するセレクトボックスには2001年と2003年しか表示されず、年を選択したらその年の実績のある月のみが月を選択するセレクトボックスに表示される。日も同じで年と月が選択された時に実績のある日のみ表示される。図10は納入実績確認を行う画面の実施例である。また、工場(3)の各現場(2)の納入実績確認作業には現場専用ページにて納入実績ボタンを押すことにより確認ができる。また、消費者については「注文実績確認」ボタンを選択することで当該ページが表示され確認できるものである。
【0022】
次に、工場管理確認作業について説明する。
工場(3)は「予定表管理」ページにて時間帯生産能力を常に把握している必要がある。販売店(1)もしくは現場(2)から本管理システム(5)を使用して予定注文が人ると、ホームページ画面上の数値に反映される。仮に本管理システム(5)を利用していない現場(2)の予定が電話などで入った場合やキャンセルになった場合は数量編集欄の「編集」ボタンをクリックし、数量変更画面を表示させ書き込みを行う。図11は工場(3)の予定表管理を行う画面の実施例である。
【0023】
次に、 工場の配車業務について説明する。
管理センター(4)が工場(3)の基本データを本管理システム(5)に登録する際、大型車、小型車の各保有車輌台数も登録する。本管理システム(5)では現場(2)単位で納入に必要な車輌台数が導き出せるので工場(3)が一日で受け付けた予定に車を何台使用するか、また自社の保有台数では何台足りないのかを表示されることで代車の台数を把握できる。これをもとに代車を他業者へ依頼するという作業が可能になる。図12は製造者が納入時に必要となる車輌の台数を表示する画面の実施例である。
【0024】
【発明の効果】
1,販売者もしくは消費者が生コンクリートの予定注文時にリアルタイムで予定注文の可否が確認出来る為、注文業務(予定注文業務)にかかる時間的誤差や作業が軽減される。
2、販売者が消費者へ注文該当日(予定該当日)の納入確認をし、その結果を製造者へ電話連絡をする作業が軽減される。
3、消費者は製造者の就業時間を考慮することなく24時間いつでも、予定注文及び予定照会が可能である。
4、製造者では予定注文の可否や納入に必要な車の台数、必要な代車の台数、消費者が希望した注文日(予定日)に予定注文が出来なかった場合の代替日の表示等を本管理システムを使って導き出せるため、熟練された受注担当者は必要ではなくなり効率の良い業務が可能である。
5、消費者は従来、希望する注文日(予定日)が予定不可の場合、現場作業工程を見直さざるをえなかったが、予定可否を24時間把握することが出来るため現場作業工程が容易に組め、時間的ロスや作業の軽減が出来る。
【0025】
このように、本発明は生コンクリートという特異な業界における流通と受発注形態をインターネットを導入することにより効率的で安定したリアルタイムな情報源を駆使してのシステムに刷新することができる。更に、ASP(アプリケーションサービスプロバイダ)により提供されることにより、販売者、消費者、製造者ともローコストにて本システムを導入することが可能である。また、インターネットの常時接続環境やいわゆるアイモードなどの情報端末機器が社会へ急速に浸透している事実が、本発明によるシステムを必要且つ受入易いものにしている。
【図面の簡単な説明】
【図1】本発明の構成例を示す図である。
【図2】本発明の新規現場登録を行う画面の実施例である。
【図3】同じく、本発明の新規現場登録を行う画面の実施例である。
【図4】販売店(1)が現場(2)の詳細データの設定を行う画面の実施例である。
【図5】工場(3)が現場(2)の詳細データの設定を行う画面の実施例である。
【図6】本発明の予定条件を入力する予定注文画面の実施例である。
【図7】6図による予定注文が可能であることを示す画面の実施例である。
【図8】6図による予定注文が不可能であることを示す画面の実施例である。
【図9】本発明の打設予定現場確認の流れを示す画面の実施例である。
【図10】本発明の納入実績確認を行う画面の実施例である。
【図11】本発明の予定表管理を行う画面の実施例である。
【図12】本発明の納入時に必要となる車輌の台数を表示する画面の実施例である。
【符号の説明】
1 販売店
2 現場
3 工場
4 管理センター
5 管理システム
6 インターネット
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention discloses a ready-mixed concrete planned state (order receiving state) of a manufacturer, and enables a seller and a consumer to make a planned order for a ready-mixed concrete and to refer to the plan via the Internet. In addition, in the management of ready-mixed concrete, the manufacturer is responsible for the order record and order status of ready-mixed concrete from sellers and consumers, the number of vehicles required for delivery, the number of substitute vehicles required for delivery, and the seller. More specifically, the present invention relates to a ready-mixed concrete schedule management system in which a consumer can confirm the order record, order availability, and schedule status of ready-mixed concrete, and the consumer can check the order record, order availability, and schedule status of ready-mixed concrete.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, ordering of ready-mixed concrete (planned ordering) has been performed by telephone or fax. When the sales form flows from the manufacturer to the seller and then to the consumer, the flow of the ordering business (planned ordering business) is as follows. And call for an order. In most cases, the seller hangs up the telephone from the consumer once after receiving the order, informs the manufacturer of the planned order content by telephone communication or the like, and confirms whether or not the consumer can respond to the planned order. If the order can be made after ascertaining the manufacturer's schedule status and whether or not the order can be made, the consumer is returned by telephone to the effect that the order has been made. If the order cannot be made, call the consumer to the effect that the order cannot be made, and then contact the manufacturer again or ask another date, or change the time, etc., and make the adjustment again. The results are then communicated to both parties.
When the order date (scheduled date) is approaching, the seller confirms whether the customer can actually deliver to the customer on that date, and telephones the result to the manufacturer.
[0003]
If the sales form is from the manufacturer directly to the consumer, the ordering process (scheduled ordering process) is as follows: The consumer wants the manufacturer to order ready-mixed concrete m3 at the hour and minute on the day and month. The manufacturer responds whether the order can or cannot be made. Then, when the order date (scheduled date) is approaching, it is confirmed whether the manufacturer can actually deliver to the consumer on that date. In addition, the manufacturer determines whether or not the order can be fulfilled by a skilled order clerk, based on his / her experience and knowledge, guessing the delivery situation after grasping the order quantity at that time. At the same time, the number of vehicles required for delivery is also estimated, and if a vehicle is missing, a substitute is requested to another company.
[0004]
[Problems to be solved by the invention]
As described above, in the conventional ordering operation of the seller by telephone (planned ordering operation), there are many time lags and duplications in transmitting the availability of the order. This is because once an order is heard from the consumer, the manufacturer is contacted by telephone to confirm the orderability, and then the customer is contacted again by telephone to confirm the order. In such cases, the transmission to the consumer may be delayed. Here, in addition to the occurrence of a time error, it is necessary to perform an operation for contacting the two parties, the manufacturer and the consumer.
[0005]
Similarly, in the delivery confirmation business, the customer confirms whether or not delivery is possible to the consumer on the applicable date (scheduled applicable date), and there is a time error when communicating the result to the manufacturer. Work that must be done. In addition, it is difficult for a skilled manufacturer to determine whether or not an order can be placed when no one is present and how many vehicles to use for delivery. Furthermore, these series of communication confirmation operations can be performed only during the business hours of manufacturing, sales, and three consumers. The present invention has been made to solve these problems.
[0006]
[Means for Solving the Problems]
In the present invention, a manufacturer, a seller, and a consumer share data via the Internet, and the manufacturer and the consumer determine their scheduled dates by disclosing their own schedule status. You can actually make a scheduled order on the Internet as a reference. Here, the order availability is immediately displayed, so that there is no time lag and work in transmitting the order availability between the manufacturer, the seller, and the consumer.
Further, in the delivery confirmation work of the seller, the work required for the communication can be reduced because the consumer can be contacted and the result can be transmitted to the manufacturer via the Internet.
In addition, the manufacturer displays the availability of scheduled orders, the number of vehicles required for delivery, the number of substitute vehicles required, and the replacement date when a scheduled order cannot be placed on the order date (scheduled date) desired by the consumer. Can be derived using this system, and no skilled order clerk is needed. In addition, the use of the Internet eliminates the time constraint that business must be performed during the business hours of the three parties.
[0007]
That is, the present invention is a ready-mixed concrete schedule management system for connecting a manufacturer, a seller, and a consumer via the Internet. The manufacturer and the seller publish their ordering information on a homepage according to the present invention, and browse the Internet. A system for enabling the manufacturer, seller and consumer to enter scheduled orders and schedule inquiries, the system for managing and authenticating the manufacturer, seller and consumer; Equipped with an information writing and data collection system by sellers and consumers, and a system for publishing the collected data.Manufacturer's schedule status management, vehicle allocation management, shipping day schedule management, seller's schedule status management, On the day of shipment management, consumers can view the manufacturer's scheduled status, order the manufacturer's scheduled order, and confirm the manufacturer's scheduled day of shipment. And a means for determining the acceptability of a scheduled order to be made to the manufacturer, and a means for displaying the number of vehicles required by the manufacturer at the time of delivery. It is.
[0008]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of the present invention will be described. Hereinafter, for convenience of description of the system, a seller is referred to as “store (1)”, a consumer is referred to as “site (2)”, and a manufacturer is referred to as “factory (3)”. ".
FIG. 1 shows a configuration example of the present invention. First, the management center (4) that manages the present invention registers arbitrary store information and factory information in the database of the management system (5). The management center (4) here is assumed to be a so-called ASP (application service provider) in order to operate the system more rationally, but is hereinafter referred to as the management center (4). The registered former dealer (1) and factory (3) log in to the homepage of the management system (5) via the Internet (6) with an ID and a password, and register information on an arbitrary site (2). The registered site (2) can log in to the homepage of the management system (5) via the Internet (6) with an ID and a password.
[0009]
Next, the site (2) data registration work will be described.
The person who registers the site (2) data differs depending on the sales form. When the sales channel is from the factory (3) to the store (1) and the site (2), the store (1) registers the site (2) data. I do. When the sales channel is from the factory (3) directly to the site (2), the factory (3) registers. Both the dealer (1) and the factory (3) log in with their ID and password on the homepage by the management system (5), and select "New site registration" from the screen displayed on the homepage to perform registration work. . Site registration is performed for each site (2) name, and even if the same constructor is used, the site (2) name is stored as different data.
[0010]
The case where the store (1) registers the site (2) will be described.
The store (1) logs in with an ID and a password on the homepage by the management system (5), and selects "new site registration" from the screen displayed on the homepage. 2 and 3 show an embodiment of a screen for registering a new site. When the basic registration is entered, the data is reflected on the home page as one site (2) data of the store (1). The dealer (1) must select "site / plan / management" displayed on the screen and set further detailed data. The setting of detailed data includes “mixing registration” and “delivery factory registration”. "Mixing registration" means (1) the type of ready-mixed concrete used by the site (2) (there are two types of ready-mixed concrete and mortar), (2) the placement location (the part where the structure is delivered), and (3) It is registration of compounding (specification), (4) continuous casting (daily casting), (5) compounding remarks (supplement of specifications), and (6) scheduled delivery date (delivery period). "Delivery factory registration" means registration of a factory (3) to be delivered to the corresponding site (2). FIG. 4 shows an example of a screen on which the store (1) sets detailed data of the site (2).
[0011]
“Delivery factory registration” has a “Delivery charge classification” column, which is used when a plurality of factories (3) deliver to one site (2). Classification). Originally, the dealer (1) wants to make a schedule in the factory (3) in accordance with the classification with the site (2). ) May be acceptable, so this “delivery division” work is required. When registration of the site (2) of the store (1) is completed, an ID automatically assigned to the site (2) and a set password are transmitted from the management system (5). The site (2) logs in from the home page of the management system (5) using the transmitted ID and password, and the system can be used.
[0012]
Next, a case where the factory (3) registers the site (2) will be described.
The factory (3) logs in with the ID and the password on the homepage by the management system (5), and selects “New site registration” from the screen displayed on the homepage. The screen for registering a new site has the same format as that of the above-mentioned store (1). When the basic registration is entered, the data is reflected on the homepage as one site (2) data of the factory (3). The factory (3) must select "site / plan / management" displayed on the screen and set further detailed data. The setting of detailed data includes “mixing registration” and “time data”. “Registration” is the same type and process as the above-mentioned store (1). FIG. 5 is an example of a screen on which the factory (3) sets detailed data of the site (2).
[0013]
"Time data" refers to (1) the time required during normal and rush hours from the factory (3) to the site (2), and (2) the time required for various types of unloading (unloading) methods. When the registration of the site (2) of the factory (3) is completed, an ID automatically assigned to the site (2) and a set password are transmitted from the management system (5). The site (2) logs in from the home page of the management system (5) using the transmitted ID and password, and the system can be used.
[0014]
Next, the management work of the site (2) on the homepage by the book management system (5) of the store (1) will be described.
The site (2) information registered by the store (1) is stored in the database of the management system (5) and is reflected on the homepage. The store (1) selects "site / plan / management" on the screen, displays a page describing the site (2) name, and clicks the arbitrary site (2) name to open each site (2). A dedicated page can be displayed. On this page, scheduled order work, scheduled status confirmation, order result confirmation, detailed data setting, basic data (site data) change and deletion, etc. are performed. Scheduled order operations include operations for placing a scheduled order, changing a planned order, and canceling a planned order.
[0015]
Next, management work of the site (2) on the homepage by the present system of the factory (3) will be described.
The site (2) information registered by the factory (3) is stored in the database of the management system (5) and reflected on the homepage. Factory (3) selects “Site / Schedule / Management” on the screen, displays a page describing the name of the site (2), and clicks on any site (2) name to dedicate each site (2) Page can be displayed. On this page, scheduled order work, scheduled status confirmation, order result confirmation, recipe data setting, time data setting, change and deletion of basic data (site data), etc. are performed. Scheduled order operations include operations for placing a scheduled order, changing a planned order, and canceling a planned order.
[0016]
Next, the scheduled order business of the store (1) will be described.
To place an order (plan), first log in to this management system (5) from the homepage with the ID and password assigned from the management center (4), and select "site / plan / management" on the screen. I do. By clicking an arbitrary site (2) name on the displayed "site / plan / management" page, the site (2) dedicated page is displayed. Next, an arbitrary factory (3) is determined from the item of "delivery factory" displayed on the site (2) dedicated page, and a "schedule" button next to the name of the factory (3) is clicked. click. Next, the user enters schedule conditions on the displayed schedule order screen. After entering the conditions, click the “Next” button. At this time, the management system (4) determines whether the scheduled order is acceptable. If the schedule is possible, the store (1) checks the order details on the screen and clicks the "order" button. This completes the planned order. If the scheduled order is not possible, check another scheduled order available date displayed by the system and click the "Reschedule" button, or click the "Back" button to change the schedule conditions and try again. Do.
[0017]
The condition items necessary for determining whether or not to schedule are (1) start time, (2) picking (unloading) method, (3) desired pitch, (4) scheduled quantity, (5) loading capacity, (6) This is the remaining production time capacity of the delivery factory. The (1) start time referred to here is the time at which unloading is started at the site (2). In the (2) unloading (unloading) method, how to unload the ready-mixed concrete is selected. The method of unloading mainly includes pouring, one pump, one pump, two pumps, two pumps each, one pump, two pumps each, two hoppers, a cat, etc. Unloading times are different. (3) The desired pitch is the number of unloads per desired time. (4) The planned quantity is the planned order quantity to be delivered. {Circle around (5)} The loading capacity is the loading quantity (m3 / vehicle) of the transport vehicle (raw concrete vehicle). {Circle around (6)} The time zone production capacity remaining of the delivery factory (3) is the quantity that can be shipped per hour at the present time.
[0018]
When the maximum value of the time zone production capacity of the factory (3) is 100 m3, if the business hours are from 7:00 to 17:00, the daily production capacity is 1100 m3. That is, when there are no scheduled orders, the remaining time capacity of the time zone is 100 m3 in each time zone. However, if there is a scheduled order, for example, if it is to be shipped at 7 o'clock, 8 o'clock, 9 o'clock, 10 o'clock, 11 o'clock at 30 m3, then 7 o'clock, 8 o'clock, 9 o'clock, 10 o'clock, 11 o'clock The time zone production capacity remaining at the hour unit is 70 m3, the 12:00, 13:00, 14:00, 15:00, 16:00 and 17:00 hour zone production capacity remaining is 100 m3. Since the time zone production capacity remaining from 70 o'clock to 11 o'clock is 70 m3, it will not be possible to accept a schedule exceeding this. FIG. 6 is an example of the scheduled order screen for inputting the scheduled conditions by the store (1). FIG. 7 is an example of a screen showing that the planned order is possible, and FIG. 8 is an example of a screen showing that the planned order is impossible. In addition, the management system (5) sets the required time from the factory (3) to the site (2) in two ways, that is, during rush hours and during normal times. Calculate the number. This also serves as a criterion for determining whether a planned order is possible.
[0019]
Next, an operation for confirming the next casting site at the store (1) will be described.
The next placement scheduled site confirmation refers to checking whether there is any change in the delivery schedule of the corresponding site (2) the day before the accepted order date (scheduled date).
For example, the sales system of the dealer (1) is Monday to Friday, the sales system of the site (2) is Monday to Saturday, the sales system of the factory (3) is Monday to Saturday, and scheduled orders are entered on all days except Sunday. Suppose you have The next placement scheduled site confirmation performed by the dealer (1) on Monday is Tuesday, the next placement scheduled site confirmation performed on Tuesday is Wednesday, and the next placement scheduled site confirmation performed on Friday is Saturday and Monday. .
[0020]
In the management system (5) according to the present invention, when the “Confirm next installation site” button is clicked on the screen, a list of the installation site on the most recent day based on the current date is displayed. The dealer (1) contacts each site (2), checks whether or not the planned order is possible, checks the confirmed site (2) in the confirmation column on the screen, and clicks the "Confirm" button. When the “Register” button is clicked on the next page, the confirmation of the placement site is completed, and this information is reflected in the applicable factory (3). In the list of the next placement scheduled site, “completed” is displayed in the confirmation column of the site (2) where the next placement scheduled site has been confirmed. In addition, since Saturday and Monday are performed on Friday, the date of Monday is specified by using an option menu of “display a schedule of another day” on the page. FIG. 9 is an example of a screen showing the flow of the confirmation of the scheduled installation site performed by the store (1). The above process is also followed for the work of confirming the next casting scheduled site of the factory (3).
[0021]
Next, the work of confirming the delivery results at each site (2) of the store (1) will be described.
The delivery result confirmation refers to seeing, on a date basis, at what site (2), at what time, what kind of product was delivered from which factory (3), and how much. The date selection is narrowed down to year, month and day, and only dates with a track record are displayed. In other words, if there is no record in 2002 and there are no records in 2001 and 2003, only 2001 and 2003 are displayed in the select box for selecting the year. Is displayed in the select box for selecting. The same applies to the day, and only the days that have a track record when the year and month are selected are displayed. FIG. 10 is an embodiment of a screen for confirming the delivery result. In addition, in the work of confirming the delivery result of each site (2) of the factory (3), the confirmation can be made by pressing the delivery result button on the site dedicated page. Further, for the consumer, the page is displayed and can be confirmed by selecting the “confirm order result” button.
[0022]
Next, the factory management confirmation work will be described.
The factory (3) needs to keep track of the time zone production capacity on the "Schedule Management" page. When a planned order is made from the store (1) or the site (2) using the present management system (5), it is reflected in the numerical value on the homepage screen. If the schedule of the site (2) that does not use the management system (5) is entered by telephone or canceled or canceled, click the “Edit” button in the quantity edit column to display the quantity change screen. Write. FIG. 11 shows an example of a screen for managing the schedule of the factory (3).
[0023]
Next, dispatch operations at the factory will be described.
When the management center (4) registers the basic data of the factory (3) in the management system (5), it also registers the number of large vehicles and small vehicles. With this management system (5), the number of vehicles required for delivery can be derived for each site (2), so how many vehicles will be used in the schedule received by the factory (3) in one day, and how many vehicles will be owned by the company The number of substitutes can be grasped by displaying whether or not the number is insufficient. Based on this, the work of requesting a substitute for another car becomes possible. FIG. 12 shows an example of a screen on which the manufacturer displays the number of vehicles required for delivery.
[0024]
【The invention's effect】
1. Since the seller or the consumer can confirm the availability of the scheduled order in real time at the time of the scheduled order of the ready-mixed concrete, the time error and the work required for the order work (scheduled order work) are reduced.
2. The work of the seller confirming delivery to the consumer on the date corresponding to the order (scheduled corresponding date) and communicating the result to the manufacturer by telephone is reduced.
3. Consumers can make scheduled orders and referrals 24 hours a day without considering the working hours of the manufacturer.
4. At the manufacturer, the availability of scheduled orders, the number of vehicles required for delivery, the number of substitutes required, and the display of replacement dates when a scheduled order cannot be made on the order date (scheduled date) desired by the consumer. Can be derived using this management system, and a skilled order clerk is not required, and efficient work is possible.
5. In the past, if the desired order date (scheduled date) could not be scheduled, the consumer had to reconsider the on-site work process. Can be assembled, time loss and work can be reduced.
[0025]
As described above, the present invention can renew the distribution and ordering form in the unique industry of ready-mixed concrete into a system utilizing an efficient and stable real-time information source by introducing the Internet. Further, by being provided by an ASP (application service provider), it is possible for sellers, consumers and manufacturers to introduce this system at low cost. Also, the fact that the Internet constantly connected environment and information terminal devices such as the so-called eye mode are rapidly penetrating into society make the system according to the present invention necessary and easy to accept.
[Brief description of the drawings]
FIG. 1 is a diagram showing a configuration example of the present invention.
FIG. 2 is an embodiment of a screen for registering a new site according to the present invention.
FIG. 3 is also an embodiment of a screen for registering a new site according to the present invention.
FIG. 4 is an example of a screen on which a store (1) sets detailed data of a site (2).
FIG. 5 is an example of a screen on which a factory (3) sets detailed data of a site (2).
FIG. 6 is an embodiment of a scheduled order screen for inputting scheduled conditions according to the present invention.
FIG. 7 is an example of a screen showing that a scheduled order according to FIG. 6 is possible.
FIG. 8 is an example of a screen showing that a scheduled order according to FIG. 6 is impossible.
FIG. 9 is an embodiment of a screen showing a flow of confirming a placement scheduled site according to the present invention.
FIG. 10 is an embodiment of a screen for confirming the delivery result of the present invention.
FIG. 11 is an example of a screen for performing schedule management according to the present invention.
FIG. 12 is an embodiment of a screen for displaying the number of vehicles required for delivery according to the present invention.
[Explanation of symbols]
1 shop 2 site 3 factory 4 management center 5 management system 6 internet

Claims (3)

インターネットを介して製造者、販売者、消費者をつなぐ生コンクリート予定管理システムであって、本発明によるホームページ上に製造者及び販売者が自己の受発注情報を公開し、インターネット閲覧入力可能な該製造者、販売者及び消費者による予定注文及び予定照会を可能にするシステムであって、前記製造者、販売者及び消費者を管理認証するシステムと、前期認証された製造者、販売者及び消費者による情報書き込み及びデータ収集システムと、収集したデータを公開するシステムとを備え、製造者においては予定状況管理、配車手配管理、出荷当日予定管理、販売者においては予定状況管理、出荷当日予定管理、消費者においては当該製造者予定状況閲覧、当該製造者予定注文、当該製造者出荷当日予定確認が可能である事を特徴とする生コンクリート予定管理システム。A ready-mixed concrete schedule management system that connects a manufacturer, a seller, and a consumer via the Internet, wherein the manufacturer and the seller can publish their ordering information on a homepage according to the present invention and can browse and input the Internet. A system for allowing a manufacturer, a seller, and a consumer to make scheduled orders and inquiring about a schedule, comprising: a system for managing and authenticating the manufacturer, the seller, and the consumer; A system for writing information and collecting data by the manufacturer, and a system for publishing the collected data. The manufacturer manages the schedule status, manages the vehicle allocation, and manages the shipment date. It is noted that consumers can view the schedule of the manufacturer, order the manufacturer, and confirm the schedule on the day of shipment of the manufacturer. Ready-mixed concrete schedule management system that. 請求項1記載の生コンクリート予定管理システムにおいて製造者に対して行われる予定注文に対し該予定注文の可否判定をする手段を備えている事を特徴とする生コンクリート予定管理システム。2. A ready-mixed concrete schedule management system according to claim 1, further comprising means for judging whether or not the planned order given to a manufacturer is acceptable. 請求項2記載の生コンクリート予定管理システムにおいて製造者が納入時に必要となる車輌の台数表示手段を備えている事を特徴とする生コンクリート予定管理システム。3. A ready-mixed concrete schedule management system according to claim 2, further comprising means for indicating the number of vehicles required by the manufacturer at the time of delivery.
JP2003153527A 2003-04-23 2003-04-23 System for managing ready mixed concrete schedule Pending JP2004326716A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2003153527A JP2004326716A (en) 2003-04-23 2003-04-23 System for managing ready mixed concrete schedule
KR1020040025468A KR20040093398A (en) 2003-04-23 2004-04-13 Ready-mixed concrete schedule management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003153527A JP2004326716A (en) 2003-04-23 2003-04-23 System for managing ready mixed concrete schedule

Publications (1)

Publication Number Publication Date
JP2004326716A true JP2004326716A (en) 2004-11-18

Family

ID=33508277

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003153527A Pending JP2004326716A (en) 2003-04-23 2003-04-23 System for managing ready mixed concrete schedule

Country Status (2)

Country Link
JP (1) JP2004326716A (en)
KR (1) KR20040093398A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022007636A (en) * 2020-06-26 2022-01-13 住友大阪セメント株式会社 Ready-mixed concrete ordering system
JP7184235B1 (en) 2021-07-14 2022-12-06 住友大阪セメント株式会社 Ready-mixed concrete shipment adjustment system and ready-mixed concrete shipment adjustment method
JP7456036B1 (en) 2023-03-15 2024-03-26 住友セメントシステム開発株式会社 Schedule management device, schedule management method, program and schedule management system
JP7470952B1 (en) 2023-11-08 2024-04-19 住友大阪セメント株式会社 Ready-mix concrete reservation system and reservation program

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022007636A (en) * 2020-06-26 2022-01-13 住友大阪セメント株式会社 Ready-mixed concrete ordering system
JP7057953B2 (en) 2020-06-26 2022-04-21 住友大阪セメント株式会社 Ready-mixed concrete ordering system
JP7184235B1 (en) 2021-07-14 2022-12-06 住友大阪セメント株式会社 Ready-mixed concrete shipment adjustment system and ready-mixed concrete shipment adjustment method
JP2023012826A (en) * 2021-07-14 2023-01-26 住友大阪セメント株式会社 Ready mixed concrete shipment amount adjustment system and ready mixed concrete shipment amount adjustment method
JP7456036B1 (en) 2023-03-15 2024-03-26 住友セメントシステム開発株式会社 Schedule management device, schedule management method, program and schedule management system
JP7470952B1 (en) 2023-11-08 2024-04-19 住友大阪セメント株式会社 Ready-mix concrete reservation system and reservation program

Also Published As

Publication number Publication date
KR20040093398A (en) 2004-11-05

Similar Documents

Publication Publication Date Title
US6922676B2 (en) Method and system for ordering items over the internet
KR100438221B1 (en) Manufacturing System for Semiconductor Integrated Circuit
CA2747928C (en) System, method, and computer program for manufacturing estimation production assembly and inventory management
US8429019B1 (en) System and method for scheduled delivery of shipments with multiple shipment carriers
US20030208390A1 (en) On-line system and method for tracking the performance of a selected request-for-proposal vendor or buyer
US20040030611A1 (en) Collaborative commerce hub
US20060212323A1 (en) Production management system
US20040054600A1 (en) Rental system
US20030088479A1 (en) Online scheduling system
WO2008157007A1 (en) System and method for real-time scheduling of human and non-human resources
WO2002044963A2 (en) Improvements relating to event process handling
CA2579873A1 (en) Lead management system
CN101923683A (en) Technician control system
JP2003228410A (en) Work commencement management system
WO2013033587A2 (en) Sales productivity system
JP2006277362A (en) Lunch order system, method, and program
JP4520087B2 (en) System for managing or notifying the results of communication with customers
JP2004326716A (en) System for managing ready mixed concrete schedule
US20050043980A1 (en) Quote and supply management system
JP2002024947A (en) Pos register store management system
JP2003182852A (en) Parcel delivery managing system, its method, and program for parcel delivery management
US20020184110A1 (en) Commodity selling apparatus
JP2002041869A (en) Transportation business transaction surrogate server, system and method for transportation business transaction using the same server and recording medium having program for computer to execute the same method recorded thereon
JP2001344465A (en) Automatic order-acceptance and ordering system and method
JP2001290985A (en) Information sharing system